City of San Mateo
Local Roadway Safety Plan
San Mateo City Council
April 15, 2024

Question for Council
• How should the following types of proposed systemic treatments be prioritized for implementation?
• Speed Management
• Leading Pedestrian Intervals
• Signal Visibility Enhancements
• No Right on Red treatment
• Centerline Hardening Treatment
2 Agenda

1. What is a Local Roadway Safety Plan?

2. LRSP vs Other Plans

3. Plan Development

4. Implementation and Monitoring

5. Next Steps
3 Framework for Safety
Improvements
Focus on all components and players
in roadway system
Understand mistakes will happen
and design a forgiving environment
Industry best practice approach for
roadway safety
Adopted by Caltrans and USDOT
4 What is a Local Roadway Safety Plan?
Analyzes historical crash patterns and trends
Prioritizes safety improvements based on crash data and stakeholder engagement
Identifies proven engineering and non-engineering strategies Meets federal safety plan guidance and Caltrans LRSP
requirements
5 LRSP vs Other Plans
6 Circulation Element
7 Goal C-1
 Design and implement a multimodal transportation network  Prioritizes walking, bicycling, and transit
 Sustainable, safe, and accessible for all users
 Connects the community using all modes of transportation  Reduces vehicle miles traveled (VMT) per capita

Strive San Mateo
General Plan 2040

High-
Level
Detailed
8 San Mateo Complete Streets Plan
2020 Bicycle
Master Plan
2012
Pedestrian
Master Plan
Reimagine
SamTrans
Caltrain 2040
Business Plan
Truck Route
Study and
Policy
Green
Infrastructure
Plan
Traffic Impact
Analysis
Guidelines
Neighborhood
Traffic
Management
Program
Strive San Mateo
General Plan 2040
Local Roadway Safety Plan
TOD Pedestrian
Access Plan
Fashion Island Boulevard Smart
Corridor and Mobility Hub
Vision
Zero
Action
Plan
LRSP vs Vision Zero Action Plan
Local Roadway Safety Plan
• Focuses on infrastructure improvements
• Works toward reducing fatal and severe injury
collisions
• Generally overseen by PW with input from
Safety Partners and community
Vision Zero Action Plan
• Reduce fatal and severe injury collisions by
a specific date
• Plan Development:
• CMO, Fire, PD, PW, and regional partners develop
actions to meet the goal
• Includes LRSP and Complete Streets Plan
recommendations
• Includes demographic-specific actions and
recommendations
• The Committee meets regularly following
adoption to identify actions that may be
needed to work toward the goal
9 Plan Development
10 Safety Partners
Engaged stakeholders and public throughout the plan development process 11 Top collision locations
Recommended Improvements:
• Best Practices
• Community feedback
Collision Trends
Community Feedback
Recommended Improvements:
• Best Practices
• Community Feedback
Plan Framework
12 Site-Specific Projects Systemic Treatments
Implementation
Site-Specific
Improvements
Top Collision Locations
13 • All collision data is mapped
• Collision severities assigned a
weighting in accordance with
AASHTO’s Highway Safety
Manual
14 Mapped Collision
Data
Top 10 Priority
Locations
Signalized Intersections

1. Humboldt Street/Poplar Avenue

2. Fashion Island Boulevard/Norfolk Street

3. Hillsdale Boulevard/Franklin Parkway

4. Peninsula Avenue/Delaware Street

5. Hillsdale Boulevard/Norfolk Street

6. El Camino Real/27th Avenue
15 Corridors

10. Hillsdale Boulevard from Saratoga Drive to
Norfolk Street
Unsignalized Intersections

7. El Camino Real/22nd Avenue

8. Humboldt Street/Indian Avenue

9. Humboldt Street/Tilton Avenue
Humboldt St/Poplar Ave Intersection –
Existing Configuration
16 Humboldt St

Humboldt St/Poplar Ave Intersection –
Proposed Improvement
17 Humboldt St

Systemic
Treatments
Collision Trends and Community Data Points
18 Systemic: Widely implementable improvements based on high-risk roadway features correlated with specific crash types
Collision Trends
19 Crash Frequency by Year
571
632 623
425
348
0 100
200
300
400
500
600
700
2017 2018 2019 2020 2021
Property Damage Only
Other Injury
Severe Injury
Fatal

2.9%

3.6% 3.3%

3.1%

4.3%
20 Mode & Severity
3.4% of reported crashes resulted in at
least one death or severe injury (18
annually)
More than 50% of fatal and severe
injury crashes involved someone
walking or riding a bike, compared with
15% of crashes overall
21 5
Crash Type & Frequency
Most frequent crash types
 Sideswipe
 Rear-end
 Broadside (right-angle)
Most frequent fatal/injury crash
types
 Vehicle-Pedestrian
 Vehicle-Bicyclist
 Broadside (right-angle)
22 66% of total
crashes
71% of
fatal/severe
injury crashes
San Mateo vs. Statewide Data
• California 2020-2024 Strategic Highway Safety Plan
• Statewide traffic safety plan
• Identified 16 challenge areas
• San Mateo data compared to Statewide Data
23 SHSP Challenge Areas
24 51%
36%
20%
23%
17%
7%
0% 10% 20% 30% 40% 50% 60%
Intersections
Pedestrians
Bicyclists
SHSP Challenge Area
Fatal/Severe Injury Collision Share
San Mateo
Statewide
30%
14%
14%
4%
34%
15%
12%
5%
0% 10% 20% 30% 40% 50% 60%
Aggressive Driving
Young Drivers
Aging Drivers
Distracted Driving
SHSP Challenge Area
Statewide
Community Input
25 Community
Input
Pop-Up Events
City webpage
StoryMap
Online survey
Posters and social media
outreach
26 Community Input
• 1,115 views (643 users)Project
Webpage
• 545 scans (485 unique scans)Project Poster
& Flyers
• 100 distributedBusiness Cards
• 507 commentsInteractive Map
• 696 visitorsStory Map
27 Community Input
Summary
Intersections
Red Light Running
Speeding
Pedestrians & Bicyclists
School Zones
28 Systemic Treatments
29 Speed
Management
• Addresses: All priority collision
types
• Cost: Varies
• Setting appropriate speed limits
• Design roadways for the speeds
we want
• Complete Streets Plan
30 Leading
Pedestrian
Intervals
(LPI)
 Addresses: Pedestrian
safety at signalized
intersections
 Cost: $10k-20k to
implement
31 Signal
Visibility
Improvements
 Addresses:
broadside collisions
 Cost: $200k – 400k
to implement
32 No Right Turn on Red
Treatment
 Addresses: right-turn collision
conflicts with pedestrians
 Cost: $2.5k - $50k, depending on
installation type
 Consideration for all LPI
intersections
 Can be installed locations with
high right-turn volumes, during
certain times of day, etc.
33 Centerline
Hardening
 Addresses: left-turning
conflicts with pedestrians
 Cost: $5k-20k/intersection
34 Systemic Treatments Summary
35 Treatment Type Issue Cost Timeline to
Implement
Difficulty to
Implement
Community Input
Speed management Vehicle-pedestrian
Vehicle-bicyclist
Broadside collisions
$$$$ Medium term
and ongoing ✓✓✓
Speeding
Peds/Bikes
School Zones
Leading Pedestrian
Interval
Vehicle-pedestrian
collisions
$ Short-term
✓ Intersections
Peds/Bikes
Signal Visibility
Enhancements
Broadside collisions $$ Short-term
✓ Intersections
Red Light Running
No Right on Red
Treatment
Vehicle-pedestrian
collisions
$-$$ Medium term
✓✓
Peds/Bikes
Centerline Hardening
Treatment
Vehicle-pedestrian $$ Medium term
✓
Peds/Bikes
School Zones
Intersections
Implementation &
Monitoring
36 Funding
Two site-specific projects already in the CIP:
Humboldt/Poplar Signal Modifications
Norfolk/Fashion Island Blvd Signal Modifications
Several other projects already completed or included in other planning efforts:
Peninsula Ave Bike Facilities
Hillsdale Blvd Improvements (Caltrans)
LPI installed ~10 years ago in Downtown
Site-Specific Projects and Systemic Treatments qualify for safety-related grant funds: SS4A and HSIP
37 Monitoring & Updating the Plan
Review crash data to track progress annually.
Revisit safety plan for broader updates every
three to five years.
Additional updates as determined with safety
partners due to new trends, technologies, or
strategies.
38 Next Steps
39 Adopt LRSP in
Spring/Summer
2024
1 Continue work on
projects already in
CIP
2 Seek grant funding
for identified projects
Request additional
CIP funding based on
identified priorities
3 Question for Council
• How should the proposed systemic treatments be prioritized for implementation?
40 Treatment Type Issue being addressed Cost Timeline to Implement
Difficulty to
Implement
Speed management
Vehicle-pedestrian
Vehicle-bicyclist
Broadside collisions
$$$$ Medium term and
ongoing ✓✓✓
Leading Pedestrian Interval Vehicle-pedestrian
collisions $ Short-term ✓
Signal Visibility Enhancements Broadside collisions $$ Short-term ✓ No Right on Red Treatment Vehicle-pedestrian
collisions
$-$$ Medium term ✓✓
Centerline Hardening Treatment Vehicle-pedestrian $$ Medium term ✓