Text extracted from the city's file for reading and search. Open the original on sanmateo.primegov.com. That file is the official record.

Wet Weather
Preparations
Informational Update
December 15, 2025
Matt Fabry, P.E.

Director – Public Works Department
1 of 21
Council Feedback & Direction
This is an informational update only; general City Council feedback is welcome.
2 of 21
3 Agenda
• Ongoing Initiatives
• Marina Lagoon Pump Station Alternatives Analysis
• Storm Drain Master Plan Update
• Marina Lagoon Spot Dredging
• Annual Maintenance
• Inspections and Cleanings (catch basins, trash capture devices, etc.) • Deployment of remote monitoring cameras
• Sandbag Stations
• New Activities
• Citywide Creek Maintenance Permit
• Community Feedback for Storm Drain Improvements
4 Ongoing Initiatives
5 of 21
Marina Lagoon
Pump Station
Alternatives Analysis
• Physical Hydraulic Modeling
Alternative selected
• Agreement for modeling
awarded on Dec 1
• Estimated completion of July
2026 for modeling results

6 of 21
LiDAR Aerial Survey
Storm Drain Master
Plan Update
• Data acquisition and model
development complete
• Current tasks include
projecting climate change,
developing criteria for project
prioritization, and reviewing
preliminary capital projects
• SIC will be briefed on January
14 and City Council will be
briefed on January 26
• Draft report expected Spring
2026

7 of 21
LiDAR Aerial Survey
Marina Lagoon Spot
Dredging
• Advertised in June 2025 and
received a single bid 30%
higher than engineer’s
estimate; no viable methods to
reduce cost
• Preparing to re-advertise in late
January 2026, and plan to
complete work by October
2026
• Lagoon users and residents will
be notified of upcoming
construction timelines,
impacts, and other related
project information
Borel Creek Outfall
Dredging
Leslie Creek Outfall
Dredging
Sediment Dewatering Near Anchor Road
8 Annual Maintenance
9 of 21
LiDAR Aerial Survey
Catch Basin Cleaning
• Two full-time staff hired to
perform storm system
maintenance
• PW observed improved
performance of storm drain
infrastructure after the last two
seasons of catch basin cleaning
• To date, more than 1,400 catch
basins and 19 miles of pipe
cleaned (as of 12/10/2025)

10 Deployment of Remote
Flood Monitoring Cameras

12 of 21
Sandbag
Stations (3)
13 New Activities
14 of 21
LiDAR Aerial Survey
Citywide Creeks
Maintenance Permit
• Agreement awarded to
Montrose Environmental on
Dec 1
• Select priority project-specific
permits will estimated to be
received by Summer 2026
• Citywide permit estimated to
be in place by Summer 2027
• Will include preparation of
electronic guidance for
property owners of private
creeks

15 of 21
LiDAR Aerial Survey
Storm Drain
Improvement
Community Feedback
• Community input tool to be
released in December 2025
• Testimonies and
photos/videos to be used to:
• Validate model results
• Identify new flooding
• Identify potential
maintenance issues

16 Questions?
Matt Fabry, PE
Public Works Director
[email protected]