ATTACHMENT D
ENVIRONMENTAL IMPACT REPORT
APPENDIX I
CLIMATE ACTION PLAN CHECKLIST
www.san-marcos.net
1 Civic Center Drive | San Marcos, CA 92069 | (760) 744-1050 Page | 1
CLIMATE ACTION PLAN CONSISTENCY REVIEW CHECKLIST
INTRODUCTION
The City of San Marcos (City) adopted an updated Climate Action Plan (CAP) in December, 2020. The CAP outlines strategies and measures that the City will undertake to achieve its proportional share of State greenhouse gas (GHG) emissions reduction targets. The purpose of the CAP Consistency Checklist (Checklist), in conjunction with the CAP, is to provide a streamlined review process for all proposed development projects that are subject to discretionary review and/or trigger environmental review pursuant to the California Environmental Quality Act (CEQA).
Analysis of GHG emissions and potential climate change impacts from new development is required under CEQA. The City’s CAP is a qualified greenhouse gas (GHG) emissions reduction plan in accordance with State CEQA Guidelines Section 15183.5. Pursuant to CEQA Guidelines Sections 15064(h)(3), 15130(d), and 15183(b), a project’s incremental contribution to a cumulative GHG emissions effect may be determined not to be cumulatively considerable if it complies with the requirements of a CAP.
The purpose of this Checklist is to implement GHG reduction measures from the CAP that apply to new discretionary development projects. New development would demonstrate consistency with relevant CAP strategies and would not conflict with the City’s ability to achieve the identified GHG reduction targets through implementation of applicable measures. Projects that are consistent with the CAP, as determined through the use of this Checklist, may rely on the CAP for the cumulative impact analysis of GHG emissions. Projects that are not consistent with the CAP must prepare a comprehensive project-specific analysis of GHG emissions, including quantification of existing and projected GHG emissions and incorporation of the measures in this Checklist to the extent feasible.
Cumulative GHG impacts would be significant for any project that is not consistent with the CAP.
This Checklist may be updated periodically to incorporate new GHG reduction techniques or to comply with later amendments to the CAP or local, State, or federal law. Comprehensive updates to this Checklist will be coordinated with each CAP update. Administrative updates to the Checklist may occur regularly, as necessary for the purpose of keeping the Checklist up-to-date and implementable.
Updates to the CAP Checklist associated with an update to the City’s CAP would also require City Council approval and shall comply with CEQA.
DRAFT
\\ fl
SAN MARCOS
DISCOVER LIFE'S POSSIBILITIES
www.san-marcos.net
1 Civic Center Drive | San Marcos, CA 92069 | (760) 744-1050 Page | 2
APPLICABILITY AND PROCEDURES
This Checklist is required only for discretionary projects1 that are subject to and not exempt from CEQA. Projects that are exempt from CEQA are deemed to be consistent with the City’s CAP, and no further review is necessary, with the exception of a Class 32 “In-Fill Development Projects” categorical exemption (State CEQA Guidelines Section 15332), for which projects are required to demonstrate consistency with the CAP through this Checklist.
General procedures for Checklist compliance and review are described below. Specific guidance is also provided under each of the questions under Steps 1 and 2 of the Checklist. ▪ The City’s Development Services - Planning Division reviews development applications and makes determinations regarding environmental review requirements under CEQA. ▪ The specific applicable requirements outlined in the Checklist shall be required as conditions of project approval.
▪ The project must provide written documentation and supporting evidence that demonstrate how the proposed project would implement each applicable Checklist requirement described herein to the satisfaction of the Planning Division. ▪ If a question in the Checklist is deemed not applicable (N/A) to a proje ct, written documentation and evidence supporting that conclusion shall be provided to the satisfaction of the Planning Division. Each Checklist question provides the scenario(s) where checking N/A may be acceptable. If a measure is deemed not applicable f or reasons other than those outlined in each question, supporting evidence will need to be provided and would be subject to Planning Division approval. A project may be determined to be inconsistent with the CAP if the N/A response is deemed to be not supported by credible evidence.
▪ Development projects requiring discretionary review that cannot demonstrate consistency with the CAP using this Checklist shall prepare a separate, project -level GHG analysis as part of the CEQA document prepared for the projec t. 1 In this context, a project is any action that meets the definition of a “Project” in Section 15378 of the State CEQA Guidelines.
DRAFT
\\ fl
SAN MARCOS
DISCOVER LIFE'S POSSIBILITIES
www.san-marcos.net
1 Civic Center Drive | San Marcos, CA 92069 | (760) 744-1050 Page | 3 Application Information
Contact Information
Project No. and Name: IM22-0007 (Capalina Apartments)
Property Address and
APN: Capalina Road, San Marcos, CA 92069
Applicant Name and Co.: Jon Rilling, Capalina SMA, LLC
Contact Phone: (760) 445-5144 Contact Email: [email protected] Was a consultant retained to complete this checklist? ☐ Yes ☐ No If Yes, complete the following:
Consultant Name: Matt Simmons
Contact
Phone: (760) 484-8832
Company Name: Consultants Collaborative Contact Email: [email protected] Project Information
1. What is the size of the project site (acres)? 2.51 Acres
2. Identify all applicable proposed land uses:
☐ Residential (indicate # of single-family dwelling units):
☐ Residential (indicate # of multi-family dwelling units): 119 Units ☐ Commercial (indicate total square footage): 4,000 sf
☐ Industrial (indicate total square footage):
☐ Other (describe):
3. Provide a description of the project proposed. This description should match the basic project description used for the CEQA document. The description may be attached to the Checklist if there are space constraints.
Proposal to rezone the current site from MU-3 to MU-2, to allow for a mix of 119 Multifamily Apartment Units and approximately 4,000 sf of ground floor commercial. The project will utilize the State’s Density Bonus law to achieve a density of 47 units per acre, with a maximum of 4-stories. The project will utilize two of the State Density Bonus Incentives by including six affordable units (set-aside for occupants that make between 30%-50% of AMI).
The remaining units will be market rate units. The Project will utilize the State incentives for parking.
The Project is 0.6 miles from a transit station, is within a low regional VMT area, and within the SANDAG smart growth area.
DRAFT
DRAFT
SAN MARCOS
D I SCOVER LIFE'S POSSIBILITIES
www.san-marcos.net
1 Civic Center Drive | San Marcos, CA 92069 | (760) 744-1050 Page | 4 STEP 1: LAND USE CONSISTENCY
The first step in this section evaluates a project’s GHG emissions consistent with the City’s Guidance to Demonstrating Consistency with the City of San Marcos Climate Action Plan: For Discretionary Projects Subject to CEQA (Guidance Document). New discretionary development projects subject to CEQA review that emit fewer than 500 metric tons of carbon dioxide equivalent (MTCO2e) annually would not contribute considerably to cumulative climate change impacts as stated in the City’s Guidance Document, and therefore, would be considered consistent with the CAP and associated emissions projections.
For projects that are subject to CAP consistency review, the next step in determining consistency is to assess the project’s consistency with the growth projections used in the development of the CAP. This section allows the city to determine a project’s consistency with the land use assumptions used in the CAP.
DRAFT
\\ fl
SAN MARCOS
DISCOVER LIFE'S POSSIBILITIES
www.san-marcos.net
1 Civic Center Drive | San Marcos, CA 92069 | (760) 744-1050 Page | 5 Step 1: Land Use Consistency
Checklist Item
(Check the appropriate box and provide an explanation and supporting documentation for your answer) Yes No
1. The size and type of projects listed below would emit fewer than 500 MTCO2e per year. Based on this threshold, does the proposed project exceed these characteristics?
▪ Single Family Housing: 36 dwelling units
▪ Multi-Family Housing: 55 dwelling units
▪ Office: 43,000 square feet
▪ Commercial Space: 20,000 square feet
▪ Regional Shopping Center: 18,000 square feet
▪ Hotel: 37 rooms
▪ Restaurant (Sit-Down): 6,500 square feet
▪ Restaurant (Drive-Thru, High Turnover): 2,400 square feet ▪ General Light Industrial: 58,000 square feet
▪ University: 263 students
▪ Mixed-Use: See Guidance to Demonstrating Consistency memorandum for methods to estimate mixed-use development thresholds
▪ Other: For project types not listed in this section the need for GHG analysis and mitigation will be made on a project-specific basis, considering the 500 MTCO2e per year screening threshold.
If “Yes”, proceed to Question 2 of Step 1.
If “No”, in accordance with the City’s CAP screening criteria, the project’s GHG impact is less than significant and is not subject to the measures of the CAP. ☒ ☐
2. Is the proposed project consistent with the City’s existing General Plan land use designation?
If “Yes”, proceed to Step 2.
If “No”, proceed to Question 3 of Step 1
☐ ☒
3. For projects not consistent with the existing General Plan land use designation, does the project include a General Plan Amendment that would generate GHG emissions equal to or less than estimated emissions generated under the existing designation?
If “Yes”, proceed to Step 2 and provide estimated project emissions under both existing and proposed designation(s) for comparison.
If “No”, the project’s GHG impact is potentially significant, and a GHG analysis must be prepared in accordance with the City’s Guidance Document and applicable CEQA guidelines. The project must incorporate each of the measures identified in Step 2 to mitigate cumulative GHG emissions impacts, along with x ☐
DRAFT
SAN MARCOS
D I SCOVER LIFE'S POSSIBILITIES
www.san-marcos.net
1 Civic Center Drive | San Marcos, CA 92069 | (760) 744-1050 Page | 6 other mitigation measures as necessary based on a project specific GHG analysis.. Proceed and complete a project specific GHG analysis, and Step 2 of the Checklist.
STEP 2: CAP MEASURES CONSISTENCY
The second step of CAP consistency review is to evaluate a project’s consistency with the applicable strategies and measures of the CAP. Each Checklist item is associated with a specific GHG reduction measure in the City’s CAP. “N/A” should only be checked based on the direction provided in each Checklist Item question. All projects for which the measure is applicable must demonstrate that they would implement measures consistent with the Checklist Item, or fully substantiate how the item would be infeasible for project implementation. “N/A” responses are subject to Planning Division review and approval. If “No” is provided as a response to a question, the project would be determined to be inconsistent with the CAP and result in a significant GHG impact.
DRAFT
SAN MARCOS
D I SCOVER LIFE'S POSSIBILITIES
www.san-marcos.net
1 Civic Center Drive | San Marcos, CA 92069 | (760) 744-1050 Page | 7 Step 2: CAP Measures Consistency
Checklist Item
(Check the appropriate box and provide an explanation for your answer. Please use additional sheets if necessary)
Yes No N/A
Project Design
1. Electric Vehicle Charging Stations (Measure T-2)
Multi-Family Residential and Non-Residential: Will the
project install electric vehicle charging stations (Level 2 or better) in at least five percent of the total parking spaces provided on-site?
Check “N/A” if the project is a single-family residential project or would not provide any parking.
☒ ☐ ☐
Please substantiate how the project satisfies question 1:
The project will comply with Measure T-2. The project include 147 parking space (142 spaces for residential and 5 spaces for commercial). The project design includes 8 parking spaces with Level 2 EV chargers, 15 EV-capable spaces and 35 EV-ready spaces. ____________________________________________________________________________ ____________________________________________________________________________ _____________________________________________________________ _______________
2. Bicycle Infrastructure (Measure T-8)
Residential and Non-Residential Projects: If the following conditions are met, would the project pay its fair-share contribution to bicycle infrastructure improvements?
☐ Intersection or roadway segment improvements
are proposed as part of the project and,
☐ The City’s General Plan Mobility Element identifies
bicycle infrastructure improvements at any
intersection(s) or roadway segment(s) that would
be improved as part of the project.
Check “N/A” if the conditions above would not be met.
☐ ☐ ☒☐
DRAFT
SAN MARCOS
DISCOVER LIFE 'S POSSIBILITIES
www.san-marcos.net
1 Civic Center Drive | San Marcos, CA 92069 | (760) 744-1050 Page | 8 Step 2: CAP Measures Consistency
Checklist Item
(Check the appropriate box and provide an explanation for your answer. Please use additional sheets if necessary)
Yes No N/A
Please substantiate how the project satisfies question 2:
____________________________________________________________________________ Not Applicable: The project site is located on the Mission Road corridor which has a bicycle lane that transitions to a sharrow lane along the project's northern frontage. The project design would not impact the bicycle lanes along Mission Road. The City's General Plan Mobility Element (Figure 3-4) does not identify any bicycle infrastructure for Capalina Road, which is the project's southern border
____________________________________________________________________________ ___________________________________________________________________________ DRAFT
SAN MARCOS
DISCOVER LIFE 'S POSSIBILITIES
www.san-marcos.net
1 Civic Center Drive | San Marcos, CA 92069 | (760) 744-1050 Page | 9 Step 2: CAP Measures Consistency
Checklist Item
(Check the appropriate box and provide an explanation for your answer. Please use additional sheets if necessary)
Yes No N/A
3. Transportation Demand Management (Measure T-9)
Multi-Family Residential and Non-Residential: Will the
project develop and implement a TDM plan that includes, at a minimum, all of the TDM strategies listed below?
☐ Provide discounted monthly transit pass or provide
at least 25 percent transit fare subsidy to
residents/employees.
☐ Provide designated car-share, carpool, vanpool,
and/or park-and-ride parking spaces.2
☐ Provide pedestrian connections between all
internal uses and to all existing or planned external
streets around the project site(s).
☐ Provide secure bicycle parking spaces or bicycle
racks, showers, and clothes lockers.
☐ Encourage telecommuting for employees (allow
one telecommute day per week or compressed
work weeks) or provide a telecommute work center
with common office space and equipment
available to residents.
-or-
Would the project implement and monitor for four (4) years a TDM program that demonstrates an alternative
transportation (i.e. carpool, public transit, bicycle, walk, telecommute) mode share of at least 29 percent 3 for all residents?
Check “N/A” if the project is a single-family residential project or is not subject to the City’s TDM Ordinance.
☒ ☐ ☐
2 The designated number of car-share, carpool, vanpool, and/or park-and-ride parking spaces provided at a rate equal to or greater than CALGreen minimum requirements.
3 Measure T-10 requires projects to increase alternative mode share by seven percent. The baseline mode share for alternative transportation (i.e. carpool, public transit, bicycle, walk, and telecommute) is 22 percent based on 2010 Census Data. x
x
x
x
x
DRAFT
SAN MARCOS
D I SCOVER LIFE'S POSSIBILITIES
www.san-marcos.net
1 Civic Center Drive | San Marcos, CA 92069 | (760) 744-1050 Page | 10 Step 2: CAP Measures Consistency
Checklist Item
(Check the appropriate box and provide an explanation for your answer. Please use additional sheets if necessary)
Yes No N/A
Please state which measure option the project for which the project would comply and substantiate how the project satisfies question 3:
The project will comply with Measure T-9. The property manager will provide transit information to the owners and make a good faith effort in offering discounted transit fares. There will be some parking space for carpool and bicycle racks onsite. The community room will have some spaces available for residents to telecommute. The property management company will provide a newsletter to inform the residents there are options for reduced transit passes. The project will provide designated car-share, carpool, vanpool, EV and/or park-and-ride spaces on site. Each apartment is equipped with showers and storage as well as areas within the home for telecommuting. Additionally, the project will have common office space as part of the commercial portion that will promote telecommuting. Adjacent to the fitness center, as part of the onsite restrooms, a shower and 2 sets of bike racks will be provided onsite.
___________________________________________________________________________ _____________________________________________________________________________
4. Reduce Parking Near Transit (Measure T-12)
Multi-Family Residential: If located within a half-mile of a major transit stop4, would the project provide at least 27 percent fewer parking spaces than required for the same use based on the City’s municipal code parking
requirements?
Check “N/A” if the project is a single-family residential or non- residential project.
☐ ☐ ☒
4 Major transit stop is defined as a bus or light-rail station with fixed service and 10-minute minimum headways during peak hours.
Project applicants should confirm with City staff if the project site would fall within this proximity tot a major transit stop.
DRAFT
SAN MARCOS
DISCOVER LIFE 'S POSSIBILITIES
www.san-marcos.net
1 Civic Center Drive | San Marcos, CA 92069 | (760) 744-1050 Page | 11 Step 2: CAP Measures Consistency
Checklist Item
(Check the appropriate box and provide an explanation for your answer. Please use additional sheets if necessary)
Yes No N/A
Please substantiate how the project satisfies question 4:
____________________________________________________________________________ Not Applicable: The project site is is located more than a half-mile from a major transit stop. ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________
5. Water Heaters (Measure E-1)
Residential: Will the project install one of, or a combination of, the following water heater types in place of natural gas water heaters?
X Electric heat pump water heater
☐ Instantaneous electric water heater
X Electric tank
☐ Solar water heater with heat pump water heater
backup
☐ Solar water heater with electric tank backup
Check “N/A” if the project is a non-residential project. x ☐ ☐
Please substantiate how the project satisfies question 5:
The project will comply with Measure E-1. The project will install electric heat pump water heaters with an electric tank.
6. Photovoltaic Installation (Measure E-2)
Non-Residential: Will the project install photovoltaic
systems with a minimum capacity of two watts per square foot of gross floor area?
Check “N/A” if the project is a residential project or if installation of on-site photovoltaic would be infeasible.
x ☐ ☐
DRAFT
SAN MARCOS
DISCOVER LIFE 'S POSSIBILITIES
www.san-marcos.net
1 Civic Center Drive | San Marcos, CA 92069 | (760) 744-1050 Page | 12 Step 2: CAP Measures Consistency
Checklist Item
(Check the appropriate box and provide an explanation for your answer. Please use additional sheets if necessary)
Yes No N/A
7. Landscaping Water Use (Measure W-1)
Residential and Non-Residential: Will the project comply with the City’s Water Efficient Landscape Ordinance?5
Check “N/A” if the project is not proposing any landscaping or is not subject to the City’s Water Efficient Landscape Ordinance. x ☐ ☐
Please substantiate how the project satisfies question 7:
____________________________________________________________________________ ____________________________________________________________________________ ___________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________
8. Urban Tree Canopy (Measure C-2)
Single-Family Residential: Will the project plant a minimum of one tree per single-family residential unit?
-or-
Multi-Family Residential and Non-Residential: If the project is providing more than 10 parking spaces, will the project plant at least one tree per five parking spaces provided? Check “N/A” if planting the required number of trees on-site would be infeasible.
☒ ☐ ☐
5 City of San Marcos Landscape Manual: https://www.san-marcos.net/home/showdocument?id=13984 The project will comply with Measures W-1. The project landscaping is designed to comply with WELO standards.____________________________________________________________________________ Please substantiate how the project satisfies question 6:
____________________________________________________________________________ The project will comply with Measure E-2. The project will install Photovoltaic systems with a capacity of two watts per sqf of gross floor area.
_________________________________________________ ___________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ DRAFT
SAN MARCOS
DISCOVER LIFE 'S POSSIBILITIES
www.san-marcos.net
1 Civic Center Drive | San Marcos, CA 92069 | (760) 744-1050 Page | 13 Step 2: CAP Measures Consistency
Checklist Item
(Check the appropriate box and provide an explanation for your answer. Please use additional sheets if necessary)
Yes No N/A
Please substantiate how the project satisfies question 8:
The project will comply with measure E-2. The project will provide 147 parking spaces which would require 30 trees. As proposed the project will be installing 83 trees on site.