ALAGIA ENGINEERING3909 SIERRA LINDA DRESCONDIDO, CA 92025(858)[email protected] Sheet #Sheet NameE1.0
THIS PROJECT SHALL CONFORM TO THE FOLLOWING CODEVERSIONS:2025 CALIFORNIA BUILDING CODE2025 CALIFORNIA ELECTRIC CODE2025 CALIFORNIA ENERGY CODECITY OF SAN MARCOS MUNICIPAL CODE2025 CALIFORNIA GREEN BUILDING STANDARDS E2.0ELECTRICAL FIXTURE SCHEDULEE2.1DEMOLITION SITE PLAN FIELDS 4 & 5DEMOLITION SITE PLAN FIELD 3E3.1E3.0NEW SITE PLAN FIELD 3E5.0NEW SITE PLAN FIELDS 4 & 5 NORTH
PROJECT SCOPE:·
····
T1.0TITLE SHEET
ENLARGED ELECTRICAL PLANSELECTRICAL SINGLE LINE DIAGRAM & SCHEDULESE6.0ELECTRICAL CONTROL SCHEDULESS1.0STRUCTURAL DETAILSS1.1STRUCTURAL DETAILS E1.1SITE SECURITY LIGHTING TITLE 24 COMPLIANCE FORMS
E6.1ELECTRICAL SWITCHGEAR DETAILSE7.0E4.1E4.0PHOTOMETRIC PLAN FIELD 3PHOTOMETRIC PLAN FIELDS 4 & 5 ELECTRICAL SPORTS LIGHTING DETAILSE8.0
ALAGIA ENGINEERING3909 SIERRA LINDA DRESCONDIDO, CA 92025(858)[email protected] Structure/Fixture SummaryStructure IDStructure HeightFixt. Attachment Ht.Fixture QtyFixture TypeLoadCircuit A1-A260' REUSE EXISTING POLE60'1TLC-LED-15001.41 kWA 60'1TLC-LED-9000.88 kWA 60'2TLC-LED-12002.34 kWA 16'1TLC-BT-5750.57 kWA A360'3TLC-LED-9002.64 kWB 16'1TLC-BT-5750.57 kWB A5-A660' NEW POLE/FOOTING60'1TLC-LED-5500.54 kWC 60'2TLC-LED-9001.76 kWC 16'1TLC-BT-5750.57 kWC B1-B270' REUSE EXISTING POLE70'1TLC-LED-15001.41 kWA 70'2TLC-LED-12002.34 kWA 16'1TLC-BT-5750.57 kWA B370' NEW POLE / FOOTING70'2TLC-LED-12002.34 kWB 70'2TLC-LED-9001.76 kWB 16'1TLC-BT-5750.57 kWB B470' NEW POLE/FOOTING70'1TLC-LED-12001.17 kWB 70'3TLC-LED-9002.64 kWB 16'1TLC-BT-5750.57 kWB B5-B660' NEW POLE/FOOTING60'1TLC-LED-9000.88 kWC 60'2TLC-LED-12002.34 kWC 16'1TLC-BT-5750.57 kWC C160' NEW POLE/FOOTING60'4TLC-LED-12004.68 kWA 16'2TLC-BT-5751.15 kWA C260' NEW POLE/FOOTING60'1TLC-LED-9000.88 kWA 60'3TLC-LED-12003.51 kWA 16'2TLC-BT-5751.15 kWA C3-C460' NEW POLE/FOOTING60'3TLC-LED-9002.64 kWB 16'1TLC-BT-5750.57 kWB 167265.69 kW Circuit SummaryCircuitDescriptionLoadFixture Qty AFIELD 330.43 kW30 BFIELD 421.92 kW26 CFIELD 513.34 kW16 Fixture Type SummaryTypeCircuitSourceWattageLumensL90L80L70Quantity TLC-BT-575ALED 5700K - 75 CRI575W52,000>120,000>120,000>120,0008 TLC-BT-575BLED 5700K - 75 CRI575W52,000>120,000>120,000>120,0006 TLC-BT-575CLED 5700K - 75 CRI575W52,000>120,000>120,000>120,0004 TLC-LED-1200ALED 5700K - 75 CRI1170W150,000>120,000>120,000>120,00015 TLC-LED-1200BLED 5700K - 75 CRI1170W150,000>120,000>120,000>120,0003 TLC-LED-1200CLED 5700K - 75 CRI1170W150,000>120,000>120,000>120,0004 TLC-LED-1500ALED 5700K - 75 CRI1410W181,000>120,000>120,000>120,0004 TLC-LED-550CLED 5700K - 75 CRI540W67,000>120,000>120,000>120,0002 TLC-LED-900ALED 5700K - 75 CRI880W104,000>120,000>120,000>120,0003 TLC-LED-900BLED 5700K - 75 CRI880W104,000>120,000>120,000>120,00017 TLC-LED-900CLED 5700K - 75 CRI880W104,000>120,000>120,000>120,0006 Single Fixture Amperage Draw ChartDriver Specicaons(.90 min power factor)Line Amperage Per Fixture(max draw) Single Phase Voltage208(60)220(60)240(60)277(60)347(60)380(60)480(60) TLC-LED-15008.47.97.36.35.04.63.6 TLC-LED-12006.96.56.05.24.23.83.0 TLC-LED-9005.24.94.53.93.12.92.3 TLC-BT-5753.33.22.92.52.01.81.5 TLC-LED-5503.23.02.82.41.91.81.4 Light Level SummaryCalculation Grid SummaryGrid NameCalculation MetricIllumination AveCircuitsFixture Qty AveMinMaxMax/MinAve/Min Field 3 (Infield)Horizontal Illuminance51.5442591.411.23A30 Field 3 (Outfield)Horizontal Illuminance31.7323451.911.36A30 Field 4 (Infield)Horizontal Illuminance53.4641591.441.30B26 Field 4 (Outfield)Horizontal Illuminance34.2825491.931.35B26 Field 5 (Infield)Horizontal Illuminance51.0933601.821.55C16 Field 5 (Outfield)Horizontal Illuminance32.0925451.831.29C16 Project Spill @ 3ft.Horizontal Illuminance0.00050.000.01--A,B,C72 Project Spill @ 5ft.Max Candela Metric81.93560.002399.62--A,B,C72 Project Spill @ 5ft.Max Vertical Illuminance Metric0.00130.000.03--A,B,C72
0.57 kWB TLC-LED-9003 A460' REUSE EXISTING POLE60' NEW POLE/FOOTING60'16'1TLC-BT-5750.57 kWB ALAGIA ENGINEERING3909 SIERRA LINDA DRESCONDIDO, CA 92025(858)[email protected]
ALAGIA ENGINEERING3909 SIERRA LINDA DRESCONDIDO, CA 92025(858)[email protected] DEMOLITION SITE PLAN FIELD 3
KEY PLAN
ALAGIA ENGINEERING3909 SIERRA LINDA DRESCONDIDO, CA 92025(858)[email protected] DEMOLITION SITE PLAN FIELDS 4 & 5
KEY PLAN
ALAGIA ENGINEERING3909 SIERRA LINDA DRESCONDIDO, CA 92025(858)[email protected] NEW SITE PLAN FIELD 3KEY PLAN
ALAGIA ENGINEERING3909 SIERRA LINDA DRESCONDIDO, CA 92025(858)[email protected] NEW SITE PLAN FIELDS 4 & 5
KEY PLAN
POLE REMOVAL DETAIL
ALAGIA ENGINEERING3909 SIERRA LINDA DRESCONDIDO, CA 92025(858)[email protected]
KEY PLAN
PHOTOMETRIC PLAN FIELD 3
ALAGIA ENGINEERING3909 SIERRA LINDA DRESCONDIDO, CA 92025(858)[email protected] PHOTOMETRIC PLAN FIELDS 4 & 5
KEY PLAN
ALAGIA ENGINEERING3909 SIERRA LINDA DRESCONDIDO, CA 92025(858)[email protected]
ENLARGED MAIN SWITCHBOARD PLAN BASE BIDENLARGED MAIN DISTRIBUTION PLAN BASE BID ENLARGED MAIN SWITCHBOARD PLAN ADDITIVE ALTERNATE #1ENLARGED MAIN DISTRIBUTION PLAN ADDITIVE ALTERNATE #1 ALAGIA ENGINEERING3909 SIERRA LINDA DRESCONDIDO, CA 92025(858)[email protected]
ALAGIA ENGINEERING3909 SIERRA LINDA DRESCONDIDO, CA 92025(858)[email protected]
ALAGIA ENGINEERING3909 SIERRA LINDA DRESCONDIDO, CA 92025(858)[email protected] ®
Notes:A. Voltage and phasing per fixture schedule.B. Calculate per load and voltage drop.C. All conduit diameters per code.D. Refer to Control and Monitoring System Installation Instructions for more details on equipment information and the installation requirements.E. Contact Musco if maximum wire length from circuit breaker to contactor exceeds value in the chart.F. Refer to surge protective device installation instructions for more details on equipment information and installationrequirements.IMPORTANT: Control (3) and monitoring (5) wiring must be in separate conduit from line and load power wiring (1,2).
Notes:A. Voltage and phasing per fixture schedule.B. Calculate per load and voltage drop.C. All conduit diameters per code.D. Refer to Control and Monitoring System Installation Instructions for more details on equipment information and the installation requirements.E. Contact Musco if maximum wire length from circuit breaker to contactor exceeds value in the chart.F. Refer to surge protective device installation instructions for more details on equipment information and installationrequirements.IMPORTANT: Control (3) and monitoring (5) wiring must be in separate conduit from line and load power wiring (1,2).
Notes:A. Voltage and phasing per fixture schedule.B. Calculate per load and voltage drop.C. All conduit diameters per code.D. Refer to Control and Monitoring System Installation Instructions for more details on equipment information and the installation requirements.E. Contact Musco if maximum wire length from circuit breaker to contactor exceeds value in the chart.F. Refer to surge protective device installation instructions for more details on equipment information and installationrequirements.IMPORTANT: Control (3) and monitoring (5) wiring must be in separate conduit from line and load power wiring (1,2). 2 3
1 To lighting circuitsEquipment ground
Electricaldistributionpanel (providedby customerfor overcurrentprotection) Off-On-Autokeyed switchesDigital cellularantenna
Control andMonitoringcabinet
5 4 Surge protectiondevice2
3 1
To lighting circuitsEquipment ground
Electricaldistributionpanel (providedby customerfor overcurrentprotection) Off-On-Autokeyed switchesDigital cellularantenna
Control andMonitoringcabinet
5 4 Surge protectiondevice2
3 1
To lighting circuitsEquipment ground
Electricaldistributionpanel (providedby customerfor overcurrentprotection) Off-On-Autokeyed switchesDigital cellularantenna
Control andMonitoringcabinet
5 4 Surge protectiondevice
ALAGIA ENGINEERING3909 SIERRA LINDA DRESCONDIDO, CA 92025(858)[email protected] ALAGIA ENGINEERING3909 SIERRA LINDA DRESCONDIDO, CA 92025(858)[email protected]
ALAGIA ENGINEERING3909 SIERRA LINDA DRESCONDIDO, CA 92025(858)[email protected]