Table 1
San Diego Region (in $000s)
2025 Regional Transportation Improvement Program
Amendment No. 8
MPO ID: SM19 25-08RTIP #:

San Marcos, City of
From Discovery Street to San Marcos Boulevard - construct 4-lane secondary arterial bridge and a 6-lane arterial street from Craven Road to Grand Avenue
Project Description:

Project Title: Grand Avenue Bridge and Street Improvements RTP REF: A-62: C-49 (2021) Change Reason: Revise funding between fiscal years
Capacity Status:CI Exempt Category:Non-Exempt
Est Total Cost: $12,524 Open to Traffic: Dec 2026
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
Local Funds $12,523 $1 $1,744 $680 $10,100 $12,524
TOTAL $12,524 $12,523 $1 $1,744 $680 $10,100

PE RW CONPRIORTOTAL
PROJECT LAST AMENDED 25-00
24/25 25/26 26/27 27/28 28/29 FUTURE
Local Funds $12,523 $1 $1,744 $680 $10,100 $12,524
$12,524 $12,523 $1 $1,744 $680 $10,100 TOTAL
MPO ID: SM22 25-08RTIP #:

Intersection at S. Santa Fe Rd and Smilax Rd. - Realign and signalize the intersection located at S. Santa Fe Road and Smilax Road. This project will also widen S. Santa Fe in the westbound direction.

Improvements will include the construction of new pavement, new intersection configuration and new bike lanes.

Project Description:

Project Title: South Santa Fe from Bosstick to Smilax #88179 RTP REF: A-28 (2019) RAS (T2-11)
TransNet - LSI: CR
Change Reason: Revise funding between fiscal years
Capacity Status:CI Exempt Category:Non-Exempt
Est Total Cost: $7,424 Open to Traffic: Jun 2024
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - H (78) $580 $580 $580
TransNet - LSI $39 $105 $39 $105 $144
TransNet - LSI Carry Over $164 $89 $75 $164
Local Funds $6,537 $263 $3,308 $2,965 $6,536
TOTAL $7,424 $7,320 $105 $391 $3,888 $3,145

PE RW CONPRIORTOTAL
PROJECT LAST AMENDED 25-00
24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - H (78) $580 $580 $580
TransNet - LSI $39 $39 $39
TransNet - LSI Carry Over $164 $105 $89 $180 $269
Local Funds $6,537 $263 $3,308 $2,965 $6,536
$7,424 $7,320 $105 $391 $3,888 $3,145 TOTAL
** Pending final SANDAG approval
1Page Tuesday, June 3, 2025
San Diego Region (in $000s)
2025 Regional Transportation Improvement Program
Amendment No. 8
MPO ID: SM24 25-08RTIP #:

San Marcos, City of
SR 78 Bridge 57 0389 - This project includes reconstruction of the State Route 78 overcrossing at Woodland Parkway, reconfiguration of on/off ramps, widening and realigning portions of Woodland Parkway, Barham Drive and Rancheros Drive. Improvements would also include continuation of new bike lanes and trails.

Project Description:

Project Title: Woodland Parkway Interchange and Barham Drive Widening & Street Improvements #88005
RTP REF: A-62; C-51 (2021)
RAS (T2-11)
Change Reason: Revise funding between fiscal years
Capacity Status:CI Exempt Category:Non-ExemptRT:78
Est Total Cost: $17,420 Open to Traffic: Jul 2026
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - L $600 $600 $600
Local Funds $16,819 $1 $9,408 $1,590 $5,822 $16,820
TOTAL $17,420 $17,419 $1 $10,008 $1,590 $5,822

PE RW CONPRIORTOTAL
PROJECT LAST AMENDED 25-00
24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - L $600 $600 $600
Local Funds $16,819 $1 $9,408 $1,590 $5,822 $16,820
$17,420 $17,419 $1 $10,008 $1,590 $5,822 TOTAL
MPO ID: SM31 25-08RTIP #:

From Via Vera Cruz Rd to Bent Ave/Craven Rd - Part of San Marcos Creek Specific Plan group of projects to widen Discovery St. to four lane secondary arterial between Via Vera Cruz and Bent Ave. Improvements include construction of roadway improvements, bike lanes and trails.

Project Description:

Project Title: San Marcos Creek Specific Plan - Discovery St. Widening and Flood Control Improvements #88265
RTP REF: A-62; C-49 (2021)
RAS (T2-11)
TransNet - LSI: CR
Change Reason: Revise funding between fiscal years
Capacity Status:CI Exempt Category:Non-Exempt
Est Total Cost: $16,829 Open to Traffic: Nov 2023
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - Bond $1,998 $1,457 $40 $500 $1,997
TransNet - LSI Carry Over $1,957 $1,500 $537 $450 $2,470 $3,457 Local Funds $4,592 $1,800 $147 $215 $6,031 $6,393
Local RTCIP $4,982 $4,982 $4,982
TOTAL $16,829 $13,529 $3,300 $2,141 $705 $13,983

PE RW CONPRIORTOTAL
PROJECT LAST AMENDED 25-00
24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - Bond $1,998 $1,457 $40 $500 $1,997
TransNet - LSI Carry Over $1,957 $537 $450 $970 $1,957
Local Funds $4,592 $1,300 $147 $215 $5,531 $5,893
Local RTCIP $4,982 $4,982 $4,982
$14,829 $13,529 $1,300 $2,141 $705 $11,983 TOTAL
** Pending final SANDAG approval
2Page Tuesday, June 3, 2025
San Diego Region (in $000s)
2025 Regional Transportation Improvement Program
Amendment No. 8
MPO ID: SM32 25-08RTIP #:

San Marcos, City of
Bridge 57C0867 - Part of San Marcos Creek Specific Plan group of projects to widen to four lane secondary arterial and construct a bridge at San Marcos Creek
Project Description:

Project Title: Via Vera Cruz Bridge and Street Improvements #88264 RTP REF: A-62: C-49 (2021) TransNet - LSI: CR
Change Reason: Increase funding, Revise funding between fiscal years Capacity Status:CI Exempt Category:Non-Exempt
Est Total Cost: $46,768 Open to Traffic: Jul 2024
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI $175 $1,155 $1,330 $1,330
TransNet - LSI Carry Over $3,894 $1,322 $3,509 $96 $8,629 $8,725 HBP $24,522 $2,390 $443 $21,689 $24,522
Local Funds $12,191 $115 $57 $12,019 $12,191
TOTAL $46,768 $40,782 $1,322 $4,664 $2,601 $500 $43,667

PE RW CONPRIORTOTAL
PROJECT LAST AMENDED 25-00
24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI $175 $175 $175
TransNet - LSI Carry Over $3,894 $3,486 $96 $7,284 $7,380 HBP $24,522 $2,390 $443 $21,689 $24,522
Local Funds $12,191 $115 $57 $12,019 $12,191
$44,268 $40,782 $3,486 $2,601 $500 $41,167 TOTAL
MPO ID: SM42 25-08RTIP #:

Discovery Street from Craven Road to Twin Oaks Valley Road (.9 miles) - The project includes the design and construction of all intersections, signals, utilities, drainage and water quality components of Discovery St. as a four lane arterial from Bent Ave. and Craven Dr. and east to Twin Oaks Valley Rd. Improvements will also include bike lanes and trails along the road.

Project Description:

Project Title: Discovery St. from Craven to Twin Oaks #ST007 RAS (T2-11) Change Reason: Revise funding between fiscal years
Capacity Status:CI Exempt Category:Non-Exempt
Est Total Cost: $21,570 Open to Traffic: Jan 2025
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
Local Funds $19,025 $571 $500 $2,000 $17,096 $19,596
Local RTCIP $1,974 $1,974 $1,974
TOTAL $21,570 $20,999 $571 $500 $2,000 $19,070

PE RW CONPRIORTOTAL
PROJECT LAST AMENDED 25-00
24/25 25/26 26/27 27/28 28/29 FUTURE
Local Funds $19,025 $1 $500 $2,000 $16,526 $19,026
Local RTCIP $1,974 $1,974 $1,974
$21,000 $20,999 $1 $500 $2,000 $18,500 TOTAL
** Pending final SANDAG approval
3Page Tuesday, June 3, 2025
San Diego Region (in $000s)
2025 Regional Transportation Improvement Program
Amendment No. 8
MPO ID: SM48 25-08RTIP #:

San Marcos, City of
Creekside Drive from Via Vera Cruz to Grand Ave (.57 miles) - construct approximately 3,000 feet of a two-lane collector road from Via Vera Cruz to Grand Avenue in the City of San Marcos; will include two 12' lanes, diagonal parking on the north side, and parallel parking on the south side; the project will also include a 10' bike trail meandering along the south side
Project Description:

Project Title: San Marcos Creek Specific Plan: Creekside Drive and Pad Grading #88505 RTP REF: A-63; C-49 (2021) TransNet - LSI: CR
Change Reason: Revise funding between fiscal years
Capacity Status:CI Exempt Category:Non-Exempt
Est Total Cost: $12,092 Open to Traffic: Dec 2024
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - Bond $1,384 $929 $455 $1,384
TransNet - LSI (Cash) $473 $473 $473
TransNet - LSI Carry Over $914 $1,600 $2,514 $2,514
Local Funds $7,720 $1 $170 $7,551 $7,721
TOTAL $12,092 $10,491 $1,601 $1,402 $625 $10,065

PE RW CONPRIORTOTAL
PROJECT LAST AMENDED 25-00
24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - Bond $1,384 $929 $455 $1,384
TransNet - LSI (Cash) $473 $473 $473
TransNet - LSI Carry Over $914 $1,100 $2,014 $2,014
Local Funds $7,720 $1 $170 $7,551 $7,721
$11,592 $10,491 $1,101 $1,402 $625 $9,565 TOTAL
MPO ID: SM54 25-08RTIP #:

Regional Arterial Management System - RAMS Traffic Signals....

TransNet - LSI RAMS of $11 is programmed in FY 2026
Project Description:

Project Title: Citywide Traffic Signals - RAMS TransNet - LSI: CR Change Reason: Revise funding between fiscal years
Capacity Status:NCI Exempt Category:Other - Traffic signal synchronization projects Est Total Cost: $130
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI $119 $11 $130 $130
TOTAL $130 $119 $11 $130

PE RW CONPRIORTOTAL
PROJECT LAST AMENDED 25-00
24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI $119 $11 $130 $130
$130 $119 $11 $130 TOTAL
** Pending final SANDAG approval
4Page Tuesday, June 3, 2025
San Diego Region (in $000s)
2025 Regional Transportation Improvement Program
Amendment No. 8
MPO ID: SM56 25-08RTIP #:

San Marcos, City of
Bridge 00L0045 - Part of San Marcos Creek Specific Plan set of projects to construct new two lane bridge to replace existing two lane low water crossing- Local and TransNet funds to match HBP funds programmed as part of CAL44 Highway Bridge Program
Project Description:

Project Title: Bent Ave. Bridge and Improvements #88263 TransNet - LSI: CR Change Reason: Revise funding between fiscal years
Capacity Status:NCI Exempt Category:Safety - Non capacity widening or bridge reconstruction Est Total Cost: $13,823
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI $103 $103 $103
TransNet - LSI Carry Over $1,222 $1,000 $63 $2,159 $2,222 Local Funds $7,148 $4,350 $122 $11,376 $11,498
TOTAL $13,823 $8,473 $5,350 $288 $13,535

PE RW CONPRIORTOTAL
PROJECT LAST AMENDED 25-00
24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI $103 $103 $103
TransNet - LSI Carry Over $1,222 $1,000 $63 $2,159 $2,222 Local Funds $7,148 $4,350 $122 $11,376 $11,498
$13,823 $8,473 $5,350 $288 $13,535 TOTAL
MPO ID: SM59 25-08RTIP #:

COMPLETED
Various streets throughout the City, potentially including Rancho Santa Fe Rd., Mulberry Dr. and San Marcos Blvd. - Street overlay greater than 1-inch thick to various streets throughout the city
Project Description:

Project Title: Annual Street Overlay Project #86009 TransNet - LSI: CR Change Reason: Complete project
Capacity Status:NCI Exempt Category:Safety - Pavement resurfacing and/or rehabilitation Est Total Cost:

CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
TOTAL

PE RW CONPRIORTOTAL

PROJECT LAST AMENDED
24/25 25/26 26/27 27/28 28/29 FUTURE
TOTAL
** Pending final SANDAG approval
5Page Tuesday, June 3, 2025
San Diego Region (in $000s)
2025 Regional Transportation Improvement Program
Amendment No. 8
MPO ID: SM62 25-08RTIP #:

San Marcos, City of
Various roadways throughout San Marcos - Street surface seals and overlays under 1 inch at various locations throughout the city.

Improvements include the applications of bituminous surface seals, restriping to current City standards to provide bike facilities wherever possible and provide updated striping at pedestrian crossings.

Project Description:

Project Title: Annual Surface Seal Project #ST001 TransNet - LSI: Maint Change Reason: Revise funding between fiscal years
Capacity Status:NCI Exempt Category:Safety - Pavement resurfacing and/or rehabilitation Est Total Cost: $250
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI Carry Over $250 $250 $250
TOTAL $250 $250 $250
* Future fund source has not been identified

PE RW CONPRIORTOTAL
PROJECT LAST AMENDED 25-00
24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI Carry Over $250 $250 $250
$250 $250 $250 TOTAL
MPO ID: SM63 25-08RTIP #:

COMPLETED
Intersection at Rancho Santa Fe and Grandon Ave - This project will modify traffic signals at the intersection of Rancho Santa Fe and Grandon by replacing traffic signal poles and mast arms. ADA improvements include the installation of a new crosswalk, an APS system, pedestrian signal heads, push buttons and pedestrian ramps.

New vehicle detection loops.

Project Description:

Project Title: Rancho Santa Fe & Grandon Traffic Signal Modification #TR001 RAS (M-44) TransNet - LSI: CR
Change Reason: Complete project
Capacity Status:NCI Exempt Category:Other - Intersection signalization projects Est Total Cost: $267
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI Carry Over $255 $12 $255 $12 $267
TOTAL $267 $255 $12 $255 $12

PE RW CONPRIORTOTAL
PROJECT LAST AMENDED 25-00
24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI Carry Over $255 $12 $255 $12 $267
$267 $255 $12 $255 $12 TOTAL
** Pending final SANDAG approval
6Page Tuesday, June 3, 2025
San Diego Region (in $000s)
2025 Regional Transportation Improvement Program
Amendment No. 8
MPO ID: SM64 25-08RTIP #:

San Marcos, City of
San Marcos Boulevard from Grand Ave to Rancho Santa Fe Rd. (6.75 miles) - This project includes the reconstruction of San Marcos Blvd. from Grand Ave. to Rancho Santa Fe Rd., including the removal and replacement of deteriorated pavement, removal of pavers at intersections, the installation of new signals throughout the corridor, updated pedestrian ramps for ADA compliance, and the repair and replacement of damaged and uplifted curbs, gutters and uplifted sidewalks.

Improvements also include buffered bike lanes where possible.

Project Description:

Project Title: San Marcos Blvd. Reconstruction #ST005 RAS (T2-11) TransNet - LSI: CR
Change Reason: Revise funding between fiscal years
Capacity Status:NCI Exempt Category:Safety - Pavement resurfacing and/or rehabilitation Est Total Cost: $11,600
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI $130 $7 $137 $137
TransNet - LSI Carry Over $1,982 $1,982 $1,982
Local Funds $2,399 $222 $2,982 $600 $5,003 $5,603
Local RTCIP $2,356 $529 $993 $3,878 $3,878
TOTAL $11,600 $2,529 $2,578 $5,493 $1,000 $600 $11,000

PE RW CONPRIORTOTAL
PROJECT LAST AMENDED 25-00
24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI $1,857 $20 $1,877 $1,877
TransNet - LSI Carry Over $291 $974 $1,265 $1,265
Local Funds $2,399 $2,704 $1,000 $600 $5,503 $6,103
Local RTCIP $2,356 $2,356 $2,356
$11,601 $4,547 $6,054 $1,000 $600 $11,001 TOTAL
** Pending final SANDAG approval
7Page Tuesday, June 3, 2025
San Diego Region (in $000s)
2025 Regional Transportation Improvement Program
Amendment No. 8
MPO ID: SM67 25-08RTIP #:

COMPLETEDSan Marcos, City of
Intersection at San Marcos Blvd and Discovery St - This project will adjust the intersection at San Marcos Blvd. and Discovery Street to eliminate the free-right turn, construct bike lanes and install a new traffic signal. The project will also widen San Marcos Blvd. in the westbound direction, for approximately 900 feet approaching the intersection providing a right turn lane into a highly used school site.

Project Description:

Project Title: San Marcos Blvd. at Discovery Street Intersection Improvements #86002 RAS (T2-11) TransNet - LSI: CR
Change Reason: Complete project
Capacity Status:NCI Exempt Category:Other - Intersection channelization projects Est Total Cost: $3,612
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI Carry Over $350 $350 $350
Local Funds $3,175 $87 $995 $2,267 $3,262
TOTAL $3,612 $3,525 $87 $995 $2,617

PE RW CONPRIORTOTAL
PROJECT LAST AMENDED 25-00
24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI Carry Over $350 $350 $350
Local Funds $3,174 $87 $995 $2,266 $3,261
$3,611 $3,524 $87 $995 $2,616 TOTAL
MPO ID: SM68 25-08RTIP #:

COMPLETED
Various locations throughout the city. - This project will consolidate the construction of a new TMC bringing it up to date with current technologies. This project will also install new supporting infrastructure for the TMC including the installation of new traffic signal controllers at various locations throughout the city.

Project Description:

Project Title: Traffic Management System Enhancement #88532 TransNet - LSI: CR Change Reason: Complete project
Capacity Status:NCI Exempt Category:Other - Traffic signal synchronization projects Est Total Cost: $2,746
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI Carry Over $1,244 $244 $1,000 $1,244
Local Funds $1,501 $1 $244 $1,258 $1,502
TOTAL $2,746 $2,745 $1 $488 $2,258

PE RW CONPRIORTOTAL
PROJECT LAST AMENDED 25-00
24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI Carry Over $1,244 $244 $1,000 $1,244
Local Funds $1,501 $1 $244 $1,258 $1,502
$2,746 $2,745 $1 $488 $2,258 TOTAL
** Pending final SANDAG approval
8Page Tuesday, June 3, 2025
San Diego Region (in $000s)
2025 Regional Transportation Improvement Program
Amendment No. 8
MPO ID: SM69 25-08RTIP #:

San Marcos, City of
Barham Dr from Campus Dr to Twin Oaks Valley Rd (.1 miles) - This project involves surface improvements including asphalt, concrete, medians, sidewalks, signage and traffic lights. Underground improvements include utility and drainage improvements, relocations and water treatment within the public right of way to accommodate the construction of additional lanes.

Project Description:

Project Title: Twin Oaks Valley Rd. & Barham Dr. Improvements #ST008 RTP REF: A-63; C-49 (2021) Change Reason: Reduce funding, Revise funding between fiscal years Capacity Status:CI Exempt Category:Non-Exempt
Est Total Cost: $8,133 Open to Traffic: May 2024
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
Local Funds $8,500 $370 $(737) $1,500 $6,633 $8,133
TOTAL $8,133 $8,500 $370 $(737) $1,500 $6,633

PE RW CONPRIORTOTAL
PROJECT LAST AMENDED 25-00
24/25 25/26 26/27 27/28 28/29 FUTURE
Local Funds $8,499 $1 $1,500 $7,000 $8,500
$8,500 $8,499 $1 $1,500 $7,000 TOTAL
MPO ID: SM72 25-08RTIP #:

Various locations throughout the city - Various roadways throughout the City will be surface sealed. Improvements include restriping to current standards and adding buffered bike lanes where possible.

Project Description:

Project Title: Annual Surface Seal Project FY24-FY27 #ST011 TransNet - LSI: Maint Change Reason: Revise funding between fiscal years
Capacity Status:NCI Exempt Category:Safety - Pavement resurfacing and/or rehabilitation Est Total Cost: $15,000
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI $1,081 $2,285 $3,366 $3,366
TransNet - LSI Carry Over $13 $10 $3 $13
Local Funds $6,762 $3,145 $1,715 $11,621 $11,621
TOTAL $15,000 $6,775 $4,226 $4,000 $10 $14,990

PE RW CONPRIORTOTAL
PROJECT LAST AMENDED 25-00
24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI $1,316 $2,374 $3,690 $3,690
TransNet - LSI Carry Over $13 $1,081 $684 $10 $1,768 $1,778 Local Funds $3,157 $3,749 $2,000 $1,626 $10,532 $10,532 $16,000 $3,170 $4,830 $4,000 $4,000 $10 $15,990 TOTAL
** Pending final SANDAG approval
9Page Tuesday, June 3, 2025
San Diego Region (in $000s)
2025 Regional Transportation Improvement Program
Amendment No. 8
MPO ID: SM74 25-08RTIP #:

San Marcos, City of
Bridge 57C0519 - Replacement of the existing Olive Street bridge. This project will also include trail and/or bicycle improvements.

Project Description:

Project Title: Olive Street Bridge #ST012 TransNet - LSI: Maint Change Reason: Revise funding between fiscal years
Capacity Status:NCI Exempt Category:Safety - Non capacity widening or bridge reconstruction Est Total Cost: $2,500
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI Carry Over $1,045 $600 $445 $1,045
Local Funds $1,455 $1,455 $1,455
TOTAL $2,500 $1,045 $1,455 $600 $1,900
* Remaining funding not yet identified

PE RW CONPRIORTOTAL
PROJECT LAST AMENDED 25-00
24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI $2 $1,023 $7 $1,032 $1,032
TransNet - LSI Carry Over $1,043 $425 $600 $868 $1,468
$2,500 $1,045 $1,448 $7 $600 $1,900 TOTAL
MPO ID: SM75 25-08RTIP #:

Rancho Santa Fe from Melrose to Island (4 miles) - Repair pavement on South Rancho Santa Fe from approx. Melrose to Island Drive Project Description:

Project Title: RSF Pavement Restoration #ST014 TransNet - LSI: CR Change Reason: Reduce funding, Revise funding between fiscal years Capacity Status:NCI Exempt Category:Safety - Pavement resurfacing and/or rehabilitation Est Total Cost: $5,600
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI $108 $2,132 $108 $2,132 $2,240
TransNet - LSI Carry Over $760 $760 $760
Local Funds $600 $2,000 $2,600 $2,600
TOTAL $5,600 $108 $2,732 $2,760 $108 $5,492

PE RW CONPRIORTOTAL
PROJECT LAST AMENDED 25-00
24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI $108 $2,267 $108 $2,267 $2,375
TransNet - LSI Carry Over $2,625 $229 $2,396 $2,625
Local Funds $2,600 $2,600 $2,600
$7,600 $108 $7,492 $337 $7,263 TOTAL
** Pending final SANDAG approval
10Page Tuesday, June 3, 2025
San Diego Region (in $000s)
2025 Regional Transportation Improvement Program
Amendment No. 8
MPO ID: SM76 25-08RTIP #:

San Marcos, City of
Various streets throughout the city - Various roadways throughout the City will be surface sealed. Improvements include restriping to current standards and adding buffered bike lanes where possible.

Project Description:

Project Title: Annual Surface Seal Project FY28-FY31 #ST018 TransNet - LSI: Maint Change Reason: Increase funding, Other, Revise funding between fiscal years Capacity Status:NCI Exempt Category:Safety - Pavement resurfacing and/or rehabilitation Est Total Cost: $20,000
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI $2,375 $2,482 $500 $4,357 $4,857
Local Funds $2,625 $2,518 $500 $14,643 $15,143 $10,000
TOTAL $20,000 $5,000 $5,000 $1,000 $19,000 $10,000

PE RW CONPRIORTOTAL
PROJECT LAST AMENDED 25-00
24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI $2,475 $2,562 $500 $4,537 $5,037
Local Funds $2,525 $12,438 $500 $14,463 $14,963
$20,000 $5,000 $15,000 $1,000 $19,000 TOTAL
MPO ID: SM77 25-08RTIP #:

Various streets and roadways throughout the City - Project proposes additional funding for deferred maintenance of roadways. Projects would predominately be rehabilitation projects. Projects would also include supplementation of existing preventative maintenance program (slurry ST018).

Project Description:

Project Title: Roadway Rehabilitation Program Group 1 #ST022 TransNet - LSI: Maint Change Reason: New Project
Capacity Status:NCI Exempt Category:Safety - Pavement resurfacing and/or rehabilitation Est Total Cost: $3,500
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
TransNet - LSI Carry Over $1,000 $1,000 $1,000
Local Funds $2,500 $500 $2,000 $2,500
TOTAL $3,500 $3,500 $500 $3,000
** Pending final SANDAG approval
11Page Tuesday, June 3, 2025
San Diego Region (in $000s)
2025 Regional Transportation Improvement Program
Amendment No. 8
MPO ID: SM78 25-08RTIP #:

San Marcos, City of
Various streets and roadways throughout the City - Project proposes additional funding for deferred maintenance of roadways. Projects would predominately be rehabilitation projects. Projects would also include supplementation of existing preventative maintenance program (slurry ST018).

Project Description:

Project Title: Roadway Rehabilitation Program Group 2 #ST023 Change Reason: New Project
Capacity Status:NCI Exempt Category:Safety - Pavement resurfacing and/or rehabilitation Est Total Cost: $4,000
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
Local Funds $4,000 $500 $3,500 $4,000
TOTAL $4,000 $4,000 $500 $3,500
MPO ID: SM79 25-08RTIP #:

Various streets and roadways throughout the City - Project proposes additional funding for deferred maintenance of roadways. Projects would predominately be rehabilitation projects. Projects would also include supplementation of existing preventative maintenance program (slurry ST018).

Project Description:

Project Title: Roadway Rehabilitation Program Group 3 #ST024 Change Reason: New Project
Capacity Status:NCI Exempt Category:Safety - Pavement resurfacing and/or rehabilitation Est Total Cost: $4,500
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
Local Funds $4,500 $500 $4,000 $4,500
TOTAL $4,500 $4,500 $500 $4,000
MPO ID: SM80 25-08RTIP #:

Various streets and roadways throughout the City - Project proposes additional funding for deferred maintenance of roadways. Projects would predominately be rehabilitation projects. Projects would also include supplementation of existing preventative maintenance program (slurry ST018).

Project Description:

Project Title: Roadway Rehabilitation Program Group 4 #ST025 Change Reason: New Project
Capacity Status:NCI Exempt Category:Safety - Pavement resurfacing and/or rehabilitation Est Total Cost: $10,500
CONRWPEPRIORTOTAL 24/25 25/26 26/27 27/28 28/29 FUTURE
Local Funds $5,000 $500 $10,000 $10,500 $5,500
TOTAL $10,500 $5,000 $500 $10,000 $5,500
** Pending final SANDAG approval