AGREEMENT FOR
MINOR CONSTRUCTION SERVICES Between
THE CITY OF SAN MARINO,
a municipal corporation
and
ABM Electrical & Lighting Solutions,
a California corporation
Dated: October 9, 2024
1 AGREEMENT FOR
MAINTENANCE / REPAIR / MINOR CONSTRUCTION SERVICES
This Agreement for Minor Construction Services (“Agreement”) is entered into as of the date referenced on the cover page (“Effective Date”) between the City of San Marino, a California municipal corporation (“City”) and (“Contractor”) ABM Electrical & Lighting Solutions (collectively “Parties”). In consideration of the mutual promises and covenants made by the parties and contained here and other consideration, the value and adequacy of which are hereby acknowledged, the parties agree as follows:
SECTION 1. SCOPE OF SERVICES
1.1 Identification of Contractor
Name: ABM Electrical & Lighting Solutions
Address: 14201 Franklin Ave
Tustin, CA 92780
License Numbers: LIC #967676
1.2 Term. Subject to the provisions of Section 8 [Termination] of this Agreement, the term of this Agreement is for 45 working days from the date set forth in the Notice to Proceed for the project.
1.3 Description of Contractor’s Services. Subject to the terms and conditions of this Agreement, Contractor agrees to perform for City those maintenance / minor construction services specified in the Scope of Services attached hereto and incorporated herein by reference as Exhibit “A” [Scope of Services] (“Services”).
Contractor agrees to furnish, for the compensation provided for herein, all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately perform and complete the Services. The Services shall be subject to inspection and approval by City. Contractor agrees to work closely with City staff in the performance of the Services and shall be available to City’s staff and Contractors at all reasonable times.
1.4 Performance of Services. Contractor represents that it possesses the requisite training, licenses and permits necessary to perform the Services, and that its performance of the Services shall conform to the standard of practice of a professional 2 having specific experience and expertise in professional services of like nature and complexity of the Services.
1.5 Compensation for Contractor’s Services.
Compensation for the Services shall be:
Time and Materials, per schedule of rates included in Exhibit C with a guaranteed not to exceed price of $57,129.00.
1.6 Extra Work. Contractor shall not be compensated for any work or services rendered in connection with its performance of this Agreement, which are in addition to or outside of the Services (“Extra Work”), except as expressly provided for herein. It shall be Contractor’s responsibility to ensure that the scope and price of any Extra Work to be performed by Contractor is approved by City in writing in advance of Contractor’s commencement of the Extra Work in accordance with Section 9.10 [Amendments] and Section 9.18 [Administration and Implementation]. City shall not be obligated to pay for or otherwise be liable for unauthorized Extra Work performed by Contractor.
1.7 Schedule of Performance. Contractor agrees to diligently perform and complete the Services in accordance with the schedule of performance attached hereto and incorporated herein by reference as Exhibit “B” [Schedule of Performance] (“Schedule of Performance”). Modifications to the Schedule of Performance must be agreed upon in writing in advance by the City Manager pursuant to Section 9.18 [Administration and Implementation] and Contractor.
1.8 Progress and Coordination. Upon City’s request, Contractor shall provide City with progress submittals showing status of Services, at times and increments as City may reasonably request, and shall provide City with a progress schedule for performance of the Services, at times and in a level of detail as City may reasonably request. Contractor shall coordinate with City and authorities with jurisdiction as necessary to perform the Services. Time is of the essence in the performance of the Services.
1.9 General Warranty. Contractor warrants all Services under this Agreement (which for purposes of this Section shall be deemed to include unauthorized Extra Work which has not been removed and any non-conforming materials incorporated into the Services) to be of good quality and free from any defective or faulty material and workmanship. All warranties and guarantees of subcontractors, suppliers and manufacturers with respect to any portion of the Services, whether express or implied, are deemed to be obtained by Contractor for the benefit of City, regardless of whether or not such warranties and guarantees have been transferred or assigned to City by separate agreement and Contractor agrees to enforce such warranties and guarantees, if necessary, on behalf of City.
3 1.10 Repair of Defects. Contractor agrees that for a period of one (1) year from and after final acceptance of the Services, or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the Services, whichever is later, Contractor shall within ten (10) days after being notified in writing by City of any defect in the Services or non-conformance of the Services, commence and prosecute with due diligence all work and services necessary to fulfill the terms of the warranty at its sole cost and expense. In addition, Contractor shall, at its sole cost and expense, repair and replace any portions of the work, facilities, fixtures, or materials damaged by its defective Services or which becomes damaged in the course of repairing or replacing defective Services. For any Services so corrected, Contractor's obligation hereunder to correct defective Services shall be reinstated for an additional one year period, commencing with the date of acceptance of such corrected Services. Contractor shall perform such tests as City may require to verify that any corrective actions are adequate to remedy the defective condition. In the event that Contractor fails to perform its obligations under this Section to the reasonable satisfaction of City, then City shall have the right to correct and replace any defective, non-conforming, or damaged Services at Contractor's sole expense. Contractor shall be obligated to fully reimburse City for any expenses incurred hereunder upon demand.
1.11 Contractor’s Representative. Contractor hereby designates the representative named in Exhibit “D” [Representatives], or his or her designee, to act as its representative for the performance of this Agreement (“Contractor’s Representative”). Contractor’s Representative shall have full authority to represent and act on behalf of the Contractor for all purposes under this Agreement. Contractor’s Representative shall supervise and direct the Services, using his or her best skill and attention, and shall be responsible for all means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Services under this Agreement.
SECTION 2. COMPENSATION AND METHOD OF PAYMENT
2.1 Compensation. City shall pay to Contractor for non-disputed Services rendered, the compensation set forth in Exhibit “C” [Compensation] attached hereto and incorporated herein by reference. Total compensation to Contractor for the Services shall not exceed the total price or “not to exceed” amount set forth in Exhibit “C,” without the prior written approval of City in accordance with Section 9.10 [Amendments] and Section
9.19 [Administration and Implementation].
2.2 Payment of Compensation. Contractor shall submit monthly invoices together with an itemized statement of Services provided. The statement shall describe the Services provided, the percent of work completed by item, together with such other reasonable detail and supporting documentation as may be required by the City Manager, or his/her designee. City will review the statement and pay, with the exception of any charges for work performed or expenses incurred by Contractor which are disputed by City, within 30 days of receiving such statement, all approved charges thereon. Payment 4 to Contractor for work performed pursuant to this Agreement shall not be deemed to waive any defect in work performed by Contractor.
SECTION 3. RESPONSIBILITIES OF CONTRACTOR
3.1 Control and Payment of Subordinates; Independent Contractor.
Contractor agrees that all Services shall be performed by Contractor or under its supervision. The personnel performing the Services under this Agreement on behalf of Contractor shall at all times be under the Contractor’s exclusive direction and control.
Contractor will determine the means, methods and details of performing the Services subject to the requirements of this Agreement. Contractor is and shall at all times remain a wholly independent contractor and not an officer, employee or agent of City. Contractor shall have no authority to bind City in any manner, nor to incur any obligation, debt or liability of any kind on behalf of or against City, whether by contract or otherwise, unless such authority is expressly conferred under this Agreement or is otherwise expressly conferred in writing by City. Contractor is not entitled to any benefits that Owner provides to Owner employees, including, without limitation, worker’s compensation benefits or payments, pension benefits, health benefits or insurance benefits. Contractor expressly waives any claim Contractor may have to any such rights. Contractor shall pay all payroll taxes imposed by any governmental entity and shall pay all other required taxes.
3.2 Standard of Care and Licenses. Contractor agrees that all Services shall be performed in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and warrants that it, its employees and subcontractors shall have sufficient skill and experience to perform the Services and that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Services, including a City Business License, and that such licenses and approvals shall be maintained in good standing throughout the term of this Agreement.
3.3 Required Corrections. Contractor shall perform, at its own expense and without reimbursement from the City, any work necessary to correct errors or omissions that are caused by the Contractor’s failure to comply with the standard of care provided for herein.
3.4 Law and Regulations. Contractor shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Services, including all Cal/OSHA requirements, and shall give all notices required by law. Contractor shall be liable for all violations of such laws and regulations in connection with Services.
3.5 Safety. Contractor shall perform the Services, and maintain its work area, so as to avoid injury or damage to any person or property and shall otherwise exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. 5 3.6 Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sexual orientation, sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.
3.7 Department of Industrial Relations Registration Contractor shall register with the California Department of Industrial Relations and shall comply with all specified requirements for electricians:
3.8 Prevailing Wage Laws. Contractor acknowledges and agrees to abide by the provisions of California Labor Code Section 1720, et seq., as well as 1771, 1773, 1773.1, 1773,2 1773.6, 1773.7, 1774, 1775, 1776, and 1777, pertaining to the obligation to pay the prevailing wages with respect to the performance of the work (“Prevailing Wage Laws”). Contractor shall defend, indemnify, and hold the City, its elected officials, officers, employees, and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.
SECTION 4. INDEMNIFICATION
4.1 Indemnity. To the extent caused by the negligence, misconduct, or other fault of Contractor, Contractor expressly agrees to, and shall, indemnify, defend, release, and hold City, and its respective officials, officers, employees, agents, and contractors harmless from and against any Action, liability, loss, damage, entry, judgment, order, lien, and Costs and Expenses caused by any act or omission of Contractor, or its officers, directors, employees, agents, or contractors, connected with the performance or failure to perform under this Agreement, notwithstanding that City may have benefited therefrom, or any challenge to this Agreement. This Section shall apply to any acts or omissions, willful misconduct or negligent conduct, whether active or passive, on the part of Contractor’s officers, directors, employees, agents and contractors, including but not limited to acts or omissions in any way related to, the release, treatment, use, generation, transportation, storage, or disposal in, on, under, to, or from the location at which work under this Agreement is performed of any Hazardous Substances by Contractor or its officers, directors, employees, agents, and subcontractors. The Parties expressly agree that any payment, or Costs and Expenses City incurs or makes to, or on behalf of, an injured employee under City’s workers’ compensation or other insurance, is included as a loss or Costs and Expenses for the purpose of this Section. City shall not be responsible for any acts, errors or omissions of any person or entity except City and its officers, agents, servants, employees or contractors. The Parties expressly agree that the obligations of Contractor under this Section shall survive the expiration or early termination of the Agreement.
4.2 Action. For purposes of this Agreement, “Action” shall mean any suit (whether legal, equitable, or declaratory in nature), proceeding or hearing (whether administrative or judicial), arbitration or mediation (whether voluntary, court-ordered, binding, or non-binding), or other alternative dispute resolution process, and the filing, 6 recording, or service of any process, notice, claim, demand, lien, or other instrument which is a prerequisite or prelude to commencement of the Action.
4.3 Costs and Expenses. For purposes of this Agreement, “Costs and Expenses” shall mean all costs and expenses, to the extent reasonable in amount, actually and necessarily incurred by a Party in good faith in the investigation, prosecution or defense of an Action, including, but not limited to, court costs, filing, recording, and service fees, copying costs, exhibit production costs, special media rental costs, reasonable attorney’s fees, Contractor fees, fees for investigators, witness fees (both lay and expert), travel expenses, deposition and transcript costs, and any other costs or expenses, the award of which a court of competent jurisdiction may determine to be just and reasonable.
4.4 Hazardous Substances. For purposes of this Agreement, “Hazardous Substances” shall mean any and all of the following:
a. any substance, product, waste or other material of any nature whatsoever which is or becomes listed, regulated, or for which liability arises for misuse, pursuant to the Comprehensive Environmental Response Compensation and Liability Act (“CERCLA”), 42 U.S.C. §9601, et seq.; the Hazardous Materials Transportation Act, 49 U.S.C. §1801, et seq.; the Resource Conservation and Recovery Act (“RCRA”), 42 U.S.C. §6901, et seq.; the Toxic Substances Control Act, 15 U.S.C.S. §2601, et seq.; the Clean Water Act, 33 U.S.C. §1251, et seq.; the Insecticide, Fungicide, Rodenticide Act, 7 U.S.C. §136, et seq.; the Superfund Amendments and Reauthorization Act, 42 U.S.C. §6901, et seq.; the Clean Air Act, 42 U.S.C. §7401, et seq.; the Safe Drinking Water Act, 42 U.S.C. §300f, et seq.; the Solid Waste Disposal Act, 42 U.S.C. §6901, et seq.; the Surface Mining Control and Reclamation Act, 30 U.S.C. §1201, et seq.; the Emergency Planning and Community Right to Know Act, 42 U.S.C. §11001, et seq.; the Occupational Safety and Health Act, 29 U.S.C. §§655 and 657; the Hazardous Waste Control Act, California Health and Safety Code (“H.&S.C.”) §25100, et seq.; the Hazardous Substance Account Act, H.&S.C.§25330, et seq.; the California Safe Drinking Water and Toxic Enforcement Act, H.&S.C. §25249.5, et seq.; the Underground Storage of Hazardous Substances, H.&S.C. §25280, et seq.; the Carpenter-Presley-Tanner Hazardous Substance Account Act, H.&S.C. §25300, et seq.; the Hazardous Waste Management Act, H.&S.C. §25170.1, et seq.; the Hazardous Materials Response Plans and Inventory, H.&S.C. §25001, et seq.; the Porter-Cologne Water Quality Control Act, Water Code §13000, et seq., all as they may from time to time be amended; and
b. any substance, product, waste or other material of any nature whatsoever which is or becomes listed, regulated, or for which liability for misuse arises pursuant to any other federal, state or local statute, law, ordinance, resolution, code, rule, regulation, order or decree due to its hazardous, toxic or dangerous nature. 7 SECTION 5. RECORDS AND AUDIT
5.1 Records and Audit. At Owner’s request and after reasonable notice and during normal business hours, Contractor shall make available to Owner, its authorized agents, officers, or employees, for audit, photocopy or compilation, any and all ledgers, books of accounts, invoices, payrolls, vouchers, cancelled checks, correspondence, internal memoranda, calculations, drafts, and other records or documents evidencing or relating to the performance of the Services (hard copy or electronic), expenditures and disbursements charged to Owner in connection with the Services. Contractor shall maintain such documents for at least three (3) years following completion of the Services. Such rights shall be specifically enforceable.
SECTION 6. INSURANCE
6.1 Maintenance of Insurance. Without limiting Contractor’s indemnification of Agency, and prior to commencement of Work, Contractor shall obtain, provide, and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described in Exhibit “F” [Insurance] and in a form satisfactory to Agency.
6.2 Subcontractors Insurance. Contractor agrees to ensure that subcontractors, and any other party involved in the performance of the Services by Contractor, provide the same minimum insurance coverage required of Contractor.
Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contractor agrees that upon request, all agreements with subcontractors and others engaged in the project will be submitted to City for review.
6.3 Modification of Insurance Provisions. The City Manager may make reasonable amendments to the insurance requirements of this section, with the written concurrence of the Finance Director or Risk Manager, in accordance with Section 9.19 [Administration and Implementation] after considering the Scope of Services, potential liabilities, and the required level of insurance to adequately protect the City.
SECTION 7. BONDS
7.1 Performance and Payment Bonds. Within the time period set forth in the contract documents and prior to commencing the work on the project, the contractor shall file with the Agency good and sufficient labor and material payment bond and performance bond in the amount of one hundred percent (100%) of the contract sum covering performance of the work other than the professional design services portion of the work.
The performance bond and payment bond shall be in the form required by the contract documents. The amounts of the payment bond and performance bond shall be increased as, when and in the amount of any change orders that are executed increasing the contract sum, the contractor shall, upon request by the Agency, provide evidence of such increases. Should the payment bond or performance bond or any surety on such bond become or be determined by the Agency to be insufficient, it shall be replaced within ten days by a bond that fully complies with the requirements of this paragraph. No further 8 payments to the contractor for the work performed shall be made or due until the contractor has fully complied with the requirements of this paragraph.
7.2 Duration. The payment bond shall remain in effect until acceptance of the work and payment of all stop notices and claims by the contractor or the subcontractors, of any tier, have been satisfied. The performance bond shall remain in effect and assure faithful performance of all the contractor’s obligations under the contract documents, including, without limitation, all obligations that survive final completion or termination, such as, but not limited to, the contractor’s warranty, commissioning, and indemnity obligations.
7.3 Surety Qualifications. At the time the contract is signed and at all times thereafter until final payment has been made by the Agency, the surety on the payment and performance bond shall be an admitted surety and the surety on the performance bond shall be licensed in the State of California and in good standing with the California Department of Insurance
7.4 Premiums. The premiums for all bonds are included in the contract sum and shall be paid by the contractor. It is California law that the premium (cost) of the bond should appear in the right-hand corner of the original bond, so the obligee knows the true cost of the bond.
7.5 Obligee. The payment bond and performance bond shall each name the Agency as obligee. This can be a requirement if the Agency is paying for the subcontract bonds, which is usually not the case.
7.6 No exoneration. Changes, change orders, unilateral change orders, field orders, modifications and adjustments to the contract sum or contract time shall in no way release or exonerate the contractor or its surety from their obligations, and notice thereof shall be waived by the surety. The foregoing provision shall be included in the terms of the payment bond, performance bond and any bonds obtained by the subcontractors.
7.7 Communications. The Agency shall have the right to communicate with the contractor’s sureties with respect to matters that are related to the contractor’s performance of its obligations under the contract documents. The contractor shall be provided with a copy of all such written communications. Such communications shall not create, or be interpreted as creating, any contractual relationship between the Agency and the surety. The name, address and phone number of the surety contact should be required in the bond; this makes communication easier for the obligee and to know how to submit a claim.
7.8 No limitation. The requirements shall be without limitation to any other obligations the contractor may have under applicable law to provide bonding for the benefit of and to assure payment to the subcontractors or subconsultants performing the work for the project.
SECTION 8. TERMINATION
9 8.1 Termination and Suspension. City may, with or without cause, direct Contractor to suspend, delay or interrupt Services, in whole or in part, for such periods of time as City may determine in its sole discretion. City may terminate performance of the Services under this Agreement in whole, or from time to time in part, for default, should Contractor commit a material breach of this Agreement, or part thereof, and not cure such breach within ten (10) calendar days of the date of City’s written notice to Contractor demanding such cure, in which case Contractor shall be liable to City for all loss, cost, expense, damage and liability resulting from such breach and termination.
City may terminate performance of the Services under this Agreement in whole, or from time to time in part, for convenience, whenever City determines that such termination is in City’s best interests. Additionally, Contractor may terminate this Agreement at any time and without cause or penalty upon thirty (30) days’ prior written notice to City. In the event this Agreement is terminated for any reason, Contractor shall be entitled to recover its costs expended up to the termination date plus reasonable profit thereon to the termination date as this Agreement would otherwise provide, but may recover no other cost, damage or expense. Contractor shall continue its work throughout the course of any dispute, and Contractor’s failure to continue work during a dispute shall be a material breach of this Purchase Order.
SECTION 9. GENERAL PROVISIONS
9.1 Assignment or Transfer. Contractor shall not assign, hypothecate, or transfer, either directly or by operation of law, this Agreement or any interest herein without the prior written consent of the City. Any attempt to do so shall be null and void, and any assignees, hypothecates or transferees shall acquire no right or interest by reason of such attempted assignment, hypothecation or transfer.
9.2 Loss and Damage. Contractor shall be responsible for all loss and damage which may arise out of the nature of the Services agreed to herein, or from the action of the elements, or from any unforeseen difficulties which may arise or be encountered in the prosecution of the Services until the same is fully completed and accepted by City.
9.3 Conflict of Interest. Contractor represents and warrants that it presently has no interest, and shall not have any interest, direct or indirect, which would conflict in any manner with the performance of work and services required under this Agreement.
Without limitation, Contractor represents to and agrees with City that Contractor has disclosed any potential conflict of interest, and will have no future conflict of interest, in providing City services hereunder, including but not limited to, any interest (financial, shared ownership, shared management, shared directors, or reporting responsibilities) Contractor may presently have, or will have in the future, with respect to any other person or entity (including but not limited to potential suppliers, vendors, Contractors, contractors, or regulatory agency) which may have an interest in the subject matter of the Services.
9.4 Confidentiality. Any information, whether proprietary or not, made known to or discovered by Contractor during the performance of or in connection with this Agreement for City, will be kept confidential and not be disclosed to any other person.
Contractor will immediately notify City in writing if it is requested to disclose any information made known to or discovered by Contractor during the performance of or in 10 connection with this Agreement. These conflict of interest, confidentiality and future service provisions and limitations shall remain fully effective indefinitely after termination of services to City hereunder.
9.5 Cooperation; Further Acts. The Parties shall fully cooperate with one another, and shall take any additional acts or sign any additional documents as may be necessary, appropriate or convenient to attain the purposes of the Agreement.
9.6 Governing Law. This Agreement shall be interpreted, construed and governed according to the laws of the State of California. In the event of litigation between the parties, venue in state trial courts shall lie exclusively in the County of Los Angeles.
9.7 Integration. This Agreement, including the attached Exhibits “A” through “F”, is the entire, complete, final and exclusive expression of the parties with respect to the matters addressed therein and supersedes all other prior agreements or understandings, whether oral or written, or entered into between Contractor and City prior to the execution of this Agreement. No statements, representations or other agreements, whether oral or written, made by any party which are not embodied herein shall be valid and binding.
9.8 Severability. If a term, condition or covenant of this Agreement is declared or determined by any court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Agreement shall not be affected thereby and the Agreement shall be read and construed without the invalid, void or unenforceable provision(s).
9.9 Prohibited Interests. Contractor represents and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Agreement. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement.
9.10 Amendments. No amendment to or modification of this Agreement shall be valid unless made in writing and approved by Contractor and City. The City Manager shall have the authority to approve any amendment to this Agreement if the total compensation under this Agreement, as amended, would not exceed the City Manager’s contracting authority under the San Marino Municipal Code. All other amendments shall be approved by the City Council. The Parties agree that the requirement for amendments or modifications to be in writing cannot be waived and that any attempted waiver shall be void.
11 9.11 No Third Party Beneficiaries. There are no intended third party beneficiaries of any right or obligation assumed by the Parties.
9.12 Delivery of Notices. All notices required or permitted to be given under this Agreement shall be in writing and shall be given to the respective parties at the addresses listed in Exhibit “D”, or at such other address as the respective parties may provide in writing for this purpose. Such notice shall be deemed made when personally delivered or when mailed, forty-eight (48) hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the party at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.
9.13 Binding Effect. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the Parties.
9.14 Waiver. Waiver by any Party to this Agreement of any term, condition, or covenant of this Agreement shall not constitute a waiver of any other term, condition, or covenant. Waiver by any Party or any breach of the provisions of this Agreement shall not constitute a waiver of any other provision, nor a waiver of any subsequent breach or violation of any provision of this Agreement. Acceptance by City of any Services by Contractor shall not constitute a waiver of any of the provisions of this Agreement.
9.15 Subcontracting. Contractor shall not subcontract any portion of the Services, except as expressly stated herein, without prior written approval of City.
Subcontracts, if any, shall contain a provision making them subject to all provisions of this Agreement.
9.16 Counterparts. This Agreement may be signed in counterparts, each of which shall constitute an original.
9.17 Authority to Execute. The person or persons executing this Agreement on behalf of Contractor represents and warrants that he/she/they has/have the authority to so execute this Agreement and to bind Contractor to the performance of its obligations hereunder.
9.18 Administration and Implementation. This Agreement shall be administered and executed by the City Manager or his or her designated representative.
The City Manager shall have the authority to issue interpretations and to make amendments to this Agreement, including amendments that commit additional funds, consistent with Section 9.10 [Amendment] and the City Manager’s contracting authority under the City’s Municipal Code.
9.19 Force Majeure. Notwithstanding any provision of this Agreement to the contrary, City and Contractor each agree that the other party hereto shall not be liable for such party’s failure to perform its respective obligations under this Agreement if such failure is due to any fire, act of God, strike, civil disturbance, acts of public authorities, epidemics/pandemics or cause beyond such party’s reasonable control; provided however that such party invoking this section shall notify the other party within ten (10) 12 days of the commencement of the force majeure event. Lack of funds shall not be deemed a cause beyond either party’s control.
9.20 Limitation on Damages. Except as may be owed to a third party under a Party’s indemnification obligations, neither Party shall be liable one to the other whether under contract, statute, tort (including negligence) or otherwise, for any indirect, exemplary, unforeseeable, loss of profits, loss of use, punitive or consequential, incidental, or special damages, even if that Party is notified in advance of such possibility, regardless of the form of the claim or action.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed the day and year first above written.
CITY OF San Marino
Philippe Eskandar
City Manager
ATTEST:
Alison Walker, City Clerk
APPROVED AS TO FORM:
Joe Montes, City Attorney
“CONTRACTOR”
ABM Electrical & Lighting Supply
By:
Name:
Title:
By:
Name:
Title:
EXHIBIT “A” SCOPE
OF SERVICES
See following page
ABM Electrical & Lighting Solutions
14201 Franklin Ave
Tustin, CA 92780
Office: (949) 888-2340
Fax: (949) 888-2350
LIC # 967676
www.abm.com NYSE Symbol: ABM
September 27, 2024
City of San Marino
c/o City of San Marino
2200 Huntington Dr.
San Marino, CA 91108
Attn: Amber Shah
Re: EV Charger Installation (Customer Supplied Ford Chargers) Scope of Work
➢ Provide and install infrastructure for ten (10) wall mounted EV chargers including lot feeder conduit and wire for transformer, panel and chargers. Rigid conduit to be surface mounted on wall, no excavation.
➢ Provide and install one (1) new 400amp main breaker
➢ Provide and install one (1) new 400amp 120/208 panel
➢ Provide and install six (6) new 60amp 2 Pole breakers + four (4) new 40amp 2 Pole breakers
➢ Install six (6) owner-provided Ford electric vehicle chargers with cord/cable management
➢ systems. (Junction boxes to be installed for four (4) additional chargers in the future.) ➢ Terminate wire, test, activate, and provide onsite commissioning for the EV charging stations.
➢ Provide and install ten (10) protective bollards
➢ Activate/Commission/program new EV chargers to customer specifications.
Notes:
• Work to be completed 1st shift prevailing wage, Los Angeles County • Make all final connections between electrical panels and Chargers • Existing electrical infrastructure repairs and upgrades excluded • This pricing includes single line drawings, wet stamped plans, and permitting labor. Permitting fees to be at “No Cost” per city.
Project cost $46,271.00
Wet stamped plan set for permitting $10,858.00
Total Project Cost $57,129.00
TERMS AND CONDITIONS
1. Customer shall permit Contractor free and timely access to areas and equipment, and allow Contractor to start and stop the equipment as necessary to perform required services. All planned work under this Agreement will be performed during Contractor’s normal working hours.
2. Contractor warrants that the workmanship hereunder shall be free from defects for one (1) year from date of installation. If any replacement part or item of equipment proves defective, Contractor will extend to Customer the benefits of any warranty Contractor has received from the manufacturer. Removal and reinstallation of any equipment or materials repaired or replaced EXHIBIT “B”
SCHEDULE OF PERFORMANCE
EXHIBIT “C”
COMPENSATION
Contract price not-to-exceed $57,129.00, per the attachment to Exhibit A EXHIBIT “D”
REPRESENTATIVES
CITY’S REPRESENTATIVE
City of San Marino
Parks and Public Works Department
Attn: Public Works Director
2200 Huntington Drive
San Marino, CA 91108
CONTRACTOR’S REPRESENTATIVE
ABM Electrical & Lighting Supply
Attn: Nate Piorek
14201 Franklin Ave
Tustin, CA 92870
EXHIBIT “E”
BONDS REQUIRED
• Contractor shall provide the following bonds: Payment bond in a sum equal to the contract price. Bond shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California EXHIBIT “F”
INSURANCE REQUIREMENTS FOR CITY OF SAN MARINO
Contractor’s Duty to Show Proof of Insurance. Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, its agents, representatives, or employees.
Coverage shall be at least as broad as:
Commercial General Liability (CGL)Contractor shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $2,000,000 per occurrence, $5,000,000 general aggregate, for bodily injury, personal injury, and property damage, and a $5,000,000 completed operations aggregate. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.
Automobile Liability
Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non-owned, or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident. .
Workers’ Compensation
Contractor shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000) for Contractor ’s employees in accordance with the laws of the State of California, Section 3700 of the Labor Code In addition, Contractor shall require each subcontractor to similarly maintain Workers’ Compensation Insurance and Employer’s Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor’s employees. Contractor may satisfy the Workers' Compensation requirement with a state approved self-insured program.
Contractor shall submit to Agency, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of Agency, its officers, agents, employees, and volunteers.
Umbrella or excess liability insurance.
Contractor shall obtain and maintain an umbrella liability insurance policy with limits that will provide bodily injury, personal injury, and property damage liability coverage, including commercial general liability, automobile liability, and employer’s liability. Such policy or policies shall include the following terms and conditions:
• A drop-down feature requiring the policy to respond if any primary insurance that would otherwise have applied proves to be uncollectible in whole or in part for any reason, other than bankruptcy or insolvency of said primary insurer; • “Pay on behalf of” wording as opposed to “reimbursement”; • Concurrency of effective dates with primary policies. Should Contractor obtain and maintain an excess liability policy, such policy shall be excess over commercial general liability, automobile liability, and employer’s liability policies.
Such policy or policies shall include wording that the excess liability policy follows the terms and conditions of the underlying policies.
Installation floater. If required by the Agency or not covered by builders’ risk (course of construction) coverage, Contractor shall obtain an installation floater for the value of the property and covering the portion of the work to be constructed, installed, altered, or repaired by Contractor. The installation floater policy must include coverage for the fixtures, materials, supplies, machinery, and equipment used in or incidental to the construction project as well as property kept off-site or while in transit. Coverage must include property of others in the Contractor’s care, custody, or control. In addition to Contractor, the Agency and all subcontractors shall be named as additional insureds on the policy with coverage extending through the final completion date.
Proof of insurance.
Contractor shall provide certificates of insurance and required endorsements to Agency as evidence of the insurance coverage required herein. Insurance certificates and endorsements must be approved by Agency’s Risk Manager prior to commencement of performance. Current certification of insurance shall be kept on file with Agency for the contract period and any additional length of time required thereafter.
In the event of a claim, Agency reserves the right to require complete, certified copies of all required insurance policies.
Duration of coverage.
Contractor shall procure and maintain for the contract period, and any additional length of time required thereafter, insurance against claims for injuries to persons or damages to property, or financial loss which may arise from or in connection with the performance of the Work hereunder by Contractor, their agents, representatives, employees, or subconsultants. Contractor must maintain general liability and umbrella or excess liability insurance for as long as there is a statutory exposure to completed operations claims. Agency and its officers, officials, employees, and agents shall continue as additional insureds under such policies.
Primary/noncontributing.
Coverage provided by Contractor shall be primary and any insurance or self-insurance procured or maintained by Agency shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and noncontributory basis for the benefit of Agency before the Agency’s own insurance or self-insurance shall be called upon to protect it as a named insured.
Products/completed operations coverage.
Products liability coverage shall extend for a minimum of three years (3) after project completion, and completed operations coverage for construction agreements shall extend for 10 years from the date of substantial completion of the project or the statute of repose, whichever is longer. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the Policy must include work performed “by or on behalf” of the insured.
Policy shall contain no language that would invalidate or remove the insurer’s duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the insurer. The Agency, its employees, shall be included as additional insureds under the Products and Completed Operations coverage.
Agency’s rights of enforcement.
In the event any policy of insurance required under this Agreement does not comply with these requirements or is canceled and not replaced, Agency has the right but not the duty to obtain the insurance it deems necessary, and any premium paid by Agency will be promptly reimbursed by Contractor or Agency will withhold amounts sufficient to pay premium from Contractor payments. In the alternative, Agency may cancel this Agreement.
Acceptable insurers.
All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance or is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the Agency’s Risk Manager.
Waiver of subrogation.
All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against Agency, its elected or appointed officers, agents, officials, employees, and volunteers or shall specifically allow Contractor or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against Agency and shall require similar written express waivers and insurance clauses from each of its subconsultants.
Enforcement of contract provisions (non estoppel).
Contractor acknowledges and agrees that any actual or alleged failure on the part of the Agency to inform Contractor of non-compliance with any requirement imposes no additional obligations on the Agency nor does it waive any rights hereunder.
Requirements not limiting.
Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Contractor maintains higher limits than the minimums shown above, the Agency requires and shall be entitled to coverage for the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the Agency.
Notice of cancellation.
Contractor agrees to oblige its insurance agent or broker and insurers to provide the Agency with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage. If any of the Contractor’s insurers are unwilling to provide such notice, then Contractor shall have the responsibility of notifying the Agency immediately in the event of Contractor’s failure to renew any of the required insurance coverages, or insurer’s cancellation or nonrenewal.
Additional insured status.
General liability, automobile liability, and umbrella/excess liability insurance policies shall provide or be endorsed to provide that Agency and its officers, officials, employees, agents, and volunteers shall be additional insureds under such policies.
Prohibition of undisclosed coverage limitations.
None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to Agency and approved of in writing.
Separation of insureds.
A severability of interests provision must apply for all additional insureds ensuring that Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions.
Pass through clause.
Contractor agrees to ensure that its subconsultants, subcontractors, and any other party who is brought onto or involved in the project/service by Contractor (hereinafter collectively “subcontractor”), provide the same minimum insurance coverage and endorsements required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. However, in the event Contractor’s subcontractor cannot comply with this requirement, which proof must be submitted to the Agency, Contractor shall be required to ensure that its subcontractor provide and maintain insurance coverage and endorsements sufficient to the specific risk of exposure involved with subcontractor’s scope of work and services, with limits less than required of the Contractor, but in all other terms consistent with the Contractor’s requirements under this agreement. This provision does not relieve the Contractor of its contractual obligations under the agreement and/or limit its liability to the amount of insurance coverage provided by its subcontractors. This provision is intended solely to provide Contractor with the ability to utilize a subcontractor who may be otherwise qualified to perform the work or services but may not carry the same insurance limits as required of the Contractor under this agreement given the limited scope of work or services provided by the subcontractor. Contractor agrees that upon request, all agreements with subcontractors, and others engaged in the project, will be submitted to Agency for review.
Agency’s right to revise requirements.
The Agency reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the Contractor a ninety (90)-day advance written notice of such change. If such change results in substantial additional cost to the Contractor, the Agency and Contractor may renegotiate Contractor’s compensation.
Self-insured retentions.
Any self-insured retentions must be declared to and approved by Agency. Agency reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible, or require proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention through confirmation from the underwriter.
Timely notice of claims.
Contractor shall give Agency prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.
Additional insurance.
Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Work.