Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 650 380 220 380 0 300 0 160 0 0 0 Future Volume (veh/h) 0 650 380 220 380 0 300 0 160 0 0 0 Initial Q (Qb), veh 000000000
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 0 1856 0 1856 Adj Flow Rate, veh/h 0 823 481 259 447 0 326 0 174
Peak Hour Factor 0.79 0.79 0.79 0.85 0.85 0.85 0.92 0.92 0.92 Percent Heavy Veh, % 333330303
Cap, veh/h 82 1238 528 360 1793 0 968 0 781
Arrive On Green 0.00 0.35 0.35 0.20 0.51 0.00 0.28 0.00 0.28 Sat Flow, veh/h 1767 3526 1503 1767 3618 0 3428 0 2768
Grp Volume(v), veh/h 0 823 481 259 447 0 326 0 174
Grp Sat Flow(s),veh/h/ln 1767 1763 1503 1767 1763 0 1714 0 1384 Q Serve(g_s), s 0.0 21.3 33.0 14.8 7.7 0.0 8.1 0.0 5.2
Cycle Q Clear(g_c), s 0.0 21.3 33.0 14.8 7.7 0.0 8.1 0.0 5.2 Prop In Lane 1.00 1.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 82 1238 528 360 1793 0 968 0 781 V/C Ratio(X) 0.00 0.66 0.91 0.72 0.25 0.00 0.34 0.00 0.22 Avail Cap(c_a), veh/h 82 1302 555 360 1857 0 968 0 781
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 29.7 33.5 40.1 14.9 0.0 30.7 0.0 29.7 Incr Delay (d2), s/veh 0.0 1.2 18.9 11.7 0.1 0.0 0.9 0.0 0.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 8.7 14.0 7.3 2.9 0.0 3.4 0.0 1.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0 30.9 52.3 51.9 15.0 0.0 31.7 0.0 30.3 LnGrp LOS A C D D B A C A C
Approach Vol, veh/h 1304 706 500
Approach Delay, s/veh 38.8 28.5 31.2
Approach LOS D C C
Timer - Assigned Phs 1 2 5 6 8
Phs Duration (G+Y+Rc), s 27.0 44.0 10.0 61.0 37.0
Change Period (Y+Rc), s 5.0 * 6.1 5.0 * 6.1 6.5
Max Green Setting (Gmax), s 22.0 * 40 5.0 * 57 30.5
Max Q Clear Time (g_c+I1), s 16.8 35.0 0.0 9.7 10.1
Green Ext Time (p_c), s 0.3 2.9 0.0 2.9 1.7
Intersection Summary
HCM 6th Ctrl Delay 34.4
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
User approved changes to right turn type.
HCM 6th Signalized Intersection Summary Year 2050 AM
2: N Pacific St & W. Mission Rd 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 30 730 90 0 640 30 0 0 70 90 0 50 Future Volume (veh/h) 30 730 90 0 640 30 0 0 70 90 0 50 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.95 1.00 0.97 1.00 0.94 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1726 1726 1726 0 1726 1726 0 1726 1726 1726 1726 1726 Adj Flow Rate, veh/h 37 890 110 0 821 38 0 0 95 120 0 67 Peak Hour Factor 0.82 0.82 0.82 0.78 0.78 0.78 0.74 0.74 0.74 0.75 0.75 0.75 Percent Heavy Veh, % 3 33033033333
Cap, veh/h 144 1252 155 0 910 42 0 0 385 191 0 160
Arrive On Green 0.09 0.43 0.43 0.00 0.29 0.29 0.00 0.00 0.27 0.12 0.00 0.12 Sat Flow, veh/h 1643 2921 361 0 3268 147 0 0 1417 1643 0 1381 Grp Volume(v), veh/h 37 499 501 0 423 436 0 0 95 120 0 67 Grp Sat Flow(s),veh/h/ln1643 1639 1643 0 1639 1690 0 0 1417 1643 0 1381 Q Serve(g_s), s 1.9 23.1 23.1 0.0 23.0 23.0 0.0 0.0 4.8 6.4 0.0 4.2 Cycle Q Clear(g_c), s 1.9 23.1 23.1 0.0 23.0 23.0 0.0 0.0 4.8 6.4 0.0 4.2 Prop In Lane 1.00 0.22 0.00 0.09 0.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 144 703 704 0 469 483 0 0 385 191 0 160 V/C Ratio(X) 0.26 0.71 0.71 0.00 0.90 0.90 0.00 0.00 0.25 0.63 0.00 0.42 Avail Cap(c_a), veh/h 144 773 775 0 525 541 0 0 385 446 0 375 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 39.4 21.7 21.7 0.0 31.8 31.8 0.0 0.0 26.3 39.0 0.0 38.0 Incr Delay (d2), s/veh 4.3 2.2 2.2 0.0 16.6 16.2 0.0 0.0 1.5 1.3 0.0 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.9 8.4 8.4 0.0 10.6 10.9 0.0 0.0 1.8 2.6 0.0 1.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 43.6 23.9 23.9 0.0 48.3 48.0 0.0 0.0 27.8 40.3 0.0 38.6 LnGrp LOS D C C A D D A A C D A D
Approach Vol, veh/h 1037 859 95 187
Approach Delay, s/veh 24.6 48.1 27.8 39.7
Approach LOS CDCD
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 46.4 15.8 13.2 33.2 30.2
Change Period (Y+Rc), s * 6.8 5.1 5.1 6.8 5.1
Max Green Setting (Gmax), s * 44 25.1 8.1 29.6 25.1
Max Q Clear Time (g_c+I1), s 25.1 8.4 3.9 25.0 6.8
Green Ext Time (p_c), s 3.6 0.4 0.0 1.5 0.3
Intersection Summary
HCM 6th Ctrl Delay 35.3
HCM 6th LOS D
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 AM
3: N. Las Posas Rd & W. Mission Rd 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 180 500 100 400 450 150 90 520 350 150 770 60 Future Volume (veh/h) 180 500 100 400 450 150 90 520 350 150 770 60 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.96 1.00 0.94 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1726 1726 1856 1856 1726 1726 1726 1856 1726 1856 Adj Flow Rate, veh/h 225 625 125 460 517 172 110 634 427 158 811 63 Peak Hour Factor 0.80 0.80 0.80 0.87 0.87 0.87 0.82 0.82 0.82 0.95 0.95 0.95 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 212 1122 568 385 825 273 137 896 974 286 1215 94 Arrive On Green 0.12 0.32 0.32 0.12 0.32 0.32 0.08 0.27 0.27 0.08 0.27 0.27 Sat Flow, veh/h 1767 3526 1401 3188 2572 850 1643 3279 2424 3428 4446 344 Grp Volume(v), veh/h 225 625 125 460 353 336 110 634 427 158 572 302 Grp Sat Flow(s),veh/h/ln1767 1763 1401 1594 1763 1659 1643 1639 1212 1714 1570 1649 Q Serve(g_s), s 14.4 17.6 7.0 14.5 20.4 20.7 7.9 20.9 15.5 5.3 19.4 19.6 Cycle Q Clear(g_c), s 14.4 17.6 7.0 14.5 20.4 20.7 7.9 20.9 15.5 5.3 19.4 19.6 Prop In Lane 1.00 1.00 1.00 0.51 1.00 1.00 1.00 0.21
Lane Grp Cap(c), veh/h 212 1122 568 385 566 532 137 896 974 286 858 451 V/C Ratio(X) 1.06 0.56 0.22 1.19 0.62 0.63 0.80 0.71 0.44 0.55 0.67 0.67 Avail Cap(c_a), veh/h 212 1122 568 385 566 532 137 902 978 286 864 454 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.90 0.90 0.90 1.00 1.00 1.00 Uniform Delay (d), s/veh 52.8 33.9 23.6 52.8 34.6 34.7 54.0 39.3 26.7 52.9 38.7 38.8 Incr Delay (d2), s/veh 78.9 2.0 0.9 110.1 5.1 5.6 34.7 4.2 1.3 7.5 4.1 7.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln10.8 7.6 2.4 11.5 9.2 8.8 4.5 8.6 4.5 2.5 7.7 8.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 131.7 35.9 24.5 162.9 39.8 40.3 88.7 43.5 28.0 60.4 42.8 46.5 LnGrp LOS F D C F D D F D C E D D
Approach Vol, veh/h 975 1149 1171 1032
Approach Delay, s/veh 56.5 89.2 42.1 46.6
Approach LOS E F D D
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s15.1 39.6 20.8 44.5 15.1 39.6 20.5 44.8 Change Period (Y+Rc), s 5.1 6.8 6.3 6.3 5.1 6.8 * 6.1 * 6.3 Max Green Setting (Gmax), s10.0 33.0 14.5 38.0 10.0 33.0 * 14 * 39 Max Q Clear Time (g_c+I1), s7.3 22.9 16.5 19.6 9.9 21.6 16.4 22.7 Green Ext Time (p_c), s 0.1 2.8 0.0 2.6 0.0 2.7 0.0 2.3 Intersection Summary
HCM 6th Ctrl Delay 58.9
HCM 6th LOS E
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
User approved changes to right turn type.
HCM 6th Signalized Intersection Summary Year 2050 AM
4: Knoll Rd/Drwy & W. Mission Rd 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 10 520 220 270 680 10 200 10 190 10 10 20 Future Volume (veh/h) 10 520 220 270 680 10 200 10 190 10 10 20 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.93 1.00 0.94 1.00 0.96 1.00 0.93 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1726 1726 1856 1856 1726 1726 1726 1856 1726 1856 Adj Flow Rate, veh/h 13 693 293 297 747 11 284 0 260 12 12 25 Peak Hour Factor 0.75 0.75 0.75 0.91 0.91 0.91 0.73 0.73 0.73 0.81 0.81 0.81 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 37 1410 546 179 1750 26 702 0 301 50 50 87
Arrive On Green 0.02 0.40 0.40 0.11 0.49 0.49 0.21 0.00 0.21 0.06 0.06 0.06 Sat Flow, veh/h 1767 3526 1364 1643 3553 52 3287 0 1410 842 842 1455 Grp Volume(v), veh/h 13 693 293 297 371 387 284 0 260 24 0 25 Grp Sat Flow(s),veh/h/ln1767 1763 1364 1643 1763 1842 1643 0 1410 1684 0 1455 Q Serve(g_s), s 0.7 14.7 16.4 10.9 13.5 13.5 7.4 0.0 17.8 1.4 0.0 1.6 Cycle Q Clear(g_c), s 0.7 14.7 16.4 10.9 13.5 13.5 7.4 0.0 17.8 1.4 0.0 1.6 Prop In Lane 1.00 1.00 1.00 0.03 1.00 1.00 0.50 1.00
Lane Grp Cap(c), veh/h 37 1410 546 179 869 908 702 0 301 100 0 87 V/C Ratio(X) 0.35 0.49 0.54 1.66 0.43 0.43 0.40 0.00 0.86 0.24 0.00 0.29 Avail Cap(c_a), veh/h 124 1410 546 179 869 908 887 0 381 135 0 116 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 48.3 22.4 22.9 44.5 16.3 16.3 33.8 0.0 37.9 44.9 0.0 45.0 Incr Delay (d2), s/veh 2.0 1.2 3.8 319.5 1.5 1.5 0.1 0.0 13.0 0.5 0.0 0.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.3 5.9 5.5 20.2 5.3 5.5 2.9 0.0 7.1 0.6 0.0 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 50.3 23.6 26.7 364.1 17.8 17.8 34.0 0.0 50.9 45.3 0.0 45.7 LnGrp LOS D C C F B B C A D D A D
Approach Vol, veh/h 999 1055 544 49
Approach Delay, s/veh 24.9 115.3 42.1 45.5
Approach LOS C F D D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s16.0 45.8 11.1 6.7 55.1 27.1
Change Period (Y+Rc), s 5.1 5.8 * 5.2 4.6 5.8 5.7
Max Green Setting (Gmax), s10.9 32.3 * 8 7.0 36.7 27.0
Max Q Clear Time (g_c+I1), s12.9 18.4 3.6 2.7 15.5 19.8 Green Ext Time (p_c), s 0.0 3.0 0.0 0.0 2.6 0.7
Intersection Summary
HCM 6th Ctrl Delay 64.8
HCM 6th LOS E
Notes
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 AM
5: N. Las Posas Rd & Armorlite Dr 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 10 0 20 170 10 50 40 900 130 30 1380 10 Future Volume (veh/h) 10 0 20 170 10 50 40 900 130 30 1380 10 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.97 1.00 0.96 1.00 0.96 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 12 0 25 187 11 55 48 1071 155 35 1624 12 Peak Hour Factor 0.80 0.80 0.80 0.91 0.91 0.91 0.84 0.84 0.84 0.85 0.85 0.85 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 40 0 252 150 60 300 91 2108 305 77 2418 18
Arrive On Green 0.02 0.00 0.17 0.09 0.23 0.23 0.05 0.47 0.47 0.04 0.47 0.47 Sat Flow, veh/h 1767 0 1506 1767 261 1305 1767 4444 642 1767 5186 38 Grp Volume(v), veh/h 12 0 25 187 0 66 48 813 413 35 1058 578 Grp Sat Flow(s),veh/h/ln1767 0 1506 1767 0 1566 1767 1689 1709 1767 1689 1847 Q Serve(g_s), s 0.7 0.0 1.4 8.5 0.0 3.4 2.6 16.7 16.7 1.9 24.3 24.3 Cycle Q Clear(g_c), s 0.7 0.0 1.4 8.5 0.0 3.4 2.6 16.7 16.7 1.9 24.3 24.3 Prop In Lane 1.00 1.00 1.00 0.83 1.00 0.38 1.00 0.02
Lane Grp Cap(c), veh/h 40 0 252 150 0 359 91 1602 811 77 1574 861 V/C Ratio(X) 0.30 0.00 0.10 1.24 0.00 0.18 0.53 0.51 0.51 0.46 0.67 0.67 Avail Cap(c_a), veh/h 141 0 587 150 0 619 124 1602 811 124 1574 861 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 0.18 0.18 0.18 0.53 0.53 0.53 Uniform Delay (d), s/veh 48.1 0.0 35.3 45.8 0.0 31.0 46.2 18.2 18.2 46.7 20.7 20.7 Incr Delay (d2), s/veh 1.5 0.0 0.1 153.8 0.0 0.1 0.3 0.2 0.4 0.8 1.2 2.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.3 0.0 0.5 10.2 0.0 1.3 1.1 6.0 6.1 0.8 8.9 10.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 49.6 0.0 35.3 199.6 0.0 31.1 46.6 18.4 18.6 47.5 22.0 23.0 LnGrp LOS D A D F A C D B B D C C
Approach Vol, veh/h 37 253 1274 1671
Approach Delay, s/veh 40.0 155.6 19.5 22.9
Approach LOS D F B C
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s10.4 53.4 14.0 22.2 11.2 52.6 7.8 28.5 Change Period (Y+Rc), s 6.0 6.0 5.5 5.5 6.0 6.0 5.5 5.5 Max Green Setting (Gmax), s7.0 22.5 8.5 39.0 7.0 22.5 8.0 39.5 Max Q Clear Time (g_c+I1), s3.9 18.7 10.5 3.4 4.6 26.3 2.7 5.4 Green Ext Time (p_c), s 0.0 1.9 0.0 0.1 0.0 0.0 0.0 0.3 Intersection Summary
HCM 6th Ctrl Delay 32.1
HCM 6th LOS C
HCM 6th Signalized Intersection Summary Year 2050 AM
7: N. Las Posas Rd & Descanso Ave 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 20 40 130 170 20 30 70 950 140 20 1510 40 Future Volume (veh/h) 20 40 130 170 20 30 70 950 140 20 1510 40 Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 0.94 1.00 0.94 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 24 47 153 233 27 41 71 864 141 20 1541 41 Peak Hour Factor 0.85 0.85 0.85 0.73 0.73 0.73 0.99 0.99 0.99 0.98 0.98 0.98 Percent Heavy Veh, % 333333333333
Cap, veh/h 172 336 425 955 181 276 158 1053 171 88 1045 28 Arrive On Green 0.28 0.28 0.28 0.28 0.28 0.28 0.09 0.24 0.24 0.05 0.21 0.21 Sat Flow, veh/h 617 1208 1525 3428 652 989 1767 4352 705 1767 5063 135 Grp Volume(v), veh/h 71 0 153 233 0 68 71 669 336 20 1028 554 Grp Sat Flow(s),veh/h/ln 1825 0 1525 1714 0 1641 1767 1689 1680 1767 1689 1821 Q Serve(g_s), s 4.1 0.0 11.3 7.4 0.0 4.4 5.3 26.2 26.5 1.5 28.9 28.9 Cycle Q Clear(g_c), s 4.1 0.0 11.3 7.4 0.0 4.4 5.3 26.2 26.5 1.5 28.9 28.9 Prop In Lane 0.34 1.00 1.00 0.60 1.00 0.42 1.00 0.07
Lane Grp Cap(c), veh/h 508 0 425 955 0 457 158 817 407 88 697 376 V/C Ratio(X) 0.14 0.00 0.36 0.24 0.00 0.15 0.45 0.82 0.83 0.23 1.48 1.48 Avail Cap(c_a), veh/h 508 0 425 955 0 457 158 817 407 88 697 376 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 0.95 0.95 0.95 0.72 0.72 0.72 Uniform Delay (d), s/veh 37.9 0.0 40.5 39.1 0.0 38.0 60.5 50.2 50.3 63.9 55.6 55.6 Incr Delay (d2), s/veh 0.6 0.0 2.4 0.6 0.0 0.7 8.6 8.6 16.5 4.2 219.5 224.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.9 0.0 4.6 3.2 0.0 1.9 2.7 11.8 12.7 0.8 33.2 36.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 38.5 0.0 42.9 39.7 0.0 38.7 69.1 58.7 66.8 68.1 275.1 279.7 LnGrp LOS D A D D A D EEEEFF
Approach Vol, veh/h 224 301 1076 1602
Approach Delay, s/veh 41.5 39.5 61.9 274.1
Approach LOS D D E F
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 13.5 40.4 45.5 18.5 35.4 45.5
Change Period (Y+Rc), s 6.5 * 6.5 6.5 6.0 6.5 6.5
Max Green Setting (Gmax), s 7.0 * 30 39.0 12.5 24.0 39.0 Max Q Clear Time (g_c+I1), s 3.5 28.5 13.3 7.3 30.9 9.4 Green Ext Time (p_c), s 0.0 0.5 0.5 0.0 0.0 0.7
Intersection Summary
HCM 6th Ctrl Delay 164.5
HCM 6th LOS F
Notes
User approved pedestrian interval to be less than phase max green. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 AM
8: N. Las Posas Rd & SR-78 WB Ramps 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 580 10 270 270 910 0 0 1600 450 Future Volume (veh/h) 0 0 0 580 10 270 270 910 0 0 1600 450 Initial Q (Qb), veh 000000000
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 1.00 1.00 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 0 0 1856 1856 Adj Flow Rate, veh/h 467 239 293 307 1034 0 0 1778 500
Peak Hour Factor 0.92 0.92 0.92 0.88 0.88 0.88 0.90 0.90 0.90 Percent Heavy Veh, % 333330033
Cap, veh/h 497 209 257 256 3039 0 0 1606 437
Arrive On Green 0.28 0.28 0.28 0.15 0.60 0.00 0.00 0.41 0.41 Sat Flow, veh/h 1767 745 913 1767 5233 0 0 4103 1070
Grp Volume(v), veh/h 467 0 532 307 1034 0 0 1517 761
Grp Sat Flow(s),veh/h/ln 1767 0 1658 1767 1689 0 0 1689 1629 Q Serve(g_s), s 25.8 0.0 28.1 14.5 10.3 0.0 0.0 40.8 40.8 Cycle Q Clear(g_c), s 25.8 0.0 28.1 14.5 10.3 0.0 0.0 40.8 40.8 Prop In Lane 1.00 0.55 1.00 0.00 0.00 0.66
Lane Grp Cap(c), veh/h 497 0 466 256 3039 0 0 1378 665
V/C Ratio(X) 0.94 0.00 1.14 1.20 0.34 0.00 0.00 1.10 1.15 Avail Cap(c_a), veh/h 497 0 466 256 3039 0 0 1378 665
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.78 0.78 0.00 0.00 0.09 0.09 Uniform Delay (d), s/veh 35.1 0.0 36.0 42.8 10.1 0.0 0.0 29.6 29.6 Incr Delay (d2), s/veh 25.9 0.0 86.8 114.9 0.2 0.0 0.0 46.7 67.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 14.4 0.0 22.3 14.2 3.3 0.0 0.0 23.9 26.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 61.0 0.0 122.8 157.6 10.3 0.0 0.0 76.3 96.7 LnGrp LOS E A F F B A A F F
Approach Vol, veh/h 999 1341 2278
Approach Delay, s/veh 93.9 44.0 83.1
Approach LOS F D F
Timer - Assigned Phs 2 5 6 8
Phs Duration (G+Y+Rc), s 66.8 19.2 47.6 33.2
Change Period (Y+Rc), s 6.8 * 4.7 6.8 5.1
Max Green Setting (Gmax), s 60.0 * 15 40.8 28.1
Max Q Clear Time (g_c+I1), s 12.3 16.5 42.8 30.1
Green Ext Time (p_c), s 4.9 0.0 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 74.1
HCM 6th LOS E
Notes
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 AM
9: N. Las Posas Rd & Grand Ave 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 180 220 20 130 200 580 30 480 190 610 790 630 Future Volume (veh/h) 180 220 20 130 200 580 30 480 190 610 790 630 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.96 1.00 0.97 1.00 0.95 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 247 301 27 144 222 644 35 565 224 701 908 724 Peak Hour Factor 0.73 0.73 0.73 0.90 0.90 0.90 0.85 0.85 0.85 0.87 0.87 0.87 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 595 950 85 145 369 744 169 1119 430 265 1042 715 Arrive On Green 0.17 0.29 0.29 0.08 0.20 0.20 0.10 0.31 0.31 0.08 0.30 0.30 Sat Flow, veh/h 3428 3265 291 1767 1856 2663 1767 3569 1370 3428 3526 1496 Grp Volume(v), veh/h 247 161 167 144 222 644 35 534 255 701 908 724 Grp Sat Flow(s),veh/h/ln1714 1763 1793 1767 1856 1332 1767 1689 1562 1714 1763 1496 Q Serve(g_s), s 7.1 7.9 8.0 9.0 12.0 21.9 2.0 14.2 14.8 8.5 26.9 32.5 Cycle Q Clear(g_c), s 7.1 7.9 8.0 9.0 12.0 21.9 2.0 14.2 14.8 8.5 26.9 32.5 Prop In Lane 1.00 0.16 1.00 1.00 1.00 0.88 1.00 1.00
Lane Grp Cap(c), veh/h 595 513 522 145 369 744 169 1059 490 265 1042 715 V/C Ratio(X) 0.41 0.31 0.32 1.00 0.60 0.87 0.21 0.50 0.52 2.65 0.87 1.01 Avail Cap(c_a), veh/h 595 513 522 145 369 744 169 1059 490 265 1042 715 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.70 0.70 0.70 1.00 1.00 1.00 0.09 0.09 0.09 Uniform Delay (d), s/veh 40.5 30.4 30.5 50.5 40.1 38.0 45.9 30.8 31.0 50.7 36.8 29.5 Incr Delay (d2), s/veh 2.1 1.6 1.6 61.6 1.4 7.3 2.8 1.7 3.9 741.7 1.0 13.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln3.1 3.5 3.6 6.3 5.5 8.7 1.0 5.8 5.8 30.8 11.1 20.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 42.6 32.0 32.1 112.1 41.4 45.3 48.7 32.5 34.9 792.5 37.8 42.9 LnGrp LOS D C C F DDDCCFDF
Approach Vol, veh/h 575 1010 824 2333
Approach Delay, s/veh 36.6 54.0 33.9 266.2
Approach LOS D D C F
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s15.0 41.0 15.5 38.5 17.0 39.0 25.6 28.4 Change Period (Y+Rc), s 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s8.5 34.5 9.0 32.0 10.5 32.5 19.1 21.9 Max Q Clear Time (g_c+I1), s10.5 16.8 11.0 10.0 4.0 34.5 9.1 23.9 Green Ext Time (p_c), s 0.0 3.0 0.0 1.1 0.0 0.0 0.3 0.0 Intersection Summary
HCM 6th Ctrl Delay 152.8
HCM 6th LOS F
Notes
User approved changes to right turn type.
HCM 6th Signalized Intersection Summary Year 2050 AM
10: Via Vera Cruz & Grand Ave 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 520 430 140 70 310 90 80 90 40 190 320 470 Future Volume (veh/h) 520 430 140 70 310 90 80 90 40 190 320 470 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.96 1.00 0.94 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 553 457 149 79 348 101 91 102 45 198 333 490 Peak Hour Factor 0.94 0.94 0.94 0.89 0.89 0.89 0.88 0.88 0.88 0.96 0.96 0.96 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 531 939 579 173 819 225 194 204 163 546 573 472 Arrive On Green 0.16 0.27 0.27 0.10 0.21 0.21 0.11 0.11 0.11 0.31 0.31 0.31 Sat Flow, veh/h 3428 3526 1523 1767 3916 1075 1767 1856 1481 1767 1856 1528 Grp Volume(v), veh/h 553 457 149 79 297 152 91 102 45 198 333 490 Grp Sat Flow(s),veh/h/ln1714 1763 1523 1767 1689 1614 1767 1856 1481 1767 1856 1528 Q Serve(g_s), s 15.5 10.9 6.8 4.2 7.6 8.2 4.8 5.2 2.8 8.7 15.1 30.9 Cycle Q Clear(g_c), s 15.5 10.9 6.8 4.2 7.6 8.2 4.8 5.2 2.8 8.7 15.1 30.9 Prop In Lane 1.00 1.00 1.00 0.67 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 531 939 579 173 706 338 194 204 163 546 573 472 V/C Ratio(X) 1.04 0.49 0.26 0.46 0.42 0.45 0.47 0.50 0.28 0.36 0.58 1.04 Avail Cap(c_a), veh/h 531 939 579 194 706 338 194 204 163 546 573 472 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.09 0.09 0.09 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 42.3 30.9 21.6 42.6 34.3 34.5 41.8 41.9 40.9 26.9 29.1 34.5 Incr Delay (d2), s/veh 24.2 0.2 0.1 0.7 0.1 0.3 0.7 0.7 0.3 0.2 1.0 51.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln8.1 4.5 2.8 1.8 3.0 3.1 2.1 2.3 1.0 3.6 6.6 17.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 66.4 31.1 21.7 43.3 34.4 34.9 42.4 42.6 41.2 27.0 30.1 86.2 LnGrp LOS F CCDCCDDDCCF
Approach Vol, veh/h 1159 528 238 1021
Approach Delay, s/veh 46.7 35.9 42.3 56.4
Approach LOS D D D E
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s14.5 33.4 36.0 20.2 27.7 16.1
Change Period (Y+Rc), s * 4.7 6.8 5.1 * 4.7 6.8 5.1
Max Green Setting (Gmax), s* 11 25.4 30.9 * 16 20.9 11.0 Max Q Clear Time (g_c+I1), s6.2 12.9 32.9 17.5 10.2 7.2 Green Ext Time (p_c), s 0.0 1.8 0.0 0.0 1.3 0.2
Intersection Summary
HCM 6th Ctrl Delay 47.8
HCM 6th LOS D
Notes
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 PM
1: N Rancho Santa Fe Rd & W. Mission Rd 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 1010 210 220 460 0 440 0 560 0 0 0 Future Volume (veh/h) 0 1010 210 220 460 0 440 0 560 0 0 0 Initial Q (Qb), veh 000000000
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 0 1856 0 1856 Adj Flow Rate, veh/h 0 1247 259 265 554 0 489 0 622
Peak Hour Factor 0.81 0.81 0.81 0.83 0.83 0.83 0.90 0.90 0.90 Percent Heavy Veh, % 333330303
Cap, veh/h 82 1382 591 311 1839 0 922 0 744
Arrive On Green 0.00 0.39 0.39 0.18 0.52 0.00 0.27 0.00 0.27 Sat Flow, veh/h 1767 3526 1507 1767 3618 0 3428 0 2768
Grp Volume(v), veh/h 0 1247 259 265 554 0 489 0 622
Grp Sat Flow(s),veh/h/ln 1767 1763 1507 1767 1763 0 1714 0 1384 Q Serve(g_s), s 0.0 35.9 13.6 15.7 9.6 0.0 13.1 0.0 22.9 Cycle Q Clear(g_c), s 0.0 35.9 13.6 15.7 9.6 0.0 13.1 0.0 22.9 Prop In Lane 1.00 1.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 82 1382 591 311 1839 0 922 0 744 V/C Ratio(X) 0.00 0.90 0.44 0.85 0.30 0.00 0.53 0.00 0.84 Avail Cap(c_a), veh/h 82 1451 620 311 1908 0 922 0 744
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 30.9 24.1 43.1 14.6 0.0 33.6 0.0 37.2 Incr Delay (d2), s/veh 0.0 8.0 0.5 24.3 0.1 0.0 2.2 0.0 10.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 15.7 4.7 8.7 3.6 0.0 5.6 0.0 8.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0 38.8 24.6 67.4 14.7 0.0 35.8 0.0 48.0 LnGrp LOS A D C E B A D A D
Approach Vol, veh/h 1506 819 1111
Approach Delay, s/veh 36.4 31.8 42.6
Approach LOS D C D
Timer - Assigned Phs 1 2 5 6 8
Phs Duration (G+Y+Rc), s 24.0 48.4 10.0 62.4 35.5
Change Period (Y+Rc), s 5.0 * 6.1 5.0 * 6.1 6.5
Max Green Setting (Gmax), s 19.0 * 44 5.0 * 58 29.0
Max Q Clear Time (g_c+I1), s 17.7 37.9 0.0 11.6 24.9
Green Ext Time (p_c), s 0.1 4.4 0.0 3.7 1.9
Intersection Summary
HCM 6th Ctrl Delay 37.3
HCM 6th LOS D
Notes
User approved pedestrian interval to be less than phase max green. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 PM
2: N Pacific St & W. Mission Rd 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 50 1190 60 0 690 60 0 0 90 50 0 40 Future Volume (veh/h) 50 1190 60 0 690 60 0 0 90 50 0 40 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.95 1.00 0.95 1.00 0.99 1.00 0.95 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1726 1726 1726 0 1726 1726 0 1726 1726 1726 1726 1726 Adj Flow Rate, veh/h 56 1337 67 0 758 66 0 0 120 57 0 45 Peak Hour Factor 0.89 0.89 0.89 0.91 0.91 0.91 0.75 0.75 0.75 0.88 0.88 0.88 Percent Heavy Veh, % 3 33033033333
Cap, veh/h 120 1247 62 0 833 73 0 0 327 372 0 314
Arrive On Green 0.07 0.39 0.39 0.00 0.27 0.27 0.00 0.00 0.23 0.23 0.00 0.23 Sat Flow, veh/h 1643 3168 158 0 3123 264 0 0 1443 1643 0 1388 Grp Volume(v), veh/h 56 690 714 0 409 415 0 0 120 57 0 45 Grp Sat Flow(s),veh/h/ln1643 1639 1687 0 1639 1661 0 0 1443 1643 0 1388 Q Serve(g_s), s 3.6 43.6 43.6 0.0 26.7 26.8 0.0 0.0 7.8 3.1 0.0 2.9 Cycle Q Clear(g_c), s 3.6 43.6 43.6 0.0 26.7 26.8 0.0 0.0 7.8 3.1 0.0 2.9 Prop In Lane 1.00 0.09 0.00 0.16 0.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 120 645 664 0 450 456 0 0 327 372 0 314 V/C Ratio(X) 0.47 1.07 1.07 0.00 0.91 0.91 0.00 0.00 0.37 0.15 0.00 0.14 Avail Cap(c_a), veh/h 120 645 664 0 450 456 0 0 327 372 0 314 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 49.3 33.6 33.6 0.0 38.9 38.9 0.0 0.0 36.1 34.3 0.0 34.3 Incr Delay (d2), s/veh 12.4 55.7 56.8 0.0 21.8 21.7 0.0 0.0 3.2 0.9 0.0 1.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln1.9 26.1 27.0 0.0 13.0 13.1 0.0 0.0 3.0 1.3 0.0 1.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 61.7 89.3 90.4 0.0 60.7 60.6 0.0 0.0 39.3 35.2 0.0 35.2 LnGrp LOS E F F AEEAADDAD
Approach Vol, veh/h 1460 824 120 102
Approach Delay, s/veh 88.8 60.7 39.3 35.2
Approach LOS F E D D
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 50.4 30.2 13.2 37.2 30.2
Change Period (Y+Rc), s * 6.8 5.1 5.1 6.8 5.1
Max Green Setting (Gmax), s * 44 25.1 8.1 29.6 25.1
Max Q Clear Time (g_c+I1), s 45.6 5.1 5.6 28.8 9.8
Green Ext Time (p_c), s 0.0 0.2 0.0 0.3 0.4
Intersection Summary
HCM 6th Ctrl Delay 75.0
HCM 6th LOS E
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 PM
3: N. Las Posas Rd & W. Mission Rd 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 240 1070 160 450 460 130 170 910 580 150 590 70 Future Volume (veh/h) 240 1070 160 450 460 130 170 910 580 150 590 70 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 0.95 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1726 1726 1856 1856 1726 1726 1726 1856 1726 1856 Adj Flow Rate, veh/h 253 1126 168 469 479 135 200 1071 682 170 670 80 Peak Hour Factor 0.95 0.95 0.95 0.96 0.96 0.96 0.85 0.85 0.85 0.88 0.88 0.88 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 191 1122 573 385 898 251 137 1082 1121 286 1405 166 Arrive On Green 0.11 0.32 0.32 0.12 0.33 0.33 0.08 0.33 0.33 0.08 0.33 0.33 Sat Flow, veh/h 1767 3526 1419 3188 2700 755 1643 3279 2456 3428 4256 503 Grp Volume(v), veh/h 253 1126 168 469 311 303 200 1071 682 170 492 258 Grp Sat Flow(s),veh/h/ln1767 1763 1419 1594 1763 1693 1643 1639 1228 1714 1570 1618 Q Serve(g_s), s 13.0 38.2 9.6 14.5 17.2 17.4 10.0 39.0 25.3 5.7 15.0 15.2 Cycle Q Clear(g_c), s 13.0 38.2 9.6 14.5 17.2 17.4 10.0 39.0 25.3 5.7 15.0 15.2 Prop In Lane 1.00 1.00 1.00 0.45 1.00 1.00 1.00 0.31
Lane Grp Cap(c), veh/h 191 1122 573 385 586 563 137 1082 1121 286 1036 534 V/C Ratio(X) 1.32 1.00 0.29 1.22 0.53 0.54 1.46 0.99 0.61 0.60 0.48 0.48 Avail Cap(c_a), veh/h 191 1122 573 385 586 563 137 1082 1121 286 1036 534 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.47 0.47 0.47 1.00 1.00 1.00 Uniform Delay (d), s/veh 53.5 40.9 24.4 52.8 32.5 32.6 55.0 40.0 25.1 53.0 31.9 32.0 Incr Delay (d2), s/veh 176.4 27.7 1.3 119.3 3.4 3.7 225.2 16.5 1.2 8.8 1.6 3.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln15.0 20.1 3.3 12.0 7.6 7.5 12.6 17.4 7.1 2.8 5.7 6.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 229.9 68.6 25.7 172.0 35.9 36.2 280.2 56.5 26.2 61.9 33.5 35.1 LnGrp LOS F F C F D D F E C E C D
Approach Vol, veh/h 1547 1083 1953 920
Approach Delay, s/veh 90.3 94.9 68.8 39.2
Approach LOS F F E D
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s15.1 46.6 20.8 44.5 15.1 46.6 19.1 46.2 Change Period (Y+Rc), s 5.1 6.8 6.3 6.3 5.1 6.8 * 6.1 * 6.3 Max Green Setting (Gmax), s10.0 33.0 14.5 38.0 10.0 33.0 * 13 * 40 Max Q Clear Time (g_c+I1), s7.7 41.0 16.5 40.2 12.0 17.2 15.0 19.4 Green Ext Time (p_c), s 0.1 0.0 0.0 0.0 0.0 2.6 0.0 2.1 Intersection Summary
HCM 6th Ctrl Delay 75.0
HCM 6th LOS E
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
User approved changes to right turn type.
HCM 6th Signalized Intersection Summary Year 2050 PM
4: Knoll Rd/Drwy & W. Mission Rd 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 10 1430 200 190 690 10 180 10 280 10 10 10 Future Volume (veh/h) 10 1430 200 190 690 10 180 10 280 10 10 10 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 0.97 1.00 0.92 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1726 1726 1856 1856 1726 1726 1726 1856 1726 1856 Adj Flow Rate, veh/h 11 1589 222 209 758 11 208 0 311 17 17 17 Peak Hour Factor 0.90 0.90 0.90 0.91 0.91 0.91 0.90 0.90 0.90 0.60 0.60 0.60 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 32 1440 577 163 1757 25 778 0 335 48 48 83
Arrive On Green 0.02 0.41 0.41 0.10 0.49 0.49 0.24 0.00 0.24 0.06 0.06 0.06 Sat Flow, veh/h 1767 3526 1413 1643 3556 52 3287 0 1413 842 842 1445 Grp Volume(v), veh/h 11 1589 222 209 376 393 208 0 311 34 0 17 Grp Sat Flow(s),veh/h/ln1767 1763 1413 1643 1763 1844 1643 0 1413 1684 0 1445 Q Serve(g_s), s 0.7 44.9 12.1 10.9 15.1 15.1 5.7 0.0 23.7 2.1 0.0 1.2 Cycle Q Clear(g_c), s 0.7 44.9 12.1 10.9 15.1 15.1 5.7 0.0 23.7 2.1 0.0 1.2 Prop In Lane 1.00 1.00 1.00 0.03 1.00 1.00 0.50 1.00
Lane Grp Cap(c), veh/h 32 1440 577 163 871 911 778 0 335 97 0 83 V/C Ratio(X) 0.34 1.10 0.38 1.28 0.43 0.43 0.27 0.00 0.93 0.35 0.00 0.20 Avail Cap(c_a), veh/h 112 1440 577 163 871 911 807 0 347 122 0 105 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 53.4 32.5 22.8 49.5 17.9 17.9 34.2 0.0 41.1 49.9 0.0 49.4 Incr Delay (d2), s/veh 2.3 57.3 1.9 166.0 1.6 1.5 0.1 0.0 29.7 0.8 0.0 0.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.3 29.1 4.1 11.8 6.1 6.3 2.3 0.0 10.8 0.9 0.0 0.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 55.7 89.8 24.8 215.5 19.5 19.4 34.3 0.0 70.8 50.7 0.0 49.9 LnGrp LOS E F C F B B C A E D A D
Approach Vol, veh/h 1822 978 519 51
Approach Delay, s/veh 81.7 61.3 56.1 50.4
Approach LOS F E E D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s16.0 50.7 11.5 6.6 60.1 31.7
Change Period (Y+Rc), s 5.1 5.8 * 5.2 4.6 5.8 5.7
Max Green Setting (Gmax), s10.9 42.3 * 8 7.0 46.7 27.0
Max Q Clear Time (g_c+I1), s12.9 46.9 4.1 2.7 17.1 25.7 Green Ext Time (p_c), s 0.0 0.0 0.0 0.0 2.7 0.2
Intersection Summary
HCM 6th Ctrl Delay 71.4
HCM 6th LOS E
Notes
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 PM
5: N. Las Posas Rd & Amorlite Dr 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 10 0 10 130 10 80 10 1680 200 100 1160 10 Future Volume (veh/h) 10 0 10 130 10 80 10 1680 200 100 1160 10 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.96 1.00 0.96 1.00 0.96 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 15 0 15 138 11 85 11 1867 222 110 1275 11 Peak Hour Factor 0.67 0.67 0.67 0.94 0.94 0.94 0.90 0.90 0.90 0.91 0.91 0.91 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 47 0 241 133 37 286 32 2248 265 112 2782 24
Arrive On Green 0.03 0.00 0.16 0.08 0.21 0.21 0.02 0.49 0.49 0.06 0.54 0.54 Sat Flow, veh/h 1767 0 1504 1767 177 1370 1767 4571 539 1767 5178 45 Grp Volume(v), veh/h 15 0 15 138 0 96 11 1375 714 110 832 454 Grp Sat Flow(s),veh/h/ln1767 0 1504 1767 0 1548 1767 1689 1733 1767 1689 1845 Q Serve(g_s), s 0.9 0.0 0.9 8.3 0.0 5.8 0.7 38.4 39.2 6.8 16.6 16.6 Cycle Q Clear(g_c), s 0.9 0.0 0.9 8.3 0.0 5.8 0.7 38.4 39.2 6.8 16.6 16.6 Prop In Lane 1.00 1.00 1.00 0.89 1.00 0.31 1.00 0.02
Lane Grp Cap(c), veh/h 47 0 241 133 0 323 32 1661 852 112 1814 991 V/C Ratio(X) 0.32 0.00 0.06 1.03 0.00 0.30 0.34 0.83 0.84 0.98 0.46 0.46 Avail Cap(c_a), veh/h 129 0 533 133 0 553 112 1661 852 112 1814 991 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 0.09 0.09 0.09 0.56 0.56 0.56 Uniform Delay (d), s/veh 52.5 0.0 39.2 50.8 0.0 36.7 53.4 24.0 24.2 51.4 15.6 15.6 Incr Delay (d2), s/veh 1.4 0.0 0.0 87.5 0.0 0.2 0.2 0.5 1.0 56.8 0.5 0.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.4 0.0 0.4 6.9 0.0 2.2 0.3 14.0 14.8 4.7 6.0 6.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 54.0 0.0 39.2 138.4 0.0 36.9 53.6 24.4 25.1 108.2 16.1 16.5 LnGrp LOS D A D F A DDCCFBB
Approach Vol, veh/h 30 234 2100 1396
Approach Delay, s/veh 46.6 96.8 24.8 23.5
Approach LOS D F C C
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s13.0 60.1 13.8 23.1 8.0 65.1 8.4 28.5 Change Period (Y+Rc), s 6.0 6.0 5.5 5.5 6.0 6.0 5.5 5.5 Max Green Setting (Gmax), s7.0 32.7 8.3 39.0 7.0 32.7 8.0 39.3 Max Q Clear Time (g_c+I1), s8.8 41.2 10.3 2.9 2.7 18.6 2.9 7.8 Green Ext Time (p_c), s 0.0 0.0 0.0 0.0 0.0 4.6 0.0 0.4 Intersection Summary
HCM 6th Ctrl Delay 29.0
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th Signalized Intersection Summary Year 2050 PM
7: N. Las Posas Rd & Descanso Ave 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 40 40 80 240 20 40 80 1890 310 30 1310 30 Future Volume (veh/h) 40 40 80 240 20 40 80 1890 310 30 1310 30 Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 0.95 1.00 0.95 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 47 47 94 273 23 45 86 2032 333 34 1506 34 Peak Hour Factor 0.85 0.85 0.85 0.88 0.88 0.88 0.93 0.93 0.93 0.87 0.87 0.87 Percent Heavy Veh, % 333333333333
Cap, veh/h 259 259 436 955 153 299 88 1405 224 88 1654 37 Arrive On Green 0.29 0.29 0.29 0.28 0.28 0.28 0.05 0.32 0.32 0.05 0.32 0.32 Sat Flow, veh/h 905 905 1525 3428 549 1074 1767 4370 697 1767 5090 115 Grp Volume(v), veh/h 94 0 94 273 0 68 86 1558 807 34 999 541 Grp Sat Flow(s),veh/h/ln 1810 0 1525 1714 0 1623 1767 1689 1690 1767 1689 1828 Q Serve(g_s), s 5.5 0.0 6.6 8.7 0.0 4.4 6.8 45.0 45.0 2.6 39.7 39.7 Cycle Q Clear(g_c), s 5.5 0.0 6.6 8.7 0.0 4.4 6.8 45.0 45.0 2.6 39.7 39.7 Prop In Lane 0.50 1.00 1.00 0.66 1.00 0.41 1.00 0.06
Lane Grp Cap(c), veh/h 517 0 436 955 0 452 88 1085 543 88 1098 594 V/C Ratio(X) 0.18 0.00 0.22 0.29 0.00 0.15 0.97 1.44 1.49 0.38 0.91 0.91 Avail Cap(c_a), veh/h 517 0 436 955 0 452 88 1085 543 88 1098 594 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 0.84 0.84 0.84 0.89 0.89 0.89 Uniform Delay (d), s/veh 37.7 0.0 38.1 39.6 0.0 38.0 66.4 47.5 47.5 64.4 45.3 45.3 Incr Delay (d2), s/veh 0.8 0.0 1.1 0.8 0.0 0.7 80.8 200.3 227.0 10.9 11.5 18.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.6 0.0 2.6 3.8 0.0 1.9 5.0 48.4 52.5 1.4 17.8 20.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 38.4 0.0 39.2 40.3 0.0 38.7 147.2 247.8 274.5 75.3 56.8 64.0 LnGrp LOS D A D D A D F F F E E E
Approach Vol, veh/h 188 341 2451 1574
Approach Delay, s/veh 38.8 40.0 253.0 59.7
Approach LOS D D F E
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 13.5 52.0 46.5 13.0 52.5 45.5
Change Period (Y+Rc), s 6.5 * 6.5 6.5 6.0 6.5 6.5
Max Green Setting (Gmax), s 7.0 * 29 40.0 7.0 28.5 39.0 Max Q Clear Time (g_c+I1), s 4.6 47.0 8.6 8.8 41.7 10.7 Green Ext Time (p_c), s 0.0 0.0 0.5 0.0 0.0 0.8
Intersection Summary
HCM 6th Ctrl Delay 161.4
HCM 6th LOS F
Notes
User approved pedestrian interval to be less than phase max green. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 PM
8: N. Las Posas Rd & SR-78 WB Ramps 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 560 10 310 570 1670 0 0 1130 540 Future Volume (veh/h) 0 0 0 560 10 310 570 1670 0 0 1130 540 Initial Q (Qb), veh 000000000
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 1.00 1.00 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 0 0 1856 1856 Adj Flow Rate, veh/h 478 194 337 600 1758 0 0 1177 562
Peak Hour Factor 0.92 0.92 0.92 0.95 0.95 0.95 0.96 0.96 0.96 Percent Heavy Veh, % 333330033
Cap, veh/h 384 129 224 535 3417 0 0 1111 500
Arrive On Green 0.22 0.22 0.22 0.61 1.00 0.00 0.00 0.33 0.33 Sat Flow, veh/h 1767 594 1031 1767 5233 0 0 3544 1521
Grp Volume(v), veh/h 478 0 531 600 1758 0 0 1177 562
Grp Sat Flow(s),veh/h/ln 1767 0 1625 1767 1689 0 0 1689 1521 Q Serve(g_s), s 23.9 0.0 23.9 33.3 0.0 0.0 0.0 36.2 36.2 Cycle Q Clear(g_c), s 23.9 0.0 23.9 33.3 0.0 0.0 0.0 36.2 36.2 Prop In Lane 1.00 0.63 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 384 0 353 535 3417 0 0 1111 500
V/C Ratio(X) 1.24 0.00 1.50 1.12 0.51 0.00 0.00 1.06 1.12 Avail Cap(c_a), veh/h 384 0 353 535 3417 0 0 1111 500
HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.09 0.09 0.00 0.00 0.09 0.09 Uniform Delay (d), s/veh 43.0 0.0 43.1 21.7 0.0 0.0 0.0 36.9 36.9 Incr Delay (d2), s/veh 130.4 0.0 241.1 57.4 0.1 0.0 0.0 29.0 58.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 24.2 0.0 33.1 15.2 0.0 0.0 0.0 18.5 20.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 173.4 0.0 284.1 79.1 0.1 0.0 0.0 65.9 95.0 LnGrp LOS F A F F A A A F F
Approach Vol, veh/h 1009 2358 1739
Approach Delay, s/veh 231.7 20.2 75.3
Approach LOS F C E
Timer - Assigned Phs 2 5 6 8
Phs Duration (G+Y+Rc), s 81.0 38.0 43.0 29.0
Change Period (Y+Rc), s 6.8 * 4.7 6.8 5.1
Max Green Setting (Gmax), s 74.2 * 33 36.2 23.9
Max Q Clear Time (g_c+I1), s 2.0 35.3 38.2 25.9
Green Ext Time (p_c), s 11.3 0.0 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 80.7
HCM 6th LOS F
Notes
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 PM
9: N. Las Posas Rd & Grand Ave 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 410 700 30 110 170 1060 50 1050 240 670 860 340 Future Volume (veh/h) 410 700 30 110 170 1060 50 1050 240 670 860 340 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 0.97 1.00 0.95 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 539 921 39 116 179 1116 54 1129 258 848 1089 430 Peak Hour Factor 0.76 0.76 0.76 0.95 0.95 0.95 0.93 0.93 0.93 0.79 0.79 0.79 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 496 1001 42 145 423 824 117 1283 293 265 1144 712 Arrive On Green 0.14 0.29 0.29 0.08 0.23 0.23 0.07 0.31 0.31 0.08 0.32 0.32 Sat Flow, veh/h 3428 3441 146 1767 1856 2672 1767 4092 935 3428 3526 1495 Grp Volume(v), veh/h 539 472 488 116 179 1116 54 932 455 848 1089 430 Grp Sat Flow(s),veh/h/ln1714 1763 1824 1767 1856 1336 1767 1689 1650 1714 1763 1495 Q Serve(g_s), s 15.9 28.5 28.5 7.1 9.1 25.1 3.2 28.8 28.8 8.5 33.2 23.6 Cycle Q Clear(g_c), s 15.9 28.5 28.5 7.1 9.1 25.1 3.2 28.8 28.8 8.5 33.2 23.6 Prop In Lane 1.00 0.08 1.00 1.00 1.00 0.57 1.00 1.00
Lane Grp Cap(c), veh/h 496 513 531 145 423 824 117 1059 517 265 1144 712 V/C Ratio(X) 1.09 0.92 0.92 0.80 0.42 1.35 0.46 0.88 0.88 3.20 0.95 0.60 Avail Cap(c_a), veh/h 496 513 531 145 423 824 117 1059 517 265 1144 712 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.21 0.21 0.21 1.00 1.00 1.00 0.09 0.09 0.09 Uniform Delay (d), s/veh 47.0 37.8 37.8 49.6 36.3 38.3 49.5 35.8 35.8 50.7 36.3 21.8 Incr Delay (d2), s/veh 66.3 24.2 23.6 9.6 0.1 161.5 12.5 10.4 18.9 991.3 2.5 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln11.2 15.2 15.7 3.5 4.0 29.1 1.8 12.7 13.6 40.0 13.8 7.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 113.3 61.9 61.3 59.2 36.3 199.8 61.9 46.2 54.7 1042.1 38.8 22.1 LnGrp LOS F E E E D F E D D F D C
Approach Vol, veh/h 1499 1411 1441 2367
Approach Delay, s/veh 80.2 167.5 49.5 395.2
Approach LOS F F D F
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s15.0 41.0 15.5 38.5 13.8 42.2 22.4 31.6 Change Period (Y+Rc), s 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s8.5 34.5 9.0 32.0 7.3 35.7 15.9 25.1 Max Q Clear Time (g_c+I1), s10.5 30.8 9.1 30.5 5.2 35.2 17.9 27.1 Green Ext Time (p_c), s 0.0 2.1 0.0 0.7 0.0 0.3 0.0 0.0 Intersection Summary
HCM 6th Ctrl Delay 202.9
HCM 6th LOS F
Notes
User approved pedestrian interval to be less than phase max green.
User approved changes to right turn type.
HCM 6th Signalized Intersection Summary Year 2050 PM
10: Via Vera Cruz & Grand Ave 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 610 710 160 130 540 160 290 180 110 400 270 430 Future Volume (veh/h) 610 710 160 130 540 160 290 180 110 400 270 430 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.96 1.00 0.96 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 649 755 170 146 607 68 294 321 138 435 293 315 Peak Hour Factor 0.94 0.94 0.94 0.89 0.89 0.89 0.80 0.80 0.80 0.92 0.92 0.92 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 639 893 687 175 763 84 339 356 290 458 481 394 Arrive On Green 0.19 0.25 0.25 0.10 0.17 0.17 0.19 0.19 0.19 0.26 0.26 0.26 Sat Flow, veh/h 3428 3526 1522 1767 4605 509 1767 1856 1512 1767 1856 1523 Grp Volume(v), veh/h 649 755 170 146 443 232 294 321 138 435 293 315 Grp Sat Flow(s),veh/h/ln1714 1763 1522 1767 1689 1737 1767 1856 1512 1767 1856 1523 Q Serve(g_s), s 20.5 22.4 7.7 8.9 13.9 14.2 17.7 18.6 8.9 26.6 15.3 21.3 Cycle Q Clear(g_c), s 20.5 22.4 7.7 8.9 13.9 14.2 17.7 18.6 8.9 26.6 15.3 21.3 Prop In Lane 1.00 1.00 1.00 0.29 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 639 893 687 175 559 288 339 356 290 458 481 394 V/C Ratio(X) 1.02 0.85 0.25 0.84 0.79 0.81 0.87 0.90 0.48 0.95 0.61 0.80 Avail Cap(c_a), veh/h 639 893 687 198 559 288 361 380 309 458 481 394 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.09 0.09 0.09 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 44.7 39.0 19.1 48.7 44.1 44.2 43.1 43.5 39.6 40.1 35.9 38.1 Incr Delay (d2), s/veh 14.9 1.0 0.1 21.2 7.0 14.4 17.7 22.3 0.5 29.4 1.6 10.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln9.8 9.5 3.7 4.9 6.2 7.1 9.2 10.5 3.3 14.9 6.9 8.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 59.6 40.0 19.2 69.9 51.1 58.6 60.8 65.8 40.0 69.5 37.5 48.3 LnGrp LOS F D B E D E E E D E D D
Approach Vol, veh/h 1574 821 753 1043
Approach Delay, s/veh 45.9 56.5 59.1 54.1
Approach LOS D E E D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s15.6 34.7 33.6 25.2 25.0 26.2
Change Period (Y+Rc), s * 4.7 6.8 5.1 * 4.7 6.8 5.1
Max Green Setting (Gmax), s* 12 25.0 28.5 * 21 16.8 22.5 Max Q Clear Time (g_c+I1), s10.9 24.4 28.6 22.5 16.2 20.6 Green Ext Time (p_c), s 0.0 0.3 0.0 0.0 0.2 0.5
Intersection Summary
HCM 6th Ctrl Delay 52.4
HCM 6th LOS D
Notes
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 3-23-3814 Armorlite Lofts
N:\3814 - Armorlite Apartments\Report\LTA Appendix.3814.doc
APPENDIX G
LONG-TERM (HORIZON YEAR 2050) + PROJECT
INTERSECTION ANALYSIS WORKSHEETS
HCM 6th Signalized Intersection Summary Year 2050 + P AM 1: N Rancho Santa Fe Rd & W. Mission Rd 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 651 380 222 384 0 300 0 161 0 0 0 Future Volume (veh/h) 0 651 380 222 384 0 300 0 161 0 0 0 Initial Q (Qb), veh 000000000
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 0 1856 0 1856 Adj Flow Rate, veh/h 0 824 481 261 452 0 326 0 175
Peak Hour Factor 0.79 0.79 0.79 0.85 0.85 0.85 0.92 0.92 0.92 Percent Heavy Veh, % 333330303
Cap, veh/h 82 1238 528 360 1793 0 968 0 781
Arrive On Green 0.00 0.35 0.35 0.20 0.51 0.00 0.28 0.00 0.28 Sat Flow, veh/h 1767 3526 1503 1767 3618 0 3428 0 2768
Grp Volume(v), veh/h 0 824 481 261 452 0 326 0 175
Grp Sat Flow(s),veh/h/ln 1767 1763 1503 1767 1763 0 1714 0 1384 Q Serve(g_s), s 0.0 21.4 33.0 14.9 7.8 0.0 8.1 0.0 5.2
Cycle Q Clear(g_c), s 0.0 21.4 33.0 14.9 7.8 0.0 8.1 0.0 5.2 Prop In Lane 1.00 1.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 82 1238 528 360 1793 0 968 0 781 V/C Ratio(X) 0.00 0.67 0.91 0.73 0.25 0.00 0.34 0.00 0.22 Avail Cap(c_a), veh/h 82 1302 555 360 1857 0 968 0 781
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 29.7 33.5 40.2 15.0 0.0 30.7 0.0 29.7 Incr Delay (d2), s/veh 0.0 1.2 18.9 12.0 0.1 0.0 0.9 0.0 0.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 8.7 14.0 7.4 2.9 0.0 3.4 0.0 1.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0 30.9 52.3 52.2 15.0 0.0 31.7 0.0 30.4 LnGrp LOS A C D D B A C A C
Approach Vol, veh/h 1305 713 501
Approach Delay, s/veh 38.8 28.7 31.2
Approach LOS D C C
Timer - Assigned Phs 1 2 5 6 8
Phs Duration (G+Y+Rc), s 27.0 44.0 10.0 61.0 37.0
Change Period (Y+Rc), s 5.0 * 6.1 5.0 * 6.1 6.5
Max Green Setting (Gmax), s 22.0 * 40 5.0 * 57 30.5
Max Q Clear Time (g_c+I1), s 16.9 35.0 0.0 9.8 10.1
Green Ext Time (p_c), s 0.3 2.9 0.0 3.0 1.7
Intersection Summary
HCM 6th Ctrl Delay 34.4
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
User approved changes to right turn type.
HCM 6th Signalized Intersection Summary Year 2050 + P AM 2: N Pacific St & W. Mission Rd 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 30 732 90 0 646 30 0 0 70 90 0 50 Future Volume (veh/h) 30 732 90 0 646 30 0 0 70 90 0 50 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.95 1.00 0.97 1.00 0.94 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1726 1726 1726 0 1726 1726 0 1726 1726 1726 1726 1726 Adj Flow Rate, veh/h 37 893 110 0 828 38 0 0 95 120 0 67 Peak Hour Factor 0.82 0.82 0.82 0.78 0.78 0.78 0.74 0.74 0.74 0.75 0.75 0.75 Percent Heavy Veh, % 3 33033033333
Cap, veh/h 144 1256 155 0 915 42 0 0 384 191 0 160
Arrive On Green 0.09 0.43 0.43 0.00 0.29 0.29 0.00 0.00 0.27 0.12 0.00 0.12 Sat Flow, veh/h 1643 2923 360 0 3270 146 0 0 1417 1643 0 1381 Grp Volume(v), veh/h 37 501 502 0 426 440 0 0 95 120 0 67 Grp Sat Flow(s),veh/h/ln1643 1639 1643 0 1639 1690 0 0 1417 1643 0 1381 Q Serve(g_s), s 1.9 23.3 23.3 0.0 23.2 23.2 0.0 0.0 4.9 6.5 0.0 4.2 Cycle Q Clear(g_c), s 1.9 23.3 23.3 0.0 23.2 23.2 0.0 0.0 4.9 6.5 0.0 4.2 Prop In Lane 1.00 0.22 0.00 0.09 0.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 144 705 706 0 471 486 0 0 384 191 0 160 V/C Ratio(X) 0.26 0.71 0.71 0.00 0.90 0.90 0.00 0.00 0.25 0.63 0.00 0.42 Avail Cap(c_a), veh/h 144 771 773 0 523 540 0 0 384 445 0 374 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 39.5 21.7 21.7 0.0 31.8 31.8 0.0 0.0 26.4 39.1 0.0 38.1 Incr Delay (d2), s/veh 4.3 2.2 2.2 0.0 17.1 16.7 0.0 0.0 1.5 1.3 0.0 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.9 8.5 8.5 0.0 10.8 11.0 0.0 0.0 1.8 2.6 0.0 1.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 43.8 23.9 23.9 0.0 48.9 48.5 0.0 0.0 28.0 40.4 0.0 38.7 LnGrp LOS D C C A D D A A C D A D
Approach Vol, veh/h 1040 866 95 187
Approach Delay, s/veh 24.6 48.7 28.0 39.8
Approach LOS CDCD
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 46.6 15.8 13.2 33.4 30.2
Change Period (Y+Rc), s * 6.8 5.1 5.1 6.8 5.1
Max Green Setting (Gmax), s * 44 25.1 8.1 29.6 25.1
Max Q Clear Time (g_c+I1), s 25.3 8.5 3.9 25.2 6.9
Green Ext Time (p_c), s 3.6 0.4 0.0 1.4 0.3
Intersection Summary
HCM 6th Ctrl Delay 35.6
HCM 6th LOS D
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 + P AM 3: N. Las Posas Rd & W. Mission Rd 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 180 500 102 402 450 150 96 520 357 150 770 60 Future Volume (veh/h) 180 500 102 402 450 150 96 520 357 150 770 60 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.96 1.00 0.94 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1726 1726 1856 1856 1726 1726 1726 1856 1726 1856 Adj Flow Rate, veh/h 225 625 128 462 517 172 117 634 435 158 811 63 Peak Hour Factor 0.80 0.80 0.80 0.87 0.87 0.87 0.82 0.82 0.82 0.95 0.95 0.95 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 212 1122 568 385 825 273 137 896 974 286 1215 94 Arrive On Green 0.12 0.32 0.32 0.12 0.32 0.32 0.08 0.27 0.27 0.08 0.27 0.27 Sat Flow, veh/h 1767 3526 1401 3188 2572 850 1643 3279 2424 3428 4446 344 Grp Volume(v), veh/h 225 625 128 462 353 336 117 634 435 158 572 302 Grp Sat Flow(s),veh/h/ln1767 1763 1401 1594 1763 1659 1643 1639 1212 1714 1570 1649 Q Serve(g_s), s 14.4 17.6 7.2 14.5 20.4 20.7 8.4 20.9 15.9 5.3 19.4 19.6 Cycle Q Clear(g_c), s 14.4 17.6 7.2 14.5 20.4 20.7 8.4 20.9 15.9 5.3 19.4 19.6 Prop In Lane 1.00 1.00 1.00 0.51 1.00 1.00 1.00 0.21
Lane Grp Cap(c), veh/h 212 1122 568 385 566 532 137 896 974 286 858 451 V/C Ratio(X) 1.06 0.56 0.23 1.20 0.62 0.63 0.85 0.71 0.45 0.55 0.67 0.67 Avail Cap(c_a), veh/h 212 1122 568 385 566 532 137 902 978 286 864 454 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.90 0.90 0.90 1.00 1.00 1.00 Uniform Delay (d), s/veh 52.8 33.9 23.6 52.8 34.6 34.7 54.3 39.3 26.8 52.9 38.7 38.8 Incr Delay (d2), s/veh 78.9 2.0 0.9 112.1 5.1 5.6 42.2 4.2 1.3 7.5 4.1 7.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln10.8 7.6 2.4 11.6 9.2 8.8 5.0 8.6 4.6 2.5 7.7 8.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 131.7 35.9 24.6 164.9 39.8 40.3 96.5 43.5 28.2 60.4 42.8 46.5 LnGrp LOS F D C F D D F D C E D D
Approach Vol, veh/h 978 1151 1186 1032
Approach Delay, s/veh 56.4 90.1 43.1 46.6
Approach LOS E F D D
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s15.1 39.6 20.8 44.5 15.1 39.6 20.5 44.8 Change Period (Y+Rc), s 5.1 6.8 6.3 6.3 5.1 6.8 * 6.1 * 6.3 Max Green Setting (Gmax), s10.0 33.0 14.5 38.0 10.0 33.0 * 14 * 39 Max Q Clear Time (g_c+I1), s7.3 22.9 16.5 19.6 10.4 21.6 16.4 22.7 Green Ext Time (p_c), s 0.1 2.8 0.0 2.6 0.0 2.7 0.0 2.3 Intersection Summary
HCM 6th Ctrl Delay 59.4
HCM 6th LOS E
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
User approved changes to right turn type.
HCM 6th Signalized Intersection Summary Year 2050 + P AM 4: Knoll Rd/Drwy & W. Mission Rd 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 10 525 222 270 681 10 201 10 190 10 10 20 Future Volume (veh/h) 10 525 222 270 681 10 201 10 190 10 10 20 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.93 1.00 0.94 1.00 0.96 1.00 0.93 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1726 1726 1856 1856 1726 1726 1726 1856 1726 1856 Adj Flow Rate, veh/h 13 700 296 297 748 11 285 0 260 12 12 25 Peak Hour Factor 0.75 0.75 0.75 0.91 0.91 0.91 0.73 0.73 0.73 0.81 0.81 0.81 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 37 1413 547 177 1750 26 702 0 301 50 50 87
Arrive On Green 0.02 0.40 0.40 0.11 0.49 0.49 0.21 0.00 0.21 0.06 0.06 0.06 Sat Flow, veh/h 1767 3526 1365 1643 3553 52 3287 0 1410 842 842 1455 Grp Volume(v), veh/h 13 700 296 297 371 388 285 0 260 24 0 25 Grp Sat Flow(s),veh/h/ln1767 1763 1365 1643 1763 1842 1643 0 1410 1684 0 1455 Q Serve(g_s), s 0.7 14.8 16.6 10.8 13.5 13.5 7.5 0.0 17.8 1.4 0.0 1.6 Cycle Q Clear(g_c), s 0.7 14.8 16.6 10.8 13.5 13.5 7.5 0.0 17.8 1.4 0.0 1.6 Prop In Lane 1.00 1.00 1.00 0.03 1.00 1.00 0.50 1.00
Lane Grp Cap(c), veh/h 37 1413 547 177 868 908 702 0 301 100 0 87 V/C Ratio(X) 0.35 0.50 0.54 1.67 0.43 0.43 0.41 0.00 0.86 0.24 0.00 0.29 Avail Cap(c_a), veh/h 124 1413 547 177 868 908 887 0 381 135 0 116 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 48.3 22.4 22.9 44.6 16.3 16.3 33.9 0.0 37.9 44.9 0.0 45.0 Incr Delay (d2), s/veh 2.0 1.2 3.8 326.4 1.5 1.5 0.1 0.0 13.0 0.5 0.0 0.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.3 6.0 5.5 20.3 5.3 5.6 2.9 0.0 7.1 0.6 0.0 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 50.3 23.6 26.7 371.0 17.8 17.8 34.0 0.0 50.9 45.3 0.0 45.7 LnGrp LOS D C C F B B C A D D A D
Approach Vol, veh/h 1009 1056 545 49
Approach Delay, s/veh 24.9 117.1 42.1 45.5
Approach LOS C F D D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s15.9 45.9 11.1 6.7 55.1 27.1
Change Period (Y+Rc), s 5.1 5.8 * 5.2 4.6 5.8 5.7
Max Green Setting (Gmax), s10.8 32.4 * 8 7.0 36.7 27.0
Max Q Clear Time (g_c+I1), s12.8 18.6 3.6 2.7 15.5 19.8 Green Ext Time (p_c), s 0.0 3.0 0.0 0.0 2.6 0.7
Intersection Summary
HCM 6th Ctrl Delay 65.4
HCM 6th LOS E
Notes
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 + P AM 5: N. Las Posas Rd & Armorlite Dr 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 10 0 20 223 10 63 40 900 146 34 1380 10 Future Volume (veh/h) 10 0 20 223 10 63 40 900 146 34 1380 10 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.97 1.00 0.96 1.00 0.96 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 12 0 25 245 11 69 48 1071 174 40 1624 12 Peak Hour Factor 0.80 0.80 0.80 0.91 0.91 0.91 0.84 0.84 0.84 0.85 0.85 0.85 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 40 0 254 150 49 310 91 2048 332 83 2410 18
Arrive On Green 0.02 0.00 0.17 0.09 0.23 0.23 0.05 0.47 0.47 0.05 0.46 0.46 Sat Flow, veh/h 1767 0 1506 1767 214 1343 1767 4363 708 1767 5186 38 Grp Volume(v), veh/h 12 0 25 245 0 80 48 829 416 40 1058 578 Grp Sat Flow(s),veh/h/ln1767 0 1506 1767 0 1558 1767 1689 1694 1767 1689 1847 Q Serve(g_s), s 0.7 0.0 1.4 8.5 0.0 4.2 2.6 17.3 17.3 2.2 24.4 24.4 Cycle Q Clear(g_c), s 0.7 0.0 1.4 8.5 0.0 4.2 2.6 17.3 17.3 2.2 24.4 24.4 Prop In Lane 1.00 1.00 1.00 0.86 1.00 0.42 1.00 0.02
Lane Grp Cap(c), veh/h 40 0 254 150 0 360 91 1585 795 83 1570 858 V/C Ratio(X) 0.30 0.00 0.10 1.63 0.00 0.22 0.53 0.52 0.52 0.48 0.67 0.67 Avail Cap(c_a), veh/h 141 0 587 150 0 615 124 1585 795 124 1570 858 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 0.16 0.16 0.16 0.53 0.53 0.53 Uniform Delay (d), s/veh 48.1 0.0 35.1 45.8 0.0 31.2 46.2 18.7 18.7 46.5 20.9 20.9 Incr Delay (d2), s/veh 1.5 0.0 0.1 312.1 0.0 0.1 0.3 0.2 0.4 0.9 1.2 2.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.3 0.0 0.5 16.8 0.0 1.6 1.1 6.2 6.3 1.0 9.0 10.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 49.6 0.0 35.2 357.9 0.0 31.3 46.5 18.9 19.1 47.3 22.1 23.1 LnGrp LOS D A D F A C D B B D C C
Approach Vol, veh/h 37 325 1293 1676
Approach Delay, s/veh 39.9 277.5 19.9 23.0
Approach LOS D F B C
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s10.7 52.9 14.0 22.4 11.2 52.5 7.8 28.6 Change Period (Y+Rc), s 6.0 6.0 5.5 5.5 6.0 6.0 5.5 5.5 Max Green Setting (Gmax), s7.0 22.5 8.5 39.0 7.0 22.5 8.0 39.5 Max Q Clear Time (g_c+I1), s4.2 19.3 10.5 3.4 4.6 26.4 2.7 6.2 Green Ext Time (p_c), s 0.0 1.7 0.0 0.1 0.0 0.0 0.0 0.3 Intersection Summary
HCM 6th Ctrl Delay 46.9
HCM 6th LOS D
HCM 6th TWSC Year 2050 + P AM
6: Armorlite Dr/Amorlite Dr & Proj Drwy 11/28/2023
Armorlite Apartments Synchro 11 Report
Intersection
Int Delay, s/veh 2
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 20 90 230 0 0 66
Future Vol, veh/h 20 90 230 0 0 66
Conflicting Peds, #/hr 10 0 0 10 10 10
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 91 91 92 92
Heavy Vehicles, % 3 33333
Mvmt Flow 22 98 253 0 0 72
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 263 0 - 0 415 273
Stage 1 - - - - 263 -
Stage 2 - - - - 152 -
Critical Hdwy 4.13 - - - 6.43 6.23
Critical Hdwy Stg 1 - - - - 5.43 -
Critical Hdwy Stg 2 - - - - 5.43 -
Follow-up Hdwy 2.227 - - - 3.527 3.327
Pot Cap-1 Maneuver 1295 - - - 592 763
Stage 1 - - - - 779 -
Stage 2 - - - - 874 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1283 - - - 570 749
Mov Cap-2 Maneuver - - - - 570 -
Stage 1 - - - - 757 -
Stage 2 - - - - 865 -
Approach EB WB SB
HCM Control Delay, s 1.4 0 10.3
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1283 - - - 749
HCM Lane V/C Ratio 0.017 - - - 0.096
HCM Control Delay (s) 7.9 0 - - 10.3
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0.1 - - - 0.3
HCM 6th Signalized Intersection Summary Year 2050 + P AM 7: N. Las Posas Rd & Descanso Ave 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 20 40 130 170 20 30 70 966 140 20 1563 40 Future Volume (veh/h) 20 40 130 170 20 30 70 966 140 20 1563 40 Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 0.95 1.00 0.94 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 24 47 153 233 27 41 71 878 136 20 1595 41 Peak Hour Factor 0.85 0.85 0.85 0.73 0.73 0.73 0.99 0.99 0.99 0.98 0.98 0.98 Percent Heavy Veh, % 333333333333
Cap, veh/h 172 336 425 955 181 276 158 1091 168 88 1079 28 Arrive On Green 0.28 0.28 0.28 0.28 0.28 0.28 0.09 0.25 0.25 0.05 0.21 0.21 Sat Flow, veh/h 617 1208 1525 3428 652 989 1767 4390 676 1767 5069 130 Grp Volume(v), veh/h 71 0 153 233 0 68 71 674 340 20 1063 573 Grp Sat Flow(s),veh/h/ln 1825 0 1525 1714 0 1641 1767 1689 1688 1767 1689 1822 Q Serve(g_s), s 4.1 0.0 11.3 7.4 0.0 4.4 5.3 26.2 26.5 1.5 29.8 29.8 Cycle Q Clear(g_c), s 4.1 0.0 11.3 7.4 0.0 4.4 5.3 26.2 26.5 1.5 29.8 29.8 Prop In Lane 0.34 1.00 1.00 0.60 1.00 0.40 1.00 0.07
Lane Grp Cap(c), veh/h 508 0 425 955 0 457 158 839 420 88 719 388 V/C Ratio(X) 0.14 0.00 0.36 0.24 0.00 0.15 0.45 0.80 0.81 0.23 1.48 1.48 Avail Cap(c_a), veh/h 508 0 425 955 0 457 158 839 420 88 719 388 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 0.95 0.95 0.95 0.64 0.64 0.64 Uniform Delay (d), s/veh 37.9 0.0 40.5 39.1 0.0 38.0 60.5 49.4 49.5 63.9 55.1 55.1 Incr Delay (d2), s/veh 0.6 0.0 2.4 0.6 0.0 0.7 8.6 7.7 14.8 3.8 220.2 224.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.9 0.0 4.6 3.2 0.0 1.9 2.7 11.7 12.7 0.8 34.3 37.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 38.5 0.0 42.9 39.7 0.0 38.7 69.1 57.1 64.3 67.7 275.3 279.4 LnGrp LOS D A D D A D EEEEFF
Approach Vol, veh/h 224 301 1085 1656
Approach Delay, s/veh 41.5 39.5 60.1 274.2
Approach LOS D D E F
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 13.5 41.3 45.5 18.5 36.3 45.5
Change Period (Y+Rc), s 6.5 * 6.5 6.5 6.0 6.5 6.5
Max Green Setting (Gmax), s 7.0 * 30 39.0 12.5 24.0 39.0 Max Q Clear Time (g_c+I1), s 3.5 28.5 13.3 7.3 31.8 9.4 Green Ext Time (p_c), s 0.0 0.5 0.5 0.0 0.0 0.7
Intersection Summary
HCM 6th Ctrl Delay 165.5
HCM 6th LOS F
Notes
User approved pedestrian interval to be less than phase max green. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 + P AM 8: N. Las Posas Rd & SR-78 WB Ramps 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 580 10 278 270 918 0 0 1640 463 Future Volume (veh/h) 0 0 0 580 10 278 270 918 0 0 1640 463 Initial Q (Qb), veh 000000000
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 1.00 1.00 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 0 0 1856 1856 Adj Flow Rate, veh/h 472 233 302 307 1043 0 0 1822 514
Peak Hour Factor 0.92 0.92 0.92 0.88 0.88 0.88 0.90 0.90 0.90 Percent Heavy Veh, % 333330033
Cap, veh/h 465 189 245 256 3131 0 0 1678 455
Arrive On Green 0.26 0.26 0.26 0.15 0.62 0.00 0.00 0.43 0.43 Sat Flow, veh/h 1767 719 932 1767 5233 0 0 4105 1069
Grp Volume(v), veh/h 472 0 535 307 1043 0 0 1552 784
Grp Sat Flow(s),veh/h/ln 1767 0 1652 1767 1689 0 0 1689 1630 Q Serve(g_s), s 26.3 0.0 26.3 14.5 9.9 0.0 0.0 42.6 42.6 Cycle Q Clear(g_c), s 26.3 0.0 26.3 14.5 9.9 0.0 0.0 42.6 42.6 Prop In Lane 1.00 0.56 1.00 0.00 0.00 0.66
Lane Grp Cap(c), veh/h 465 0 434 256 3131 0 0 1439 694
V/C Ratio(X) 1.02 0.00 1.23 1.20 0.33 0.00 0.00 1.08 1.13 Avail Cap(c_a), veh/h 465 0 434 256 3131 0 0 1439 694
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.77 0.77 0.00 0.00 0.09 0.09 Uniform Delay (d), s/veh 36.8 0.0 36.9 42.8 9.2 0.0 0.0 28.7 28.7 Incr Delay (d2), s/veh 45.7 0.0 122.8 114.6 0.2 0.0 0.0 37.1 59.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 17.0 0.0 25.2 14.2 3.1 0.0 0.0 22.9 26.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 82.6 0.0 159.7 157.3 9.4 0.0 0.0 65.8 88.5 LnGrp LOS F A F F A A A F F
Approach Vol, veh/h 1007 1350 2336
Approach Delay, s/veh 123.5 43.0 73.4
Approach LOS F D E
Timer - Assigned Phs 2 5 6 8
Phs Duration (G+Y+Rc), s 68.6 19.2 49.4 31.4
Change Period (Y+Rc), s 6.8 * 4.7 6.8 5.1
Max Green Setting (Gmax), s 61.8 * 15 42.6 26.3
Max Q Clear Time (g_c+I1), s 11.9 16.5 44.6 28.3
Green Ext Time (p_c), s 5.0 0.0 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 75.4
HCM 6th LOS E
Notes
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 + P AM 9: N. Las Posas Rd & Grand Ave 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 180 220 20 130 200 586 30 482 190 643 797 630 Future Volume (veh/h) 180 220 20 130 200 586 30 482 190 643 797 630 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.96 1.00 0.97 1.00 0.95 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 247 301 27 144 222 651 35 567 224 739 916 724 Peak Hour Factor 0.73 0.73 0.73 0.90 0.90 0.90 0.85 0.85 0.85 0.87 0.87 0.87 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 595 950 85 145 369 757 112 1104 423 280 1154 764 Arrive On Green 0.17 0.29 0.29 0.08 0.20 0.20 0.06 0.31 0.31 0.08 0.33 0.33 Sat Flow, veh/h 3428 3265 291 1767 1856 2663 1767 3572 1367 3428 3526 1500 Grp Volume(v), veh/h 247 161 167 144 222 651 35 535 256 739 916 724 Grp Sat Flow(s),veh/h/ln1714 1763 1793 1767 1856 1332 1767 1689 1562 1714 1763 1500 Q Serve(g_s), s 7.1 7.9 8.0 9.0 12.0 21.9 2.1 14.3 14.9 9.0 26.0 36.0 Cycle Q Clear(g_c), s 7.1 7.9 8.0 9.0 12.0 21.9 2.1 14.3 14.9 9.0 26.0 36.0 Prop In Lane 1.00 0.16 1.00 1.00 1.00 0.88 1.00 1.00
Lane Grp Cap(c), veh/h 595 513 522 145 369 757 112 1044 483 280 1154 764 V/C Ratio(X) 0.41 0.31 0.32 1.00 0.60 0.86 0.31 0.51 0.53 2.63 0.79 0.95 Avail Cap(c_a), veh/h 595 513 522 145 369 757 112 1044 483 280 1154 764 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.69 0.69 0.69 1.00 1.00 1.00 0.09 0.09 0.09 Uniform Delay (d), s/veh 40.5 30.4 30.5 50.5 40.1 37.6 49.2 31.2 31.4 50.5 33.6 26.4 Incr Delay (d2), s/veh 2.1 1.6 1.6 61.1 1.3 6.8 7.1 1.8 4.1 736.5 0.5 3.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln3.1 3.5 3.6 6.3 5.5 8.7 1.1 5.8 5.9 32.4 10.6 17.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 42.6 32.0 32.1 111.6 41.4 44.4 56.3 33.0 35.5 787.0 34.2 29.7 LnGrp LOS D C C F D D E C D F C C
Approach Vol, veh/h 575 1017 826 2379
Approach Delay, s/veh 36.6 53.3 34.8 266.7
Approach LOS D D C F
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s15.5 40.5 15.5 38.5 13.5 42.5 25.6 28.4 Change Period (Y+Rc), s 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s9.0 34.0 9.0 32.0 7.0 36.0 19.1 21.9 Max Q Clear Time (g_c+I1), s11.0 16.9 11.0 10.0 4.1 38.0 9.1 23.9 Green Ext Time (p_c), s 0.0 3.0 0.0 1.1 0.0 0.0 0.3 0.0 Intersection Summary
HCM 6th Ctrl Delay 153.9
HCM 6th LOS F
Notes
User approved changes to right turn type.
HCM 6th Signalized Intersection Summary Year 2050 + P AM 10: Via Vera Cruz & Grand Ave 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 546 430 147 70 310 90 82 90 40 190 320 474 Future Volume (veh/h) 546 430 147 70 310 90 82 90 40 190 320 474 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.96 1.00 0.94 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 581 457 156 79 348 101 93 102 45 198 333 494 Peak Hour Factor 0.94 0.94 0.94 0.89 0.89 0.89 0.88 0.88 0.88 0.96 0.96 0.96 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 531 939 579 173 819 225 194 204 163 546 573 472 Arrive On Green 0.16 0.27 0.27 0.10 0.21 0.21 0.11 0.11 0.11 0.31 0.31 0.31 Sat Flow, veh/h 3428 3526 1523 1767 3916 1075 1767 1856 1481 1767 1856 1528 Grp Volume(v), veh/h 581 457 156 79 297 152 93 102 45 198 333 494 Grp Sat Flow(s),veh/h/ln1714 1763 1523 1767 1689 1614 1767 1856 1481 1767 1856 1528 Q Serve(g_s), s 15.5 10.9 7.1 4.2 7.6 8.2 4.9 5.2 2.8 8.7 15.1 30.9 Cycle Q Clear(g_c), s 15.5 10.9 7.1 4.2 7.6 8.2 4.9 5.2 2.8 8.7 15.1 30.9 Prop In Lane 1.00 1.00 1.00 0.67 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 531 939 579 173 706 338 194 204 163 546 573 472 V/C Ratio(X) 1.09 0.49 0.27 0.46 0.42 0.45 0.48 0.50 0.28 0.36 0.58 1.05 Avail Cap(c_a), veh/h 531 939 579 194 706 338 194 204 163 546 573 472 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.09 0.09 0.09 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 42.3 30.9 21.7 42.6 34.3 34.5 41.8 41.9 40.9 26.9 29.1 34.5 Incr Delay (d2), s/veh 45.3 0.2 0.1 0.7 0.1 0.3 0.7 0.7 0.3 0.2 1.0 54.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln9.7 4.5 3.0 1.8 3.0 3.1 2.1 2.3 1.0 3.6 6.6 17.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 87.6 31.1 21.8 43.3 34.4 34.9 42.5 42.6 41.2 27.0 30.1 88.7 LnGrp LOS F CCDCCDDDCCF
Approach Vol, veh/h 1194 528 240 1025
Approach Delay, s/veh 57.4 35.9 42.3 57.7
Approach LOS E D D E
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s14.5 33.4 36.0 20.2 27.7 16.1
Change Period (Y+Rc), s * 4.7 6.8 5.1 * 4.7 6.8 5.1
Max Green Setting (Gmax), s* 11 25.4 30.9 * 16 20.9 11.0 Max Q Clear Time (g_c+I1), s6.2 12.9 32.9 17.5 10.2 7.2 Green Ext Time (p_c), s 0.0 1.8 0.0 0.0 1.3 0.2
Intersection Summary
HCM 6th Ctrl Delay 52.5
HCM 6th LOS D
Notes
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 + P PM 1: N Rancho Santa Fe Rd & W. Mission Rd 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 1015 210 221 462 0 440 0 562 0 0 0 Future Volume (veh/h) 0 1015 210 221 462 0 440 0 562 0 0 0 Initial Q (Qb), veh 000000000
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 0 1856 0 1856 Adj Flow Rate, veh/h 0 1253 259 266 557 0 489 0 624
Peak Hour Factor 0.81 0.81 0.81 0.83 0.83 0.83 0.90 0.90 0.90 Percent Heavy Veh, % 333330303
Cap, veh/h 82 1384 592 311 1841 0 920 0 743
Arrive On Green 0.00 0.39 0.39 0.18 0.52 0.00 0.27 0.00 0.27 Sat Flow, veh/h 1767 3526 1507 1767 3618 0 3428 0 2768
Grp Volume(v), veh/h 0 1253 259 266 557 0 489 0 624
Grp Sat Flow(s),veh/h/ln 1767 1763 1507 1767 1763 0 1714 0 1384 Q Serve(g_s), s 0.0 36.2 13.6 15.8 9.7 0.0 13.1 0.0 23.0 Cycle Q Clear(g_c), s 0.0 36.2 13.6 15.8 9.7 0.0 13.1 0.0 23.0 Prop In Lane 1.00 1.00 1.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 82 1384 592 311 1841 0 920 0 743 V/C Ratio(X) 0.00 0.91 0.44 0.86 0.30 0.00 0.53 0.00 0.84 Avail Cap(c_a), veh/h 82 1449 619 311 1906 0 920 0 743
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 0.0 30.9 24.1 43.2 14.6 0.0 33.7 0.0 37.3 Incr Delay (d2), s/veh 0.0 8.2 0.5 24.8 0.1 0.0 2.2 0.0 11.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 15.8 4.7 8.8 3.6 0.0 5.6 0.0 8.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 0.0 39.1 24.6 68.0 14.7 0.0 35.9 0.0 48.3 LnGrp LOS A D C E B A D A D
Approach Vol, veh/h 1512 823 1113
Approach Delay, s/veh 36.6 32.0 42.9
Approach LOS D C D
Timer - Assigned Phs 1 2 5 6 8
Phs Duration (G+Y+Rc), s 24.0 48.5 10.0 62.5 35.5
Change Period (Y+Rc), s 5.0 * 6.1 5.0 * 6.1 6.5
Max Green Setting (Gmax), s 19.0 * 44 5.0 * 58 29.0
Max Q Clear Time (g_c+I1), s 17.8 38.2 0.0 11.7 25.0
Green Ext Time (p_c), s 0.1 4.2 0.0 3.8 1.8
Intersection Summary
HCM 6th Ctrl Delay 37.5
HCM 6th LOS D
Notes
User approved pedestrian interval to be less than phase max green. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 + P PM 2: N Pacific St & W. Mission Rd 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 50 1197 60 0 693 60 0 0 90 50 0 40 Future Volume (veh/h) 50 1197 60 0 693 60 0 0 90 50 0 40 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.95 1.00 0.95 1.00 0.99 1.00 0.95 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1726 1726 1726 0 1726 1726 0 1726 1726 1726 1726 1726 Adj Flow Rate, veh/h 56 1345 67 0 762 66 0 0 120 57 0 45 Peak Hour Factor 0.89 0.89 0.89 0.91 0.91 0.91 0.75 0.75 0.75 0.88 0.88 0.88 Percent Heavy Veh, % 3 33033033333
Cap, veh/h 120 1247 62 0 834 72 0 0 327 372 0 314
Arrive On Green 0.07 0.39 0.39 0.00 0.27 0.27 0.00 0.00 0.23 0.23 0.00 0.23 Sat Flow, veh/h 1643 3169 157 0 3124 263 0 0 1443 1643 0 1388 Grp Volume(v), veh/h 56 694 718 0 411 417 0 0 120 57 0 45 Grp Sat Flow(s),veh/h/ln1643 1639 1687 0 1639 1662 0 0 1443 1643 0 1388 Q Serve(g_s), s 3.6 43.6 43.6 0.0 26.9 26.9 0.0 0.0 7.8 3.1 0.0 2.9 Cycle Q Clear(g_c), s 3.6 43.6 43.6 0.0 26.9 26.9 0.0 0.0 7.8 3.1 0.0 2.9 Prop In Lane 1.00 0.09 0.00 0.16 0.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 120 645 664 0 450 456 0 0 327 372 0 314 V/C Ratio(X) 0.47 1.08 1.08 0.00 0.91 0.91 0.00 0.00 0.37 0.15 0.00 0.14 Avail Cap(c_a), veh/h 120 645 664 0 450 456 0 0 327 372 0 314 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 49.3 33.6 33.6 0.0 38.9 38.9 0.0 0.0 36.1 34.3 0.0 34.3 Incr Delay (d2), s/veh 12.4 57.7 58.9 0.0 22.6 22.5 0.0 0.0 3.2 0.9 0.0 1.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln1.9 26.4 27.4 0.0 13.1 13.3 0.0 0.0 3.0 1.3 0.0 1.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 61.7 91.3 92.5 0.0 61.5 61.4 0.0 0.0 39.3 35.2 0.0 35.2 LnGrp LOS E F F AEEAADDAD
Approach Vol, veh/h 1468 828 120 102
Approach Delay, s/veh 90.8 61.5 39.3 35.2
Approach LOS F E D D
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 50.4 30.2 13.2 37.2 30.2
Change Period (Y+Rc), s * 6.8 5.1 5.1 6.8 5.1
Max Green Setting (Gmax), s * 44 25.1 8.1 29.6 25.1
Max Q Clear Time (g_c+I1), s 45.6 5.1 5.6 28.9 9.8
Green Ext Time (p_c), s 0.0 0.2 0.0 0.3 0.4
Intersection Summary
HCM 6th Ctrl Delay 76.4
HCM 6th LOS E
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 + P PM 3: N. Las Posas Rd & W. Mission Rd 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 240 1070 167 457 460 130 173 910 584 150 590 70 Future Volume (veh/h) 240 1070 167 457 460 130 173 910 584 150 590 70 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 0.95 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1726 1726 1856 1856 1726 1726 1726 1856 1726 1856 Adj Flow Rate, veh/h 253 1126 176 476 479 135 204 1071 687 170 670 80 Peak Hour Factor 0.95 0.95 0.95 0.96 0.96 0.96 0.85 0.85 0.85 0.88 0.88 0.88 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 191 1122 573 385 898 251 137 1082 1121 286 1405 166 Arrive On Green 0.11 0.32 0.32 0.12 0.33 0.33 0.08 0.33 0.33 0.08 0.33 0.33 Sat Flow, veh/h 1767 3526 1419 3188 2700 755 1643 3279 2456 3428 4256 503 Grp Volume(v), veh/h 253 1126 176 476 311 303 204 1071 687 170 492 258 Grp Sat Flow(s),veh/h/ln1767 1763 1419 1594 1763 1693 1643 1639 1228 1714 1570 1618 Q Serve(g_s), s 13.0 38.2 10.2 14.5 17.2 17.4 10.0 39.0 25.6 5.7 15.0 15.2 Cycle Q Clear(g_c), s 13.0 38.2 10.2 14.5 17.2 17.4 10.0 39.0 25.6 5.7 15.0 15.2 Prop In Lane 1.00 1.00 1.00 0.45 1.00 1.00 1.00 0.31
Lane Grp Cap(c), veh/h 191 1122 573 385 586 563 137 1082 1121 286 1036 534 V/C Ratio(X) 1.32 1.00 0.31 1.24 0.53 0.54 1.49 0.99 0.61 0.60 0.48 0.48 Avail Cap(c_a), veh/h 191 1122 573 385 586 563 137 1082 1121 286 1036 534 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 0.36 0.36 0.36 1.00 1.00 1.00 Uniform Delay (d), s/veh 53.5 40.9 24.5 52.8 32.5 32.6 55.0 40.0 25.1 53.0 31.9 32.0 Incr Delay (d2), s/veh 176.4 27.7 1.4 126.5 3.4 3.7 233.8 14.2 0.9 8.8 1.6 3.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln15.0 20.1 3.5 12.4 7.6 7.5 12.9 17.1 7.2 2.8 5.7 6.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 229.9 68.6 25.9 179.3 35.9 36.2 288.8 54.2 26.0 61.9 33.5 35.1 LnGrp LOS F F C F D D F D C E C D
Approach Vol, veh/h 1555 1090 1962 920
Approach Delay, s/veh 90.0 98.6 68.7 39.2
Approach LOS F F E D
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s15.1 46.6 20.8 44.5 15.1 46.6 19.1 46.2 Change Period (Y+Rc), s 5.1 6.8 6.3 6.3 5.1 6.8 * 6.1 * 6.3 Max Green Setting (Gmax), s10.0 33.0 14.5 38.0 10.0 33.0 * 13 * 40 Max Q Clear Time (g_c+I1), s7.7 41.0 16.5 40.2 12.0 17.2 15.0 19.4 Green Ext Time (p_c), s 0.1 0.0 0.0 0.0 0.0 2.6 0.0 2.1 Intersection Summary
HCM 6th Ctrl Delay 75.7
HCM 6th LOS E
Notes
* HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
User approved changes to right turn type.
HCM 6th Signalized Intersection Summary Year 2050 + P PM 4: Knoll Rd/Drwy & W. Mission Rd 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 10 1433 201 190 695 10 182 10 280 10 10 10 Future Volume (veh/h) 10 1433 201 190 695 10 182 10 280 10 10 10 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 0.97 1.00 0.92 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1726 1726 1856 1856 1726 1726 1726 1856 1726 1856 Adj Flow Rate, veh/h 11 1592 223 209 764 11 210 0 311 17 17 17 Peak Hour Factor 0.90 0.90 0.90 0.91 0.91 0.91 0.90 0.90 0.90 0.60 0.60 0.60 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 32 1440 577 163 1757 25 778 0 335 48 48 83
Arrive On Green 0.02 0.41 0.41 0.10 0.49 0.49 0.24 0.00 0.24 0.06 0.06 0.06 Sat Flow, veh/h 1767 3526 1413 1643 3556 51 3287 0 1413 842 842 1445 Grp Volume(v), veh/h 11 1592 223 209 379 396 210 0 311 34 0 17 Grp Sat Flow(s),veh/h/ln1767 1763 1413 1643 1763 1844 1643 0 1413 1684 0 1445 Q Serve(g_s), s 0.7 44.9 12.2 10.9 15.2 15.2 5.7 0.0 23.7 2.1 0.0 1.2 Cycle Q Clear(g_c), s 0.7 44.9 12.2 10.9 15.2 15.2 5.7 0.0 23.7 2.1 0.0 1.2 Prop In Lane 1.00 1.00 1.00 0.03 1.00 1.00 0.50 1.00
Lane Grp Cap(c), veh/h 32 1440 577 163 871 911 778 0 335 97 0 83 V/C Ratio(X) 0.34 1.11 0.39 1.28 0.43 0.43 0.27 0.00 0.93 0.35 0.00 0.20 Avail Cap(c_a), veh/h 112 1440 577 163 871 911 807 0 347 122 0 105 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 53.4 32.5 22.8 49.5 17.9 17.9 34.2 0.0 41.1 49.9 0.0 49.4 Incr Delay (d2), s/veh 2.3 58.1 1.9 166.0 1.6 1.5 0.1 0.0 29.7 0.8 0.0 0.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.3 29.3 4.2 11.8 6.1 6.4 2.3 0.0 10.8 0.9 0.0 0.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 55.7 90.6 24.8 215.5 19.5 19.4 34.3 0.0 70.7 50.7 0.0 49.9 LnGrp LOS E F C F B B C A E D A D
Approach Vol, veh/h 1826 984 521 51
Approach Delay, s/veh 82.4 61.1 56.1 50.4
Approach LOS F E E D
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s16.0 50.7 11.5 6.6 60.1 31.7
Change Period (Y+Rc), s 5.1 5.8 * 5.2 4.6 5.8 5.7
Max Green Setting (Gmax), s10.9 42.3 * 8 7.0 46.7 27.0
Max Q Clear Time (g_c+I1), s12.9 46.9 4.1 2.7 17.2 25.7 Green Ext Time (p_c), s 0.0 0.0 0.0 0.0 2.7 0.2
Intersection Summary
HCM 6th Ctrl Delay 71.6
HCM 6th LOS E
Notes
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 + P PM 5: N. Las Posas Rd & Amorlite Dr 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 10 0 10 160 10 87 10 1680 258 114 1160 10 Future Volume (veh/h) 10 0 10 160 10 87 10 1680 258 114 1160 10 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 0.96 1.00 0.96 1.00 0.96 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 15 0 15 170 11 93 11 1867 287 125 1275 11 Peak Hour Factor 0.67 0.67 0.67 0.94 0.94 0.94 0.90 0.90 0.90 0.91 0.91 0.91 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 47 0 241 133 34 289 32 2168 329 112 2780 24
Arrive On Green 0.03 0.00 0.16 0.08 0.21 0.21 0.02 0.49 0.49 0.06 0.54 0.54 Sat Flow, veh/h 1767 0 1504 1767 163 1382 1767 4412 669 1767 5178 45 Grp Volume(v), veh/h 15 0 15 170 0 104 11 1423 731 125 832 454 Grp Sat Flow(s),veh/h/ln1767 0 1504 1767 0 1545 1767 1689 1703 1767 1689 1845 Q Serve(g_s), s 0.9 0.0 0.9 8.3 0.0 6.3 0.7 40.7 42.1 7.0 16.6 16.6 Cycle Q Clear(g_c), s 0.9 0.0 0.9 8.3 0.0 6.3 0.7 40.7 42.1 7.0 16.6 16.6 Prop In Lane 1.00 1.00 1.00 0.89 1.00 0.39 1.00 0.02
Lane Grp Cap(c), veh/h 47 0 241 133 0 323 32 1660 837 112 1813 991 V/C Ratio(X) 0.32 0.00 0.06 1.27 0.00 0.32 0.34 0.86 0.87 1.11 0.46 0.46 Avail Cap(c_a), veh/h 129 0 533 133 0 552 112 1660 837 112 1813 991 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 0.09 0.09 0.09 0.54 0.54 0.54 Uniform Delay (d), s/veh 52.5 0.0 39.2 50.8 0.0 36.9 53.4 24.6 24.9 51.5 15.6 15.6 Incr Delay (d2), s/veh 1.4 0.0 0.0 169.4 0.0 0.2 0.2 0.6 1.3 95.5 0.5 0.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln0.4 0.0 0.4 10.0 0.0 2.4 0.3 14.9 15.6 6.0 5.9 6.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 54.0 0.0 39.2 220.3 0.0 37.1 53.6 25.2 26.2 147.0 16.1 16.5 LnGrp LOS D A D F A DDCCFBB
Approach Vol, veh/h 30 274 2165 1411
Approach Delay, s/veh 46.6 150.7 25.7 27.8
Approach LOS D F C C
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s13.0 60.1 13.8 23.1 8.0 65.1 8.4 28.5 Change Period (Y+Rc), s 6.0 6.0 5.5 5.5 6.0 6.0 5.5 5.5 Max Green Setting (Gmax), s7.0 32.7 8.3 39.0 7.0 32.7 8.0 39.3 Max Q Clear Time (g_c+I1), s9.0 44.1 10.3 2.9 2.7 18.6 2.9 8.3 Green Ext Time (p_c), s 0.0 0.0 0.0 0.0 0.0 4.6 0.0 0.4 Intersection Summary
HCM 6th Ctrl Delay 35.4
HCM 6th LOS D
Notes
User approved pedestrian interval to be less than phase max green.
HCM 6th TWSC Year 2050 + P PM
6: Amorlite Dr & Proj Drwy 11/28/2023
Armorlite Apartments Synchro 11 Report
Intersection
Int Delay, s/veh 1.5
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 72 320 220 0 0 37
Future Vol, veh/h 72 320 220 0 0 37
Conflicting Peds, #/hr 10 0 0 10 10 10
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 94 94 92 92
Heavy Vehicles, % 3 33333
Mvmt Flow 78 348 234 0 0 40
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 244 0 - 0 758 254
Stage 1 - - - - 244 -
Stage 2 - - - - 514 -
Critical Hdwy 4.13 - - - 6.43 6.23
Critical Hdwy Stg 1 - - - - 5.43 -
Critical Hdwy Stg 2 - - - - 5.43 -
Follow-up Hdwy 2.227 - - - 3.527 3.327
Pot Cap-1 Maneuver 1316 - - - 373 782
Stage 1 - - - - 794 -
Stage 2 - - - - 598 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1303 - - - 339 767
Mov Cap-2 Maneuver - - - - 339 -
Stage 1 - - - - 728 -
Stage 2 - - - - 592 -
Approach EB WB SB
HCM Control Delay, s 1.5 0 10
HCM LOS B
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 1303 - - - 767
HCM Lane V/C Ratio 0.06 - - - 0.052
HCM Control Delay (s) 7.9 0 - - 10
HCM Lane LOS A A - - B
HCM 95th %tile Q(veh) 0.2 - - - 0.2
HCM 6th Signalized Intersection Summary Year 2050 + P PM 7: N. Las Posas Rd & Descanso Ave 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 40 40 80 240 20 40 80 1948 310 30 1340 30 Future Volume (veh/h) 40 40 80 240 20 40 80 1948 310 30 1340 30 Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 0.95 1.00 0.95 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 47 47 94 273 23 45 86 2095 333 34 1540 34 Peak Hour Factor 0.85 0.85 0.85 0.88 0.88 0.88 0.93 0.93 0.93 0.87 0.87 0.87 Percent Heavy Veh, % 333333333333
Cap, veh/h 252 252 425 955 153 299 88 1444 223 88 1692 37 Arrive On Green 0.28 0.28 0.28 0.28 0.28 0.28 0.05 0.33 0.33 0.05 0.33 0.33 Sat Flow, veh/h 905 905 1525 3428 549 1074 1767 4394 678 1767 5094 112 Grp Volume(v), veh/h 94 0 94 273 0 68 86 1596 833 34 1021 553 Grp Sat Flow(s),veh/h/ln 1810 0 1525 1714 0 1623 1767 1689 1695 1767 1689 1829 Q Serve(g_s), s 5.5 0.0 6.6 8.7 0.0 4.4 6.8 46.0 46.0 2.6 40.5 40.5 Cycle Q Clear(g_c), s 5.5 0.0 6.6 8.7 0.0 4.4 6.8 46.0 46.0 2.6 40.5 40.5 Prop In Lane 0.50 1.00 1.00 0.66 1.00 0.40 1.00 0.06
Lane Grp Cap(c), veh/h 504 0 425 955 0 452 88 1110 557 88 1122 607 V/C Ratio(X) 0.19 0.00 0.22 0.29 0.00 0.15 0.97 1.44 1.49 0.38 0.91 0.91 Avail Cap(c_a), veh/h 504 0 425 955 0 452 88 1110 557 88 1122 607 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 0.84 0.84 0.84 0.87 0.87 0.87 Uniform Delay (d), s/veh 38.4 0.0 38.8 39.6 0.0 38.0 66.4 47.0 47.0 64.4 44.8 44.8 Incr Delay (d2), s/veh 0.8 0.0 1.2 0.8 0.0 0.7 80.8 201.4 230.6 10.7 11.1 18.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.6 0.0 2.7 3.8 0.0 1.9 5.0 49.7 54.4 1.4 18.1 20.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 39.2 0.0 40.0 40.3 0.0 38.7 147.2 248.4 277.6 75.1 55.9 62.8 LnGrp LOS D A D D A D F F F E E E
Approach Vol, veh/h 188 341 2514 1608
Approach Delay, s/veh 39.6 40.0 254.6 58.7
Approach LOS D D F E
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 13.5 53.0 45.5 13.0 53.5 45.5
Change Period (Y+Rc), s 6.5 * 6.5 6.5 6.0 6.5 6.5
Max Green Setting (Gmax), s 7.0 * 30 39.0 7.0 29.5 39.0 Max Q Clear Time (g_c+I1), s 4.6 48.0 8.6 8.8 42.5 10.7 Green Ext Time (p_c), s 0.0 0.0 0.5 0.0 0.0 0.8
Intersection Summary
HCM 6th Ctrl Delay 162.5
HCM 6th LOS F
Notes
User approved pedestrian interval to be less than phase max green. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 + P PM 8: N. Las Posas Rd & SR-78 WB Ramps 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 560 10 339 570 1699 0 0 1152 548 Future Volume (veh/h) 0 0 0 560 10 339 570 1699 0 0 1152 548 Initial Q (Qb), veh 000000000
Ped-Bike Adj(A_pbT) 1.00 0.96 1.00 1.00 1.00 0.97
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 0 0 1856 1856 Adj Flow Rate, veh/h 494 172 368 600 1788 0 0 1200 571
Peak Hour Factor 0.92 0.92 0.92 0.95 0.95 0.95 0.96 0.96 0.96 Percent Heavy Veh, % 333330033
Cap, veh/h 384 111 238 503 3417 0 0 1173 529
Arrive On Green 0.22 0.22 0.22 0.57 1.00 0.00 0.00 0.35 0.35 Sat Flow, veh/h 1767 513 1097 1767 5233 0 0 3544 1522
Grp Volume(v), veh/h 494 0 540 600 1788 0 0 1200 571
Grp Sat Flow(s),veh/h/ln 1767 0 1610 1767 1689 0 0 1689 1522 Q Serve(g_s), s 23.9 0.0 23.9 31.3 0.0 0.0 0.0 38.2 38.2 Cycle Q Clear(g_c), s 23.9 0.0 23.9 31.3 0.0 0.0 0.0 38.2 38.2 Prop In Lane 1.00 0.68 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 384 0 350 503 3417 0 0 1173 529
V/C Ratio(X) 1.29 0.00 1.54 1.19 0.52 0.00 0.00 1.02 1.08 Avail Cap(c_a), veh/h 384 0 350 503 3417 0 0 1173 529
HCM Platoon Ratio 1.00 1.00 1.00 2.00 2.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.09 0.09 0.00 0.00 0.09 0.09 Uniform Delay (d), s/veh 43.0 0.0 43.1 23.7 0.0 0.0 0.0 35.9 35.9 Incr Delay (d2), s/veh 147.4 0.0 258.4 88.9 0.1 0.0 0.0 14.8 39.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 26.0 0.0 34.5 19.5 0.0 0.0 0.0 17.1 19.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 190.4 0.0 301.4 112.6 0.1 0.0 0.0 50.7 75.6 LnGrp LOS F A F F A A A F F
Approach Vol, veh/h 1034 2388 1771
Approach Delay, s/veh 248.4 28.3 58.7
Approach LOS F C E
Timer - Assigned Phs 2 5 6 8
Phs Duration (G+Y+Rc), s 81.0 36.0 45.0 29.0
Change Period (Y+Rc), s 6.8 * 4.7 6.8 5.1
Max Green Setting (Gmax), s 74.2 * 31 38.2 23.9
Max Q Clear Time (g_c+I1), s 2.0 33.3 40.2 25.9
Green Ext Time (p_c), s 11.7 0.0 0.0 0.0
Intersection Summary
HCM 6th Ctrl Delay 82.5
HCM 6th LOS F
Notes
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
HCM 6th Signalized Intersection Summary Year 2050 + P PM 9: N. Las Posas Rd & Grand Ave 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 410 700 30 110 170 1082 50 1057 240 688 864 340 Future Volume (veh/h) 410 700 30 110 170 1082 50 1057 240 688 864 340 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 0.97 1.00 0.95 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 539 921 39 116 179 1139 54 1137 258 871 1094 430 Peak Hour Factor 0.76 0.76 0.76 0.95 0.95 0.95 0.93 0.93 0.93 0.79 0.79 0.79 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 496 1001 42 145 423 834 117 1270 288 277 1144 712 Arrive On Green 0.14 0.29 0.29 0.08 0.23 0.23 0.07 0.31 0.31 0.08 0.32 0.32 Sat Flow, veh/h 3428 3441 146 1767 1856 2672 1767 4098 930 3428 3526 1495 Grp Volume(v), veh/h 539 472 488 116 179 1139 54 937 458 871 1094 430 Grp Sat Flow(s),veh/h/ln1714 1763 1824 1767 1856 1336 1767 1689 1650 1714 1763 1495 Q Serve(g_s), s 15.9 28.5 28.5 7.1 9.1 25.1 3.2 29.1 29.2 8.9 33.4 23.6 Cycle Q Clear(g_c), s 15.9 28.5 28.5 7.1 9.1 25.1 3.2 29.1 29.2 8.9 33.4 23.6 Prop In Lane 1.00 0.08 1.00 1.00 1.00 0.56 1.00 1.00
Lane Grp Cap(c), veh/h 496 513 531 145 423 834 117 1047 512 277 1144 712 V/C Ratio(X) 1.09 0.92 0.92 0.80 0.42 1.37 0.46 0.89 0.90 3.14 0.96 0.60 Avail Cap(c_a), veh/h 496 513 531 145 423 834 117 1047 512 277 1144 712 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 0.18 0.18 0.18 1.00 1.00 1.00 0.09 0.09 0.09 Uniform Delay (d), s/veh 47.0 37.8 37.8 49.6 36.3 38.1 49.5 36.2 36.2 50.5 36.4 21.8 Incr Delay (d2), s/veh 66.3 24.2 23.6 8.3 0.0 166.2 12.5 11.7 20.8 963.9 2.7 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln11.2 15.2 15.7 3.4 4.0 30.0 1.8 13.1 14.1 40.8 14.0 7.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 113.3 61.9 61.3 57.9 36.3 204.3 61.9 48.0 57.1 1014.4 39.1 22.1 LnGrp LOS F E E E D F E D E F D C
Approach Vol, veh/h 1499 1434 1449 2395
Approach Delay, s/veh 80.2 171.5 51.4 390.8
Approach LOS F F D F
Timer - Assigned Phs 1 2345678
Phs Duration (G+Y+Rc), s15.4 40.6 15.5 38.5 13.8 42.2 22.4 31.6 Change Period (Y+Rc), s 6.5 6.5 6.5 6.5 6.5 6.5 6.5 6.5 Max Green Setting (Gmax), s8.9 34.1 9.0 32.0 7.3 35.7 15.9 25.1 Max Q Clear Time (g_c+I1), s10.9 31.2 9.1 30.5 5.2 35.4 17.9 27.1 Green Ext Time (p_c), s 0.0 1.8 0.0 0.7 0.0 0.2 0.0 0.0 Intersection Summary
HCM 6th Ctrl Delay 203.1
HCM 6th LOS F
Notes
User approved pedestrian interval to be less than phase max green.
User approved changes to right turn type.
HCM 6th Signalized Intersection Summary Year 2050 + P PM 10: Via Vera Cruz & Grand Ave 11/28/2023
Armorlite Apartments Synchro 11 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 625 710 164 130 540 160 297 180 110 400 270 445 Future Volume (veh/h) 625 710 164 130 540 160 297 180 110 400 270 445 Initial Q (Qb), veh 0 00000000000
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.96 1.00 0.96 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 1856 Adj Flow Rate, veh/h 665 755 174 146 607 68 298 327 138 435 293 332 Peak Hour Factor 0.94 0.94 0.94 0.89 0.89 0.89 0.80 0.80 0.80 0.92 0.92 0.92 Percent Heavy Veh, % 3 33333333333
Cap, veh/h 639 883 687 175 751 83 343 360 294 458 481 394 Arrive On Green 0.19 0.25 0.25 0.10 0.16 0.16 0.19 0.19 0.19 0.26 0.26 0.26 Sat Flow, veh/h 3428 3526 1522 1767 4605 509 1767 1856 1512 1767 1856 1523 Grp Volume(v), veh/h 665 755 174 146 443 232 298 327 138 435 293 332 Grp Sat Flow(s),veh/h/ln1714 1763 1522 1767 1689 1737 1767 1856 1512 1767 1856 1523 Q Serve(g_s), s 20.5 22.5 7.9 8.9 13.9 14.2 18.0 19.0 8.9 26.6 15.3 22.7 Cycle Q Clear(g_c), s 20.5 22.5 7.9 8.9 13.9 14.2 18.0 19.0 8.9 26.6 15.3 22.7 Prop In Lane 1.00 1.00 1.00 0.29 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 639 883 687 175 551 283 343 360 294 458 481 394 V/C Ratio(X) 1.04 0.85 0.25 0.84 0.80 0.82 0.87 0.91 0.47 0.95 0.61 0.84 Avail Cap(c_a), veh/h 639 883 687 198 551 283 361 380 309 458 481 394 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.09 0.09 0.09 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 44.7 39.3 19.1 48.7 44.3 44.5 43.0 43.3 39.3 40.1 35.9 38.6 Incr Delay (d2), s/veh 23.4 1.1 0.1 21.2 7.9 16.1 18.0 23.4 0.4 29.4 1.6 14.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln10.5 9.5 3.9 4.9 6.3 7.2 9.3 10.8 3.3 14.9 6.9 9.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 68.2 40.4 19.2 69.9 52.2 60.6 60.9 66.7 39.7 69.5 37.5 52.9 LnGrp LOS F D B E D E E E D E D D
Approach Vol, veh/h 1594 821 763 1060
Approach Delay, s/veh 49.7 57.7 59.6 55.4
Approach LOS D E E E
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s15.6 34.4 33.6 25.2 24.7 26.5
Change Period (Y+Rc), s * 4.7 6.8 5.1 * 4.7 6.8 5.1
Max Green Setting (Gmax), s* 12 25.0 28.5 * 21 16.8 22.5 Max Q Clear Time (g_c+I1), s10.9 24.5 28.6 22.5 16.2 21.0 Green Ext Time (p_c), s 0.0 0.2 0.0 0.0 0.2 0.4
Intersection Summary
HCM 6th Ctrl Delay 54.5
HCM 6th LOS D
Notes
User approved volume balancing among the lanes for turning movement. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier.
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 3-23-3814 Armorlite Lofts
N:\3814 - Armorlite Apartments\Report\LTA Appendix.3814.doc
APPENDIX H
EXCERPTS FROM THE CITY OF SAN MARCOS MUNICIPAL
CODE PARKING RATE
SAN MARCOS MUNICIPAL CODE
____________
VOLUME I
____________
2018 Republication of the Code of Ordinances of
San Marcos, California
____________
PREFACE
This Code constitutes a complete republication of the general and permanent ordinances of the City of San Marcos, California.
Page Numbering System
The page numbering system used in this Code is a prefix system. The letters to the left of the colon are an abbreviation which represents a certain portion of the volume. The number to the right of the colon represents the number of the page in that portion. In the case of a title of the Code, the number to the left of the colon indicates the number of the title. The following are typical parts of codes of ordinances, which may or may not appear in this Code at this time, and their corresponding prefixes:
CHARTER CHT:1
CHARTER COMPARATIVE TABLE CHTCT:1
RELATED LAWS COMPARATIVE TABLE RLCT:1
CODE CD1:1
CODE COMPARATIVE TABLES CCT:1
C.
D.
E.
1. 2.
3. Mixed Use Sites. Where multiple land uses are combined within a single building, structure, or parcel, off-street parking facilities for a single use shall not be considered as providing required parking facilities for any other uses. The aggregate number of parking spaces for each separate use, required by this chapter, shall be met, except where otherwise specified and a reduction of parking is allowed in compliance with Section 20.340.050 (Off-Street Parking and Trip Reduction Measures).
Rounding Calculations. Calculations resulting in a fractional number shall be treated as follows: one (1) parking space is required for fractions of one-half (0.5) or greater; no additional parking space is required for fractions of less than one-half (0.5).
Calculations.
Gross Floor Area Calculations. Gross floor area calculations are based on the area within the surrounding exterior walls of a building or any portion, thereof, including shared bathroom spaces, storage areas, and areas for circulation.
Seating Calculations. Where fixed seats provided are either benches, bleachers, or pews, such seats shall be calculated at one (1) seat per eighteen (18) inches and one (1) seat per twenty-four (24) inches of booth length for dining.
Assembly Area Calculations. All rooms or areas that can be logically used for seating, in addition to any fixed seating area, shall be calculated in determining the parking requirement for assembly areas.
Table 20.340-1
Parking Requirements by Land Use
Land Use Minimum Required Parking Additional Use Regulations Residential Uses
Animal Keeping, Small None required
Accessory Dwelling
Unit/Accessory Dwelling (Ord.
2017-1445, 7/11/2017)
1 space/accessory dwelling
unit
Caretaker Unit 1 space Interior dimension: 20 feet x
20 feet
Multifamily Dwelling Studio: 1 space/unit;
1 Bedroom Unit: 1.5
space/unit
2+ Bedroom Unit*: 2
spaces/unit; 1 space shall be
covered Guest Parking: 1
space/3 units
*1 garage space shall be
provided for condominiums,
duplexes, townhomes, patio
homes. Apartments shall
provide one covered parking
space (garage or carport) of
the required ratio. Additional
multifamily requirements are
provided in Section
20.340.040.G
Multifamily Dwelling,
A ordable
Housing (deed restricted)
1.7 spaces/unit Additional multifamily
requirements are provided in
Section 20.340.040.G
Non-Commercial HorticultureNone required.
Planned Residential
Development (PRD)
Sum of individual parking
requirements for each use;
residential parking by
bedroom count
Chapter 20.435 (Planned
Residential Development)
Private Residential Garage None required.
Recreational Vehicles
(RVs)/Parks
To be determined by the
Director during SDP or CUP
review process.
Residential Care Facility,
Small & Large
1 space/3 residents Provision of parking shall be
based on the population
served and level of care
provided at the facility.
Minimum requirements here
are guidelines for
establishing appropriate
service levels on a case by
case basis at time of SDP
review
Rooming House 1 space/room; plus 2 spaces
Senior/Age-Restricted
Dwelling or Unit
1.25 spaces/unit Satis es resident and visitor
parking
Single-Family Attached 2 spaces/unit 1 space shall be covered Single-Family Detached ≤ 3,000 s.f. unit: 2 attached
covered spaces required;
>3,000 s.f. unit: 3 attached
covered spaces required
See Table 20.340-5 for
additional standards; Section
20.340.060.H
Sport Court, on a Residential
Lot
None required. Residential Zones only.
Supportive Housing Studio: 1 space/unit
1 Bedroom Unit: 1.5
space/unit
2+ Bedroom Unit: 2
spaces/unit; 1 space shall be
covered, Guest Parking: 1
space/3 units
Agricultural/Horticultural,
Non-Commercial
No parking required.
Agricultural/Horticultural,
Commercial
1 space/250 s.f. gross oor
area plus 1 space/1,000 s.f.
outdoor area usage
Agricultural/Horticultural,
Processing and Packaging
1 space/250 s.f. gross oor
area plus 1 space/1,500 s.f.
outdoor area/greenhouse
spaceSmall Animals
Plants and Crops
Wholesale Production 1 space/3 employees plus on-
site area for 1 commercial
loading/unloading vehicle
Only applies in R-1-20 Zone
Greenhouse/Nursery 1 space/250 s.f. gross oor
area; plus 1 space/1,500 s.f.
outdoor area usageCommercial Production
Retail
Sales Stand 2 spaces
General Retail Uses
Adult Entertainment Business1 space/250 s.f. gross oor area plus 1 space/2
employees
Animal Shelter 1 space/250 s.f. gross oor
area
Bar 1 space/3 seats or 1
space/100 s.f. gross oor
area whichever is greater
Catering 2.5 space/1,000 s.f. gross