City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
CITY OF SAN MARCOS
PRIORITY DEVELOPMENT PROJECT (PDP)
STORM WATER QUALITY MANAGEMENT PLAN (SWQMP)
FOR
MARCOS SPECIFIC PLAN WESTEND
TSM #22-0002
GRAND AVENUE AND LINDA VISTA DRIVE
SAN MARCOS, CA
ASSESSOR'S PARCEL NUMBER(S):
219-152-70, -74, -76, -77, -79
ENGINEER OF WORK:
___________________________________________________________________________________ KENNETH T. KOZLIK, PE C71883
PREPARED FOR:
CALIFORNIA PACIFIC HOMES, INC.
5251 CALIFORNIA AVENUE, SUITE 250
IRVINE, CA 92617
949-833-6104
PDP SWQMP PREPARED BY:
FUSCOE ENGINEERING, INC.
6390 GREENWICH DRIVE, SUITE 170
SAN DIEGO, CA 92122
858-554-1500
DATE OF SWQMP:
May 12, 2023
PLANS PREPARED BY:
FUSCOE ENGINEERING, INC.
6390 GREENWICH DRIVE, SUITE 170
SAN DIEGO, CA 92122
858-554-1500
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
Page intentionally blank
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
TABLE OF CONTENTS
Acronym Sheet
PDP SWQMP Preparer's Certification Page
PDP SWQMP Project Owner's Certification Page
Submittal Record
Project Vicinity Map
FORM I-1 Applicability of Storm Water BMP Requirements
FORM I-2 Project Type Determination Checklist (Standard Project or PDP) FORM I-3B Site Information Checklist for PDPs
FORM I-4 Source Control BMP Checklist for All Development Projects FORM I-5 Site Design BMP Checklist for All Development Projects FORM I-6 Summary of PDP Structural BMPs
Attachment 1: Backup for PDP Pollutant Control BMPs
Attachment 1a: DMA Exhibit
Attachment 1b: Tabular Summary of DMAs and Design Capture Volume Calculations Attachment 1c: Harvest and Use Feasibility Screening (when applicable) Attachment 1d: Categorization of Infiltration Feasibility Condition (when applicable) Attachment 1e: Pollutant Control BMP Design Worksheets / Calculations Attachment 2: Backup for PDP Hydromodification Control Measures Attachment 2a: Hydromodification Management Exhibit
Attachment 2b: Management of Critical Coarse Sediment Yield Areas Attachment 2c: Geomorphic Assessment of Receiving Channels Attachment 2d: Flow Control Facility Design
Attachment 3: Structural BMP Maintenance Plan
Attachment 3a: B Structural BMP Maintenance Thresholds and Actions Attachment 3b: Draft Maintenance Agreement (when applicable) Attachment 4: Copy of Plan Sheets Showing Permanent Storm Water BMPs
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
ACRONYMS
APN Assessor's Parcel Number
BMP Best Management Practice
HMP Hydromodification Management Plan
HSG Hydrologic Soil Group
MS4 Municipal Separate Storm Sewer System
N/A Not Applicable
NRCS Natural Resources Conservation Service
PDP Priority Development Project
PE Professional Engineer
SC Source Control
SD Site Design
SDRWQCB San Diego Regional Water Quality Control Board
SIC Standard Industrial Classification
SWQMP Storm Water Quality Management Plan
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
Page intentionally blank
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
PDP SWQMP PROJECT OWNER'S CERTIFICATION PAGE – CALIFORNIA PACIFIC HOMES, INC.
Project Name: MARCOS SPECIFIC PLAN
Permit Application Number: [Insert Permit Application Number]
PROJECT OWNER'S CERTIFICATION
This PDP SWQMP has been prepared for CALIFORNIA PACIFIC HOMES, INC. by Fuscoe Engineering, Inc.
The PDP SWQMP is intended to comply with the PDP requirements of the City of San Marcos BMP Design Manual, which is a design manual for compliance with local City of San Marcos and regional MS4 Permit (California Regional Water Quality Control Board San Diego Region Order No. R9-2015-0100) requirements for storm water management.
The undersigned, while it owns the subject property, is responsible for the implementation of the provisions of this plan. Once the undersigned transfers its interests in the property, its successor-in- interest shall bear the aforementioned responsibility to implement the best management practices (BMPs) described within this plan, including ensuring on-going operation and maintenance of structural BMPs. A signed copy of this document shall be available on the subject property into perpetuity.
________________________________________________________ Project Owner's Signature
________________________________________________________ Print Name
________________________________________________________ Company
____________________________
Date
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
X
X
X
X
SUBMITTAL RECORD
Use this Table to keep a record of submittals of this PDP SWQMP. Each time the PDP SWQMP is re- submitted, provide the date and status of the project. In column 4 summarize the changes that have been made or indicate if response to plancheck comments is included. When applicable, insert response to plancheck comments behind this page.
Submittal
Number
Date Project Status Summary of Changes
1 March 11, 2022 Preliminary Design /
Planning/ CEQA
Final Design
Initial Submittal
2 October 11, 2022 Preliminary Design /
Planning/ CEQA
Final Design
Second Submittal
3 December 19,
2022
Preliminary Design /
Planning/ CEQA
Final Design
Third Submittal
4 March 14, 2023 Preliminary Design /
Planning/ CEQA
Final Design
Fourth Submittal
5 May 12, 2023 Preliminary Design /
Planning/ CEQA
Final Design
Fifth Submittal
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
PROJECT VICINITY MAP
Project Name: MARCOS SPECIFIC PLAN
Permit Application Number: [Insert Permit Application Number]
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
X
Applicability of Storm Water Best Management Practices (BMP) Requirements (Storm Water Intake Form for all Development Permit Applications) For detailed information please visit:
http://www.san-marcos.net/departments/development-services/stormwater/development-planning Form I-1
[March 15, 2016]
Project Identification
Project Name: Marcos Specific Plan
Description:
Proposed mixed-use development incorporating commercial and multi-family residential uses.
Permit Application Number (if applicable): Date: 5/12/2023 Project Address: Grand Avenue and Linda Vista Drive
Determination of Requirements
This form is required as part of the City’s application process. The purpose of this form is to identify potential land development planning storm water requirements that apply to development projects.
Development projects are defined as construction, rehabilitation, redevelopment, or reconstruction of any public or private projects. In addition, the identification of a development project, as it relates to storm water regulations, would truly apply to development and redevelopment activities that have the potential to contact storm water and contribute a source of pollutants, or reduce the natural absorption and infiltration abilities of the land.
To access the BMP Design Manual, Storm Water Quality Management Plan (SWQMP) templates, and other pertinent information related to this program please refer to:
http://www.san-marcos.net/departments/development-services/stormwater/development-planning
Please answer each of the following steps below, starting with Step 1 and progressing through each step until reaching "Stop".
Step Answer Progression
Step 1: Based on the above, Is the project a
"development project" (See definition above)?
See Section 1.3 of the BMP Design Manual for
further guidance if necessary.
Yes Go to Step 2.
No Permanent BMP requirements do not apply. No
SWQMP will be required. Provide brief discussion
below. STOP.
Discussion / justification if the project is not a "development project" (e.g., the project includes only interior remodels within an existing building):
Step 2: Is the project a Standard Project, Priority
Development Project (PDP), or exception to PDP
definitions?
To answer this item, complete Form I-2, Project
Type Determination. See Section 1.4 of the BMP
Design Manual in its entirety for guidance.
In addition to Section 1.4, please refer to the
City’s SWQMP Submittal Requirements form.
Standard Project Only Standard Project requirements apply, including Standard Project SWQMP. STOP.
PDP Standard and PDP requirements apply, including
PDP SWQMP. Go to Step 3 on the following page.
Exception to PDP
definitions
Standard Project requirements apply, and any
additional requirements specific to the type of
project. Provide discussion and list any additional
requirements below. Prepare Standard Project
SWQMP. STOP.
Discussion / justification, and additional requirements for exceptions to PDP definitions, if applicable:
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
X
X
X
X
Form I-1 Page 2, Form Date: March 15, 2016
Step 3 (PDPs only). Please answer the list of questions in this section to determine if hydromodification requirements reply to the proposed PDP. Does the project:
Step 3a. Discharge storm water
runoff directly to the Pacific Ocean?
Yes STOP. Hydromodification requirements do not apply. No Continue to Step 3b.
Step 3b. Discharge storm water
runoff directly to an enclosed
embayment, not within protected
areas?
Yes STOP. Hydromodification requirements do not apply. No Continue to Step 3c.
Step 3c. Discharge storm water
runoff directly to a water storage
reservoir or lake, below spillway or
normal operating level?
Yes STOP. Hydromodification requirements do not apply. No Continue to Step 3d.
Step 3d. Discharge storm water
runoff directly to an area identified in
WMAA?
Yes STOP. Hydromodification requirements do not apply. No Hydromodification requirements apply to the project. Go to Step
4. Discussion / justification if hydromodification control requirements do not apply:
Step 4 (PDPs subject to
hydromodification control
requirements only). Does protection
of critical coarse sediment yield areas
apply based on review of WMAA
Potential Critical Coarse Sediment
Yield Area Map?
See Section 6.2 of the BMP Design
Manual for guidance.
Yes Management measures required for protection of critical coarse sediment yield areas (Chapter 6.2).
Stop.
No Management measures not required for protection of critical coarse sediment yield areas.
Provide brief discussion below.
Stop.
Project site is not identified as a Potential Critical Course Sediment Yield Area
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
X
X
X
Project Type Determination Checklist Form I-2
[March 15, 2016]
Project Information
Project Name/Description: Marcos Specific Plan
Permit Application Number (if applicable): Date: 10/11/2022 Project Address: Grand Avenue and Linda Vista Drive
Project Type Determination: Standard Project or Priority Development Project (PDP) The project is (select one): New Development Redevelopment The total proposed newly created or replaced impervious area is: 155,750 ft2 (3.58 acres) Is the project in any of the following categories, (a) through (f)? Yes
No
(a) New development projects that create 10,000 square feet or more of impervious surfaces (collectively over the entire project site). This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land.
Yes
No
(b) Redevelopment projects that create and/or replace 5,000 square feet or more of impervious surface (collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surfaces). This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land.
Yes
No
(c) New and redevelopment projects that create and/or replace 5,000 square feet or more of impervious surface (collectively over the entire project site), and support one or more of the following uses:
Restaurants. This category is defined as a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812).
Hillside development projects. This category includes development on any natural slope that is twenty-five percent or greater.
Parking lots. This category is defined as a land area or facility for the temporary parking or storage of motor vehicles used personally, for business, or for commerce.
Streets, roads, highways, freeways, and driveways. This category is defined as any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles.
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
X
X
X
X
Form I-2 Page 2, Form Date: March 15, 2016
Yes
No
(d) New or redevelopment projects that create and/or replace 2,500 square feet or more of impervious surface (collectively over the entire project site), and discharging directly to an Environmentally Sensitive Area (ESA). “Discharging directly to” includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands).
Note: ESAs are areas that include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Board and San Diego Water Board; State Water Quality Protected Areas; water bodies designated with the RARE beneficial use by the State Water Board and San Diego Water Board; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. See BMP Design Manual Section 1.4.2 for additional guidance.
Yes
No
(e) New development projects, or redevelopment projects that create and/or replace 5,000 square feet or more of impervious surface, that support one or more of the following uses:
(i) Automotive repair shops. This category is defined as a facility that is categorized in any one of the following SIC codes: 5013, 5014, 5541, 7532- 7534, or 7536-7539.
(ii) Retail gasoline outlets (RGOs). This category includes RGOs that meet the following criteria: (a) 5,000 square feet or more or (b) a projected Average Daily Traffic (ADT) of 100 or more vehicles per day.
Yes
No
(f) New or redevelopment projects that result in the disturbance of one or more acres of land and are expected to generate pollutants post construction.
Note: See BMP Design Manual Section 1.4.2 for additional guidance.
Does the project meet the definition of one or more of the Priority Development Project categories (a) through (f) listed above?
No – the project is not a Priority Development Project (Standard Project). Yes – the project is a Priority Development Project (PDP).
The following is for redevelopment PDPs only:
The area of existing (pre-project) impervious area at the project site is: 12,216 ft2 (A) The total proposed newly created or replaced impervious area is 155,750ft2 (B) Percent impervious surface created or replaced (B/A)*100: 1275% The percent impervious surface created or replaced is (select one based on the above calculation):
less than or equal to fifty percent (50%) – only new impervious areas are considered PDP OR
greater than fifty percent (50%) – the entire project site is a PDP
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
Site Information Checklist
For PDPs
Form I-3B (PDPs)
[March 15, 2016]
Project Summary Information
Project Name Marcos Specific Plan
Project Address Grand Avenue and Linda Vista Drive
Assessor's Parcel Number(s) (APN(s)) 219-152-70, -74, -76, -77, -79 Permit Application Number
Project Hydrologic Unit Select One:
Santa Margarita 902
San Luis Rey 903
Carlsbad 904
San Dieguito 905
Penasquitos 906
San Diego 907
Pueblo San Diego 908
Sweetwater 909
Otay 910
Tijuana 911
Project Watershed
(Complete Hydrologic Unit, Area, and Subarea
Name with Numeric Identifier)
Carlsbad Hydrologic Unit, San Marcos Hydrologic
Area, Richland Hydrologic Sub-Area, 904.52
Parcel Area
(total area of Assessor's Parcel(s) associated
with the project)
4.73 Acres (206,040 Square Feet)
Area to be Disturbed by the Project
(Project Area)
5.03 Acres (219,274 Square Feet)
Project Proposed Impervious Area
(subset of Project Area)
3.86 Acres (167,966 Square Feet)
Project Proposed Pervious Area
(subset of Project Area)
0.98 Acres (42,745 Square Feet)
Note: Proposed Impervious Area + Proposed Pervious Area = Area to be Disturbed by the Project.
This may be less than the Parcel Area.
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
X
X
X
X
X
X
X
Form I-3B Page 2 of 10, Form Date: March 15, 2016
Description of Existing Site Condition
Current Status of the Site (select all that apply):
Existing development
Previously graded but not built out
Demolition completed without new construction
Agricultural or other non-impervious use
Vacant, undeveloped/natural
Description / Additional Information:
The project site was previously developed with commercial/industrial uses. The buildings have since been demolished, but portions of building slabs and paved parking areas remain.
Existing Land Cover Includes (select all that apply):
Vegetative Cover
Non-Vegetated Pervious Areas
Impervious Areas
Description / Additional Information:
The project site was previously developed with commercial/industrial uses. The buildings have since been demolished, but portions of building slabs and paved parking areas remain.
Underlying Soil belongs to Hydrologic Soil Group (select all that apply):
NRCS Type A
NRCS Type B
NRCS Type C
NRCS Type D
Approximate Depth to Groundwater (GW):
GW Depth < 5 feet
5 feet < GW Depth < 10 feet
10 feet < GW Depth < 20 feet
GW Depth > 20 feet
Existing Natural Hydrologic Features (select all that apply):
Watercourses
Seeps
Springs
Wetlands
None
Description / Additional Information:
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
Form I-3B Page 3 of 10, Form Date: March 15, 2016
Description of Existing Site Drainage Patterns
How is storm water runoff conveyed from the site? At a minimum, this description should answer:
(1) whether existing drainage conveyance is natural or urban; (2) Is runoff from offsite conveyed through the site? if yes, quantify all offsite drainage areas, design flows, and locations where offsite flows enter the project site, and summarize how such flows are conveyed through the site;
(3)Provide details regarding existing project site drainage conveyance network, including any existing storm drains, concrete channels, swales, detention facilities, storm water treatment facilities, natural or constructed channels; and
(4) Identify all discharge locations from the existing project site along with a summary of conveyance system size and capacity for each of the discharge locations. Provide summary of the pre-project drainage areas and design flows to each of the existing runoff discharge locations.
Describe existing site drainage patterns:
The existing site consists of development areas that were previously commercial pads but have had the buildings demolished. From an aerial view, the site visually appear flat. The channel was recently improved by the City of San Marcos (CIP Project Code 88214, “Grand Avenue Drainage / Road Improvements”, IP-4826 and VWD no. 201930). The development area had new storm drain added to collect runoff from the pads and discharge into the improved channel. A bridge was constructed to link to the neighboring development site, east of this site.
Upon closer inspection of the topography, one can see that there are some subtle flow paths where the site drains to the storm drain outlets that were constructed as part of the channel improvements at nodes 200 and 400. The westerly third of the residential site leads to a local depression near node 10 before spilling out onto the adjacent property to the west.
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
Form I-3B Page 4 of 10, Form Date: March 15, 2016
Description of Proposed Site Development
Project Description / Proposed Land Use and/or Activities:
This project consists of approximately 5.03 acres near the southwest corner of the Linda Vista Drive and Grand Avenue intersection in the city of San Marcos, California. Located at the north of the channel, the site will be used to develop 102 residential condominiums.
List/describe proposed impervious features of the project (e.g., buildings, roadways, parking lots, courtyards, athletic courts, other impervious features):
Impervious areas will include buildings; vehicular paving in drive aisles and parking areas; and pedestrian pavement for sidewalk, bike paths, and walkways.
List/describe proposed pervious features of the project (e.g., landscape areas):
The project will include extensive landscape areas. Decomposed granite (DG) is also proposed for some parking spaces and walkways. As a conservative approach for BMP sizing, the DG areas were assumed to be impervious.
Does the project include grading and changes to site topography? Yes
No
Description / Additional Information:
The project will be graded support drainage of the proposed project area to the storm water BMPs and the creek.
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
Form I-3B Page 5 of 10, Form Date: March 15, 2016
Description of Proposed Site Drainage Patterns
Does the project include changes to site drainage (e.g., installation of new storm water conveyance systems)?
Yes
No
If yes, provide details regarding the proposed project site drainage conveyance network, including storm drains, concrete channels, swales, detention facilities, storm water treatment facilities, natural or constructed channels, and the method for conveying offsite flows through or around the proposed project site. Identify all discharge locations from the proposed project site along with a summary of the conveyance system size and capacity for each of the discharge locations. Provide a summary of pre- and post-project drainage areas and design flows to each of the runoff discharge locations. Reference the drainage study for detailed calculations.
Describe proposed site drainage patterns::
The proposed development areas will be re-graded to ensure that the runoff is routed to the channel. The site has a system of concrete swales and storm drains to collect runoff and convey it to water quality basins and/or underground detention structures for hydromodification storage before being discharged to the channel at nodes 200, 400 and 1000.
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
X
X
X
X
X
X
X
X
Form I-3B Page 6 of 10, Form Date: March 15, 2016
Identify whether any of the following features, activities, and/or pollutant source areas will be present (select all that apply):
On-site storm drain inlets
Interior floor drains and elevator shaft sump pumps
Interior parking garages
Need for future indoor & structural pest control
Landscape/Outdoor Pesticide Use
Pools, spas, ponds, decorative fountains, and other water features Food service
Refuse areas
Industrial processes
Outdoor storage of equipment or materials
Vehicle and Equipment Cleaning
Vehicle/Equipment Repair and Maintenance
Fuel Dispensing Areas
Loading Docks
Fire Sprinkler Test Water
Miscellaneous Drain or Wash Water
Plazas, sidewalks, and parking lots
Description / Additional Information:
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
Form I-3B Page 7 of 10, Form Date: March 15, 2016
Identification and Narrative of Receiving Water and Pollutants of Concern Describe flow path of storm water from the project site discharge location(s), through urban storm conveyance systems as applicable, to receiving creeks, rivers, and lagoons as applicable, and ultimate discharge to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable):
Discharge from the site enters the unnamed creek with runs southwest through the site. The creek continues to flow southwest to a confluence with San Marcos Creek just upstream of Lake San Marcos.
San Marcos Creek discharges to Batiquitos Lagoon, which is tidally connected to the Pacific Ocean.
List any 303(d) impaired water bodies within the path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable), identify the pollutant(s)/stressor(s) causing impairment, and identify any TMDLs and/or Highest Priority Pollutants from the WQIP for the impaired water bodies:
303(d) Impaired Water Body Pollutant(s)/Stressor(s)
TMDLs / WQIP Highest Priority
Pollutant
San Marcos Creek DDE, Phosphorous, Sediment
Toxicity, Selenium
DDE, Phosphorous, Sediment
Toxicity, Selenium
San Marcos Lake Ammonia Nitrogen, Nutrients Ammonia Nitrogen, Nutrients
Identification of Project Site Pollutants*
*Identification of project site pollutants is only required if flow-thru treatment BMPs are implemented onsite in lieu of retention or biofiltration BMPs (note the project must also participate in an alternative compliance program unless prior lawful approval to meet earlier PDP requirements is demonstrated)
Identify pollutants expected from the project site based on all proposed use(s) of the site (see BMP Design Manual Appendix B.6):
Pollutant
Not Applicable to the
Project Site
Expected from the
Project Site
Also a Receiving Water
Pollutant of Concern
Sediment X X
Nutrients X X
Heavy Metals X X
Organic Compounds
X
Trash & Debris X
Oxygen Demanding
Substances X
Oil & Grease X
Bacteria & Viruses X
Pesticides X
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
X
Form I-3B Page 8 of 10, Form Date: March 15, 2016
Hydromodification Management Requirements
Do hydromodification management requirements apply (see Section 1.6 of the BMP Design Manual)? Yes, hydromodification management flow control structural BMPs required. No, the project will discharge runoff directly to existing underground storm drains discharging directly to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. No, the project will discharge runoff directly to conveyance channels whose bed and bank are concrete-lined all the way from the point of discharge to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean.
No, the project will discharge runoff directly to an area identified as appropriate for an exemption by the WMAA for the watershed in which the project resides.
Description / Additional Information (to be provided if a 'No' answer has been selected above):
Critical Coarse Sediment Yield Areas*
*This Section only required if hydromodification management requirements apply Based on the maps provided within the WMAA, do potential critical coarse sediment yield areas exist within the project drainage boundaries?
Yes
No, No critical coarse sediment yield areas to be protected based on WMAA maps
If yes, have any of the optional analyses presented in Section 6.2 of the BMP Design Manual been performed?
6.2.1 Verification of Geomorphic Landscape Units (GLUs) Onsite 6.2.2 Downstream Systems Sensitivity to Coarse Sediment 6.2.3 Optional Additional Analysis of Potential Critical Coarse Sediment Yield Areas Onsite No optional analyses performed, the project will avoid critical coarse sediment yield areas identified based on WMAA maps
If optional analyses were performed, what is the final result? No critical coarse sediment yield areas to be protected based on verification of GLUs onsite Critical coarse sediment yield areas exist but additional analysis has determined that protection is not required. Documentation attached in Attachment 2.b of the SWQMP. Critical coarse sediment yield areas exist and require protection. The project will implement management measures described in Sections 6.2.4 and 6.2.5 as applicable, and the areas are identified on the SWQMP Exhibit.
Discussion / Additional Information:
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
Form I-3B Page 9 of 10, Form Date: March 15, 2016
Flow Control for Post-Project Runoff*
*This Section only required if hydromodification management requirements apply List and describe point(s) of compliance (POCs) for flow control for hydromodification management (see Section 6.3.1). For each POC, provide a POC identification name or number correlating to the project's HMP Exhibit and a receiving channel identification name or number correlating to the project's HMP Exhibit.
Has a geomorphic assessment been performed for the receiving channel(s)? No, the low flow threshold is 0.1Q2 (default low flow threshold) Yes, the result is the low flow threshold is 0.1Q2
Yes, the result is the low flow threshold is 0.3Q2
Yes, the result is the low flow threshold is 0.5Q2
If a geomorphic assessment has been performed, provide title, date, and preparer:
The receiving channel has been restored and is an actively managed conservation area, which will ensure erosion impacts will be minimal.
Discussion / Additional Information: (optional)
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
Form I-3B Page 10 of 10, Form Date: March 15, 2016
Other Site Requirements and Constraints
When applicable, list other site requirements or constraints that will influence storm water management design, such as zoning requirements including setbacks and open space, or local codes governing minimum street width, sidewalk construction, allowable pavement types, and drainage requirements.
Optional Additional Information or Continuation of Previous Sections As Needed This space provided for additional information or continuation of information from previous sections as needed.
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
X
X
X
Source Control BMP Checklist
for All Development Projects
(Standard Projects and Priority Development Projects)
Form I-4
[March 15, 2016]
Project Identification
Project Name: Marcos Specific Plan
Permit Application Number
Source Control BMPs
All development projects must implement source control BMPs SC-1 through SC-6 where applicable and feasible. See Chapter 4 and Appendix E of the Model BMP Design Manual for information to implement source control BMPs shown in this checklist.
Answer each category below pursuant to the following.
"Yes" means the project will implement the source control BMP as described in Chapter 4 and/or Appendix E of the Model BMP Design Manual. Discussion / justification is not required. "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion / justification must be provided.
"N/A" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e.g., the project has no outdoor materials storage areas).
Discussion / justification may be provided.
Source Control Requirement Applied?
SC-1 Prevention of Illicit Discharges into the MS4 Yes No N/A Discussion / justification if SC-1 not implemented:
SC-2 Storm Drain Stenciling or Signage Yes No N/A Discussion / justification if SC-2 not implemented:
SC-3 Protect Outdoor Materials Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal
Yes No N/A
Discussion / justification if SC-3 not implemented:
SC-4 Protect Materials Stored in Outdoor Work Areas from Rainfall, Run-On, Runoff, and Wind Dispersal
Yes No N/A
Discussion / justification if SC-4 not implemented:
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
Form I-4 Page 2 of 2, Form Date: March 15, 2016
Source Control Requirement Applied?
SC-5 Protect Trash Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal
Yes No N/A
Discussion / justification if SC-5 not implemented:
SC-6 Additional BMPs Based on Potential Sources of Runoff Pollutants (must answer for each source listed below)
On-site storm drain inlets
Interior floor drains and elevator shaft sump pumps
Interior parking garages
Need for future indoor & structural pest control
Landscape/Outdoor Pesticide Use
Pools, spas, ponds, decorative fountains, and other water features Food service
Refuse areas
Industrial processes
Outdoor storage of equipment or materials
Vehicle and Equipment Cleaning
Vehicle/Equipment Repair and Maintenance
Fuel Dispensing Areas
Loading Docks
Fire Sprinkler Test Water
Miscellaneous Drain or Wash Water
Plazas, sidewalks, and parking lots
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Discussion / justification if SC-6 not implemented. Clearly identify which sources of runoff pollutants are discussed. Justification must be provided for all "No" answers shown above.
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
X
X
X
X
Site Design BMP Checklist
for All Development Projects
(Standard Projects and Priority Development Projects)
Form I-5
[March 15, 2016]
Project Identification
Project Name – Marcos Specific Plan
Permit Application Number
Site Design BMPs
All development projects must implement site design BMPs SD-1 through SD-8 where applicable and feasible. See Chapter 4 and Appendix E of the Model BMP Design Manual for information to implement site design BMPs shown in this checklist.
Answer each category below pursuant to the following.
"Yes" means the project will implement the site design BMP as described in Chapter 4 and/or Appendix E of the Model BMP Design Manual. Discussion / justification is not required. "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion / justification must be provided.
"N/A" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e.g., the project site has no existing natural areas to conserve).
Discussion / justification may be provided.
Site Design Requirement Applied?
SD-1 Maintain Natural Drainage Pathways and Hydrologic Features Yes No N/A Discussion / justification if SD-1 not implemented:
SD-2 Conserve Natural Areas, Soils, and Vegetation Yes No N/A Discussion / justification if SD-2 not implemented:
Site was previously disturbed.
SD-3 Minimize Impervious Area Yes No N/A
Discussion / justification if SD-3 not implemented:
SD-4 Minimize Soil Compaction Yes No N/A
Discussion / justification if SD-4 not implemented:
SD-5 Impervious Area Dispersion Yes No N/A
Discussion / justification if SD-5 not implemented:
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
X
X
Form I-5 Page 2 of 2, Form Date: March 15, 2016
Site Design Requirement Applied?
SD-6 Runoff Collection Yes No N/A
Discussion / justification if SD-6 not implemented:
SD-7 Landscaping with Native or Drought Tolerant Species Yes No N/A Discussion / justification if SD-7 not implemented:
SD-8 Harvesting and Using Precipitation Yes No N/A Discussion / justification if SD-8 not implemented:
Harvest and reuse of stormwater is not feasible since irrigation demand will be low following rain events and native/low water use plants will be used.
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
Summary of PDP Structural BMPs Form I-6 (PDPs)
[March 15, 2016]
Project Identification
Project Name – Marcos Specific Plan
Permit Application Number
PDP Structural BMPs
All PDPs must implement structural BMPs for storm water pollutant control (see Chapter 5 of the BMP Design Manual). Selection of PDP structural BMPs for storm water pollutant control must be based on the selection process described in Chapter 5. PDPs subject to hydromodification management requirements must also implement structural BMPs for flow control for hydromodification management (see Chapter 6 of the BMP Design Manual). Both storm water pollutant control and flow control for hydromodification management can be achieved within the same structural BMP(s).
PDP structural BMPs must be verified by the local jurisdiction at the completion of construction. This may include requiring the project owner or project owner's representative and engineer of record to certify construction of the structural BMPs (see Section 1.12 of the BMP Design Manual). PDP structural BMPs must be maintained into perpetuity, and the local jurisdiction must confirm the maintenance (see Section 7 of the BMP Design Manual).
Use this form to provide narrative description of the general strategy for structural BMP implementation at the project site in the box below. Then complete the PDP structural BMP summary information sheet (page 3 of this form) for each structural BMP within the project (copy the BMP summary information page as many times as needed to provide summary information for each individual structural BMP).
Describe the general strategy for structural BMP implementation at the site. This information must describe how the steps for selecting and designing storm water pollutant control BMPs presented in Section 5.1 of the BMP Design Manual were followed, and the results (type of BMPs selected). For projects requiring hydromodification flow control BMPs, indicate whether pollutant control and flow control BMPs are integrated or separate.
Based on the geotechnical investigation, percolation rates at the site are very low. Therefore, infiltration BMPs are considered infeasible. Biofiltration BMPs were selected for the majority of the site as the highest performing BMPs that are feasible. Runoff will be collected in gutters, cross gutters, and shallow storm drain, which will direct the runoff to the biofiltration BMPs. The biofiltration BMPs have been sized for both pollutant control and hydromodification mitigation.
In DMA 3, sufficient space for a biofiltration basin is not available due to an existing public sewer line and easement. Here, a proprietary biofiltration unit and underground detention vault will be utilized to satisfy pollutant control and hydromodification requirements.
EPA SWMM was used to model the BMPs for hydromodification mitigation requirements.
The project street frontage on Grand Avenue will be treated utilizing Green Street features. The frontage improvements include addition of a sidewalk and bike path separated from Grand Avenue by a landscaped parkway. The sidewalk and bike path will be sloped to the landscaped parkway which will include street trees where allowed by sight distance constraints. This landscaped parkway and street trees will provide retention and pollutant removal of runoff from the sidewalk and bike path in accordance with Green Street guidance.
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
Form I-6 Page 2 of X, Form Date: March 15, 2016
(Page reserved for continuation of description of general strategy for structural BMP implementation at the site)
(Continued from page 1)
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
X
Form I-6 Page 3 of X (Copy as many as needed) Form Date: March 15, 2016 Structural BMP Summary Information
(Copy this page as needed to provide information for each individual proposed structural BMP) Structural BMP ID No. BMP 1
Construction Plan Sheet No.
Type of structural BMP:
Retention by harvest and use (HU-1)
Retention by infiltration basin (INF-1)
Retention by bioretention (INF-2)
Retention by permeable pavement (INF-3)
Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1)
Biofiltration with Nutrient Sensitive Media Design (BF-2) Proprietary Biofiltration (BF-3) meeting all requirements of Appendix F Flow-thru treatment control with prior lawful approval to meet earlier PDP requirements (provide BMP type/description in discussion section below)
Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below)
Flow-thru treatment control with alternative compliance (provide BMP type/description in discussion section below)
Detention pond or vault for hydromodification management Other (describe in discussion section below)
Purpose:
Pollutant control only
Hydromodification control only
Combined pollutant control and hydromodification control Pre-treatment/forebay for another structural BMP
Other (describe in discussion section below)
Who will certify construction of this BMP?
Provide name and contact information for the
party responsible to sign BMP verification forms if
required by the [City Engineer] (See Section 1.12 of
the BMP Design Manual)
Kenneth T. Kozlik, PE
Fuscoe Engineering, Inc.
6390 Greenwich Drive, Suite 170
San Diego, CA 92122
[email protected]
Who will be the final owner of this BMP?
To-Be-Formed Homeowner’s Association
Who will maintain this BMP into perpetuity?
To-Be-Formed Homeowner’s Association
What is the funding mechanism for maintenance?
Private
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
Form I-6 Page 4 of X (Copy as many as needed) , Form Date: March 15, 2016 Structural BMP ID No. BMP 1
Construction Plan Sheet No.
Discussion (as needed):
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
X
Form I-6 Page 5 of X (Copy as many as needed) Form Date: March 15, 2016 Structural BMP Summary Information
(Copy this page as needed to provide information for each individual proposed structural BMP) Structural BMP ID No. BMP 2
Construction Plan Sheet No.
Type of structural BMP:
Retention by harvest and use (HU-1)
Retention by infiltration basin (INF-1)
Retention by bioretention (INF-2)
Retention by permeable pavement (INF-3)
Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1)
Biofiltration with Nutrient Sensitive Media Design (BF-2) Proprietary Biofiltration (BF-3) meeting all requirements of Appendix F Flow-thru treatment control with prior lawful approval to meet earlier PDP requirements (provide BMP type/description in discussion section below)
Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below)
Flow-thru treatment control with alternative compliance (provide BMP type/description in discussion section below)
Detention pond or vault for hydromodification management Other (describe in discussion section below)
Purpose:
Pollutant control only
Hydromodification control only
Combined pollutant control and hydromodification control Pre-treatment/forebay for another structural BMP
Other (describe in discussion section below)
Who will certify construction of this BMP?
Provide name and contact information for the
party responsible to sign BMP verification forms if
required by the [City Engineer] (See Section 1.12 of
the BMP Design Manual)
Kenneth T. Kozlik, PE
Fuscoe Engineering, Inc.
6390 Greenwich Drive, Suite 170
San Diego, CA 92122
[email protected]
Who will be the final owner of this BMP?
To-Be-Formed Homeowner’s Association
Who will maintain this BMP into perpetuity?
To-Be-Formed Homeowner’s Association
What is the funding mechanism for maintenance?
Private
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
Form I-6 Page 6 of X (Copy as many as needed) , Form Date: March 15, 2016 Structural BMP ID No. BMP 2
Construction Plan Sheet No.
Discussion (as needed):
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
X
Form I-6 Page 7 of X (Copy as many as needed) Form Date: March 15, 2016 Structural BMP Summary Information
(Copy this page as needed to provide information for each individual proposed structural BMP) Structural BMP ID No. BMP 3-MWS
Construction Plan Sheet No.
Type of structural BMP:
Retention by harvest and use (HU-1)
Retention by infiltration basin (INF-1)
Retention by bioretention (INF-2)
Retention by permeable pavement (INF-3)
Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1)
Biofiltration with Nutrient Sensitive Media Design (BF-2) Proprietary Biofiltration (BF-3) meeting all requirements of Appendix F Flow-thru treatment control with prior lawful approval to meet earlier PDP requirements (provide BMP type/description in discussion section below)
Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below)
Flow-thru treatment control with alternative compliance (provide BMP type/description in discussion section below)
Detention pond or vault for hydromodification management Other (describe in discussion section below)
Purpose:
Pollutant control only
Hydromodification control only
Combined pollutant control and hydromodification control Pre-treatment/forebay for another structural BMP
Other (describe in discussion section below)
Who will certify construction of this BMP?
Provide name and contact information for the
party responsible to sign BMP verification forms if
required by the [City Engineer] (See Section 1.12 of
the BMP Design Manual)
Kenneth T. Kozlik, PE
Fuscoe Engineering, Inc.
6390 Greenwich Drive, Suite 170
San Diego, CA 92122
[email protected]
Who will be the final owner of this BMP?
To-Be-Formed Homeowner’s Association
Who will maintain this BMP into perpetuity?
To-Be-Formed Homeowner’s Association
What is the funding mechanism for maintenance?
Private
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
Form I-6 Page 8 of X (Copy as many as needed) , Form Date: March 15, 2016 Structural BMP ID No. BMP 3-MWS
Construction Plan Sheet No.
Discussion (as needed):
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
X
X
Form I-6 Page 9 of X (Copy as many as needed) Form Date: March 15, 2016 Structural BMP Summary Information
(Copy this page as needed to provide information for each individual proposed structural BMP) Structural BMP ID No. BMP 3-DET
Construction Plan Sheet No.
Type of structural BMP:
Retention by harvest and use (HU-1)
Retention by infiltration basin (INF-1)
Retention by bioretention (INF-2)
Retention by permeable pavement (INF-3)
Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1)
Biofiltration with Nutrient Sensitive Media Design (BF-2) Proprietary Biofiltration (BF-3) meeting all requirements of Appendix F Flow-thru treatment control with prior lawful approval to meet earlier PDP requirements (provide BMP type/description in discussion section below)
Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below)
Flow-thru treatment control with alternative compliance (provide BMP type/description in discussion section below)
Detention pond or vault for hydromodification management Other (describe in discussion section below)
Purpose:
Pollutant control only
Hydromodification control only
Combined pollutant control and hydromodification control Pre-treatment/forebay for another structural BMP
Other (describe in discussion section below)
Who will certify construction of this BMP?
Provide name and contact information for the
party responsible to sign BMP verification forms if
required by the [City Engineer] (See Section 1.12 of
the BMP Design Manual)
Kenneth T. Kozlik, PE
Fuscoe Engineering, Inc.
6390 Greenwich Drive, Suite 170
San Diego, CA 92122
[email protected]
Who will be the final owner of this BMP?
To-Be-Formed Homeowner’s Association
Who will maintain this BMP into perpetuity?
To-Be-Formed Homeowner’s Association
What is the funding mechanism for maintenance?
Private
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
Form I-6 Page 10 of X (Copy as many as needed) , Form Date: March 15, 2016 Structural BMP ID No. BMP 3-DET
Construction Plan Sheet No.
Discussion (as needed):
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
ATTACHMENT 1
BACKUP FOR PDP POLLUTANT CONTROL BMPS
This is the cover sheet for Attachment 1.
Indicate which Items are Included behind this cover sheet:
Attachment
Sequence
Contents Checklist
Attachment 1a DMA Exhibit (Required)
See DMA Exhibit Checklist on the back of
this Attachment cover sheet.
Included
Attachment 1b Tabular Summary of DMAs Showing
DMA ID matching DMA Exhibit, DMA
Area, and DMA Type (Required)*
*Provide table in this Attachment OR on
DMA Exhibit in Attachment 1a
Included on DMA Exhibit in
Attachment 1a
Included as Attachment 1b, separate
from DMA Exhibit
Attachment 1c Form I-7, Harvest and Use Feasibility
Screening Checklist (Required unless the
entire project will use infiltration BMPs)
Refer to Appendix B.3-1 of the BMP
Design Manual to complete Form I-7.
Included
Not included because the entire
project will use infiltration BMPs
Attachment 1d Form I-8, Categorization of Infiltration
Feasibility Condition (Required unless
the project will use harvest and use
BMPs)
Refer to Appendices C and D of the BMP
Design Manual to complete Form I-8.
Included
Not included because the entire
project will use harvest and use
BMPs
Attachment 1e Pollutant Control BMP Design
Worksheets / Calculations (Required)
Refer to Appendices B and E of the BMP
Design Manual for structural pollutant
control BMP design guidelines
Included
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: May 12, 2023
Use this checklist to ensure the required information has been included on the DMA Exhibit:
The DMA Exhibit must identify:
Underlying hydrologic soil group
Approximate depth to groundwater
Existing natural hydrologic features ( watercourses, seeps, springs, wetlands) Critical coarse sediment yield areas to be protected
Existing topography and impervious areas
Existing and proposed site drainage network and connections to drainage offsite Proposed demolition
Proposed grading
Proposed impervious features
Proposed design features and surface treatments used to minimize imperviousness Drainage management area (DMA) boundaries, DMA ID numbers, and DMA areas (square footage or acreage), and DMA type (i.e., drains to BMP, self-retaining, or self-mitigating) Potential pollutant source areas and corresponding required source controls (see Chapter 4, Appendix E.1, and Form I-3B)
Structural BMPs (identify location, type of BMP, and size/detail)
MWS 8-20
MARCOSDMA EXHIBITJOB NO.DRAWN BY:SHEET1 of 2GNIREEN EIGN6390 Greenwich Dr., Suite 170San Diego, California 92122tel 858.554.1500 fax 858.597.0335www.fuscoe.com LEGEND
DATUM NOTE
MARCOSDMA AND HYDROMODIFICATIONDETAILSJOB NO.DRAWN BY:SHEET2 of 2GNIREEN EIGN6390 Greenwich Dr., Suite 170San Diego, California 92122tel 858.554.1500 fax 858.597.0335www.fuscoe.com BIOFILTRATION/PLANTER DETAIL(BMPS 1 & 2)
PROPRIETARY BIOFILTRATION DETAILMODULAR WETLANDS MWS-L-8-20-VNOT TO SCALE
URBANPOND PRECAST CONCRETESTORMWATER DETENTION MODULEBY BIOCLEANNOT TO SCALE
Toliet User Unit Toliet Water Efficient Total Use per
of Normalization Flushing Urinals Visitor Factor Factor Resident or Employee Residential Resident 18.5 NA NA 0.5 9.3
Dwelling Units 102 units Resident per Unit 3.0 Resident Toliet and Urinal Demand 380 cubic - feet / day 36 hr. Demand 571 cubic - feet DCV 9,814 cubic - feet 36 hr. Demand ≥ DCV No
DCV > 36 hr. Demand > 0.25DCV No
36 hr. Demand < 0.25DCV Yes
Harvest Use: Not Feasible
Harvest and use is considered to be infeasible
General Landscape Type 36-Hour Planning Level Irrigation Demand Units Hydrozone - Moderate Plant Water Use 1,470 gal /acre / 36 hrs Proposed Planted Area 1.47 acres
36 hr. Demand 289 cubic - feet DCV 9,814 cubic - feet 36 hr. Demand ≥ DCV No
DCV > 36 hr. Demand > 0.25DCV No
36 hr. Demand < 0.25DCV Yes
Harvest Use: Not Feasible
Harvest and use is considered to be infeasible
Toliet and Urinal Water Usage per Resident or Employee
Land Use Type Per Capita Use per Day
Planning Level Irrigation Demand by Plant Factor and Landscape Type
Categorization of Infiltration Feasibility Condition Form I-8
Part 1 – Full Infiltration Feasibility Screening Criteria Would infiltration of the full design volume be feasible from a physical perspective without any undesirable consequences that cannot be reasonably mitigated?
Criteria Screening Question Yes No
1 Is the estimated reliable infiltration rate below proposed facility locations greater than 0.5 inches per hour? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2 and Appendix D.
☐ ☒
Provide basis:
Infiltration to be verified by testing per city’s BMP Manual Appendix D. Maximum infiltration rate observed was 0.04 in/hr. Testing performed by GeoTek, Inc, in their report Draft Geotechnical Evaluation, Proposed Commercial Development, SWC Grading Avenue and Linda Vista Drive, dated 5/28/2020.
Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. 2 Can infiltration greater than 0.5 inches per hour be allowed without increasing risk of geotechnical hazards (slope stability, groundwater mounding, utilities, or other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2. ☐ ☒
Provide basis:
Infiltration to be verified by testing per city’s BMP Manual Appendix D. Maximum infiltration rate observed was 0.04 in/hr. Testing performed by GeoTek, Inc, in their report Draft Geotechnical Evaluation, Proposed Commercial Development, SWC Grading Avenue and Linda Vista Drive, dated 5/28/2020.
Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability.
3 Can infiltration greater than 0.5 inches per hour be allowed without increasing risk of groundwater contamination (shallow water table, storm water pollutants or other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3. ☐ ☒
Provide basis:
Infiltration to be verified by testing per city’s BMP Manual Appendix D. Maximum infiltration rate observed was 0.04 in/hr. Testing performed by GeoTek, Inc, in their report Draft Geotechnical Evaluation, Proposed Commercial Development, SWC Grading Avenue and Linda Vista Drive, dated 5/28/2020.
Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. 4 Can infiltration greater than 0.5 inches per hour be allowed without causing potential water balance issues such as change of seasonality of ephemeral streams or increased discharge of contaminated groundwater to surface waters? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3.
☐ ☒
Provide basis:
Infiltration to be verified by testing per city’s BMP Manual Appendix D. Maximum infiltration rate observed was 0.04 in/hr. Testing performed by GeoTek, Inc, in their report Draft Geotechnical Evaluation, Proposed Commercial Development, SWC Grading Avenue and Linda Vista Drive, dated 5/28/2020.
Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability.
Part 1
Result*
If all answers to rows 1-4 are “Yes” a full infiltration design is potentially feasible. The feasibility screening category is Full Infiltration.
If any answer from row 1-4 is “No”, infiltration may be possible to some extent but would not generally be feasible or desirable to achieve a “full infiltration” design.
Proceed to Part 2
Full
Infiltration
Feasible
☐
Full
Infiltration
Infeasible
☒
*To be completed using gathered site information and best professional judgement considering the definition of MEP in the MS4 permit. Additional testing and/or studies may be required by Agency/Jurisdictions to substantiate findings.
Categorization of Infiltration Feasibility Condition Form I-8
Part 2 – Partial Infiltration vs. No Infiltration Feasibility Screening Criteria Would infiltration of water in any appreciable amount be physically feasible without any negative consequences that cannot be reasonably mitigated?
Criteria Screening Question Yes No
5 Do soil and geologic conditions allow for infiltration in any appreciable rate or volume? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2 and Appendix D.
☐ ☒
Provide basis:
Infiltration to be verified by testing per city’s BMP Manual Appendix D. Maximum infiltration rate observed was 0.04 in/hr. Testing performed by GeoTek, Inc, in their report Draft Geotechnical Evaluation, Proposed Commercial Development, SWC Grading Avenue and Linda Vista Drive, dated 5/28/2020.
Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. 6 Can infiltration in any appreciable quantity be allowed without increasing risk of geotechnical hazards (slope stability, groundwater mounding, utilities, or other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2. ☒ ☐
Provide basis:
Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability.
7 Can infiltration in any appreciable quantity be allowed without posing significant risk for groundwater related concerns (shallow water table, storm water pollutants or other factors)? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3.
☒ ☐
Provide basis:
Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. 8 Can infiltration be allowed without violating downstream water rights? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3. ☒ ☐
Provide basis:
Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability.
Part 2
Result*
If all answers to rows 1-4 are “Yes” a partial infiltration design is potentially feasible. The feasibility screening category is Partial Infiltration.
If any answer from row 5-8 is “No”, infiltration of any volume is considered to be infeasible within the drainage area. The feasibility screening category is No Infiltration.
Partial
Infiltration
☐
No
Infiltration
☒
*To be completed using gathered site information and best professional judgement considering the definition of MEP in the MS4 permit. Additional testing and/or studies may be required by Agency/Jurisdictions to substantiate findings.
Green Street SWQMP for Marcos October 5, 2022
INTRODUCTION
Project Description:
The Marcos project consists of approximately 10.8 acres near the southwest corner of the Linda Vista Drive and Grand Avenue intersection in the city of San Marcos, California. The project is bisected by a channel which separates the project into two development areas. The 5.0 acres north of the channel will be used to develop 102 condominium residential units while the 5.8 acres south of the channel will be developed for commercial and mixed use.
Existing Conditions:
The existing site consists of two development area that were previously commercial pads but have had the buildings demolished. From an aerial view, both areas visually appear flat. The channel was recently improved by the City of San Marcos (CIP Project Code 88214, “Grand Avenue Drainage / Road Improvements”, IP-4826 and VWD no. 201930). Please reference Appendix 7 in the Drainage Report for channel improvement drawings. Each development area had new storm drain added to collect runoff from the pads and discharge into the improved channel. A bridge was constructed to link the two development areas.
Proposed Conditions :
In the proposed condition, onsite drainage will be covered by a separate SWQMP. Proposed public improvements around the site will be treated by gre en street elements including trees. Ultimately, the proposed development areas will be re-graded to ensure that the runoff is routed to the channel.
Green Street SWQMP for Marcos October 5, 2022
Green Street Elements
Public improvement treatment will be provided by pr ivate green street element trees. Proposed trees would capture storm water, provide shade, and cool pavement.
Water Quality Compliance:
The proposed project would not require Regional Wat er Quality Control Board Section 401 Certification or a U.S. Army Corps of Engineers 404 permit. The project site is fully developed and devoid of natural vegetation and habitat.
Operation/Maintenance:
Green street elements would fall under the responsi bility of would be formed Homeowners Association.
22 Applicability of Storm Water Best Management Practices (BMP) Requirements (Storm Water Intake Form for all Development Permit Applications) For detailed information please visit:
http://www.san‐marcos.net/departments/development‐services/stormwater/development‐planning Form I‐1
Version 1.0
[March 15, 2016]
Project Identification
Project Name:
Description:
Permit Application Number (if applicable): Date:
Project Address:
Determination of Requirements
This form is required as part of the City’s application process. The purpose of this form is to identify potential land development planning storm water requirements that apply to development projects.
Development projects are defined as construction, rehabilitation, redevelopment, or reconstruction of any public or private projects. In addition, the identification of a development project, as it relates to storm water regulations, would truly apply to development and redevelopment activities that have the potential to contact storm water and contribute a source of pollutants, or reduce the natural absorption and infiltration abilities of the land.
To access the BMP Design Manual, Storm Water Quality Management Plan (SWQMP) templates, and other pertinent information related to this program please refer to:
http://www.san‐marcos.net/departments/development‐services/stormwater/development‐planning
Please answer each of the following steps below, starting with Step 1 and progressing through each step until reaching "Stop".
Step Answer Progression
Step 1: Based on the above, Is the project a
"development project"? (see definition above)
See Section 1.3 of the BMP Design Manual for
further guidance if necessary.