Construction Contract
Rev 4/26
1 3
4 9
6 AGREEMENT WITH FOG CITY ROOFING & CONSTRUCTION, LLC

FOR PUBLIC IMPROVEMENT
FOR

SENIOR CENTER ROOF IMPROVEMENTS
CITY PROJECT NO. 46F056
THIS AGREEMENT FOR PUBLIC IMPROVEMENTS (“Agreement”), made and entered into in the City of San Mateo, County of San Mateo, State of California, by and between the CITY OF SAN MATEO, a municipal corporation existing under the laws of the State of California, (hereinafter called "City") and FOG CITY ROOFING & CONSTRUCTION, LLC, a CORPORATION, with offices at 6605 San Leandro Street, Oakland, CA 94621 (hereinafter called "Contractor"), entered into this day of ____________________.

RECITALS:
(a) City has taken appropriate proceedings to authorize construction of the public work and improvements or other matters herein provided, and execution of this Agreement. (b) A notice was duly published for bids for the contract for the improvement hereinafter described.
(c) After notice duly given, on the date hereof, the City awarded the contract for the construction of the improvements hereinafter described to Contractor.

IT IS AGREED, as follows:

1. Scope of Work. Contractor shall perform the work according to Exhibit A - Scope of Work, attached and incorporated for reference.

2. Contract Price. City shall pay, and the Contractor shall accept, the sum of Two Hundred Forty-Nine Thousand Sixty-Nine dollars ($249,069.00) in full payment for the work set forth above.

Said price is determined by the prices contained in Contractor's bid, and shall be paid as described in the Contract Book. In the event work is performed or materials furnished in addition to or a reduction of those set forth in Contractor's bid and the specifications herein, such work and materials will be paid for as described in the Contract Book.

3. The Contract Documents. The complete contract consists of the following documents: this Agreement; the Notice Inviting Sealed Proposals; the Accepted Proposal; the Contract Book which includes the Special Provisions and Contract Drawings, Addendum Number 1 issued to the Contract Book, the APWA-AGC Standard Specifications for Public Works Construction, 2015 Edition, the Faithful Performance Bond, and the Labor and Material Bond (hereinafter referred to as the “contract documents”).

Construction Contract
Rev 4/26
1 3
4 9
6 All rights and obligations of City and Contractor are fully set forth and described in the contract documents. The contract documents constitute the entire contract between the parties hereto pertaining to the subject matter hereof, fully supersede any and all prior understandings, representations, warranties and agreements between the parties hereto, or any of them, pertaining to the subject matter hereof, and may be modified only by written agreement signed by all of the parties hereto.

All of the above-named documents are complementary and are intended to operate in harmony, so that any work called for in one, and not mentioned in the other, or vice versa, is to be executed the same as if mentioned in all said documents. In the event of any variation or discrepancy between any portion of this Agreement and any portion of the contract documents, this Agreement shall prevail.

The precedence of the remaining contract documents will be as specified in the Contract Book.

4. Schedule. All work shall be performed in accordance with the schedule provided pursuant to the Contract Book.

5. Performance by Sureties. In the event of any termination as hereinbefore provided, City shall immediately give written notice thereof to Contractor and Contractor's sureties, and the sureties shall have the right to take over and perform the Agreement, provided, however, that if the sureties, within 5 days after giving them said notice of termination, do not give City written notice of their intention to take over the performance thereof within 5 days after notice to City of such election, City may take over the work and prosecute the same to completion, by contract or by any other method it may deem advisable, for the account, and at the expense of Contractor, and the sureties shall be liable to City for any excess cost or damages occasioned City thereby; and, in such event, City may, without liability for so doing, take possession of, and utilize in completing the work, such materials, appliances, plant and other property belonging to Contractor as may be on the site of the work and necessary therefor.

6. Legal Work Day - Penalties for Violation. Eight hours of labor shall constitute a legal day's work.

Contractor shall not require more than 8 hours labor in a day and 40 hours in a calendar week from any person employed by Contractor in the performance of such work unless such excess work is compensated for at not less than 1-1/2 times the basic rate of pay. Contractor shall forfeit as a penalty to City the sum of $25.00 for each laborer, workman or mechanic employed in the execution of this contract by Contractor, or by any subcontractor for each calendar day during which such laborer, workman or mechanic is required or permitted to labor more than 8 hours in any calendar day and 40 hours in any one calendar week in violation of the provisions of Sections 1810 and 1816, inclusive, of the Labor Code of the State of California.

7. Prevailing Wage Scale. The prevailing wage scale as determined by the Director of Industrial Relations of the State of California, in force on the day the bid was announced, will be the minimum paid to all craftsmen and laborers working on this project. Contractor shall also require any subcontractors who work or provide any services related to the project to pay all persons performing labor or rendering service under said subcontract or other arrangement at least the general prevailing rate of wages, determined as set forth herein for the respective crafts and employments, including such wages for holiday and overtime work. A copy of the correct determination will be posted at the job site. It is Construction Contract
Rev 4/26
1 3
4 9
6 understood that it is the responsibility of Contractor to determine the correct scale. Copies of the prevailing wage rates are on file at the City Clerk's office, however, errors or defects in the materials in the City Clerk's office will not excuse a bidder's failure to comply with the actual scale then in force.

Contractor must submit certified payrolls to the Department of Industrial Relations in accordance with Labor Code Section 1776.

Contractor agrees to comply with the City’s minimum wage ordinance as codified in Municipal Code Chapter 5.92, which differs from the state minimum wage and includes a Consumer Price Index escalator.

8. Senate Bill 854 Compliance Required. In accordance with Labor Code Sections 1725.5 and 1771.1, all contractors and subcontractors must be registered with the Department of Industrial Relations.

In accordance with Labor Code Section 1771.4 the contractor must post job site notices as required by regulation and this project will be subject to compliance monitoring and enforcement by the Department of Industrial Relations.

9. Insurance. The Contractor shall procure and maintain for the duration of the contract and five years thereafter the insurance as specified in Exhibit B of this agreement.

10. Indemnity. Contractor agrees to hold harmless and indemnify City, its elected and appointed officials, employees, volunteers, and agents from and against any and all claims, loss, liability, damage, and expense arising out of Contractor’s performance of this Agreement, except for those claims arising out of City’s active negligence, sole negligence or willful misconduct. Contractor agrees to defend City, its elected and appointed officials, employees, volunteers, and agents against any such claims.

The Contractor’s duty to indemnify shall survive expiration or early termination of this Agreement.

11. Attorney Fees. Attorney fees in total amount not exceeding $5000, shall be recoverable as costs (by the filing of a cost bill) by the prevailing party in any action or actions to enforce the provisions of this Agreement. The above $5000 limit is the total of attorney fees recoverable whether in the trial court, appellate court, or otherwise, and regardless of the number of attorneys, trials, appeals, or actions. It is the intent of this provision that neither party shall have to pay the other more than $5000 for attorney fees arising out of an action, or actions to enforce the provisions of this Agreement.

12. Mediation. Should any dispute arise out of this Agreement, any party may request that it be submitted to mediation. The parties shall meet in mediation within 30 days of a request. The mediator shall be agreed to by the mediating parties; in the absence of an agreement, the parties shall each submit one name from mediators listed by either the American Arbitration Association, the California State Board of Mediation and Conciliation, or other agreed-upon service. The mediator shall be selected by a blind draw.

The cost of mediation shall be borne equally by the parties. Neither party shall be deemed the prevailing party. No party shall be permitted to file a legal action without first meeting in mediation and making a good faith attempt to reach a mediated settlement. The mediation process, once Construction Contract
Rev 4/26
1 3
4 9
6 commenced by a meeting with the mediator, shall last until agreement is reached by the parties but not more than 60 days, unless the maximum time is extended by the parties.

13. Provisions Cumulative. The provisions of this agreement are cumulative, and in addition to and not in limitation of, any other rights or remedies available to City.

14. Notices. All notices shall be in writing, and delivered in person or transmitted by certified mail, postage prepaid.
a. Notices required to be given to City shall be addressed as follows:

Public Works Director
City of San Mateo
330 West 20th Avenue
San Mateo, CA 94403
Notices required to be given to Contractor shall be addressed as appears in the signature block as shown on the Bidder's Statement.

15. Interpretation. As used herein any gender includes each other gender, the singular includes the plural and vice versa.

16. Governing Law and Venue. This Agreement, the contract documents, and the performance hereon shall be governed, interpreted, construed, and regulated by the laws of the State of California. The parties agree that any action related to this Agreement or the contract documents will be venued in the County of San Mateo.

17. Headings. The title and headings of the various sections of this Agreement and the contract documents are intended solely for convenience of reference and are not intended to explain, modify, or place any construction on any provisions.

18. No Partnership or Agency. Nothing in this Agreement nor the contract documents shall be deemed to constitute a partnership in law between City and Contractor, or any sub-contractor, to constitute either party as an agent of the other for any purpose; or to entitle either party to commit or bind the other in any manner unless expressly agreed upon in the contract documents.

19. Severability. If any part or provision of the contract documents is determined by any court to be illegal, invalid, or unenforceable, in whole or in part, the contract documents shall continue to be valid as to its other provisions and the remainder of the affected provision, unless it can be concluded from the circumstances that, in the absence of the provisions found to be null and void, the parties would not have entered into the contract documents. The parties shall use all reasonable efforts to replace any and all provisions or parts found to be null and void with provisions that are valid under the applicable law and come closest to their original intention.

Construction Contract
Rev 4/26
1 3
4 9
6 20. Waiver. None of the following shall operate as a waiver of any provision of the contract documents, or of any power herein reserved by the City, or any right to damages herein provided: 1) inspection by the City or its authorized agents or representatives; 2) any order or certificate for payment, or any payment for, or acceptance of the whole or any part of the work by the City; 3) an extension of time; or 4) any position taken by the City or its authorized agents or representatives.

21. Warranty. Contractor warrants and guarantees that the materials and equipment provided shall be at least of the quality specified and new unless otherwise required or permitted by the contract documents, and, if no quality is specified, then the materials and equipment shall be of commercial grade, suitable for heavy public use in facilities of similar size and complexity, that the work performed hereunder will be free from defects, and that the work will conform to the requirements of the contract documents.
[SIGNATURE PAGE FOLLOWS]
Construction Contract
Rev 4/26
1 3
4 9
6 Construction Contract
Rev 4/26
1 3
4 9
6 IN WITNESS WHEREOF, this agreement between the CITY OF SAN MATEO and Fog City Roofing & Construction, LLC has been duly executed by the parties hereinabove named, as of the day and year first above written.

CITY OF SAN MATEO CONTRACTOR
Matt Fabry
Public Works Director
Date Adriano Silva
Its Authorized Agent
President
If a Corporation, can be either 1)
President or 2) Vice President
plus an additional corporate
officer (i.e., Secretary, Treasurer)
who shall sign below.

Date

APPROVED AS TO FORM
Linh Nguyen
Assistant City Attorney
Date
Exhibit A: Scope of Work
Exhibit B: Insurance Requirements
Construction Contract
Rev 4/26
1 3
4 9
6 Exhibit A
Scope of Work
Section 02 40 00
General Demolition
Part 1. General

1.01 Related Documents
A. The Drawings and general provisions of the Contract, including General and Special Conditions and Division 1, General Requirements, apply to the work specified in this section.

B. Parts 1,2,3,4,5,6, Title 24 of the California Code of Regulations (California Building Code) is to be considered an integral part of this section.

C. All California Prevailing Wage Laws apply to the work of this section.

1.02 Work Included
A. The following is a general description of the work included in this section. This description does not limit the scope of work shown in the drawings nor does it relieve the Contractor of any responsibility for coordination of ALL work of this Contract.

Item Description
General General Demolition Requirements
Special Coordination Refer to Related Sections for specific project requirements not included herein.

B. Related work may be described in other sections of this Project Manual. All sections of this project manual are related. Contractor shall coordinate the work of this section with all other sections.

1.03 Submittals
A. Provide the following submittals per the requirements of Division 1.

Item Description
Catalog Cuts n/a
Product Data n/a
Samples n/a
Shop Drawings n/a
Schedule Include Schedule entry on Gantt Chart for General Demolition

1.04 References/Standards
A. The following References and Standards are incorporated into the requirements of this Section as they apply to products, assembly, manufacturing procedures and installation.

References shall be utilized in determining “Industry Standards” and other acceptable manufacture and installation methods but shall not relieve the Contractor of any other responsibilities of the Contract. Where conflicts occur between multiple listed references, the Contractor shall assume that the more restrictive standard applies and shall seek determination from the Architect regarding applicable standard.

References n/a
Standard n/a

1.05 Quality Assurance
A. Provide the following per Division 1
Construction Contract
Rev 4/26
1 3
4 9
6 Item Description
Supervision Full time supervision and observation by the Item Description
Contractor of all on-site Construction Activities.
 Ensure that all items to be retained in good
condition and turned over to owner are properly
protected.

Qualifications of Workers General Contractor shall ensure that all workers providing labor on this project are fully competent
and experienced in the area of work being
performed. General Contractor shall require
subcontractors to remove any unqualified workers
from the project.

Product Acceptance n/a
Substrate Acceptance General Contractor (Superintendent) shall verify all substrates / conditions prior to allowing installation
of any item.

1.06 Quality Control by Contractor
A. The following specific procedures shall be required to demonstrate adequate levels of quality provided for project components and systems. Exclusion of any item from this list does not relieve the Contractor of any responsibilities for quality procedures covered elsewhere in the Contract Documents.

Item Description
Supervision Per Division 1
Testing n/a
Special Inspections n/a
Mock Ups n/a

1.07 Quality Control by Owner
A. The following specific procedures shall be required to demonstrate adequate levels of quality provided for project components and systems. Exclusion of any item from this list does not relieve the Contractor of any responsibilities for quality procedures covered elsewhere in the Contract.

Item Description
Observation Per Division 1.

Inspection n/a
Testing n/a
Special Inspections n/a

1.08 Closeout
A. Provide the following Close Out materials in accordance with Division 1.

Item Description
Product Manuals n/a
System Manuals n/a
Maint. Tools/Materials n/a
Surplus Materials n/a
Training n/a
Construction Contract
Rev 4/26
1 3
4 9
6 Construction Contract
Rev 4/26
1 3
4 9
6 1.09 Warranty
A. Provide written warranty in accordance with Division 1.

Item Description
Warranty Form Per Division 1
Warranty Period 1 year
Warranty Start Date of Substantial Completion
Part 2. Products

2.01 Not Used
Part 3. Execution

3.01 Demolition Section of Other Disciplines
A. This section shall apply to all demolition work defined under any other section of this Specification. Conflicts between this section and other sections shall be resolved by the Architect with favor to the most restrictive stipulation.

B. All trades shall review all documents to determine the extent to which their demolition work may require support work from other trades.

C. The Contractor shall be responsible to ensure that all trade work required for demolition tasks is provided regardless of the inclusion of that trade in any Plans or Demolition Sections.

1. Contractor shall provide complete service including specified demolition work as well as collateral requirements for repair, closure, termination or re-routing. No claims shall be made for incidental or peripheral demolition work associated with any specified work.

3.02 Transfer of Responsibility and Disposition of Materials A. Contractor shall consult with Owner prior to commencing any demolition and determine which existing items and equipment are of value to the Owner. These items shall be carefully removed to avoid damage and shall be delivered to the Owner as directed.

B. Title to all remaining items, equipment and fixtures required to be removed, shall be vested in the Contractor whereupon the Owner will not be responsible for the condition, loss or damage to said property. All such items shall be removed from the Owner's property.

3.03 Supervision Requirements
A. Provide continuous supervision of all demolition activities. All demolition work shall be done in conjunction with the Contract Documents and shall accommodate provisions of all aspects of the Documents.

B. Conduct demolition to minimize interference with adjacent structures.

C. Conduct operations with minimum interference to public or private accesses.

D. Maintain egress and access at all times. Do not close or obstruct roadways without permits.

E. Cease operations immediately if adjacent structures appear to be in danger. Notify Architect.

3.04 Site Safety during Demolition Operations
A. Contractor shall provide fire watch for the site or facility during temporary shutdown of fire alarm or fire suppression systems.

Construction Contract
Rev 4/26
1 3
4 9
6 Construction Contract
Rev 4/26
1 3
4 9
6 B. Contractor shall provide security services for the site or facility during temporary shutdown of the security systems.

C. Contractor shall provide traffic control during disruption of normal traffic flow on site due to temporary alterations in site circulation system.

D. Contractor shall provide pedestrian control during demolition operations to ensure pedestrians are protected from equipment and materials.

E. Contractor shall provide vision shielding to prevent observation by the public of cutting and welding torches or any other source of bright light that may damage vision.

F. Refer to Site Safety Section of this specification.

3.05 Demolition Scheduling
A. Contractor acknowledges that Demolition Scheduling shall be coordinated with the Architect for the beneficial operation of the Site. Contractor shall place no limitation on the extent of coordination of Demolition activities for this purpose.

B. Contractor acknowledges that Demolition work may occur in multiple and repetitive tasks and may occur at different locations at different times, dependent on the needs of the Site to maintain access, operation, utilities, systems and safety.

1. Demolition tasks may be restricted to certain work times based on any one of the following:
(a) Occupancy of adjacent areas by City and the need to minimize disruption at particular times.
(b) Need to maintain operation of critical systems and utilities at particular times

2. Demolition tasks may be restricted to certain work areas based on the nature and scope of the task and its potential affect on the users of adjacent occupied spaces.

C. All Demolition Scheduling shall be reviewed with the Architect prior to commencing operations.

1. Demolition of any items that could affect daily operations of the site shall be scheduled with the City to occur and be replaced with new construction.

2. Demolition Operations may be limited to hours before and after work hours, depending on the time of year and the nature of the demolition work.

3. Demolition Operations may be limited to periods outside of normal work hours, such as weekends and holidays.

D. Contractor shall provide allowance for multiple demolition exercises as may be required to facilitate city schedule. Coordination of demolition scheduling with City operational needs shall not be allowed as the basis of delay claims.

3.06 Notification of Demolition
A. Provide notification of the commencement of any demolition task or phase 48 hours in advance.

B. Do not commence demolition until the Architect has approved the task or phase and coordinated the schedule with the City.

3.07 Demolition Equipment
A. Contractor shall provide all equipment and materials as may be necessary to perform the demolition work within the limitations of this section. No claims shall be made for special equipment or processes based on limitations of this section.

Construction Contract
Rev 4/26
1 3
4 9
6 Construction Contract
Rev 4/26
1 3
4 9
6 B. Contractor shall provide equipment and tools of appropriate size, operation and function to accomplish demolition tasks within the restrictions described herein.

1. Provide equipment of appropriate size to ensure the protection of existing facilities, materials and systems.

3.08 Preparation
A. Provide, erect, and maintain temporary barriers and security devices. Include chain link fence around each phase of construction

1. Include protection of all existing trees.

B. Mark all items to be removed.

C. Provide layout as required to direct slab and wall removal. Identify slab and walls requiring precise cutting and demolition for future fitting of new construction.

3.09 Dust Control
A. All demolition activities shall include adequate measures for dust control. Contractor shall provide any and all means necessary to prevent the circulation of dust into adjacent buildings and site areas.

B. Contractor shall provide the following as needed or at the request of the Architect:

1. Watering shall occur over transit areas including equipment routes, equipment loads and parking areas.

2. Opening protection at all areas that may include plastic barriers, fans and other means to prevent dust from spreading throughout building.

3. Dust removal: Sweep or wash down of adjacent site and building areas that will be used by the public.

C. Use all means necessary to prevent the spread of dust during performance of the work of this Section; provide dust curtains of fireproof polyethylene where indicated and where applicable, moisten surfaces as required.

D. Provide sealed membranes with zipper operated doors over corridors and passage ways separating the work zone from occupied spaces. Provide sealed membranes over windows and ventilation openings.

1. Membranes shall not limit operability of windows and ventilation systems in areas occupied by the public.

2. In no case shall barriers obstruct required exit routes.

3.10 Demolition
A. Demolish and remove components in an orderly and careful manner, in sequence as indicated on Drawings or as determined by consultation with Architect.

B. Coordinate all structural shoring and demolition to insure that no settling, deflection or other failure occurs as a result of removal or modification of existing elements.

C. Protect existing supporting structural members.

D. Clearly direct demolition work so that items to remain are protected.

E. Disconnect, cap and identify designated utilities.

1. Cap utilities at appropriate locations for future service, reconnection.

2. Architect may require removal of piping and raceway beyond specific work areas in order to achieve appropriate location for utility termination.

Construction Contract
Rev 4/26
1 3
4 9
6 Construction Contract
Rev 4/26
1 3
4 9
6 F. Execute demolition work to ensure safety of persons and adjacent property against damage by falling debris or other causes in connection of this work.

3.11 Termination of Utilities
A. All demolition of utility piping, wring or ductwork shall include functional termination of piping, wiring and ductwork to remain such that:

1. Operation of remaining systems is not affected or disrupted.

2. Terminations can be accessed for reconnection or re-routing either as part of this work or as specified in other projects.

B. Demolition of site and building utilities shall provide for termination and investigation regarding the operation of remaining components in adjacent buildings. Contractor shall explicitly ensure that removal of any component specified herein does not prevent remaining components from operating in occupied spaces.

3.12 Re-Installation / Reconstruction
A. Demolition work may require the temporary removal of material, assemblies and equipment that is intended to remain. Demolition work shall require the re-installation of such items to their original condition

1. Reinstallation may affect utility systems and components, electrical systems, communications and data systems and alarm systems.

2. All critical systems shall be maintained in working order for the remainder of the site.

No demolition work shall be allowed that will disable and system beyond the extent of a temporary shutdown.

3. Contractor is responsible for returning any system to operation for adjacent areas where work of this contract has interrupted that operation.

3.13 Repair and Replacement of Damaged Assemblies, Utilities Systems A. Promptly repair damages caused to adjacent facilities by demolition operations, as directed by the Architect and at no cost to the City.

B. Contractor is responsible for repair, replacement of any system or component damaged by demolition work.

3.14 Surface Restoration of Materials to Remain
A. Where surfaces are to remain unfinished, as indicated on the drawings, Contractor shall restore such surfaces to be free of paint, plaster, fasteners, and holes.

1. Contractor shall power-wash and/or sand/bead-blast all masonry and concrete surfaces indicated as to remain unfinished.

2. Contractor shall extract all fasteners, including powder-driven fasteners, expansion anchors, and lead anchors, and patch resulting holes to match adjacent surface.

Alternatively, fasteners may be cut off at least 1/2” below surface of remaining material, and patched to match adjacent surface.

B. Unfinished surfaces which are to remain visible when construction is complete shall be restored uniformly, regardless of whether the damage or marks were pre-existing or caused by demolition work.

C. Surfaces receiving new finishes shall be prepared per Specifications and manufacturer’s instructions for the specified finishes.

3.15 Disposal of Debris
A. Remove from the site and legally dispose of all debris resulting from demolition operations.

Construction Contract
Rev 4/26
1 3
4 9
6 Construction Contract
Rev 4/26
1 3
4 9
6 B. Provide certification that all materials have been disposed of at appropriate facilities via appropriate methods.

1. Provide dump receipts describing yardage and material content.

2. Provide certification for all hazardous materials.

3.16 Recycling
A. Prepare a recycling plan describing the types and estimated quantities of materials to be removed that can be recycled.

B. Dispose of all recyclable materials at appropriate disposal facilities as required by local regulatory agencies.

C. Provide receipts from all facilities at which material was deposited for recycling purposes.

3.17 Cleaning
A. Remove demolished materials from site as work progresses.

1. Provide debris box or trucking as appropriate to task.

2. Remove debris boxes upon filling to capacity.

3. Remove partially filled boxes within one week of delivery.

4. Prevent access to debris boxes by the public.

B. Leave areas of work in clean condition.

1. Provide sweeping, vacuuming, mopping and other janitorial services as required.

End of Section
Construction Contract
Rev 4/26
1 3
4 9
6 Section 06 10 00
Rough Carpentry
Part 1. General

1.01 Provisions
A. All of the provisions of the General Conditions, Supplementary General Conditions and Special Conditions, Division 1 - General Requirements, and any applicable provisions elsewhere in the Contract documents shall apply to work of this Section as fully as if repeated here.

1.02 Description
A. Work Included: Execution and completion of all rough and finish carpentry as shown and specified including, but not necessarily limited to, the following:

1. Framing in and patching existing holes where items are removed.

2. Furnishing and installing miscellaneous materials not specified elsewhere which are required to complete the work.

1.03 Quality Assurance
A. Comply with the referenced standards of the following trade associations:

1. West Coast Lumber Inspection Bureau (WCLIB)

2. Western Wood Products Association (WWPA)

3. American Forest and Paper Association (AF&PA)

4. The Engineered Wood Association (APA)

5. California Redwood Association (CRA)
B. Comply with all referenced requirements of the 2025 California Building Code (CBC) with DSA-SS Amendments.

C. Comply with the referenced preservative treatment requirements of the American Wood Preservers Association (AWPA).

D. Inspection: Prior to all work of this section, carefully inspect the installed work of all other trades and verify that all such work is complete to the point where this installation may properly commence.

E. Discrepancies: In the event of discrepancy, immediately notify the Architect. Do not proceed with installation in areas of discrepancy until all such discrepancies have been fully resolved.

F. Lumber may be rejected by the Structural Engineer, whether or not it has been installed, for excessive warp, twist, bow, crook, mildew, fungus, or mold, as well as for improper cutting and fitting.

1.04 Delivery & Storage of Material
A. All materials shall be properly packed and handled while in transit so as to arrive at the job site in undamaged condition. Manufactured materials shall be delivered in suitable containers plainly marked with brand and manufacturer's name.

B. Storage arrangements shall be subject to the Architect's approval and shall afford every access for inspection and identification of each item. Lumber shall be piled off the ground, on skids, in a manner that prevents twisting or warping and affords proper ventilation, drainage, and protection from termites and decay, rain and excessive sun. Plywood shall be protected from dampness. All material shall be protected from the elements and from any and all damage or deterioration.

Coordinate material storage area with Owner.

C. Damaged or deteriorated materials or assemblies shall not be used in the work and shall be replaced at no extra cost to the Owner.

1.05 Submittals
A. Samples: Submit samples of each wood material which is to receive a transparent or natural finish. Submit 12-inch-long samples of full member width and thickness for solid lumber and 12 inch long by 6 inch wide for plywood. Samples will be reviewed by Architect for appearance only. Compliance with all other requirements is the exclusive responsibility of the Contractor.

B. Wood Treatment Data: For informational purposes, submit two copies of the chemical treatment manufacturers' instructions for proper use of each type of treated material. Indicate by means of copy of the letter of transmittal, that copy of each instruction has been distributed to the installer of the material.

1. Dip Treatment: For each type specified, include certification by treating plant, identifying the chemical solutions used, submersion period and conformance with specified standards.

2. Pressure Treatment: For each type specified, include certification by the treating plant, identifying the chemicals and process used, net amount of salts retained and conformance with applicable standards. For water borne preservatives, include statement that moisture content of treated materials was reduced to a maximum of 15% prior to shipment to project site.

C. Fire Retardant Treatment: Include certification by the treating plant that the treatment material complies with the governing ordinances and that treatment will not "bleed" through the surface finish materials scheduled to be used.

Part 2. Products

2.01 Lumber
A. General: All material shall conform to these specifications and to the applicable current editions of the Standard Specifications of the ASTM and the California Building Code.

B. Lumber Grading: Douglas Fir, WCLIB "Standard Grading & Dressing Rules for West Coast Lumber," No.17.

C. Lumber Grade Marking: Each piece of lumber shall bear the official grade mark of an appropriate inspection bureau certified by the Board of Review, American Lumber Standard Committee. Surfaces that are exposed to view shall not bear grade marks, stamps, or any other type of identifying mark.

D. Lumber Size and Patterns: Surfaced four sides, dress sizes to U.S. Product Standard PS 20, work to sizes shown. Sizing and surfacing shall be as required and approved for the particular location. All framing shall be sized and where exposed shall be surfaced.

E. Fir Plywood: U.S. Product Standard PS 1-07 for plywood, Douglas Fir CDX, Douglas Fir Structural I, grade stamped and edge branded to DFPA Standards of the Engineered Wood Association. Use standard sheathing with exterior glue.

F. Boards and dimension lumber 2" or less in thickness shall have an average moisture content of 15% or less, but no portion of a shipment shall be over 19%. Air-dried lumber is desired but, if necessary, lumber may be kiln-dried. However, the drying process must be slow and regulated to cause only an amount of checking comparable with air-dried stock. All wood thicker than 2½" shall be well seasoned stock, moisture content not to exceed 19% at time of installation.

G. All framing, unless otherwise shown, shall be Douglas Fir, No.1, and for stud, plate, blocking, and backing, No.1.

H. Redwood – No. 1 or better.

2.02 Lumber Fastenings
A. Nails and Spikes: ASTM F1667, Common wire, unless otherwise noted.

1. Nailing of wood member shall conform to the California Building Code and/or as indicated. Box nails are not permitted.

2. Penetration: Per Section 2304.10 and Table 2304.10.1 of the CBC or as noted on the Drawings.

3. To connect pieces 2" net in thickness, 16d nails may be used.

4. Do not drive nails closer together than half their length, nor closer to edge of piece of lumber or timber than one-quarter their length.

5. Spacing and size of nails to be such that splitting will not occur. Pre-bore holes for nails wherever necessary to prevent splitting. Bore diameter of holes smaller than diameter of nail or spike (¾ diameter).

6. For plywood nailing, size and spacing as indicated. Nails shall have edge distances of not less than 3/8".

7. Use galvanized nails where exposed to weather.

B. Screws: Bright steel wood screws complying with ANSI/ASME Standard B18.6.1.

1. Screws are to be turned into place, not driven. Self-tapping where required for fastening to metal framing.

2. Countersink where heads will interfere or as required.

3. Screw bore holes the same diameter and depth as shank; bore holes for threaded portion of screws with bit no larger than base of thread.

4. Use galvanized or cadmium-plated screws on all fastenings exposed to weather.

C. Bolts: Standard mild steel, square head machine bolts with square nuts and malleable iron or steel plate washers, conforming to ASTM A307.

1. To be installed in drilled holes the diameter of the bolt, 1/32 inch to 1/16-inch oversize.

2. Bolting of wood members shall conform to CBC requirements and as called for on the drawings.

3. Washers: Provide all bolts bearing on wood, unless noted otherwise on the drawings, with malleable iron or steel plate washers under heads and nuts.

4. Use galvanized bolts, nuts, and washers where exposed to weather.

D. Lag Screws: Conform to "National Design Specifications for Wood Construction", AF&PA, latest edition and ANSI/ASME Standard B18.2.1.

1. Lag screws shall be screwed and not driven into place. Penetration in each timber shall not be less than 2/3 of the length of the lag screw.

2. Hole shall be bored the same diameter and depth as the shank, after which the hole shall be continued to a depth equal to the length of the lag screw with a diameter no larger than ¾ of the shank diameter.

3. Washers: Provide all lag screws bearing on wood with malleable iron or steel plate washers under heads.

4. Use galvanized lag screws and washers where exposed to weather.

E. Metal framing devices shall be as manufactured by Simpson Company, San Leandro, CA or approved equal.

1. For connectors in contact with or connected through pressure-preservative treated wood, they shall be galvanized with Z-Max or HDG coatings as recommended by the manufacturer.

2. Where “Min” and”Max” options are listed in the product catalog, install per “Max” option unless otherwise noted on the Drawings.

F. Fasteners for pressure-preservative treated and fire-retardant treated wood, galvanized & stainless steel metal framing devices, shall be hot-dipped zinc coated galvanized, stainless steel, silicon bronze or copper. Fasteners required to be corrosion resistant shall be either zinc-coated fasteners, aluminum alloy wire fasteners or stainless steel fasteners.

2.03 Materials-Preservative Treatment
A. Preservative Treatment: Water borne type complying with AWPA Standard P5. Acceptable manufacturers and products: Osmose "Naturewood", Arch Wood Protection “Wolmanized Outdoor”, or approved equal. Chromated copper arsenate (CCA) based treatments shall not be used unless approved by the Architect.

1. Apply all preservative treatment to comply with AWPA Standards T1, M4, and the appropriate AWPA Commodity Specification based on the individual member’s Use Category listed in AWPA Standard U1.

B. Provide preservative treatment for all wood at the roof, such as insulation nailers, curbs, plywood backup, etc., all wood in contact with concrete, and all wood exposed to weather.

C. Provide labeling in conformance with CBC Section 2303.1.9.1 on all preservative treated material delivered to the job site.

2.04 Materials-Fire Retardant Treatment
A. Fire Retardant Treatment: Water born chemical treatment to comply with AWPA Standard P-5 and achieve a flame spread index of 25 or less when tested in accordance with ASTM E84. Use of ammonium phosphates is prohibited. Acceptable manufacturers and products:

Osmose "FirePRO", Hoover "Pyro-Guard" and "Exterior Fire-X", or approved equal.

B. Apply in compliance with the applicable AWPA Standard for type of wood and application.

C. Provide fire retardant treatment for all wood noted on the Drawings to receive it.

D. Where treated items are indicated on the Drawings to receive a transparent or opaque paint finish, use a fire retardant treatment which will not bleed through or adversely affect the bond of the finish material.

E. Provide labeling in conformance with CBC Section 2303.2.4 on all fire treated material delivered to the job site.

Part 3. Execution

3.01 Workmanship
A. General: All rough carpentry shall produce joints true, tight, and well-nailed with all members assembled in accordance with the drawings and with all pertinent codes and regulations. Carefully layout framing to be straight, true, and plumb.

B. Selection of lumber pieces: Carefully select all members; select individual pieces so that knots and obvious defects will not interfere with placing bolts or proper nailing or making proper connections.

C. Shimming: Do no shim sills, joists, short studs, trimmers, headers, lintels, or other framing components.

3.02 General Framing
A. General

1. In addition to all framing operations normal to the fabrication and erection indicated on the drawings. Install all backing required for the work of other trades. Install furring, stripping, grounds, curbs, cants, etc., indicated, specified, or required.

2. Set all horizontal or sloped members with crown up.

3. Do not notch, bore, or cut members for pipes, ducts, conduits, or for other reasons except as shown on the drawings, or as specifically approved in advance by the Structural Engineer.

4. Joists and beams at same level shall be connected with metal framing devices, "U" type, except as noted on the Drawings.

5. Provide furring as needed to accommodate and/or conceal the various components and equipment of Mechanical, Electrical and Systems of other Divisions of Work.

B. Bearings

1. Make all bearings full unless otherwise indicated on the drawings. Set headers on edge, supported on each end by cripples.

2. Finish all bearing surfaces on which structural members are to rest so as to give sure and even support; where framing members slope, cut or notch the ends as required to give uniform bearing surface.

C. Wood Grounds and Nailers

1. Provide wherever shown and where required for screeding, or attachment of other work. Form to shapes as shown and cut as required for true line and level of work to be attached. Coordinate location with other work involved.

2. Attach wood nailers to steel framing with 1/2" diameter bolts at 4'-0" o.c. unless otherwise noted on drawings.

3. Attach wood nailers to concrete walls with 1/2" diameter expansion shield at 4'-0" o.c. maximum unless otherwise noted on drawings.

4. Attach all other wood grounds and nailers to substrates as required to support applied loading. Countersink bolts and nuts flush with surfaces, unless otherwise shown.

Where possible when attachment made to concrete, anchor to formwork before concrete placement.

3.03 Blocking
A. Install all blocking as required by governing codes and as required to support all items of finish and to cut off all concealed draft openings, both vertical and horizontal, between ceiling and floor areas.

B. Install 2x blocking at all intersections and edges of finished surface for bearing, and at all points where required to support fixtures, cabinets, hardware, flashing, and equipment of any other trade. Blocking to receive fixtures shall be secured to framing with steel clips.

1. Install 2x blocking at all ceiling or soffits where support spacing for finish material is over 24" o.c. Add blocking at 24" o.c. to support gypsum drywall ceiling and at 16" o.c. to support plaster ceilings.

C. Blocking between joists:

1. Install wood solid blocking between joists where the span exceeds eight feet.

2. The distance between a line of blocking and a bearing wall shall not exceed eight feet.

3. Solid blocking may be omitted for roof and ceiling joists eight inches (nominal) in depth where the omission is permitted by code, except where otherwise indicated on the drawings.

4. Install solid blocking between joists at all points of support and wherever sheathing or flooring is discontinuous.

5. Blocking may be omitted where joists rest on ribbons and are nailed to studs, and where joists are supported on metal joist hangers.

3.04 Built-Up Beams
A. Non-used

3.05 Stud Walls and Partitions
A. Non-Used

3.06 Alignment
A. On all framing members to receive a finished wall or ceiling, align the finish subsurface to vary not more than 1/8 inch from the plane of surfaces of adjacent framing and furring members.

3.07 Installation of Plywood Sheathing
A. Placement:

1. Place all plywood with face grain perpendicular to supports and continuously over at least two supports, except where otherwise specifically shown on the drawings.

2. Center joists accurately over supports, unless otherwise specifically shown on the drawings, stagger the end joints of plywood panels to achieve a minimum of continuity of joints.

3. Nail all panel edges to framing members or blocking at least 1-1/2" thick and as shown on the drawings. Space nails at panel edges as indicated on drawings, or if not indicated, according to the CBC requirements. Place nails not less than 3/8" from panel edges and driven solidly into the support.

4. Provide 1/8 inch minimum separation at ends and edges of plywood sheathing installed under cement plaster.

5. Sheathing surfaces shall be free of warp, twist, buckles, holes and other defects.

B. Glued Plywood: Install in accordance with APA recommendations. Apply a bead of adhesive to joints and to edges at all floor joists and beams. Apply a bead in a snake-like manner to joists at plywood butt edges.

C. Protection of Plywood: Protect all plywood from moisture by use of all required waterproof coverings until the plywood has in turn been covered with the next succeeding component or finish.

3.08 Fastenings
A. Nailing:

1. Use only common wire nails of the dimensions shown on the Nailing schedule, except where otherwise specifically noted in the drawings.

2. All nailing to conform to minimum requirements shown on the drawings and/or as referenced by these specifications.

3. For conditions not covered on the drawings, provide penetration into the piece receiving the point of not less than 1/2 the length of the nail provided, however, that 16d nails may be used to connect two pieces of two inch (nominal) thickness.

4. In diaphragms, the minimum penetrations shall be 1-3/8" for 8d nails and 1-1/2" for 10d nails.

5. Do all nailing without splitting wood, pre-boring as required; replace all split members.

B. Bolts and Screws:

1. Bolts: Drill holes 1/32" larger in diameter than the bolts being used, drill straight and true from one side only. Bolt threads shall not bear on wood.

2. Screws:
(a) Penetration for wood screws shall not be less than six diameters unless otherwise shown on the Drawings. Penetration (not including length of tapered tip) for lag screws shall not be less than four diameters unless otherwise shown on the Drawings.
(b) For lag screws and wood screws, pre-bore holes in accordance with A.I.T.C. and with a maximum diameter as root of thread, enlarge holes to shank diameter for length of shank.
(c) Screw, do not drive, all lag screws and wood screws. (d) Bolts with upset threads not permitted.

3. Provide washers under heads and nuts of all bolts and lag screws.

4. Washers for bolts in shear shall have a net area of not less than 16 times the area of bolt or lag screw, and shall be either of steel not less in thickness than 1/10 the length of the washer's longest side, or of malleable iron having a thickness of not less than 1/2 the bolt or screw diameter.

5. Washers shall have a bearing surface for the nut or head that is not less than or equal in diameter to the long diameter of the nut or head.

C. Anchor Bolts:

1. Anchor sills on concrete with 5/8" diameter x 12" anchor bolts at 48" o.c. maximum spacing, minimum 2 each piece and one within 9" of each end, except as noted on the drawings.

2. Provide one anchor bolt within 9" of each side of holes or notches 1-1/8" or larger.

3.09 Sealing
A. Seal ends of beam 4" nominal or thicker with two coats of sealer. Seal ends of plywood that will be exposed to weather with three coats of sealer.

3.10 Roof Curbs and Sleepers
A. Provide where required for the attachment of other work. Form to the shapes and cut as required for true line and level of work to be attached. Set true to line and level, plumb, with other work involved.

B. Attach to substrates securely as required to support the applied loading.

3.11 Cleaning Up
A. General: Keep the premises in a neat, safe, and orderly condition at all times during the execution of this portion of the work, free from accumulation of sawdust, cut-ends, and debris.

B. Sweeping:

1. At the end of each working day, or more often, if necessary, thoroughly sweep all surfaces where refuse from this portion of the work has settled.

2. Remove the refuse to the area of the job site set aside for its storage.

3. Upon completion of the work, remove all debris, rubbish, and surplus materials from the site, resulting from work under this section. Do not leave any wood, shavings, sawdust, etc, on the ground or buried in fill or inside framing.

End of Section

Section 07 31 13
Composition Asphalt Shingle Roofing
Part 1. General

1.01 Scope
A. Work included:

1. Provide all labor, materials, and equipment necessary to remove existing shingle roof system and install a new 40-year, dimensional, composition asphalt shingle roof system as specified herein.

1.02 Quality Assurance
A. Use adequate numbers of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods for proper performance of the work specified.

B. Cooperate as required in performance of the specified inspecting and testing.

C. The owner/owner’s representative shall inspect the roof deck(s) for nailing prior to installation of new roof. Roofing contractor shall verify that this has been accomplished.

1.03 Submittals
A. Product data: Within seven (7) calendar days after the Contractor has received the Owner’s notice to Proceed, submit:

1. Materials list of the items proposed to be provided under this Section.

2. Manufacturer’s specifications and other data needed to prove compliance with the specified requirements.

1.04 Job Conditions
A. Roofing contractor shall schedule work as appropriate to accommodate senior center operations.

B. Examination and acceptance of roof decks & other work in place on which specified work is to be applied shall be made to ensure that conditions are satisfactory for the installation of specified materials. Report in writing to the owner any defects which may adversely influence completion or performance of specified work. Absence of such notification will be construed as acceptance of work in place.

C. Roof deck inspection – roofing cannot be started until the roof deck has been inspected and accepted by wither a project inspector, owner or owner’s representative.

D. Label – All materials must be clearly labeled with all pertinent information for specified roof deck construction.

1.05 Product Handling
A. Comply with accepted roofing practice.

B. Storage of materials:

1. Stand roll goods on end, and store on a clean floor to keep ends of rolls free from foreign matter.

2. Store roofing materials in a dry place, on raised platforms and cover with waterproof tarpaulins, OR, store inside enclosed vans protected from the sun and the weather.

3. Keep lids tightly sealed on all cutback adhesives and flashing cements.

1.06 Standards
A. Roofing shall achieve a Class “A” fire rating and be listed by an approved laboratory (recognized by the California State Fire Marshal) for the slopes and type of deck to which the roofing is to be applied. All roof covering shall comply with Chapter 32 and Appendix Chapter California State Amended U.B.C.

1.07 Warranty
A. Upon completion of the work of this Section, and as a condition of its acceptance, pay the costs for, and secure and deliver to the owner:

1. A two (2)-year standard roof system warranty issued by the installing roofing contractor.

2. A standard roof system warranty issued by the manufacturer of the composition asphalt shingles.

Note: Prior to bidding, verify that the work of this Section, if completed in accordance with the specifications, will qualify for the stipulated warranty. Should the indicated construction not be acceptable for the stipulated warranty, advise the owner as to the required changes.

1.08 Quality Control
A. The roofing contractor shall notify the owner/owner’s representative prior to starting the roofing operation. A project inspector or owner’s representative shall be present during each phase of the roofing operations. The roofing contractor shall have a copy of the manufacturer’s specifications and installation manual at the job site.

Part 2. Products

2.01 Materials
A. Shingle Underlayment:

1. A self-adhering modified asphalt membrane for use as a shingle underlayment.

2. A synthetic membrane for use as a shingle underlayment.

B. 40 year Composition Asphalt Shingle: Fiberglass, asphalt composition shingles. Dimensional.

Class “A” fire rated. ASTM D-3462, Type 1. Color to be determined by Owner.

C. Flashing Cement: Trowelbale, fibrated asphalt mastic for flashing requirements on horizontal and vertical surfaces. ASTM D-2822, Type I / Federal Specification #SS-C-153, Type I.

D. Approved Nails: Corrosion resistant, 3/8” head, 10 to 12 gauge barbed shank roofing nails.

E. Galvanized Sheet Metal: All fabricated sheet metal parts and pieces shall be made in strict accordance with the S.M.A.C.N.A. Architectural Sheet Metal Manual (5th Edition)

2.02 Other Materials
A. Provide other materials, not specifically described but required for a complete and proper installation, as selected by the Contractor subject to the approval of the owner or owner’s representative.

Part 3. Execution

3.01 General Requirements
A. The composition asphalt shingle roof system shall be installed in strict accordance with the shingle manufacturer’s specifications.

B. Roof Penetrations: All penetrations through the new roofing, e.g., vent pipes, stacks, duct work, etc., must have a proper metal sleeve flashing with flange, pan flashing with flange, or other flanged flashing installed.

C. Pitch Pans: Where column stubs, sign anchors railing posts, tank supports, antenna support cables, or other projections extend through the roof surface, install a minimum 3-inch-high flashing collar with a minimum 4-inch flange. Install flange in the roof assembly as a typical roof vent would be installed according to the manufacturer’s recommendations. Fil the pan with non-shrink grout to within 1 (one) inch of the top of the pan. Fill the remainder of the pan with Neoprene Flashing Cement of modified mastic. (Fill to a point slightly above the top edge of the pan collar.)
Note: Inside Surface of Pitch Pan Collar Shall Be cleaned With Mineral Spirits or Solvent Base Cleaner Prior to Installation
D. No roofing work shall be attempted or completed during inclement weather other than installation of emergency water stops. Inclement weather shall be defined as, but not be limited to: precipitation fog / strong wind / frost.

1. Water stops must be cleanly removed prior to resumption of roof application.

2. No roofing materials shall be applied when the ambient air temperature is below 40 F.

E. Any details or procedures not covered in the specifications shall be installed or performed using the recommended procedure found in the current NRCA Roofing & Waterproofing Manual.

3.02 Surface Preparation
A. Remove existing roof system down to the deck surface. Inspect roof deck for structural integrity and secure attachment to supporting members.

B. As required, any newly installed plywood decking shall also be inspected for secure attachment to supporting members.

C. Cracks or openings in the roof deck more than 1/4-inch will not be allowed.

D. Make the surface of the roof deck, to include vertical walls and curbs, smooth, clean and dry.

E. At the eaves, install perimeter flashing metal *corrosion resistant drip edge) to the wood deck.

Secure the drip edge with approved nails at 12 (twelve) inches on center. Drip edge dimensions shall be 2” x 2”.

F. Remove and replace existing expansion joints with new. New metal shall match existing in style, dimension and gauge.

3.03 Application of Composition Asphalt Shingle Roofing A. Underlayment

1. The underlayment application shall be in strict accordance with the selected shingle manufacturer’s written specification. Any variation or deviation from the

manufacturer’s specifications Must be requested of, and approved by, the project inspector or the owner.

B. Corrosion Resistant Nails

1. 4 (four) nails are required per shingle, positioned on the fastener line.

2. The nails shall be of sufficient length to penetrate through the roofing material and into the wood decking a minimum of 3/4 inch.

3. Nails must be driven flush with the shingle surface.

4. Wire Staple Fasteners Will Not Be Accepted.

C. Shingle Application

1. The shingle application shall be in strict accordance with the selected shingle manufacturer’s written specification. Any variation or deviation from the manufacturer’s specifications Must be requested of , and approved by, the project inspector or the owner.

2. Ridge Line: Shingles that project beyond the ridge line shall be trimmed and capped with dimensional ridge shingles. The dimensional ridge shingles shall be installed in accordance with the manufacturer’s written specifications. The ridge line shingles shall be installed in a straight and uniform manner.

3. Low profile relief vents or ridgeline venting shall be installed as required per manufacturer’s specifications.

D. Metal Flashing

1. The new metal flashing pieces, e.g., roof jacks, vents, pan flashings, etc., shall be installed in the roof system as the field shingle courses are being installed.

2. The bottom flange (down slope flange) of the metal flashing pieces shall be left exposed and shall cover the head-lap of the shingle below.

3. The shingle courses abutting the sides and top of the flashing pieces shall be trimmed approximately 1 (one) inch around the base of the flashing to allow a water wat so that dirt and debris will not build up behind the flashing.

4. Step flashing shall be installed per manufacturer’s guidelines at all roof to wall detail.

3.04 Special Instructions
A. As required, remove (E) gutter and down leaders and install (N). Dimensions of the new gutter and down leaders shall match the dimensions of the gutter and down leaders being removed.

End of Section

Section 07 51 00
Roof Rehabilitation / Roof Coating
Part 1. General

1.01 Scope
A. Work Specified

1. Provide all labor, materials, equipment and supervision necessary to install a seamless, fully adhered, fluid applied roof coating system over a properly prepared aggregate surfaced, built-up roof system as outlined in this specification.

1.02 Quality Assurance
A. Manufacturer Qualifications:

1. The manufacturer(s) of the specified coatings shall be able to provide evidence that production of roof coatings is the primary business of their company and that they engage in coating production on a daily / regular basis.

2. The manufacturers of the specified coatings shall have been in the business of producing said coatings for a minimum of twenty (20) years.

B. Applicator / Contractor Qualifications:

Note: Because specialized equipment is required for the application of the specified coatings, the evidence of experience & expertise in the application of previously installed coating systems is paramount in the selection & award of the successful Applicator, and the owner reserves the right, based on evidence of previous projects, to be final authority on the acceptance or rejection of any bid.

1. The Applicator shall be experienced in the application of urethane, polyurea and silicone roof coatings utilizing spray equipment. The Applicator shall be prepared to provide evidence of their successful urethane, polyurea & silicone coating installations by listing a minimum of ten (10) projects installed over the past three (3) years equal in scope to the project specified herein and make those projects available for the owner’s representative to inspect.

2. Roofing contractors and specialty-spray roof coating contractors must hold a valid C-39 license, and, if not currently certified, will need to be certified by the coating manufacturer(s) to install the specified fluid-applied coating system pending review of the Applicator’s submittal of projects testifying to their experience and workmanship.

3. All contractors shall inspect the work before submitting bids and shall familiarize themselves with the conditions of the roof and the areas to be repaired and coated as specified herein. Submission of a bid shall be accepted evidence that such an investigation has been made. No allowance shall be made on behalf of the contractor because of existing conditions.

4. All dimensions shall be obtained by the contractor for the accommodation of equipment and materials furnished and installed by the contractor.

5. The contractor / applicator awarded the project shall provide and maintain the same roofing foreman and crew from the start of the job until its completion, unless a change is approved by the owner’s representative and the roof coating manufacturer’s representative.

6. The contractor awarded the project must also maintain an adequate number of skilled workmen who are thoroughly trained and experienced in the necessary crafts, and who

are completely familiar with the specified requirements and the methods needed for proper performance of the work on this project.

7. The contractor awarded the project must present to the owner a statement of current insurance coverage for any insurance required by the owner. The insurance coverage(s) must remain in force for the duration of the project.

8. The contractor awarded the project shall be represented at the scheduled pre-job conference by the job foreman and the contractor’s project superintendent.

9. The project contractor shall comply with all fire, safety and security regulations.

10. The project contractor will be held responsible for any damage caused to the buildings or grounds resulting from the execution of his work.

11. The project contractor shall cooperate, as required, in performance of the manufacturer’s inspections and testing.

C. Pre-Installation Conference:

1. Convene approximately two (2) weeks prior to commencement of the work on the specified roof rehabilitation project.

2. The Contractor shall notify the owner’s representative and Material Manufacturer’s technical representative approximately ten (10) days prior to the pre-installation conference.

3. The conference shall be attended by the Contractor / Applicator, any subcontractor or installer of a roofing component or project related component, the owner’s representative, the roof coating manufacturer’s representative and any other representatives directly concerned with performance of the work on the Project.

Objectives of the conference include:
(a) Review methods and procedures related to roof coating work. (b) Review roof coating requirements (specifications, and any other contract documents).
(c) Review any required submittals, both completed and yet to be completed. (d) Review and finalize project schedule related to roof coating work and verify availability of materials, Contractor’s personnel, equipment and facilities needed to complete the project in a timely manner and avoid delays. (e) Review weather, the weather forecast and procedures for coping with unfavorable conditions, including provision for temporary protection of any newly applied roof coating.
(f) If substantial disagreements exist at conclusion of conference, determine how disagreements will be resolved and set date for reconvening a follow-up conference.

D. Requirements of Regulatory Agencies:

1. The fluid-applied roof coating system shall maintain the fire rating of the (E) built-up roof system per ASTM E108 (Spread of Flame) as required for public buildings per State and Local building codes.

2. Materials used in the fluid-applied roof coating system shall meet Federal, State, and local VOC regulations.

E. Adhesion Tests:

1. Adhesion tests must be conducted to ensure sufficient adhesion will exist between:
(a) The prepared roof surface and the polyurethane base coat, (b) The polyurethane base coat and the polyurea mid-coat, and the (c) The polyurea mid-coat and the silicone top coat.

(For details on the adhesion test adhere to the specified coating manufacturer’s adhesion test guidelines.)

1.03 Delivery, Storage and Handling
A. Delivery: Materials shall be delivered in original sealed containers that are clearly marked with supplier’s name, brand name and type of material.

B. Storage and Handling: Recommended material storage temperature is 70-75 degrees F. Handle products to avoid damage to containers. Do not store for long periods in direct sunlight.

1.04 Project Conditions
A. Do not proceed with application of any fluid-applied roof coating materials when the substrate temperature is less than 40-degrees F, when the substrate is damp / frosty or when precipitation is imminent. The ambient temperature should be above 40-degrees F and is more than 5-degrees F above the dew point and rising. (Refer to coating manufacturer’s guidelines.) B. As required, coordinate fluid-applied roof coating work with any other trade(s) to ensure the (N ) coatings are protected from construction traffic, any miscellaneous abuse and until the coating installations are complete.

C. Read and follow the health and safety guidelines found in the Material Safety Data Sheets (MSDS) and on the product container labels.

D. The contractor shall maintain the work area in a neat and orderly condition, i.e., clean the job site daily and remove from the premises any waste material, empty containers, rags and debris caused be the performance of the work included in the contract.

1.05 Warranty
A. Upon completion of the work on the subject Project, and as a condition of its acceptance, pay the costs for, secure and deliver to the Owner a copy of the fully executed warranties specified below:

1. A two (2) year standard roof system warranty issued by the installing roofing contractor.

2. A manufacturer’s 20-year Labor & Material Roof Warranty / Leak Warranty at the completion of the installation / application of the fluid-applied roof coating system.

Note: The Contractor / Applicator must be certified by the coating material manufacturer, or have been approved by the manufacturer prior to the spray application, in order to provide the specified manufacturer’s roof warranty as described above.

Part 2. Products

2.01 Materials
A. Fluid-applied Roofing Materials: (Per Basis of Design)

1. Urethane Base Coat: GacoBase U95 Aliphatic Urethane

2. Polyurea Mid-Coat: GacoFlex U8782 Fast Set Polyurea Hybrid

3. Elastomeric Top Coat: Gaco S4200 Silicone

4. Biodegradable Cleaner: GacoWash

5. Sealant: GacoPatch

6. Primer: GacoFlex E5320

7. Flashing Tape: GacoRoofTape or Gaco LiquidRoofTape
B. Related Materials / Roof Accessories:

1. EATON Dura-Blok Rooftop Supports: Hard rubber sleeper with integral Unistrut

C. Typical physical & performance properties of the cured fluid-applied roof coating materials specified on this project are: See Accompanying / Attached Product Data Sheets

1. PDS – GACOBASE U95 / Two Component Urethane Base Coating

2. PDS – GACOBASE U8782 / Fast Set Polyurea Hybrid Coating

3. PDS – GACOFLEX S42 Series / High adhesion 100 % silicone Coating D. Manufacturers:

1. GACO, Inc.

Brand Manufactured by Holcim Solutions and Products US, LLC www.gaco.com or approved equal*

2.02 Acceptable Coating Manufacturers (Basis of Design) A. Gaco, Inc. (www.gaco.com)

1. Roof coating systems manufactured by others can be acceptable provided the roof coating systems are equivalent to those specified regarding the type of coatings utilized, quantity of coating utilized as well as the warranty requirements of this specification.

Additionally, the coating manufacturer must meet the following qualifications:
(a) They specialized in manufacturing the roofing coating system to be provided. (b) They have the same minimum of twenty (20) years of experience manufacturing the roofing coating products & system to be provided.
(c) They are able to provide a Labor & Material / Roof Leak Warranty (single source) that is backed by corporate assets and, or, Completed Products Liability Insurance in excess of $2,000,000 per-occurrence.

Note: Variances in product application guidelines for coating manufacturers other than those included in this specification as “basis of design” manufacturers, may be allowed as required to achieve the substitute manufacturer’s specific roof warranty requirements pending the owner’s acceptance & approval.

B. **Approved Equal: Approved equal, for purposes of this project, means approved by the owner or owner’s representative prior to bid opening. A roofing contractor presenting a bid for this project represents that the bid price is predicated upon the use of the materials listed in PART 2 – PRODUCTS of this roof rehabilitation & roof coating specification or the use of materials for an alternate roof rehabilitation system known the be approved prior to the Project’s bid opening as indicated by a Project addendum sent to all qualified bidders.

1. Prior to bid opening: A bidder who proposes to submit a quotation for an alternate roof rehabilitation & coating system must submit to the Owner for approval of the following:
(a) An explanation of why the alternate should be considered. (b) A list of at least six (6) projects where the proposed alternate material or system was installed under similar conditions. These projects shall be made available for inspection by the Owner’s representative, shall be located within one hundred (100) miles of the Owner’s office and shall be a minimum of ten (10) years old. (c) A detailed installation specification for the alternate system.

Note: Proposed alternates will not be considered without sufficient time for thorough examinations by the Owner. Therefore, any application for approval of alternates must be received by the Owner in a timely manner. Owner requests that any application for approval of an alternate on this project be submitted between 10-14 days prior to the bid opening date. It is preferable that a 14-day notice be provided and it is mandatory that a minimum 10-day notice be provided or the alternate substitute will not receive consideration for approval.

2. After award of bid: In the event that a submittal for a substitution needs to be made after the award of the bid, the submittal must indicate the cost savings benefit to credited to the owner, and, or, the tangible benefit to the owner if the substitute product or system is approved. Failure to indicate a cost benefit or the tangible benefit(s) to the owner can be sole justification for rejection of the substitution. In addition, the application for approval of the substitution must conform to the requirements presented in Section 2.02 ACCEPTABLE COATING MANUFACTURERS, B./1./a.b. & c.

C. The Owner reserves the right to be final authority on the acceptance or rejection of any proposed alternate material, coating or system.

2.03 Accessories
A. Miscellaneous materials such as expansion joints, metal flashing, adhesives, asphalt primer, retro-fit drains, etc., shall be compatible with the fluid-applied roof coating system and approved by the coating manufacturer. All materials shall be applied and or installed in accordance with its manufacturer’s recommendations.

Part 3. Execution

3.01 Surface Preparation
A. Carefully vacuum and sweep the (E) roof surface to remove ALL gravel or aggregate, and “lightly” spud any accumulations of dried asphalt bitumen that remain on the roof to create a smooth, “clump” free surface. Repair any damage to the (E) roof membranes created by the gravel / aggregate removal as indicated below at 3.01/C.

B. As required, remove all existing abandoned mechanical equipment down to sound substrate.

Replace roofing in these areas with like or similar materials to math existing roof level. The width, adhesion and/or fastening requirements of any new material must be compatible with the existing roof and meet local codes.

C. As required, repair all blisters splits, fish-mouths, seams, holes, and other roof surface imperfections and flashing areas with like or similar roofing materials. The width, adhesion and/or fastening requirements of any new material must be compatible with the existing roof AND be approved by the coating manufacturer. (Note: Bidder shall identify and request approval for the roof material selected to make required repairs to the (E) roofing/ flashing membranes prior to any installation.)
D. As required, (E) flashing membranes can be repaired using compatible flashing material. If flashings are damaged beyond repair, flashing must be replaced with like or similar type roofing materials and must be compatible with existing roofing system. The flashing membrane shall be installed per the manufacturer’s written specifications. (Note: Bidder shall identify and request approval for the roof material selected to make required repairs to the (E) roof / flashing membranes prior to any installation.)
E. Thoroughly clean all exposed metal surfaces that are to remain in place and become integral with the (N) coating system, such as pipe sleeves, drains, boxes, ducts, etc. Remove all loose paint, rust and asphalt or loose roofing materials of any kind.

F. Remove the (E) sheet metal coping over al the short parapet walls and replace with (N). The (N) sheet metal coping shall match, as closely as possible the dimensions of that being removed. As required, install high-temperature S/A membrane so as to cover the top horizontal surface of the short parapet walls and extend down the vertical surface of the short

parapet walls a minimum & maximum of 2-inches. (Notes: (1.) No S/A membrane shall be visible after the (N) coping is installed. (2.) Securely fasten / attach the (N) sheet metal coping to the parapet walls in a manner consistent with good roofing practice.) G. Allow roof and other prepared surfaces to dry completely before proceeding with coating application.

H. Protect all adjoining areas that are not to receive the fluid-applied roof coating system and provide a suitable work station to mix the coating materials as required.

3.02Surface Examination (Prior to commencement of any spray coating application) A. A nuclear scan, infrared scan or multiple and random probes into the (E) roof system using a Demhorst moisture meter must be performed, and any wet or moist roofing substrate must be removed and replaced. (Note: The moisture scan or physical moisture probes must be pre- scheduled and witnessed by the manufacturer’s representative and, or, the owner’s representative.)

1. Any roof repairs and repair tie-ins that are required shall be performed so as to match the (E) roof system and, or be compatible with the (N) coating procedures to be employed. Any and all repair procedures shall be endorsed / approved by the coating material manufacturer and all roof repairs shall be complete before commencement of any spray application.

B. Verify that all roof rehabilitation repairs as indicated in Section 3.08 – Special Instructions, have been completed before commencement of any spray application, C. Inspect roof surfaces to insure they are clean, smooth, sound, properly prepared and free of moisture, dirt, dust and debris.

D. Verify all roof penetrations, mechanical equipment, perimeter edge metal and all other on- roof items are in place and secure.

E. Verify all roof drainage systems are clean and function properly.

F. As required, verify that all air conditioning and air intake vents are suitably protected or closed.

G. Verify all critical areas in the vicinity of the spray application, e.g., parking lots, street parking, etc., are suitably protected or vacated.

3.03 Application of New Elastomeric Sprayed Coatings
A. Application of Aliphatic Urethane Base Coat (Leveling & Priming)

1. To a clean, properly prepared and dry roof surface, spray apply the U95 aliphatic urethane coating over the prepared roof surface as follows:

Urethan Base Coat: Apply U95 urethane coating at a rate of 5-gallons per 100 square feet to yield a uniform thickness of 80 wet mils / 60 dry mils in strict accordance with procedures outlined by Gaco, Inc. (See wet/dry mil chart.) Carry a base coat up all pipe protrusion and walls. ** Allow the U95 base coat to cure a minimum of eighteen (18) hours between coats or until it can be walked on. (**Note: The thickness of 48 wet mils / 36 dry mils, equating to an application rate of 3-gallons per 100 square feet.) B. Application of Polyurea Mid-Coat

1. To a clean, dry roof surface, spray apply the U98782 polyurea coating over the aliphatic urethane base coat as follows:

Polyurea Coat: Apply U8782 Polyurea Hybrid fast set coating at a rate of two (2) gallons per 100 square feet to obtain a 32 mil Wet Film Thickness (WFT) / 32 mil Dry Film Thickness (DFT). Coat

all surfaces including expansion joint covers and flashing. At all perimeter edges and penetrations an extra pass must be applied.

Note: Additional coats of material may be required over rough or granular surfaces to achieve the overall minimum dry film thickness (DFT) requirement. Modified bitumen & built-up roofs have varying degrees of cracks in the surface of the asphalt and bleed-out at seams. With this application it is highly recommended that a test patch be installed to determine how much coating will be needed because asphalt roof surface profiles vary due to weathering and other factors. Applications that do not meet the minimum DFT will not be eligible for coverage under the labor and material warranty provided b the manufacturer. Requirements: It is important to apply the subject coatings in strict accordance with the manufacturer’s guidelines to achieve the specified manufacturer’s warranty and the owner will not allow or accept any deviation that is “less” than the manufacturer’s guideline thickness. (Note: U8782 must be coated within the same day of application. If this timeframe is exceeded, GacoFlex E5320 2-part Epoxy Primer/Filler must be applied at a rate of one (1) gallon / 600-800 square feet to produce 1-2 mil DFT. For rough surfaces, apply the epoxy primer/filler at a rate of one (1) gallon / 250 square feet to produce 1-2 mil DFT. Do not over-apply. When properly mixed and spray applied, E5320 Primer should remain a translucent pink color in its cured state. Allow primer to cure for a minimum of six (6) hours (longer in overcast or humid conditions) before proceeding to the next step in the coating application process. Also, granular and rough surfaces may require more material to achieve minimum mil thicknesses. Application below the minimum mil thicknesses can cause adhesion failure which would result in a non-warrantable application.

C. Application of S4300 Silicone Top Coat (Reflective Surface Coating)

1. To a clean, dry roof surface, spray apply and back-roll the S4200 Silicone Coating over the polyurea mid-coat as follows:

Silicone Top Coat: Apply the S4200 Silicone topcoat at a rate of 2.50 gallons per 100 square feet to yield a uniform thickness of 35+ wet mils / 32+ dry mils in strict accordance with procedures outlines by Gaco, Inc. (See wet/dry mil chart.) Carry top coat up all pipe protrusions and walls. If multiple coats are required, allowed each coat to cure a minimum of eighteen (18) hours between coats or until it can be walked on.

3.04 Field Quality Control
A. Manufacturer’s Field Services: Inspection by the coating manufacturer’s representative is required to verify the proper installation of the system. Any areas that do not meet the minimum standards for application as specified herein shall be corrected at the contractor’s expense. Manufacturer’s inspection or verification shall not constitute acceptance of responsibility for any improper application of material.

3.05 Cleaning
A. Manufacturer’s Field Services: Inspection by the coating manufacturer’s representative is required to verify the proper installation of the system. Any areas that do not meet the minimum standards for application as specified herein shall be corrected at the contractor’s expense. Manufacturer’s inspection or verification shall not constitute acceptance of responsibility for any improper application of material.

3.06 Protection
A. Surfaces not intended to receive the roof coating system shall be protected during the application of the system. Should this protection not be effective any respective surfaces shall be restored to their proper conditions by cleaning, repairing or replacing. All debris from completion of work shall be completely removed from the project site.

3.07 Special Instructions
A. All electrical conduit, water lines and gas lines that rest on the roof surface shall be raised and placed on hard rubber block sleepers. The hard rubber sleepers shall be fitted with an integral Unistrut clamping device. The hard rubber blocking shall be positioned on the roof surface per any applicable code requirements but only after all the roof rehabilitation procedures have been completed and all of the new roof coatings have been applied and are thoroughly dry / cured.

B. Any (E) roof anomaly in the (E) roof field membrane, e.g., blisters, dry voids, mole runs, membrane ruptures or splits, shall be repaired per NRCA and manufacturer guidelines as part of the roof rehabilitation work prior to any spray applications / coating applications. Note: An attempt will be made to identify and mark all roof anomalies with orange paint that need to be corrected. However, prior to the commencement of any spray coating, one last inspection of the (E) roof surface shall be conducted to identify and additional membrane blisters that may have been missed in a previous inspection so that they can also be repaired prior to spray application of any (N) coating.

End of Section

Section 07 62 00
Architectural Sheet Metal, Flashing and Trim
Part 1. General

1.01 Related Documents
A. The Drawings and general provisions of the Contract, including General and Special Conditions, General Requirements, apply to the work specified in this section.

B. Parts 1,2,3,4,5,6, Title 24 of the California Code of Regulations (California Building Code) is to be considered an integral part of this section.

C. All California Prevailing Wage Laws apply to the work of this section.

1.02 Work Included
A. The following is a general description of the work included in this section. This description does not limit the scope of work shown in the drawings nor does it relieve the Contractor of any responsibility for coordination of ALL work of this Contract.

Item Description
General Furnish all labor, materials, and equipment necessary to install sheet metal flashing work shown on the drawings and specified herein, Included, but not limited to:

Special Coordination  Roof flashings including copings, cleats, cornice cap and flashing, reglets, counter flashings, curb cap
flashings, saddle flashings, roof penetration
flashings, air and gas vent roof terminations and
exhaust hoods.
 Conductor heads, rainwater leaders, downspouts,
straps, gutters, diverters, hangers and splash blocks
or pans.
 Wall opening flashings, window head flashing, door
head flashing, window sill covers at metal siding,
siding termination flashings, pan flashings, saddle
flashings.
 Rain caps for exhaust vents where termination is
made through wall.
 Sheet metal flashing, counter flashing and pan
flashing indicated in the drawings.
 Cleaning, repair and re using existing components
listed in this Section, which are undamaged or can
be restored to a new condition, for which the
Contractor will provide warranty.
 All other miscellaneous exterior galvanized sheet
metal 24 gauge and lighters as shown in the
Drawings, and also not specifically shown but
necessary to complete the work.

B. Related work may be described in other sections of this Project Manual. All sections of this project manual are related. Contractor shall coordinate the work of this section with all other sections.

1.03 Submittals
A. Provide the following submittals per the requirements of the General Conditions.

Item Description
Catalog Cuts n/a
Product Data n/a
Samples n/a
Shop Drawings Describe material properties, profile, jointing pattern, jointing details, fastening methods, and installation
details.

Schedule Include Schedule entry on Gantt Chart for Installation

1.04 References/Standards
A. The following References and Standards are incorporated into the requirements of this Section as they apply to products, assembly, manufacturing procedures and installation.

References shall be utilized in determining “Industry Standards” and other acceptable manufacture and installation methods but shall not relieve the Contractor of any other responsibilities of the Contract. Where conflicts occur between multiple listed references, the Contractor shall assume that the more restrictive standard applies and shall seek determination from the Architect regarding applicable standard.

References The work shall comply with the latest edition of the manual "Suggested Specifications for Architectural
Sheet Metal Work, and "Architectural Sheet Metal
Manual" published by the Sheet Metal and Air-
Conditioning Contractors' National Association
(SMACNA)
NRCA (National Roofing Contractors Association) -
Roofing Manual.

1.05 Quality Assurance
A. Provide the following per the General Conditions.

Item Description
Supervision Full time supervision and observation by the Contractor of all on-site Construction Activities including ordering, procurement and delivery of all materials and products
manufactured or assembled off-site.

Qualifications of Workers Applicator: Company specializing in sheet metal flashing work with five years minimum experience.

The Contractor shall guarantee against any and all
defects in material or workmanship of those items
furnished and installed, repaired or sheet metal
remaining in use as part of this Work for a period of 3 years after the recording of Notice of Completion.

Failure types include but are not limited: failure to stay in place, lifting fasteners, buckling, break in seams,
corrosion, loss of paint adhesion.

Product Acceptance General Contractor (Superintendent) shall verify and accept all products delivered to site prior to installation.

Substrate Acceptance General Contractor (Superintendent) shall verify all substrates / conditions prior to allowing installation of any item.

Structural calculations Provide structural calculations as required to meet

California Building Code. Calculations shall be by a
Structural Engineer licensed in the state of California.

Fabrication drawings shall be stamped by a California
Licensed Structural Engineer.

1.06 Quality Control by Contractor
A. The following specific procedures shall be required to demonstrate adequate levels of quality provided for project components and systems. Exclusion of any item from this list does not relieve the Contractor of any responsibilities for quality procedures covered elsewhere in the Contract Documents.

Item Description
Supervision Per the General Conditions

1.07 Quality Control by Owner
A. The following specific procedures shall be required to demonstrate adequate levels of quality provided for project components and systems. Exclusion of any item from this list does not relieve the Contractor of any responsibilities for quality procedures covered elsewhere in the Contract.

Item Description
Observation Per the General Conditions

1.08 Closeout
A. Provide the following Close Out materials in accordance with the General Conditions.

Item Description
Product Manuals Maintenance and Operations instructions / manuals provided by all product / material manufacturers.

System Manuals Maintenance and Operations instructions / manuals provided by subcontractors for assemblies / systems.

Surplus Materials n/a
Training n/a

1.09 Warranty
Provide written warranty in accordance with the General Conditions Item Description
Warranty Form Per the General Conditions.

Warranty Period 1 year
Warranty Start Date of Substantial Completion
Part 2. Products

2.01 Materials
A. Sheet metal trims are used in various locations to provide closure between structural steel framing system and related wall assemblies. System is intended to provide weather tight closure to prevent the infiltration of outside air and moisture.

B. System is intended to be architectural true and straight and shall occur in straight parallel and perpendicular lines as appropriate to particular details.

C. Conform to SMACNA Architectural Sheet Metal Manual for cleats, attachments, joints and other standard configurations not shown.

2.02 Accessories
A. Plastic Cement: ASTM D2822 made with Group II asphalt.

B. Bituminous Coating Compound: FS TT-C-494, cold-applied mastic compounded for 15-mil dry-film coating thickness.

C. Sealant: Polyurethane as specified in Section 07920. For metal to metal contact, Geocel 2000 is acceptable.

D. Underlayment: ASTM D266; no. 15 asphalt saturated roofing felt, unless heavier weight is noted on the Drawings.

E. Nails: Hot-dipped galvanized nails shall be long enough to provide a minimum penetration of 3/4 inch into wood, 1 inch into concrete surfaces.

F. Screens: Debris screen shall be 1/4" mesh hardware cloth, 23 gauge wire, galvanized.

G. Solder: ASTM 332; alloy grade 50A (50% tin, 50% lead).

H. Soldering Flux: Rosin or muriatic acid killed with zinc. Neutralize flux after soldering.

I. Miscellaneous Steel: ASTM A36, galvanized; shapes and sizes shown.

J. Zinc-Rich Paint: MIL-P-21035; weight not less than 21 lbs. per gallon and containing not less than 95% pure zinc.

K. Etching Primer, in preparation for painting by others: Flashing surfaces to be finished painted include coping, conductor heads, head flashing, downspouts, and other flashing visible below the roof level.

D.J. Simpson Galva-Wipe, Ospho, or other pickling solutions.

2.03 Fasteners and Anchors
A. Downspout Straps and Anchorage Devices: Hangers shall be fabricated from minimum 1/16" thick x 2 inch wide galvanized steel flat stock. Attach straps with min. 1/4-inch id. stainless steel or hot dipped galvanized bolts at masonry, wedge type or in shields. Similar lag bolt anchors for installation to wood studs. See drawings for additional requirements B. Fasteners: Non corrosive, compatible with base metal. Screws and washers shall be plated with zinc or cadmium. Where fasteners are exposed, use panhead or washer head screws with neoprene washers, coat heads with sealant.

2.04 Shop Fabrication and Assembly
A. Shop fabrications: All flashing terminations to have saddle flashings, with minimum 6 inch legs in any direction. Saddle flashings, pan flashings to be lapped, spot welded and all joints soldered and sealed to form 'one piece' assemblies.

B. Form sections true to shape, accurate in size, square, and free from distortion or defects.

C. Fabricate cleats and starter strips of same material as sheet or next heavier gauge, minimum 2" wide, interlockable with sheet.

D. Form pieces in longest practical lengths.

E. Form flare in metal edge for receipt of sealant where detailed.

F. Form material with flat lock seam.

G. Fabricate vertical faces with bottom edge formed outward 1/4 inch and hemmed to form drip. Hem exposed edges on underside 1/2 inch (13 mm); miter and seam corners.

H. Fabricate flashings to allow toe to extend 6 inches minimum over/under roofing underlayment, wall moisture barrier. Return and break edges.

I. Form scuppers, splash pans, custom pieces and downspouts of profiles and sizes indicated on Drawings and to properly collect and remove water. Fabricate complete with required connection pieces.

J. Work exposed to moisture or weather must be thoroughly watertight with provision for free expansion without leaks.

K. Width of Seams:

1. Flat-Lock Seam: 1/2 inch wide.

2. Lapped Seam (Soldered, Subject to Stress): 1 inch wide.

3. Lapped Seam (Soldered, Not Subject to Stress): 1/2 inch wide.

4. Lapped Seam (Expansion Joint, Filled with Sealant Tape or White Lead): 4 inches wide.

L. Expansion and Contraction:

1. Provide for thermal expansion and contraction and building movement in completed work without overstressing materials, breaking connections, or producing wrinkles and distortion in finished surfaces.

2. Where subject to thermal expansion and contraction, attach members with clips to permit movement without damage. Provide slotted or oversize holes with neoprene washers to accommodate thermal expansion and contraction of sheet metal. Install coping with cleats one side, and slotted holes 24 " o.c. to allow for expansion.

3. Make lock-seam work flat and true to line, and sweat full of solder, except where installed to permit expansion and contraction. Lap flat lock seams, and lap seams where soldered according to pitch, but in no case less than 4 inches. Make seams in direction of water flow. Do not buck water.

Part 3. Execution

3.01 General
A. Sheet metal Work exposed to the weather shall be installed watertight with suitable provision for free expansion and contraction without causing leaks. Seams shall overlap in the direction of the water flow. Flat seams shall be at least 1/2-inch wide, single locked, and sweated with solder or single locked and malleted flat. Loose-lock seams shall be single locked and without solder with bottom hook 1-1/4 inches and top hook 1 inch wide, unless otherwise shown or specified. Lap seams where permitted shall be min 2" wide, bedded in sealant, over backing plate.

B. Where flashing is to be rigidly secured, screw or nail flanges at 4" o.c. minimum, unless noted.

C. Lightly sand and prime surfaces which are to be installed with roofing materials. Primer as recommended by roofing cement manufacturer.

D. Providing flashing and counter flashing as shown on the Drawings and necessary to insure watertight conditions. Special care shall be taken to provide flashing in areas where different materials meet.

E. Dissimilar Materials Isolation: To prevent corrosion and galvanize corrosion (electrolysis), isolate galvanized steel metal flashing with bituminous coating when in contact with copper, redwood or red cedar. Isolate lead flashing or aluminum from uncured concrete and mortar.

Apply bituminous paint between dissimilar metal materials.

3.02 Inspection
A. Verify roof openings, curbs, pipes, sleeves, ducts, or vents through roof are solidly set, can’t strips and reglets in place, and nailing strips located. Verify all blocking and backing necessary for securing flashing is in place.

B. Verify membrane termination and base flashings are in place, sealed and secure.

C. Beginning of installation means acceptance of existing conditions and substrates.

3.03 Coordination
A. Sheet metal trims may require partial installation in conjunction with the work of other trades. Coordinate all such work to ensure that cleats and other attachment devices are installed in the proper sequence.

B. Examine drawings and anticipate all installation sequence issues to insure that flashings are installed to produce positive drainage and weather tight conditions.

C. Provide fabricated flashings prior to installation of building systems requiring flashing below or behind.

D. Provide all cricket and roof daring components at clerestory windows prior to installation of windows.

3.04 Preparation
A. Field measure site conditions prior to fabricating work.

B. Install blocking, starter and edge strips, and cleats before starting installation.

C. Prepare flashing to have paint finish with etching primer. Rinse thoroughly.

3.05 Installation
A. Strike a true and level line along entire substrate prior to installation. Layout entire assembly to determine appropriate start and finish points.

B. Finished work shall be visibly straight and true, regardless of deflection in supporting substrate.

C. Install all parts to insure positive drainage and weather tight conditions.

D. Conform to drawing details included in SMACNA and NRCA manuals. Where a conflict between reference standards, drawings and specifications occur, the more strict requirement as determined by the Architect shall govern.

E. Downspouts: Join lengths with formed seams sealed watertight.

F. Fit flashings tight in place, unless providing for expansion. Make corners square, surfaces true and straight in planes, and lines accurate to profiles. Slope horizontal surfaces to shed water.

G. Window Sills: At window openings within metal siding, cover sill with GSM to match existing, lay in with metal siding.

H. Coping: Replace existing wood blocking, blocking anchors where damaged or corroded.

Provide new blocking above first watch. Wrap parapet top with self adhering bitumen membrane moisture barrier. Install new coping with cleats, pan head screws at 24" o.c.

Install in 10 FT lengths with hemmed edges, joint covers, one piece corners, saddle flashings at all changes in direction.

I. Set splash pans where rainwater leaders or downspouts spill rainwater collected from roofs onto lower roofs or grades.

J. Where pan, saddle or termination flashing abuts wood framed wall, ensure wall moisture barrier laps over flange of sheet metal 4 inches minimum. Although not specifically detailed, provide additional asphalt felt paper, self adhering bituminous membrane where needed at wall to flashing joints to provide proper lap in all materials.

K. Door Pan Flashing, Door and Window Head Flashing: Refer to Drawings for size, configuration and fabrication requirements. Provide and install flashings at all exterior openings as indicated on the Drawings. Extend ends of head flashings at doors and windows 1/2" past door or window.

End of Section

Section 07 72 00
Roof Opening Protection System
Part 1. General

1.01 Section Includes
A. HathcProtector roof hatch safety system

1.02 Related Sections
A. Not Used

1.03 References
A. OSHA 29 CFR 1910.23(a) Occupational Health and Safety Standards for General Industry, Subpart Guarding floor and wall openings and holes.

1.04 Submittals
A. Submit under provisions outlined in division 01.

B. Product Data: Manufacturer’s data sheets on each product to be used, including:

1. Preparation instructions and recommendations.

2. Storage and handling requirements and recommendations.

3. Installation methods.

C. Shop Drawings: Complete details of entire railing layout, showing member sized and part identification, fasteners, anchors, fittings, and evidence of compliance with structural performance requirements.

1.05 Quality Assurance
A. Manufacturer Qualifications: Minimum of 15 years experience manufacturing portable railing systems.

B. Installer Qualifications: Minimum 2 person crew capable of positioning base plates and installing portable railing systems according to manufacturers instructions.

1.06 Delivery, Storage, and Handling
A. Store products in manufacturer’s unopened packing until ready for installation.

Part 2. Products

2.01 Manufacturers
A. Basis of Design: Garlock Safety Systems.

B. Substitutions: Or approved equivalent.

C. Request for substitutions will be considered in accordance with provisions of Division 01.

2.02 Design Requirements
A. Structural Performance: Comply with requirements of applicable local, state, and federal codes.

B. Structural performance of top rails and supports:

1. Capable of withstanding a concentrated load of 200 pounds (90.6 kg), applied to the top rail at any point and in any direction.

2. Capable of withstanding a uniform load of 50 pounds per linear foot (74.3 kg/m) applied to the top rail horizontally with a simultaneous load of 100 pounds per linear foot (148.6 kg/m) applied vertically downward.

3. Design need not provide for both concentrated and uniform loads to be applied concurrently.

C. Structural performance of railing infill:

1. Capable of withstanding a horizontal concentrated load of 200 pounds (90.6 kg), applied to one foot (30.5mm) square area at any point on the infill.

2. Infill includes panels, intermediate rails, posts, and other elements.

3. Design need not provide for infill loads to be applied concurrently with top rail loading.

4. Horizontal members not to exceed 12 inch (305mm) spacing over lens area of skylight if present.

2.03 Materials
A. Roof Hatch Protector: HatchProtector roof hatch safety system. Meets OSHA Requirements:
1910.23(a) (4) and 192.501(b) (4)

1. Descriptions: Compression fit design mounts directly to the roof hatch.

2. Material:
(a) Frame: Galvanized steel corner frame and base.
(b) Rails: telescoping 1-5/8 inch (41mm) O.D. by 0.0065 inch (2.7mm) wall HREW galvanized tubing for outer tubes.

3. Finish:
(a) Epoxy powder coated color as selected by Architect.

4. Size (Width / Length):
(a) 36 inch (914mm) / 36 inch (914mm).

5. Height:
(a) Top Rail: 42 inches (1067 mm).
(b) Mid Rail: 20 inches (508mm).

6. Gate: Self closing steel gate.

Part 3. Execution

3.01 Examination
A. Do not begin installation until substrates have been properly prepared.

B. If substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding.

3.02 Preparation
A. Clean surfaces thoroughly prior to installation.

B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

3.03 Installation
A. Install in accordance with manufacturer's instructions.

B. Before installation, inspect all parts to ensure no damaged parts are used.

C. Install diagonal braces on corner stanchions and at terminations of cable runs.

D. Railing must be secured to base with securing pins.

E. Where there is a danger of falling materials onto someone below insert a steel Speed Board into the toeboard bracket on the base plate and secure with securing pins to base.

3.04 Protection
A. Protect installed products until completion of project.

B. Touch-up, repair or replace damaged products before Substantial Completion.

End of Section

Section 09 91 10
Painting – New and Existing Construction
Part 1. General

1.01 Related Documents
A. The Drawings and general provisions of the Contract, including General and Special Conditions, apply to the work specified in this section.

B. Parts 1,2,3,4,5,6, Title 24 of the California Code of Regulations (California Building Code) is to be considered an integral part of this section.

C. All California Prevailing Wage Laws apply to the work of this section.

1.02 Work Included
A. The following is a general description of the work included in this section. This description does not limit the scope of work shown in the drawings nor does it relieve the Contractor of any responsibility for coordination of ALL work of this Contract.

Item Description
General Provision and installation of all painted coatings regardless of location on project
 All preparation, surface cleaning, sanding, filling, de- glossing and priming required.

1.03 Submittals
A. Provide the following submittals:

Item Description
Catalog Cuts n/a
Samples Submit samples for Architect's review of color and texture only. Compliance with all other requirements is the
exclusive responsibility of the Contractor. Provide a listing of the materials and application for each coat of each
finish sample
 On 12" x 12" hardboard, provide two samples of each
color and material, with texture to simulate actual
conditions. Resubmit each sample as requested until
required sheen, color, and texture is achieved
 Include samples of proposed Tinted Primer Color. Refer PART 2 – Products For Primer Color Requirements
 Samples shall be created utilizing the same process that will be used in the field. If painting is to be sprayed, then samples shall be sprayed. If painting is to be brushed, then samples shall be brushed. If painting is to be rolled, then samples shall be rolled.

Product Data Submit two copies of the manufacturer’s MSDS and PDS sheets which will include paint-label analysis and
application instructions for each material specified
Paint Schedule Submit a paint schedule that includes manufacturer and paint system for each type of surface and substrate to be painted. Do not begin work until this schedule is approved by the Architect in writing.

Shop Drawings n/a

Schedule Include Schedule entry and conclusion on Gantt Chart for Installation of all coatings for this project.
Provide a Schedule of the products to be used on each
building component. Include Manufacturer, product,
sheen, number of coats and proposed method for
installation as well as the intended preparation to
successfully install the coating systems.

1.04 References / Standards
A. The following References and Standards are incorporated into the requirements of this Section as they apply to products, assembly, manufacturing procedures and installation.

References shall be utilized in determining “Industry Standards” and other acceptable manufacture and installation methods but shall not relieve the Contractor of any other responsibilities of the Contract. Where conflicts occur between multiple listed references, the Contractor shall assume that the more restrictive standard applies and shall seek determination from the Architect regarding applicable standard.

References In addition to compliance with all pertinent codes and regulations, meet or exceed “Standard Type 1", as defined by the Painting and Decorating Contractors of America in the "Modern Guide to Paint Specifications", latest edition  Meet or exceed requirements of SSPC for all steel surfaces  MPI – Master Painters Institute, Architectural Painting Specifications Manual http://www.specifypaint.us
Standard EPA Method 24 – Determination of Volatile Matter Content, water Content, Density, Volume Solids, and
Weight Solids of surface coating.
 ASTM E2129, Standard Practice for Data Collection for Sustainability Assessment of Building Products
 ASTM D3960, Standard Practice for Determining Volatile Organic Compound (VOC) Content of Paints and Related
Coatings.
 ASTM D5116, Standard Guide for Small-Scale
Environmental Chamber Determinations of Organic
Emissions from Indoor Materials/Products
 ASTM D6670, Standard Practice for Full-Scale Chamber
Determination of Volatile Organic Emissions from Indoor Materials/Products.

1.05 Quality Assurance
A. Provide the following:

Item Description
Supervision Full time supervision and observation by the Contractor of all on-site Construction Activities including ordering, procurement and delivery of all materials and products
manufactured or assembled off-site.
 Superintendent: Contractor shall provide knowledgeable personnel – Superintendent or Foreman – familiar with
the scope of the Project and capable of communicating
the status of the Work on a daily basis to the Architect and at all Required Inspections.

Qualifications of Workers General Contractor shall ensure that all workers providing labor on this project are fully competent and experienced in the area of work being performed. All
workers will have at least two years of training from the supplying contractor. Documentation will be required.

Use only qualified journeymen painters for the mixing
and applications of paint on exposed surfaces; in the
acceptance or rejection of installed painting, no
allowance will be made for lack of skill.
General Contractor shall require subcontractors to
remove any unqualified workers from the project.

Product Acceptance General Contractor (Superintendent) shall verify and accept all products delivered to site prior to installation. Architect reserves the right to reject any material not installed per current industry standards or recommended installation instructions of the Manufacturer, or not
installed per these Specifications.

Substrate Acceptance General Contractor (Superintendent) shall verify all substrates / conditions prior to allowing installation of any primer, finish system or patching/repair product.
Inspection: Prior to all work of this section, carefully inspect the installed work of all other trades and verify that all such work is complete to the point where this
installation may properly commence. Refer Part 3 –
Execution for more detailed Contractor Inspection
requirements.
Moisture levels of all surfaces will be tested and
documented by the painting contractor and the General
Contractor. Additionally, all exposed masonry surfaces
will be tested for PH and documented. All PH levels
tested will be below: 10 PH before any repair, priming or painting will begin.
All existing coatings will be tested and verified to be lead free before any work can begin.

1.06 Quality Control by Contractor
A. The following specific procedures shall be required to demonstrate adequate levels of quality provided for project components and systems. Exclusion of any item from this list does not relieve the Contractor of any responsibilities for quality procedures covered elsewhere in the Contract Documents.

Item Description
Supervision Per Part 1.05
Testing n/a
Special Inspections n/a
Mock Ups Provide mock-up for each color and sheen selection on each building component on the project. Use the same
primer, paint, number of coats, and installation method that will be used for the final installation
 Coordinate exact location for mock up in field with the Architect
 Designated surface shall be the standard of quality for related surfaces upon review and acceptance by
Architect.

1.07 Quality Control by Owner
A. The following specific procedures shall be required to demonstrate adequate levels of quality provided for project components and systems. Exclusion of any item from this list does not relieve the Contractor of any responsibilities for quality procedures covered elsewhere in the Contract.

Item Description
Review by Architect Contractor shall notify Architect at the following milestones so that Architect may review the condition of the work. Failure to coordinate these reviews may result in later work being removed for corrections in the earlier work:
 After power washing, cleaning, de-glossing, and
preparation of all surfaces to receive paint
 After completed application of prime coat
 After application of final coat
 After final post application site clean-up operations are completed
 Prior to release of final payment

1.08 Close Out
A. Provide the following Close Out materials:

Item Description
Product Manuals Maintenance and Operations instructions / manuals provided by all product / material manufacturers.

System Manuals Maintenance and Operations instructions / manuals provided by subcontractors for assemblies / systems.

Surplus Materials Provide (5) gallons of each type and color of paint used on the project
Training n/a

1.09 Warranty
A. Provide written warranty, as follows:

Item Description
Warranty Form Sub-Contractor and manufacturer to provide warranty against defects in materials or workmanship.

Replacement or repair of such defects shall be repaired or replaced in a timely fashion at no additional cost to the Owner.

Warranty Period  3 years
Warranty Start  Date of Substantial Completion

1.10 Painting Scope
A. General

1. Painting and finishing of exposed items and surfaces throughout the Project, except as herein specified.

2. Study Drawings and Schedules and Specifications of other trades and include priming and preparation where no other is specified. Be responsible for total mil thickness of coating systems as specified herein, including others’ shop coats

3. "Paint", as used herein, means all coating systems materials, including primers, emulsions, enamels, sealers and fillers, stains and other applied materials, whether used as prime, intermediate or finish coats.

4. Paint all exposed paintable surfaces, whether or not colors are designated in "schedules", except where the natural finish of the material is obviously intended to be exposed and not painted. (Obviously, do not paint window glass, masonry, fire equipment, etc.)

5. Paint all wood and steel fences and gates (Excludes steel chain link fences).

6. Paint all steel chipping containers identified on plans, including stenciled signage.

B. Colors:

1. To match existing adjacent surfaces.

2. Unless otherwise noted, provide all materials from a single manufacturer.

3. The contractor shall allow for a range of colors and shall anticipate the possibility of a different color on each type of material included in the project. No limits shall be assumed regarding numbers of colors, including selection of deep tones, except that colors will not be changed within the bound of a given material.

4. Generally and unless otherwise specified herein or noted on Finish Schedules the quantity of colors and finishes shall be based on the following criteria:
(a) Color selection will be based on (1) base color and up to (4) accent colors, which may be deep or bright colors.

C. Existing Construction: Renovated Finish

1. Where existing clear finishes occur on wood surfaces and are scheduled for “Renovated Finishes”, provide preparation, surface repair, stripping (where required) and new finishes

2. In some cases, existing finish may be adequate as base for new finish

3. All areas requiring renovated finish will be reviewed in the field with the Architect prior to execution. Areas deemed to be heavily damaged may be re-designated for painted finish at the discretion of the Architect
D. Floor Coatings

1. Refer to other sections of this Project Manual for floors to receive paint, sealer, or similar coatings.

E. Specific Items Included: The following is intended to clarify items requiring paint. This list does not limit the scope of work shown in the drawings nor does it relieve the Contractor of any responsibility for coordination of all work of this Contract. The general contractor shall make all new surfaces, existing surfaces and repaired surfaces “ready for paint.” Once the Painting contractor has applied primer or paint to a surface he/she has assumed complete responsibility for the “readiness” of that substrate.

Interior Paint
 Building walls
 Building posts, columns, and pilasters.
 Acoustical wood panels on walls
 Fire extinguisher cabinets on walls
 Other cabinets on walls
 Lockers, where indicated
 Exposed roof structure members
 Exposed roof decking
 Mechanical system components at ceiling
 Doors
 Steel fence and gates, where indicated
 Metal structure of basketball backstops, where indicated  Exposed conduit, pipes, and wires

1.11 Painting / Renovation Not Included
A. The following categories of work are not included as part of the painter-applied finish work, unless otherwise shown or specified. No finish on the following

Do Not Paint: Stainless steel and nonferrous metals when used for metal doors and windows, counters, hardware, electrical plates, lighting fixtures, etc.
 Galvanized surfaces identified per plans to remain
unpainted.
 Soffit vent screens that are currently unpainted
 Electrical, mechanical, and plumbing equipment and
ductwork, except noted electrical conduits, ceiling
registers, grilles, and diffusers which shall be field painted over manufacturer's prime coat
 Acoustical surfaces
 Fire alarm equipment: Smoke detectors, heat detectors, strobes, horns. Including protective cages or enclosures around such equipment.
 Factory-finished surfaces, equipment, etc
 Concealed Surfaces: Unless otherwise indicated, painting is not required on surfaces such as walls or ceilings in concealed areas and inaccessible areas, foundation
spaces, furred areas, utility tunnels, pipe spaces, and shafts
 Existing concrete or masonry surfaces not specifically indicated as to receive paint, including concrete columns and masonry walls. These surfaces are to be renovated
per Project Manual Section 09912.
 Operating Parts and Labels
 Where necessary to gain access or protect surfaces the painting contractor shall remove and replace at no extra cost removable items such as fittings, awnings, shutters, cover plates, doors and handles.
 Any surface where a coating will interfere with movement and fit such as threads and hinges
 Glass, porcelain, plastic, textiles and other materials not suitable to be painted
 Shop coated, powder coated and baked enamel surfaces
 City name, logo, or mascot. Unless otherwise noted on the plans, these are to be cleaned and graffiti coated.

B. Do not paint any moving parts of operating units, mechanical and electrical parts, such as valve and damper operators, linkages, door closers, sensing devices, motor and fan shafts, unless otherwise indicated.

C. Do not paint over any code-required labels, such, as UL and, fire ratings, Factory Mutual, or any equipment identification, performance rating, name, or nomenclature plates.

D. All masking, tape, paper, and plastic adhered to these items shall be removed by the Painting Contractor upon completion of paining and after required drying time. Absolutely no tape residue will be left on any surface. No tape will remain on an exterior surface for more that (14) days.

Part 2. Products

2.01 Paint
A. Paint, surface treatments, and finishes are shown in the Finish Schedules, Elevations, or indicated in the Specifications of the Contract Documents. Paint colors will be selected from the manufacturer's mixed colors prior to installation.

1. All surfaces shall receive a paint finish, except the exclusions in 1.10 and 1.11. If no finish is particularly indicated, the finish shall be the minimum coating specified in the paint finish schedule of this Section, for the particular substrate involved. It is the responsibility of the Painting Contractor to verify the exact coating choice, color, and sheen, as it relates to each and every substrate before a coating or primer is applied to any surface.

B. All paints shall comply with Flame Spread limitations defined in 2010 CBC Table 803.9. Refer to Drawings for specific requirements based on usage.

C. Final acceptance of colors will be from brush-out samples applied in situ.

D. Proprietary names used to designate colors or materials are not intended to imply that products of the manufacturer’s are required to the exclusion of equivalent products of other manufacturer's.

E. Bids are to be based on specified coatings as manufactured by Benjamin Moore & Co., except as otherwise specified.

F. Requests for changes or variations must be made in writing by the Contractor to the Architect detailing the reasons, extra cost or savings per hour of labor and/or per gallon of paint. It is the burden of the Painting Contractor to prove the equivalency of any intended substitution of primers or coatings four weeks before beginning the project.

G. Paint Coordination: Provide finish coats and primers that are compatible and manufactured by the same manufacturer, except as otherwise specified. Review other Sections of these Specifications in which prime paints are to be provided to ensure compatibility of total coating systems for various substrates. Upon request from other trades, furnish information on characteristics of specified finish materials, to ensure compatible prime coats are used.

Provide barrier coats over incompatible primers or remove and re-prime as required. Notify the Architect, in writing, of any anticipated problems using specified coating systems with substrates primed by others.

H. Primer: All primers and undercoats are to be tinted to the approximate shade of the selected finish coat, but the tint shall be sufficiently different to allow easy determination of the boundaries between coats. Where the color schedule calls for the use of deep tones, it is the responsibility of the Painting Contractor to utilize the appropriate Deep Base Primers as Manufactured by Benjamin Moore & Co. (or equal) for use on the surface for which they are intended.

2.02 Surface Repair / Stabilization Materials
A. Hardener for wood that is damaged, slightly decayed, softened, or weathered:

1. Quick drying, Solvent-borne resin hardener, such as Minwax High Performance Wood Hardener, System 3 End Rot, Abatron Liquid Wood, or approved equal.

B. Filler for defects in wood.

1. 2-part Epoxy filler such as Minwax High Performance Wood Filler, System 3 Wood Putty, Abatron Wood Filler, or approved equal.

2. 2 component filler such as 3m Bondo or approved equal.

C. Metal Etch / rust converter for rusty surfaces:

1. Phosporic Acid metal etch and prep such as Jasco Prep n’ Prime, Ospho Rust Treatment, or approved equal.

2.03 Material Quality
A. Provide premium quality grade of the various types of coatings as regularly manufactured by approved paint materials manufacturers. Materials not displaying the manufacturer's identification as a standard, premium-grade product will not be acceptable.

B. Provide undercoat paint (Primer) produced by the same manufacturer as the finish coats.

Use only thinners approved by the paint manufacturer, and use only within recommended limits.

2.04 Materials
A. Unless otherwise specified, the products indicated under "Painting" are products of “Benjamin Moore & Co.;” comparable-quality products of Dunn-Edwards, ICI, Kelly-Moore, Pratt & Lambert or approved equivalent will be acceptable. Proof of equivalence is required in writing by the Painting Contractor.

B. Colors used shall be selected for their permanence and non-fading qualities. In addition, colors that are used over concrete and plaster shall not be applied if the concrete or plaster surface has a Ph rating higher than 13.

C. All paint and coatings must be delivered to the job site in the manufacturer’s original and unopened containers, plainly marked with the proper designation of the product, as well as the name of the manufacturer. All coating materials at the job site shall be subject to inspection by the Architect.

D. The contractor shall retain sufficient quantities of paint of the same batch until completion of the entire project to permit uniform touch-up. Normal minor damages to painted areas by other trades during the course of the construction project shall be touched-up by the Painting Contractor at no extra cost.

E. It is to be understood by the General Contractor and the Painting Contractor that all coatings must conform to all state and local regulations including VOC rules at the time of application.

Part 3. Execution

3.01 Contractor’s Inspection
A. It is the General Contractor and Painting Contractors responsibility to examine the areas and conditions under which painting work is to be applied. Notify the Architect, in writing, of conditions detrimental to the proper and timely completion of the work. Do not proceed with the work until unsatisfactory conditions have been corrected and inspected by the Architect.

B. All surfaces to be painted must be free of dirt, rust, scale, grease, moisture, scuffed surfaces, glossy, or conditions otherwise detrimental to the formation of a durable paint film.

C. Any surface which has been primed or painted constitutes acceptance of the surfaces and the conditions within any particular area.

D. Surfaces not being painted shall be protected from drips, spatter, over-spray and other paint contamination by means of masking, drop sheets and protective covers.

3.02 Surface Preparation
A. General: Perform preparation and cleaning procedures in strict accordance with the paint manufacturer's instruction and as herein specified for each particular substrate condition.

1. The Painting Contractor shall be wholly responsible for the quality of his work, and is not to commence any part of it until the surface is in proper condition.

2. If the Painting Contractor considers a surface unsuitable for proper finishing, he shall notify the Architect in writing. The Painting Contractor is not to apply any material until corrective measures have been taken, or the Architect has instructed them to proceed.

3. If the Painting Contractor has been instructed by the General Contractor to begin painting under conditions and circumstances he believes could result In poor performance and early failure of the coating, he shall immediately inform the Architect in writing and request from the Architect for a decision in writing.

B. General, Existing Construction:

1. Remove all hardware, hardware accessories, machined surfaces, plates, lighting fixtures, and similar items in place and not to be finish-painted, or provide surface-applied protection prior to surface preparation and painting operations. Remove, if necessary, for the complete painting of the items and adjacent surfaces. Following completion of painting of each space or area, reinstall the removed items by workmen skilled in the trades involved.

2. Clean surfaces to be painted before applying paint or surface treatments. Remove oil and grease or waxes prior to mechanical cleaning. Schedule the cleaning and painting so that containments from the cleaning process will not fall onto wet, or newly painted surfaces.

3. Refer to the manufacture’s Technical Data Sheet for specified product and comply with the requirements regarding application such as: mixing of the components, thinning, pot life, and application equipment such as: roller type and nap length, brush type, tip size and gun type, air and fluid pressure, hose length and hose I.D., etc.

4. Ensure that expectations of humidity, precipitation and temperature (substrate, ambient and material) during application and curing of paints are within the range permitted by the manufacturer.

5. When substrate temperatures are high, care must be taken while applying the paint to prevent formation of voids, pinholes, and bubbles due to the rapid evaporation of solvent.

C. Wood:

1. Clean wood surfaces to be painted of all dirt, oil, or other foreign substances with scrapers, solvent, and sandpaper, as required. Sand smooth all finished surfaces and remove dust. Scrape and clean small, dry, seasoned knots and apply a thin coat of white shellac other approved sealer before application of the priming coat multiple thin coats of white shellac may be necessary to “seal” the knot from “bleeding”. After priming, fill holes and imperfections in finish surfaces with putty or plastic wood filler. Sandpaper smooth when dried. Spot prime over all exposed fillers. Preapproval from the Architect in writing is required before any wood surfaces can be pressure washed. All wood surfaces that are intended to be power washed will need to be identified and agreed upon in advance by the painting contractor, Architect and General Contractor.

2. Repair of defects, decay, and stabilization of soft areas: On all wood not identified to be replaced, all imperfections, divots, soft and weathered wood, and minor damaged areas shall be repaired before painting. All end grain shall be treated with wood hardener prior to repair and painting. All “butt” joints will be caulked with a Urethane base caulking to ensure a flexible joint to allow for the lateral expansion and contraction of the joint. The repair areas shall blend seamlessly into the surrounding surface. a. Scrape and remove all loose material from the damaged area. b. Treat the area with wood hardener per manufacturer’s instructions c. Fill with epoxy filler. Multiple coats may be required d. Sand smooth and blend into surrounding area. Inspect and apply additional filler if required.
e. Spot prime over patched and repaired surfaces.

3. Fill all cracks, joints, seams with caulk and allow to cure (see caulking manufacturer recommendations as it pertains to “cure: times.

4. Multiple coats of paint that are in an advanced state of deterioration and prior applications of cement-based paints must be removed by scraping, sanding or by the use of mechanical grinder. These areas will be referenced by the Architect and General Contractor during the “walk through”.

5. New Wood must be dry, free of grease, oil mildew, mortar and asphalt spatters and mill glaze. Rough surfaces are to be sanded smooth. Cracks are to be caulked ; door and window trim and joints are to be caulked after surfaces have been primed so as to create a “sandwich” effect between the caulking/putty and the primed substrate. Nail holes are not to be filled. Painting is not to be done during or immediately following foggy, rainy or frosty weather, nor when the temperature is expected to go below 50F before the coating has dried. Avoid painting surfaces while they are exposed directly to the hot sun, and refrain from painting during windy or threatening weather. Pressure treated wood (PTW) must be tested prior to coating to determine proper penetration of coating. Surface must be sprinkled with water to determine absorption into substrate.

If water drops remain on PTW surface, do not paint. If water penetrates immediately into the surface, prepare surface as you would any wood and then prime. Smooth planed clapboards or siding must be sanded thoroughly with 80 grit sandpaper to remove the “mill glaze” to allow proper penetration and adhesion of the paint coating.

If mildew is evident, it must be removed by scrubbing with a commercial mildew wash formulated for this purpose. Caution: Follow manufacturer’s directions; wear rubber gloves, work goggles and protective clothing.
(a) All timber delivered to the job site shall be tested with a moisture meter. All wood testing at or below 18% moisture content shall be immediately primed. (b) Prime edges, ends, face, undersides, and backsides of such wood surfaces. When transparent finish is required, use spar varnish for back priming. (c) Timber surfaces to be embedded in plaster or masonry shall be fully primed prior to installation. All timber end grain is to receive one extra primer coat. (d) Back prime all new exterior wood.
(e) If more than (14) days have expired since the time of original priming all surfaces to be top- coated shall be lightly sanded or re-primed before a finish coat can be applied.

6. Previously Painted Wood must have all blistered, peeling, scaling and deteriorating paint removed to a clean, sound substrate, by scraping, grinding, sanding and/or wire brushing. Spot prime where bare wood is exposed. Chalk must be thoroughly removed to a sound substrate by wire brushing, sanding or by power washing. Remove all loose or split caulking, putty or glazing

7. Previously stained exterior wood:
(a) After ensuring that wood is dry, free of grease, oil mildew, mortar and asphalt spatters and mill glaze, sand with 80 grit sand paper to achieve an adequate profile for complete primer adhesion.
(b) Prime with a stain blocking acrylic primer.

D. New Exterior Cement Plaster:

1. Surfaces are to be dry, free of greasy residue, mortar and asphalt spatters. Thoroughly brush with a stiff fiber brush to remove loose particles.

2. Remove form release agents with appropriate solvents.

3. Remove laitance deposits by hand or power wire brushing, or other appropriate means.

4. Allow poured concrete and precast concrete to cure for 60-90 days; block and stucco surfaces 30-60 days. Fill all structural cracks and crevices with the appropriate caulking/patching compound. If efflorescence is present, first dampen the surface with water, and then scrub the surface with a 10% solution of muriatic acid. Caution: Wear rubber boots and gloves, work goggles, and protective clothing. After treatment, thoroughly flush the surface with clean water to remove all acid and allow to dry thoroughly before painting. If mildew is evident, it must be removed by scrubbing with a commercial mildew wash formulated for this purpose. Caution: Follow manufacturer’s directions; use rubber gloves, work goggles and wear protective clothing.

E. Previously painted Exterior Cement Plaster:

1. Remove all peeling, scaling and deteriorating paint and chalk to a sound substrate by hand scraping, use of mechanical grinders or high-pressure washing. Fill all structural cracks and crevices with the appropriate caulking/patching compound. If mildew is present, remove by scrubbing with a commercial mildewcide wash formulated for this purpose.

2. Caution: Follow manufacturer’s directions; wear rubber gloves, work goggles, and wear protective clothing.

F. Ferrous Metals:

1. Thoroughly clean New steel surfaces to remove all grease in accordance with SSPC-SP1 “Solvent Cleaning”

2. Remove rust, mill scale, etc., in accordance with SSPC-SP2-63 “Hand Tool Cleaning” or SSPC-SP3-63 “Power Tool Cleaning”. Particular care is to be exercised to remove welding flux, slag and fume deposits as is possible by blast cleaning, washing with water, Phosphate rinsing, or power tool cleaning. Weld Spatters and burs must be removed.

Primer coats should be applied immediately after the surface is dry and within the same day as the acid wash was applied so that rust does not reappear do to overnight moisture. Factory applied “shop coat” primers must be re-primed with a rust inhibitive 2 component epoxy primer before finish coats are applied.

G. Previously painted steel:

1. Thoroughly clean following SSPC-SP1-63 to remove all grease, oil and dirt.

2. All loose, peeling and scaling paint is to be removed by hand scraping or power tool cleaning. Rusted surfaces should be cleaned in accordance with SSPC-SP2_63“ Hand Tool Cleaning” or SSPC-SP3-63 “Power Tool Cleaning”.

3. Surfaces are to be thoroughly cleaned after sanding, scraping, hand and tool cleaning, etc. Dull all glossy surfaces by sanding.

4. Removal of multiple coats of paint that are in an advanced state of deterioration shall be accomplished by sandblasting or by the use of a mechanical grinder.

H. New galvanized metals:

1. Thoroughly clean to remove all grease, oil dirt and contaminants in accordance with SSPC-SP1 “Solvent Cleaning”.

I. Metal Downspouts and Structural Posts:

1. Remove all foreign material including but not limited to tape and previous painted coatings that are flaking or chipped.

2. All existing paint shall be removed completely down to bare metal prior to installation of new primer and paint. All rust areas shall be sanded smooth and treated with metal etch / rust converter.

J. Weathered previously painted galvanized metal:

1. Remove all peeling and scaling paint, rust and chalk by scraping, sanding and wire brushing.

2. After scraping, sanding, and wire brushing thoroughly clean the surface, re-prime exposed metal with a 95% zinc primer by Rustoleum or other pre-approved manufacturer, and finish as specified.

K. Painting of special assemblies

1. Existing louvers, vents, and screens:
a. Clean all sides of all fixed and operating louvers. Clean all aluminum frames of louvers, if existing.
b. Remove screens on the exterior of louvers, if equipped, and strip down to bare metal as specified by the Architect.
c. Clean all excess paint from operable louvers if interfering with their operation.

Clean all chains, gears, and all moving parts.
d. Paint louvers and screens separately and reassemble when dry.

2. Doors and frames
a. Remove all paint if it will interfere with adhesion of the new coating system. b. Fill all dents, holes, and other surface imperfections with epoxy filler. c. Sand smooth all chipped areas and apply several coats of primer to build up the surface until smooth.
d. Finish coats of paint shall be sprayed or brushed. NOT ROLLED. Rolled-on paint or any paint applied otherwise with a rough or “stippled/orange peeled” final texture will be rejected.
e. Carefully paint doors which will touch adjoining surfaces when closed. To prevent blocking (fusing of uncured coating), the doors are not to be closed until the coating is cured enough as to not allow the door and jam to fuse together. Where excessive coating film thickness impacts the operation, previous paint and excess

film thickness shall be removed by sanding, grinding or stripping and the item repainted.

3. Wood Windows
a. Refer to section 08 81 10 Glass and Glazing for glass replacement and glazing compound spot repair.
b. Carefully paint operable wood windows which will touch adjoining surfaces when closed. To prevent blocking (fusing of uncured coating), the windows are not to be closed until the coating is cured enough as to not allow the door and jam to fuse together. Where excessive coating film thickness prevents windows from closing, previous paint and excess film thickness shall be removed and the item repainted.

4. Lockers – as indicated on plans
a. Thoroughly clean all lockers, remove all stickers and other foreign matter. b. Repair minor dents and surface imperfections with a 2 component plastic filler. c. Remove all staples, tacks, and other foreign items from the wood end caps at the ends of the banks. Fill all imperfections with epoxy and sand smooth. d. Mask all hardware and tags on the door faces before painting. e. Lockers shall be painted by airless, conventional or HVLP sprayer.

3.03 Materials Preparation
A. Mix and prepare painting materials in accordance with manufacturer's directions.

B. Store materials not in actual use in tightly covered containers. Maintain containers used in storage, mixing, and application of paint in a clean condition, free of foreign materials and residue. Store materials not in actual use out of the direct sun at all times.

C. Stir materials before application to produce a mixture of uniform density, and stir as required during the application of the materials. Do not stir surface film into the material.

Remove the film, and if necessary, strain the material before using.

3.04 Application
A. General:

1. See Operations and Sequence section below for the definition of a “Coat” of paint or finish.

2. Apply paint in accordance with the Manufacturer's directions paying particular attention to recommended square feet per gallon. Use applicators and techniques best suited for the type of material being applied and that will provide a smooth professional, brush mark free finished surface.

3. Apply additional coats when undercoats, stains, or other conditions show through the final coat of paint, until the paint film is of uniform finish, color, and appearance.

4. Paint surfaces behind moveable equipment and furniture the same as similar exposed surfaces. Paint surfaces behind permanently fixed equipment or furniture with prime coat only. Re-set all moveable equipment or furnishings in their original location upon completion and inspection by Architect.

5. Paint interior surfaces of ducts, where visible through registers or grilles, with a flat, non-specular black paint.

6. Paint the backside of access panels and removable or hinged covers to match the exposed surfaces in the coating specified for the substrate.

7. Finish exterior doors on tops, bottoms, and side edges the same as the exterior faces, unless otherwise indicated.

8. Sand lightly between each succeeding enamel or varnish coat and remove all sanding dust before work commences.

9. No spraying to be done without prior written approval of the Architect or Owner.

B. Minimum Coating Thickness

1. Provide a total dry-film thickness as recommended by manufacturer, but not less than

4.5 mils for the entire coating system of prime the finish coat for three-coat work.

2. Prime Coats: Apply a prime coat to material which is required to be painted, and which has not been prime-coated by others.

3. Re-coat primed and sealed walls and ceilings where there is evidence of suction spots or unsealed areas in first coat, to assure a finish coat with no burn through or other defects due to insufficient sealing.

4. Stipple Enamel Finish: Roll and redistribute paint to an even and fine texture. Leave no evidence of rolling such as laps, irregularity in texture, skid marks, or other surface imperfections.

5. Pigmented (Opaque) Finishes: Completely cover to provide an opaque, smooth surface of uniform finish, color, appearance, and coverage. Cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other surface imperfections are not acceptable and shall be repaired and re-painted.

6. Transparent (Clear) Finishes: Use multiple coats to produce a glass-smooth surface film of even luster. Always apply the first two coats in gloss and the final coat in the referenced final finish sheen. Provide a finish free of laps, cloudiness, color, irregularity, runs, brush marks, orange peel, nail holes, or other surface imperfections. (a) Provide finish for final coats, unless other- wise indicated.(Unnecessary)

3.05 Clear Finish Renovation
A. Repairs

1. Do not begin finish renovation until all repairs have been made. Repairs may include patching, insertion of new panels or wood parts and spot wood repair.

B. Preparation:

1. Do not accept substrates in which panels, trims or other materials are loose, bowed or otherwise not in full contact with substrate.

2. Fill all nail holes and small cracks with permanent hardening putty to match final finish.

Do NOT fill originally existing joints between panels.

3. Sand after putty has hardened to remove all residues and produce a smooth finish.

4. Light sand all wood surfaces prior to application of first coat. Sanding shall knock down all previous stubble and residue from previous finishes.

5. Clean with tack cloth to remove sanding dust.

6. Fully clean area and ensure that dust will not become airborne from movement of or air infiltration.

C. Application

1. Apply gloss clear finish with high quality brush or spray. Stroke parallel to grain and pull stroke full length to avoid brush ends and runs.

2. After first coat is dry, and per manufacturer specification, light sand completed finish to knock down all stubble, dust and residue.

3. Apply second coat of clear gloss fully covering all areas applied by the first coat. Allow to dry and inspect.

4. All areas that remain rough, or stubbled or include dust shall be sanded, cleaned and final coated again with the referenced final sheen.

3.06 Operations and Sequence
A. All work is conditioned on adequate coating and finishing of all visible surfaces. Contractor shall provide all equipment necessary to meet this requirement. Equipment shall include lifts, scaffolding, ladders and any other appurtenances required to access surfaces.

B. Sequence of operations shall be determined by the requirements of the paint manufacturer and the finish requirements of this specification. Finish quality shall not be compromised by limitations resulting from equipment movement or setup.

C. Multiple setups may be required to apply different coatings or colors.

D. Multiple passes at each surface will be required to allow for multiple coatings and interim curing time. Contractor shall allow for as many passes as necessary to adequately coat each surface.

E. Contractor shall allow for multiple passes where the requirements of one finish component are different than those of another.

F. Drying Time between coats: Time between coats of primer and finish coats shall be dictated by the Required Inspections (refer to PART 1.) Each coat shall be allowed to dry completely before application of next coat.

1. “Coat” shall constitute a complete covering of any surface according to mfr. instructions for application of the particular coating specified and shall include manufacturer’s specified drying time between coats. If mfr. specified curing time has not accrued prior to a subsequent coat, then the subsequent coat shall be considered a part of the previous coat and shall not constitute a required coat per these specifications. Multiple passes of any application device used for any coating shall not be considered multiple coats.

3.07 Cleanup and Protection
A. Cleanup:

1. During the progress of the work, remove from the Project daily all discarded paint materials, rubbish, cans, and rags.
(a) Comply with local regulations for disposal of all paint materials including paint, stain, wood preservative finishes, solvents, and other related materials. (b) Recycle paint as available in jurisdiction. Separate materials by type. Where paint recycling is not available, materials shall be treated as hazardous waste and disposed in an appropriate manner.

2. Upon completion of painting work, clean all window glass and other paint-spattered surfaces. Remove spattered paint by proper methods of washing and scraping, using care not to scratch or otherwise damaged finished surfaces. Cut and face all operating windows. All operable windows need to be shown to work correctly to the Architect before the project will be considered complete.

B. Protections: Protect the work of other trades, whether to be painted or not, against damage by painting and finishing work. Correct any damages by cleaning, repairing, or replacing and repainting as directed by Architect.

1. Provide "Wet Paint" signs as required to protect newly painted finishes. Remove temporary protective wrappings provided by others for protection of their work after completion of painting operations.

3.08 Product Delivery, Handling and Storage
A. Delivery all materials to the job site in original, new, and unopened packages and containers bearing manufacturer's name and label.

3.09 Job Conditions
A. Do not apply water-base paints when the temperature of surfaces to be painted and the surrounding air temperatures are below 50 degrees F., unless otherwise permitted by the paint manufacturer's printed instructions.

B. Do not apply solvent-thinned paints when the temperature of surfaces to be painted and the surrounding air temperatures are below 45 degrees F., unless otherwise permitted by the paint manufacturer's printed instructions.

C. Do not apply paint in snow, rain, fog, or mist or when the relative humidity exceeds 85% or to damp or wet surfaces, unless permitted by the paint manufacturer's printed instructions. Painting may be continued during inclement weather only if the areas and surfaces to be painted are enclosed and heated within the temperature limits specified by the paint manufacturer during application and drying period.

Part 4. Coating Systems

4.01 Materials
A. For purposes of scheduling, the products indicated under Painting Systems are products of Benjamin Moore & Co.

B. Products used shall be selected for their permanence and non-fading qualities.

C. Colors and Finishes: Paint colors, surfaces treatments, and finishes are shown on the Drawings and indicated in the Schedules of the Contract Documents.

D. Use only vinyl acrylic or 100% acrylic paint; no oil (alkyd) based paints are allowed unless otherwise specified.

4.02 Paint Schedule
A. This schedule is comprehensive, there may be items listed here that are not within the scope of this project.

End of Section

EXHIBIT B

INSURANCE REQUIREMENTS FOR CONSTRUCTION CONTRACTS
Contractor shall procure and maintain for the duration of the contract, and for x years thereafter, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees, or subcontractors.

MINIMUM SCOPE AND LIMIT OF INSURANCE

Coverage shall be at least as broad as:

1.Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $5,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.

2.Automobile Liability: Insurance Services Office Form CA 0001 covering Code 1 (any auto), with limits no less than $5,000,000 per accident for bodily injury and property damage.

3.Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employers’ Liability insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease.

4.Builder’s Risk (Course of Construction) insurance utilizing an “All Risk” (Special Perils) coverage form, with limits equal to the completed value of the project and no coinsurance penalty provisions.

5.Surety Bonds as described below.

6.Professional Liability (if Design/Build), with limits no less than $2,000,000 per occurrence or claim, and $2,000,000 policy aggregate.

7.Contractors’ Pollution Legal Liability and/or Asbestos Legal Liability and/or Errors and Omissions (if project involves environmental hazards) with limits no less than $1,000,000 per occurrence or claim, and $2,000,000 policy aggregate.

If the contractor maintains broader coverage and/or higher limits than the minimums shown above, the Entity requires and shall be entitled to the broader coverage and/or higher limits maintained by the contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the Entity.

Self-Insured Retentions
Self-insured retentions must be declared to and approved by the Entity. At the option of the Entity, either: the contractor shall cause the insurer shall to reduce or eliminate such self-insured retentions as respects the Entity, its officers, officials, employees, and volunteers; or the Contractor shall provide a financial guarantee satisfactory to the Entity guaranteeing payment of losses and related investigations, claim administration, and defense expenses. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or Entity.

Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:

1.The Entity, its officers, officials, employees, volunteers, and agents are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of the Contractor. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10, CG 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used).

2. For any claims related to this project, the Contractor’s insurance coverage shall be primary insurance coverage at least as broad as ISO CG 20 01 04 13 as respects the Entity, its officers, officials, employees, volunteers, and agents. Any insurance or self- insurance maintained by the Entity, its officers, officials, employees, volunteers, and agents shall be excess of the Contractor’s insurance and shall not contribute with it.

3. Each insurance policy required by this clause shall provide that coverage shall not be canceled, except with notice to the Entity.

Builder’s Risk (Course of Construction) Insurance
Contractor may submit evidence of Builder’s Risk insurance in the form of Course of Construction coverage. Such coverage shall name the Entity as a loss payee as their interest may appear.

If the project does not involve new or major reconstruction, at the option of the Entity, an Installation Floater may be acceptable. For such projects, a Property Installation Floater shall be obtained that provides for the improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery and equipment. The Property Installation Floater shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the Work, including during transit, installation, and testing at the Entity’s site.

Claims Made Policies – (If at all possible avoid and require occurrence type CGL policies) If any coverage required is written on a claims-made coverage form:

1. The retroactive date must be shown, and this date must be before the execution date of the contract or the beginning of contract work.

2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of contract work.

3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the contract effective, or start of work date, the Contractor must purchase extended reporting period coverage for a minimum of five (5) years after completion of contract work.

4. A copy of the claims reporting requirements must be submitted to the Entity for review.

5. If the services involve lead-based paint or asbestos identification/remediation, the Contractors Pollution Liability policy shall not contain lead-based paint or asbestos exclusions. If the services involve mold identification/remediation, the Contractors Pollution Liability policy shall not contain a mold exclusion, and the definition of Pollution shall include microbial matter, including mold.

Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M.

Best rating of no less than A: VII, unless otherwise acceptable to the Entity.

Waiver of Subrogation
Contractor hereby agrees to waive rights of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the Entity for all work performed by the Contractor, its employees, agents and subcontractors.

Verification of Coverage
Contractor shall furnish the Entity with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to Entity before work begins. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. The Entity reserves the right to require complete, certified copies of all required insurance policies, including endorsements, required by these specifications, at any time.

Subcontractors
Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that Entity is an additional insured on insurance required from subcontractors. For CGL coverage subcontractors shall provide coverage with a form at least as broad as CG 20 38 04 13.

Surety Bonds
Contractor shall provide the following Surety Bonds:

1. Bid bond

2. Performance bond

3. Payment bond

4. Maintenance bond
The Payment Bond and the Performance Bond shall be in a sum equal to the contract price. If the Performance Bond provides for a one-year warranty a separate Maintenance Bond is not necessary. If the warranty period specified in the contract is for longer than one year a Maintenance Bond equal to 10% of the contract price is required. Bonds shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California.

Special Risks or Circumstances
Entity reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other circumstances.