ATTACHMENT G

VEHICLE MILES TRAVELED MEMORANDUM

MEMORANDUM
N:\3703 - Woodward 46 Apartment\Report\VMT Memo\VMT Memo.3703 June 2025 Revised.docx To: Ms. Sophia Mitchell
Sophia Mitchell & Associates
Date: June 4, 2025
From: John Boarman, P.E.

Renald Espiritu
LLG, En
gineers
LLG Ref: 3-22-3703
Subject: Woodward 46 Apartment Project
Linscott, Law and Greenspan, Engineers (LLG) has prepared this technical memorandum to provid e additional substantial evid ence supporting the use of the “Adjacency to High-Quality Transit” sc reening criterion for the Woodward 46 Apartment Project (hereafter referred to as the “Project”) to demonstrate that the Project qualifies for screening from a formal Vehicle Miles Traveled (VMT) analysis.

The Project proposes to construct 46 condo minium units east of Woodward Street, north of Mission Road and sout h of Vineyard Road in th e City of San Marcos. The Project is also located within walking distance of several amenities, including restaurants and cafes, a public library, a high-quality fitn ess center to the south, and the Twin Oaks Town Center to the west of the Project site, which includes a convenience store and other commercial businesses.

A VMT report was prepared for the Project under separate cover and is included in Attachment A. The Project was originally screened out based on its location within a High Quality Transit Area, per the map provided in the City of San Marcos Transportation Impact Analysis Guidelines (dated November 16, 2020) , which is included in Attachment B.

The Project is not located in a VMT efficien t area (15% or more below the base year average household VMT/capita) based on the applicable location-based screening map produced by SANDAG. The San Diego av erage regional VMT/capita is 18.9.

Using the SANDAG screening map for residential projects under per capita measurements, the Project is located in census tract 200.23 and would be expected to generate 17.8 VMT/capita. This equates to 94.0% of the regional average VMT/capita, as shown in the SANDAG screening map included in Attachment C .

Hence, the Project is 9% over the regi onal average and would have a potential significant VMT impact.

Ms. Sophia Mitchell
June 4, 2025

Page 2 ends

N:\3703 - Woodward 46 Apartment\Report\VMT Memo\VMT Memo.3703 June 2025 Revised.docx Figure A shows the location of the Project in re lation to the San Marcos Civic Center Transit Center, which is less than 0.30 miles away (approximately 1,200 feet from the nearest Project access to the sidewalk to the nearest access point to the transit station).

Therefore, the Project is located within a High Quality Transit Area (see Attachment B). The City's Transportation Impact Anal ysis Guidelines provides applicable VMT reduction percentages for projects in the City of San Marcos. According to the City’s Transportation Impact Analysis Guidelines, a project located within half a mile (or a ten-minute walk) of a major transit cente r can receive a VMT reduction of up to

14.4%. These VMT reduction percen tages are obtained from the San Diego Association of Governments (SANDAG) Mobility Management Guidebook (dated June 2019) and Mobility Management VMT Reduction Calculator Tool , which are included in Attachment D.

The formula used to calcula te the reduction percenta ge takes into account the difference in transit mode share with th e implementation of this strategy. Assuming that just 4% of the Project's residents, who previously lived in areas where transit was less accessible, will now use transit at th e Project site, thereby reducing single- occupancy vehicle use, this would re sult in a 10.9% VMT reduction, which is sufficient to lower the 17.8 VM T/capita in the Project's census tract to below the significant VMT impact threshold. Therefor e, applying this 10.9% reduction to the 94% VMT resident per capita for the censu s tract would result in the Project VMT being 83.1% of the regional mean which concludes the Project would not have significant VMT impact and validates the pr oject screening for adjacency to high quality transit. Attachment D includes the results from the VMT Reduction Calculator Tool.

Additionally, the Project incorporates the following features which complement the conclusion that the Project would have not have a significant VMT impact as they support active transportation modes:
 Internal sidewalk connection to Woodward Street
 The Project footprint is clustered to promote density and preserve open space  Pedestrian safety features at the Project entry driveway (e.g., truncated domes)  Street lighting addition to Woodward Street for pedestrian safety Figure B shows the Project site plan.

Ms. Sophia Mitchell
June 4, 2025

Page 3 ends

N:\3703 - Woodward 46 Apartment\Report\VMT Memo\VMT Memo.3703 June 2025 Revised.docx The Project will also incorporate se veral Transportation Demand Management (TDM) strategies, including:
 Subsidized transit passes for residents
 Reserved parking spaces for carpool/vanpool/park-and-ride, etc.  A bike repair station
 Bike lockers (within garages)
Please let us know if you have any questions. Thank you.

cc: File

FIGURES
Figure A: Project Area Map
Figure B: Project Site Plan

A

TTACHMENT
Attachment A: Woodward 46 Apartment Project VMT Report
Attachment B: High Quality Transit Areas map from City of San Marcos Transportation Impact Analysis Guidelines
Attachment C: SANDAG VMT Screening Map
Attachment D: SANDAG Mobility Management Guidebook and Mobility Management VMT Reduction Calculator Tool results
Project Area Map
Figure A
Woodward 46 Apartment Project
Project
Site
San Marcos
Civic Center
Transit

0.3 miles
EXIST. TOWNHOMES
APN: 220-210-50
APN: 220-480-12
APN: 220-480-13
APN: 220-480-01
APN: 220-386-01

W O O D W A R D S T R E E T
∆
Feet
04 0 8 0
SCALE 1":40'
Site Plan
Figure B
Woodward 46 Apartment Project

LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 3-22-3703 Woodward 46 Apartment Project
N:\3703 - Woodward 46 Apartment\Report\VMT Memo\VMT Memo Attachments Cover Pages.3703.doc

ATTACHMENT A

VEHICLE MILES TRAVELED STUDY
WOODWARD 46 APARTMENT PROJECT
San Marcos, California
March 27, 2024
LLG Ref. 3-22-3703
Prepared by: Under the Supervision of:

Renald Espiritu John Boarman, P.E.

Transportation Engineer II Principal

LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 3-22-3703 Woodward 46 Apartment Project
N:\3703 - Woodward 46 Apartment\Report\VMT.3703 March 2024.docx i

TABLE OF CONTENTS

SECTION PAGE

1.0  Introduction ................................................................................................................................ 3

2.0  Project Description .................................................................................................................... 4

3.0  Vehicle Miles Traveled: Overview and Background .............................................................. 8

3.1  VMT Background ............................................................................................................... 8

3.2  Senate Bill 743 .................................................................................................................... 8

4.0  VMT Significance Criteria & Methodology ............................................................................ 9

4.1  Local / Regional Agency Transition to SB743 ................................................................... 9

4.2  Screening Criteria ............................................................................................................... 9

4.3  Mitigation Measures and Strategies for VMT Reduction ................................................. 10

5.0  VMT Analysis ........................................................................................................................... 11

APPENDICES

APPENDIX
A. City of San Marcos Transportation Impact Analysis Guidelines – High Quality Transit Areas map, City of San Marcos Municipal Code Parking Rate, and Floor Area Ratio calculations

LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 3-22-3703 Woodward 46 Apartment Project
N:\3703 - Woodward 46 Apartment\Report\VMT.3703 March 2024.docx ii

LIST OF FIGURES
SECTION—F IGURE # F OLLOWING PAGE
Figure 2–1  Vicinity Map ................................................................................................................... 5 Figure 2–2  Project Area Map ............................................................................................................ 6 Figure 2–3  Site Plan .......................................................................................................................... 7

LIST OF TABLES
SECTION—T ABLE # P AGE
Table 5–1 City of San Marcos Municipal Code Parking Requirements & Calculations .................... 11

LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 3-22-3703 Woodward 46 Apartment Project
N:\3703 - Woodward 46 Apartment\Report\VMT.3703 March 2024.docx 3 VEHICLE MILES TRAVELED STUDY
WOODWARD 46 APARTMENT PROJECT
San Marcos, California
March 27, 2024

1.0 INTRODUCTION
Linscott, Law & Greenspan, Engineers (LLG) has prepared this Vehicle Miles Traveled (VMT) study to determine the VMT impacts for the Woodward 46 Apartment Project (herea fter referred to as “Project”). The Project proposes to construct 46 condominium units east of Woodward Street, north of Mission Road and south of Vineyard Road in the City of San Marcos.

The VMT analysis presented in this report includes the following:
 Project Description
 Vehicle Miles Traveled: Overview and Background
 VMT Significance Criteria and Methodology
 VMT Analysis
 Conclusions

LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 3-22-3703 Woodward 46 Apartment Project
N:\3703 - Woodward 46 Apartment\Report\VMT.3703 March 2024.docx 4 2.0 PROJECT DESCRIPTION
The Project proposes to develop 46 condominium units east of Woodward Stre et, north of Mission Road and south of Vineyard Road in the City of San Marcos. Site access is proposed via one (1) full- access driveway to Woodward Street. The propos ed Project would require a General Plan Amendment but is consistent in terms of Section 3.11 under Threshold #2, General Plan Consistency in the Project’s Environmental Impact Report.

Figure 2–1 shows the Project vicinity. Figure 2–2 shows a more detailed Project area map.

Figure 2–3 shows the Project site plan.

S.D.

COUNTY

CARLSBAD

CORONADO

ENCINITAS
SOLANA
BEACH

CHULA VISTA

OCEANSIDE
VISTA

SAN MARCOS
POWAY
SANTEE

EL CAJON

LA MESA
LEMON
GROVE

NATIONAL
CITY

SAN DIEGO
S.D. COUNTYS.D. COUNTY

ESCONDIDO
Time: 10:13 AM
Date: 1/19/2023
N:\3679\Figures
Vicinity Map
Figure 2-1
[
Woodward 46 Apartment Project
§¨8
§¨5 §¨805
§¨5
§¨15
§¨5
§¨8
"Ã54
"Ã125
"Ã94
"Ã52
"Ã163
"Ã56
"Ã78
"Ã67
§¨15
Project Site
Project Area Map
Figure 2-2
Woodward 46 Apartment Project
N:\3703\Figures
Date: 02/01/23
Project
Site
EXIST. TOWNHOMES
APN: 220-210-50
APN: 220-480-12
APN: 220-480-13
APN: 220-480-01
APN: 220-386-01

W O O D W A R D S T R E E T
∆

CORNERSTONE
WOOD
APN 220

WOODWARD ST, S
Feet
04 0 8 0
SCALE 1":40'
T
N:\3703\Figures
Date: 02/01/23
Site Plan
Figure 2-3
Woodward 46 Apartment Project

LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 3-22-3703 Woodward 46 Apartment Project
N:\3703 - Woodward 46 Apartment\Report\VMT.3703 March 2024.docx 8 3.0 VEHICLE MILES TRAVELED: OVERVIEW AND BACKGROUND
This section presents background on an evaluation of potential transportation impacts of the Project per the California Governor's O ffice of Planning and Research (OPR ) to implement California State Law Senate Bill (S.B.) 743 and the City’s adopted Transportation Impact Analysis Guidelines , December 2020.

3.1 VMT Background
VMT is a measurement of miles traveled by vehicl es within a specified re gion and for a specified time period. VMT measures the efficiency of the transportation network. VMT is calculated based on individual vehicle trips genera ted and their associated trip lengths. VMT accounts for two-way (round trip) travel and is often estimated for a typical weekday to measure transportation impacts.

3.2 Senate Bill 743
In September 2013, the Governor 's Office signed SB 743 into law, starting a process that fundamentally changes the way transportation imp act analysis is conduc ted under CEQA. These changes include the elimination of auto delay, leve l of service (LOS), and similar measurements of vehicular roadway capacity and traffic congestion as the basis for determini ng significant impacts.

The guidance identifies VMT as the most approp riate CEQA transportation metric, along with the elimination of Auto Delay/LOS fo r CEQA purposes statewide. The justification for this paradigm shift is that Auto Delay/LOS impacts lead to improvements that increase roadway capacity and therefore induce more traffic and greenhouse gas emissions.

In December 2018, after over five years of stakeholde r-driven development, the California Natural Resource Agency certified and adopted the CEQA St atute. As of July 1, 2020, the VMT guidelines are applicable statewide.

LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 3-22-3703 Woodward 46 Apartment Project
N:\3703 - Woodward 46 Apartment\Report\VMT.3703 March 2024.docx 9 4.0 VMT SIGNIFICANCE CRITERIA & METHODOLOGY

4.1 Local / Regional Agency Transition to SB743
The City of San Marcos adopted the Transportation Impact Analysis (TIA) Guidelines , November 2020 version, that provides signi ficance determination thresholds for VMT and VMT analysis methodologies. The City’s TIA Guidelines was utilized as the basis for this VMT analysis.

4.2 Screening Criteria
Based on the TIA Guidelines , the requirement to prepare a de tailed transportation VMT analysis applies to all land development pr ojects except for those that meet at least one of the provided screening criteria. A project that meets at least one of the screeni ng criteria listed below would be considered to have a less-than-significant impact due to the project or location characteristics.  Small Projects (less than 110 daily vehicle trips)
 Affordable Housing (100% deed restricted)
 Local Serving Retail and Public Facilities (50,000 square feet gross floor area or less)  Adjacency to High-Quality Transit. A high-quality transit area is defined as the one-half mile walkshed around either of the following:
o An existing major transit st op, defined as a site contai ning an existing rail transit station or the intersection of two or more bus routes with a combined frequency of service interval of 15 mi nutes or less during the mo rning and afternoon peak commute periods. In addition, a rail transit station must be within 0.25 miles of bus stops serving at least one bus route with individual service intervals no longer than 30 minutes during peak commute periods per route in order to qualify as a high-quality transit area.
o An existing stop along a high-quality transit corridor, defined as a corridor with fixed route bus service with combined service intervals (gaps between buses serving the corridor) no longer than 15 minutes during peak commute hours.

However, this presumption does not apply if the project:

1. has a floor area ratio (FAR) of less than 0.75;

2. includes more parking for use by residents, customers, or employees of the project than required by the City;

3. is inconsistent with the City’s current General Plan, as determined by the City; or, replaces affordable residential units with a smaller number of moderate- or high- income residential units.
 Map-Based Screening (projects located in VMT efficient areas): Residential and employment projects that are proposed in areas that genera te VMT below adopted City thresholds can be presumed to have a less-than-significant tr ansportation impact and would not require a detailed VMT analysis. This determinat ion must be made using SANDAG’s online

LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 3-22-3703 Woodward 46 Apartment Project
N:\3703 - Woodward 46 Apartment\Report\VMT.3703 March 2024.docx 10 residential and employment VMT maps, which show census tracts in the city where the VMT is below the regional average. The following ty pes of projects could be screened out using this approach:
o Residential projects propos ed in census tracts with residential VMT per capita below the City’s threshold of exceed ing 85 percent of the SANDAG regional average
o Employment projects proposed in census tracts with work VMT per employee below the City’s threshold of exceed ing 85 percent of the SANDAG regional average

4.3 Mitigation Measures and Strategies for VMT Reduction If a project is not presumed to ha ve a less than significant VMT impact due to project characteristics and/or location, then it is cons idered to have a significant impact and will re quire mitigation measures and strategies.

LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 3-22-3703 Woodward 46 Apartment Project
N:\3703 - Woodward 46 Apartment\Report\VMT.3703 March 2024.docx 11 5.0 VMT ANALYSIS
Per the TIA Guidelines, a VMT analysis for CEQA purposes will not be required as the project is located within a high-quality transit area. The High-Quality Transit Areas map shows the Project site is within this area. The following is a discussion of the three items (listed in Section 4.2) that are potential caveats:

FLOOR AREA RATIO AND GENERAL PLAN
Per coordination with City staff, the Specific Plan requires a minimum floor area ratio of 0.75.

The proposed Project would requir e a General Plan Amendment but is consistent in terms of Section 3.11 under Threshold #2, General Plan Consis tency in the Project’s Environmental Impact Report.

PARKING
The Project proposes a total of 46 condominium units. Per the City of San Marcos Municipal Code, Chapter 20.340 , 108 parking spaces are required. A summary of the parking code requirements and calcul ations are shown in Table 5–1 . The project proposes to provide 108 parking spaces. Therefore, the project meets the parking requirements and does not exceed.

TABLE 5–1

CITY OF SAN MARCOS MUNICIPAL CODE PARKING REQUIREMENTS & CALCULATIONS Parking Code Land Use Required Off-Street Parking
Ratea
Project Quantity
(dwelling units)
Required
Parking
Residential Uses
Duplex 2 spaces / dwelli ng unit 46 3-bedroom 92
Guest 1 space / 3 dwelling unit 46 3-bedroom 16
Total Spaces 108
Footnotes:
a. Rates from the City of San Marcos Municipal Code, Chapter 20.340.

Appendix A contains the TIA Guidelines’ High-Quality Transit Areas map, excerpts from the City of San Marcos Municipal Code Parking Rate and floor area ratio calculation.

Therefore, based on the City’s TIA Guidelines, a VMT analysis is not requi red as the Project is located in a high-quality transit area. VMT impacts are presumed to be less than significant.

TECHNICAL APPENDICES
WOODWARD 46 APARTMENT PROJECT
San Marcos, California
March 27, 2024

LLG Ref. 3-22-3703

LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 3-22-3703 Woodward 46 Apartment Project
N:\3703 - Woodward 46 Apartment\Report\VMT Appendix.3703.doc

APPENDICES

APPENDIX
A. City of San Marcos Transportation Impact Analysis Guidelines – High Quality Transit Areas map, City of San Marcos Municipal Code Parking Rate, and Floor Area Ratio calculations

LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 3-22-3703 Woodward 46 Apartment Project
N:\3703 - Woodward 46 Apartment\Report\VMT Appendix.3703.doc

APPENDIX A

CITY OF SAN MARCOS TRANSPORTATION IMPACT
ANALYSIS GUIDELINES – HIGH QUALITY TRANSIT AREAS MAP, CITY OF SAN MARCOS MUNICIPAL CODE

PARKING RATE, AND FLOOR AREA RATIO CALCULATIONS

C A R L S B A D

V I S T A

E S C O N D I D O
City of San Marcos
SB 743 Implementation

L E G E N D
304
305
347
353
445
NCTD SPRINTER Light Rail Line
! Transit Stop
Half Mile Transit Buffer
Half Mile Walkshed
City of San Marcos
Sphere of Influence
Areas within the Sphere of Influence
Neighboring City
High Quality
Transit Areas
Data sources: SANGIS; CalAtlas. Map date: February 24, 2020.

FIGURE X
±
1:72,000
0 1½
Miles
NCTD Breeze Routes
Single-Family Detached ≤ 3,000 s.f. unit: 2 attached covered spaces required;
>3,000 s.f. unit: 3 attached covered
spaces required
See Table 20.340-5 for additional
standards; Section 20.340.060.H
Sport Court, on a Residential LotNone required. Residential Zones only.

Supportive Housing Studio: 1 space/unit
1 Bedroom Unit: 1.5 space/unit
2+ Bedroom Unit: 2 spaces/unit; 1
space shall be covered, Guest
Parking: 1 space/3 units
Transitional Housing 2 covered spaces/unit
Recreation, Education & Public Assembly Uses
Animal Keeping, Large 1 space/250 s.f. gross oor area
Assembly and RecreationTo be determined by the Director during SDP or CUP review process.

Automobile Parking Lot or Storage
Garage (Enclosed or Freestanding)
Adequate for facility, building, or
area served.

Cemetery As provided by internal circulation
system.

Child Care Facility, Daycare Center1 space/2 employees plus 1 space/5 children (per maximum capacity) or
1 space/10 children where
adequate drop-o facilities are
provided per 20.340.040.I.1.

Club 10 spaces/1,000 s.f. of assembly
oor area
College, Nontraditional Campus
Setting
3 spaces/1,000 s.f.

College, Traditional Campus1 space/3 non-resident students; plus 1 space/3 employees and
faculty
****
EXIST. TOWNHOMESAPN: 220-210-50
APN: 220-480-12APN: 220-480-13
APN: 220-480-01
APN: 220-386-01

W O O D W A R D S T R E E T
Δ
CORNERSTONE COMMUNITIESWOODWARDAPN 220-210-49WOODWARD ST, SAN MARCOS CAFeet04080SCALE 1":40' TENTATIVE MAP Lot a
Lot: 137,921 SF
Bldg.: 103,460
FAR: 0.75
137,921 sf
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 3-22-3703 Woodward 46 Apartment Project
N:\3703 - Woodward 46 Apartment\Report\VMT Memo\VMT Memo Attachments Cover Pages.3703.doc

ATTACHMENT B

C A R L S B A D

V I S T A

E S C O N D I D O
City of San Marcos
SB 743 Implementation

L E G E N D
304
305
347
353
445
NCTD SPRINTER Light Rail Line
! Transit Stop
Half Mile Transit Buffer
Half Mile Walkshed
City of San Marcos
Sphere of Influence
Areas within the Sphere of Influence
Neighboring City
High Quality
Transit Areas
Data sources: SANGIS; CalAtlas. Map date: February 24, 2020.

FIGURE X
±
1:72,000
0 1½
Miles
NCTD Breeze Routes
Project
Site
Project
Site
LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 3-22-3703 Woodward 46 Apartment Project
N:\3703 - Woodward 46 Apartment\Report\VMT Memo\VMT Memo Attachments Cover Pages.3703.doc

ATTACHMENT C

LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 3-22-3703 Woodward 46 Apartment Project
N:\3703 - Woodward 46 Apartment\Report\VMT Memo\VMT Memo Attachments Cover Pages.3703.doc

ATTACHMENT D

Mobility
Management
Guidebook
JUNE 2019
®
I ..
--·1
�
........ .-�, '.,
' •• • ••
'" . ' �..

LAND USE STRATEGIES

IMPACT ON VMT
Reduction of up to 14 % of project VMT
VMT reduction affected by:
 Current transit mode share in project area.
 Proximity and access to transit station.
 Frequency of and accessibility provided by nearby transit service.

IMPLEMENTATION CONS IDERATIONS
 Transit corridors that provide direct connections to the region’s downtown or major employment centers are
significantly more likely to attract new TOD compared
to transit lines that do not serve these destinations.
 Walking and biking are essential to the success of TOD.

COMPLEMENTARY STRATE GIES
 Higher-Density Development
 Mixed-Use Development
 Reduced Parking
 Employer Transit Pass Subsidy
 Bikeshare

CASE STUDY
Villa Encantada Apartments was completed in 2019 as a
TOD that provides 67 affordable, high-quality apartments and 1,000 square feet of neighborhood-serving retail.

Located at the 62nd/Encanto Trolley Station, the project was developed as a partnership between MTS and AMCAL
Multi-Family Housing. The apartment complex is a
20-minute Trolley ride to downtown via the Orange Line.

Image source: San Diego Metropolitan Transit System

IMPLEMENTATION RESO URCES
 SANDAG developed a Regional TOD Strategy as part of
San Diego Forward: The Regional Plan to promote and
incentivize sustainable development throughout the
region. A variety of reports are available at:
arb.ca.gov/cc/sb375/policies/transitservice/transit_brief.pdf

REFERENCE
Lund, H., et al. 2004. “Travel Characteristics of Transit- Oriented Development in California.”
bart.gov/sites/default/files/docs/Travel_of_TOD.pdf
Tal, G., et al. 2013. “Technical Background Document on the Impacts of Transit Access (Distance to Transit) Based on a Review of the Empirical Literature.”
arb.ca.gov/cc/sb375/policies/transitservice/transit_brief.pdf

TRANSIT -ORIENTED DEV ELOPMENT
Transit -Oriented Development (TOD) refers to projects built in walkable areas that have easy access to public transit and typically offer a mix of uses, including housing, retail, offices, and/or community facilities. TOD should be built within a half -mile of a high -frequency rail transit station (e.g. , SPRINTER, COASTER, Trolley) and, at a minimum, incorporate adequate bike and pedestrian facilities that facilitate connections to and from transit, encouraging transit use and reducing single -occupancy vehicle use .

SCALE OF APPLICATION : Project Scale

Level of application: Project/Site Return to Main 
Type of VMT affected:  Project‐generated trips Results Summary  Max VMT reduction: 14.4%
Is the project within 0.5 mile of a rail transit station  yes user input, source (1) (e.g., SPRINTER, COASTER, Trolley)?
Default [city/CPA] transit mode share (all trips) coefficient,  source (2), overridden User override of existing transit mode share 4.0% user input, optional Transit mode share used for calculation 4.0% calculated Ratio of transit mode share for TOD area compared  4.9 constant,  source (3) to transit mode share for surrounding [city/CPA]
Transit mode share with strategy 19.6% calculated
Mode shift factor 0.7 constant,  source (2)
Change in VMT (as compared to same project in ‐10.9% FALSE FALSE non‐TOD location)
Transit mode share is capped at 27%, source (3).

Sources:
(2). SANDAG. 2016. Activity Based Model. (v14.0.1, scenario ID 232) (3). Lund, H., et al. 2004. "Travel Characteristics of Transit‐Oriented Development in California." www.bart.gov/sites/default/files/docs/Travel_of_TOD.pdf 2A. Transit Oriented Development
Description: Transit Oriented Development (TOD) refers to projects built in compact, walkable areas that have easy access to public transit, ideally in a location with a mix of uses, including housing, retail, offices, and community facilities. TODs are generally described as places within a 10 minute walk of a high‐frequency rail transit station (e.g. SPRINTER, COASTER, Trolley). They should, at a minimum, incorporate bike and pedestrian access to transit, thereby encouraging transit use and reducing vehicle travel.
(1). Tal, G., et al. 2013. "Technical Background Document on the Impacts of Transit Access (Distance to Transit) Based on a Review of the Empirical Literature." www.arb.ca.gov/cc/sb375/policies/transitservice/transit_brief.pdf Formula: % Change in VMT = difference in transit mode share with strategy * mode shift factor Exclude from Results

TRANSPORTATION IMPACT

ANALYSIS GUIDELINES
City of San Marcos, CA
November 16, 2020

City of San Marcos SB 743 Implementation Project #24296 October 9, 2020 Page 4
Kittelson & Associates, Inc. Orange, California
Table 1: Applicable VMT Reduction Strategies
Tier and
Category
Mitigation
Measure
Description Maximum VMT
Reduction
Land Use
Applicability
Implementation
Body/Method
Source
Project Tier:

Land Use and
Location
Increase Site
Density
This measure increases the density of households and
employment per acre for the project site over what was used in the initial project VMT estimation. Density can be measured in terms of jobs, residents, employees, or dwelling units per unit area. Floor area ratio may be used as a proxy for employment, when employment is not known, or when considering non-office commercial developments.

Up to 30% Residential,
Office, Retail
Developer, City CAPCOA
(1.1)
Increase Site
Diversity
This measure involves improving the mix of uses and
jobs/housing balance within a project or a planning area, incorporating a range of complementary land uses that provide a balanced development approach relative to the surrounding neighborhood and encourage shorter trips and transportation alternatives.

Up to 30% Residential,
Office, Retail
Developer, City SANDAG
(2B)
Major Transit
Center
Accessibility
This measure locates a project within half a mile or a ten minute walk of a major transit center, defined as a rail transit station or a bus rapid transit station, but can be any transit stop with frequent service (5 to 15 minute headways) and significant transfer opportunities to other transit routes.

Residential and commercial centers designed around rail and bus stations are known as Transit-Oriented Development and contain bike and pedestrian access.

Up to 14.4% Residential,
Office, Retail
Developer, City SANDAG
(2A)
Integrate
Affordable
Housing
This measure incorporates a higher proportion of affordable housing within the residential portion of a project, subdivision, or a planning area. Income has a statistically significant effect on whether someone will drive a single-occupant vehicle to work or for other trip purposes.

Up to 32.5% of
home VMT
Residential,
Office, Retail
Developer, City San Jose
(PC-003)
Project Tier:

Commute
Demand
Management
Strategies
Voluntary
Employer
Commute
Program
This measure consists of a variety of measures to reduce single- occupant vehicle commuting through an employer, such as carpool/vanpool programs, subsidized transit passes,
preferential carpool parking, bicycle facilities, and flexible work schedules. Unlike a mandatory program, this strategy does not require monitoring, reporting, or performance standards.

Note, this measure cannot be analyzed in combination with a mandatory employer commute program. In addition, separate commute demand management measures should not be
analyzed if already included under this measure.

Up to 6.2% of
work VMT
Office, Retail Tenant SANDAG
(1A)