Appendix N
Fire Protection Plan

Fire Protection Plan
PPacificc Projectt
FEBRUARYY 20233
Prepared for:

CITYY OFF SANN MARCOSS
1 Civic Center Drive
San Marcos, California 92069
Contact: Joseph Farace
Prepared by:
605 Third Street
Encinitas, California 92024
Contact: Brian Grover
Michael Huff
Principal Fire Protection Planner

Printed on 30% post-consumer recycled material.

PACIFIC FIRE PROTECTION PLAN
13170 iFEBRUARY 2023
Table of Contents
SSECTIONN PAGEE NO..

Executive Summary ...........................................................................................................................................................1 1 Introduction .................................................................................................................. ........................................2

1.1 Project Summary ............................................................................................................. .......................2

1.1.1 Location.................................................................................................................. ...................2

1.1.2 Current On-site and Surrounding Land Use ............................................................................3

1.1.3 Project Description ....................................................................................................... ............3 2 Project Site Risk Analysis.................................................................................................... .............................. 11

2.1 Environmental Setting and Field Assessment .................................................................................. .1 1

2.2 Site Characteristics and Fire Environment ................................................................................... ..... 11

2.2.1 Topography................................................................................................................ ............. 11

2.2.2 Climate ................................................................................................................... ................ 12

2.2.3 Vegetation (Fuels)........................................................................................................ .......... 12

2.2.4 Fire History .............................................................................................................. ............... 17

2.2.5 Post-Development Conditions............................................................................................... 18

2.3 Project Area Fire Risk Assessment........................................................................................... .......... 18 3 Emergency Response and Service................................................................................................ ................... 20

3.1 Emergency Response.......................................................................................................... ................ 20

3.2 Emergency Service Level ..................................................................................................... ............... 21

3.2.1 Cumulative Impacts on Fire Response................................................................................. 28 4 Buildings and Infrastructure.................................................................................................. ........................... 30

4.1 Access ...................................................................................................................... ............................ 30

4.1.1 Primary and Emergency Access............................................................................................ 30

4.1.2 Gates ..................................................................................................................... ................. 30

4.1.3 Maximum Dead-End Road Length ........................................................................................ 31

4.1.4 Road Width and Circulation ................................................................................................ .. 31

4.1.5 Surface ................................................................................................................... ................ 31

4.1.6 Vertical Clearance........................................................................................................ .......... 32

4.1.7 Premise Identification.................................................................................................... ........ 32

4.2 Ignition Resistant Construction and Fire Protection Systems .......................................................... 32

4.3 Fire Protection Systems ..................................................................................................... ................. 32

4.3.1 Water ..................................................................................................................... ................. 32

4.3.2 Fire Hydrants............................................................................................................. ............. 33

4.3.3 Mid-Rise Building Requirements .......................................................................................... 42

4.4 Ongoing Building and Infrastructure Maintenance ........................................................................... 45

PACIFIC FIRE PROTECTION PLAN
13170 iiFEBRUARY 2023

4.5 Pre-Construction Requirements ............................................................................................... .......... 45

4.6 Defensible Space and Vegetation Management............................................................................... 45

4.6.1 Fuel Modification Zones ................................................................................................... ..... 45

4.6.2 Habitat Area Maintenance .................................................................................................. .. 46 5 Conclusion.................................................................................................................... ..................................... 48 6 List of Preparers............................................................................................................. ................................... 50 7 References .................................................................................................................... .................................... 52

AAPPENDICESS
AP h o t o g r a p h L o g
B Fire History
C SMFD Approved Dead End Road Lengths
D SMFD Undesirable Species Plant List

FIGURESS
Figure 1 Project Location....................................................................................................... ...............................5 Figure 2 Fire Hazard Severity Zone.............................................................................................. ........................7 Figure 3 Conceptual Site Plan.................................................................................................... ..........................9 Figure 4 Vegetation Communities................................................................................................. .................... 13 Figure 5 Response Time – San Marcos Fire Station 2 ................................................................................. ... 22 Figure 6 Response Time – San Marcos Fire Station 1 ................................................................................ .... 24 Figure 7 Response Time – Vista Fire Station 4..................................................................................... ........... 26 Figures 8A 150-foot Hosepull Exhibit – South Development......................................................................... ..... 34 Figures 8B 150-foot Hosepull Exhibit – North Development ......................................................................... ..... 36 Figures 8C 150-foot Hosepull Exhibit – North Development ......................................................................... ..... 38 Figures 8D 150-foot Hosepull Exhibit – North Development .......................................................................... .... 40

TABLESS
Table 1 Project Vegetation Communities and Land Cover Types .................................................................. 15 Table 2 San Marcos Fire Department Responding Stations Summary......................................................... 20

PACIFIC FIRE PROTECTION PLAN
13170 iiiFEBRUARY 2023

INTENTIONALLY LEFT BLANK

PACIFIC FIRE PROTECTION PLAN
13170 ivFEBRUARY 2023
Acronyms and Abbreviations
AAcronym/Abbreviation DDefinitionn
AMSL Above Mean Sea Level
APN Assessor’s Parcel Number
BTU British Thermal Unit
CAL FIRE California Department of Forestry and Fire Protection CBC California Building Code
CC&Rs Covenants, Conditions and Restrictions
CFC California Fire Code
FAHJ Fire Authority Having Jurisdiction
FMZ Fuel Modification Zone
FPP Fire Protection Plan
FRAP Fire and Resource Assessment Program
GIS Geographic Information Systems
HOA Homeowner’s Association
ISO Insurance Service Office
MPH miles per hour
NFPA National Fire Protection Association
Project Pacific Project
SMFD San Marcos Fire Department
SRA State Responsibility Area
USGS United States Geological Survey
VWD Vallecitos Water District
VFD Vista Fire Department
VHFHSZ Very High Fire Hazard Severity Zone
WRCC Western Regional Climate Center
WUI Wildland Urban Interface

PACIFIC FIRE PROTECTION PLAN
13170 vFEBRUARY 2023

INTENTIONALLY LEFT BLANK

PACIFIC FIRE PROTECTION PLAN
13170 1FEBRUARY 2023
Executive Summary
The Pacific Project proposes the development of 449 resid ential units, including a mix of apartments, rowhomes, villas, and affordable flats on approximately 15.09 acres of the 33.2-acre project site. The proposed residential units would include a mix of apartments with a five-story podium building, three-story rowhomes, three-story villas, and affordable flats within a four-story building. The project includes a total of 927 parking spaces and 134,985 square feet of common open space area. 68 of the 449 total units (15% of the total) would be designated as deed- restricted affordable units. The approximately 33.2-acre Project site is an infill site located in the western portion of the City of San Marcos (City), at the northwest corner of S. Las Posas Road and Linda Vista Drive, comprised of Assessor’s Parcel Numbers (APNs) 219-222-01, 219-222-02, 219-222-03, and 219-222-04. La Mirada Road abuts the site’s northern boundary, while South Pacific Street abuts the property’s western boundary. The Project complies with Fire Code standards for private road widths and requests acceptance by SMFD for several dead-end streets that exceed 150 feet without a turnaround.

The Project site is located directly across from the Grand Plaza shopping center on S. Las Posas Road. Light industrial uses are adjacent to the Project site’s northern, southern, and western boundary, and Bradley Park is located across from the Project site’s southwestern corner. Single- and multi-family residential uses are located to the west and south of Bradley Park. The Project site is relatively flat, ranging in elevation from approximately 527 feet above mean sea level (amsl) in the southeast portion of the project area to 551 feet in the northwest corner of the Project site. The Project is located in an area that is highly urbanized.

The Pacific Project property lies within an area considered a Non-High Hazard Severity Zone, as designated by the City of San Marcos and the California Department of Forestry and Fire Protection (CAL FIRE). Fire hazard designations are based on topography, vegetation, and weather, amongst other factors. The Project site is within a developed City landscape, surrounded by urban land uses on all sides. The Project site is not considered by Dudek to meet the definitions of wildland given its urban location. Further, the site currently, and post-project, would not represent a significant wildfire hazard based on the flat terrain, fuel types, including low growing vegetation and vernal pools, which by definition, preclude the growth of heavier fuel types that could, over time, present a wildfire threat.

The Project site is within the jurisdiction of the San Marcos Fire Department (SMFD). The SMFD operates two fire stations that could respond to an incident on the Projec t site, including Station Nos. 1 and 2, with additional response from Vista Fire Department (VFD) Station 4, if necessary. Total response time to the Project site is expected to be less than 7 minutes from Station No. 2, given its location less than 5.0 miles from the Project site.

SMFD Station No. 1 & VFD Station 4 will respond to an incident on the Project site only if necessary. Therefore, emergencies within the Project site would conform to SMFD’s emergency response standard for first units (average maximum initial response of no more than 8 minutes for fire apparatus and 9 minutes for ambulance, 90% of calls).

In addition, automatic/mutual aid agreements are in place with all surrounding communities and have been recently improved through the implementation of a computer-aided dispatch system.

PACIFIC FIRE PROTECTION PLAN
13170 2FEBRUARY 2023
1 Introduction
This Fire Protection Plan (FPP) has been prepared for the Pacific Project in San Marcos, California. The purpose of this plan is to generate and memorialize the fire safety requirements of the Fire Authority Having Jurisdiction (FAHJ), namely the San Marcos Fire Department (SMFD). Requir ements are based on site-specific characteristics and incorporate input from the Project’s developer/applicant, Project planners, engineers, and architects, as well as SMFD.

As part of the assessment, the plan has considered the property location and its topography, surrounding urban land uses, climatic conditions, fire history, and the proposed land use. The plan addresses water supply, access (including secondary/emergency access where applicable), st ructural ignitability and ignition resistive building features, fire protection systems and equipment, and impacts to existing emergency services. The FPP recommends measures that developers/builders will take to reduce the probability of structural ignition throughout the Project.

The following tasks were performed as part of the analysis conducted for this plan:
• Gather site-specific climate, terrain, and fuel data; • Collect site photographs;
• Process and analyze the data using the latest GIS technology; • Analyze and guide the design of proposed infrastructure; • Analyze the existing emergency response capabilities; • Assess the risk associated with the Project and the Project site; and • Prepare FPP report documenting the site’s fire safety.

Field observations were utilized to augment existing digital site data in formulating the recommendations presented in this FPP. Refer to Appendix A for site photographs of existing site conditions.

This FPP is consistent with the City of San Marcos Municipal Code (Chapter 17.64- Fire Code). Further, the FPP is consistent with the California Code of Regulations Titles 14 and 24, the 2019 California Fire Code (CFC), and 2019 California Building Code (Chapter 7A).

1.1 Project Summary

1.1.1 Location
The approximately 33.2-acre Project site is an infill site located in the western portion of the City of San Marcos (City), at the northwest corner of S. Las Posas Road and Linda Vista Drive, comprised of Assessor’s Parcel Numbers (APNs) 219-222-01, 219-222-02, 219-222-03, and 219-222-04. La Mirada Road abuts the Project site’s northern boundary, while Pacific Street abuts the property’s western boundary. The Grand Plaza shopping center is located directly across S. Las Posas Road. Light industrial uses are adjacent to the Project site’s northern, southern, and western boundary, and Bradley Park is located across from the site’s southwestern corner. Single- and multi-family residential uses are located to the west and south of Bradley Park. The Project location is depicted in Figure 1, Project Vicinity.

PACIFIC FIRE PROTECTION PLAN
13170 3FEBRUARY 2023
The entirety of the Pacific property lies within the local re sponsibility area (LRA) as a Non-Very High Fire Hazard Severity Zone (Non-VHFHSZ) by CAL FIRE (Figure 2, Fire Hazard Severity Zone Map).

1.1.2 Current On-site and Surrounding Land Use
The Project site is located in an urban setting and is considered an infill site. The Project site is currently vacant and has no existing impervious areas. The Project site surface conditions generally consist of rolling unimproved earthen terrain, with native grasses and vegetation. The Project site is immediately bordered by S. Las Posas Road to the east, Linda Vista Drive to the south, La Mirada Road along the northern boundary and Pacific Street abuts the property’s western boundary.

Surrounding land uses include industrial uses to the no rth, south, and west, and commercial uses to the east, specifically the Grand Plaza shopping center is locate d directly across S. Las Posas Road. The 24-acre Bradley Park is located across from the Project site’s southwes tern corner. Residential uses are located to the south and west of Bradley Park. Surrounding land uses outside of the immediately adjacent industrial and commercial land uses include designated parks, single and multi-family residential, and schools/educational facilities. The closest freeway is State Route 78 located approximately 0.44 mile north of the Project site.

1.1.3 Project Description
The approximately 33.2-acre project site is an infill site located in the western portion of the City of San Marcos, at the northwest corner of S. Las Posas Road and Linda Vista Drive, comprised of Assessor’s Parcel Numbers (APNs) 219-222-01, 219-222-02, 219-222-03, and 219-222-04. La Mirada Drive abuts the site’s northern boundary, while South Pacific Street abuts the property’s western boundary. The Grand Plaza shopping center is located directly across S. Las Posas Road. Light industrial uses are adjacent to the site’s northern, southern, and western boundary, and Bradley Park is located across from the site’s southwestern corner. Single- and multi- family residential uses are located to the west and south of Bradley Park.

Per Figure 3, the Project would allow for the development of 449 residential units, including a mix of apartments, rowhomes, villas, and affordable flats on approximately 15.09 acres of the 33.2-acres project site. Proposed residential units would include a mix of apartments within a five-story podium building, three- story rowhomes, three-story villas, and affordable flats within a four-story building. The number of units proposed per housing type is outlined in the table below:

HHousingg Type NNumberr off Units
Rowhomes 101
Villas 108
Apartments 172
Affordable Flats 68
TTotal 4449
68 of the 449 total units (15 percent of the total) would be designated as deed-restricted affordable units. The Project would also include a total of 927 parking spaces and 134,985 square feet of common open space area. The Project also proposes landscaping, bio-rete ntion areas and circulation improvements. The remaining

PACIFIC FIRE PROTECTION PLAN
13170 4FEBRUARY 2023
approximately 17.94 acres of the 33.2-acre Project site would be preserved and restored open space and habitat area. The Project would have a density of approximately 13.5 dwelling units per acre (DU/AC), including the proposed open space and habitat area.

The project proposes a General Plan Amendment, Rezone, Specific Plan, Tentative Map, and Multi-Family Site Development Plan. The General Plan Amendment and Re zone would change the General Plan designation and Zoning from Industrial (I) to Specific Plan Area (SPA). The Specific Plan has been prepared with the intent to provide a comprehensive plan to ensure the efficient development of a new residential community. The Specific Plan serves as both a policy document and a regulatory document for the systematic implementation of the policies and goals of the General Plan. The Tent ative Map presents specific lot configurations for the site. The Multi-Family Site Development Plan will configure the site for multi family dwelling units, street configuration, infrastructure, recreational open space, and private open space.

As part of the project, additional pedestrian connectivity would be provided along three of the adjacent street frontages. The project would provide a 6-foot sidewalk and Class II buffered bike lane along the project’s frontage on Pacific Street; the project would provide a 12-foot urban trail (shared use path) along the project’s frontage on Linda Vista Drive; and the project would also provide a 12-foot urban trail (shared use path) along the project’s frontage on La Mirada Drive. In additi on to the proposed sidewalk and trail connections, the project would add a bus stop and shelter with a bus turnout along South Las Posas Road a djacent to the development area and would install a 4-way traffic signal at the intersection of Linda Vista Drive and Pacific Street. Furthermore, the project would upsize approximately 1,458-feet of existing water pipe from 8-inches to 12-inches and would convert approximately 1,400-feet of existing overhead power lines to underground along La Mirada.
78 RICHMARAVE
DESC

ANSO AVE
ALTURA
DR
CRAVEN
RD

BUSINESS PARKDR

LAKERIDGEDR

ACACIADR
POINS

WHITESANDSDR

LA SOMBRA DR

W SAN MARCOS BLVD

ECHO LN
W

MISSION
RD

SANT ABARBARADR

SMILAX RD

LAFLORA
DR

SANMARINO
DR

OLEANDER AVE

SSANTAFEAVE

NLASPOSASRD

VIA PORTOLA

KNOLL R
D

PALOMARCOSAVE

TESOROAVE

VIA LAVENTA
MCMAH
RR D

DISCOVERY S
T

NAVAJO ST

MIMOSAAVE

GLENDALEAVE

RUSH DR

SRANCHOSANTAFERD
01ST ST
QUAIL
HILLDR

AVENIDAAGUILA

GRANDON AV
E

SPECIALTYDR

PAWNEE ST

SANPABLODR

SP A C I F I CS T

PRIVATERD

LAS FLORES D
R
W
BORDEN
RD
POPPY
RD

VIEWPOINTDR
SHENAN

DOAHAVE
LA TIE
RRA D
R
LAN
OCHEDR
CAPAL
INA RD

CAMINODELSOL

BINGHAM DR

NP A C I F I CS T
APPLE

WILDEDR

HILLHAVENDR

GRAND AVE

HOLLENCREST RD
KIRKW
ALLDR

VIOLETAVE
BLUES
AGE DR

AUTUMN DR
CORT
ELOREN

HONEYSUCKLEDR

CASITALN

AVENIDAAZUL

WINDRIDGECIR
SST

VIA VERA
CRUZ

ARBORVIEW
DR
CREE
KS T

LA MIRADA DR
LINDA VISTA DR09TH
ST
ALLEY

HAPPY HILL LN

HELMSDALERD
JOYCT

LOSVALLECITOSBLVD

SCOTTST

LA COLUSA DR

COMETCIR

CURRY COM BDR

SB E N TA V E

WESTLAKEDR

DECISION
ST
ARMO

RLITE DR

TOYONTER

TILLEY LN

PRIVATERD

TI G ER WAY
VIRGI
NIA PL

LACASITADR

ACTIVITYDR

SEQUOIAS
T

LOMAALTADR

DELEONERD
FIRELN

PRIVATE
RD

PRIVATE
RD
Project Location
Fire Protection Plan for Pacific Project
SOURCE: SANGIS 2020
Date: 12/7/2021 - Last saved by: lterry - Path: Z:\Projects\j1317001\MAPDOC\DOCUMENT\FPP\Fig 1_ProjectLocation.mxd 02 , 0 0 0 1,000
Feet
Project Boundary
FIGURE 1
Chula Vista
Solana Beach
Encinitas
San Diego
Carlsbad
Oceanside
La Mesa
Santee
Poway
San Marcos
Escondido
Vista
Imperial
Beach
Del Mar
Coronado
Riverside
County
Mexico
905
209
75 52
94 241
9854
73 125
274
195
56 86
111
67 74
74 76 79
78 805
215
15 5
8 Project Site

PACIFIC FIRE PROTECTION PLAN
13170 6FEBRUARY 2023

INTENTIONALLY LEFT BLANK

SAN MARCOS
S.D. COUNTY
VISTA

CARLSBAD
S.D. COUNTY
78 Fire Hazard Severity Zone
Fire Protection Plan for Pacific Project
SOURCE: CAL FIRE 2009
Date: 11/22/2022 - Last saved by: lterry - Path: Z:\Projects\j1317001\MAPDOC\DOCUMENT\FPP\Fig 2 FHSZ.mxd 03 , 0 0 0 1,500
Feet
Project Boundary
City Limits
Local Responsibility Area
Fire Hazard Severity Zone
Very High
FIGURE 2

PACIFIC FIRE PROTECTION PLAN
13170 8FEBRUARY 2023

INTENTIONALLY LEFT BLANK

PACIFIC FIRE PROTECTION PLAN
13170 11FEBRUARY 2023
2 Project Site Risk Analysis

2.1 Environmental Setting and Field Assessment
Dudek conducted a Project site evaluation on November 9, 2021, in order to confirm/acquire site information, document existing site conditions, and determine potential actions for addressing the protection of the Project’s structures. While on-site, Dudek’s Fire Planners assessed the area’s topography, natural vegetation, and fuel loading, surrounding land use, and general susceptibility to wildfire. Among the field tasks that were completed included:
• Topography evaluation
• Vegetation/fuel assessments
• Existing infrastructure evaluations
• Photograph documentation of the existing condition
• Off-site, adjacent property fuel and topography conditions • Surrounding land use confirmations
• Estimation of vegetation ignition fire behavior
•I n g r e s s / e g r e s s d o c u m e n t a t i o n • Nearby Fire Station reconnaissance.

2.2 Site Characteristics and Fire Environment
Fire environments are dynamic systems and include many types of environmental factors and site characteristics.

Fires can occur in any environment where conditions are conducive to ignition and fire movement. Areas of naturally vegetated open space are typically comprised of conditio ns that may be favorable to wildfire spread. The three major components of the fire environment are topography, vegetation (fuels), and climate. The state of each of these components and their interactions with each other determines the potential characteristics and behavior of a fire at any given moment. It is important to note that wi ldland fire may transition to urban fire if structures are receptive to ignition. Structure ignition depends on a variety of factors and can be prevented through a layered system of protective features including fire-resistive landscapes directly adjacent to the structure(s), application of known ignition resistive materials and methods, and suitable infrastructure for firefighting purposes. Understanding the existing wildland vegetation and urban fuel conditions on and adjacent to the Project site is necessary to understand the potential for fire within and around the Pacific Project. The Project site is not within a fire hazard severity zone and the site’s vegetation is a low-growing grass that will be mowed annually by the Project and enforced by the SMFD. Therefore, the vegetation ignition and wildfire threat is anticipated to be minimal.

2.2.1 Topography
The Project site is relatively flat, ranging in elevation from approximately 527 feet above mean sea level (amsl) in the southeast portion of the project area to 551 feet in the northwest corner of the Project site.

PACIFIC FIRE PROTECTION PLAN
13170 12FEBRUARY 2023

2.2.2 Climate
North San Diego County and the Project area are influenced by the Pacific Ocean and are frequently under the influence of a seasonal, migratory subtropical high-pressure cell known as the “Pacific High.” Wet winters and dry summers with mild seasonal changes characterize the Southern California climate. This climate pattern is occasionally interrupted by extreme periods of hot weather, winter storms, or dry, easterly Santa Ana winds. The average high temperature for the Project area is approximately 76°F, with daily highs in the summer and early fall months (June–September) exceeding 88°F. Precipitation typically occurs between December and March with an average rainfall of 16.22 inches (Western Regional Climate Center 2022).

The prevailing wind pattern is from the west (on-shore), but the presence of the Pacific Ocean causes a diurnal wind pattern known as the land/sea breeze system. During the day, winds are from the west–southwest (sea), and at night winds are from the northeast (land), averaging 2 miles per hour (mph). During the summer season, the diurnal winds may average slightly higher (approximately 16 mph) than the winds during the winter season due to greater pressure gradient forces. Surface winds can also be influenced locally by topography and slope variations. The highest wind velocities are associated with downslope, canyon, and Santa Ana winds.

Typically the highest fire danger is produced by the high-pressure systems that occur in the Great Basin, which result in the Santa Ana winds of Southern California. Sustained wind speeds recorded during recent major fires in San Diego County exceeded 30 mph and may exceed 50 mph during extreme conditions. The Santa Ana wind conditions are a reversal of the prevailing southwesterly winds that usually occur on a region-wide basis during late summer and early fall. Santa Ana winds are warm winds that flow from the higher desert elevations in the north through the mountain passes and canyons. As they converge through the canyons, their velocities increase.

Consequently, peak velocities are highest at the mouths of canyons and dissipate as they spread across valley floors. Santa Ana winds generally coincide with the regional drought period and the period of highest fire danger.

The Pacific Project site is affected by strong winds, such as Santa Ana winds.

2.2.3 Vegetation (Fuels)
Seven vegetation communities or habitat types occur within the Project site and within the biological study area:
vernal pools, Diegan coastal sage scrub (including disturbed and baccharis-dominated), native grassland, non- native grassland, disturbed habitat, and developed. The acreage of each on-site vegetation community or land cover type is provided in Table 1. Vegetation community locations on the Project site can be seen on Figure 4, Vegetation Communities.

Vegetation Communities
Fire Protection Plan for Pacific Project
FIGURE 4
SOURCE: HELIX 2021
S Pacific St
S Las Posas Rd
Ryan Dr
Linda Vista Dr
La M
irada Dr
Source: Aerial (NearMap, 2019)0 150 Feet
Project Site
Vegetation Community
Vernal Pool
Diegan Coastal Sage Scrub
Baccharis Dominated
Diegan Coastal Sage Scrub - Disturbed
Native Grassland
Mixed Grassland - Disturbed
Non-native Grassland
Disturbed Habitat
Urban/Developed

PACIFIC FIRE PROTECTION PLAN
13170 14FEBRUARY 2023

INTENTIONALLY LEFT BLANK

PACIFIC FIRE PROTECTION PLAN
13170 15FEBRUARY 2023
TTablee 1.. Projectt Vegetationn Communitiess andd Landd Coverr Types VVegetationn Communityy orr Landd Coverr Type AAcres11
Wetland
Vernal Pool (44000) 0.44
Wetland Subtotal 0.44
Upland
Native Grassland (42100) 13.61
Diegan Coastal Sage Scrub-disturbed (32500) 0.71
Diegan Coastal Sage Scrub-Baccharis-dominated (32530) 0.37 Grassland – mixed and disturbed (32500) 13.90
Non-native Grassland (42200) 3.48
Disturbed Habitat (11300) 0.65
Developed (12000) 0.08
Upland Subtotal 32.80
TOTAL 33.24
Source: Pacific EIR, Appendix C, Helix 2022.
1 Acres rounded to the nearest 0.01 acre for wetland habitat and 0.1 acre for upland habitat.

Vernall Poolss (44000)
Vernal pools are seasonally flooded depressions that supp ort a highly specialized plant habitat and unique flora and fauna adapted to living in extreme dry and wet co nditions. Vernal pools are associated with two important physical conditions: a subsurface hardpan or claypan that inhibits the downward percolation of water and a topography characterized by a series of low hummocks called mima mounds and low depressions (the vernal pools) which prevents above-ground water runoff. As a result of these two physical conditions, water collects in these depressions during the rainy season. As the rainy season ends and the dry season begins, the water that has collected in these vernal pools is gradually evaporated. As water evaporates from these pools, a gradient of low soil water availability to high soil water availability is cr eated from the periphery of the pool margins to the center of the pool. The chemical composition of the remaining pool water becomes more concentrated as the pool water is evaporated, creating a gradient of low ion concentration at the pool periphery to high ion concentration at the pool center. A temporal succession of plant species will occur at the receding pool margins, depending upon the physical and chemical microenvironmental characteristics of the pool. Vernal pools in a wet year will have a high proportion of native species that are endemic to this habitat. During these years, the exotic, ruderal species, characteristic of the non-native grasslands that occur on the surrounding mima mounds will not invade these pools, unable to tolerate the physiological conditions of the ephemeral pool. In years of scarce rainfall that is insufficient to saturate the soil and create a surface pool, the native endemic flora will not germinate and pools are often invaded by the exotic species. Vernal pools are typically identified and separated from other wetlands by the presence of “vernal pool indicator species.”
Within the project site, vernal pool indicator species were detected at many of the depressions. Typical species found in the project site within areas mapped as vernal pools include San Diego button-celery, dwarf woolly-heads (Psilocarphus brevissimusvar. brevissimus), American pillwort (Pilularia americana),flowering-quillwort(Triglochin scilloides), annual hairgrass (Deschampsia danthonioides), pale spike-rush(Eleocharis macrostachya), toad rush

PACIFIC FIRE PROTECTION PLAN
13170 16FEBRUARY 2023
(Juncus bufonius), Mexican rush (Juncus mexicanus), hyssoploosestrife (Lythrum hyssopifolia), and curly dock (Rumex crispus).

DDiegann Coastall Sagee Scrubb (Includingg Disturbedd andd Baccharis-Dominated;; 32500)) Diegan coastal sage scrub may be dominated by a variety of species depending upon soil type, slope, and aspect.

Typical species found within Diegan coastal sage scru b include California sagebrush (Artemisia californica), California buckwheat (Eriogonum fasciculatum), laurel sumac (Malosma laurina),and black sage (Salvia mellifera).

Disturbed Diegan coastal sage scrub contains many of the same shrubspecies as undisturbed Diegancoastal sage scrub but has a higher proportion (above 25 percent) of non-native species. Within the project site, Disturbed Diegan coastal sage scrub contains California buckwheat and California sagebrush, a variety of native herbs, non- native grasses, and herbaceous weeds. Baccharis dominated Diegan coastal sage scrub is dominated by coyote brush (Baccharispilularis), with lesser amounts of other typical coastal sage scrub species.

Grasslandd (40000))
Grasslands primarily consist of annual grasses and other annual herbaceous species, generally mid-height up to three feet tall. Grasslands in southern California occur in a variety of forms such as but are not limited to: mixed grassland, valley needlegrass, saltgrass, non-native, and broadleaf or artichoke thistle dominated. Percent plant cover within grasslands is typically high (at least 75 percent),and the composition of native versus non-native species varies year by year (less than20 percent native to greater than 90 percent native) depending on site disturbances, annual rainfall, and growing season conditions. Based on surveys in 2019, 2021, and 2022 of the Project site, three subtypes or forms of grassland were identified and recorded: mixed disturbed grassland, native grassland, and non-native grassland. Areas found on-site to bean intermixed mosaic of both native and non-native herbaceous species were mapped as mixed disturbed grassland. The species composition and plant density of mixed grassland mapped on-site varies throughout/across the site, seems to change throughout the growing season, varies from year to year, and ultimately, does not clearly reflect a consistent dominance of either native or non-native species. Below are descriptions of the other two grassland types observed on-site; native grassland and non-native grassland.

Nativee Grasslandd (42100)
Native grassland is typically a community dominated by perennial bunchgrasses such as purple needlegrass (Stipa pulchra)or other native grass species. Native and non-native annuals tend to occur between the perennials, often exceeding the bunchgrass in cover. Native grasslands generally occur on fine-textured soils that exclude the growth of annual exotic grass species. The percentage of native species at any one time can be quite low (Oberbauer 2008). Areas on-site found to be dominated with dense patc hes of purple needlegrass were mapped as native grassland. Additionally, native grasslands on-site reflect areas found during the focused rare plant surveys to be dominated by Orcutt’s brodiaea (Brodiaea orcuttii), thre ad-leaved brodiaea, or chaparral brodiaea (Brodiaea jolonensis) were mapped as native grassland. Further, areas of the site supporting at least 20 percent native plant cover were also mapped as native grassland. Such areas are primarily comprised of common golden stars (Bloomeriacrocea) and California blue-eyed grass (Sisyrinchium bellum); however, these areas also supported a high percentage of non-native annual species, including wild oats (Avenasp.), foxtail chess (Bromusmadritensis), soft chess (Bromus hordeaceus), and Bermuda grass (Cynodon dactylon).

PACIFIC FIRE PROTECTION PLAN
13170 17FEBRUARY 2023
NNon-Nativee Grasslandd (42200)
Non-native grassland is a dense to sparse cover of annu al grasses, often associated with numerous species of showy-flowered native annual forbs “wildflowers” (Oberbauer 2008). This grassland typically occurs on gradual slopes, with deep, fine-textured, usually clay soils. Characteristic species include wild oats, red brome (Bromusrubens), ripgut (B. diandrus), ryegrass (Festucasp.), and mustard (Brassicasp.).In accordance with the MHCP definition, this vegetation community was mapped in areas supporting at least 30 percent non-native plant cover. On-site such primarily included wild oats, foxtail chess, soft chess, Bermuda grass, rattail sixweeks grass (Festuca myuros), and purple false brome (Brachypodium distachyon).

Disturbedd Habitatt (11300)
Disturbed habitat includes land cleared of vegetation (e.g., dirt roads), land containing a preponderance of non- native plant species such as ornamentals or ruderal exotic species that take advantage of disturbance (previously cleared or abandoned landscaping), or land showing signs of past or present animal usage that removes any capability of providing viable habitat. An unpaved road/trail bisects the site. Additionally, the northeast corner of the Project site is characterized by bare ground and sparse annual non-native weeds.

Developedd Landd (12000)
Urban/developed land includes areas that have been constructed upon or otherwise covered with a permanent, unnatural surface and may include, for example, structures, pavement, irrigated landscaping, or hardscape to the extent that no natural land is evident. These area s no longer support native or naturalized vegetation.

Urban/developed land in the Project site consists of Linda Vista Drive in the southeast corner of the site and utilities in the northeast corner of the site.

2.2.4 Fire History
Fire history is an important component of a site-specific FPP. Fire History data provides valuable information regarding fire spread, fire frequency, ignition source s, and vegetation/fuel mosaics across a given landscape.

According to available data from the CAL FIRE in the FRAP database, twenty-six (26) fires have burned within a 5- mile radius of the Project site, with no fires occurring on the Project site since the beginning of the historical fire data record. Recorded wildfires within 5 miles range from approximately 12 acres to 40,248 (1943 Fire) acres, the second-largest fire (Harmony Fire-1996) was larger than 9,359 acres and the average fire size is 848 acres (not including the 1943 Fire and Harmony Fire or fires smaller than 10 acres). The Cocos Fire (1995 acres) is the most recent fire, which occurred approximately 2.5 mile southe ast of the Project site. SMFD may have data regarding smaller fires (less than 10 acres) that have occurred on the Project site that have not been included herein. Fire history for the Project site is depicted in Appendix B.

Based on an analysis of this fire hi story data set, specifically, the years in which the fires burned, the average interval between wildfires in the area was calculated to be 3 years with intervals ranging between 0 to 17 years.

Because the fuel bed is minimal and will be maintained and the Project occurs within an entirely developed and urban area, the wildfire threat is considered very low. Even if a vegetation fire did ignite on the post-Project open space area, fuels, terrain, and extremely short duration for the wildfire based on lack of fuels to sustain it would result in a minimal threat.

PACIFIC FIRE PROTECTION PLAN
13170 18FEBRUARY 2023

2.2.5 Post-Development Conditions
Based on the Project site, the preserve area low, maintained fuels and the urbanized nature of the vicinity, the post- development wildfire risk is minimal and vegetation fire wo uld not be readily facilitated due to lack of vegetative fuels. It should be noted that according to SMFD’s agreement with the applicable wildlife agencies, the entire site will be provided weed abatement annually, removing potential for wildfire on the site, confirming the non-fire hazard severity zone classification, and enabling the Project to eliminate the use of fuel modification zones and ignition resistant construction.

2.3 Project Area Fire Risk Assessment
With the conversion of the landscape to ignition-resistant development and the annual weed abatement on the preserved areas of the site, wildfires would not have fuels needed to spread on-site. Given the climatic, vegetative, topographic characteristics, and local fire history of the area, the Project Site, once developed, is determined to not be subject to wildfires. The potential for off-site wildfire encroaching on, or showering embers on-site is considered very low.

PACIFIC FIRE PROTECTION PLAN
13170 19FEBRUARY 2023

INTENTIONALLY LEFT BLANK

PACIFIC FIRE PROTECTION PLAN
13170 20FEBRUARY 2023
3 Emergency Response and Service

3.1 Emergency Response
The Project site is located within the jurisdiction of the San Marcos Fire Department (SMFD), and consequently, SMFD provides the initial response. The SMFD jurisdictional response area encompasses approximately 33 square miles with a population of approximately 96,000 residents. The SMFD currently operates four Fire Stations, two of which are analyzed herein due to their proximity to the Project site and could respond to an incident at the Pacific Project site. Primary response would be from SMFD Station 1, with SMFD Station 2 & Vista Fire Department (VFD) Station 4 responding as necessary.

Within the area’s emergency services system, fire and emergency medical services are provided by Fire Departments (San Marcos Fire Department and Vista Fire Department) County Service Areas (CSA), and CAL FIRE.

Generally, each agency is responsible for structural fire protection and wildland fire protection within their area of responsibility. However, mutual aid agreements enable no n-lead fire agencies to respond to fire emergencies outside their district boundaries. In the Project area, fi re agencies cooperate on a statewide master mutual aid agreement for wildland fires and there are mutual aid agreements in place with neighboring fire agencies (North County Boundary Drop Program) and typically include interdependencies that exist among the region’s fire protection agencies for structural and medical responses, but are primarily associated with the peripheral “edges” of each agency’s boundary. These agreements are voluntary, as no local governmental agency can exert authority over another. While the San Marcos Fire Protection District provides primary service to the City of San Marcos, the District also has an existing automatic mutual aid fire agreement in place with the cities of Carlsbad, Vista, Escondido, Encinitas, and the Rancho Santa Fe Fire Protection District.

Table 2 presents a summary of the location, fire apparatus equipment, staffing levels, maximum travel distance, and estimated travel time for the two nearby SMFD stations that would respond to a fire or medical emergency at the Pacific Project site. Travel distances are derived from Google road data while travel times are calculated applying the nationally recognized RAND Corporation formula used by the Insurance Services Office (ISO) Public Protection Classification Program’s Response Time Standard: (T=0.65 + 1.7D), where T=time and D=distance). The response travel time formula discounts speed for intersections, vehicle deceleration, and acceleration, and does not include turnout donning time.

TTablee 22.. Sann Marcoss Firee Departmentt Respondingg Stationss Summary SStation LLocation EEquipment SStaffing
MMaximumm
TTravell
DDistance**
TTravell
TTime**
TTotall
RResponsee
TTime***
SMFD
Station 1
180 W. Mission
Road San
Marcos,
California
- Paramedic Engine Co.
- Pierce 100-foot MDL
Tiller and Body
Assembly quintuple
combination pumper.
-T y p e 3 E n g i n e
-
Paramedic Ambulance
-Battalion Chief
On duty:
10 2.33 mi. 4m i n u t e s
37 secs.
6M i n u t e s
37 secs

PACIFIC FIRE PROTECTION PLAN
13170 21FEBRUARY 2023
TTablee 22.. Sann Marcoss Firee Departmentt Respondingg Stationss Summary SStation LLocation EEquipment SStaffing
MMaximumm
TTravell
DDistance**
TTravell
TTime**
TTotall
RResponsee
TTime***
SMFD
Station 2
1250 S. Rancho
Santa Fe Road
San Marcos,
California
- Paramedic Engine Co.
- Paramedic Ambulance
On-duty: 5 2.23 mi. 4m i n u t e s
26 secs.
6m i n u t e s
26 secs
VFD
Station 4
2121 Thibodo
Road
Vista, California
- Paramedic Engine Co.
- Paramedic Ambulance
On-duty: 5 2.73 mi. 5m i n u t e s
17 secs.
7m i n u t e s
17 secs
* Distance measured to the central portion of th e Project site Project site, refer to Figures 5 to 7. ** Application of the ISO formula, T=0.65+1.7(Distance), a 35-mph travel speed, and does not include turnout time. *** Application of the ISO formula, T=0.65+1.7( Distance), a 35-mph travel speed, plus an additional 2 minutes for dispatch and turnout time.

Based on the Pacific Project site location in relation to existing SMFD stations, travel time to the Project site for the first responding engine from SMFD Station 2 is 4 minutes, 26 seconds to the central portion of the Project site, entering from the furthest ingress/egress point on La Mirada Drive. Travel time for secondary response is approximately 4 minutes and 37 second. However, travel time does not account for dispatch and turnaround time.

In order to estimate a total response time, an additional two minutes were added to the total travel time. This results in an estimated response of 6 minutes and 26 seconds for Project from SMFD Station 2. The total secondary response for SMFD Station 1 would be approximately 6 minute and 37 seconds and approximately 7 minutes and 17 seconds from VFD Station 3. SMFD’s internal response time standard is to have the first arriving fire apparatus on-site within 8 minutes (average maximum initial response of no more than 8 minutes for fire apparatus and 9 minutes for ambulance, 90% of calls). The Project would conform with SMFD’s internal response time standard, and as discussed in Section 3.2 below, will not have an overall impact on SMFD’s ability to meet its average response goals.

3.2 Emergency Service Level
The SMFD estimates approximately 11,486 total annual calls (Nailon, J. 2021) and a City population of approximately 95,000 (SMFD 2021). The per capita call volu me is roughly 0.12 for the City of San Marcos. As of 2020, the City of San Marcos has a person per household ratio of 3.09 (DOF 2020). Using this household ratio of

3.09, the development of 495 residential dwelling units at the Project site would generate approximately 1,530 people. The emergency service level analysis was based on the maximum occupancy level and the Project is expected to generate roughly 184 calls per year, most of which are expected to be medical-related calls, consistent with typical emergency call statistics.

Service level requirements are not expected to be significantly impacted with the increase of approximately 184 calls per year or 0.5 calls per day for a station (SMFD Station 2) that currently responds to roughly 18 calls per day (6,502 calls per year) in its primary service area. Therefore, the Project is not expected to cause a decline in SFMD’s emergency response times. Additional response, rounding out the effective firefighting force (the manpower needed to effectively fight a structure fire and/or respond to serious medical emergency) would be provided by SMFD Stations 1 and VFD Station 4.

SOURCE: SANDAG 2020, ESRI Basemap 2021
Date: 3/26/2021 - Last saved by: tfriesen - Path: Z:\Projects\j1317001\MAPDOC\DOCUMENT\Fire_ResponseTimes\ServiceArea\Figure2_SMFS2_S erviceArea.mxd 02 , 0 0 0 1,000
Feet
*Response times calculated using posted speed limits. New roads within the project area assumed speeds of 20 MPH.

Response Time - San Marcos Fire Station 2
Pacific Project FPP
FIGURE 
San Marcos Fire Station 2
Response Route(2.23 miles to
project site)
Project Site: 4 minute to 4
minute 26 second drive time*

PACIFIC FIRE PROTECTION PLAN
13170 23FEBRUARY 2023

INTENTIONALLY LEFT BLANK
SOURCE: SANDAG 2020, ESRI Basemap 2021
Date: 3/26/2021 - Last saved by: tfriesen - Path: Z:\Projects\j1317001\MAPDOC\DOCUMENT\Fire_ResponseTimes\ServiceArea\Figure1_SMFS1_S erviceArea.mxd 02 , 0 0 0 1,000
Feet
San Marcos Fire Station 1
*Response times calculated using posted speed limits. New roads within the project area assumed speeds of 20 MPH.

FIGURE 
Response Time - San Marcos Fire Station 1
Pacific Project FPP
Response Route(2.33 miles to
project site)
Project Site: 4 minute to 4
minute 37 second drive time*

PACIFIC FIRE PROTECTION PLAN
13170 25FEBRUARY 2023

INTENTIONALLY LEFT BLANK
SOURCE: SANDAG 2020, ESRI Basemap 2021
Date: 3/26/2021 - Last saved by: tfriesen - Path: Z:\Projects\j1317001\MAPDOC\DOCUMENT\Fire_ResponseTimes\ServiceArea\Figure3_VistaFS 4_ServiceArea.mxd 02 , 0 0 0 1,000
Feet
Vista Fire Station 4
*Response times calculated using posted speed limits. New roads within the project area assumed speeds of 20 MPH.

Response Route(2.73 miles to
project site)
Project Site: 4 minute 30 second
to 5 minute 17 second drive
time*
FIGURE 
Response Time - Vista Fire Station 4
Pacific Project FPP

PACIFIC FIRE PROTECTION PLAN
13170 27FEBRUARY 2023

INTENTIONALLY LEFT BLANK

PACIFIC FIRE PROTECTION PLAN
13170 28FEBRUARY 2023

3.2.1 Cumulative Impacts on Fire Response
Cumulative impacts from multiple projects can cause fire response service decline and must be analyzed for each project. The Pacific Project and its estimated population of 1,530 people is an increase in potential service demand of approximately 184 calls per year (0.5 calls per day), which is within the capacity of the existing fire stations that will service the Pacific Project. There are seven
1 other future projects in the vici nity of SMFD Station 2 and when considered cumulatively would be mitigated by increased funding available from each project to the SMFD through property taxes and other fees associated with each project, including the Pacific Project; therefore, the potential impact of multiple projects is considered less than sign ificant, as this funding would be utilized to maintain or enhance fire response capabilities.
1 Per Pacific EIR Figure 2-7, Cumulative Projects Map, there are seven cumulative projects within the vicinity of SMFD Station 2. These projects are listed in Table 2-3, Cumulative Projects, of the EIR, which include projects 5, 7, 19, 26, 36, 43, and 45.

PACIFIC FIRE PROTECTION PLAN
13170 29FEBRUARY 2023

INTENTIONALLY LEFT BLANK

PACIFIC FIRE PROTECTION PLAN
13170 30FEBRUARY 2023
4 Buildings and Infrastructure
The City of San Marcos Municipal Code, Chapter 17.64 (2018 International Fire Code and 2019 California Fire and Building Codes adopted by reference with several modifications) governs the building and infrastructure in new developments. The Project will meet or exceed applicable codes. x The Municipal Code Section 17.64.210 (Buildings 4 stories and higher) in its entirety, applies to the project x New structures shall be tested for Emergency responder radio coverage in accordance with Section 510 of the California Fire Code. (Mid Rise Buildings).

If requested, the Project applicant shall submit an emergency response map update in a format compatible with current department mapping to the SMFD.

The following summaries highlight important fire protection features. All underground utilities, hydrants, water mains, curbs, gutters, and sidewalks will be installed, and the drive surface shall be approved prior to combustibles being brought on-site.

4.1 Access

4.1.1 Primary and Emergency Access
The Project would be accessible from two points on La Mirada Drive, one point on Pacific Street, and one point on Linda Vista Drive. A gated emergency access road is proposed along S. Las Posas Road. The California Fire Code, along with the San Marcos Fire Department, administers the rules and regulations on fire access design. The Project would be designed to provide fire and emergency responders suitable fire access roads dimensions and surfaces (Chapter 5, §503.1 through §503.4 of the California Fire Code), an adequate number of emergency rated entrances to the community (Appendix D, §D106 of the California Fire Code), and entryway gate access for first responders (Chapter 5 of the California Fire Code, §503.6).

All driveway turning radii is designed to accommodate a Pierce 100-foot MDL Tiller and Body Assembly quintuple combination pumper (aerial ladder truck).

4.1.2 Gates
There is one gate proposed for the emergency access road along S. Las Posas Road on the eastern portion of the Project site. Gates on private roads and/or private driveways are permitted, but subject to Fire Code requirements and standards, including:
x Gates will be equipped with conforming sensors for detecting emergency vehicle “Opticom” strobe lights from any direction of approach.
x All automatic gates will be equipped with a Knox, emergency key-operated switch overriding all command functions and opening the gate(s). Knox Key Box shall be provided. A master key for entry to all gates,

PACIFIC FIRE PROTECTION PLAN
13170 31FEBRUARY 2023
enclosures and equipment rooms or areas is required. Knox box shall be mounted in area approved by fire dept. at height of 60 to 66 inches above grade. Knox Box shall be type with side hinged door. Gate activation devices will be equipped with a battery backup or manual mechanical disconnect in case of power failure.

Further, gates will be:
x Minimum 20 feet wide of clearance for one-way traffic when fully open at entrance. x Minimum of two feet wider than road width at exit.
x Constructed from non-combustible or exterior fire-rated treated wood materials. x Inclusive of provisions for manual operation from both sides, if power fails. Gates will have the capability of manual activation from the development side or a vehicle (including a vehicle detection loop).

4.1.3 Maximum Dead-End Road Length
Dead-end fire apparatus access roads that exceed 150 feet shall have an approved turnaround (County Code Section 503.2.5). There are three dead-end roads within the Project site that slightly exceed 150 feet (1 foot beyond at 151 feet total length). SMFD has accepted th ese dead-end roads as substantially complying with their 150 feet maximum and will not require turnarounds (Appendix C). All of the dead-end roads are straight and on flat grades, making the engine access less problematic. The combination of these factors provide justification for SMFD, with their concurrence, to grant a modification to allow the 1-foot dead-end road length exceedance. Both SMFD’s 100-foot Aerial Tiller and quintuple combination pumper or Quint 2 have adequate room to access the
residential structures.

4.1.4 Road Width and Circulation
On-site roads will be constructed to current City of San Marcos Road standards and 2019 CFC, including minimum 24-foot road widths unobstructed by parking, and shall be improved with asphalt paving materials that support the imposed loads of fire apparatus (not less than 75,000 lbs.). The FPP recommends a turning radius for fire apparatus access roads of 28 feet as measured on the inside edge of the improved width or as indicated by SMFD. On-site parking is restricted to straight-in parking within the designated parking areas. There will be no parallel parking within the Project site. Parking will be restricted throughout development by posting signs stating “No Parking- Fire Lane” CVC (California Vehicle Code 22500.1) to preserve the unobstructed width for emergency response. Legally enforceable signs shall be posted at each entrance driveway and throughout the property. Signs shall be securely mounted facing the direction towards oncoming traffic entering the area and clearly visible indicating that “violating vehicles will be towed at owner’s expense.” Prior to a final fire inspection for the proposed development, a written agreement for services with a towing company per CVC 22658(a) will be in place.

4.1.5 Surface
All fire access and vehicle roadways shall be designed and maintained to support the imposed loads not less than 75,000 pounds of fire apparatus and shall be provided with an approved paved surface as described above. All 2 A Quint is a fire service apparatus that serves the dual purpose of an engine and a ladder truck. SMFD’s Quint is 40 feet long by 8.5 feet wide and has inside and outside turning radii of 28 feet and 42 feet, respectively, as spec ified on City’s Hammerhead and Turning Radius templates. All roadway standards, including turning radii and turnaround, must designed and built to support the fire department’s Quint

PACIFIC FIRE PROTECTION PLAN
13170 32FEBRUARY 2023
underground utilities, hydrants, water mains, curbs, gutters, and sidewalks must be installed, and the drive surface shall be approved prior to combustibles being brought on-site (CFC Section 503.2).

4.1.6 Vertical Clearance
The minimum unobstructed vertical clearance of 13 feet 6 inches will be maintained for the entire required width for all streets, including driveways that require emergency vehicle access.

4.1.7 Premise Identification
Identification of roads and structures will comply with SMFD and CFC, Section 505.1, as follows:
• Each building shall have a minimum 12-inch address number, with 1-1/2-inch stroke or to the SMFD satisfaction. Numbers shall be mounted in visible locations and contrast in color to the background, be reflectorized, and 6 to 8 feet above grade. Addresses shall be posted at the beginning of construction and be maintained thereafter.
• Streets and roads shall be identified with approved signs consistent, uniform in design, and good taste and style per the City of San Marcos requirements. The size of letters, numbers, and symbols shall be a minimum of 4- inch letter height, ½-inch stroke, reflectorized, and be contrasting with the background color of the sign. The street sign shall be clearly visible totraffic approaching from all directions. Temporary signs shall be installed at each street intersection when the construction of new roadways allows passage by vehicles and be visible from all directions. Signs shall be of an approved size, weather-resistant, and be maintained until replacement by permanent signs.

The SMFD requires an illuminated directory map at all driveways. The final Location of directory maps and content shall be approved by the fire department.

4.2 Ignition Resistant Construction and Fire Protection Systems
The Project is not within a wildland urban interface or a fire hazard severity zone and therefore, does not require the ignition resistant construction defined in Chapter 7A of the California Building Code.

4.3 Fire Protection Systems

4.3.1 Water
Water service for the Pacific Project site will be provided by Vallecitos Water District (VWD) and will be consistent with SMFD requirements. There is existing 855 Zone and 920 Zone water facilities in the vicinity of the Project site.

The 920 Zone facilities consist of 24-inch and 30-inch transmission lines that do not provide direct service to properties in the area. Water service to existing development in the area is from connections to the 855 Zone which includes 12-inch lines in Linda Vista Drive and Pacific Street, and 8-inch lines in La Mirada Drive and S. Las Posas Road.

PACIFIC FIRE PROTECTION PLAN
13170 33FEBRUARY 2023
The domestic system for the Pacific Project would consist of two connections to the public water system with an on- site loop between the connections. A water meter and backflow preventer would be required at each connection to the public water system. The Project would connect to the existing 855 Zone water facilities within the adjacent Linda Vista Drive, Pacific Street, La Mirada Drive and/or S. Las Posas Road. Landscaped areas associated with the Project would require a separate irrigation service and meter.

4.3.2 Fire Hydrants
All hydrants will be consistent with SMFD Design Standards (two 4-inch ports and one 2.5-inch port). Reflective blue dot hydrant markers shall be installed in the street to indicate the location of the hydrant. Crash posts will be provided where needed in on-site areas where vehicles coul d strike fire hydrants or fire department connections.

Hydrants shall be located along fire access roadways as determined by the SMFD Fire Marshal to meet operational needs every 300 feet (on-center) of fire access roadways, regardless of parcel size, pursuant to the San Marcos Fire Code (Section 17.64.130).

4.3.2.1 150 Feet Hose Pull
The project site substantially conforms to the 150-foot hose pull requirement with all buildings fully reachable except for a 10-foot gap along the southern Project’s southern edge, just north of Linda Vista Drive, as indicated in Figures 8A through 8D. Per these same figures, the Project proposes to provide additional hydrants and standpipes to extend the engine’s hose pull reach.

PACIFIC FIRE PROTECTION PLAN
13170 42FEBRUARY 2023

4.3.3 Mid-Rise Building Requirements
In addition to other applicable provisions of the Fire Code, other laws and regulations, and any policies of the chief, the provisions of this article apply to every newly constructed mid-rise building, of any type of construction, or any mid-rise building which undergoes a complete renovation that requires the complete vacancy of the building to complete the renovation.

4.3.3.1 Automatic Fire Sprinkler Systems
Every mid-rise building must be protected throughout by an automatic fire sprinkler system that is designed and installed in conformance with latest adopted Edition of NFPA 13 and in accordance with the following:

A control valve and a water flow alarm must be provided for each floor. Each control valve and flow alarm must be electronically supervised.

Every mid-rise building must be provided with a class I standpipe system that is interconnected with the fire sprinkler system. The system must consist of two and one-half-inch hose valves that must be located in each stair enclosure, on every floor level.

Two hose outlets must also be located on the roof, ou tside of each stair shaft enclosure that penetrates the roof. The standpipe system must be designed, inst alled, and tested in accordance with the NFPA 14 edition as referenced in chapter 80 of the California Fire Code.

Fire Department standpipe connections and valves serving the floor must be within the vestibule and located in a manner so as not to obstruct egress when hose lines are connected and charged.

4.3.3.2 Fire Alarm Systems
Smoke detectors must be provided in accordance with this section. Smoke detectors must be connected to an automatic fire alarm system installed in accordance with the NFPA 72 edition as referenced in Chapter 80 of the California Fire Code. The actuation of any device required by this section shall operate the emergency voice alarm signaling system and shall operate all equipment necessary to prevent the circulation of smoke through air return and exhaust ductwork. Smoke detectors shall be located as follows:

In every mechanical equipment, electrical, transformer, telephone equipment, unmanned computer equipment, elevator machinery or similar room and in all elevator lobbies. Elevator lobby detectors shall be connected to an alarm verification zone or be listed as a releasing device.

In the main return-air and exhaust-air plenum of each air-conditioning system. The smoke detector shall be located in a serviceable area downstream of the last duct inlet.

At each connection to a vertical duct or riser serving two or more stories from a return-air duct or plenum of an air conditioning system. In R,- 1 R-2 Occupancies, an approved smoke detector is allowed to be used in each return-air riser carrying not more than 5,000 cubic feet per minute and serving not more than 10 air inlet openings.

For Group R,- 1 and R-2 Occupancies, in all corridors serving as a means of egress for an occupant load for 10 or more persons.

PACIFIC FIRE PROTECTION PLAN
13170 43FEBRUARY 2023
An approved and listed, automatic and manual, fully addressable and electronically supervised fire alarm system shall be provided in conformance with this code and California Building Code and NFPA 72 edition as reference in Chapter 80 of the California Fire Code.

4.3.3.3 Building Access
Building access must be provided and approved by the fire chief.

4.3.3.4 Emergency Voice Alarm Signaling System
The operation of any automatic fire detector or water flow device must automatically sound an alert tone followed by a pre-recorded voice instruction giving appropriate information and direction on a general or selective basis to the following terminal areas:

1. Elevators

2. Elevator lobbies

3. Corridors
Exit Stairways
Rooms and tenant spaces
Dwelling units
Hotel Guest Rooms
Areas designated as safe refuge within the building

4.3.3.5 Fire Command Center
A fire command center for Fire Department operations shall be provided. The location and accessibility of the fire command center shall be approved by the Fire Code Official. The room shall be separated from the remainder of the building by not less than one-hour, fire barrier and be located on an exterior wall, not within building. The room shall be a minimum of 200 square feet with a minimum dimension of 10 feet. It shall contain the following facilities as a minimum:

1. Voice alarm and public address panels

2. Fire Department communications panel

3. Fire alarm annunciator panel

4. Elevator enunciator panel (when Building exceeds 55 feet in height)

5. Status indicators and controls of air handling systems (Stairwell Pressurization)

6. Controls for unlocking stairwell doors

7. Fire Pump status indicators (if required)
Complete building plans set
Worktable
Elevator control switches for switching of emergency power

PACIFIC FIRE PROTECTION PLAN
13170 44FEBRUARY 2023

4.3.3.6 Annunciation Identification
Control panels in the central control station shall be permanently identified as to their function. Water flow, automatic fire detection and manually activated fire alarms, supervisory and trouble signals shall be monitored by an approved, UL listed Central Monitoring Station and annunciated in the Fire Command Center by means of an audible and visual indicator. For the purposes of annunciation, zoning shall be in accordance with the following:

1. When the system serves more than one building, each building shall be considered as separate.

2. Each floor in a building shall be a separate zone.

3. When one or more risers serve the same floor, each riser shall be a separate zone.

4.3.3.7 Elevators
Elevators and elevator lobbies shall comply with the provisions of Chapter 30 of the California Building Code. At least one elevator cab shall be assigned for fire department use and shall serve all floors of the building. This cab shall be provided large enough to accommodate an ambulance type stretcher in accordance with section 3002.4 of the California Building Code.

4.3.3.8 Fire Department Communication System
An approved two-way, Fire Department communication system designed and installed in accordance with the NFPA 72 edition as referenced in Chapter 80 of the California Fire Code shall be provided for Fire Department use per section 907.2.13.2.

New structure shall be tested for Emergency responder radio coverage in accordance with Section 510 of the California Fire Code.

4.3.3.9 Means of Egress
In addition to the requirements of Chapter 10, egress components of Mid-Rise buildings shall comply with the following:

EExtentt off Enclosure
Stairway enclosures must be continuous and must fully enclose all portions of the stairway. Exit enclosure shall exit directly to the exterior of the building or include an exit passageway on the ground floor, leading to the exterior of the building. Each exit enclosure shall extend through the roof and be provided with a door that leads onto the roof.

Pressurizedd Enclosuress andd Stairways
All required stairways and enclosures in a mid-rise buildi ng shall be pressurized as specified in the California Building Code Section 909. Pressurized Stairways shall be designed to exhaust smoke manually when needed.

Vestibules
Pressurized stairway enclosures, serving mid-rise buildings shall be provided with a pressurized entrance vestibule on each floor that complies with the California Building Code Section 909.

PACIFIC FIRE PROTECTION PLAN
13170 45FEBRUARY 2023
PPressuree Differences
The minimum pressure difference within a vestibule shall be in accordance with the California Building Code Section 909.

Lockingg off Stairwayy Doors
All stairway doors that are locked to prohibit access from the interior of the stairway shall have the capability of being unlocked simultaneously, without unlatching, upon a signal from the fire control room. Upon failure of normal electrical service, or activation of any fire alarm, the locking mechanism must automatically retract to the unlocked position.

A telephone or other two-way communication system connected to an approved emergency service which operates continuously shall be provided at not less than every third floor in each required exit stairway vestibule.

Approved signage shall be provided in each stairwell vestibule stating doors are locked, on which floor(s) entry may be made, and on which floor(s) a telephone is located. Hardware for locking of stairway vestibule doors shall be State Fire Marshal listed and approved by the Fire Code Official by permit before installation. Stairway doors located between the vestibules and stairway shaft shall not be locked.

4.4 Ongoing Building and Infrastructure Maintenance
The Pacific Project HOA shall be responsible for long-term funding and maintenance of private roads and fire protection systems, including fire sprinklers and private fire hydrants.

4.5 Pre-Construction Requirements
Before bringing combustible materials onto the site, utilities shall be in place, fire hydrants operational, an approved all-weather roadway in place, and fuel modification zones established and approved.

4.6 Defensible Space and Vegetation Management

4.6.1 Fuel Modification Zones
Because the entire site will be provided annual weed ab atement, there is no requirement for fuel modification zones. The Project owners will provide sitewide maintenance in the landscaped areas and will abate the preserved portions of the site by providing appropriate vegetation management to the satisfaction of the SMFD.

4.6.1.1 Vegetation Management
Pre-Constructionn Requirementss
ƒ Perimeter vegetation management areas must be implemented and approved by the SMFD before combustible materials being brought on site.
ƒ Existing flammable vegetation shall be reduced by 50% on vacant lots upon commencement of construction.

PACIFIC FIRE PROTECTION PLAN
13170 46FEBRUARY 2023
ƒ Dead fuel, ladder fuel (fuel which can spread fire from the ground to trees), and downed fuel shall be removed and trees/shrubs shall be properly limbed, pruned, and spaced per this plan.

UUndesirablee Plantss
Certain plants are considered to be undesirable in the landscape due to characteristics that make them highly flammable. These characteristics can be physical or chemical. The plants included in the SMFD Undesirable Species Plant List (Appendix D) are unacceptable from a fire safety standpoint and shall not be planted on the site unless otherwise approved by the SMFD.

4.6.2 Habitat Area Maintenance
Preserved habitat vegetation management shall be completed annually no later than June 1st of each year and more often as needed for fire safety, as determined by the SMFD. Year-to-year vegetation management will vary depending on the precipitation but will occur no later than June 1st. The Project management shall be responsible for all vegetation management throughout the common landscape areas of the Project site. The Pacific Project HOA shall be responsible for ensuring long-term funding and ongoing compliance with SMFD-required habitat area vegetation maintenance.

PACIFIC FIRE PROTECTION PLAN
13170 47FEBRUARY 2023

INTENTIONALLY LEFT BLANK

PACIFIC FIRE PROTECTION PLAN
13170
48 FEBRUARY 2023
5 Conclusion
This FPP is submitted in support of an application for the Pacific Project in San Marcos. It is submitted in compliance with the requirements of the SMFD and City Fire Code. The requirements in this document meet fire safety, building design elements, and landscaping recommendations of the SMFD. Fire and Building Codes and other local, county, and state regulations in effect at the time of each building permit application supersede these recommendations unless the FPP recommendation is more restrictive.

The Project is within an area that has a low wildfire and vegetation fire hazard with a corresponding low wildfire risk and therefore, it is unlikely that the Project’s structures and occupants would be subject to property loss or personal harm from a wildfire event. However, there are no guarantees that fire will not occur in the area or that fire will not damage property or cause harm to persons or their property. Implementation of the required construction features provided by the applicable codes summarized in this FPP will accomplish the goal of this FPP to assist firefighters in their efforts to protect these structures and reduce the fire risk associated with this Project. For maximum benefit, the developer, contractors, engineers, and architects are responsible for the proper implementation of the concepts and requirements set forth in this report. Residents and/or owners are responsible to maintain their structures and landscaping as required by this report, the applicable Fire Code, and the SMFD.

PACIFIC FIRE PROTECTION PLAN
13170
49 FEBRUARY 2023

INTENTIONALLY LEFT BLANK

PACIFIC FIRE PROTECTION PLAN
13170
50 FEBRUARY 2023
6 List of Preparers
PProjectt Managerr
Michael Huff
Fire Protection Planner; San Diego County California Environmental Quality Act Consultant List Dudek
Plann Preparerr
Lisa Maier
Fire Protection Analyst
Dudek
Computerr Aidedd Design/Drafting
Lesley Terry
CADD Specialist
Dudek

PACIFIC FIRE PROTECTION PLAN
13170
51 FEBRUARY 2023

INTENTIONALLY LEFT BLANK

PACIFIC FIRE PROTECTION PLAN
13170
52 FEBRUARY 2023
7 References
CAL FIRE. 2017. Fire and Resource Assessment Program. California Department of Forestry and Fire. Website access via http://frap.cdf.ca.gov/data/frapgismaps/select.asp?theme=5.

Cohen, Jack D. 1995. Structure ignition assessment model (SIAM). In: Weise, D.R.; Martin, R.E., technical coordinators. Proceedings of the Biswell symposium: fire issues and solutions in urban interface and wildland ecosystems. 1994 February 1517; Walnut Creek, CA. Gen. Tech. Rep. PSW-GTR-158. Albany, California: Pacific Southwest Research Station, Forest Service, U.S. Department of Agriculture; 85–92 Cohen, J.D. 2000. Preventing disaster: home ignitability in the wildland-urban interface. Journal of Forestry 98(3):
15–21.

Cohen, J.D. and Saveland, J. 1997. Structure Ignition Assessment Can Help Reduce Fire Damages in the W-UI.

Fire Management Notes 57(4): 19–23.

Cohen, Jack and Steve Quarles. 2011. Structure Ignition Assessment Model; The Origins and Basis of SIAM.From presentation at the 2011 NFPA Wildland Fire - Backyard and Beyond Conference in October 2011.

DOF (Department of Finance). 2020. E-5 Population and Housing Estimates for Cities, Counties and the State — January 1, 2011-2020. Updated May 2020. Accessed March 18, 2021. http://www.dof.ca.gov/Forecasting/Demographics/Estimates/E-5/.

FireFamily Plus 2021. http://www.firelab.org/project/firefamilyplus.

Foote, Ethan I.D.; Gilless, J. Keith. 1996. Structural survival. In: Slaughter, Rodney, ed. California's I-zone.

Sacramento, California: CFESTES; 112–121.

FRAP (Fire and Resource Assessment Program). 2021. California Department of Forestry and Fire Protection. http://frap.cdf.ca.gov/.

Hunter, Cliff. 2007. Personal communication with Rancho Santa Fe Fire Protection District Fire Marshal following after-fire loss assessments.

Institute for Business and Home Safety (IBHS). 2008. Megafires: The Case for Mitigation. 48 pp.

Keeley, J.E. and C.J. Fotheringham. 2003. “Impact of Past, Present, and Future Fire Regimes on North American Mediterranean Shrublands.” In Fire and Climatic Change in Temperate Ecosystems of the Western Americas, edited by T.T. Veblem, W.L. Baker, G. Montenegro, and T.W. Swetnam, 218–262. New York, New York: Springer-Verlag.

Keeley, J.E. 2004. “Invasive Plants and Fire Management in California Mediterranean-Climate Ecosystems.” Edited by M. Arianoutsou. In 10th MEDECOS-International Conference on Ecology, Conservation Management. Rhodes, Greece.

Nailon, J. 2021. “San Marcos Fire Department Service Calls Volume.” Personal communication (phone call) with J.

Nailon, Fire Marshal and Dudek. June 2, 2021.

PACIFIC FIRE PROTECTION PLAN
13170
53 FEBRUARY 2023
NFPA 72. Standard for the Installation, Maintenance, and Use of Signaling Systems for Central Station Service.

NFPA 1144. Standard for Reducing Structure Ignition Hazards from Wildland Fire. 2008. Technical Committee on Forest and Rural Fire Protection. Issued by the Standards Council on June 4, 2007, with an effective date of June 24, 2007. Approved as an American National Standard on June 24, 2007.

San Marcos Fire Department (SMFD), 2021. San Marcos Fire Department, Department Overview (Webpage).

Available at: https://www.san-marcos.net/departments/public-safety/fire-department/department- overview.

PACIFIC FIRE PROTECTION PLAN
13170
54 FEBRUARY 2023

INTENTIONALLY LEFT BLANK

AAppendix A
Photograph Log

APPENDIX A / PHOTOGRAPH LOG
13170 A-1DECEMBER 2021
PPhotographh 1. View of on-site chaparral and scrub vegetation standing in the northeastern corner of the Project site along S. Las Posas Road and La Mirada Drive looking south along the eastern property boundary.

PPhotographh 22.. View of on-site chaparral and scrub vegetation within the vernal pool areas in the northern portion of the Project site, standing in the northeastern corner of the along S. Las Posas Road and La Mirada Drive looking west/southwest.

APPENDIX A / PHOTOGRAPH LOG
13170 A-2DECEMBER 2021
PPhotographh 33.. View of on-site chaparral and scrub vegetation within the vernal pool areas in the northern portion of the Project site standing in the northeastern corner of the Project site along S. Las Posas Road and La Mirada Drive looking northwest up the northern property boundary.

PPhotographh 44.. View of on-site chaparral and scrub vegetation within the vernal pool areas in the northern portion of the Project site, standing in the northeastern corner of the along S. Las Posas Road and La Mirada Drive looking west/southwest.

APPENDIX A / PHOTOGRAPH LOG
13170 A-3DECEMBER 2021
PPhotographh 55.. View of on-site chaparral and scrub vegetation within the vernal pool areas in the northern portion of the Project site, standing in the northeastern corner of the along S. Las Posas Road and La Mirada Drive looking west towards S. Pacific Street.

PPhotographh 66.. View of on-site chaparral and scrub vegetation within the vernal pool areas in the northern portion of the Project site, standing in the northeastern corner of the along S. Las Posas Road and La Mirada Drive looking west towards S. Pacific Street.

APPENDIX A / PHOTOGRAPH LOG
13170 A-4DECEMBER 2021
PPhotographh 77.. View of on-site chaparral and scrub vegetation within the vernal pool areas in the northern portion of the Project site, standing along La Mirada Drive looking southwest towards S. Pacific Street.

PPhotographh 88.. View of on-site low-load grass-scrub vegetation in the northwestern portion of the Project site, standing in the northwestern corner of the along S. Pacific Street and La Mirada Drive looking east towards S.

Las Posas Road.

APPENDIX A / PHOTOGRAPH LOG
13170 A-5DECEMBER 2021
PPhotographh 99.. View of on-site low-load grass-scrub vegetation in the northwestern portion of the Project site, standing in the northwestern corner of the along S. Pacific Street and La Mirada Drive looking south/southeast over the Project site towards S. Las Posas Road and Linda Vista Drive.

PPhotographh 100.. View of on-site low-load grass-scrub vegetation along La Mirada Drive looking west towards S.

Pacific Street.

APPENDIX A / PHOTOGRAPH LOG
13170 A-6DECEMBER 2021
PPhotographh 111.. View of on-site low-load grass-scrub vegetation in the northwestern portion of the Project site, standing on the west side of S. Pacific Street looking east towards the Project site.

PPhotographh 122.. View of on-site low-load grass/grass-shrub vegetation in the northwestern portion of the Project site, standing in the northwestern corner of the along S. Pacific Street and La Mirada Drive looking east along the northern property border.

APPENDIX A / PHOTOGRAPH LOG
13170 A-7DECEMBER 2021
PPhotographh 133.. View of on-site low-load grass vegetation in the southwestern portion of the Project site, standing in the southwest corner of the along S. Pacific Street and Linda Vista Drive looking east across the southern portion of the Project site.

PPhotographh 144.. View of on-site low-load grass/grass-shrub vegetation in the northwestern portion of the Project site, standing in the northwestern corner of the along S. Pacific Street and La Mirada Drive looking east along the northern property border.

APPENDIX A / PHOTOGRAPH LOG
13170 A-8DECEMBER 2021
PPhotographh 155.. View of on-site low-load grass vegetation in the southwestern portion of the Project site, standing in the southwest corner of the along S. Pacific Street and Linda Vista Drive looking north across the western portion of the Project site.

PPhotographh 166.. View of on-site low-load grass vegetation in the southwestern portion of the Project site, standing in the southwest corner of the along S. Pacific Street and Linda Vista Drive looking east across the southern portion of the Project site.

APPENDIX A / PHOTOGRAPH LOG
13170 A-9DECEMBER 2021
PPhotographh 177.. View of on-site low-load grass vegetation in the southern portion of the Project site, standing along Linda Vista Drive looking east across the southern portion of the Project site towards S. Las Posas Road.

PPhotographh 188.. View of on-site low-load grass vegetation in the southern portion of the Project site, standing along Linda Vista Drive looking east across the southern portion of the Project site towards the southeastern portion of the Project site along S. Las Posas Road.

APPENDIX A / PHOTOGRAPH LOG
13170 A-11DECEMBER 2021
PPhotographh 199.. View of on-site low-load grass vegetation in the southern portion of the Project site, standing along Linda Vista Drive looking east across the southern portion of the Project site towards the southeastern portion of the Project site along S. Las Posas Road.

PPhotographh 220.. View of on-site low-load grass vegetation in the southern portion of the Project site, standing along Linda Vista Drive looking north across the Project site.

AAppendix B
Fire History

5-Mile Buffer
Project Boundary
Quantity of Times
Burned
1 2
3 4
5 Brush Fire at Palomar
College (1/14/2021)
SOURCE: BASE MAP- ESRI MAPPING SERVICE; FIRE DATA-CALFIRE 2020 02 1
Miles
Date: 12/7/2021 - Last saved by: lterry - Path: Z:\Projects\j1317001\MAPDOC\DOCUMENT\FPP\Appendix B Fire History 2020.mxd Fire History Map
Fire Protection Plan for Pacific Project

APPENDIX B

APPENDIX A / PHOTOGRAPH LOG
13170 A-10DECEMBER 2021

AAppendix C
SMFD Approved Dead End Road Lengths

AAppendix D
SMFD Undesirable Species Plant List

1 Civic Center Drive | San Marcos, CA 92069-2918 | (760) 744-1050 | (760) 744-5213 Fax | www.san-marcos.net

UNDESIRABLE PLANT SPECIES LIST
Both native and ornamental plants can be highly flammable. Flammable plant material in your landscape can increase the fire risk directly around your home. Certain plants are considered to be undesirable in the landscape due to characteristics that make them highly flammable. These characteristics can be either physical or chemical. For instance, physical properties would include large amounts of dead material retained within the plant, such as twigs, needles, and leaves; rough or peeling bark; and production of copious amounts of litter. Chemical properties include the presence of volatile substances, such as oils, resins, waxes, and pitch. Plant material with these characteristics should not be planted close to your structures. The following plants have been declared "undesirable" within I50-foot fuel modification zone surrounding all structures. All vegetation is listed alphabetically by botanical name, followed by the common name. The following plants have been declared "undesirable" within I50-foot fuel modification zone surrounding all structures. All vegetation is listed alphabetically by botanical name, followed by the common name.

Natives:

Adenostoma Jasciculatum - Chamise
Adenostoma Sparsifolium - Red Shank
Artemesia califomica - California Sagebrush
Eriogonum Jasciculatum - Common Buckwheat
Heterotheca grandiflora - Telegraphweed
Rhus laurina - Laurel Sumac
Salvia species - Sage (native species)
Ornamentals:

Abies species - Fir Trees
Acacia redolens - Prostrate Acacia*
Agonis juniperina - Juniper Myrtle
Araucaria species - Monkey Puzzle, Bunya-Bunya, Norfolk Island Pine* Arundo donax - Giant Cane
Bambusa species - Bamboo*
Calocedrus decurrens- Incense Cedar
Cedrus species - Cedars*
Chamaecyparis species - False Cedars
Chamaerops humils - Mediterranean Fan Palm*
1 Civic Center Drive | San Marcos, CA 92069-2918 | (760) 744-1050 | (760) 744-5213 Fax | www.san-marcos.net Cryptomeria japonica - Japanese Cryptomeria
Cortadera species - Pampas Grass
Cupressocyparis leylandii ~ Leylandii Cypress*
Cupressus species - Cypress*
Cytisus species - Scotch Broom, French Broom
Eucalyptus Species - Eucalyptus*
Juniperus species - Junipers*
Miscanthus species- Silver Grass
Muehlenbergia species - Deer Grass*
Pennisetum setaceum - Fountain grass, including all cultivars and varieties* Phoenix species - Date Palms*
Pinus species - Pines*
Rosmarinus offcinalis - Rosemary*
Tecoma capensis - Cape Honeysuckle*
Trachycarus fortunei - Windmll Palm*
WashinRtonia species - Fan Palms*
*Except as permitted in the planting lists and San Marcos Fire Department landscape Standards
Note:

1. To view a picture of listed plants, go to www.wikipedia.org and search for the Botanical
Name of the plant.

2. If the owner wishes to retain these plants, they must be adequately maintained (pruning, thinning, irrigation, litter removal, and or weeding) to reduce the potential for spreading a fire through the landscape.

References:

County of Los Angeles Fire Department. Fuel Modification Plan Guidelines. July 2011.

County of San Diego, Department of Planning and Land Use. Water Efficient Landscape Design
Manual. February 2010.
1 Civic Center Drive | San Marcos, CA 92069-2918 | (760) 744-1050 | (760) 744-5213 Fax | www.san-marcos.net In an effort to protect homes from a future devastating wildland fire, the San Marcos Fire Department has put together this booklet. You will find valuable information pertaining to both desirable and undesirable trees, shrubs, ground covers, vines and palm trees. The goal of this brochure is to educate the public on issues pertaining to landscaping and to keep their homes safe. Please feel free to contact us if you have any questions, comments, or concerns.

Canopy Trees: Broad spreading trees that make good accent trees.

Grow 25-50 ft. tall and should be spaced 30-40 ft. apart.

Botanical Name Common Name Dripline To
Structure (ft.)
Evergreen or
Deciduous
Albizia julibrissin Silk Floss 10 D
Chorisia speciosa Floss Silk Tree 10 D
Cinnamomum camphora Camphor 10 E
Erythrinia species Coral 10 D
Ficus species 10 D
Jacaranda mimosifolia 10 D
Koelreuteria paniculate Golden Raintree 10 D
Melaleuca linarifolia Paperbark 10 E
Pinus halepensis Aleppo Pine 30 E
Platanus acerfolia Sycamore 10 D
Phoenix canariensis Canary Island Date Palm 30 E Podacarpus gracilior Fern Pine 10 E
Pyrus kawakami Evergreen Pear 10 E
Quercus species Oak 10 E
Rhus lancea African Sumac 10 E Robinia pseudoacacia Black Locust 10 D
Schinus species Pepper Tree 30 E
Spathodea campanulata African Tulip Tree 10 D
Tipuana tipu Tipu Tree 10 D
Ulmus parvifolia Chinese Elm 10 D
Zelkova serrata Sawleaf Zelkova 10 D
1 Civic Center Drive | San Marcos, CA 92069-2918 | (760) 744-1050 | (760) 744-5213 Fax | www.san-marcos.net Vertical Growing Trees: Upright character and are good choices for narrow areas.

Grow up to 30 ft. tall and should be spaced 20-30 ft. apart.

Botanical Name Common Name Dripline To
Structure (ft.)
Evergreen or
Deciduous
Betula pendula European White Birch 10 D
Brachychiton populeneus Bottle Tree 10 D
Callistemon viminalis Weeping Bottle Brush Tree 30 E Dracena Drago Dragon Tree 10 E
Hymenosporum flavum Sweetshade Tree 10 E
Maytenus boaria Mayten 10 E
Melaleuca quinquenervia Paperbark Tree 10 E
Metrosideros tomentosa New Zealand Christmas Tree 10 E Tristania conferta Brisbane Box Tree 10 E Ornamental Trees: Various canopy heights and widths that serve many uses such as accent trees.

Grow 15-40 ft. tall and should be spaced 20-25 ft. apart.

Botanical Name Common Name Dripline To
Structure (ft.)
Evergreen or
Deciduous
Acer palmatum Japanese Maple 10 D
Agonis flexuosa Peppermint Tree 10 E Arbutus unedo Strawberry Tree 10 E
Avocado species 30 E
Bauhinia species Orchid tree 10 D
Cassia leptophylla Gold Medallion Tree 10 D Cercis candensis Redbud 10 D
Citrus species 10 E
Cupniopsis anacardiodes Carrotwood tree 10 E
Geijera parvifolia Australian Willow 10 E Lagerstroemia indica Crape myrtle 10 D
Lagunaria patersonii Primrose Tree 10 E
Magnolia species 10 E/D
Olea europaea Olive Tree 10 E Pistacia chinensis Chinese Pistache 10 D
Prunus species 10 E/D
1 Civic Center Drive | San Marcos, CA 92069-2918 | (760) 744-1050 | (760) 744-5213 Fax | www.san-marcos.net Pyrus species Ornamental Pear 10 E/D
Tabebuia species Trumpet Tree 10 E/D
Low-Multi Branching Trees: Large shrubs and small tree forms good for under-story screening.

Grow 10-25 ft. tall and should be spaced 15-20 ft. apart.

Botanical Name Common Name Dripline To
Structure (ft.)
Evergreen or
Deciduous
Acacia species 30 E
Eriobotrya deflexa Bronze Loquat 10 E
Feijoa sellowiana Guava 10 E
Melalueca nesophila Pink Melalueca 10 E
Myoporum laetum 10 E
Pittosporum undulatum Victorian Box 10 E
Punica granatum Pomegranate 10 D
Thevitia thevetiodes Giant Thevitia 10 E
Tall Skyline Trees: Dramatic Silhouettes against the skyline.

Grow 40-70 ft. tall and should be spaced 30-40 ft. apart.

Botanical Name Common Name Dripline To
Structure (ft.)
Evergreen or
Deciduous
Acer macrophyllum Bigleaf Maple 10 D
Alnus rhombifolia White Alder tree 10 D Cedrus species Cedar tree 30 E
Eucalyptus species 30 E
Fraxinus species Ash tree 10 D
Grevilla robusta Silk Oak 10 D
Liriodendron tulipifera Tulip Tree 10 D
Liquidambar species Sweet gum 10 D
Pinus canariensis Canary Island Pine 30 E Pinus torreyana Torrey Pine 30 E Platanus racemosa Sycamore 10 D
Populus fremonti Western Cottonwood 10 D Populus nigri Lombardy Poplar 10 D 1 Civic Center Drive | San Marcos, CA 92069-2918 | (760) 744-1050 | (760) 744-5213 Fax | www.san-marcos.net Palm Trees: Vary from single to multiple trunks.

Grow 20-100 ft. tall and should be spaced 20-40 ft. apart.

Botanical Name Common Name Dripline To
Structure (ft.)
Evergreen or
Deciduous
Archontophoenix alexandrae Alexandra Palm 10 E Archontophoenix cunninghamiana King Palm 10 E
Brahea armata Blue Hesper Palm 30 E Brahea edulis Guadalupe Palm 30 E
Chamaerops humilis Mediterranean Fan Palm 30 E Cycas revoluta Sago Palm 10 E
Howea forsteriana Kentia Palm 30 E
Phoenix canariensis Canary Island Date Palm 30 E Phoenix dactylifera Date Palm 30 E
Phoenix reclinata Senegal Date Palm 30 E Phoenix roebelenii Pygmy Date Palm 30 E
Syagrus romanzoffianum Queen Palm 10 E
Trachycarpus fortunei Windmill Palm 30 E
Washingtonia filifera California Fan Palm 30 E Washingtonia robusta Mexican Fan Palm 30 E
All other Palm species Various Palms 30 E
NOTE:
** This booklet is intended to guide the public on what types of trees and shrubs are acceptable to the San Marcos Fire Department. Other trees and shrubs not listed are still acceptable to use upon approval by the San Marcos Fire Department.
** Trees listed as requiring 30’ spacing from dr ipline to structure are considered non-fire resistive trees by the San Marcos Fire Depart ment. Consult a design professional or the San Marcos Fire Department for site specific questions regarding tree placement ** Trees that grow near power lines pose a potential electrical hazard. San Diego Gas & Electric (SDG&E) is required by law to maintain minimum clearances between all vegetation and power lines. No tree should be allowed to grow with in 10 feet of electrical conductors. SDG&E provides a suggested species list of trees that are appropriate to grow under or adjacent to power lines. This list, along with other information regarding SDG&E Vegetation Management, can be found at http://sdge.com/safety/treesafety
.

← All documents from this meeting