Cities Index.
Agenda packet, special meeting

San Mateo City Council
May 6, 2024

Document
Agenda packet, special meeting
Meeting
May 6, 2024
Body
San Mateo City Council
Pages
38
Original file
5.9 MB
Text extracted from the city's file for reading and search. Open the original on sanmateo.primegov.com. That file is the official record.

CITY OF SAN MATEO
City Council Special Meeting
May 6, 2024
5:00 PM
City Hall Council Chamber
Entrance is on O’Farrell Street

COUNCIL MEMBERS
Lisa Diaz Nash, Mayor
Rob Newsom Jr., Deputy Mayor
Rich Hedges
Amourence Lee
Adam Loraine

AGENDA
THIS MEETING CAN BE ATTENDED IN PERSON OR REMOTE BY JOINING ZOOM – SEE CODES BELOW.

PUBLIC COMMENTS WILL BE ACCEPTED BOTH IN PERSON AND REMOTEL Y.

SEE END OF AGENDA FOR OPTIONS AND INSTRUCTIONS ON HOW TO PARTICIPATE IN THE MEETING.

To join via Zoom – click here:

Monday, May 6, 2024
To join via telephone: (408) 638-0968
Webinar ID: 843 2355 8389 Passcode: 117103

CALL TO ORDER
Roll Call
AB 2449 Requests and Considerations for Meeting Participation by Teleconference due to Just Cause or Emergency Circumstances

STUDY SESSION
The public will have an opportunity to comment during the consideration of these items.

1. Wireless Ordinance and Design Standards Update – Study Session Provide direction to staff as to what extent updates and amendments to the City’s wireless regulations should be prepared and brought back for consideration by the Sustainability and Infrastructure Commission and City Council.

CEQA:

This study session item is exempt from CEQA review because, as a study session, the Council cannot take any action. Therefore, there is no possibility of any effect on the environment. (Pub. Res. §21065.) CEQA review of the draft Ordinance and Design Standards will occur when those documents are presented to the Council.

ADJOURNMENT
----------------------------------------------------------------------------------------------------------------------------- AGENDAS:

Agendas and material are posted on the City’s website on the Friday preceding each Council Meeting and can be viewed on the City's website at
www.cityofsanmateo.org
. Any supplemental material distributed to the Council after the posting of the agenda will be made part of the official record.

WATCHING A MEETING ON TV:

City Council meetings are broadcast live on Comcast/channel 27, Wave/channel 26, or AT&T/channel 99.

For transmission problems during the broadcast, please call (650) 522-7099. For all other broadcast comments, call (650) 522-7040, Monday-Friday, 8 a.m. - 5 p.m.

WATCHING A MEETING ON A COMPUTER:

There are three ways to stream.
1) Public Meeting Portal
www.cityofsanmateo.org/publicmeetings
2) City YouTube channel and stream it on YouTube:
http://youtube.com/CityofSanMateo
3) Watch TV live stream:
https://www.cityofsanmateo.org/193/Channel-San-Mateo-Live-Stream

PUBLIC COMMENTS/REQUEST TO SPEAK

1 of 104

Prior to the Meeting
Send comments to:
[email protected]
until 4 p.m. the day of the meeting.

During the meeting
By Zoom:

Click the link at the top of the agenda and you’ll be added to the meeting. All attendees are muted by default. When the item of interest is open for consideration, select the “Raise Your Hand” icon and you will be called on at the appropriate time.

By telephone:

Call (408) 638-0968 and enter the conference ID found at the top of the meeting agenda. When the item of interest is open for consideration, select *9 to raise your hand. When called upon, press *6 to unmute, state your name and provide your comments.

In Person:

At the meeting complete a “Request to Speak” form, submit a request at the speaker kiosk or scan the QR code.

ACCESSIBILITY:

In compliance with the Americans with Disabilities Act, those with disabilities requiring special accommodations to participate in this meeting may contact the City Clerk’s Office at (650) 522-7040 or [email protected]
. Notification 48 hours prior to the meeting will
enable the City to make reasonable arrangements to ensure accessibility to this meeting.

2 of 104

CITY OF SAN MATEO
1 0
2 1
1 CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 1 Section Name: STUDY SESSION Account Number: 10-4662 File ID: 24-8633 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: Public Works Department
MEETING DATE: May 6, 2024
CONTENT UPDATED: May 3, 2024 – Updates are indicated in highlights.

SUBJECT:

Wireless Ordinance and Design Standards Update – Study Session RECOMMENDATION:

Provide direction to staff as to what extent updates and amendments to the City’s wireless regulations should be prepared and brought back for consideration by the Sustainability and Infrastructure Commission and City Council.

BACKGROUND:

The feedback requested from the City Council is set forth at the end of this report and will be described at the beginning of the staff presentation to the Council. Additionally, an overview of applicable federal and state law is set forth towards the end of this report and described in more detail in Attachment 5.

On July 16, 2018, the City Council adopted its first wireless ordinance as San Mateo Municipal Code (SMMC) Chapter

17.10, “Wireless Communication Facilities in the Public Right-of-Way” (Ordinance), which addresses small wireless facilities within the public rights-of-way.

Small wireless facilities are those that meet certain Federal Communications Commission (FCC) criteria, namely (1) specified height limits for the structure on which they are mounted, (2) each antenna is no more than three cubic feet in volume, (3) associated wireless equipment is no more than 28 cubic feet in volume, (4) the facilities do not result in human exposure to RF radiation in excess of applicable safety standards, (5) the facilities are not located on tribal lands, and (6) do not result in technical registration requirements.

After the Ordinance was adopted, the FCC adopted a Declaratory Ruling and Third Report and Order, FCC 18-133 (the “Small Cell Order”). The Small Cell Order imposed various new requirements on municipalities, which included a “technical feasibility” caveat to local aesthetic authority and a new “shot clock” for small wireless facilities that required approval or denial within 60 days for small cells on existing structures and within 90 days for small cells on new support structures.

In 2020, to comply with the Small Cell Order, the City began development of a new ordinance and associated design standards. In 2021, the City amended the Ordinance and adopted the Design Standards and Application Requirements (Design Standards) currently in effect.

In 2023, the City received numerous small cell permit applications, several of which were brought to the Sustainability and Infrastructure Commission for appeal hearings. Extensive public comments about the permit applications and the

3 of 104

CITY OF SAN MATEO
1 0
2 1
1 Ordinance were submitted in writing and at public meetings. It became apparent that the existing Ordinance and Design Standards are not serving the community’s interests in an orderly deployment process with rigorous design standards. The feedback from both community and industry stakeholders was to request amendments to the Ordinance, the Design Standards, and the City’s review process for permit applications. The City Council directed staff to explore amendments to the Ordinance which would be responsive to the concerns expressed by the community.

An update to the City’s Ordinance and Design Standards (Update) would incorporate stakeholder feedback as well as recommendations based on staff’s experience to date processing these applications. Staff’s approach to the Update thus far has included seeking feedback from the public and the telecom industry (telecom providers with active license agreements with the City). Multiple in-person meetings were held with the community to receive feedback and to discuss their concerns. Outside of the in-person meetings, the public was allowed to submit comments and suggestions, and approximately 50 proposed recommendations were received. Staff also invited all existing wireless small cell master license agreement holders (Industry) to submit comments and recommendations. In addition, a virtual meeting with Industry representatives was held to get a better understanding of their suggestions and feedback. Furthermore, the City has retained consultants experienced in this area to review comments from the public, industry, and staff, and which will ultimately result in the drafting of amendments to the Ordinance and Design Standards based on Council’s direction.

SUMMARIZED PUBLIC COMMENTS TO DATE:

The City received various recommendations and comments from the public. Below is a list of the most common requests grouped into categories. For the full compilation of public comments, please see Attachment 1. •Gap In Coverage: This feedback concerns requiring the applicant to demonstrate there is a significant gap in coverage in the application. The public has asked for signal maps, speed test data, geographic distribution of personal wireless service, and data from a drive test.
•Restrictions on Certain Land-Uses: Requests from the public included prohibiting small cells from residential and school zones altogether, imposing setbacks requirements from homes between 500 – 600 feet and including separate design guidelines specific to residential zones. In addition, the public has requested that the effect of small cell facilities on property values to be a factor in the City’s review process. •Appeal Process: These general requests from the public include increasing the appeal deadline and to require the burden of proof for appeals to be with the applicant, as opposed to the appellant. •Public Notice and Outreach: The feedback is two-fold. First, the public requests making the notices, which are distributed as part of every application, more visible and in additional languages. Second, the public has requested that applicants hold mandatory community meetings for each application. •Definitions and Clarity: The existing design standards utilize terms that are not explicitly defined, even if in common usage, such as “technically feasible.” The public would like terms that are critical to the application review process to be better defined.
•Required Facility Separation: The public has requested that small cell facilities are placed a minimum distance apart.
•Post-Installation: The public has requested a means of monitoring the RF emissions after the site begins operation either by requiring applicants or City staff to perform/submit annual RF inspections and prepare/submit RF compliance reports.
•Pole Options: Community members have asked for an outright prohibition on allowing wireless small cell facilities on city owned streetlight poles.
•City Internal Review Process: Community members have sought more visibility into what is being submitted before the beginning of review process such as an online portal hosting the applications. In addition, they would like to see 3rd party technical experts reviewing elements of the applications such as potential fire risk from wireless small cell facilities.

4 of 104

CITY OF SAN MATEO
1 0
2 1
1 SUMMARIZED INDUSTRY COMMENTS TO DATE:

The industry submitted their comments by redlining the existing design standards and Ordinance. Staff compiled the comments and recommendations and the feedback received. Below is a list of the most common requests grouped into categories. The comments from the industry are compiled in Attachment 2. •Installation Standards: The Industry recommends softening restrictions on streetlight circuit voltage impact to reduce situations triggering meter pedestals.
•Conformance with Other Regulations: The Industry requests that City requirements conform to other regulations such as FCC volume limits, CPUC regulations, and PG&E requirements. •Appeal Process: The Industry proposed that appeals be heard by a hearing officer rather than the Sustainability and Infrastructure Commission to streamline the application approval process. •Definitions and Clarity: The Industry wants to replace subjectivity with objectivity in the Design Standards, including their interpretation and application. A specific example is the current Design Standards require the proposed installation to be the “least obtrusive.”
•Pole Options: The Industry is proposing to expand the pole options available for wireless small cell facility installations.
•Application Requirements: Most of these requests seek to reduce the amount of information that needs to be submitted that is not legally required. Some of the proposed changes include reducing the radius to provide alternative sites in the alternative site analysis and reducing number of angles of the renders.

FEDERAL AND STATE LAWS:

This section contains a general explanation of key federal and state laws that apply to the processing of permit applications for small wireless facilities. A more detailed explanation is set forth in Attachment 5. In addition to the City Attorney’s Office, outside legal counsel will be available at the meeting to go over these concepts and answer any questions that the City Council may have.

I. Federal Telecommunications Act
Congress adopted the Telecommunications Act of 1996 (“TCA”) to, among many other things, facilitate personal wireless service facilities deployments nationwide. The adopted legislation preserved local land-use authority subject to specific limitations enumerated in the Act. Under those “specific limitations,” local regulations cannot (1) regulate based on environmental impacts from radiofrequency (“RF”) emissions, (2) unreasonably discriminate among functionally equivalent services; or (3) prohibit or effectively prohibit the provision of personal wireless services. In addition, local decisions must be made within a reasonable time and any denial requires a written decision based on substantial evidence in the written record. These limitations are germane to all personal wireless facilities in all regulatory classifications.

With regard to RF emissions, Congress authorized the FCC to establish national standards for human exposure limits to RF emissions, and preempted state and local regulations. Also, local governments may still treat facilities that create different visual, aesthetic, or safety concerns differently, as allowed by general zoning rules, notwithstanding the general prohibition on unreasonable discrimination amongst functionally equivalent services.

A “reasonable” time for local governments to act under the “shot clock” rules is generally 60 days to collocate a small wireless facility on an existing structure, and 90 days to process a small wireless facility that is not collocated. The ability to meet shot clock deadlines is important because failure to act within them gives rise to a claim for unreasonable delay.

Compliance is especially important in California because, as discussed in Part III below, failure to timely approve or deny may result in an automatic approval.

5 of 104

CITY OF SAN MATEO
1 0
2 1
1 II. Federal Laws for “Small Wireless Facilities” and “Eligible Facilities Requests” (EFRs) On September 27, 2018, the FCC adopted a Declaratory Ruling and Third Report and Order, FCC 18-133 (the “Small Cell Order”). The Small Cell Order covered many topics but the key changes in the law included: (1) a reinterpretation and new legal test for an “effective prohibition” that abrogates the significant gap element in prior judicial tests; (2) defines a new regulatory classification for “small wireless facilities”; (3) limited the fees that can be charged for small wireless facilities; (4) described specific limitations on local aesthetic regulations for small wireless facilities; and (5) established new shot clock rules specific to applications for these facilities.

Additionally, federal law requires that State and local governments “may not deny, and shall approve” any “eligible facilities request” for collocation, removal, or replacement of transmission equipment on an “existing wireless tower” or “base station” so long as it does not cause a “substant[ial] change in [that site’s] physical dimensions.” More information about small wireless facilities and “eligible facilities requests” is described in Attachment 5.

III. California Wireless Siting Laws
California Public Utilities Code Section 7901 provides that telephone corporations may construct facilities along public roads in ways and locations that do not “incommode” the public use of the road. While local governments cannot require telephone corporations to obtain a local franchise, rules related to aesthetics, noise, health and safety are fair game under Section 7901. Public Utilities Code Section 7901.1 also affirms local authority to regulate the time, place and manner in which telephone corporations access the right-of-way. These regulations relate to temporary construction activities and must be applied in a nondiscriminatory manner.

In addition to any federal remedies, California law provides for a “deemed approved” remedy for certain applications for wireless facilities if the City fails to act within the FCC shot clock. To be deemed approved, the City must have failed to act within the shot clock period, all public notices required for the application must be given, and the applicant must provide written notice to the City.

Under AB 965, state law now imposes specified rules on “batched” applications. Effective January 1, 2024, state law requires local public agencies to process substantially similar “broadband projects” (e.g., wireless facilities, fiber optic cable lines, etc.) submitted at the same time by the same applicant simultaneously under a single permit application.

These batches must be processed within the “presumptively reasonable” timeframe under applicable law, which includes timelines under both federal and state laws. Batched applications are subject to “deemed approved” regulations, within certain limits, and can include up to 50 projects for cities with populations over 50,000.

FEEDBACK REQUESTED FROM THE CITY COUNCIL:

Following staff outreach, stakeholder comments clearly favor an update to the City’s regulations for wireless facilities.

Comments from community members and associations favor restricting wireless small cell deployment within the City of San Mateo. Industry comments are more technical and mainly consist of making City design standards more objective and streamlining the permit review process.

Based on a review of all stakeholders’ input on potential amendments to the City’s Municipal Code and Design Standards, staff recommends that the City Council direct staff to evaluate potential updates to the City’s regulations for wireless facilities siting and prepare a draft update for public review and comment.

Specifically, does the City Council agree with staff recommendations to amend the Municipal Code and Design Standards to:

6 of 104

CITY OF SAN MATEO
1 0
2 1
1 1) Comply with state mandated batch-processing rules. 2) Explore objective design standards to make installations less intrusive. 3) Allow hearing officers to consider appeals and extend the appeal timeframe from 5 to 10 days. 4) Make on-site notices of proposed facilities more visible and in more languages. 5) Revise the design standards to be more objective, add a definition of “technically infeasible,” remove conflicting requirements, and clarify which standards apply to which design cases. 6) Maintain the existing 250-foot separation requirement between freestanding poles. 7) Require applicants to submit an annual radio frequency (RF) report for each installed facility. 8) Expand pole options to reduce impacts on the right-of-way, including more discretion to use freestanding poles when warranted.
9) Explore options to use third-party experts to assist with technical reviews. 10) Explore options to reduce the number of meter pedestals in the right-of-way. 11) Amend the design guidelines to be consistent with other applicable regulations. 12) Revise application requirements to require all relevant information to be submitted as part of the permit application for transparency and to allow staff and the public to better understand the proposal and feasible alternatives.
13) Adopt a fee to recover costs for appeal hearings, as there is currently no such fee.

NEXT STEPS:

Following Council direction, staff will prepare amendments to the Ordinance and Design Standards. The draft amendments will be presented in a future Sustainability and Infrastructure Commission meeting. Staff intends to present the draft Ordinance and Design Standards to the City Council following the SIC meeting for an ordinance introduction and consideration of revised Design Standards, following by adoption of the draft Ordinance at the next regular Council meeting.

BUDGET IMPACT:

There is no budget impact associated with this study session.

ENVIRONMENTAL DETERMINATION:

This study session item is exempt from CEQA review because, as a study session, the Council cannot take any action.

Therefore, there is no possibility of any effect on the environment. (Pub. Res. §21065.) CEQA review of the draft Ordinance and Design Standards will occur when those documents are presented to the Council.

NOTICE PROVIDED:

All meeting noticing requirements were met. Additionally, a public hearing notice was published for this study session.

ATTACHMENTS:

Att 1 – Consolidated Public Request List
Att 2 – Consolidated Industry Request List
Att 3 – Wireless Ordinance
Att 4 – Design Standards and Application Requirements
Att 5 – Federal and State Laws
Att 6 – Public Comments
STAFF CONTACT:

Jay Yu, Engineering Manager
[email protected]
(650) 522-7323

7 of 104

CITY OF SAN MATEO
1 0
2 1
1 Jason Hallare, Senior Engineer
[email protected]
650-522-7316

8 of 104

DS+O SECTION
Source Type Comment
Ordinance
Definitions
NCO
(meeting 2/7/24)
Definition Clarity Define what a "technical infeasibility" is.

Ordinance
Definitions
NCO
(Greenfire Law)
Definition Clarity Define "effective prohibition" based on rulings of the Ninth Circuit courts and the necessary information required.

Ordinance
Definitions
BC4AD
(letter 3/24)
Coverage Define "significant gap" based on First Circuits ruling of "whenever a provider is prevented from filling a significant gap in it's own service.

Ordinance
Tolling
NCO
(letter 2/14/24)
Appeal Add a provision to allow City to toll any shot clock to accommodate appeal hearings' scheduling and motion.

Ordinance
Appeals
NCO
(meeting 2/7/24)
Appeal Increase duration of the 5-day appeal window.

Ordinance
Appeals
NCO
(letter 2/14/24)
Appeal Remove that the Appellant has the burden of proof during appeals.

Ordinance
Violations and Fines
NCO
(letter 2/14/24)
RF Emissions Implement fines for non-compliance with permitted improvements and RF emissions.

Ordinance
Violations and Fines
BC4AD
(letter 3/24)
Implement fines and banning program for ERP violations (as a way to generate revenue).

Design Standards
Site Location
NCO
(meeting 2/7/24)
Residential
Restrictions
Treat residential areas as Restricted Sites. Restrict wireless installations in residential zones and within 500-ft of residential zones.

Design Standards
Site Location
NCO
(Greenfire Law)
Residential
Restrictions
Regulate proximity to residences.

Design Standards
Site Location
NCO
(meeting 2/7/24)
Private Property Do not allow wireless installations on private property.

Design Standards
Site Location
NCO
(letter 2/14/24)
Private Property Define preference for locating on private property over the ROW and prefer collocation on Macro or transmission towers.

Design Standards
Site Location
NCO
(Greenfire Law)
Residential
Restrictions
Provide specific restrictions on placement within residential areas, schools, and parks. Palo Alto has a 600-ft restriction from schools.

Design Standards
Site Location
NCO
(Greenfire Law)
Residential
Restrictions
Copy Encinitas "the technically feasible location farthest from all residences will be deemed the most preferred alternative" Design Standards
Pole Selection
NCO
(Greenfire Law)
Freestanding PolesDefine the preference of new freestanding poles where there are more prefered zones nearby.

Design Standards
Pole Selection
NCO
(meeting 2/7/24)
City Streetlights Do not allow City streetlights to be used/leased for wireless installs.

Design Standards
Pole Selection
BC4AD
(letter 3/24)
Design Do not allow strand mount antennas
Design Standards
Pole Selection
NCO
(Greenfire Law)
Design Add spacing requirements between all poles, not just between freestanding poles.

Design Standards
Aesthetic Standards
BC4AD
(letter 3/24)
Definition Clarity Define "least obtrusive" using the "least intrusive means" standard from Second and Third Circuit courts: "Allows for a meaningful comparison of alternative sites and identifies the best solution for the community, not merely the last one remaining"
Design Standards
Aesthetic Standards
NCO
(Greenfire Law)
Definition Clarity Revise "obstruction of views" to have a detailed definition of where facilities cannot be installed. Palo Alto restricts installs within the central 50% of a property's front PL.

Design Standards
Aesthetic Standards
NCO
(Greenfire Law)
Definition Clarity Maximally require facilities to be "stealth"

GENERAL PUBLIC INPUT
General Public Input 1 of 3
ATTACHMENT 1 - CONSOLIDATED PUBLIC REQUEST LIST

9 of 104

DS+O SECTION
Source Type Comment

GENERAL PUBLIC INPUT
Design Standards
Aesthetic Standards
NCO
(meeting 2/7/24)
Design Standard
Aesthetics
Limit the height of the antenna placement such that they're not inline with bedrooms.

Design Standards
Aesthetic Standards
NCO
(Greenfire Law)
Definition Clarity Revise "protection of trees" to allow for some flexibility with 'harmless' pruning for sites with more preferred locations.

Design Standards
Aesthetic Standards
NCO
(meeting 2/7/24)
Freestanding Poles Have separate aesthetic criteria for freestanding poles.

Design Standards
Aesthetic Standards
NCO
(letter 2/14/24)
Design Standard
Aesthetics
Include a criteria of Property Value consideration for adjacent parcels.

Design Standards
Aesthetic Standards
BC4AD
(letter 3/24)
RF Emissions Regulate the ERP at the antenna face of wireless facilties such that the equipment will not exceed the level necessary for telecommunications service.

Design Standards
Process and Procedures
NCO
(meeting 2/7/24)
Notices and
Meetings
Require mandatory neighborhood meetings.

Design Standards
Process and Procedures
NCO
(meeting 2/7/24)
Notices and
Meetings
Require notices to also be provided in Spanish and Chinese Design Standards
Process and Procedures
NCO
(meeting 2/7/24)
Process and
Procedures
Publicly post application packages that are still under review instead of waiting for public requests.

Design Standards
Process and Procedures
NCO
(Greenfire Law)
Process and
Procedures
Clarify that a technical expert consultant will be presumably required to review gaps.

Design Standards
Process and Procedures
NCO
(meeting 2/7/24)
Process and
Procedures
Require that Fire Department review applications.

Design Standards
Process and Procedures
NCO
(meeting 2/7/24)
Process and
Procedures
Allow public to attend an Applicants's weekly submittal meetings.

Design Standards
Process and Procedures
NCO
(letter 2/14/24)
Process and
Procedures
Define the appeal process including the behind the scenes communication and coordination.

Design Standards
Standard COAs
NCO
(meeting 2/7/24)
RF Emissions Require frequent RF assessment reports be submitted.

Design Standards
Standard COAs
NCO
(meeting 2/7/24)
RF Emissions Require City to perform annual RF inspections.

Design Standards
Standard COAs
NCO
(Greenfire Law)
Insurance and
Liability
Indemnification shall come from any parent entitiy, not just the permittee.

Design Standards
Standard COAs
NCO
(meeting 2/7/24)
Insurance and
Liability
Require pollution insurance to cover RF emissions.

Application
Submission Form
NCO
(meeting 2/7/24)
Insurance and
Liability
Require applicant certify all submitted materials are under the penalty of perjury.

Application
Submission Form
BC4AD
(letter 3/24)
Application Require applicants, upfront, provide written notice of any claim to an effective prohibition from the Ordinance, design standards, or app.

Application
Photo Simulations
NCO
(Greenfire Law)
Design Standard
Aesthetics
Require mock-ups of maximum expansion for future add-ons.

Application
Environmental
NCO
(Greenfire Law)
NEPA Clarify that the applicant must establish compliance with the FCC's NEPA regulations and provide proof of the necessary NEPA checklist completion.

General Public Input 2 of 3

10 of 104

DS+O SECTION
Source Type Comment

GENERAL PUBLIC INPUT
Application
Purpose and Technical
Objectives
NCO
(meeting 2/7/24)
Coverage Require applicant to submit "lack of coverage" information and verified via a "drive test"
Application
Purpose and Technical
Objectives
BC4AD
(letter 3/24)
Coverage Require applicants to submit Signal Maps, dropped call records, and perform drive tests.

Application
Purpose and Technical
Objectives
BC4AD
(letter 3/24)
Coverage Require applicants to submit speed test data sampling corresponding to a propagation model that generated the coverage maps.

Application
Purpose and Technical
Objectives
NCO
(Greenfire Law)
Coverage Require to detail the geographic distribution of personal wireless services currently available and explain the function of the service intended to be provided.

Application
Purpose and Technical
Objectives
BC4AD
(letter 3/24)
Coverage Defined that "inadequate coverage" shall not be where a frequency or frequencies its customers use are not the most preferred frequency of the carrier.

Application
Purpose and Technical
Objectives
NCO
(meeting 2/7/24)
Coverage Require applicant to state what type of service is to be provided (WiFi, Cellular, Broadband, 5G, etc.)
Application
Purpose and Technical
Objectives
BC4AD
(letter 3/24)
Coverage Require applicants explain the necessity/need of a site. "The technology required for the equipment to function and anything less will result in a prohibition of provision of service"..."Any situation involving a workable choice between or among alternatives is not a need or necessity."
Application
Structural Analysis
NCO
(Greenfire Law)
Structural Analysis Include wind and temperature in structural analysis. Include 100-yr flood resilience. Include description of launch and fall zones.

REFERENCES
NCO (Meeting 2/7/24) An in-person meeting between City staff and the NoCellOuts group at City Hall on 2/7/2024.

NCO (Greenfire Law) A letter written by Greenfire Law, PC (Ariel Strauss) on behalf of NoCellOuts dated 12/13/2023.

NCO (Letter 2/14/24) A letter of NoCellOuts comments regarding the staff Appeal Training Presentation for SIC meeting 2/14/2024.

BC4AD (Letter 3/13/24) A report of BC4AD comments on the Wireless ordinance, design standards, and application 3/2024 General Public Input 3 of 3

11 of 104

DS+O SECTION
Source Type Comment
Ordinance
Limited Exceptions
CC
(input 2/26/24)
Ordinance Allow the Director to grant limited exceptions without having to demonstrate prohibition of services.

Ordinance
Appeals
CC
(input 2/26/24)
Appeals Revise to use a different arbiter for appeals than the SIC. Suggests using the City Manager.

Design Standards
Pole Selection
CC
(input 2/26/24)
Design Standard -
More Options
Revise to allow existing non-standard, decorative, and/or traffic signals for support options.

Design Standards
Aesthetic Standards
CC
(input 2/26/24)
Definition and
Clarification
Revise to be less subjective and remove reference that may inferr the ability to regulate technology being proposed.

Design Standards
Aesthetic Standards
CC
(input 2/26/24)
Design Standard -
Compliance Update
Revise all volume limits to match Federal Law limits
Design Standards
Aesthetic Standards
CC
(input 2/26/24)
Design Standard -
Compliance Update
Revise to be consistent with standard PG&E requirements such as ground mounted meter pedestals where facilities are proposed within a median.

Design Standards
Aesthetic Standards
CC
(input 2/26/24)
Definition and
Clarification
Revise to clarify if the preference of pole-top attachment is not allowed by the pole owner, that pole-mounted or side-arm is acceptable.

Design Standards
Aesthetic Standards
CC
(input 2/26/24)
Design Standards -
Aesthetics
Remove language restriction that new overhead service drops are not allowed. CC states that if overhead service drops are in the area, this restriction will be discriminative. PUC 7901.1.

Design Standards
Aesthetic Standards
CC
(input 2/26/24)
Remove or clarify the language on existing overhead lines and requiring to overlash. CC states one company cannot overlash on another company.

Design Standards
Installation Standards
MLA
(Meeting 3/6/24)
Application - Circuit
tracing
Clarify that circuit tracing shall be performed under a separate permit.

Design Standards
Installation Standards
CC
(input 2/26/24)
Design - Technical Increase the maximum allowable voltage drop on streetlight circuits from 3% to 5%.

Design Standards
Installation Standards
CC
(input 2/26/24)
Design Standard -
Compliance Update
Remove smart meters from shrouding requirement as PG&E does not allow smart meters to be within shrouds (must be accessable to PG&E).

Design Standards
Installation Standards
CC
(input 2/26/24)
Design Standards -
Aesthetics
Remove restriction on warning stickers to not have their backgrounds match the pole color. Conceal/camo of the warning stickers defeats their purpose.

Design Standards
Installation Standards
CC
(input 2/26/24)
Application - Power
walks
Remove power walks from the streetlight requirements as City has never provided this service.

Application
Submission Form
CC
(input 2/26/24)
Application - Cost
Estimate
Remove Construction Cost estimate from the from. It has no merit on anything related to the permit review nor the fees.

Application
Construction Plans
CC
(input 2/26/24)
Application - Site
Survey
Remove requirement for a full site and boundary survey of entire blocks. CC claims this is "overly burdensom and can be
discriminatory"
Application
Construction Plans
CC
(input 2/26/24)
Application -
Elevation Views
Reduce number of elevation views from 4 different angles to 2.

Application
Prior Permits
CC
(input 2/26/24)
Compliance Update -
Application
Remove language for federal build-out requirements as that is a remnant of Macro facilities.

Application
Pole Owner Auth
CC
(input 2/26/24)
Application -
Verification
Remove structural certification from pole owner authorizations since pole owners (PG&E and AT&T) do not provide this.

Application
RF Report
CC
(input 2/26/24)
Application - RF
Emissions Detail
Clarify cumulative effects to be assessed where any nearby facility is within 150-ft of the proposed site.

INDUSTRY INPUT
Industry Input 1 of 2
ATTACHMENT 2 - CONSOLIDATED INDUSTRY REQUEST LIST

12 of 104

DS+O SECTION
Source Type Comment

INDUSTRY INPUT
Application
Noise Report
CC
(input 2/26/24)
Application - License
requirement
Replace licensed engineer certification with "acoustical expert" Application
Purpose and Technical
Objectives
CC
(input 2/26/24)
Coverage Remove requirement asking whether the project is to for coverage or capacity gaps. CC claims City cannot legally require proof of gap of coverage/capacity nor regulate based on gaps of
coverage/capacity.

Application
Purpose and Technical
Objectives
CC
(input 2/26/24)
Coverage Remove requirement asking if drive tests were performed for the data if they were.

Application
Purpose and Technical
Objectives
CC
(input 2/26/24)
Application -
Targeted use
Remove requirement to describe uses within the target service area and the negative impact if the project does not move forward.

Application
Purpose and Technical
Objectives
CC
(input 2/26/24)
Application - design
justification
Remove requirement to explain the factual reasons why a proposed location, antenna height, and equipment are necessary.

Application
Alt Sites Analysis
CC
(input 2/26/24)
Application - reduce
the ASA radius from
500feet to 250 feet.

Revise to reduce the ASA radius from 500-ft to 250-ft. CC claims this more accurately reflects the range of the technology.

Application
Alt Sites Analysis
CC
(input 2/26/24)
Application - Site
Analysis
Clarify that conceptual design info should only be required where an alternate site is considered feasible.

Application
Alt Sites Analysis
MLA
(Meeting 3/6/24)
Application - Site
Analysis
Clarify that the assessment should only consider existing poles in the ROW or frontyard PUEs, not within private property
(backyards).

Application
Structural Analysis
CC
(input 2/26/24)
Application -
Structural
Allow civils along with structurals to prepare and stamp the structural analysis reports.

Application
Structural Analysis
CC
(input 2/26/24)
Application
Structural
Revise to assess to Risk Category II instead of IV as these facilities and the proposed support structures fall under Risk Cat II per CBC.

REFERENCES
CC (Input 2/26/24) Doc files containing markups/revisions/comments from Crown Castle, Inc 2/26/2024 MLA (Meeting 3/6/24) A virtual meeting hosted by City and Wireless Providers with MLAs 3/6/2024 Industry Input 2 of 2

13 of 104

CITY OF SAN MATEO
ORDINANCE NO. 2021-18
Amend Various Sections of Chapter 17.10, “Wireless Communication Facilities in the Public Right-of-Way,” to Title 17 of the San Mateo Municipal Code
WHEREAS, The City has an existing Wireless Communication Facilities in the Public Right-of-Way ordinance codified in Chapter 17.10; and
WHEREAS, The City wishes to amend various sections of Chapter 17.10 to ensure compliance with Federal Communications Commission order titled “Declaratory Ruling and Third Report and Order in the Matter of Accelerating Wireless Broadband Deployment by Removing Barriers to Infrastructure Investment” and current law; and
WHEREAS, The City wishes to streamline the application process and adopt a comprehensive set of standards.

NOW, THEREFORE, THE COUNCIL OF THE CITY OF SAN MATEO ORDAINS AS FOLLOWS:

Section 1. Section 17.10.010 of the San Mateo Municipal Code is amended as follows:

17.10.010 Purpose and Intent
(a) The City of San Mateo intends this Chapter 17.10 to establish reasonable, uniform and comprehensive standards and procedures for wireless facilities deployment, construction, installation, collocation, modification, operation, relocation, and removal within the City's public right-of-way, consistent with and to the extent permitted under federal and California state law. Pursuant to 47 U.S.C. 332(c)(7), the City may not regulate the placement, construction, and modification of wireless service facilities on the basis of the environmental effects of radio frequency emissions to the extent that such facilities comply with the Federal Communications Commission’s regulations concerning such emissions. To the extent permitted by federal law, the standards and procedures contained in this Chapter are intended to, and should be applied to, protect and promote public health, safety and welfare, and also balance the benefits that flow from robust, advanced wireless services with the City's local values, which include without limitation, the aesthetic character of the City, its neighborhoods and community. This Chapter is also intended to reflect and promote the community interest by (1) ensuring that the balance between public and private interest is maintained on a case-by-case basis; (2) protecting the City's visual character from potential adverse impacts or visual blight created or exacerbated by wireless communications infrastructure; (3) protecting and preserving the City's environmental resources; and (4) promoting access to high-quality, advanced wireless services for the City's residents, businesses and visitors.
(b) This Chapter is not intended to, nor shall it be interpreted or applied to: (1) prohibit or effectively prohibit any personal wireless service provider's ability to provide personal wireless services; (2) prohibit or effectively prohibit any entity's ability to provide any interstate or intrastate telecommunications service, subject to any competitively neutral and nondiscriminatory rules, regulations or other legal requirements for rights-of-way management; (3) unreasonably discriminate among providers of functionally equivalent services; (4) deny any request for authorization to place, construct or modify personal wireless service facilities on the basis of environmental effects of radio frequency emissions to the extent that such wireless facilities comply DocuSign Envelope ID: BC6BDFC2-FD08-4578-ABEA-69423EE4F74F

14 of 104

Ordinance No. 2021-18 Page 2 of 11
Wireless Telecommunications Facilities ROW

with existing or future FCC's regulations concerning such emissions; (5) prohibit any collocation or modification that the City may not deny under federal or California state law; (6) impose any unfair, unreasonable, discriminatory or anticompetitive fees that exceed the reasonable cost to provide the services for which the fee is charged; or (7) otherwise authorize the City to preempt any applicable federal or California law.

Section 2. Section 17.10.020 of the San Mateo Municipal Code is amended as follows:

17.10.020 General Definitions
The abbreviations, phrases, terms and words used in this Chapter will have the meanings assigned to them in this Section unless context indicates otherwise. Undefined phrases, terms or words in this Section will have the meanings assigned to them in 47 U.S.C. § 153, as may be amended from time to time, and, if not defined therein, will have their ordinary meanings. In the event that any definition assigned to any phrase, term or word in this Section conflicts with any federal or state-mandated definition, the federal or state-mandated definition will control.
(a) Base Station means the same as defined by the FCC in 47 C.F.R. § 1.6100(b)(1), as may be amended. (b) City Council means the City Council of the City of San Mateo. (c) Collocation means the same as defined by the FCC in 47 C.F.R. § 1.60002(g), as may be amended. (d) CPUC means the California Public Utilities Commission established in the California Constitution, Article XII, § 5, or its duly appointed successor agency. (e) Design Standards and Application Requirements means the aesthetic and design standards and the wireless permit application requirements for wireless facilities adopted by the Director of Public Works, consistent with this Chapter.
(f) Director means the Director of Public Works of the City of San Mateo, or the Director's designee. (g) FCC means the Federal Communications Commission or its duly appointed successor agency. (h) FCC Shot Clock means the reasonable time frame within which the City generally must act on a given wireless application, as defined by the FCC and as may be amended from time to time. (i) Wireless Permit means the permit issued by the Department of Public Works for any work required in the public right-of-way for the installation or in support or otherwise related to a wireless facility, consistent with the Design Standards and Application Requirements adopted by the Director of Public Works consistent with this Chapter.
(j) Personal Wireless Services means the same as defined in 47 U.S.C. § 332(c)(7)(C)(i), as may be amended, which defines the term as commercial mobile services, unlicensed wireless services and common carrier wireless exchange access services.

DocuSign Envelope ID: BC6BDFC2-FD08-4578-ABEA-69423EE4F74F

15 of 104

Ordinance No. 2021-18 Page 3 of 11
Wireless Telecommunications Facilities ROW

(k) Personal Wireless Service Facilities means the same as defined in 47 U.S.C. § 332(c)(7)(C)(i), as may be amended, which defines the term as facilities that provide personal wireless services. (l) Pole License or City Pole License means the license that the department of public works may issue for any wireless facility installation on a City-owned pole located within the public right of way, consistent with the requirements of this Chapter.
(m) Public right-of-way or City right-of-way means any public street, public way, public alley, or public place and the space on, above or below it, and all extensions thereof, and additions thereto, under the ownership or control of the city of San Mateo and in its jurisdiction. (n) RF means radio frequency or electromagnetic waves generally between 30 kHz and 300 GHz in the electromagnetic spectrum range or otherwise within applicable legal exposure standards and limits. (o) Section 6409 means Section 6409(a) of the Middle Class Tax Relief and Job Creation Act of 2012, Pub. L. No. 112-96, 126 Stat. 156, codified as 47 U.S.C. § 1455(a), as may be amended. (p) Small Cell Wireless Facility(ies) means the same as defined by the FCC in 47 C.F.R. § 1.6002(l), as may be amended.
(q) Temporary Wireless Facilities means portable wireless facilities intended or used to provide personal wireless services on a temporary or emergency basis (r) Tower means the same as defined by the FCC in 47 C.F.R. § 1.6100(b)(9), as may be amended. (s) Transmission equipment means the same as defined by the FCC in 47 C.F.R. § 1.6100(b)(8), as may be amended.
(t) Wireless means any FCC-licensed or authorized wireless communication service transmitted over frequencies in the electromagnetic spectrum.

Section 3. Section 17.10.030 of the San Mateo Municipal Code is amended as follows:

17.10.030 Applicability
(a) Applicable Wireless Facilities. The provisions in this Chapter shall be applied to all wireless facilities, including, without limitation, all new facilities and existing facilities, within the City's public rights-of-way, including small cell wireless facilities, and all applications to construct, install, operate, collocate, modify, reconstruct, relocate or otherwise deploy wireless facilities within the City's public rights-of-way, including Section 6409 requests, except as may be expressly provided otherwise in this Chapter. (b) Exempt Wireless Facilities. Notwithstanding Section 17.10.030(a), the provisions in this Chapter will not be applicable to: (1) wireless facilities not proposed or currently located in the public right-of-way; (2) wireless facilities owned and operated by the City for public purposes; (3) amateur radio facilities; and (4) wireless facilities or equipment owned and operated by CPUC-regulated electric companies for use in DocuSign Envelope ID: BC6BDFC2-FD08-4578-ABEA-69423EE4F74F

16 of 104

Ordinance No. 2021-18 Page 4 of 11
Wireless Telecommunications Facilities ROW

connection with electrical power generation, transmission and distribution facilities subject to CPUC General Order 131-D.
(c) Special Provisions for Section 6409 Approvals. Notwithstanding Section 17.10.030(a), all requests for approval to collocate, replace, or remove transmission equipment at an existing wireless tower or base station located in the public right-of-way and submitted pursuant to Section 6409 will be reviewed under the general wireless permit application procedures provided in this Chapter, as well as the special Section 6409 provisions provided in Section 17.10.110 and the Design Standards and Application Requirements.

Section 4. Section 17.10.040 of the San Mateo Municipal Code is amended as follows:

17.10.040 Required Approvals
(a) Wireless Permit. A wireless permit, subject to the City’s prior review and approval in accordance with the procedures in this Chapter and the City’s Design Standards and Application Requirements, is required for any applicant seeking to construct, install, modify, maintain or engage in an activity relating to a wireless facility in, on, under, or above the public right-of-way prior to conducting any work related to such wireless facility. (b) City Pole License. Before any wireless facility is installed on a City owned pole located within the public right-of-way, wireless communications providers shall obtain a City pole license by entering into a master license agreement with the City in a form as approved by the City attorney, for the use of a City pole in a specified license area, and pay a license fee subject to the City’s fee schedule. Any applicant seeking a master license agreement shall additionally pay a master license agreement administrative fee subject to the City’s fee schedule to reimburse the City for reasonable costs in connection with its preparation, review of, and action upon the request for such an agreement. The applicant seeking a City pole license must also apply for and obtain a wireless permit.
(c) Other Permits and Regulatory Approvals. In addition to any permit or approval required under this Chapter, the applicant must obtain all other permits and regulatory approvals as may be required by any other federal, state or local government agencies, which includes without limitation any other permits and/or approvals issued by other City departments or divisions. Furthermore, any permit or approval granted under this Chapter or deemed to be granted or approved by law shall remain subject to any and all lawful conditions and/or legal requirements associated with such other permits or approvals. (d) Fees. All required fees, security instruments, and cash deposits related to the wireless permit, the City pole license, and other required permits and approvals consistent with this Chapter must be paid in full or be satisfied in order for a wireless permit or a City pole license to be issued by the City. In addition, City may seek reimbursement of the actual reasonable costs related to licensing, permitting, and administering wireless facilities in the public right-of-way as set by the City Council. Failure to comply with this provision shall be a basis to deny, revoke, or terminate the wireless permit, the City pole license or other applicable permit.

Section 5. Section 17.10.050 of the San Mateo Municipal Code is amended as follows:

DocuSign Envelope ID: BC6BDFC2-FD08-4578-ABEA-69423EE4F74F

17 of 104

Ordinance No. 2021-18 Page 5 of 11
Wireless Telecommunications Facilities ROW

17.10.050 Application Process and Requirements
(a) Permit Application Form. The applicant shall submit a complete, duly executed wireless permit application in a form approved by the City, which may be updated from time to time by the Director. (b) Generally Applicable Design Standards and Application Requirements. All new wireless facilities and collocations, modifications or other changes to existing wireless facilities must conform to the City’s Design Standards and Application Requirements, which may be updated from time to time by the Director to be necessary or appropriate to process any application governed under this Chapter, as authorized by the city council.
(c) Procedures for a Duly Filed Application. Any application for a wireless permit will not be considered duly filed or complete unless submitted in accordance with any and all written rules and policies the City may adopt consistent with this Chapter, including but not limited to the Design Standards and Application Requirements.
(d) Notice. Within five (5) calendar days of submitting an application for a wireless permit, the applicant shall provide written notice by first class U.S. mail to all property owners and residents within a 500’ radius of the proposed project site. In addition, the notice shall be posted in a minimum of three (3) locations near the project site. The content of the notice shall be in a form approved by the city and include information as specified in the Design Standards and Application Requirements, including but not limited to: 1) a general description of the proposed improvements and other equipment to be constructed or installed, and proposed site location; 2) applicant’s contact information for property owners and residents to submit comments regarding the project and the timeline to do so; 3) city’s webpage to access and be notified of decisions on applications; and 4) right to appeal a decision and timeline to do so.

Notices shall be in English and in other languages as deemed appropriate by the city. The applicant shall provide documentation of satisfaction of the notification requirement to the City prior to approval of the wireless permit.
(e) Additional Procedures. The City Council authorizes the Director to establish any other forms and procedures relating to the implementation of this Chapter.

Section 6. Section 17.10.060 of the San Mateo Municipal Code is amended as follows:

17.10.060 Peer and Independent Consultant Review
(a) Authorization. The City Council authorizes the Director, in the Director's discretion, to select and retain an independent consultant with specialized training, experience and/or expertise in telecommunications issues satisfactory to the Director in connection with any permit application. (b) Scope. The Director may request an independent consultant review on any issue that involves specialized or expert knowledge in connection with wireless facilities deployment or permit applications for wireless facilities, as further provided in the Design Standards and Application Requirements.

DocuSign Envelope ID: BC6BDFC2-FD08-4578-ABEA-69423EE4F74F

18 of 104

Ordinance No. 2021-18 Page 6 of 11
Wireless Telecommunications Facilities ROW

(c) Consultant Fees; Deposit. In the event that the Director elects to retain an independent consultant in connection with any permit application, the applicant shall be responsible for the reasonable costs in connection with the services provided as detailed in the Design Standards and Application Requirements. The City shall not issue any construction or grading permit to any applicant with any unpaid deposit requests or invoices.

Section 7. Section 17.10.070 of the San Mateo Municipal Code is amended as follows:

17.10.070 Decisions, Decision Notices, Limited Exceptions, Protests, Appeals (a) Decisions. The Director shall approve, conditionally approve, or deny a complete application for a wireless permit. A wireless permit shall be acted on within all processing timelines required by the FCC shot clocks, applicable state or federal laws, or other applicable timelines. (b) Required Findings for Approval. The Director may approve or conditionally approve an application for a wireless permit submitted under this Chapter when the Director finds all of the following:
(1) the applicant and the proposed wireless facility comply with all applicable requirements of this Chapter and the City Design Standards and Application Requirements; and (2) the application is deemed complete by the Director; and (3) the proposed wireless facility complies with all applicable federal, state and local laws, regulations, rules, restrictions and conditions, which includes without limitation, the California Building Standards Code or any local building codes; the Americans with Disabilities Act, and all applicable health and safety requirements, including Public Utilities Commission General Order 95, (and as these rules may be amended or superseded); General Plan and any applicable specific plan; the San Mateo Municipal Code; and any conditions or restrictions in any permit or other governmental approval issued by any public agency with jurisdiction over the project; and (4) the applicant has demonstrated that its proposed wireless facility will be in compliance with all applicable FCC rules and regulations for human exposure to RF emissions. (c) Conditional Approvals; Denials without Prejudice. Subject to any applicable federal or California laws, nothing in this Chapter is intended to limit the Director’s ability to conditionally approve or deny without prejudice any application governed under this Chapter as may be necessary or appropriate to protect and promote the public health, safety and welfare, and to advance the goals or policies in the General Plan and any specific plan, the San Mateo Municipal Code and/or this Section. (d) Limited Exceptions for Personal Wireless Service Facilities. In the event that an applicant claims that strict compliance with this Chapter and the Design Standards and Application Requirements would effectively prohibit the applicant's ability to provide personal wireless services, the Director may grant a limited exception from such requirements in accordance with the required findings provided in the Design Standards and Application Requirements.

DocuSign Envelope ID: BC6BDFC2-FD08-4578-ABEA-69423EE4F74F

19 of 104

Ordinance No. 2021-18 Page 7 of 11
Wireless Telecommunications Facilities ROW

(e) Decision Notices to the Applicant. After the director acts on an application, and within the timeframe provided in the Design Standards and Application Requirements or before the FCC Shot Clock expires (whichever occurs first), the Director or designee shall send a written notice to the applicant. In the event that the Director denies the application (with or without prejudice), the written notice to the applicant must contain: (1) the reasons for the decision and (2) instructions for how and when to file an appeal. (f) Decision Notice to Public. The decision on an application along with the appeal process, shall be posted on the city’s webpage on the same date as the decision is made. Notices to property owners and residents within 500’ of the project site shall be sent within the timeframe provided in the Design Standards and Application Requirements.
(g) Appeals. The applicant or any person who is a property owner or resident within 500’ of the project site may appeal any decision by the Director to approve or deny an application for a wireless permit. Appeals must be filed with the Secretary of the Sustainability and Infrastructure Commission within five calendar days following the Director’s decision. The Secretary shall set the appeal for hearing on the agenda for the next regular or special meeting of the Sustainability and Infrastructure Commission, or otherwise within a time frame needed to comply with all applicable state or federal laws. Appeals from an approval will not be permitted to the extent that the appeal is based on environmental effects from RF emissions that comply with all applicable FCC regulations. The Sustainability and Infrastructure Commission shall review the appeal de novo, with the appellant having the burden of proof to establish the basis for seeking a reversal of the Director’s decision, and issue a decision at the hearing. The decision of the Sustainability and Infrastructure Commission shall be final and not subject to any further administrative appeals.

Section 8. Section 17.10.080 of the San Mateo Municipal Code is amended as follows:

17.10.080 Standard Conditions of Approval
(a) Standard Conditions. All wireless facilities, whether approved by the Director or deemed approved or deemed granted by law shall be automatically subject to all standard conditions of approval as provided in Appendix C of the Design Standards and Application Requirements. (b) Modifications to Standard Conditions. The Director (or the Sustainability and Infrastructure Commission on appeal) shall have discretion to modify or amend any standard conditions of approval on a case- by-case basis as may be necessary or appropriate to protect and promote the public health, safety and welfare, allow for the proper operation of the approved wireless facility, maintain compliance with applicable laws and/or to advance the goals or policies in the General Plan and any specific plan, the San Mateo Municipal Code and/or this Chapter.

Section 9. Section 17.10.090 of the San Mateo Municipal Code is amended as follows:

DocuSign Envelope ID: BC6BDFC2-FD08-4578-ABEA-69423EE4F74F

20 of 104

Ordinance No. 2021-18 Page 8 of 11
Wireless Telecommunications Facilities ROW

17.10.090 Revocation; Abandonment
(a) Revocation. Any wireless permit, City pole license, or other authorized use of the public right-of-way granted under this Chapter may be revoked or modified for cause in accordance with the provisions of this Section.
(1) Revocation proceedings may be initiated by the Director. (2) Action. The Director shall act on the proposed revocation after the time for any appeal has lapsed.
(3) Required Findings. The Director may revoke or modify the permit, City pole license, or right to use, if it makes any of the findings provided in the Design Standards and Application Requirements. (4) Notice of Action. The Director shall issue a written determination of revocation and mail the determination to the permittee within the timeframe provided in the Design Standards and Application Requirements.
(5) A permittee whose permit or right has been revoked may have the revocation reviewed, upon written appeal to the Sustainability and Infrastructure Commission as set forth in this Chapter. (b) Abandonment. Wireless facilities no longer used to provide service shall be removed by the last known owner of record of such facility, at the sole cost of said owner and to the satisfaction of the City.

Section 10. Section 17.10.100 of the San Mateo Municipal Code is amended as follows:

17.10.100 Temporary Wireless Facilities
Temporary wireless facilities may be placed and operated within the City without a wireless permit only when a duly authorized federal, state, county or City official determines an emergency exists within a region that includes the City in whole or in part. The applicant must still obtain all other permits and regulatory approvals as may be required by any other federal, state or local government agencies, which includes without limitation other any other permits and/or approvals issued by other City departments or divisions. Any temporary wireless facilities placed pursuant to this Section must be removed within thirty calendar days after the date the emergency is lifted by a duly authorized federal, state, county or City official. Any person or entity that places temporary wireless facilities pursuant to this Section must send a written notice that identifies the site location and person responsible for its operation to the Director as soon as reasonably practicable.

Section 11. Section 17.10.110 of the San Mateo Municipal Code is amended as follows:

17.10.110 Special Provisions for Section 6409 Approvals (a) Applicability. This Section applies to all requests for approval to collocate, replace or remove transmission equipment at an existing wireless tower or base station located in the public rights-of-way DocuSign Envelope ID: BC6BDFC2-FD08-4578-ABEA-69423EE4F74F

21 of 104

Ordinance No. 2021-18 Page 9 of 11
Wireless Telecommunications Facilities ROW

submitted pursuant to Section 6409. For all such requests, the applicant shall seek a wireless permit under Section 17.10.040(a), and except for the notice requirements in Section 17.10.050(d), comply with all other requirements in this Chapter and any special Section 6409 requirements as provided in the Design Standards and Application Requirements.
(b) Additional Section 6409 Definitions. In addition to the definitions in Section 17.10.020, the abbreviations, phrases, terms and words used in this Section will have the following meanings assigned to them unless context indicates otherwise. Undefined phrases, terms or words in this Section will have the meanings assigned to them in 47 U.S.C. § 153, as may be amended from time to time, and, if not defined therein, will have their ordinary meanings. In the event that any definition assigned to any phrase, term or word in this Section conflicts with any federal or state-mandated definition, the federal or state-mandated definition will control. (1) Eligible Support Structure means the same as defined by the FCC in 47 C.F.R. § 1.6100(b)(4), as may be amended.
(2) Existing means the same as defined by the FCC in 47 C.F.R. § 1.6100(b)(5), as may be amended.
(3) Section 6409 request means all requests for approval to collocate, replace or remove transmission equipment at an existing wireless tower or base station located in the public rights-of-way submitted pursuant to Section 6409.
(4) Substantial change or Substantially change means the same as defined by the FCC in 47 C.F.R. § 1.6100(b)(7), as may be amended.
(c) Required Approval. Any request to collocate, replace or remove transmission equipment at an existing wireless tower or base station located in the public right-of-way submitted with a written request for approval under Section 6409 as indicated in the application form, shall require approval of a wireless permit under the general standards and procedures of this Chapter, unless specified otherwise or excepted, as well as any additional Section 6409 special provisions as provided in this Section and the Design Standards and Application Requirements.
(d) Additional Required Findings for Section 6409 Request Approval. The city staff may approve or conditionally approve a wireless permit application for a Section 6409 request when the city staff finds that the proposed project meets the approval requirements in this Chapter and the Design Standards and Application Requirements, as well as the following additional required findings:
(1) involves collocation, removal or replacement of transmission equipment on an existing wireless tower or base station;
(2) does not substantially change the physical dimensions of the existing wireless tower or base station; and
(3) remains in compliance with all applicable FCC RF standards.

DocuSign Envelope ID: BC6BDFC2-FD08-4578-ABEA-69423EE4F74F

22 of 104

Ordinance No. 2021-18 Page 10 of 11
Wireless Telecommunications Facilities ROW

(4) Criteria for Denial without Prejudice. Notwithstanding any other provision in this Chapter, and consistent with all applicable federal laws and regulations, the city staff may deny without prejudice any application for a Section 6409 request when the city staff finds that the proposed project:
(A) does not meet the findings required in Section 17.10.110(d); (B) involves the replacement of the entire eligible support structure; or (C) violates any legally enforceable law, regulation, rule, standard or permit condition reasonably related to public health or safety.
(e) Appeals. Any applicant may appeal the city staff’s written decision to deny without prejudice an application for Section 6409 request to the Director of Public Works within five (5) calendar days of the notice of decision. The written appeal together with any applicable appeal fee must be tendered to the City Clerk within five calendar days from the city staff’s written decision and must state in plain terms the grounds for reversal and the facts that support those grounds. The Director of Public Works shall be the appellate authority for all appeals from the city staff’s written decision to deny without prejudice an application for section 6409 approval.

The Public Works Director shall review the application de novo; provided, however, that the Public Works Director’s decision shall be limited to only whether the application should be approved or denied in accordance with the provisions in this Section and any other applicable laws. The Director of Public Works shall issue a written decision that contains the reasons for the decision, and such decision shall be final and not subject to any further administrative appeals.

Section 12. Section 17.10.120 of the San Mateo Municipal Code is amended as follows:

17.10.120 Review of Ordinance
Wireless communications technology is currently subject to rapid change. Innovations may render the need for specific sections of this Chapter to be reviewed and revised. The City Council may amend this Chapter or its rules and policies by resolution after a change to the FCC’s regulations or standards, or any applicable state or federal laws.

Section 13. Environmental Determination. This review of an ordinance is not a project subject to CEQA, because it can be seen with certainty that it will not cause a physical change in the environment. (Public Resources Code Section 21065.).

Section 14. Severability. In the event any section, clause or provision of this ordinance shall be determined invalid or unconstitutional, such section, clause or provision shall be deemed severable and all other sections or portions hereof shall remain in full force and effect.

Section 15. Publication. This Ordinance shall be published in summary in a newspaper of general circulation, posted in the City Clerk's Office, and posted on the City's website, all in accord with Section 2.15 of the City Charter.

DocuSign Envelope ID: BC6BDFC2-FD08-4578-ABEA-69423EE4F74F

23 of 104

Ordinance No. 2021-18 Page 11 of 11
Wireless Telecommunications Facilities ROW

Section 16. Legislative History and Effective Date. This ordinance was introduced on June 7, 2021, and adopted on June 21, 2021, and shall be effective 30 days after its adoption.

The foregoing ordinance was adopted by the City Council of the City of San Mateo, State of California by the following vote:

AYES: Council Members Rodriguez, Bonilla, Goethals, Lee and Papan NOES: None
ABSENT: None
ATTEST:

Patrice M. Olds, City Clerk

Eric Rodriguez, Mayor

DocuSign Envelope ID: BC6BDFC2-FD08-4578-ABEA-69423EE4F74F

24 of 104

25 of 104

Table of Contents

Chapter 1 Background and Purpose.................................................................................... 1 Chapter 2 Site Location, Pole Selection, & Design Standards .............................................. 3 Chapter 3 Application Process and Requirements .............................................................. 7 Chapter 4 Installations on Streetlight Poles ....................................................................... 14 Chapter 5 Installations on Utility Poles .............................................................................. 21 Chapter 6 Installations of Freestanding Poles .................................................................... 26 Chapter 7 Section 6409 Approvals ..................................................................................... 35 Chapter 8 Non-Conforming Wireless Facilities ................................................................... 36

Appendix .............................................................................................................................. 37 App A Wireless Communications Facilities Permit Application App B Wireless Communications Facilities Permit Application Checklist App C Standard Conditions of Approval for Wireless Communications Facilities

26 of 104

List of Figures

Figure 4.1 - Unacceptable Installation on Streetlight Pole Figure 4.2 – Acceptable Design on Streetlight Replacement Pole Figure 4.3 – Acceptable Design on Streetlight Foundation Replacement (Existing Pole) Figure 5.1 - Unacceptable Installations on Utility Poles Figure 5.2 – Acceptable Designs on Utility Poles
Figure 6.1 – Freestanding Wireless Facility Spacing Radius Figure 6.2 – Freestanding Wireless Facility in Amenity Zone Figure 6.3 – Freestanding Wireless Facility Sight-Line Requirements Figure 6.4 – Freestanding Wireless Facility Location between Property Lines Figure 6.5 – Freestanding Wireless Facility in Commercial Area

List of Tables

Table 4.1 – Design Standards For Installations on Streetlight Poles Table 4.2 – Procedures For Attachments to Streetlight Poles Table 5.1 – Design Standards For Installations on Utility Poles Table 5.2 – Procedures For Attachments to Utility Poles Table 6.1 – Design Standards For Installations of Freestanding Poles Table 6.2 – Procedures For Freestanding Poles
Table 7.1 – Procedures For Section 6409 Approvals

27 of 104

The Design Standards and Application Requirements - 2021

Page 1 ends

The purpose of this document, the Design Standards and Application Requirements, is to establish requirements and design standards for installing wireless communication facilities in the City of San Mateo’s right -of-way (ROW). The City of San Mateo seeks to permit wireless carriers to install wireless communications facilities , within the public right -of-way, in order to provide cellular coverage and capacity throughout the City , while ensuring facilities are well-maintained and do not
significantly detract from City streetscapes.

The City does not regulate the technologies
wireless carriers use, but it does have certain
powers to regulate the time, place, manner and
aesthetics of wireless communications facilities.

These design standards and requirements are
intended to c onvey design preferences and
application requirements.

However, the City recommends and prefers that wireless carriers avoid pole locations where equipment would be in front of architecturally significant features , or in locations where they would have visual impacts of significance, such as residential neighborhoods, near schools and parks.

Wireless providers should be made aware of the City’s preference for installation of wireless facilities on City owned streetlights, due to the improved aesthetic qualitie s of these facilities. Wireless providers s hall work with the City to establish a license agreement for the use of City owned streetlights . Secondly, the City recommends and prefers installation in areas not zoned residential, as well as near schools or parks. Residential areas should be considered as the last option.

These requirements are meant to provide a general overview of the procedures and requirements for installation of wireless communications facilities on both City owned and utility poles located within the public right of way. Additional conditions, information and/or procedures may be necessary based on the circumstances, project scope and the location being proposed by the applicant, or as deemed necessary by the City.

San Mateo Municipal Code Chapter 17.10, “Wireless Communications Facilities in the Public Right-of-Way” was adopted by City Council in 2021 (hereinafter the “Code”). The abbreviations, phrases, terms and words used in these Design Standards and Application Requirements will have the same meanings assigned to them in Chapter

17.10 of the Code . Undefined phrases, terms or words in this document will have the meanings assigned to them in 47 U.S.C. § 153, as may be amended from time to time, and, if not defined therein, wi ll have their ordinary meanings. If there are a ny discrepancies between the standards and requirements in this document and the Code, the Code shall prevail.

The applicant or its successors shall comply fully with all conditions specified in this document, or as modified by the Director of Public Works. Failure to comply with any condition shall constitute grounds for revocation of an applicable permit or license . In the event that radio frequency ( RF) emissions for the site exceed Federal Communications Commission ( FCC) standards, the applicant will be required to immediately cease and desist The purpose of this document is to
establish requirements for
installing wireless facilities in the
City of San Mateo’s right-of-way.
1 BACKGROUND AND PURPOSE

28 of 104

The Design Standards and Application Requirements - 2021

Page 2 ends

operation of the facility until such time that the violation is corrected to the satisfaction of the Director of Public Works.

Any carrier/provider authorized by the City to operate a specific wireless communications facility installation may assign the operation of the facility to another carrier licensed by the California Public Utilities Commission (CPUC) and FCC for that radio frequency provided that such transfer is made known to the City in advance of such operation, and all conditions of approval for the subject installation are carried out by the new carrier/provider.

Below are requirements to aid wireless communications providers in planning facility locations and compiling the necessary information to obtain a Wireless Permit as provided in San Mateo Municipal Code Chapter 17.10 “Wireless Communications Facilities in the Public Right -of-Way”. Wireless communications providers are also directed to review and comply with all other requirements as provided in Chapter 17.10, that can be found on the City’s website.

Three different types of wireless facility infrastructure installations are permitted within San Mateo rights of way. These types include:

1. Attachments to streetlight poles

2. Attachments to utility poles and utility lines

3. Freestanding wireless facility infrastructure

An overview of each type is included on the following pages.

29 of 104

The Design Standards and Application Requirements - 2021

Page 3 ends

2 SITE LOCATION, POLE SELECTION, & DESIGN

STANDARDS

To aid in minimizing visual and aesthetic impacts, all wireless communications facilities shall be designed, installed and located based on the following design preferences and standards below. In instances where a facility is proposed for installation at a location or in a manner that is not the highest preference as listed below, the applicant shall make a factual showing that all higher preferences are technically infeasible:

Site Location

1. The preferred locations shall be installed in the following order from most preferred to least preferred:

1) Manufacturing districts;
2) Transportation corridor or transit-orientated development districts; 3) Executive districts;
4) Central business districts;
5) Commercial districts;
6) Agricultural and open space districts;
7) Shoreline districts;
8) Residential districts with multi-family residential uses; 9) Residential districts with single-family residential uses.

Applications that involve lesser-preferred locations may be approved so long as the applicant demonstrates by clear and convincing evidence in writing that any more preferred locations or structures within 500 feet from the proposed site would be technically infeasible.

Pole Selection

1. Wireless facilities should be installed on existing standard streetlights or utility poles whenever technically feasible. If the application proposes a wireless facility on a new pole or structure, the applicant must identify all existing potential poles or support structures within 500 feet from the proposed site along the subject right-of-way that is available and technically feasible. The applicant must also demonstrate by clear and convincing evidence in writing that any of these identified existing poles or support structures within 500 feet from the proposed site would be technically infeasible, and/or that the new support structure is the only technical feasible option to the exclusion of any alternative or reasonable combination of alternatives.

2. If the applicant demonstrates by clear and convincing evidence in writing tha t the identified existing poles or support structures are not technically feasible, then the applicant may propose a new free - standing pole. New free-standing poles shall be located outside of driveways and intersection sight lines.

New free-standing poles shall be located near property corners or side property lines, and not directly in front of residences and businesses.

30 of 104

The Design Standards and Application Requirements - 2021

Page 4 ends

3. Wireless facilities shall not be located on non -standard, decorative streetlights, wooden streetlights or traffic signals.

4. All new wireless facilities require a new encroachment permit and comply with applicable standards and specifications required by the City.

Design Standards

1. Least Obtrusive. Proposed installations should be the least obtrusive possible in compliance with the City’s Design Standards, with regard to appearance, size, and location. If installations are available that are less obtrusive than those allowed by the City’s wireless communications facilities ordinance, applicants must use those installations unless the City determines that those installations are not feasible.

2. Pole heights shall be minimized. The maximum height of any facilities mounted on an existing utility pole shall not exceed 4 feet, plus the minimum separation from supply lines required by CPUC General Order 95 (GO 95), as may be amended or superseded. Legally required lightning arresters and beacons shall be included when calculating the height of facilities. For wireless facilities placed on any new freestanding poles, the pole height, inclusive of all equipment, shall not exceed 35 feet.

3. Obstruction of Views. New wireless communications facilities installations shall not obstruct views from habitable living areas (such as bedrooms, balconies, living rooms) to the maximum extent feasible.

4. Protection of Trees. Wireless communications facilities shall not damage existing trees. If pruning is required for the installation, a separate Tree Permit must be obtained from Parks and Recreation.

5. Interference with City Facilities and Other Uses. Proposed installations shall not cause any interference with: (i) the operation of any City facilities or services, including , but not limited to, signs, banners, lighting, communication, parking meters, traffic signs or signals, etc. ; (ii) any fire hydrants or water valves; (iii) access to any doors, gates, sidewalk doors, or other ingress and egress points to any building appurtenant to the rights-of-way; or (iv) access to any fire escape.

6. Accessory Equipment. Accessory equipment shall be located entirely on the pole in a vertical arrangement to the maximum extent feasible. Accessory equipment shall not collectively exceed 17 cubic feet in overall volume. Accessory equipment contains associated equipment for non-antenna gear.

7. Ground Mounted Equipment. Ground mounted equipment cabinets shall not be used, to the maximum extent possible. Ground mounted equipment shall not collectively exceed 17 cubic feet in overall volume. If utilized, ground mounted equipment shall be placed in a location that does not obstruct pedestrian or vehicular traffic and shall be located in the least conspicuous location avai lable within a reasonable distance from the pole. Ground mounted equipment should be installed within an existing or replacement street feature including, without limitation, bus stop shelters, trash bins, benches, kiosks, advertisement panels or other street furniture to conceal the equipment. Ground mounted equipment contains associated equipment for non-antenna gear.

31 of 104

The Design Standards and Application Requirements - 2021

Page 5 ends

8. Cables, Wires and Connectors. All cables, wires and other connectors shall be routed through conduits within a pole whenever possible, and all external conduits, conduit attachments, cables, wires and other connectors must be concealed from public view to the maximum extent feasible.

9. Lights. Wireless facilities may not include exterior lights other than as may be required under Federal Aviation Administration ( FAA), Federal Communications Commission ( FCC), other applicable governmental regulations or applicable pole owner policies related to public or worker safety. All exterior lights permitted or required to be installed must be installed in locations and within enclosures that mitigates illumination impacts on other properties to the maximum extent feasible. Any lights associated wi th the electronic equipment shall be appropriately shielded from public view. Flashing lights shall be installed.

10. Signage and Stickers. All wireless facilities must include signage that accurately identifies the equipment owner/operator, the owner/operator’s site name or identification number and a toll-free number to the owner/operator’s network operations center. Wireless facilities may not bear any other signage or advertisements unless expressly approved by the City, required by law or recommended unde r existing and future FCC or other United States governmental agencies for compliance with RF emissions regulations. RF notification s igns shall be placed where appropriate , and not at pedestrian eye level, unless required by the FCC or other regulatory ag encies. Large repetitive warning stickers shall not be installed.

11. Smart Meters. Wireless facility designers shall use PG&E Smart Meters or flat-rate billing with no electric meter, if feasible.

12. Noise. Wireless facilities and all accessory equipment and transmission equipment must comply with all City noise control standards and regulations and shall not exceed, either individually or cumulatively, the applicable ambient noise level in the subject zoning district. The applicant shall incorporate appropriate noise-baffling materials and/or strategies whenever necessary to avoid any ambient noise from equipment reasonably likely to exceed the applicable level. Fans shall not be utilized to the maximum extent possible.

13. Antenna Location. To the maximum extent technically feasible, a ntennas shall be placed at the top of the pole.

14. Shrouding. All antennas and associated cables, jumpers, wires, mounts, masts, brackets and other connectors and hardware shall be installed within a single shroud or radome to the maximum extent technically feasible. For wireless facilities on utility poles, all antennas shall be shrouded, and located at the top of the pole or strand- mounted, to the maximum extent technically feasible. For pole -top antennas, the shroud shall not exceed 2.5 times the median pole diameter and must taper down to pole.

For side-arm antennas, the shroud shall cover the cross arm and any cables, jumpers, wires or other connectors between the vertical riser and the antenna.

15. Antenna Volume. Each individual antenna associated with a single wireless facility shall not exc eed 3 cubic feet. The cumulative volume for all antennas on a single wireless facility shall not exceed: (A) 3 cubic feet in residential areas; or (B) 6 cubic feet in nonresidential areas.

32 of 104

The Design Standards and Application Requirements - 2021

Page 6 ends

16. Horizontal Projection. Side-mounted antennas, where permitted, shall not project: (A) more than 2 feet from the support structure; (B) over any roadway for vehicular travel; or (C) over any abutting private property. If applicable laws require a side-mounted antenna to project more than 2 feet from the support structure, the projection shall be no greater than required for compliance with such laws. Pole-mounted antennas and accessory equipment should be installed in a manner tha t minimizes horizontal projections, which includes, without limitation, installi ng equipment within the pole or as flush to the pole as possible.

17. Landscaping. All wireless facilities must include landscape features and a landscape maintenance plan when proposed to be placed in a landscaped area. The City may require additional landscape features to screen the wireless facility from public view, avoid or mitigate potential adverse impacts on adjacent properties or otherwise enhance the concealment. All plants proposed or required must be native and/or drought resistant.

18. Site Security Measures. Wireless facilities may incorporate reasonable and appropriate site security measures, such as locks and anti- climbing devices, to prevent unauthorized access, theft or vandalism.

All wireless facilities shall be cons tructed from graffiti -resistant materials. The City may require additional concealment elements as the approval authority finds necessary to blend the security measures and other improvements into the natural and/or built environment. The City shall not approve barbed wire, razor ribbon, electrified fences or any similar security measures.

19. Backup Power Sources. Permanent backup power sources within the public rights -of-way shall not be utilized.

20. Utilities. All cables and connectors for telephone, primary electric and other similar utilities shall be routed underground to the extent feasible in conduits large enough to accommodate future collocated wireless facilities. To the extent feasible, undergrounded cables and wires must transition directly into the pole base without any external doghouse. Meters, panels, disconnect switches and other associated improvements must be placed in inconspicuous locations to the extent possible and technically feasible.

The City shall not approve new overhead utility l ines or service drops merely because compliance with the undergrounding requirements would increase the project cost. In areas with existing overhead lines, new communication lines shall be “overlashed” with existing communication lines to the extent technically feasible. Microwave or other wireless backhaul is discouraged when it would involve a separate and unconcealed antenna.

21. Public Safety. No wireless facilities shall interfere with access to a fire hydrant, fire station, fire escape, water valve, underground vault, valve housing structure or any other public health or safety facility. No wireless facility installation, use or maintenance shall endanger or shall be reasonably likely to endanger the safety of persons or property. No wireless acilities shall unreasonably interfere with or unreasonably impede the flow of pedestrian or vehicular traffic including any legally parked or stopped vehic le, the ingress into or egress from any residence or place of business, the use of poles, posts, traffic signs or signals, hydrants, mailboxes, permitted sidewalk dining, permitted street furniture or other objects permitted at or near the location where the wireless facilities are located.

22. Replacement Pole Location. All replacement poles must: (1) be located as close to the removed pole as possible; (2) be aligned with the other existing poles along the public rights-of-way; and (3) be compliant with all applicable standards and specifications identified by or required by the City.

33 of 104

The Design Standards and Application Requirements - 2021

Page 7 ends

23. Compliance with Applicable Laws. All wireless facilities shall be installed and maintained in compliance with all applicable laws, regulations, codes or other rules, which include, at a minimum, the Uniform Building, National Electrical Code, and all FCC rules for human exposure to RF emissions. All wireless facilities and their locations shall comply with the Americans with Disabilities Act.

34 of 104

The Design Standards and Application Requirements - 2021

Page 8 ends

3 APPLICATION PROCESS AND REQUIREMENTS

Voluntary Informational Meeting with City Staff
Prior to submittal of an application, applican ts are encouraged to meet with City staff in order to present the scope, location, and types of poles utilized. Applicants can ask questions regarding the permit application and checklist requirements. This voluntary informational meeting with City staff does not cause the FCC Shot Clock to begin.

Voluntary Informational Neighborhood Meeting
After meeting with City staff and prior to submittal of an application, applicants are encouraged to hold a community meeting for a proposed wireless facility. This voluntary neighborhood meeting does not cause the FCC Shot clock to begin.

The purpose of the neighborhood meeting is for the applicant to explain the proposal to the surrounding property owners and residents, and to receive their input. This meeting should accomplish three main goals:

 Establishment of dialogue between the applicant and the surrounding property owners and residents.  Allow for project modification early in the process based on feedback.  Avoid further delays due to projects that may be inconsistent with the City’s standards.

As the applicant, you host and conduct the meeting; Public Works staff may be present as a resource only.

Public Works staff will work with the applicant to select a date, time, and location for the neighborhood meeting based on the following requirements:

 Meetings should be held on Monday through Thursdays starting no earlier than 6:30 p.m.  Meetings should be held at City Hall or conducted virtually.  Meetings should be 1 to 2 hours maximum.
 After 15 minutes, if there are no attendees, the meeting may be ended.

Meetings cannot be held on the following dates:

 Evenings of City Council or any City Commission meetings. Please check the C ity’s website at http://www.cityofsanmateo.org/index.aspx?nid=60
and
http://www.cityofsanmateo.org/index.aspx?nid=192 for the City Council, Sustainability and Infrastructure Commission, Parks and Recreation Commission, Community Relations Commission, and Planning Commission meeting dates.
 Legal holidays, common religious holidays or during the week of Thanksgiving and De cember 15th - January 1st.

Public Works staff will work with the applicant to coordinate a public notice for the community meeting.

35 of 104

The Design Standards and Application Requirements - 2021

Page 9 ends

The applicant is encouraged to bring presentation- sized graphics of the conceptual project plans, including an existing and proposed site plan and exterior elevations of all sides of the proposed facility, and a PowerPoint presentation. A mock -up of the proposed installation is highly recommended. The applicant is encouraged to record the meeting to aid in developing the meeting summary. If recorded, applicant must post a notice at the meeting site that indicates the meeting is being recorded.

All attendees shall sign in to ensure a complete record of attendees, including City staff and all members of the project team. Attend ees shall be asked to provide their email and/or mailing address for future notices. A member of the applicant’s team must be dedicated to taking detailed notes from the meeting and prepare a Meeting Summary.

The meeting agenda generally consists of the following:

 The applicant will typically open the meeting by describing the purpose of the meeting and introducing the team members. Public Works staff will remain throughout the meeting to answer any questions regarding wireless facility standards and the application process.  The applicant will manage the remainder of the meeting. The City recommends that the applicant’s PowerPoint presentation on the proposed project should include a description of the purpose of the installation, the way the design has responded to various aesthetic issues and important design features.

The applicant’s presentation team shall include the following staff: proj ect manager, RF engineer, area manager, technical staff, and dedicated staff for recording meeting notes.  After the formal presentation, the applicant may open the discussion to attendees, being available to answer questions or take comments. If questions are raised related to the application process or City regulations that are more appropriately answered by City staff, he or she will answer those questions.  Once discussion has finished, the applicant will typically close the meeting by describing the next steps in the process. No official action may be taken by the City at any community meeting.

The City requests that the applicant submit to the City a written summary of the meeting within seven (7) calendar days of the meeting. The Meeting Summary should include a list of attendees, the major issues raised, any questions and answers discussed during the meeting. Please send the draft meeting summary and the sign- in sheet to Public Works staff who attended the meeting for final editing. The applicant is encouraged to email the meeting summary to all the meeting attendees who provided an email address.

Application Submittal
The applicant shall submit a complete, duly executed permit application using the Wireless Communications Facilities Permit Application Form attached hereto in Appendix A, which may be updated from time to time by the Director . The applicant shall comply with any additional instructions or requirements provided on the application form.

The application shall include all required materials as listed in the Wireless Communications Facilities Permit Application Checklist attached hereto in Appendix B . The applicant shall also comply with the Application Requirements-Required Materials provided in Appendix B.

36 of 104

The Design Standards and Application Requirements - 2021

Page 10 ends

All applications , along with any required materials and deposit s, must be submitted to the City at a pre - scheduled appointment with City Staff. The City Staff shall use reasonable efforts to provide the applicant with an appointment within five (5) working days after the City Staff receives a written request.

Applications Deemed Withdrawn
To promote efficient review and timely decisions, an application will be automatically deemed withdrawn by the applicant when the applicant fails to tender a substantive response to City Staff within 90 calendar days after City Staff deems the application incomplete in a subsequent written notice to the applicant after a prior written notice of incompleteness has been provided. The City Staff may, in its discretion, grant a written extension for up to an additional 30 calendar da ys when the applicant submits a written request prior to the 90th day that shows good cause to grant the extension. Delays due to circumstances outside the applicant's reasonable control will be considered good cause to grant the extension.

Notice Requirements For Wireless Permits (Section 6409 Applications are exempt from noticing requirements)[SMMC 17.10.050(d)]
Within five (5) calendar days of submitting a wireless permit application, the applicant shall provide notice by first class US mail to all property owners and residents within a 500’ radius of the proposed project site. In addition, the notice shall be posted in a minimum of three (3) locations near the project site. The notices at a minimum shall contain the following:

1. A general description of the project, improvements and other equipment to be constructed or installed, including the proposed site location, photo simulations, samples or renderings depicting the finished installation in context with the surrounding natural and built environment.

2. Identify when construction, installation, excavation or other work would begin and end.

3. The applicant’s name and contact information as provided to the City on the application.

4. The contact name and information for the applicant’s representative.

5. A statement that interested parties may submit comments regarding the project within five (5) calendar days of the notice, to the applicant, and instructions on how to do so.

6. Include a link to the City’s Small Cell Infrastructure webpage:
https://www.cityofsanmateo.org/3865/Small-Cell-Infrastructure. Include language that, “Members of the public interested in receiving information on application decisions should sign up for notifications on the Small Cell Infrastructure webpage.”

7. A statement that interested parties may appeal any decision within five (5) calendar days of the Notice of Decision, and instructions on how to do so.

8. A statement that, “The FCC does not allow appeals when based solely on the environmental effects from radio frequency emissions that are compliant with applicable FCC regulations and guidelines.”

Notices shall be in English and other languages as deemed appropriate by the City.

Applicant shall provide notification documentation to the City prior to approval of any permit. Such documentation includes:

1. A copy of the notice. Notice shall be approved by City staff prior to mailing.

2. Proof of notification such as an affidavit attesting that the notice was mailed to all property owners and residents within 500’ of the project site. Proof shall include the method of delivery and a list of recipients.

37 of 104

The Design Standards and Application Requirements - 2021

Page 11 ends

3. A log of concerns, comments, questio ns, and /or actual responses from interested parties with information on the name of the persons and dates of the responses.

Standard Conditions of Approval [SMMC 17.10.080]
All wireless facilities, whether approved by the Director or deemed approved or deemed granted by law shall be automatically subject to all standard conditions of approval as provided in the Standard Conditions of Approval for Wireless Communications Facilities, attached hereto in Appendix C.

Decision Notices to the Applicant [SMMC 17.10.070(e)]
City staff shall provide written notice to the applicant within five (5) calendar days after acting on the application.

If the application is denied, the notice shall include the reasons for the decision and instructions for filing an appeal.

Notice of Decision to the Public [SMMC 17.10.070(f)]
City staff shall post notice of the decision by the City with the appeal process on the Small Cell Infrastructure webpage on the same date as when the decision notice is sent to the applicant. https://www.cityofsanmateo.org/3865/Small-Cell-Infrastructure

The online posted notice shall include the following:

1. Date of the posting and date by which appeals must be filed.

2. Location of the site.

3. Link to application materials.

4. Directions for filing an appeal.

5. Appellant’s name and contact information.

Members of the public , including property owners and residents within 500’ of the project site, interested in receiving information on decisions on applications should sign up for notifications on the Small Cell Infrastructure webpage. Notices to the property owners and residents within 500’ of the project site and others who have requested the notice of decision from the city shall be sent expeditiously and within one business day from the date of the decision on the application. Notice shall be sent electronically to the extent practicable.

Peer and Independent Consultant Review [SMMC 17.10.060] The Director may, in its discretion, select and retain an independent consultant with specialized training, experience and/or expertise in telecommunications issues satisfactory to the Director in connection with any permit application.

The Director may request an independent consultant review on any issue that involves specialized or expert knowledge in connection with wireless facilities deployment or permit applications for wireless facilities, which include without limitation: (a) permit application c ompleteness and/or accuracy; (b) pre -construction planned compliance with applicable regulations for human exposure to RF emissions; (c) post- construction actual compliance with applicable regulations for human exposure to RF emissions; ( d) whether and to what extent any technically feasible and/or potentially available alternative sites or concealment techniques may exist; ( e) the applicability, reliability and/or sufficiency of any information, analyses or methodologies used by the applicant to reach any conclusions about any issue with the City's discretion to review; and ( f) any other issue identified by the Director that requires expert or specialized knowledge. The Director may request that the independent consultant prepare written reports, testify at public meetings, hearings and/or appeals and attend meetings with City staff and/or the applicant.

38 of 104

The Design Standards and Application Requirements - 2021

Page 12 ends

In the event that the Director elects to retain an independent consultant in connection with any permit application, the applicant shall be responsible for the reasonable costs in connection with the services provided.

Before the independent consultant may perform any services, the applicant shall tender to the City a deposit in an amount equal to the estimated cost for the services to be provided, as deter mined by the Director. The Director may request additional deposits as reasonably necessary to ensure sufficient funds are available to cover the reasonable costs in connection with the independent consultant's services. In the event that the deposit exceeds the total costs for consultant's services, the Director shall promptly return any unused funds to the applicant after the wireless facility has been installed and passes a final inspection by the appropriate City official or his or her designee. In the event that the reasonable costs for the independent consultant's services exceed the deposit, the Director shall invoice the applicant for the balance. The City shall not issue any permit to any applicant with any unpaid deposit requests or invoices.

Limited Exceptions for Personal Wireless Service Facilities [SMMC 17.10.070(d)] In the event that an applicant claims that strict compliance with SMMC Chapter 17.10 and the se Design Standards and Application Requirements would effectively prohibit the applicant's ability to provide personal wireless services, the Director may grant a limited exception from such requirements in accordance with the following:

1. Required Findings. The Director shall not grant any limited exception unless the applicant shows that:

(A) the proposed wireless facility qualifies as a "personal wireless service facility" as defined in 47 U.S.C. § 332(c)(7)(C)(ii), as may be amended or superseded; and (B) the appl icant has provided the Director with a reasonable and clearly defined technical service objective to be achieved by the proposed wireless facility; and (C) the applicant has provided the Director with a written statement that contains a detailed and fact- specific explanation as to why the proposed wireless facility cannot be deployed in compliance with the applicable provisions in SMMC Chapter 17.10 and these Design Standards and Application Requirements; and
(D) the applicant has provided the Director with a meaningful comparative analysis with the factual reasons why all alternative locations and/or designs identified in the administrative record (whether suggested by the applicant, the City, public comments or any other source) are not technically feasible or potentially available to reasonably achieve the applicant's reasonable and clearly defined technical service objective to be achieved by the proposed wireless facility; and (E) the applicant has demonstrated to the Director that the proposed locati on and design is the least non-compliant configuration that will reasonably achieve the applicant's reasonable and clearly defined technical service objective to be achieved by the proposed wireless facility, which includes without limitation a meaningful comparative analysis into multiple smaller or less intrusive wireless facilities dispersed throughout the intended service area.

2. Limitations on Exceptions. Any limited exception shall be narrowly tailored to ensure that any deviations from the requirements in SMMC Chapter 17.10 or the Design Standards and Application Requirements are no greater than necessary to avoid an effective prohibition of the applicant's personal wireless services. Limited exceptions shall be based on the facts and circumstances of the applicant, its demonstrated technical service objectives at the time the exception is granted and the proposed wireless facility and shall not be deemed to establish any precedent for similar deviations for the same or any other applicant, location or wireless facility.

39 of 104

The Design Standards and Application Requirements - 2021

Page 13 ends

Appeals [SMMC 17.10.070(g)] (Section 6409 Applications are exempt from appeals by the public) The applicant or property owners/residents within a 500 foot radius of the proposed project site who received notice of an application, as provided in the Code, may appeal any decision to approve or deny an application for a Wireless Permit. The appeals shall be filed with the Secretary of the Sustainability and Infrastructure Commission within five (5) calendar days of the City’s Notice of Conditional Approval. Appeals received after the five (5) calendar days will not be considered. The appeal hearing shall be placed on the agenda for the next regular or special meeting of the Sustainability and Infrastructure Commission, or otherwise within a time frame needed to comply with all applicable state or federal laws. Written notice of the hearing date shall be provided to the appellant as soon as practicable and at least 3 calendar days prior to the hearing.

An appeal shall include the following at a minimum in order to be considered:

1. Location of the site being appealed.

2. A written statement that contains a detailed and fact-specific description of the reason for the appeal with reference to specific Code or Design Standard violations.

3. Appellant’s name and contact information.

Important Note: The FCC does not allow appeals if it is based on environmental effects from RF emissions that comply with all applicable FCC regulations.

Appeals from an approval of an application will not be permitted to the extent that the appeal is based on environmental effects from RF emissions that comply with all applicable FCC regulations. The Sustainability and Infrastructure Commission shall review the appeal de novo, with the appellant having the burden of proof to establish the basis for seeking a reversal of the Director’s decision, and issue a decision at the hearing. The decision of the Sustainability and Infrastructure Commission shall be final and not subject to any further administrative appeals. The decision shall be posted on the City’s webpage on the same date as the decision is made.

Revocation of Permits or Other Authorized Use
Any wireless permit, City pole license, or other authorized use of the public right-of-way granted under SMMC Chapter 17.10 may be revoked or modified for cause in accordance with the following:

1. Revocation proceedings may be initiated by the Director.

2. Action. The Director shall act on the proposed revocation after the time for any appeal has lapsed.

3. Required Findings. The Director may revoke or modify the permit, City pole license, or right to use, if it makes any of the following findings:

(A) The permittee obtained the approval by means of fraud or misrepresentation of a material fact; (B) The permittee substantially expanded or altered the use or structure beyond what is set forth in the permit or substantially changed the installation’s character; (C) The use in question has ceased to exist or has been suspended or abandoned; (D) Failure to comply with any condition of a permit issued; (E) Failure to comply with SMMC Chapter 17.10 and/or the Design Standards and Application Requirements;

40 of 104

The Design Standards and Application Requirements - 2021

Page 14 ends

(F) A substantive change of law affecting a utility’s authority to occupy or use the public right-of-way or the City’s ability to impose regulations relating to such occupation or use; (G) A facility’s interference with a City project;
(H) A facility’s interference with vehicular or pedestrian use of the public right-of-way; Failure to make a safe and timely restoration of the public right-of-way; or (I) For permits approved for a wireless facility on a City pole, termination of the applicable master license agreement or revocation of a City-owned pole license.

4. Notice of Action. The Director shall issue a written determination of revocation and mail the determination to the perm ittee within ten (10) calendar days of such determination. The decision shall be posted on the City’s webpage on the same date as the decision is made.

41 of 104

The Design Standards and Application Requirements - 2021

Page 15 ends

4 INSTALLATIONS ON STREETLIGHT POLES
The following are design requirements for installations on streetlight poles.

Table 4.1 – Design Standards For Installations on Streetlight Poles Luminaire • Per San Mateo standards or as designated by the Director of Public Works.

Electric Service/Metering • Per PG&E’s requirements. Smart Meters or flat-rate billing, if available. • All new electrical conduit shall be separate and enclosed in a braided sleeve. • Applicant shall survey and document all loads connected to circuit involved, including any non-streetlight load.
• Circuit tracing shall be completed using proper circuit tracing equipment. • Applicant shall conduct load analysis to evaluate loading level and voltage drop on the entire circuit the meter is receiving power from. Maximum voltage drop allowed for the entire streetlighting circuit is 3% (cumulative).
• Calculations shall be completed by an electrical engineer. • Reserve at minimum 40% of circuit load capacity (not breaker rating) for City’s use. • Replacement of light fixtures with LEDs is allowed to free up capacity in the circuit . LED fixtures shall meet City standards or as designated by the Director of Public Works. • Conductors shall be spliced at base of pole in pull box. If there is no existing pull box, installation of a new pull box will be required.
• Grounding rod shall be located in the pull box.

Communication/Backhaul
Service
• Applicant shall secure their own communication/backhaul arrangements independent of City facilities.
• A utility encroachment permit for fiber optic installations will be required.

Shroud • Antenna and Smart Meter shall be within a shroud , to the maximum extent technically feasible.

Hand Holes • A hand hole shall be provided at the top of the pole to maintain fiber and electrical service for streetlights and future attachments.

Color • Equipment shall be painted, treated or finished to match existing streetlight aesthetics. • Paint shall be powder coated over zinc paint.
• Equipment cabinets shall be galvanized.

Structural Analysis • Structural analysis shall be prepared and stamped by a professionally licensed structural engineer. Cert ification that the pole foundation and attachments meet or exceed design parameters shall be provided to the Public Works Department. The analysis shall comply with current building code standards. The wireless facility shall be designed for a risk category IV. • All structural components of the pole, standard, base, equipment cabinet, couplers, anchor bolts, luminaires, antenna , shroud, and other attachments to be used shall be designed in accordance with AASHTO’s Standard Specifications for Structural Supports for Highway Signs, Luminaires, and Traffic Signals, TIA- 222 rev G and ASC E 7-16 with IBC 201 8 (or latest standard), plus amendment for other local conditions.
• Any pole not meeting these requirements may not be used for a wireless facility installation or must be replaced.
• Certification is required for replacement poles.

Antenna • Antennas shall be shrouded and shall be located at the top of the pole to the maximum extent technically feasible.

42 of 104

The Design Standards and Application Requirements - 2021

Page 16 ends

• Individual antennas shall not exceed 3 cubic feet; cumulative volume for all antennas shall not exceed 3 cubic feet in residential areas or 6 cubic feet in nonresidential areas.

Stickers/Signs • Any on-pole cabinet and ground mounted utility box should be labeled with a (1) RF warning sticker, background to match pole color, no larger than 4 x 6 inches. Facing to the street near the elevation of the antennae, (2) 4-inch by 6-inch (maximum) plate with the provider’s name, location identifying information, and 24- hour emergency telephone number, and (3) No advertising, logos or decals.
• Existing traffic signs may be relocated to screen accessory equipment. CA MUTCD requirements for sign mounting height shall be met. Equipment screened by a sign must not change the silhouette of the sign as viewed by motorists. • Pole number labels shall be installed if missing.

Cables/Wiring • All cables shall be located inside the pole to the maximum extent technically feasible, labeled for identification and enclosed in a separate braided sleeve. • External conduit attachment to the pole is not permitted. • No wires or cables shall be visible on the exterior of the pole. • Splicing is permitted in the pull box at base of pole. Splicing of small wiring to streetlight wiring in the pole is not permitted. If the p ull box is not present, a new pull box will need to be installed, and conduit proved and rewired.
• Any existing conduit that is not usable shall be replaced with new conduit. • Foundations without conduit will need to have new conduit added to the existing foundation, or a new foundation installed in accordance with these Design Standards . • Fuses shall be located behind the hand hole or in the pull box. • Existing wires in pole must be removed before any drilling or welding takes place on pole.

Hardware • All mounting hardware shall be compatible with mounting surface and weather resistant.

Disconnect Switch • Bottom of disconnect switch shall b e mounted at a minimum of 7 feet above grade or per PG&E’s standards.

Equipment Cabinet • Maximum dimension shall be 17 CF.
• If required, fans shall not emit noise higher than City standards. • Passive louvers and/or other passive ventilation systems shall be primary means of temperature control.
• Cabinets shall be located such that it meets the Americans with Disabilities Act of 1990 and does not obstruct, impede, or hinder the usual pedestrian or vehicular travel way. • Equipment cabinet contains associated equipment for non-antenna gear.

43 of 104

The Design Standards and Application Requirements - 2021

Page 17 ends

Figure 4.1 - Unacceptable Installation on a Streetlight

Antenna must include a smooth
transition between pole and antenna
if feasible
Conduit, mounting bracket, and
other hardware must be hidden or in
a shroud
All conduit, wires and other
hardware shall be located internally
within pole

44 of 104

The Design Standards and Application Requirements - 2021

Page 18 ends

Figure 4.2 – Acceptable Design on a Streetlight Replacement

Antennas are located at the top of
the pole and have smooth transition
between pole and antennas
All conduit, wires and other
hardware are located internally
within pole
Accessory equipment is located
entirely in a cabinet at base of pole

45 of 104

The Design Standards and Application Requirements - 2021

Page 19 ends

Figure 4.3 – Acceptable Design on a Streetlight Foundation Replacement (Existing Pole)

Antennas are located at the top of
the pole
Accessary equipment is hidden by
existing signage

46 of 104

The Design Standards and Application Requirements - 2021

Page 20 ends

Table 4.2 – Procedures For Attachments to Streetlight Poles [SMMC] Pre-Application

1. Master License Agreement. Applicant executes a license agreement with the City for any City-owned poles in the public right-of-way. To start the process for preparation of a license agreement, applicant shall pay required fee per current Comprehensive Fee Schedule.

2. Voluntary Information al Meeting with City Staff. Applicant may request a voluntary pre -submittal informational meeting with City staff to review potential locations and streamline the review process. This voluntary informational meeting with City Staff does not cause the FCC Shot Clock to begin.

3. Voluntary Informational Neighborhood Meeting. Applicant is encouraged to hold a voluntary informational neighborhood meeting at City Hall or via Zoom to discuss the proposed project with residents and property owners within 500’ of the project location in order to receive feedback from interested parties. This voluntary neighborhood informational meeting does not cause the FCC Shot Clock to begin.

Application

4. Submittal Appointment. Applicant submits application, checklist, required materials, and deposit at a pre - scheduled appointment. City Staff shall use reaso nable efforts to provide the applicant with an appointment within five (5) working days after the City Staff receives a written request. • Shot Clocks Starts

5. Notice Requirements. Within five (5) calendar days of application submittal, applicant provides notice by first class United States mail to all property owners and residents within a 500’ radius of proposed project and posts in at least three locations near the project site.

6. City Review. The City shall have ten (10) calendar days from the submission of the application to determine whether the application is incomplete. If the City deems that the application is complete, it shall review the application in accordance with the FCC shot clock limits.

7. Power Walks. Applicant conducts power walks with City staff to determine point of electrical service connection. This shall be shown on the plans when applicant resubmits.

8. Applicant Resubmittal. If the City deems that the application is incomplete, the applicant responds to corrections and resubmits materials.
• Shot Clocks Restarts

9. Subsequent City Reviews and Resubmittals. City staff reviews and shall have ten (10) calendar days from the re- submission to determine whether the application is incomplete. If the City deems that the application is complete, it shall review the application in accordance with the FCC shot clock limits.

10. Conditional Approval. City staff may approve the application when all findings are met as provided in the Code. If findings are not met, application will be denied and applicant will need to resubmit.

11. Notice of Decision. A decision notice is sent to the applicant within five (5) calendar days after the City acts on an application. City staff shall post the N otice of Decision with appeal process on the Small Cell Infrastructure webpage when the decision notice is sent to the applicant. https://www.cityofsanmateo.org/3865/Small-Cell-Infrastructure [SMMC 17.10.070(e)] [SMMC 17.10.070(f)]

12. Limited Exceptions. If the applicant claims that strict compliance with the Design Standards and Application Requirements would effectively prohibit the applicant's ability to provide personal wireless services, City staff may grant a limited exception if required findings are met.

Appeals

13. Appeals. The applicant or any person who received notice of an application as provided in the Code may appeal any decision to approve or deny a Wireless Permit. Appeals must be filed with the Sustainability & Infrastructure Commission (S&IC) Secretary within five (5) calendar days of the Notice of Conditional Approval. If no appeals, project may be approved. If an appeal is received, staff will schedule a public hearing with S&IC to consider and act on the application in accordance with the required findings. If t he appeal is denied by the S&IC, the project may be approved. If the appeal is approved by the S&IC, the project is denied and the applicant will need to resubmit. [SMMC 17.10.070(f)]
Building Permit 14. Building Permit. Applicant applies for a Building Permit with the Building Division for PG&E release. A separate fee shall apply.

Encroachment
Permit

15. Encroachment Permit. Applicant applies for an Encroachment Permit with the Public Works Department.

A separate fee shall apply as provided in the City’s Fee Schedule. Encroachment permit shall include traffic control plans and insurance. Prior to construction, applicant shall contact Public Works for an inspection.

16. Performance Bond. Applicant shall provide Public Works with a Performance Bond in compliance with COA A.13 and B.15.

47 of 104

The Design Standards and Application Requirements - 2021

Page 21 ends

Post
Application

17. Certification. Applicant shall provide Public Works Post -Installation Certification in compliance with COA A.3 and B.5.

18. Contact Information. Applicant shall provide up-to-date contact information to Public Works in compliance with COA A.11 and B.13.

48 of 104

The Design Standards and Application Requirements - 2021

Page 22 ends

5 INSTALLATIONS ON UTILITY POLES
The following are general specifications for installations on utility poles.

Table 5.1 – Design Standards For Installations on Utility Poles

Electric Service/Metering • Per PG&E’s requirements. Smart Meters or flat-rate billing, if available. • All new electrical conduit shall be separate.

Communication/Backhaul
Service
• Applicant shall secure their own communication/backhaul arrangements independent of City facilities.
• A utility encroachment permit for fiber optic installations will be required.

Shroud • Antenna and Smart Meter shall be within a shroud , to the maximum extent technically feasible.

Color • Equipment shall be painted, treated or finished to match existing utility pole aesthetics.
• All electrical equipment, boxes, and other appurtenances shall have an appropriate National Electrical Manufacturers Association (NEMA) rating for outdoor uses and provide adequate protection.
• Paint shall be powder coated over zinc paint in accordance with NEMA standards. • Equipment cabinets shall be galvanized in accordance with NEMA standards.

Pole Selection Site Analysis • If the applicant proposes a wireless facility on a new utility pole, the applicant must first identify all existing potential poles or support structures within 500 feet from the proposed site along the subject right- of-way that is available and technically feasible. The applicant must also demonstrate by clear and convincing evidence in writing that any of these identified existing poles or support structures within 500 feet from the proposed site would be technically infeasible.

Antenna • Antennas shall be shrouded , and located at the top of the pole or strand - mounted, to the maximum extent technically feasible.
• Individual antennas shall not exceed 3 cubic feet; cumulative volume for all antennas shall not exceed 3 cubic feet in residential areas or 6 cubic feet in nonresidential areas.

Stickers/Signs • Any on-pole cabinet and ground mounted utility box should be labeled with (1) a RF warning sticker, background to match pole color, no larger than 4 x 6 inches.

Facing to the street near the elevation of the antennae, (2) 4 -inch by 6 -inch (maximum) plate with the provider’s name, location identifying information, and 24-hour emergency telephone number, and (3) No advertising, logos or decals. • Existing traffic signs may be relocated to screen accessory equipment. CA MUTCD requirements for sign mounting height shall be met. Equipment screened by a sign must not change the silhouette of the sign as viewed by motorists. • Pole number labels shall be installed if missing.

Cables/Wiring • To the maximum extent technically feasible, all cables shall be located inside a conduit painted to match the pole.

49 of 104

The Design Standards and Application Requirements - 2021

Page 23 ends

• No wires or cables shall be visible on the exterior of the conduit to the maximum extent technically feasible.

Hardware • All mounting hardware shall be compatible with mounting surface and weather resistant.

Disconnect Switch • Bottom of disconnect switch shall be mounted at a minimum of 7 feet above grade or per PG&E’s standards.

Equipment Cabinet • Maximum dimension shall be 17 CF.
• If required, fans shall not emit noise higher than City standards. • Passive louvers and/or other passive ventilation systems shall be primary means of temperature control.
• Cabinets shall be located such that it meets the Americans with Disabilities Act of 1990 and does not obstruct, impede, or hinder the usual pedestrian or vehicular travel way.
• Equipment cabinets contains associated equipment for non-antenna gear.

Safety Zones • A safety zone is required per the latest CPUC GO 95

Pole Owner • Applicant shall provide written authorization from the pole owner. • Authorization shall indicate that the pole is structurally sound for additional loads.

50 of 104

The Design Standards and Application Requirements - 2021

Page 24 ends

Figure 5.1 - Unacceptable Installations on Utility Poles

Accessary equipment is not painted
to match the wood pole
Wires are not in a conduit
Abrupt transition from pole to
antenna

51 of 104

The Design Standards and Application Requirements - 2021

Page 25 ends

Figure 5.2 – Acceptable Designs on Utility Poles

Strand mounted wireless facility
Wiring is located in a conduit
Accessary equipment is painted to
match the wood pole and shrouded

52 of 104

The Design Standards and Application Requirements - 2021

Page 26 ends

Table 5.2 – Procedures For Attachments to Utility Poles [SMMC] Pre-Application

1. Voluntary Information al Meeting with City Staff. Applicant may request a voluntary pre -submittal informational meeting with City staff to review potential locations and streamline the review process. This voluntary informational meeting does not cause the FCC Shot Clock to begin.

2. Voluntary Informational Neighborhood Meeting. Applicant is encouraged to hold a voluntary informational neighborhood meeting at City Hall or via Zoom to discuss the proposed project with residents and property owners within a 500’ radius of the project location in order to receive feedback from interested parties. This voluntary neighborhood meeting does not cause the FCC Shot Clock to begin.

Application

3. Submittal Appointment. Applicant submits Application, Checklist, Required Materials, and Deposit at a pre- scheduled appointment. City staff shall use reasonable efforts to provide the applicant with an appointment within five (5) calendar days after City Staff receives a written request. • Shot Clocks Starts

4. Notice Requirements. Within five (5) calendar days of application submittal, applicant provide s notice by first class United States mail to all property owners and residents within 500’ of proposed project and posts in at least three locations near the site.

5. City Review. The City shall have ten (10) calendar days from the submission of the application to determine whether the application is incomplete. If the City deems that the application is complete, it shall review the application in accordance with the FCC shot clock limits.

6. Applicant Resubmittal. If the City deems that the application is incomplete, the applicant responds to corrections and resubmits materials.
• Shot Clocks Restarts

7. Subsequent City Reviews and Resubmittals. City staff reviews and shall have ten ( 10) calendar days from the re-submission to determine whether the application is incomplete. If the city deems that the application is complete, it shall review the application in accordance with the FCC shot clock limits.

8. Conditional Approval. City staff may approve the application when all findings are met as provided in the Code. If findings are not met, application will be denied and applicant will need to resubmit.

9. Notice of Decision. A decision notice is sent to the applicant within five (5) calendar days after the City acts on an application. City staff shall post the N otice of Decision with appeal process on the Small Cell Infrastructure webpage when the decision notice is sent to the applicant. https://www.cityofsanmateo.org/3865/Small-Cell-Infrastructure [SMMC 17.10.070(e)] [SMMC 17.10.070(f)]

10. Limited Exceptions. If the applicant claims that strict compliance with the Design Standards and Application Requirements would effectively prohibit the applicant’s ability to provide personal wireless services, City staff may grant a limited exception if required findings are met.

Appeals

11. Appeals. The applicant or any person who received notice of an application as provided in the Code may appeal any decision to approve or deny a Wireless Permit. Appeals must be filed with Sustainability & Infrastructure Commission (S&IC) Secretary within five ( 5) calendar days of the Notice of Conditional Approval. If no appeals, the project may be approved. If an appeal is received, staff will schedule a public hearing with S&IC to consider and act on the application in accordance with the required findings. If the appeal is denied by the S&IC, the project may be approved. If the appeal is approved by the S&IC, the project is denied and the applicant will need to resubmit.
[SMMC 17.10.070(f)]
Encroachment
Permit

12. Encroachment Permit. Applicant applies for an Encroachment Permit with the Public Works Department. A separate fee shall apply as provided in the City’s Fee Schedule. Encroachment permit shall include traffic control plans and insurance. Prior to construction, applicant shall contact Public Works for an i nspection.

13. Performance Bond. Applicant shall provide Public Works with a Performance Bond in compliance with COA A.13 and B.15.

Post
Application

14. Certification. Applicant shall provide Public Works Post-Installation Certification in compliance with COA A.3 and B.5.

15. Contact Information. Applicant shall provide up-to-date contact information to Public Works in compliance with COA A.11 and B.13.

53 of 104

The Design Standards and Application Requirements - 2021

Page 27 ends

6 INSTALLATIONS OF FREESTANDING POLES
The following are general specifications for the installations of wireless facilities on new privately-owned freestanding poles.

Table 6.1 – Design Standards for Installations of Freestanding Poles Ownership of Pole • Freestanding poles shall not be owned by the City and shall be owned by the applicant.

Luminaire • Per San Mateo standards or as designated by the Director of Public Works.

Electrical Service/Metering • Per PG&E’s requirements. Smart Meters or flat-rate billing, if available. • Conductors shall be spliced at base of pole in pull box. If there is no existing pull box, installation of a new pull box will be required.
• Grounding rod shall be located in the pull box.
• Tie into an existing City electrical circuit is not allowed.

Pole Type • Round, straight, galvanized steel.
• Pole bases shall be sized to handle the listed equipment and all other equipment required by the owner of the freestanding pole.

Shroud/Cover

• All hardware shall be hidden. Only one equipment shroud, containing all required wireless facility equipment, shall be installed per pole. Anchor bolts shall either be hidden from view, preferred, or treated and painted to match the pole color.

Color • Pole shall be galvanized in accordance with AASHTO M 111. • Equipment shall be painted to match existing pole aesthetics, paint shall be powder coated over zinc paint. Equipment cabinets shall still be galvanized.

Pole Height • The pole height inclusive of all equipment shall not exceed 35 feet.

Structural Analysis • Structural analysis shall be prepared and stamped by a pro fessionally licensed structural engineer. Certification that the pole foundation and attachments meet or exceed design parameters shall be provided to the Public Works Department. The analysis shall comply with current building code standards. The wireless facility shall be designed for a risk category IV.
• All structural components of the pole, standard, base, equipment cabinet, couplers, anchor bolts, luminaires, antenna, shroud, and other attachments to be used shall be designed in accordance with
AASHTO’s Standard Specifications for Structural
Supports for Highway Signs, Luminaires, and Traffic Signals, TIA-222 rev G and ASCE 7-16 with IBC 2018 (or latest standard), plus amendment for other local conditions.

Pole Selection Site Analysis • If the applicant proposes a wireless facility on a new freestanding pole, the applicant must first identify all existing potential poles or support structures within 500 feet from the proposed site along the subject right-of-way that is available and technically feasible. The applicant must also demonstrate by clear and convincing evidence in writing that any of these identified existing poles or support structures within 500 feet from the proposed site would be technically infeasible.

54 of 104

The Design Standards and Application Requirements - 2021

Page 28 ends

Conduits Sweeps • Eight (8) 2” PVC conduit sweeps shall be required. Conduit shall accommodate wireless facility carrier electrical and fiber with up to four (4) spare sweeps for future service.

Antenna • The top of the antenna shall be no higher than 48 in. above the top of the pole. • Antennas shall be shrouded to the maximum extent technically feasible. • A tapered transition between the pole and antenna shall be included if feasible. • Antennas shall be located at the top of the pole to the maximum extent technically feasible.

Stickers/Signs • Any on-pole cabinet and ground mounted utility box should be labeled with a (1) RF warning sticker, background to match pole color, no larger than 4 x 6 inches. Facing to the street near the elevation of the antennae, (2) 4-inch by 6-inch (maximum) plate with the provider’s name, location identifying information, and 24 -hour emergency telephone number, and (3) No advertising, logos or decals. • Existing traffic signs may be relocated to screen accessory equipment. CA MUTCD requirements for sign mounting height shall be met. Equipment screened by a sign must not change the silhouette of the sign as viewed by motorists. • A pole number label shall be installed.

Hardware • All mounting hardware shall be compatible with mounting surface and weather resistant.

Disconnect Switch • Bottom of disconnect switch shall be mounted at a minimum of 7 feet above grade or per PG&E’s standards.

Equipment Cabinet • All equipment shall be located internal to the equipment cabinet or recessed as much as possible in the equipment cabinet.
• All equipment shall be mounted per the Owner’s requirements.

Removal of Freestanding
Poles
• Poles shall be promptly removed under a separate encroachment permit once applicant is no longer using the pole to actively provide telecommunications service.

55 of 104

The Design Standards and Application Requirements - 2021

Page 29 ends

Placement Requirements

All freestanding wireless facility poles shall be privately owned and must be permitted by the City of San Mateo.

Freestanding poles shall not be approved except as provided in these Design Standards and Application Requirements. Freestanding poles shall be placed in accordance with the following requirements:

1. In a manner that does not impede, obstruct, or hinder pedestrian or vehicular travel.

2. So as not to be located along the frontage of a historic building, deemed historic on a federal, state, or local level.

3. So as not to significantly create a new obstruction to property sight lines, when reasonably feasible.

4. At the intersection of property lines, or along secondary property street facing.

5. Within the street amenity zone whenever possible.

6. In alignment with existing trees, utility poles, and streetlights.

7. Equal distance between trees when possible, with a minimum of 15 feet separation such that no proposed disturbance shall occur within the critical root zone of any tree.

8. With appropriate clearance from existing utilities.

9. Outside of the 20 -foot equipment clear zone (for base cabinets les s than 18-inches in diameter) or 30 - foot clear sight triangle (for base cabinets equal to or greater than 18-inches in diameter) at intersection corners as shown in Figure 5-7.

10. 10 feet away from the triangle extension of an alley way flare.

11. Shall not be located within 100 feet of the apron of a fire station or other adjacent emergency service facility.

12. No closer than 250 feet away, radially, from another privately-owned freestanding wireless facility.

13. Avoid, when reasonably feasible, placement in residential areas, near schools, and parks.

56 of 104

The Design Standards and Application Requirements - 2021

Page 30 ends

Figure 6.1 – Freestanding Wireless Facility Spacing Radius

Freestanding poles shall be located
a minimum of 250 feet from other
freestanding poles
Existing streetlights and utility pole
locations do not affect the placement
of freestanding poles. Minimum 250
feet does not apply.

57 of 104

The Design Standards and Application Requirements - 2021

Page 31 ends

Figure 6.2 – Freestanding Wireless Facility in Amenity Zone

Freestanding wireless facilities shall be located such that they in no way impede, obstruct, or hinder the usual pedestrian or vehicular travel, affect public safety, obstruct the legal access to or use of the public ROW, violate applicable law, violate or conflict with the City’s separate public ROW design standards, specifications, or design district requirements, violate the Federal Americans with Disabilities Act of 1990, or in any way create a risk to public health, safety, or welfare. Free standing wireless facilities shall be located within the ROW and off set from the sidewalk as shown in Figure 5.3

Figure 6.3 – Freestanding Wireless Facility Sight-Line Requirements

58 of 104

The Design Standards and Application Requirements - 2021

Page 32 ends

Freestanding wireless facilities shall be located at intersecting property lines as much as possible. Whenever possible, the freestanding wireless facilities shall be located on the secondary street. Do not locate wireless facilities in clear sight triangle. Wireless facilities shall also be located a minimum of 15 feet away from trees to prevent disturbance within the critical root zone of any tree. The wireless facilities shall not be installed between the perpendicular extension of the primary street- facing wall plane of any single or two -family residence as shown in Figure 5-4.

Figure 6.4 – Freestanding Wireless facility Location between Property Lines

59 of 104

The Design Standards and Application Requirements - 2021

Page 33 ends

Figure 6.5 – Freestanding Wireless Facility in Commercial Area

When located adjacent to a commercial establishment, such as a shop or restaurant, care should be taken to locate the wireles s facility such that it does not negatively impact the business. More specifically, wireless facilities shall not be located in -front of store front windows, primary walkways, primary entrances or exits, or in such a way that it would impede a delivery to the building. Wireless facilities should be located between properties as much as possible as shown above. Wireless facilities shall match the architecture of the surrounding neighborhood. The City shall have the authority to mandate the color and other a esthetics of wireless facility installations consistent with the City’s design preferences and the requirements in San Mateo Municipal Code Chapter 17.10.

60 of 104

The Design Standards and Application Requirements - 2021

Page 34 ends

Table 6.2 – Procedures For Freestanding Poles [SMMC]
Pre-Application

1. Voluntary Informational Meeting with City Staff. Applicant may request a voluntary pre -submittal informational meeting with City staff to review potential locations and streamline the review process. This meeting is highly recommended in order to identify acceptab le designs. This voluntary informational meeting with City staff does not cause the FCC Shot Clock to begin.

2. Voluntary Informational Neighborhood Meeting. Applicant is encouraged to hold a voluntary neighborhood meeting at City Hall or via Zoom to discuss the proposed project with residents and property owners within a 500’ radius of the project location in order to receive feedback from interested parties.

This meeting is highly recommended for new freestanding poles. This voluntary neighborhood meeting does not cause the FCC Shot clock to begin.

Application

3. Submittal Appointment. Applicant submits Application, Checklist, Required Materials, and Deposit at a pre- scheduled appointment. City staff shall use reasonable efforts to provide the applicant with an appointment within five (5) working days after City staff receives a written request.

• Shot Clocks Starts

4. Notice Requirements. Within five (5) calendar days of application submittal, applicant provides notice by first class United States mail to all property owners and residents within 500’ of proposed project and posts in at least three locations near the site.

5. City Review. The City shall have ten (10) calendar days from the submission of the application to determine whether the application is incomplete. If the City deems that the application is complete, it shall review the application in accordance with the FCC shot clock limits.

6. Power Walks. Applicant conducts power walks with City staff to determine point of electrical service connection. This shall be shown on the plans when applicant resubmits.

7. Applicant Resubmittal. If the City deems that the application is incomplete, the applicant responds to corrections and resubmits materials.
• Shot Clocks Restarts

8. Subsequent City Reviews and Resubmittals. City staff reviews and shall have ten ( 10) calendar days from the re- submission to determine whether the application is incomplete. If the City deems that the application is complete, it shall review the application in accordance with the FCC Shot Clock limits.

9. Conditional Approval. City staff may approve the application when all findings are met as provided in the Code. If findings are not met, application will be denied and applicant will need to resubmit.

10. Notice of Decision. A decision notice is sent to the applicant within five (5) calendar days after the City acts on an application. City staff shall post notice of conditional approval with appeal process on the Small Cell Infrastructure webpage when the decision notice is sent to the applicant. https://www.cityofsanmateo.org/3865/Small-Cell-Infrastructure [SMMC 17.10.070(e)] [SMMC 17.10.070(f)]
Limited Exceptions. If the applicant claims that strict compliance with the Design Standards and Application Requirements would effectively prohibit the applicant’s ability to provide personal wireless services, City staff may grant a limited exception if required findings are met.

Appeals

11. Appeals. The applicant or any person who received notice of an application as provided in the Code may appeal any decision to approve or d eny a Wireless Permit. Appeals must be filed with Sustainability & Infrastructure Commission (S&IC) Secretary within five ( 5) calendar days following the decision. If no appeals, the project may be approved. If an appeal is received, staff will schedule a public hearing with S&IC to consider and act on the application in accordance with the required findings. If the appeal is denied by the S&IC, the project may be approved. If the appeal is approved by the S&IC, the project is denied and the applicant will need to resubmit.
[SMMC 17.10.070(f)]

Building Permit

12. Building Permit. Applicant applies for a Building Permit with the Building Division for PG&E release. A separate fee shall apply.

61 of 104

The Design Standards and Application Requirements - 2021

Page 35 ends

Encroachment
Permit

13. Encroachment Permit. Applicant applies for an Encroachment Permit with the Public Works Department.

A separate fee shall apply as provided in the City’s Fee Schedule. Encroachment permit shall include traffic control plans and insurance. Prior to construction, applicant shall contact Public Works for an inspection.

14. Performance Bond. Applicant shall provide Public Works with a Performance Bond in compliance with COA A.13 and B.15.

Post
Application

15. Certification. Applicant shall provide Public Works Post -Installation Certification in compliance with COA A.3 and B.5.

16. Contact Information. Applicant shall provide up-to-date contact information to Public Works in compliance with COA A.11 and B.13.

62 of 104

The Design Standards and Application Requirements - 2021

Page 36 ends

7 SECTION 6409 APPROVALS

Section 6409 Approvals shall comply with SMMC 17.10.110 and all design standards and application requirements in this document.

Table 7.1 – Procedures For Section 6409 Approvals [SMMC] Pre-Application

1. Voluntary Information Meeting with City Staff. Applicant may request a voluntary pre -submittal informational meeting with the City staff to review proposed modifications to the existing facility and streamline the review process. This meeting is highly recommended in order to identify acceptable designs.

This voluntary informational meeting does not cause the FCC Shot Clock to begin.

2. Voluntary Informational Neighborhood Meeting. Applicant is encouraged to hold a voluntary informational neighborhood meeting at City Hall or via Zoom to discuss the proposed project with residents and property owners within 500’ of the project location in order to receive feedback from interested parties. This voluntary informational neighborhood meeting does not cause the FCC Shot Clock to begin.

Application

3. Submittal Appointment. Applicant submits Application, Checklist, Required Materials, and Deposit at a pre- scheduled appointment. City staff shall use reasonable efforts to provide the applicant with an appointment within five (5) working days after City staff receives a written request. Alternative sites analysis is not required for Section 6409 approvals. A Section 6409 Evaluation indicating whether the proposed modification is an eligible facilities request that complies with the FCC is requ ired. • Shot Clocks Starts

4. City Review. The City shall have ten (10) calendar days from the submission of the application to determine whether the application is incomplete. If the City deems that the application is complete, it shall review the application in accordance with the FCC shot clock limits.

5. Applicant Resubmittal. If the City deems that the application is incomplete, the applicant responds to corrections and resubmits materials.
• Shot Clocks Restarts

6. Subsequent City Reviews and Resubmittals. City staff reviews and shall have ten ( 10) calendar days from the re-submission to determine whether the application is incomplete. If the city deems that the application is complete, it shall review the application in accordance with the FCC shot clock limits.

7. Conditional Approval. City staff may approve the application when all findings are met as provided in the Code. If findings are not met, application will be denied and applicant will need to resubmit.

8. Notice of Decision. A decision notice is sent to the applicant within five (5) calendar days after the City acts on an application. City staff shall post the Notice of Decision on the Small Cell Infrastructure webpage when the decision notice is sent to the applicant. https://www.cityofsanmateo.org/3865/Small-Cell-Infrastructure [SMMC 17.10.070(e)] [SMMC 17.10.070(f)]

9. Limited Exceptions. If the applicant claims that strict compliance with the Design Standards and Application Requirements would effectively prohibit the applicant’s ability to provide personal wireless services, City staff may grant a limited exception if required findings are met.

Appeals

10. Appeals. The applicant only (not the public) may appeal any decision to deny a Wireless Permit for 6409.

Appeals must be filed with the Director of Public Works within five ( 5) calendar days of the N otice of Decision. If the appeal is approved by the Director of Public Works, the project is denied and the applicant will need to resubmit.
[SMMC 17.10.110(e)]
Encroachment
Permit

11. Encroachment Permit. Applicant applies for an Encroachment Permit with the Public Works Department.

A separate fee shall apply as provided in the City’s Fee Schedule. Encroachment permit shall include traffic control plans and insurance. Prior to construction, applicant shall contact Public Works for an inspection.

12. Performance Bond. Applicant shall provide Public Works with a Performance Bond in compliance with COA A.13 and B.15.

Post
Application

13. Certification. Applicant shall provide Public Works Post -Installation Certification in compliance with COA A.3 and B.5.

14. Contact Information. Applicant shall provide up-to-date contact information to Public Works in compliance with COA A.11 and B.13.

63 of 104

The Design Standards and Application Requirements - 2021

Page 37 ends

8 NON-CONFORMING WIRELESS FACILITIES
Any non -conforming wireless facilities in existence at the time these Design Standards and Application Requirements become effective shall be brought into conformance with the current Design Standards within ten (10) years upon receiving written notice from the City, or otherwise in accordance with applicable law.

Applicants are not only required to comply with these Design Standards and Application Requirements during the initial application, but are also required to continue to monitor compliance with application Design Standards in the future in accordance with applicable law.

64 of 104

The Design Standards and Application Requirements - 2021

Page 38 ends

APPENDIX

65 of 104

Appendix A: Wireless Communications Facilities
Permit Application

66 of 104

Public Works Department
www.cityofsanmateo.org
[email protected]
(650) 522-7300

Engineering Division
330 West 20th Avenue
San Mateo, CA 94403

Revised: March 2021

Wireless Communications Facilities
Permit Application

INSTRUCTIONS:

Prior to submittal of this Application, the Application Checklist and all other required materials, a meeting with staff is strongly encouraged. This voluntary informational meeting with City staff does not cause the FCC Shot Clock to begin.

City staff may deem the application incomplete if the applicant fails to include any required information or materials. Applications shall comply with SMMC

17.10 and the Design Standards and Application Requirements.

Applicants may submit applications by appointment only. Please contact the Public Works Department for an appointment.

Applicant:

Name: ______________________________________________________ Company: ___________________________________________________ Mailing Address: ______________________________________________ City, State, Zip: _______________________________________________ Phone: __________________________ Fax: _______________________ E-mail: _____________________________________________________ Authorized Representative:

Name: ___________________________________________________________ Company: ________________________________________________________ Mailing Address: ___________________________________________________ City, State, Zip: ____________________________________________________ Phone: ____________________________ Fax: __________________________ E-mail: __________________________________________________________ Pole Owner:

Name: ______________________________________________________ Company: ___________________________________________________ Mailing Address: ______________________________________________ City, State, Zip: _______________________________________________ Phone: __________________________ Fax: _______________________ E-mail: _____________________________________________________

Pole Owner’s Signature:
_________________________________________________________________ Printed Name: _________________________________ Date: _______________ Applicant’s Signature: (if different from Property Owner) _________________________________________________________________ Printed Name: _________________________________ Date: _______________ Proposed Site Location and Description:

Proposed Project Address: ________________________________________________________ Pole Number a:_____________________________________ Zoning District (for ROW, provide nearest zoning district): ________________________________ a If in the ROW, provide the pole number for the streetlight or pole.

Latitude/Longitude of Location: __________________________________________________________________________________________________________ Construction Value ($)/Project Description: _______________________________________________________________________________________________ ___________________________________________________________________________________________________________________________________ ___________________________________________________________________________________________________________________________________ Applicant’s Request:
□ WIRELESS PERMIT □ SECTION 6409 APPROVAL □ OTHER __________________________________________________________________

STAFF USE ONLY
Applicable Shot Clock Period (for informational purposes only): □ 60 days □ 90 days □ OTHER: __________ Pre-App Submittal Meeting ________________________________________ Neighborhood Meeting ____________________________________________ Application Submittal _____________________________________________

Application Deemed Complete _____________________________________ Shot Clock Expiration _____________________________________________ Conditionally Approved ___________________________________________ Appeal _________________________________________________________

67 of 104

Appendix B: Wireless Communications Facilities
Permit Application Checklist

68 of 104

Public Works Department
www.cityofsanmateo.org
[email protected]
(650) 522-7300

Engineering Division
330 West 20th Avenue
San Mateo, CA 94403

Revised: March 2021

Wireless Communications Facilities
Permit Application Checklist

INSTRUCTIONS:

Prior to submittal of this Application Checklist, Application and all other required materials, a meeting with City staff is strongly encouraged. The City also recommends applicant holds a voluntary neighborhood meeting. These voluntary meetings shall not cause the FCC Shot Clock to begin.

City staff may deem the application incomplete if the applicant fails to include any required information or materials. Applications shall comply with SMMC

17.10 and Design Standards and Application Requirements.

All starred (*) items in the checklist below are not required for a Section 6409 Approval.

Applicants may submit applications by appointment only. Please contact the Public Works Department for an appointment.

Applicant:

Name: ______________________________________________________ Company: ___________________________________________________ Mailing Address: ______________________________________________ City, State, Zip: _______________________________________________ Phone: __________________________ Fax: _______________________ E-mail: _____________________________________________________ Proposed Site Location and Description:

Proposed Project Address: ___________________________________________ Project Description: _________________________________________________ Pole Number a:_____________________________________________________ a If in the ROW, provide the pole number for the streetlight or pole.

Applicant’s Request:
□ WIRELESS PERMIT □ SECTION 6409 APPROVAL
□ OTHER(describe request) __________________________________

APPLICATION CHECKLIST – REQUIRED MATERIALS

APPLICATION FORM AND DEPOSIT

PROJECT PLANS

VOLUNTARY NEIGBORHOOD MEETING

SUMMARY
[Attachment 1]

PHOTO SIMULATIONS
[Attachment 2]

PUBLIC NOTICE, AFFIDAVIT, LOG OF

COMMENTS
[Attachment 3]

PRIOR PERMITS & REGULATORY

APPROVALS
[Attachments 4a, 4b, 4c, 4d]

PROPERTY OWNER’S AUTHORIZATION
[Attachment 5]

INITIAL CEQA ASSESSMENT
[Attachment 6]

RF COMPLIANCE REPORT
[Attachment 7]

NOISE COMPLIANCE REPORT
[Attachment 8]

SECTION 6409 EVALUATION (if applicable)
[Attachment 9]

PROJECT PURPOSE AND TECHNICAL
OBJECTIVES INFORMATION*
[Attachment 10]

ALTERNATIVE SITES ANALYSIS*
[Attachment 11]

STRUCTURAL CERTIFICATION (if applicable)
[Attachment 12]

69 of 104

APPLICATION REQUIREMENTS – REQUIRED MATERIALS

The following Application Requirements contain the requirements for a complete wireless facility permit application. For the application to be deemed complete, the applicant must submit all the applicable application materials in the Application Checklist in accordance with the Application Req uirements along with all other generally applicable materials required for the requested permit or approval.

Notes: All starred (*) items are not required for a Section 6409 Approval. After the City issues the requested permit, the applicant must obtain all other required permits (including, without limitation and as applicable, building, electrical, plumbing, encroachment, etc.) prior to performing the installation.

APPLICATION FORM AND DEPOSIT

Instructions: Complete the Wireless Facilities Permit Appl ication available on the City’s website or at the Public Works Department and submit the corresponding application deposit for the requested permit or approval. You may find the City’s fee schedule on the City’s website or contact the Public Works Department for appropriate filing fees.

PROJECT PLANS

Instructions: Provide two sets of complete 24 x 36- inch project plans drawn to a scale of not less than 1/16" equals one foot and a digital file of such plans in portable document format (PDF). Project plans must contain all the following:

1. Cover Sheet
A complete cover sheet must include at a minimum:
a detailed project description that specifies the proposed installation and/or modifications including without limitation all physical elements such as antennas, radios, power services, all cables, mounts, and all other elements of the proposed project
site information that includes the proposed site address, site latitude and longitude (WGS 84 datum), zoning classification of the nearest private property, project team contact information site map, and pole number (if applicable)

2. Site Survey (Only required for proposed ground mounted equipment) Only a California- registered Civil Engineer or licensed surveyor may prepare the site survey. A complete site survey must include:
property and right -of-way boundaries with all bearings, distances, monuments, iron rods, caps or other markers clearly shown and called out
boundaries for all easements and/or dedications with all dimensions clearly shown and called out approximate topographical contour lines with elevations called out

any trees at least 4 inches in diameter at a point approximately 4.5 feet above ground all structures or improvements on the property or within the right of way within any block partially or entirely occupied by the project and any elements thereof
all structures or improvements on adjacent parcels within 15 feet from the property line a north arrow, date, scale and legend
wet stamp and wet signature from the licensed preparer general specifications and notes identifying the applicable public health and safety codes and standards

70 of 104

3. Site Development Plan
A complete site development plan must include:
plan-view drawings, which include:
the entire property or right-of-way block with the proposed project improvements detailed before-and-after views for any equipment pads, enclosures, cabinets, pedestals and/or vaults all existing and proposed equipment with all dimensions, labels and ownership identifications clearly called out
boundaries for all easements, encroachments and/or other rights -of-way for access and utilities in connection with the wireless site with all dimensions clearly shown and called out all existing and proposed primary and backup utilities, including without limitation all cables, connectors, risers, conduits, cable shrouds, trays, bridges and/or doghouses, transformers, disconnect switches, panels, meters, pedestals, cabinets, vaults, generators and/or generator sockets detailed before-and-after elevation drawings from all four cardinal directions, which include:
all existing and proposed structures, improvements and/or fixtures with all dimensions clearly called out all existing and proposed equipment with all dimensions, labels and ownership identifications clearly called out
all existing and proposed fiber optic cables, conduits, riser s, guy wires, anchors, primary and secondary power lines clearly called out
callouts and notes for any proposed new or extended concealment elements a north arrow, date, scale and legend

4. Equipment Inventory
The equipment inventory does not need to include primary utility cables, panels or cabinets, or any other objects not primarily designed or intended for radio communications purposes. All other equipment must be inventoried with the following information for each component:
manufacturer and model number
basic dimensions (height, width, length and weight)
table showing volumes of all equipment

VOLUNTARY NEIGHBORHOOD MEETING SUMMARY

Instructions: Provide a summary of neighborhood meeting if conducted. Label the summary as “ Attachment 1 – Neighborhood Meeting Summary” and attach it to the application. If a meeting is not conducted, mark the checklist box with an “X”.

PHOTO SIMULATIONS

Instructions: Provide photo simulations of the proposed project as constructed. The photo simulations must be in a high- resolution format and show the proposed facility from reasonable line- of-sight locations that would accurately and reliably reflect the appearance of the proposed facility and/or modifications as-built. Label these photo simulations “Attachment 2 – Photo Simulations” and attach them to this application. Except as otherwise provided, photo simulations must contain all the following:

71 of 104

1. Current Site Photographs
Current site photographs must include:
photographs of the existing site from at least two different reasonable line- of-sight locations from public streets or other adjacent viewpoints;
a map detail showing each location where a photograph was taken, the proposed site and the direction to the site from each photo location;
Include a close-up view of the equipment, including all wires, conduits, equipment, etc.

2. Photo Simulations
Photo simulations must include:
an accurate and reliable visual representation of the proposed facility from the same reasonable line- of-sight locations used in the curr ent site photographs and must include without limitation all interconnecting cables, conduits, brackets, and electronic equipment such as antennas, radio units, powering, and the like; a map detail showing each location where a photograph was taken, the proposed site and the direction to the site from each photo location;
Include a close-up view of the equipment, including all wires, conduits, equipment, etc.

3. Section 6409 Photo Simulation
For Section 6409 Approval applications, the applicant must provide at least one photo simulation that demonstrates the impact of the proposed modification on all concealment elements of the support structure. Concealment elements include but are not limited to radomes, cable shrouds, painting, landscaping, equipment enc losures and designs and/or techniques intended to blend with the surrounding built and/or natural environment.

PUBLIC NOTICE, AFFIDAVIT, LOG OF COMMENTS

Instructions: Provide a copy of the notice mailed to all property owners and residents within 500’ of the proposed project, proof of notification mailing (affidavit), and log of concerns, comments, questions with response in accordance with the Application Requirements and Design Standards. Label the notice, affidavit and log “ Attachment 3 – PUBLIC NOTICE, AFFIDAVIT, LOG” and attach it to this application.

PRIOR PERMITS AND REGULATORY APPROVALS

Instructions: Provide true and correct copies of all the following:

1. Prior Permits
If the applicant requests a Section 6409 Approval, provide copies of all prior local regulatory approvals (original siting permits and any modification permits) issued for the facility with any corresponding conditions of approval and project plans approved by the applicable regulatory authority. Alternatively, the applicant may submit a written justification that sets forth the reasons why prior regulatory approvals were not required for the wireless facility at the time it was constructed or modified. Label this documentation “Attachment 4a – Prior Permits” and attach it to this application.

2. FCC Licenses
If the applicant or service provider proposes to operate in FCC -licensed spectrum, provide proof of licenses for all planned operating bands. If there are federal build- out requirements, indicate which and whether they have b een fully satisfied. If not satisfied, indicate what remains to be satisfied. Label this documentation “ Attachment 4b – FCC Licenses” and attach it to this application.

72 of 104

3. FAA Forms
If the proposed facility requires the applicant to file FAA form 7460 or oth er documentation under Federal Aviation Regulation Part 77.13 et seq., or under the FCC rules, provide such documentation. Label this documentation “Attachment 4c – FAA Forms” and attach it to this application.

4. Certificate of Public Convenience and Necessity (CPCN) / Wireless ID Registration (WIR) For all applications for facilities in the public right-of-way, provide a true and correct copy of the applicant’s CPCN and/or WIR issued by the California Public Utilities Commission or its successor agency. Label this documentation “Attachment 4d – CPCN / WIR” and attach it to this application.

POLE OWNER’S AUTHORIZATION

Instructions: For privately owned poles, provide a letter of authorization from the pole owner that authorizes the applicant to perform the installation or modification. The letter must be signed by the owner. In lieu of a letter of authorization for facilities in the public right-of-way, the applicant may submit the property owner’s standard authorization form issued in the property owner’s regular course of business to demonstrate that the applicant has the authority to perform the installation or modification. Label this authorization “Attachment 5 – Property Owner’s Authorization” and attach it to this application.

INITIAL CEQA ASSESSMENT

Instructions: Complete, sign and attach to this application a fully executed Environmental Information Form. Label this form “Attachment 6 – Environmental Information Form” and attach it to this application. The Environmental Information Form may be obtained electronically on the City’s website or by contacting the Public Works Department.

RF COMPLIANCE REPORT

Instructions: Provide an RF exposure compliance report prepared and certified by an RF engineer that certifies that the proposed facility, as well as any collocated facilities and any cumulative emissions from adjacent areas, will comply with applicable federal RF human exposure standards and limits. At a minimum, the RF exposure compliance report must provide the same information and in the same form as the FCC LSGAC Appendix A form for each band of operations. For projects on or attached to poles subject to CPUC General Order 95 regulation, provide evidence of compliance with CPUC General Order 95, Rule 94. Label this report “Attachment 7 – RF Compliance Report” and attach it to this application.

The RF compliance report must include:
the actual frequency, actual or maximum power levels (in watts effective radiated power (ERP)), and the actual or maximum transmitting channels for all existing and proposed antennas at the site. exhibits that show:
the location and orientation of all transmitting antennas; the boundaries of areas with RF exposures (whether individually or cumulatively) in excess of the uncontrolled/general population limit (as that term is defined by the FCC); the boundaries of areas with RF exposures (whether individually or cumulatively) in excess of the controlled/occupational limit (as that term is defined by the FCC).

Note: Each such boundary must be clearly marked and identified for every transmitting antenna at the project site, whether owned/operated by the applicant or another licensee. To the extent that the project site contains collocated transmitters from multiple operators, the RF exposure compliance report must evaluate all the transmitting antennas that may cause cumulative emissions.

73 of 104

NOISE COMPLIANCE REPORT

Instructions: Provide a noise compliance report for the proposed facility and all associated equipment including all environmental control units, sump pumps, temporary backup power generators, and permanent backup power generators in order to demonstrate compliance with the City’s noise regulations. The noise compliance report must be prepared and certified by an engineer and include an analysis of the manufacturers’ specifications for all noise-emitting equipment and a depiction of the proposed equipment relative to all adjacent property lines. In lieu of a noise compliance report, the applicant may submit evidence from the equipment manufacturer that the ambient noise emitted from all the proposed equipment will not, both individually and cumulatively, exceed the applicable limits. Label this analysis “Attachment 8 – Noise Compliance Report” and attach it to the application.

SECTION 6409 EVALUATION

Instructions: If the applicant requests approval pursuant to Section 6409(a) of the Middle Class Tax Relief and Job Creation Act of 2012 (codified as 47 U.S.C. § 1455(a)), the applicant must complete and submit justification whether the proposed modification is an eligible facilities request that complies with the applicable FCC substantial change thresholds. Label thi s worksheet “Attachment 9 – Section 6409 Evaluation” and attach it to the application.

PROJECT PURPOSE AND TECHNICAL OBJECTIVES*

Instructions: For applications not subject to Section 6409, provide the following information to demonstrate the intended technical service objectives and the nature of the existing service capabilities of the applicant’s network in the area that would be served by the proposed facility or enhanced by the proposed modification. Label this analysis “Attachment 10 – Project Purpose and Technical Objectives” and attach it to the application.

1. Project Purpose
Identify and describe the project purpose. Possible responses analyze whether the proposed facility or modification will:
add new personal wireless service coverage to an area in which the licensee does not currently provide any personal wireless service coverage;
add new personal wireless service capacity to an area in which the licensee currently provides personal wireless service coverage.

If the project has a different purpose from the options described above, provide such purpose in full detail.

2. Technical Objectives
Provide a detailed written statement that describes the technical objectives the applicant intends the proposed wireless facility to achieve and the factual reasons why the proposed location, centerline height and equipment configuration are necessary to achieve those objectives. In addition, the statement must include all the following required information and/or materials:
a street-level map that shows the general geographic area of the service area(s) to be improved through the proposed wireless facility (the “Service Area”);
a written narrative that describes the uses (commercial, residential, primary thoroughfare, highway, etc.) within the Service Area, and the manner in which those uses would be negatively affected if the Service Area were to remain unaddressed;
a statement as to whether the applicant conducted any drive test(s) and, if so, all drive test results and data (in .XLS or .CSV or similar format) together with a report that describes how and when the applicant conducted such test(s).

3. Network Map
Provide an overview map of the applicant’s network within the City’s jurisdictional and territorial boundaries that shows (1) all the existing wireless facilities that applicant currently owns and/or operates and (2) all future wireless facilities that are reasonably foreseeable within two years of the application submission. The map must provide a legend that

74 of 104

distinguishes between “macro” cells and small cell facilities.

ALTERNATIVE SITES ANALYSIS*

Instructions: For applications not subject to Section 6409, provide a detailed written analysis that describes how the proposed wireless facilit y complies with all the applicable requirements in the San Mateo Municipal Code, which includes without limitation the provisions specific to wireless facilities, and all the alternative locations and designs considered before submitting this application. Label this analysis “Attachment 11 – Alternative Sites Analysis” and attach it to the application.

The Alternative Sites Analysis shall be included as part of the neighborhood meeting, if conducted. In addition, the analysis must include all the following required information and/or materials:

a street-level map that shows the general geographic area surrounding the proposed location annotated to show:
all existing wireless facilities within the relevant geographic area the search ring used for this particular project. The search ring shall be a minimum radius of 500’. all locations for each alternative considered for this particular project for each alternative site considered, a detailed written description that includes, without limitation all the following:
the nearest physical address
zoning district designation for the nearest private property support structure type considered
general design concept and concealment elements/techniques considered overall height and achievable antenna centerline height the factual reasons why the applicant considered the potential alternative site location and/or design to be unacceptable, infeasible, unavailable or not in accordance with the development standards in San Mateo Municipal Code Chapter 17. 10. Note: This explanation must include a meaningful comparative analysis and such technical information and other factual justification as are necessary to document the reasons why each alternative is unacceptable, infeasible, unavailable or not as consistent with the development standards in Chapter 17.10. Conclusory statements that a particular alternative is unacceptable, infeasible, unavailable or not in accordance with the development standards in Chapter

17.10 will be deemed incomplete.

If the applicant did not locate any alternatives within the search ring, the analysis must expressly state that no such alternatives were considered.

STRUCTURAL CERTIFICATION

Instructions: Provide certification prepared and stamped by a professionally licensed structural engineer certifying that the pole foundation and attachments meet or exceed design parameters detailed in the design standards. Label this analysis “Attachment 12 – Structural Certification” and attach it to the application.

75 of 104

Appendix C: Standard Conditions of Approval
for Wireless Communications
Facilities

76 of 104

STANDARD CONDITIONS OF APPROVAL FOR WIRELESS COMMUNICATIONS FACILITIES IN

THE PUBLIC RIGHTS-OF-WAY PURSUANT TO SAN MATEO MUNICIPAL CODE SECTION

17.10.080

A. Standard Conditions for Wireless Facilities Permits.

1. Permit Term. This permit will automatically expire 10 years and one day from its issuance if a new permit has not been applied for in writing at least 120 days prior to permit expiration, except when California Government Code § 65964(b), as may be amended or superseded in the future, authorizes the City to establish a shorter term for public safety or substantial land use reasons. Any other permits or approvals issued in connection with any collocation, modification or other change to this wireless facility, which inc ludes without limitation any permits or other approvals deemed- granted or deemed- approved under federal or state law, will not extend this term limit unless expressly provided otherwise in such permit or approval or required under federal or state law.

2. Compliance with Approved Plans. Before the Department of Public Works issues any encroachment permit and/or other ministerial permits required to commence construction in connection with this permit, the permittee must incorporate this permit, all conditions associated with this permit and the approved photo simulations into the project plans (the “Approved Plans”). The permittee must construct, install and operate the wireless facility in substantial compliance with the Approved Plans. Any alterations, modifications or other changes to the Approved Plans, whether requested by the permittee or required by other departments or public agencies with jurisdiction over the wireless facility, must be submitted in a written request subject to the City’s prior review and approval, who may refer the request to the original approval authority if the City finds that the requested alteration, modification or other change deviates from the Approved Plans or implicates a significant or substantial land-use concern.

3. Post-Installation Certification. Within 60 calendar days after the permittee commences full, unattended operations of a wireless facility approved or deemed-approved under San Mateo Municipal Code Chapter 17.10, the permittee shall provide the City with documentation that the wireless facility has been installed and/or constructed in compliance with the Approved Plans. Such documentation must include as -built drawings, GIS data, post installation RF study, and site photographs.

4. Build-Out Period. This permit will automatically expire one (1) year from the approval or deemed-granted date. The City may grant one written extension to a date certain, but not to exceed one (1) additional year, when the permittee shows good cause to extend the limitations period in a written request for an extension submitted at least 30 days prior to the automatic expiration date in this condition.

5. Maintenance Obligations; Vandalism . During any maintenance or repair operations, the permittee shall keep the site, which includes without limitation any and all improvements, equipment, structures, access routes, fences and landscape features, in a neat, clean and safe condition. The permittee, at no cost to the City, shall remove and remediate any graffiti or other vandalism on its equipmen t within 48 hours after the permittee receives notice or otherwise becomes aware that such graffiti or other vandalism occurred.

77 of 104

6. Compliance with Laws. The permittee shall maintain compliance at all times with all federal, state and local statutes, regula tions, orders or other rules that carry the force of law (“Laws”) applicable to the permittee, the subject property, the wireless facility or any use or activities in connection with the use authorized in this permit, which includes without limitation any Laws applicable to human exposure to RF emissions. The permittee expressly acknowledges and agrees that this obligation is intended to be broadly construed and that no other specific requirements in these conditions are intended to reduce, relieve or other wise lessen the permittee’s obligations to maintain compliance with all Laws. In the event that the City fails to timely notice, prompt or enforce compliance with any applicable provision in the San Mateo Municipal Code, any permit, any permit condition or any applicable law or regulation, the applicant or permittee will not be relieved from its obligation to comply in all respects with all applicable provisions in the San Mateo Municipal Code, any permit, any permit condition or any applicable law or regulation.

7. Cooperation with RF Compliance Evaluations. At all times relevant to this permit, the permittee and the property owner shall reasonably cooperate with efforts by the City to evaluate whether the wireless facility complies with all applicable FCC rules and regulations for human exposure to RF emissions. Such cooperation shall be at no cost to the City and may include, but is not limited to: (1) furnishing the City with a written affidavit signed by an RF engineer certifying the wireless facility’s compliance with applicable FCC rules and regulations; (2) providing technical data such as the frequencies in use, power output levels and antenna specifications, reasonably necessary to evaluate compliance with maximum permissible exposure levels set by the FCC; (3) allowing the City or its designee to have supervised access to the areas near the wireless facility for inspections and field measurements; and (4) promptly responding to all requests by the City or its designee for information and/or cooperation with respect to any of the foregoing.

8. Adverse Impacts on Other Properties. The permittee shall use all reasonable efforts to avoid any and all undue or unnecessary adverse impacts on nearby properties that may arise from the permittee’s or its authorized personnel’s construction, installation, operation, modification, maintenance, repair, removal and/or other activities at the site.

The permittee shall not perform or cause others to perform any construction, installation, operation, modification, maintenance, repair, removal or other work that involves he avy equipment or machines except during normal construction work hours authorized by the San Mateo Municipal Code. The restricted work hours in this condition will not prohibit any work required to prevent an actual, immediate harm to property or persons, or any work during an emergency declared by the City. The City may issue a stop work order for any activities that violates this condition.

9. Backup Power; Generators. The permittee shall operate backup power generators only during (a) commercial power outa ges or (b) for maintenance purposes during normal construction hours in accordance with the San Mateo Municipal Code. The City may approve a temporary power source and/or generator in connection with initial construction, major repairs or in the event of an emergency. The permittee shall not operate any permanent backup generators located in the public right-of-way.

10. Inspections; Emergencies. The permittee expressly acknowledges and agrees that the City’s officers, officials, staff or other designee may ent er onto the site and inspect the improvements and equipment upon reasonable prior notice to the permittee, or promptly after an emergency. The City’s officers, officials, staff or other designee may, but will not be obligated to, enter onto the site area without prior notice to support, repair, disable or remove any improvements or equipment in emergencies or when such improvements or

78 of 104

equipment threatens actual, imminent harm to property or persons. The permittee, if present, may observe the City’s officers, officials, staff or other designee while any such inspection or emergency access occurs.

11. Permittee’s Contact Information. The permittee shall furnish the City with accurate and up-to-date contact information for a person responsible for the wireless f acility, which includes without limitation such person’s full name, title, direct telephone number, facsimile number, mailing address and email address. The permittee shall keep such contact information up to date at all times and immediately provide the City with updated contact information in the event that either the responsible person or such person’s contact information changes.

12. Indemnification. The permittee shall defend, indemnify and hold harmless the City, City Council and City boards, commissions, agents, officers, officials, volunteers, and employees from any and all (1) damages, liabilities, injuries, losses, costs and expenses and from any and all claims, demands, law suits, writs and other actions or proceedings (“Claims”) brought against the City or its agents, officers, officials, volunteers, and/or employees to challenge, attack, seek to modify, set aside, void or annul the City’s approval of this permit, and (2) other Claims of any kind or form, whether for personal injury, death or property damage, that arise from or in connection with the permittee’s or its agents’, directors’, officers’, employees’, contractors’, subcontractors’, licensees’, or customers’ acts or omissions in connection with this permit or the wireless facility.

Permittee’s duty to defend and indemnify shall not apply to the extent such Claims are caused by the sole or active negligence or willful misconduct of the City. In the event the City becomes aware of any Claims, the City will use best efforts to promptly notify the permittee and the private property owner and shall reasonably cooperate in the defense.

The permittee expressly acknowledges and agrees that the City shall have the right to approve, which approval shall not be unreasonably withheld, the legal counsel providing the City’s defense, and the property owner and/or permittee (as applicable) shall promptly reimburse City for any costs and expenses directly and necessarily incurred by the City in the course of the defense. The permittee expressly acknowledges and agrees that the permittee’s indemnification obligations under this condition are a material consideration that motivates the City to approve this permit, and that such indemnification obligations will survive the expiration or revocation of this permit.

13. Performance Bond. Before the Department of Public Works issues any encroachment permit and/or other ministerial permits required to commence construction in connection with this permit, the permittee shall post a performance bond from a surety and in a form acceptable to the City in an amount reasonably necessary to cover the cost to remove the improvements and restore all affected areas based on a written estimate from a qualified contractor with experience in wi reless facilities removal. The written estimate must include the cost to remove all equipment and other improvements, which includes without limitation all antennas, radios, batteries, generators, utilities, cabinets, mounts, brackets, hardware, cables, wires, conduits, structures, shelters, towers, poles, footings and foundations, whether above ground or below ground, constructed or installed in connection with the wireless facility, plus the cost to completely restore any areas affected by the removal wor k to a standard compliant with applicable laws. In establishing or adjusting the bond amount required under this condition, and in accordance with California Government Code § 65964(a), the City shall take into consideration any information provided by the permittee regarding the cost to remove the wireless facility to a standard compliant with applicable laws. The performance bond shall expressly survive

79 of 104

the duration of the permit term to the extent required to effectuate a complete removal of the subject wireless facility in accordance with this condition.

14. Permit Revocation. The City may review this permit at any time due to complaints about noncompliance with applicable laws or any approval conditions attached to this permit. In accordance with all applicable laws, the City may revoke this permit or amend these conditions as the City deems necessary or appropriate to correct any such noncompliance.

15. Record Retention. The permittee must maintain, for the duration of the permit term, complete and accurate copies of all permits and other regulatory approvals issued in connection with the wireless facility, which includes without limitation this approval, the approved plans and photo simulations incorporated into this approval, all conditions associated with this approval and any ministerial permits or approvals issued in connection with this approval. In the event that the permittee does not maintain such records as required in this condition, any ambiguities or uncertainties that would be resolved through an inspection of the missing records will be construed against the permittee. The per mittee may keep electronic records; provided, however, that copies kept in the City’s possession will control over any conflicts, and originals will control over all other copies in any form.

16. Undergrounded Utilities. In the event that other public utilities or cable television operators in the public right -of-way underground their facilities where the permittee’s wireless facility is located, the permittee must underground its equipment except the antennas and antenna supports, to the extent technically feasible. Such undergrounding shall occur at the permittee’s sole cost and expense except as reimbursed pursuant to law. In areas with existing overhead lines, new communication lines shall be “overlashed” with existing communication lines to the extent technically feasible.

17. Electric Meter Removal. In the event that the commercial electric utility provider adopts or changes its rules obviating the need for a separate or ground- mounted electric meter and enclosure, the permittee on its own initiative and at its sole cost and expense shall apply to the City for permission to remove the separate or ground-mounted electric meter and enclosure and restore the affected area to its original condition.

18. Rearrangement and Relocation. The permittee acknowledges that the City, in its sole discretion and at any time, may: (1) change any street grade, width or location; (2) add, remove or otherwise change any improvements in, on, under or along any street, sidewalk, or right of way owned by the City or any other public agency, which includes without limitation any sewers, storm drains, conduits, pipes, vaults, boxes, cabinets, poles and utility systems for gas, water, electric or telecommunications; and/or (3) perform any other work deemed necessary, useful or desirable by the City (collectively, “City Work”).

The City reserves the rights to do any and all City Work without any admission on its part that the City would not have such rights without the express reservation in this permit. In the event that the City determines that any City Work will require the permittee’s facility to be rearranged and/or relocated, the permittee shall, at its sole cost and expense, do or cause to be done all things necessary to accomplish such rearrangement and/or relocation. If the permittee fails or refuses to either permanently or temporarily rearrange and/or relocate the permittee’s facility within a reasonable time after the City’s notice, the City may (but will not be obligated to) cause the rearrangement or relocation to be performed at the permittee’s sole cost and expense. The City may exercise its rights to rearrange or relocate the permittee’s facility without prior notice to permittee when the

80 of 104

City determines that the City Work is immedi ately necessary to protect public health or safety. The permittee shall reimburse the City for all costs and expenses in connection with such work within 10 calendar days after a written demand for reimbursement and reasonable documentation to support such costs. In addition, the permittee shall indemnify, defend and hold the City, its agents, officers, officials, employees and volunteers harmless from and against any Claims in connection with rearranging or relocating the permittee’s facility, or turning on or off any water, oil, gas, electricity or other utility service in connection with the permittee’s facility, except to the extent such Claims are caused by the sole or active negligence or willful misconduct of the City.

19. Landscaping. The permittee shall replace any landscape features damaged or displaced by the construction, installation, operation, maintenance or other work performed by the permittee or at the permittee’s direction on or about the site. In the event that any trees are damaged or displaced, the permittee shall hire and pay for a licensed arborist to select, plant and maintain replacement landscaping in an appropriate location for the species. Only ISA Certified workers under the supervision of a licensed arborist shall be used to install the replacement tree(s). The box size and other standards for any replacement trees shall be subject to the City’s approval in consultation with the licensed arborist. The permittee shall, at all times, be responsible to maintain any replacement landscape features.

20. Encroachment Permit General Conditions. The permittee shall comply with the City of San Mateo’s Encroachment Permit General Conditions.

21. Insurance Requirements. Commercial general liability (or comprehensive) and property damage insurance indicating the City of San Mateo as an additional insured is required.

Coverage shall be at least as broad as:

i. Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 covering CGL on an "occurrence" basis, including products - completed operations, personal & advertising injury, contractual liability, property damage, death, bodily injury, and limited pollution liability endorsement, with limits no less than $5 ,000,000 per occurrence; $10,000,000 aggregate. If a gener al aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. ii. Limited Pollution Liability Coverage: Insurance in the amount of $5,000,000 per claim and in the aggregate covering third party claims for bodily injury, property damage or cleanup costs as required by law, where the pollution is caused during and by permittee’s work and for permittee’s products and completed operations. (This may satisfy the requirement for a limited pollution liability endorsement on the Commercial General Liability insurance policy.)
iii. Automobile Liability: ISO Form Number CA 00 01 covering any auto (Code 1), or if permittee has no owned autos, hired, (Code 8) and non- owned autos (Code 9), with limit no less than $1,000,000 per accident for bodily injury and property damage.
iv. Workers' Compensation: as required by the State of California, with Statutory Limits, and Employer's Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease. The Workers Compensation policy shall be endorsed with a waiver of subrogation in favor

81 of 104

of City (and its elected and appointed officials, employees, and volunteers).

The insurers shall agree to waive all rights of subrogation against City and its officials, officers, employees, and volunteers for all work performed by permittee and its employees, agents, and contractors.
v. Professional Liability: (Applicable to all permittee’s contractors and subcontractors of any tier performing any professional services including engineers, surveyors, or consultants relating to this agreement) with limits of $2,000,000 per claim, and $2,000,000 policy aggregate. vi. Contractors’ Pollution Liability: (Applicable to all permittee’s contractors and subcontractors of any tier performing any removal, remediation, abatement, transportation or disposal of any hazardous materials and/or projects involving environmental hazards relating to permit) with limits of $2,000,000 per occurrence and $2,000,000 policy aggregate.
vii. “All Risk” Property Insurance: against all risks of loss or damage to any wireless communication facility(ies) or betterments, personal property, trade fixtures, equipment, and/or merchandise located in, on, at, under, above, or about the City’s right of way, license area, and/or City -owned pole(s) (including, but not limited to, loss resulting from fire, windstorm, hail, lightning, vandalism, malicious mischief, and such other perils ordinarily included in extended coverage casualty insurance policies). Such insurance shall be maintained in an amount sufficient to cover not less than one hundred percent (100%) of the full replacement value thereof (whichever is greater) with no coinsurance penalty pr ovision. Permittee may self-insure this risk with prior notice to the City.

If the permittee maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the permittee.

Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:

Additional Insured Status
The City, its elected and appointed officials, employees, volunteers, and agents are to be covered as insureds on the auto policy for liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the permittee ; and on the COL policy with respect to liability arising out of work or operations performed by or on behalf of the permittee including materials, parts or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the permittee’s insurance (at least as broad as ISO Form CG 20 10, 11 85 or both CG 20 10 and CG 20 37 forms if later revisions used).

Primary Coverage
For any claims related to the permit, the permittee’s insurance coverage shall be primary insurance as respects the City, its elected and appointed officials, employees, volunteers, and agents. Any insurance or self -insurance maintained by the City, its elected and appointed officials, employees, volunteers, or agents shall be excess of the permittee’s insurance and shall not contribute with it.

Notice of Cancellation

82 of 104

Each insurance policy required above shall provide that coverage shall not be canceled, except after thirty (30) days' prior written notice (10 days for non-payment) has been given to the City.

Waiver of Subrogation
Permittee hereby grants to City a waiver of any right to subrogation, which any commercial general liability, automobile liability, and worker’s compens ation insurer of said permittee may acquire against the City by virtue of the payment of any loss under such insurance. Permittee agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies reg ardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.

Self-lnsured Retentions
Any self-insured retentions must be declared to and approved by the City. The City may require the permittee to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention.

Claims Made Policies. If any insurance coverage required herein is written on a “claims made” policy: (a) the retroactive date must be shown, and this date must be before the execution date of the permit or the beginning of the permitted project or work; (b) insurance must be maintained and evidence of insurance must be provided for at leas t the duration of any applicable Master License Agreement and/or the applicable permit(s)) and five (5) years after completion of the subject work; and (c) if coverage is canceled or non-renewed, and not replaced with another claims -made policy form with a retroactive date prior to the permit effective, or start of work date, permittee must purchase extended reporting period coverage for a minimum of five (5) years after completion of any work; and (d) a copy of the claims reporting requirements must be sub mitted to the City for review upon request.

Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best's rating of no less than A:VII, unless otherwise acceptable to the City.

Verification of Coverage
Permittee shall furnish the City with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the permittee's obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.

Contractors and Subcontractors. Permittee shall require and verify that all contractors and subcontractors (if any) maintain the same insurance limits as required of permittee, unless otherwise agreed to by the City.

Special Risk or Circumstances. City, upon prior written notice to, review and written acceptance by permittee, reserves the right to modify these insurance requirements at any time, including, but not limited to, limits, based on t he nature of the risk, prior experience, insurer, coverage, or other special circumstances.

83 of 104

22. Traffic Control. Traffic control per Caltrans standards. No street closures allowed, must allow through traffic at all times. Permittee must notify City of San Mateo's Police (650) 522-7700, Fire (650) 522-7940, and San Mateo County Communications (650) 363-4961, at least 24 – 48 hours in advance of lane closures or det ours; and immediately upon removal of lane closure or detour.

23. Traffic Control Plans (TCPs). Site-specific TCP’s are required where any of the following criteria are met, and shall be prepared in accordance with the “Guidelines for Submittal of Site-Specific TCP’s” found in the Encroachment Permit Packet:
i. Any roadway that is classified as a collector or arterial. Roadway classifications are defined in the Circulation Element of the General Plan. A map of roadway classifications can be seen here:
http://www.cityofsanmateo.org/DocumentCenter/Home/View/7192 and is attached to this document.
ii. Any roadway (including local roadways) that requires full road closures or detours. iii. Any roadway with a speed limit over 25 mph.

The City reserves the right to require site-specific TCP’s where deemed necessary.

24. Underground Service Alert (USA). Forty-eight (48) hours before commencing work, the permittee shall contact Underground Service Alert (USA) at 1- 800-227-2600 to verify elevations and locations of all existing utilities

25. Private Sewer Laterals. The City of San Mateo does not mark private sewer laterals in the public right-of-way as part of the Underground Service Alert (USA) program. Permittee is to take precautions to locate and protect private sewer laterals from damage during construction. In the event any damage is discovered, the Permittee is required to immediately dig and repair the sewer lateral to restore sewer service. If new facilities are being installed by the boring method the Permittee is also required to video inspect any sewer and storm mains that are crossed by their facilities as part of this project, a copy of this video is to be provided to the City.

The above conditions are in addition to all other standards, requirements, and conditions adopted by the City, all wireless facilities permits, whether approved by the City or deemed approved by the operation of law, shall be automatically subject to the conditions in this section. The City (or the appellate authority on appeal) shall have discretion to modify or amend these conditions on a case-by- case basis as may be necessary or appropriate under the circumstances to protect public health and safety or allow for the proper operation of the approved facility consistent with the goals and applicable provisions of San Mateo Municipal Code Chapter 17.10.

B. Standard Conditions for Section 6409 Approvals. In addition to all other conditions adopted by the City, all section 6409 approvals, whether approved by the City or deemed approved by the operation of law, shall be automatically subject to the conditions in this section. The City (or the appellate authority on appeal) shall have discretion to modify or amend these conditions on a case-by-case basis as may be necessary or appropriate under the ci rcumstances to protect public health and safety or allow for the proper operation of the approved facility consistent with the goals and applicable provisions of San Mateo Municipal Code Chapter 17.10.

84 of 104

1. Permit Term. The City’s grant or grant by operation of law of a section 6409 approval constitutes a federally -mandated modification to the underlying permit or other prior regulatory authorization for the subject tower or base station, and will be regarded as a modification to the underlying approval for the subject tower or base station. The City’s grant or grant by operation of law of a section 6409 approval will not extend the permit term, if any, for any underlying permit or other underlying prior regulatory authorization.

Accordingly, the term for a section 6409 approval shall be coterminous with the underlying permit or other prior regulatory authorization for the subject tower or base station.

This
condition shall not be applied or interpreted in any way that would cause the term of the underlying permit for the modified facility to be less than 10 years in total length.

2. Compliance Obligations Due to Invalidation. In the event that any court of competent jurisdiction invalidates all or any portion of Section 6409 or any FCC rule that interprets Section 6409 such that federal law would not mandate approval for any section 6409 approval(s), such approval(s) shall automatically expire one year from the effective date of the judicial order, unless the decision would not authorize accelerated termination of previously approved section 6409 approvals or the City grants an extension upon written request from the permittee that shows good cause for the extension, which includes without limitation extreme financial hardship. Notwithstanding anything in the previous sentence to the contrary, the City may not grant a permanent exemption or indefinite extension. A permittee shall not be required to remove its improvements approved under the invalidated section 6409 approval when it has obtained the applicable permit(s) or submitted an application for such permit(s) before the one-year period ends.

3. City’s Standing Reserved. The City’s grant or grant by operation of law of a section 6409 approval does not waive, and shall not be construed to waive, any standing by the City to challenge Section 6409, any FCC rules that interpret Section 6409 or any section 6409 approval.

4. Compliance with Approved Plans. Before the Department of Public Works issues any permits required to commence construction in connection with this section 6409 approval, the permittee must incorporate this section 6409 approval, all conditions associated with this section 6409 approval and any approved photo simulations into the project plans (the “Approved Plans”). The permittee must construct, install and operate the wireless facility in substantial compliance, as determined by the City , with the Approved Plans. An y alterations, modifications or other changes to the Approved Plans, whether requested by the permittee or required by other departments or public agencies with jurisdiction over the wireless facility, must be submitted in a written request subject to the City ’s prior review and approval. The City may revoke the section 6409 approval if the City finds that the requested alteration, modification or other change may cause a substantial change as that term is defined by the FCC in 47 C.F.R. § 1.6100(b)(7), as may be amended.

5. Post-Installation Certification. Within 60 calendar days after the permittee commences full, unattended operations of a wireless facility approved or deemed-approved under San Mateo Municipal Code Chapter 17.10, the permittee shall provide the City with documentation reasonably acceptable to the City that the wireless facility has been installed and/or constructed in substantial compliance with the Approved Plans. Subject to the City’s discretion, such documentation may include, but shall not be limited to, as - built drawings, site surveys, GIS data and site photographs.

6. Build-Out Period. This section 6409 approval will automatically expire one (1) year from the approval or deemed-granted date unless the permittee obtains all other permits and

85 of 104

approvals required to install, construct and/or operate the approved wireless facility, which includes without limitation any permits or approvals required by any federal, state or local public agencies with jurisdiction over the subject property, the wireless facility or its use. The City may grant one written extension up to one (1) year when the permittee shows good cause to extend the limitations period in a written request for an extension submitted at least 30 calendar days prior to the automatic expiration date in this condition.

7. Maintenance Obligations; Vandalism. The permittee shall keep the site, which includes without limitation any and all improvements, equipment, structures, access routes, fences and landscape features, in a neat, clean and safe condition in accordance with the Approved Plans and all conditions in this permit. Any concealment elements shall be kept in “like new” condition at all times. The permittee shall keep the site area free from all litter and debris at all times. The permittee, at no cost to the City, shall remove and remediate any graffiti or other vandalism at the site within 48 hours after the permittee receives notice or otherwise becomes aware that such graffiti or other vandalism occurred. The permittee and property owner shall maintain any and all landscape features in accordance with an approved landscape plan, if any, and shall replace dying or dead trees, foliage or other landscape elements shown on the Approved Plans within 30 calendar days after written notice from the City.

8. Compliance with Laws. The permittee shall maintain compliance at all times with all federal, state and local statutes, regulations, orders or other rules that carry the force of law (“Laws”) applicable to the permittee, the subject property, the wireless facility or any use or activities in connection with the use authorized in this section 6409 approval, which includes without limitation any Laws applicable to human exposure to RF emissions. The permittee expressly acknowledges and agrees that this obligation is intended to be broadly construed and that no other specific requirements in these conditions are intended to reduce, relieve or otherwise lessen the permittee’s obligations to maintain compliance with all Laws. In the event that the City fails to timely notice, prompt or enforce compliance with any applicable provision in the San Mateo Municipal Code, any permit, any permit condition or any applicable law or regulation, the applicant or permittee will not be relieved from its obligation to comply in all respects with all applicable provisions in the San Mateo Municipal Code, any permit, any permit condition or any applicable law or regulation.

9. Cooperation with RF Compliance Evaluations. At all times relevant to this permit, the permittee and the property owner shall reasonably cooperate with efforts by the City to evaluate whether the wireless facility complies with all applicable FCC rules and regulations for human exposure to RF emissions. Such cooperation shall be at no cost to the City and may include, but is not limited to: (1) furnishing the City with a written affidavit signed by an RF engineer certifying the wireless facility’s compliance with applicable FCC rules and regulations; (2) providing technical data such as the frequencies in use, power output levels and antenna specifications, reasonably necessary to evaluate compliance with maximum permissible exposure levels set by the FCC; (3) allowing the City or its designee to have supervised access to the areas near the wireless facility for inspections and field measurements; and (4) promptly responding to all requests by the City or its designee for information and/or cooperation with respect to any of the foregoing.

10. Adverse Impacts on Other Properties. The permittee shall use all reasonable efforts to avoid any and all undue or unnecessary adverse impacts on nearby properties that may arise from the permittee’s or its authorized personnel’s construction, installation, operation, modification, maintenanc e, repair, removal and/or other activities at the site.

86 of 104

The permittee shall not perform or cause others to perform any construction, installation, operation, modification, maintenance, repair, removal or other work that involves heavy equipment or machines except during normal construction hours authorized by the San Mateo Municipal Code. The restricted work hours in this condition will not prohibit any work required to prevent an actual, immediate harm to property or persons, or any work during an emergency declared by the City. The City may issue a stop work order for any activities that violates this condition.

11. Backup Power; Generators. The permittee shall operate backup power generators only during (a) commercial power outages or (b) for maintenance pur poses during normal construction hours in accordance with the San Mateo Municipal Code. The City may approve a temporary power source and/or generator in connection with initial construction, major repairs or in the event of an emergency. The permittee shall not operate any permanent backup generators located in the public right-of-way.

12. Inspections; Emergencies. The permittee expressly acknowledges and agrees that the City’s officers, officials, staff or other designee may enter onto the site and inspect t he improvements and equipment upon reasonable prior notice to the permittee, or at any time during an emergency. The City’s officers, officials, staff or other designee may, but will not be obligated to, enter onto the site area without prior notice to sup port, repair, disable or remove any improvements or equipment in emergencies or when such improvements or equipment threatens actual, imminent harm to property or persons. The permittee, if present, may observe the City’s officers, officials, staff or other designee while any such inspection or emergency access occurs.

13. Permittee’s Contact Information. The permittee shall furnish the City with accurate and up-to-date contact information for a person responsible for the wireless facility, which includes with out limitation such person’s full name, title, direct telephone number, facsimile number, mailing address and email address. The permittee shall keep such contact information up to date at all times and immediately provide the City with updated contact inf ormation in the event that either the responsible person or such person’s contact information changes.

14. Indemnification. The permittee shall defend, indemnify and hold harmless the City, City Council and City boards, commissions, agents, officers, officials, employees and volunteers from any and all (1) damages, liabilities, injuries, losses, costs and expenses and from any and all claims, demands, law suits, writs and other actions or proceedings (“Claims”) brought against the City or its agents, officers, officials, employees or volunteers to challenge, attack, seek to modify, set aside, void or annul the City’s approval of this section 6409 approval, and (2) other Claims of any kind or form, whether for personal injury, death or property damage, that arise from or in connection with the permittee’s or its agents’, directors’, officers’, employees’, contractors’, subcontractors’, licensees’, or customers’ acts or omissions in connection with this section 6409 approval or the wireless facility. Permittee’s duty to defend and indemnify shall not apply to the extent such Claims are caused by the sole or active negligence or wil lful misconduct of the City. In the event the City becomes aware of any Claims, the City will use best efforts to promptly notify the permittee and the private property owner and shall reasonably cooperate in the defense. The permittee expressly acknowled ges and agrees that the City shall have the right to approve, which approval shall not be unreasonably withheld, the legal counsel providing the City’s defense, and the property owner and/or permittee (as applicable) shall promptly reimburse City for any c osts and expenses directly and necessarily incurred by the City in the course of the defense. The permittee expressly

87 of 104

acknowledges and agrees that the permittee’s indemnification obligations under this condition are a material consideration that motivates the City to approve this section 6409 approval, and that such indemnification obligations will survive the expiration or revocation of this section 6409 approval.

15. Performance Bond. Before the Department of Public Works issues any encroachment permit and/or other ministerial permits required to commence construction in connection with this section 6409 approval, the permittee shall post a performance bond from a surety and in a form acceptable to the City in an amount reasonably necessary to cover the cost to remove the improvements and restore all affected areas based on a written estimate from a qualified contractor with experience in wireless facilities removal. The written estimate must include the cost to remove all equipment and other improvements, whi ch includes without limitation all antennas, radios, batteries, generators, utilities, cabinets, mounts, brackets, hardware, cables, wires, conduits, structures, shelters, towers, poles, footings and foundations, whether above ground or below ground, constructed or installed in connection with the wireless facility, plus the cost to completely restore any areas affected by the removal work to a standard compliant with applicable laws. In establishing or adjusting the bond amount required under this condition, and in accordance with California Government Code § 65964(a), the City shall take into consideration any information provided by the permittee regarding the cost to remove the wireless facility to a standard compliant with applicable laws. The performance bond shall expressly survive the duration of the permit term to the extent required to effectuate a complete removal of the subject wireless facility in accordance with this condition.

16. Recall to Approval Authority; Permit Revocation. The City may recall this section 6409 approval for review at any time due to complaints about noncompliance with applicable laws or any approval conditions attached to this section 6409 approval after notice and an opportunity to cure the violation is provided to the permit tee. If the noncompliance continues after notice and reasonable opportunity to cure the noncompliance, the City may revoke this section 6409 approval or amend these conditions as the City deems necessary or appropriate to correct any such noncompliance.

17. Record Retention. The permittee must , for the duration of the permit term, maintain complete and accurate copies of all permits and other regulatory approvals issued in connection with the wireless facility, which includes without limitation this approval, the approved plans and photo simulations incorporated into this approval, all conditions associated with this approval and any ministerial permits or approvals issued in connection with this approval. In the event that the permittee does not maintain such records as required in this condition, any ambiguities or uncertainties that would be resolved through an inspection of the missing records will be construed against the permittee. The permittee may keep electronic records; provided, however, tha t hard copies or electronic records kept in the City’s regular files will control over any conflicts between such City-controlled copies or records and the permittee’s electronic copies, and complete originals will control over all other copies in any form.

18. Undergrounded Utilities. In the event that other public utilities or cable television operators in the public right -of-way underground their facilities where the permittee’s wireless facility is located, the permittee must underground its equipment except the antennas and antenna supports, to the extent technically feasible. Such undergrounding shall occur at the permittee’s sole cost and expense except as reimbursed pursuant to law. In areas with existing overhead lines, new communication lines shall be “overlashed” with existing communication lines to the extent technically feasible.

88 of 104

19. Electric Meter Removal. In the event that the commercial electric utility provider adopts or changes its rules obviating the need for a separate or ground- mounted electric meter and enclosure, the permittee on its own initiative and at its sole cost and expense shall apply to the City for permission to remove the separate or ground-mounted electric meter and enclosure and restore the affected area to its original condition.

20. Rearrangement and Relocation. The permittee acknowledges that the City, in its sole discretion and at any time, may: (1) change any street grade, width or location; (2) add, remove or otherwise change any improvements in, on, under or along any street ow ned by the City or any other public agency, which includes without limitation any sewers, storm drains, conduits, pipes, vaults, boxes, cabinets, poles and utility systems for gas, water, electric or telecommunications; and/or (3) perform any other work deemed necessary, useful or desirable by the City (collectively, “City Work”). The City reserves the rights to do any and all City Work without any admission on its part that the City would not have such rights without the express reservation in this permit. In the event that the City determines that any City Work will require the permittee’s facility to be rearranged and/or relocated, the permittee shall, at its sole cost and expense, do or cause to be done all things necessary to accomplish such rearrangement and/or relocation. If the permittee fails or refuses to either permanently or temporarily rearrange and/or relocate the permittee’s facility within a reasonable time after the City’s notice, the City may (but will not be obligated to) cause the rearrangement or relocation to be performed at the permittee’s sole cost and expense. The City may exercise its rights to rearrange or relocate the permittee’s facility without prior notice to permittee when the City determines that the City Work is immediately necessary to protect public health or safety. The permittee shall reimburse the City for all costs and expenses in connection with such work within 10 days after a written demand for reimbursement and reasonable documentation to support such costs. In addition, the permittee shall indemnify, defend and hold the City, its agents, officers, officials, employees and volunteers harmless from and against any Claims in connection with rearranging or relocating the permittee’s facility, or turning on or off any water, oil, gas, electricity or other utility service in connection with the permittee’s facility.

21. Landscaping. The permittee shall replace any landscape features damaged or displaced by the construction, installation, operation, maintenance or other work per formed by the permittee or at the permittee’s direction on or about the site. In the event that any trees are damaged or displaced, the permittee shall hire and pay for a licensed arborist to select, plant and maintain replacement landscaping in an appropr iate location for the species. Only ISA Certified workers under the supervision of a licensed arborist shall be used to install the replacement tree(s). The box size and other standards for any replacement trees shall be subject to the City’s approval in consultation with the licensed arborist. The permittee shall, at all times, be responsible to maintain any replacement landscape features.

89 of 104

1 Attachment 5 – Federal and State Laws – Wireless Ordinance and Design Standards Update I. Federal Telecommunications Act
A. Radio Frequency Emissions
Congress delegated authority to the FCC to establish a national standard for human RF emissions exposure limits. In the TCA, Congress likewise preempted state and local regulations:

No State or local government or instrumentality thereof may regulate the placement, construction, and modification of personal wireless service facilities on the basis of the environmental effects of radio frequency emissions to the extent that such facilities comply with the [FCC]’s regulations concerning such emissions.

The Telecommunications Act also expanded the FCC’s authority to preempt state or local actions (or failures to act) that violate the statutory prohibition. Pursuant to its delegated authority from Congress, the FCC established rules and standards for human exposure to RF emissions (the “FCC Rules”). The FCC Rules occupy the field, which means that state and local governments cannot establish their own standards or engage in supplemental regulation.

The FCC Rules regulate exposure rather than emissions. Although the FCC Rules apply different maximum power levels for different frequencies, it does not distinguish between different frequency modulation technologies (e.g., “4G” versus “5G”). The FCC Rules also regulate thermal effects from RF emissions rather than non-thermal effects.

Site operators must continuously comply with the FCC Rules. At the federal level, the compliance evaluation process generally involves a demonstration through predictive models based on the proposed equipment’s maximum output power or a compliance certification by the operator for facilities that qualify for “categorical exclusion” from routine compliance evaluation. On-site tests are rarely required except in enforcement actions by FCC staff.

Although state and local governments cannot establish their own standards for RF exposure, local officials may require wireless applicants to demonstrate compliance with the FCC Rules. In the RF Procedures Order, the FCC acknowledged that state and local governments have a legitimate interest in compliance with the FCC Rules. However, the RF Procedures Order does not dictate any specific method for compliance demonstrations. Instead, the FCC encouraged municipalities and industry to establish best practices that resemble the FCC’s own compliance evaluation process.

B. Unreasonable Discrimination
Under the TCA, local governments may not unreasonably discriminate against providers of functionally equivalent services. “[F]unctionally equivalent services . . . refer[s] only to personal wireless services . . . that directly compete against one another.” Thus, different regulations for non-commercial facilities and commercial facilities would not be unreasonable discrimination. The standard permits reasonable discrimination and localities retain “flexibility to treat facilities that create different visual, aesthetic, or safety concerns differently to the extent permitted under generally applicable zoning requirements, even if those facilities provide functionally equivalent services.” To prevail on this claim, carriers must

90 of 104

2 show that the local government discriminated between two similar service providers who submitted two similar proposals in two similar contexts.

C. Actual and Effective Prohibitions
A single permit denial can cause an effective prohibition. However, the test to determine when a permit denial effectively prohibits personal wireless services is somewhat uncertain due to recent actions by the FCC to displace prior judicial interpretations.

In 2005, the Ninth Circuit federal appeals court adopted a test that requires the applicant to show that (1) a “significant gap” in the applicant’s service coverage exists; and (2) the proposed facility was the “least intrusive means” to mitigate the significant gap. Both elements require a fact-intensive analysis that courts undertake without deference to findings made by the local government.

In 2018, the FCC interpreted that an effective prohibition occurs when a city “materially limits or inhibits the ability of any competitor or potential competitor to compete in a fair and balanced legal and regulatory environment.” This test applies to an entity’s ability to provide a personal wireless service, a telecommunication service or both. This test also applies “not only when filling a coverage gap but also when densifying a wireless network, introducing new services or otherwise improving service capabilities.” The FCC Order that discussed this new interpretation was focused on small wireless facilities, and it was left unclear whether the new standard was intended to apply to other types of wireless facilities.

Although the Ninth Circuit affirmed the FCC’s authority to adopt the “materially inhibit” standard, the ambiguity remains, and it has not applied the test to a local permit denial for a wireless facility. As a practical matter, parties in litigation over these issues often argue both standards. This pattern will likely continue until there is further clarification.

D. Final Action within a Reasonable Time
The TCA requires state and local governments to act on duly filed applications within a “reasonable” time. FCC interpretations for what amounts to a reasonable time for local review, when applications may be deemed incomplete and what consequences arise from a failure to act within the applicable timeframe, differs based on the wireless facility proposed in each application. These FCC rules are known as the shot clock rules.

The shot clock encompasses all the authorizations necessary for the deployment, including discretionary zoning and ministerial building and safety permits. The shot clock may be tolled by mutual agreement between the applicant and permitting agency. Special rules exist to toll the shot clock for applications that are incomplete. Some key rules are also summarized in the list below:
•General Shot Clock Timing:
o60 days to collocate a small wireless facility on an existing structure. ▪Or an “eligible facilities request” under “Section 6409” (described below) o90 days to process a small wireless facility that is not collocated. o150 days to process most other facilities, such as a new cell tower.

91 of 104

3 •Shot Clock Commencement: The shot clock begins to run when an application is submitted whether the application is complete or not.
•Publicly Stated Rule: Application requirements must be in some publicly stated format (e.g., municipal code, wireless policy, online materials, handouts, checklists, guidelines, etc.). Local governments need not codify application requirements to enforce them for FCC shot-clock purposes.
•One-Bite Rule: The first incomplete notice must contain all the missing or incomplete items for a complete application. Subsequent incomplete notices toll the shot clock only when the response by the applicant fails to meet the criteria identified in the first incomplete notice.

The ability to meet shot clock deadlines is important because failure to act within them gives rise to a claim for unreasonable delay. Compliance is especially important in California because, as discussed in Part IV.B below, failure to timely approve or deny may result in an automatic approval.

E. Written Denial Requirements
Denials—and the reasons for the denial—must be in writing. Although the reasons need not appear in the same writing as the denial itself, the reasons must be “contemporaneously available.” Moreover, the writing may take various forms, such as a formal resolution, approved meeting minutes or a letter from staff, so long as the reasons for denial are sufficiently clear to enable judicial review.

F. Substantial Evidence Standard for Denials under Judicial Review All wireless permit denials must be supported with “substantial evidence in a written record.” “Substantial evidence” refers to the legal standard judges use to evaluate agency decisions and requires:
(1) an authorization in local law to deny the application on the basis cited by the local government and (2) reasonable evidence to support the local decisionmakers’ conclusion. Although the standard is deferential towards the agency, courts have held that speculative or generalized concerns do not constitute substantial evidence.

G. General TCA Remedies
Any person aggrieved by a final action or failure to act in connection with a permit application may seek expedited review in federal district court within 30 days from the final action or failure to act. If the matter relates to preempted RF regulations, aggrieved parties may petition the FCC for relief as an alternative to judicial review. Federal courts retain discretion to craft appropriate remedies but an order to issue permits to the applicant is an increasingly common result for TCA violations, and the FCC encourages courts to issue injunctions even for procedural violations. However, plaintiff-applicants generally cannot recover damages, attorney’s fees, or costs for TCA violations by a state or local government.

II. Federal Laws for “Small Wireless Facilities”
On September 27, 2018, the FCC adopted a Declaratory Ruling and Third Report and Order, FCC 18-133 (the “Small Cell Order”). The Small Cell Order covered many topics but the key changes in the law included: (1) a reinterpretation and new legal test for an “effective prohibition” that abrogates the

92 of 104

4 significant gap element in prior judicial tests; (2) defines a new regulatory classification for “small wireless facilities”; (3) limited the fees that can be charged for small wireless facilities; (4) described specific limitations on local aesthetic regulations for small wireless facilities; and (5) established new shot clock rules specific to applications for these facilities. Portions of the Small Cell Order were invalidated by the Ninth Circuit, as noted in the second bullet point below.

The FCC’s new test for effective prohibition was discussed in more detail in Part I.A above. The other key changes are summarized below:
• Fee Limitations: The FCC limits fees for small wireless facilities to costs. Fees effectively prohibit small wireless facilities unless: “(1) the fees are a reasonable approximation of the state or local government’s costs, (2) only objectively reasonable costs are factored into those fees, and (3) the fees are no higher than the fees charged to similarly situated competitors in similar situations.” “Fees” include both one-time charges (such as an application fee) and recurrent charges (such as a pole attachment fee or rent). However, limitations on recurring fees do not apply to facilities placed outside the ROW, such as a small wireless facility installed on the rooftop above city hall.
• Limitations on Aesthetic Regulations: Aesthetic requirements must be (1) reasonable and (2) published in advance. In this context, “reasonable” means “technically feasible and reasonably directed to avoiding or remedying the intangible public harm of unsightly or out-of-character deployments are also permissible.” The FCC Order also required aesthetic requirements to be no more burdensome than those applied to other ROW users and objective, but the Ninth Circuit invalidated those two requirements on judicial review.
• Batched Applications: State and local governments must allow applicants to submit “batched” applications. A “batch” means either multiple applications submitted at the same time or a single application that covers multiple facilities. The FCC does not mandate which approach state or local governments adopt. The longest shot clock applicable to any site in the batch defines the shot clock for all other sites included in the same batch. For example, if a batch includes three collocations and one installation on a replacement pole, the 90-day shot clock applies to all four facilities.

III. Federal Laws for “Eligible Facilities Requests” (EFRs) Section 6409(a) requires that State and local governments “may not deny, and shall approve” any “eligible facilities request” for collocation, removal, or replacement of transmission equipment on an “existing wireless tower” or “base station” so long as it does not cause a “substant[ial] change in [that site’s] physical dimensions.” A “tower” means any structure built solely or primarily to support transmission equipment, whether it actually supports any equipment or not. A “base station” means a non-tower structure in a fixed location approved for use as a wireless support by the local jurisdiction that actually supports transmission equipment at the time a collocation or modification request is submitted.

FCC regulations and orders adopted in 2014 and in 2020 interpret key terms in this statute and impose certain substantive and procedural limitations on local review. Localities must review applications submitted for approval pursuant to Section 6409(a), but the applicant bears the burden to show it

93 of 104

5 qualifies for mandatory approval.
a. Substantial Change Thresholds and Timing
The FCC created a multi-part test to determine whether a “substantial change” occurs or not, which involves thresholds for height increases, width increases, new equipment cabinets, new excavation, changes to concealment elements and permit compliance. Thresholds differ between towers and base stations. For example, a height increase of a base station or right-of-way facility of up to 10 feet or 10% (whichever is greater) would be considered a ministerial “eligible facilities request.” So too would a width increase of up to 6 feet for the same facility. Other thresholds apply in the context of additional equipment cabinets (generally, four), changes in concealment, and compliance with prior conditions of approval.

A project that exceeds any one threshold causes a substantial change. Additionally, the FCC considers a substantial change to occur when the project replaces the entire support structure or violates a generally applicable law or regulation reasonably related to public health and safety. State and local jurisdictions cannot consider any other criteria or threshold for a substantial change.

If the local government fails to approve or deny an EFR application within the 60-day shot clock, federal regulations deem the application granted upon a written notice from the applicant. Local governments may challenge the deemed granted notice in federal court within 30 days from the notice, but otherwise the applicant may proceed with construction.

IV. California Wireless Siting Laws
A. Public Utilities Code Sections 7901 and 7901.1
California Public Utilities Code Section 7901 provides that telephone corporations may construct facilities along public roads in ways and locations that do not “incommode” the public use of the road. In 2019, the California Supreme Court held that incommode means “to disturb or give inconvenience to public road use”, which preserves local authority to regulate on the basis of its traditional police power.

Thus, while local governments cannot require telephone corporations to obtain a local franchise, rules related to aesthetics, noise, health and safety are fair game under Section 7901.

Public Utilities Code Section 7901.1 affirms local authority to regulate the time, place and manner in which telephone corporations access the right-of-way. These regulations relate to temporary construction activities and must be applied in a nondiscriminatory manner.

B. Deemed-Approved Remedies for Failures to Timely Approve or Deny Applications In addition to any federal remedies, California law provides for a “deemed approved” remedy for certain applications for wireless facilities when the city or county fails to act within the FCC shot clock. This remedy is available for macro facilities, small wireless facilities, and collocations, but not for eligible facilities requests (which already have a federal deemed granted remedy) or any facilities proposed to be installed on properties or structures owned or controlled by fire departments.

To be deemed approved, the city or county must have failed to act within the shot clock period, all public notices required for the application must be given, and the applicant must provide written notice

94 of 104

6 to the city or county. Cities and counties may challenge this determination by seeking judicial review within 30 days from the applicant’s written notice.

C. AB 965 (Carrillo) [Cal. Gov’t Code § 65964.3]
Effective January 1, 2024, state law requires local public agencies to process substantially similar “broadband projects” (e.g., wireless facilities, fiber optic cable lines, etc.) submitted at the same time by the same applicant simultaneously under a single permit application. These batches must be processed within the “presumptively reasonable” timeframe under applicable law, which includes timelines under both federal and state laws.

A batched application is deemed approved when the local public agency fails to approve or deny the application within the presumptively reasonable timeline. With some caveats, and subject to compliance with certain health and safety rules, an application may be “deemed approved” if the City does not issue the permits or provide a written decision with the reasons for denial within the presumptively reasonable timeline. The maximum limit is 50 projects for cities with populations over 50,000, and the batched application generally stands or falls as a group.

95 of 104

96 of 104

From: Irena Mavridis
To: Lisa Diaz Nash; Rob Newsom; Richard Hedges; Adam Loraine; Amourence Lee; Martin McTaggart; Linda San Felipe Subject: Fw: [cell-tower] California: Cell facilities in San Mateo | Letters To Editor Date: Saturday, May 4, 2024 2:24:15 PM
Good Afternoon Honorable Mayor and Council members.

Please see below, sent today and circulated by Joel M. Moskowitz, Ph.D., Director Center for Family and Community Health at the School of Public Health University of California, Berkeley
Dr. Moskowitz also shares documents though a google group with thousands of members. His own professional website has been visited over 3 million times. Dr. Moskowitz just shared the San Mateo Daily Journal “Letter to the Editor” from neurosurgeon Dr. Aleksandyr Lavery highlighting brain cancer concerns related to the small cell facilities being placed near homes.

Please see below.

Thank you,
Irena
Sent from Yahoo Mail for iPhone
Begin forwarded message:

On Saturday, May 4, 2024, 1:07 PM, 'Joel M. Moskowitz' via Cell tower wrote:

Cell facilities in San Mateo
Editor,
As a neurosurgeon who operates on patients with brain
cancer, I’m concerned with the well documented links
between glioblastomas and radiation exposure. There is
false reassurance given by the wireless industry that
cell facilities operate within FCC radiation guidelines. I am deeply troubled by the small cell facility proliferation in San Mateo residential areas.

The International Commission on the Biological
Effects of Electromagnetic Fields (ICBE-EMF), a

97 of 104

“consortium of scientists and doctors” who study RF
radiation, argued the FCC’s limits were based on scant
science and erroneous assumptions in an October 2022
peer-reviewed article.

Citing more than 200 scientific studies, ICBE-EMF said:
“Adverse effects observed at exposures below the
assumed threshold include non-thermal induction of
reactive oxygen species, DNA damage,
cardiomyopathy, carcinogenicity, sperm damage, and
neurological effects. Multiple human studies have found statistically significant associations between RFR
exposure and increased brain and thyroid cancer risk.
… Consequently, these exposure limits, based on false
suppositions, do not adequately protect workers,
children, and the general population from short-term or long-term RFR exposures” (icbe-emf.org
).

I urge San Mateo to take action and revoke the nearly
200 permits mentioned by Irena in her Op-Ed “Don’t
‘Cell Out’ San Mateo.” These antennas are potentially
dangerous and studies show non-thermal radiation
below outdated 1996 approved limits causes harm,
including cancer. I don’t want this next to my home. As a surgeon, I have a duty to the public’s health. The city has just as much of a duty to the community’s health
and safety as I do.

Aleksandyr Lavery
San Mateo

98 of 104

https://www.smdailyjournal.com/opinion/letters_to_editor/cell- facilities-in-san-mateo/article_c5e54afc-09ae-11ef-
b326-a7da7fe65457.html
--
Aleksandyr Lavery, MD, is a neurosurgeon with Kaiser Permanente in Redwood City.
https://mydoctor.kaiserpermanente.org/ncal/providers/aleksandyrwlavery --
Joel M. Moskowitz, Ph.D., Director
Center for Family and Community Health
School of Public Health
University of California, Berkeley
Electromagnetic Radiation Safety
Website:
https://www.saferemr.com
Facebook: https://www.facebook.com/SaferEMR
Twitter: @berkeleyprc
--
You received this message because you are subscribed to the Google Groups "Cell tower" group.

To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]
.

To view this discussion on the web visit https://groups.google.com/d/msgid/cell- tower/CAAc%3DJ5KztziQb_TCH8hrXqn7gAZQjZYMkGO4Uk%2Bj_O-
DKcmq%2BA%40mail.gmail.com.

99 of 104

From: Kolja Schlütter
To: [email protected]; [email protected]; [email protected]; [email protected]
Subject: Support for 5G Deployment in San Mateo
Date: Saturday, May 4, 2024 3:45:41 PM
Dear San Mateo City Council,
I'm reaching out today amidst concerns and scheduled rallies against the deployment of 5G and associated Small Cell technology in our city. With the upcoming council meeting's public comment section likely to address these issues, I feel it's important to present a perspective grounded in global research and regulatory compliance.
5G technology, along with Small Cells, is not a novel or untested experiment. It's a globally deployed mobile advancement that has been rigorously tested and approved by hundreds of regulatory bodies around the world. The overwhelming scientific consensus confirms that 5G technology is safe for public use. This isn’t just an opinion—it's a conclusion backed by a multitude of studies from reputable organizations worldwide.

Despite the skepticism some community members might have, we need to consider the legal framework established by the Federal Communications Commission (FCC). The FCC's guidelines on 5G are clear and are not merely suggestions but federal mandates. The council's role does not include regulating telecommunications at this level—this is a federal matter, and deviation from this could lead not only to legal entanglements but also to significant, unforeseen expenses for our city budget. It’s a path that could set a concerning precedent for future interactions with federal regulations.

For those in our community who are convinced of the dangers of 5G and believe they possess contrary evidence, the appropriate course of action would be to take their concerns to our representatives in Washington DC or directly to the FCC. It is at that level that their evidence can and should be evaluated, not at the local council level.

I fully support the deployment of 5G in the city of San Mateo. This technology promises enhanced connectivity, which is particularly crucial in areas of our community currently facing inadequate data speeds and service—many of which are in the hillier regions of our city.

I trust the council will consider the broader benefits of 5G technology, the scientific consensus on its safety, and the legal framework we operate under. Let's ensure San Mateo remains a forward-thinking community, ready to embrace technologies that promise to improve our quality of life and economic prosperity.

Best regards,
Kolja Schluetter

100 of 104

From: Michael
To: City Council (San Mateo)
Cc: Martin McTaggart
Subject: 5/6 Council Special Meeting - Small Cell Wireless Facilities Ordinance - Please Support and Fund Strengthening Date: Monday, May 6, 2024 10:31:29 AM
Greetings Mayor Nash and Councilmembers - Please support and fund strengthening our small cell wireless facilities ordinance. Residents rely on the city to protect us from indiscriminate companies who don't prioritize our health and safety. I'm concerned that our city seems to consistently roll over on issues - we're told we have little ability to push back against federal laws, but in reality we have substantial latitude as evidenced by numerous other cities' stronger ordinances. We need to adopt a stronger culture of putting residents first, and this ordinance would be a good start. I'm also concerned learning that the city reduced group presentation times from 15 mins to 5, ironically without soliciting input. There is a concerning quelling of input by reducing times to 1 minute along with group times that has the effect of silencing important voices. We're going in the wrong direction here. The city should also fund Ariel Strauss' time - it's clear our city attorney is not an expert here, and we end up hiring out for many issues. Madam Mayor - please allow Mr. Strauss to answer questions as well - I understand that is your prerogative.

Let's get this right - it's too important.

Thank you - Michael Weinhauer

101 of 104

From: Mary Komatsu
To: City Council (San Mateo)
Subject: Small cell near my home, permit # 2023-000136
Date: Monday, May 6, 2024 1:20:28 PM
Dear City Council,
There is a small cell facility proposed and partially approved near my home at 2321 Armada Way. I can see the proposed unit from my bedroom window. I appealed the decision in the October/November, 2023.

Crown Castle deceptively omitted the very large, four foot tall above ground smart meter from the photo visualization of the project. The infrastructure committee decided not to approve the smart meter during my appeal.

But they did approve the permit.

I am extremely uncomfortable with the idea of a 24/7 cell device that I can see from my bedroom window. I think this could impact my health as I have a skin condition. There is no proof that the radio energy emission is safe over the long term.

I know we are drafting a new ordinance and I want to be protected under the terms of the NEW ordinance. I want the original permit REVOKED. The original permit should never have been approved in the first place, especially as my community did not get due process because Crown Castle omitted the four foot tall smart meter from the photo visualization.

Thank you for your consideration,
Mary Komatsu
Sent from my iPad

102 of 104

103 of 104

104 of 104

← All documents from this meeting