Project Number
(Approval Date) Project Name Construction
Complete? Electric Vehicle Charging Stations (T-2) Transportation Demand Management (T-9) Increase Transit Ridership (T-11) Reduce Parking Near Transit (T-12) Water Heaters (E-1) Photovoltaic Installation (E-2) Landscaping Water Use (W-1) Urban Tree Canopy (C-2) CUP20-0006
(11/01/2021)
Arco Gas Station, AMPM
Mini-Mart, and Car Wash
No Yes.
The project will include 25 on-site parking
spaces; five percent of this amount would
equate to two (1.25 rounded up) spaces. The
project would exceed the requirement by
providing EV charging at three parking space
No. Project was approved prior to current TDM
ordinance and is was determined that due to the
minimal employee count, TDM strategies included in
the CAP such as mass transit subsidies, carpool
spaces, pedestrian connections, bicycle racks,
employee showers/lockers, and telecommuting
would not achieve meaningful GHG reductions and
therefore are not applicable.
N/A N/A - Project not multi-family residential
and not within one-half mile of a major
transit stop.
N/A - Measure applies to residential
projects only.
Yes.
The floor area would be 4,795 sq ft.
Consistency would require a
photovoltaic system with a capacity of
approximately 9.6 kilowatts (kW). The
project would comply through
installation of at least 9.6 kW of solar
panels on the car wash roof .
Yes.
The project would comply with the City's Water
Efficient Landscape Ordinance. The Maximum
Applied Water Allowance (MAWA) for the project
is 471,444 gallons per year.
0.2757 acres landscaping
Yes.
The project includes 25 on-site parking
spaces; one tree per five spaces would
equate to five trees. The project would
exceed this requirement by planting 21
total trees, which includes 5 marina
arbutus trees, 11 coast live oak trees,
and 5 desert museum palo verde trees.
GPA22-0003
(3/26/2024)
Mixed use development
project , Capalina
No. Yes,. The project will include 147 parking
spaces; five percent would equate to 8 (7.35
rounded up) spaces. The project would meet
this requiremnet by providing 8 parking
spaces with Level 2 EV chargers.
Yes. Project is conditioned to submit a TDM plan for
review and approval prior to building permit issuance.
N/A N/A - Project is not within one-half mile of a
major transit stop.
Yes. The project will install electric
heat pump water heaters with an
electric tank.
Yes. The non-residential floor area
would be 4,000 sq ft. The project will
provide photovoltaic system with a
capacity of at least 8 kilowatts (kW).
The project would comply through
installation of at least 8 kW of solar
panels on the roof of the mixed-use
project.
Yes.
The project would comply with the City's Water
Efficient Landscape Ordinance. The Maximum
Applied Water Allowance of 501,725 gallons per
year.
0.3915 acres landscaping
Yes.
The project includes 147 on-site
parking spaces; one tree per five
spaces would equate to 30 trees. The
project proposes to plant 30 trees in
the parking area.
SDP22-0002
(4/15/2024)
SDP22-0002 HUGHES
SMCC, LLC
No. Yes,. The project will include 72 parking
spaces; five percent would equate to 4 (3.6
rounded up) spaces. The project would meet
this requiremnet by providing 4 parking
spaces with Level 2 EV chargers.
Yes. Project is conditioned to submit a TDM plan for
review and approval prior to building permit issuance.
N/A N/A - Project not multi-family residential
and not within one-half mile of a major
transit stop.
N/A - Measure applies to residential
projects only.
Yes.
The floor area would be 67,410 sq ft.
Consistency would require a
photovoltaic system with a capacity of
approximately 134.8 kilowatts (kW).
The project would comply through
installation of at least 134.8 kW of
solar panels on the roof.
Yes.
The project would comply with the City's Water
Efficient Landscape Ordinance. The Maximum
Applied Water Allowance of 382,733 gallons per
year.
0.581 acres landscaping
Yes.
The project includes 72 on-site parking
spaces; one tree per five spaces would
equate to 15 trees. The project
proposes to plant approximately 30
trees in the parking area.
SP22-0003
(11/14/2023)
SP22-0003 MARCOS
SPECIFIC PLAN
No. Yes. The project will include 238 parking
spaces on the West End Residential; five
percent would equate to 12 (11.9) rounded
up) spaces. The project will include 278
parking spaces on the East End Commercial;
five percent would equate to 14 (13.9)
rounded up) spaces. . The project would
meet this requiremnet by providing at least
12 parking spaces with Level 2 EV chargers
on the West End Residential and at least 14
Level 2 EV chargers on the East End
Commercial.
Yes. Project is conditioned to submit a TDM plan for
review and approval prior to building permit issuance.
N/A N/A - Project is not within one-half mile of a
major transit stop by walking distance.
SR78 does not allow for access within one-
half mile.
The residential components (102
West End and 7 live/work East End)
will comply with the electric water
heater requirements.
Yes. The non-residential floor area
would be 56,934 sq ft. The project will
provide photovoltaic system with a
capacity of at least 113.9 kilowatts
(kW). The project would comply wiht
this item through installation of at
least 113.9 kW of solar panels on the
roofs of the East End commercial
project.
Yes.
The project would comply with the City's Water
Efficient Landscape Ordinance. The Maximum
Applied Water Allowance of 845,616 gallons per
year for the East End Commercial and 625,018
gallons per year for the West End Residential for a
total MAWA of 1,470,634.
Residential 0.9149 acres landscaping,
Commercial 1.2816 acres; totaling 2.1965 acres
landscaping.
Yes. Project will include 26 open
parking spaces on the West End
Residential and 278 open parking
spaces on the East End Commercial.
One tree per five spaces equates to 6
trees on the West End Residential and
56 trees on East End Commercial. The
project proposes to plant at least 13
trees in West End residential parking
area and at least 57 trees in East End
Commercial parking area. .
MFS20-0002
(10/26/2021)
MARIPOSA II PHASE II No Yes.
At least 7 EV charging stations.
Yes.
The apartment manager will provide transit
information to the tenants and make a good faith
effort in offering discounted transit fares. There will be some parking spaces for carpool and bicycle racks
onsite. The community room will have some space
available for residents to telecommute.
N/A This is an affordable unit project.
Consession allowed for 16% reduction
in parking. Site Is not within half mile of
transit. 96 units approved and under
construction.
Yes.
The project will install solar hot
water with electric heater.
n/a Yes.
The project will conform to any applicable State &
Local water-use requirements. Estimated water-
use calculations can be found on the sheet LC-2
of the submittal package. Landscape aree =
40,145 sf (0.92 ac)
Yes.
The project will plant at least one tree
per five parking spaces as detailed in
the project's conceptual landscape
plan. LP22-00007 approved 4/3/23.
128 new trees; 25 replaced trees.
SP20-0002
(5/24/2022)
Hall Land Company, 151
Condos on Barham Drive
No Yes.
The Project is providing 56 guest parking
spaces with 5% Level ii EV parking spots
which equates to 3 spaces.
Yes.
The HOA manager will provide transit information to
the owners and make a good faith effort in offering
discounted transit fares. There will be some parking
space for carpool and bicycle racks onsite. The
community room will have some spaces available for
residents to telecommute. The HOA will provide a
newsletter to inform the residents there are options
for reduced transit passes. The project will provide
designated car-share, carpool, vanpool, EV and/or
park-and-ride spaces on site. Each home is equipped
with showers and storage that includes space for
bicycles as well as areas within the home for
telecommuting.
N/A N/A Yes.
The project is proposing an electric
tank in the units.
n/a Yes.
The project will comply with the WELO.
Landscape area = 136,861 sf (3.14 ac)
Yes.
The project proposes 66 parking
spaces of which 10 are reserved for
residents with 243 trees noted on the
landscape plan that will be planted.
LP23-00011 approved 2/23/24. 185
new trees; 9 replaced trees
Appendix A - Data for approved development
Project Number
(Approval Date) Project Name Construction
Complete? Electric Vehicle Charging Stations (T-2) Transportation Demand Management (T-9) Increase Transit Ridership (T-11) Reduce Parking Near Transit (T-12) Water Heaters (E-1) Photovoltaic Installation (E-2) Landscaping Water Use (W-1) Urban Tree Canopy (C-2) SDP22-0001
(1/12/2024)
SAN MARCOS
HOSPITALITY LLC: 115-
room hotel
No Approved: 6 charging stations; 28 EV
ready; 11 EV capable
Approval did not require TDM; however, project
will provide EV spaces. Walking distance to
Sprinter station.
Yes. 80,119 sf
(including basement
parking); 68, 389 sf
(without basement
parking)
N/A N/A Yes. The floor area of the project
would be 68,389 sq ft. Consistency
with this item would require a
photovoltaic system with a capacity
of approximately 137 kilowatts
(kW). The project would comply
with this item through installation
of at least 137 kW of solar panels
on hotel roof.
Yes. Landscape area = 8,281 sf (0.19 ac) LP24-00003 approved 4/23/24. 28 new trees; 12 replaced trees.
SP19-0004
(9/28/2021)
STARBUCKS DRIVE-
THRU
Yes Approved and built 2 charging stations. Approval did not require TDM; however, project will provide EV spaces and bike rack.
N/A N/A N/A No. Building too small. Yes. Landscape area = 6,940 sf (0.16 ac) LP21-00012 approved 12/17/21. 29 new trees.
SP20-0001
(11/9/2021)
138-unit Assisted Living
and Memory Care
Facility
No Approved for 3 charging stations Yes. Project will construct public sidewalk between Mission Rd and TOV Rd; walkway
connections between public sidewalk and
facility; bike rack; existing bike lanes on Mission
Rd and TOV Rd; walking distance to Sprinter
station; Operator will provide transit, rideshare,
and carpool info to employees; Reimbursement
of monthy transit pass for employees
Yes. 127,975 sf
building
N/A N/A Yes. The floor area would be
127,975 sq ft. Consistency with this
item would require a photovoltaic
system with a capacity of
approximately 256 kilowatts (kW).
The project would comply with this
item through installation of at least
256 kW of solar panels on the roof
of the assisted living facility.
Yes. Landscape area = 28,111 sf (0.65 ac) LP23-00008 approved 7/11/23. 55 new trees.
SP21-0003
(7/25/2023)
SP21-0003, MERITAGE
HOMES, GRAN VISTA
No Approved for 120 EV capable garage
spaces and 2 charging stations for
guests.
Yes. Project will construct walkway connections
to public sidewalk; existing bike lanes on Mission
Rd and Las Posas Rd; bike racks; Walking
distance to Sprinter station; Transit, carpool, and
rideshare info; subsidized transit passes.
Yes. 120 approved
units.
N/A yes, Electric water heaters n/a Yes. Landscape area = 73,139 sf (1.68 ac) LP23-00013 approved 1/12/24. 383 new trees.
SC23-0003
(6/2/2023)
UNIVERSITY DISTRICT
SDP for Phase A/222
Bldg.
No (Under
Construction)
25 Ev required and 25 proposed (5% of
requried), this is 25% of the 484 orginal
parking spaces requried. With the
reduction to 463 spaces, the developer is
still providing 25 EV spaces, so over the
requreiemnt.
Yes Yes, 463 units, 16,524
square-feet of
commercial space
50% reduced parking, 463 approved
and 463 under construction a the
moment.
NA, they have one Central Ultity
Plant for the complex, Power
source of the utility plant is solr
and electric.
463, PV is shared by roof solar
because it is an apt. SDP21-0003
Yes. Sheet LI101 (Landscape Irrigation Plan)
provides calculations to demonstrate
compliance with the City’s Water Efficient
Landscape Ordinance.
On Site 222 Building/Ph. A
Ground Level
Planting Area - 17,651 sf
Decomposed Granite - 286 sf
Gravel - 866 sf
Total ground floor landscaping = 18,803 sf or
0.43 acres
Paseo
Planting Area - 6,884 sf
Decomposed Granite - 2,106 sf
Sand & Wood Chips - 661 sf
Artificial Turf - 6,857
Total Paseo landscaping = 16,508 sf or 0.37
acres
Phase A and B, combined, will
plant 105 trees.
SDP21-0004
(11/6/2023)
University District West -
Residential
No (Under
Construction)
5% of requreid, which equates to a total
of 8 EV guest spaces and 425 EVCS ready
spaces.
Yes No. 480 single family
codos. No units
constructed at this
time
NA (Feel free to reach out to go over
this)
Electric per each unit - total 480 Solar per each unit provided 0.42 acres of public landscaping and 12.25 acres of private/HOA landscaping
The SDP does not propose any
single family residential. 117 trees
within the public right of way will be
planted and 1,004 trees within
private for a total of 1,121 trees.
TSM19-0002
(2/22/2023)
UDSP West Side TSM NA Yes NA NA NA NA NA NA
CUP19-0010
(3/7/2022)
HOLLANDIA DAIRY NO Listed as N/A, but there's also a note that a TDM must be prepared.
The project provides pedestrian connections to local
sidewalks and bicycle racks for employees to use.
However, as an industrial food production facility
which operates in shifts methods such as ride sharing
and remote working are not feasible because
employees must be onsite to perform work and work
is spread between many departments and various
shifts throughout the day.
Yes.
New 1,033 PV systems have been
installed on the office building roof as
well as over the employee parking area
in 2018, prior to project.
The proposed landscaping is limited to a section
along the west side of the property, allowing
shrubs to grow for screening. The total landscape
area is less than 2,500 sq. ft. and is not subject to
WELO requirements. At the time of construction
drawing submission, the landscape area will be
confirmed to remain under 2,500 sq. ft. It appears
that the project may not proceed with
construction.
Existing trees are not proposed to
be impacted by project but will be
required to be replaced at a ratio of
1:1 if impacted. No new trees
proposed.
Project Number
(Approval Date) Project Name Construction
Complete? Electric Vehicle Charging Stations (T-2) Transportation Demand Management (T-9) Increase Transit Ridership (T-11) Reduce Parking Near Transit (T-12) Water Heaters (E-1) Photovoltaic Installation (E-2) Landscaping Water Use (W-1) Urban Tree Canopy (C-2) GPA21-0001
(6/27/2023)
Arco Gas Station, Car
Wash, and Convenience
Store
NO 2-EV Parking spaces required by CAP. 0
Constructed
N/A N/A N/A 28.4 kW sized system required.
Project not yet built.
The 13,032 square feet of landscaping is
subject to WELO and is proposed to use
154,563 gallons per year. Landscape Permit
not yet submitted to verify final landscape
area.
The project would include 49 total
trees. All are new trees.
SP22-0004
(12/12/2023)
SPA- LENNAR OCRR
REDEVELOPMENT
NO 25-EV Parking spaces required by CAP. 0
Constructed
YES N/A 202 units with electric tankless
water heaters.
620 Kw for 10,400 non-residential
mixed use portion of project.
Approx. 87,500 sqft of landscaping. No
Landscape Permit approved yet.
The project includes 243 trees, 97
of which will be replacement trees
and 146 new trees.
Permit
Issue Date As-Built Date New
Sidewalk
Replaced or
Upgraded
Sidewalk
New ADA
Ramps
Replaced
ADA
Ramps
New Trail
Replaced or
Upgraded
Trail
New or
Enhanced
Crosswalk
Striping
Bike Lanes
Added
Bike Lanes
Improved Improvement Description
1/1/21-
7/31/22 1/1/21-7/31/22 (Linear
Feet) (Linear Feet) (Each) (Each) (Linear
Feet) (Linear Feet) (Linear Feet) (Linear
Feet)
(Linear
Feet) For existing facilities that were improved
Block 3 (Barham Dr) IP20-00005 44250 45201 - 50 - - - - - - - Replacement of existing sidewalk along frontage on Barham Dr.
Mission Villas IP20-00010 44259 45503 - 314 2 - - - 98 - - New ADA ramps and crosswalk striping to be added at the intersection of Woodward and Mission Rd.
Murai (Lennar
Homes)
IP18-00011 44522 Constructed. As-
built TBD
8,985 - 8 - 2,842 - - - - New surface improvements from the project subdvision connection to Las Posas.
Discovery Street
Segment 2
IP19-00008 44319 Constructed, As-
built TBD
2,429 - 4 - 2,429 - 190 1,995 - Extension of Discovery Street includes new bike lanes, 15ft wide concrete sidewalk/trail and new crosswalk
striping at new intersections.
Woodsprings Hotel
(Grand Ave)
IP20-00003 44626 45329 833 - 4 2 - - - - - New sidewalk, curb and gutter, and ADA ramps to be installed along the project frontages of Grand Ave. and Pacific St.
Highlands Phase II IP21-00001 44522 Constructed, As-
built TBD
2,067 - 2 - 600 - - - - New surface improvements from the project subdvision connection to Las Posas including new ADA ramps,
sidewalk, and DG trail segments.
Sunrise Condos IP20-00007 44614 Constructed, As-
built TBD
6,186 - 14 - - - 24 - - New surface improvements from the project subdvision connection to Barham including new ADA ramps and
sidewalk improvements.
Highlands Phase III IP21-00002 44495 Constructed, As-
built TBD
1,292 - 2 - - - - - - New surface improvements from the project subdvision connection to Las Posas.
Richland Elementary
School
IP21-00004 44462 Constructed, As-
built TBD
- 647 1 8 - - 179 - - New ADA ramps and crosswalk striping for new driveways cuts into the school and crosswalk
improvements with new traffic signal at Richland and
Borden.
Smilax Offsite
(County)
IP21-00007 44621 Constructed, As-
built TBD
- 1,940 5 - - - - - - Half width street improvements along property frontage of Smilax includes placement of ultimate curb line with realigned sidewalk and ada ramps across new project
driveway.
Highlands Phase IV IP21-00008 44502 In construction 3,640 - 4 - 1,471 - 80 - - New surface improvements from the project subdvision connection to Las Posas including new ADA ramps,
sidewalk, and DG trail segments.
Highlands Phase V IP21-00010 44659 In construction 3,899 - 4 - 1,106 - 80 - - New surface improvements from the project subdvision connection to Las Posas including new ADA ramps,
sidewalk, and DG trail segments.
ST009- ADA Impv
(Bailey Ct)
IP21-00019 44572 Constructed, As-
built TBD
621 242 2 - - - - - - Replacement of existing sidewalk along Bingham Dr. and new sidewalk construction on Bailey Ct. Pedestrian ramp from Mission Sports Park to Armorlite improved.
Mission 24 IP19-00014 44642 - 363 2 1 - - - - - Sidewalk and ADA ramp improvements along Avenida Chapala.
29,952 3,556 54 11 8,448 - 651 1,995 - Appendix B. Performance Data for CAP Measure T-8: Bike Lanes, Sidewalks, Trails (January 1, 2021 through July 31, 2022) Drawing NumberDrawing Name
TOTAL
Permit Issue
Date As-Built Date New
Sidewalk
Replaced or
Upgraded
Sidewalk
New ADA
Ramps
Replaced
ADA Ramps New Trail
Replaced or
Upgraded
Trail
New or
Enhanced
Crosswalk
Striping
Bike Lanes
Added
Bike Lanes
Improved Improvement Description
8/1/22-
7/31/24 8/1/22-7/31/24 (Linear Feet) (Linear Feet) (Each) (Each) (Linear Feet) (Linear Feet) (Linear Feet) (Linear Feet) (Linear Feet) For existing facilities that were improved Fenton/Discovery
Village North - North
City Drive
IP23-00004 45314 In construction
755 - 2 - - - 85 700 - New segment of buffered Class II on North City Dr between Discovery St & West City Court (roundabout).
North City West - North
City Drive
IP22-00017 45471 In construction
2,045 - 20 - - - 520 1,723 - New segment of buffered Class II on North City Dr between West City Court (roundabout) to terminus (temporary cul- de-sac).
MAAC Preschool Child
Development Center
IP18-00003 44186 45068
- 122 - 1 - - - - - Replaced sidewalk along Gosnell Way and Firebird St.
Mesa Rim IP19-00003 43899 45180 230 - 2 - - - - - - Addition of sidewalk along Industrial St.
California Allstars IP20-00006 44433 TBD 325 - - - - - - - 305 Addition of sidewalk and replaced bike striping along Twin Oaks Valley Rd.
El Dorado Public
Improvements
IP19-00017 44040 44816
- 1,437 6 - - 48 - - Updaded sidewalk along Richmar Ave and Pleasant Way.
Added crosswalk stiping crossing Pleasant Way.
North City East - Phase
A
GP22-00012 45413 In construction
1,218 - - - - - - 512 - Paseo- new segment of non-vehicular access between
former June Way & Campus Way thru the Phase A building
site (222 North City Dr).
Cielo - Las Posas &
Mission Rd
IP23-00012 45421 In construction
- 900 - 3 - - 345 - 240 Update crosswalks to conteintenal striping and update
ADA ramps on Mission & Las Posas, and Palm & Las Posas
intersections. Update bike lanes and add segment of green conflict stiping on Las Posas.
American Rentals -
Linda Vista Dr
IP22-00009 45152 TBD - 154 - - - - - - - Replaced sidewalk along Linda Vista.
South Pacific IP22-00014 45168 In construction 70 - 2 - - - - - - Addition of sidewalk along Pacific St. 4,643 2,613 26 10 - - 998 2,935 545 TOTAL Drawing
NumberDrawing Name
Appendix B. Performance Data for CAP Measure T-8: Bike Lanes, Sidewalks, Trails (August 1, 2022 through July 31, 2024) 2020-2022 Baseline Avg. 53,893,649 100% 2023 37,027,496 69%
2024 (year-to-date) 12,871,584 24%
2023-2024 Use Avg. 23,053,360 46%
Water Usage (Gallons)
Appendix C. Performance Data for CAP Measure W-2: Water Use in City Parks 53,893,649
37,027,496
12,871,584
23,053,360
2020-2022 Baseline Avg. 2023 2024 (year-to-date) 2023-2024 Use Avg.
Water Usage (Gallons)
100%
69%
24% YTD
46% YTD
Park Site Month Water Usage
(gallons) Baseline % Park Site Month Water Usage
(gallons) Baseline %
All Parks January 1,173,363 1 All Parks January 480,964 0 All Parks February 1,669,037 1 All Parks February 267,036 0 All Parks March 2,094,649 1 All Parks March 264,792 0 All Parks April 2,195,879 1 All Parks April 386,716 0 All Parks May 4,483,013 1 All Parks May 2,629,220 1 All Parks June 6,635,508 1 All Parks June 4,540,360 1 All Parks July 8,019,807 1 All Parks July 6,662,436 1 All Parks August 7,922,816 1 All Parks August 6,743,220 1 All Parks September 7,283,276 1 All Parks September 5,185,136 1 All Parks October 5,662,360 1 All Parks October 3,772,164 1 All Parks November 3,761,443 1 All Parks November 3,639,768 1 All Parks December 2,992,499 1 All Parks December 2,455,684 1 All Parks Total: 53,893,649 1 All Parks Total: 37,027,496 1 Park Site Month Water Usage
(gallons) Baseline % Park Site Month Water Usage
(gallons) Baseline %
All Parks January 851,224 1 All Parks January 666,094 1 All Parks February 477,224 0 All Parks February 372,130 0 All Parks March 297,704 0 All Parks March 281,248 0 All Parks April 854,216 0 All Parks April 620,466 0 All Parks May 3,825,272 1 All Parks May 3,227,246 1 All Parks June 5,417,764 1 All Parks June 4,979,062 1 All Parks July 920,788 0 All Parks July 3,791,612 0 All Parks August 227,392 0 All Parks August 3,485,306 0 All Parks September - - All Parks September 2,592,568 0 All Parks October - - All Parks October 1,886,082 0 All Parks November - - All Parks November 1,819,884 0 All Parks December - - All Parks December 1,227,842 0 All Parks Total: 12,871,584 0 All Parks Total: 24,949,540 0 Appendix C. Performance Data for CAP Measure W-2: Water Use in City Parks *Reflects water usage data from January 1 through
August 31
Year 2020-2022 (annual average) Year 2023
Year 2024 (year-to-date)* Year 2023-2024 (annual average)