U 39 San Francisco, California
Revised Cal. P.U.C. Sheet No. 56296-E
Cancelling Revised Cal. P.U.C. Sheet No. 55837-E
Electric Sample Form No. 79-1220-02 Sheet 1
Interconnection Agreement for Net Energy Metering 2 (NEM2) of a Renewable Electric Generating Facility of 1,000 kW or Less, Except NEM2 Solar or Wind Facilities of 30 kW or Less,
and Virtual Net Energy Metering (NEM2V) of a Renewable Electric Generating Facility of 1,000 kW or Less
(Continued)
Advice 6976-E Issued by Submitted June 30, 2023
Decision Meredith Allen Effective June 30, 2023
Vice President, Regulatory Affairs Resolution
Please Refer to Attached
Sample Form
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING
FACILITY OF 1,000 KW OR LESS, EXCEPT NEM2
SOLAR OR WIND FACILITIES OF 30 KW OR
LESS, AND VIRTUAL NET ENERGY METERING
(NEM2V) OF A RENEWABLE ELECTRIC
GENERATING FACILITY OF 1,000 KW OR LESS
_______________________________
† Information collected on this form is used in accordance with PG&E’s Privacy Policy. Page 1 of 11 The Privacy Policy is available at pge.com/privacy. Form 79-1220-02 Advice 4773-G/6976-E
Automated Document, Preliminary Statement A June 2023
This INTERCONNECTION AGREEMENT FOR NET ENERGY METERING 2 (NEM) OF A RENEWABLE ELECTRIC GENERATING FACILITY OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET ENERGY METERING (NEM2V) OF A RENEWABLE ELECTRIC GENERATING FACILITY OF 1,000 KW OR LESS (Agreement) 1 is entered into by and between ____________________________________________ (Customer- Generator), and Pacific Gas and Electric Company (PG&E), a California Corporation. Customer- Generator and PG&E are sometimes also referred to in this Agreement jointly as “Parties” or individually as “Party.” In consideration of the mutual promises and obligations stated in this Agreement and its attachments, the Parties agree as follows:
1. SCOPE AND PURPOSE
1.1 This Agreement provides for Custom er-Generator to interconnect and operate a Renewable Electrical Generation Facility as defined in Schedule NEM2 (if this is a NEM2 Solar or Wind Generating Facility less than 30 kW, please use form 79-1151A- 02) (Generating Facility) in parallel with PG&E’s Electric System to serve the electrical loads connected to the electric service account that PG&E uses to interconnect Customer-Generator’s Generating Facility. Cu stomer-Generator’s Generating Facility is intended primarily to offset par t or all of the Customer-Generator’s own electrical requirements. Consistent with, and in order to effectuate, the provisions of Sections 2827 of the California Public Utilities Code and PG&E’s electric rate Schedule NEM2 (NEM2), Parties enter into this Ag reement. This Agreement applies to the Customer-Generator’s Generating Fac ilities identified below with the specified characteristics and generating capacity, and does not allow interconnection or operation of facilities different than those described.
2. SUMMARY AND DESCRIPTION OF CUSTOMER-GENERATOR’S GENERATING FACILITY
AND DESIGNATION OF OTHERWISE-APPLICABLE RATE SCHEDULE
2.1 A description of the Generating Facili ty, including a summary of its significant components, and a single-line diagram sh owing the general arrangement of how Customer-Generator’s Generating Facility and loads are interconnected with PG&E’s Electric System, is attached to and made a part of this Agreement. (This description is supplied by Customer-Generator as Appendix A).
2.2 Generating Facility identif ication number: __________________ (Assigned by PG&E).
1 Additional forms are available on PG&E’s website at http://www.pge.com/gen).
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page 2 of 11 Form 79-1220-02
Advice 4773-G/6976-E
June 2023
2.3 Customer-Generator’s electric serv ice agreement ID number: __________________ (Assigned by PG&E).
2.4 Name and address used by PG&E to locate the electric service account used to interconnect the Generating Facility with PG&E’s Electric System:
Name: _____________________________
Address: ___________________________
City/Zip Code: _______________________
2.5 The Gross Nameplate Rating of the Generating Facility: _______ kW.
2.6 The Net Nameplate Rating of the Generating Facility: _______ kW.
2.7 The expected annual energy production of the Generating Facility is _______ kWh.
2.8 Customer-Generator’s other wise-applicable rate schedule as of the execution of this Agreement is __________________.
2.9 The Generating Facility’s expected dat e of Initial Operat ion is _____ ____________.
The expected date of Initial Operation shall be within two years of the date of this Agreement.
2.10 Smart Inverters - For Customer-Generator applications received on or after September 9, 2017, the Customer-Generat or certifies that their inverter-based Generating Facilities fully comply with Section Hh of Rule 21, including configuration of protective settings and default settings, in accordance with the specifications therein.
Distribution Provider may require a field verification of the Customer-Generator’s inverter. Customer-Generator further agrees to cooperate fully with any such request and make their inverter available to the Dist ribution Provider for such verification.
Customer-Generator understands that in the event the inverter is not set in accordance with Section Hh of Rule 21, Custome r-Generator will need to cease operation of generating facility until verification is confirmed by Distribution Provider. (Solar inverter models and firmware versions that comply with Rule 21 Section Hh can be found at https://www.energy.ca.gov/programs-and-topics/topics/renewable- energy/solar-equipment-lists.)
Verification of compliance with such requirements shall be provided by the Customer- Generator upon request by PG&E in accordance with PG&E’s Electric Rule 21.
An “existing inverter” is defined as an in verter that is a component of an existing Generating Facility that meets one or more of the following conditions:
(a) it is already approved by PG&E for interconnection prior to September 9, 2017 (b) the Customer-Generator has submitt ed the interconnection application prior to September 9, 2017,
(c) the Customer-Generator provides evidence of having applied for an electrical permit for the Generating Facility installati on that is dated prior to September 9,
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page 3 of 11 Form 79-1220-02
Advice 4773-G/6976-E
June 2023
2017 and submitted a complete interconnection application 2 no later than March 31, 2018, or
(d) the Customer-Generator provides evidence of a final inspection clearance from the governmental authority having jurisdiction over the Generating Facility prior to September 9, 2017.
All “existing inverters” are not required to be Smart Inverters and are only subject to Section H of Rule 21. Customer-Generator r eplacing an “existing inverter” certifies it is being replaced with either:
(i) inverter equipment that complies with Section Hh of Rule 21, (encouraged); or
(ii) a conventional invert er that is of the same size and equivalent ability to that of the inverter being repl aced, as allowed in Rule 21 Section H.3.d.ii.
3. DOCUMENTS INCLUDED AND DEFINED TERMS
3.1 This Agreement includes the following exhibits that are specifically incorporated herein and made a part of this Agreement.
Appendix A Description of Generating Facility and Single-Line Diagram (Supplied by Customer-Generator).
Appendix B A Copy of PG&E’s Agreement for Installation or Allocation of Special Facilities (Forms 79-255, 79-280, 79-702) or Agreements to Perform Any Tariff Related Work (62-4527), if applicable (Formed by the Parties).
Appendix C Schedule NEM2 / NEM2V Customer-Generator Warranty That it Meets the Requirements for an Eligible Customer-Generator and Is an Eligible Renewable Electrical Generation Facility Pursuant to Section 2827 of the California Public Utilities Code (if applicable).
Appendix D NEM2 Load Aggregation Custom er-Generator Declaration Warranting NEM2 Aggregation Is Located On Same or Adjacent or Contiguous Property to Generator Parcel (if applicable)
Appendix E Customer-Generator Affidavit Warranting That NEM2V Arrangement Is Sized to Load (if applicable)
Appendix F NEMV, NEM2V, Storage (if applicable)
2 A complete application consists all of the following without deficiencies:
1. A completed Interconnection Application including all supporting documents and required payments, (continued next page)
2. A completed signed Interconnection Agreement,
3. Evidence of the Customer-Generator final inspection clearance from the governmental authority having jurisdiction over the generating system.
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page 4 of 11 Form 79-1220-02
Advice 4773-G/6976-E
June 2023
Appendix G Operating Requirements fo r Energy Storage Device(s) (when applicable)
In addition, PG&E Electric Tariff Rules and Rates, including but not limited to Electric Rules 2, 14, 15, 16, and 21, Schedule NE M2 (if applicable), Schedule NEM2V (if applicable) and Customer-Gener ator’s otherwise-applicable rate schedule, available at PG&E’s website at www.pge.com or by request, are specifically incorporated herein and made part of this Agreement.
3.2 When initially capitalized, whether in the si ngular or in the plural, the terms used herein shall have the meanings assigned to them either in this Agreement or in PG&E’s Electric Rule 21, Section C.
4. TERM AND TERMINATION
4.1 This Agreement shall become effective as of the last date entered in Section 20 below.
The Agreement shall continue in full force and effect until the earliest date that one of the following events occurs:
(a) The Parties agree in writing to terminate the Agreement. (b) Unless otherwise agreed in writing by the Partie s, at 12:01 A.M. on the day following the date the electric service account through which Customer- Generator’s Generating Facility is interconnected to PG&E is closed or terminated. (c) At 12:01 A.M. on the 61
st day after Customer-Generator or PG&E provides written Notice pursuant to Section 10 below to the other Party of Customer-Generator’s or PG&E’s intent to terminate this Agreement.
4.2 Customer-Generator may elect to termi nate this Agreement pursuant to the terms of Section 4.1(c) for any reason. PG&E may el ect to terminate this Agreement pursuant to the terms of Section 4.1(c) for one or more of the following reasons:
(a) A change in applicable rules, tariffs, or regulations, as approved or directed by the Commission, or a change in any local, stat e or federal law, st atute or regulation, either of which materially alters or otherwise affects PG&E’s ability or obligation to perform PG&E’s duties under this Agreement; or,
(b) Customer-Generator fails to take all corrective actions specified in PG&E’s Notice that Customer-Generator’s Generating Facility is out of compliance with the terms of this Agreement within the time frame set forth in such Notice; or, (c) Customer-Generator abandons the Gener ating Facility. PG&E shall deem the Generating Facility to be a bandoned if PG&E determines, in its sole opinion, the Generating Facility is nonoperational and Customer-Generator does not provide a substantive response to PG&E Notice of its intent to terminate this Agreement as a result of Customer-Generator’s apparent abandonment of the Generating Facility affirming Customer-Generator’s intent and ability to continue to operate the Generating Facility; or,
(d) Customer-Generator’s Generating Facility ceases to meet all applicable safety and performance standards set out in Section 5.
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page 5 of 11 Form 79-1220-02
Advice 4773-G/6976-E
June 2023
4.3 Notwithstanding any other provisions of this Agreement, PG&E shall have the right to unilaterally file with the Commission, pursuant to the Commission’s rules and regulations, an application to terminate this Agreement.
4.4 Any agreements attached to and incorporated into this Agreement shall terminate concurrently with this Agreement unless the Parties have agreed otherwise in writing.
5. GENERATING FACILITY REQUIREMENTS
5.1 Customer-Ge nerator’s Generating Fa cility must meet all applicable safety and performance standards established by the Na tional Electrical Code, the Institute of Electrical and Electronics Engineers, and a ccredited testing laboratories such as Underwriters Laboratories and, where applic able, rules of the Commission regarding safety and reliability including Rule 21.
5.2 Customer-G enerator shall: (a) ma intain the Generating Facility and Interconnection Facilities in a safe and pru dent manner and in conformance with all applicable laws and regulations including, but not limit ed to, Section 5.1, and (b) obtain any governmental authorizations and permits required for the construction and operation of the Generating Facility and Interconnection Facilities. Customer-Generator shall reimburse PG&E for any and all losses, damages, claims, penalties, or liability it incurs as a result of Customer-Generator's failure to obtain or maintain any governmental authorizations and permits required for co nstruction and operation of Customer- Generator's Generating Facility.
5.3 Customer-Ge nerator shall not commence parallel operation of the Generating Facility until PG&E has provided express written approval. Such approval shall normally be provided no later than thirty (30) business days following PG&E’s receipt of: (1) a completed Rule 21 Generator Interconnection Application (Form 79-1174-02), including all supporting documents and payments as described in the Application; (2) a signed and completed INTERCONNECTION AGREEMENT FOR A NET ENERGY METERING (NEM2/NEM2V) OF A RE NEWABLE ELECTRICAL GENERATION FACILITY OF 1,000 KW OR LESS, EXCEPT SOLAR OR WIND (Form 79-XXXX-02); and (3) a copy of the Customer-Generator’s final inspection clearance from the governmental authority having jurisdiction over the Generating Facility. Such approval shall not be unreaso nably withheld. PG&E shall have the right to have representatives present at the Commissioning Test as defined in Rule 21. Customer- Generator shall notify PG&E at least five (5) business days prior to the initial testing.
5.4 In order to promote the safety and reliability of the cust omer Generating Facility, the applicant certifies that as a part of each interconnection request for NEM2, that all major solar system components are on the verified equipment list maintained by the California Energy Commission and certifies that other equipment, as determined by PG&E, has safety certification from a nationally recognized testing laboratory.
5.5 Applicant certifies as a part of each interconnection request for NEM2 that (i) a warranty of at least 10 years ha s been provided on all equipment and on its installation, or
(ii) a 10-year service warranty or executed “agreement” has been provided ensuring proper maintenance and continued system performance.
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page 6 of 11 Form 79-1220-02
Advice 4773-G/6976-E
June 2023
5.6 Customers on this tariff must pay for th e interconnection of their Generation Facilities as provided in Electric Rule 21, pursuant to Decision 16-01-044.
6. INTERCONNECTION FACILITIES
6.1 Customer-Generator and/or PG&E, as appropriate, shall provide Interconnection Facilities that adequately pr otect PG&E’s Electric Syst em, personnel, and other persons from damage or injury, which may be caused by the operation of Customer- Generator’s Generating Facility.
6.2 Customer-Generator shall be solely resp onsible for the costs, design, purchase, construction, permitting, operation, and main tenance of the Interc onnection Facilities that Customer-Generator owns.
6.3 If the provisions of PG&E’s Electric Rule 21, or any other tariff or rule approved by the Commission, require PG&E to own and operate a portion of the Interconnection Facilities, Customer-Generator and PG&E shall promptly execute an Special Facilities Agreement that establishes an d allocates responsibility fo r the design, installation, operation, maintenance, and ownership of the Interconnection Facilities. This Special Facilities Agreement shall be attached to and made a part of this Agreement as Appendix B.
7. LIMITATION OF LIABILITY
Each Party’s liability to the other Party for any loss, cost, claim, injury, liability, or expense, including reasonable attorney’s fees, relating to or arising from any act or omission in its performance of this agreement, shall be limit ed to the amount of direct damage actually incurred. In no event shall either Party be liabl e to the other Party for any indirect, special, consequential, or punitive damages of any kind whatsoever.
8. INSURANCE
8.1. Customer-G enerator Facility is required to comply with standards and rules set forth in Section 5 and provide the following for insurance policies in place. (a) For NEM2V Customer-Generators onl y, to the extent that Customer- Generator has currently in force property insurance and commercial general liability or personal liability insurance, Customer-Generator agrees that it will maintain such insurance in force for the duration of this Agreement in no less amounts than those currently in effect. Pacific Gas and Electric Company shall have the right to inspect or obtain a copy of the original policy or policies of insurance prior to commencing operation. As long as Customer- Generator meets the requirements of this Section 8.1(a), Customer- Generator shall not be required to purchase any additional liability insurance. I have insurance. I hereby certify t hat there is presently insurance coverage in the amount of $_______________ for the Schedule NEM2V Generating Facility location.
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page 7 of 11 Form 79-1220-02
Advice 4773-G/6976-E
June 2023
Insuring Company’s Name: ____________________________________
Insurance Policy # ___________________________________________
I do not have insurance. I hereby certif y that there is presently $0 (zero) dollars of insurance for the Schedule NEM2V Generating Facility location.
8.2. Customer-Generator shall furnish the required certificates and all endorsements to PG&E prior to Parallel Operation.
8.3. The certificate shall provide thirty (30) calendar days’ written notice to PG&E prior to cancellation, termination, alteration, or material change of such insurance.
8.4. PG&E shall have the right to inspect or obt ain a copy of the original policy or policies of insurance.
If at any time during this agreement the Customer-Generator fails to meet the requirements in Section 5, the following insurance shall apply:
Customer-Generator shall procure and maintain a commercial general liability insurance policy at least as broad as the Insurance Services Office (ISO) commercial general liability coverage “occurrence” form; or, if Customer-Generator is an individual, then liability coverage with respect to premises and use at least as broad as the ISO homeowners’ or personal liability Insu rance occurrence policy form, or substitute, providing equivalent coverage no less than the following limits, based on generator size:
(a) Two million dollars ($2,000,000) fo r each occurrence if the Gross Nameplate Rating of the Generating Facility is greater than one hundred (100) kW; or
(b) One million dollars ($1,000,000) fo r each occurrence if the Gross Nameplate Rating of the Generating Facility is greater than twenty (20) kW and less than or equal to one hundred (100) kW; or
(c) Five hundred thousand dollars ($500,000) for each occurrence if the Gross Nameplate Rating of the Generating Facility is twenty (20) kW or less;
(d) Two hundred thousand dollars ($200,000) for each occurrence if the Gross Nameplate Rating of the Generating Facility is ten (10) kW or less and the Generating Facility is connected to an account receiving residential service from PG&E.
The insurance shall, by endorsement:
(a) Add PG&E as an additional insured;
(b) State that coverage provided is primary and is not in excess to or contributing with any insurance or self-insurance maintained by PG&E. (c) Contain a severability of interest clause or cross-liability clause
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page 8 of 11 Form 79-1220-02
Advice 4773-G/6976-E
June 2023
8.5. If Customer-Generator’s Generating Facility is connec ted to an account receiving residential service from PG&E and the requirement of Section 8.1 prevents Customer- Generator from obtaining the insurance required in this Section, then upon Customer- Generator’s written Notice to PG&E in accordance with Section 10.1, the requirements of Section 8.1 may be waived.
8.6. Customer-Generator may self-insure with approval from PG&E. Evidence of an acceptable plan to self-insure, at least th irty (30) calendar days’ prior to operations shall be submitted. Customer-Generators su ch as state agencies that self-insure under this section are exempt from Section 8.1.
If Customer-Generator ceases to self-insure to the level required hereunder, or if Customer-Generator is unable to provide continuing evidence of Customer- Generator’s ability to self-insure, Customer-Generator ag rees to immediately obtain the coverage required under agreement.
8.7. All required certificates, endorsements or letters of self-insurance shall be issued and submitted via email or mail to the following:
Pacific Gas and Electric Company
Attn: Electric Grid Interconnection – Contract Management 300 Lakeside Drive, Suite 210
Oakland, CA 94612
Email: [email protected]
9. INDEMNITY FOR FAILURE TO COMPLY WITH INSURANCE PROVISIONS
9.1 If Customer-Generator fails to comply with the insurance provisions of this Agreement, Customer-Generator shall, at its own cost, defend, save harmless and indemnify PG&E, its directors, officers, employees, agents, assignees, and successors in interest from and against any and all loss, liability, damage, claim, cost, charge, demand, or expense of any kind or nature (including attorney's fees and other costs of litigation) resulting from the death or injury to any person or damage to any property, including the personnel and property of the utility, to the extent that the utility would have been protected had Customer-Generator complied with all such insurance provisions. The inclusion of this Section 9.1 is not intended to create any expressed or implied right in Customer-Generator to elect not to provide any such required insurance.
9.2 The provisions of this Section 9 shall not be construed to relieve any insurer of its obligations to pay any insurance claims in accordance with the provisions of any valid insurance policy.
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page 9 of 11 Form 79-1220-02
Advice 4773-G/6976-E
June 2023
10. NOTICES
10.1 Any written notice, demand, or request r equired or authorized in connection with this Agreement (Notice) shall be deemed properly gi ven if delivered in person or sent by first class mail, postage prepaid, to the person specified below:
If to PG&E: Pacific Gas and Electric Company
Attention: Electric Grid Interconnection – Contract Management 300 Lakeside Drive, Suite 210
Oakland, CA 94612
Email: [email protected]
If to Customer-Generator:
Customer-Generator Name:
Address:
City:
Phone: ( )
F A X : ( )
10.2 A Party may change its address for Notices at any time by providing the other Party notice of the change in accordance with Section 10.1.
10.3 The Parties may also designate operat ing representatives to conduct the daily communications, which may be necessary or convenient for the administration of this Agreement. Such designations, includ ing names, addresses, and phone numbers may be communicated or revised by one Party’s Notice to the other.
11. REVIEW OF RECORDS AND DATA
11.1 PG&E shall have the right to review and obtain copies of Cu stomer-Generator’s operations and maintenance records, logs, or other information such as Generating Facility availability, mainte nance outages, circuit breake r operation requiring manual reset, relay targets and unusual events pertaining to Customer-Generator’s Generating Facility or its interconnection to PG&E.
11.2 Customer-Generator authorizes to releas e to the California Energy Commission (CEC) information regarding Customer -Generator’s facility, including customer name and Generating Facility location, size, and operational characteri stics, as requested from time to time pursuant to the CEC’s rules and regulations.
12. ASSIGNMENT
Customer-Generator shall not voluntarily as sign its rights nor delegat e its duties under this Agreement without PG&E’s written consent. Any assignment or delegation Customer- Generator makes without PG&E’s written consent shall not be valid. PG&E shall not unreasonably withhold its consent to Customer-Generator’s assignment of this Agreement.
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page 10 of 11 Form 79-1220-02
Advice 4773-G/6976-E
June 2023
13. NON-WAIVER
None of the provisions of this Agreement shall be considered waived by a Party unless such waiver is given in writing. The failure of a Pa rty to insist in any one or more instances upon strict performance of any of the provisions of this Agreement or to take advantage of any of its rights hereunder shall not be construed as a waiver of any such provisions or the relinquishment of any such rights for the future, but the same shall continue and remain in full force and effect.
14. DISPUTES
14.1 Dispute Resolution
Any dispute arising between the Parties r egarding a Party’s performance of its obligations under this Agreement or requirements related to the interconnection of the Generating Facility shall be resolved according to the procedures in Rule 21.
15. REVIEW OF RECORDS AND DATA
15.1 Applicable Tax Laws and Regulation
The Parties agree to follow all applicable tax laws and regulations, consistent with CPUC policy and Internal Revenue Service requirements.
15.2 Maintenance of Tax Status
Each Party shall cooperate with the other to maintain the other Party's tax status.
Nothing in this Agreement is intended to adversely affect the Distribution Provider's tax exempt status with respect to the issuance of bonds including, but not limited to, local furnishing bonds
16. GOVERNING LAW, JURISDICTION OF COMMISSION, INCLUSION OF PG&E’s TARIFF
SCHEDULES AND RULES
16.1 This Agreement shall be interpreted, governed, and construed under the laws of the State of California as if executed and to be performed wholly within the State of California without giving effect to choice of law provisions that might apply to the law of a different jurisdiction.
16.2 This Agreement shall, at all times, be subj ect to such changes or modifications by the Commission as it may from time to time direct in the exercise of its jurisdiction.
16.3 The interconnection and services provided under this Agreement shall at all times be subject to the terms and conditions set forth in the Tariff Schedules and Rules applicable to the electric service provided by PG&E, which Tariff Schedules and Rules are hereby incorporated into this Agreement by this reference.
16.4 Notwithstanding any other provisions of this Agreement, PG&E shall have the right to unilaterally file with the Commission, pursuant to the Commission’s rules and regulations, an application for change in rates, charges, classification, service, tariff or rule or any agreement relating thereto.
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page 11 of 11 Form 79-1220-02
Advice 4773-G/6976-E
June 2023
17. CRD POWER CONTROL SYSTEM CERTIFICATION
When applicable, Customer-Generator confirms that the Renewable Electrical Generation Facility including Energy Storage over 10 kW that has received UL 1741 CRD for Power Control Systems (PCS) certificat ion will comply with either No Gr id Charge or No Storage Export as defined in Schedule NEM2.
18. AMENDMENT AND MODIFICATION
This Agreement can only be amended or modified in writing, signed by both Parties.
19. ENTIRE AGREEMENT
This Agreement, including any incorporated Tari ff Schedules and Rules, contains the entire Agreement and understanding between the Partie s, their agents, and em ployees as to the subject matter of this Agreement. Each party also represents that in entering into this Agreement, it has not relied on any promise, inducement, representation, warranty, agreement or other statement not set forth in this Agreem ent or in the incorporated Tariff Schedules and Rules.
20. SIGNATURES
IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed by their duly authorized representatives. This Agreement is effective as of the last date set forth below.
PACIFIC GAS AND ELECTRIC COMPANY
(Customer-Generator’s Name)
(Signature) (Signature)
(Print Name) (Print Name)
(Title) (Title)
(Date) (Date)
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page 1 of 1 Form 79-1220-02, Appendix A
Advice 4773-G/6976-E
June 2023
APPENDIX A
DESCRIPTION OF GENERATING FACILITY
AND SINGLE-LINE DIAGRAM
(Provided by Customer-Generator)
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page 1 of 1 Form 79-1220-02, Appendix B
Advice 4773-G/6976-E
June 2023
APPENDIX B (If Applicable)
Any Rule 2 or Rule 21 Agreements for the Installation or Allocation of Special Facilities (Forms 79-255, 79-280, 79-702) or Agreements to Perform Any Tariff Related Work (62-4527)
(Formed between the Parties)
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page 1 of 3 Form 79-1220-02, Appendix C
Advice 4773-G/6976-E
June 2023
APPENDIX C
(NOT APPLICABLE TO SOLAR AND/OR WIND)
SCHEDULE NEM2 CUSTOMER-GENERATOR WARRANTY THAT IT
MEETS THE REQUIREMENTS FOR AN ELIGIBLE CUSTOMER-
GENERATOR AND IS AN ELIGIBLE RENEWABLE ELECTRICAL
GENERATION FACILITY PURSUANT TO SECTION 2827 OF THE
CALIFORNIA PUBLIC UTILITIES CODE
(This Affidavit is required every time a new NEM2 or NEM2V interconnection agreement for a Renewable Electrical Generation Facility is executed or whenever there is a change in ownership of the Generating Facility)
Check Type of Renewable Electrical Generation Facility:
biomass geothermal municipal solid waste
solar thermal fuel cell landfill gas
small hydroelectric
generation ocean wave digester gas
ocean thermal tidal current
NEM2 / NEM2V Customer-Generator (Customer) declares that (1) it meets the requirements to be an “Eligible Customer-Generator” and its Generating Facility.
(2) (a) meets the requirements of an “Renew able Electrical Generation Facility”, as defined in Section 2827(b)(5) of the California Public Utilities Code and (b) satisfies the definitions of the renewable resource for the Renewable Electrical Generation Facility in the latest version of the California Energy Commission’s (CEC’s) Renewables Portfolio Standard (RPS) Eligibility Guidebook and the Overall Program Guidebook.3 (Eligibility Requirements).
Included in these eligibility requirements (check as applicable) pursuant to Public Utilities Code section 2827(b)(5) and Public Resource Code Section 25741 paragraph 1(a):
3 The RPS Guidebooks can be found at: https://www.energy.ca.gov/programs-and- topics/programs/renewables-portfolio-standard
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page 2 of 3 Form 79-1220-02, Appendix C
Advice 4773-G/6976-E
June 2023
If the Renewable Electrical Gene ration Facility is a fuel cell, or otherwise uses renewable biogas or otherwise, Eligible Customer-Generator warrants that the fuel cell is powered solely with renewable fuel.
If the Renewable Electrical Generation Facility is a Small hydroelectric generating facility, customer warrants that it will not cause an adverse impact on instream beneficial uses, nor cause a change in the volume or timing of streamflow).
If the Customer uses biogas or a renewable fuel as the fuel for their Renewable Electric Generation Facility:
Eligible Customer-Generator warrants that the Renewable Generation Facility is powered solely with renewable fuel.
Eligible Customer-Generator warrants that, beginning on the date of Initial Operation and continuing throughout the term of this Agreement, Eligible Customer-Generator and the Generating Facility shall continue to meet the Eligibility Requirements. If Eligible Custom er-Generator or the Generating Facility ceases to meet the Eligibility Requirements, Eligible Customer-Generator shall promptly provide PG&E with Notice of such change pursuant to Section 10 of this Agreement. If at any time during the term of this Agreement PG&E determines, at its sole discretion, that Eligible Customer- Generator or Generating Facility may no longer meet the Eligibility Requirements, PG&E may require Eligible Customer-Generator to provide evidence that Eligible Customer-Generator and/or Generating Facility continues to meet the Eligibility Requirements, within 15 business days of PG&E’s request for such evidence. Additionally, PG&E may periodicall y (typically, once per year) inspect Producer’s Generating Facility and/or require documentation from Eligible Customer-Generator to monitor the Generating Facility’s compliance with the Eligibility Requirements. If PG&E determines at its sole judgment that Eligible Customer-Generator either failed to provide evidence in a timely manner or that it provided insufficient evidence that its Generating Facility continues to meet the Eligibility Requirements, then the Eligibility Status shall be deemed ineffective until such time as Eligible Customer-Generator again demonstrates to PG&E’s reasonable satisfaction that Eligible Customer- Generator meets the requirements for an Eligible Customer–Generator and/or the Generating Facility meets the requirements for a Eligible electrical generating facility (the Eligibility Status Change).
PG&E shall revise its records and the administration of this Agreement to reflect the Eligibility Status Change and provide Notice to Eligible Customer-Generator of the Eligibility Status Change pursuant to Section 10 of this Agreement. Such Notice sha ll specify the effective date of the Eligibility Status Change. This date shall be the first day of the ca lendar year for which PG&E determines in its sole discretion that the Eligible Customer-Generator and/or Generating Facility first ceased to meet the Eligibility Requirements. PG&E shall invoice the Eligible Customer-Generator for any tariff charges that were not previously billed during the period between the effective date of the Eligibility Status Change and the date of the Notice in reliance upon Eligible Customer-Generator’s representations that Eligible Customer-Generator and/or Generating Facility complied with the Eligibility Requirements and therefore was eligible for the rate treatment available under the Net Energy Metering provisions of PG&E’s Schedule NEM2 or NEM2V, Net Energy Metering Service for Eligible Customer-Generators.
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page 3 of 3 Form 79-1220-02, Appendix C
Advice 4773-G/6976-E
June 2023
Any amounts to be paid or refunded by Eligible Customer-Generator, as may be invoiced by PG&E pursuant to the terms of this warranty, shall be paid to PG&E within 30 days of Eligible Customer- Generator’s receipt of such invoice.
Unless otherwise ordered by the CPUC, this Agreement at all times shall be subject to such modifications as the CPUC may direct from time to time in the exercise of its jurisdiction.
I certify the above is true and correct,
Customer-Generator Signature:
N a m e :
T i t l e :
Date:
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page 1 of 2 Form 79-1220-02, Appendix D
Advice 4773-G/6976-E
June 2023
APPENDIX D
NEM2 LOAD AGGREGATION APPENDIX
(If Applicable)
Customer-Generator Declaration Warranting NEM2 Aggregation Is Located on Same or Adjacent or Contiguous Property to Generator Parcel
In accordance with Schedule NEM2, I, Customer-Generator represent and warrant under penalty of perjury that:
1) The total annual output in kWh of the generat or is less than or equal to 100% of the annual aggregated electrical load in kWh of the meters within the arrangement, including the load on the generating account itself (before being offset by the generator), and including any estimated future additional load; and
2) Each of the aggregated account meters associated with this NEM2 generator account are located either:
(i) on the property where the renewable electrical generation facility is located, or (ii) are located within an unbroken chain of contiguous parcels that are all solely owned, leased or rented by the customer-generator. For purposes of Load Aggregation, parcels that are divided by a street, highway, or public thoroughfare are considered contiguous, provided they are within an unbroken chain of otherwise contiguous parcels
that are all solely owned leased or rented by the
customer-generator.
For example, assume there are five parcels (A,
B, C, D, E, and F) that form a cluster of
contiguous parcels and D and E are separated
from A, B, C and F by a street, highway, or public
thoroughfare. For the purposes of participating in
Load Aggregation, all five parcels are considered
contiguous, provided they are otherwise
contiguous and all are solely owned, leased or
rented by the customer-generator. Refer to the
diagram at left (for illustrative purposes only.)
3) PG&E reserves the right to request a parcel map
to confirm the property meets the requirements of 2) above; and 4) Customer-Generator agrees to notify PG&E if there is any change of status that makes any of the participating meters ineligible for meter aggregation to ensure that only eligible meters are participating; PG&E will require an updated Appendix and Declaration form; and
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page 2 of 2 Form 79-1220-02, Appendix D
Advice 4773-G/6976-E
June 2023
5) Upon request by PG&E, I agree to provide documentation that all aggregated meters meet the requirements of Rate Schedule NEM2 Special Condition 6 including but not limited to parcel maps and ownership records.
Customer Generator’s Name Signature
Date Type/Print Name
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page1 of 1
Form 79-1220-02, Appendix E
Advice 4773-G/6976-E
June 2023
APPENDIX E
(If Applicable)
CUSTOMER-GENERATOR AFFIDAVIT WARRANTING THAT NEM2V
ARRANGEMENT IS SIZED TO LOAD
In accordance with Schedule NEM2V, I, Customer-Generator warrant that:
1) the Generator Account associated with this NEM2V agreement is sized to offset no more than part or all of the annual usage (kWh) requirements of all the Benefitting Accounts included in this NEM2V Arrangement, and
2) the Eligible Allocation Percentage established for each Benefitting Account is sized to offset no more than part or all or the annual usage (kWh) requirement for that specific Benefitting Account.
Service Address of Generator: ________________________________________________ ________________________________________________
Customer Generator’s Name Signature
Date Type/Print Name
Title
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page1 of 1
Form 79-1220-02, Appendix F
Advice 4773-G/6976-E
June 2023
APPENDIX F
(If Applicable)
NEMV, NEM2V Storage
Applicants adding storage pursuant to Schedules NEMV, NEM2V under the Special Condition for storage must include proper documentation per PG&E’s Distribution Interconnection Handbook (DIH).
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page 1 of 2 Form 79-1220-02, Appendix G
Advice 4773-G/6976-E
June 2023
APPENDIX G
Operating Requirements for Energy Storage Device(s)
(when applicable)
The following Operating Requirement(s) apply to the charging functions of the Generating Facility:
Producer’s storage device(s) will not consume power from Distribut ion Provider’s Distribution System at any time.
Producer’s storage device(s) will not cause the Host Load to exceed its normal peak demand.
Normal peak demand is defined as the highest amount of power required from the Distribution System by Producer’s complete facilities without the influenc e or use of the energy storage device(s).
To avoid upgrades or other technical mitigation items identified in the interconnection process, Producer has chosen the following Generating Facility operating constraint(s):
For the annual period between _____________ [Month/Day] and _____________ [Month/Day] And during the hours of ____________________________
The storage device(s) will consume no more than a total of ___ kW from the Distribution System.
This operating constraint voids the need for the following specific mitigation scope:
No other charging function limitation is required fo r this Generating Facilit y except the requirements above. Producer will be responsibl e for the costs of t he corresponding upgrades or other technical mitigations if at any time the Producer elects to forego or violates the operating requirement.
Consistent with current load service Rules, Distribution Provider is not required to reserve capacity for load. Producer is re sponsible to contact the utility for any modification to its equipment or change in operations that may result in increased load demand per Electric Rule 3.C.
If any operating requirement is specified above, Distribution Provider reserves the right to ask for data at the 15-minute interval level at any time to ve rify that the operating r equirement is being met.
INTERCONNECTION AGREEMENT FOR
NET ENERGY METERING 2 (NEM2)
OF A RENEWABLE ELECTRIC GENERATING FACILITY
OF 1,000 KW OR LESS, EXCEPT NEM2 SOLAR OR WIND
FACILITIES OF 30 KW OR LESS, AND VIRTUAL NET
ENERGY METERING (NEM2V) OF A RENEWABLE
ELECTRIC GENERATING FACILITY OF 1,000 KW OR
LESS
________________________________________
Automated Document, Preliminary Statement A Page 2 of 2 Form 79-1220-02, Appendix G
Advice 4773-G/6976-E
June 2023
Distribution Provider will make such request via a wr itten notice no more t han once per calendar quarter. Producer must provide such data wi thin 30 Calendar Days of the written request.
If the Generating Facility fails to adhere to the operating requirements at any time, it will be disconnected immediately in accordance with Rule 21 Section D.9 and not reconnected until an approved mitigation (e.g., supervising controls) is in place as determined by Distribution Provider.