1 In this context, a project is any action that meets the definition of a “Project” in Section 15378 of the State CEQA Guidelin es.
Application Information
Step 1: Land Use Consistency
☐ ☐
☐ ☐
☐ ☐
Step 2: CAP Measures Consistency
Checklist Item
(Check the appropriate box and provide an explanation for your answer. Please use additional sheets if necessary)
Yes No N/A
☐ ☐ ☐
☐ ☐ ☐
Step 2: CAP Measures Consistency
Checklist Item
(Check the appropriate box and provide an explanation for your answer. Please use additional sheets if necessary)
Yes No N/A
☐ ☐ ☐
2 The designated number of car -share, carpool, vanpool, and/or park -and-ride parking spaces provided at a rate equal to or greater than CALGreen minimum requirements.
3 Measure T -10 requires projects to increase alternative mode share by seven percent. Th e baseline mode share for alternative transportation (i.e. carpool, public transit, bicycle, walk, and telecommute) is 22 percent based on 2010 Census Data.
Step 2: CAP Measures Consistency
Checklist Item
(Check the appropriate box and provide an explanation for your answer. Please use additional sheets if necessary)
Yes No N/A
☐ ☐ ☐
☐ ☐ ☐
4 Major transit stop is defined as a bus or light -rail station with fixed service and 10 -minute min imum headways during peak hours.
Project applicants should confirm with City staff if the project site would fall within this proximity tot a major transit st op.
Step 2: CAP Measures Consistency
Checklist Item
(Check the appropriate box and provide an explanation for your answer. Please use additional sheets if necessary)
Yes No N/A
☐ ☐ ☐
☐ ☐ ☐
5 City of San Marcos Landscape Manual: https://www.san -marcos.net/home/showdocument?id=13984 Step 2: CAP Measures Consistency
Checklist Item
(Check the appropriate box and provide an explanation for your answer. Please use additional sheets if necessary)
Yes No N/A
☐ ☐ ☐