5 CITY OF SAN MATEO
RESOLUTION NO._______
RESOLUTION ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2026-27 FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and
WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and
WHEREAS, the City, will receive an estimated $3 million in RMRA funding in Fiscal Year 2026-27 from SB 1; and
WHEREAS, this is the 10th year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and
WHEREAS, the proposed project list is part of the City’s Pavement Management Program which is endorsed by the San Mateo City Council through budget adoption and public process; and WHEREAS, the City used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the communities priorities for transportation investment; and
WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate 16 roadway segments throughout the City this year;
WHEREAS, the 2023 California Statewide Local Streets and Roads Needs Assessment found that the City streets and roads are in a good condition, however some of the street segments in poor condition have not been addressed and this revenue will help the City increase the overall quality of its roadway system and over the next decade will bring streets and roads into a better condition; and
WHEREAS, the SB 1 project list and overall investment in the City’s local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting- edge technology, materials and practices, will have significant positive co-benefits statewide. 1 3
4 0
5 NOW, THEREFORE IT IS HEREBY RESOLVED, ORDERED AND FOUND by the City Council of the City of San Mateo, State of California, as follows:
1. The foregoing recitals are true and correct.
2. The following list of newly proposed projects will be funded in-part or solely with Fiscal Year 2026-27 Road Maintenance and Rehabilitation Account revenues:
Project Title: Citywide Street Rehabilitation Package 7-B Project Description: Project work includes milling of pavement surface or removal of asphalt concrete and base, overlaying asphalt concrete or placement of asphalt concrete and base, upgrading curb access ramps, installation of pavement markings and striping, and other incidental work.
Project Location: The following locations identified are subject to be changed.
Street From To
27th Avenue Alameda de las Pulgas Hacienda Street
Alley 14 42nd Avenue 41st Avenue
Aragon Boulevard Alameda de las Pulgas Harvard Road
Buena Vista Avenue Alameda de las Pulgas Isabelle Avenue De Anza Boulevard SR 92 Polhemus Road
De Anza Court De Anza Boulevard End
Delaware Street Charles Lane 16th Avenue Channel
Edinburgh Street Castilian Way Aragon Boulevard
Eldorado Street Poplar Avenue Cypress Avenue
Norfolk Street Flint Avenue Waters Park Drive
Norfolk Street Kehoe Avenue Dale Avenue
Oakwood Drive S End Crestwood Drive
Oakwood Drive Crestwood Drive End
O’Farrell Street 20th Avenue End
Parrott Court City Limit End
Pinewood Court Parkwood Drive End
Estimated Project Schedule: Start (07/26) – Completion (10/27) based on the component being funded with RMRA funds.
Estimated Project Useful Life: The estimated average useful life of the Project is 20 years.