Cities Index.
Att 8 - Traffic and Parking Evaluation Memorandum Dated November 11, 2025

San Mateo City Council
January 12, 2026

Document
Att 8 - Traffic and Parking Evaluation Memorandum Dated November 11, 2025
Meeting
January 12, 2026
Body
San Mateo City Council
Pages
16
Original file
1.9 MB
Text extracted from the city's file for reading and search. Open the original on sanmateo.primegov.com. That file is the official record.
Page 1 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

MEMORANDUM
To:

From:

Date:

Subject:

City of San Mateo
Mike Mowery, P.E.

Kimley-Horn and Associates, Inc.

November 11, 2025
Traffic and Parking Evaluation Memorandum for 2033 La Salle Drive The purpose of this memorandum is to describe the approach and findings of a Traffic Evaluation for the proposed project at 2033 La Salle Drive (Project) in the City of San Mateo (City). The memorandum provides the assumptions for project understanding, data collection, and methodology of the analysis.

Project Description
The Project site is adjacent to residential uses and The Carey School elementary campus, located on La Salle Drive. The City’s designation for the site is One Family Dwelling “B” (R1B). The Carey School is proposing to redevelop the existing single-family residence, and an attached dwelling unit (ADU) at 2033 La Salle Drive into an early childhood center that can accommodate up to 75 children and 16 staff members. It is anticipated that approximately 50% of children would carpool with a sibling that is a student at The Carey School. The proposed site plan is included as Attachment A.

The Carey School’s Parking and Traffic Plan (Attachment E) includes information, policies, and procedures relating to traffic and parking for both the proposed early childhood center and the existing school campus. The Parking and Traffic Plan outlines that Project’s child drop-off/pick-up will occur at one of the following locations, as shown in Figure 1, depending on time of day and carpool situation:
• Early care drop-off/extended care pick-up: Park in Project parking lot and walk-in • Peak Period drop-off (8:00-8:25 AM)/pick-up (3:00-3:25 PM): Either at o Staffed carline in Project parking lot or
o Sibling drop-off/pick-up in elementary school staffed carline on Alameda de las Pulgas (Grades 2, 3, 5) and La Salle Drive (Grades PS, K, 1, 4) . Early childhood center students will be dropped off at the designated area for their oldest sibling. Staff will walk children from drop-off/pickup area to building.

Page 2 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

Figure 1: Student Loading Locations
The Parking and Traffic Plan provides detailed procedures for each of student loading locations. For the Project site d uring off-peak period, vehicles will park in one of the parking spaces and then walk the child into the care center. During peak period, vehicles cannot park and will follow the drop-off and pick-up procedure:
• From 20th Avenue, vehicles will follow one-way loop down La Salle Drive and complete full circle before entering Project driveway
• Staff will direct vehicles into designated loading spot and will supervise children entering/exiting the vehicle
• Vehicles will exit project site and head north towards 20th Avenue

TRIP GENERATION
The standard practice of starting an assessment of transportation related elements for new projects is to evaluate what the multi-modal transportation (vehicle, bike, and pedestrian) change may include. A trip generation analysis was conducted to determine the number of trips the Project would generate.

The trip generation was determined based on average rates from Institute of Transportation Engineer’s (ITE) publication, Trip Generation, 11th Edition.

Project Site
Parking Lot
Elementary
School Loading
Area

Page 3 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

Trip credits were taken to account for the existing single-family residence, and ADU to be demolished.

For the existing residential trips, data for ITE Land Use 220: Single Family Detached Housing was used.

For the proposed early childhood center, ITE Land Use 565: Day Care Center was used. Note Trip Generation does not provide trip generation data during the School PM for both the existing and the proposed land uses, therefore as a conservative approach the commute PM trip generation rates were used instead. Also, ITE Trip Generation Vehicle Time of Day Distribution tables reports that approximately 6.6% of daily residential trips ( 1 trip) and 4.3% of daily day care trips (13 trips) occur during the School PM peak hour of 2:00 and 3:00 PM.

For the proposed use, a carpool trip reduction was applied because approximately 50% of students of proposed childhood center have a sibling that attends the existing elementary school and would arrive in the same vehicle. As a conservative approach, this percentage was determined based on the lowest observed percentage in the 6 most recent school years of an existing off-site childhood center currently operated by the applicant, as shown in Figure 2. Note that the 6-year average is closer to 60%. The sibling carpool trips will utilize the existing Carey School drop off and pick up areas at Alameda de las Pulgas and La Salle and then walk to the Project.

Figure 2. Percentage of Sibling at Existing Childcare Facility 61%
79%
61% 61%
50% 50%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2020-2021 2021-2022 2022-2023 2023-2024 2025-2025 2025-2026 Sibling at The Carey School Other
The 6-year average shows that 60% of daycare children are siblings to student(s) enrolled at The Carey School.

Page 4 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

Table 1 presents the overall trip generation for the proposed project. The trips associated with the existing use were subtracted from the total since the homes will be removed. The proposed project will generate a net new 133 daily trips, 28 net new trips in the AM peak hour, 27 net new trips in the School PM peak hour, and 27 net new trips in the PM peak hour.

Page 5 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

Table 1:Project Trip Generation
ITE Land Use Code Size Units Daily Rate
AM Peak School PM Peak PM Peak
Rate In% Out% Rate** In% Out% Rate In% Out%
210 Single-Family
Detached Housing Dwelling Unit(s) 9.43 0.70 25% 75% 0.94 63% 37% 0.94 63% 37% 565 Day Care Center Student(s) 4.09 0.78 53% 47% 0.79 47% 53% 0.79 47% 53% Scenario ITE Land
Use Code Land Use Size Units Daily Trips AM Peak School PM Peak PM Peak Total In Out Total In Out Total In Out
Existing
Residential 210 Single-Family
Detached Housing 2 Dwelling
Unit(s) 19 1 0 1 2 1 1 2 1 1
Total Existing Trips 19 1 0 1 2 1 1 2 1 1
Proposed
Total 565 Day Care Center 75 Student(s) 307 59 31 28 59 28 31 59 28 31 Carpool Trip
Reduction 565 Day Care Center 38 Student(s) -155 -30 -16 -14 -30 -14 -16 -30 -14 -16 Total Proposed Trips 152 29 15 14 29 14 15 29 14 15
Total Net New Trips (Proposed – Existing) 133 28 15 13 27 13 14 27 13 14 Source: ITE Trip Generation, 11th Edition
*As a conservative approach, it was assumed that 50% of students will be siblings to a student(s) of the existing The Carey School (elementary). Note that the 6-year average is closer to 60%. The sibling carpool trips will utilize the existing Carey School loading areas at Alameda de las Pulgas and La Salle and then walk to the Project. **ITE Trip Generation does not provide rates for the School PM peak for residential or day care center land uses therefore the PM trip rates were used.

Page 6 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

TRIP ASSIGNMENT
As shown in Table 1, it is anticipated that during the peak hours approximately 29 trips will utilize the staff car line in the Project parking lot and the remaining 30 trips will utilize the sibling loading areas on Alameda de Las Pulgas or La Salle Drive shown inFigure 1. It is assumed that 95% of net new trips will come from the west of W 20th Avenue and La Salle Dr, while the remaining 5% of trips will come from the east.

Level of Transportation Analysis
As of July 1, 2020, the State of California has fully adopted a change in the California Environmental Quality Act (CEQA) significant impact methodology for transportation impacts to use vehicle miles traveled (VMT) as opposed to level of service (LOS) via State Bill 743 (SB 743). To address this change, the City of San Mateo developed and adopted the Transportation Impact Analysis Guidelines (TIA Guidelines) to provide screening criteria for determin ation of the level of transportation analysis and requirements for a transportation analysis.

Transportation analysis may consist of analysis required by CEQA and/or supplemental non -CEQA Local Transportation Analysis (LTA). The City’s TIA Guidelines outline criteria for determining the level of transportation analysis for a given project.

CEQA Screening
A project may be exempt from performing CEQA analysis if the project meets at least one screening criteria based on:
• Small Project
• Affordable Housing
• Local-Serving Retail and Public Services
• High-Quality Transit Area (HQTA)
• Consistency with RTP/SCS
The Project is determined to be exempted from CEQA analysis as summarized in Table 2. This determination is made based on the Local-Serving Retail and Public Services screening criteria. Based on the current Project information given for this analysis, a presumption of less than significance can be made and no VMT analysis is required. Detailed evaluation for each criterion is discussed in the following sections.

Table 2: Project CEQA Screening
CEQA Land Use Screening Criteria Project Exempt?
Small Project No, Daily trips > 110
Affordable Housing N/A
Local-Serving Retail and Public Services Yes, 5,908 SF
High-Quality Transit Area (HQTA) No. Not in HQTA
Project Located in Low VMT Area No. Not in low VMT area Consistency with RTP/SCS N/A

Page 7 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

Small Project
Small projects are defined as projects that generate less than 110 daily vehicle trips. An average of 110 average daily trips roughly equates to:
• 10 single family residential units
• 11 multifamily residential units
• 11,000 square feet of office
As shown in Table 1, the Project generates a net new 133 daily trips, which is greater than the 110- vehicle trip threshold and does not satisfy this criterion.

Affordable Housing
Project components which consist of 100 percent deed restricted affordable housing may be exempt.

The project does not include any components that fit this description.

Local-service Retail and Public Services
Projects that are locally serving retail equal or less than 50,000 square feet may be exempt. The City’s guidelines determine local serving retail based on location, characteristics, and envision goods and services the retail development would provide. The goods and services provided would be something people would need on a regular basis and be close to where people live. Some examples in the City’s guidelines include groceries, medicines, restaurants, and fitness and beauty services.

Based on the City’s guidelines, the childcare service provided by the Project is considered as local serving since the Project is located in a residential area of the City and the provided service needed on a daily weekday basis. Since the Project is a local service less than 50,000 square, it may be screened out from further VMT analysis.

High-Quality Transit Area (HQTA)
Locations within high-quality transit area, and/or near Caltrain stations, may be screened out. Figure 3 illustrates the HQTA within the City, which does not include the Project vicinity , therefore the Project does not satisfy this screening criterion.

Projects Located in Low VMT Areas
Residential and employment projects within areas that generate VMT below adopted City thresholds can be screened out from further VMT analysis. The VMT per capita and VMT per employee are shown in the San Mateo Transportation Impact Guidelines. Figures in Attachment B of San Mateo Transportation Impact Guidelines show that existing VMT are higher than the City’s thresholds and therefore could not be screened out.

Page 8 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

Figure 3: High-Quality Transit Area (Source: San Mateo Transportation Impact Guidelines, June 2020) Project Site

Page 9 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

Local Transportation Analysis
A non -CEQA local transportation analysis (LTA) may be required to evaluate the effects of the development project on the circulation network in proximity of the project site. LTA for the project may include the following analysis and evaluations:
• Traffic operation analysis
• Site Review
o Site access and circulation
o Parking assessment

PROJECT TRAFFIC OPERATION
The Carey School’s Parking and Traffic Plan (Attachment E) includes information, policies, and procedures relating to traffic and parking for both the proposed early childhood center and the existing school campus. The plan is shared with parents and students each year with reminders sent out regularly.

The Parking and Traffic Plan outlines that Project’s child drop-off/pick-up will occur at one of three (3) student locations, shown in Figure 1, depending on time of day and carpool situation. For vehicles accessing the Project site during off-peak period, vehicles will park in one of the parking spaces and then walk the child into the care center. During peak period, vehicles cannot park and will follow the drop-off and pick-up procedure:
• From 20th Avenue, vehicles will follow one-way loop down La Salle Drive and complete full circle before entering Project driveway
• Staff will direct vehicles into designated loading spot and will supervise children entering/exiting the vehicle
• Vehicles will exit project site and head north towards 20th Avenue Carpool vehicles will utilize the sibling drop-off/pick-up in elementary school staffed carline on Alameda de las Pulgas (Grades 2, 3, 5) or La Salle Drive (Grades PS, K, 1, 4). Early childhood center students will be dropped off at the designated area for their oldest sibling. Staff will walk children from drop-off/pickup area to building.

TRAFFIC OPERATION ANALYSIS
Traffic operation analysis was conducted for the unsignalized intersection of W 20 th Avenue and La Salle Drive during the AM, School PM, and commute PM peak hours. The traffic analysis utilized traffic counts that were collected on Thursday, September 4th, 2025 during the AM (7-9 AM), school PM (2-4 PM), and the commute PM peak (4-6 PM) peak periods when school (including the existing elementary campus) was in session. Raw counts are included in Attachment B.

Page 10 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

Figure 4 shows the peak hour turning movement counts for the existing conditions as well as the projected volumes with the addition of the Project (existing plus project). The peak hours occurs at the following times:
• AM Peak: 7:45 – 8:45 AM
• School PM: 2:30 – 3:30 PM
• Commute PM: 5:00 – 6:00 PM

Figure 4: W 20th Avenue and La Salle Drive Peak Hour Volumes The intersection level of service (LOS) and queuing were conducted to determine the potential change in traffic operation at the study intersection. LOS for the intersection was determined using the Highway Capacity Manual 7th Edition (HCM 7) methodology within Synchro 12 software. For side street stop control (SSSC) intersections, HCM methodology defines LOS as a function of the average control delay for the worst minor street movement/approach or major street left-turn. The results are presented below in Table 3. The analysis indicates the intersection performs at an acceptable LOS C or better for all peak periods. It is anticipated that the Project will increase delay by 1.6 second per vehicle or less.

Synchro outputs are included in Attachment C.

Table 3: W 20th Avenue and La Salle Drive LOS Summary
Time
Period
Existing Existing Plus Project
LOS Delay LOS Delay Variance
AM
Overall A 2.5 A 3.1 0.6
Worst Approach (NB) B 12.9 B 13.8 0.9
School PM
Overall A 1.7 A 2.2 0.5
Worst Approach (NB) B 14.0 C 15.5 1.5
Commute
PM
Overall A 0.5 A 0.8 0.3
Worst Approach (NB) B 14.4 C 16.0 1.6

Page 11 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

Queues were also determined using the Highway Capacity Manual 7th Edition (HCM 7) methodology within Synchro 12 software. Similar to LOS, HCM 7 methodology reports queue lengths for the worst minor street movement/approach or major street left-turn. HCM 7 outputs reports queues by the number of vehicles and were converted to feet assuming 25 feet per vehicle.

The results are presented below in Table 4. The analysis indicates the queue lengths were all at most one vehicle during all peak periods. It is anticipated that the Project will not increase any existing queues by more than one vehicle, or 25 feet. Synchro outputs are included in Attachment C.

Table 4: W 20th Avenue and La Salle Drive Queuing Summary Time
Period Approach
Queue Length
Existing Existing Plus Project Variance
# Vehicle Feet* # Vehicle Feet* # Vehicle Feet*
AM
NB 0.7 18 1.0 25 0.3 8
WB 0.0 - 0.0 - 0.0 -
School
PM
NB 0.6 15 0.9 23 0.3 8
WB 0.1 3 0.1 3 0.0 -
Commute
PM
NB 0.2 5 0.4 10 0.2 5
WB 0.0 - 0.0 - 0.0 -
*Assumes 25 feet per vehicle
Based on the results of the traffic analysis it was determined that the Project would result in minimal impact to existing operations.

PLAN REVIEW
Site Circulation
As discussed in the Project Description section and school’s Parking and Traffic Plan, childcare drop- off and pick-up operation will differ depending on time of day. During off-peak period, vehicles will park in one of the parking spaces and then walk the child into the care center. During peak periods, vehicles cannot park in the Project’s parking lot and drop-off/pick-up operations will occur at the staffed carline within the Project’s parking lot or sibling drop-off at the staffed carline for the adjacent elementary school on Alameda de las Pulgas. The drop -off and pick up activities will be grouped in distinct 15 -minute schedules to best manage the safety and efficiency of these operations. The Carey School will monitor these activities and make adjustments for improvements if needed.

Student Loading Queue
A student loading queue analysis was conducted to determine if the proposed loading area for the early childhood center would be adequate during a 25-minute peak during the morning drop-off and afternoon pick-up periods. The queue for the existing elementary campus was not evaluated as the Project will not increase the number of vehicles for that site. The queuing analysis compared the arrival and departure rates for the loading queue.

Page 12 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

During peak morning and afternoon peak periods, non -carpool students will utilize the staff carline within the Project parking lot. It is assumed that approximately 50 feet (2 vehicles) between the entry and exit drive aisles may be used for student loading activity and approximately 45 feet (2 vehicles) could queue in the entry throat before spilling onto La Salle Drive . This equates to overall vehicle storage of 4 vehicles, where 2 vehicles for loading activities and 2 vehicles for waiting.

As a conservative approach, the arrival rate assumed that all peak hour vehicles would arrive with in linear distribution within the 25 -minute peak period. Note Trip Generatio n defines trip as a one directional movement, therefore the number of vehicles was the maximum between the inbou nd or outbound trips. For both peak periods, it is estimated the average arrival rate of 0.6 vehicles per minute (veh/min).

The departure rate was determined based on average drop-off and pick-up dwelling times and active loading queue storage. Based on engineering and professional judgment, conservative estimates for average drop-off and pick-up dwelling times of 4 minutes (240 seconds) were used in the analysis. The drop-off/pick-up time is the assumed amount of time it takes for a vehicle to enter a temporary curb - side space and for children to safely exit or enter the car. For both peak periods, it is estimated the average departure rate of 0.5 veh/min.

The results of the student loading queues are summarized in Table 5. Since the arrival rate is greater than the departure rate, there will be an unserved rate of 0.1 veh/min which equates to approximately

2.5 vehicle queue (unserved rate multiplied by 25-minute peak period). The queue analysis calculation is included in Attachment D.

To minimize queues spillover, a sensitivity analysis was conducted to determine the average dwelling time which would result in two-vehicle queue, one-vehicle queue, or no queue in the entry throat. The results of the sensitivity analysis are presented in Table 6 where the average dwelling times ranged from 3.8 minute (230 seconds) for two -vehicle queue to 3.3 minutes (200 seconds) for no queue. As stated previously, The Carey School will monitor these activities and make adjustments for improvements if needed.

Table 5: Student Loading Queue Analysis Summary
Morning Drop-off
(8:00-8:25 AM)
Afternoon Pick-up
(3:00-3:25 PM)
Dwell Time (sec) 240 240
# vehicles during peak period* 15 15
Arrival Rate (veh/ min) 0.6 0.6
Departure Rate (veh /min) 0.5 0.5
Unserved Queue (veh) 2.5 2.5
*Assumed the maximum between inbound and outbound peak hour trips.

Table 6: Dwelling Time Sensitivity Analysis Summary

Page 13 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

Unserved Queue
(Vehicle)
Dwell time
(seconds)
2 230
1 210
0 200
Parking Assessment
The Project will provide 11 parking spaces on-site. In addition, The Carey School has a shared parking agreement where it leases a total of 45 parking spaces, where 15 spaces will be dedicated to the proposed early childhood center, from the buildings at 1900-2000 Alameda de las Pulgas. The parking lease term runs from March 1, 2025, through March 31, 2030, with options for extension.

For on-site parking, one (1) space will be dedicated to the Director and all remaining Staff will utilize the remote parking spaces at 1900-2000 Almeda de las Pulgas. The remaining ten (10) spaces will be utilized for parent drop-off and pick-up, outside of the staffed carline operations noted in the section above.

Parking requirements for the proposed Project are presented in Chapter 27.64.160 of San Mateo’s Municipal Code. For day nurseries, including preschools and nursery schools, the minimum parking required includes:
• 1 space for each employee.
• Designated spaces for loading and unloading children, where 1 space per 6 persons (or portion thereof) licensed at the facility with maximum of 3 spaces for up to 30 licensed persons, and thereafter 1 space per 10 licensed person.
o The loading/unloading spaces may be located on street frontage with appropriate permits for loadings zones.
o The overall requirement may be reduced by 1 space by the provision of a permanently assigned employee to assist children from the drop-off area to the facility.

Table 7 summarizes the parking requirement for the Project, which is 23 spaces. The combined total of on-site parking and remote parking equates to 26 spaces, which satisfies the City’s requirements. It should be noted that this analysis does not include spaces for the staffed carline on Alameda de las Pulgas or La Salle Drive, reflecting a conservative approach to the drop-off and pick-up operations.

Page 14 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

Table 7: Project Parking Requirements Summary
Amount Parking Requirement # Parking
stalls
16 Staff 1 space per employee 16
75 Children
1 space per 6 persons with a maximum of 3 spaces
for 30 licensed persons, then 1 space per 10 licensed
persons
8 Reduction for permanent assigned employees to assist with loading -1 Minimum parking requirement 23
Proposed
Parking
On-Site 11
Off-Site 15
Total 26
Surplus (+) / Deficient (-) +3
Parking analysis also evaluated if the parking inventory for the building located at 1900-2000 Alameda de las Pulgas would remain sufficient after leasing 45 spaces to The Carey School. The 1900 Alameda Building is evaluated based on the R&D parking requirements noted in the City’s parking requirements.

This evaluation is based on the City’s record of improvements starting in year 2020 for Speculative Lab and Support Spaces completed for the 1900 Alameda building, under Building Permit BD-2020-275487 and subsequent improvement permits for all the leasable space. Based on the 1900 Alameda use as Laboratory and 1950 and 2000 Alameda uses as Office, the combined minimum parking requirement would result in 713 parking spaces. This parking space requirement is assuming a 100% occupancy of the buildings rather than reflective of a specific tenant occupancy percentage, which would be less than 100% due to hybrid schedules for many employers in the regions. The 1900-2000 Alameda buildings provide 801 parking spaces, inclusive of a 430-space parking structure and a 371 -space surface lot.

The shared use of all parking spaces was documented as a Declaration of Covenants, Conditions and Restrictions (CC&R’s) recorded on June 6, 1984 , as Instrument No 1984-061165 with the County of San Mateo.

In summary, the inventory of 801 parking spaces allows for a sufficient supply of the 713 required Office/R&D parking, as well as the 45 spaces leased to The Carey School, leaving a surplus of 43 spaces available. Table 8 summarizes the calculation of these results.

Table 8: 1900-2000 Alameda Parking Evaluation
Building Amount Parking
Requirement
# Parking
stalls
1900 Alameda 113,000 GSF R&D: 1 per 500 SF 226
1950-2000 Alameda 153,336 GSF Office: 1 per 315 SF 487
Total 713
Current Parking Inventory 801
Surplus (+) / Deficient (-) +88
Remaining surplus after 45-space lease to The Carey School +43

Page 15 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

CONCLUSION
The following is a summary of the traffic and parking evaluation:

Project Description
• The Project site is located at 2033 La Salle Drive, which is adjacent to residential uses and The Carey School elementary campus.
• The Project is proposing to redevelop the existing single-family residence and an attached dwelling unit (ADU) into an early childhood center that can accommodate up to 75 children. It is anticipated that approximately 50% of children would carpool with a sibling that is a student at The Carey School.
• The proposed project will generate a net new 133 daily trips, 28 net new trips in the AM peak hour, 27 net new trips in the School PM peak hour, and 27 net new trips in the PM peak hour.

Vehicle Miles Traveled
• The Project is determined to be exempted from CEQA analysis based on the Local-Serving Retail and Public Services screening criteria.

Traffic Operation
• Level of service analysis found that the intersection of W 20th Avenue and La Salle Drive will operate at LOS C or better during the AM, School PM, and commute PM peak hours with the addition of Project traffic
• Queuing analysis found that the Project will not increase any existing queues by more than one vehicles or 25 feet.
• The results of the traffic analysis found that the Project would result in minimal impact to existing operations.

Plan Review
• Childcare drop-off and pick-up operation will differ depending on time of day. o During the Project’s peak hour, drop-off/pickup operations will occur at the staffed carline within the Project’s parking lot or sibling drop-off at the staffed carline for the adjacent elementary school on Alameda de las Pulgas.
o During non-peak times, vehicles may park in the Project parking lot and walk-in. o The Carey School will monitor these activities and make adjustments for improvements if needed.
• Student loading found that staff carline would need to have an average dwell time of less than 4 minutes to ensure that queues do not spill onto La Salle Drive during peak periods. • The combined total on-site parking and off-site parking equates to 26 spaces, which satisfies the City’s requirements of 23 spaces.

Page 16 ends

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

ATTACHMENT
Attachment A – Site Plan
Attachment B – Traffic Counts
Attachment C – Synchro Reports
Attachment D – Student Loading Queue Worksheet
Attachment E – The Carey School’s Parking and Traffic Plan

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

Attachment A – Site Plan

FD
FD
FD
FDFD
FD
FD
ADA
VAN
ADA
VAN
5 9' - 11 3/8"
6' - 0"
5' - 6 1/32"
3 9' - 2 1/2"
3 4' - 7 1/2"
24' - 4 1/2"
M

AIN BUILDING
5 ,895.3 SF

TRASH ENCLOSURE
103.7 SF
25' - 8 1/2" 31' - 5"
47' - 8" 9' - 5 1/2"
9 ' - 11 1/2"1
' - 6" 1
22' - 3 7/8"

LA SALLE DRIVE

FLOOR AREA CALCULATION
R1-B
7,076 SF (0.27 FAR)
5,895.3 SF
* Per San Mateo Municipal Code Section 27.18.060
** Per San Mateo Municipal Code Section 27.04.200(b)(2)(c), covered walkways have been excluded
*** See Sheet G0.01 PROJECT INFORMATION - ZONING SUMMARY for ALLOWABLE FLOOR AREA calculations
MAIN BUILDING GROSS AREA**

TRASH ENCLOSURE GROSS AREA

TOTAL PROPOSED FLOOR AREA

DISTRICT
103.7 SF
MAXIMUM ALLOWABLE FAR*
5,999 SF ***
6,000 SF (0.22 FAR)MAXIMUM RESIDENTIAL USE FAR*

AS SHOWN
STUDIO BONDY ARCHITECTURE OWNS ALL COPYRIGHTS AND OTHER INTELLECTUAL PROPERTY RIGHTS IN THIS WORK PRODUCT AND IT IS PROTECTED BY UNITED STATES COPYRIGHT LAWS AND INTERNATIONAL TREATY PROVISIONS. REFER TO THE PROJECT MANUAL FOR APPLICABLE USE RESTRICTIONS. ORIGINAL DRAWING IS 30" X 42". SCALE ENTITIES ACCORDINGLY IF REDUCED. 110 LINDEN STREET | OAKLAND, CA | 94607
510.836.6594 | [email protected]
PROJECT NO.:

NOT FOR CONSTRUCTION
2/12/2025 5:10:35 PM

FLOOR AREA DIAGRAM
A1.02

SPAR / SUP PLANNING

APPLICATION
2423.00
2033 LA SALLE DRIVE
SAN MATEO, CA 94403
P: 650.345.8205

EARLY CHILDHOOD

CENTER FOR THE

CAREY SCHOOL
TRUE
1/8" = 1'-0"1 FLOOR AREA CALCULATION DIAGRAM
S

PAR / SUP PLANNING

APPLICATION

02.14.2025
Attachment A

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

Attachment B – Traffic Counts

National Data & Surveying Services
Intersection Turning Movement Count
Location: La Salle Dr & W 20th Ave
City: San Mateo Project ID:

Control: 1-Way Stop(NB) Date:

NS/EW Streets:
0 1 0 0 0 0 0 0 0 1 0 0 0 1 0 0

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
7:00 AM 0 0 0 0 0 0 0 0 0 35 0 0 0 22 0 1 58
7:15 AM 0 0 1 0 0 0 0 0 0 18 1 0 0 18 0 0 38
7:30 AM 0 0 3 0 0 0 0 0 0 34 2 0 2 27 0 0 68
7:45 AM 7 0 2 0 1 0 0 0 0 32 7 0 5 39 0 1 94
8:00 AM 20 0 7 0 0 0 1 0 0 57 18 0 6 37 0 0 146
8:15 AM 5 0 0 0 0 0 0 0 0 42 2 0 1 43 1 0 94
8:30 AM 3 0 3 0 0 0 0 0 0 55 3 0 0 35 0 0 99
8:45 AM 1 0 0 0 0 0 0 0 0 57 1 0 0 31 0 0 90

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
TOTAL VOLUMES : 36 0 16 0 1 0 1 0 0 330 34 0 14 252 1 2 687 APPROACH %'s : 69.23% 0.00% 30.77% 0.00% 50.00% 0.00% 50.00% 0.00% 0.00% 90.66% 9.34% 0.00% 5.20% 93.68% 0.37% 0.74% PEAK HR : 7:45 AM 40 TOTAL
PEAK HR VOL : 35 0 12 0 1 0 1 0 0 186 30 0 12 154 1 1 433 PEAK HR FACTOR : 0.438 0.000 0.429 0.000 0.250 0.000 0.250 0.000 0.000 0.816 0.417 0.000 0.500 0.895 0.250 0.250 Headers NBL NBT NBR NBU SBL SBT SBR SBU EBL EBT EBR EBU WBL WBT WBR WBU 0 1 0 0 0 0 0 0 0 1 0 0 0 1 0 0

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
2:00 PM 1 0 0 0 0 0 0 0 0 43 3 0 0 33 0 0 80
2:15 PM 1 0 0 0 0 0 0 0 0 63 1 0 0 34 0 0 99
2:30 PM 1 0 2 0 0 0 0 0 0 55 8 1 3 115 0 1 186
2:45 PM 10 0 9 0 0 0 0 0 0 49 12 0 6 53 0 0 139
3:00 PM 9 0 12 0 0 0 0 0 0 43 14 0 2 39 0 0 119
3:15 PM 7 0 9 0 0 0 0 0 0 53 12 0 2 34 0 1 118
3:30 PM 2 0 1 0 0 0 0 0 0 75 4 0 1 49 0 0 132
3:45 PM 5 0 0 0 0 0 0 0 0 60 2 0 0 39 0 0 106

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
TOTAL VOLUMES : 36 0 33 0 0 0 0 0 0 441 56 1 14 396 0 2 979 APPROACH %'s : 52.17% 0.00% 47.83% 0.00% 0.00% 88.55% 11.24% 0.20% 3.40% 96.12% 0.00% 0.49% PEAK HR : 2:30 PM 12:00 AM TOTAL
PEAK HR VOL : 27 0 32 0 0 0 0 0 0 200 46 1 13 241 0 2 562 PEAK HR FACTOR : 0.675 0.000 0.667 0.000 0.000 0.000 0.000 0.000 0.000 0.909 0.821 0.250 0.542 0.524 0.000 0.500 0 1 0 0 0 0 0 0 0 1 0 0 0 1 0 0

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
4:00 PM 2 0 2 0 0 0 0 0 0 57 6 0 1 34 0 0 102
4:15 PM 2 0 1 0 0 0 1 0 0 56 1 0 0 29 0 0 90
4:30 PM 1 0 1 0 0 0 0 0 0 90 3 0 2 33 0 0 130
4:45 PM 3 0 1 0 0 0 0 0 0 99 5 1 1 51 0 0 161
5:00 PM 1 0 5 0 0 0 0 0 0 99 4 0 2 52 1 1 165
5:15 PM 2 0 2 0 1 0 0 0 1 105 7 0 1 69 0 0 188
5:30 PM 5 0 1 0 0 0 0 0 0 107 1 0 2 64 0 0 180
5:45 PM 1 0 3 0 0 1 0 0 0 144 3 0 0 48 0 0 200

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
TOTAL VOLUMES : 17 0 16 0 1 1 1 0 1 757 30 1 9 380 1 1 1216 APPROACH %'s : 51.52% 0.00% 48.48% 0.00% 33.33% 33.33% 33.33% 0.00% 0.13% 95.94% 3.80% 0.13% 2.30% 97.19% 0.26% 0.26% PEAK HR : 5:00 PM 12:00 AM TOTAL
PEAK HR VOL : 9 0 11 0 1 1 0 0 1 455 15 0 5 233 1 1 733 PEAK HR FACTOR : 0.450 0.000 0.550 0.000 0.250 0.250 0.000 0.000 0.250 0.790 0.536 0.000 0.625 0.844 0.250 0.250 25-080286-001
9/4/2025
05:00 PM - 06:00 PM

0.9160.833 0.500 0.801 0.857

0.7550.702 0.950 0.538
02:30 PM - 03:30 PM
07:45 AM - 08:45 AM

0.741

PM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NOON NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

0.435 0.500 0.720 0.933

AM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
Data - Total
La Salle Dr La Salle Dr W 20th Ave W 20th Ave
National Data & Surveying Services
Intersection Turning Movement Count
Location: La Salle Dr & W 20th Ave
City: San Mateo Project ID:

Control: 1-Way Stop(NB) Date:

NS/EW Streets:
0 1 0 0 0 0 0 0 0 1 0 0 0 1 0 0

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 3
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1
8:45 AM 0 0 0 0 0 0 0 0 0 3 0 0 0 1 0 0 4

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
TOTAL VOLUMES : 0 0 0 0 0 0 0 0 0 3 0 0 0 6 0 0 9
APPROACH %'s : 0.00% 100.00% 0.00% 0.00% 0.00% 100.00% 0.00% 0.00% PEAK HR : 7:45 AM 40 0 0 TOTAL
PEAK HR VOL : 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 4
PEAK HR FACTOR : 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.333 0.000 0.000 Headers NBL NBT NBR NBU SBL SBT SBR SBU EBL EBT EBR EBU WBL WBT WBR WBU 0 1 0 0 0 0 0 0 0 1 0 0 0 1 0 0

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
2:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2:45 PM 0 0 0 0 0 0 0 0 0 1 0 0 0 2 0 0 3
3:00 PM 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 2
3:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3:30 PM 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1
3:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
TOTAL VOLUMES : 0 0 0 0 0 0 0 0 0 3 0 0 0 3 0 0 6
APPROACH %'s : 0.00% 100.00% 0.00% 0.00% 0.00% 100.00% 0.00% 0.00% PEAK HR : 2:30 PM 175 0 0 TOTAL
PEAK HR VOL : 0 0 0 0 0 0 0 0 0 2 0 0 0 3 0 0 5
PEAK HR FACTOR : 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.500 0.000 0.000 0.000 0.375 0.000 0.000 0 1 0 0 0 0 0 0 0 1 0 0 0 1 0 0

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1
4:15 PM 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 2
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 2
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 1 0 0 0 5 0 0 6
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NL NT NR NU SL ST SR SU EL ET ER EU WL WT WR WU TOTAL
TOTAL VOLUMES : 0 0 0 0 0 0 0 0 0 4 0 0 0 8 0 0 12
APPROACH %'s : 0.00% 100.00% 0.00% 0.00% 0.00% 100.00% 0.00% 0.00% PEAK HR : 5:00 PM 293 0 0 TOTAL
PEAK HR VOL : 0 0 0 0 0 0 0 0 0 1 0 0 0 6 0 0 7
PEAK HR FACTOR : 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.250 0.000 0.000 0.000 0.300 0.000 0.000 25-080286-001
9/4/2025
05:00 PM - 06:00 PM

0.2920.250 0.300
02:30 PM - 03:30 PM

0.4170.500 0.375
07:45 AM - 08:45 AM

0.333

PM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NOON NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

0.333

AM NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
Data - Bikes
La Salle Dr La Salle Dr W 20th Ave W 20th Ave
National Data & Surveying Services
Intersection Turning Movement Count
Location: La Salle Dr & W 20th Ave Project ID:

City: San Mateo Date:

NS/EW Streets:

EB WB EB WB NB SB NB SB TOTAL
7:00 AM 0 0 0 2 1 2 1 0 6
7:15 AM 0 2 1 0 0 0 1 1 5
7:30 AM 0 0 0 0 0 0 1 0 1
7:45 AM 1 0 2 3 0 0 0 1 7
8:00 AM 1 11 0 0 0 0 1 4 17
8:15 AM 2 3 2 1 0 0 1 1 10
8:30 AM 2 0 1 3 0 0 1 0 7
8:45 AM 2 1 1 0 0 0 0 0 4

EB WB EB WB NB SB NB SB TOTAL
TOTAL VOLUMES : 8 17 7 9 1 2 6 7 57
APPROACH %'s : 32.00% 68.00% 43.75% 56.25% 33.33% 66.67% 46.15% 53.85% PEAK HR : 7:45 AM 39 -1 -1 TOTAL
PEAK HR VOL : 6 14 5 7 0 0 3 6 41
PEAK HR FACTOR : 0.750 0.318 0.625 0.583 0.750 0.375
Headers NEB NWB SEB SWB ENS ESB WNB WSB

EB WB EB WB NB SB NB SB TOTAL
2:00 PM 1 0 1 0 0 0 0 0 2
2:15 PM 2 1 0 0 0 0 0 0 3
2:30 PM 0 2 2 8 1 2 6 1 22
2:45 PM 0 6 0 6 1 1 5 1 20
3:00 PM 1 1 6 0 0 0 1 3 12
3:15 PM 2 0 3 2 0 0 2 2 11
3:30 PM 3 0 3 3 0 0 5 0 14
3:45 PM 1 2 2 2 0 0 2 0 9

EB WB EB WB NB SB NB SB TOTAL
TOTAL VOLUMES : 10 12 17 21 2 3 21 7 93
APPROACH %'s : 45.45% 54.55% 44.74% 55.26% 40.00% 60.00% 75.00% 25.00% PEAK HR : 2:30 PM 173 -2 -2 TOTAL
PEAK HR VOL : 3 9 11 16 2 3 14 7 65
PEAK HR FACTOR : 0.375 0.375 0.458 0.500 0.500 0.375 0.583 0.583

EB WB EB WB NB SB NB SB TOTAL
4:00 PM 3 5 0 1 0 0 2 0 11
4:15 PM 1 2 5 0 0 0 0 2 10
4:30 PM 3 0 1 0 0 0 0 0 4
4:45 PM 2 3 1 1 0 0 1 0 8
5:00 PM 0 1 0 0 0 0 0 0 1
5:15 PM 1 2 0 0 0 0 1 0 4
5:30 PM 1 0 1 0 0 0 2 0 4
5:45 PM 1 1 0 1 0 0 0 0 3

EB WB EB WB NB SB NB SB TOTAL
TOTAL VOLUMES : 12 14 8 3 0 0 6 2 45
APPROACH %'s : 46.15% 53.85% 72.73% 27.27% 75.00% 25.00% PEAK HR : 5:00 PM 290 -3 -3 TOTAL
PEAK HR VOL : 3 4 1 1 0 0 3 0 12
PEAK HR FACTOR : 0.750 0.500 0.250 0.250 0.375
25-080286-001
9/4/2025

0.7500.583 0.500 0.375
05:00 PM - 06:00 PM
02:30 PM - 03:30 PM

0.7390.500 0.675 0.417 0.750

0.6030.417
PM

NORTH LEG SOUTH LEG EAST LEG WEST LEG
NOON

NORTH LEG SOUTH LEG EAST LEG WEST LEG

0.600 0.450
07:45 AM - 08:45 AM
AM

NORTH LEG SOUTH LEG EAST LEG WEST LEG
Data - Pedestrians (Crosswalks)
La Salle Dr La Salle Dr W 20th Ave W 20th Ave
Prepared by National Data & Surveying Services
ID: 25-080286-001 Day:

City: San Mateo Date:

AM 1 0 1 0 AM
NOON 0 0 0 0 NOON
PM 0 1 1 0 PM

AM NOON PM PM NOON AM
0 0 0 0 0 1 0 1
1 233 241 154
0 1 0 0 0 5 13 12
0 0 1 0 TEV 433 562 733 0 1 2 1
186 200 455 1 PHF 0.74 0.76 0.92
30 46 15 0 0 0 1 0

AM NOON PM PM NOON AM
PM 0 9 0 11 PM
NOON 0 27 0 32 NOON
AM 0 35 0 12 AM
Pedestrians (Crosswalks)
Cars (PM) HT (PM)
59 42

NORTHBOUND
La Salle Dr
Cars (NOON) HT (NOON)
02:30 PM - 03:30 PM
468 234 200
Cars (AM) 21 HT (AM)
W 20th Ave

EASTBOUND

WESTBOUND
W20thAve
190 269 242

CONTROL
1-Way Stop(NB)
0 2:00 PM - 04:00 PM
05:00 PM - 06:00 PM 2
La Salle Dr & W 20th Ave
Peak Hour Turning Movement Count
La Salle Dr Thursday
SOUTHBOUND 9/4/2025
4:00 PM - 06:00 PM
PEAK HOURS 07:45 AM - 08:45 AM 1 7:00 AM - 09:00 AM

COUNTPERIODS

NOONAM PM
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM
NOON
NOON
PM
AM
NOON
AM
PM
NOON
AM
PM
NOON
PM
AM
0 7
6 3
14 3
1 11
5 1
16 7 0
2 0
0 3
0 4
9 14
3 3
6 0
0 10
4 0
0 0
0 1
0 0
0 2
10 2
0 0
0 0
1 0
0 0
1 00
1 0
0 0
0 0
0 0
1 233
415
451
1 0
1 1
10 0
9 0
239
1246
198
0 0
0 0
31 0
27 1
153
1230
185
0 1
0 1
12 0
35 kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

Attachment C – Synchro Reports

HCM 7th TWSC Existing
1: La Salle Drive & 20th Avenue Timing Plan: AM
Synchro 12 Report
Kimley-Horn Page 1
Intersection
Int Delay, s/veh 2.5
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 186 30 12 154 35 12
Future Vol, veh/h 186 30 12 154 35 12
Conflicting Peds, #/hr 0 12 12 0 9 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 72 72 93 93 44 44
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 258 42 13 166 80 27
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 312 0 492 291
Stage 1 - - - - 291 -
Stage 2 - - - - 200 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1248 - 536 748
Stage 1 - - - - 758 -
Stage 2 - - - - 833 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1234 - 520 739
Mov Cap-2 Maneuver - - - - 520 -
Stage 1 - - - - 750 -
Stage 2 - - - - 817 -
Approach EB WB NB
HCM Control Delay, s/v 0 0.57 12.9

HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 562 - - 130 -
HCM Lane V/C Ratio 0.19 - - 0.01 -
HCM Control Delay (s/veh) 12.9 - - 7.9 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.7 - - 0 -
HCM 7th TWSC Existing
1: La Salle Drive & 20th Avenue Timing Plan: School PM
Synchro 12 Report
Kimley-Horn Page 1
Intersection
Int Delay, s/veh 1.7
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 200 46 13 241 27 32
Future Vol, veh/h 200 46 13 241 27 32
Conflicting Peds, #/hr 0 27 27 0 21 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 54 54 70 70
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 211 48 24 446 39 46
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 286 0 777 262
Stage 1 - - - - 262 -
Stage 2 - - - - 515 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1276 - 365 777
Stage 1 - - - - 782 -
Stage 2 - - - - 599 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1243 - 340 757
Mov Cap-2 Maneuver - - - - 340 -
Stage 1 - - - - 762 -
Stage 2 - - - - 572 -
Approach EB WB NB
HCM Control Delay, s/v 0 0.41 13.99

HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 485 - - 92 -
HCM Lane V/C Ratio 0.174 - - 0.019 -
HCM Control Delay (s/veh) 14 - - 8 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.6 - - 0.1 -
HCM 7th TWSC Existing
1: La Salle Drive & 20th Avenue Timing Plan: PM
Synchro 12 Report
Kimley-Horn Page 1
Intersection
Int Delay, s/veh 0.5
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 455 15 5 223 9 11
Future Vol, veh/h 455 15 5 223 9 11
Conflicting Peds, #/hr 0 2 2 0 3 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 80 80 86 86 83 83
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 569 19 6 259 11 13
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 590 0 854 580
Stage 1 - - - - 580 -
Stage 2 - - - - 274 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 986 - 329 514
Stage 1 - - - - 560 -
Stage 2 - - - - 772 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 984 - 325 513
Mov Cap-2 Maneuver - - - - 325 -
Stage 1 - - - - 559 -
Stage 2 - - - - 765 -
Approach EB WB NB
HCM Control Delay, s/v 0 0.19 14.4

HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 407 - - 39 -
HCM Lane V/C Ratio 0.059 - - 0.006 -
HCM Control Delay (s/veh) 14.4 - - 8.7 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.2 - - 0 -
HCM 7th TWSC Existing Plus Project
1: La Salle Drive & 20th Avenue Timing Plan: AM
Synchro 12 Report
Kimley-Horn Page 1
Intersection
Int Delay, s/veh 3.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 186 44 13 154 47 13
Future Vol, veh/h 186 44 13 154 47 13
Conflicting Peds, #/hr 0 12 12 0 9 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 72 72 93 93 44 44
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 258 61 14 166 107 30
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 331 0 503 301
Stage 1 - - - - 301 -
Stage 2 - - - - 203 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1228 - 528 739
Stage 1 - - - - 751 -
Stage 2 - - - - 831 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1214 - 511 730
Mov Cap-2 Maneuver - - - - 511 -
Stage 1 - - - - 742 -
Stage 2 - - - - 814 -
Approach EB WB NB
HCM Control Delay, s/v 0 0.62 13.77

HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 546 - - 140 -
HCM Lane V/C Ratio 0.25 - - 0.012 -
HCM Control Delay (s/veh) 13.8 - - 8 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 1 - - 0 -
HCM 7th TWSC Existing Plus Project
1: La Salle Drive & 20th Avenue Timing Plan: School PM
Synchro 12 Report
Kimley-Horn Page 1
Intersection
Int Delay, s/veh 2.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 200 58 14 241 40 33
Future Vol, veh/h 200 58 14 241 40 33
Conflicting Peds, #/hr 0 27 27 0 21 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 54 54 70 70
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 211 61 26 446 57 47
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 299 0 787 268
Stage 1 - - - - 268 -
Stage 2 - - - - 519 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1263 - 360 771
Stage 1 - - - - 777 -
Stage 2 - - - - 597 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1230 - 334 751
Mov Cap-2 Maneuver - - - - 334 -
Stage 1 - - - - 757 -
Stage 2 - - - - 569 -
Approach EB WB NB
HCM Control Delay, s/v 0 0.44 15.51

HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 446 - - 99 -
HCM Lane V/C Ratio 0.234 - - 0.021 -
HCM Control Delay (s/veh) 15.5 - - 8 0
HCM Lane LOS C - - A A
HCM 95th %tile Q(veh) 0.9 - - 0.1 -
HCM 7th TWSC Existing Plus Project
1: La Salle Drive & 20th Avenue Timing Plan: PM
Synchro 12 Report
Kimley-Horn Page 1
Intersection
Int Delay, s/veh 0.8
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 455 27 6 223 22 12
Future Vol, veh/h 455 27 6 223 22 12
Conflicting Peds, #/hr 0 2 2 0 3 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 80 80 86 86 83 83
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 569 34 7 259 27 14
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 605 0 864 588
Stage 1 - - - - 588 -
Stage 2 - - - - 276 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 973 - 325 509
Stage 1 - - - - 555 -
Stage 2 - - - - 770 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 971 - 320 508
Mov Cap-2 Maneuver - - - - 320 -
Stage 1 - - - - 554 -
Stage 2 - - - - 762 -
Approach EB WB NB
HCM Control Delay, s/v 0 0.23 15.99

HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 368 - - 47 -
HCM Lane V/C Ratio 0.111 - - 0.007 -
HCM Control Delay (s/veh) 16 - - 8.7 0
HCM Lane LOS C - - A A
HCM 95th %tile Q(veh) 0.4 - - 0 -

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

Attachment D – Student Loading Queue Worksheet

Assumptions: Demand
Drop-Off AM - 8:00 - 8:25
240 sec dwell 15 veh

0.5 veh / min Capacity
Total Arrival Time
25 min
Arrival Rate

0.60 veh / min
Unserved Rate (Arrival - Departure)

0.10 veh / min
Queue:

2.5 veh

62.5 feet
Pick-Up PM - 3:00 - 3:25
240 sec dwell 15 veh

0.5 veh / min Capacity
Total Arrival Time
25 min
Arrival Rate

0.60 veh / min
Unserved Rate (Arrival - Departure)

0.10 veh / min
Queue:

Queue Storage: 2.5 veh
2 veh 62.5 feet
50 feet
25 feet / veh
Projected Queuing for 2033 La Salle Drive
9/10/2025
Assumptions: Demand
Drop-Off AM - 8:00 - 8:25
230 sec dwell 15 veh

0.521739 veh / min Capacity
Total Arrival Time
25 min
Arrival Rate

0.60 veh / min
Unserved Rate (Arrival - Departure)

0.08 veh / min
Queue:

2.0 veh

48.9 feet
Pick-Up PM - 3:00 - 3:25
230 sec dwell 15 veh

0.521739 veh / min Capacity
Total Arrival Time
25 min
Arrival Rate

0.60 veh / min
Unserved Rate (Arrival - Departure)

0.08 veh / min
Queue:

Queue Storage: 2.0 veh
2 veh 48.9 feet
50 feet
25 feet / veh
Projected Queuing for 2033 La Salle Drive (2-vehicle queue) 9/10/2025
Assumptions: Demand
Drop-Off AM - 8:00 - 8:25
210 sec dwell 15 veh

0.571429 veh / min Capacity
Total Arrival Time
25 min
Arrival Rate

0.60 veh / min
Unserved Rate (Arrival - Departure)

0.03 veh / min
Queue:

0.7 veh

17.9 feet
Pick-Up PM - 3:00 - 3:25
210 sec dwell 15 veh

0.571429 veh / min Capacity
Total Arrival Time
25 min
Arrival Rate

0.60 veh / min
Unserved Rate (Arrival - Departure)

0.03 veh / min
Queue:

Queue Storage: 0.7 veh
2 veh 17.9 feet
50 feet
25 feet / veh
Projected Queuing for 2033 La Salle Drive (1-vehicle queue) 9/10/2025
Assumptions: Demand
Drop-Off AM - 8:00 - 8:25
200 sec dwell 15 veh

0.6 veh / min Capacity
Total Arrival Time
25 min
Arrival Rate

0.60 veh / min
Unserved Rate (Arrival - Departure)

0.00 veh / min
Queue:

0.0 veh

0.0 feet
Pick-Up PM - 3:00 - 3:25
200 sec dwell 15 veh

0.6 veh / min Capacity
Total Arrival Time
25 min
Arrival Rate

0.60 veh / min
Unserved Rate (Arrival - Departure)

0.00 veh / min
Queue:

Queue Storage: 0.0 veh
2 veh 0.0 feet
50 feet
25 feet / veh
Projected Queuing for 2033 La Salle Drive (No queue)
9/10/2025

kimley-horn.com 4637 Chabot Drive, Suite 300, Pleasanton, CA 94588 925-398-4840

Attachment E – The Carey School’s Parking and Traffic Plan

The

Carey

School’s

Parking

and

Traffic

Plan

This plan has been updated to include the proposed Carey School Early Childhood Center (ECC)

on

La

Salle

Drive

into

Carey’s

existing

Parking

and

Traffic

Plan.

This

plan,

including
on
designated

pick-up

and

drop-off

locations,

traffic

flow,

and

escort

requirements, is shared with
the

Carey

Community

each

year

and

reminders

are

sent

regularly

to

require

all

community

members

to

follow

the

plan

as

outlined

below.

The

requirements

of

this

plan

will

be

monitored

by

Carey’s

Head

of

School,

Director

of

Operations

and

Director

of

Facilities.

One of our primary responsibilities as neighborhood community members is to execute a safe and

efficient

parking

and

traffic

plan.

The

plan

that

follows

is

one

we

have

developed

in

collaboration

with

the

City

of

San

Mateo

and

our

neighbors.

The

principal

goals

of

the

plan

are

two:

1. To ensure the safety of the children, the school community, and those in the neighborhood.

2. To create an efficient flow of traffic to minimize the traffic impact on the neighborhood for

daily

school

operations

and

special

events.

We appreciate all you do to maintain good relationships with our neighbors, and therefore, we require

your

full

adherence

to

this

plan

at

all

times.

A. Staggered Start and End Times
The school has early morning care beginning at 7:45 am and extended care each afternoon until 6:00

pm.

We

ask

that

you

utilize

the

chart

below

for

the

location

and

drop-off

and

pick-up

times

of

each

grade:

Grade
Start Time
Morning Peak Time Location
End Time
Afternoon Peak Time Location Kindergarten 8:15 8:00-8:15 La Salle 2:45 2:45-2:55 La Salle First 8:15 8:00-8:15 La Salle 3:00 3:00-3:10 La Salle Second 8:15 8:00-8:15 Alameda 3:00 3:00-3:10 Alameda Third 8:15 8:00-8:15 Alameda 3:15 3:15-3:25 Alameda One Carey School Lane • San Mateo, CA 94403 • Phone (650) 345-8205 • Fax (650) 345-2528 • www.careyschool.org

Fourth 8:15 8:00 - 8:15 La Salle 3:15 3:15 -3:25 La Salle Fifth 8:15 8:00 - 8:15 Alameda 3:15 3:15 -3:25 Alameda 3s 8:30 8:15 - 8:30 ECC Parking Lot 2:35 2:35 - 2:45 ECC Parking Lot Pre-K 8:30 8:15 - 8:30 ECC Parking Lot 2:35 2:35 - 2:45 ECC Parking Lot 2s 8:45 8:30 - 8:45 ECC Parking Lot 2:30 2:30 - 2:35 ECC Parking Lot *Note: If you have more than one child in the school, please use the designated area/time for the

oldest

child.

B. Staffing
● During peak morning times, there will be five administrators at drop-off and pick-up areas

(on

the

Alameda

and

on

the

La

Salle

circle),

and

one

staff

member

on

the

corner

of

20th

Ave

and

La

Salle

(denoted

by

the

numeral

5)

from

8:00-8:25

am

and

3:00-3:30

pm

to

assist

children

and

to

help

direct

the

flow

of

traffic.

Please

see

the

exhibits

of

the

La

Salle

circle

below

where

the

numbers

denote

administrator

on

duty.
● During peak afternoon times, each lead and assistant teacher for grades will supervise the

pick-up

for

the

respective

grades. ● All school staff on duty use walkie talkies to communicate and create a safe and efficient process.

Note: Additionally, the administrators on duty will help ensure that the driveways are free for neighbor

use

(driveways

denoted

on

exhibit

with

X).

On

rare

occasions,

when

a

car

in

the

queue

blocks

the

flow

of

traffic,

they

will

be

asked

to

drive

around

the

block.

C.

Preschool

Student

Logistics
*The following logistics apply to all locations preschool students are dropped off and picked up (La

Salle,

Alameda,

ECC

parking

lot)
● Preschool students with siblings should be dropped off and picked up with their oldest sibling
● To ensure safe exit and entrance of cars on La Salle and Alameda, preschool students should

be

seated

closest

to

the

rear

passenger

door

so

staff

can

ensure

their

safe

exit

and

entrance

to

vehicles.
● School staff shall be assigned to escort all preschool students from all designated pick-up locations

on

La

Salle

and

the

Alameda

to

the

school

building,

and

from

the

building

back

to

each

pick-up

location.

One Carey School Lane • San Mateo, CA 94403 • Phone (650) 345-8205 • Fax (650) 345-2528 • www.careyschool.org

● While assigned staff are escorting students to or from the building, another staff member

shall

remain

stationed

at

each

drop-off

and

pick-up

location

to

receive

arriving

preschool

students

and

ensure

continuous

supervision.

Each

location

must

always

have

at

least

one

dedicated

staff

member

present

during

the

entire

pick-up

and

drop-off

period. ● Students shall be escorted by school staff or parents/guardians between the 2033 La Salle

parking

lot

and

the

school

building.

Unaccompanied

students

are

not

permitted

to

walk

between

these

areas.

D. Traffic Procedures La Salle (Grades PS, K, 1, 4) All vehicles are required to drive slowly on La Salle, when turning off of and returning to 20th Ave.

*Numbers in exhibit are personnel locations
Rules of the Road:

One Carey School Lane • San Mateo, CA 94403 • Phone (650) 345-8205 • Fax (650) 345-2528 • www.careyschool.org

● Please do not park on the La Salle Circle during peak hours as it is used for drop-off and pick-up.
● Pull all the way forward on La Salle by completing the full circle around the cul-de-sac.

The

forward-most

drop-off

and

pick-up

location

would

be

just

beyond

the

school’s

driveway.
● In order to ensure safe access and egress to and from the neighborhood, please stay in your

vehicle

at

all

times

and

follow

the

flow

of

traffic

and

do

not

leave

the

line

to

turn

back

around,

especially

by

using

a

neighbor’s

driveway.
● Staff will direct cars into each designated drop-off/pick-up spot in the circle and supervise

children

entering/exiting

the

vehicle.
● Families and faculty/staff are asked not to park on La Salle during the school day. If you need

to

come

to

campus,

utilize

parking

on

the

Alameda,

in

the

ECC

parking

lot,

2000

Alameda

or

short-term

parking

in

the

circle

outside

of

carline

operation.

E. Traffic Procedures Alameda (Grades 2, 3, 5) All vehicles are required to drive slowly on the Alameda into the white zone. The School maintains

a

speed

limit

monitor

to

encourage

drivers

to

maintain

a

safe

speed.

Be

advised

that

parking

will

not

be

allowed

from

the

end

of

the

white

zone

to

the

end

of

the

red

zone

fire

hydrant

on

the

Alameda

from

2:30

pm

–

3:30

pm.

*Numbers in exhibit are personnel locations
Rules of the Road:

One Carey School Lane • San Mateo, CA 94403 • Phone (650) 345-8205 • Fax (650) 345-2528 • www.careyschool.org

● The white zone in front of the school is designated as a drop-off/pick-up zone only.

Please

do

not

park

in

this

area.
● In order to ensure the safety of passenger cars behind you, please stay in your vehicle at all

times

and

pull

all

the

way

forward

on

the

Alameda

to

the

forward-most

spot

in

the

white

zone

(Note

that

this

spot

is

several

car

lengths

in

front

of

the

front

gate).
● Staff will direct cars into each designated drop-off/pick-up spot in the white zone and supervise

children

entering/exiting

the

vehicle.

F. Early Childhood Center Drop-Off and Pick-Up

*Numbers in exhibit are personnel locations
Rules of the Road:
● Pull all the way forward on La Salle, complete the full circle and then pull into the ECC driveway.

Pull

as

far

forward

as

possible

in

the

drop-off

lane

to

keep

traffic

flowing.

One Carey School Lane • San Mateo, CA 94403 • Phone (650) 345-8205 • Fax (650) 345-2528 • www.careyschool.org

● Staff will direct cars into each designated drop-off/pick-up spot in the parking lot and supervise

children

entering/exiting

the

vehicle.

Remain

in

your

car

unless

directed

otherwise

by

staff.

● In order to ensure safe access and egress to and from the neighborhood, please follow the

one-way

loop

from

W

20th

Ave

down

La

Salle

Dr

through

the

drop-off

loop

and

do

not

jump

the

line,

follow

the

flow

of

traffic.

If

dropping

off,

have

your

child

signed

in

on

Procare

and

have

their

backpacks

and

belongings

ready

to

speed

up

unloading.

F. Extended Care Drop-Off and Pick-Up During Non-Peak Times School is open as of 7:45 am and those dropping off before 8:00 am must walk students to the gate

where

they

are

monitored

upon

entry

to

the

premises.

The

Alameda

(non-white

zone)

and

La

Salle

cul-de-sac

are

available

for

parking

during

these

times.

When

picking

up

your

student

from

extended

care,

please

park

parallel

on

Alameda

or

in

the

ECC

parking

lot.

The

faculty

parking

lot

is

not

available

for

parent

parking

unless

otherwise

specified

(see

Special

Events).

G. Special Events The School has established parking routines for special events are tailored to the anticipated parking

need

of

the

particular

event

in

an

effort

to

minimize

the

impact

on

the

neighborhood.

For

nighttime

events,

the

campus

grounds

may

be

used

for

parking,

which

increases

the

onsite

spaces

by

30. The

school

partners

with

the

commercial

property

at

2000

Alameda

to

handle

overflow

parking

or

for

parents

that

wish

to

park

and

walk

their

children

into

school.

H. Contacting the School In the event you have observations or concerns about the parking or traffic conditions near The Carey

School,

please

contact

Head

of

School,

Neely

Norris

at

(650)

345-8205

or

send

an

email

to

[email protected].

I. Help the Environment To relieve traffic and to help the environment, we encourage the following modes of transportation

to

and

from

school:
● Walk/Bike to School: The Carey School Bi-Ped Club - Contact The Carey School for more

information.

● Carpool to School: School Pools - The School maintains a GoKid account which is a convenient

and

reliable

school

carpooling

program

for

schools

which

helps

families

form

One Carey School Lane • San Mateo, CA 94403 • Phone (650) 345-8205 • Fax (650) 345-2528 • www.careyschool.org

and manage carpools.

Also, when in the queue, turn your car off if you will be waiting for more than a minute. Idling wastes

gas

and

causes

more

pollution

than

restarting

your

car.

Thank you for your assistance in making The Carey School safe and for being a responsible

community

member.

If you have any questions about these protocols, please contact Neely Norris, Head of School at [email protected] or (650)345-2044.

One Carey School Lane • San Mateo, CA 94403 • Phone (650) 345-8205 • Fax (650) 345-2528 • www.careyschool.org

Preschool Enrollment Data With Sibling Numbers and Grades By Class and Year School year Preschool Class
Enrollment in
Class
# of Students
with Older
Siblings
Grades of
Older Siblings
(Preschool
students
represented by
letter)
2020-2021 PK-#1 11 8
a- 1st
b- 2nd, 4th
c-1st, 3rd
d- 1st
e- 3rd
f- K
g- 1st
h- 5th
PK-#2 12 6
a- 1st
b- K
c-2nd
d- 2nd
e-1st
f- 1st, 2nd
2021-2022 PK-#1 12 9
a- 2nd
b- 2nd
c-1st
d- 2nd
e- 3rd
f-2nd, 5th
g- 1st
h- 2nd
i- 2nd
PK-#2 12 10
a- 1st
b- 3rd
c-2nd
d- 3rd
e- 1st
f-2nd
g- 3rd
h- 2nd
i-2nd
j-2nd
2022-2023 3s 12 9
a- 1st
b- 1st
c-K
d- 1st
e- K
f-1st
g- 1st
h- 1st
i-1st
PK-#1 14 8
a- 2nd
b- 2nd
c-4th
d- 1st
e-2nd
f-1st, 2nd
g- 3rd
h- 1st
PK-#2 12 6
a- 2nd
b- K
c-2nd, 4th
d- 2nd
e-1st
f-2nd
2023-2024 3s 12 9
a- 3rd
b- K, 3rd
c-K
d- K, 2nd
e-2nd, 4th, 5th
f-K
g- 1st, 4th
h- 3rd
i- 1st
PK-#1 13 7
a- 2nd
b- 2nd
c-2nd
d- 5th
e-2nd
f-2nd
g- 1st, 5th
PK-#2 13 7
a- 1st
b- 2nd
c-K
d- 2nd
e-2nd
f-4th
g- 5th
2024-2025 3s 12 5
a- 1st
b- K
c-2nd
d- K, 5th
e-2nd
PK-#1 14 7
a- 3rd
b- 1st, 4th
c-1st, 3rd
d- 3rd
e-3rd, 4th
f-2nd, 5th
g- 2nd
PK-#2 14 8
a- 2nd
b- 4th
c-K
d- 1st
e-1st
f-K
g- 1st
h- 4th
2025-2026 3s 12 11
a- 1st
b- K, 1st
c-K
d- K
e- K
f-K
g- 1st
h- K
i-2nd
j-1st
k- 3rd
PK-#1 14 5
a- K
b- 3rd
c-2nd
d- 2nd
e-1st
PK-#2 14 4
a- 1st
b- 3rd
c-1st
c-1st, 4th

← All documents from this meeting