ATTACHMENT D
ENVIRONMENTAL IMPACT REPORT
APPENDIX F-2
SWQMP
APPENDIX F-2
Stormwater Quality Management Plan
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 2/24/2022
CITY OF SAN MARCOS
PRIORITY DEVELOPMENT PROJECT (PDP)
STORM WATER QUALITY MANAGEMENT PLAN (SWQMP)
FOR
SOUTH PACIFIC
SOUTH PACIFIC STREET
SAN MARCOS , CA 92078
ASSESSOR'S PARCEL NUMBER(S):
219-223-20&22
ENGINEER OF WORK:
___________________________________________________________________________________
Robert Dentino, PE 45629
PREPARED FOR:
Hughes Circuits, Inc.
546 South Pacific Street
El Cajon, CA 92078
Contact Person: Joe Hughes
Phone: (760) 744-0300x304
E-mail: [email protected]
PDP SWQMP PREPARED BY:
Excel Engineering
440 State Place
Escondido, CA 92029
(760) 745-8188
DATE OF SWQMP:
2/24/2022
SDP22-0002
PLANS PREPARED BY:
Excel Engineering
440 State Place
Escondido, CA 92029
(760) 745-8188
AMMENDED:
11/13/2023
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 9/21/2021
Page intentionally blank
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 9/21/2021
TABLE OF CONTENTS
Acronym Sheet
PDP SWQMP Preparer's Certification Page
PDP SWQMP Project Owner's Certification Page
Submittal Record
Project Vicinity Map
FORM I-1 Applicability of Storm Water BMP Requirements
FORM I-2 Project Type Determination Checklist (Standard Project or PDP) FORM I-3B Site Information Checklist for PDPs
FORM I-4 Source Control BMP Checklist for All Development Projects FORM I-5 Site Design BMP Checklist for All Development Projects FORM I-6 Summary of PDP Structural BMPs
Attachment 1: Backup for PDP Pollutant Control BMPs
Attachment 1a: DMA Exhibit
Attachment 1b: Tabular Summary of DMAs and Design Capture Volume Calculations Attachment 1c: Harvest and Use Feasibility Screening (when applicable) Attachment 1d: Categorization of Infiltration Feasibility Condition (when applicable) Attachment 1e: Pollutant Control BMP Design Worksheets / Calculations Attachment 2: Backup for PDP Hydromodification Control Measures Attachment 2a: Hydromodification Management Exhibit
Attachment 2b: Management of Critical Coarse Sediment Yield Areas Attachment 2c: Geomorphic Assessment of Receiving Channels Attachment 2d: Flow Control Facility Design
Attachment 3: Structural BMP Maintenance Plan
Attachment 3a: B Structural BMP Maintenance Thresholds and Actions Attachment 3b: Draft Maintenance Agreement (when applicable) Attachment 4: Copy of Plan Sheets Showing Permanent Storm Water BMPs
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 9/21/2021
ACRONYMS
APN Assessor's Parcel Number
BMP Best Management Practice
HMP Hydromodification Management Plan
HSG Hydrologic Soil Group
MS4 Municipal Separate Storm Sewer System
N/A Not Applicable
NRCS Natural Resources Conservation Service
PDP Priority Development Project
PE Professional Engineer
SC Source Control
SD Site Design
SDRWQCB San Diego Regional Water Quality Control Bo ard SIC Standard Industrial Classification
SWQMP Storm Water Quality Management Plan
`
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 2/24/2022
PDP SWQMP PREPARER'S CERTIFICATION PAGE
Project Name: South Pacific
Permit Application Number:
PREPARER'S CERTIFICATION
I hereby declare that I am the Engineer in Responsible Charge of design of storm water best management practices (BMPs) for this project, and that I have exercised responsible charge over the design of the BMPs as defined in Section 6703 of the Business and Professions Code, and that the design is consistent with the PDP requirements of the City of San Marcos BMP Design Manual, which is a design manual for compliance with local City of San Marcos and regional MS4 Permit (California Regional Water Quality Control Board San Diego Region Order No. R9-2015-0100) requirements for storm water management.
I have read and understand that the [City Engineer] has adopted minimum requirements for managing urban runoff, including storm water, from land development activities, as described in the BMP Design Manual. I certify that this PDP SWQMP has been completed to the best of my ability and accurately reflects the project being proposed and the applicable BMPs proposed to minimize the potentially negative impacts of this project's land development activities on water quality. I understand and acknowledge that the plan check review of this PDP SWQMP by the [City Engineer] is confined to a review and does not relieve me, as the Engineer in Responsible Charge of design of storm water BMPs for this project, of my responsibilities for project design.
________________________________________________________ Engineer of Work's Signature, PE Number & Expiration Date
Robert D. Dentino, RCE 45629, 12-31- 22_______________________ Print Name
Excel Engineering__________________________________________ Company
____________________________
Date
Engineer's Seal:
11/3/2023
-
No. 45629
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 9/21/2021
Page intentionally blank
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 2/24/2022
PDP SWQMP PROJECT OWNER'S CERTIFICATION PAGE
Project Name: South Pacific
Permit Application Number:
PROJECT OWNER'S CERTIFICATION
This PDP SWQMP has been prepared for Hughes Circuit s, Inc. by Excel Engineering. The PDP SWQMP is intended to comply with the PDP requirements of the City of San Marcos BMP Design Manual, which is a design manual for compliance with local City of San Marcos and regional MS4 Permit (California Regional Water Quality Control Board San Diego Region Order No. R9-2015-0100) requirements for storm water management.
The undersigned, while it owns the subject property , is responsible for the implementation of the provisions of this plan. Once the undersigned trans fers its interests in the property, its successor-i n- interest shall bear the aforementioned responsibili ty to implement the best management practices (BMPs) described within this plan, including ensuri ng on-going operation and maintenance of structural BMPs. A signed copy of this document shall be available on the subject property into perpetuity.
________________________________________________________ Project Owner's Signature
________________________________________________________ Print Name
Hughes Circuits, Inc. ________________________________________ Company
____________________________
Date
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 9/21/2021
Page intentionally blank
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 9/21/2021
SUBMITTAL RECORD
Use this Table to keep a record of submittals of this PDP SWQMP. Each time the PDP SWQMP is re- submitted, provide the date and status of the project. In column 4 summarize the changes that have been made or indicate if response to plancheck comments is included. When applicable, insert response to plancheck comments behind this page.
Submittal
Number
Date Project Status Summary of Changes
1 Preliminary Design /
Planning/ CEQA
Final Design
Initial Submittal
2 Preliminary Design /
Planning/ CEQA
Final Design
3 Preliminary Design /
Planning/ CEQA
Final Design
4 Preliminary Design /
Planning/ CEQA
Final Design
□
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 2/24/2022
PROJECT VICINITY MAP
Project Name: South Pacific
Permit Application Number:
VICINITY MAP
~
NOT TO SCALE
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/20/2021
Applicability of Storm Water Best Management Practices (BMP) Requirements (Storm Water Intake Form for all Development Permit Applications) For detailed information please visit:
http://www.san-marcos.net/departments/development-services/stormwater/development-planning Form I -1
[March 15, 2016]
Project Identification
Project Name: South Pacific
Description: Proposed project is an industrial project that will include driveways, a single building, structural BMPs, parking and all amenities.
Permit Application Number (if applicable): N/A Date:
Project Address:
Determination of Requirements
This form is required as part of the City’s application process. The purpose of this form is to identify potential land deve lopment planning storm water requirements that apply to development projects.
Development projects are defined as construction, rehabilitation, redevelopment, or reconstruction of any public or private projects. In addition, the identification of a development project, as it relates to storm water regulations, would truly apply to development and redevelopment activities that have the potential to contact storm water and contribute a source of pollutants, or reduce the natural absorption and infiltration abilities of the land.
To access the BMP Design Manual, Storm Water Quality Management Plan (SWQMP) templates, and other pertinent information related to this program please refer to:
http://www.san-marcos.net/departments/development-services/stormwater/development-planning
Please answer each of the following steps below, starting with Step 1 and progressing through each step until reaching "Stop".
Step Answer Progression
Step 1: Based on the above, Is the project a
"development project" (See definition above)?
See Section 1.3 of the BMP Design Manual for
further guidance if necessary.
Yes Go to Step 2.
No Permanent BMP requirements do not apply. No
SWQMP will be required. Provide brief discussion
below.
STOP.
Discussion / justification if the p roject is not a "development project" (e.g., the project includes only interior remodels within an existing building):
Step 2: Is the project a Standard Project, Priority
Development Project (PDP), or exception to PDP
definitions?
To answer this item, complete Form I-2, Project
Type Determination. See Section 1.4 of the BMP
Design Manual in its entirety for guidance.
In addition to Section 1.4, please refer to the
City’s SWQMP Submittal Requirements form.
Standard Project Only Standard Project requirements apply, including Standard Project SWQMP. STOP.
PDP Standard and PDP requirements apply, including
PDP SWQMP. Go to Step 3 on the following page.
Exception to PDP
definitions
Standard Project requirements apply, and any
additional requirements specific to the type of
project. Provide discussion and list any additional
requirements below. Prepare Standard Project
SWQMP. STOP.
Discussion / justification, and additional requirements for exceptions to PDP definitions, if applicable:
2/24/2022
NE Corner of South Pacific Street , San Marcos, CA 92078 City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/20/2021
Form I -1 Page 2 , Form Date: March 15, 2016
Step 3 (PDPs only) . Please answer the list of questions in this section to determine if hydromodification requirements reply to the proposed PDP. Does the project:
Step 3a. Discharge storm water
runoff directly to the Pacific Ocean?
Yes STOP . Hydromodification requirements do not apply. No Continue to Step 3b.
Step 3b . Discharge storm water
runoff directly to an enclosed
embayment, not within protected
areas?
Yes STOP . Hydromodification requirements do not apply. No Continue to Step 3c.
Step 3c . Discharge storm water
runoff directly to a water storage
reservoir or lake, below spillway or
normal operating level?
Yes STOP . Hydromodification requirements do not apply. No Continue to Step 3d.
Step 3d . Discharge storm water
runoff directly to an area identified in
WMAA?
Yes STOP . Hydromodification requirements do not apply. No Hydromodification requirements apply to the project. Go to Step
4. Discussion / justification if hydromodification control requirements do not apply:
Step 4 (PDPs subject to
hydromodification control
requirements only). Does protection
of critical coarse sediment yield areas
apply based on review of WMAA
Potential Critical Coarse Sediment
Yield Area Map?
See Section 6.2 of the BMP Design
Manual for guidance.
Yes Management measures required for protection of critical coarse sediment yield areas (Chapter 6.2).
Stop.
No Management measures not required for protection of critical coarse sediment yield areas.
Provide brief discussion below.
Stop.
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 2/24/2022
No Potential Critical Coarse Sediment Yield areas nearby that will influence the project.
Potential Critical Coarse Sediment
Proposed Project
Proposed Project
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/20/2021
Project Type Determination Checklist Form I-2
[March 15, 2016]
Project Information
Project Name/Description: South Pacific
Permit Application Number (if applicable): Date:
Project Address:
Project Type Determination: Standard Project or Priority Development Project (PDP) The project is (select one): New Development Redevelopment The total proposed newly created or replaced impervious area is: _ _ ft2 (__ __) acres Is the project in any of the following categories, (a) through (f)? Yes
No
(a) New development projects that create 10,000 square feet or more of impervious surfaces (collectively over the entire project site). This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land.
Yes
No
(b) Redevelopment projects that create and/or replace 5,000 square feet or more of impervious surface (collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surfaces). This includes commercial, industrial, residential, mixed-use, and public development projects on public or private land.
Yes
No
(c) New and redevelopment projects that create and/or replace 5,000 square feet or more of impervious surface (collectively over the entire project site), and support one or more of the following uses:
(i) Restaurants. This category is defined as a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification (SIC) code 5812). (ii) Hillside development projects. This category includes development on any natural slope that is twenty-five percent or greater.
(iii) Parking lots. This category is defined as a land area or facility for the temporary parking or storage of motor vehicles used personally, for business, or for commerce.
(iv) Streets, roads, highways, freeways, and driveways. This category is defined as any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles.
2/24/2022
NE Corner of South Pacific Street , San Marcos, CA 92078 106214.09
2.44 I
I
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/20/2021
Form I -2 Page 2 , Form Date: March 15, 2016
Yes
No
(d) New or redevelopment projects that create and/ or replace 2,500 square feet or more of impervious surface (collectively over the entire project site), and discharging directly to an Environmentally Sensitive Area (ESA). “Discharging directly to” includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the project to the ESA (i.e. not commingled with flows from adjacent lands).
Note: ESAs are areas that include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Board and San Diego Water Board; State Water Quality Protected Areas; water bodies designated with the RARE beneficial use by the State Water Board and San Diego Water Board; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. See BMP Design Manual Section 1.4.2 for additional guidance.
Yes
No
(e) New development projects , or redevelopment projects that create and/or replace 5,000 square feet or more of impervious surface, that support one or more of the following uses:
(i) Automotive repair shops. This category is defined as a facility that is categorized in any one of the following SIC codes: 5013, 5014, 5541, 7532- 7534, or 7536-7539.
(ii) Retail gasoline outlets (RGOs). This category includes RGOs that meet the following criteria: (a) 5,000 square feet or more or (b) a projected Average Daily Traffic (ADT) of 100 or more vehicles per day.
Yes
No
(f) New or redevelopment projects that result in the dis turbance of one or more acres of land and are expected to generate pollutants post construction.
Note: See BMP Design Manual Section 1.4.2 for additional guidance.
Does the project meet the definition of one or more of the Priority Development Project categories (a) through (f) listed above?
No – the project is not a Priority Development Project (Standard Project). Yes – the project is a Priority Development Project (PDP).
The following is for redevelopment PDPs only:
The area of existing (pre-project) impervious area at the project site is: ________ ft 2 (A)
The total proposed newly created or replaced impervious area is ________ ft 2 (B) Percent impervious surface created or replaced (B/A)*100: _______% The percent impervious surface created or replaced is (select one based on the above calculation):
less than or equal to fifty percent (50%) – only new impervious areas are considered PDP OR
greater than fifty percent (50%) – the entire project site is a PDP
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/22/2021
Site Information Checklist
For PDPs
Form I-3B (PDPs)
[March 15, 2016]
Project Summary Information
Project Name South Pacific
Project Address
Assessor's Parcel Number(s) (APN(s))
Permit Application Number
Project Hydrologic Unit Select One:
Santa Margarita 902
San Luis Rey 903
Carlsbad 904
San Dieguito 905
Penasquitos 906
San Diego 907
Pueblo San Diego 908
Sweetwater 909
Otay 910
Tijuana 911
Project Watershed
(Complete Hydrologic Unit, Area, and Subarea
Name with Numeric Identifier)
The project is located in the Richland Hydrologic Sub
Area of the San Marcos Hydrologic Area of the
Carlsbad Hydrologic Unit (904.52).
Parcel Area
(total area of Assessor's Parcel(s) associated
with the project)
_ _ Acres (_ _____ Square Feet)
Area to be Disturbed by the Project
(Project Area)
_ __ Acres (_ _____ Square Feet)
Project Proposed Impervious Area
(subset of Project Area)
_ __ Acres (_ _____ Square Feet)
Project Proposed Pervious Area
(subset of Project Area)
_ __ Acres (_ _____ Square Feet)
Note: Proposed Impervious Area + Proposed Pervious Area = Area to be Disturbed by the Project.
This may be less than the Parcel Area.
NE Corner of South Pacific Street ,
San Marcos, CA 92078
219-223-20&22
2.926
127456.56
2.926
127456.56
106214.09
2.44 0.49
21242.47
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/22/2021
Form I-3B Page 2 of 10, Form Date: March 15, 2016
Description of Existing Site Condition
Current Status of the Site (select all that apply):
Existing development
Previously graded but not built out
Demolition completed without new construction
Agricultural or other non-impervious use
Vacant, undeveloped/natural
Description / Additional Information:
Existing Land Cover Includes (select all that apply):
Vegetative Cover
Non-Vegetated Pervious Areas
Impervious Areas
Description / Additional Information:
Underlying Soil belongs to Hydrologic Soil Group (select all that apply):
NRCS Type A
NRCS Type B
NRCS Type C
NRCS Type D
Approximate Depth to Groundwater (GW):
GW Depth < 5 feet
5 feet < GW Depth < 10 feet
10 feet < GW Depth < 20 feet
GW Depth > 20 feet
Existing Natural Hydrologic Features (select all that apply):
Watercourses
Seeps
Springs
Wetlands
None
Description / Additional Information:
The existing site condition is undeveloped natural area with soil type D.
Note: At the upper northwest corner of the
project site the GW depth is 4'. At the rest
portion of the project site the GW depth is
between 6'-10'.
□
✓
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/22/2021
Form I-3B Page 3 of 10 , Form Date: March 15, 2016
Description of Existing Site Drainage Patterns
How is storm water runoff conveyed from the site? At a minimum, this description should answer:
(1) whether existing drainage conveyance is natural or urban; (2) Is runoff from offsite conveyed through the site? If yes, quantify all offsite drainage areas, design flows, and locations where offsite flows enter the project site, and summarize how such flows are conveyed through the site;
(3)Provide details regarding existing project site drainage conveyance network, including any existing storm drains, concrete channels, swales, detention facilities, storm water treatment facilities, natural or constructed channels; and
(4) Identify all discharge locations from the existing project site along with a summary of conveyance system size and capacity for each of the discharge locations. Provide summary of the pre-project drainage areas and design flows to each of the existing runoff discharge locations.
Describe existing site drainage patterns:
The majority of the existing offsite surface slopes generally from the north to the south. When the water reaches South Pacific Street along the west border of the project, it flows into the existing dual 48 inches pipes then flow through vacant property before entry the project area.
The site is currently undeveloped. The existing onsite surface slope is approximately 2% and runs generally from the north to the south. When the water from offsite reaches to the north edge of the project, it flows along the slope until it reaches the project’s POC at the south edge of the property. According to the Web Soil Survey, the entire existing site is Soil Type D.
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/22/2021
Form I-3B Page 4 of 10 , Form Date: March 15, 2016
Description of Proposed Site Development
Project Description / Proposed Land Use and/or Activities:
List/describe proposed impervious features of the project (e.g., buildings, roadways, parking lots, courtyards, athletic courts, other impervious features):
List/describe proposed pervious features of the project (e.g., landscape areas):
Does the project include grading and changes to site topography? Yes
No
Description / Additional Information:
The project is proposing to build a building, parking lots with landscape area, and structural Biofiltration BMPs (BF-2) along with a Modular Wetlands proprietary biofiltration (BF-3).
The proposed impervious areas of the project will include a building, the associated parking lot, and the paved road.
The proposed pervious areas of the project will include two biofiltration BMPs (BF-2), pervious pavers in the parking stalls, and minor landscaped areas around the building's footprint.
The current site has a slight upward slope from South Pacific then drops down to a lower elevation that creates an entire channel that conveys waters from the north. The proposed project will raise the site and allow the water to convey through the site through proposed Reinforced Concrete Pipes.
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 2/24/2022
Form I-3B Page 5 of 10 , Form Date: March 15, 2016
Description of Proposed Site Drainage Patterns
Does the project include changes to site drainage (e.g., installation of new storm water conveyance systems)?
Yes
No
If yes, provide details regarding the proposed project site drainage conveyance network, including storm drains, concrete channels, swales, detention facilities, storm water treatment facilities, natural or constructed channels, and the method for conveying offsite flows through or around the proposed project site. Identify all discharge locations from the proposed project site along with a summary of the conveyance system size and capacity for each of the discharge locations. Provide a summary of pre- and post-project drainage areas and design flows to each of the runoff discharge locations. Reference the drainage study for detailed calculations.
Describe proposed site drainage patterns:
The project proposes to build a building, parking and landscape areas. The proposed parking slopes to the project’s biofiltration basin (BMP-A) at 0.5%. To decrease impervious area on the site, the parking stalls will be installed with pervious concrete. The proposed building is approximately 1.298 acres. The 1.024 acres of the building will discharge roof water into BMP-A, another 0.274 acres of the building will discharge roof water into BMP-B. After all stormwater from parking lot and roof get collected and treated in BMP-A and BMP-B, it flows into the 48 inches storage tank, which is located at the north and east edge of the project site. This storage tank is used for detaining post-developed onsite water. At the end of the storage tank, a weir plate with two orifices is used for regulating low flow. Each of the biofiltration basins have an emergency spillway that will ultimately allow water to go to the street. It should be noted this is a last attempt emergency spillway for safety; these spillways should not have water actually going through them.
A 24 inches pipe connect the storage tank with two proposed new 66 inches culverts. These two new 66 inches culverts run from the north to the south and meet with the existing two 66 inches culvert at south pacific street. These two 66 inches culverts route storm water through the site and finally collects into the POC at the South Pacific Street.
At the west and south edge of the project site, there is approximately 0.497 acres which include pervious and landscaped slope that will not flow to the basins. This section drains surface water from the north to the south and collects in an existing 18 inches storm drain pipe which ties to an existing 27 inches storm drain to the POC.
At the south side of the project site, there is BMP-C which is a modular wetland system to convey storm water from north to south. The proposed 18 inches outlet pipe of the modular wetland is connecting with the existing 18 inches RCP pipe where the headwall used to be. Storm water drains southernly to the modular wetland system and get treated, then drains into the existing 18 inches storm drain pipe to the POC.
At the southeast corner of the project site, there is a dispersion area to route surface runoff from impervious street area to the adjacent pervious area. This is to slow surface runoff and reduce discharge by infiltration and evapotranspiration.
BMP-D is the dispersion area for DMA-4. 100% of the impervious will be going to the dispersion area.
At the east part of the project site, the parcel APN 219-223-20, water is intercepted at the south easterly corner at a headwall which connects to dual 24 inches pipes. These two new 24 inches pipes goes under BMP-B and connect with the two proposed new 66 inches culverts to route storm water to the POC at the South Pacific Street.
For more information on these flows, see the Drainage Study of this project.
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/22/2021
Form I-3B Page 6 of 10, Form Date: March 15, 2016
Identify whether any of the following features, activities, and/or pollutant source areas will be present (select all that apply):
On-site storm drain inlets
Interior floor drains and elevator shaft sump pumps
Interior parking garages
Need for future indoor & structural pest control
Landscape/Outdoor Pesticide Use
Pools, spas, ponds, decorative fountains, and other water features Food service
Refuse areas
Industrial processes
Outdoor storage of equipment or materials
Vehicle and Equipment Cleaning
Vehicle/Equipment Repair and Maintenance
Fuel Dispensing Areas
Loading Docks
Fire Sprinkler Test Water
Miscellaneous Drain or Wash Water
Plazas, sidewalks, and parking lots
Description / Additional Information:
□
□
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/22/2021
Form I-3B Page 7 of 10 , Form Date: March 15, 2016
Identification and Narrative of Receiving Water and Pollutants of Concern Describe flow path of storm water from the project site discharge location(s), through urban storm conveyance systems as applicable, to receiving creeks, rivers, and lagoons as applicable, and ultimate discharge to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable):
List any 303(d) impaired water bodies within the path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable), identify the pollutant(s)/stressor(s) causing impairment, and identify any TMDLs and/or Highest Priority Pollutants from the WQIP for the impaired water bodies:
303(d) Impaired Water Body Pollutant(s)/Stressor(s)
TMDLs / WQIP Highest Priority
Pollutant
San Marcos Creek
Lake San Marcos
Batiquitos Lagoon Pathogen
Identification of Project Site Pollutants*
*Identification of project site pollutants is only required if flow-thru treatment BMPs are implemented onsite in lieu of retention or biofiltration BMPs (note the project must also participate in an alternative compliance program unless prior lawful approval to meet earlier PDP requirements is demonstrated)
Identify pollutants expected from the project site based on all proposed use(s) of the site (see BMP Design Manual Appendix B.6):
Pollutant
Not Applicable to the
Project Site
Expected from the
Project Site
Also a Receiving Water
Pollutant of Concern
Sediment
Nutrients
Heavy Metals
Organic Compounds
Trash & Debris
Oxygen Demanding
Substances
Oil & Grease
Bacteria & Viruses
Pesticides
*
*Note: Only Applies to BMP-C (Modular Wetlands Flow Through) Indicator Bacteria, Phosphorus,
Selenium
Ammonia (N), Copper, Nutrients,
Phosphorus
Nutrients
X
X
X
X
X
X
X
X
X
The flow path of storm water from the project site discharge the upper of San Marcos Creek then to the Lake San Marcos and ultimate discharge to the Pacific Ocean.
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/22/2021
Form I-3B Page 8 of 10 , Form Date: March 15, 2016
Hydromodification Management Requirements
Do hydromodification management requirements apply (see Section 1.6 of the BMP Design Manual)? Yes, hydromodification management flow control structural BMPs required. No, the project will discharge runoff directly to existing underground storm drains discharging directly to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. No, the project will discharge runoff directly to conveyance channels whose bed and bank are concrete-lined all the way from the point of discharge to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean.
No, the project will discharge runoff directly to an area identified as appropriate for an exemption by the WMAA for the watershed in which the project resides.
Description / Additional Information (to be provided if a 'No' answer has been selected above):
Critical Coarse Sediment Yield Areas*
*This Section only required if hydromodification management requirements apply Based on the maps provided within the WMAA, do potential critical coarse sediment yield areas exist within the project drainage boundaries?
Based on the maps provided within the WMAA, do potential critical coarse sediment yield areas exist within the project drainage boundaries?
Yes
No, No critical coarse sediment yield areas to be protected based on WMAA maps
If yes, have any of the optional analyses presented in Section 6.2 of the BMP Design Manual been performed?
6.2.1 Verification of Geomorphic Landscape Units (GLUs) Onsite 6.2.2 Downstream Systems Sensitivity to Coarse Sediment 6.2.3 Optional Additional Analysis of Potential Critical Coarse Sediment Yield Areas Onsite No optional analyses performed, the project will avoid critical coarse sediment yield areas identified based on WMAA maps
If optional analyses were performed, what is the final result? No critical coarse sediment yield areas to be protected based on verification of GLUs onsite Critical coarse sediment yield areas exist but additional analysis has determined that protection is not required. Documentation attached in Attachment 2.b of the SWQMP. Critical coarse sediment yield areas exist and require protection. The project will implement management measures described in Sections 6.2.4 and 6.2.5 as applicable, and the areas are identified on the SWQMP Exhibit.
Discussion / Additional Information:
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/22/2021
Form I-3B Page 9 of 10 , Form Date: March 15, 2016
Flow Control for Post -Project Runoff*
*This Section only required if hydromodification management requirements apply List and describe point(s) of compliance (POCs) for flow control for hydromodification management (see Section 6.3.1). For each POC, provide a POC identification name or number correlating to the project's HMP Exhibit and a receiving channel identification name or number correlating to the project's HMP Exhibit.
Has a geomorphic assessment been performed for the receiving channel(s)? No, the low flow threshold is 0.1Q2 (default low flow threshold) Yes, the result is the low flow threshold is 0.1Q2
Yes, the result is the low flow threshold is 0.3Q2
Yes, the result is the low flow threshold is 0.5Q2
If a geomorphic assessment has been performed, provide title, date, and preparer:
Discussion / Additional Information: (optional)
There is one POC at the southeast corner of the property. Water flows from biofiltration basins and storage tank to the street at this point.
San Marcos Creek Specific Plan, Master Water Quality and Hydromodification Management Plan, Final December 15, 2011, City of San Marcos.
See Attachment 2C for the geomorphic assessment.
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/22/2021
Form I-3B Page 10 of 10 , Form Date: March 15, 2016
Other Site Requirements and Constraints
When applicable, list other site requirements or constraints that will influence storm water management design, such as zoning requirements including setbacks and open space, or local codes governing minimum street width, sidewalk construction, allowable pavement types, and drainage requirements.
Optional Additional Information or Continuation of Previous Sections As Needed This space provided for additional information or continuation of information from previous sections as needed.
There is a section constraint at the street that makes sizing an appropriate biofiltration system work, in this case Modular Wetlands bio clean was chossen.
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/20/2021
Source Control BMP Checklist
for All Development Projects
(Standard Projects and Priority Development Projects)
Form I-4
[March 15, 2016]
Project Identification
Project Name: South Pacific
Permit Application Number:
Source Control BMPs
All development projects must implement source control BMPs SC-1 through SC-6 where applicable and feasible. See Chapter 4 and Appendix E of the Model BMP Design Manual for information to implement source control BMPs shown in this checklist.
Answer each category below pursuant to the following.
• "Yes" means the project will implement the source control BMP as described in Chapter 4 and/or Appendix E of the Model BMP Design Manual. Discussion / justification is not required. • "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion / justification must be provided.
• "N/A" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e.g., the project has no outdoor materials storage areas).
Discussion / justification may be provided.
Source Control Requirement Applied?
SC-1 Prevention of Illicit Discharges into the MS4 Yes No N/A Discussion / justification if SC-1 not implemented:
SC-2 Storm Drain Stenciling or Signage Yes No N/A Discussion / justification if SC-2 not implemented:
SC-3 Protect Outdoor Materials Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal
Yes No N/A
Discussion / justification if SC-3 not implemented:
SC-4 Protect Materials Stored in Outdoor Work Areas from Rainfall, Run-On, Runoff, and Wind Dispersal
Yes No N/A
Discussion / justification if SC-4 not implemented:
I I
I I
I I
I I
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/20/2021
Form I-4 Page 2 of 2, Form Date: March 15, 2016
Source Control Requirement Applied?
SC-5 Protect Trash Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal
Yes No N/A
Discussion / justification if SC-5 not implemented:
SC-6 Additional BMPs Based on Potential Sources of Runoff Pollutants (must answer for each source listed below)
On-site storm drain inlets
Interior floor drains and elevator shaft sump pumps
Interior parking garages
Need for future indoor & structural pest control
Landscape/Outdoor Pesticide Use
Pools, spas, decorative fountains, and other water features Food service
Refuse areas
Industrial processes
Outdoor storage of equipment or materials
Vehicle and Equipment Cleaning
Vehicle/Equipment Repair and Maintenance
Fuel Dispensing Areas
Loading Docks
Fire Sprinkler Test Water
Miscellaneous Drain or Wash Water
Plazas, sidewalks, and parking lots
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Discussion / justification if SC-6 not implemented. Clearly identify which sources of runoff pollutants are discussed. Justification must be provided for all "No" answers shown above.
✓ ✓ □
□ □
-
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/20/2021
Site Design BMP Checklist
for All Development Projects
(Standard Projects and Priority Development Projects)
Form I-5
[March 15, 2016]
Project Identification
Project Name: South Pacific
Permit Application Number
Site Design BMPs
All development projects must implement site design BMPs SD-1 through SD-8 where applicable and feasible. See Chapter 4 and Appendix E of the Model BMP Design Manual for information to implement site design BMPs shown in this checklist.
Answer each category below pursuant to the following.
• "Yes" means the project will implement the site design BMP as described in Chapter 4 and/or Appendix E of the Model BMP Design Manual. Discussion / justification is not required. • "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion / justification must be provided.
• "N/A" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e.g., the project site has no existing natural areas to conserve).
Discussion / justification may be provided.
Site Design Requirement Applied?
SD-1 Maintain Natural Drainage Pathways and Hydrologic Features Yes No N/A Discussion / justification if SD-1 not implemented:
SD-2 Conserve Natural Areas, Soils, and Vegetation Yes No N/A Discussion / justification if SD-2 not implemented:
SD-3 Minimize Impervious Area Yes No N/A
Discussion / justification if SD-3 not implemented:
SD-4 Minimize Soil Compaction Yes No N/A
Discussion / justification if SD-4 not implemented:
SD-5 Impervious Area Dispersion Yes No N/A
Discussion / justification if SD-5 not implemented:
There are no significant areas of level vegetation to implement this BMP. All impervious areas are directed to a biofiltration pond.
I I
I I
I I
I I
I I
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/20/2021
Form I-5 Page 2 of 2, Form Date: March 15, 2016
Site Design Requirement Applied?
SD-6 Runoff Collection Yes No N/A
Discussion / justification if SD-6 not implemented:
SD-7 Landscaping with Native or Drought Tolerant Species Yes No N/A Discussion / justification if SD-7 not implemented:
SD-8 Harvesting and Using Precipitation Yes No N/A Discussion / justification if SD-8 not implemented:
I I
I I
I I
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/20/2021
Summary of PDP Structural BMPs Form I-6 (PDPs)
[March 15, 2016]
Project Identification
Project Name: South Pacific
Permit Application Number:
PDP Structural BMPs
All PDPs must implement structural BMPs for storm water pollutant control (see Chapter 5 of the BMP Design Manual). Selection of PDP structural BMPs for storm water pollutant control must be based on the selection process described in Chapter 5. PDPs subject to hydromodification management requirements must also implement structural BMPs for flow control for hydromodification management (see Chapter 6 of the BMP Design Manual). Both storm water pollutant control and flow control for hydromodification management can be achieved within the same structural BMP(s).
PDP structural BMPs must be verified by the local jurisdiction at the completion of construction. This may include requiring the project owner or project owner's representative and engineer of record to certify construction of the structural BMPs (see Section 1.12 of the BMP Design Manual). PDP structural BMPs must be maintained into perpetuity, and the local jurisdiction must confirm the maintenance (see Section 7 of the BMP Design Manual).
Use this form to provide narrative description of the general strategy for structural BMP implementation at the project site in the box below. Then complete the PDP structural BMP summary information sheet (page 3 of this form) for each structural BMP within the project (copy the BMP summary information page as many times as needed to provide summary information for each individual structural BMP).
Describe the general strategy for structural BMP implementation at the site. This information must describe how the steps for selecting and designing storm water pollutant control BMPs presented in Section 5.1 of the BMP Design Manual were followed, and the results (type of BMPs selected). For projects requiring hydromodification flow control BMPs, indicate whether pollutant control and flow control BMPs are integrated or separate.
Step 1, the project was divided up and evaluated at the DMA scale. Each DMA area was classified as Self- Treating, Self-Retaining or Draining to a Best Management Practice (BMP).
Step 2, For the DMAs that drain to BMPs, the appropriate runoff factors were applied to each area and the required Design Capture Volume (DCV) of each sub area calculated. For this project, Harvest and reuse is not considered feasible.
Step 3, due to the impermeability of the underlying soils, (soil type D), infiltration BMPs are not feasible.
Step 3A&B for the no infiltration condition leads to section 5.5.3 which is the Biofiltration BMP category.
The various sizing methods included in Appendix B.5 were followed and the entire DCV can be treated within the proposed BMPs.
Step 4, each Biofiltration area is sized in accordance with the fact sheet BF- found in appendix E of the BMP design manual. This project requires hydromodification controls, so the Biofiltration units accomplish both storm water treatment and flow control mitigation in an integrated design.
(Continue on page 2 as necessary.)
2 Step 4, each Biofiltration BMP area is sized in accordance with the fact sheet BF 2 or Proprietary biofiltration with BF3 found in appendix E of the BMP design manual. This project requires hydromodification controls, so the Biofiltration units accomplish both storm water treatment and flow control mitigation in an integrated design.
I
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/20/2021
Form I -6 Page 2 of 4, Form Date: March 15, 2016
(Page reserved for continuation of description of general strategy for structural BMP implementation at the site)
(Continued from page 1)
DMA 5 and DMA 6 are self mitigating area and drain to
natural areas; therefore they not a part of sizing calculations.
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/20/2021
Form I -6 Page 3 of 4 (Copy as many as needed) Form Date: March 15, 2016 Structural BMP Summary Information
(Copy this page as needed to provide information for each individual proposed structural BMP) Structural BMP ID No.
Construction Plan Sheet No.
Type of structural BMP:
Retention by harvest and use (HU-1)
Retention by infiltration basin (INF-1)
Retention by bioretention (INF-2)
Retention by permeable pavement (INF-3)
Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1)
Biofiltration with Nutrient Sensitive Media Design (BF-2) Proprietary Biofiltration (BF-3) meeting all requirements of Appendix F Flow-thru treatment control with prior lawful approval to meet earlier PDP requirements (provide BMP type/description in discussion section below)
Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below)
Flow-thru treatment control with alternative compliance (provide BMP type/description in discussion section below)
Detention pond or vault for hydromodification management Other (describe in discussion section below)
Purpose:
Pollutant control only
Hydromodification control only
Combined pollutant control and hydromodification control Pre-treatment/forebay for another structural BMP
Other (describe in discussion section below)
Who will certify construction of this BMP?
Provide name and contact information for the
party responsible to sign BMP verification forms if
required by the [City Engineer] (See Section 1.12 of
the BMP Design Manual)
The Engineer o f Work
Robert Dentino
Excel Engineering
440 State Place
Escondido, CA 92029
Who will be the final owner of this BMP?
Project Owner
Who will maintain this BMP into perpetuity?
Project Owner
What is the funding mechanism for maintenance?
Project Owner
BMP-A
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/20/2021
Form I -6 Page 4 of 4 (Copy as many as needed) Form Date: March 15, 2016 Structural BMP Summary Information
(Copy this page as needed to provide information for each individual proposed structural BMP) Structural BMP ID No.
Construction Plan Sheet No.
Type of structural BMP:
Retention by harvest and use (HU-1)
Retention by infiltration basin (INF-1)
Retention by bioretention (INF-2)
Retention by permeable pavement (INF-3)
Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1)
Biofiltration with Nutrient Sensitive Media Design (BF-2) Proprietary Biofiltration (BF-3) meeting all requirements of Appendix F Flow-thru treatment control with prior lawful approval to meet earlier PDP requirements (provide BMP type/description in discussion section below)
Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below)
Flow-thru treatment control with alternative compliance (provide BMP type/description in discussion section below)
Detention pond or vault for hydromodification management Other (describe in discussion section below)
Purpose:
Pollutant control only
Hydromodification control only
Combined pollutant control and hydromodification control Pre-treatment/forebay for another structural BMP
Other (describe in discussion section below)
Who will certify construction of this BMP?
Provide name and contact information for the
party responsible to sign BMP verification forms if
required by the [City Engineer] (See Section 1.12 of
the BMP Design Manual)
The Engineer o f Work
Robert Dentino
Excel Engineering
440 State Place
Escondido, CA 92029
Who will be the final owner of this BMP?
Project Owner
Who will m aintain this BMP into perpetuity?
Project Owner
What is the funding mechanism for maintenance?
Project Owner
BMP-B
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/20/2021
Form I -6 Page 4 of 4 (Copy as many as needed) Form Date: March 15, 2016 Structural BMP Summary Information
(Copy this page as needed to provide information for each individual proposed structural BMP) Structural BMP ID No.
Construction Plan Sheet No.
Type of structural BMP:
Retention by harvest and use (HU-1)
Retention by infiltration basin (INF-1)
Retention by bioretention (INF-2)
Retention by permeable pavement (INF-3)
Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1)
Biofiltration with Nutrient Sensitive Media Design (BF-2) Proprietary Biofiltration (BF-3) meeting all requirements of Appendix F Flow-thru treatment control with prior lawful approval to meet earlier PDP requirements (provide BMP type/description in discussion section below)
Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below)
Flow-thru treatment control with alternative compliance (provide BMP type/description in discussion section below)
Detention pond or vault for hydromodification management Other (describe in discussion section below)
Purpose:
Pollutant control only
Hydromodification control only
Combined pollutant control and hydromodification control Pre-treatment/forebay for another structural BMP
Other (describe in discussion section below)
Who will certify construction of this BMP?
Provide name and contact information for the
party responsible to sign BMP verification forms if
required by the [City Engineer] (See Section 1.12 of
the BMP Design Manual)
The Engineer o f Work
Robert Dentino
Excel Engineering
440 State Place
Escondido, CA 92029
Who will be the final owner of this BMP?
Project Owner
Who will m aintain this BMP into perpetuity?
Project Owner
What is the funding mechanism for maintenance?
Project Owner
BMP-C (Modular Wetlands)
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/20/2021
Form I-6 Page 4 of 4 (Copy as many as needed) Form Date: March 15, 2016 Structural BMP Summary Information
(Copy this page as needed to provide information for each individual proposed structural BMP) Structural BMP ID No.
Construction Plan Sheet No.
Type of structural BMP:
Retention by harvest and use (HU-1)
Retention by infiltration basin (INF-1)
Retention by bioretention (INF-2)
Retention by permeable pavement (INF-3)
Partial retention by biofiltration with partial retention (PR-1) Biofiltration (BF-1)
Biofiltration with Nutrient Sensitive Media Design ( BF-2) Proprietary Biofiltration (BF-3) meeting all requirements of Appendix F Flow-thru treatment control with prior lawful approval to meet earlier PDP requirements (provide BMP type/description in discussion section below)
Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below)
Flow-thru treatment control with alternative compliance (provide BMP type/description in discussion section below)
Detention pond or vault for hydromodification management Other (describe in discussion section below)
Purpose:
Pollutant control only
Hydromodification control only
Combined pollutant control and hydromodification con trol Pre-treatment/forebay for another structural BMP
Other (describe in discussion section below)
Who will certify construction of this BMP?
Provide name and contact information for the
party responsible to sign BMP verification forms if
required by the [City Engineer] (See Section 1.12 of
the BMP Design Manual)
The Engineer of Work
Robert Dentino
Excel Engineering
440 State Place
Escondido, CA 92029
Who will be the final owner of this BMP?
Project Owner
Who will maintain this BMP into perpetuity?
Project Owner
What is the funding mechanism for maintenance?
Project Owner
BMP-E (Storage Pipe)
Hydromodification and Hydrology Detention
Hydromodification and Hydrology Detention
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/20/2021
ATTACHMENT 1
BACKUP FOR PDP POLLUTANT CONTROL BMPS
This is the cover sheet for Attachment 1.
Indicate which Items are Included behind this cover sheet:
Attachment
Sequence
Contents Checklist
Attachment 1a DMA Exhibit (Required)
See DMA Exhibit Checklist on the back of
this Attachment cover sheet.
Included
Attachment 1b Tabular Summary of DMAs Showing
DMA ID matching DMA Exhibit, DMA
Area, and DMA Type (Required)*
*Provide table in this Attachment OR on
DMA Exhibit in Attachment 1a
Included on DMA Exhibit in
Attachment 1a
Included as Attachment 1b,
separate from DMA Exhibit
Attachment 1c Form I -7, Harvest and Use Feasibility
Screening Checklist (Required unless the
entire project will use infiltration BMPs)
Refer to Appendix B.3-1 of the BMP
Design Manual to complete Form I-7.
Included
Not included because the entire
project will use infiltration BMPs
Attachment 1d Form I -8, Categorization of Infiltration Feasibility Condition (Required unless
the project will use harvest and use
BMPs)
Refer to Appendices C and D of the BMP
Design Manual to complete Form I-8.
Included
Not included because the entire
project will use harvest and use BMPs
Attachment 1e Pollutant Control BMP Design
Worksheets / Calculations (Required)
Refer to Appendices B and E of the BMP
Design Manual for structural pollutant
control BMP design guidelines
Included
Attachment 1A
DMA Exhibit
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/20/2021
Use this checklist to ensure the required information has been included on the DMA Exhibit:
The DMA Exhibit must identify:
Underlying hydrologic soil group
Approximate depth to groundwater
Existing natural hydrologic features (watercourses, seeps, springs, wetlands) Critical coarse sediment yield areas to be protected
Existing topography and impervious areas
Existing and proposed site drainage network and connections to drainage offsite Proposed demolition
Proposed grading
Proposed impervious features
Proposed design features and surface treatments used to minimize imperviousness Drainage management area (DMA) boundaries, DMA ID numbers, and DMA areas (square footage or acreage), and DMA type (i.e., drains to BMP, self-retaining, or self-mitigating) Potential pollutant source areas and corresponding required source controls (see Chapter 4, Appendix E.1, and Form I-3B)
Structural BMPs (identify location, type of BMP, and size/detail)
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS I
I
/1
I
I
I I
•
/ I
/ )
Cl----s 1-----s--- ' s-----s-----s-----<>
--~---~---------~-~~-- / c·:? ~ - / 'S:.otl!Jtof:1C/FIC '- '\, , ", / 'W ·, - (POE, " ~ )
'
'
-- r I
•
)
I
(
' I
' '
'\
~
1r
I
-
\
\
\
I /f //
I 1, I I
/ I ¥11 if
~- f '!) \
\
I
I
/' ) I
/) \
I ' I
I
\
I
I
I
I
I
I
\
\
'
" \
""
)
I
\ aOJ7! ACRES \
IJl,/A-6 \
I
*AREA IS /
/
SELF-NI RCA RNG
I
I / I /
f -
_.,,
-
PERMANENT WATER QUALITY
TREATMENT FACILITY
DETAIL
~
\
I
I
/
\
\
--" '\
'\
\
'\
'\
)
I
/ J I
I /
I
I
I /
I
I
I
HEIR ABO/£ lHE
PONO BASE
SIZE PER PLAN
I
I
/l I
PR0/40E DETACHABLE GRA 1EI)
CAP FOR NAIN!ENANCE ANO
llfRE NESH/fRASH RACK TO
PROTECT HEIR ANO OR/flCE
fR(}l,I Cl. OGG/NG
LECENO
WA Bot/NOARY -
WA/ER ot/ALITY EHECR/£ AREA
-'t"
-
J
I' Z' ~~'1,
'AB°"~Y, E
VA'lk I:
I; 1,
1\
1,
'flNAL S/27NG:
DISTANCE fROAI TOE
OF SLOPE TO UNER
E
7? OR/flCE
7?FORA1EI)
ROff!.INE
PER .m'L ENGINE!.
REC(JA(NENOA RONS NOT TO SCALE
v~ 120' v~ -
611 PVC PIPE PERFORATION
LAYOUT OETA/L
NOT TO SCALE
SlR//Cll/RAL BIO-BASIN S//AINARY TA8l£
Al A2 AJ B BOK RISER ORfRCES ErtFCll/£ C 0 £ OICRFlOW ONA ONA nP£ IJNP nP£ /JFIJNP AREA (INC/I} (INC/I} (INCH} (INC/I} {INCH} (INC/I} {INCH} S1RI/Cll/R£ 0/AVETEH /JIP£HA/£A8l£ NAVE NAVE (SflFI) WATEH !W/JF aEAN /JPf'ER SIZE lJNEll f (/(/Al/TY BASIN 0/IT ORlflCE AIEIJIA CRA/£l. (HSET
(INCHES} /JPf'ER LOll£R
{INCH} {INCH}
ONA-I ORA/NS ffJ IJNP-A BIOFH. lRA new 2866 !J 12 6 18 12 J 2,f)(2,f f.50 /f3' IJNP - - ONA-2 ORA/NS ffJ 9NP-8 8/0fll IRA new !J6J !J ,,, 6 18 12 .J.5 2,{)(2,f f.8125 /f3' IJNP - - ONA-J ORA/NS ffJ 'IJAIP-C t.loot/1.AR
IJNP 11£1ZANIJ - - - - - - - - - - - -
ONA--1 ORA/NS ffJ IJNP-0 0/SPERSICW 8!J-I #f,f
IJNP AREA - - - - - - - - - -
'NOlE· 81,/P-C IS NOT BEING (JS£0 FOR ROW CONlROI..
''NOlE· 81,/P-O HAS II INCHES ANENOEO SO'L -f 3 INCHES OF N(JLCH FOR TOTAL OF 14 INCHES OF JIEO/A.
HltMYl«IC OZ Qf('I.P
lHE HYlJROI.OG/CAL SO'L GROt/P FOR !HIS S/lE IS TYPE 0.
QZS'IM' !ilE fEAllJR&
• lHE APPRO)(!NA!E OEPlH TO GRot/NOWA!ER IS 4-!0 fEEl
• !HERE ARE NO NATlJRAL HYOROI.OG/C ITATlJRES ON lHE Sil£ • lHE S/lE PROPOSES TO CONNECT TO lHE E)(!SllNG P(JBL/C STO/i'l,I ORAIN SYS!EN LOCA 1EI) IN lHE Sot/lH EOGE OF lHE Sil£
• BASEO ON WA!ERSHEO NAPPING OF PO!ENRAL CR/11CAL COARSE SEOINENT YIELO AREAS (Cl:5'YA}. lHEl?E ARE NO CC:SYA LOCA!EO llflHIN lHE PROECT Bot/NOARY OR WB(JTARY TO THE R(JNOFF B~ASSEO AROt/NO lHE Sil£
Silt IJNP S//AINARY TAB!.£
£Fll'Cll/£ At.lENlJllJ
Ot.lA ONA nP£ IJNP nP£ OF IJNP AREA = NAt.1£ NAVE (Sf/Fl) 0£PlH (INCH}
ONA-/ ORA/NS ffJ IJNP-0 0/SPERSION /J-12 II 9NP AREA
WAlER OIJAL/TY BASIN INSTALLAllON NOlES:
!. J INCHES OF 1/El.L -AGtZJ, SHREOOEO HARO/fOOO N(JLCH.
2. AN (JNOERORAIN Cl.EANot/T llflH A NINIJl(JN 6-/NCH 0/ANE!ER ANO LOCKABLE CAP IS PLACEO £/,£RY 250 TO .JOOFEET AS REot/lREO BASEO ON (JNIJERORAIN LENGTH.
3. 1£GETARON (JSEO SHot/LO BE S(JITABLE FOR lHE Cl.lNA!E PER LANOSCAPE PLANS
4. RL !ER COARSE IS A NIN/N(JN OF 6 INCHES PR0/40EO IN TWO SEPARA 1E 3 INCH LA IV?S. lHE TOP LA}ER SHA!.L BE NAOE OF ASlY CJJ CHOKER SANO ANO lHE BOTTOl,I LAIV? BE OF ASlY Na 8 ACGRECAlE NARKERS STAKES SHALL BE (JS£0 TO ENS/JRE (JNIFORN LIFT lH/CKNESS.
5. AASHTO Na 57 STONE OR Cl.ASS 2 PERNEABLE PER CAL 1RANS SPEClflCARON 68-1.025 IS REC(JA(NENOElJ FOR lHE AGQl?ECA 1E STORACE LA }ER. WASHEO, OPEN-GRAOEO CRLISHEO ROCK NAY BE (JSEO, HOHEVER, A ,f. INCH AHN/N(JN WASHEO PEA GRA ill flL !ER Cot/RSE LA IV? AT lHE TOP OF THE CR(JSHEO ROCK IS REot/lREO.
6. INPERAIEABLE UNER SHALL BE INSTALLEO /#HEN lHE 8/0flL 1RA RON BASIN IS llflH/N 10 ITET OF RETAINING WALLS OR B(J/LOING Fot/NOARONS, OR AS RECOl.fNENOElJ BY lHE .%¥LS ENGINEER, OR REot/lRElJ BY THESE PLANS. IJIPERNEABLE UNER SHALL BE JO AHL lH/CI( (PER COfJNTY OF SAN 0/EGO GREEN S1l?E£1S OES/GN STANOARO ORA/lfNG GS-3.00 ANO Cot/NTY GREEN S1l?E£1S S/JPPLEMENT TO CAL 1RANS SPEClflCARONS 20-/1.088) CONRG//REO TO ENRl?El.Y ENCOl.fPASS lHE S/OES OF !HE WA 1ER ot/ALITY BASIN.
7. /JIPERl,/EABLE LINER BE CONS1R(JC1EO IN COl.fPLIANCE llflH lHE COfJNTY OF SAN 0/EGO GREEN S1REE1S Sl/PPLEJIENT TO CAL 1RANS SPECIRCARONS 20-11.088.
8. B/OflL1RARON sm NEO/A LAIV? (BSI.I) SHALL CONSIST OF 60% TO 80% BY VOl.(JJIE SANO, (Ip TO 20% BY VOl.(JNE TOPSO'L, ANO (JP 20% BY VOl.(JNE C(JA(POST (PER Cot/NTY OF SAN 0/EGO 81,/P OES/GN NAN(JAL SEP!ENBER 2020 APPENO/% F.2 SECRON 80J-2 BLENOElJ BSI.I CRl!ERIA ANO lESRNG REot/lREI.IENlS) PLACEO IN 6' LIFTS ANO C&PAC1EI) llflH WATER PRIOR TO lHE NEXT
WATER QUALITY SIGN- PLACED AT
EACH BIOFILTRATION BASIN SOURCE CONTROL
L/Fl IN/HAL PERAIEABILITY SHALL BE 8' PER Hot/R (llflH ASSLINEO STABIL/ZEO PERJIEABILITY OF 5• PER Hot/R)
J Jj
NOTE: ALL BIOFlLlRATION AREAS WILL
HAVE A SIGN POSTED TO BE
VISIBLE AT ALL TIMES.
IAIPEHAIEABL.E LINEN £OGE ANCHIR OETAIL
NOT TO SCALE
---CATCH BASIN
PER PLAN
SCH 40 PW: NALE
AOAP!ER (NilPKSoC)
SCH 40 PW: lHREAOEO
ENO CAP (FPT)
_________ J-..w.i.,--ORJLL OR/flCE HOI.E AT
I lli.--AHN. J4'), cl(_ ROHt.lNE OF ENO CAP
ld'J,'. •• \_;~: ; (SIZE PER BIO-BASIN OETAIL)
Na 57 STONE
LOH£'R ORIFICE OETAIL
NOT TO SCALE
.m'L NI% ~
LAIV?
GRAill
LAIV? !'::i
I
I
1. I
I
I
• :::::J \~;W:S~CTOR
LOI/ER OR!flCE
SIZE PER TABLE
CA,r;HIJAS/N DETAIL SEE ORlflCE OETAIL
NOT TO SCALE
OETA/L
iVO OUI.IP/NC" AT CATCH BASINS
NOlE· ALL CATCH BASINS llflH GRATES SHALL
BE SlENC/LEO llflH CITY REot/lREO llEI,/ PER
ABO/£ OETAIL (OAS NAN(JFACTlJRING /S/)0 OR
Eot/lVALENT).
SOURCE CONTROL REQUIREMENT
SC-1 PREVIENTION OF ILLICIT DISCHARGES
SC-2 STORM DRAIN STENCILING OR SIGNAGE
SC-5 PROTECT TRASH STORAGE
NODE IMPLEMENTAION
EFFECTIVE IRRIGATION WILL BE IMPLEMENTED AND
VIEHICLE WASHING IS PROHIBITED
STENCIL EVERY INLET WITH PROHIBITIVE WORDS: "NO
DUMPING! DRAINS TO WATERWAYS" AND "NO CONTAMINE"
IN SPANISH.
TRASH ENCLOSURE WILL BE PROTECTED BY LID OR BE
WALLED WITH ROOF TO AVOID STORMWATER GET
CONTAMINATED
SCALE· 1:50
9. lHE AGCRECA!E STORACE LAYE'R SHALL BE COl.fPAClEO IN ACCOROANCE llflH .%¥LS ENGINEER's RECOl.fNENOA RONS.
ta 01£RROW SlRtlCTlJRE TO HA/£ A AHN/N(JN OF 2 INCHES OF fREEBOARO.
If. ALL UNER INSTALLA 110NS, flELO JIEZO/NG OF SEANS, ANO OBSE'RVA RON OF SO'L AH% PLACEI.IENT SHALL REWIRE SPECIAL INSPECRON BY lHE PROECT CEO!ECHNICAL ENGINEER OR OTHER (){IAUREO PERStw. A LET!ER CERRFYING PROPER INSTALLARON SHALL BE PROl40EO TO lHE ENGINEER OF RECORO TO ACCEPTANCE OF lHE FAC/LIRES.
12. SPECIAL INSPECRON SHALL BE REot/lRElJ FOR CONS1R(JC110N OF ALL 8/0flL 1RA RON BASINS.
INSPEC110N SHALL BE PERFORNEO BY A ot/AL/flEO IN0/140/IAL (Sl/CH AS.· ENGINEER OF RECORO, OSO}. INSPECRON SHALL INCJ.(JOE:
• /,£/?/flCARON OF 01£RALL OINENS/ONS PRIOR TO PLACENENT OF NA!ERIALS,· • PLACEI.IENT OF lHE LINER, IF REot/lRElJ;ANO SEANS OR PENE1RA110NS • PLACEI.IENT OF lHE GRA ill, flL !ER NA lERIALS, ANO flL 1ER NEOIA; • ALL INLET ANO ot/llET SlRtlCTlJRES INCJ.(JOING (JNOERORA/NS, IF REot/lREO. • CONTRACTOR SHALL TAKE P/CllJRES AT EACH STAGE OF INSTALLARON ANO S(JBN/TlEO TO ENGINEER FOR 1£R/flCA110N OF INSTALL.
INSPECTOR SHALL BE GIIIEN A NIN/N(JN OF ,f.8 Hot/RS PRIOR TO INSPEClltw. (JPON COl.fPLERON lHE INSPECTOR SHALL PR0/40E A CERllflCARON TO lHE ENGINEER OF /#ORK. !3. PROPOSEO NA !ERIALS, S(JCH AS AGCREGA IE, fll !ER NA !ER/AL, ANO flL !ER JIEO/A SHALL BE S/JBl,I/TlEO TO lHE ENGINEER OF IHJRK FOR APPROVAL.
SOUTH PACIFIC STREET -- -- - - -0 50 100 150 200 OMA EXHIB/ T Attachment 1B
Tabular Summary of DMA's
1 85th percentile 24-hr storm depth from Figure B.1-1 d= 0.67 0.67 0.67 inches 2 Area tributary to BMP (s) A= 1.82 0.47 0.50 Acres
3 Area weighted runoff factor (estimate using Appendix B.1.1 and B.2.1) C= 0.77 0.80 0.64 unitless
4 Street trees volume reduction TCV= cubic-feet
5 Rain barrels volume reduction RCV= cubic-feet
6 Calculate DCV=
(3630 x C x d x A) - TCV -RCV DCV= 3,411.00 922.00 774.00 cubic-feet Worksheet B-2.1 Design Capture Volume
Drainage Basin ID or NameDMA-1 DMA-2 DMA-3 UNITS
85th Percentile 24-hr Storm Depth 0.67 0.67 0.68 INCHES Impervious Surfaces 66,908 17,980 14,565 SQFT
Engineered Pervious Surfaces 12,444 2,662 7,094 SQFT
Total Tributary Area 79,352 20,643 21,659 SQFT
Total Tributary Area 1.82 0.47 0.50 ACRE
Attachment 1C
Harvest and Use Feasibility
Screening Checklist
Appendix I: Forms and Checklists
I-26 February 2016
Harvest and Use Feasibility Checklist Form I-7
1. Is there a demand for harvested water (check all that apply) at the project site that is reliably present during the wet season?
Toilet and urinal flushing
Landscape irrigation
Other:______________
2. If there is a demand; estimate the anticipated average wet season demand over a period of 36 hours.
Guidance for planning level demand calculations for toilet/urinal flushing and landscape irrigation is provided in Section B.3.2.
[Provide a summary of calculations here]
3. Calculate the DCV using worksheet B-2.1.
DCV = __________ (cubic feet)
3a. Is the 36 hour demand greater
than or equal to the DCV?
Yes / No
3b. Is the 36 hour demand greater than
0.25DCV but less than the full DCV?
Yes / No
3c. Is the 36 hour demand
less than 0.25DCV?
Yes
Harvest and use appears to be
feasible. Conduct more detailed
evaluation and sizing calculations
to confirm that DCV can be used
at an adequate rate to meet
drawdown criteria.
Harvest and use may be feasible.
Conduct more detailed evaluation and
sizing calculations to determine
feasibility. Harvest and use may only be
able to be used for a portion of the site,
or (optionally) the storage may need to be
upsized to meet long term capture targets
while draining in longer than 36 hours.
Harvest and use is
considered to be infeasible.
Is harvest and use feasible based on further evaluation? Yes, refer to Appendix E to select and size harvest and use BMPs. No, select alternate BMPs.
DCV = 4333
0.25xDCV=1083.25
Flushing: (72 employees)x(9.3 gal/emp) = 669.6 gallons (669.6 gal)(1.5 days)/(7.48 gal/cu. ft.) = 134.3 cu. ft.
Irrigation: 36-hr Mod. Water per Table B.3-3 = (1,470 gal days/acre)(0.49 acres)/(7.48 gal/cu feet) = 96.3 cu ft.
Total Demand = 230.6 cu. ft.
4333
~
~
□
~ C3 i C3 CD
~
Attachment 1D
Categorization of Infiltration
Feasibility Condition
I-8
I-8
X
X
The NRCS soils across the site are all Type D soils. the site soils are consistent with the NRCS mapped soil types based on site explorations and percolation testing. According to soil report, the approximate depth to groundwater is between 4-10 feet, which should have an infiltration rate is 0.
The NRCS soils across the site are all Type D soils. the site soils are consistent with the NRCS mapped soil types based on site explorations and percolation testing. According to soil report, the approximate depth to groundwater is between 4-10 feet, which should have an infiltration rate is 0.
Worksheet : Categorization of Imtltration Feasibility Condition 111 lfil ■ llln1 ■ -.••••11 l~•t1lln.•n-n11uun 11
...
Part 1 - Full Infiltration Feasibility Screening Criteria Would infiltration of the full design volume be feasible from a physical perspective without any undesirable consequences that cannot be reasonably mitigated?
Criteria Screening Question
1 Is the estimated reliable infiltration rate below proposed facility locations greater than 0.5 inches per hour? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2 and Appendix D.
Provide basis:
Yes No
Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/ data source applicability. 2 Can infiltration greater than 0.5 inches per hour be allowed without increasing risk of geotechnical hazards (slope stability, groundwater mounding, utilities, or other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2.
Provide basis:
Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability.
C-11
I-8
I-8
X
X
The NRCS soils across the site are all Type D soils. the site soils are consistent with the NRCS mapped soil types based on site explorations and percolation testing. According to soil report, the approximate depth to groundwater is between 4-10 feet, which should have an infiltration rate is 0.
The NRCS soils across the site are all Type D soils. the site soils are consistent with the NRCS mapped soil types based on site explorations and percolation testing. According to soil report, the approximate depth to groundwater is between 4-10 feet, which should have an infiltration rate is 0. - - -'-l.fljTiil""l~i
Criteria Screening Question
3 Can infiltration greater than 0.5 inches per hour be allowed without increasing risk of groundwater contamination (shallow water table, storm water pollutants or other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3.
Provide basis:
Yes No
Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/ data source applicability. 4 Can infiltration greater than 0.5 inches per hour be allowed without causing potential water balance issues such as change of seasonality of ephemeral streams or increased discharge of contaminated groundwater to surface waters? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3.
Provide basis:
Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/ data source applicability.
Part 1
If all answers to rows 1 - 4 are "Yes" a full infiltration design is potentially feasible. The feasibility screening category is Full Infiltration
Result* If any answer from row 1-4 is "No", infiltration may be possible to some extent but would not generally be feasible or desirable to achieve a "full infiltration" design .
Proceed to Part 2
*To be completed using gathered site information and best professional judgment considering the definition of MEP in the MS4 Permit . Additional testing and/ or studies may be required by City Engineer to substantiate findings.
C-12
I-8
X
Duetositesoilsnotpercolatingandthesignificantamountofclayeysoils,itisunlikelythatany appreciablevolumeofwaterwillinfiltrate.
X
The NRCS soils across the site are all Type D soils. the site soils are consistent with the NRCS mapped soil types based on site explorations and percolation testing. According to soil report, the approximate depth to groundwater is between 4-10 feet, which should have an infiltration rate is 0. - - -'-l.fljTiil""l~i ~ I ' ....
Part 2 - Partial Infiltration vs. No Infiltration Feasibility Screening Criteria Would infiltration of water in any appreciable amount be physically feasible without any negative consequences that cannot be reasonably mitigated?
Criteria Screening Question
5 Do soil and geologic conditions allow for infiltration in any appreciable rate or volume? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2 and AppendixD .
Provide basis:
Yes No
Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/ data source applicability and why it was not feasible to mitigate low infiltration rates .
6 Can Infiltration in any appreciable quantity be allowed without increasing risk of geotechnical hazards (slope stability, groundwater mounding, utilities, or other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2.
Provide basis:
Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/ data source applicability and why it was not feasible to mitigate low infiltration rates.
C-13
I-8
No
Inf.
X
X
The NRCS soils across the site are all Type D soils. the site soils are consistent with the NRCS mapped soil types based on site explorations and percolation testing. According to soil report, the approximate depth to groundwater is between 4-10 feet, which should have an infiltration rate is 0.
The NRCS soils across the site are all Type D soils. the site soils are consistent with the NRCS mapped soil types based on site explorations and percolation testing. According to soil report, the approximate depth to groundwater is between 4-10 feet, which should have an infiltration rate is 0. - - -'-l.fljTiil""l~i
Criteria Screening Question
7 Can Infiltration in any appreciable quantity be allowed without posing significant risk for groundwater related concerns (shallow water table, storm water pollutants or other factors)? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3.
Provide basis:
Yes No
Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/ data source applicability and why it was not feasible to mitigate low infiltration rates.
8 Can infiltration be allowed without violating downstream water rights? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3.
Provide basis:
Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/ data source applicability and why it was not feasible to mitigate low infiltration rates.
If all answers from row 1-4 are yes then partial infiltration design is potentially feasible.
Part 2 The feasibility screening category is Partial Infiltration.
Result* If any answer from row 5-8 is no, then infiltration of any volume is considered to be infeasible within the drainage area. The feasibility screening category is No Infiltration. *To be completed using gathered site information and best professional judgment considering the definition of MEP in the MS4 Permit . Additional testing and/ or studies may be required by City Engineer to substantiate findings C-14
Attachment 1E
Pollutant Control BMP Design
Worksheets & Calculations
0 1 DCV Start with 0 if no Carry over from Another
DMA DCV 0 cubic-feet
2 DCV retained DCV retained 0 cubic-feet
3 DCV biofiltered DCV biofiltered 0 cubic-feet
4 DCV requiring flow-thru
(Line 1 — Line 2 —0.67*Line 3) DCV flow-thru 0 cubic-feet 5 Adjustment factor (Line 4 / Line 1) AF= 1 unitless
6 Design rainfall intensity i= 0.2 in/hr
7 Area tributary to BMP (s) A= 1.5369 acres
8 Area-weighted runoff factor (estimate using
Appendix B.2) C= 0.800 unitless
9 Calculate Flow Rate = AF x (C x I x A)*1.5 Q= 0.37 cfs Worksheet B-6.1Flow-thru Design Flows
BMP-C Sizing for MWS
L-8-12-5'6"-C
Category # Description i ii iii Units
1 Drainage Basin ID or Name BMP-A BMP-B BMP-D unitless
2 85th Percentile 24-hr Storm Depth 0.67 0.67 0.67 inches 3 Impervious Surfaces Not Directed to Dispersion Area (C=0.90) 66,908 17,980 sq-ft 4 Semi-Pervious Surfaces Not Serving as Dispersion Area (C=0.30) sq-ft 5 Engineered Pervious Surfaces Not Serving as Dispersion Area (C=0.10) 12,444 2,662 sq-ft 6 Natural Type A Soil Not Serving as Dispersion Area (C=0.10) sq-ft 7 Natural Type B Soil Not Serving as Dispersion Area (C=0.14) sq-ft 8 Natural Type C Soil Not Serving as Dispersion Area (C=0.23) sq-ft 9 Natural Type D Soil Not Serving as Dispersion Area (C=0.30) sq-ft 10 Does Tributary Incorporate Dispersion, Tree Wells, and/or Rain Barrels? No No Yes yes/no 11 Impervious Surfaces Directed to Dispersion Area per SD-B (Ci=0.90) 6,575 sq-ft 12 Semi-Pervious Surfaces Serving as Dispersion Area per SD-B (Ci=0.30) sq-ft 13 Engineered Pervious Surfaces Serving as Dispersion Area per SD-B (Ci=0.10) 4,773 sq-ft 14 Natural Type A Soil Serving as Dispersion Area per SD-B (Ci=0.10) sq-ft 15 Natural Type B Soil Serving as Dispersion Area per SD-B (Ci=0.14) sq-ft 16 Natural Type C Soil Serving as Dispersion Area per SD-B (Ci=0.23) sq-ft 17 Natural Type D Soil Serving as Dispersion Area per SD-B (Ci=0.30) sq-ft 18 Number of Tree Wells Proposed per SD-A #
19 Average Mature Tree Canopy Diameter ft
20 Number of Rain Barrels Proposed per SD-E #
21 Average Rain Barrel Size gal
22 Total Tributary Area 79,352 20,642 11,348 sq-ft
23 Initial Runoff Factor for Standard Drainage Areas 0.77 0.80 0.00 unitless 24 Initial Runoff Factor for Dispersed & Dispersion Areas 0.00 0.00 0.56 unitless 25 Initial Weighted Runoff Factor 0.77 0.80 0.56 unitless 26 Initial Design Capture Volume 3,411 922 355 cubic-feet 27 Total Impervious Area Dispersed to Pervious Surface 0 0 6,575 sq-ft 28 Total Pervious Dispersion Area 0 0 4,773 sq-ft
29 Ratio of Dispersed Impervious Area to Pervious Dispersion Area n/a n/a 1.40 ratio 30 Adjustment Factor for Dispersed & Dispersion Areas 1.00 1.00 0.00 ratio 31 Runoff Factor After Dispersion Techniques 0.77 0.80 0.00 unitless 32 Design Capture Volume After Dispersion Techniques 3,411 922 0 cubic-feet 33 Total Tree Well Volume Reduction 0 0 0 cubic-feet
34 Total Rain Barrel Volume Reduction 0 0 0 cubic-feet
35 Final Adjusted Runoff Factor 0.77 0.80 0.00 unitless 36 Final Effective Tributary Area 61,101 16,514 0 sq-ft 37 Initial Design Capture Volume Retained by Site Design Elements 0 0 355 cubic-feet 38 Final Design Capture Volume Tributary to BMP 3,411 922 0 cubic-feet False
False
Automated Worksheet B.1: Calculation of Design Capture Volume (V2.0) Dispersion
Area, Tree Well
& Rain Barrel
Inputs
(Optional)
Standard
Drainage Basin
Inputs
Results
Tree & Barrel
Adjustments
Initial Runoff
Factor
Calculation
Dispersion
Area
Adjustments
No Warning Messages
Category # Description i ii Units
1 Drainage Basin ID or Name BMP-A BMP-B sq-ft
2 Design Infiltration Rate Recommended 0.000 0.000 in/hr 3 Design Capture Volume Tributary to BMP 3,411 922 cubic-feet 4 Is BMP Vegetated or Unvegetated? Vegetated Vegetated unitless 5 Is BMP Impermeably Lined or Unlined? Lined Lined unitless 6 Does BMP Have an Underdrain? Underdrain Underdrain unitless 7 Does BMP Utilize Standard or Specialized Media? Standard Standard unitless 8 Provided Surface Area 1,920 759 sq-ft
9 Provided Surface Ponding Depth 6 6 inches
10 Provided Soil Media Thickness 18 18 inches
11 Provided Gravel Thickness (Total Thickness) 15 15 inches 12 Underdrain Offset 3 3 inches
13 Diameter of Underdrain or Hydromod Orifice (Select Smallest) 0.50 0.50 inches 14 Specialized Soil Media Filtration Rate in/hr
15 Specialized Soil Media Pore Space for Retention unitless 16 Specialized Soil Media Pore Space for Biofiltration unitless 17 Specialized Gravel Media Pore Space unitless
18 Volume Infiltrated Over 6 Hour Storm 0 0 cubic-feet
19 Ponding Pore Space Available for Retention 0.00 0.00 unitless 20 Soil Media Pore Space Available for Retention 0.05 0.05 unitless 21 Gravel Pore Space Available for Retention (Above Underdrain) 0.00 0.00 unitless 22 Gravel Pore Space Available for Retention (Below Underdrain) 0.40 0.40 unitless 23 Effective Retention Depth 2.10 2.10 inches
24 Fraction of DCV Retained (Independent of Drawdown Time) 0.10 0.14 ratio 25 Calculated Retention Storage Drawdown Time 120 120 hours 26 Efficacy of Retention Processes 0.12 0.16 ratio
27 Volume Retained by BMP (Considering Drawdown Time) 412 148 cubic-feet 28 Design Capture Volume Remaining for Biofiltration 2,999 774 cubic-feet 29 Max Hydromod Flow Rate through Underdrain 0.0113 0.0113 cfs 30 Max Soil Filtration Rate Allowed by Underdrain Orifice 0.25 0.64 in/hr 31 Soil Media Filtration Rate per Specifications 5.00 5.00 in/hr 32 Soil Media Filtration Rate to be used for Sizing 0.25 0.64 in/hr 33 Depth Biofiltered Over 6 Hour Storm 1.53 3.87 inches 34 Ponding Pore Space Available for Biofiltration 1.00 1.00 unitless 35 Soil Media Pore Space Available for Biofiltration 0.20 0.20 unitless 36 Gravel Pore Space Available for Biofiltration (Above Underdrain) 0.40 0.40 unitless 37 Effective Depth of Biofiltration Storage 14.40 14.40 inches 38 Drawdown Time for Surface Ponding 24 9 hours
39 Drawdown Time for Effective Biofiltration Depth 56 22 hours 40 Total Depth Biofiltered 15.93 18.27 inches
41 Option 1 - Biofilter 1.50 DCV: Target Volume 4,498 1,160 cubic-feet 42 Option 1 - Provided Biofiltration Volume 2,549 1,156 cubic-feet 43 Option 2 - Store 0.75 DCV: Target Volume 2,249 580 cubic-feet 44 Option 2 - Provided Storage Volume 2,249 580 cubic-feet 45 Portion of Biofiltration Performance Standard Satisfied 1.00 1.00 ratio 46 Do Site Design Elements and BMPs Satisfy Annual Retention Requirements? Yes Yes yes/no 47 Overall Portion of Performance Standard Satisfied (BMP Efficacy Factor) 1.00 1.00 ratio 48 Deficit of Effectively Treated Stormwater
0 0 cubic-feet
Retention
Calculations
Automated Worksheet B.3: BMP Performance (V2.0)
False
False
BMP Inputs
Biofiltration
Calculations
False
False
False
False
Result
False
False
No Warning Messages
CURB OPENING
CURB OPENING
STANDARD DETAIL
STORMWATER BIOFILTRATION SYSTEM
MWS-L-8-16-5'-6"-C
SITE SPECIFIC DATA
INTERNAL BYPASS DISCLOSURE:
PLAN VIEW
ELEVATION VIEW
RIGHT END VIEW
LEFT END VIEW
GENERAL NOTES
INSTALLATION NOTES
PROJECT NUMBER 15339
PROJECT NAME SOUTH PACIFIC STREET
PROJECT LOCATION SAN MARCOS, CA
STRUCTURE ID BMP-C
TREATMENT REQUIRED
VOLUME BASED {CF) FLOW BASED {CFS)
N/A 0.3695
TREATMENT HGL AVAILABLE (FT) N/K
PEAK BYPASS REQUIRED {CFS) - IF APPLICABLE 7.0
PIPE DATA I.£ MATERIAL DIAMETER d
INLET PIPE 1 N/A N/A N/A
INLET PIPE 2 N/A N/A N/A
d
OUTLET PIPE 521.37 RCP 18" <I
PRETREATMENT BIOFILTRA TION DISCHARGE
RIM ELEVATION 526.95 526.95 526.95
SURFACE LOAD H-20 DIRECT N/A H-20 DIRECT
FRAME & COVER 2EA ¢30" OPEN PLANTER ¢30"
WETLANDMEDIA VOLUME (CY) 11.15
ORIFICE SIZE {DIA. INCHES) ¢2.90"
NOTES: PRELIMINARY NOT FOR CONSTRUCTION. ENGINEER TO CONFIRM ELEVATIONS AND PEAK FLOW RAT£ ALL MANHOLE CASTINGS TO BE ADA COMPLIANT.
1. CONTRACTOR TO PROVIDE ALL LABOR, EQUIPMENT, MATERIALS AND
INCIDENTALS REQUIRED TO OFFLOAD AND INSTALL THE SYSTEM AND
APPURTENANCES IN ACCORDANCE WITH THIS DRAWING AND THE
MANUFACTURERS' SPECIFICATIONS, UNLESS OTHERWISE STATED IN MANUFACTURER'S CONTRACT.
2. UNIT MUST BE INSTALLED ON LEVEL BAS£ MANUFACTURER
RECOMMENDS A MINIMUM 6" LEVEL ROCK BASE UNLESS SPECIFIED BY THE PROJECT ENGINEER. CONTRACTOR IS RESPONSIBLE FOR VERIFYING PROJECT ENGINEER's RECOMMENDED BASE SPECIFICATIONS.
<I
4 <I :
• <I·
,i
PEAK HGL
-
/ifo;ALL
--71/£RS
C/L
VERTICAL
UNDERDRAJN
MANIFOLD
d
.a
'A1
<I d
_ll
526.95
RIM/FG
~ ~~~~~~~ h!l --------- -i----W--~
. <!
4. CONTRACTOR TO SUPPLY AND INSTALL ALL EXTERNAL CONNECTING PIPES. ALL PIPES MUST BE FLUSH WITH INSIDE SURFACE OF
CONCRETE (PIPES CANNOT INTRUDE BEYOND FLUSH). INVERT OF OUTFLOW PIPE MUST BE FLUSH WITH DISCHARGE CHAMBER FLOOR.
ALL PIPES SHALL BE SEALED WATERTIGHT PER MANUFACTURER'S STANDARD CONNECTION DETAIL.
5. CONTRACTOR RESPONSIBLE FOR INSTALLATION OF ALL PIPES, RISERS, MANHOLES, AND HATCHES. CONTRACTOR TO USE GROUT AND/OR
BRICKS TO MATCH COVERS WITH FINISHED SURFACE UNLESS SPECIFIED
OTHERWISE
6"~ .------------~;:=g:----------. r-6·
6. VEGETATION SUPPLIED AND INSTALLED BY OTHERS. ALL UNITS WITH
VEGETATION MUST HAVE DRIP OR SPRAY IRRIGATION SUPPLIED AND INSTALLED BY OTHERS.
7. CONTRACTOR RESPONSIBLE FOR CONTACTING BIO CLEAN FOR
ACTIVATION OF UNIT. MANUFACTURER'S WARRANTY IS VOID WITHOUT
PROPER ACTIVATION BY A BIO CLEAN REPRESENTATIVE
1. MANUFACTURER TO PROVIDE ALL MATERIALS UNLESS OTHERWISE NOTED.
2. ALL DIMENSIONS, ELEVATIONS, SPECIFICATIONS AND CAPACITIES ARE SUBJECT TO CHANG£ FOR PROJECT SPECIFIC DRAWINGS DETAILING EXACT DIMENSIONS, WEIGHTS AND ACCESSORIES PLEASE CONTACT BIO CLEAN.
THE DESIGN AND CAPACITY OF THE PEAK CONVEYANCE METHOD TO BE REVIEWED AND APPROVED BY THE ENGINEER OF RECORD. HGL(S) AT PEAK FLOW SHALL BE ASSESSED TO ENSURE NO UPSTREAM FLOODING. PEAK HGL AND BYPASS CAPACITY SHOWN ON DRAWING ARE USED FOR GUIDANCE ONLY.
~' " 0 D U 1., ,A R
~ETLAND5 THE INFORIIATION CONTAINED IN THIS OOCUl,fENT IS THE SOLE PROPERTY OF FORTERRA ANO ITS COMPANIES. THIS OOCUMENT.
7l: ::::0:/,/fJ; =-~~ ~,:_:: o,, NOR ANY PAlff THEREOF, A44Y BE USED, REPRODUCED OR l,f(){)(flED PROPRIETARY AND CONFIDENTIAL:
Bio~ Clean
7.67"11': =14- 1EA1ED F1J/IE1(//( PA1ENIS OR IN ANY A44NNER WITH OUT THE WRITTEN CONSENT OF FORTERRA. 0/HER PA1ENIS - AFortemCom
TREATMENT FLOW (CFS) 0.3695
OPERATING HEAD {FT) 2.7
PRETREATMENT LOADING RATE {GPM/SF) 1.6
WETLAND MEDIA LOADING RATE (GPM/SF) 1.0
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/20/2021
ATTACHMENT 2
BACKUP FOR PDP HYDROMODIFICATION CONTROL MEASURES
This is the cover sheet for Attachment 2.
Mark this box if this attachment is empty because the project is exempt from PDP hydromodification management requirements.
Indicate which Items are Included behind this cover sheet:
Attachment
Sequence
Contents Checklist
Attachment 2a Hydromodification Management Exhibit
(Required)
Included
See Hydromodification Management
Exhibit Checklist on the back of this
Attachment cover sheet.
Attachment 2b Management of Critical Coarse Sediment
Yield Areas (WMAA Exhibit is required,
additional analyses are optional)
See Section 6.2 of the BMP Design
Manual.
Exhibit showing project drainage
boundaries marked on WMAA
Critical Coarse Sediment Yield Area
Map (Required)
Optional analyses for Critical Coarse
Sediment Yield Area Determination
6.2.1 Verification of Geomorphic
Landscape Units Onsite
6.2.2 Downstream Systems
Sensitivity to Coarse Sediment
6.2.3 Optional Additional Analysis
of Potential Critical Coarse
Sediment Yield Areas Onsite
Attachment 2c Geomorphic Assessment of Receiving
Channels (Optional)
See Section 6.3.4 of the BMP Design
Manual.
Not performed
Included
Submitted as separate stand-alone
document
Attachment 2d Flow Control Facility Design, including
Structural BMP Drawdown Calculations
and Overflow Design Summary
(Required)
See Chapter 6 and Appendix G of the
BMP Design Manual
Included
Submitted as separate stand-alone
document
Attachment 2e Vector Control Plan (Required when
structural BMPs will not drain in 96
hours)
Included
Not required because BMPs will
drain in less than 96 hours
Attachment 2A:
Hydromodification Management Exhibit
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 7/20/2021
Use this checklist to ensure the required information has been included on the Hydromodification Management Exhibit:
The Hydromodification Management Exhibit must identify:
Underlying hydrologic soil group
Approximate depth to groundwater
Existing natural hydrologic features (watercourses, seeps, springs, wetlands) Critical coarse sediment yield areas to be protected
Existing topography
Existing and proposed site drainage network and connections to drainage offsite Proposed grading
Proposed impervious features
Proposed design features and surface treatments used to minimize imperviousness Point(s) of Compliance (POC) for Hydromodification Management Existing and proposed drainage boundary and drainage area to each POC (when necessary, create separate exhibits for pre-development and post-project conditions) Structural BMPs for hydromodification management (identify location, type of BMP, and size/detail)
NO CURB OPTIONNOTES:
ti)
ti)
ti)
ti)
I /-f
- r
I / I
I / / / / I I /
f .'--( - -
•
/ -
/
/
/
/
I
I
I I
( \
, : I , 1'
.../
DISTANCE FROAI TOE
OF SlOPE TO UNER
£
/
/
,r--
----
/
,
'
' ...__ J
-l~
I
,
L
I
I
-
NOT TO SCALE
Smt/Cll/llAL BI0-8A51N Sl/1,fl,/ARY TABLE
Al A2 AJ
/JJ,/A 91,ff' EHEClllE' (INCH) (INCH) (INCH) /JJ,/A TIP£ TIP£ OF 91,ff' AREA NAME NAN£ (stn) WAllR TOP OF ClEAN Q/JALITY 8A51N OUT
1)1,fA-f IJRAINS TO 91,ff'-A 8IOf1L TRA llON 2865 g 12 8 91,ff' /JJ,/A-2 IJRAINS TO 91,ff'-8 8IOf1L TRA new 96.J g f,I 8 91,ff' /JJ,/A-J IJRAINS TO 'IJJ,/P-C AIOlJl/lAR
91,ff' IIE!ZANO - - - -
/JJ,/A--1 IJRAINS TO 91,ff'-0 0/SPEHS/CW 89-1 91,ff' AREA - - - 'NOTE· Bl,IP-C IS NOT BE/NC VSEO FOR FZOW CONlROL
"NOTE· Bl,IP-0 HAS 11 INCHES Al,IENOEO SOh'. + J INCHES OF AIVLCH FOR TOTAL OF N INCHES AIEOIA.
8 (INCH) C
(INCH) /Jl'P£R IIEIJIA {Y?Jf7C£
- 1/J
- 18
- -
- . .,,,
80% RISER
0 E OICRR.OW
(INCH) (INCH) Smt/ClT.IRE
GRAlfl. OffSET SIZE
{INCHES)
12 J 2-1)(24
12 J.5 2-1)(2,1
- - -
- - -
.
' • . - • . . . ..,--. • ' .
_,///
. /
Q I
\. I
I •
\ "" \ \
•
• pi,r;
CJSIJBORAIN CJ
• •
• • • • ,
•
• •
,_...,,,TCH BASIN
PER PLAN
SCH ,f(} Pl1: NALE
AOAP!ER (Vi!PKSoC)
'CH ,f(} Pl1: lHREAOEO
ENO CAP (FPT)
=====~==eel t--"c OR/LL OR/RC£ HO/.£ AT
11 AIIN. j "fjrJ( FlO/lllNE OF ENO CAP
~ :J,,j;_ 1 - r:::::, : (SIZE PER BIO-BASIN DETAIL)
\_AASHTO
Na 57 STONE
LOH£"R OR/RC£ OETAIL
NOT TO SCALE
WA!ER Ot/AUTY BASIN SOIL NO!ES
I. BIOF/L !RA 170N SQIL 1,1£lJIA LA !'E'R (BSA/) SHALL CONSIST OF 60% TO 80% BY VOi.VAi£ SANO, VP TO 20% BY JIOl.(11,1£ TOPSQIL, ANO VP 20% BY VOi.VA/£ COAIPOST (PER CO/.INTY OF SAN 0/ECO BAIP OESICN AIANVAL SEPlEVBER 2020 APPENOIX F.2 SEC110N 80J-2 BLENOEO BSN CR/lERIA ANO 7ES11NC REOIJIREIIENTS) Pl.ACED IN 6" LIFTS ANO C(Jl,IPAC1EO HflH WA!ER PRIOR TO lHE NEXT LIFT. IN/11AL PERAIEABILITY SHALL BE 8" PER HOI.IR (HflH ASSVVEO SlABIUZEO PERAIEABILITY OF 5• PER HOI.IR)
OR/flC£S
PERMANENT WATER QUALITY
TREATMENT FACILITY
0/MIEllR Mlf'flrl,f£A8t£
/Jl'P£R LOIIER
(INCH) (INCH)
- 1.50
- l.8125
- -
- -
l/NEI??
/f'S
/f'S
-
-
KU:F \'.; cu~ VIA lk W/'.YS ::_~.•J-1
1,IAll'ITAJN '0,'ITH CARE ·~:) ',IODIFIC.ATO'l5 1'.'-f-C,- A.GE~.C" A~PRCl\l,\L DETAIL
WATER QUALITY SIGN- PLACED AT
EACH BIOFILTRATION BASIN
NOTE: ALL BIOFILTRATION AREAS WILL
HAVE A SIGN POSTED TO BE
VISIBLE AT ALL TIMES.
-v~ /20" •~
6" PVC PIPE PERFORATION
LAYOVT IJETA/L
NOT TO SCALE
OETAIL
iVO IJVAIP/NC" AT CATCH BASINS
NO!F: ALL CATCH BASINS HflH CRA!ES SHALL
BE SlENCILEO HflH CITY REOIJIREO /lD,I PER
ABOYE OET,4/L (OAS AIANVFAClVR/NC ;/500 OR
£(,){I/VALENT)
'>
I
I
IAIPERJJEABLE l/NEB ElJ6'E ANCHOR OETAIL
NOT TO SCALE
mtJRaot;re ,&I IRQfJP
lHE HYOROI.OC/CAL SQIL CROIJP FOR lHIS SllE IS T'tP£ 0. £Wl,WG SIIE fFAllJliES:
• lHE APPRO)(IAIA!F OEPlH TO CROI.INOWA!ER IS 4-10
/Hl
• lHERE ARE NO NAlVRAL HYOROI.OC/C fEAlVRES ON lHE
SITE
• lHE Sl!F PROPOSES TO CONNECT TO lHE £)(1S11NC
PLIBL/C STORA/ DRAIN S/'SlD,I LOCA1EO IN lHE SOLllH
EOCE OF lHE SITE
• BASED ON WA!ERSHEO l,IAPP/NC OF P07EN11AL CR/11CAL
COARSE SElJIAIENT YIELO AREAS (XSYA) lHERE ARE NO
XSYA LOCA1EO HflHIN lHE PR(),/£CT BOLINOARY OR
lR/BLllARY TO lHE RLINOfF BW'ASSEO AROI.INO lHE SITE
B
f" TO BE HEIR SlRVClVR.
SHEET, 1/2' 7H, roc OR
18' OOHN
SlREAAI PIPE
./
A
• ~
'fl!E HOPE
"OIi/ al/ENT
1/8• lHICK L BRACKET -
(4- L -BRACKETS TOTAL)
12" INLET PIPE
B i - -
-- - \
5JtJ. 89 RIAi
CA TCHBASIN SIZE
48~'x48"
••
HEIR S r' WE TO BE Hl!FC HOPE
SHEET, 1/." lH/CK, OR EOIJIVALIENT
45.96"
48'%48" A '--12"/NL ETPIPE
'--SlAINLESS S!FEL BO!. T
PIPE OVT PER &LE --,,---12" INLET PIPE
CATCHBASIN Fl PER PLANS:._.-1-=,-i.....-....:,,2"-~::'-'"'---""'--' (4 BO!. TS PER L -BRACKET)
528.17 TC
96"
ltER CIJVIHa. SlRI/Cll/R£ HJ
PLAN JfEW
NOT TO SCALE
---6" '· C
HllECHOPE
EOIJIVALIENT
HOl.£5 (2 TOTAL)
~6-+--~ 1111 I f/8"
1--- ' rj _1 THICK
L-,--'--'--.---i;=:..,.._--'-'--~ L-BRACKET
ltER CIJVIHa. SlRI/Cll/R£ HJ
S£ClltW A-A ZIN 0/A
NOT TO SCALE
a·
0£TA/l.
TRAVEL LANE 24"t..tlN 6'" '--,'."--'-"'-'-==-==-+Y----VARIES----l-='-'-"=----, MIN
CUTOFF WALL AT
END OF PAVEMENT] PER SORSD Cr-22
S1REET FLOW
• r, ,;
MATERIAL AND
COMPACTION PER
PROJ::CT PLANS AND
SPECIFICATIONS
AMENDED SOIL
6" SCARIFIED SOIL
30 MIL
PLASTIC
LINER
1. REFER TO GS-2.00 FOR ALL DETAILS NOT SHOWN HERE.
2. CURB CUT WIDTH PER DESIGN PLANS.
MATERIAL
AND COMPACTION
PER PROJECT
PLANS AND
SPECIFICATIONS
THICKENED
SIDEWALK W/
EDGE TREATMENT
3" SHREDDED HARDWOOD
MULCH OR ROCK LA YER
PER DESIGN PLANS
45.96"
S£ClltW B-B
NOT TO SCALE
HEIR B
C
:9.96"
6 ,, ORIF!i C
6 IIER awm NOJE:
lHE PLIRPOSE OF lHIS
21Jl~j SlRVCll/RE IS FOR A00/110NAL
f------~~..,. HYIJROl,IOOIFICA110N fl.OW
/tER CIJVIHa. SlRI/Cll/R£ IJ CONlROI. SEPARA 7E FROAI TYPICAL IIA/N /tER BIOF/L !RA 110N FZOW AIOOEUNC
NOT TO SCALE
SCALE· !:30
-- -- - - -0 30 60 90 /20
SOUTH PACIFIC STREET
HYOROMOOIFICA 1/0N
MANAGEMENT EXHIBIT
Attachment 2B:
Management of Critical Coarse Sediment Yield Areas
City of San Marcos PDP SWQMP Template Date: March 15, 2016 PDP SWQMP Preparation Date: 2/24/2022
No Potential Critical Coarse Sediment Yield areas nearby that will influence the project.
Potential Critical Coarse Sediment
Proposed Project
Proposed Project
Attachment 2C:
Geomorphic Assessment of Receiving Channels
CITY OF SAN MARCOS
FINAL December 15, 2011
San Marcos Creek Specific Plan
Master Water Quality and Hydromodification
Management Plan
FINAL San Marcos Creek Specific Plan
Master Water Quality and Hydromodification
Management Plan
i
Final December 15, 2011
TABLE OF CONTENTS
Page
STORMWATER PROGRAM MANAGER APPROVAL OF MASTER WQTR ............. i-ii
OBJECTIVES OF MASTER WATER QUALITY AND HYDROMODIFICATION MANAGEMENT PLAN (MASTER WQ/HMP MANAGEMENT PLAN .......................... iii
1.0 PROJECT DESCRIPT ION & PHASING............................................................ 1-1
1.1 San Marcos Creek Specific Plan ............................................................ 1-1 Figure: San Marcos Creek Project Vicinity .......................................... F1-1
1.2 Alternative Assessment For Order R9 2007-0001 Compliance .............. 1-3
1.3 Project Planning ..................................................................................... 1-3 Figure: San Marcos Creek Project Vicinity Future Land Use ................ F1-2 Figure: San Marcos Creek Projec t Vicinity Land Use (2009 SANDAG Designatio ns ......................................................................................... F1-3 Figure: San Marcos Creek Impr ovements Alternative 7 ...................... F1-4
2.0 EXISTING CO NDITIONS .................................................................................. 2-1
2.1 Watershed .............................................................................................. 2-1
2.2 303(d) Listings for San Marc os Creek/Lake San Marcos ....................... 2-1 Table 2-1 2010 303(d) Listings for San Marcos Creek/ Lake San Marcos 2-1
Table 2-2 Basin Plan Inland Surfac e Waters Beneficial Uses For San Marcos Creek/Lak e San Marcos ............................................................ 2-2 Figure: San Marcos Creek Specific Plan HAS Map .............................. F2-1 Figure: Lake San Marcos Area ........................................................................ F2-2
2.3 Existing Treatment Controls In Specific Plan Area ................................. 2-5 Figure: San Marcos Creek Vicinity Existing MS4 System/Water Quality ~~
~
'
~
'
FINAL San Marcos Creek Specific Plan
Master Water Quality and Hydromodification
Management Plan
ii
Final December 15, 2011
BMP's Marc os ...................................................................................... F2-3 Table 2-3 Estimated Existing Land Use Pollutant Concentrations .......... 2-7
2.4 SWAMP Assessments in San Marcos Creek ......................................... 2-8 Table 2-4 Summary of SWAMP 2002/2007 Physical Habitat
Assessment for San Marcos Creek in Specific Plan Area ........................................ 2-8
2.5 Existing Water Quality in Specific Plan Area .......................................... 2-9 Figure: San Marcos Creek Monitoring Stations .................................... F2-4
3.0 WATER QUALITY / HYDROM ODIFICATION COMPLIANCE
REQUIREMENTS ............................................................................................. 3-1
3.1 Drainage Managem ent Areas ................................................................. 3-1 Figure 3-1 DMA Areas ............................................................................ 3-2
3.2 Hydromodificati on Assessment .............................................................. 3-3
3.3 Hydromodification Criteria Used For Specific Plan Analysis ................... 3-4
3.4 San Marcos Creek Channel Susceptability Analysis .............................. 3-6
3.5 Summary of Chang and Consulta nts June 2011 HMP/Water Quality Analysis .................................................................................................. 3-6 Figure 3-2 Proposed IBI and DMA Locatoi ns ......................................... 3-7
3.6 Hydromodification Facility Sizing ............................................................ 3-8 Table 3-1 Bioretention Basin Si zing to Treat Public Areas ..................... 3-9 Table 3-2 Bioretention Basin Sizing to Treat All Areas (100% of Public and 100% of Pr ivate) ............................................................................ 3-10
3.7 Conclusion ............................................................................................ 3-11
4.0 WATER QUALITY POLLUTANT RE MOVAL EFFECTIVENESS .................... 4-12
4.1 Study Fi ndings ...................................................................................... 4-12 Table 4-1 Bioretention Polluta nt Removal Effectiveness ...................... 4-12 Table 4-2 Comparison Between Existing and Proposed Pollutant Concentrations-With Treatment (B ioretention) for Entire Study Area ...................................................................................................... 4-13 ~~
~
'
~
'
FINAL San Marcos Creek Specific Plan
Master Water Quality and Hydromodification
Management Plan
iii
Final December 15, 2011
Table 4-3 Percent Difference Between Existing and Pr oposed Pollutant Concentrations- With Treatment (Bioretention) by Drainage Management Ar ea ................................................................................ 4-14 Table 4-4 Comparison Between Ex isting, Proposed with Treatment, and Literature Pollutant Concentra tions For Entire Study Area ............ 4-15 Table 4-5 Comparison Between Ex isting, Proposed with Treatment, and Literature Pollutant Concentrations by Drainage Management Area ...................................................................................................... 4-16
4.2 Larry Walker and Associat es Independent Validation .......................... 4-16
4.3 Las Posas/San Marcos Creek Restoration Expected Water Quality Benefits ................................................................................................ 4-17
4.4 Recommended Fiel d Validation ............................................................ 4-17
4.5 Conclusions
.......................................................................................... 4-18
5.0 PRIVATE DEVELOPMEN T REQUIREMENTS ................................................. 5-1
5.1 Model Block Development ...................................................................... 5-1
5.2 Basic Guidelines For Model Bloc k Private Development For Permit Compli ance ............................................................................................ 5-1
5.3 Temporary Water Quality Impac ts (Construction/Biological) .................. 5-3
APPENDICES
A. Preliminary Water Q uality Treatment Analysis
B. Water Quality/HMP Analysis
C. Water Quality/HMP Calculation Summary
D. Water Quality Uptake of Restoration Projects
E. Existing Water Quality Baseline Data
~~
~
'
~
'
Administration
1 Civic Center Drive
San Marcos, CA 92069-2918
December 15, 2011
Mike Porter
San Diego Regional Water Quality Control Board
917 4 Sky Park Court, Suite 100
San Diego, CA. 92123-4340
Tel: 760.744.1050
Fax: 760.744.9520
Web: www.San-Marcos.net
Re: WQTR 401 Permit Condition for City of San Marcos - San Marcos Creek Specific Plan - City of San Marcos Stormwater Program Manager Letter Confirmation of Final Master Water Quality and Hydromodification Management Plan (Final Master WQTR Dated December 15, 2011) Meets Local SUSMP Requirements
Dear Mr. Porter:
This letter serves to confirm to the San Diego Regional Water Quality Control Board in the determination that the subject project will comply with certain 401 Certification conditions requiring priority development projects to confirm that their project design meets local SUSMP requirements.
The adopted San Marcos Creek Specific Plan and the Final Master WQTR dated December 15, 2011 are framework plans for guiding development in a 135-acre specific plan area. A Final Master Water Quality and Hydromodification Management Plan (Master WQTR) has been completed to guide development and ensure that hydromodification (HMP) effects and Water Quality Requirements can be met under Order R9 2007-0001 at a master plan level and project specific level.
The Final Master WQTR has provided a technical assessment of permit compliance for meeting water quality and HMP requirements for 100 percent of the public facilities and a minimum percentage of private development in shared bioretention facilities in the Promenade. Private development will be required to implement LID and other water quality/HMP facilities for any remainder treatment required onsite.
In addition, the Final Master WQTR includes recommendations for monitoring the efficacy of the BMP effectiveness as part of a 401 permit conditions as requested.
The City is attaching the Final Master Water Quality Technical Report (WQTR) to this letter. By way of my signature below and my signature on each individual development project Water Quality Improvement Plans (WQIPs) in the Specific Plan Area, I certify that the both the attached Final Master WQTR and each individual development project in the Specific Plan Area meets the following Local SUSMP Requirements of the City of San Marcos and that the measures being taken are protective of water quality:
• 85th percentile capture of the 24 hour storm;
• LID Requirements;
• Site Design Requirements;
• Source Control Requirements; and
• Hydromodification Requirements
Any revisions made hereafter will continue to comply with the local SUSMP requirements and will not result in any decreases in water quality treatment or capacity. This Final Master WQTR is signed by way of this letter by the City of San Marcos Stormwater Program Manager and provided to the San Diego Water Board to fulfill the condition of the 401 Certification for this project.
Erica Ryan
Stormwater Program Manager
City of San Marcos
FINAL San Marcos Creek Specific Plan
Master Water Quality and Hydromodification
Management Plan
vi
Final December 15, 2011
Objectives of Master Water Qu ality and Hydromodification Management Plan (Master WQ/HMP Management Plan)
This Master WQ/HMP Management Plan for t he San Marcos Creek Specific Plan is intended to:
1. Provide a master management plan fo r water quality and hydromodification facilities within the specific plan development area;
2. Meet the Municipal Sto rmwater Permit Requirements for development in the San Diego Regional Wate r Quality Control Boar d (SDRWQCB) Order R9 2007-0001 (Permit) for water quality and hydromodification (HMP) development requirements as of January 14, 2011;
3. Implement shared and managed water qua lity and HMP facilities for each of the eight designated drainage management areas (DMAs);
4. Identify the required surface storage bioretention capacity in each of the eight DMA WQ/HMP facilities to adequately treat urban runoff and retain and release the natural rainfall rate for all public facilities and a designated portion of private development;
5. Identify a framework to be implemented and submitted annually with the 401 permit Mitigation and Monitoring Reporting Program (MMRP) to:
a. Ensure achievement of antici pated pollutant removal rates by treatment controls to implement a net reduction of current urban runoff load to water bodies downstream (S an Marcos Creek, Lake San Marcos, Batiquitos Lagoon, and the Pacific Ocean);
b. Ensure HMP capacity is adequate for each DMA;
c. Ensure improving IBI/BMI scores over time; and
d. Ensure water quality improvement over time in San Marcos Creek. e. Coordinate with required annual biological MMRP reporting requirements.
f. Provide baseline framework for 401 certification compliance.
6. Identify a consistent application of water quality treat ment design, review and construction implementation for private development projects; In addition to ensuring consistency in t he application of WQ/H MP within a private development project located in the San Marcos Creek Specific Plan area, the Master WQ/HMP Management Plan also ensures that the Specific Plan area functions within ongoing watershed planning so that eac h project takes into consideration its ~~
~
'
~
'
FINAL San Marcos Creek Specific Plan
Master Water Quality and Hydromodification
Management Plan
vii
Final December 15, 2011
role within the Specific Plan area as well as within the SAN MARCOS Creek watershed.
~~
~
'
~
'
FINAL San Marcos Creek Specific Plan
Master Water Quality and Hydromodification
Management Plan
1-1
Final December 15, 2011
1.0 PROJECT DESCRIPTION AND PHASING
1.1 SAN MARCOS CREEK SPECIFIC PLAN
Figure 1-1 shows the project location in the City of San Marcos. The San Marcos Creek adopted Specific Plan represents an effort to create a managed planning framework for future growth and redev elopment of the approximately 214-acre area along San Marcos Creek in central San Marcos between Discovery Street and SR 78. Approximately 124 acres are proposed for development.
The overall goals of the Specific Plan are to:
1. Create a smart growth downtown area which is currently absent in San Marcos; and
2. Restore San Marcos Creek/Las Posas Creek in the Specific Plan Area.
The Specific Plan provides a comprehensive vision for a creekside district along with goals, policies and development standards to guide future public and private actions relating to the area’s development and conservation of open space and natural resources. The Spec ific Plan also serves as the mechanism for insuring that future development wi ll be coordinated and occur in an order ly and well- planned manner. The vision for the Specif ic Plan area is a generally more urbanized feel.
The proposed land-use is a sm art growth based mixed-use commercial core and “downtown” for San Marcos. The proposed Specific Plan land-uses will balance retail and entertainment uses with a mix of residential, office, and service uses to neighborhoods with both active and passi ve elements. The proposed land-use within the Specific Plan consists of the following:
Streets: 42.6 acres
Mixed-Use: 75.6 acres
Improved Parks: 17.3 acres
Subtotal Development Area: 135.54 acres
Natural Open-Space:78.5 acres
Total Area: 214.00 acres
~~
~
'
~
'
FINAL San Marcos Creek Specific Plan
Master Water Quality and Hydromodification
Management Plan
1-2
Final December 15, 2011
Figure 1-1 Vicinity Map
~~
~
'
~
'
San Marcos Creek
Project Vicinity
~ San Marcos Creek
0 Lakes
D San Marcos Creek Specific Plan Arc.i
• - - Discovery Street ROW 1, ___ ~ (lnduded in mnster WQTR analysis) D San Marcos City Limits
Source of Data: SanGIS, 07/10 and City of
San Marcos, 2/11
Created By: City of San Marcos GIS
Every effort has been made to assure the accuracy of
the maps and data provided: however, some information
may not be accurate or current The City of San Marcos
assumes no responsibility arising from use of this
Information and incorporates by rererence its disclaimer regarding the lack of any warranties, 'Nhether expressed or implied, concerning the use of the same. For
additional information see the Disclaimer on the City's website.
FINAL San Marcos Creek Specific Plan
Master Water Quality and Hydromodification
Management Plan
1-3
Final December 15, 2011
1.2 ALTERNATIVE ASSESSMENT FOR ORDER R9 2007-0001 COMPLIANCE
The proposed project used as the basis fo r the assessment and development of the Master WQ/HMP Management Plan is the City’s preferred Alternative 7 to be consistent with the Army Corps of Engi neers 404(b) analysis and the selected LEDPA for the project. Alternative 7 was evaluated for compliance with the January 14, 2011 Order R9 2007-0001 requirements.
Figure 1-2 shows the current Alternative 7 concept plan developed by WRT in September 2011. Figure 1 was used as t he basis by Mikhail Ogawa Engineering (MOE) and Wayne Chang Consul tants for the Water Qua lity and HMP Order R9 2007-0001 compliance assessments
Other alternatives developed by the City, including Alternatives 1-6, 8, 8a, and 9, were also assessed for Order R9 2007- 0001 water quality and hydromodification compliance. All other alternatives we re found to be permi t compliant or the development footprints were adjusted to accommodate required bioretention acreages for water quality and hydromodification.
1.3 P
ROJECT PHASING
The project will be constructed in two primary phases: