REQUEST FOR QUALIFICATIONS
ON-CALL NPDES/STORMWATER
ENGINEERING SERVICES
CITY OF SAN MARINO
OCTOBER 2, 2024
605 Third Street / Encinitas, CA 92024 / 760.942.5147
Contact for Clarification:
Nicole Rieger, Project Manager
Phone: 760.479.4148 | Fax: 619.591.1399
Email: [email protected]
Request for Qualifications— On-Call NPDES/Stormwater Engineering Services i Transmittal Letter
October 2, 2024
Amber Shah, Public Works Director
City of San Marino
2200 Huntington Drive
San Marino, California 91108
Subject: Request for Qualifications—On-Call NPDES/Stormwater Engineering Services Dear Amber Shah:
Providing the City of San Marino (City) with on-call National Pollution Discharge Elimination System (NPDES)/stormwater engineering services requires a skilled consultant team that has experience addressing the technical complexities and regulatory environment of this critical area of municipal infrastructure. Dudek has worked in the County of Los Angeles for more than 30 years and with our recent work with the City, we have a deep understanding of the City’s stormwater system. This knowledge and experience will allow us to ensure the City successfully complies with stormwater regulations, competes for available funding, and is prepared for future regulatory updates. Under the NPDES/stormwater services contract, Dudek will provide the City the following strengths:
Deep Bench of Stormwater Experts. Dudek has assembled a comprehensive project team to anticipate and address your needs for NPDES compliance and comprehensive stormwater services. We have the depth and breadth of staff to perform the Scope of Work as defined in Exhibit A and will help the City achieve your program goals while maintaining control costs.
Responsive and Available Team. The Dudek team specifically chosen for this contract, as shown in the organization chart below, has the availability and capacity to provide the requested services in a timely and efficient manner. We have included a wide range of team members with different specialties to accommodate the specifics of any task order request. Project Manager Nicole Rieger has relevant, local project management experience and will make this contract a top priority. In addition, Dudek offers the City a team of accessible, committed staff members who will apply critical thinking and a problem-solving mindset that will help advance the City’s stormwater program toward greater efficiency and resilience.
DUDEK CONTACTS
Contact Authorized for Contractual
Negotiation: Joseph Monaco
Title: President and CEO
Phone:
760.942.4157
Fax: 760.632.0164
Email: [email protected]
Contact for Clarification: Nicole Rieger
Title: Project Manager
Phone:
760.479.4148
Fax:
619.591.1399
Email: [email protected]
Corporate Office: 605 Third Street
Encinitas, California 92024
Local Office: 225 South Lake
Avenue, Suite 225-M210,
Pasadena,California 91101
Website: www.dudek.com
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services ii Dudek is structured legally as an 100% employee-owned S-Corporation. Dudek Managerial and Principals are listed below.
Joseph Monaco | President and CEO
Eric Wilson | Executive Vice President
Pete Campbell | Vice President
Helder Guimaraes | Chief Financial Officer; Treasurer
Michael McGrattan | Chief Information Officer
Amy M. Paul | General Counsel; Secretary
Danielle Voss | Vice President,
Human Resources; Assistant Secretary
We look forward to continuing our work with the City. If you have any questions regarding our qualifications, please contact Nicole Rieger at [email protected] or 760.479.4148.
Sincerely,
Joseph Monaco
Dudek President/CEO
Amy Paul
Dudek Secretary
Nicole Rieger
Project Manager
Joseph Monaco is authorized to sign on behalf of Dudek and obligate Dudek contractually.
Request for Qualifications— On-Call NPDES/Stormwater Engineering Services iii Request for Qualifications— On-Call NPDES/Stormwater Engineering Services iv Table of Contents
SECTIONS
Transmittal Letter.................................................................................................................................................................................i Section 1: Proposal Summary...........................................................................................................................................................1 Section 2: Financial Information....................................................................................................................................................26 Section 3: Response Forms............................................................................................................................................................28 Section 4: Discretionary Supplemental Materials.......................................................................................................................29 TABLE
1 Required Firm Information..................................................................................................................................................9
FIGURES
1 Dudek Team Organization ...............................................................................................................................................21 2 Dudek Client Approach.....................................................................................................................................................22 3 Dudek Communication Structure...................................................................................................................................23 4 Dudek QA/QC Process......................................................................................................................................................24
APPENDIX
A Resumes
Request for Qualifications— On-Call NPDES/Stormwater Engineering Services 1 Section 1: Proposal Summary
Executive Summary
DUDEK BACKGROUND AND QUALIFICATIONS
Dudek has grown from a civil engineering firm founded in 1980 to a full services engineering and environmental practice with over 30 years’ experience in Los Angeles County. Our National Pollution Discharge Elimination System (NPDES)/stormwater services are founded on a collaborative, holistic approach that integrates watershed science, regulatory policy, civil engineering, community engagement, and funding expertise to help permittees like the City efficiently comply with regulations, leverage available funding, and prepare for the future.
Dudek has a broad understanding of the watershed-based planning and technical stormwater analysis, regulatory compliance, and financial planning requirements that are specific to the Los Angeles region.
Dudek’s local and regional project portfolio includes diverse stormwater and infrastructure-related planning, implementation, and assessment programs and capital improvement program (CIP) projects. Our diverse technical capabilities and applied experience present the City with an opportunity to leverage this diverse work experience in the region.
We specialize in municipal stormwater program planning and implementation by supporting strategic planning and asset management, jurisdictional program and document development, grant and funding consultation, stormwater engineering tasks, and best management practice (BMP) design and installation. We are currently assisting a number of municipal agencies statewide to develop and implement comprehensive stormwater programs to meet NPDES permit compliance goals.
Dudek understands the City is often faced with the difficult task of balancing program decisions within the context of public safety, environmental concerns, regulatory requirements, and budget constraints. Our experienced managers and technical experts pride themselves on developing project solutions that satisfy multiple competing needs through pragmatic prioritization and well-organized task management approaches. Our diverse team of engineers, scientists, and planners are trained to work across disciplines to identify efficiencies and optimization within our clients’ programs. The strengths detailed in the following sections are a result of Dudek’s cumulative experiences developing and managing stormwater compliance programs with a focus on the balance between regulatory compliance and effective solutions.
DUDEK SNAPSHOT
▪ Multidisciplinary engineering
and environmental services
▪ 900+ employees
▪ California corporation
focused on California
infrastructure
▪ Founded in 1980;
employee-owned
DUDEK SERVICES
▪ Environmental Analytical
Services Support Broad
Technical Requirements and
Regulatory Compliance Goals
▪ Stormwater, Groundwater,
and Natural Resources
Monitoring, Planning,
and Design
▪ Hydrology and Hydraulics
▪ Strategic Planning and
Regulatory Compliance
▪ Construction Management,
Monitoring, and Inspection
▪ Water Conservation/
Energy Planning
▪ CEQA/NEPA Compliance
▪ Agency Permitting
▪ Grant Applications and
Funding Administration
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 2
RELATIONSHIPS WITH LOCAL AGENCIES
Dudek has worked hard to build our reputation for superior and comprehensive environmental analysis, regulatory compliance, infrastructure design, and construction planning and implementation. Dudek has developed meaningful relationships with regional resource agency personnel at the City and surrounding municipalities and agencies, including the following:
▪ Los Angeles Regional Water Quality Control Board
▪ County of Los Angeles
▪ City of Pasadena
▪ Council for Watershed Health
▪ Army Corps of Engineers
▪ California Department of Fish and Wildlife
▪ U.S. Geological Survey
▪ U.S. Fish and Wildlife Service
▪ Caltrans
▪ California Department of Water Resources
WHY DUDEK IS BEST SUITED TO WORK WITH THE CITY OF SAN MARINO Dudek puts its clients first and will execute all task orders with care and responsibility, looking for ways to advance your goals for the stormwater system. We believe that every project and task is an important opportunity that can contribute to overall watershed health. We know the City has not been able to utilize available Safe, Clean Water funding and we believe we can assist in identifying and advancing innovative water quality improvement projects in the City. Our team members are empowered to think critically about the data we collect, the policies and regulations we interpret, the programs we implement, and the projects that we design. Our staff are problem solvers who have the ability to make decisions in a timely fashion to maintain forward momentum and advance program success.
Dudek is small enough for project managers to make nimble decisions, but large and diverse enough to quickly draw from our pool of technical resources. We are committed to working collaboratively with you from start to finish. Our in-house technical specialties cover various locally applicable environmental and engineering challenges. With more than 200 successful on-call municipal contracts, Dudek has built a reputation for providing supportive environmental, regulatory, engineering, and funding expertise, offering municipalities a cost-effective way to accomplish short- and long-term goals.
PROPOSED FIXED PRICE
For a task-by-task breakdown and total fixed proposal price, refer to the separately submitted Pricing Proposal, per the specifications in the Request for Qualifications (RFQ).
Respondent Qualifications and Experience
The Dudek team presented in this proposal has experience with NPDES Municipal Separate Storm Sewer System (MS4) permits, including specific requirements for the coastal watersheds of Los Angeles County. Our team includes degreed professionals in environmental science, geology, engineering, hydrogeology, hydrology, and biology.
Project Manager Nicole Rieger has a stormwater pollution prevention plan (SWPPP) developer license and 21 years’ experience providing management and support services for stormwater projects. Dudek staff has extensive experience working with the Los Angeles Regional Water Quality Control Board (RWQCB).
The team
presented in this
proposal will be
100% committed
to this contract
and up to
100% available.
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 3 Nicole Rieger has relevant, local project management experience and will make this contract a top priority. In addition, Dudek offers the City a team of accessible, committed staff members who are ready to begin work immediately. We have a flat internal structure, meaning that our deep bench of senior staff, skilled managers, technical experts, and practitioners are available to support Nicole Rieger.
The Dudek team specifically chosen for this contract has the availability and capacity to provide services on upcoming City projects. We have included a wide range of team members with different specialties to accommodate the specifics of any project. Program leads are featured below and include industry-leading experts in the areas of grant funding, interested party coordination, and NPDES compliance inspections, monitoring, training, and reporting.
Although Dudek has low employee turnover, should it be necessary, the project team personnel named in this proposal will not be substituted without the City’s written approval. Resumes with information specified in the RFQ follow below, and full-length resume qualifications are included in Appendix A.
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 4
RESUMES
Nicole Rieger, PE, QSD
PROJECT MANAGER
Nicole Rieger is a senior engineer with 21 years’ experience in civil engineering, specializing in floodplain, drainage, and stormwater quality design and analysis. Nicole has extensive experience working with clients as a drainage and stormwater design lead on municipal, roadway, and private development projects and is well versed in stormwater quality requirements. She has engineered and managed projects from preliminary and final design through construction. Years of Relevant Experience 21 Education
California Polytechnic State
University, San Luis Obispo
BS, Civil Engineering,
Certifications
California Professional Civil
Engineer (PE), CA No. 70782
(Expires: 6/30/2025)
Qualified SWPPP Developer,
No. 24471
Professional Affiliations
American Public Works
Association
American Society of Civil
Engineers
CASQA
Floodplain Managers
Association
Contact Information
2280 Historic Decatur Road,
Suite 200, San Diego,
California 92106 |
760.479.4148
State of Residence
California
Firms in the Past 10 Years
Dokken Engineering (2016)
Relevant Projects/Experience
▪ Stormwater System Condition Assessment | City of San Marino Served as the project manager for the project to address several key objectives. Performed a field reconnaissance and survey to model the existing stormwater system, including preparing a GIS database; planning, implementing, and analyzing a closed-circuit television (CCTV) inspection plan; reviewing the project to correct existing deficiencies; developing project costs and prioritizing recommended CIP projects; and identifying potential ongoing maintenance activities. (2019–2021)
▪ Municipal Waterways Maintenance Plan Support | City of San Diego Served as the lead engineer to support the City in the preparation of the environmental impact report (EIR) for the maintenance plan.
The project work included the preparation of the hydrologic and hydraulic assessments and associated report, the municipal waterways maintenance plan, and other California Environmental Quality Act (CEQA) and EIR-related documentation related to hydraulics. The hydraulic studies included Hydrologic Engineering Center River Analysis System (HEC-RAS) analysis for over 60 channels to determine the maximum extent of the maintenance required to restore each channel’s flood control function, while minimizing the impacts to sensitive environmental resources in the area. The project required multidisciplinary coordination efforts, as well, to balance flood control benefits with other environmental factors. (2019–2021)
▪ Recycled Water Expansion Project | City of Oceanside
Served as the drainage and stormwater lead in the preliminary site assessment and engineering design for proposed recycled water tanks located throughout the City. Because of the size of the tanks, the projects were required to meet the San Diego Municipal Separate Storm Sewer (MS4) permit stormwater quality
requirements, including hydromodification. (2016–2023)
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 5 Andrea Dransfield, QSP/QSD
NPDES TRAINING, INSPECTIONS, AND COMPLIANCE
Andrea Dransfield is a biologist with 13 years’ experience in biological surveys, water quality monitoring and reporting, habitat assessment, construction and compliance monitoring, habitat restoration, and GIS analysis. Additional experience includes industrial stormwater sampling, construction site SWPPPs, BMP monitoring and reporting for the Stormwater Multi-Application and Report Tracking System, and coordination of Municipal Separate Storm Sewer System (MS4) stormwater programs. Andrea has experience preparing scientific publications, biological technical reports and assessments, and restoration monitoring reports.
Relevant Projects/Experience
▪ City of Goleta MS4 Program | City of Goleta
Coordinating the City’s stormwater management program. This program protects water quality in accordance with RWQCB, pursuant to NPDES requirements. Assisting the City in meeting MS4 requirements, adopting the Santa Barbara County Stormwater Technical Guide for Low Impact Development, and implementing the City’s Stormwater Management Plan. This involves water quality sampling, dry-weather sampling of outfalls, pollution prevention and facilities maintenance, illicit discharge detection and elimination, and community education and outreach. Regarding construction projects, the MS4 requirements include construction plan reviews, providing contractor BMP training, BMP inspections, and final stormwater control measure inspections to ensure compliance. (2019–Ongoing)
▪ Kellogg Crossing Self-Storage| City of Goleta
Providing environmental compliance monitoring services for this self-storage project. Services include weekly monitoring and reporting regulatory compliance conditions. Andrea serves as a liaison between the City of Goleta, contractors, and relevant agencies to ensure projects are compliant with conditions of approval. (2022–2024)
▪ Caballero BESS | CSI Electric
Conducted weekly and quarterly SWPPP inspections using Dudek’s data collection and reporting tool, stormwater sampling to measure pH and turbidity, storm inspections, and Rain Event Action Plans (REAPs). Responsible for following SWPPP protocols and ensuring regulatory compliance, monitoring construction site stormwater BMP, producing inspection reports, and reviewing requirements with site managers. (2024–Ongoing)
Years of Relevant Experience
13 Education
San Francisco State
University MA, Geography,
Resource Use and
Environmental Planning
Brandon University
BSc, Environmental Science
and Zoology
Certifications
40-Hour HAZWOPER
ArcGIS, Marxan, and STATA
Qualified SWPPP
Developer/Practitioner
(QSD/QSP), No. 28740
Certified Professional in
Erosion and Sediment Control
(CPESC), No. 16143
Professional Affiliations
California Stormwater Quality
Association (CASQA)
Santa Barbara County
Association of MS4 Managers
(SBCAMM)
Contact Information
3760 State Street, Suite 101,
Santa Barbara, California
93105 | 805.308.8540
State of Residence
California
Firms in the Past 10 Years
BioReg Consulting
(2014–2016)
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 6 Vipul Joshi
SAFE, CLEAN WATER PROGRAM LEAD
Vipul Joshi leads Dudek’s statewide Watershed Sciences practice with 26 years’ industry experience. Vipul has supported clients with integrated water resource planning, design, permitting, and implementation by focusing on sustainable ecological management solutions designed to address current and future regulatory requirements. He has completed projects and programs ranging from small-scale infrastructure repairs to large-scale, citywide programs. He has worked closely with applicants to obtain and comply with grantfunding requirements, including under the State Revolving Fund and Water Infrastructure Finance and Innovation Act.
Relevant Projects/Experience
▪ Arroyo Seco Canyon | City of Pasadena Water and Power Dudek prepared an EIR for the replacement of a water diversion structure and design of multiple treatment basins within the Arroyo Seco in Pasadena. Vipul assisted in the coordination and completion of regulatory permits, including addressing migratory steelhead, with the Los Angeles RWQCB, U.S. Army Corps of Engineers, California Department of Fish and Wildlife, and U.S. Fish and Wildlife Service. (2019–2022)
▪ Integrated Watershed Engineering Assessment | City of San Diego Served as stream restoration technical lead for multiple multidisciplinary watershed assessments to identify and rank potential stream restoration projects to serve an integrated CIP to address stormwater infrastructure deficiencies, meet stormwater regulatory requirements, and compete for grant funds. Led a team to develop desktop- and field-based assessment of San Diego Bay and Mission Bay watersheds that resulted in over 50 conceptual projects.
Also led development of a standardized scoring methodology that was applied Citywide. Each project was evaluated utilizing the standard scoring method; fact sheets and cost estimates were also prepared along with typical cross-section details. The resulting assessment positions the City of San Diego to implement strategic improvements to comply with current and future regulations and forecast budget needs. (2019–2023)
▪ Los Peñasquitos Lagoon Restoration | City of San Diego Served as Dudek’s project manager, lead biologist, and regulatory specialist for a 140-acre lagoon restoration project designed to address a sediment total maximum daily load (TMDL) issued by the San Diego RWQCB and funded by the State Revolving Fund and Water Innovation Financing Act. The project consists of construction of several sediment management features, storm drain improvements, new freshwater conveyance channels, and reestablishment of tidal wetland hydrology to support salt marsh habitat and rehabilitation of a substantially degraded riparian floodplain. Vipul led the biological and regulatory permitting services, including negotiation with regulatory agencies on TMDL, compensatory wetlands mitigation, 404(b)(1) analysis, endangered species take, and local conservation plan conformance. (2019–Ongoing)
Years of Relevant
Experience
26 Education
University of California,
San Diego
BS, Evolution, Behavior,
and Ecology
Professional Affiliations
California Native Plant
Society Ecological Society
of America U.S. Green
Building Council
Contact Information
2280 Historic Decatur Road,
Suite 200, San Diego,
California 92106|
760.479.4284
State of Residence
California
Firms in the Past 10 Years
Dudek
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 7 Shannon Brown, PE
TRASH TMDL AND PROGRAM COMPLIANCE
Shannon Brown is a civil engineer with 15 years’ experience as a consultant specializing in stormwater, water, and sewer management and infrastructure design projects. He is experienced in a broad range of disciplines, including stormwater, water, and sewer master planning, regulatory permit compliance, preparation of design drawings and specifications, hydrology and hydraulics modeling, and
geospatial analysis.
Relevant Projects/Experience
▪ Municipal Waterways Maintenance Plan | City of San Diego Served as project engineer. The plan supports the findings of a programmatic environmental impact statement for maintenance of more than 60 earthen and concrete-lined channels throughout the City. Project work included preparation of hydrologic and hydraulic assessments, associated technical reporting, and planning and construction-level channel maintenance plans. The hydraulic studies included HEC-RAS analysis to determine the extent of maintenance required to restore each channel’s flood control function while minimizing the impacts to sensitive environmental resources in the area. (2019–2021)
▪ Small Municipal Separate Storm Sewer System Permit Compliance Program (SMSSSP) | City of Goleta
Served as technical reviewer and project engineer. Dudek has played a key role in redeveloping Goleta’s Phase II stormwater program to ensure all municipal operations and new development requirements meet or exceed the SMSSSP provisions. Dudek developed a list of action items designed to address stormwater program needs based on each item’s relative threat to water quality, operational feasibility, and budget. Ongoing program support activities include preparation of technical reports and analyses, development of stormwater training materials and jurisdictional program procedures, regulatory audit preparation, drafting and issuance of notice of violations, illicit connection/ discharge investigations, stormwater plan review, SWPPP development, and post-construction BMP inspection.
(2022–Ongoing)
▪ Saratoga Creek Restoration Project: Hydrology and Hydraulics Analysis and SWPPP | Santa Clara Valley Water District
Served as project engineer. This project involved revegetation of a half-mile of stream bank after hazard tree removal activities.
Shannon developed a HEC-RAS model of the project area to assess potential impacts to bank stability following tree removal and restoration. Following the design phase, he assisted in the development of a multiyear SWPPP for the restoration construction activities.(2018–2022)
Years of Relevant Experience
15 Education
California State University,
Fullerton; MS,
Environmental Engineering
University of California,
Davis BS, Environmental
and Resource Science
Certifications
Professional Civil Engineer
(PE), California No. 92771
(Expires 12/31/2025)
OSHA 30-Hour
Construction Safety
Qualified SWPPP Developer
Contact Information
605 Third Street, Encinitas,
California 92024 |
760.479.4869
State of Residence
California
Firms in the Past 10 Years
Cardno (2011-–2018)
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 8 Jane Gray
GRANT FUNDING
Jane Gray is a regional planner, environmental specialist with 27 years’ project management and environmental planning experience, specializing in water/wastewater planning and permitting, policy analysis, land use planning, project development and entitlement services, and grant writing and management. Jane Gray has a diverse and nuanced planning background, having worked as a project manager, analyst, and environmental planner for nongovernmental entities, public agencies, and private firms and corporations throughout California.
Relevant Projects/Experience
▪ Underrepresented Communities, California Tribes, and Small Farmers Groundwater Technical Assistance (URCTA) Program | California Department of Water Resources (DWR)
Leading and managing the development and implementation of the URCTA Program with DWR, including statewide, multilingual communication, outreach, and engagement to community-based organizations/community-based partners, Groundwater
Sustainability Agencies, Resource Conservation Districts, cities, counties, URCs, tribal governments, and others. Completing needs assessments for URCs, California tribes, and small farmers in Sustainable Groundwater Management Act-regulated basins, conducting site visits, coordinating with project partners, providing direct technical assistance to eligible URCs, California tribes, and small farmers. Created bilingual K–12 water literacy educational materials for all 10 hydrological regions in the state. Created an accessible mapping application and heat maps associated with the program. (2022–Ongoing)
▪ Creek and Watershed Management Plan (CWMP) and Program | City of Goleta
Provided community engagement during the preparation of the CWMP and since adoption of the CWMP in 2020, has been leading the technical advisory committee (TAC) and supporting implementation of projects associated with the plan for the implementation of projects.
This includes support of public meetings and workshops, TAC meetings, and other community outreach events and forums, such as Creek Week, The Lemon Festival, State of the City, and other events.
Work includes StoryMap development coordination of languageappropriate support services, generation of meeting, event, and workshop materials, meeting minutes, agenda, and presentations, tabling, and coordinating with partners on projects. (2018–Present) ▪ MS4 Program Support and Implementation | City of Goleta Managing staff at Dudek who are coordinating the City’s stormwater management program. This program protects water quality in accordance with the RWQCB, pursuant to NPDES requirements.
Assisting the City in meeting MS4 requirements, adopting the Santa Barbara County Stormwater Technical Guide for Low Impact Development, and implementing the City’s Stormwater Management Plan. This involves water quality sampling, dry-weather sampling of
Years of Relevant Experience
27 Education
Universität Dortmund,
Germany
MS, Regional Planning and
Management
State University of New York,
BS, Social Work
Professional Affiliations
Chair, Central Coast Regional
Water Quality Control Board
Santa Barbara
County Agricultural
Advisory Committee
2nd District
Supervisorial Appointee
Contact Information
3760 State Street, Suite 101
,Santa Barbara, California
93105 | 805.308.8531
State of Residence
California
Firms in the Past 10 Years
Dudek (2006)
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 9 outfalls, pollution prevention and facilities maintenance, illicit discharge detection and elimination, and community education and outreach. Regarding construction projects, the MS4 requirements include construction plan reviews, providing contractor BMP training, BMP inspections, and final stormwater control measure inspections to ensure compliance. (2017–Ongoing)
▪ Integrated Regional Water Management (IRWM) |
Santa Barbara County
Providing overall program management, meeting, and event coordination for the Santa Barbara County IRWM Program, working directing with the Regional Water Management Group to develop, fund, and implement watershedwide projects within the IRWM region. Conducting IRWM Plan updates and revisions as needed in addition to project funding support (grant applications) and grant administration. (2007–Present)
Table 1. Required Firm Information
Name of Proposed Firm Dudek
Legal Structure S-Corporation
Managerial Personnel Joseph Monaco | President and CEO
Eric Wilson | Executive Vice President
Pete Campbell | Vice President
Danielle Voss | Vice President, Human Resources; Assistant Secretary Helder Guimaraes | Chief Financial Officer; Treasurer
Michael McGrattan | Chief Information Officer
Amy M. Paul | General Counsel; Secretary
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 10 Dudek Expertise
NPDES Compliance and Reporting
Dudek has prepared and facilitated submission of required reports and progress updates pursuant to multiple NPDES programs, including the current Order for MS4 Discharges within coastal watersheds of Los Angeles County, the
Upper Los Angeles River Watershed Management
Program, the Coordinated Integrated Monitoring Program, and various TMDL requirements. Dudek’s team of
regulatory specialists ensures that accurate and consistent data and metrics are used to provide required reporting.
We work as an integrated team with various municipal
departments within the City to ensure proper NPDES
training and response. We have developed methods to
track the City’s responsibilities for MS4 stormwater runoff, as well as specific
industrial/commercial facility program requirements. We are adept at developing, implementing, and analyzing
programs, such as the 5-year Daily Generation Rate
compliance field study, and have worked with multiple
clients to develop cost-effective methods to ensure current compliance and help the City plan for future
regulatory updates.
Stormwater
Dudek has a talented team of hydrologists, engineers, and certified erosion and sediment control leads (CESCLs) to help you manage stormwater issues throughout the City at any stage, from planning and monitoring to specific project construction. We can also help with industrial stormwater permit compliance, flood control planning and design, and municipal stormwater master planning.
Our environmental and engineering professionals are adept at preparing stormwater permit documents and design plans. We are experienced with stormwater compliance and water quality facilities design. We help municipal and private clients navigate the construction and post-construction permit requirements with a focus on compliance and minimal maintenance costs.
Our stormwater experts integrate water quality and drainage design analysis into a single comprehensive model for both regional and local projects, and we tailor client-specific BMPs to targeted pollutant removal goals. Small projects can often be managed with a simple site survey, drainage path analysis, and implementation of standard BMPs.
Funding and Interested Party Coordination
Dudek understands funding and interested party coordination are integral parts of managing stormwater infrastructure in California. Our team is actively engaged in both the local interested party groups witin the Upper Los Angeles River watershed and in statewide and regional funding programs. We have supported numerous clients in their outreach and coordination efforts to develop program support and identify opportunities for
DUDEK MUNICIPAL STORMWATER
PROGRAM ASSISTANCE EXPERIENCE
MULTIDISCIPLINARY ENVIRONMENTAL
AND ENGINEERING SERVICES
▪ Extensive San Diego stormwater
program management expertise
▪ Trash Order planning and
implementation
▪ TMDL compliance planning and
regulatory assistance
▪ Water quality monitoring, analysis,
and interpretation
▪ NPDES permit renewal strategy
and negotiation
▪ Integrated MS4 database and
infrastructure asset GIS support
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 11 partnerships. Our team supports underrepresented communities statewide and assists in identifying grant opportunities, scoping competitive projects, and developing technically competent grant applications for the successful award of monies. We are well versed in the various grant programs at the state and federal level, and we work with our clients to strategize in advance of the release of grant solicitations so that projects are ready and competitive. We also work with jurisdictions to be responsive and competitive regarding unexpected grant opportunities. We support our clients in the management of grants, which is important to build a solid and successful record of accomplishment, implementation, and responsible grant administration.
Project Staff Experience
The Dudek team assigned to this program brings with them experience in municipal program development, implementation, and assessment. They will assist your staff in balancing the often-times differing needs of compliance requirements and budget realities. Our technical experts understand the importance of integrating water quality improvement efforts, NPDES permit compliance, trash management, flood risk reduction, and operations and maintenance activities with overall department cost-effectiveness goals. Dudek’s experience serving as a trusted advisor to local and regional municipal agencies presents the City with access to diverse perspectives and lessons learned that lead to efficient planning efforts and practical solutions. Importantly, we understand the need to communicate our technical work in clear, concise reporting formats to effectively convey project goals and results to diverse interested parties within San Marino and the surrounding communities. Our team’s collaborative, multidisciplinary, water-resource-based applied technical approach will provide financial, operational efficiency, and community outreach benefits to the City and its stormwater program.
Our team comprises highly educated and credentialed scientists and engineers who reflect the full breadth of services required under this contract. Team members include professional engineers, master’s level scientists, certified professionals in planning and erosion and sediment control; Professional Geologists; and SWPPP developers. Below is a representative list of projects highlighting our team’s capabilities on similar projects and programs.
Recent Relevant Project Experience
STORMWATER SYSTEM CONDITION ASSESSMENT AND MASTER PLAN, CITY OF SAN MARINO Client: City of San Marino
Contact: Michael Throne, Director of Public Works at the City of La Mesa; 8130 Allison Avenue, La Mesa California 91942;
[email protected]; 626.300.0718
Key Personnel: Nicole Rieger, Shannon Brown
Licensed Engineers/Architects: Nicole Rieger, Shannon Brown Contract Amount: $150,000
Period of Performance: 2019–2021
Relevant Services Performed: Storm drain condition assessment Project Description: Dudek prepared a stormwater system condition assessment (SSCA) to assess the condition of the current storm drain system and review the ability of the system to meet future drainage conditions. The project included compiling available data from multiple sources into an updated GIS layer, including CCTV data, assessing the condition of storm drain facilities within the City’s jurisdiction, identifying deficiencies, and developing projects to correct those deficiencies and accommodate future development. A CIP was created that considers prioritization, as well as costs and funding, and provided recommendations for stormwater Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 12 management policies. The final SSCA will serve as a guidance document for programming storm drain system capital improvements and provide the basis for implementing a long-range improvement program to address future aging, capacity and regulatory issues.
Description of how experience qualifies team to accomplish proposed project roles: Dudek stormwater engineers gained a comprehensive understanding of the City’s drainage systems through field investigation and CCTV video review. The Dudek team will leverage this knowledge to help implement and guide the City’s MS4 program, including identifying specific projects that can utilize available water quality improvement funding.
SIERRA MADRE MEDIAN RETROFIT
Client: City of Pasadena
Reference: Dawn Petschauer, Project Manager; 100 N.
Garfield Avenue, Room N023, Pasadena, California
91101; [email protected]; 626.744.3929
Key Personnel: Nicole Rieger, Shannon Heffernan |
Licensed Engineers/Architects: Nicole Rieger
Contract Amount: $501,700
Period of Performance: 2024–Ongoing
Relevant Services Performed: Stormwater drain
assessments, pump station considerations, water quality improvement considerations.
Project Description: Dudek is in the process of developing design plans for the Sierra Madre Boulevard Median Enhancement site within the City of Pasadena and Rio Hondo watershed. Both regional and low-impact development best management practices, specifically dry wells and bioretention facilities, are proposed in the Sierra Madre Boulevard medians to treat the diverted flows and surface street flows, respectively, to improve downstream water quality. Dudek is working to develop creative solutions that ensure the technical feasibility of the project and positioning the design for future construction grant funding with the Safe, Clean Water Program with a clear demonstration of effectiveness and constructability. The project will also outline the landscaping concept design for the medians, including preserving existing trees where feasible, incorporating native and drought tolerant species, and increasing the tree canopy. Several technical designs will be assessed, including stormwater diversion locations, pump station considerations, and landscape planting palette. Additionally, Dudek is organizing community outreach utilizing surveys, a native plant booklet designed in-house, and other brochuretype deliverables.
Description of how experience qualifies team to accomplish proposed project roles: Dudek has experience working with multiple parties and agencies to develop a multifaceted design, ensure the technical feasibility of the project, and position the design for future construction grant funding with the Safe, Clean Water Program Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 13
LACY PARK BOX CULVERT REPLACEMENT REPORT
Client: City of San Marino
Contact: Amber Shah, Public Works Director; 2200 Huntington Drive, San Marino, California 91108; [email protected]; 626.300.0700 Key Personnel: Nicole Rieger, Shannon Brown |
Licensed Engineers/Architects: Nicole Rieger, Shannon Brown Contract Amount: $237,880
Period of Performance: 2021–Ongoing
Relevant Services Performed: Storm drain evaluation and replacement, alternatives analysis, site evaluations, utility research Project Description: Lacy Park is a heavily used public space in the City of San Marino, California. An existing box culvert traverses a large section of Lacy Park from Virginia Rd on the east side to its connection to the downstream 54-foot reinforced concrete pipe storm drain east of the rose garden. The box culvert is in poor condition and required replacement. Dudek evaluated options to minimize construction impacts to the park and maintain access for park patrons. Dudek is also evaluating several alternatives to reroute the storm drain pipe away from the park to reduce the construction costs for a special design box culvert and the feasibility to implement an infiltration BMP in an existing parking lot. Project tasks include site evaluations, land surveying and mapping, geotechnical investigations, utility research, a robust alternatives analysis, and final design documents.
Description of how experience qualifies team to accomplish proposed project roles: Dudek has local experience working on storm drain projects.
CITY OF GOLETA MS4 SUPPORT SERVICES
Client: City of Goleta
Contact: Melissa Nelson, Environmental Services Manager; 130 Cremona Drive, Suite B, Goleta, California 93117;
[email protected]; 805.961.7565
Key Personnel: Nicole Rieger, Andrea Dransfield, Jane Gray, Shannon Brown, Maryse Suppiger
Licensed Engineers/Architects: Nicole Rieger, Shannon Brown Contract Amount: $600,880
Period of Performance: 2019–Ongoing
Relevant Services Performed: Municipal Stormwater NPDES program support
Project Description: Dudek is conducting professional MS4 permit compliance program support services in conjunction with the City’s Phase II Small General MS4 permit compliance program. Our team has provided services in the area of program management, oversight, technical/regulatory guidance, and program implementation. Dudek has developed, reviewed, implemented, and/or tracked the City’s public education and outreach, illicit discharge detection and elimination, construction site runoff control, pollution prevention for municipal operations, and post-construction stormwater management for new development and redevelopment.
Dudek also provided strategic programmatic support in the area of data management and innovation to streamlined compliance tracking and reporting.
Description of how experience qualifies team to accomplish proposed project roles: Dudek stormwater specialists have experience functioning as extension of staff to the City’s stormwater program, working within a municipal Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 14 system to make incremental improvements to various systems and processes that allows the City to efficiently comply with current regulation and prepare proactively for future regulation.
TRASH AMENDMENT PLANNING SUPPORT, MONTEREY, CALIFORNIA
Client: City of Monterey
Contact: Steve Wittry, Public Works Director; 580 Pacific Street, Monterey, California 93940; [email protected]; 831.646.3920 Key Personnel: Shannon Brown |
Licensed Engineers/Architects: Shannon Brown
Contract Amount: $34,600
Period of Performance: 2018–2019
Relevant Services Performed: Stormwater NPDES program support Project Description: Dudek assisted in the preparation of the City of Monterey’s Track 2 Implementation Plan in accordance with the Amendment to the Water Quality Control Plan for the Ocean Waters of California and Part 1 Trash Provisions of the Water Quality Control Plan for Inland Surface Waters, Enclosed Bays, and Estuaries of California (Trash Amendments). We continue to coordinate with City staff and provide technical support for development of internal planning documents detailing implementation schedule, costs, and other information that is pertinent to City planning, engineering, and operations staff.
Description of how experience qualifies team to accomplish proposed project roles: The project team gained relevant experience in the developing a municipal stormwater trash control implementation program that meets regulatory standards and leverages existing City practices to the maximum extent.
AS-NEEDED ENGINEERING AND ENVIRONMENTAL SERVICES, SAN DIEGO, CALIFORNIA Client: City of San Diego, Stormwater Department
Contact: David Wells, Senior Contracts Manager; 9370 Chesapeake Drive, Suite 100, San Diego, California 92123; [email protected]; 858.541.4339
Key Personnel: Vipul Joshi, Nicole Rieger, Shannon Brown | Licensed Engineers/Architects: Nicole Rieger, Shannon Brown Contract Amount: $7,500,000
Period of Performance: 2012–Ongoing
Relevant Services Performed: Provided as-needed stormwater engineering and consulting services
Project Description: Dudek has served the City of San Diego Stormwater Department under multiple as-needed services contracts with a broad scope of work that includes BMP development and engineering, stormwater infrastructure asset management services, environmental assessment and permitting, stormwater monitoring, strategic planning, and program management. Project work under this contract includes stormwater pilot study experimental design and implementation, stormwater monitoring, asset technical report preparation and interpretation, grant-funding proposal preparation, regulatory agency coordination and negotiation, and support of TMDL development and compliance efforts.
Description of how experience qualifies team to accomplish proposed project roles: Dudek stormwater specialists gained experience in the development, assessment, and implementation of municipal stormwater quality and regulatory compliance projects.
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 15
STORM WATER MANAGEMENT PROGRAM ADMINISTRATION, CARPINTERIA, CALIFORNIA Client: City of Carpinteria
Contact: Charlie Ebeling, Public Works Director, City of Ventura; 501 Poli Street, Ventura, California 93001;
[email protected]; 805.654.7808
Key Personnel: Jane Gray |
Licensed Engineers/Architects: N/A
Contract Amount: $34,750
Period of Performance: 2009–2010
Relevant Services Performed: Worked to implement elements of a Stormwater Management Program (SWMP)
Project Description: The City of Carpinteria contracted with Dudek as extension of staff to assist in the initial implementation for various elements of the City's SWMP. The work includes responding to comments on the SWMP by RWQCB, local non-government organizations (NGOs), and the public; meetings with the RWQCB and chairing public workshops/hearings until the end of the public comment period; and responding to comments and implementing required revisions to the SWMP from the RWQCB.
Description of how experience qualifies team to accomplish proposed project roles: Dudek assisted the City in developing and posting a SWMP and corresponding website for the City and other interested parties to access all the compiled documents associated with the development of the SWMP, and to develop and implement the City's public information program for the project.
SANITARY SEWER SPILL MONITORING PROGRAM, CITY OF PASADENA Client: City of Pasadena
Contact: Christina Monde, Project Manager; 100 N. Garfield Avenue, Room N023, Pasadena, California 91101;
[email protected]; 626.744.7311
Key Personnel: Shannon Brown | Licensed Engineers/Architects: Shannon Brown Contract Amount: $38,000
Period of Performance: 2024–Ongoing
Relevant Services Performed: Compliance with Waste Discharge Requirements for NPDES permit
Project Description: Dudek is preparing a Sanitary Sewer System Spill Water Quality Monitoring Plan that identifies the location, procedure, and reporting requirements for collecting water quality samples in the receiving water in the unlikely event there is a spill. The final plan will be used by the City’s Public Works Staff as a reference document as well as procedures for what to do during a spill. The plan’s content is based on requirements of the Statewide Waste Discharge Requirements General Order for Sanitary Sewer Systems Order WQ 2022-0103-DWQ (WDR) adopted by the State Water Resources Control Board (SWRCB) on December 6, 2022.
Description of how experience qualifies team to accomplish proposed project roles: The experience being gained in waste discharge regulatory compliance extends to the requirements of the MS4 permit for municipalities.
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 16 Client References
STORMWATER SYSTEM CONDITION ASSESSMENT
Contact: Michael Throne, Director of Public Works, City of La Mesa; 8130 Allison Avenue, La Mesa California 91942;
[email protected]; 626.300.0718
Key Personnel: Nicole Rieger, Shannon Brown
Licensed Engineers/Architects: Nicole Rieger, Shannon Brown Dates: 2019–2021
Relevant Services Performed:
▪ Stormwater System Condition Assessment and Review
▪ Analysis of future drainage conditions
▪ GIS layer from multiple sour ces
▪ Development of a CIP
▪ Provided recommendations for stormwater management policies to address future aging, capacity, and regulatory issues.
ON-CALL PROFESSIONAL SERVICES AGREEMENT
Contact: City of Pasadena; Christina Monde, Project Manager; 100 N. Garfield Avenue, Room N023, Pasadena, California 91101;
[email protected]; 626.744.7311
Key Personnel: Nicole Rieger, Shannon Heffernan, Shannon Brown Licensed Engineers/Architects: Nicole Rieger, Shannon Brown Dates: 2020–Ongoing
Relevant Services Performed:
▪ Sanitary Sewer System Spill Water Quality Monitoring Plan ▪ Compliance with Waste Discharge Requirements for NPDES permit ▪ Requirements of the MS4 permit for municipalities
▪ Water quality improvement considerations
▪ Future grant opportunities
STORMWATER AND WATERSHED MANAGEMENT SERVICES
Contact: City of Goleta; Melissa Nelson, Environmental Services Manager; 130 Cremona Drive, Suite B,
Goleta, California, 93117; [email protected]; 805.961.7565 Key Personnel: Nicole Rieger, Andrea Dransfield, Jane Gray, Shannon Brown, Maryse Suppiger
Licensed Engineers/Architects: Nicole Rieger, Shannon Brown Dates: 2019–Ongoing
Relevant Services Performed:
▪ Municipal Stormwater NPDES program support.
▪ MS4 permit compliance program support
▪ Management, oversight, technical/regulatory guidance, annual reporting, and program implementation
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 17 Subconsultants
Dudek does not foresee the need to utilize subconsultants on projects resulting from this contract.
Proposal
PROPOSED APPROACH
Dudek has an effective and proven approach to as-needed technical consulting task orders. Each task order request is carefully reviewed, assigned to appropriate staff, and a proposed is developed within 2 business days that is reviewed by Nicole Rieger and includes a comprehensive scope of work, schedule, and cost estimate that conforms with the contract fee schedule and restrictions. We manage projects to meet client and technical needs using sound science and engineering principles. Our team focuses on data quality, careful management of budget, and schedule milestones. The team assigned to each task is fully committed to the task, until complete.
All work is completed in close coordination with City staff with regular progress reports provided via email or a shared online platform (e.g., SharePoint). Progress reports include not only updates on past performance but also upcoming work and potential challenges, critical path issues, and important action items that must be resolved to successfully complete the task. These measures ensure that there are no surprises with regards to schedule, invoice charges, or deliverable content and quality. Our approach is founded on solid project management principals and well developed quality assurance/quality control (QA/QC) processes. Our focus on these central tenets to performing on-call program work has guided our expert technical project support for the past four decades.
A more detailed approach to specific scope of services is provided below:
Task 1: Safe, Clean Water Municipal Program Annual Plans and Annual Reports Dudek Safe, Clean Water (SCW) Program Manager Vipul Joshi will work with City staff to ensure that the City is fully engaged with and can successfully leverage the SCW program funds and technical support to implement projects and programs within the City. We will provide local staff to attend SCW watershed coordination meetings, interface with the watershed coordinators, and review program updates and requirements. We will work with you to understand the current status of any SCW-funded projects and assist in the preparation, review, and submittal of required SCW plans and reports. At the City’s request, we can identify and/or evaluate potential projects that would be eliglble for funding and/or technical assistance through the SCW program. Dudek will apply an integrated approach to these project assessments, ensuring that as many objectives as can be met through a single project (e.g., flood control, water quality, habiat restoration, and community benefit) are identified. These multiple objectives will help qualify projects not only for the SCW program, but potentially other grant funds (see Task 9).
Task 2: Annual Reports to Regulatory Agencies
Dudek will assist the City with preparation of annual reports to various regulatory agencies to ensure compliance with the MS4 permit. Dudek will utilize any templates and/or tracking software that the City has developed to streamline tracking and reporting. Dudek will well versed with various municipal GIS and other tracking software and can advise the City on ways to enhance and improve tracking of education, outreach, street sweeping, catch basin cleaning, industrial/commerical inspections, illicit discharges, and special studies. Dudek applies state-ofthe-art science to evaluate and interpret data in the context of current and potential future regulations. This approach ensures that the City can maintain compliance in a cost-effective manner that makes efficient use of limited municipal funds.
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 18 Task 3: Representing the City at Meetings Engagement
Dudek is prepared to represent the City at interested party meetings. Our approach starts with early coordination with City staff to understand past engagement with these entities, current status of the relevant City’s projects and programs, and anticipated key issues or concerns. Interested party engagement sets the framework for the City to leverage regional work products and planning efforts to assist in the development of City-specific implementation and planning efforts. Moving forward, key decisions with potential impacts to the City’s trash compliance approach and regional MS4 permit reissuance topics will be dependent on outcomes, collaborative use, and perceived RWQCB acceptance of regional work products. Our team utilizes this engagement to assess benefits and constraints for various planning and implementation options and then synthesize lessons learned to meet our client needs. Our collaborative experience and working relationships with regional partner agencies and nonprofits and their consultant teams will provide a direct benefit to the City in our ability to synthesize regional work into a City-specific compliance approach that meets multiple planning, operations and funding objectives.
Dudek staff will provide written updates within 2 business days of each meeting and maintain an active, up-todate inventory of meeting agenda, presentation materials, notes, and action items that would be available to City staff through an online shared platform (e.g., SharePoint).
Task 4: NPDES Training
Upon request, Dudek would develop NPDES training for City staff to ensure compliance and efficiently integrate the program with overall municipal services. Dudek staff will review any past training materials that are retained by the City and develop agreed-upon parameters for all training, including learning objectives, regulatory requirements, audience characteristics, format, length, location, and overall style. Dudek will develop draft training materials and a training agenda/outline for City review at least 2 weeks prior to the training. These materials will be prepared by our stormwater compliance experts working with our learning and development manager, who is a trained educator. The training materials will include visual aids and graphics and real-world examples from the local area to enhance learning and ensure relevancy. Quick reference guides and online tools can be made available for easy access following the training. Dudek staff will be also be available to address follow-up questions or other implementation challenges. If Dudek is tasked with preparing follow-up training, then lessons learned will be incorporated to ensure a continually improving training system is implemented.
Task 5: Inspections of Commercial Facilities
Dudek will develop an inspection protocol, confirm inspection locations, and review data collection, QA/QC procedures, and data delivery methods with the City project manager prior to conducting inspections. Dudek’s industrial/commerical facility inspectors are trained on stormwater regulations, water quality data collection protocols, and safety requirements, and they utilize a Esri GIS mobile data inventory platform to collect and record data. This allows project management and City staff to review data in real time and, if necesary, communicate with the inspector to modify data collection techniques. This methodology minimizes the potential that reinspections would need to occur upon final review of the data. All inspections are completed in a professional manner with clear communication to on-site facility workers; all inspectors will have proper identification, will provide the appropriate City staff contact upon request, and will follow safety protocols. Inspections are an opportunity for business owner education and inspectors will be equipped to provide information to owners and operators and identify target locations for additional outreach. Following data collection, Dudek will implement a thorough audit following agreed-upon QA/QC procedures. With the mobile data inventory collection system, compilation and reporting of data is highly streamlined. Dudek reports provide inspection data in an accessible and easy-to-understand format, with key findings and recommendations clearly articulated for City staff to communicate with management, if required.
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 19 Task 6: 5-Year Daily Generation Rate Compliance Field Study The Dudek team will work collaboratively with City staff to implement the 5-year Daily Generation Rate (DGR) trash compliance study in conformance with Los Angeles River Watershed Trash TMDL. Dudek has assisted various municipalities with trash monitoring and trash control methods to ensure compliance with current and future trash control regulation. We will apply these broad lessons and approaches to assist the City in evaluating potential trash monitoring methods for the DGR study, such as street sweeping, manual pickup, or other methods commonly used in the region.
Dudek will work with the City to create a DGR field study that is easily repeatable and produces a result that can be efficiently quantified in a compliance report for the Regional Board. It is anticipated that planning for the DGR will consist of defining a study drainage area, locating associated storm drain inlets to be blocked during the study, and an appropriate trash collection method based on expected trash loading and logistical feasibility. Part of the processes will be to develop a centralized database for storing DGR results after each annual field study for efficient Regional Board reporting and potential audits.
Task 7: Program Compliance and Recommend Actions
Dudek is especially adept with ensuring our municipal clients are not only compliant with current regulations but are proactively prepared to evaluate and implement recommended actions to ensure cost-effective compliance under future regulations. A number of water quality and multidisciplinary environmental protection regulatory elements converge within the City’s jurisdiction. Multiple agencies, including the City and other interested parties, manage urban runoff, habitat, and water quality improvement activities. In addition, regulatory requirements, such as watershed management plans and statewide Trash Amendments, provide significant potential operational, budgetary, and compliance challenges for the City. Accordingly, the development and implementation of effective watershed-based analytical approaches to restore and maintain the health of surface waters and manage natural resources is predicated on City staff and management concurrence on compliance strategies and jurisdictional program reporting requirements. These strategies and reporting efforts require consideration of scientific data, operational capacity, cost, and regulatory policy implications related to oftentimes multiple regulatory requirements. The Dudek team approach to program regulatory compliance combines multidisciplinary technical expertise and regulatory compliance experience that will benefit City staff in implementing environmental projects in and around City jurisdiction. Further, our team has demonstrated experience presenting technical information to a wide range of agencies, organizations, and individuals that have allowed complex technical details to be understood by nontechnical interested parties.
The Dudek team’s practical knowledge and applied experience with local regulations, policies, City activities, and local interested party processes allows us to provide a comprehensive and science-based holistic perspective to evaluate directly and indirectly applicable regulatory documents in support of the City. Our team’s comprehensive understanding of the City’s responsibilities in complying with multiple regulatory requirements, including the Regional MS4 Permit, TMDLs, and industrial and construction general stormwater permits, provides the experience to successfully manage stormwater program elements from idea to implementation and monitoring.
Task 8: Identify Potential Stormwater Quality Improvement Projects Dudek’s stormwater engineers have completed a comprehensive condition assessment of the City storm drain system and are uniquely suited to identifing appropriate potential stormwater quality improvement projects. We are currently working on the Lacy Park Box Culvert Replacement and have demonstated knowledge with designing improvements that meet multiple City objectives, including water quality improvement. Dudek approaches Citywide evaluations for potential projects from a holistic perspective, evaluating not just infrastructure Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 20 deficiences, but the interplay of dissadvantaged community investment, habitat restoration, water quality protection, and flood risk reduction. Dudek’s broad range of in-house technical experts provides the ability to conduct comprehensive evaluations of opportunities that lead to the identification of projects that can successfully address multiple City goals in a cost-effective manner. Dudek may complete a comprehensive Citywide study utilizing a combination of GIS and field studies, with a systematic selection of potential projects, comprehensive summaries of the relevant details of those project (e.g., engineering feasibility, potential water quality improvement, regulatory context, and costs), and a prioritized ranking that allows the City to complete longrange budget planning and positions the City to adapt to funding opportunities. Dudek may also complete site-specific assessments to evaluate existing or future CIPs in terms of potential water quality improvements. For these types of tasks, we would coordinate with City staff (and/or consultants) with information regarding the project, develop options for integrated water quality improvements, and prepare technical memoranda to facilitate project evaluation and communicate with City management.
Task 9: Identify Grant-Funding Opportunities
Dudek has a 94% grant award success rate and has prepared and submitted grant applications for various clients throughout California, including municipalities; NGOs; water, wastewater, and community service districts; and agencies. Dudek maintains a high rate of successful grant awards because we are selective and work with our clients to position projects well for funding. Dudek has an organized, responsive, and nimble approach to identifying, writing, and securing grant funding and over the past 5 years, has obtained over $138 million in grant and loan monies for our clients. Moreover, our team is rooted in planning and development of nuanced, multibenefit projects that successfully knit together intricate project challenges and opportunities to yield positive results for ecosystems, communities, and agencies.
Dudek’s key priority before commencing a grant application is to determine whether there is a high correlation between the needs and benefits of the project vis-à-vis the grant requirements/guidelines and scoring rubric. If the team determines there is a good fit, Dudek will maximize the competitiveness of the project through work plans, budgets, and schedules that will be responsive to the funding solicitation. Dudek will attend any fundingagency-led workshops or events and, as necessary and appropriate, establish contact with the funding agency representative to discuss the project(s) and obtain insights, confirm deadlines, discuss project discriminators, establish funding priorities, and have any questions answered. Dudek will coordinate with the City to provide key takeaways and/or discuss any change in strategy. For each project that an application is prepared for, Dudek will generate a Request for Information (RFI) and a grant application tracking sheet. The RFI will outline the materials Dudek needs to generate a comprehensive, competitive application that satisfies the application requirements.
The tracking sheet is a tool to provide both accountability and structured deliverables. In the grant tracking sheet, Dudek will outline a timeline for each draft application package, including development and completion of sections, the draft, and final application; timelines for the City to review and comment on the draft and final application; and final grant submittal. Throughout development of a grant application, Dudek will also engage the services of our technical editors, who will verify that documents adhere to grant guidelines or requirements, such as font size and number of characters, words, or pages; have correct citations, grammar, and spelling; and properly use abbreviations and numbers. They will also fact-check and add editorial polish. The technical editors will review substance with respect to internal consistency, characterization of the project, clarity and concision of responses to required questions, and appropriateness of content and structure.
Task 10: Assist with As-Needed NPDES or Stormwater-Related Tasks Dudek provides full-service engineering and environmental services and excels at providing as-needed services to local municipalities. We maintain a flat structure that allows our project managers to identify and deploy appropriate staff to meet any challenge or need. In addition to the extensive NPDES and stormwater services that Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 21 are described above, we have local CEQA/NEPA practitioners, a dedicated Publications and graphic design staff, full service civil engineering, groundwater and hazardous materials experts, and local landscape architects and fire planners, just to name some of the key services we can provide. We have found that many municipalities benefit from our data management services, which leverage lessons learned from various database platforms to evaluate your current database for architecuture improvements or provide you with informed options for integrating a new platform or services.
PERFORMANCE CRITERIA
Team Organization
Dudek will provide seamless management between City staff and our team to complete tasks with an awareness of the City’s environmental and political sensitivities. Figure 1 presents our proposed project staffing and team organization.
We understand that the City is considering the Dudek team in its entirety; therefore, we will not make changes in team composition without prior consultation and written approval of the City.
Figure 1 outlines proposed lines of communication for this contract; brief biographies are provided on page 4 and focused resumes are provided in Appendix A.
Figure 1. Dudek Team Organization
Task Order Execution
The structure and flexibility of the Dudek team provide the ability to adapt resources and the execution approach to meet client needs throughout any task life cycle. The Dudek task order execution approach applies a common understanding of the goals and objectives to project-related decision-making. Critical aspects of the Dudek Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 22 approach include identifying logistical, environmental, and regulatory factors; evaluating and communicating critical issues; and focusing on quality data collection, analysis, and reporting.
For each task order, a key component will be communication with and management of our specialty service provider team. Our project manager, Nicole Rieger, has extensive experience managing large multidisciplinary teams to execute diverse technical work aligned with a common project goal framework. Nicole Rieger’s demonstrated project management techniques, such as brief weekly project team update conference calls, real-time monitoring of project costs and quality metrics, and proactive communication and coordination with client project managers and staff, are keys to the delivery of quality, cost-effective technical services. Nicole Rieger will utilize these techniques as needed throughout the project life cycles.
Major Strengths of the Team
Diverse, Specialized, and Experienced Project Team
Dudek has assembled a diverse and expert suite of service providers to meet the City’s environmental analytical and regulatory compliance needs. Individually, our team has proven technical capability, responsive service, and data quality management expertise. Collectively, the Dudek team has recent experience collaboratively executing project work in the local environment and represents a panel of technical professionals with a wide range of skills to advise the City on how to effectively and efficiently execute stormwater compliance tasks. Combined with our funding professionals, we will help the City leverage available funding to implement discrete water quality improvement projects and improve water quality protection activities.
Potential Risks and Mitigations
Dudek has a practical and proven project approach to mitigating risks. We manage task orders to meet client and technical needs, using sound science and engineering principles, a focus on data quality, and careful management of budget and schedule milestones. Our approach to mitigating risks, such as budget overruns and schedule delays, is built from solid project management principals and well-developed QA/QC processes.
Project Management Approach
The primary aspects of Dudek’s client approach (Figure 2) to project management include communication, managing adherence to the scope, keeping the progression of work on schedule, cost controls, collaboration, and predicting and avoiding risk. In addition, Dudek prides itself on integrating a fundamental focus on high-quality work, optimized resource allocation, change management, and maintaining focus toward meeting our client and project goals and objectives.
The following sections describe the Dudek project management approach to execute these elements and our philosophy and tools to deliver a successful project. Our approach focuses on four main components:
▪ Task order planning
▪ Communication
Figure 2. Dudek Client Approach
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 23 ▪ Task order control
▪ Quality control
During the execution of any scope of work, the Dudek team applies an adaptive management approach to adjust the level of detail or utilization of specific project management techniques and tools necessary to ensure successful project delivery.
Task Order Planning
Planning is a critical step in the successful management of every project. Dudek project managers begin the planning stage during the development of the task order proposal and continue applying an adaptive approach throughout project execution. Planning considerations include:
▪ Clarifying the task requirements and confirming the project goals and outcomes ▪ Communication with the client, project interested parties, and service provider team ▪ Iteratively estimate and refine resource requirements, level of effort, and cost ▪ Monitor project budget and schedule
▪ Integrate quality standards at each project stage
The Dudek approach applies these planning concepts throughout the project life cycle. With Dudek's strong oversight and coordination, our team will focus on meeting the schedule and staying within budget.
Communication
The Dudek culture promotes proactive, open, and professional communication through all project stages. The adaptive nature of as-needed assignments is well suited to our flexible and comprehensive communication approach, including written, oral, graphic, and personal messaging techniques. The communications plan generally includes an interested party registry, communication schedule, and
issues/action/decision documentation maintenance. Additionally, Nicole Rieger tailors the communication approach for each task order based on the preferred means of communication for the client and project interested parties. Dudek used a single point-of-contact communication structure to suit client needs (Figure 3). As a rule, Dudek prepares detailed monthly progress reports that provide a written summary of project progress, upcoming work efforts, client needs, project changes, and scope/budget/schedule comments.
Task Order Controls
Dudek’s project managers monitor and control the project budget, schedule, and quality using a suite of tools from project inception to completion. Dudek project tools include real-time project budget management, online schedule management software, and internal/external interim and final data and reporting quality assurance/quality control (QA/QC) checks. As the project advances, our project manager communicates with the team regularly to evaluate project resource requirements, budget, and schedule.
Figure 3. Dudek
Communication Structure
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 24 Quality Control
The Dudek approach to project QA/QC applies technical knowledge and project familiarity with an integrated QC plan process. A QA/QC control plan may be prepared for each project or task based on project technical aspects, client requirements, and industry standards. Dudek then follows and updates, as appropriate, the following QA/QC plan components:
▪ Technical adequacy to meet project goals
▪ Client standards and procedures
▪ Deliverables such as data files, graphics, procedures, reports, and calculations ▪ Third-party analytical and data review, where appropriate ▪ Expert in-house detail check, review, and documentation ▪ Procedures for corrective action
Dudek designed our QA/QC processes to ensure the accuracy and consistency of submittals and deliverables. Our team’s highest priority is to protect client interests by delivering quality technical services. The Dudek team recognizes data QA/QC in environmental projects as a multifaceted, iterative process integrated within each project implementation stage. Our approach to data quality for this effort provides a means for the project team, data analysts, and City staff to validate, evaluate, analyze, and interpret the quality of monitoring data related to regulatory and other project drivers (Figure 4). The Dudek team’s comprehensive QA/QC process contains four interrelated components: Validation, Evaluation, Statistics, and Interpretation. Each stage of the process comprises independent QA/QC elements and is linked to the overall data interpretation process.
Each stage of the data QA/QC and interpretation process prompts the data reviewer to assess project data in an increasingly broad context. The process begins with a refined assessment of data collection and analysis procedures termed Validation. In the Validation step, the project team evaluates field monitoring compliance with the project monitoring plan, Quality Assurance Project Plan (QAPP) provisions, laboratory handling, and analytical QA/QC requirements. This step establishes the validity, representativeness, and usability of the collected data for the intended purpose.
Next, our QA/QC process enters the Evaluation stage, where project data is assessed for alignment with expected results. In this stage, the Dudek project team will utilize our multidisciplinary technical experts and experience in similar environmental monitoring programs within the City and region to evaluate project results.
Our process then moves to the Statistics stage, where appropriate and applicable statistical procedures are used to evaluate the dispersion and variability, outliers, presence of data gaps, and data confidence concerning the project goals and objectives. This portion of the QA/QC process is designed to allow sound, science-based, and statistically valid conclusions to be derived from appropriately validated and evaluated data.
Figure 4. Dudek uses an integrated QA/QC
process to evaluate environmental data from
project initiation to completion.
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 25 The final stage of our comprehensive QA/QC process is Interpretation. The Interpretation process integrates the Validation, Evaluation, and Statistical QA/QC components to assess project data against project objectives, applicable water and/or sediment quality objectives, and available data resources to meet regulatory and/or other project drivers.
The Dudek team will implement this Validation, Evaluation, Statistics, and Interpretation QA/QC process for the project work collected under this contract. Our integrated quality focus will benefit the City by providing reliable and quality-driven environmental services to meet regulatory and management decision needs.
Ability to Perform Work as Scheduled
Staff Availability and Continuity
Dudek offers the City a team of accessible, committed staff members ready to begin work immediately. Internally, Dudek hires and retains the most qualified engineers and environmental specialists. We take care of our professionals. As a result, we have low staff turnover and career longevity and can deliver a team that will stay with this project. Key team members Nicole Rieger, Jane Gray, Shannon Brown, and Vipul Joshi have worked together for over 6 years.
On-Time Delivery
Dudek has a reputation for consistently delivering projects on time and within budget. We rise to the challenges of meeting tight timelines and, in doing so, have developed expertise in critical path management, fast-track scheduling, efficient staffing, and workload management. We have achieved this record of on-time performance by consistently applying several fundamental strategies. These strategies include early identification of methodologies, determining existing issues, implementing an interactive process, and using consistently applied administrative systems. In addition, Nicole Rieger will provide regular status updates to the City identifying work completed, work underway, and any needs for project data or information.
Multiple Task Order Management
Dudek project managers follow similar project tracking, scheduling, and budgeting systems. In addition, by utilizing a standard file management system, flexible budget, and schedule tracking systems, our project managers can manage multiple task order and quickly pick up and support other project managers if the need arises. These integrated management systems allow Nicole Rieger, as contract manager to provide real-time updates regarding critical path items and budget utilization across all task orders.
Firm’s Claims Experience
Refer to Dudek’s Claims and Litigation History in Section 2 of this proposal on page 26.
Request for Qualifications— On-Call NPDES/Stormwater Engineering Services 26 Section 2: Financial Information
Financial Statements
Dudek is an employee-owned corporation that has been profitable each year since its founding in 1980. The firm is in sound financial condition and has no financial or legal issues that would impede our ability to provide the services sought by the City. In addition, Dudek has a strong, experienced, fiscally responsible management team, allowing the company to finance operations with internally generated funds.
Dudek’s financial statements for the most recently completed three fiscal years (2021- 2023) as requested in Section 10 of the RFQ are provided as a separate attachment and have been uploaded as a separate document in the “Proposal Without Cost” section. However, please note that Dudek considers this information to be confidential.
Fair and Reasonable Cost Information The Pricing Proposal has been uploaded as a separate attachment, as stated in the RFQ.
Dudek does not have any existing or past financial relationships with current members of the City Council, City staff, or entities for which said members are employed, or have an interest, both past and present. Dudek’s past and current contracts with the City include the following:
▪ City of San Marino Phase I ESA (2011)
▪ Wastewater Collection System Master Plan (2019)
▪ Chelsea Road Storm Damage (2022)
▪ FY 24–25 CIP Budget for Stormwater System (2024)
▪ Spill Emergency Response Plan (SERP) Update (Ongoing) ▪ Lacy Park Box Culvert Replacement (Ongoing)
▪ Lift Station Improvement Program, Project No. 21-8022 (Ongoing) Claims and Litigation History
Dudek Summary of Legal Claims in Last 5 Years Involving Professional Consulting Services:
Elsinore Valley Municipal Water District v. Water Works Engineers LLC, et al.
On November 12, 2021, Elsinore Valley Municipal Water District (the “District”) filed a civil complaint against Water Works Engineers LLC (WWE) in California Superior Court, County of Riverside, for alleged design defects in a water reclamation facility. The District filed a first amended complaint against WWE on September 26, 2022, for breach of contract and professional negligence. WWE subsequently cross-claimed against the construction firm as well as Dudek (and other firms) for its role as construction manager. Dudek was not involved in the design of the project and denied any liability. This matter was dismissed in 2024.
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 27 Letter from Insurance Broker
Request for Qualifications— On-Call NPDES/Stormwater Engineering Services 28 Section 3: Response Forms
Acceptance of Form of Professional Services Agreement,
including any proposed modifications
As submitted on the submission platform, OpenGov, per the requirements in the RFQ, Dudek has attached proposed modifications to the Professional Services Agreement to our RFQ/RFP Response. The proposed modifications are listed in Section 4 on pages 29-30.
Proposal Authorization
As submitted on the submission platform, OpenGov, per the requirements in the RFQ, Dudek is a Respondent to the Request for Qualifications/Request for Proposals of City for Request for Qualifications—On-Call NPDES/Stormwater Engineering Services (“RFQ/RFP”) and possesses the legal authority to submit this Proposal.
Dudek is authorized to conduct all negotiations for and legally bind the respondent in all matters relating to this proposal submittal.
Dudek has reviewed, understands, is able to comply with, and agrees to be bound by the General Conditions Governing this RFP.
Dudek grants the City a right to conduct reference checks and reasonable investigation of all information provided by Respondent.
Dudek certifies that this proposal is irrevocable until 120 days after its submission date.
Dudek confirms that we have read and can satisfy all insurance requirements specified in this RFQ/RFP.
Request for Qualifications— On-Call NPDES/Stormwater Engineering Services 29 Section 4: Discretionary
Supplemental Materials
Explanation of discretional supplementary materials
Dudek has not included any additional discretional supplementary materials in this proposal.
Any desired materials
Dudek has not included any additional desired materials in this proposal.
Modifications to Professional Services Agreement
Dudek respectfully would like to propose the following exceptions in red to the City’s Professional Services Agreement:
Section 6.0 Reports, Information, and Work Product
6.3.: If any use by city of any of the Work Product or other deliverables is held to constitute an infringement and the use of any of the same is enjoined, Consultant, at its expense, shall: (a) secure for City the right to continue using such Work Product and/or other deliverables by suspension of any injunction, or by procuring a license or licenses for City; or (b) modify the Work Product and other deliverables so that they become non- infringing while remaining in compliance with the requirements of this Agreement.. Consultant shall not be liable for any reuse of the Work Product beyond the original purpose of this Agreement or modification of its Work Product.
Section 12.0 Insurance
12.1: The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms provided by City, if requested. All certificates and endorsements shall be received and approved by City before work commences. City reserves the right to require complete, certified copies of all required insurance policies, at any time.
12.6: Proof of insurance. Consultant shall provide certificates of insurance and required endorsements to Agency as evidence of the insurance coverage required herein. Insurance certificates and endorsements must be approved by Agency’s Risk Manager prior to commencement of performance. Current certification of insurance shall be kept on file with Agency for the contract period and any additional length of time required thereafter.
Agency reserves the right to require complete, certified copies of all required insurance policies, at any time.
12.11 Waiver of subrogation. All insurance coverage maintained or procured pursuant to this agreement, except for Professional Liability, shall be endorsed to waive subrogation against Agency, its elected or appointed officers, agents, officials, employees, and volunteers or shall specifically allow Consultant or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Consultant hereby waives its own right of recovery against Agency and shall require similar written express waivers and insurance clauses from each of its subconsultants.
Request for Qualifications—On-Call NPDES/Stormwater Engineering Services 30 Indemnification, Hold Harmless, and Duty to Defend.
12.23 To the fullest extent permitted by law, Consultant shall indemnify, defend, and hold harmless Agency and any and all of its officials, employees, and agents (“Indemnified Parties”) from and against any and all claims, losses, liabilities, damages, costs, and expenses, including reasonable attorney’s fees and costs, to the extent they arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.
Consultant’s duty to defend shall consist of reimbursement of defense costs incurred by Agency in direct proportion to the Consultant’s proportionate percentage of fault. Consultant’s percentage of fault shall be determined, as applicable, by a court of law, jury, or arbitrator. In the event any loss, liability or damage is incurred by way of settlement or resolution without a court, jury or arbitrator having made a determination of the Consultant’s percentage of fault, the parties agree to mediation with a neutral third-party to determine the Consultant’s proportionate percentage of fault for purposes of determining the amount of indemnity and defense cost reimbursement owed to the Agency.
12.24 Notwithstanding the foregoing and without diminishing any rights of Agency under Indemnification and Defense for Professional Services, for any liability, claim, demand, allegation against Agency arising out of, related to, or pertaining to any negligent act or omission of Consultant, but which is not a design professional service, Consultant shall defend, indemnify, and hold harmless Agency, its officials, employees, and agents (“Indemnified Parties”) from and against any and all damages, costs, expenses (including reasonable attorney’s fees and expert witness fees), judgments, settlements, and/or arbitration awards, whether for personal or bodily injury, property damage, or economic injury, and arising out of, related to, any concurrent or contributory negligence on the part of the Agency, except for the sole or active negligence of, or willful misconduct of the Agency. Notwithstanding the foregoing, with respect to any professional liability claim or lawsuit, this indemnity does not include providing the primary defense of Indemnitees, provided, however, Consultant shall be responsible for Indemnitee’s defense costs to the extent such costs are incurred as a result of Consultant’s negligence, recklessness or willful misconduct.
24.0 Attorneys’ Fees
If either party commences any legal, administrative, or other action against the other party arising out of or in connection with this Agreement, the prevailing party in such action shall be entitled to have and recover from the losing party all of its reasonable attorneys’ fees and other costs incurred in connection therewith.
Appendix A
Resumes
1 Nicole Rieger, PE, QSD
PROJECT MANAGER
Nicole Rieger is a project manager with 21 years’ experience in civil engineering, specializing in floodplain, drainage, and stormwater quality design and analysis. Ms. Rieger has extensive experience working with clients as a drainage and stormwater design lead on municipal, roadway, and private development projects and is well versed in stormwater quality requirements.
She has engineered and managed projects through all phases, from preliminary and final design through construction.
Relevant Project Experience
Drainage Master Plan, City of Temecula, California Serving as the project manager for the preparation of a drainage master plan for all City owned storm drain assets. Project scop includes updating the existing GIS data, performing hydrology and hydraulics modeling, providing recommendations on storm drain capital improvements and green infrastructure improvements, and preparing a drainage master plan to inform the capital improvement program.
Updated Drainage Master Plan, City of Placentia, California Served as the Dudek lead for the updates to the drainage master plan for all City owned storm drain assets. Project scope includes updating the existing GIS data, performing hydrology and hydraulics modeling, providing recommendations on storm drain capital improvements, and preparing an updated drainage master plan to inform the capital improvement program.
Stormwater System Condition Assessment, City of San Marino, California.
Served as the project manager for the stormwater system assessment to address several key objectives. Performed a field reconnaissance and survey to model the existing stormwater system, including preparation of a geographic information system database, plan, implement and analyze a CCTV inspection plan, identify project to correct existing deficiencies, develop project costs and prioritize recommended CIP projects and identify potential ongoing maintenance activities.
San Elijo Water Reclamation Facility Preliminary Treatment Upgrades, San Elijo Joint Powers Authority, Encinitas, California. Prepared a technical memorandum and preliminary design for bioretention basins to be located near the preliminary treatment upgrades. The bioretention basins were designed to meet several objectives, including meeting the regulatory requirements of the San Diego MS4 permit and Industrial General Permit, meeting grant requirements, and meeting the stormwater requirements for the near-term future projects planned at the facility.
Design included reviewing the site for ways to reduce sediment discharges, which is a priority pollutant of concern for the downstream water bodies.
Park Drive Drainage Improvements, City of Carlsbad, California. Serving as the project manager for addressing retaining wall degradation, slope failures, and drainage issues along Park Drive to alleviate safety concerns and reduce maintenance efforts. In addition to standard engineering solutions, the team evaluated bioengineering Education
California Polytechnic
State University,
San Luis Obispo
BS, Civil Engineering,
2002
Certifications
Professional Civil
Engineer (PE), CA
No. 70782
Qualified SWPPP
Developer, No. 24471
Professional Affiliations
American Public
Works Association
American Society of
Civil Engineers
CASQA
Floodplain Managers
Association
2 solutions to improve erosive conditions. An assessment of the groundwater conditions impacting the retaining wall and slope integrity was provided, as was a hydrologic and hydraulic assessment, to better convey runoff away from the slope face. The alternatives analysis included evaluating multiple solutions and documenting the benefits and costs of each scenario, including roadway improvements. Dudek is currently preparing final engineering documents as well as the environmental documents and permitting.
Regional Stormwater Program Evaluation, Marine Corps Installations West (MCIWEST), Various Locations in Southern California. Led the effort to create a manual for post-construction BMP requirements for various Marine Corps installations in Southern California. The project team conducted a regional evaluation of seven MCIWEST water quality programs to assess their compliance with new and emerging requirements, including the California Construction General Permit, draft Industrial General Permit, Small MS4, and regional permits. Through a structured evaluation of program information, policies, procedures, and annual report information combined with on-site interviews with key stormwater program staff, the team was able to draw on their significant expertise with other clients to recommend a strategy using a suite of recommendations (policy, procedures, training, and BMPs) to close the gaps identified. As a result of this evaluation, MCIWEST was able to remove two installations from industrial permit coverage and significantly reduce the number of facilities (and outfalls) subject to industrial permit inspection and monitoring requirements.
Master Maintenance Program Support, City of San Diego, California. Served as the lead engineer to support the City of San Diego’s Master Storm Water System Maintenance Program in the preparation to maintain three priority channel segments. The project work included the preparation of the Individual Hydrologic and Hydraulic Assessments, maintenance plans, and other documentation required in the Individual Maintenance Plans for each of the inaugural three channels. The hydraulic studies include HEC-RAS analysis to determine the maximum extent of the maintenance required to restore each channel’s flood control function while minimizing the impacts to sensitive environmental resources in the area. The project required multi-disciplinary coordination efforts and frequent collaboration with the client due to a reduced timetable to meet the permitting requirements. The task also included preliminary alternatives analysis for appropriate modifications to the channels to reduce the need for maintenance activities.
U.S. Coast Guard SWPPP Contract, Haskell Inc., San Pedro, California. Served as project manager to prepare a SWPPP for the project, which included the construction of a proposed building along with sewer, water, and fire/water utilities and floating dock improvements along the piers. Also prepared the notice of intent, annual reports, and notice of termination (NOT) through the State Water Resources Control Board’s SMARTS system.
Cal Fire Highway 17 Fuel Reduction – Emergency Shaded Fuel Break Project, Santa Clara County Firesafe Council, Santa Clara County, California. Served as the engineering lead to support the erosion control and stormwater management tasks. Prepared a Caltrans Water Pollution Control Plan for approval and implementation for the vegetation removal activities. Provided technical guidance to field staff on appropriate BMPs and provided implementation recommendations. Tasks included interpretation and application of Caltrans stormwater management requirements and ensuring appropriate measures were being implemented during and after implementation. Also included monitoring and reporting/documentation associated with the implementation of the Caltrans Water Pollution Control Plan.
Additional Project Experience
▪ Watershed Asset Management Plan Flood Control Assessment, City of San Diego, California. ▪ Cardinal Drive Emergency Storm Drain Project, Flatiron West, San Diego, California. ▪ Stormwater Asset Ownership Verification City of San Diego, California. ▪ MS4 Permit Compliance Program, City of Goleta, California. 1 Jane Gray
GRANT FUNDING
Jane Gray is a regional planner, environmental specialist, and project manager with 27 years’ project management and environmental planning experience, specializing in water/wastewater planning and permitting, agricultural resource and policy planning, policy analysis, land use planning, project development and entitlement services, and grant writing and management. Ms. Gray has a diverse and nuanced planning background, having worked as a project manager, analyst, and environmental planner for non-governmental entities, public agencies, and private firms and corporations. She has been responsible for projects varying from small-scale development and infrastructure planning in developing economies to private residential and commercial developments throughout California.
Ms. Gray brings an effective and customized approach to efficiently deliver services. Her ability to skillfully negotiate the often-disparate interests involved in projects and bring about consensus is an asset in any situation. Ms. Gray has organizational expertise, technical aptitude, planning proficiency, and competency facilitating projects through contentious issues in a variety of communities.
Relevant Project Experience
Project Management, Communication and Engagement, Technical Needs Assessment Technical Assistance, for the URCTA Program – Underrepresented Communities, California Tribes and Small Farmers Technical Assistance Program. Providing communication and engagement, facilitation, technical needs assessment, technical assistance services, program. As the Project Manager, is leading and managing all components of the contract; spearheading communication and engagement, workshop coordination and facilitation, and community, Tribal and Small Farmer engagement and community dialogue; conducting needs, risks, and vulnerabilities assessments; surveys; heat mapping; and community prioritization and evaluation. The project entails extensive data collection, management and curation of ethnographic information, extensive community surveying, and provision of technical assistance, technical summaries and memoranda, report writing, and outcome analysis. Dudek has created 9 videos in 7 languages, bilingual statewide K-12 Water Literacy educational materials for all 10 hydrologic regions in the state, graphic novels with Native language text based on Tribal Water stories that have been turned into hardbound books, coloring books and animations that have narrations in Tribal languages.
Project Management, Community Engagement and Facilitation for a Community and Needs Assessment and Strategic Plan, City of Davis Parks and Recreation Department, Davis, California. Providing outreach, communication and engagement to City of Davis for development of a community needs assessment, internal staffing interviews, development of a departmental mission and visions and strategic plan for the operation, maintenance and development of new and ongoing programming, recreational facilities and infrastructure. The work entails in Education
Universität Dortmund,
Germany
MS, Regional Planning
and Management
State University of New
York, Buffalo
BS, Social Work
Professional Affiliations
Chair, Central Coast
Regional Water Quality
Control Board
2nd District Appointee to
the County Agricultural
Advisory Committee
Association of Women in
Water, Energy and
Environment, Member
2 person tabling events, meetings, site visits, in person interviews, workshops and facilitation and development of technical memoranda, needs assessment, and the strategic plan. Leading projects, coordinating and managing work products, managing sub-consultants and ensuring a high caliber of deliverables.
Project Management, Community Engagement and Equity Strategic Development and Implementation, Yolo County Climate Action and Adaptation Plan, Yolo County, California. Leading the preparation of a climate action and adaptation plan in concert with Yolo County (County) staff and commission working groups to develop the community engagement and equity strategy, co-develop engagement materials, and follow up on meeting outcomes; update the County’s greenhouse gas (GHG) inventory with the latest available, reliable data; and provide projections for specified intermediate years out to 2050. The team is preparing a retrospective assessment of progress to date, a narrative for a consumption based GHG inventory, and identifying accessible metrics and benchmarks. In addition, our team is recommending an approach for integrating consumption- and production-based inventories at a future date, as well as ways of tracking and reporting progress using better data and accounting methods. We are also collaborating with the Yolo County Resources Conservation District to prepare a high-level inventory of GHG emissions and carbon sequestration potential for natural and working lands, and developing a contained set of emission mitigation and sequestration strategies that can be readily implemented. Additionally, we are preparing engineering and economic analyses of the portfolio, including implementation issues. Finally, we will identify County vulnerabilities to climate change and prepare adaptation and resilience strategies, develop a feasible funding and financing roadmap with specific recommendations, and prepare an implementation and monitoring plan that is readily adapted over time and integrated with County resource-management tools.
Communication and Engagement, San Mateo County Harbor District Master Plan, San Mateo County Harbor District.
Conducted community engagement and outreach for the San Mateo County Harbor District Master Plan, including development of community interview questions, interviews with key community leaders in cities and county, including elected officials, key NGO leaders, commissions, and others at the Marina and Harbor, business community members, mariners and anglers, marina and harbor users and others. Generated and conducted community surveys, outreach events, pop-up events and workshops and generated technical memoranda and plan sections and led and facilitated community workshops and meetings.
Project Management for the Santa Barbara County Integrated Regional Water Management Program, California.
Providing overall project management, coordination consultants, internal staff, project proponents, and communities for the Santa Brabara County IRWM Program. Coordinating agencies’ staff and communication with NGOs and Community Based Organizations (CBOs) to for Plan implementation, work in the Bond Coalition, coordination with the Central Coast Funding Area Partners, coordination on quarterly meetings, generation of meeting materials, agendas, coordination of guest speakers, program development and Plan updates.
Communication and Engagement, Groundwater Sustainability Plan Implementation, City of Santa Monica, California. Providing community engagement and facilitation services for plan implementation related to public meetings and workshops, Technical Advisory Committee meetings, and other community outreach events and forums. This includes coordination of language-appropriate support services as well as generation of meeting and workshop materials, meeting minutes, agendas, and presentations.
Project Management Communication and Engagement for the Creek and Watershed Management Plan Development and CWMP Implementation, City of Goleta. Provided overall project management for communication, engagement, tabling, workshops, events and materials for the development of the City’s Creek and Watershed Management Plan. Currently providing public and community engagement support; leading the technical advisory committee; grant strategy and funding; project prioritization; and development, implementation, and coordination and implementation of the plan’s goals.
1 Andrea Dransfield
NPDES TRAINING, INSPECTIONS, AND COMPLIANCE
Andrea Dransfield (AN-dree-uh DRANZ-feeld; she/her) is a biologist with 13 years’ experience in marine and terrestrial biological surveys, water quality monitoring and reporting, habitat assessment, construction monitoring, habitat restoration and geographic information system (GIS) analysis. She is California Department of Fish and Wildlife (CDFW) trained in stream habitat surveys, monitoring water quality, and identifying and monitoring special-status species, such as the California red-legged frog (Rana draytonii) and Southern California steelhead (Oncorhynchus mykiss), as well as invasive species, Quagga mussels (Dreissena bugensis). She is National Park Service trained in habitat restoration, plant propagation, and invasive species control. Ms. Dransfield has conducted biological surveys for terrestrial and aquatic species and conducted reviews of aquatic species reports for coastal development and resource management projects. Ms. Dransfield’s field experience encompasses inland, coastal, and marine environments and includes conducting nesting bird surveys, mammal burrow/den surveys, and biological surveys for various special-status plant and wildlife species, such as burrowing owl (Athene cunicularia) and white-tailed kite (Elanus leucurus). Additional experience includes industrial stormwater sampling, construction site stormwater pollution prevention plans (SWPPPs), best management practice (BMP) monitoring and reporting for Stormwater Multi-Application and Report Tracking System, and coordination of Municipal Separate Storm Sewer System (MS4) stormwater programs. Ms. Dransfield has experience preparing scientific publications, biological technical reports, SWPPP inspection reports, nesting bird letter reports, biological assessments, and restoration monitoring reports.
Relevant Project Experience
City of Goleta Public Works, California. Coordinating the City of Goleta’s stormwater management program. This program protects water quality in accordance with the Regional Water Quality Control Board, pursuant to National Pollution Discharge Elimination System requirements. Assisting the City in meeting MS4 requirements, adopting the Santa Barbara County Stormwater Technical Guide for Low Impact Development, and implementing the City’s Stormwater Management Plan. This involves water quality sampling, dry-weather sampling of outfalls, pollution prevention and facilities maintenance, illicit discharge detection and elimination, and community education and outreach.
Regarding construction projects, the MS4 requirements include construction plan reviews, providing contractor BMP training, BMP inspections, and final stormwater control measure inspections to ensure compliance.
Education
San Francisco
State University
MA, Geography, Resource
Use and Environmental
Planning, 2013
Brandon University
BSc, Environmental
Science and Zoology,
2008
Certifications
BOEM/JNCC Marine
Mammal Observer (MMO)
and Protected Species
Observer (PSO)
PADI Rescue Diver
Caulerpa taxifolia
Surveyor
40-Hour HAZWOPER
ArcGIS, Marxan,
and STATA
CPESC
QSP/QSD
Professional Affiliations
California Stormwater
Quality Association
(CASQA)
Santa Barbara County
Association of MS4
Managers (SBCAMM)
USFWS BeachCombers
The Wildlife Society
2 Caballero BESS, CSI Electric, Nipomo, California. Conducted weekly/ quarterly SWPPP inspections using Dudek’s data collection and reporting tool, stormwater sampling to measure pH and turbidity, storm inspections, and REAPs. Responsible for following SWPPP protocols and ensuring regulatory compliance, construction site stormwater BMP monitoring, producing reports for clients, and discussing reports with site managers.
Sandman Mixed-Use Condition Compliance, Franciscan Developments Inc., Santa Barbara, California. Conducted weekly/quarterly SWPPP inspections during the rainy season using Dudek’s data collection and reporting tool, stormwater sampling to measure pH and turbidity, storm inspections, and REAPs.
Kellogg Crossing Self-Storage, City of Goleta, California. Providing environmental compliance monitoring services for this self-storage project. Services include weekly monitoring and reporting regulatory compliance conditions.
Ms. Dransfield serves as a liaison between the City of Goleta, contractors, and relevant agencies to ensure projects are compliant with conditions of approval.
Sansum Cancer Center, G.L. Bruno Associates Inc., Santa Barbara, California. Conducted weekly/quarterly SWPPP inspections using Dudek’s data collection and reporting tool, stormwater sampling to measure pH and turbidity, storm inspections, and REAPs. Provided compliance monitoring services and stormwater BMP installation and maintenance oversight for the Sansum Cancer Center.
Cabrillo Business Park Lots 8 and 11, Investec Real Estate Companies, Goleta, California. Conducted weekly/ quarterly SWPPP inspections using Dudek’s data collection and reporting tool, stormwater sampling to measure pH and turbidity, storm inspections, and REAPs. Responsible for following SWPPP protocols and ensuring regulatory compliance, construction site stormwater BMP monitoring, producing reports for clients, and discussing reports with site managers.
Emergency Permitting Services, Montecito Water District, Santa Barbara County, California. Conducted pre-construction surveys, nesting bird surveys, and project monitoring, including an assessment of the impact areas associated with the geotechnical surveys. Currently overseeing restoration monitoring, performing quarterly qualitative and quantitative monitoring, and submitting annual reports to the RWQCB.
Westmont Road Storm Drain Rehabilitation, City of Santa Barbara, California. This project regraded the channel bed immediately upstream of a storm drain that conveys the flow adjacent to Westmont Road from an unnamed tributary to Sycamore Creek. Per the Habitat Mitigation and Monitoring Plan, currently overseeing restoration monitoring, performing quarterly qualitative and quantitative monitoring, and submitting annual reports to the RWQCB.
Industrial Stormwater Monitoring, Frog Environmental Inc., Long Beach, California. Worked with Frog Environmental collecting stormwater runoff samples from industrial sites in Santa Barbara and Ventura Counties for testing at a State of California certified lab.
El Estero WWTP Secondary Upgrade Biological Monitoring, City of Santa Barbara, California. Conducted SWPPP inspections for the El Estero WWTP Secondary Process Improvement Project, which involved using Dudek’s data collection and reporting tool, following SWPPP protocols and ensuring regulatory compliance, producing reports for clients, and discussing reports with site managers. Biological resources surveys and compliance monitoring were performed in accordance with biological resource mitigation measures. Dudek was present on site to monitor activities associated with the project, including installation of BMPs, project setup, mobilization, jet grouting, and activities within the secondary facilities buildings. 1 Vipul Joshi
SAFE CLEAN WATER PROGRAM LEAD
Vipul Joshi is a senior project manager and ecologist with 26 years’ experience in natural resources management planning. Mr. Joshi focuses on providing ecological management solutions to clients responsible for sustaining multiple natural resources on lands throughout California. He has a background and training in watershed science, regulatory permitting, permit compliance, and project management. Mr. Joshi is experienced with California environmental regulations and has managed constraints analysis, entitlement processing, permit acquisition, and biological construction monitoring for a variety of public and private projects and programs.
Mr. Joshi has specific experience with National Pollutant Discharge Elimination System (NPDES) permitting with a variety of local jurisdictions; state and federal Endangered Species Act permit processing; wetlands permitting, and management of permit compliance. Specific experience includes managing large municipal on-call contracts that are focused on water resources management, regulatory compliance, and multi-benefit resource management.
Relevant Project Experience
Haynes Intake Channel Infill Project Mitigated Negative Declaration, Los Angeles Department of Water and Power, Long Beach, California. Served as senior regulatory specialist for a project where the Los Angeles Department of Water and Power (LADWP) is seeking to infill the intake channel at Haynes Generating Station in Long Beach to make room for a future energy project. Key project issues included impacts to eelgrass and other marine species, coastal permitting and sea level rise, and potential impacts to waters of the United States.
Environmental Compliance and Regulatory Permitting Support, San Gabriel Dam Emergency Maintenance Project, Los Angeles County Public Works, Azusa, California. Overseeing biological and regulatory technical studies and permit applications with multiple resource agencies as well as Los Angeles County Public Works Stormwater Maintenance Division to facilitate implementation and compliance for emergency, long-term maintenance of the facility. Developed permitting strategy and mitigation options for CEQA compliance, protected species habitat measures, and potential compensatory wetlands mitigation.
Arroyo Seco Canyon Project Areas 2 and 3 Environmental Impact Report, City of Pasadena, California. Served as senior regulatory specialist supporting preparation of an Environmental Impact Report (EIR) for water infrastructure improvements within the Arroyo Seco, upstream of Devil’s Gate Dam and within the Hahamongna Watershed Park Master Plan boundaries. Oversaw technical staff who prepared the Biological Resources Technical Report, assisted the City in responding to agency and public comments, and facilitated the application and coordination with resource agencies for regulatory permits.
Integrated Watershed Engineering Assessment, City of San Diego Stormwater Department, California. Served as stream restoration technical lead for multiple multi-disciplinary watershed assessments to identify and rank potential stream restoration projects to serve integrated Capital Improvement Program to address stormwater Education
University of California,
San Diego
BS, Evolution, Behavior,
and Ecology, 1997
Professional Affiliations
California Stormwater
Quality Association
California Native Plant
Society
Ecological Society of
America
2 infrastructure deficiencies, meet stormwater regulatory requirements, and compete for grant funds. Led a team to develop desktop and field based assessment of San Diego Bay and Mission Bay watersheds that resulted in over 50 conceptual projects. Also led development of a standardized scoring methodology that was applied City-wide.
Each project was evaluated utilizing the standard scoring method; fact sheets and cost estimates were also prepared along with typical cross-section details. The resulting assessment positions the City of San Diego to implement strategic improvements to comply with current and future regulations and forecast budget needs.
Municipal Waterways Maintenance Plan, City of San Diego Transportation and Stormwater Department, City of San Diego, California. Served as project manager to develop the Municipal Waterways Maintenance Plan (MWMP) and EIR for the City of San Diego’s on-going stormwater facility maintenance program. Coordinated preparation of the MWMP that details the planned maintenance activities, specific facility maintenance plans, biological compensatory mitigation sites, agency permitting procedures, and technical studies. Dudek also supports the City’s strategic outreach communications, including workshops with elected official, regulatory agencies, and non-governmental organizations.
North City Project Pure Water San Diego Program, City of San Diego Public Utilities Department, San Diego, California. Served as senior regulatory specialist for acquisition of Section 404, 401, and 1602 permits for impacts to vernal pool and other jurisdictional waters to expand the existing North City Water Reclamation Plant and construct an adjacent North City Pure Water Facility to provide 30 million gallons per day of potable recycled water.
Syphon Reservoir Environmental Regulatory Evaluation, Irvine Ranch Water District, Irvine, California. Served as the biological and regulatory task manager to determine feasibility for converting and expanding the existing Syphon Reservoir to a recycled water reservoir. Lead a team of biological and restoration specialists to develop the best approach to design and permit the project, while minimizing mitigation costs and processing delays. Developed a regulatory permitting engagement strategy to support Irvine Ranch Water District planning.
Hodges Reservoir Natural Treatment System, City of San Diego Public Utilities Department, San Diego County, California. Led a team to develop a conceptual design and identify early implementation phases for a natural treatment system (NTS) to reduce and remove nutrients and pollutants draining into Hodges Reservoir, a drinking water reservoir in San Diego North County, owned by the City of San Diego.
Salton Sea Species Conservation Habitat Project, California Department of Fish and Wildlife, Imperial County, California. Dudek provided the California Department of Fish and Wildlife and California Department of Water Resources assistance in the planning, design, and permitting of this wildlife habitat restoration project. Lead regulatory permitting specialist responsible for preparation of applications and processing of state and federal permits. Successfully completed a 404(b)(1) Alternatives Analysis and Section 7 Consultation for desert pupfish, to assist the U.S. Army Corps of Engineers in determining the Least Environmentally Damaging Practicable Alternative.
Bay Crossing Water Main Replacement, City of Newport Beach, California. Lead biologist and regulatory permitting specialist for the replacement of multiple water lines crossing Upper and Lower Newport Bay. Dudek prepared construction plans, coordinated with the US Army Corps of Engineers to confirm compliance with Section 408 with regards to federal navigation channels, completed terrestrial and marine biological assessments, and will be preparing CEQA documents, Section 401/404 waters permits applications, and a Coastal Development Permit for the project.
As-Needed Regulatory Services, Orange County Public Works Department, Orange County California. Served as Program Manager and facilitated completion of multiple task orders, including infrastructure permitting, restoration design and implementation, biological monitoring, regulatory fact sheets for internal staff training, and preparation of County-wide compensatory mitigation opportunities and constraints evaluation. 1 Shannon Brown, PE
TRASH TMDL AND PROGRAM COMPLIANCE
Shannon Brown is a civil engineer with 15 years’ experience as a consultant specializing in stormwater, water, and sewer infrastructure management, program implementation, and project design. Mr. Brown is experienced in a broad range of disciplines, including regulatory permit compliance, preparation of technical studies, hydrology and hydraulics modeling, and geospatial analysis. Mr. Brown also has a background in state and federal environmental compliance, including environmental impact documentation, special studies, and field data collection.
Relevant Project Experience
Small Municipal Separate Storm Sewer System Permit Compliance Program, City of Goleta, California. Served as technical reviewer and project engineer.
Dudek is currently supporting the City of Goleta through technical project implementation and extension of staff services. Dudek has played a key role in overhauling and redeveloping Goleta’s Phase II stormwater program to ensure all municipal operations and new development requirements meet or exceed the Small Municipal Separate Storm Sewer System permit provisions. Dudek combined local and regional stormwater expertise to develop a list of prioritized action items designed to address stormwater program needs based on each item’s relative threat to water quality, operational feasibility, and budget. Ongoing program support activities include preparation of technical reports and analyses, development of stormwater training materials and jurisdictional program procedures, regulatory audit preparation, drafting and issuance of notice of violations to City stakeholders, illicit connection/illicit discharge investigations, new development stormwater plan review, stormwater pollution prevention plan development, and post-construction BMP inspection.
Stormwater System Condition Assessment, City of San Marino, California. Served as the project engineer for the stormwater system assessment to address several key objectives. Performed a field reconnaissance and survey to model the existing stormwater system, including preparation of a geographic information system database, plan, implement and analyze a CCTV inspection plan, identify project to correct existing deficiencies, develop project costs and prioritize recommended CIP projects and identify potential ongoing maintenance activities.
Trash Amendments Planning, City of Carlsbad, California. Served as project engineer. Dudek prepared a regulatory compliance implementation plan and internal action plan. The implementation plan detailed installation of structural and nonstructural stormwater trash control BMPs throughout the City under a Track 2 compliance pathway and a citywide On-Land Visual Trash Assessment control monitoring program. Dudek also prepared an action plan that serves as a framework for internal implementation of the trash amendments, documenting annual steps for a multidepartment, collaborative effort to ensure compliance within the allotted 10-year time frame. In December 2018, the final implementation plan was submitted for approval to the San Diego Regional Water Quality Control Board, and an internal action plan was developed in 2019.
Education
California State University,
Fullerton
MS, Environmental
Engineering, 2017
University of California,
Davis
BS, Environmental and
Resource Science, 2009
Certifications
Professional Civil
Engineer (PE), California
No. 92771
OSHA 30-Hour
Construction Safety
Professional Affiliations
California Stormwater
Quality Association
(CASQA)
2 Drainage Master Plan, City of Temecula, California Serving as the lead engineer for the preparation of a drainage master plan for all City owned storm drain assets. Project scop includes updating the existing GIS data, performing hydrology and hydraulics modeling, providing recommendations on storm drain capital improvements and green infrastructure improvements, and preparing a drainage master plan to inform the capital improvement program.
Trash Amendments Compliance, Port of San Diego, California. Served as lead engineer and project manager.
Dudek has been supporting the Port of San Diego with their Trash Amendments compliance program since 2018.
Project scopes have included development of a State Water Resources Control Board required implementation program, development of internal guidance documents for strategic assessment and adaptive management, project design for trash capture BMP installation, and general NPDES permit guidance. Dudek has supported the Port with design and installation of 15 BMPs specifically for trash capture.
Trash Amendments Compliance, City of Victorville, California. Served as project manager. Project scope included an evaluation of existing and proposed trash control measures such as street sweepeing, industrial/commercial inspection programs, complaint enforcements, and structural BMP implementation as well as baseline trash surveys. Dudek produced an updated Implementation Plan for the City to submit to the Regional Water Quality Control Board and is conducting on-going trash surveys.
Municipal Waterways Maintenance Plan, City of San Diego, California. Served as project engineer. The Municipal Waterways Maintenance Plan supports the findings of a programmatic environmental impact statement for maintenance of more than 60 earthen and concrete-lined channels throughout the City. Project work included preparation of hydrologic and hydraulic assessments, associated technical reporting, and planning and construction-level channel maintenance plans. The hydraulic studies include Hydrologic Engineering Center – River Analysis System analysis to determine the extent of maintenance required to restore each channel’s flood control function while minimizing the impacts to sensitive environmental resources in the area.
As-Needed Project Support, City of Monterey, California. Served as project engineer. Dudek has supported City stormwater program tasks since 2018, including a stormwater fee study and development of the City’s trash amendment compliance plan. The fee study included analysis of the cost of City implementation of stormwater requirements associated with the Small Municipal Separate Storm Sewer System general permit. The analysis was intended to provide City decision-makers with information on current program costs, revenues, and options for fee-based cost-recovery scenarios for City compliance activities. For trash amendment compliance, Mr. Brown assisted in preparation of the City’s Track 2 Implementation Plan as well as development of internal planning documents for use by planning, engineering, and operations staff. 800.450.1818 | [email protected]