CITY OF SAN MATEO
City Council Regular Meeting
July 20, 2026
7:00 PM
City Hall Council Chamber
Entrance is on O’Farrell Street
COUNCIL MEMBERS
Adam Loraine
Nicole Fernandez
Danielle Cwirko-Godycki
Lisa Diaz Nash
Robert Newsom Jr.
AGENDA
THIS MEETING CAN BE ATTENDED IN PERSON OR REMOTE BY JOINING ZOOM – SEE CODES BELOW.
PUBLIC COMMENTS WILL BE ACCEPTED BOTH IN PERSON AND REMOTELY.
SEE END OF AGENDA FOR OPTIONS AND INSTRUCTIONS ON HOW TO PARTICIPATE IN THE MEETING.
To join via Zoom – click here: July 20, 2026
To join via telephone: (408) 638-0968
Webinar ID: 894 5002 3522 No Passcode Required
The City Council meeting will conclude by 11:00 p.m. unless otherwise extended by council vote.
Any unheard items will automatically move forward to the next regular meeting.
CALL TO ORDER
Pledge of Allegiance
Roll Call
CEREMONIAL
1. Parks & Recreation Appreciation Month — Proclamation
2. Disability Pride Month — Proclamation
CONSENT CALENDAR
All matters listed under the Consent Calendar are considered by the Council to be routine and will be enacted by one motion without discussion. If discussion is desired, that item may be removed and considered separately.
3. Marina Lagoon Operations and Maintenance Permit Assistance – Agreement Approve an agreement with WRA, Inc. for Marina Lagoon Operations and Maintenance Permit Assistance in the amount of $259,460; approve a contingency reserve in the amount of $50,000; and authorize the Public Works Director to execute the agreement in substantially the form presented and issue amendments within the contingency amount.
CEQA: Approval of this agreement is exempt from CEQA review as an “existing facility,” because it consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of existing or former use. (CEQA Guidelines Section 15301.)
4. Marina Branch Public Library Restoration Project Furnishings and Shelving – Agreements 1 of 833
Adopt a Resolution to approve an alternative purchasing procedure for an agreement with Coordinated Resources, Inc. (CRI) to provide furnishings and installation services for the Marina Branch Library Restoration Project in the amount of $183,466.41; establish a contingency reserve in the amount of $30,000; adopt a Resolution to approve an alternative purchasing procedure for an agreement with Ross McDonald Co., Inc. to provide shelving and installation services in the amount of $238,652.85; establish a contingency reserve in the amount of $25,000; and authorize the Public Works Director to execute the agreements in substantially the form presented and issue change orders within the contingency amounts.
CEQA: This project is categorically exempt from CEQA as an “existing facility,” because it consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of existing or former use. (CEQA Guidelines Section 15301.)
5. Public Utility Easement Dedication Acceptance — Adoption Adopt a Resolution to accept the grant of public utility easement dedication acceptance in private alley near property located at 31-57 S B St.; and authorize the City Manager to execute the easement dedication in substantially the form presented.
CEQA: The acceptance of this easement dedication is not a project for CEQA because it can be seen with certainty that it will not cause a physical change in the environment. (Public Resources Code 21065.)
6. Collection System Construction Management Services for the Clean Water Program – Amendments Approve Amendments No. 4 to professional service agreements with Tanner Pacific, Inc. and Townsend Management, Inc. to continue providing as-needed construction management services for the Clean Water Program’s Wastewater Treatment Plant and Collection System Rehabilitation projects to extend the term of each agreement through January 1, 2028; increase the agreement with Tanner Pacific, Inc. by $350,000 for a new total agreement amount not to exceed $6,350,000 and authorize the Public Works Director to execute the amendments in substantially the form presented and approve future amendments within the approved updated budget.
CEQA: The City prepared a Final Programmatic Environmental Impact Report (Final PEIR) in accordance with the California Environmental Quality Act (CEQA) (SCH No. 2015032006). The PEIR was certified by Council on June 6, 2016. In accordance with CEQA, the Final PEIR serves as the primary environmental compliance document for implementation of the Clean Water Program. The City prepared Addenda to the Final PEIR that were approved on July 16, 2018 (Addendum 1) and April 15, 2019 (Addendum 2). This work is within the scope of the project evaluated in the PEIR and Addendum.
7. Emergency Rental Assistance Program — Approval
Approve an agreement with Samaritan House to continue administration of the Emergency Rental Assistance Program in the amount of $220,000 for Fiscal Year 2026-27 and approve updated Program Guidelines; authorize the City Manager to execute the agreement in substantially the form presented.
CEQA: This agreement is not a project subject to CEQA, because it can be seen with certainty that it will not cause a physical change in the environment (Public Resources Code Section 21065).)
8. Pump Station Mechanic I/II and Pump Station Mechanic III Job Specification – Amendment Adopt a Resolution to amend the Pump Station Mechanic I/II and Pump Station Mechanic III job specifications to remove the California Water Environment Association (CWEA) Collection Systems Maintenance Certification requirement from the minimum qualifications and add the CWEA Mechanical Technologist Certification as a preferred qualification.
2 of 833
CEQA: This job specification update is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b)(5).)
9. Basin D Sanitary Sewer Rehabilitation Project – Bid Rejection Adopt a Resolution to reject all bids received for the Basin D Sanitary Sewer Rehabilitation Project and authorize the Public Works Department to initiate a second Notice Inviting Bids.
CEQA: The California Environmental Quality Act (CEQA) does not apply to the rejection of bids because CEQA is inapplicable to projects that are disapproved, under CEQA Guidelines section 15270.
10. Diesel Fuel Procurement and Delivery — Amendment
Approve Amendment No. 1 to the agreement with Bosco Oil, Inc. DBA Valley Oil Company for Diesel Fuel Procurement and Delivery in the amount of $319,000 for a new agreement total of $719,000; establish a contingency in the amount of $45,600; and authorize the Public Works Director to issue amendments and change orders within the contingency amount.
CEQA: This Amendment is not a project subject to CEQA, because it can be seen with certainty that it will not cause a physical change in the environment. (Public Resources Code Section 21065.)
11. Public Works Standard Drawings – Update
Adopt a Resolution to update all City of San Mateo Department of Public Works Standard Drawings.
CEQA: This adoption is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b) (5).))
12. Below Market Rental Rates, Sales Prices and Unit Community Priorities — Adoption Adopt a Resolution to establish 2026 maximum rental rates and sales prices for affordable housing, as required by the City of San Mateo's Below Market Rate (BMR) housing program; and establish Community Priority for units containing three or more bedrooms, which may allow a developer to provide fewer BMR units in exchange for units with more bedrooms, as long as all other BMR program provisions are followed.
CEQA: This Resolution is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b) (5).)
13. 19th Avenue / Fashion Island Blvd Multimodal Improvements Project – Adoption Adopt a Resolution authorizing the City to request to the One Bay Area Grant (OBAG) 3 Regional Discretionary Funding for the 19th Avenue and Fashion Island Boulevard Multimodal Improvements Project (Project) to allocate grant funding in the amount of $3,375,000 to the construction phase and to act as the implementing agency for the Project by updating the original OBAG 3 application.
CEQA: The proposed resolution authorizing a request for Project funding is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b)(5).) CEQA review of the Project itself will take place when a construction contract is awarded.
14. Monitoring, Reporting, and Regulatory Compliance Services at the East Third Avenue Landfill – Agreement 3 of 833
Approve an agreement with Stearns, Conrad and Schmidt Consulting, Inc. (SCS) for Monitoring, Reporting, and Regulatory Compliance Services at the East Third Avenue Landfill in the amount of $108,875 for a two-year term; and authorize the Public Works Director to execute the agreement in substantially the form presented.
CEQA: This Monitoring, Reporting, & Regulatory Compliance Services is categorically exempt from CEQA as an “existing facility,” because it consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of existing or former use. (CEQA Guidelines Section 15301.)
15. Storm Drain Master Plan Update — Agreement
Approve an agreement with Schaaf & Wheeler for the Storm Drain Master Plan Update in the amount not to exceed $129,770; establish a contingency reserve of $13,000; and authorize the Public Works Director to execute the agreement in substantially the form presented and issue amendments within the contingency reserve.
CEQA: This Project is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b)(5).)
16. San Mateo Public Library Main Branch Cafe Operating Lease — Agreement Approve a Property Lease and Operating Agreement with Henok Getahun for operation of the PLUR Cafe at the Main Library Branch for two years commencing on July 22, 2026, through July 21, 2028, in accordance with Municipal Code Section 3.62.030(b); and authorize its execution by the City Librarian.
CEQA: This Lease Agreement is categorically exempt from CEQA as an “existing facility,” because it consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of existing or former use. (CEQA Guidelines Section 15301.)
17. Youth and Adult Tennis and Pickleball Recreation Programs — Amendment Approve Amendment No. 1 with Todd Dissly Athletics, LLC (TDA) to make a one-time payment of $20,171.04 for services already rendered, to increase annual compensation from $300,000 to up to $350,000 annually, with a $25,000 contingency, resulting in the overall six (6) years $2,050,000; and authorize the Director of Parks & Recreation to execute the amendment and change orders in substantially the form presented.
CEQA: This Amendment No. 1 is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b)(5))
18. Citywide Commercial Economic Assessment Services — Appropriation and Agreement Adopt a Resolution to appropriate $114,868 from the Advance Planning Fund to the Citywide Economic Assessment project; adopt a resolution authorizing Retail Real Estate Resources, LLC to examine sales or transactions and use tax records for all sales and transactions and use taxes; approve an agreement with Retail Real Estate Resources, LLC to support preparation of a Citywide Commercial Economic Assessment and authorize the City Manager to execute the agreement in substantially the form presented.
CEQA: Approval of the budget appropriation and professional services agreement with RRER is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b)(5).) Approval of the Resolution to authorize examination of sales or transactions and use tax records is not a project subject to CEQA, because it consists of a government fiscal activity which does not involve any commitment to any specific project which may result in a potentially significant physical impact on the environment. (CEQA Guidelines Section 15378(b)(4).) 4 of 833
19. Library Materials Acquisition — Agreement
Adopt a Resolution authorizing an alternative purchasing procedure to approve an agreement with Ingram Library Services LLC to provide library materials including books, audiobooks, DVD/Blu-Ray, CD/MP3 and customized collection development services in an amount not to exceed $500,000 annually for fiscal years 2025- 26, 2026-27, and 2027-28, with an optional three-year term extension, for a potential total agreement amount not to exceed $3,000,000; and authorize the City Manager to approve any appropriate changes that do not increase the total not to exceed amount and execute the agreement on behalf of the City.
CEQA: Approval of an agreement with Ingram Library Services LLC is exempt from CEQA, because it can be seen with certainty that there is no possibility the purchase of library materials may have a significant effect on the environment. (CEQA Guidelines Section 15061(b)(3).)
20. Boards and Commission Appointment Subcommittee — Appointment Recommendation Appoint Seema Patel to the Planning Commission for a full term from July 20, 2026, through June 10, 2030.
CEQA: This appointment recommendation is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b)(5).)
PUBLIC COMMENT
Members of the public wishing to comment on any item not appearing on the agenda may address the City Council at this time. State law prevents Council from taking action on any matter not on the agenda; your comments may be referred to staff for follow up.
Public comment is limited to a total of 15 minutes; however, an opportunity for additional public comment may be provided later in the agenda.
PUBLIC HEARING
City Council action on the following public hearing(s) represents a final decision concluding all administrative proceedings. Judicial review may be had only if a petition is filed with the Court not later than the 90th day following the date the decision is made.
Judicial review of environmental determinations may be subject to a time period for litigation as short as 30 days following the date the decision is made.
21. Appeal of a Planning Commission Approval of a New Six-Story Multifamily Residential Development — Adoption Adopt a Resolution to deny the appeal and uphold the Planning Commission's decision to approve a Site Plan and Architectural Review (SPAR), a Site Development Planning Application (SDPA), and a Vesting Tentative Parcel Map (VTM) for the construction of a new six-story multifamily residential building with 181 dwelling units and associated site improvements at 715/723 North San Mateo Drive, and find that the Project is exempt from further review under the California Environmental Quality Act (CEQA) pursuant to Public Resources Code section 21080.66, based on the Findings for Approval and subject to the Conditions of Approval.
CEQA: Approval of the Project is subject to a new statutory exemption under Public Resources Code section 21080.66, signed into law by AB 130. To facilitate the City’s review of the Project under this exemption, on August 11, 2025, the applicant provided a memo to document the Project’s qualification under Public Resources Code section 21080.66(a) (Attachment 7). The Project complies with AB 130; an assessment of how the Project complies is in the attached Draft Resolution. In accordance with Public Resources Code section 21080.66(b)(1)(A), the City formally noticed Native American tribes for consultation regarding the Project and its potential impacts on tribal cultural resources. One tribe responded to the City’s notice to request consultation with the City. The Project Conditions of Approval (Attachment 1) include the conditions that are required to satisfy the requirements of AB 130 to avoid impacts on tribal cultural resources. 5 of 833
NEW BUSINESS
22. November 3, 2026 Election – Consideration of Placing a ¼-Cent Transactions and Use (Sales) Tax Measure on the Ballot –Ordinance Introduction
Adopt a Resolution ordering and calling for an election to be consolidated with the General Municipal Election to be held on November 3, 2026, and submitting to the voters a measure to increase the Transactions and Use (sales) tax by an additional ¼-cent, appropriating $158,000 for related election costs, and authorizing two members of the City Council to submit arguments; and introduce an ordinance establishing San Mateo Municipal Code Chapter 3.51 (Supplemental Transactions and Use Tax). (Approval requires at least four votes of the fivemember City Council.) CEQA: This item is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b)(5).)
PUBLIC HEARING
City Council action on the following public hearing(s) represents a final decision concluding all administrative proceedings. Judicial review may be had only if a petition is filed with the Court not later than the 90th day following the date the decision is made.
Judicial review of environmental determinations may be subject to a time period for litigation as short as 30 days following the date the decision is made.
23. November 3, 2026 Election – Placement of Charter Amendments on the Ballot Adopt a Resolution to place a measure on the ballot to revise the City Charter to reflect the change to district elections, update the process for scheduling Council meetings and filling Council vacancies, and update or remove various other provisions that are outdated, appropriate $20,400 for related election costs, and authorize two members of the City Council to submit arguments.
CEQA: Placing the proposed measure on the ballot is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b)(5).)
REPORTS, ANNOUNCEMENTS, AND COMMITTEE UPDATES
City Manager, City Attorney and Council Members report on their various assignments and liaison roles and Council requests for scheduling future items.
ADJOURNMENT
----------------------------------------------------------------------------------------------------------------------------- AGENDAS: Agendas and material are posted on the City’s website on the Friday preceding each Council Meeting and can be viewed on the City's website at www.cityofsanmateo.org . Any supplemental material distributed to the Council after the posting of the agenda will be made part of the official record.
WATCHING A MEETING ON TV: City Council meetings are broadcast live on Comcast/channel 27, Wave/channel 26, or AT&T/channel 99.
For transmission problems during the broadcast, please call (650) 522-7099. For all other broadcast comments, call (650) 522-7040, Monday-Friday, 8 a.m. - 5 p.m.
WATCHING A MEETING ON A COMPUTER: There are three ways to stream. 1) Public Meeting Portal www.cityofsanmateo.org/publicmeetings 2) City YouTube channel and stream it on YouTube: http://youtube.com/CityofSanMateo 3) Watch TV live stream: https://www.cityofsanmateo.org/193/Channel-San-Mateo-Live-Stream
PUBLIC COMMENTS/REQUEST TO SPEAK
Prior to the Meeting
Send comments to: [email protected] until 4 p.m. the day of the meeting. 6 of 833
During the meeting
By Zoom: Click the link at the top of the agenda and you’ll be added to the meeting. All attendees are muted by default. When the item of interest is open for consideration, select the “Raise Your Hand” icon and you will be called on at the appropriate time.
By telephone: Call (408) 638-0968 and enter the conference ID found at the top of the meeting agenda. When the item of interest is open for consideration, select *9 to raise your hand. When called upon, press *6 to unmute, state your name and provide your comments.
In Person: At the meeting complete a “Request to Speak” form. Organized Group and Presentations: Up to five (5) minutes for a group presentation, with as many speakers as can be accommodated within that time allowance. To qualify for a group presentation, all individuals associated with the presentation must be clearly identified and confirmed as in attendance at the meeting. Presentation materials must be submitted to [email protected] one (1) business day in advance of the meeting.
Presentations: PowerPoints, videos, or other media to be presented during public comment are accepted only by email to [email protected] at least 24 hours prior to the meeting. Once received, the Clerk will have them shared at public comment for the specified item. To uphold strong cybersecurity management practices, USB’s or other physical electronic storage devices are not accepted.
Signs: Signs and symbolic materials less than 2 feet by 3 feet are permitted provided that: (1) sticks, posts, poles or similar/other type of handle objects are strictly prohibited; (2) the items do not create a facility, fire, or safety hazard; and (3) persons with such items remain seated when displaying them and must not raise the items above shoulder level, obstruct the view or passage of other attendees, or otherwise disturb the business of the meeting.
ACCESSIBILITY: In compliance with the Americans with Disabilities Act and to ensure meaningful access for all participants, including those with limited English proficiency, individuals requiring special accommodation or language assistance to participate in this meeting may contact the City Clerk’s Office at (650) 522-7040 or [email protected]. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting.
SPANISH INTERPRETATION: If you need interpretation of your communications to the City Council from Spanish to English or English to Spanish, please contact the City Clerk Department at (650) 522-7040 or by email at [email protected]. Notification of at least 48 hours will usually enable the City to make arrangements.
INTERPRETACIÓN AL ESPAÑOL: Si necesita interpretación del inglés al español o del español al inglés para sus comunicaciones al Concejo de la Ciudad, comuníquese con el Departmento del Secretario Municipal al (650) 522-7040 o por correo electrónico a [email protected]. Por favor, avísenos con al menos 48 horas de anticipación para que la ciudad pueda hacer los arreglos necesarios. 7 of 833
CITY OF SAN MATEO
CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 3 Section Name: CONSENT CALENDAR Account Number: 10-4677 File ID: 26-11203 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: Public Works Department
MEETING DATE: July 20, 2026
SUBJECT:
Marina Lagoon Operations and Maintenance Permit Assistance – Agreement RECOMMENDATION:
Approve an agreement with WRA, Inc. for Marina Lagoon Operations and Maintenance Permit Assistance in the amount of $259,460; approve a contingency reserve in the amount of $50,000; and authorize the Public Works Director to execute the agreement in substantially the form presented and issue amendments within the contingency amount.
BACKGROUND:
Historically, the City has conducted maintenance activities within the Marina Lagoon in accordance with a Regional General Permit (RGP7) from the U.S. Army Corp of Engineers (USACE), a Lake and Streambed Alteration Agreement (LSAA) with the California Department of Fish and Wildlife (CDFW), and a Water Quality Certification issued by the Regional Water Quality Control Board (RWQCB) for routine maintenance activities conducted within the Marina Lagoon. These activities include:
Oversight of construction and maintenance of public and private docks Maintenance of stormwater outfalls and inlet gate
Bank protection and stabilization
Construction and maintenance of new fences
Sand replenishment at existing beaches at Lakeshore Park and Aquatic Park Sediment dredging at the inlets for Laurel Creek, Borel Creek, and Leslie Creek Removal/Treatment of nuisance aquatic vegetation
On April 20, 2026, the City issued a Request for Proposals for professional consulting services to renew the Marina Lagoon Operations and Maintenance permits, update the dock permit application, and update the Marina Lagoon Operation and Maintenance Manual, which was last revised in 2016. The current permits are five-year permits that expire at the end of 2026 and early 2027.
Four (4) proposals were received by the due date of May 15, 2026, and are listed below:
Integral Consulting, Inc.
(in collaboration with ECORP and JHS Consulting, LLC)
$228,500
WRA, Inc. $259,460
LSA $277,576
Nichols Consulting Engineers $314,290
8 of 833
CITY OF SAN MATEO
After scoring the proposals based on knowledge and experience working on similar projects in the Bay Area, staff determined that WRA, Inc. was the most qualified firm due to their technical expertise and relevant experience. This is a critically important effort for the City. Without receipt of regulatory permits, the City cannot perform necessary maintenance for the Marina Lagoon. Therefore, staff recommend awarding a professional consulting agreement to WRA, Inc. The agreement term will extend from July 2026 to February 2032.
BUDGET IMPACT:
Funding for these consultant services is budgeted in the Regulatory Compliance 2026-27 operating budget for the Marina Lagoon. Funding for future years of the agreement will be requested as necessary through the annual budget development process to support the continued implementation of the agreement.
ENVIRONMENTAL DETERMINATION:
Approval of this agreement is exempt from CEQA review as an “existing facility,” because it consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of existing or former use. (CEQA Guidelines Section 15301.)
STRATEGIC PLAN ALIGNMENT
This agreement supports the Infrastructure initiative.
NOTICE PROVIDED
All meeting noticing requirements were met.
ATTACHMENTS
Att 1 – Agreement
STAFF CONTACT
Gustavo Lopez, Environmental Programs Coordinator
[email protected]
(650) 522-7342
Sven Edlund, Regulatory Compliance Manager
[email protected]
(650) 522-7296
9 of 833
Professional Consultant Services Page 1 of 14
Rev 5/25
AGREEMENT WITH WRA INC.
FOR PROFESSIONAL CONSULTANT SERVICES
FOR
MARINA LAGOON OPERATIONS AND MAINTENANCE PERMIT ASSISTANCE This Agreement, made and entered into this day of ____________________, by and between the CITY OF SAN MATEO, a municipal corporation existing under the laws of the State of California (“CITY”), and WRA Inc., a CORPORATION, (“CONSULTANT”), whose address is 2169-G East San Francisco Blvd, San Rafael, CA 94901.
RECITALS:
A. CITY desires certain professional services hereinafter described.
B. CITY desires to engage CONSULTANT to provide these professional services by reason of its qualifications and experience for performing such services and CONSULTANT has offered to provide the required services on the terms and in the manner set forth herein.
NOW, THEREFORE, IT IS AGREED as follows:
SECTION 1 - SCOPE OF SERVICES
The scope of services to be performed by CONSULTANT under this Agreement is as described in Exhibit A to this Agreement, attached and incorporated by reference.
SECTION 2 - DUTIES OF CONSULTANT
CONSULTANT shall be responsible for the professional quality, technical accuracy and coordination of all work furnished by CONSULTANT under this Agreement. CONSULTANT shall, without additional compensation, correct or revise any errors or deficiencies in its work.
CONSULTANT represents that it is qualified to furnish the services described under this Agreement.
CONSULTANT shall be responsible for employing or engaging all persons necessary to perform the services of CONSULTANT.
CONSULTANT agrees to comply with the City’s minimum wage ordinance as codified in Municipal Code Chapter 5.92, which differs from the state minimum wage and includes a Consumer Price Index escalator.
SECTION 3 - DUTIES OF CITY
CITY shall provide pertinent information regarding its requirements for the project. 10 of 833
Professional Consultant Services Page 2 of 14
Rev 5/25
CITY shall examine documents submitted by CONSULTANT and shall render decisions pertaining thereto promptly, to avoid unreasonable delay in the progress of CONSULTANT's work.
SECTION 4 - TERM
The services to be performed under this Agreement shall commence on August 1, 2026, and be completed by June 30, 2032.
SECTION 5 - PAYMENT
Payment shall be made by CITY only for services rendered and upon submission of a payment request upon completion and CITY approval of the work performed. In consideration for the full performance of the services set forth in Exhibit A, CITY agrees to pay CONSULTANT a fee in an amount of $259,460, pursuant to the cost table included as Exhibit B to this Agreement, attached and incorporated by reference. CONSULTANT’s hourly billing rates may be increased each January based on the 12-month national CPI-U (all items) as of the preceding December, but such increase shall not exceed three percent (3%).
SECTION 6 - TERMINATION
Without limitation to such rights or remedies as CITY shall otherwise have by law, CITY shall have the right to terminate this Agreement or suspend work on the Project for any reason, upon ten (10) days' written notice to CONSULTANT. CONSULTANT agrees to cease all work under this Agreement upon receipt of said written notice.
Upon termination and upon CITY's payment of the amount required to be paid, documents become the property of CITY, and CONSULTANT shall transfer them to CITY upon request without additional compensation.
SECTION 7 - OWNERSHIP OF DOCUMENTS
All documents prepared by CONSULTANT in the performance of this Agreement, although instruments of professional service, are and shall be the property of CITY, whether the project for which they are made is executed or not.
SECTION 8 - CONFIDENTIALITY
All reports and documents prepared by CONSULTANT in connection with the performance of this Agreement are confidential until released by CITY to the public. CONSULTANT shall not make any such documents or information available to any individual or organization not employed by CONSULTANT or CITY without the written consent of CITY before any such release. 11 of 833
Professional Consultant Services Page 3 of 14
Rev 5/25
SECTION 9 - INTEREST OF CONSULTANT
CONSULTANT covenants that it presently has no interest, and shall not acquire any interest, direct or indirect, financial or otherwise, which would conflict in any manner or degree with the performance of the services under this Agreement.
SECTION 10 - CONSULTANT'S STATUS
It is expressly agreed that in the performance of the professional services required under this Agreement, CONSULTANT shall at all times be considered an independent contractor as defined in Labor Code Section 3353, under control of the CITY as to the result of the work but not the means by which the result is accomplished. Nothing herein shall be construed to make CONSULTANT an agent or employee of CITY while providing services under this Agreement.
SECTION 11 - INDEMNITY
CONSULTANT agrees to hold harmless and indemnify CITY, its elected and appointed officials, employees, volunteers, and agents from and against any and all claims, loss, liability, damage, and expense arising out of CONSULTANT’s performance of this Agreement, except those claims arising out of CITY’s sole negligence or willful misconduct. CONSULTANT agrees to defend City, its elected and appointed officials, employees, volunteers, and agents against any such claims. The CONSULTANT’S duty to indemnify shall survive expiration or early termination of this Agreement.
SECTION 12 - INSURANCE
CONSULTANT shall procure and maintain for the duration of the contract and three years thereafter (five years for building or major improvements) the insurance specified in Exhibit C to this Agreement.
SECTION 13 - NON-ASSIGNABILITY
Both parties hereto recognize that this Agreement is for the personal services of CONSULTANT and cannot be transferred, assigned, or subcontracted by CONSULTANT without the prior written consent of CITY.
SECTION 14 - RELIANCE UPON PROFESSIONAL
SKILL OF CONSULTANT
It is mutually understood and agreed by and between the parties hereto that CONSULTANT is skilled in the professional calling necessary to perform the work agreed to be done under this Agreement and that CITY relies upon the skill of CONSULTANT to do and perform the work in accordance with the degree of skill and care ordinarily used by competent practitioners of the same professional discipline under similar circumstances and in similar localities, and CONSULTANT agrees to thus perform the work. The acceptance of CONSULTANT's work by CITY does not operate as a release of CONSULTANT from said obligation.
12 of 833
Professional Consultant Services Page 4 of 14
Rev 5/25
SECTION 15 - WAIVERS
The waiver by either party of any breach or violation of any term, covenant, or condition of this Agreement or of any provisions of any ordinance or law shall not be deemed to be a waiver of such term, covenant, condition, ordinance or law or of any subsequent breach or violation of the same or of any other term, condition, ordinance, or law. The subsequent acceptance by either party of any fee or other money which may become due hereunder shall not be deemed to be a waiver of any preceding breach or violation by the other party of any term, covenant, or condition of this Agreement or of any applicable law or ordinance.
SECTION 16 - SEVERABILITY
If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect.
SECTION 17 - COSTS AND ATTORNEY FEES
Attorney fees in total amount not exceeding $5000, shall be recoverable as costs (by the filing of a cost bill) by the prevailing party in any action or actions to enforce the provisions of this Agreement. The above $5000 limit is the total of attorney fees recoverable whether in the trial court, appellate court, or otherwise, and regardless of the number of attorneys, trials, appeals, or actions. It is the intent of this Agreement that neither party shall have to pay the other more than $5000 for attorney fees arising out of an action, or actions to enforce the provisions of this Agreement.
SECTION 18 - NON-DISCRIMINATION
CONSULTANT warrants that it is an Equal Opportunity Employer and shall comply with applicable regulations governing equal employment opportunity. Neither CONSULTANT nor any of its subcontractors shall discriminate in the employment of any person because of race, color, national origin, ancestry, physical handicap, medical condition, marital status, sex, or age, unless based upon a bona fide occupational qualification pursuant to the California Fair Employment and Housing Act.
SECTION 19 - MEDIATION
Should any dispute arise out of this Agreement, any party may request that it be submitted to mediation. The parties shall meet in mediation within 30 days of a request. The mediator shall be agreed to by the mediating parties; in the absence of an agreement, the parties shall each submit one name from mediators listed by either the American Arbitration Association, the State Mediation and Conciliation Service, or other agreed-upon service. The mediator shall be selected by a blind draw.
The cost of mediation shall be borne equally by the parties. Neither party shall be deemed the prevailing party. No party shall be permitted to file a legal action without first meeting in mediation and making a good faith attempt to reach a mediated settlement. The mediation process, once commenced by a meeting with the mediator, shall last until agreement is reached by the parties but not more than 60 days, unless the maximum time is extended by the parties. 13 of 833
Professional Consultant Services Page 5 of 14
Rev 5/25
SECTION 20 - LITIGATION
CONSULTANT shall testify at CITY'S request if litigation is brought against CITY in connection with CONSULTANT's services under this Agreement. Unless the action is brought by CONSULTANT, or is based upon CONSULTANT's wrongdoing, CITY shall compensate CONSULTANT for preparation for testimony, testimony, and travel at CONSULTANT's standard hourly rates at the time of actual testimony.
SECTION 21 - NOTICES
All notices hereunder shall be given in writing and mailed, postage prepaid, addressed as follows:
To CITY: Gustavo Lopez
City of San Mateo
1949 Pacific Blvd
San Mateo, CA 94403
To CONSULTANT: WRA Inc.
Attn: Leslie J. Allen
2169-G East San Francisco Blvd
San Rafael, CA 94901
SECTION 22 - AGREEMENT CONTAINS ALL
UNDERSTANDINGS; AMENDMENT
This document represents the entire and integrated agreement between CITY and CONSULTANT and supersedes all prior negotiations, representations, and agreements, either written or oral.
This document may be amended only by written instrument, signed by both CITY and CONSULTANT.
14 of 833
Professional Consultant Services Page 6 of 14
Rev 5/25
SECTION 23 - CONFLICTS
In the event of any conflict between the provisions of this Agreement and any other referenced exhibit or document attached to this Agreement, the language and terms of this Agreement shall control.
SECTION 24 - AUTHORITY TO ENTER INTO AGREEMENT
CONSULTANT has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and to bind each respective party.
SECTION 24 - GOVERNING LAW AND VENUE
This Agreement shall be governed by the laws of the State of California and, in the event of litigation, venue will be in the County of San Mateo.
[SIGNATURE PAGE FOLLOWS]
15 of 833
Professional Consultant Services Page 7 of 14
Rev 5/25
IN WITNESS WHEREOF, CITY OF SAN MATEO and WRA INC.
have executed this Agreement the day and year first above written.
CITY OF SAN MATEO CONSULTANT
Matt Fabry, PE
Public Works Director
Date Leslie J. Allen
Its Authorized Agent
Principal-in-Charge
Date
APPROVED AS TO FORM
Linh P. Nguyen
Assistant City Attorney
Date
Attachments:
Exhibit A: Scope of Services
Exhibit B: Budget and Fee Schedule
Exhibit C: Insurance Requirements
16 of 833
Professional Consultant Services Page 8 of 14
Rev 5/25
EXHIBIT A
SCOPE OF SERVICES
Consultant shall provide the City of San Mateo (City) with professional services to obtain all required permits and agreements that will allow the City to conduct their routine maintenance activities at the Marina Lagoon. Permitting agencies shall include, but not limited to, the U.S. Army Corps of Engineers (USACE), the Regional Water Quality Control Board (RWQCB), and California Fish and Wildlife (CDFW).
The Scope of Services is comprised of six tasks:
Task 1: Project Management
Task 2: Prepare Technical Reports and Documentation for CEQA (if necessary) Task 3: Prepare Permit Applications and Coordinate with Agencies Task 4: Update Dock Application Package
Task 5: Annually: Provide Permit Support and Prepare Annual Reports Task 6: Update Operation and Maintenance (O&M) Manual for Marina Lagoon At a minimum, all Proposers shall submit a proposal responding to the entire Scope of Services.
However, Proposers may recommend changes and include alternatives to the Scope of Services if (1) additional tasks are required by laws or regulations, (2) tasks below are not specifically required by laws or regulations, or (3) tasks below can be modified to meet the City’s above-stated objectives.
Task 1: Project Management
This task includes but is not limited to:
• Developing and maintaining a master project schedule, including timelines for review of major deliverables
• Leading a kick-off meeting as well as regularly scheduled meetings, including preparation of agendas and meeting minutes, to introduce the project strategy and schedule, and update the City on progress for key milestones
• Preparing monthly progress reports and invoices
• Coordinating the project team, including staff and subconsultant firms, and managing all work • Monitoring all project activities and implementing quality assurance and quality control protocols and standards
• Assembling and maintaining project files within a file sharing service that includes, all documentation and data resulting from, or related to, the Consultant’s services for the project, including, but not limited to, survey files, documented assumptions, working drawings, meeting minutes, all correspondence, video libraries, etc.
• Attending meetings with regulatory agencies, as necessary, to introduce or resolve items related to permitting
17 of 833
Professional Consultant Services Page 9 of 14
Rev 5/25
Anticipated Deliverables:
• Project Schedule
• Progress Reports
• Meeting Minutes
Task 2: Prepare Technical Reports and Documentation for CEQA (as necessary) This task includes but is not limited to:
• Preparing Environmental Assessments and Studies as required for the California Environmental Quality Act (CEQA) determination including but not limited to:
I. Biological Resources Study
II. Mitigation Plan
III. Cultural Resource Assessment (if needed)
• Preparing a draft Project Description, consistent with the requirements of CEQA Guideline Section 15124, which will form the basis from which to engage resource agencies, initiate impact evaluations, and to prepare permit applications.
• Preparing a draft Initial Study/Mitigated Negative Declaration (IS/MND) or Environmental Impact Report (EIR), depending upon what may be appropriate based on consultant’s review of the intended maintenance work discussed in Appendices C.
Anticipated Deliverables:
• Draft and Final Project Description
• Draft and Final Biological Resources Study and any other Technical Studies as may be required as supporting documents to support the regulatory permitting.
Task 3: Prepare Permit Applications and Coordinate with Agencies This task includes preparation of permit applications and on-going coordination with applicable regulatory agencies for, but not limited to, the following permits:
• Regional Water Quality Control Board (RWQCB) Section 401 Water Quality Certification permit • US Army Corps of Engineers (USACE) Section 404 permit • California Department of Fish and Wildlife (CDFW) 1602 Lake and Streambed Alteration (LSA) Agreement
• Others as may be identified by the consultant which are necessary to permit routine maintenance work.
Additional agencies may need to be contacted to confirm they do not have interests or jurisdiction for these projects (e.g. Bay Conservation & Development Commission, State Tidelands Commission, and the United States Fish and Wildlife Service). Consultant will prepare a draft permit package for City review for each of the above listed permits and agreements. 18 of 833
Professional Consultant Services Page 10 of 14
Rev 5/25
Anticipated Deliverables:
• Draft and Final RWQCB Section 401 permit package
• Draft and Final USACE Section 404 permit package
• Draft and Final CDFW 1602 LSA permit package
• Others as may be identified by the consultant which are necessary to permit routine maintenance work.
Task 4: Update Dock Application Package
The consultant shall simplify the dock construction application package to improve clarity and usability for property owners while ensuring full compliance with applicable agency requirements.
Anticipated Deliverables:
• Update the Dock Construction Permit Application in compliance with Lagoon Permit requirements • Draft and final packet after RWQCB, USACE, and CDFW feedback Task 5: Annually: Provide Permit Support and Prepare Annual Reports.
Notify agencies at the beginning of each year of the planned activities expected. During the year, provide support in interpreting permit conditions for staff, and at the end of the year, prepare summary reports of all activities completed in the past year.
Expected Duties:
• Notify agencies of maintenance activities planned at the beginning of each year of the permit. • Prepare and submit an annual report to each agency after the City has reviewed a draft copy beforehand.
Task 6: Update Operation and Maintenance (O&M) Manual for Marina Lagoon Following the successful completion of the permitting process, the consultant will update the existing O&M Plan. The current manual was developed and last revised in August 2016; much of its content is now outdated and requires a comprehensive update.
Anticipated Deliverables:
• Revise/Update Manual
• On-call support for questions
• Provide updates/revisions as necessary during the 5-year permit term 19 of 833
Professional Consultant Services Page 11 of 14
Rev 5/25
EXHIBIT B
BUDGET AND FEE SCHEDULE
20 of 833
Professional Consultant Services Page 12 of 14
Rev 5/25
21 of 833
Professional Consultant Services Page 13 of 14
Rev 5/25
EXHIBIT C
INSURANCE REQUIREMENTS
MINIMUM SCOPE OF INSURANCE
Coverage shall be at least as broad as:
1. Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 12 07 covering CGL on an “occurrence” basis, including products-completed operations, personal & advertising injury, with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.
2. Automobile Liability: ISO Form Number CA 00 01 covering any auto (Code 1), or if CONSULTANT has no owned autos, hired, (Code 8) and non-owned autos (Code 9), with limit no less than $1,000,000 per accident for bodily injury and property damage.
3. Workers’ Compensation: as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.
4. Professional Liability (Errors and Omissions): Insurance appropriate to the CONSULTANT’s profession, with limit no less than $1,000,000 per occurrence or claim, $2,000,000 aggregate.
If the CONSULTANT maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the CONSULTANT.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status
The City, its elected and appointed officials, employees, volunteers, and agents are to be covered as insureds on the auto policy for liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the CONSULTANT; and on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the CONSULTANT including materials, parts or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the CONSULTANT’s insurance (at least as broad as ISO Form CG 20 10, 11 85 or both CG 20 10 and CG 20 37 forms if later revisions used).
Primary Coverage
For any claims related to this contract, the CONSULTANT’s insurance coverage shall be primary insurance as respects the City, its elected and appointed officials, employees, volunteers, and agents.
Any insurance or self-insurance maintained by the City, its elected and appointed officials, employees, volunteers, or agents shall be excess of the CONSULTANT’s insurance and shall not contribute with it.
Notice of Cancellation
Each insurance policy required above shall provide that coverage shall not be canceled, except after thirty (30) days’ prior written notice (10 days for non-payment) has been given to the City. 22 of 833
Professional Consultant Services Page 14 of 14
Rev 5/25
Waiver of Subrogation
CONSULTANT hereby grants to City a waiver of any right to subrogation which any insurer of said CONSULTANT may acquire against the City by virtue of the payment of any loss under such insurance.
CONSULTANT agrees to obtain any endorsement that may be necessary to effect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.
Deductibles and Self-Insured Retentions
Any deductibles or self-insured retentions must be declared to and approved by the City. The City may require the CONSULTANT to purchase coverage with a lower deductible or retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention.
Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City.
Verification of Coverage
CONSULTANT shall furnish the City with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the CONSULTANT’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. 23 of 833
CITY OF SAN MATEO
CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 4 Section Name: CONSENT CALENDAR Account Number: 10-4662 File ID: 26-11304 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: Public Works Department
MEETING DATE: July 20, 2026
SUBJECT:
Marina Branch Public Library Restoration Project Furnishings and Shelving – Agreements RECOMMENDATION:
Adopt a Resolution to approve an alternative purchasing procedure for an agreement with Coordinated Resources, Inc. (CRI) to provide furnishings and installation services for the Marina Branch Library Restoration Project in the amount of $183,466.41; establish a contingency reserve in the amount of $30,000; adopt a Resolution to approve an alternative purchasing procedure for an agreement with Ross McDonald Co., Inc. to provide shelving and installation services in the amount of $238,652.85; establish a contingency reserve in the amount of $25,000; and authorize the Public Works Director to execute the agreements in substantially the form presented and issue change orders within the contingency amounts.
BACKGROUND:
The Marina Branch Public Library Restoration Project (Project) will implement critical improvements, including foundation and structural repairs; mechanical, electrical and plumbing upgrades; accessibility improvements; exterior and landscaping improvements; and a relocated deck. The Project is currently under construction, with an estimated completion date of February 2027.
In addition to the building and site improvements, the Project will procure and install new furnishings and shelving, including office, workstation, and public furniture, to replace the existing furniture and shelving that have exceeded their reasonable service life. Under the City’s Architectural Design Agreement with Siegel & Strain Architects, furnishing and shelving packages were developed with products approved by City library staff. The products are from reputable manufacturers known for durability and high commercial quality and are compatible with existing and preferred library equipment used by the City.
Furnishings would be purchased and installed using OMNIA Partners cooperative purchasing pricing through CRI. Shelving units would be purchased and installed using The Interlocal Purchasing System (TIPS) pricing through Ross McDonald Co., Inc. (Ross McDonald). Two separate purchasing organizations are being used because the shelving manufacturer's products are exclusively available through TIPS.
San Mateo Municipal Code Section 3.60.070(h)(3) authorizes the City Council to approve alternative purchasing procedures when it finds doing so is in the best interest of the City. OMNIA Partners and TIPS are purchasing cooperatives that competitively solicit bids and award contracts for quality products, including furnishings and shelving. Public agencies can then utilize the awarded contracts that underwent the solicitation process to receive competitive pricing and the lowest available prices by manufacturers.
In addition, using this purchasing process will save the City and design team significant time and costs, allowing the City to 24 of 833
CITY OF SAN MATEO
procure the preferred furnishings and shelving. Procurement and installation of the furnishings through CRI and the shelving through Ross McDonald is in the best interest of the City as the cooperative purchasing process provides competitive solicited pricing, reduces staff and design effort, and ensures consistency with the City’s preferred products.
Staff recommends City Council adopt a Resolution to approve an alternative purchasing procedure for an agreement with Coordinated Resources Inc. to provide furnishings and installation services in the amount of $183,466.41 and an agreement with Ross McDonald Co., Inc. to provide shelving and installation services in the amount of $238,652.85 at the Marina Branch Library. Staff recommends contingency reserves for each agreement commensurate with the potential unknowns and risks tied to procurement and installation.
BUDGET IMPACT:
Sufficient funds are available in the Marina Library Structural Improvements Project (665100) to fund these agreements and contingency reserves.
ENVIRONMENTAL DETERMINATION:
This project is categorically exempt from CEQA as an “existing facility,” because it consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of existing or former use. (CEQA Guidelines Section 15301.)
STRATEGIC PLAN ALIGNMENT
This project supports the Healthy Community for All initiative.
NOTICE PROVIDED
All meeting noticing requirements were met.
ATTACHMENTS
Att 1 – Proposed Resolution (CRI)
Att 2 – Agreement (CRI)
Att 3 – Proposed Resolution (Ross McDonald)
Att 4 – Agreement (Ross McDonald)
STAFF CONTACT
Charlie Evans, Assistant Engineer
[email protected]
(650) 522-7320
Stephanie Piñon, Senior Engineer
[email protected]
(650) 522-7315
25 of 833
CITY OF SAN MATEO
RESOLUTION NO. ____ (2026)
APPROVING AN ALTERNATIVE PURCHASING PROCEDURE TO APPROVE AN AGREEMENT WITH COORDINATED RESOURCES INC. TO FURNISH AND INSTALL FURNITURE IN THE AMOUNT OF $183,466.41 FOR THE MARINA
BRANCH PUBLIC LIBRARY RESTORATION PROJECT
WHEREAS, the Marina Branch Library located at 1530 Susan Court, San Mateo (“Library”) is a City-owned property and being restored as part of the Marina Branch Public Library Restoration Project (“Project”); and WHERAS, the existing furniture at the Library has exceeded its reasonable service life and has been discarded as part of the planned Project and cannot be reused; and WHEREAS, to provide furniture for library use upon completion of the Project, staff proposes the purchase of a set of furniture and their associated materials to be furnished and installed with the Project; and WHEREAS, OMNIA Partners, a group purchasing organization that works with public agencies off of prenegotiated vendor contracts, was utilized to receive pricing from Coordinated Resources Inc. (dba CRI) (CRI); and WHERAS, San Mateo Municipal Code Section 3.60.030 generally requires competitive bidding for contracts of $100,000 or more; and
WHEREAS, San Mateo Municipal Code Section 3.60.070(h)(3) authorizes the City Council to approve an alternative purchasing procedure when it is in the best interest of the City; and WHEREAS, the timely procurement and installation of the library furniture and their associated materials is critical to meet the schedule for the startup of the restored Library facility; and WHEREAS, OMNIA offers services to make the government procurement process more efficient through its cooperative purchasing program; and
WHEREAS, OMNIA has conducted competitive, public bids to select furniture vendors to achieve competitive pricing and selected CRI; and
WHEREAS, CRI will provide the furniture and their associated materials, design, project management and installation services; and
WHERAS based on the bid obtained from OMNIA, staff recommends approval of the agreement with CRI because it is in the best interest of the City for the reasons set forth in this resolution.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN MATEO, CALIFORNIA, HEREBY RESOLVES that:
1. The purchase of Project furniture and their associated materials is not a project subject to CEQA, because it can be seen with certainty that there is no possibility that the purchase of and installation of furniture and their associated materials for the Marina Branch Library may have a significant effect on the environment (CEQA Guidelines Section 15061(b)(3).)
2. In accordance with Municipal Code 3.60.070(h)(3), the purchase and installation of furniture and their associated materials for the Marina Branch Library Restoration Project from CRI based on pricing from OMNIA is in the City’s best interest for these reasons:
26 of 833
a. OMNIA has conducted competitive, public bids to select vendors for the listed furniture and their associates materials to achieve competitive pricing and selected CRI; and b. Timely procurement and installation of the furniture and their associated materials in the restored Library Facility is critical to meet the Project schedule.
3. The agreement with Coordinated Resources, Inc. (dba CRI) in an amount not to exceed $183,466.41 is approved.
4. A contingency amount of $30,000.00 is approved.
5. The Public Works Director is authorized to execute the agreement in substantially the form presented and issue amendments within the contingency reserve.
27 of 833
Contract for Services with SB854 Page 1 of 13
Rev. 4/26
AGREEMENT WITH COORDINATED RESOURCES INC.
FOR
MARINA BRANCH PUBLIC LIBRARY RESTORATION PROJECT – FURNITURE PACKAGE This Agreement, made and entered into this day of ____________________, by and between the CITY OF SAN MATEO, a municipal corporation existing under the laws of the State of California ("CITY"), and Coordinated Resources Inc. (dba CRI), a Corporation (“VENDOR”), whose address is 585 Howard Street, San Francisco, CA 94105.
RECITALS:
A. CITY desires certain furniture purchase and installation services hereinafter described.
B. CITY desires to engage VENDOR to provide these services by reason of its qualifications and experience for performing such services and VENDOR has offered to provide the required services on the terms and in the manner set forth herein.
NOW, THEREFORE, IT IS AGREED as follows:
SECTION 1 - SCOPE OF SERVICES
The scope of services to be performed by VENDOR under this Agreement is as described in Exhibit A to this Agreement, which is attached and incorporated by reference.
SECTION 2 - DUTIES OF VENDOR
VENDOR shall be responsible for the professional quality, technical accuracy and coordination of all work furnished by VENDOR under this Agreement. VENDOR shall, without additional compensation, correct or revise any errors or deficiencies in its work.
VENDOR represents that it is qualified to furnish the services described under this Agreement.
VENDOR shall be responsible for employing or engaging all persons necessary to perform the services of VENDOR.
VENDOR and his subcontractors shall comply with State’s Prevailing Wage Laws.
VENDOR agrees to comply with the City’s minimum wage ordinance as codified in Municipal Code Chapter 5.92, which differs from the state minimum wage and includes a Consumer Price Index escalator.
VENDOR or subcontractor shall not be qualified to bid on, be listed in a bid proposal, or engage in the performance of any contract for public work unless currently registered and qualified to perform 28 of 833
Contract for Services with SB854 Page 2 of 13
Rev. 4/26
public work pursuant to Section 1725.5 of the Labor Code. For the work performed for the City, the VENDOR and his subcontractors shall pay the workers at the prevailing wage rate as determined by the California Department of Industrial Relations, for this locality. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
SECTION 3 - DUTIES OF CITY
CITY shall provide pertinent information regarding its requirements for the project.
CITY shall examine documents submitted by VENDOR and shall render decisions pertaining thereto promptly, to avoid unreasonable delay in the progress of VENDOR's work.
SECTION 4 - TERM
The services to be performed under this Agreement shall commence on August 1, 2026 and be completed on February 28, 2027.
SECTION 5 - PAYMENT
Payment shall be made by CITY only for services rendered and upon submission of a payment request upon completion and CITY approval of the work performed. In consideration for the full performance of the services set forth in Exhibit A, CITY agrees to pay VENDOR in an amount of $183,466.41, a fee pursuant to rates stated in Exhibit B, attached and incorporated by reference.
SECTION 6 – TERMINATION
Without limitation to such rights or remedies as CITY shall otherwise have by law, CITY shall have the right to terminate this Agreement or suspend work on the Project for any reason, upon ten (10) days' written notice to VENDOR. VENDOR agrees to cease all work under this Agreement upon receipt of said written notice.
SECTION 7 - OWNERSHIP OF DOCUMENTS
All documents prepared by VENDOR in the performance of this Agreement are and shall be the property of CITY, whether the project for which they are made is executed or not.
SECTION 8 - CONFIDENTIALITY
All reports and documents prepared by VENDOR in connection with the performance of this Agreement are confidential until released by CITY to the public. VENDOR shall not make any such documents or information available to any individual or organization not employed by VENDOR or CITY without the written consent of CITY before any such release. 29 of 833
Contract for Services with SB854 Page 3 of 13
Rev. 4/26
SECTION 9 - INTEREST OF VENDOR
VENDOR covenants that it presently has no interest, and shall not acquire any interest, direct or indirect, financial or otherwise, which would conflict in any manner or degree with the performance of the services under this Agreement.
SECTION 10 - VENDOR'S STATUS
It is expressly agreed that in the performance of the services required under this Agreement, VENDOR shall at all times be considered an independent contractor as defined in Labor Code Section 3353, under control of the CITY as to the result of the work but not the means by which the result is accomplished. Nothing herein shall be construed to make VENDOR an agent or employee of CITY while providing services under this Agreement.
SECTION 11 - INDEMNITY
VENDOR agrees to hold harmless and indemnify CITY, its elected and appointed officials, employees, volunteers, and agents from and against any and all claims, loss, liability, damage, and expense arising out of VENDOR’s performance of this Agreement, except for those claims arising out of CITY’s sole negligence or willful misconduct. VENDOR agrees to defend City, its elected and appointed officials, employees, volunteers, and agents against any such claims. The VENDOR’S duty to indemnify shall survive expiration or early termination of this Agreement.
SECTION 12 - INSURANCE
VENDOR shall procure and maintain for the duration of the contract the insurance specified in Exhibit C to this Agreement.
SECTION 13 - NONASSIGNABILITY
Both parties hereto recognize that this Agreement is for the personal services of VENDOR and cannot be transferred, assigned, or subcontracted by VENDOR without the prior written consent of CITY.
SECTION 14 - RELIANCE UPON SKILL OF VENDOR
It is mutually understood and agreed by and between the parties hereto that VENDOR is skilled in the performance of the work agreed to be done under this Agreement and that CITY relies upon the skill of VENDOR to do and perform the work in the most skillful manner, and VENDOR agrees to thus perform the work. The acceptance of VENDOR's work by CITY does not operate as a release of VENDOR from said obligation.
30 of 833
Contract for Services with SB854 Page 4 of 13
Rev. 4/26
SECTION 15 - WAIVERS
The waiver by either party of any breach or violation of any term, covenant, or condition of this Agreement or of any provisions of any ordinance or law shall not be deemed to be a waiver of such term, covenant, condition, ordinance or law or of any subsequent breach or violation of the same or of any other term, condition, ordinance, or law. The subsequent acceptance by either party of any fee or other money which may become due hereunder shall not be deemed to be a waiver of any preceding breach or violation by the other party of any term, covenant, or condition of this Agreement or of any applicable law or ordinance.
SECTION 16 - COSTS AND ATTORNEY FEES
Attorney fees in total amount not exceeding $5000, shall be recoverable as costs (by the filing of a cost bill) by the prevailing party in any action or actions to enforce the provisions of this Agreement. The above $5000 limit is the total of attorney fees recoverable whether in the trial court, appellate court, or otherwise, and regardless of the number of attorneys, trials, appeals, or actions. It is the intent of this provision that neither party shall have to pay the other more than $5000 for attorney fees arising out of an action, or actions to enforce the provisions of this Agreement.
SECTION 17 - NON-DISCRIMINATION
VENDOR warrants that it is an Equal Opportunity Employer and shall comply with applicable regulations governing equal employment opportunity. Neither VENDOR nor any of its subcontractors shall discriminate in the employment of any person because of race, color, national origin, ancestry, physical handicap, medical condition, marital status, sex, or age, unless based upon a bona fide occupational qualification pursuant to the California Fair Employment and Housing Act.
SECTION 18 - MEDIATION
Should any dispute arise out of this Agreement, any party may request that it be submitted to mediation. The parties shall meet in mediation within 30 days of a request. The mediator shall be agreed to by the mediating parties; in the absence of an agreement, the parties shall each submit one name from mediators listed by either the American Arbitration Association, the State Mediation and Conciliation Service, or other agreed-upon service. The mediator shall be selected by a blind draw.
The cost of mediation shall be borne equally by the parties. Neither party shall be deemed the prevailing party. No party shall be permitted to file a legal action without first meeting in mediation and making a good faith attempt to reach a mediated settlement. The mediation process, once commenced by a meeting with the mediator, shall last until agreement is reached by the parties but not more than 60 days, unless the maximum time is extended by the parties. 31 of 833
Contract for Services with SB854 Page 5 of 13
Rev. 4/26
SECTION 19 - LITIGATION
VENDOR shall testify at CITY's request if litigation is brought against CITY in connection with VENDOR's services under this Agreement. Unless the action is brought by VENDOR, or is based upon VENDOR's wrongdoing, CITY shall compensate VENDOR for preparation for testimony, testimony, and travel at VENDOR's standard hourly rates at the time of actual testimony.
SECTION 20 - NOTICES
All notices hereunder shall be given in writing and mailed, postage prepaid, addressed as follows:
To CITY: Director of Public Works
City of San Mateo
330 West 20th Avenue
San Mateo, CA 94403
To VENDOR: Coordinated Resources Inc (dba, CRI)
Attn: Jennifer Burton
585 Howard Street
San Francisco, CA 94105
SECTION 21 - AGREEMENT CONTAINS ALL
UNDERSTANDINGS; AMENDMENT
This document represents the entire and integrated agreement between CITY and VENDOR and supersedes all prior negotiations, representations, and agreements, either written or oral.
This document may be amended only by written instrument, signed by both CITY and VENDOR.
SECTION 22 - GOVERNING LAW AND VENUE
This Agreement shall be governed by the laws of the State of California and, in the event of litigation, venue will be in the County of San Mateo.
[SIGNATURE PAGE FOLLOWS]
32 of 833
Contract for Services with SB854 Page 6 of 13
Rev. 4/26
IN WITNESS WHEREOF, CITY OF SAN MATEO and Coordinated Resources Inc (dba CRI) have executed this Agreement the day and year first above written.
CITY OF SAN MATEO VENDOR
Alex Khojikian
City Manager
Date Kristen McKenzie
Its Authorized Agent
President
Date
APPROVED AS TO FORM
Linh Nguyen
Assistant City Attorney
Date
CITY OF SAN MATEO
Attachments:
Exhibit A: Scope of Services
Exhibit B: Payment Rates
Exhibit C: Insurance Requirements
33 of 833
Contract for Services with SB854 Page 7 of 13
Rev. 4/26
EXHIBIT A
SCOPE OF SERVICES
34 of 833
Contract for Services with SB854 Page
8 of 13
Rev. 4/26
35 of 833
Contract for Services with SB854 Page
9 of 13
Rev. 4/26
36 of 833
Contract for Services with SB854 Page 10 of 13
Rev. 4/26
37 of 833
Contract for Services with SB854 Page 11 of 13
Rev. 4/26
EXHIBIT B
PAYMENT RATES
38 of 833
Contract for Services with SB854 Page 12 of 13
Rev. 4/26
EXHIBIT C
INSURANCE REQUIREMENTS
MINIMUM SCOPE OF INSURANCE
Coverage shall be at least as broad as:
1. Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 12 07 covering CGL on an “occurrence” basis, including products-completed operations, personal & advertising injury, with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.
2. Automobile Liability: ISO Form Number CA 00 01 covering any auto (Code 1), or if VENDOR has no owned autos, hired, (Code 8) and non-owned autos (Code 9), with limit no less than $1,000,000 per accident for bodily injury and property damage.
3. Workers’ Compensation: as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.
If the VENDOR maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the VENDOR.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status
The City, its elected and appointed officials, employees, volunteers, and agents are to be covered as insureds on the auto policy for liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the VENDOR; and on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the VENDOR including materials, parts or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the VENDOR’s insurance (at least as broad as ISO Form CG 20 10, 11 85 or both CG 20 10 and CG 20 37 forms if later revisions used).
Primary Coverage
For any claims related to this contract, the VENDOR’s insurance coverage shall be primary insurance as respects the City, its elected and appointed officials, employees, volunteers, and agents. Any insurance or self-insurance maintained by the City, its elected and appointed officials, employees, volunteers, or agents shall be excess of the VENDOR’s insurance and shall not contribute with it.
Notice of Cancellation
Each insurance policy required above shall provide that coverage shall not be canceled, except after thirty (30) days’ prior written notice (10 days for non-payment) has been given to the City.
Waiver of Subrogation
VENDOR hereby grants to City a waiver of any right to subrogation which any insurer of said VENDOR may acquire against the City by virtue of the payment of any loss under such insurance. VENDOR agrees to obtain any endorsement that may be necessary to effect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.
39 of 833
Contract for Services with SB854 Page 13 of 13
Rev. 4/26
Deductibles and Self-Insured Retentions
Any deductibles or self-insured retentions must be declared to and approved by the City. The City may require the VENDOR to purchase coverage with a lower deductible or retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention.
Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City.
Verification of Coverage
VENDOR shall furnish the City with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the VENDOR’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. 40 of 833
CITY OF SAN MATEO
RESOLUTION NO. ____ (2026)
APPROVING AN ALTERNATIVE PURCHASING PROCEDURE TO APPROVE AN AGREEMENT WITH ROSS MCDONALD COMPANY INC. TO FURNISH AND INSTALL SHELVING IN THE AMOUNT OF $238,652.85 WHEREAS, the Marina Branch Library located at 1530 Susan Court, San Mateo (“Library”) is a City-owned property; and
WHERAS, the existing shelves at the Library have exceeded their reasonable service life and have been demolished as part of the planned Marina Branch Public Library Restoration Project (“Project”) and cannot be reused; and
WHEREAS, to provide shelving for library use upon completion of the library renovation, staff proposes the purchase of a set of shelving and their associated materials to be furnished and installed with the Project; and
WHEREAS, The Interlocal Purchasing System (TIPS) is a purchasing cooperative, which operates as the lead agency to conduct competitive bidding for goods and services for use by public agencies; and WHEREAS, TIPS was utilized to receive pricing from Ross McDonald Co., Inc. (Ross McDonald), a preselected vendor; and WHERAS, San Mateo Municipal Code Section 3.60.030 generally requires competitive bidding for contracts of $100,000 or more; and
WHEREAS, San Mateo Municipal Code Section 3.60.070(h)(3) authorizes the City Council to approve an alternative purchasing procedure when it is in the best interest of the City; and WHERAS, the timely procurement and installation of the library shelving and their associated materials is critical to meet the schedule for the startup of the restored Library facility; and WHEREAS, TIPS offers services to make the government procurement process more efficient through its cooperative purchasing program; and
WHEREAS, TIPS has conducted competitive, public bids to select shelving vendors to achieve competitive pricing and selected Ross McDonald; and
WHEREAS, Ross McDonald will provide the shelving and their associated materials, design, project management and installation services; and
WHERAS based on the bid obtained from TIPS, staff recommends approval of the agreement with Ross McDonald because it is in the best interest of the City for the reasons set forth in this resolution.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN MATEO, CALIFORNIA, HEREBY RESOLVES that:
1. The purchase of Project shelving and their associated materials is not a project subject to CEQA, because it can be seen with certainty that there is no possibility that the purchase of shelving and their associated materials for the Marina Branch Library may have a significant effect on the environment (CEQA Guidelines Section 15061(b)(3).)
41 of 833
2. In accordance with Municipal Code 3.60.070(h)(3), the purchase of shelving and their associated materials for the Marina Branch Library Restoration Project from Ross McDonald based on pricing from TIPS is in the City’s best interest for these reasons:
a. TIPS has conducted competitive, public bids to select vendors for the listed shelving and their associates materials to achieve competitive pricing and selected Ross McDonald; and b. Timely procurement and installation of the furniture and their associated materials in the restored Library Facility is critical to meet the Project schedule.
3. The agreement with Ross McDonald Co., Inc. in an amount not to exceed $238,652.85 is approved.
4. A contingency amount of $25,000 is approved.
5. The Public Works Director is authorized to execute the agreement in substantially the form presented and issue amendments within the contingency reserve.
42 of 833
Contract for Services with SB854 Page 1 of 12
Rev. 4/26
AGREEMENT WITH ROSS MCDONALD COMPANY, INC
FOR
MARINA BRANCH PUBLIC LIBRARY RESTORATION PROJECT – SHELVING PACKAGE This Agreement, made and entered into this day of ____________________, by and between the CITY OF SAN MATEO, a municipal corporation existing under the laws of the State of California ("CITY"), and Ross McDonald Company, Inc., a corporation ("VENDOR"), whose address is 1154 Stealth Street, Livermore, CA 94551.
RECITALS:
A. CITY desires certain shelving and installation services hereinafter described.
B. CITY desires to engage VENDOR to provide these services by reason of its qualifications and experience for performing such services and VENDOR has offered to provide the required services on the terms and in the manner set forth herein.
NOW, THEREFORE, IT IS AGREED as follows:
SECTION 1 - SCOPE OF SERVICES
The scope of services to be performed by VENDOR under this Agreement is as described in Exhibit A to this Agreement, which is attached and incorporated by reference.
SECTION 2 - DUTIES OF VENDOR
VENDOR shall be responsible for the professional quality, technical accuracy and coordination of all work furnished by VENDOR under this Agreement. VENDOR shall, without additional compensation, correct or revise any errors or deficiencies in its work.
VENDOR represents that it is qualified to furnish the services described under this Agreement.
VENDOR shall be responsible for employing or engaging all persons necessary to perform the services of VENDOR.
VENDOR and his subcontractors shall comply with State’s Prevailing Wage Laws.
VENDOR agrees to comply with the City’s minimum wage ordinance as codified in Municipal Code Chapter 5.92, which differs from the state minimum wage and includes a Consumer Price Index escalator.
VENDOR or subcontractor shall not be qualified to bid on, be listed in a bid proposal, or engage in the performance of any contract for public work unless currently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. For the work performed for the City, the VENDOR and his subcontractors shall pay the workers at the prevailing wage rate as determined by the 43 of 833
Contract for Services with SB854 Page 2 of 12
Rev. 4/26
California Department of Industrial Relations, for this locality. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
SECTION 3 - DUTIES OF CITY
CITY shall provide pertinent information regarding its requirements for the project.
CITY shall examine documents submitted by VENDOR and shall render decisions pertaining thereto promptly, to avoid unreasonable delay in the progress of VENDOR's work.
SECTION 4 - TERM
The services to be performed under this Agreement shall commence on August 1, 2026 and be completed on February 28, 2027.
SECTION 5 - PAYMENT
Payment shall be made by CITY only for services rendered and upon submission of a payment request upon completion and CITY approval of the work performed. In consideration for the full performance of the services set forth in Exhibit A, CITY agrees to pay VENDOR in an amount of $238,652.85, a fee pursuant to rates stated in Exhibit B, attached and incorporated by reference.
SECTION 6 – TERMINATION
Without limitation to such rights or remedies as CITY shall otherwise have by law, CITY shall have the right to terminate this Agreement or suspend work on the Project for any reason, upon ten (10) days' written notice to VENDOR. VENDOR agrees to cease all work under this Agreement upon receipt of said written notice.
SECTION 7 - OWNERSHIP OF DOCUMENTS
All documents prepared by VENDOR in the performance of this Agreement are and shall be the property of CITY, whether the project for which they are made is executed or not.
SECTION 8 - CONFIDENTIALITY
All reports and documents prepared by VENDOR in connection with the performance of this Agreement are confidential until released by CITY to the public. VENDOR shall not make any such documents or information available to any individual or organization not employed by VENDOR or CITY without the written consent of CITY before any such release. 44 of 833
Contract for Services with SB854 Page 3 of 12
Rev. 4/26
SECTION 9 - INTEREST OF VENDOR
VENDOR covenants that it presently has no interest, and shall not acquire any interest, direct or indirect, financial or otherwise, which would conflict in any manner or degree with the performance of the services under this Agreement.
SECTION 10 - VENDOR'S STATUS
It is expressly agreed that in the performance of the services required under this Agreement, VENDOR shall at all times be considered an independent contractor as defined in Labor Code Section 3353, under control of the CITY as to the result of the work but not the means by which the result is accomplished. Nothing herein shall be construed to make VENDOR an agent or employee of CITY while providing services under this Agreement.
SECTION 11 - INDEMNITY
VENDOR agrees to hold harmless and indemnify CITY, its elected and appointed officials, employees, volunteers, and agents from and against any and all claims, loss, liability, damage, and expense arising out of VENDOR’s performance of this Agreement, except for those claims arising out of CITY’s sole negligence or willful misconduct. VENDOR agrees to defend City, its elected and appointed officials, employees, volunteers, and agents against any such claims. The VENDOR’S duty to indemnify shall survive expiration or early termination of this Agreement.
SECTION 12 - INSURANCE
VENDOR shall procure and maintain for the duration of the contract the insurance specified in Exhibit C to this Agreement.
SECTION 13 - NONASSIGNABILITY
Both parties hereto recognize that this Agreement is for the personal services of VENDOR and cannot be transferred, assigned, or subcontracted by VENDOR without the prior written consent of CITY.
SECTION 14 - RELIANCE UPON SKILL OF VENDOR
It is mutually understood and agreed by and between the parties hereto that VENDOR is skilled in the performance of the work agreed to be done under this Agreement and that CITY relies upon the skill of VENDOR to do and perform the work in the most skillful manner, and VENDOR agrees to thus perform the work. The acceptance of VENDOR's work by CITY does not operate as a release of VENDOR from said obligation.
45 of 833
Contract for Services with SB854 Page 4 of 12
Rev. 4/26
SECTION 15 - WAIVERS
The waiver by either party of any breach or violation of any term, covenant, or condition of this Agreement or of any provisions of any ordinance or law shall not be deemed to be a waiver of such term, covenant, condition, ordinance or law or of any subsequent breach or violation of the same or of any other term, condition, ordinance, or law. The subsequent acceptance by either party of any fee or other money which may become due hereunder shall not be deemed to be a waiver of any preceding breach or violation by the other party of any term, covenant, or condition of this Agreement or of any applicable law or ordinance.
SECTION 16 - COSTS AND ATTORNEY FEES
Attorney fees in total amount not exceeding $5000, shall be recoverable as costs (by the filing of a cost bill) by the prevailing party in any action or actions to enforce the provisions of this Agreement. The above $5000 limit is the total of attorney fees recoverable whether in the trial court, appellate court, or otherwise, and regardless of the number of attorneys, trials, appeals, or actions. It is the intent of this provision that neither party shall have to pay the other more than $5000 for attorney fees arising out of an action, or actions to enforce the provisions of this Agreement.
SECTION 17 - NON-DISCRIMINATION
VENDOR warrants that it is an Equal Opportunity Employer and shall comply with applicable regulations governing equal employment opportunity. Neither VENDOR nor any of its subcontractors shall discriminate in the employment of any person because of race, color, national origin, ancestry, physical handicap, medical condition, marital status, sex, or age, unless based upon a bona fide occupational qualification pursuant to the California Fair Employment and Housing Act.
SECTION 18 - MEDIATION
Should any dispute arise out of this Agreement, any party may request that it be submitted to mediation. The parties shall meet in mediation within 30 days of a request. The mediator shall be agreed to by the mediating parties; in the absence of an agreement, the parties shall each submit one name from mediators listed by either the American Arbitration Association, the State Mediation and Conciliation Service, or other agreed-upon service. The mediator shall be selected by a blind draw.
The cost of mediation shall be borne equally by the parties. Neither party shall be deemed the prevailing party. No party shall be permitted to file a legal action without first meeting in mediation and making a good faith attempt to reach a mediated settlement. The mediation process, once commenced by a meeting with the mediator, shall last until agreement is reached by the parties but not more than 60 days, unless the maximum time is extended by the parties. 46 of 833
Contract for Services with SB854 Page 5 of 12
Rev. 4/26
SECTION 19 - LITIGATION
VENDOR shall testify at CITY's request if litigation is brought against CITY in connection with VENDOR's services under this Agreement. Unless the action is brought by VENDOR, or is based upon VENDOR's wrongdoing, CITY shall compensate VENDOR for preparation for testimony, testimony, and travel at VENDOR's standard hourly rates at the time of actual testimony.
SECTION 20 - NOTICES
All notices hereunder shall be given in writing and mailed, postage prepaid, addressed as follows:
To CITY: Director of Public Works
City of San Mateo
330 West 20th Avenue
San Mateo, CA 94403
To VENDOR: Ross McDonald Company, Inc.
Attn: Garen McDonald
1154 Stealth Street
Livermore, CA 94551
SECTION 21 - AGREEMENT CONTAINS ALL
UNDERSTANDINGS; AMENDMENT
This document represents the entire and integrated agreement between CITY and VENDOR and supersedes all prior negotiations, representations, and agreements, either written or oral.
This document may be amended only by written instrument, signed by both CITY and VENDOR.
SECTION 22 - GOVERNING LAW AND VENUE
This Agreement shall be governed by the laws of the State of California and, in the event of litigation, venue will be in the County of San Mateo.
[SIGNATURE PAGE FOLLOWS]
47 of 833
Contract for Services with SB854 Page 6 of 12
Rev. 4/26
IN WITNESS WHEREOF, CITY OF SAN MATEO and Ross McDonald Company, Inc. have executed this Agreement the day and year first above written.
CITY OF SAN MATEO VENDOR
Alex Khojikian
City Manager
Date Garen McDonald
Its Authorized Agent
President
Date
APPROVED AS TO FORM
Linh Nguyen
Assistant City Attorney
Date
CITY OF SAN MATEO
Attachments:
Exhibit A: Scope of Services
Exhibit B: Payment Rates
Exhibit C: Insurance Requirements
48 of 833
Contract for Services with SB854 Page 7 of 12
Rev. 4/26
EXHIBIT A
SCOPE OF SERVICES
VENDOR shall furnish and install the items set forth herein:
49 of 833
Contract for Services with SB854 Page
8 of 12
Rev. 4/26
50 of 833
Contract for Services with SB854 Page
9 of 12
Rev. 4/26
51 of 833
Contract for Services with SB854 Page 10 of 12
Rev. 4/26
EXHIBIT B
PAYMENT RATES
52 of 833
Contract for Services with SB854 Page 11 of 12
Rev. 4/26
EXHIBIT C
INSURANCE REQUIREMENTS
MINIMUM SCOPE OF INSURANCE
Coverage shall be at least as broad as:
1. Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 12 07 covering CGL on an “occurrence” basis, including products-completed operations, personal & advertising injury, with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.
2. Automobile Liability: ISO Form Number CA 00 01 covering any auto (Code 1), or if VENDOR has no owned autos, hired, (Code 8) and non-owned autos (Code 9), with limit no less than $1,000,000 per accident for bodily injury and property damage.
3. Workers’ Compensation: as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.
If the VENDOR maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the VENDOR.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status
The City, its elected and appointed officials, employees, volunteers, and agents are to be covered as insureds on the auto policy for liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the VENDOR; and on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the VENDOR including materials, parts or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the VENDOR’s insurance (at least as broad as ISO Form CG 20 10, 11 85 or both CG 20 10 and CG 20 37 forms if later revisions used).
Primary Coverage
For any claims related to this contract, the VENDOR’s insurance coverage shall be primary insurance as respects the City, its elected and appointed officials, employees, volunteers, and agents. Any insurance or self-insurance maintained by the City, its elected and appointed officials, employees, volunteers, or agents shall be excess of the VENDOR’s insurance and shall not contribute with it.
Notice of Cancellation
Each insurance policy required above shall provide that coverage shall not be canceled, except after thirty (30) days’ prior written notice (10 days for non-payment) has been given to the City.
Waiver of Subrogation
VENDOR hereby grants to City a waiver of any right to subrogation which any insurer of said VENDOR may acquire against the City by virtue of the payment of any loss under such insurance. VENDOR agrees to obtain any endorsement that may be necessary to effect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.
53 of 833
Contract for Services with SB854 Page 12 of 12
Rev. 4/26
Deductibles and Self-Insured Retentions
Any deductibles or self-insured retentions must be declared to and approved by the City. The City may require the VENDOR to purchase coverage with a lower deductible or retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention.
Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City.
Verification of Coverage
VENDOR shall furnish the City with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the VENDOR’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. 54 of 833
CITY OF SAN MATEO
CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 5 Section Name: CONSENT CALENDAR Account Number: 26-4662 File ID: 26-11059 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: Public Works Department
MEETING DATE: July 20, 2026
SUBJECT:
Public Utility Easement Dedication Acceptance — Adoption RECOMMENDATION:
Adopt a Resolution to accept the grant of public utility easement dedication acceptance in private alley near property located at 31-57 S B St.; and authorize the City Manager to execute the easement dedication in substantially the form presented.
BACKGROUND:
On November 21, 2022, DTSM Donut Delite, LLC (herein referred to as the “Applicant”) submitted a planning application (PA-2022-089) with the Planning Division for a Site Plan and Architectural Review for construction of a new mixed-use building consisting of 41,190 square-feet of retail, commercial, and office uses located at 31-57 South B Street and a Vesting Tentative Map to merge four existing parcels into one (collectively referred to as “Project”) in the City of San Mateo. The planning application was entitled under Resolution No. 5 (2024) by the Planning Commission of the City of San Mateo at a regular meeting held on July 23, 2024.
The Project is currently in the process of obtaining building permits and recording of the Parcel Map. During the building permit review, the Applicant determined that the Project and adjacent properties would benefit from a Public Utility Easement Dedication within the private alley. The private alley is a tenant-in-common and all affected property owners will sign the easement dedication in substantial conformance with Attachment 1. The total easement to be dedicated contains approximately 4,299 square feet by extending 20 feet into the private alley adjacent to the Project property.
BUDGET IMPACT:
All staff costs associated with review and approval of this easement dedication is paid for by the Applicant through permit fees based on the current Master Fee Schedule.
ENVIRONMENTAL DETERMINATION:
The acceptance of this easement dedication is not a project for CEQA because it can be seen with certainty that it will not cause a physical change in the environment. (Public Resources Code 21065.) STRATEGIC PLAN ALIGNMENT:
This plan supports the Economic Development initiative.
NOTICE PROVIDED
All meeting noticing requirements were met.
55 of 833
CITY OF SAN MATEO
ATTACHMENTS
Att 1 – Proposed Resolution
STAFF CONTACT
John Thompson, Assistant Engineer
[email protected]
(650) 522 - 7577
56 of 833
CITY OF SAN MATEO
RESOLUTION NO. ____ (2026)
ACCEPTING THE PUBLIC UTILITY EASEMENT DEDICATION IN PRIVATE ALLEY NEAR PROPERTY LOCATED AT 31- 57 S B ST, SAN MATEO
WHEREAS, DTSM Donut Delite, LLC (herein referred to as the “Applicant”) on November 21, 2022, submitted planning application PA-2022-089 with the Planning Division for a Site Plan and Architectural Review for construction of a new mixed-use building consisting of 41,190 square-feet of retail/commercial and office uses located at 31-57 South B Street and a Vesting Tentative Map to merge four parcels into one (collectively referred to as “Project”) in the City of San Mateo; and WHEREAS, the planning application was entitled under Resolution No. 5 (2024) by the Planning Commission of the City of San Mateo, California, at a regular meeting held on July 23, 2024; and WHEREAS, the Project determined during the Building Permit review that a Public Utility Easement (PUE) is required to facilitate public utilities including, but not limited, to water, gas, sewer and drainage pipes, and/or underground wires and conduits for electrical, television, and telephone services and any and all atgrade appurtenances necessary thereto; and WHEREAS, the Applicant coordinated with adjacent property owners that share tenant-in-common with the private alley parcel in agreement of the PUE dedication; and WHEREAS, the total easement to be dedicated contains approximately 4,299 square feet, and will be
20.00 ft into the private alley adjacent to the Project property.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN MATEO, CALIFORNIA, HEREBY RESOLVES that:
1. The acceptance of this easement dedication is not a project for CEQA because it can be seen with certainty that it will not cause a physical change in the environment. (Public Resources Code 21065.)
2. The dedication of a Public Use Easement is accepted.
3. The City Manager is authorized to execute the dedication, in substantially the form attached hereto as Exhibit A.
57 of 833
Exhibit A
Grant of Public Utility Easement
58 of 833
RECORDING REQUESTED BY
AND WHEN RECORDED RETURN TO:
CITY OF SAN MATEO
Housing Division
330 W. 20th Avenue
San Mateo, CA 94403
APN(s): 034-154-030
Space Above This Line Reserved for Recorder’s Use Exempt from Recording Fee Per Government Code Section 27383 and 6103
GRANT OF PUBLIC UTILITY EASEMENT
The undersigned Grantor declares:
DOCUMENTARY TRANSFER TAX -$0-;
CITY TRANSFER TAX -$0-; and
SURVEY MONUMENT FEE -$0-,
[ ] computed on the consideration or full value of property conveyed, OR [ ] computed on the consideration or full value less value of liens and/or encumbrances remaining at time of sale,
[ ] unincorporated area;
[ X ] City of SAN MATEO, and
FOR GOOD AND VALUABLE CONSIDERATION, the receipt and sufficiency of which are hereby acknowledged, DTSM Donut Delite, LLC, a Delaware limited liability company, Izmirian Family Partners, LP, a California limited partnership, and Sylvia Shun-Yuan Chen and Henry Chen as Co-Trustees of the Cheng Kuang Chen Bypass Trust. hereby GRANTS to The City of San Mateo, a municipal corporation, Public purpose easements (“PUE”) across, under, and over that certain area of land described and shown on Exhibits “A” and “B” attached hereto (the “Easement Area”) and incorporated herein by reference, situated in the City of San Mateo, County of San Mateo, State of California for subsurface public utilities including but not limited to water, gas, sewer and drainage pipes, and/or underground wires and conduits for electrical, television, and telephone services and any and all at-grade appurtenances necessary thereto. [Signatures Follow on Next Page]
59 of 833
Dated: _____________________________, 2026
DTSM Donut Delite Venture, LLC,
a Delaware limited liability company
By:________________________________
Name:______________________________
Title:_______________________________
Dated: _____________________________, 2026
Izmirian Family Partners, LP,
a California limited partnership
By: Robert E. Izmirian, as Trustee of The Robert Edward Izmirian Trust u/a/d 9/7/04 Its: General Partner
By: __________________________
Name: Robert E. Izmirian
Its: Trustee
Dated: _____________________________, 2026
Sylvia Shun-Yuan Chen and Henry Chen as Co-Trustees of the Cheng Kuang Chen Bypass Trust,
By:________________________________
Name:______________________________
Title:_______________________________
By:________________________________
Name:______________________________
Title:_______________________________
60 of 833
CERTIFICATE OF ACCEPTANCE
This is to certify that the interest in real property conveyed by this Grant of Public Utility Easement dated __________, 2026, from Grantor to the City of San Mateo, a municipal corporation, is hereby accepted by order of its City Council’s Resolution No. _____, adopted _________________, 2026, and the City of San Mateo consents to the recordation thereof by its duly authorized officer.
CITY OF SAN MATEO,
a municipal corporation
APPROVED AS TO FORM,
a municipal corporation
Alex Khojikian, City Manager Mazarin Vakharia, Assistant City Attorney Date: ____________________, 2026
[Signature shall be notarized]
Date: ____________________, 2026
61 of 833
EXHIBIT “A”
LEGAL DESCRIPTION OF PROPERTY
62 of 833
EXHIBIT “B”
PLAT MAP
63 of 833
CITY OF SAN MATEO
CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 6 Section Name: CONSENT CALENDAR Account Number: 72-4674 File ID: 26-11253 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: Public Works Department
MEETING DATE: July 20, 2026
SUBJECT:
Collection System Construction Management Services for the Clean Water Program – Amendments RECOMMENDATION:
Approve Amendments No. 4 to professional service agreements with Tanner Pacific, Inc. and Townsend Management, Inc. to continue providing as-needed construction management services for the Clean Water Program’s Wastewater Treatment Plant and Collection System Rehabilitation projects to extend the term of each agreement through January 1, 2028; increase the agreement with Tanner Pacific, Inc. by $350,000 for a new total agreement amount not to exceed $6,350,000 and authorize the Public Works Director to execute the amendments in substantially the form presented and approve future amendments within the approved updated budget.
BACKGROUND:
The Clean Water Program (CWP) includes improvements to wastewater system capacity, flow management, and inflow and infiltration reduction to comply with regulatory requirements. Construction management services provide as-needed support for the remainder of the CWP Wastewater Treatment Plant (WWTP) and collection system improvement projects, which include improvements to various WWTP process facilities, new capacity relief sewers, sewer rehabilitations/repairs, and lift station improvements.
On June 21, 2021, City Council approved agreements with Tanner Pacific, Inc. (Tanner Pacific) and Townsend Management, Inc. (Townsend Management) to provide as-needed construction management services for various CWP collection system projects under the CWP. Each agreement was approved for an amount not to exceed $3,000,000 with a term of three years.
On August 15, 2022, City Council approved amendments (Amendment No. 1) to both Tanner Pacific and Townsend Management agreements to include construction management services for WWTP projects, with no additional cost to the original agreement amounts, and to extend the term of the agreements from three years to five years to July 2026.
On June 20, 2023, City Council approved amendments (Amendment No. 2) to both Tanner Pacific and Townsend Management agreements to increase each agreement amount by $2,000,000 for a revised total agreement amount of $5,000,000 for each agreement.
On April 21, 2025, City Council approved amendments (Amendment No. 3) to both Tanner Pacific and Townsend Management agreements to increase each agreement amount by $1,000,000 for a revised total agreement amount of $6,000,000 for each agreement and to extend both agreements through January 1, 2027.
Amending the construction management services agreement for Tanner Pacific to increase the agreement amount and extend the agreement timeline, and amending the construction management services agreement for Townsend 64 of 833
CITY OF SAN MATEO
Management to extend the agreement timeline will allow for the full inclusion of the CWP’s remaining WWTP and collection system projects. Based on current project estimates, Townsend Management should be able to conclude its projects without increasing the agreement amount. Please see Attachment 3 for cost estimates.
Amendments No. 4 will be the final amendment to the existing Tanner Pacific and Townsend Management construction management services agreements. To support future construction management needs beyond the completion of the current CWP work, the City intends to issue a new Request for Qualifications for as-needed construction management services.
Based on the above, staff recommends approval of each Amendment No. 4 to extend the agreements with Tanner Pacific and Townsend Management through the anticipated January 1, 2028, completion of the CWP’s planned construction and project closeouts, and to increase Tanner Pacific’s agreement amount by $350,000 for a new total agreement amount of $6,350,000.
BUDGET IMPACT:
There are sufficient funds in the various Clean Water Program projects available to fund these amendments.
ENVIRONMENTAL DETERMINATION:
The City prepared a Final Programmatic Environmental Impact Report (Final PEIR) in accordance with the California Environmental Quality Act (CEQA) (SCH No. 2015032006). The PEIR was certified by Council on June 6, 2016. In accordance with CEQA, the Final PEIR serves as the primary environmental compliance document for implementation of the Clean Water Program. The City prepared Addenda to the Final PEIR that were approved on July 16, 2018 (Addendum 1) and April 15, 2019 (Addendum 2). This work is within the scope of the project evaluated in the PEIR and Addendum.
STRATEGIC PLAN ALIGNMENT
This staff report supports the Infrastructure initiative.
NOTICE PROVIDED
All meeting noticing requirements were met.
ATTACHMENTS
Att 1 – Amendment No. 4 - Tanner Pacific
Att 2 – Amendment No. 4 - Townsend Management
Att 3 – Construction Management Services Current Cost Estimates
STAFF CONTACT
Laura Webb, Senior Engineer
[email protected]
(650) 522-7322
Thomas Williams, Engineering Manager
[email protected]
(650) 522-7307
65 of 833
AMENDMENT NO. 4 TO THE AGREEMENT
BETWEEN THE CITY OF SAN MATEO AND TANNER PACIFIC, INC.
FOR CLEAN WATER PROGRAM COLLECTION SYSTEM CONSTRUCTION MANAGEMENT
SERVICES
($3,000,000 [Original Amount], $0 [Amendment No. 1], $2,000,000 [Amendment No. 2], $1,000,000 [Amendment No. 3], $350,000 [Amendment No. 4]) This Amendment is made and entered into this day of _____________ by and between the CITY OF SAN MATEO, a municipal corporation existing under the laws of the State of California ("CITY"), and TANNER PACIFIC, INC. ("CONSULTANT").
WHEREAS, the CITY and “CONSULTANT” entered into an Agreement for CLEAN WATER PROGRAM COLLECTION SYSTEM CONSTRUCTION MANAGEMENT SERVICES (“Agreement”) on July 1, 2021; and
WHEREAS, on September 13, 2022, the CITY and CONSULTANT executed Amendment No. 1, expanding the scope of the Agreement and the term of the Agreement by two years, for a total Agreement timeline of five years; and
WHEREAS, on July 17, 2023, the CITY and CONSULTANT executed Amendment No. 2, increasing the Agreement by $2,000,000, for a total Agreement in the amount of $5,000,000; and
WHEREAS, on May 23, 2025, the CITY and CONSULTANT executed Amendment No. 3, extending the term of the Agreement to January 1, 2027, and increasing the Agreement by $1,000,000, for a total Agreement in the amount of $6,000,000; and WHEREAS, CITY and CONSULTANT, wish to amend the Agreement to extend the term of the Agreement and to increase the Agreement amount by $350,000, for a total Agreement amount of $6,350,000.
NOW, THEREFORE, the parties agree as follows:
1. Section 7 – “Term, Progress, and Completion” of the Agreement is amended as follows:
“This Agreement shall be valid until January 1, 2028.
It is understood and agreed that time is of the essence of this Agreement.
CITY agrees to exercise due diligence in performing its tasks to implement the CONSULTANT’S timetable.”
66 of 833
2. The first paragraph of Section 8—“Payment” of the Agreement is amended as follows:
“Payment shall be made by the CITY only for services rendered and upon submission of a payment request upon completion and CITY approval of the work performed. In consideration for full performances of the services and any reimbursable expenses set forth in this Agreement, CITY agrees to pay CONSULTANT a fee based on verified time and materials not to exceed $6,350,000. Requests for payments shall be itemized and correspond to the various items of work described in Exhibit A and shall be based on the rate and cost schedule set forth in Exhibit B.”
3. The remaining terms of the Agreement remain in full force and effect.
IN WITNESS WHEREOF, CITY OF SAN MATEO and TANNER PACIFIC, INC. have executed this Amendment No. 4 on ____________________.
CITY OF SAN MATEO CONSULTANT
Tanner Pacific, Inc.
____________________________ ___________________________________ Matt Fabry Date William Tanner Date
Public Works Director President
APPROVED AS TO FORM
___________________________
Linh P. Nguyen Date
Assistant City Attorney
67 of 833
AMENDMENT NO. 4 TO THE AGREEMENT
BETWEEN THE CITY OF SAN MATEO AND
TOWNSEND MANAGEMENT, INC.
FOR CLEAN WATER PROGRAM COLLECTION SYSTEM
CONSTRUCTION MANAGEMENT SERVICES
($3,000,000 [Original Amount], $0 [Amendment No. 1], $2,000,000 [Amendment No. 2], $1,000,000 [Amendment No. 3], $0 [Amendment No. 4])
This Amendment is made and entered into this day of _____________ by and between the CITY OF SAN MATEO, a municipal corporation existing under the laws of the State of California ("CITY"), and TOWNSEND MANAGEMENT, INC. ("CONSULTANT").
WHEREAS, the CITY and CONSULTANT entered into an Agreement for CLEAN WATER PROGRAM COLLECTION SYSTEM CONSTRUCTION MANAGEMENT SERVICES (“Agreement”) on July 9, 2021; and
WHEREAS, on September 13, 2022, the CITY and CONSULTANT executed Amendment No. 1, extending the scope of the Agreement and the term of the Agreement by two years, for a total Agreement timeline of five years; and
WHEREAS, on July 10, 2023, the CITY and CONSULTANT executed Amendment No. 2, increasing the Agreement by $2,000,000, for a total Agreement in the amount of $5,000,000; and
WHEREAS, on May 23, 2025, the CITY and CONSULTANT executed Amendment No. 3, extending the term of the Agreement to January 1, 2027, and increasing the Agreement by $1,000,000, for a total Agreement in the amount of $6,000,000; and WHEREAS, CITY and CONSULTANT wish to amend the Agreement to extend the term of the Agreement.
NOW, THEREFORE, the parties agree as follows:
1. Section 7 – “Term, Progress, and Completion” of the Agreement is amended as follows:
“This Agreement shall be valid until January 1, 2028.
It is understood and agreed that time is of the essence of this Agreement.
CITY agrees to exercise due diligence in performing its tasks to implement the CONSULTANT’S timetable.”
2. The remaining terms of the Agreement remain in full force and effect. 68 of 833
[SIGNATURES ON THE FOLLOWING PAGE]
IN WITNESS WHEREOF, CITY OF SAN MATEO and TOWNSEND MANAGEMENT, INC. have executed this Amendment No. 4 on __________________.
CITY OF SAN MATEO CONSULTANT
Townsend Management, Inc.
____________________________ ___________________________________ Matt Fabry Date Zamir Zuraek Date
Public Works Director President
APPROVED AS TO FORM
___________________________
Linh P. Nguyen Date
Assistant City Attorney
69 of 833
Tanner Pacific Contract Award: June 21, 2022
Approved End Date (per Amendment No.3): January 1, 2027 Description Amount
Original Agreement: $3,000,000
Amendment No. 1: $0
Amendment No. 2: $2,000,000
Approved Task Order 1 (Basin A): -$940,070
Approved Task Order 2 (IAP 3): -$1,433,124
Approved Task Order 3 (Basin A Add'l) -$394,590
Approved Task Order 4 (WWTP Digester Pumps) -$181,781
Approved Task Order 5 (Basin C): -$632,210
Approved Task Order 6 (IAP 3 Add'l) -$671,605
Amendment No. 3: $1,000,000
Task Order 7 (Digester Transfer Pump Impts Add'l) -$64,528 Task Order 8 (3 Wat Pump Ferric Chlo Constructability) -$8,346 Task Order 9 (MCC Replacement Constructability) -$8,765 Task Order 10 (IAP 3 add'l No. 2) -$679,756
Task Order 11 (3-Water pumping and Ferric Chloride) -$424,473 Task Order 12 (Basin C add'l) -$142,498
Available Funds: $418,254
Future Task Orders to be Added Amount
Biogas and Biosolids Evalulation: Digester 1 Cleaning $155,250 Polymer Injection System $97,750
MCC Replacement - Constructability Review $10,080
IAP3 Extension $480,976
Total Future Task Orders: $744,056
Total Funds Needed Amount
Current Available Funds $418,254
Total Future Task Orders $744,056
Additonal Funds Needed for Amendment No. 4: $325,802
Recommended Additional Funding Request (Rounded): $350,000 AƩ 3 – ConstrucƟon Management Services Current Cost EsƟmates 70 of 833
Townsend Management Incorporated Contract Award: June 21, 2022 Approved End Date (per Amendment No.3): January 1, 2027 Description Amount
Original Agreement: $3,000,000
Amendment No. 1: $0
Amendment No. 2: $2,000,000
Approved Task Order 1 (Delaware): -$655,844
Approved Task Order 2a (ECR Constructability Review): -$10,703 Approved Task Order 2b (Basin E): -$525,793
Approved Task Order 3 (EC Relief): -$830,429
Approved Task Order 4 (Basin B): -$496,564
Approved Task Order 5 (ECR Constructability Review 2): -$18,926 Approved Task Order 6 (Lift Stations): -$1,238,760
Amendment No. 3: $1,000,000
Task Order 7 (Basin B Closeout): -$59,982
Available Funds: $2,162,999
Future Task Orders to be Added Amount
Basin D $865,000
El Camino Real & Large Diameter $280,000
Total Future Task Orders: $1,145,000
Total Funds Needed Amount
Current Available Funds $2,162,999
Total Future Task Orders $1,145,000
Total Predicted Amount Remaining upon Contract Completion: $1,017,999 Att 3 – Construction Management Services Current Cost Estimates 71 of 833
CITY OF SAN MATEO
CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 7 Section Name: CONSENT CALENDAR Account Number: 10-3133 File ID: 26-11330 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: Community Development Department
MEETING DATE: July 20, 2026
SUBJECT:
Emergency Rental Assistance Program — Approval
RECOMMENDATION:
Approve an agreement with Samaritan House to continue administration of the Emergency Rental Assistance Program in the amount of $220,000 for Fiscal Year 2026-27 and approve updated Program Guidelines; authorize the City Manager to execute the agreement in substantially the form presented.
BACKGROUND:
On July 28, 2025, the City Council approved an Emergency Rental Assistance Program (ERAP) to address growing eviction rates in San Mateo. In a 2025 study on eviction rates conducted by the Mills Legal Center at Stanford, non-payment of rent was the most common cause for evictions in San Mateo County. Samaritan House was selected as the administrator of the program because of their role as a Core Service Agency in the County of San Mateo and their experience administrating rental assistance programs.
The ERAP was funded with $168,000 in Housing Successor Funds for the contract term of August 1, 2025 to July 31, 2026.
The program’s budget allocated $150,000 for assistance payments and $18,000 for administrative expenses. Each approved household can receive up to $4,000 in assistance within the contract term. Financial assistance may cover rent, security deposits, and utility payments.
The need for emergency rental assistance programs is still prevalent among low-income tenants in San Mateo. This program has successfully prevented 66 low-income households from being evicted, with $128,407 of the funds disbursed by the third quarter of the 2025-26 program year. According to Samaritan House reporting, the most common reasons for households applying for assistance are loss of employment and illness. It is anticipated that by the end of the agreement term, July 31, 2026, all 2025-26 ERAP funds will have been expended.
Samaritan House has consistently leveraged ERAP funds with other funding sources to maximize the number of households served and maintain the program throughout the year. Of the $232,400 in total funds that were provided to San Mateo residents in the form of emergency rental assistance in the third quarter of this program year (February 1, 2026, to April 30, 2026), approximately 31% of that, or $71,948, was from the City’s ERAP funding. However, this still fell short of the total amount requested during this period by 20% as San Mateo residents requested a total of $290,235 from Samaritan House for rental assistance in this period.
Due to the increasing need for financial assistance, and in alignment with earlier City Council direction, staff recommends increasing the ERAP budget to $220,000, with an annual goal to serve at least 60 households, and to continue with Samaritan House as the ERAP Program Administrator. The 2026-27 ERAP Agreement (Attachment 1) includes the updated term, annual goal for households served, and budget. The ERAP utilizes the San Mateo County Income Limits (as published 72 of 833
CITY OF SAN MATEO
by the California Department of Housing and Community Development) to identify the 60% area median income (AMI) thresholds as part of the eligibility requirements. Since these limits are updated annually, this Agreement includes the updated (2026) income limits. The Emergency Rental Assistance Program Guidelines (Attachment 2) were originally approved by City Council on June 28, 2025, when the program was established. Staff recommends updating the Program Guidelines (Attachment 2) to reflect the 2026-27 program budget and 2026 income limits to remain consistent with the ERAP Agreement (Attachment 1).
BUDGET IMPACT:
The Housing Successor Fund, also known as the Low and Moderate Income Asset Fund (F255), is again proposed as the funding source for the ERAP budget, with an amount of $220,000. Fund 255 has a current fund balance of $5,448,000 and saw annual revenue of approximately $454,000 in FY 2025-26. With funding from Fund 255, the program will not have an impact on the City’s General Fund. Funding for the ERAP was included in City’s adopted 2026-28 Operating Budget, so a separate budget appropriation is not necessary.
Health and Safety Code Section 34176.1(a)(2)(A) allows up to $500,000 of Housing Successor Funds per fiscal year, plus any percentage change in the cost of living, for homeless prevention and rapid rehousing services for individuals and families who are homeless or would be homeless but for this assistance. These funds may be used for short-term or medium-term rental assistance, contributions toward the construction of local or regional homeless shelters, housing relocation and stabilization services including housing search, mediation, or outreach to property owners, credit repair, security or utility deposits, utility payments, rental assistance for a final month at a location, moving cost assistance, and case management, or other appropriate activities for homelessness prevention and rapid rehousing of persons who have become homeless.
Emergency Rental Assistance Program Budget for 2026-27
Line Item Housing Successor Funds (F255)
Administration $20,000
Rental Assistance $200,000
Total: $220,000
ENVIRONMENTAL DETERMINATION:
This agreement is not a project subject to CEQA, because it can be seen with certainty that it will not cause a physical change in the environment (Public Resources Code Section 21065).
STRATEGIC PLAN ALIGNMENT:
This staff report supports the Housing initiative.
NOTICE PROVIDED:
All meeting noticing requirements were met.
ATTACHMENTS
Att 1 – Emergency Rental Assistance Program 2026-27 Agreement Att 2 – Updated Emergency Rental Assistance Program Guidelines
STAFF CONTACT
Jennifer Mora, Housing Specialist I
[email protected]
(650) 522-7230
73 of 833
Contract for Services Page 1 of 11
Rev 12/22
AGREEMENT WITH SAMARITAN HOUSE
FOR COMMNUNITY SERVICES
FOR
EMERGENCY RENTAL ASSISTANCE PROGRAM
This Agreement, made and entered into this day of____________________, by and between the CITY OF SAN MATEO, a municipal corporation existing under the laws of the State of California ("CITY"), and SAMARITAN HOUSE, a California nonprofit organization ("ORANIZATION"), whose address is 4031 Pacific Boulevard, San Mateo, CA 94403.
RECITALS:
A. CITY desires certain Emergency Rental Assistance services hereinafter described.
B. CITY desires to engage ORGANIZATION to provide these Emergency Rental Assistance services by reason of its qualifications and experience for performing such services and ORGANIZATION has offered to provide the required services on the terms and in the manner set forth herein.
NOW, THEREFORE, IT IS AGREED as follows:
SECTION 1 - SCOPE OF SERVICES
.
The scope of services to be performed by ORGANIZATION under this Agreement is as described in Exhibit A to this Agreement, which is attached and incorporated by reference.
SECTION 2 - DUTIES OF ORGANIZATION
ORGANIZATION shall be responsible for the professional quality, technical accuracy and coordination of all work furnished by ORGANIZATION under this Agreement. ORGANIZATION shall, without additional compensation, correct or revise any errors or deficiencies in its work.
ORGANIZATION represents that it is qualified to furnish the services described under this Agreement.
ORGANIZATION shall be responsible for employing or engaging all persons necessary to perform the services of ORGANIZATION.
ORGANIZATION agrees to comply with the City’s minimum wage ordinance as codified in Municipal Code Chapter 5.92, which differs from the state minimum wage and includes a Consumer Price Index escalator.
74 of 833
Contract for Services Page 2 of 11
Rev 12/22
SECTION 3 - DUTIES OF CITY
CITY shall provide pertinent information regarding its requirements for the project.
CITY shall examine documents submitted by ORGANIZATION and shall render decisions pertaining thereto promptly, to avoid unreasonable delay in the progress of ORGANIZATION'S work.
SECTION 4 - TERM
The services to be performed under this Agreement shall commence on August 1, 2026 and be completed on July 31, 2027.
SECTION 5 - PAYMENT
Payment shall be made by CITY only for services rendered and upon submission of a payment request upon completion and CITY approval of the work performed. In consideration for the full performance of the services set forth in Exhibit A, CITY agrees to pay ORGANIZATION a fee in an amount of $220,000, pursuant to rates stated in Exhibit B, attached and incorporated by reference.
SECTION 6 - TERMINATION
Without limitation to such rights or remedies as CITY shall otherwise have by law, CITY shall have the right to terminate this Agreement or suspend work on the Project for any reason, upon ten (10) days' written notice to ORGANIZATION. ORGANIZATION agrees to cease all work under this Agreement upon receipt of said written notice.
SECTION 7 - OWNERSHIP OF DOCUMENTS
All documents prepared by ORGANIZATION in the performance of this Agreement are and shall be the property of CITY, whether the project for which they are made is executed or not.
SECTION 8 - CONFIDENTIALITY
All reports and documents prepared by ORGANIZATION in connection with the performance of this Agreement are confidential until released by CITY to the public. ORGANIZATION shall not make any such documents or information available to any individual or organization not employed by ORGANIZATION or CITY without the written consent of CITY before any such release.
SECTION 9 - INTEREST OF ORGANIZATION
ORGANIZATION covenants that it presently has no interest, and shall not acquire any interest, direct or indirect, financial or otherwise, which would conflict in any manner or degree with the performance of the services under this Agreement.
75 of 833
Contract for Services Page 3 of 11
Rev 12/22
SECTION 10 - ORGANIZATION'S STATUS
It is expressly agreed that in the performance of the services required under this Agreement, ORGANIZATION shall at all times be considered an independent ORGANIZATION as defined in Labor Code Section 3353, under control of the CITY as to the result of the work but not the means by which the result is accomplished. Nothing herein shall be construed to make ORGANIZATION an agent or employee of CITY while providing services under this Agreement.
SECTION 11 - INDEMNITY
ORGANIZATION agrees to hold harmless and indemnify CITY, its elected and appointed officials, employees, and agents from and against any and all claims, loss, liability, damage, and expense arising out of ORGANIZATION’s performance of this Agreement, except for those claims arising out of CITY’s sole negligence or willful misconduct. ORGANIZATION agrees to defend City, its elected and appointed officials, employees, and agents against any such claims. The ORGANIZATION’S duty to indemnify shall survive expiration or early termination of this Agreement.
SECTION 12 - INSURANCE
ORGANIZATION shall procure and maintain for the duration of the contract the insurance specified in Exhibit C to this Agreement.
SECTION 13 - NONASSIGNABILITY
Both parties hereto recognize that this Agreement is for the personal services of ORGANIZATION and cannot be transferred, assigned, or subcontracted by ORGANIZATION without the prior written consent of CITY.
SECTION 14 - RELIANCE UPON SKILL OF ORGANIZATION
It is mutually understood and agreed by and between the parties hereto that ORGANIZATION is skilled in the performance of the work agreed to be done under this Agreement and that CITY relies upon the skill of ORGANIZATION to do and perform the work in the most skillful manner, and ORGANIZATION agrees to thus perform the work. The acceptance of ORGANIZATION's work by CITY does not operate as a release of ORGANIZATION from said obligation. 76 of 833
Contract for Services Page 4 of 11
Rev 12/22
SECTION 15 - WAIVERS
The waiver by either party of any breach or violation of any term, covenant, or condition of this Agreement or of any provisions of any ordinance or law shall not be deemed to be a waiver of such term, covenant, condition, ordinance or law or of any subsequent breach or violation of the same or of any other term, condition, ordinance, or law. The subsequent acceptance by either party of any fee or other money which may become due hereunder shall not be deemed to be a waiver of any preceding breach or violation by the other party of any term, covenant, or condition of this Agreement or of any applicable law or ordinance.
SECTION 16 - COSTS AND ATTORNEY FEES
Attorney fees in total amount not exceeding $5000, shall be recoverable as costs (by the filing of a cost bill) by the prevailing party in any action or actions to enforce the provisions of this Agreement. The above $5000 limit is the total of attorney fees recoverable whether in the trial court, appellate court, or otherwise, and regardless of the number of attorneys, trials, appeals, or actions. It is the intent of this provision that neither party shall have to pay the other more than $5000 for attorney fees arising out of an action, or actions to enforce the provisions of this Agreement.
SECTION 17 - NON-DISCRIMINATION
ORGANIZATION warrants that it is an Equal Opportunity Employer and shall comply with applicable regulations governing equal employment opportunity. Neither ORGANIZATION nor any of its sub-ORGANIZATIONS shall discriminate in the employment of any person because of race, color, national origin, ancestry, physical handicap, medical condition, marital status, sex, or age, unless based upon a bona fide occupational qualification pursuant to the California Fair Employment and Housing Act.
SECTION 18 - MEDIATION
Should any dispute arise out of this Agreement, any party may request that it be submitted to mediation. The parties shall meet in mediation within 30 days of a request. The mediator shall be agreed to by the mediating parties; in the absence of an agreement, the parties shall each submit one name from mediators listed by either the American Arbitration Association, the State Mediation and Conciliation Service, or other agreed-upon service. The mediator shall be selected by a blind draw.
The cost of mediation shall be borne equally by the parties. Neither party shall be deemed the prevailing party. No party shall be permitted to file a legal action without first meeting in mediation and making a good faith attempt to reach a mediated settlement. The mediation process, once commenced by a meeting with the mediator, shall last until agreement is reached by the parties but not more than 60 days, unless the maximum time is extended by the parties. 77 of 833
Contract for Services Page 5 of 11
Rev 12/22
SECTION 19 - LITIGATION
ORGANIZATION shall testify at CITY's request if litigation is brought against CITY in connection with ORGANIZATION's services under this Agreement. Unless the action is brought by ORGANIZATION, or is based upon ORGANIZATION's wrongdoing, CITY shall compensate ORGANIZATION for preparation for testimony, testimony, and travel at ORGANIZATION's standard hourly rates at the time of actual testimony.
SECTION 20 - NOTICES
All notices hereunder shall be given in writing and mailed, postage prepaid, addressed as follows:
To CITY: Alex Khojikian
City Manager
City of San Mateo
330 West 20th Avenue
San Mateo, CA 94403
To ORGANIZATION: Samaritan House
Attn: Laura Bent, Chief Executive
Officer
4301 Pacific Boulevard
San Mateo, CA 94403
SECTION 21 - AGREEMENT CONTAINS ALL
UNDERSTANDINGS; AMENDMENT
This document represents the entire and integrated agreement between CITY and ORGANIZATION and supersedes all prior negotiations, representations, and agreements, either written or oral.
This document may be amended only by written instrument, signed by both CITY and ORGANIZATION.
SECTION 22 - GOVERNING LAW AND VENUE
This Agreement shall be governed by the laws of the State of California and, in the event of litigation, venue will be in the County of San Mateo.
[SIGNATURE PAGE FOLLOWS]
78 of 833
Contract for Services Page 6 of 11
Rev 12/22
IN WITNESS WHEREOF, CITY OF SAN MATEO and SAMARITAN HOUSE have executed this Agreement the day and year first above written.
CITY OF SAN MATEO SAMARITAN HOUSE
Alex Khojikian
City Manager
Date Laura Bent
Chief Executive Officer
Date
APPROVED AS TO FORM
Mazarin Vakharia
Assistant City Attorney
Date
Attachments:
Exhibit A: Scope of Services
Exhibit B: Agreement Budget
Exhibit C: Insurance Requirements
79 of 833
Contract for Services Page 7 of 11
Rev 12/22
EXHIBIT A
SCOPE OF SERVICES
1. PROJECT SUMMARY: Provide emergency financial assistance in the form of rent, security deposit, and/or utility payments to individuals and families to stabilize their housing and prevent displacement. This will be accomplished by assessing client eligibility according to the City’s Emergency Rental Assistance Program guidelines. Upon approval, rent payments will be disbursed directly to vendors (i.e. landlords, owners, property managers, etc.). Samaritan House will serve 60 households in the City of San Mateo this program year (2026-2027).
2. TIMELINE: Samaritan House’s Emergency Rental Assistance program is a continuing program.
Therefore, we do not foresee any obstacles to implementing our project workplan as described, fully achieving our projected goals, and fully expending our contracted funds by the end of the fiscal year ending July 31, 2027.
3. RECIPIENT ELIGIBILITY: Households who receive rental assistance shall be residents of the City of San Mateo and are at-risk of displacement. Their income shall not exceed the 2026 60% AMI of the San Mateo County Income Guidelines, as updated from time to time (Attachment 1).
4. DETERMINATION OF ASSISTANCE AMOUNT: Samaritan House will use its standard procedures for determining the amount of rental assistance for each household. In no event shall the total assistance to a household exceed $4,000 per fiscal year.
5. INCOME VERIFICATION: Each client who arrives at Samaritan House must be screened for income eligibility prior to receiving services. Each client has an intake session in which they fill out the intake questionnaire packet with an Intake Coordinator. The packet includes screening forms, which gather information on demographics, household information, income and expenses, history of program utilization, and other relevant information. Supporting documentation is required to support eligibility and verify income including pay stubs, bank statements, lease agreements, benefit letters and other documents as appropriate as stated in the program’s guidelines. Other verification (i.e. direct staff contact with landlord) may be required. This third-party documentation and/or client signatures on certification forms are always available on file for review.
6. DUPLICATION OF BENEFITS: Samaritan House will check that the applicant is not receiving duplicative benefits to cover rental costs. To ensure that there is no duplication of benefits, applicants must inform Samaritan House about additional financial assistance or applications to other rental assistance programs. Receiving financial aid does not disqualify the applicant from receiving emergency rental assistance but must be noted in their application. Samaritan House will also ensure that the applicant is not receiving rental assistance through another source of funding through their existing rental assistance program.
80 of 833
Contract for Services Page 8 of 11
Rev 12/22
EXHIBIT A ATTACHMENT 1
60% AMI – 2026 SAN MATEO COUNTY INCOME GUIDELINES
Size of Family or Number
in Household
Monthly Gross Income Annual Gross Income
1 $7,355 $88,260
2 $8,405 $100,860
3 $9,455 $113,460
4 $10,505 $126,060
5 $11,350 $136,200
6 $12,190 $146,280
7 $13,030 $156,360
8 $13,870 $166,440
81 of 833
Contract for Services Page 9 of 11
Rev 12/22
EXHIBIT B
AGREEMENT BUDGET
Budget Line Item San Mateo Program Total
Labor
Case Manager $8,065 $8,065
Case Manager $8,065 $8,065
Taxes/Benefits $3,870 $3,870
Rental Assistance $200,000 $200,000
TOTAL $220,000 $220,000
82 of 833
Contract for Services Page 10 of 11
Rev 12/22
EXHIBIT C
INSURANCE REQUIREMENTS
MINIMUM SCOPE OF INSURANCE
Coverage shall be at least as broad as:
1. Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 12 07 covering CGL on an “occurrence” basis, including products-completed operations, personal & advertising injury, with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.
2. Automobile Liability: ISO Form Number CA 00 01 covering any auto (Code 1), or if ORGANIZATION has no owned autos, hired, (Code 8) and non-owned autos (Code 9), with limit no less than $1,000,000 per accident for bodily injury and property damage.
3. Workers’ Compensation: as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.
If the ORGANIZATION maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the ORGANIZATION.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status
The City, its elected and appointed officials, employees, and agents are to be covered as insureds on the auto policy for liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the ORGANIZATION; and on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the ORGANIZATION including materials, parts or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the ORGANIZATION’s insurance (at least as broad as ISO Form CG 20 10, 11 85 or both CG 20 10 and CG 20 37 forms if later revisions used).
Primary Coverage
For any claims related to this contract, the ORGANIZATION’s insurance coverage shall be primary insurance as respects the City, its elected and appointed officials, employees, and agents. Any insurance or self-insurance maintained by the City, its elected and appointed officials, employees, or agents shall be excess of the ORGANIZATION’s insurance and shall not contribute with it.
Notice of Cancellation
Each insurance policy required above shall provide that coverage shall not be canceled, except after thirty (30) days’ prior written notice (10 days for non-payment) has been given to the City. 83 of 833
Contract for Services Page 11 of 11
Rev 12/22
Waiver of Subrogation
ORGANIZATION hereby grants to City a waiver of any right to subrogation which any insurer of said ORGANIZATION may acquire against the City by virtue of the payment of any loss under such insurance. ORGANIZATION agrees to obtain any endorsement that may be necessary to effect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.
Deductibles and Self-Insured Retentions
Any deductibles or self-insured retentions must be declared to and approved by the City. The City may require the ORGANIZATION to purchase coverage with a lower deductible or retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention.
Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City.
Verification of Coverage
ORGANIZATION shall furnish the City with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the ORGANIZATION’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. 84 of 833
City of San Mateo
Emergency Rental Assistance (ERA) Program
Adopted July 28, 2025
Updated July 20, 2026
85 of 833
1 Contents
Introduction .......................................................................................................................2 Housing Element .............................................................................................................2 Metropolitan Transportation Commission – Transit Oriented Communities (TOC) Grant........2 Funding ..........................................................................................................................3 Samaritan House .............................................................................................................5 Purpose of These Guidelines.............................................................................................6 Contact Information ........................................................................................................6 Application .........................................................................................................................7 Eligibility .........................................................................................................................7 Income Guidelines...........................................................................................................7 Amount and Type of Assistance ........................................................................................8 Duplication of Benefits.....................................................................................................8 Required Documentation for Tenants................................................................................8 Application Process..........................................................................................................9 Language Access Plan.......................................................................................................9 Outreach ..........................................................................................................................10 Grant Administration.........................................................................................................11 Reimbursements ...........................................................................................................11 Leveraging Funds...........................................................................................................11 Performance Progress Reports........................................................................................11 Recordkeeping ..............................................................................................................11 Additional Program Information .....................................................................................12 Compliance Monitoring..................................................................................................12 86 of 833
2 Introduction
On April 21, 2025, City Council directed Housing Staff to develop an emergency rental assistance program to help San Mateo’s low-income residents from being displaced from their homes. Staff presented to City Council the prevalence of displacement within the City of San Mateo, with nonpayment of rent being a key factor. As a proposal to reduce evictions and displacement, an emergency rental assistance program was mentioned. Multiple jurisdictions throughout San Mateo County (South San Francisco, Brisbane, Foster City, Redwood City) currently have emergency rental assistance programs, many of which started in response to the COVID-19 pandemic. These programs have been successful in reducing displacement and keeping community members in their homes. Thus, these jurisdictions continued funding these forms of assistance using various funding sources, including Housing Successor funds.
Housing Element
This program supports the Housing Element’s Goal to address the City’s housing needs through protection - Goal H-3: Protection of Current Residents to Prevent Displacement. An issue identified in the Housing Element is the displacement of low-income renters in San Mateo. The increasing rental rates, along with the slow increase in incomes, disproportionally impacts communities who spend more than 30% of their monthly income towards rent. When experiencing eviction or displacement, households often have to leave their community in San Mateo to find more affordable housing.
To protect our existing communities, programs such as an emergency rental assistance program can aid housing insecure households from having to leave the City entirely. With the intervention of a service operator, households can get more housing stability through the introduction of additional resources. Therefore, based on the data that shows nonpayment of rent as being a key driver of displacement, and to support implementation of Policy H 3.1:
Prevent Homelessness, establishing an emergency rental assistance program will be an effective tool to help reduce San Mateo residents from being displaced from their homes and at-risk for homelessness.
Metropolitan Transportation Commission – Transit Oriented Communities (TOC) Grant
This program is also in compliance with the Metropolitan Transportation Commission’s (MTC) Transit-Oriented Communities (TOC) Policy. To meet TOC Policy requirements, jurisdictions need to establish local policies that address minimum residential and commercial office densities for new development; affordable housing production, preservation and protection, and stabilizing businesses to prevent displacement; parking management; and transit station 87 of 833
3 access. By establishing an emergency rental assistance program, the City will meet the TOC’s Affordable Housing Protection Policy #5: Rental Assistance Program. This Protection Policy requires jurisdictions to provide a dedicated funding source and program for rental assistance to low-income households. The proposed rental assistance program meets the requirements for TOC Policy Compliance:
• Provide a total allocation of at least $300,000 over a four-year One Bay Area Grant (OBAG) cycle. At the time of publication of this report, the current OBAG cycle is in its third round covering the years of 2023-2026. If funded for four years, this program’s budget will exceed the $300,000 threshold with a total of $672,000. Since we are approaching the end of the third OBAG cycle, this program will continue to comply during the fourth OBAG cycle.
• The program will be funded through the Housing Successor Fund, a local funding source that allows homelessness programs such as rental assistance to be funded through. • This policy requires the eligibility of applicants to meet the 80 percent of AMI or less threshold, to be considered low-income. This program will be eligible to residents who meet the 60 percent AMI or less threshold.
• Outreach for this program will include promotion via the City’s website and other communication channels as a method to make information available to City of San Mateo residents.
Funding
The City will provide up to $220,000 from the Housing Successor Fund, also known as the Low and Moderate Income Housing Asset Fund (LMIHAF), to the emergency rental assistance program to support eligible City of San Mateo residents for FY 2026-27. Funding may be renewed annually upon City Council approval. The program administrator, Samaritan House, will provide assistance of up to $4,000 per household and per fiscal year for rental and utility payments to prevent tenants from being evicted and displaced from San Mateo.
Line Item Amount
Administration $20,000
Rental Assistance $200,000
Total: $220,000
The Housing Successor Fund is a public fund used by California “successor housing agencies” to manage and utilize revenues left over from dissolved redevelopment agencies. The City of San Mateo receives revenues to this fund from loan repayments, lease payments, and sales of property previously acquired with LMIHAF funds. These funds are regulated to be used in the future for housing assistance to households whose income does not exceed 80% of the median income, as well as a portion that is allowed for administrative purposes. 88 of 833
4 California Health and Safety Code Section 34176.1(a)(2)(A) allows up to $500,000 of Housing Successor Funds per fiscal year, plus any percentage change in the cost of living, per fiscal year for homeless prevention and rapid rehousing services for individuals and families who are homeless or would be homeless but for this assistance. These funds may be used for short-term or medium-term rental assistance, contributions toward the construction of local or regional homeless shelters, housing relocation and stabilization services including housing search, mediation, or outreach to property owners, credit repair, security or utility deposits, utility payments, rental assistance for a final month at a location, moving cost assistance, and case management, or other appropriate activities for homelessness prevention and rapid rehousing of persons who have become homeless.
Staff reviewed emergency rental assistance programs in nearby jurisdictions to gather more information on best practices and how operators were selected. Jurisdictions with such programs did not launch a Request for Proposals (RFP), but sole-sourced eligible operators who have the capacity to effectively administer an emergency rental assistance program. Many jurisdictions selected core service agencies who previously ran rental assistance programs during the COVID-19 pandemic and had previous service agreements. There are eight core service agencies within San Mateo County who work in collaboration with the County’s Human Service Agency to provide individuals and families with basic emergency and support services to stabilize their living situations. Core Service Agencies provide clients with crisis intervention and referrals based on an evaluation of their needs and qualifications for assistance. By partnering with a core service agency, San Mateo residents will have access to receive the services these agencies provide and can address other disparities that impact their housing stability.
Cities with an Emergency Rental Assistance Program:
City Funding Source Amount Max per
Household
People Served Operator
South San
Francisco
Housing Successor
Funds
$150,000 $4,5000 33 individuals YMCA
Half Moon Bay General Funds $50,000 $3,000 16 individuals Coastside Hope
Daly City Housing Successor
Funds
$50,000 $5,000 10 individuals Daly City
Partnership
Redwood City General Funds $120,000 $5,000 24 individuals Fair Oaks Community
Center
89 of 833
5 Foster City* Measure K $35,000 $3,000 11 individuals Samaritan House
Brisbane Housing Successor
Funds
$100,000 –
One time
$4,000 25 individuals Samaritan
House
*Foster City’s Emergency Rental Assistance Program is only available to residents living in Below Market Rate Units
There are multiple factors that can prevent a tenant from making their monthly rent and/or utility payments such as employment loss and emergencies (i.e. medical), among other factors.
These unforeseen circumstances can lead to a household getting evicted, and a resource such as an emergency rental assistance program can help prevent that.
Samaritan House
The City of San Mateo partnered with Samaritan House during the COVID-19 pandemic (2020- 2022) to utilize $961,000 of Community Development Block Grant CARES Act (CDBG-CV) funds for an emergency rental assistance program. The success of that program led to the recommendation of Samaritan House to be the operator for the City’s new emergency rental assistance program. Samaritan House is part of the core service agencies in San Mateo County that provide safety net services to help stabilize households seeking food, clothing, and emergency housing assistance. Aside from the services Samaritan House provides, they are also the only core service agency in the City of San Mateo. Samaritan House administers an existing emergency rental assistance program that uses various funding sources to help with rent payments. The City’s Emergency Rental Assistant Program will supplement this existing program to expand services and rental assistance to more City of San Mateo residents.
Through Samaritan House, individuals who apply to the emergency rental assistance program can be connected to other resources that can help stabilize their household and finances.
Samaritan House provides a variety of services such as food distribution, case management, shelter services, housing case management, and even financial empowerment services.
Samaritan House works in close collaboration with the County’s Human Services Agency to provide individuals and families with basic emergency and support services to stabilize their living situations. Core Service Agencies such as Samaritan House provide clients with crisis intervention and referrals based on an evaluation of their needs and qualifications for additional assistance. Through Samaritan House, a household experiencing certain socioeconomic challenges can be addressed and increase their housing and financial stability. 90 of 833
6 Purpose of These Guidelines
The purpose of these guidelines is to define program rules and requirements, and to provide information to potential applicants as well as the community. Since guidelines can never address every type of administrative/accounting problem or situation that may arise during the contract period, the City’s Housing Division staff is available to respond to requests for clarification or additional information. If new procedures or policies are implemented during the contract period, Housing staff will provide timely notification and technical assistance.
Note that these Guidelines are neither intended to be all inclusive or so restrictive that they cannot be amended. Minor modifications to these Guidelines can be made with approval of the Community Development Department Director. Major modifications (such as those that would significantly affect funding levels, potential applicants or recipients) must be approved by the City Council.
Contact Information
The following is contact information for the Emergency Rental Assistance Program.
Housing Division, Community Development Department
330 West 20th Avenue
San Mateo, CA 94403
(650) 522-7220
Rachel Horst at [email protected]
Jennifer Mora at [email protected]
91 of 833
7 Application
Eligibility
To be eligible to receive rental assistance, applicants must meet the following requirements:
• Live in the City of San Mateo
• Household gross income at 60% AMI or lower of the San Mateo County Income Guidelines
• Not related to Landlord
• Have a signed lease agreement or application to a rental unit • Utility bill must be under the applicant’s name
Income Guidelines
60% AMI – 2026 SAN MATEO COUNTY INCOME GUIDELINES
Size of Family or Number
in Household
Monthly Gross Income Annual Gross Income
1 $7,355 $88,260
2 $8,405 $100,860
3 $9,455 $113,460
4 $10,505 $126,060
5 $11,350 $136,200
6 $12,190 $146,280
7 $13,030 $156,360
8 $13,870 $166,440
Updated June 1, 2026
Gross income is determined as the amount received within the previous 30 days/1 month.
Household income is determined by all household members who are 18 years or older. For cases where a roommate needs financial assistance, they are considered separately from the main household if they are not related to the main household.
Income guidelines are updated on an annual basis; therefore, the most recent income guidelines will be included in the grant agreement if extended for an additional year. 92 of 833
8 Amount and Type of Assistance
The City will provide up to three months of rental and/or utilities assistance in an amount not to exceed $4,000 per household per fiscal year. Security deposits are also an eligible expense if the applicant got displaced. Applicants can seek financial assistance multiple times until they hit the $4,000 limit. However, each time they return to request additional assistance, they must show proof of the latest critical need.
Upon finalizing an application, Samaritan House will introduce the client to additional resources that can increase their housing stability to prevent the risk of displacement after the $4,000 limit. In the case that an applicant has already reached their $4,000 limit, but demonstrates an urgent need to receive assistance, Samaritan House will contact the Community Development Department for approval.
Payments will be made directly to the applicant’s landlord, property management firm, and/or utility company. Under no circumstances will payments be made directly to the applicant.
Samaritan House will process all financial assistance payments.
Duplication of Benefits
Best practices for rental assistance are recommended for Samaritan House to check that the applicant is not receiving duplicative benefits to cover rental costs. To ensure that there is no duplication of benefits, applicants must inform Samaritan House about other financial assistance or applications to other rental assistance programs. Receiving financial aid does not disqualify the applicant from receiving emergency rental assistance but must be noted in their application.
Samaritan House must also ensure that the applicant is not receiving rental assistance through another source of funding through their rental assistance program.
Required Documentation for Tenants
• Complete intake form
• Proof of rent due, including one of the following:
o Eviction notice
o Notice of Delinquent Rent
o 3-Day Pay or Quit
• Proof of utility bill due
• Proof of Identification for each member of the household. One of the following:
o Photo ID
o Birth certificate
o Social Security
93 of 833
9 • Employment/Income Verification
o Paycheck stubs (within the past 30 days)
o CalWorks
o Child Support
o Social Security
o Unemployment letter
o Termination Letter
o Employment offer letter
o Bank statements for the last 2-3 months
• Rental/lease agreement
Application Process
Applicants must complete an application, gather the required documentation noted above, and set an appointment with Samaritan House by calling (650) 347-3648 or visiting their office at 4031 Pacific Boulevard, San Mateo, CA 94403. During their appointment time, applicants will meet with a case manager to ensure their application is complete, and all required documentation is secured. Incomplete applications or missing documentation will result in a delay of services. Once the appointment is done, the case manager will advise the client of the application review process. Clients are contacted about the status of their application within one week of their appointment date.
In the event that an application for rental assistance is denied, the applicant is eligible to submit an appeal to Samaritan House and the Community Development Department and the Housing Division. Applicant must express to Samaritan House their interest in submitting an appeal, and Samaritan House will provide the applicant with the Appeal Request forms and notify City staff.
Appeals will be responded within a week of receiving an appeal request.
Language Access Plan
To increase accessibility to our community members, intake forms will be available in English and Spanish. For other languages, translation and interpretation services can be available throughout the application process.
94 of 833
10 Outreach
To promote the availability of the program, City staff will announce the implementation of the program through their Housing and Policy Updates newsletter and through the City’s website and social media channels. Information on the eligibility requirements and on how to apply will be added to the Housing and Neighborhood Services website. Samaritan House promotes its services to the community at large through a host of means. These include flyers, social media, tabling events, presentations, and sharing information with other community-based organizations and governmental entities.
95 of 833
11 Grant Administration
Reimbursements
Reimbursements requests are to be prepared by Samaritan House containing invoices for eligible expenses. Reimbursement requests will be prepared on City-provided templates and are due quarterly via email. The following documentation is required to support each listed expense:
Personnel/Administrative Costs:
1. Timesheets (signed by staff and supervisor)
2. Paycheck stubs
3. Fringe benefit documentation
Rental Assistance:
1. Copy of check made to landlord or property management company
2. Copy of applicant intake form
Leveraging Funds
In the case that Samaritan House is in a budget deficit for the emergency rental assistance program, City staff must be notified. Samaritan House is expected to first utilize the $168,000 award for City of San Mateo residents prior to leveraging other funding sources.
Performance Progress Reports
Samaritan House will submit a progress report to the City each quarter to highlight any success or challenges and track how many San Mateo clients were served. City staff will provide a template to Samaritan House to track their progress each quarter. Submissions will be accepted through email.
Staff will utilize the data shared in the performance progress report to prepare an annual progress report for the City Council and will be presented on an annual basis at a City Council meeting.
Recordkeeping
Recordkeeping and Record Retention requirements must be in compliance with 24 CFR 92.508.
Records must be retained for five years after the period of rental assistance ends or from the time the project is closed, whichever is longer. Records shall include documentation of compliance with the requirements stated in these guidelines, including:
• Tenant eligibility
• No duplication of benefits
96 of 833
12 • Lease requirements
Documentation will be available for review by City’s Housing staff. Samaritan House is responsible for ensuring that all records are maintained for the appropriate period for all households receiving emergency rental assistance.
Additional Program Information
Additional requirements include but are not limited to:
1. Samaritan House will develop and utilize a standard program application form. Each household must complete the standard application form. If necessary, the City will aid in preparing the form; especially to the elderly, handicapped, non-English speaking persons, and persons who are unable to read and/or write.
2. All households deemed ineligible for assistance must be notified by Samaritan House in writing (or via their preferred method of communication) of such determination and the reasons for such determination. The household should also be notified of other potential resources.
3. Samaritan House should document their efforts to ensure clients are complying with the requirements.
4. Conflict of Interest: Samaritan House must disclose all real, potential, or perceived conflicts of interest to City as outlined in 2 CFR Part 200, as applicable, regarding the receipt of, assistance provided with, or expenditure of City funds. All conflicts of interest must be disclosed and resolved prior to providing emergency rental assistance to the household.
5. Conflicts are applicable to both City staff and Samaritan House staff as well as their immediate family members. This assistance would not be permitted when such conflict existed.
a. Any exceptions to the Conflict of Interest policy can only be granted directly by the City Manager, and no assistance will be issued without approval.
6. Samaritan House has access to technical assistance through the City’s Housing Division.
Compliance Monitoring
The City is responsible for conducting monitoring reviews of the Emergency Rental Assistance program.
1. The City will utilize a risk assessment tool to determine the relative risk among funded entities and projects.
2. Samaritan House will receive on-site, desk, or remote monitoring reviews based on the risk assessment.
97 of 833
CITY OF SAN MATEO
CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 8 Section Name: CONSENT CALENDAR Account Number: 10-2311 File ID: 26-11363 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: Human Resources Department
MEETING DATE: July 20, 2026
SUBJECT:
Pump Station Mechanic I/II and Pump Station Mechanic III Job Specification – Amendment RECOMMENDATION:
Adopt a Resolution to amend the Pump Station Mechanic I/II and Pump Station Mechanic III job specifications to remove the California Water Environment Association (CWEA) Collection Systems Maintenance Certification requirement from the minimum qualifications and add the CWEA Mechanical Technologist Certification as a preferred qualification.
BACKGROUND:
After a recent review of the job specifications by the Public Works Department and Human Resources Department, it was identified that the CWEA Collection Systems Maintenance Certification was not required for employees to perform the essential job functions of the Pump Station Mechanic I/II and Pump Station Mechanic III positions. The CWEA Certification is required for the Wastewater Treatment Plant Operator and Wastewater Treatment Plant Mechanic positions by the California State Water Resources Control Board.
Furthermore, the Public Works Department would like to add the Mechanical Technologist Certification as preferred certification. Although not required by the California State Water Resources Control Board, this certification is more in alignment with the job duties of the Pump Station Mechanic I/II and Pump Station Mechanic III positions in the Field Maintenance Department.
As a result, the City is revising the minimum qualifications for the Pump Station Mechanic I/II and Pump Station Mechanic III job specifications, as outlined below:
Pump Station Mechanic II
Possession of a CWEA Collection System Maintenance Mechanical Technologist Grade II (or higher) Certification or the ability to obtain one within 12 months of date of hire and retain the certification while employed in this position is preferred.
Pump Station Mechanic III
Possession of a CWEA Collection System Maintenance Mechanical Technologist Grade III (or higher) Certification or the ability to obtain one within 12 months of date of hire and retain the certification while employed in this position is preferred.
SEIU was notified and requested to meet and confer and subsequently accepted the proposed changes on May 18, 2026.
BUDGET IMPACT:
There is no fiscal impact as there is sufficient funding within the current budget to support salary schedule revision. 98 of 833
CITY OF SAN MATEO
ENVIRONMENTAL DETERMINATION:
This job specification update is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b)(5).)
STRATEGIC PLAN ALIGNMENT
This staff report supports the Organizational Health and Good Governance initiative.
NOTICE PROVIDED
All meeting noticing requirements were met.
ATTACHMENTS
Att 1 – Proposed Resolution
Exhibit A – Pump Station Mechanic I_II Job Specification Exhibit B – Pump Station Mechanic III Job Specification Att 2 – Pump Station Mechanic I_II
Att 3 – Pump Station Mechanic III
STAFF CONTACT
Waylen Leopoldino, Senior Human Resource Analyst
[email protected]
(650) 522-7265
99 of 833
CITY OF SAN MATEO
RESOLUTION NO. ____ (2026)
APPROVING THE JOB SPECIFICATION AMENDMENT FOR THE PUMP STATION MECHANIC I/II AND III.
WHEREAS, pursuant to the San Mateo Municipal Code Section 2.57.030(d), approval of new classifications and related job specifications, salary schedules, compensation changes, elimination or reinstatement of positions, reallocation of positions, reclassifications, and revisions of job specifications must be approved by City Council Resolution; and
WHEREAS, the proposed changes as detailed below are in response to Public Works Department’s requests to revise the job specifications for the classifications of Pump Station Mechanic I/II and Pump Station Mechanic III to accurately reflect the requirements of the classifications.
WHEREAS, the proposed amendment to the classifications of Pump Station Mechanic I/II and Pump Station Mechanic III are attached hereto as Exhibit A; and incorporated by reference; and WHEREAS, the employee associations representing the impacted classifications have been informed of the classification updates and have not brought forth any objections or concerns.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN MATEO, CALIFORNIA, HEREBY RESOLVES that:
1. The revisions to the job specifications for the classifications of Pump Station Mechanic I/II and Pump Station Mechanic III are not subject to CEQA because it can be seen with certainty that they will not cause a physical change in the environment. (CEQA Guidelines Section 15378(b)(5).)
2. The revisions to the job specifications for the classifications of Pump Station Mechanic I/II and Pump Station Mechanic III are approved and attached as Exhibit A. 100 of 833
PUMP STATION MECHANIC I/II
DEFINITION
To perform semi-skilled and skilled work in the installation maintenance and repair of pumps, motors, chain drives, valves, and related equipment; and to do related work as required.
DISTINGUISHING CHARACTERISTICS
Pump Mechanic I: This is the entry level class in the Pump Mechanic series. Positions in this class normally perform beginning level mechanical repair and maintenance work on a wide variety of wastewater and storm water lift station and equipment. Under this class, individuals employed at the entry level (Pump Mechanic I) may, based on the acquisition of higher skill levels through training and experience, become eligible for promotion to the Pump Mechanic II position. This promotion would be based on satisfactory demonstration of skills through examination or certification from an accepted organization, training institution, or school and demonstrated ability to perform high level maintenance and repairs on City pump stations.
Particular skill areas of interest are installation and maintenance of telemetry systems, computerized pump control systems and pump preventative maintenance programs.
Pump Mechanic II: This is the journey level class in the Pump Mechanic series. Positions assigned to this class are flexibly staffed and are expected to perform the most skilled repair and maintenance work and have a thorough knowledge of the operational characteristics, maintenance and repair methods and techniques and most typical system difficulties for the full range of equipment and operational systems in a lift station. All positions assigned to this class require the ability to work independently, exercising judgment and initiative. Pump Station Mechanics II may also be expected to assist in the oversite of less experienced personnel.
SUPERVISION RECEIVED AND EXERCISED
Receives supervision from the Public Works Supervisor or Pump Maintenance Mechanic III as directed. Technical or functional supervision may be provided by higher level maintenance personnel.
Assignments may require indirect supervision of less experienced maintenance personnel.
EXAMPLES OF IMPORTANT AND ESSENTIAL DUTIES - Depending upon assignment, duties may include, but are not limited to, the following:
Operate machines and tools in repairing defective parts of pumps, compressors, motors, incinerators, lift stations, and related mechanical equipment.
Maintain accurate mechanical maintenance records.
101 of 833
City of San Mateo
Pump Station Mechanic I/II
Fully utilize the computerized work systems in accordance with workflow processes.
Install, repair, replace, and modify pumps, controllers, bearings, seals, hydraulic pipes, timing devices and assist in installing telemetering electrical equipment.
Use a variety of power tools, hand tools, cutting and welding equipment and multi-meters.
Clean, oil and paint pump station equipment.
Perform preventive maintenance on the Pump Station equipment.
Evaluate equipment performance and identify problem areas.
Maintain stock inventory and adequate supply of replacement parts.
Perform general maintenance duties in the Pump Stations, including buildings, grounds and equipment as required.
Pump mechanics may be required to respond to emergency situations after normal working hours and be subject to serve on emergency stand-by alert and call out status on a rotational basis.
Train and assist less experienced maintenance personnel.
Perform related duties and responsibilities as required.
QUALIFICATIONS
Pump Station Mechanic I
Knowledge of:
Standard practices, methods, tools, and materials used in mechanical trades.
Mechanical principles of pumps, controllers, motors chain drives and lift stations.
General methods of electric, mechanical, and plumbing repairs.
Occupational hazards and standard safety precautions necessary in the work. 102 of 833
City of San Mateo
Pump Station Mechanic I/II
Ability to:
Perform skilled mechanical work independently.
Understand and carry out oral and written instructions.
Work from sketches, blueprints, and diagrams.
Use and care for bench and hand tools, machines, and equipment of the mechanical trades.
Develop and maintain accurate maintenance records.
Use computers and handheld electronic devices in the course of work.
Develop and maintain accurate maintenance records including Computerized Maintenance Management System information.
Experience and Education
Any combination equivalent to experience and education that could likely provide the required knowledge and abilities would be qualifying. A typical way to obtain the knowledge and abilities would be:
Experience:
One year of experience in the repair and maintenance of mechanical equipment such as pumps, motors, and related apparatus.
Education:
High School diploma or equivalent.
License or Certificate:
Possession of, or ability to obtain, and maintain a valid California Driver’s License.
Possession of, or ability to maintain a valid Class A Commercial Driver’s License is required within 12 months of employment.
103 of 833
City of San Mateo
Pump Station Mechanic I/II
Pump Station Mechanic II
In addition to the qualifications for Pump Mechanic I:
Knowledge of:
Operating and repair characteristics of pumping stations mechanical systems.
Particular safety hazards associated with wastewater pump operations and the discharge hazards and conditions that may result from mechanical malfunctions.
Ability to:
Perform journey level mechanical maintenance work including the troubleshooting of equipment for both minor and major repair work.
Accurately determine mechanical repair needs and estimate the cost and time of repairs.
Open and close W/O in the CMMS (commuter maintenance management system) system.
Perform basic operators of SCADA software from a desktop or remotely from a laptop.
Perform mechanical and minor electrical maintenance work including the troubleshooting of equipment for both minor and major repair work.
Ability to use computers and electronic communication devices in the course of work.
Experience and Education
Any combination equivalent to experience and education that could likely provide the required knowledge and abilities would be qualifying. A typical way to obtain the knowledge and abilities would be:
Experience:
Two years’ experience performing duties comparable to those of a Pump Mechanic I.
Education:
High school diploma or equivalent.
License or Certificate:
Possession of, or ability to obtain, and maintain a valid California Driver’s License. 104 of 833
City of San Mateo
Pump Station Mechanic I/II
Possession of, and ability to maintain, a valid Class A Commercial Driver’s License is required within 12 months of employment.
Possession of a CWEA Mechanical Technologist Grade II (or higher) Certification is preferred.
ADA SPECIAL REQUIREMENT:
Essential duties require the following physical abilities and work environment:
Ability to sit, stand, walk, kneel, crouch, squat, stoop, reach, crawl, twist, climb, and lift 90 pounds; exposure to extreme noise, outdoors, confining workspace, electrical hazards, vibration, chemicals, dust, toxic waste, mechanical hazards, and explosive materials; availability for standby and call back.
Ability to wear a respirator and maintain a face seal while using a respirator.
ADOPTED CC: 6-17-96
REVISED CC: 2-01-16, 8-21-17, 7-20-26
FORMER TITLES:
BARGAINING UNIT: SEIU MAINTENANCE UNIT
FLSA: NON-EXEMPT
PERFORMANCE APPRAISAL: MECHANICS
DOT: YES
PRE APPT-MEDICAL: YES
SAFETY SENSITIVE: YES
REQUIRED HARASSMENT PREVENTION TRAINING: SUPERVISORY
FORM 700: NO
JOB CODES: PUMP STATION MECH I – 6123, PUMP STATION MECH II - 6124 ABOLISHED:
105 of 833
PUMP STATION MECHANIC III
DEFINITION
To perform highly skilled work in the installation maintenance and repair of pumps, motors, chain drives, valves and related equipment; and to do related work as required.
DISTINGUISHING CHARACTERISTICS
This is the advanced journey level class in the Pump Mechanic series. This position is distinguished from Pump Station Mechanic I/II by its lead function and the degree of technical expertise required in performing the more complex work. This class may be responsible for lead over the Pump Mechanics I/II.
SUPERVISION RECEIVED AND EXERCISED
Receives supervision from the Public Works Supervisor. Technical or functional supervision may be provided by higher level maintenance personnel.
Exercises lead supervision over other Pump Mechanics, including provision of technical supervision, assignment of work and/or the training of less experienced mechanics.
EXAMPLES OF DUTIES
Depending upon assignment, duties may include, but are not limited to, the following:
Read and interpret drawings, plans and diagrams of pump stations and sewer collection systems infrastructure.
Inspect, diagnose and perform major and minor repair work on motors, pumps, compressors, life stations and related conveyance mechanical equipment.
Maintain accurate mechanical maintenance records.
Troubleshoot, test and identify defects in electrical circuits, controls and equipment.
Fully support and utilize the computerized Maintenance Management System to maintain accurate records reports of work performance.
Fully utilize the computerized work systems in accordance with workflow processes.
Install, repair, replace, and modify pumps, controllers, bearings, seals, hydraulic pipes, timing devices and assist in installing telemetering electrical equipment.
Use a variety of power tools, hand tools, cutting and welding equipment and multi-meters. 106 of 833
City of San Mateo
Pump Station Mechanic III
Clean, oil and paint pump station equipment.
Perform preventive and corrective maintenance on the Pump Station equipment.
Evaluate equipment performance and identify problem areas.
Maintain stock inventory and adequate supply of replacement parts.
Perform general maintenance duties in the Pump Stations, including buildings, grounds and equipment as required.
Provide lead technical supervision, including the direction of work assignments and/or the training of less experienced pump maintenance mechanics and assure safe work practice and procedures are adhered to.
May be required to respond to emergency situations after normal working hours and be subject to serve on emergency stand-by alert and call out status on a rotational basis.
Assist in the preparation of administrative reports.
Perform related duties and responsibilities as assigned.
QUALIFICATIONS
In addition to the qualifications of Pump Mechanics I and II Knowledge of:
Installation, diagnosis, operating and repair characteristics of the entire range of pumping stations mechanical systems.
Particular safety hazards associated with wastewater pump operations and the discharge hazards and conditions that may result from mechanical malfunctions.
General principles of supervision and on-the-job training.
General principles and practices of project management.
Ability to:
Perform advanced level mechanical maintenance work including the troubleshooting of equipment for both minor and major repair work.
Understand and carry out oral and written instructions. 107 of 833
City of San Mateo
Pump Station Mechanic III
Read and interpret blueprints, sketches and diagrams.
Use and care for bench and hand tools, machines and equipment of the mechanical trades.
Develop and maintain accurate maintenance records.
Use computers and handheld electronic devices in the course of work.
Communicate clearly and concisely, both orally and in writing.
Establish, maintain, and foster positive and harmonious working relationships with those contacted in the course of work.
Lead, train and provide input in the evaluation of Pump Mechanics.
Ability to use computers and electronic communication devices in the course of work.
Experience and Education
Any combination equivalent to experience and education that could likely provide the required knowledge and abilities would be qualifying. A typical way to obtain the knowledge and abilities would be:
Experience:
Four years’ experience performing duties comparable to those of a Pump Mechanic I/II, specifically focused on conveyance systems and pump stations.
Education:
High school diploma or equivalent.
Specialized training in the maintenance and repair of major mechanical systems. 108 of 833
City of San Mateo
Pump Station Mechanic III
License or Certificate:
Possession of, or ability to obtain, and maintain a valid California Driver’s License.
Possession of, and ability to maintain, a valid Class A Commercial Driver’s License is required within 12 months of employment.
Possession of a CWEA Mechanical Technologist III (or higher) Certification is preferred.
ADA SPECIAL REQUIREMENT:
Essential duties require the following physical abilities and work environment:
Ability to sit, stand, walk, kneel, crouch, squat, stoop, reach, crawl, twist, climb, and lift 90 pounds; exposure to extreme noise, outdoors, confining workspace, electrical hazards, vibration, chemicals, dust, toxic waste, mechanical hazards, and explosive materials; availability for standby and call back.
Ability to wear a respirator and maintain a face seal while using a respirator.
ADOPTED CC: 9-03-13
REVISED CC: 2-01-16, 8-21-17, 7-20-26
FORMER TITLES:
BARGAINING UNIT: SEIU MAINTENANCE UNIT
FLSA: NON-EXEMPT
PERFORMANCE APPRAISAL: MAINTENANCE LEAD WORKERS
DOT: YES
PRE APPT-MEDICAL: YES
SAFETY SENSITIVE: YES
REQUIRED HARASSMENT PREVENTION TRAINING: SUPERVISORY
FORM 700: NO
JOB CODES: 6140
ABOLISHED:
109 of 833
PUMP STATION MECHANIC I/II
DEFINITION
To perform semi-skilled and skilled work in the installation maintenance and repair of pumps, motors, chain drives, valves, and related equipment; and to do related work as required.
DISTINGUISHING CHARACTERISTICS
Pump Mechanic I: This is the entry level class in the Pump Mechanic series. Positions in this class normally perform beginning level mechanical repair and maintenance work on a wide variety of wastewater and storm water lift station and equipment. Under this class, individuals employed at the entry level (Pump Mechanic I) may, based on the acquisition of higher skill levels through training and experience, become eligible for promotion to the Pump Mechanic II position. This promotion would be based on satisfactory demonstration of skills through examination or certification from an accepted organization, training institution, or school and demonstrated ability to perform high level maintenance and repairs on City pump stations.
Particular skill areas of interest are installation and maintenance of telemetry systems, computerized pump control systems and pump preventative maintenance programs.
Pump Mechanic II: This is the journey level class in the Pump Mechanic series. Positions assigned to this class are flexibly staffed and are expected to perform the most skilled repair and maintenance work and have a thorough knowledge of the operational characteristics, maintenance and repair methods and techniques and most typical system difficulties for the full range of equipment and operational systems in a lift station. All positions assigned to this class require the ability to work independently, exercising judgment and initiative. Pump Station Mechanics II may also be expected to assist in the oversite of less experienced personnel.
SUPERVISION RECEIVED AND EXERCISED
Receives supervision from the Public Works Supervisor or Pump Maintenance Mechanic III as directed. Technical or functional supervision may be provided by higher level maintenance personnel.
Assignments may require indirect supervision of less experienced maintenance personnel.
EXAMPLES OF IMPORTANT AND ESSENTIAL DUTIES - Depending upon assignment, duties may include, but are not limited to, the following:
Operate machines and tools in repairing defective parts of pumps, compressors, motors, incinerators, lift stations, and related mechanical equipment.
Maintain accurate mechanical maintenance records.
110 of 833
City of San Mateo
Pump Station Mechanic I/II
Fully utilize the computerized work systems in accordance with workflow processes.
Install, repair, replace, and modify pumps, controllers, bearings, seals, hydraulic pipes, timing devices and assist in installing telemetering electrical equipment.
Use a variety of power tools, hand tools, cutting and welding equipment and multi-meters.
Clean, oil and paint pump station equipment.
Perform preventive maintenance on the Pump Station equipment.
Evaluate equipment performance and identify problem areas.
Maintain stock inventory and adequate supply of replacement parts.
Perform general maintenance duties in the Pump Stations, including buildings, grounds and equipment as required.
Pump mechanics may be required to respond to emergency situations after normal working hours and be subject to serve on emergency stand-by alert and call out status on a rotational basis.
Train and assist less experienced maintenance personnel.
Perform related duties and responsibilities as required.
QUALIFICATIONS
Pump Station Mechanic I
Knowledge of:
Standard practices, methods, tools, and materials used in mechanical trades.
Mechanical principles of pumps, controllers, motors chain drives and lift stations.
General methods of electric, mechanical, and plumbing repairs.
Occupational hazards and standard safety precautions necessary in the work.
Ability to:
111 of 833
City of San Mateo
Pump Station Mechanic I/II
Perform skilled mechanical work independently.
Understand and carry out oral and written instructions.
Work from sketches, blueprints, and diagrams.
Use and care for bench and hand tools, machines, and equipment of the mechanical trades.
Develop and maintain accurate maintenance records.
Use computers and handheld electronic devices in the course of work.
Develop and maintain accurate maintenance records including Computerized Maintenance Management System information.
Experience and Education
Any combination equivalent to experience and education that could likely provide the required knowledge and abilities would be qualifying. A typical way to obtain the knowledge and abilities would be:
Experience:
One year of experience in the repair and maintenance of mechanical equipment such as pumps, motors, and related apparatus.
Education:
High School diploma or equivalent.
License or Certificate:
Possession of, or ability to obtain, and maintain a valid California Driver’s License.
Possession of, or ability to maintain a valid Class A Commercial Driver’s License is required within 12 months of employment.
Pump Station Mechanic II
In addition to the qualifications for Pump Mechanic I:
Knowledge of:
112 of 833
City of San Mateo
Pump Station Mechanic I/II
Operating and repair characteristics of pumping stations mechanical systems.
Particular safety hazards associated with wastewater pump operations and the discharge hazards and conditions that may result from mechanical malfunctions.
Ability to:
Perform journey level mechanical maintenance work including the troubleshooting of equipment for both minor and major repair work.
Accurately determine mechanical repair needs and estimate the cost and time of repairs.
Open and close W/O in the CMMS (commuter maintenance management system) system.
Perform basic operators of SCADA software from a desktop or remotely from a laptop.
Perform mechanical and minor electrical maintenance work including the troubleshooting of equipment for both minor and major repair work.
Ability to use computers and electronic communication devices in the course of work.
Experience and Education
Any combination equivalent to experience and education that could likely provide the required knowledge and abilities would be qualifying. A typical way to obtain the knowledge and abilities would be:
Experience:
Two years’ experience performing duties comparable to those of a Pump Mechanic I.
Education:
High school diploma or equivalent.
License or Certificate:
Possession of, or ability to obtain, and maintain a valid California Driver’s License.
Possession of, and ability to maintain, a valid Class A Commercial Driver’s License in required within 12 months of employment.
Possession of a CWEA Collection System Maintenance GradeMechanical Technologist Grade II (or higher) Certification or the ability to obtain one within 12 months of date of hire and retain the certification while employed in this positionis preferred. 113 of 833
City of San Mateo
Pump Station Mechanic I/II
ADA SPECIAL REQUIREMENT:
Essential duties require the following physical abilities and work environment:
Ability to sit, stand, walk, kneel, crouch, squat, stoop, reach, crawl, twist, climb, and lift 90 pounds; exposure to extreme noise, outdoors, confining workspace, electrical hazards, vibration, chemicals, dust, toxic waste, mechanical hazards, and explosive materials; availability for standby and call back.
Ability to wear a respirator and maintain a face seal while using a respirator.
ADOPTED CC: 6-17-96
REVISED CC: 2-01-16, 8-21-17, 07-20-26
FORMER TITLES:
BARGAINING UNIT: SEIU MAINTENANCE UNIT
FLSA: NON-EXEMPT
PERFORMANCE APPRAISAL: MECHANICS
DOT: YES
PRE APPT-MEDICAL: YES
SAFETY SENSITIVE: YES
REQUIRED HARASSMENT PREVENTION TRAINING: SUPERVISORY
FORM 700: NO
JOB CODES: PUMP STATION MECH I – 6123, PUMP STATION MECH II - 6124 ABOLISHED:
114 of 833
PUMP STATION MECHANIC III
DEFINITION
To perform highly skilled work in the installation maintenance and repair of pumps, motors, chain drives, valves and related equipment; and to do related work as required.
DISTINGUISHING CHARACTERISTICS
This is the advanced journey level class in the Pump Mechanic series. This position is distinguished from Pump Station Mechanic I/II by its lead function and the degree of technical expertise required in performing the more complex work. This class may be responsible for lead over the Pump Mechanics I/II.
SUPERVISION RECEIVED AND EXERCISED
Receives supervision from the Public Works Supervisor. Technical or functional supervision may be provided by higher level maintenance personnel.
Exercises lead supervision over other Pump Mechanics, including provision of technical supervision, assignment of work and/or the training of less experienced mechanics.
EXAMPLES OF DUTIES
Depending upon assignment, duties may include, but are not limited to, the following:
Read and interpret drawings, plans and diagrams of pump stations and sewer collection systems infrastructure.
Inspect, diagnose and perform major and minor repair work on motors, pumps, compressors, life stations and related conveyance mechanical equipment.
Maintain accurate mechanical maintenance records.
Troubleshoot, test and identify defects in electrical circuits, controls and equipment.
Fully support and utilize the computerized Maintenance Management System to maintain accurate records reports of work performance.
Fully utilize the computerized work systems in accordance with workflow processes.
Install, repair, replace, and modify pumps, controllers, bearings, seals, hydraulic pipes, timing devices and assist in installing telemetering electrical equipment. 115 of 833
City of San Mateo
Pump Station Mechanic III
Use a variety of power tools, hand tools, cutting and welding equipment and multi-meters.
Clean, oil and paint pump station equipment.
Perform preventive and corrective maintenance on the Pump Station equipment.
Evaluate equipment performance and identify problem areas.
Maintain stock inventory and adequate supply of replacement parts.
Perform general maintenance duties in the Pump Stations, including buildings, grounds and equipment as required.
Provide lead technical supervision, including the direction of work assignments and/or the training of less experienced pump maintenance mechanics and assure safe work practice and procedures are adhered to.
May be required to respond to emergency situations after normal working hours and be subject to serve on emergency stand-by alert and call out status on a rotational basis.
Assist in the preparation of administrative reports.
Perform related duties and responsibilities as assigned.
QUALIFICATIONS
In addition to the qualifications of Pump Mechanics I and II Knowledge of:
Installation, diagnosis, operating and repair characteristics of the entire range of pumping stations mechanical systems.
Particular safety hazards associated with wastewater pump operations and the discharge hazards and conditions that may result from mechanical malfunctions.
General principles of supervision and on-the-job training.
General principles and practices of project management.
Ability to:
Perform advanced level mechanical maintenance work including the troubleshooting of equipment for both minor and major repair work.
116 of 833
City of San Mateo
Pump Station Mechanic III
Understand and carry out oral and written instructions.
Read and interpret blueprints, sketches and diagrams.
Use and care for bench and hand tools, machines and equipment of the mechanical trades.
Develop and maintain accurate maintenance records.
Use computers and handheld electronic devices in the course of work.
Communicate clearly and concisely, both orally and in writing.
Establish, maintain, and foster positive and harmonious working relationships with those contacted in the course of work.
Lead, train and provide input in the evaluation of Pump Mechanics.
Ability to use computers and electronic communication devices in the course of work.
Experience and Education
Any combination equivalent to experience and education that could likely provide the required knowledge and abilities would be qualifying. A typical way to obtain the knowledge and abilities would be:
Experience:
Four years’ experience performing duties comparable to those of a Pump Mechanic I/II, specifically focused on conveyance systems and pump stations.
Education:
High school diploma or equivalent.
Specialized training in the maintenance and repair of major mechanical systems. 117 of 833
City of San Mateo
Pump Station Mechanic III
License or Certificate:
Possession of, or ability to obtain, and maintain a valid California Driver’s License.
Possession of, and ability to maintain, a valid Class A Commercial Driver’s License is required within 12 months of employment.
Possession of a CWEA Collection System Maintenance GradeMechanical Technologist III (or higher) Certification or the ability to obtain one within 12 months of date of hire and retain the certification while employed in this positionis preferred.
ADA SPECIAL REQUIREMENT:
Essential duties require the following physical abilities and work environment:
Ability to sit, stand, walk, kneel, crouch, squat, stoop, reach, crawl, twist, climb, and lift 90 pounds; exposure to extreme noise, outdoors, confining work space, electrical hazards, vibration, chemicals, dust, toxic waste, mechanical hazards, and explosive materials; availability for standby and call back.
Ability to wear a respirator and maintain a face seal while using a respirator.
ADOPTED CC: 9-03-13
REVISED CC: 2-01-16, 8-21-17, 7-20-26
FORMER TITLES:
BARGAINING UNIT: SEIU MAINTENANCE UNIT
FLSA: NON-EXEMPT
PERFORMANCE APPRAISAL: MAINTENANCE LEAD WORKERS
DOT: YES
PRE APPT-MEDICAL: YES
SAFETY SENSITIVE: YES
REQUIRED HARASSMENT PREVENTION TRAINING: SUPERVISORY
FORM 700: NO
JOB CODES: 6140
ABOLISHED:
118 of 833
CITY OF SAN MATEO
CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 9 Section Name: CONSENT CALENDAR Account Number: 72-4674 File ID: 26-11371 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: Public Works Department
MEETING DATE: July 20, 2026
SUBJECT:
Basin D Sanitary Sewer Rehabilitation Project – Bid Rejection RECOMMENDATION:
Adopt a Resolution to reject all bids received for the Basin D Sanitary Sewer Rehabilitation Project and authorize the Public Works Department to initiate a second Notice Inviting Bids.
BACKGROUND:
The Clean Water Program (CWP) is improving the City of San Mateo’s sanitary sewer system to prevent sanitary sewer overflows and unauthorized discharge of sewage. As part of the CWP, the annual sanitary sewer rehabilitation project proactively upgrades and rehabilitates aging sewer pipes to reduce inflow and infiltration.
Basin D includes those City areas west of Highway 101, south of Highway 92 and 9th Avenue, and north of 27th Avenue and Belmont. All Basin D sewers were evaluated using video inspection, with identified priority defects included in the project for repair. This work will ensure proper operation of the sewer collection system, reduce infiltration and inflow, and fix defects to prevent potential sanitary sewer overflows. The project includes the following sewer work: pipe spot repairs, full segment pipe replacements, rehabilitation and replacement of manholes, trenchless cured-in-place pipe spot repairs, pre- and post-installation video inspections, and site restorations.
In accordance with Municipal Code section 3.60.030, a competitive public process was used to obtain bids for the Project.
A Notice Inviting Sealed Proposals was issued to advertise the Project on May 14, 2026. On the bid opening of June 11, 2026, six (6) bids were received. Per the requirements specified in the Contract Book, bids were compared based on the total bid amount.
Contractor Base Bid Amount
Express Plumbing (EPS), Inc. $4,136,058.00
DeVaney Engineering, Inc. $5,127,614.00
Westland Contractors, Inc. $5,247,820.00
C2R Engineering, Inc. $5,514,330.00
WestRock Engineering, Inc. $5,683,402.00
JDB & Sons Construction, Inc. $5,884,500.00
Upon receiving bids, staff determined that there were inconsistencies in the detailed bid costs for the lowest two bidders.
Therefore, staff recommends rejecting all bids pursuant to San Mateo Municipal Code section 3.60.040(a)(4). City staff will readvertise the Project immediately.
119 of 833
CITY OF SAN MATEO
BUDGET IMPACT:
There is no budget impact for the rejection of bids.
ENVIRONMENTAL DETERMINATION:
The California Environmental Quality Act (CEQA) does not apply to the rejection of bids because CEQA is inapplicable to projects that are disapproved, under CEQA Guidelines section 15270.
STRATEGIC PLAN ALIGNMENT
This report supports the Infrastructure initiative.
NOTICE PROVIDED
All meeting noticing requirements were met.
ATTACHMENTS
Att 1 – Proposed Resolution
STAFF CONTACT
Laura Webb, Senior Engineer
[email protected]
(650) 522-7322
Thomas Williams, Engineering Manager
[email protected]
(650) 522-7307
120 of 833
CITY OF SAN MATEO
RESOLUTION NO. ____ (2026)
REJECTING ALL BIDS FOR THE
BASIN D SANITARY SEWER REHABILITATION PROJECT
WHEREAS, work began on the design phase of the Basin D Sanitary Sewer Rehabilitation Project (Project) in October 2024, which includes pipe spot repairs, full segment pipe replacements, rehabilitation and replacement of manholes, trenchless cured-in-place pipe spot repairs, pre- and post-installation video inspections, and site restoration in multiple locations throughout the City of San Mateo; and WHEREAS, the City advertised the Project on May 14, 2026 in accordance with Section 3.60.040 of the San Mateo Municipal Code; and
WHEREAS, on the June 11, 2026 bid opening date, six (6) bids were received; and WHEREAS, City staff reviewed the bids received and found inconsistencies in bid amounts received; and WHEREAS, pursuant to San Mateo Municipal Code section 3.60.040(a)(4), the City Council, at its discretion, may reject all bids received.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN MATEO, CALIFORNIA, HEREBY RESOLVES that:
1. The California Environmental Quality Act (CEQA) does not apply to the rejection of bids because CEQA is inapplicable to projects that are disapproved, under CEQA Guidelines section 15270.
2. In accordance with the provisions of San Mateo Municipal Code Section 3.60.040(a)(4), all bids for the Basin D Sanitary Sewer Rehabilitation Project are rejected. 121 of 833
CITY OF SAN MATEO
CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 10 Section Name: CONSENT CALENDAR Account Number: 82-4683 File ID: 26-11372 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: Public Works Department
MEETING DATE: July 20, 2026
SUBJECT:
Diesel Fuel Procurement and Delivery — Amendment
RECOMMENDATION:
Approve Amendment No. 1 to the agreement with Bosco Oil, Inc. DBA Valley Oil Company for Diesel Fuel Procurement and Delivery in the amount of $319,000 for a new agreement total of $719,000; establish a contingency in the amount of $45,600; and authorize the Public Works Director to issue amendments and change orders within the contingency amount.
BACKGROUND:
The City currently operates a fleet of over 300 vehicles and pieces of equipment, including sedans, trucks, street sweepers, tractors, police patrol vehicles, aerial lifts, motorcycles, turf mowers, and sewer trucks (Fleet). The Fleet incorporates various propulsion technologies, such as conventional internal combustion engines (ICE), hybrid electric (HEV), plug-in hybrid electric (PHEV), battery electric (EV), and compressed natural gas (CNG) vehicles. To support these vehicles, the City owns and operates a fueling station at the Corporation Yard. By purchasing diesel fuel in bulk and maintaining an onsite fuel storage and dispensing system for exclusive use of City vehicles and equipment, the City has had significant operational efficiencies and cost savings. The City procures renewable diesel, which is primarily produced from renewable, plant-based sources.
In June of 2025, BOSCO dba Valley Oil Company, was awarded a two-year agreement for diesel fuel procurement and delivery in the amount of $400,000, with funding allocated over two fiscal years at $200,000 a year. This award was based on the lowest proposal obtained through the City’s established Request for Proposal process advertised for Diesel Fuel Procurement and Delivery in April of 2025.
In March 2026, expenses began to exceed the estimated annual allocation of $200,000. In Fiscal Year 2025-26, the expenses totaled approximately $335,000 in the first year of the two-year contract, reducing the amount authorized and available for the second year. This was due to sustained increase of fuel prices throughout the fiscal year, which impacted overall expenditures despite no significant change in fuel consumption levels.
Based on expenditure trends observed during the current fiscal year, it is anticipated that elevated fuel pricing will persist into Fiscal Year 2026-27. To ensure sufficient funding for projected fuel expenditures in Fiscal Year 2026-27, an additional $319,000 in expenditure authority is requested. The increase reflects a continuation of current usage levels paired with conservative fuel price projections, ensuring that sufficient funding is in place to support Citywide operations and mitigate the risk of future shortfalls. If fuel costs exceed current projections and additional funding will be required, staff will return to City Council in Fiscal Year 2026-27 to request additional appropriations as needed. 122 of 833
CITY OF SAN MATEO
BUDGET IMPACT:
Funding for fuel procurement and delivery is budgeted annually in the Vehicle and Equipment Maintenance Fund. The Facilities and Fleet Division provides fuel services to City departments and recovers associated costs through chargebacks based on actual usage. As a result, fuel expenditures are offset by cost recovery from other departments. Staff will request Council approval of additional budget appropriations, as needed, if realized costs exceed the available budget.
ENVIRONMENTAL DETERMINATION:
This Amendment is not a project subject to CEQA, because it can be seen with certainty that it will not cause a physical change in the environment. (Public Resources Code Section 21065.)
STRATEGIC PLAN ALIGNMENT
This staff repot support the Infrastructure initiative.
NOTICE PROVIDED
All meeting noticing requirements were met.
ATTACHMENTS
Att 1 – Amendment
STAFF CONTACT
Daniel Heffelfinger, Fleet Services Supervisor
[email protected]
(650) 522-7366
Steve Wu, Facilities and Fleet Services Manager
[email protected]
(650) 522-7345
James O’Connell, Deputy Director Public Works
[email protected]
(650) 522-7287
123 of 833
Contract Amendment Page 1 of 2
CAO Approved June 2024
AMENDMENT NO. 1 TO THE AGREEMENT
BETWEEN THE CITY OF SAN MATEO AND
BOSCO OIL, INC. DBA VALLEY OIL COMPANY FOR
DIESEL FUEL PROCUREMENT AND DELIVERY SERVICES
($400,000 [Original Amount] / $319,000 [Amendment No. 1]) This Amendment is made and entered into this day of ______________ by and between the CITY OF SAN MATEO, a municipal corporation existing under the laws of the State of California ("CITY"), and BOSCO OIL, INC. DBA VALLEY OIL COMPANY ("CONTRACTOR").
WHEREAS, CITY and CONTRACTOR entered into an Agreement for diesel fuel procurement and delivery services (“Agreement”) on June 26, 2025; and
WHEREAS, CITY and CONTRACTOR wish to amend the Agreement to increase compensation by $319,000, for a new total Agreement amount of $719,000.
NOW, THEREFORE, the Parties agree as follows:
1. Section 5 – Payment of the Agreement is amended to read:
“Payment shall be made by the CITY only for services rendered and upon submission of a payment request upon completion and CITY approval of the work performed. In consideration for the full performance of the services set forth in Exhibit A, as amended, CITY agrees to pay CONTRACTOR a fee in an amount not to exceed $719,000, in accordance with the rate set forth in Exhibit B, inclusive costs associated with the additional scope of work.”
2. The remaining terms of the Agreement remain in full force and effect. [SIGNATURE PAGE FOLLOWS]
124 of 833
Contract Amendment Page 2 of 2
CAO Approved June 2024
IN WITNESS WHEREOF, CITY OF SAN MATEO and CONTRACTOR have executed this Amendment No. 1 on ___________________.
CITY OF SAN MATEO CONTRACTOR
Matt Fabry
Public Works Director
Date Bob Buck
Its Authorized Agent
President
If a Corporation, can be either 1)
President or 2) Vice President plus
an additional corporate officer
(i.e., Secretary, Treasurer) who
shall sign below.
Date
APPROVED AS TO FORM ADDITIONAL CORPORATE
OFFICER
(if necessary per the above)
Linh P. Nguyen
Assistant City Attorney
Date
125 of 833
CITY OF SAN MATEO
CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 11 Section Name: CONSENT CALENDAR Account Number: 10-4662 File ID: 26-11375 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: Public Works Department
MEETING DATE: July 20, 2026
SUBJECT:
Public Works Standard Drawings – Update
RECOMMENDATION:
Adopt a Resolution to update all City of San Mateo Department of Public Works Standard Drawings.
BACKGROUND:
The Public Works Department is in the process of a multi-phase update to the Public Works design and construction standards. This first phase includes a complete overhaul of the Public Works Standard Drawings (Standards) to replace the existing standard drawings. Later phases will incorporate a comprehensive review and rewrite of the Subdivision Code (Title 26), adoption of standard construction specifications, and adoption of a design criteria handbook for public and private projects.
The Standards outline the design and construction standards for public infrastructure improvements such as sewer, stormwater, streets, sidewalks, streetlights, and traffic signage, and striping. The City currently has 72 Standard Detail drawings, the majority of which have not been updated for more than 20 years. This update will bring the Standards up to industry best practices, technical advancements, and regulatory requirements. With the technical expertise and drafting services provided by Kimley-Horn & Associates, Inc. and BKF Engineers (collectively “Consultants”), staff have updated the Standards that will provide clearer details for design and construction of the public infrastructure.
Staff, with the Consultants, initiated a review of the existing Standards to assess and identify necessary updates.
Throughout the project, coordination took place between the different divisions within Public Works including Traffic, Transportation Planning, Clean Water Program, Capital Improvement, and Operations & Maintenance. During the process of revising drawings and drafting new ones, each division submitted comments and redlines to ensure that the new Standards would best fit the needs of projects relevant to the City. This review also included a comparative analysis of standard drawings from municipalities including South San Francisco, Redwood City, Roseville, and Belmont. This process provided insight into regional practices in Public Works design and helped staff identify areas where the Standards could be improved or streamlined.
The new 95 standard drawings, as shown in Attachment 1 Exhibit A, have been subjected to substantial review by City engineering staff. Details regarding the updated standard drawings sections are summarized below:
Substantial Standard Drawing revisions are:
1. Street Geometries – Standardized layout of streets and roadways for vehicular, pedestrian, and bicyclist use and safety.
2. Roadway Improvements – Standardized dimensions and constructability of hardscape improvements such as sidewalks, curbs, gutters, driveways, and curb ramps.
126 of 833
CITY OF SAN MATEO
3. Storm Drain – Standardized materials and construction, replaced curb drain and depression details, and added trash capture devices.
4. Sanitary Sewer – Standardized materials and construction and clarified lateral installations.
5. Utilities – Standardized manhole types and construction, updated pipe crossings, added shallow manholes, and added abandonment details.
6. Restoration – Updated street restoration for intersections.
7. Parking – Standardized street parking dimensions and markers.
8. Traffic – Standardized crosswalks, updated bike improvements details, and added signage details.
9. Electrical – Standardized conduit construction and materials and added typical streetlight spacing.
10. Landscape – No substantial changes.
The Standards have been prepared to assist all persons engaged in the design or construction of Public Works improvements and are generally applicable to all construction within the City. These drawings shall be followed in any construction which, upon completion, will be accepted and maintained by the City. However, note that there may be specific cases where constructed public improvements are maintained by property owners or developers as agreed upon through Maintenance Agreements with the City.
Staff have assessed the fiscal impacts of the proposed updates to the City’s Standard Drawings applicable to residents, developers, and utilities. Resident impact primarily stems from sewer or water lateral replacements, which have not been substantially changed from the current requirements. Developers and utility providers are expected to experience minimal impact, as they typically are required to implement significant public improvement restoration as part of their permit conditions. The City can expect a minimal increase in project costs for utility projects encompassing sewer, stormwater, and streetlight improvements since the changes to the standard details were driven by the construction details and practices from City projects.
Once approved, Public Works will reissue one revised set of Standards. These Standards will be available online and accessible for those who plan to do work within the City’s limits. To minimize the impact of projects, future amendments to the Standards are proposed to be approved at the staff level and will be performed through addendum and insertion of revised pages.
BUDGET IMPACT:
Kimley-Horn & Associates, Inc. and BKF Engineers were contracted for amounts of $77,000 and $89,870, respectively, to provide technical expertise and drafting services for the Standard Drawings Project. Future City projects will incorporate the appropriate Standard Drawings and budget their construction costs accordingly.
ENVIRONMENTAL DETERMINATION:
This adoption is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b)(5).) STRATEGIC PLAN ALIGNMENT:
This plan supports the Infrastructure initiative
NOTICE PROVIDED
All meeting noticing requirements were met.
ATTACHMENTS
Att 1 – Proposed Resolution
STAFF CONTACT
Jason Hallare, Engineering Manager
[email protected]
(650) 522-7316
127 of 833
CITY OF SAN MATEO
RESOLUTION NO. ____ (2026)
PUBLIC WORKS STANDARD DRAWINGS UPDATE
WHEREAS, San Mateo Municipal Code Section 23.48.040 provides that all revisions of standard specifications for public works construction may be made by resolution of the Council; and WHEREAS, the City’s standard specifications (“Standard Drawings”) are important standards for development, construction, and maintenance of public infrastructure within the City; and WHEREAS, the majority of the existing City’s Standard Drawings were last updated over 20 years ago, and substantial changes in technology, materials, and regulatory standards have since occurred that necessitate updates to the City’s Standard Drawings; and
WHEREAS, City Staff have undertaken a comprehensive review of all existing Standard Drawings, including consultation with design experts, a comparative analysis of standard drawings from neighboring municipalities for insight into regional best practices, and coordination with Public Works divisions; and WHEREAS, the proposed update to the City’s Standard Drawings, attached hereto as Exhibit A, will replace all existing standard drawings.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN MATEO, CALIFORNIA, HEREBY RESOLVES that:
1. Adoption of the Standard Drawings is not an action subject to CEQA because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b)(5).)
2. Nothing in this resolution shall be deemed to limit the authority of this Council, or any commission, board or officer of the City, to require higher or different standards as may otherwise be duly authorized or required.
3. The City’s Standard Drawings attached as Exhibit A, and incorporated by reference, are hereby approved and adopted as the City’s minimum standards, specifications, and regulations for construction of public works improvements in the City of San Mateo.
4. The Director of Public Works is authorized to implement the new Standard Drawings, in Exhibit A as approved, for all work related to public infrastructure and make the Standard Drawings available to the public on the City’s website.
128 of 833
A
C
C
A M
E
O
T Y
I
T
FO
S N
LI FOR
A
NIA
CITY OF SAN MATEO
DEPARTMENT OF PUBLIC WORKS
STANDARD DRAWINGS
ADOPTED AUGUST 2026
EXHIBIT A
129 of 833
GENERAL
G-1A GENERAL REQUIREMENTS
G-1B CITY STANDARD GENERAL NOTES
G-2 STANDARD ABBREVIATIONS
G-3 STANDARD LINES AND SYMBOLS
DETAIL TITLE
STREETS GEOMETRIES
A-1A TYPICAL STREET SECTIONS
A-1B TYPICAL STREET SECTIONS
A-1C TYPICAL STREET SECTIONS
A-2 CUL-DE-SAC
A-3 CORNER KNUCKLE
A-4 CURB EXTENSIONS
A-5 VEHICLE TURNOUT
A-6A SIGHT TRIANGLE (CORNERS)
A-6B SIGHT TRIANGLE (DRIVEWAYS)
ROADWAY IMPROVEMENTS
C-1 STREET IMPROVEMENT STANDARD NOTES
C-2A STANDARD CURB AND GUTTER
C-2B SPECIAL CURB AND GUTTER
C-2C VALLEY GUTTER
C-3 DITCHES
C-4A STANDARD SIDEWALK (MONOLITHIC)
C-4B STANDARD SIDEWALK (SEPARATED)
C-4C SIDEWALK RESTORATION
C-5A STANDARD DRIVEWAY
C-5B LIMITED ROW DRIVEWAY
C-5C PRIVATE STREET ENTRANCE
C-6A CURB RAMPS
C-6B CURB RAMP CLEARANCES AND MODIFICATIONS
C-7 BUS TURNOUT
C-8 CONCRETE PAD
C-9A STANDARD MEDIAN
C-9B MOUNTABLE MEDIAN
C-9C DOWEL-IN MEDIAN
C-10 CITY MONUMENT
8/17/2026
INDEX
IN-1
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
AL NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
130 of 833
STORM DRAINAGE
D-1 DRAINAGE STANDARD NOTES
D-2 CURB DRAIN
D-3 CATCH BASIN TYPE G-3
D-4 CATCH BASIN TYPE E-3
D-5 CATCH BASIN TYPE F-2
D-6 CATCH BASIN FRAME AND GRATE
D-7 CATCH BASIN APRON
D-8 STORM DRAIN TURNING BOX
D-9 STORM DRAIN JUNCTION BOX
D-10 INLET MARKER
D-11 TRASH CAPTURE DEVICES
DETAIL NO. DETAIL TITLE
SANITARY SEWER
S-1 SEWER STANDARD NOTES
S-2 SEWER LATERAL (MAIN IN STREET)
S-3 SEWER LATERAL (MAIN IN EASEMENT)
S-4 SEWER LATERAL CONNECT TO NEW MAIN
S-5 SEWER LATERAL CONNECT TO EX MAIN
S-6 SEWER DROP CONNECTION
UTILITIES
U-1 CONCENTRIC MANHOLE (UP TO 33-INCH)
U-2 ECCENTRIC MANHOLE (UP TO 33-INCH)
U-3 SHALLOW MANHOLE (UP TO 33-INCH)
U-4 STANDARD MANHOLE BASE (UP TO 33-INCH)
U-5A MANHOLE BASE SECTION (36 TO 48-INCH)
U-5B MANHOLE BASE PLAN (36 TO 48-INCH)
U-6 MANHOLE FRAME AND COVER
U-7 MANHOLE ADJUST TO GRADE
U-8 PIPE CONNECTION TO MANHOLE
U-9 PIPE CROSSING
U-10 PIPE ABANDONMENT
U-11 MANHOLE ABANDONMENT
U-12 TRENCH SUPPORT COLLAR
8/17/2026
INDEX
IN-2
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
131 of 833
RESTORATION
R-1 UTILITY TRENCH (TYPICAL STREETS)
R-2 UTILITY TRENCH (CONCRETE BASE STREET)
R-3 ROCKWHEEL TRENCH
R-4 MICROTRENCH
R-5 POTHOLE RESTORATION
R-6A PAVEMENT RESTORATION (EXCAVATIONS)
R-6B PAVEMENT RESTORATION (EXCAVATIONS)
R-6C PAVEMENT RESTORATION (EXCAVATIONS)
DETAIL NO. DETAIL TITLE
PARKING
P-1 ON-STREET PARKING STANDARDS
P-2 PARKING METER
P-3 OFF-STREET PARKING STANDARDS
P-4 OFF-STREET PARKING DETAILS
P-5 GARAGE CURVES
P-6 GARAGE RAMP PROFILES
TRAFFIC
T-1 STANDARD SIGN POST
T-2 STREET NAME SIGN
T-3 INTERNALLY ILLUMINATED STREET NAME SIGN
T-4 CROSSWALKS
T-5 RAISED CROSSWALK
T-6A SPEED CUSHION
T-6B SPEED CUSHION DETAILS
T-7 BIKE LANES
T-8A BIKE ROUTES
T-8B BIKE ROUTE SIGNS
T-8C BIKE BOULEVARD SIGNS
T-9 BUFFERED BIKE LANES
8/17/2026
INDEX
IN-3
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
132 of 833
ELECTRICAL
E-1 ELECTRICAL SPECIFICATIONS
E-2 TYPICAL ELECTROLIER PULL BOX
E-3 TYPICAL PULL BOX AND CONDUIT
E-4 TYPICAL UNMETERRED CIRCUIT LAYOUT
E-5 STANDARD STREETLIGHT FOUNDATION
E-6A STREETLIGHT LAYOUTS
E-6B STREETLIGHT PLACEMENT
E-7A STANDARD ELECTROLIER (COBRA HEAD)
E-7B DECORATIVE STREETLIGHT (PENDANT)
E-7C DECORATIVE STREETLIGHT (POST TOP)
DETAIL NO. DETAIL TITLE
STREET TREES
TR-1 TREE GRATE
TR-1 TREE GRATE
8/17/2026
INDEX
IN-4
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
133 of 833
GENERAL PUBLIC IMPROVEMENT REQUIREMENTS:
1. CONTRACTOR IS RESPONSIBLE FOR OBTAINING NECESSARY PERMITS AND CONTACTING PUBLIC WORKS INSPECTOR FOR PRE-CONSTRUCTION MEETINGS AND INSPECTIONS FOR CONSTRUCTION AND RESTORATION IN THE PUBLIC RIGHT-OF-WAY.
2. ALL WORK IN THE PUBLIC RIGHT-OF-WAY SHALL BE PERFORMED BY A CALIFORNIA LICENSED CLASS "A" CONTRACTOR, UNLESS OTHERWISE APPROVED BASED ON THE SCOPE OF WORK AND THE CONTRACTOR'S LICENSE.
3. CONSTRUCTION PLANS FOR WORK WITHIN THE PUBLIC RIGHT-OF-WAY SHALL INCLUDE THE CITY STANDARD GENERAL NOTES (CITY DETAIL G-1B).
4. CONSTRUCTION PLANS ARE RECOMMENDED TO USE OR INCLUDE THE CITY STANDARD ABBREVIATIONS, LINE TYPES, AND SYMBOLS. 8/17/2026
GENERAL REQUIREMENTS
G-1A
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
134 of 833
CITY STANDARD GENERAL NOTES:
1. APPROVAL OF THESE PLANS IS SUBJECT TO ALL OF THE FOLLOWING CITY STANDARD NOTES AND SHOWN ON THE PLANS.
2. APPROVAL OF THESE PLANS DOES NOT RELEASE THE PERMITTEE OR OWNER OF THE RESPONSIBILITY FOR THE CORRECTION OF MISTAKES, ERRORS, OR OMISSIONS CONTAINED THEREIN. IF DURING THE COURSE OF CONSTRUCTION OF THE IMPROVEMENTS, PUBLIC INTEREST REQUIRES A
MODIFICATION OF THESE IMPROVEMENT PLANS OR ANY CITY SPECIFICATIONS, THE PUBLIC WORKS DIRECTOR SHALL HAVE THE AUTHORITY TO APPROVE AND REQUIRE SUCH MODIFICATION AND TO SPECIFY THE MANNER IN WHICH THE SAME IS TO BE MADE.
3. ANY REVISION TO THESE APPROVED PLANS SHALL BE ACCURATELY SHOWN ON A REVISED PLANS REVIEWED AND APPROVED BY THE PUBLIC WORKS DIRECTOR PRIOR TO INSTALLATION OF THE IMPROVEMENTS.
4. ALL CONSTRUCTION WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE CITY OF SAN MATEO STANDARD DETAILS AND SPECIFICATIONS.
5. CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AT LEAST 48 HOURS PRIOR TO STARTING WORK.
6. EXISTING UTILITIES:
A. CONTRACTOR SHALL BE RESPONSIBLE FOR THE VERIFICATION OF ALL EXISTING UTILITIES IN THE FIELD.
B. 48 HOURS PRIOR TO DIGGING, CONTRACTOR SHALL PRE-MARK THE WORK AREA, CALL UNDERGROUND SERVICE ALERT (USA) (CALL 8-1-1) FOR A TICKET, AND OBTAIN A TICKET NUMBER.
C. CONTRACTOR SHALL REMOVE ALL USA MARKINGS AS SOON AS THEY ARE NO LONGER NEEDED. REMOVAL OF PAINT USA MARKINGS SHALL BE VIA HIGH PRESSURE WATER METHOD ONLY.
7. CONTRACTOR WILL BE RESPONSIBLE TO RESTORE ALL DAMAGED, REMOVED, OR OTHERWISE DISTURBED WALLS, FENCES, SERVICES, UTILITIES, HARDSCAPE IMPROVEMENTS, SIGNAGE, STRIPING, OR OTHER FEATURES DUE TO THE CONTRACTOR'S WORK. RESTORATION SHALL BE TO CITY STANDARDS AS APPLICABLE OR REPLACED IN-KIND WHERE CITY STANDARDS ARE NOT APPLICABLE.
8. ALL CITY SURVEY MONUMENTS SHALL BE PRESERVED. IN THE EVENT THAT A CITY MONUMENT IS LOST OR DAMAGED DUE TO CONSTRUCTION
ACTIVITIES, THE CONTRACTOR, AT THEIR SOLE EXPENSE, SHALL BE RESPONSIBLE FOR THE RE-ESTABLISHMENT AND THE FILING OF A CORNER RECORD WITH THE COUNTY'S SURVEYOR'S OFFICE. A RECORD OF SURVEY SHALL BE FILED FOR ALL NEW CITY MONUMENTS SET IN CONJUNCTION WITH THIS IMPROVEMENT PLAN, UNLESS A FINAL OR PARCEL MAP REQUIRING SAID MONUMENTS IS RECORDED AS PART OF THIS PROJECT.
9. ALL CONSTRUCTION STAKING FOR SHALL BE DONE BY A LICENSED LAND SURVEYOR REGISTERED CIVIL ENGINEER.
10. ALL PUBLIC OR PRIVATE FACILITIES, FURNITURE, UTILITIES, OR LANDSCAPING THAT REQUIRE RELOCATION AS DETERMINED BY THE PUBLIC WORKS DIRECTOR SHALL BE RELOCATED AT THE SOLE EXPENSE OF THE PERMITTEE.
11. TREE PERMITS FROM THE DEPARTMENT OF PARK AND RECREATION SHALL BE OBTAINED PRIOR TO INSTALLATION AND REMOVAL OF STREET TREES.
12. FOR ANY LANE CLOSURES, THE CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN AND OBTAIN APPROVAL OF THE PUBLIC WORKS DIRECTOR BEFORE DEPLOYING THE CLOSURE. THE CONTRACTOR SHALL PROVIDE CONES, BARRICADES, SIGNS, OR FLAGGERS AS NECESSARY TO CONTROL TRAFFIC AND PREVENT HAZARDOUS CONDITIONS PER CALTRANS MANUAL ON TRAFFIC CONTROL DEVICES, LATEST EDITION.
13. ACCESSIBLE PEDESTRIAN PATH OF TRAVELS SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION TO THE SATISFACTION OF THE PUBLIC WORKS DIRECTOR.
14. STOCKPILING OR STORAGE OF CONSTRUCTION MATERIALS AND EQUIPMENT IS NOT ALLOWED IN OR UPON THE PUBLIC RIGHT-OF-WAY WITHOUT WRITTEN APPROVAL FROM THE PUBLIC WORKS DIRECTOR.
15. NO OPEN TRENCHES OR EXCAVATIONS SHALL BE LEFT THE END OF THE WORK DAY. TRAFFIC PLATES OR HOT MIX ASPHALT SHALL BE INSTALLED AND COMPACTED BY MECHANICAL MEANS TO PRODUCE A SMOOTH SURFACE FOR PEDESTRIAN AND VEHICULAR TRAFFIC. ALL PLATE EDGES SHALL BE SECURED TO PREVENT RATTLING AND MOVEMENT AS WELL AS PROTECTED WITH ASPHALT WITH A 2-FT TAPER. LONG TERM INSTALLATIONS (6 OR MORE DAYS) SHALL REQUIRE PUBLIC WORKS DIRECTOR APPROVAL AND REQUIRE THE PLATES TO BE INSTALLED FLUSH TO THE ROADWAY SURFACE.
16. CONSTRUCTION SITES SHALL BE KEPT CLEAN AT ALL TIMES. THE CONTRACTOR OR PERMITTEE SHALL NOT BE ALLOWED TO LEAVE THE SITE PRIOR TO THOROUGHLY CLEANING SIDEWALKS, CURBS, GUTTERS, AND STREET SURFACES. CLEANING SHALL BE ACCOMPLISHED BY EITHER HAND OR MACHINE SWEEPING AS REQUIRED AT NO COST TO THE CITY. THE CONTRACTOR SHALL NOT BE ALLOWED TO FLUSH THE STREETS WITH WATER UNTIL AFTER THE AREA HAS BEEN COMPLETELY AND THOROUGHLY SWEPT AND ALL DEBRIS PICKED UP AND PROPERLY DISPOSED OF.
17. CONSTRUCTION SHALL COMPLY WITH THE BAY AREA AIR DISTRICT'S DUST CONTROL MEASURES.
18. UPON DISCOVERY OF HAZARDOUS MATERIALS, THE CONTRACTOR SHALL PROMPTLY NOTIFY THE PUBLIC WORKS INSPECTOR IN WRITING.
19. UPON DISCOVERY OF HUMAN REMAINS AND/OR CULTURAL MATERIALS, ALL PROJECT-RELATED CONSTRUCTION SHOULD CEASE WITHIN A 100-FT RADIUS. THE CONTRACTOR SHALL NOTIFY THE SAN MATEO COUNTY CORONER IMMEDIATELY. 8/17/2026
CITY STANDARD GENERAL NOTES
G-1B
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
135 of 833
A AREA
AB AGGREGATE BASE
AC ASPHALT CONCRETE
ADA AMERICANS WITH DISABILITIES ACT
ASTM AMERICAN SOCIETY FOR TESTING MATERIALS
AWS AMERICAN WELDING SOCIETY
BC BACK OF CURB
BM BENCHMARK
BW BACK OF WALK
CB CATCH BASIN
CBR CALIFORNIA BEARING RATIO
CDF CONTROLLED DENSITY FILL
CIPP CURED-IN-PLACE PIPE
℄, C/L CENTER LINE
CL CLASS
CLR CLEARANCE, CLEAR
CLSM CONTROLLED LOW STRENGTH MATERIAL
CO CLEANOUT
COMM COMMUNICATIONS
COMP COMPACTION
CONC CONCRETE
CONST CONSTRUCT, CONSTRUCTION
COSM CITY OF SAN MATEO
CY, C.Y. CUBIC YARDS
Ø, D, DIA DIAMETER
°, DEG DEGREE
DI DROP INLET
DTL DETAIL
DPW DEPARTMENT OF PUBLIC WORKS
DWY, D/W DRIVEWAY
E, ELEC ELECTRIC
EA EACH
EASE EASEMENT
EG EXISTING GRADE
EL ELEVATION
ELEC ELECTRIC, ELECTRICAL
EP EDGE OF PAVEMENT
EQ EQUAL
EVA EMERGENCY VEHICLE ACCESS
E.W. EACH WAY
EX EXISTING
FC FACE OF CURB
FF FINISHED FLOOR ELEVATION
FG FINISHED GRADE ELEVATION
FS FINISHED SURFACE ELEVATION
FDC FIRE DEPARTMENT CONNECTION
FH FIRE HYDRANT
FL FLOW LINE
FM FORCE MAIN
FT FEET
G GAS
GA, GAL GALVANIZED
GB GRADE BREAK
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GIP GALVANIZED IRON PIPE
GPM GALLONS PER MINUTE
HDPE HIGH-DENSITY POLYETHYLENE
HMA HOT-MIX ASPHALT
HP HIGH POINT
I.D. INSIDE DIAMETER
INV INVERT
IPS IRON PIPE SIZE
IRR IRRIGATION
JP JOINT POLE
JT JOINT TRENCH
LF LINEAL FEET, LINEAR FEET
LG LIP OF GUTTER
MAX MAXIMUM
MH MANHOLE
MIN MINIMUM
MON MONUMENT
NTS NOT TO SCALE
NO., # NUMBER
O.C., O/C ON CENTER
O.D. OUTSIDE DIAMETER
PAE PUBLIC ACCESS EASEMENT
PCC PORTLAND CEMENT CONCRETE
PB PULL BOX
PED PEDESTRIAN
⅊, P/L PROPERTY LINE
PSE PUBLIC SIDEWALK EASEMENT
PSI POUNDS PER SQUARE INCH
PUE PUBLIC UTILITY EASEMENT
PVC POLYVINYL CHLORIDE
R RADIUS
RCP REINFORCED CONCRETE PIPE
REBAR REINFORCEMENT BAR
RRFB RECTANGULAR RAPID FLASHING BEACON
ROW, R.O.W. RIGHT OF WAY
RIM RIM ELEVATION
S SLOPE
SD STORM DRAIN
SEC SECTION
SF, SQFT SQUARE FEET
SHT SHEET
SL STREET LIGHT
SMMC SAN MATEO MUNICIPAL CODE
SS SANITARY SEWER
ST STREET
STA STATION
STD STANDARD
STRUCT STRUCTURAL
SUP SUPERINTENDENT
SW SIDEWALK
T, TELE TELECOMM, TELEPHONE
TC TOP OF CURB
TEMP TEMPORARY
THK THICKNESS
TP TOP OF PAVEMENT
TS TRAFFIC SIGNAL
TW TRAVEL WAY
TYP TYPICAL
U.S.A UNDERGROUND SERVICE ALERT (811)
VC VERTICAL CURVE
VCP VITRIFIED CLAY PIPE
VERT VERTICAL
VIS VISIBILITY
W/ WITH
WM WATER METER
WV WATER VALVE
WYE WYE FITTING
XING CROSSING
NOTES:
1. THESE ARE STANDARD CITY ABBREVIATIONS TO BE USED IN CONSTRUCTION PLANS. 8/17/2026
STANDARD ABBREVIATIONS
G-2
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
136 of 833
PROPOSED EXISTING
SUBDIVISION / PROJECT SITE BOUNDARY
PROPERTY / RIGHT-OF-WAY LINE
EASEMENT LINE
CENTERLINE
GUTTER, FACE OF CURB, AND BACK OF CURB
SIDEWALK
BUILDING OUTLINE
STORM DRAIN LINE
SANITARY SEWER LINE
OVERHEAD LINE
JOINT TRENCH LINE
WATER LINE
MANHOLE
CLEANOUT
CATCH BASIN / DROP INLET
W W W
OH OH OH
PAVEMENT (DEEP AC, GRIND/OVERLAY, SLURRY)
JT JT JT
100 CONTOUR LINE
STREET LIGHT CONDUIT LINE
PULL BOX
SL SL SL
BENCHMARK / TEMPORARY BENCHMARK
STREET LIGHT
STREET SIGN
W
CB DI
W W
OH OH OH
JT JT JT
SL SL SL
100
BM
STREET TREE
FIRE HYDRANT
SD SS
X X X X X X FENCE LINE
JP JOINT POLE
FH
CO
PB
WM WATER METER
FLOWLINE
SLOPE/GRADE 1.0%
DESCRIPTION
SANITARY SEWER FORCE MAIN
SS SS
FM FM FM FM FM FM
G G G G G G GAS LINE
E E ELECTRIC LINE
C C COMMUNICATION LINE
E E
C C
E E
C C
CB DI
CO
PB
BM TBM
JP
FH
WM
1.0%
8/17/2026
STANDARD LINES AND SYMBOLS
G-3
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
137 of 833
RESERVED
8/17/2026
TYPICAL STREET SECTIONS
A-1A
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
138 of 833
RESERVED
8/17/2026
TYPICAL STREET SECTIONS
A-1B
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
139 of 833
RESERVED
8/17/2026
TYPICAL STREET SECTIONS
A-1C
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
140 of 833
NOTES:
1. A = 25' MINIMUM
2. B = 18' MINIMUM UNLESS OTHERWISE APPROVED
3. P = 7' MINIMUM OR AS REQUIRED PER CURRENT CITY PEDESTRIAN MASTER PLAN
4. NO PARKING ALLOWED WITHIN CUL-DE-SAC. IF PARKING IS TO BE PROVIDED, MAINTAIN A 48-FT CLEAR RADIUS FROM THE PARKING.
PLAN
Δ VARIES
PROPERTY LINE
R = 55' MIN
R = 60' MIN FOR INDUSTRIAL STREETS
CURB LINE
R = 48' MIN
CURB LINE
R = 57' MIN
PROPERTY LINE
R = 50' MIN
⅊ ℄ ⅊
A
P B
A
B P
P
8/17/2026
CUL-DE-SAC
A-2
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
141 of 833
NOTES:
1. P = 7' MINIMUM OR AS REQUIRED PER CURRENT CITY PEDESTRIAN MASTER PLAN
2. USE NORMAL SECTION FROM INNER CURB TO CENTER LINE.
3. FROM CROWN LINE TO OUTER CURB, THE MAXIMUM SLOPE IS 1" PER FOOT.
4. SUPERELEVATION PERCENTAGES SHOWN ARE STRAIGHT FROM CENTERLINE TO CROWN LINE.
5. ELEVATIONS ARE REQUIRED WHERE CIRCLED.
6. WHEN STREETS HAVE TILT-TYPE SECTION, THE CROWN LINE WILL NOT NECESSARILY TERMINATE ON THE CENTERLINE PERPENDICULAR TO THE POINT OF TANGENCY OF THE CURB.
CURVE DATA
PROPERTY LINE
R1 = 25' (MIN)
Δ1 = VARIABLE
CURB LINE
R2 = 25' + P (MIN)
P = 7' (MIN OR NOTE 1)
CENTER LINE
R3 = 25' + A
A = 25' (MIN)
P
A
A
W
W
A A
P P
P
12'
P
PLAN
Δ1 Δ3 CROWN LINE
50' MIN
Δ2
1%
Δ2 50' MIN
CURB LINE
R3 = W + 10' - P
PROPERTY LINE
R3 = W + 10'
Δ3 = Δ1 + 2Δ2
CURVE DATA
CURB RADIUS = 100' + P
PROPERTY LINE RADIUS = 100'
Δ1/4
Δ1/4
Δ1/4
Δ1/4
⅊ ℄ ⅊
1.5%
2%
1.5%
1%
8/17/2026
CORNER KNUCKLE
A-3
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
142 of 833
CURB EXTENSION ON BOTH STREETS CURB EXTENSION ON MINOR STREET ONLY
MID-BLOCK CURB EXTENSION
CURB EXTENSION DIMENSIONS
DIMENSION TABLE
W L X Y Z
4' 15.0' 10.0' 5.0' 2.7'
5' 16.6' 11.1' 5.5' 3.3'
6' 18.0' 12.0' 6.0' 4.0'
7' 19.3' 12.8' 6.4' 4.7'
8' 20.4' 13.6' 6.8' 5.3'
CURB EXTENSIONS (BULBOUTS) NOTES: 1. EXTENSION WIDTH SHOULD NOT EXCEED THE WIDTH OF THE
ADJACENT PARKING STALL OR EXTEND INTO AN ADJACENT BIKE
LANE WHICHEVER IS FARTHEST FROM THE CURB.
2. EXTENSIONS SHOULD BE USED ON MEDIUM TO LOW TRAFFIC
VOLUME ROADS OR WHERE PEDESTRIAN PRIORITY IS GIVEN.
3. CORNER RADII SHALL ALLOW FOR APPROPRIATE VEHICLE TURNING AS DIRECTED BY PUBLIC WORKS DIRECTOR.
4. HIGH-VISIBILITY CROSSWALKS ARE RECOMMENDED WITH ALL
CURB EXTENSIONS.
5. FOR MID-BLOCK EXTENSIONS OR UNCONTROLLED INTERSECTION
CROSSINGS, HIGH-VISIBILITY CROSSWALKS AND RECTANGULAR
RAPID FLASHING BEACONS (RRFB) SHALL BE PROVIDED.
W = CURB EXTENSION WIDTH
L = CONFORM LENGTH
MAJOR
STREET MINOR STREET EXTENSION LENGTH VARIES
EXTENSION
LENGTH
VARIES
15'R MIN
NOTE 3
EXISTING
CURB RETURN
PROPERTY
LINE
FACE OF CURB
CROSSWALKS
MAJOR
STREET MINOR STREET EXTENSION LENGTH VARIES
15'R MIN
NOTE 3
EXISTING
CURB RETURN
PROPERTY
LINE
FACE OF CURB
CROSSWALKS
VARIES
4'MIN VARIES 4'MIN
VARIES
4'MIN
VARIES
15' MIN WIDTH VARIES 4' MIN
FACE OF
CURB
RRFB W/
PUSH BUTTON
X Y
L
(EXTENSION LENGTH) Z W (EXTENSION WIDTH)
NEW
CURB LINE
EXISTING
CURB LINE
10'R
20'R
⅊ ⅊
⅊ ⅊
LENGTH VARIES
6' MIN
HIGH-VIS
CROSSWALK
CURB RAMP
8/17/2026
CURB EXTENSIONS
A-4
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
143 of 833
PLAN
NOTES:
1. VEHICLE TURNOUTS SHALL REQUIRE APPROVAL FROM THE PUBLIC WORKS DIRECTOR.
2. WHERE PUBLIC RIGHT-OF-WAY WIDTH IS LIMITED, PUBLIC ACCESS EASEMENTS SHALL BE REQUIRED AND DEDICATED TO THE CITY.
3. INCREASE LENGTH BY 24-FT PER ADDITIONAL STALL LENGTH.
R=6'
Δ=45°
TYP
W (VARIES)
FLOWLINE
24' MINIMUM
NOTE 3
R=6'+W
Δ=45°
TYP
6'R
Δ=45°
TYP
SIDEWALKS
STD C-4A OR C-4B
VALLEY GUTTER
STD C-2C 8'-1"
FACE OF CURB
BACK OF WALK
AC PAVEMENT
8/17/2026
VEHICLE TURNOUT
A-5
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
144 of 833
NOTES:
1. THIS DRAWING IS A GUIDELINE. CASES NOT ADDRESSED BY THIS SHEET OR SMMC CHAPTER 27.84 SHALL REQUIRE PUBLIC WORKS
DIRECTOR APPROVAL.
2. TRAFFIC SIGHT TRIANGLE SHALL BE MEASURED 45' FROM THE INTERSECTION POINT OF THE CURB LINES AS SHOWN ABOVE. IN THE DOWNTOWN AREA, INTERSECTIONS MAY BE REDUCED TO 25' ON CASE BY CASE BASIS AS APPROVED BY THE PUBLIC WORKS DIRECTOR.
3. VEGETATION, FENCES, OR OTHER STRUCTURES SHALL BE NO TALLER THAN 36" ABOVE THE CURB WITHIN TRAFFIC SIGHT TRIANGLE.
4. TREES SHALL BE TRIMMED BACK TO THE TRUNK AT LEAST 8' ABOVE THE SIDEWALK WITHIN THE TRAFFIC SIGHT TRIANGLE.
5. THE FOLLOWING ARE EXEMPT FROM THESE RESTRICTIONS:
A. EXISTING PERMANENT BUILDINGS
B. UTILITY POLES
C. CITY SIGNAGE, SIGNALS, AND SIGNAL EQUIPMENT
D. PLANTS IN OPEN GROWTH HABITATS THAT DO NOT FORM A HEDGE
AND TRIMMED TO LEAVE UNOBSTRUCTED CROSS VISIBILITY
E. WHERE THE GROUND CONTOUR PHYSICALLY CONSTRICTS CROSS
VISIBILITY SECTION A-A
CORNER PLAN 36" MAX 8' MIN NOTE 4
NOTE 3
BACK OF WALK
BACK OF WALK
45'
NOTE 2 45' NOTE 2
RIGHT-OF-WAY/
PROPERTY LINE
TRAFFIC SIGHT TRIANGLE
NOTE 2
SIDEWALKS
FACE OF CURB
A A
SIDEWALKS
⅊
⅊
LIP OF GUTTER
FACE OF CURB
8/17/2026
SIGHT TRIANGLE
(CORNERS) A-6A
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
145 of 833
NOTES:
1. THIS DRAWING IS A GUIDELINE. CASES NOT ADDRESSED BY THIS SHEET OR SMMC CHAPTER 27.84 SHALL REQUIRE PUBLIC WORKS DIRECTOR APPROVAL.
2. TRAFFIC SIGHT TRIANGLE SHALL BE MEASURED 10' FROM THE INTERSECTION POINT OUTSIDE EDGE OF THE PEDESTRIAN PATH OF TRAVEL AND THE DRIVEWAY AS SHOWN ABOVE. FOR ZERO-LOT LINE PROJECTS, THIS SIGHT TRIANGLE MAY BE REDUCED OR WAIVED IF ALTERNATIVE PEDESTRIAN SAFETY MEASURES ARE PROVIDED AND APPROVED BY THE PUBLIC WORKS DIRECTOR.
3. VEGETATION, FENCES, OR OTHER STRUCTURES SHALL BE NO TALLER THAN 36" ABOVE THE CURB WITHIN TRAFFIC SIGHT TRIANGLE OR PEDESTRIAN SIGHT TRIANGLE.
4. TREES SHALL BE TRIMMED BACK TO THE TRUNK AT LEAST 8' ABOVE THE CURB.
5. THE FOLLOWING ARE EXEMPT FROM THESE RESTRICTIONS:
A. UTILITY POLES
B. CITY SIGNAGE, SIGNALS, AND SIGNAL EQUIPMENT
SECTION A-A DRIVEWAY PLAN
PEDESTRIAN SAFETY 36" MAX 8' MIN NOTE 4
NOTE 3
BACK OF WALK
SIDEWALKS
PEDESTRIAN ℄
SIGHT TRIANGLE
NOTE 2
A
A
10'
BOTH SIDES
OF DWY 10'
DRIVEWAY
ROW/⅊
SIDEWALKS
⅊ ⅊
8/17/2026
SIGHT TRIANGLE
(DRIVEWAYS) A-6B
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
146 of 833
STREET IMPROVEMENT NOTES: SAWCUTS: SHALL BE FULL DEPTH AND PERFORMED AFTER A USA TICKET (811) HAS BEEN CALLED. SAWCUTTING IN CONCRETE SHALL ONLY BE PERFORMED AT EXISTING JOINTS.
SUBGRADE: SHALL BE COMPACTED TO 90% RELATIVE COMPACTION WITHIN LIMITS OF CONCRETE SIDEWALK AND CURB RAMPS; EVERYWHERE ELSE, INCLUDING AREAS BENEATH CONCRETE AND ASPHALT, SHALL BE COMPACTED TO 95% RELATIVE COMPACTION. WHERE UNSUITABLE
SUBGRADE MATERIAL IS ENCOUNTERED, REMEDIAL WORK SHALL BE DONE, INCLUDING BUT NOT LIMITED TO, OVER-EXCAVATING AND REPLACING WITH CLASS II AGGREGATE BASE. IF SITE CONDITIONS PREVENT ACHIEVING THE REQUIRED RELATIVE COMPACTION, A FABRIC MAY BE USED IF APPROVED BY THE PUBLIC WORKS DIRECTOR.
BASE: BASE MATERIAL UNDER CONCRETE OR ASPHALT SHALL MEET CLASS II AGGREGATE BASE STANDARDS. THOROUGHLY WET BASE PRIOR TO PLACING CONCRETE.
CONCRETE: SHALL MEET CALTRANS CLASS A 6-SACK MIX WITH 3 4" TO 1" AGGREGATE AND MINIMUM 3,000 PSI. ADD 1
2 TO 3
4 POUNDS BY WEIGHT OR 1
PINT BY VOLUME OF LAMPBLACK PER CUBIC YARD OF CONCRETE MIX. MAX SLUMP OF 4". NO ADMIXTURES WITHOUT APPROVAL OF THE PUBLIC WORKS DIRECTOR. CURE VIA THE IMPERVIOUS MEMBRANE METHOD. BROOM FINISH ALL SURFACES AND PERPENDICULAR TO PATH OF TRAVEL FOR SIDEWALKS. UNDERMINING EXISTING CONCRETE IS NOT ALLOWED.
FORMS: FACES SHALL NOT VARY FROM THE PLAN DIMENSIONS BY MORE THAN 0.02 FEET. FORMS SHALL MEET GRADE. ALL FORMWORK SHALL BE INSPECTED BY PUBLIC WORKS PRIOR TO PLACING CONCRETE.
EXPANSION JOINTS: SHALL BE FULL DEPTH OF THE CONCRETE WITH A 1 2" THICK FULL-DEPTH ASPHALTIC FIBER PLACED BETWEEN AND USING #4 X 24" SMOOTH DOWELS. EXPANSION JOINTS SHALL BE CONSTRUCTED AT A MAXIMUM OF 50' INTERVALS IN CONCRETE CURBS, GUTTERS, SIDEWALKS, RETURNS, DRIVEWAYS, AND AT COLD JOINTS. EXPANSION JOINT ASPHALTIC FIBER SHALL BE PLACED AROUND BASE OF UTILITY POLES AND HYDRANTS. FINISH CONCRETE ADJACENT TO EXPANSION JOINTS WITH AN EDGER TOOL.
CONTROL JOINTS: SHALL BE 1
2" DEEP AND 14" WIDE WITH A CLEANLY ROUNDED EDGE. CONTROL JOINTS SHALL BE CONSTRUCTED AT A MAXIMUM OF 10' INTERVALS IN CONCRETE CURBS GUTTERS, SIDEWALKS, RETURNS, AND DRIVEWAYS.
SCORE JOINTS: SHALL BE 1
4" DEEP AND 14"WIDE WITH A CLEANLY ROUNDED EDGE. SCORE JOINTS SHALL BE PLACED STRAIGHT AND UNIFORMLY SPACED BETWEEN CONTROL JOINTS ON SIDEWALKS. SCORE JOINTS SHALL NOT EXCEED 30" INTERVALS TRANSVERSELY OR 36" INTERVALS LONGITUDINALLY.
DOWELS: INSTALL (DRILL & EPOXY) #4 X 24" DOWELS AT EXPANSION JOINTS AND WHERE CONNECTING NEW TO EXISTING SIDEWALK. CENTER DOWELS BETWEEN CONTROL AND SCORE JOINTS FOR 3' OR SMALLER SIDEWALK PANELS, OR TWO EVEN-SPACED DOWELS FOR 3' TO 5' PANELS.
ASPHALT: SHALL BE PLACED AS 1
2" TYPE A HOT-MIX ASPHALT ("HMA") PER CURRENT CALTRANS STANDARD SPECIFICATIONS (15% RAP MAX). HMA MATCHING EXISTING PAVEMENT THICKNESS OR 4" MINIMUM, WHICHEVER IS GREATER, SHALL BE USED IN STREETS. TACK COAT ALL ASPHALT AND CONCRETE EDGES AND SURFACES PRIOR TO HMA PLACEMENT. ASPHALT PAVEMENT RESTORATION SHALL BE MADE FLUSH WITH THE ADJACENT SURFACES AT CONFORMS AND EDGES WITH A MAXIMUM TOLERANCE OF 1 8". ALL FINISHED EDGES SHALL BE SEALED.
RUBBERIZED ASPHALT (RHMA) SHALL BE REQUIRED WHERE BEING REPLACED AND CONFORM TO CURRENT CALTRANS STANDARD SPECIFICATIONS. ASPHALT PAVEMENT CROSS SLOPES FROM CROWN TO LIP OF GUTTER SHALL BE 2% MIN AND 5% MAX.
AC PLUG: WHERE NEW CONCRETE IS BEING POURED ADJACENT TO EXISTING AC PAVEMENT, A 12" MINIMUM WIDE BAND OF AC PAVEMENT SHALL BE REMOVED AND REPLACED FOR THE FULL DEPTH (6" MINIMUM / 12" MAXIMUM) OF THE EXISTING AC PAVEMENT.
SIDEWALKS: RUNNING SLOPE SHALL NOT EXCEED STREET SLOPE. CROSS SLOPE SHALL BE DESIGNED FOR A MAXIMUM 1.5% AND CONSTRUCTED TO BE LESS THAN 2.0%. UNDERMINING IS NOT ALLOWED.
GUTTERS: STANDARD GUTTER WIDTH SHALL BE 24". NEW CONSTRUCTION SHALL INSTALL NEW GUTTERS OR REPLACE EXISTING GUTTERS WITH THE STANDARD 24". MINOR PROJECTS PERFORMING REPAIRS ONLY MAY MATCH THE EXISTING GUTTER WIDTH. GUTTER WIDTH TRANSITIONS SHALL BE 6' MINIMUM. MAXIMUM GUTTER SLOPE FROM PAVEMENT TO FLOWLINE SHALL BE 5%. UNDERMINING IS NOT ALLOWED.
STRIPING: ALL TRAFFIC STRIPING AND MARKINGS SHALL BE HOT-APPLIED THERMOPLASTIC PAINT WITH GLASS BEADING (AASHTO M247 TYPE 2).
PREFORMED THERMOPLASTIC SHALL ONLY BE ALLOWED FOR STRIPING RESTORATION FOR TRENCH RESTORATIONS. 8/17/2026
STREET IMPROVEMENT
STANDARD NOTES C-1
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
147 of 833
TYPE "B"
ROLLED CURB & GUTTER
TYPE "A"
CURB & GUTTER
NOTES: 1. REFER TO DETAIL C-1 FOR ALL CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED ON THIS SHEET.
2. NEW CONSTRUCTION SHALL USE TYPE A OR C ONLY. TYPE B SHALL ONLY BE USED TO REPLACE DAMAGED EXISTING ROLLED CURBS.
3. EXPANSION, CONTROL, AND SCORE JOINTS SHALL BE PLACED PER SPECIFICATIONS ON CITY DETAIL C-1.
4. GUTTER SHALL BE SLOPED TOWARD THE CURB A MINIMUM 2% OR MAXIMUM 5%.
5. PROVIDE AND INSTALL DOWELS AS SHOWN AT EXPANSION JOINTS AND WHERE CONNECTING NEW TO EXISTING CONCRETE.
6. AC PLUG SHALL BE PROVIDED WHEREVER CURB AND GUTTER ARE INSTALLED ADJACENT TO EXISTING AC PAVEMENT.
7. NEW CONCRETE SHALL CONFORM TO EXISTING AT THE NEAREST JOINT UNLESS APPROVED OTHERWISE.
8. TRANSITIONS BETWEEN DIFFERENT CURB TYPES SHALL BE 5-FT IN LENGTH.
9. AGGREGATE BASE SHALL BE PLACED, COMPACTED, AND EXTEND 1' BEYOND LIP OF GUTTER PRIOR TO FORMING AND POURING CONCRETE.
10. FOR REPAIR OR REPLACEMENT, CURB AND GUTTER SHALL BE POURED MONOLITHIC AND ACROSS THE FULL WIDTH TO EDGE OF ASPHALT.
TYPE "C"
VERTICAL CURB
6" 24"
6" 6"
6" PCC
6" CL 2 AB
BACK OF CURB DEFINED
BY CONTROL JOINT
SIDEWALK
DTL C-4A
BACK OF CURB
FOR PARK STRIPS
1 2"R
1"R
1 1
DOWEL
TYP
8.5" 24"
6"
BACK OF CURB
DEFINED BY
CONTROL JOINT 4"
1"
1 1
SIDEWALK
DTL C-4A
6" PCC
6" CL 2 AB
3"
DOWEL
6"R TYP
4"R
12" MIN
AC PLUG
12" MIN
AC PLUG
6" 16" 6" CL 2 AB 6"
DOWEL
TYP
4" 3" 3" 3"
1 2"R 1
2"R
1"
1:6 BATTER
TYP 10"
12" MIN
AC PLUG
1:6 BATTER
TYP
8/17/2026
STANDARD CURB AND GUTTER
C-2A
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
148 of 833
NOTES:
1. TYPE C AND D CURBS AND GUTTERS REQUIRE APPROVAL FROM THE PUBLIC WORKS DIRECTOR WHO MAY ALLOW THEM TO BE INSTALLED WHERE CURRENTLY EXISTS, FOR FIRE LANE ACCESS, OR OTHER LOCATIONS AS SPECIFIED OR REQUIRED BY THE PUBLIC WORKS DIRECTOR.
2. REFER TO DETAIL C-1 FOR ALL CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED ON THIS SHEET.
3. EXPANSION, CONTROL, AND SCORE JOINTS SHALL BE PLACED PER SPECIFICATIONS ON CITY DETAIL C-1.
4. GUTTER SHALL BE SLOPED TOWARD THE CURB A MINIMUM 2% OR MAXIMUM 5%.
5. PROVIDE AND INSTALL DOWELS AS SHOWN AT EXPANSION JOINTS AND WHERE CONNECTING NEW TO EXISTING CONCRETE.
6. AC PLUG SHALL BE PROVIDED WHEREVER CURB AND GUTTER ARE INSTALLED ADJACENT TO EXISTING AC PAVEMENT.
7. NEW CONCRETE SHALL CONFORM TO EXISTING AT THE NEAREST JOINT UNLESS APPROVED OTHERWISE.
8. TRANSITIONS BETWEEN DIFFERENT CURB TYPES SHALL BE 5-FT IN LENGTH.
9. AGGREGATE BASE SHALL BE PLACED, COMPACTED, AND EXTEND 1' BEYOND LIP OF GUTTER PRIOR TO FORMING AND POURING CONCRETE.
10. FOR REPAIR OR REPLACEMENT, CURB AND GUTTER SHALL BE POURED MONOLITHIC AND ACROSS THE FULL WIDTH TO EDGE OF ASPHALT.
TYPE "D"
SPECIAL CURB & GUTTER
TYPE "E"
SPECIAL CURB & GUTTER
6"
DOWEL
TYP
R=18" 4.5"
24" 24"
6" NORMAL CURB
BACK OF CURB DEFINED
BY CONTROL JOINT
SIDEWALK
DTL C-4A
1 1
6" CL 2 AB 6" 8"
12" MIN
AC PLUG
BACK OF CURB DEFINED
BY CONTROL JOINT
SIDEWALK
DTL C-4A
1 1
R=11"
R=6" 5" 6"
6" PCC
15" 24"
3"8"
6"
DOWEL
TYP 6" PCC
12" MIN
AC PLUG
6" CL 2 AB
1:6 BATTER
TYP
1:6 BATTER
TYP
8/17/2026
SPECIAL CURB AND GUTTER
C-2B
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
149 of 833
VALLEY GUTTER SPECS
CONCRETE LONGITUDINAL REBAR
W m #4 REBAR EQUAL
SPACING
(FT) (IN) COUNT (IN)
4 3/4 3 21
6 1 3 33
8 1 1/2 4 30
TYPE "F"
VALLEY GUTTER
NOTES: 1. VALLEY GUTTERS REQUIRE APPROVAL BY THE PUBLIC WORKS DIRECTOR.
2. REFER TO DETAIL C-1 FOR ALL CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED ON THIS SHEET.
3. VALLEY GUTTERS SHALL NOT BE INSTALLED WHERE LONGITUDINAL SLOPE EXCEEDS 6%.
4. SLOPE GUTTER TO FLOWLINE. CROSS SLOPE SHALL NOT EXCEED 4%.
5. EXPANSION JOINTS SHALL BE PLACED AS SHOWN AND AT 50' MAX INTERVALS WITH 1 2"X12"
SLIP DOWELS.
6. CONTROL JOINTS SHALL BE PLACED CENTER BETWEEN EXPANSION JOINTS OR AT MAXIMUM 10' INTERVALS.
7. PROVIDE #4 REBAR 21" O.C. E.W. IN APRON. GUTTER REBAR SHALL EXTEND ACROSS THE APRON.
8. WHERE INSTALLING NEW VALLEY GUTTER ADJACENT TO EXISTING PAVEMENT, A 12" MIN WIDE AC PLUG SHALL BE PROVIDED.
9. GUTTER FLOW ARROWS SHOWN ON THE PLAN ARE FOR EXAMPLE ONLY. DESIGN
FLOWLINE SHALL FLOW TOWARD A CITY STORM DRAIN FACILITY AND SHALL NOT HAVE PONDING WITHIN THE GUTTER.
PLAN
SECTION A-A
LONGITUDINAL REBAR, TYP
SEE TABLE
W
W/2 6"
TYP
1:6 BATTER
TYP
3" CLR
TYP
8" PCC
6" CL 2 AB
OR MATCH EX AB THICKNESS
WHICHEVER IS GREATER
℄
CONTROL JOINT
TYP
W
A
A
FLOWLINE
TYP
DOWEL TYP
DTL C-2A
APRON
NOTE 7 W/2 #4 REBAR - 6'±
AT 45° ANGLE
TYP
EXPANSION JOINT
TYP
APRON
NOTE 7 2' STD EXTEND VALLEY GUTTER
REBAR ACROSS APRON
NOTE 7
TYP
m
12" MIN
AC PLUG
FACE OF CURB
BACK OF WALK
FACE OF CURB
BACK OF WALK
#4 REBAR, TYP
TRANSVERSE 21" O.C.
8/17/2026
VALLEY GUTTER
C-2C
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
150 of 833
NOTES: 1. REFER TO DETAIL C-1 FOR ALL CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED ON THIS SHEET.
2. ALL SECTIONS SHALL BE AT LEAST 4" THICK.
3. CONCRETE SHALL BE CLASS "B" (5 SACK).
4. BOTH SIDES OF THE DITCH SHALL BE FORMED WITH 2"x4" LUMBER AS SHOWN.
5. DITCH SIDES SHALL BE BACKFILLED AND COMPACTED IMMEDIATELY AFTER THE REMOVAL OF SIDE FORMS.
6. NO CONCRETE SHALL BE PLACED PRIOR TO FORM INSPECTION BY THE ENGINEER.
7. NO DITCH IS TO BE CONSTRUCTED ON FILLED GROUND PRIOR TO CERTIFICATION OF THE FILL BY THE GEOTECHNICAL ENGINEER.
8. NO EXPANSION JOINTS SHALL BE REQUIRED.
TYPE "A" CONCRETE LINED DITCHES
TYPE "B" CONCRETE LINED DITCHES
1:1
1:1
6" 12" 6"
4" 12" 4"
VARIES
12" MIN
1:1
12"
SLOPE TO MATCH BANK 8"
2"X4" FORM
2"X4" FORM
2"X4" FORM
8/17/2026
DITCHES
C-3
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
151 of 833
NOTES: 1. REFER TO DETAIL C-1 FOR ALL CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED ON THIS SHEET.
2. SIDEWALKS SHALL BE POURED MONOLITHIC WITH CURBS AND GUTTERS.
3. INSTALL DOWELS AT EXPANSION JOINTS. CENTER DOWELS BETWEEN CONTROL AND SCORE JOINTS FOR 3' OR SMALLER PANELS, OR TWO EVEN-SPACED DOWELS FOR 3' TO 5' PANELS.
4. EXPANSION, CONTROL, AND SCORE JOINTS SHALL BE PLACED PER SPECIFICATIONS ON CITY DETAIL C-1.
5. NEW CONCRETE SHALL CONFORM TO EXISTING SIDEWALK AT THE NEAREST JOINT.
6. WHERE EXISTING SIDEWALK WIDTHS ARE LESS THAN THE MINIMUM 5', PROVIDE A SIDEWALK WIDTH TRANSITION OF ONE PANEL LENGTH.
7. POSTS FOR SIGNAGE, PEDESTRIAN PUSH BUTTONS, OR PARKING METERS SHALL BE SET 18" ON CENTER FROM THE FACE OF CURB. ALL OTHER VERTICAL OBSTRUCTIONS SHALL PROVIDE 18" MIN CLEARANCE TO FACE OF CURB.
8. THE CLEAR WIDTH PEDESTRIAN PATH OF TRAVEL AT LOCATIONS OF VERTICAL OBSTRUCTIONS SHALL BE A MINIMUM OF 32" CLEARANCE FOR A LENGTH NOT GREATER THAN 24".
9. REFER TO CITY DETAIL C-4 FOR CONFORMING AT EXISTING SIDEWALK OR REPLACING EXISTING SIDEWALK.
10. SIDEWALK WIDTHS AT NEW DEVELOPMENT SHALL CONFORM TO THE CURRENT PEDESTRIAN MASTER PLAN.
11. UNDERMINING OF THE SIDEWALK, CURB, OR GUTTER IS NOT ALLOWED.
SECTION A-A
ISOMETRIC VIEW
VARIES
(2' TYP)
NOTE 3
SLOPE= 1%-1.5%
4" PCC (TYPE A CURB)
6" PCC (ALL OTHERS) 6" CL 2 AB
4"
1 1
SIDEWALK POURED
MONOLITHIC WITH
CURB AND GUTTER
A
A
BACK OF
WALK
PEDESTRIAN SIDEWALK
SEE BELOW
BACK OF CURB
DEFINED BY
CONTROL JOINT
POSTS AND METERS
18" O.C. FROM FC
NOTE 7
4"
DOWEL, TYP
NOTE 3
⅊
CLEAR WIDTH
NOTE 8
CONTROL JOINT SPACING NOTE 4
SCORE JOINT EVEN SPACING NOTE 4
PEDESTRIAN ZONE
VARIES (5' MIN)
FURNISHING ZONE
VARIES (0'-4')
BACK OF CURB
DEFINED BY
CONTROL JOINT
AC PLUG
8/17/2026
STANDARD SIDEWALK
(MONOLITHIC) C-4A
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
152 of 833
SECTION A-A
NOTES: 1. REFER TO DETAIL C-1 FOR ALL CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED ON THIS SHEET.
2. INSTALL DOWELS AT EXPANSION JOINTS. CENTER DOWELS BETWEEN CONTROL AND SCORE JOINTS FOR 3' OR SMALLER PANELS, OR TWO EVEN-SPACED DOWELS FOR 3' TO 5' PANELS.
3. EXPANSION, CONTROL, AND SCORE JOINTS SHALL BE PLACED PER SPECIFICATIONS ON CITY DETAIL C-1.
4. NEW CONCRETE SHALL CONFORM TO EXISTING SIDEWALK AT THE NEAREST JOINT.
5. WHERE EXISTING SIDEWALK WIDTHS ARE LESS THAN THE MINIMUM 5', PROVIDE A SIDEWALK WIDTH TRANSITION OF ONE PANEL LENGTH.
6. POSTS FOR SIGNAGE, PEDESTRIAN PUSH BUTTONS, OR PARKING METERS SHALL BE SET 18" ON CENTER FROM THE FACE OF CURB. ALL OTHER VERTICAL OBSTRUCTIONS SHALL PROVIDE 18" MIN CLEARANCE TO FACE OF CURB.
7. THE CLEAR WIDTH PEDESTRIAN PATH OF TRAVEL AT LOCATIONS OF VERTICAL OBSTRUCTIONS SHALL BE A MINIMUM OF 32" CLEARANCE FOR A LENGTH NOT GREATER THAN 24".
8. REFER TO CITY DETAIL C-4 FOR CONFORMING AT EXISTING SIDEWALK OR REPLACING EXISTING SIDEWALK.
9. SIDEWALK WIDTHS AT NEW DEVELOPMENT SHALL CONFORM TO THE CURRENT PEDESTRIAN MASTER PLAN.
ISOMETRIC VIEW
A
A
PARK STRIP
CONSISTING OF LANDSCAPE,
SPECIAL PAVING,
OR OTHER SURAFACES
BACK OF
WALK
VARIES
(2' TYP)
PEDESTRIAN ZONE
VARIES (5' MIN)
PARK STRIP
VARIES (3' TYP)
NOTE 2
SLOPE= 1%-1.5%
4"
4" PCC 6" CL 2 AB
4"
PEDESTRIAN SIDEWALK
SEE BELOW
POSTS AND METERS
18" O.C. FROM FC
NOTE 6
DOWEL, TYP
NOTE 2
⅊
CLEAR WIDTH
NOTE 7
CONTROL JOINT SPACING NOTE 3
SCORE JOINT EVEN SPACING NOTE 3
8/17/2026
STANDARD SIDEWALK
(SEPARATED) C-4B
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
153 of 833
NOTES: 1. THIS DETAIL IS FOR SIDEWALK RESTORATION, REPLACEMENT, OR CONFORMING DUE TO MINOR CONSTRUCTION OR DAMAGE.
RESTORATION OR REPLACEMENT LIMITS SHALL BE DETERMINED BY A PUBLIC WORKS INSPECTOR WITH 2 SIDEWALK PANELS AS THE MINIMUM WIDTH.
2. REFER TO DETAIL C-1 FOR ALL CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED ON THIS SHEET.
3. FOR SIDEWALK REPAIR DUE TO WEATHERING CRACKING, TREE UPHEAVAL, OR ADA NON-COMPLIANCE, THEN A SINGLE PANEL MAY BE REPAIRED INDIVIDUALLY.
4. NO PARTIAL PANEL REPAIRS ALLOWED. SIDEWALK RESTORATION SHALL REPLACE THE ENTIRE SIDEWALK PANEL.
5. RESTORATION SHALL MATCH THE EXISTING SIDEWALK WIDTH UNLESS OTHERWISE REQUIRED BY THE PUBLIC WORKS DIRECTOR.
6. WHERE SIDEWALK IS ADJACENT TO CURB AND GUTTER, RESTORATION SHALL INCLUDE REPLACEMENT OF THE CURB AND GUTTER TO INSTALL AS MONOLITHIC SIDEWALK, CURB, AND GUTTER.
7. SAWCUTTING SHALL BE AT EXISTING SIDEWALK JOINTS. IF EXISTING CURB AND GUTTER JOINTS DO NOT ALIGN WITH THE SIDEWALK JOINTS, CONTINUE THE SAWCUT FROM THE SIDEWALK THROUGH THE GUTTER TO CREATE A NEW JOINT.
8. NEW SIDEWALK SHALL BE FLUSH WITH EXISTING SIDEWALK.
9. NEW GUTTER FLOWLINE SHALL BE FLUSH WITH EXISTING FLOWLINE.
10. DOWEL INTO EXISTING CONCRETE. WHERE EXISTING SIDEWALK THICKNESS IS LESS THAN 3", NEW SIDEWALK SHALL KEY INTO THE EXISTING SIDEWALK INSTEAD OF DOWELING IN.
11. UNDERMINING EXISTING CONCRETE SHALL NOT BE ALLOWED.
12. IN THE DOWNTOWN AREA: RESTORATION SHALL BE A FULL PANEL (BRICK LINE TO BRICK LINE) OR AS DIRECTED BY THE PUBLIC WORKS INSPECTOR IN THE FIELD. SIDEWALK PATTERN, MATERIAL, AND FINISH SHALL MATCH EXISTING UNLESS OTHERWISE APPROVED BY THE PUBLIC WORKS DIRECTOR.
ISOMETRIC VIEW
NEW SIDEWALK
PER DTL C-4A OR C-4B
BACK OF CURB
DEFINED BY
CONTROL JOINT
DOWEL INTO EXISTING
NOTE 10
NEW CURB AND GUTTER
PER DTL C-2A
EXISTING SIDEWALKS EXISTING CURB
AND GUTTER
PROPERTY SIDE
STREET SIDE
1.5% MAX
SAWCUT AT NEAREST JOINT
NOTE 7
REPLACE FROM EXISTING JOINT TO EXISTING JOINT NOTE 1
8/17/2026
SIDEWALK RESTORATION
C-4C
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
154 of 833
DETAIL A
SECTION A-A
NOTES: 1. REFER TO DETAIL C-1 FOR ALL CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED ON THIS SHEET.
2. DRIVEWAY SHALL BE POURED MONOLITHIC WITH THE GUTTER.
3. EXPANSION, CONTROL, SCORE JOINTS, AND DOWELS SHALL BE PLACED PER SPECIFICATIONS ON CITY DETAIL C-1.
4. PROVIDE EXPANSION JOINT BETWEEN PUBLIC SIDEWALK AND PRIVATE DRIVEWAY.
5. DRIVEWAY EDGE MINIMUM CLEARANCES ARE 1' TO PARCEL LINE AND CURB INLETS, 5' TO FIRE HYDRANTS, 15' TO CURB RETURNS, AND 22' TO THE NEAREST DRIVEWAY SERVING THE SAME PARCEL UNLESS APPROVED OTHERWISE BY THE PUBLIC WORKS DIRECTOR.
6. DRIVEWAYS FOR SINGLE-FAMILY SHALL BE 10' TO 12' WIDE. PUBLIC WORKS DIRECTOR APPROVAL REQUIRED FOR UP TO 20' WIDE MAXIMUM.
7. DRIVEWAYS FOR NON-SINGLE-FAMILY SHALL BE 12' TO 26' WIDE.
8. NEW CONCRETE SHALL CONFORM TO EXISTING AT THE NEAREST JOINT.
9. DRIVEWAYS FOR TRUCK OR EVA SHALL BE 8" THICK PCC AND INCLUDE #4 REBAR AT 18" ON CENTER EACH WAY OR 6"X6" METAL WIRE MESH.
ISOMETRIC VIEW
NOTE 3
PEDESTRIAN ZONE
VARIES (5' MIN)
SLOPE= 1%-1.5% 6"
1"
1"
PARK STRIP/DRIVEWAY ZONE
VARIES (4' TO 6') 24"
A
A
6"
PARK STRIP
OR SIDEWALK
PEDESTRIAN
SIDEWALK
6" CL 2 AB
1 2"R
1"R
6" PCC (STANDARD)
8" PCC (TRUCK OR EVA)
NOTE 9
DETAIL A
BACK OF
WALK
PARK STRIP
OR SIDEWALK
PEDESTRIAN SIDEWALK
6"
TRANSITION
BACK OF CURB
DEFINED BY
CONTROL JOINT
TYPE A
GUTTER
BACK OF WALK
NOTE 4
SCORE
JOINT
TYP
CONTROL
JOINT
TYP
DOWELS, TYP
NOTE 3
DRIVEWAY WIDTH NOTE 6 & 7
TRANSITION 18"
CLEARANCE NOTE 5
SCORE JOINT EVEN SPACING NOTE 3 CONTROL JOINT SPACING NOTE 3
AC PLUG
CONTROL
JOINT, TYP
VERTICAL OBSTRUCTIONS
18" MIN CLEAR
CLEARANCE NOTE 5
8/17/2026
STANDARD DRIVEWAY
C-5A
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
155 of 833
SECTION A-A
NOTES: 1. REFER TO DETAIL C-1 FOR ALL CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED ON THIS SHEET.
2. DRIVEWAY SHALL BE POURED MONOLITHIC WITH THE GUTTER.
3. EXPANSION, CONTROL, SCORE JOINTS, AND DOWELS SHALL BE PLACED PER SPECIFICATIONS ON CITY DETAIL C-1.
4. PROVIDE EXPANSION JOINT BETWEEN PUBLIC SIDEWALK AND PRIVATE DRIVEWAY.
5. DRIVEWAY EDGE MINIMUM CLEARANCES ARE 1' TO PARCEL LINE AND CURB INLETS, 5' TO FIRE HYDRANTS, 15' TO CURB RETURNS, AND 22' TO THE NEAREST DRIVEWAY SERVING THE SAME PARCEL UNLESS APPROVED OTHERWISE BY THE PUBLIC WORKS DIRECTOR.
6. DRIVEWAYS FOR SINGLE-FAMILY SHALL BE 10' TO 12' WIDE. PUBLIC WORKS DIRECTOR APPROVAL REQUIRED FOR UP TO 20' WIDE MAXIMUM.
7. DRIVEWAYS FOR NON-SINGLE-FAMILY SHALL BE 12' TO 26' WIDE.
8. NEW CONCRETE SHALL CONFORM TO EXISTING AT THE NEAREST JOINT.
9. DRIVEWAYS FOR TRUCK OR EVA SHALL BE 8" THICK PCC AND INCLUDE #4 REBAR AT 18" ON CENTER EACH WAY OR 6"X6" METAL WIRE MESH.
10. WHERE CONSTRAINED BY R.O.W. WIDTHS, REDUCE TO 36" MINIMUM WITH PUBLIC WORKS DIRECTOR APPROVAL.
DETAIL A ISOMETRIC VIEW
A
PEDESTRIAN ZONE
VARIES (4' MIN)
NOTE 10 24"
NOTE 3
1%-1.5%
PARK STRIP/DRIVEWAY ZONE
VARIES (2.5' MIN)
6"
A
PEDESTRIAN
SIDEWALK
DETAIL A
BACK OF
WALK
PEDESTRIAN SIDEWALK
6" CL 2 AB
6" PCC (STANDARD)
8" PCC (TRUCK OR EVA)
NOTE 9
1"
1" 1
2"R
1"R
PARK STRIP OR
CONCRETE SIDEWALK
BACK OF CURB
DEFINED BY
CONTROL JOINT
TYPE A
GUTTER
BACK OF WALK
NOTE 4
DOWELS, TYP
NOTE 3
SCORE JOINT EVEN SPACING NOTE 3 CONTROL JOINT SPACING NOTE 3 DRIVEWAY OPENING NOTE 6 & 7
TRANSITION 18"
CLEARANCE NOTE 5
CONTROL
JOINT, TYP
6"
TRANSITION
AC PLUG
PARK STRIP
OR SIDEWALK
VERTICAL
OBSTRUCTIONS
18" MIN CLEAR
6"
CLEARANCE NOTE 5
8/17/2026
LIMITED ROW DRIVEWAY
C-5B
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
156 of 833
NOTES: 1. THIS PRIVATE DRIVEWAY DETAIL SHALL BE USED AS THE INGRESS/EGRESS INTERFACE BETWEEN PUBLIC RIGHT-OF-WAY AND PRIVATELY OWNED STREETS.
2. REFER TO DETAIL C-1 FOR ALL CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED ON THIS SHEET.
3. PUBLIC ACCESS EASEMENT SHALL BE GRANTED AS REQUIRED TO ALLOW PUBLIC USE OF CURB RAMPS.
4. CONCRETE APRON CROSS SLOPES SHALL NOT EXCEED 4%.
5. EXPANSION JOINTS SHALL BE PLACED WITH 1
2"X12" SLIP DOWELS AT 30" O.C.
6. CONTROL JOINTS SHALL BE PLACED AT THE CENTERLINE OF THE DRIVEWAY OR 10' MAX INTERVALS.
7. BASE ROCK SHALL EXTEND 1' BEYOND LIP OF GUTTER PRIOR TO POURING CONCRETE.
8. WHERE INSTALLING NEW DRIVEWAY ON EXISTING STREETS, A 12" MIN WIDE AC PLUG SHALL BE PROVIDED.
9. CALTRANS CURB RAMP CASES A, C, G, CH AND CM ARE ACCEPTABLE CURB RAMP LAYOUTS.
PLAN
SECTION A-A
STOP
20' MIN
PRIVATE STREET
"STOP"
MARKING
"STOP" SIGN
CALTRANS R-1
1' STOP LINE
WHERE SIDEWALK
CONTINUES ON-SITE
CURB WHERE SIDEWALK
DOES NOT CONTINUE
ON-SITE
FACE OF CURB
LIP OF GUTTER
CURB RAMP
NOTE 9
CURB RAMP
NOTE 9 8' SW
PRIVATE
SW
GUTTER FLOWLINE
LIP OF GUTTER
FACE OF
CURB CITY ROW PRIVATE STREETS
SPACING
NOTE 6
CONTROL
JOINT
NOTE 6
3% MAX
10' MIN 2'
6"
#4 REBAR
18" O.C. E.W.
CENTERED
8" PCC
6" CL 2 AB
DOWELS, TYP
NOTE 5 CITY ROW PRIVATE STREETS
3% MAX
DOWELS, TYP
NOTE 5 2'
VARIES 1%-1.5%
VARIES 4' ADA PATH VARIES SW 10' MIN 4' ADA PATH
A
A
ADA4' PATH
10' RADIUS,
TYP
EXPANSION
JOINT, TYP
12" MIN
AC PLUG
12" MIN
AC PLUG
8/17/2026
PRIVATE STREET ENTRANCE
C-5C
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
157 of 833
CASE "A"
STANDARD
CASE "C"
NARROW SIDEWALKS
NOTES: 1. ALL CITY CURB RAMPS ARE BASED ON CALTRANS STANDARD PLANS FOR CURB RAMPS. DESIGNS SHALL COMPLY WITH WHICHEVER STANDARD IS MORE STRICT. REFER TO CALTRANS STANDARD PLANS FOR ALL OTHER DETAILS RELATED TO CURB RAMPS.
2. CASE A SHALL BE USED FOR ALL RAMPS AND SHALL BE DIRECTIONAL. CASE C MAY BE USED ON SIDEWALKS WITH LIMITED WIDTH.
3. FOR ANY CASE UNABLE TO BE ADDRESSED BY THIS STANDARD OR THE CALTRANS STANDARD PLANS DUE TO PHYSICAL CONSTRAINTS, MODIFIED RAMPS ON DETAIL C-6B SHALL BE USED.
4. REFER TO DETAIL C-1 FOR ALL CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED ON THIS SHEET.
5. SIDEWALK AND RAMP THICKNESS IS 4" MINIMUM AND CONSTRUCTED PER DETAIL C-4A.
6. DETECTABLE WARNING SURFACES SHALL BE CAST IN PLACE AND SHALL BE YELLOW COLOR #33538 OF FED-STD-595. NO UTILITY BOXES ALLOWED WITHIN THE DETECTABLE WARNING AREA.
7. THE BOTTOM OF THE RAMP SHALL BE FLUSH WITH THE GUTTER FLOWLINE.
8. WHERE INSTALLING RAMPS IN EXISTING STREETS, A (1' MINIMUM, 4' MAXIMUM) AC PLUG FOR THE FULL WIDTH OF THE RAMP SHALL BE PROVIDED.
9. CATCH BASINS SHALL BE RELOCATED OUTSIDE OF THE LOWER LANDING OF A RAMP WITH A MINIMUM 1-FT SEPARATION.
10. ANY SIGNAGE, SIGN POSTS, OR PAVEMENT STRIPING REMOVED DURING CONSTRUCTION OF CURB RAMPS SHALL BE REPLACED AND/OR REINSTALLED AS DIRECTED BY THE PUBLIC WORKS DIRECTOR.
SECTION A-A
SECTION C-C
NOTE 6
NOTE 6
TOP OF CURB TO
MATCH RAMP SLOPE
TYP
A
A
C
C
RAMP
FLARE
RAMP
6" MIN HIGH RETAINING CURB
AS NECESSARY
RAMP FLARE
TOP OF RAMP
ROUNDED TRANSITION GUTTER FLOWLINE
NOTE 7
GUTTER FLOWLINE
NOTE 7
RETAINING CURB
AS NECESSARY
UPPER
LANDING
CATCH BASIN
NOTE 9
1'
MIN
CATCH BASIN
NOTE 9
BACK OF
CURB
LIP OF GUTTER
UPPER LANDING
LOWER LANDING
UPPER LANDING
24"
GUTTER
24"
GUTTER
AC PLUG
1' MIN WIDE
4' MAX WIDE
BACK OF
SIDEWALK
1'
MIN
LIP OF GUTTER
BACK OF CURB
BACK OF SIDEWALK
RAMP RAMP
LOWER
LANDING
AC PLUG
1' MIN WIDE
4' MAX WIDE
UPPER LANDING
LOWER
LANDING
MM/DD/YYYY
CURB RAMPS
C-6A
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
158 of 833
OBSTRUCTION CLEARANCES
RAMP OBSTRUCTION NOTES: 1. VERTICAL OBSTRUCTIONS SHALL NOT BE INSTALLED IN THE RAMP.
2. EXISTING OR NEW FIRE HYDRANTS MAY BE ALLOWED WITHIN RAMP FLARES WITH PUBLIC WORKS DIRECTOR APPROVAL.
3. NEW UTILITY AND SIGNAL POLES SHALL NOT BE INSTALLED IN NEW RAMP FLARES. EXISTING UTILITY
AND SIGNAL POLES MAY BE ALLOWED WITHIN RAMP FLARES WITH PUBLIC WORKS DIRECTOR APPROVAL.
4. UTILITY BOXES SHALL NOT BE INSTALLED IN THE RAMP.
MERGED CURB RAMP ALLEY CROSSING CURB RAMP
MODIFIED RAMP NOTES: 1. THESE MODIFIED RAMPS SHALL ONLY BE USED WHERE EXISTING CONSTRAINTS RESTRICT THE USE OF THE STANDARD CURB RAMPS FROM DETAIL C-6A. MODIFIED RAMPS REQUIRE SPECIAL APPROVAL FROM THE PUBLIC WORKS DIRECTOR.
2. REFER TO DETAIL C-6A FOR ADDITIONAL RAMP NOTES.
2. REFER TO DETAIL C-1 FOR ALL CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED ON THIS SHEET OR DETAIL C-6A.
3. LANDINGS SHALL HAVE 4'-2" MINIMUM WIDTH AND LENGTH AND BE DESIGNED TO 1.0%-1.5% CROSS SLOPE AND RUNNING SLOPE, EXCEPT WHERE STREET RUNNING SLOPE EXCEEDS 5% THEN THE UPPER LANDING SHALL BE DESIGNED AS LEVEL TO THE EXTENT FEASIBLE.
4. LOWER LANDINGS WITHIN THE ROADWAY, SUCH AS CASE A, SHALL HAVE 4'-2" MINIMUM WIDTH AND LEGTH AND BE DESIGNED TO 1.0%-1.5% CROSS SLOPE PARALLEL TO THE CURB AND 1.0%-4.5% MAX SLOPE PERPENDICULAR TO THE CURB. 6"
MIN
6"
MIN
FLARED SIDES RAMP WIDTH FLARED SIDE
FIRE HYDRANT
NOTE 2
UTILITY OR SIGNAL POLE
NOTE 3
RETAINING CURB
AS NECESSARY
GUTTER
FLOWLINE
GUTTER
5' MIN 5' MIN
7.5%
MAX 7.5% MAX 7.5% MAX 1.5% MAX
1.5% MAX
1.5% MAX
5' MIN
GUTTER
FLOWLINE
GUTTER
FACE OF
CURB
FACE OF
CURB
PROPERTY
LINE PROPERTY
LINE
ALLEY
(MINOR STREET) MAJOR STREET
VARIES
VARIES VARIES
RAMP
RAMP
RAMP
⅊
⅊
⅊
⅊
UPPER
LANDING
LOWER
LANDING
LOWER
LANDING
UPPER
LANDING
UPPER
LANDING
8/17/2026
CURB RAMP CLEARANCES
AND MODIFICATIONS C-6B
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
159 of 833
PLAN
SECTION A-A
DETAIL A
NOTES: 1. REFER TO DETAIL C-1 FOR ALL CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED ON THIS SHEET.
2. EXPANSION JOINTS SHALL BE PLACED AT 50' INTERVALS OR AS SHOWN WITH 1 2"X12" SLIP DOWELS AT 30" O.C.
3. NEW CONCRETE SHALL CONFORM TO EXISTING AT THE NEAREST JOINT UNLESS APPROVED OTHERWISE.
4. CONTROL AND SCORE JOINTS SHALL BE PLACED PER SPECIFICATIONS ON CITY DETAIL C-1.
5. BASE ROCK SHALL EXTEND 1' BEYOND LIP OF GUTTER PRIOR TO POURING CONCRETE.
6. WHERE INSTALLING PAD IN EXISTING STREETS, A 12" MIN WIDE AC PLUG SHALL BE PROVIDED.
7. POUR SIDEWALK SEPARATELY FROM CURB.
8. PAVEMENT FOR SIDEWALK SHALL CONFORM TO CITY DETAIL C-4B.
9. PUBLIC ACCESS EASEMENTS SHALL BE GRANTED TO THE CITY AS NECESSARY.
DETAIL B
10'
18'R
TYP
DOWELS FLOWLINE
TYP
FACE OF CURB
BACK OF WALK
80'
EXPANSION JOINTS
TYP
SIDEWALKS
DTL C-4B
CONFORM
NOTE 3 8'-1"
A
A
6" 8'-1" 6"
1 1" 2"R
1"R
DETAIL A
OPTIONAL
SHELTER & PAD
BY OTHERS
11.5" PCC
6" CL 2 AB
SLOPE= 1%-1.7% 3% MAX
2'
6"
3% MAX
2'
#3 REBAR
18" O.C. E.W.
#4 REBAR
18" O.C. E.W.
CENTERED
3" CLEAR 3"
11.5" PCC
BACK OF CURB
DETAIL B
NOTE 7
BACK OF CURB
NOTE 7
CONTROL
JOINTS
TYP
12" MIN
AC PLUG
CONCRETE CURB
CONCRETE
SIDEWALK
1 4" EXPANSION JOINT
#4 X 8" SLIP DOWEL
24" O.C.
8/17/2026
BUS TURNOUT
C-7
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
160 of 833
PLAN
DETAIL A DETAIL B
NOTES: 1. REFER TO DETAIL C-1 FOR ALL CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED ON THIS SHEET.
2. EXPANSION JOINTS SHALL BE PLACED AT 50' INTERVALS OR AS SHOWN WITH 1 2"X12" SLIP DOWELS AT 30" O.C.
3. NEW CONCRETE SHALL CONFORM TO EXISTING AT THE NEAREST JOINT UNLESS APPROVED OTHERWISE.
4. CONTROL AND SCORE JOINTS SHALL BE PLACED PER SPECIFICATIONS ON CITY DETAIL C-1.
5. BASE ROCK SHALL EXTEND 1' BEYOND NEW CONCRETE PRIOR TO POURING CONCRETE.
6. WHERE INSTALLING PAD IN EXISTING STREETS, A 12" MIN WIDE AC PLUG SHALL BE PROVIDED.
7. POUR SIDEWALK SEPARATELY FROM CURB.
8. PAVEMENT FOR SIDEWALK SHALL CONFORM TO CITY DETAIL C-4B.
SECTION A-A
10' DOWELS
TYP
FACE OF CURB
BACK OF WALK
80'
EXPANSION
JOINTS
TYP
SIDEWALKS
DTL C-4B
CONFORM
NOTE 3 10'-1"
A
A
OPTIONAL
SHELTER & PAD
BY OTHERS
BACK OF CURB
NOTE 7
CONTROL
JOINTS
TYP 6"
1 1" 2"R
1"R3"
CONCRETE CURB
CONCRETE
SIDEWALK
1 4" EXPANSION JOINT
#4 X 8" SLIP DOWEL
24" O.C.
6" 8'-1"
DETAIL A
11.5" PCC
6" CL 2 AB
3%-5%
#4 REBAR
18" O.C. E.W.
CENTERED
3" CLEAR
BACK OF CURB
DETAIL B
NOTE 7
12" MIN
AC PLUG SLOPE
MATCH EX PAVEMENT
GRADE BREAK
TO MATCH EX
GUTTER
DOWELS
TYP
FACE OF CURB
CONFORM
NOTE 3
8/17/2026
CONCRETE PAD
C-8
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
161 of 833
PAVER MEDIAN
STANDARD MEDIAN NOTES: 1. REFER TO DETAIL C-1 FOR ALL CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED ON THIS SHEET.
2. PAVER AND/OR LANDSCAPED MEDIANS SHALL COMPLY WITH PARKS & RECREATION DIVISION (P&R) STANDARD DETAILS AND BE INSTALLED WHERE DIRECTED BY P&R.
3. CONCRETE MEDIAN STAMP PATTERN AND COLORING SHALL BE APPROVED BY PARKS & RECREATION PRIOR TO INSTALL. A SAMPLE MAY BE REQUIRED TO BE SUBMITTED FOR REVIEW.
4. MEDIANS SHALL HAVE A MINIMUM 1% SLOPE TOWARD THE CURB OR DRAIN.
5. CURB SHALL BE TYPE "C" VERTICAL CURB WHEN ROAD SLOPES AWAY FROM MEDIAN AND TYPE "A" CURB AND GUTTER WHEN ROAD SLOPES TOWARD MEDIAN.
6. WHERE INSTALLING MEDIANS IN EXISTING STREETS, A 12" MIN WIDE AC PLUG SHALL BE PROVIDED.
7. ALL UTILITY OR SERVICE BOXES SHALL BE RESET TO GRADE AS REQUIRED.
CONCRETE MEDIAN
VARIES
1' MIN
CURBS, TYP
NOTE 5
INTERLOCKING PAVERS
NOTE 2
REFER TO P&R DETAILS
FOR SAND BEDDING
AND BASE
4" CL 2 AB
4" PCC
STAMP AND COLOR
NOTE 3 VARIES
1' MIN
CURBS, TYP
NOTE4
INSTALL #4 REBAR
EVERY 4' ALONG CURB
TYP
FL
TC
FL
TC
AC PLUG AC PLUG
AC PLUG AC PLUG
8/17/2026
STANDARD MEDIAN
C-9A
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
162 of 833
MOUNTABLE MEDIAN
SECTION A-A
CURB
TRANSITION
MOUNTABLE MEDIAN
PLAN
MOUNTABLE MEDIAN NOTES: 1. MOUNTABLE MEDIAN SHALL ONLY BE INSTALLED WHERE DIRECTED BY THE PUBLIC WORKS DIRECTOR AND USED ON MEDIANS 2'-3' WIDE WHERE VEHICULAR TRAFFIC IS EXPECTED TO CROSS OVER (INTERSECTIONS AND DRIVEWAYS).
1. REFER TO DETAIL C-1 FOR ALL CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED ON THIS SHEET.
2. MOUNTABLE MEDIAN SHALL MATCH THE WIDTH OF THE MEDIAN CONNECTING TO IT.
3. EXPANSION JOINT SHALL BE PLACED BETWEEN MOUNTABLE MEDIAN AND THE STANDARD MEDIAN WITH 1 2"X12" SLIP
DOWELS (CENTER BETWEEN CONTROL JOINTS).
ALIGN
ALONG FL
BC
1' CURB TRANSITION
CURB
MOUNTABLE CURB
TC
5'-10' MEDIAN WIDTH
A
A
CURB
TRANSITION
BC
SCORE LINE
TC
CONTROL
JOINT
SAWCUT &
CONFORM
AC PLUG
FL 1'
4-#4 REBARS
LONGITUDINAL
2.5" CLR TO CORNERS
2" 10"
MATCH MEDIAN
3'-2" MAX 6" 6"
#2 TIES 12" O.C.
2" CLR
6" CL 2 AB 6"
1"R
TC
SCORE
BC
SAWCUT &
CONFORM
EX AC
PAVEMENT FL
SAWCUT &
CONFORM
EX AC
PAVEMENT
EXPANSION
JOINT
NOTE 3
12" MIN
AC PLUG
12" MIN
AC PLUG
DOWEL
NOTE 3
8/17/2026
MOUNTABLE MEDIAN
C-9B
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
163 of 833
DOWEL-IN MEDIAN
2' WIDE
DOWEL-IN MEDIAN
TACK-ON MEDIAN NOTES: 1. DOWEL-IN MEDIANS REQUIRE SPECIAL APPROVAL FROM PUBLIC WORKS DIRECTOR.
2. WITHIN 35-FT OF INTERSECTION, ONLY STANDARD CONCRETE MEDIANS AND MOUNTABLE MEDIANS SHALL BE USED.
3. REFER TO DETAIL C-1 FOR ALL CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED ON THIS SHEET.
4. 4# LONGITUDINAL REBAR WIRED WITH #14 WIRE TO VERTICAL #4 REBAR 12" LONG GROUTED IN HOLES DRILLED 4' O.C.
5. PROVIDE SCORE LINE 6" BEHIND TOP OF CURB TO CREATE THE BACK OF CURB LINE. 1" 6" 12" 6" 1"
PCC TC 1" 6"
EX AC
PAVEMENT
EX BASE 6"
#4 VERTICAL REBAR
4' O.C. ALONG MEDIAN
NOTE 4
#4 LONGITUDINAL REBAR
NOTE 4
EX BASE #4 VERTICAL REBAR, TYP
4' O.C. ALONG MEDIAN
NOTE 4
1" 6" 6" 1"
VARIES
12" MIN 1"6" 6"
#4 LONGITUDINAL REBAR, TYP
NOTE 4
FL
TC
FL
BC
BC
EX AC
PAVEMENT
8/17/2026
DOWEL-IN MEDIAN
C-9C
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
164 of 833
MONUMENT LID
NOTES: 1. CITY DATUM IS SAN MATEO VERTICAL DATUM.
2. MARKER DISK SHALL BE 3" BRASS DISK. EXACT POINT TO BE DETERMINED
BY ACCURATE SURVEY AND CLEARLY PUNCHED IN TOP OF BRASS MARKER TOGETHER WITH SURVEYOR'S LICENSE IN 1
8" HIGH NUMERALS.
3. CONCRETE MONUMENT AND CONCRETE FRAME SHALL BE CONSTRUCTED USING PVC FORM TUBES WHICH MAY BE LEFT IN PLACE.
4. DRILL HOLE AND POUR CONCRETE AGAINST UNDISTURBED EARTH.
5. CAST FRAME AND LID SHALL BE D&L SUPPLY COMPANY MODELS K-6015-01 AND K-6015-R1 OR APPROVED EQUIVALENT.
CITY
OF SAN MATE
L.S./R.C.E O
BRASS PLATE
DETAIL 30" MIN 4" 10" 2" MIN 12" MIN
PCC MONUMENT
NOTE 4
6"Ø MIN
6"ØX12" PVC
FORM TUBE
NOTE 3
PVC
FORM TUBE 2" MIN
4" MIN CLEAR
ALL AROUND
MARKER
DISK
NOTE 2 8" MAX
12"Ø
LID AND FRAME
24"Ø
6" 6"
CLASS II AB
EX PAVEMENT
PCC FRAME
NOTE 3
EX PAVEMENT BASE
STREET SURFACE
CAST IRON OR CAST
STEEL FRAME AND
LID, NOTE 5
LIFTING NOTCH
LID, NON-SKID
& TRAFFIC RATED
3" EMBEDMENT 3"Ø
8/17/2026
CITY MONUMENT
C-10
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
165 of 833
DRAINAGE NOTES:
1. CONCRETE SHALL BE CLASS "A" (6 SACK MIX) UNLESS OTHERWISE NOTED.
2. ALL CONCRETE (PRE-CAST AND CAST-IN-PLACE) SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4000 PSI AT 28 DAYS.
3. ALL GRATES, LIDS, AND FRAMES SHALL BE DESIGNED TO WITHSTAND H-20 LOADING.
4. ALL NEW INLETS MUST HAVE AN INLET MARKER INSTALLED ON CURB. SEE DETAIL D-10.
5. FOR ALL INLETS EXCEPT FOR THOSE USED AS JUNCTION BOXES, BASIN FLOORS SHALL HAVE WOOD TROWEL FINISH AND A MINIMUM SLOPE OF 4:1,
UNLESS OTHERWISE NOTED, FROM ALL DIRECTIONS TOWARD OUTLET PIPE BY CASTING GROUT FILL ON TOP OF BASE SLAB OR BY CASTING AS PART OF THE STRUCTURE BASE.
ACCEPTED PIPE MATERIALS:
PIPE MATERIAL ALLOWED LOCATION
PVC SDR 26 PUBLIC ROW / EASEMENT
HDPE DR17 PUBLIC ROW / EASEMENT
REINFORCED CONC PIPE* PUBLIC ROW / EASEMENT
* REQUIRES SPECIAL APPROVAL FROM PUBLIC WORKS.
8/17/2026
DRAINAGE STANDARD NOTES
D-1
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
166 of 833
NOTES: 1. WHERE THERE IS EXISTING SIDEWALK, CURB, & GUTTER, REMOVE A 20" MINIMUM SECTION OF CURB (AND ALIGN WITH ADJACENT SIDEWALK JOINTS) AND REPLACE SIDEWALK PER DETAIL C-4A AND CURB AND GUTTER PER DETAIL C-2A.
2. PIPE MATERIAL SHALL BE 3" DUCTILE IRON PIPE, PVC SCHEDULE 40, OR HDPE.
3. PIPE SHALL BE INSTALLED IN CENTER BETWEEN TWO JOINTS, OR FOR MULTIPLE PIPES, PROVIDE 71 2"" MINIMUM CLEARANCE TO A JOINT.
4. SAWCUT SIDEWALK PANELS AT EXISTING JOINTS OR SCORE MARKS. CONSTRUCTION JOINTS SHALL BE INSTALLED WITH 1 2"X24" SLIP
DOWELS EMBEDDED 6" ON BOTH SIDES. PLACE DOWELS CENTERED BETWEEN JOINTS FOR 3' OR SMALLER PANELS, OR TWO EVEN-SPACED DOWELS FOR 3' TO 5' PANELS.
5. REFER TO DETAIL C-1 FOR ALL CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED ON THIS SHEET.
6. CORING SHALL NOT BE ALLOWED.
7. MULTIPLE PIPES SHALL REQUIRE PUBLIC WORKS DIRECTOR APPROVAL. 3" MIN CLEARANCE BETWEEN PIPES WHERE ALLOWED.
8. WHERE CURB HEIGHT IS LESS THAN 6-INCHES, MULTIPLE 1.5" DIAMETER PIPES MAY BE USED, SUBJECT TO PUBLIC WORKS DIRECTOR APPROVAL.
SECTION A-A
ISOMETRIC VIEW
6"
12"
6X6 W10XW10 WIRE MESH
IN SIDEWALK ℄
6"
12" 2" CLRTOP OF CURB / SIDEWALK
GUTTER
FLOWLINE
BOTTOM OF
SIDEWALK
BOTTOM OF
GUTTER
3"Ø PIPE
INVERT TO MATCH FLOWLINE
3" PCC AROUND PIPE
UNDER SIDEWALK
3"Ø PIPE
NOTE 3
SAWCUT AT EXISTING JOINT
NOTE 4
DOWELS, TYP
SINGLE PIPE MAX CAPACITY = 67GPM = 0.15 CFS
MATCH EXISTING SIDEWALK
4" MIN THICK
CURB AND GUTTER,
MATCH EXISTING TYPE
OUTLET,
CUT PIPE FLUSH TO CURB FACE
PIPE INVERT TO MATCH FLOWLINE
STUB,
FOR CONNECTING
ON-SITE DRAINAGE
FL
TC
MATCH EXISTING GUTTER
6" MIN THICK
REPLACE FROM EXISTING JOINT TO EXISTING JOINT
A
A
℄
8/17/2026
CURB DRAIN
D-2
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
167 of 833
PLAN
6" 6"
3'-1 3
8 " 2- 1
2 " AT 3" O.C. 4'-1"
8" 3" 3"
10"
2"
1 2
" 4"
4" 7"
4"
9"
6"
6"
4'-1" 1'-0" DEPTH, D=VARIES
DOWEL DETAIL
ANCHOR DETAIL
SECTION B-B
SECTION A-A
NOTES:
1. CONNECTION PIPES TO BE LOCATED ACCORDING TO
PLANS AND BOTTOM OF BASIN TO BE SLOPED TO
OUTLET.
2. ALL REBAR TO BE 2" CLEAR.
2 REQUIRED
3 REQUIRED WHEN TOP AT
BASIN AND SIDEWALK ARE
NOT MONOLITHIC
FRAME & GRATE
DOWEL
CURB
ANCHOR
3 4
"Ø
3 8
"Ø
FULL WELD
#4 BARS AT 12" O.C.
EACH WAY (PLACE IF
D>4')
SUBGRADE
UNDISTURBED
EARTH OR
CRUSHED ROCK
R = 3"
DOWEL
SET FACE OF
ANGLE IN PLANE
OF CURB
FRAME & GRATE
NOTE 1
1 2
"ØX12"
AT 10" O.C. GALV. L3- 1
2 "X3- 1
2 "X 5
16" A
A
B B
GUTTER
MM/DD/YYYY
CATCH BASIN
TYPE G-3 D-3
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
168 of 833
PLAN
6" 6"
3'-1 3
8 " 3'-6"
6"
9"
6"
6"
3'-6" 1'-0" DEPTH, D=VARIES
SECTION A-A
NOTES:
1. TYPE E-2 CATCH BASIN SHALL ONLY BE USED AS DIRECTED BY PUBLIC WORKS DIRECTOR.
2. CONNECTION PIPES TO BE LOCATED ACCORDING TO PLANS AND BOTTOM OF BASIN TO BE SLOPED TO OUTLET.
3. WHERE CATCH BASIN IS USED AS AN OUTLET TO A "BUBBLE UP" SYSTEM, ELIMINATE DEPRESSION IN GUTTER AND INSTALL FRAME AND GRATE IN PLANE OF NORMAL GUTTER. 9" NOTE 3
FRAME & GRATE
NOTE 3
#4 BARS@ 12" O.C. EACH WAY
(PLACE IF D>4')
R = 3"
SET FACE OF
ANGLE IN PLANE
OF CURB
CURB FACE
A
A
GUTTER
SUBGRADE
UNDISTURBED
EARTH OR
CRUSHED ROCK
8/17/2026
CATCH BASIN
TYPE E-3 D-4
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
169 of 833
ANCHOR DETAIL
DOWEL DETAIL
2 REQUIRED
3 REQUIRED WHEN TOP AT
BASIN AND SIDEWALK ARE
NOT MONOLITHIC
SECTION A-A
T T
6"
NOTES:
1. TYPE F-2 CATCH BASIN SHALL ONLY BE USED AS DIRECTED BY PUBLIC WORKS DIRECTOR.
2. FOR DETAILS OF FRAME AND GRATE, SEE DWG D-6.
3. CONNECTION PIPES TO BE LOCATED ACCORDING TO PLANS
AND BOTTOM OF BASIN TO BE SLOPED TO OUTLET.
4. ALL REBAR SHALL BE 2-INCH CLEAR.
5. INSTALL PROTECTION BAR ACROSS OPENING.
6. T=6" IF "V" IS 4'-0" OR LESS
T=8" IF "V" IS BETWEEN 4'-0" & 8'-0"
T=10" IF "V" IS 8'-0" OR MORE
SECTION B-B
PLAN
CURB PLATE DETAIL
B B
A
A
3 8
"Ø
WELD ALL ROUND
CURB PLATE
3 8
"Ø
SUBGRADE
UNDISTURBED EARTH
OR CRUSHED ROCK
GUTTER PLATE & ANCHOR
R=8"
SET FACE OF ANGLE
IN PLANE OF CURB
NOTE 5
CURB PLATE
GUTTER
FLOWLINE
6 1
DOWEL
ANCHOR
DOWEL
4" R
ON OPENING
FRAME & GRATE
SEE NOTE 2
BLEND WALLS TO
I.D. OF PIPE
REBAR HOOP
(4) 1
2 " Ø DEF. BARS
X 2'-73
8" LONG,
3 1
2" O.C.
#4 REBAR AT 12" C-C
EACH WAY
NOTE 5
# 4 REBAR HOOP
Ø = PIPE O.D. +6"
3" CLEAR
GUTTER
FLOWLINE
TOP OF
CURB
1 4
" R
11 16" R SIDEWALK
ANCHOR
5 16" X 10" GALV. ROLLED PLATE
FORMED AS SHOWN
65°
7 1
8" 5
8" 5"
7" 1
1 2" 1
2" 2"
6" 9" V 9"
36" 23"
4 1
50"
T
6"
1" CLR
10" 3"
4" R 3"
8"
ANCHOR
PLATE
6"
2' 15
8" + 2T 6" 4' 11" + T
(2) 1
2 " Ø DEF. BARS X
1'-9" LONG, 12" O.C.
DOWEL 9"
8/17/2026
CATCH BASIN
TYPE F-2 D-5
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
170 of 833
STANDARD FRAME
STANDARD GRATE
SECTION A-A
SECTION B-B
SECTION C-C
SECTION D-D
DETAIL A
NOTES: 1. TOP AND BOTTOM SURFACE OF GRATE TO BE GROUND FLUSH AFTER WELDING.
2. ALL METAL SURFACES SHALL BE HOT DIPPED GALVANIZED IN ACCORDANCE WITH ASTM. ALL FABRICATING, SHEARING, BENDING, AND WELDING SHALL BE DONE PRIOR TO GALVANIZING.
3. WELD CROSS BARS AT EVERY 4TH BEARING BAR.
TYP 3
16 TYP 3
16 TYP 3
16 3" x 3" x 1
4 " ANGLE
TYP
2 1
2" x 3" x 1
4 " ANGLE
TYP
3" x 3" x 1
4 " ANGLE
2 1
2" x 3" x 1
4 " ANGLE
1 1
2" 5" 3" 3"
3" 3" 3"
36"
5" 30
7 8" 5"
A
A
307
8" B B 36"
D
C
D
C
253
16" 30"
END BAR, TYP
2 1
2" X 3
8" STEEL
(2 REQUIRED)
BEARING BAR, TYP
2 1
2" X 3
8" STEEL
(18 REQUIRED)
TYP 3
16 1", TYP
DETAIL A
CROSS BAR, TYP
1 4"Ø STEEL
(4 REQUIRED)
6", TYP
30"
BEARING BAR
2 1
2" X 3
8" STEEL
END BAR
2 1
2" X 3
8" STEEL
BEARING BAR, TYP
2 1
2"
516" 5
16"
2 1
2" 253
16" 1", TYP
TYP 3
16 CROSS BAR
NOTE 3
8/17/2026
CATCH BASIN
FRAME AND GRATE D-6
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
171 of 833
APRON PLAN
GUTTER SLOPE ≤5%
APRON PLAN
GUTTER SLOPE >5%
NOTES: 1. REFER TO DETAIL C-1 FOR ALL CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED ON THIS SHEET.
2. ATTACH INLET MARKER (MEDALLION) ON TOP CURB CENTERED ABOVE THE INLET. INLET MARKER TO BE PROVIDED BY PUBLIC WORKS. SEE DETAIL D-10.
3. INSTALL EXPANSION JOINT AND DOWEL INTO EXISTING CURB AND GUTTER PER STD C-2A.
4. WHERE INSTALLING INLET APRONS IN EXISTING STREETS, A 12" MIN WIDE AC PLUG SHALL BE PROVIDED. 3' VARIES PER BASIN TYPE 3'
TC
FL
LG
JOINT TYP
NOTE 3
OPENING VARIES
PER BASIN TYPE
2' VARIES PER BASIN TYPE 5'
TC
FL
LG
JOINT TYP
NOTE 3
CONCRETE
APRON
CONCRETE
APRON
INLET MARKER
NOTE 2
INLET MARKER
NOTE 2
≤5% ≤5%
>5% VARIES >5%
≤8% ≤8%
VARIES
OPENING VARIES
PER BASIN TYPE
DOWEL TYP
NOTE 3
DEPTH VARIES
PER BASIN TYPE
DEPTH VARIES
PER BASIN TYPE
DOWEL TYP
NOTE 3
CONCRETE
CURB
CONCRETE
CURB
8/17/2026
CATCH BASIN APRON
D-7
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
172 of 833
NOTES:
1. LENGTHS AND WIDTHS WILL VARY AS NECESSARY TO ACCOMMODATE SIZE AND ANGLES OF CONNECTING PIPES.
2. SIDE ENTRY CONFIGURATION MAY BE MODIFIED TO ACCOMMODATE FIELD CONDITIONS WITH THE APPROVAL OF THE PUBLIC WORKS DIRECTOR.
3. WHERE INSTALLED IN EXISTING STREETS, A 12" MIN WIDE AC PLUG SHALL BE PROVIDED AROUND BOX AND PAVEMENT RESTORATION SHALL BE PROVIDED IN COMPLIANCE WITH DETAILS R-6A THRU R-6C.
4. FOR SHALLOW DRAINS, USE CHRISTY B1324 TRAFFIC-RATED BOX WITH 1 2 " HEX PLATE LID.
5. STEPS ARE NOT ALLOWED.
6. OUTLET PIPE SHALL BE 12" MAXIMUM DIAMETER. OUTLET PIPE SHALL HAVE SAME OR GREATER SLOPE THAN INLET PIPE.
7. PROVIDE SURVEY STAKES TO INDICATE LOCATION AND ELEVATION.
T W T
2" CLR
T W OR L T
1 4" 14" L
T 3" 6"12" DEPTH VARIES 6"
LEGEND
T=THICKNESS
L=LENGTH
W=WIDTH PLAN SECTION
PROFILE SECTION
STRUCTURE COVER TABLE
STRUCTURE DEPTH L W COVER(S)
LESS THAN 3' 24" 24" (1) 36"X36"
3' TO 6' 36" 36" (2) 24"X48"
OVER 6' 36" 48" (2) 30"X48"
WALL THICKNESS TABLE
STRUCTURE DEPTH T
4' OR LESS 6"
BETWEEN 4' TO 8' 8"
8' OR OVER 10"
T DETAIL WHERE
TWO COVERS
USED
2 1
2 " X 1 1
2 " X 1
4 " WELD TO CHECKPLATE
SHAPE CHANNELS
FOR SMOOTH
FLOW
1"Ø PICKHOLE IN
EACH COVER
IF USED AS DROP
INLET, FORM SIDES TO
FIT STD. DITCH PER
DWG. INSTALL 1
2 "Ø
GALV. BAR ACROSS
OPENING AND
2 1
2 " X 1 1
2 " X 1
4 " AT TOP
1 2
" THICK GALV. STL.
CHECKPLATE
8" CL 2 AB OR
8" 1 1
2 " DRAIN ROCK (IN BAY MUD)
PAVEMENT
RESTORATION
NOTE 3
8/17/2026
STORM DRAIN TURNING BOX
D-8
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
173 of 833
PLAN
SECTION A-A SECTION B-B
NOTES:
1. WHERE INSTALLED IN EXISTING STREETS, A 12" MIN WIDE AC PLUG SHALL BE PROVIDED AROUND BOX AND PAVEMENT RESTORATION SHALL BE PROVIDED IN COMPLIANCE WITH DETAILS R-6A THRU R-6C.
2. FOR SHALLOW DRAINS, USE CHRISTY B1324 TRAFFIC-RATED BOX WITH 1 2 " HEX PLATE LID.
3. STEPS ARE NOT ALLOWED.
4. OUTLET PIPE SHALL BE 12" MAXIMUM DIAMETER. OUTLET PIPE SHALL HAVE SAME OR GREATER SLOPE THAN INLET PIPE.
5. OUTLET PIPE INVERT SHALL BE 1" MINIMUM LOWER THAN INLET PIPES INVERTS.
5. PROVIDE SURVEY STAKES TO INDICATE LOCATION AND ELEVATION.
6. A CONCRETE APRON IS REQUIRED FOR INLETS AT VALLEY GUTTERS AND PAVED AREAS. #4 HORIZ BARS
@ 10" OC
#4 BARS TYP
IN APRON
CONCRETE APRON
SLOPE TO GRATE AS REQUIRED
NOTE 4
FRAME & GRATE
OPTIONAL
VALLEY GUTTER A
A
B B
GUTTER FLOW
INLET PIPE
OUTLET
PIPE
JUNCTION BOX
CL 2 AB OR
1 1
2 " DRAIN ROCK (IN BAY MUD)
℄
12" 12" 12" 12"
12" 24" 12" 2" 8"
24"
2" CLR TYP
6" TYP
4 #4 VERT BARS
ALL SIDES 8"
4 #4 BARS
EACH WAY
TYP
℄
9" 12" 12" 9"
CONC
APRON
CONCRETE
APRON DEPTH VARIES 5' MAX 8" 6" 3" CLR
2" CLR TYP
6" TYP
24"
CL 2 AB OR
1 1
2 " DRAIN ROCK (IN BAY MUD)
8/17/2026
STORM DRAIN JUNCTION BOX
D-9
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
174 of 833
INLET MARKER (MEDALLION)
NOTES:
1. MEDALLION IS ANODIZED ALUMINUM (COLORED BLUE AND SILVER) AND FURNISHED BY PUBLIC WORKS.
2. MEDALLION IS TO BE ATTACHED TO INLETS USING EPOXY CEMENT OR CAST IN PLACE WITH CURB.
4" Ø
ATTACH MEDALLION ON
TOP OF CURB,
CENTERED OVER INLET
SILVER
1 2
" LETTERS TYP
BLUE BACKING
8/17/2026
INLET MARKER
D-10
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
175 of 833
CONNECTOR PIPE SCREEN NOTES: 1. TRASH CAPTURE DEVICES SHALL BE INSTALLED AS DIRECTED BY PUBLIC WORKS DIRECTOR.
2. ALL TRASH CAPTURE DEVICE SYSTEMS SHALL BE A CERTIFIED TRASH FULL CAPTURE SYSTEM PER THE MOST CURRENT CERTIFICATION LIST PUBLISHED BY CALIFORNIA STATE WATER RESOURCES CONTROL BOARD. ONLY CONNECTOR PIPE SCREEN OR HANGING BASKET TYPE DEVICES SHALL BE ALLOWED.
3. CONTRACTORS TO CONFIRM MODEL AND CONFIGURATION WITH CITY STAFF PRIOR TO ORDERING MATERIALS.
4. ALL INSTALLATION METHODS AND MATERIALS SHALL CONFORM TO THE MANUFACTURER'S SPECIFICATIONS.
5. ALL TRASH CAPTURE DEVICE SYSTEMS SHALL INCLUDE ACCESS FOR VECTOR CONTROL.
CONNECTOR PIPE SCREEN DETAIL
HANGING BASKET DETAIL
WALL ANCHORS, TYP
RACK SUPPORT, TYP
ANCHOR TO WALL
HINGES, TYP
OUTLET
LID / DEFLECTOR
HINGED FOR ACCESS
TRASH CAPTURE SCREEN
CONFIGURATION VARIES CATCH BASIN BASE
INLETS
UPSTREAM OF SCREEN
HANGING BASKET SCREEN
OUTLET
INLET
DEFLECTOR,
FOR HOODED INLETS
SLOPED TO BASKET
FRAME,
SLOPED TO BASKET
HOODED INLET OPENING
ACCESS HATCH
CATCH BASIN BASE
BASKET HANGERS, TYP
8/17/2026
TRASH CAPTURE DEVICES
D-11
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
176 of 833
SEWER NOTES:
1. ENCROACHMENT PERMITS ARE REQUIRED FOR ANY WORK IN PUBLIC RIGHT-OF-WAY OR WITHIN A PUBLIC EASEMENT. A SEPARATE BUILDING PERMIT IS REQUIRED FOR WORK ON PRIVATE PROPERTY.
2. ALL WORK MUST BE INSPECTED BY CITY INSPECTOR PRIOR TO BACKFILLING.
2. PROPERTY OWNER OR CONTRACTOR IS RESPONSIBLE FOR LOCATING UTILITIES EXISTING IN PRIVATE PROPERTY INCLUDING EASEMENT AREA. LOCATING EXISTING UTILITIES SHALL BE PERFORMED TO IDENTIFY ANY CONFLICTS BEFORE ANY DIGGING.
3. WORK SHALL BE IN ACCORDANCE WITH THE CITY STANDARDS FOR NEW CONSTRUCTION, CALIFORNIA PLUMBING CODE (CPC), AND THE
MATERIAL MANUFACTURER'S INSTALLATION GUIDELINES, EXCEPTIONS TO STANDARDS MUST BE APPROVED IN ADVANCE IN WRITING BY PUBLIC WORKS DIRECTOR.
4. WORK NOT CONFORMING TO THE CITY STANDARDS SHALL BE COMPLETELY EXCAVATED AND REINSTALLED TO MEET STANDARD. ANY
SIDEWALK, DRIVEWAY, OR CURB & GUTTER, REMOVED BY THE CONTRACTOR IN THE COURSE OF SANITARY SEWER REPAIR OR INSTALLATION MUST BE REPLACED TO CITY STANDARDS BY THE CONTRACTOR AT NO COST TO THE CITY.
5. FOR NEW CONSTRUCTION, NO COMMON/SHARED SEWER LATERAL IS PERMITTED, LATERAL CONNECTIONS SHALL BE CONNECTED TO THE MAIN WITH 1/4,1/8, 1/16 LONG RADIUS BEND AS MANUFACTURED BY J-M EAGLE OR APPROVED EQUAL.
6. IF CPC MINIMUM LATERAL SLOPE IS NOT MET, INSTALL SEWER LATERAL BACKFLOW PREVENTER IN ACCORDANCE WITH CPC, SECTION 7, "SANITARY SEWER" REQUIREMENTS.
7. SANITARY SEWER COUPLING SHALL BE FLEX SEAL ADJUSTABLE COUPLING (ARC) MANUFACTURED BY MISSION RUBBER CO. OR EQUAL.
INSTALL FACTORY WYE AT ALL NEW MAINLINE CONNECTION OR RECONNECTION.
8. INSTALL FACTORY WYE AND FLEX SEAL COUPLING TO MATCH EXISTING SEWER MAINLINE. SADDLE AND TEE CONNECTION TO MAINLINE IS NOT PERMITTED, EXCEPT FOR FUSED SADDLES FOR EXISTING HDPE MAINS OR AS APPROVED BY PUBLIC WORKS DIRECTOR.
9. PRIVATE SANITARY SEWER CLEAN-OUT SHALL PROVIDE ACCESS TO THE LATERAL IN THE DIRECTION OF FLOW FROM THE BUILDING AND SHALL BE IN ACCORDANCE WITH THE LATEST CPC REQUIREMENTS. TWO-WAY CLEAN-OUT INSTALLATION SHALL BE IN ACCORDANCE WITH THE LATEST CPC REQUIREMENTS.
10. PIPE INSTALLATION MAY BE BY OPEN TRENCH METHOD OR TRENCHLESS METHOD. ENTIRE LENGTH OF THE PIPE SHALL BE FULLY SUPPORTED ON FIRM BEDDING MATERIAL. · OPEN TRENCH METHOD: TRENCH SHALL BE SAWCUT, EXCAVATED, AND BACKFILLED IN ACCORDANCE WITH CITY STANDARDS. · TRENCHLESS METHODS INCLUDE PIPE BURSTING, PIPE REAMING OR SLIPLINING. LINER SHALL NOT EXTEND INTO MAINLINE. SLIPLINING EXISTING LATERAL WITH PE OR HDPE PIPES IS NOT ALLOWED. CURE-IN-PLACE PIPE LINING IS NOT ALLOWED.
11. NO STORM DRAIN FACILITIES (ROOF, LEADERS, AREA DRAINS, ETC.) ARE ALLOWED TO BE CONNECTED TO SEWER LATERALS. ANY EXISTING CONNECTIONS SHALL BE PERMANENTLY DISCONNECTED FROM SEWER LATERAL AND REDIRECTED TO A STORM DRAIN SYSTEM.
ACCEPTED PIPE MATERIALS:
PIPE MATERIAL ALLOWED LOCATION
PVC SDR 26 PUBLIC ROW / EASEMENT
HDPE DR17 PUBLIC ROW / EASEMENT
DUCTILE IRON PIPE EASEMENT
CAST IRON PIPE EASEMENT
ABS PIPE EASEMENT
ACCEPTED LATERAL PIPE SIZES:
PROPERTY TYPE PIPE ID SIZE CONNECTION AT MAIN
SINGLE FAMILY 4-INCH (MIN) WYE, LONG BEND
6-INCH (MAX) WYE, LONG BEND
NON-SINGLE FAMILY 6-INCH (MIN) WYE, LONG BEND
8-INCH WYE, LONG BEND
10-INCH (OR >) MANHOLE
8/17/2026
SEWER STANDARD NOTES
S-1
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
177 of 833
LATERAL PLAN
LATERAL PROFILE
NOTES: 1. REFER TO DETAIL S-1 FOR SPECIFICATIONS.
2. LATERAL CONNECTION TO CITY MAIN SHALL CONFORM TO CITY STANDARD DETAILS S-4 AND S-5. MANHOLES ARE REQUIRED FOR LATERALS 10" OR LARGER.
3. WHERE SEWER MAIN INVERT IS MORE THAN 60" FROM THE SURFACE, A VERTICAL BEND SHALL BE REQUIRED.
4. BUILDING TWO-WAY CLEANOUT SHALL BE INSTALLED FROM THE BUILDING FACE IN COMPLIANCE WITH ADOPTED PLUMBING CODE.
CLEANOUT SIZE SHALL MATCH LATERAL SIZE.
5. TRENCHES SHALL BE BACKFILLED AND RESTORED PER CITY DETAILS R-1 & R-2 AS APPLICABLE.
6. SIDEWALK, CURB, AND GUTTER SHALL BE RESTORED PER CITY STANDARDS. SAWCUTS SHALL BE MADE AT THE EXISTING JOINTS.
PARTIAL SIDEWALK PANEL SAWCUTTING/REMOVAL IS NOT ALLOWED.
7. PAVEMENT SHALL BE RESTORED PER CITY DETAILS R-6A THRU R-6C.
OWNER MAINTAINED CITY MAINTAINED
℄
PRIVATE LATERAL CITY SEWER MAIN
EXISTING
CITY MAIN
2% MIN SLOPE
PRIVATE
LATERAL
TWO-WAY
CLEANOUT
RISER
45° SWEEP
NOTE 3
BUILDING FACE
CONNECT TO MAIN
VIA WYE FITTING
NOTE 2
℄
℄
BUILDING CLEANOUT
NOTE 4 PRIVATE LATERAL
45° SWEEP
NOTE 3
CITY MAIN
LOCATION VARIES
IN STREET
BUILDING
FACE
BUILDING
CLEANOUT
NOTE 4 FLOW
45°
2' TO 5'
⅊
OWNER MAINTAINED CITY MAINTAINED
PRIVATE LATERAL CITY SEWER MAIN
FC
ENCROACHMENT
PERMIT REQUIRED
RESTORE PAVEMENT
NOTE 5 & 7
RESTORE SIDEWALK
CURB, & GUTTER
NOTE 6
℄
EXISTING
GRADE COVER 24" MIN
⅊
SIDEWALK
WIDTH VARIES
8/17/2026
SEWER LATERAL
(MAIN IN STREET) S-2
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
178 of 833
LATERAL PLAN
LATERAL PROFILE
NOTES: 1. REFER TO DETAIL S-1 FOR SPECIFICATIONS.
2. LATERAL CONNECTION TO CITY MAIN SHALL CONFORM TO CITY STANDARD DETAILS S-4 AND S-5. MANHOLES ARE REQUIRED FOR LATERALS 10" OR LARGER.
3. WHERE SEWER MAIN INVERT IS MORE THAN 60" FROM THE SURFACE, A VERTICAL BEND SHALL BE REQUIRED.
4. BUILDING TWO-WAY CLEANOUT SHALL BE INSTALLED FROM THE BUILDING FACE IN COMPLIANCE WITH ADOPTED PLUMBING CODE.
CLEANOUT SIZE SHALL MATCH LATERAL SIZE.
5. TRENCHES SHALL BE BACKFILLED AND RESTORED PER CITY DETAIL R-1.
6. RESTORE SURFACE TO EXISTING GRADE.
OWNER MAINTAINED CITY MAINTAINED
℄
PRIVATE LATERAL CITY SEWER MAIN
EXISTING
CITY MAIN
2% MIN SLOPE
PRIVATE
TWO-WAY LATERAL
CLEANOUT
RISER
45° SWEEP
NOTE 3
BUILDING FACE
CONNECT TO MAIN
VIA WYE FITTING
NOTE 2
℄
℄
℄
BUILDING CLEANOUT
NOTE 4 PRIVATE LATERAL
45° SWEEP
NOTE 3
CITY MAIN
LOCATION VARIES
IN EASEMENT
BUILDING
FACE
BUILDING
CLEANOUT
NOTE 4 FLOW
45°
2' TO 5'
OWNER MAINTAINED CITY MAINTAINED
PRIVATE LATERAL CITY SEWER MAIN
RESTORE TO GRADE
⅊
PUBLIC UTILITY EASEMENT ⅊
(VARIES, 5' TYPICAL)
PUBLIC UTILITY EASEMENT
(VARIES, 5' TYPICAL)
ENCROACHMENT PERMIT REQUIRED
EXISTING
GRADE COVER 24" MIN
8/17/2026
SEWER LATERAL
(MAIN IN EASEMENT) S-3
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
179 of 833
SECTION A-A
LATERAL CONNECTION PLAN
NOTES: 1. MANUFACTURED WYE FITTINGS SHALL HAVE PLAIN ENDS.
2. HDPE LATERAL TO HDPE MAIN SHALL BE FUSED.
A
A
NEW SEWER
MAIN
NEW SEWER
MAIN
JOINTS
NOTE 2
MANUFACTURED
WYE FITTING
NOTE 1
45° SWEEP
SEWER LATERAL
FLOW
℄
℄ ℄
℄
℄
℄
SEWER LATERAL
45° SWEEP
ROTATE TO ALIGN TO
LATERAL SLOPE
ROTATE WYE FITTING
45° OR AS DIRECTED BY
ENGINEER/INSPECTOR
NEW SEWER
MAIN
FLOW
8/17/2026
SEWER LATERAL
CONNECT TO NEW MAIN S-4
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
180 of 833
SECTION A-A
LATERAL CONNECTION PLAN
NOTES: 1. MANUFACTURED WYE FITTINGS SHALL HAVE PLAIN ENDS.
2. HDPE LATERAL TO HDPE MAIN SHALL BE FUSED. SOLVENT WELDED JOINTS ARE NOT PERMITTED.
3. COUPLINGS SHALL ONLY BE USED FOR LATERAL CONNECTION REPLACEMENT OR INSTALLATION ON EXISTING MAINS.
4. COUPLINGS SHALL BE BANDED, RUBBER COUPLING WITH TWO STAINLESS STEEL CLAMPS: FERNCO (1000 OR 5000 SERIES) OR MISSION (FLEX-SEAL ARC).
5. IF EXISTING MAIN HAS BEEN INTERNALLY REHABILITATED (SLIPLINED OR CIPP) AS CONFIRMED BY INSPECTING UP AND DOWNSTREAM MANHOLES, CAREFULLY BREAK AWAY THE HOST PIPE TO INSERT NEW WYE.
A
A
EX SEWER
MAIN
EX SEWER
MAIN
JOINTS
NOTE 2
MANUFACTURED
WYE FITTING
NOTE 1
45° SWEEP
SEWER LATERAL
FLOW
℄
℄ ℄
℄
℄
℄
SEWER LATERAL
45° SWEEP
ROTATE TO ALIGN TO
LATERAL SLOPE
ROTATE WYE FITTING
45° OR AS DIRECTED BY
ENGINEER/INSPECTOR
EX SEWER
MAIN
FLOW
BANDED RUBBER
COUPLER
NOTES 3 & 4
6' MIN
8/17/2026
SEWER LATERAL
CONNECT TO EX MAIN S-5
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
181 of 833
DROP MANHOLE SECTION
NOTES: 1. DROP CONNECTION SHALL BE USED WHERE ELEVATION DIFFERENCE BETWEEN INLET AND OUTLET INVERTS IS 18" OR GREATER.
2. ALL PIPING SHALL BE PVC OR HDPE.
3. DROP CONNECTION SHALL BE ENCASED IN CONCRETE 6" MIN AROUND DROP PIPE.
4. WATERSTOPS SHALL BE A-LOK, KORE-N-SEAL, OR APPROVED EQUAL. GROUT AROUND WATERSTOP.
5. INLETS SHALL BE FLUSH WITH MANHOLE INSIDE WALL.
45° ELBOW
6" MIN
MANHOLE
INSIDE
WALL
WATERSTOP
GROUT AROUND
WATERSTOP TEE
PVC OR HDPE PIPE
COUPLING FOR EX SEWER
BELL & SPIGOT FOR NEW SEWER
UPSTREAM
SEWER
5' MIN ℄
℄
℄
℄ VARIES 18" MIN
WATERSTOP
MANHOLE BASE
EXTEND CONCRETE BASE
6" MIN AROUND DROP PIPE
SLOPE BASE
TOWARD OUTLET
CONCRETE ENCASEMENT
6" MIN AROUND
INLET FLUSH TO FACE
INLET FLUSH
TO FACE
8/17/2026
SEWER DROP CONNECTION
S-6
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
182 of 833
NOTES: 1. THIS MANHOLE BASE SHALL BE USED FOR MAIN PIPES OF UP TO 33" DIAMETER.
2. BEDDING THICKNESS AND TYPE SHALL BE AS RECOMMENDED PER PROJECT SPECIFIC GEOTECHNICAL ENGINEER RECOMMENDATIONS AND APPROVED BY PUBLIC WORKS DIRECTOR. PARTICULAR ATTENTION SHALL BE PAID TO BEDDING WITHIN BAY MUD.
3. CAST-IN-PLACE CONCRETE BASE SHALL BE FORMED CIRCULAR WITHIN STREETS OR SQUARE WITHIN EASEMENTS.
4. SOFFIT ELEVATION OF ALL INLET PIPES SHALL SHALL BE NO LESS THAN THE SOFFIT ELEVATION OF THE OUTLET PIPE, EXCEPT FOR OVERFLOW OUTLETS OR DROP INLETS.
5. ALL MANHOLES SHALL PROVIDE A MINIMUM 0.10' DROP ACROSS THE MANHOLE FROM INLET TO OUTLET.
6. FLOOR OF MANHOLE SHALL BE SLOPED A MINIMUM 1
2" PER FOOT TOWARD THE FLOWLINE. PROVIDE LEDGES AND CHANNELIZE BASE ONLY FOR SANITARY SEWER MANHOLES. SEE CITY DETAIL U-4 FOR PLAN.
7. WATERSTOPS SHALL BE PROVIDED ON ALL INLET AND OUTLET PIPE ENTRY POINTS. WATERSTOPS SHALL BE INSTALLED PER PIPE MANUFACTURER RECOMMENDATIONS.
8. ALL PRECAST SECTIONS SHALL CONFORM TO ASTM C-478 SPECIFICATIONS.
9. FRAME AND BASE SHALL BE SET TO THE PRECAST SECTIONS WITH 1:3 MORTAR MIX. 10 ALL JOINTS SHALL BE SEALED WITH GROUT, RAM-NEK SEAL, OR APPROVED EQUAL.
11. MANHOLE FRAME AND COVER SHALL CONFORM TO CITY DETAIL U-5 & U-6.
12. MANHOLE COLLAR AND SURFACE TREATMENT SHALL CONFORM TO CITY DETAIL U-6.
MANHOLE SECTION
24" Ø
PROVIDE TWO JOINTS
WITHIN 24" OF BASE
AT ALL INLETS OR OUTLET
6" 6" 6" MIN 8" MIN
#4 REBAR
12" O.C. E.W.
8" CL 2 AB
NOTE 2
SEWER MH BASES
FORM LEDGE
SLOPE 1:24
NOTE 5 30" VARIES PRECAST RISER
SECTIONS
ALL JOINTS SEALED WITH
RAM-NEK OR EQ
PRECAST CONCENTRIC
CONE SECTION
MANHOLE FRAME AND COLLAR
PER CITY DETAIL U-6
48" Ø
3" CLR
WATERSTOP
CAST-IN-PLACE
CONCRETE BASE
SEE CITY DETAIL U-4
OUTLET INLET
8/17/2026
CONCENTRIC MANHOLE
(UP TO 33-INCH) U-1
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
183 of 833
MANHOLE SECTION
NOTES: 1. THIS MANHOLE BASE SHALL BE USED FOR MAIN PIPES OF UP TO 33" DIAMETER.
2. BEDDING THICKNESS AND TYPE SHALL BE AS RECOMMENDED PER PROJECT SPECIFIC GEOTECHNICAL ENGINEER RECOMMENDATIONS AND APPROVED BY PUBLIC WORKS DIRECTOR. PARTICULAR ATTENTION SHALL BE PAID TO BEDDING WITHIN BAY MUD.
3. CAST-IN-PLACE CONCRETE BASE SHALL BE FORMED CIRCULAR WITHIN STREETS OR SQUARE WITHIN EASEMENTS.
4. SOFFIT ELEVATION OF ALL INLET PIPES SHALL SHALL BE NO LESS THAN THE SOFFIT ELEVATION OF THE OUTLET PIPE, EXCEPT FOR OVERFLOW OUTLETS OR DROP INLETS.
5. ALL MANHOLES SHALL PROVIDE A MINIMUM 0.10' DROP ACROSS THE MANHOLE FROM INLET TO OUTLET.
6. FLOOR OF MANHOLE SHALL BE SLOPED A MINIMUM 1
2" PER FOOT TOWARD THE FLOWLINE. PROVIDE LEDGES AND CHANNELIZE BASE ONLY FOR SANITARY SEWER MANHOLES. SEE CITY DETAIL U-4 FOR PLAN.
7. WATERSTOPS SHALL BE PROVIDED ON ALL INLET AND OUTLET PIPE ENTRY POINTS. WATERSTOPS SHALL BE INSTALLED PER PIPE MANUFACTURER RECOMMENDATIONS.
8. ALL PRECAST SECTIONS SHALL CONFORM TO ASTM C-478 SPECIFICATIONS.
9. FRAME AND BASE SHALL BE SET TO THE PRECAST SECTIONS WITH 1:3 MORTAR MIX. 10 ALL JOINTS SHALL BE SEALED WITH GROUT, RAM-NEK SEAL, OR APPROVED EQUAL.
11. MANHOLE FRAME AND COVER SHALL CONFORM TO CITY DETAIL U-5 & U-6.
12. MANHOLE COLLAR AND SURFACE TREATMENT SHALL CONFORM TO CITY DETAIL U-6.
PROVIDE TWO JOINTS
WITHIN 24" OF BASE
AT ALL INLETS OR OUTLET
WATERSTOP
6" 6" 6" MIN 8" MIN
#4 REBAR
12" O.C. E.W.
8" CL 2 AB
NOTE 2
SEWER MH BASES
FORM LEDGE
SLOPE 1:24
NOTE 5 36" VARIES
MANHOLE FRAME AND COLLAR
PER CITY DETAIL U-6
48" Ø
24" Ø
3" CLR
CAST-IN-PLACE
CONCRETE BASE
SEE CITY DETAIL U-4
PRECAST RISER
SECTIONS
ALL JOINTS SEALED WITH
RAM-NEK OR EQ
PRECAST ECCENTRIC
CONE SECTION
OUTLET INLET
8/17/2026
ECCENTRIC MANHOLE
(UP TO 33-INCH) U-2
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
184 of 833
MANHOLE SECTION
NOTES: 1. THIS MANHOLE BASE SHALL BE USED FOR MAIN PIPES OF UP TO 33" DIAMETER.
2. BEDDING THICKNESS AND TYPE SHALL BE AS RECOMMENDED PER PROJECT SPECIFIC GEOTECHNICAL ENGINEER RECOMMENDATIONS AND APPROVED BY PUBLIC WORKS DIRECTOR. PARTICULAR ATTENTION SHALL BE PAID TO BEDDING WITHIN BAY MUD.
3. CAST-IN-PLACE CONCRETE BASE SHALL BE FORMED CIRCULAR WITHIN STREETS OR SQUARE WITHIN EASEMENTS.
4. SOFFIT ELEVATION OF ALL INLET PIPES SHALL SHALL BE NO LESS THAN THE SOFFIT ELEVATION OF THE OUTLET PIPE, EXCEPT FOR OVERFLOW OUTLETS OR DROP INLETS.
5. ALL MANHOLES SHALL PROVIDE A MINIMUM 0.10' DROP ACROSS THE MANHOLE FROM INLET TO OUTLET.
6. FLOOR OF MANHOLE SHALL BE SLOPED A MINIMUM 1
2" PER FOOT TOWARD THE FLOWLINE. PROVIDE LEDGES AND CHANNELIZE BASE ONLY FOR SANITARY SEWER MANHOLES. SEE CITY DETAIL U-4 FOR PLAN.
7. WATERSTOPS SHALL BE PROVIDED ON ALL INLET AND OUTLET PIPE ENTRY POINTS. WATERSTOPS SHALL BE INSTALLED PER PIPE MANUFACTURER RECOMMENDATIONS.
8. ALL PRECAST SECTIONS SHALL CONFORM TO ASTM C-478 SPECIFICATIONS.
9. FRAME AND BASE SHALL BE SET TO THE PRECAST SECTIONS WITH 1:3 MORTAR MIX. 10 ALL JOINTS SHALL BE SEALED WITH GROUT, RAM-NEK SEAL, OR APPROVED EQUAL.
11. MANHOLE FRAME AND COVER SHALL CONFORM TO CITY DETAIL U-5 & U-6.
12. MANHOLE COLLAR AND SURFACE TREATMENT SHALL CONFORM TO CITY DETAIL U-6. 8" MIN #4 REBAR
12" O.C. E.W.
8" CL 2 AB
NOTE 2 18" 25" MIN 43" MAX
CAST-IN-PLACE
CONCRETE BASE
SEE CITY DETAIL U-4
2" MIN CLR
CONE TO PIPE
PROVIDE TWO JOINTS
WITHIN 24" OF BASE
AT ALL INLETS OR OUTLET
WATERSTOP
PRECAST CONCENTRIC
CONE SECTION
36" Ø
24" Ø
3" CLR
MANHOLE FRAME AND COLLAR
PER CITY DETAIL U-6
NOTE 5
6" 6"
OUTLET INLET
8/17/2026
SHALLOW MANHOLE
(UP TO 33-INCH) U-3
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
185 of 833
NOTES: 1. THIS MANHOLE BASE SHALL BE USED FOR MAIN PIPES OF UP TO 33" DIAMETER.
2. CAST-IN-PLACE CONCRETE BASE SHALL BE CLASS A 6-SACK PER CALTRANS STANDARDS PLACED AGAINST UNDISTURBED EARTH OR APPROVED BACKFILL MATERIAL AT 95% COMPACTION.
3. BASE SHALL BE SET TO THE PRECAST SECTIONS WITH 1:3 MORTAR MIX.
4. PRECAST SECTIONS SHALL CONFORM TO ASTM C-478 SPECIFICATIONS.
5. WATERSTOPS SHALL BE PROVIDED ON ALL INLET AND OUTLET PIPE ENTRY POINTS. WATERSTOPS SHALL BE A-LOK, KORE-N-SEAL, OR APPROVED EQUAL WITH GROUT AROUND WATERSTOP.
6. ALL MANHOLES SHALL PROVIDE A MINIMUM 0.10' DROP ACROSS THE MANHOLE.
7. SOFFIT ELEVATION OF ALL INLET PIPES SHALL SHALL BE NO LESS THAN THE SOFFIT ELEVATION OF THE OUTLET PIPE, EXCEPT FOR OVERFLOW OUTLETS.
8. CHANNELIZE BASE ONLY FOR SANITARY SEWER MANHOLES.
MANHOLE BASE PLAN
PROVIDE TWO JOINTS
WITHIN 24" OF BASE
AT ALL INLETS OR OUTLET
MINIMUM 90° ANGLE INLETS TO OUTLET
WATERSTOP
TYP
FLOW FLOW FLOW FLOW MIN. 0.10' DROP ACROSS MH SLOPE
1:24 MIN
SLOPE
1:24 MIN
SLOPE
1:24 MIN
CAST-IN-PLACE
CONCRETE BASE
PRECAST SECTIONS
DOWNSTREAM MAIN
OUTLET PIPE
UPSTREAM MAIN
INLET PIPE
UPSTREAM BRANCH
INLET PIPE
℄
℄
℄
CHANNEL ONLY FOR
SANTIARY SEWER
NOTE 7
SQUARE MANHOLE BASE
WITHIN EASEMENTS
CIRCULAR MANHOLE BASE
WITHIN STREETS
8/17/2026
STANDARD MANHOLE BASE
(UP TO 33-INCH) U-4
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
186 of 833
MANHOLE SECTION
(36"-48" MAINS)
NOTES: 1. THIS MANHOLE BASE SHALL BE USED FOR MAIN PIPES OF 36" TO 48" DIAMETER.
2. BEDDING THICKNESS AND TYPE SHALL BE AS RECOMMENDED PER PROJECT SPECIFIC GEOTECHNICAL ENGINEER RECOMMENDATIONS AND APPROVED BY PUBLIC WORKS DIRECTOR. PARTICULAR ATTENTION SHALL BE PAID TO BEDDING WITHIN BAY MUD.
3. SOFFIT ELEVATION OF ALL INLET PIPES SHALL SHALL BE NO LESS THAN THE SOFFIT ELEVATION OF THE OUTLET PIPE, EXCEPT FOR OVERFLOW OUTLETS OR DROP INLETS.
4. ALL MANHOLES SHALL PROVIDE A MINIMUM 0.10' DROP ACROSS THE MANHOLE FROM INLET TO OUTLET.
5. FLOOR OF MANHOLE SHALL BE SLOPED A MINIMUM 1
2" PER FOOT TOWARD THE FLOWLINE. PROVIDE LEDGES AND CHANNELIZE BASE ONLY FOR SANITARY SEWER MANHOLES. SEE CITY DETAIL U-5B FOR PLAN.
6. WATERSTOPS SHALL BE PROVIDED ON ALL INLET AND OUTLET PIPE ENTRY POINTS. WATERSTOPS SHALL BE INSTALLED PER PIPE MANUFACTURER RECOMMENDATIONS.
7. ALL PRECAST SECTIONS SHALL CONFORM TO ASTM C-478 SPECIFICATIONS.
8. FRAME AND BASE SHALL BE SET TO THE PRECAST SECTIONS WITH 1:3 MORTAR MIX. 9 ALL JOINTS SHALL BE SEALED WITH GROUT, RAM-NEK SEAL, OR APPROVED EQUAL.
10. MANHOLE FRAME AND COVER SHALL CONFORM TO CITY DETAIL U-5 & U-6. 11 MANHOLE COLLAR AND SURFACE TREATMENT SHALL CONFORM TO CITY DETAIL U-6.
MANHOLE BASE DIMENSIONS
DIA A B C D E F
36" 53" 36" 9.5" 7.5" 58" 11"
42" 60" 42" 10" 8" 60" 9"
48" 68" 48" 11" 9" 66" 9"
#4 REBAR DIAGONALS
AT OPENING, TYP
#5 REBAR @ 12" O.C. E.W.
SIDES AND BOTTOM
4" CLR, TYP
2-#5 REBAR
AT OPENING
PRECAST
RISER
SECTIONS
24" Ø
MANHOLE FRAME AND COLLAR
PER CITY DETAIL U-6
ALL JOINTS SEALED WITH
RAM-NEK OR EQ
PRECAST CONE SECTION
PER CITY DETAILS U-1 OR U-2
C
A D B 30" VARIES
E
F B F
8" CL 2 AB
NOTE 2
48" Ø
8/17/2026
MANHOLE BASE SECTION
(36 TO 48-INCH) U-5A
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
187 of 833
NOTES: 1. THIS MANHOLE BASE SHALL BE USED FOR MAIN PIPES OF 36" TO 48" DIAMETER.
2. CAST-IN-PLACE CONCRETE BASE SHALL BE CLASS A 6-SACK PER CALTRANS STANDARDS PLACED AGAINST UNDISTURBED EARTH OR APPROVED BACKFILL MATERIAL AT 95% COMPACTION.
3. BASE SHALL BE SET TO THE PRECAST SECTIONS WITH 1:3 MORTAR MIX.
4. PRECAST SECTIONS SHALL CONFORM TO ASTM C-478 SPECIFICATIONS.
5. PRECAST CONCENTRIC TAPER SECTION SHALL BE USED.
6. WATERSTOPS SHALL BE PROVIDED ON ALL INLET AND OUTLET PIPE ENTRY POINTS. WATERSTOPS SHALL BE A-LOK, KORE-N-SEAL, OR APPROVED EQUAL WITH GROUT AROUND WATERSTOP.
7. LAY CUT PIPE THROUGH MANHOLE MANHOLE AND CONFORM TO CONTOUR OF BASE.
8. ALL MANHOLES SHALL PROVIDE A MINIMUM 0.10' DROP ACROSS THE MANHOLE.
9. CROWN ELEVATION OF ALL INLET PIPES SHALL BE NO LESS THAN THE CROWN ELEVATION OF THE OUTLET PIPE, EXCEPT FOR OVERFLOW PIPES.
MANHOLE PLAN
#5 REBAR
AT OPENINGS
3" CLR
#5 REBAR
AT OPENINGS
3" CLR
CAST-IN-PLACE
CONCRETE BASE
PRECAST
SECTIONS FLOW 12" 12"
℄
℄ FLOW FLOWWATERSTOP
WATERSTOP 48" Ø MIN. 0.10' DROP ACROSS MH
8/17/2026
MANHOLE BASE PLAN
(36 TO 48-INCH) U-5B
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
188 of 833
NOTES: 1. FRAME AND COVER SHALL BE SOUTH BAY FOUNDRY MODEL SBF1900, OR APPROVED EQUAL. ALL IRON WORKS SHALL MEET PERFORMANCE SPECIFICATIONS.
2. ALL MATERIAL USED IN MANUFACTURING SHALL CONFORM TO ASTM A48, CLASS 35B.
3. FRAME AND COVER SHALL BE RATED FOR H-20 LOADING.
3. COVER SHALL BE IMPRINTED WITH EITHER "STORM DRAIN" OR "SANITARY SEWER" MATCHING SYSTEM TYPE.
PLAN
FRAME SECTION
COVER SECTION
SIDE PRY HOLE
BLIND PICK HOLE
ASTM GRID PATTERN
COVER LABEL
"STORM" OR "SEWER" LETTERING
BLIND PICK HOLE
25 1
4"
25 3
8" 26 1
4" 24"
31 1
2"
1 1
8"
1 1
8" 4 1
2"
8/17/2026
MANHOLE FRAME AND COVER
U-6
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
189 of 833
MANHOLE ADJUSTMENT TO GRADE
NOTES: 1. THIS DETAIL SHALL BE USED WHERE FRAME AND COVERS ARE BEING ADJUSTED TO GRADE.
2. FRAMES AND COVERS SHALL BE RAISED WITHIN 48 HOURS OF FINAL PAVING.
3. SEAL ALL JOINTS WITH RAM-NEK OR EQUAL.
4. GRADE RINGS SHALL BE A MAXIMUM OF 12" HIGH FOR NEW CONSTRUCTION AND MAXIMUM 18" HIGH FOR EXISTING MANHOLES. FOR ADJUSTMENTS THAT WOULD EXCEED 18" OF GRADE RINGS, THE MANHOLE SHALL HAVE NEW PRECAST RISER SECTIONS INSTALLED.
5. CONCRETE COLLAR SHALL BE PLACED AGAINST NEATLY EDGED EXCAVATION.
6. RAISE EXISTING MANHOLE TO BE FLUSH WITH EXISTING GRADE IN PAVED OR IMPROVED AREAS AND 4-INCHES ABOVE
HIGHEST ADJACENT GRADE IN LANDSCAPED OR UNIMPROVED AREAS OR AS DIRECTED BY THE CITY INSPECTOR TO AVOID FUTURE BURIAL.
AC OVER COLLAR
2" MIN DEPTH
12" MIN WIDE
LEVEL FRAME WITH MORTAR
1:3 MORTAR, 1" MIN
TYP
CAST-IN-PLACE
CONCRETE COLLAR
TYP
PRECAST ADJUSTING
GRADE RINGS, TYP
EXISTING
PAVEMENT 12" MIN 6" MIN 18" MAX
EXISTING MANHOLE 4" MIN
EXISTING
GRADE
MANHOLE
COVER COLLAR
12" MIN WIDE
MH RIM FLUSH TO FG MH RIM 4" ABOVE FG
IN IMPROVED AREAS IN UNIMPROVED AREAS
8/17/2026
MANHOLE ADJUST TO GRADE
U-7
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
190 of 833
OUTLET PIPE CONNECTION DETAIL
NOTES: 1. WATERSTOPS SHALL BE INSTALLED PER PIPE MANUFACTURER RECOMMENDATIONS.
INLET PIPE CONNECTION DETAIL
NOTES: 1. INLET PIPE CONNECTION ALLOWED FOR STORM DRAIN SYSTEMS.
2. INLET PIPE CONNECTION ALLOWED FOR SANITARY SEWER SYSTEMS WHERE INLET INVERT IS LESS THAN 18" ABOVE OUTLET INVERT; OTHERWISE, REFER TO DROP CONNECTION DETAIL. SHAPE AND SLOPE NEW INVERT CHANNEL IN EXISTING STRUCTURES FOR SMOOTH FLOW FROM SANITARY SEWER CONNECTION.
3. WATERSTOPS SHALL BE INSTALLED PER PIPE MANUFACTURER RECOMMENDATIONS.
BASE
CHANNEL
MANHOLE
4' LONG TRENCH
CLSM OR PCC WATERSTOP
EXISTING MANHOLE: CHIP OUT EX MANHOLE BASE,
INSTALL WATERSTOP, DRY PACK, RESMOOTH CHANNEL
NEW MANHOLE: POUR MANHOLE
BASE AROUND NEW PIPE AND
WATERSTOP, SMOOTH CHANNEL
NEW PVC OR HDPE PIPE
GROUTING SHALL BE
TROWELED SMOOTH TO THE
INSIDE MANHOLE WALL
BASE
CHANNEL
MANHOLE
4' LONG TRENCH
CLSM OR PCC
6" AROUND PIPE WATERSTOP
NEW PVC OR HDPE PIPE
NEW MANHOLE: INSTALL PIPE AND
WATERSTOP PER MFG INSTRUCTIONS,
FLUSH TO INSIDE WALL
EXISTING MANHOLE: CHIP OUT EX MANHOLE WALL/BASE,
INSTALL WATERSTOP, DRY PACK, RESMOOTH INSIDE MANHOLE NOTE 1 8/17/2026
PIPE CONNECTION TO MANHOLE
U-8
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
191 of 833
NEW PIPE OVER
EXISTING PIPE
NEW PIPE UNDER
EXISTING PIPE
SECTION B-B
SECTION A-A
NOTES: 1. PIPE CROSSINGS WITH VERTICAL CLEARANCE BETWEEN 6" TO 12" SHALL COMPLY WITH THE ABOVE DETAILS. UNDER NO CASE SHALL THE VERTICAL CLEARANCES BETWEEN STORM DRAIN AND SANITARY SEWER PIPES BE LESS THAN 6".
2. FOR SANITARY SEWERS CROSSING WATER MAINS, VERTICAL CLEARANCE AND CROSSING DETAIL SHALL COMPLY WITH CALIFORNIA WATER SERVICE COMPANY OR SAN FRANCISCO PUBLIC UTILITY COMMISSION AS APPLICABLE.
3. TRENCH BACKFILL AND RESTORATION SHALL CONFORM TO CITY STANDARD DETAILS R-1 THRU R-5. #5 REBAR
CENTERED
ACROSS
TRENCH
8" MIN
TYP
EXISTING SEWER
OR STORM PIPE
ROOFING PAPER
OR BOND BREAKER
O.D./2 + 4"
2" MIN
6" MIN
NEW PIPE
CONCRETE
SADDLE
O.D./2
+ 4"
#5 REBAR
12" O.C. 6" MIN O.D.
NEW PIPE
EXISTING SEWER
OR STORM PIPE
O.D. 6" MIN O.D.
EXISTING SEWER
OR STORM PIPE
CONCRETE
SADDLE
CONCRETE
CRADLE
BACKFILL
PER TRENCH STD
BACKFILL
PER TRENCH STD
BACKFILL
PER TRENCH STD
O.D.
EXISTING SEWER
OR STORM PIPE
ROOFING PAPER
OR BOND BREAKER
CONCRETE
SADDLE
6" MIN
NEW PIPE
8" MIN
TYP
NEW PIPE
1 4O.D. 4"MIN
O.D./2
+ 4"
BACKFILL
PER TRENCH STD
O.D./2 + 4"
1 4O.D. 4"MIN
NEW PIPE
℄
EX PIPE
℄
NEW PIPE
℄
EX PIPE
℄
A
A
B
B
8/17/2026
PIPE CROSSING
U-9
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
192 of 833
PIPE DIAMETER 12" OR LARGER
PIPE DIAMETER SMALLER THAN 12"
NOTES: 1. ALL PIPE PLUGS SHALL BE INSTALLED TO THE SATISFACTION OF THE PUBLIC WORKS INSPECTOR.
2. ABANDONED PIPES, 12" OR LARGER, SHALL BE BROKEN INTO 50' SEGMENTS AND COMPLETELY FILLED WITH SAND SLURRY.
3. FOR SERVICE LATERALS AT MAIN, CUT OUT AND REMOVE MAIN SECTION AND REPLACE WITH NEW MAIN PIPE, CAP AND ABANDON SERVICE LATERAL PER THE ABOVE DETAILS.
4. FOR ALL PIPE ABANDONMENT IN BAY MUD OR EAST OF US-101, ALL PIPE SIZES SHALL BE ENTIRELY FILLED WITH SAND SLURRY AND PLUGGED.
EXISTING PIPE
CONCRETE PLUG
FACE OF CUT PIPE
SAND SLURRY
8" MIN
CONCRETE PLUG
FACE OF CUT PIPE
EXISTING PIPE EXISTING PIPE
8" MIN
CONCRETE PLUG
SAND SLURRY
FILL ENTIRE
PIPE
SAND SLURRY
FILL ENTIRE
PIPE
FACE OF CUT PIPE
12" MIN 36" MIN
50' MAX SEGMENTS
NOTE 2
8/17/2026
PIPE ABANDONMENT
U-10
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
193 of 833
NOTES: 1. "T" CUT RESTORATION SHALL EXTEND 24" BEYOND THE OUTER DIAMETER OF THE MANHOLE. REMOVE AND REPLACE THE PAVEMENT SECTION MATCH EXISTING (6" AC MINIMUM). BASE LAYER SHALL BE CLASS 2 AGGREGATE BASE MATCHING THE EXISTING BASE LAYER OR 8" MINIMUM. WHERE THE "T" CUT EDGE IS WITHIN 3' OF THE ADJACENT CURB AND GUTTER, THE "T" CUT SHALL BE EXTENDED TO THE ADJACENT CURB OR GUTTER.
2. A 2" GRIND AND OVERLAY SHALL BE REQUIRED FOR ALL TRENCH RESTORATION IN THE ROADWAY. EXTENTS SHALL BE PER STANDARD DETAILS R-6A THROUGH R-6C.
3. REMOVE FRAME, COVER, TAPER, AND RISER SECTIONS DOWN TO A MINIMUM 4' FROM THE SURFACE.
4. PLUG ALL PIPES OPENINGS, INLETS, AND OUTLETS PER STANDARD PIPE ABANDONMENT DETAIL U-9.
5. AFTER PLUGGING ALL PIPES CONNECTED TO THE MANHOLE, BACKFILL THE REMAINDER OF THE MANHOLE AND ALL OTHER VOIDS WITH CONTROLLED LOW STRENGTH MATERIAL (CLSM).
MANHOLE ABANDONMENT SECTION
24" MIN MANHOLE O.D.
2" GRIND AND OVERLAY
EXTENTS VARY
NOTE 2
24" MIN
2" GRIND AND OVERLAY
EXTENTS VARY
NOTE 2
EXISTING
CONCRETE BASE
EXISTING
MANHOLE RISERS 4' MIN NOTE 3
BACKFILL MANHOLE
WITH CLSM
NOTE 5
BACKFILL MANHOLE
AND VOIDS
WITH CLSM
NOTE 5
DRILL/KNOCK HOLE
MIN 6"Ø IN BASE OR RISER OR
AS DIRECTED BY CITY INSPECTOR
STANDARD
PIPE ABANDONMENT
NOTE 4
EX AC
PAVEMENT
REPLACE
PAVEMENT SECTION
NOTE 1
REMOVE MANHOLE
TAPER AND RISER
SECTIONS
8/17/2026
MANHOLE ABANDONMENT
U-11
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
194 of 833
SECTION A-A
PLAN
ISOMETRIC VIEW
NOTES: 1. TRENCH SUPPORT COLLARS TO BE PROVIDED FOR PIPES INSTALLED ON SLOPES OF 30% OR GREATER.
2. MAXIMUM SPACING BETWEEN COLLARS SHALL BE 35' ON CENTER.
A
35' O.C. MAXIMUM SPACING BETWEEN COLLARS
CONCRETE TRENCH
SUPPORT COLLAR
TYP
PIPE
FINISHED GRADE
1' 1'
A
PIPE
1' 1'
TRENCH WIDTH
TRENCH WIDTH
CONCRETE TRENCH
SUPPORT COLLAR 1' 1'
TRENCH SUPPORT COLLAR
6" THICK CONCRETE TRENCH LIMITS
PIPE 6"
TRENCH BACKFILL
TRENCH LIMITS
8/17/2026
TRENCH SUPPORT COLLAR
U-12
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
195 of 833
TRENCH SECTION
(TYPICAL STREETS)
NOTES:
1. "T" CUT SHALL CONSIST OF REMOVAL AND REPLACEMENT WITH HOT MIX ASPHALT FOR FULL DEPTH OF THE EXISTING ASPHALT CONCRETE LAYER OR 6" MINIMUM, WHATEVER IS GREATER.
2. WHERE THE "T" CUT EDGE IS WITHIN 3' OF THE ADJACENT CURB AND GUTTER, THE "T" CUT SHALL BE EXTENDED TO THE ADJACENT CURB OR GUTTER.
3. ALL STRIPING OR SIGNAGE DISTURBED BY THE PROJECT SHALL BE RESTORED TO CITY STANDARDS. SEE CITY DETAIL C-1.
4. FOR PAVED AREAS, BACKFILL SHALL BE CLASS 2 AGGREGATE BASE AT 95% COMPACTION. CONTROLLED DENSITY FILL (CDF) SHALL REQUIRE PUBLIC WORKS DIRECTOR APPROVAL.
5. FOR UNPAVED AREAS, SELECT BACKFILL MATERIAL SHALL BE MATERIAL FROM EXCAVATION, FREE FROM STONES OR LUMPS EXCEEDING 3" IN GREATEST DIMENSION, VEGETATION MATTER, OR UNSATISFACTORY MATERIAL.
6. WHERE UNSUITABLE SUBBASE MATERIAL IS ENCOUNTERED, TRENCH SHALL OVEREXCAVATE BY 12" AND BACKFILL WITH CLASS 1, TYPE A PERMEABLE MATERIAL.
7. PRIOR TO FINISHING THE WORK DAY, OPEN TRENCHES SHALL BE PLATED OR BACKFILLED AND PAVED WITH EXISTING PAVEMENT.
8. ASPHALT TYPE SHALL MATCH EXISTING ASPHALT. IF TYPE A, HOT MIX ASPHALT SHALL MEET 2010 CALTRANS STANDARD SPECIFICATIONS SECTION 39 (15% RAP)
9. PAVEMENT RESTORATION LIMITS SHALL CONFORM TO CITY STANDARD DETAILS R-6A THRU R-6C
10. ADDITIONAL MORATORIUM PAVING OR SLURRY SEAL MAY APPLY PER SMMC 17.32.
EX SUBBASE
NOTE 6
CLASS 1, TYPE A
PERMEABLE
(95% COMPACTION)
PIPE
WARNING
TAPE
CLASS 2 AB
OR CDF
NOTE 4 & 5
TACK COAT ALL SURFACES
PRIOR TO AC INSTALL
EXISTING
CURB AND GUTTER
"T" CUT FULL DEPTH
HMA REPLACEMENT
NOTE 1
6" MIN PIPE O.D. 6" MIN
6" MIN
1 4 PIPE O.D.
MIN 4"
12" MAX
6" MIN
24" MIN
24" MIN
NOTE 2
2" GRIND AND
HMA OVERLAY
NOTE 9
6" MIN
8/17/2026
UTILITY TRENCH
(TYPICAL STREETS) R-1
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
196 of 833
TRENCH SECTION
(CONCRETE BASE STREETS)
NOTES:
1. THIS DETAIL APPLIES TO ALL EXCAVATIONS ON CONCRETE BASE STREETS.
2. SAWCUT FULL CONCRETE BASE DEPTH PRIOR TO TRENCHING.
3. BORE 12" MINIMUM INTO EXISTING CONCRETE BASE SLAB AND INSTALL #6 REBAR WITH EPOXY AS SHOWN. EPOXY SHALL CONFORM TO CALTRANS SPECIFICATIONS.
4. "T" CUT SHALL CONSIST OF REMOVAL AND REPLACEMENT WITH NEW CONCRETE OF FULL DEPTH OF THE EXISTING CONCRETE.
5. WHERE THE "T" CUT EDGE IS WITHIN 3' OF THE ADJACENT CURB, GUTTER OR EDGE OF PAVEMENT, THE "T" CUT SHALL BE EXTENDED TO THE ADJACENT CURB, GUTTER OR EDGE OF PAVEMENT.
6. ALL STRIPING OR SIGNAGE DISTURBED BY THE PROJECT SHALL BE RESTORED TO CITY STANDARDS. SEE CITY DETAIL C-1.
7. CONCRETE SHALL BE 3,500 PSI, 5.5 SACK, 1.5" MAX COARSE AGGREGATE.
8. PRIOR TO FINISHING THE WORK DAY, OPEN TRENCHES SHALL BE PLATED OR BACKFILLED AND PAVED WITH HMA. ON ARTERIAL STREETS, PLATES SHALL BE TACK-WELDED TOGETHER AND SHALL BE RECESSED TO BE FLUSH WITH EXISTING PAVEMENT.
9. ASPHALT TYPE SHALL MATCH EXISTING ASPHALT. IF TYPE A, HOT MIX ASPHALT SHALL MEET 2010 CALTRANS STANDARD SPECIFICATIONS SECTION 39 (15% RAP)
10. PAVEMENT RESTORATION LIMITS SHALL CONFORM TO CITY STANDARD DETAILS R-6A THRU R-6C
11. WHERE UNSUITABLE SUBBASE MATERIAL IS ENCOUNTERED, TRENCH SHALL OVEREXCAVATE BY 12" AND BACKFILL WITH CLASS 1, TYPE A PERMEABLE MATERIAL.
12. FOR TRENCHES LESS THAN 12" WIDE, STAGGER REBAR 9" O.C.
13. CONCRETE SHALL CURE MINIMUM 5 DAYS PRIOR TO PAVING.
14. ADDITIONAL MORATORIUM PAVING OR SLURRY SEAL MAY APPLY PER SMMC 17.32.
CLASS 1, TYPE A
PERMEABLE
PIPE (95% COMPACTION)
WARNING
TAPE
EXISTING AC PAVEMENT
TACK COAT ALL SURFACES
PRIOR TO AC INSTALL
EXISTING CONCRETE BASE
CLASS 2 AB OR CDF
#6 REBAR 18" O.C.
EACH WAY
NOTE 12
24" DOWEL
12" EMBEDMENT
WITH EPOXY
TYP
NEW PCC BASE
MATCH EXISTING DEPTH
EX SUBBASE
NOTE 11
"T" CUT FULL DEPTH
HMA REPLACEMENT
NOTE 4
24" MIN
NOTE 10
12" MIN
TYP
24" MIN
NOTE 10
6" MIN
1 4 PIPE O.D.
MIN 4"
12" MAX
6" MIN
6" MIN PIPE O.D. 6" MIN
8/17/2026
UTILITY TRENCH
(CONCRETE BASE STREET) R-2
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
197 of 833
NOTES:
1. ROCKWHEEL TRENCHES SHALL ONLY BE USED TO INSTALL TELECOMMUNICATION OR ELECTRICAL CONDUITS IN ASPHALT CONCRETE ROADWAYS.
2. ROCKWHEEL TRENCHES ARE NOT ALLOWED ON OR THROUGH CONCRETE BASE STREETS, SIDEWALKS, PARKWAYS, CURBS, GUTTERS, OR LATERALS UNLESS APPROVED BY THE CITY.
3. CONTRACTOR SHALL POTHOLE ANY CROSSING UTILITY OR PARALLEL UTILITY (INCLUDING LATERALS) WITHIN 18-INCH OF PROPOSED ALIGNMENT TO A DEPTH OF 6-INCHES BELOW THE BOTTOM OF THE ROCKWHEEL TRENCH. POTHOLES SHALL BE IMMEDIATELY FILLED.
4. "T" CUT SHALL CONSIST OF REMOVAL AND REPLACEMENT WITH HOT MIX ASPHALT FOR FULL DEPTH OF THE EXISTING ASPHALT CONCRETE LAYER OR 6" MINIMUM, WHICHEVER IS GREATER.
5. THE EDGE OF THE ROCKWHEEL TRENCH SHALL HAVE A 2' MINIMUM HORIZONTAL CLEARANCE TO THE LIP OF GUTTER OR FACE OF CURB WHERE NO GUTTER EXISTS.
6. WHERE THE "T" CUT EDGE IS WITHIN 3' OF THE ADJACENT CURB AND GUTTER, THE "T" CUT SHALL BE EXTENDED TO THE ADJACENT CURB OR GUTTER.
7. UP TO TWO (2) CONDUITS MAY BE VERTICALLY STACKED CONDUITS PER ROCKWHEEL TRENCH.
8. ALL STRIPING OR SIGNAGE DISTURBED BY THE PROJECT SHALL BE RESTORED TO CITY STANDARDS. SEE CITY DETAIL C-1.
9. PRIOR TO FINISHING THE WORK DAY, OPEN TRENCHES SHALL BE PLATED OR BACKFILLED AND PAVED WITH EXISTING PAVEMENT.
10. ASPHALT TYPE SHALL MATCH EXISTING ASPHALT. IF TYPE A, HOT MIX ASPHALT SHALL MEET 2010 CALTRANS STANDARD SPECIFICATIONS SECTION 39 (15% RAP)
11. PAVEMENT RESTORATION LIMITS SHALL CONFORM TO CITY STANDARD DETAILS R-6A THRU R-6C
12. ADDITIONAL MORATORIUM PAVING OR SLURRY SEAL MAY APPLY PER SMMC 17.32.
ROCKWHEEL TRENCH SECTION
95% COMPACTED SAND
MIN 1" BEDDING
MIN 1" COVER
TACK COAT ALL SURFACES
PRIOR TO AC INSTALL
EXISTING BASE
3-SACK CONCRETE
SLURRY
EXISTING AC PAVEMENT
FIRST CONDUIT
TELE/ELEC
EXISTING
CURB AND GUTTER
24" MIN
NOTE 5
6" MIN
24" MIN
"T" CUT FULL DEPTH
HMA REPLACEMENT
NOTE 4
6" MAX
4" MIN
18" MIN
MM/DD/YYYY
ROCKWHEEL TRENCH
R-3
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
198 of 833
NOTES:
1. MICROTRENCHING SHALL ONLY BE USED TO INSTALL TELECOMMUNICATION OR ELECTRICAL CONDUITS IN ASPHALT CONCRETE ROADWAYS.
2. MICROTRENCHING IS NOT ALLOWED ON OR THROUGH CONCRETE BASE STREETS, SIDEWALKS, PARKWAYS, CURBS, GUTTERS, OR LATERALS UNLESS APPROVED BY THE CITY.
3. CONTRACTOR SHALL IDENTIFY ALL EXISTING UTILITIES, INCLUDING SERVICE CONNECTIONS, IN THE FIELD.
4. CONTRACTOR SHALL POTHOLE ANY CROSSING UTILITY OR PARALLEL UTILITY (INCLUDING SEWER AND GAS LATERALS) WITHIN 18-INCH OF PROPOSED ALIGNMENT TO A DEPTH OF 6-INCHES BELOW THE BOTTOM OF THE MICROTRENCH. POTHOLES SHALL BE IMMEDIATELY BACKFILLED.
5. SAWCUT FULL CONCRETE BASE DEPTH PRIOR TO TRENCHING.
6. THE EDGE OF THE MICROTRENCH SHALL HAVE A 2' MINIMUM HORIZONTAL CLEARANCE TO THE LIP OF GUTTER OR FACE OF CURB WHERE NO GUTTER EXISTS.
7. "T" CUT SHALL CONSIST OF REMOVAL AND REPLACEMENT WITH HOT MIX ASPHALT FOR FULL DEPTH OF THE EXISTING ASPHALT CONCRETE LAYER OR 6" MINIMUM, WHATEVER IS GREATER.
8. WHERE THE "T" CUT EDGE IS WITHIN 3' OF THE ADJACENT CURB AND GUTTER, THE "T" CUT SHALL BE EXTENDED TO THE ADJACENT CURB OR GUTTER.
9. UP TO TWO (2) CONDUITS MAY BE VERTICALLY STACKED CONDUITS PER MICROTRENCH. AT THE DISCRETION OF THE PUBLIC WORKS DIRECTOR, AN ADDITIONAL CONDUIT SHALL BE PLACED ABOVE THE APPLICANTS CONDUITS, FOR USE BY THE CITY.
10. CONDUITS MUST BE PLACED IN ZONE 1 FIRST. IF THERE ARE CONFLICTS PRESENT, THEN ZONE 2 MAY BE UTILIZED, ZONE 3 CAN BE USEDONLY IF THEY ARE CONFLICTS PRESENT IN BOTH ZONES 2 AND 3.
11. ALL MICROTRENCHING SHALL BE IDENTIFIED WITH A METAL IDENTIFICATION TAG LISTING THE OWNER, YEAR OF CONSTRUCTION, AND INCLUDING THE WORDS "NOT A SURVEY POINT". IF THE WORK IS DONE MORE THAN 50' IN LENGTH, PLACE THE TAG NEAR EACH END OF THE MICROTRENCH AND AT INTERVALS NOT EXCEEDING 50'.
12. ALL STRIPING OR SIGNAGE DISTURBED BY THE PROJECT SHALL BE RESTORED TO CITY STANDARDS. SEE CITY DETAIL C-1.
13. PRIOR TO FINISHING THE WORK DAY, OPEN TRENCHES SHALL BE PLATED OR BACKFILLED AND PAVED WITH EXISTING PAVEMENT.
14. ASPHALT TYPE SHALL MATCH EXISTING ASPHALT. IF TYPE A, HOT MIX ASPHALT SHALL MEET 2010 CALTRANS STANDARD SPECIFICATIONS SECTION 39 (15% RAP)
15. PAVEMENT RESTORATION LIMITS SHALL CONFORM TO CITY STANDARD DETAILS R-6A THRU R-6C
16. ADDITIONAL MORATORIUM PAVING OR SLURRY SEAL MAY APPLY PER SMMC 17.32. 12" MIN
SECTION VIEW
CONDUIT DEPTH TABLE
ZONE CONDUIT DEPTH
1 20" - 26"
2 16" - 20"
3 12" - 16"
3-SACK CDF
"T" CUT FULL DEPTH
1 2" HMA REPLACEMENT
ZONE 3 CONDUIT
3 2
1 CONDUIT ZONES
VARIES
NOTES 9 & 10
EXISTING
LIP OF GUTTER
ZONE 2 CONDUIT
ZONE 1 CONDUIT
24" MIN 4" 24" MIN
24" MIN
NOTES 6 & 8
8/17/2026
MICROTRENCH
R-4
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
199 of 833
NOTES:
1. SAWCUT FULL CONCRETE BASE DEPTH PRIOR TO TRENCHING.
2. "T" CUT SHALL CONSIST OF REMOVAL AND REPLACEMENT WITH HOT MIX ASPHALT FOR FULL DEPTH OF THE EXISTING ASPHALT CONCRETE LAYER OR 6" MINIMUM, WHATEVER IS GREATER. IF THE SUBBASE IS CONCRETE, THE "T" CUT SHALL REPLACE THE EXISTING CONCRETE SECTION TO FULL DEPTH.
3. WHERE THE "T" CUT EDGE IS WITHIN 3' OF THE ADJACENT CURB AND GUTTER, THE "T" CUT SHALL BE EXTENDED TO THE ADJACENT CURB OR GUTTER.
4. ALL STRIPING OR SIGNAGE DISTURBED BY THE PROJECT SHALL BE RESTORED TO CITY STANDARDS. SEE CITY DETAIL C-1.
5. FOR PAVED AREAS, SELECT BACKFILL SHALL BE CONTROLLED DENSITY FILL (CDF)
6. FOR UNPAVED AREAS, SELECT MATERIAL SHALL BE MATERIAL FROM EXCAVATION, FREE FROM STONES OR LUMPS EXCEEDING 3" IN GREATEST DIMENSION, VEGETATION MATTER, OR UNSATISFACTORY MATERIAL.
7. ASPHALT TYPE SHALL MATCH EXISTING ASPHALT. IF TYPE A, HOT MIX ASPHALT SHALL MEET 2010 CALTRANS STANDARD SPECIFICATIONS SECTION 39 (15% RAP)
8. WHEN MULTIPLE POTHOLES WHOSE OURSIDE EDGES ARE WITHIN 24" OF EACH OTHER, "T CUT RESTORATION SHALL BE CONTINUOUS.
9. ADDITIONAL MORATORIUM PAVING OR SLURRY SEAL MAY APPLY PER SMMC 17.32.
EXCAVATION
WIDTH
POTHOLE RESTORATION LIMITS PLAN
POTHOLE SECTION
CLASS 2 AB
OR CDF
"T" CUT FULL DEPTH
HMA REPLACEMENT
NOTE 2
EXISTING AC
PAVEMENT
TACK COAT ALL
SURFACES PRIOR
TO AC INSTALL
EXISTING UTILITY
EXISTING BASE
NOTE 2
EXISTING
CURB AND GUTTER
EDGE OF ASPHALT
RESTORATION
EXCAVATION HOLE
12" MIN
12" MIN
NOTE 3
6" MIN
12" 12"
12"
12"
8/17/2026
POTHOLE RESTORATION
R-5
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
200 of 833
EXCAVATION RESTORATION NOTES:
1. ASPHALT TYPE SHALL MATCH EXISTING ASPHALT. REFER TO DETAIL C-1 FOR SPEC.
2. IF A NEW RESTORATION IS DONE WITHIN AN EXISTING PATCH, THE BOUNDARIES OF THE FINAL RESTORATION FOR THE PATCHES SHALL COINCIDE.
3. ALL RESTORATIONS SHALL BE SQUARED UP AND PARALLEL TO THE EDGE OF THE ROADWAY.
4. ALL RESTORATION SHALL BE COMPLETED IN A TIMELY MANNER. AFTER BACKFILL IS RESTORED AND COMPACTED, ASPHALT SHALL BE PLACED 5 DAYS. FINAL RESTORATION SHALL BE COMPLETED NO LATER THAN 10 DAYS.
5. ANY ADJACENT CONCRETE SHALL CURE A MINIMUM 5 DAYS PRIOR TO PAVING.
6. ALL STRIPING SHALL BE COMPLETED BETWEEN 2 DAYS TO 7 DAYS AFTER THE PAVEMENT HAS BEEN PLACED.
CASE 2: EXCAVATION >25% LENGTH OF STREET
RESTORATION CASE 2: FOR EXCAVATIONS 25% OR MORE OF THE TOTAL STREET
LENGTH, ASPHALT SURFACE SHALL BE RESTORED FOR THE
FULL WIDTH AND FULL LENGTH OF ANY AFFECTED LANE.
RESTORATION CASE 1: FOR EXCAVATIONS LESS THAN 25% OF THE TOTAL STREET
LENGTH, ASPHALT SURFACE SHALL BE RESTORED FOR THE
FULL WIDTH OF ANY AFFECTED LANE AND 2' PAST THE
EXCAVATION. FOR UNMARKED STREETS, RESTORE TO THE
CENTER OF THE STREET.
CASE 1: EXCAVATION <25% LENGTH OF STREET
CASE 3: EXCAVATION OVER CENTERLINE
RESTORATION CASE 3: FOR EXCAVATIONS CROSSING OVER THE CENTERLINE, BOTH
LANES SHALL BE RESTORED FOR THE FULL WIDTH THEN
APPLY CASE 1 OR 2. DEPICTED ABOVE IS A EXCAVATION
CROSSING THE CENTERLINE AND LONGER THAN 25% OF THE
STREET.
CENTER LINE
AREA OF AC PAVEMENT
RESTORATION
LANE LINE
CROSSWALK
PROPERTY LINE
TRAFFIC FLOW
PARKING TEE
AREA OF EXCAVATION
LEGEND
L = STREET LENGTH
L = STREET LENGTH
L = STREET LENGTH
<0.25L
2'
2' <0.25L
>0.25L
>0.25L
2'
8/17/2026
PAVEMENT RESTORATION
(EXCAVATIONS) R-6A
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
201 of 833
CASE 4: EXCAVATIONS WITHIN CLOSE PROXIMITY
RESTORATION CASE 4: FOR TWO OR MORE EXCAVATIONS WITHIN 50' LONGITUDINAL
OF ONE ANOTHER OR ON THE SAME SIDE OF THE
CENTERLINE, THE PAVEMENT RESTORATION SHALL BE
CONTINUOUS BETWEEN THE EXCAVATIONS. FOR
LONGITUDINAL EXCAVATIONS, THIS CASE APPLIES BETWEEN
THE TWO NEAREST ENDS; HOWEVER, THE TOTAL LENGTH OF
THE TWO EXCAVATIONS COMBINED STALL BE LESS THAN 25%
OF THE STREET.
CASE 5: 8 OR MORE LATERALS ON SAME BLOCK
RESTORATION CASE 5: FOR PROJECTS INSTALLING 8 OR MORE LATERALS ON THE SAME BLOCK OR WHEN 50% OR MORE OF THE PROPERTIES
ON A BLOCK REQUIRE LATERAL EXCAVATION, THE PAVEMENT
RESTORATION SHALL EXTEND THE ENTIRE LENGTH OF THE
BLOCK FOR. THIS APPLIES PER LANE.
CENTER LINE
AREA OF AC PAVEMENT
RESTORATION
LANE LINE
CROSSWALK
PROPERTY LINE
TRAFFIC FLOW
PARKING TEE
AREA OF EXCAVATION
LEGEND
EXCAVATION RESTORATION NOTES:
1. ASPHALT TYPE SHALL MATCH EXISTING ASPHALT. REFER TO DETAIL C-1 FOR SPEC.
2. IF A NEW RESTORATION IS DONE WITHIN AN EXISTING PATCH, THE BOUNDARIES OF THE FINAL RESTORATION FOR THE PATCHES SHALL COINCIDE.
3. ALL RESTORATIONS SHALL BE SQUARED UP AND PARALLEL TO THE EDGE OF THE ROADWAY.
4. ALL RESTORATION SHALL BE COMPLETED IN A TIMELY MANNER. AFTER BACKFILL IS RESTORED AND COMPACTED, ASPHALT SHALL BE PLACED 5 DAYS. FINAL RESTORATION SHALL BE COMPLETED NO LATER THAN 10 DAYS.
5. ANY ADJACENT CONCRETE SHALL CURE A MINIMUM 5 DAYS PRIOR TO PAVING.
6. ALL STRIPING SHALL BE COMPLETED BETWEEN 2 DAYS TO 7 DAYS AFTER THE PAVEMENT HAS BEEN PLACED.
L = STREET LENGTH
≤50'
2'
2'
≤50'
2' 2' <0.25L
L = STREET LENGTH
2'
2'
2'
2'
2'
SAME SIDE
OF CL
8/17/2026
PAVEMENT RESTORATION
(EXCAVATIONS) R-6B
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
202 of 833
CENTER LINE
AREA OF AC PAVEMENT
RESTORATION
LANE LINE
CROSSWALK
PROPERTY LINE
TRAFFIC FLOW
PARKING TEE
AREA OF EXCAVATION
UPGRADE CURB RAMPS
TO BE ADA COMPLIANT
LEGEND
CASE 6: SINGLE STREET WIDTH ONLY
RESTORATION CASE 6: WHEN EXCAVATION IS THRU THE INTERSECTION ALONG ONE
SIDE, THE AFFECTED LANES SHALL BE RESTORED AS
SHOWN.
CASE 7: CENTERLINE
RESTORATION CASE 7: WHEN EXCAVATION IS THRU THE INTERSECTION'S
CENTERLINE, THE ENTIRE INTERSECTION SHALL BE
RESTORED AS SHOWN.
CASE 8: THREE OR MORE QUADRANTS
RESTORATION CASE 8: WHEN EXCAVATION IS THRU THREE QUADRANTS OR MORE, THE ENTIRE INTERSECTION SHALL BE RESTORED AS SHOWN.
CASE 9: DIAGONAL ACROSS
RESTORATION CASE 9: WHEN EXCAVATION IS ACROSS AN INTERSECTION AT AN
ANGLE, THE ENTIRE INTERSECTION SHALL BE RESTORED AS
SHOWN.
EXCAVATION RESTORATION NOTES:
1. ASPHALT TYPE SHALL MATCH EXISTING ASPHALT. REFER TO DETAIL C-1 FOR SPEC.
2. IF A NEW RESTORATION IS DONE WITHIN AN EXISTING PATCH, THE BOUNDARIES OF THE FINAL RESTORATION FOR THE PATCHES SHALL COINCIDE.
3. ALL RESTORATIONS SHALL BE SQUARED UP AND PARALLEL TO THE EDGE OF THE ROADWAY.
4. ALL RESTORATION SHALL BE COMPLETED IN A TIMELY MANNER. AFTER BACKFILL IS RESTORED AND COMPACTED, ASPHALT SHALL BE PLACED 5 DAYS. FINAL RESTORATION SHALL BE COMPLETED NO LATER THAN 10 DAYS.
5. ANY ADJACENT CONCRETE SHALL CURE A MINIMUM 5 DAYS PRIOR TO PAVING.
6. ALL STRIPING SHALL BE COMPLETED BETWEEN 2 DAYS TO 7 DAYS AFTER THE PAVEMENT HAS BEEN PLACED.
7. WHERE SHOWN, CORNER RAMPS SHALL BE RECONSTRUCTED TO BE IN COMPLIANCE WITH ADA REQUIREMENTS.
8/17/2026
PAVEMENT RESTORATION
(EXCAVATIONS) R-6C
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
203 of 833
HYDRANTS AND ALLEYS
NON-SIGNAL INTERSECTIONS AND ADA STALLS
SIGNAL INTERSECTIONS
PARKING TEE
A= 1.6 SF
CASE 1 (SIGNALIZED INTERSECTIONS):
AT ALL SIGNALIZED INTERSECTIONS, PARKING SHALL BE PROHIBITED FOR 30' MIN ON THE NEAR SIDE AND 20' MIN ON THE FAR SIDE.
CASE 2 (NON-SIGNALIZED INTERSECTIONS):
AT ALL NON-SIGNALIZED INTERSECTIONS, PARKING SHALL BE PROHIBITED FOR 20' MIN ON EITHER SIDE.
CASE 3 (ADA-STALLS):
ADA STALLS SHALL BE LOCATED SUCH THAT PERSONS WITH DISABILITIES ARE NOT COMPELLED TO WALK OR WHEEL BEHIND PARKED VEHICLES BESIDES THEIR OWN. STALLS SHALL BE MARKED WITH BLUE CURB AND ADA STALL SIGN R99C(CA).
CASE 4 (FIRE HYDRANTS):
PARKING SHALL BE PROHIBITED 15' MIN ON EITHER SIDE OF A FIRE HYDRANT.
CASE 5 (ALLEYWAYS):
PARKING SHALL BE PROHIBITED 6' ON THE NEAR AND FAR SIDE OF AN INTERSECTION TO AN ALLEY.
PARKING NOTES:
1. PARALLEL STALLS SHALL BE 24' LONG AND 8' WIDE. LENGTH MAY BE REDUCED TO 20' FOR END STALLS.
2. PARKING STALLS OTHER THAN PARALLEL SHALL REQUIRE SPECIAL APPROVAL FROM PUBLIC WORKS.
3. PARKING TEES SHALL ONLY BE PROVIDED WHERE PARKING DESIGNATION IS REQUIRED BY PUBLIC WORKS.
4. PARKING TEES SHALL BE WHITE THERMOPLASTIC WITH GLASS BEADING.
5. PARKING METERS SHALL BE LOCATED WITHIN 3' OF THE NOSE END OF THE PARKING STALL AND 18" O.C.
FROM THE FACE OF CURB.
6. PARKING RESTRICTION SHALL BE MEASURED FROM THE EDGE OF CURB RETURN OR THE OUTSIDE EDGE OF THE CROSSWALK STRIPING WHICHEVER IS CLOSER TO THE STALL.
FIRE HYDRANT
15' MIN
RED
15' MIN
RED 6' RED
20' BLUE
END STALL
24' TYP
STD STALL 8' TYP
24' TYP
STD STALL 8' TYP
24' TYP
STD STALL 8' TYP
20' RED
30' RED
ADA STALL
SIGNAGE STREET STREET STREET STREET ALLEY
STREET
STREET
STREET
STREET
STREET
STREET
4" WHITE
STRIPE
TYP STREET SIDE CURB SIDE
12" 24" 12"
20' TYP
END STALL
20' TYP
END STALL
20' TYP
END STALL STREET
8/17/2026
ON-STREET PARKING STANDARDS
P-1
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
204 of 833
NOTES:
1. PRIOR TO INSTALLING NEW OR REPLACING OLD METER POLE, CONTRACTOR SHALL NOTIFY CITY 48 HOURS PRIOR TO WORK TO VERIFY POLE LOCATIONS.
2. METER POLES SHALL BE PLUMBED BEFORE AND AFTER CONCRETE IS PLACED.
3. METER POLES SHALL BE PAINTED BLACK WITH PPG AMERLOCK 400 OR APPROVED EQUAL. WHERE STALL CURB IS COLORED (GREEN, YELLOW, OR WHITE), METER POLE SHALL BE PAINTED TO MATCH CURB COLOR INSTEAD.
4. CONCRETE SHALL BE CLASS A, 6 SACK MIX.
PARKING METER TO BE REMOVED OR INSTALLED
BY CITY FORCES. CALL CITY 48 HOURS PRIOR TO
WORK REQUIRED.
METER POLE
GALVANIZED RIGID STEEL PIPE 2" I.D.
PAINTED BLACK
NOTE 3
DRILL PIPE AND INSERT
4" ROD THROUGH PIPE
CONCRETE BASE
NOTE 4
ADJACENT
FC SURFACE
12" Ø
18" 3" 18" 36"
8/17/2026
PARKING METER
P-2
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
205 of 833
PARKING STALL DIMENSIONS
S =
D = (L + R) SINϴ
AISLE WIDTHS:
A = BSINϴ
1-WAY: A = 12' MINIMUM
2-WAY: A = 22' MINIMUM
L = STALL LENGTH
W = STALL WIDTH
S = STALL LENGTH AT CURB
D = STALL WIDTH AT CURB
A = DRIVE AISLE WIDTH
B = BACKUP DISTANCE
STANDARD STALLS:
W = 8.5'
L = 18'
B = 24'
W
R = W
SINϴ
TANϴ
MINIMUM PARKING DIMENSIONS TABLE
Ø
S
(FT)
R
(FT)
D
(FT)
A (1-WAY)
(FT)
A (2-WAY)
(FT)
COM STD COM STD COM STD COM STD COM STD
0° 21 22 0 0 7 8 13 14 22 22
30° 16 17 13.9 14.7 15.5 16.4 12 12 22 22
45° 11.3 12 8 8.5 17.7 18.7 15.6 17 22 22
60° 9.2 9.8 4.6 4.9 18.7 19.8 19.1 20.8 22 22
90° 8 8.5 0 0 17 18 22 24 22 24
LEGEND
COMPACT STALLS: DIMENSIONS:
W = 7.5'
L = 15'
B = 22'
EQUATIONS FOR CALCULATIONS
PARKING LOT LAYOUT TWO-WAY
D A
S
L
R
B
W
ϴ
STALL STRIPING
TYP
8/17/2026
OFF-STREET PARKING STANDARDS
P-3
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
206 of 833
PERMISSIBLE BUMPER OVERHANG
NOTE:
1. IN NO CASE SHALL THE BUMPER OVERHANG EXTEND INTO A PEDESTRIAN PATH OF TRAVEL.
2. FOR ADDITIONAL INFO: SEE S.M.M.C. CHAPTER 227.64 OFF STREET PARKING AND LOADING.
NOTES:
1. DEAD-ENDS SHALL ONLY BE ALLOWED FOR TWO-WAY DRIVE AISLES.
2. SUFFICIENT AREA WILL BE PROVIDED NEAR THE END OF DEAD-END AISLES FOR TURN AROUND UNDER FULL LOT CONDITIONS.
DEAD-END AISLES
OVERHANG OVER LANDSCAPE OVERHANG TOWARD VERTICAL OBSTRUCTION
RESTRICTED STALLS ADJACENT RESTRICTED OR END STALLS CONFINED STALLS
NON-STANDARD STALLS
NOTE:
1. FOR COMPACT STALLS, SUBTRACT ONE FOOT FROM THE ABOVE MINIMUM DIMENSIONS. 9' MIN 10' MIN 10' MIN
PLANTING AREA
SIDEWALK CURB OR
WHEEL STOP
VERTICAL
OBSTRUCTION
CURB OR
WHEEL STOP TWO-WAY
STRIPE ENDS FOR NO PARKING
STALL
TYP
10'
MIN
10'
MIN
10'
MIN
10'
MIN
10'
MIN
10'
MIN
9'
MIN
9' W
MIN
STALL
TYP
WALL
TYP
COLUMN
TYP
2'
NOTE 1
2'
NOTE 1
4' MIN
8/17/2026
OFF-STREET PARKING DETAILS
P-4
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
207 of 833
RADIUS TO CURBS OR BARRIERS 6" OR SHORTER (WHEEL RADIUS).
RADIUS TO COLUMNS, WALLS, OR VERTICAL STRUCTURES (BODY OVERHAND RADIUS).
NOTES:
1. FOR CURVES ON RAMPS, WHERE VIEW OF RAMP IS OBSTRUCTED BY WALLS OR OTHER VERTICAL ELEMENTS, MIRRORS SHALL BE INCORPORATED AS REQUIRED BY PUBLIC WORKS DIRECTOR.
2. ADDITIONAL REQUIREMENTS MAY APPLY PER S.M.M.C. CHAPTER 27.64 "OFF-STREET PARKING AND LOADING."
TWO-WAY CURVE PLAN
ONE-WAY CURVE PLAN
16' MIN 32'
MIN
18' 30' MIN MIN
16' MIN
12' MIN
16' MIN 44'
MIN
18' 42' MIN MIN
28' MIN
12' MIN
12' MIN
8/17/2026
GARAGE CURVES
P-5
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
208 of 833
RAMP-UP PROFILE
RAMP-DOWN PROFILE
HIGH POINT
BW
0% GARAGE
FLOOR
FC PROPERTY
LINE / BW
18% MAX
DRIVEWAY
DRIVEWAY
10' VERTICAL CURVE VARIES 10' VERTICAL CURVE
5.5' MIN
VARIES
18% MAX
0% GARAGE
FLOOR
10' VERTICAL CURVE VARIES
5' VERTICAL
CURVE
5.5' MIN
VARIES
VALLEY GUTTER OR
OTHER DRAINAGE
COLLECTOR
FC
⅊
⅊
8/17/2026
GARAGE RAMP PROFILES
P-6
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
209 of 833
SIGN POST
SIGN POST NOTES:
1. METAL POSTS SHALL BE TRINITY HIGHWAY SQR-LOC EZ-OUT OR APPROVED EQUAL. SIGN POST MUST BE BREAKAWAY.
2. AT INSTALLATION, COVER SLEEVE AND ANCHOR HOLES BELOW CONCRETE WITH TAPE TO PREVENT CONCRETE FROM FALLING INTO SLEEVE AND ANCHOR.
3. THE SIGN POST SHALL BE LOCATED AT THE BACK OF WALK OR AS DIRECTED BY THE CLEAR ACCESSIBLE PATH OF TRAVEL IN THE SIDEWALK.
4. UTILIZE RED GREASE ON RIVET BOLT PRIOR TO INSTALLATION.
5. WITHIN SIDEWALK, THE DIAMETER OF THE CONCRETE BASE SHALL MATCH THE DIAMETER OF THE CORING BIT USED, MINIMUM 6". WITHIN NATIVE GROUND SURFACE, THE DIAMETER OF THE CONCRETE BASE SHALL BE 12" MINIMUM.
SIDEWALK 3" 18" MIN FC 16" SLEEVE 24" POST DEPTH 30" ANCHOR AND BASE 2 1 4" X 214" 12 GA ANCHOR
2 1
2" X 212" 12 GA SLEEVE
CONCRETE BASE
NOTE 5
ANCHOR POLE TO SLEEVE
3 8" JUMBO RIVET
ATTACH SIGN TO POLE
2 - 3
8" JUMBO RIVETS
W/ BLACK PLASTIC WASHERS
SIGN
(CONFIGURATION VARIES)
EXTEND POLE
2" ABOVE SIGN
PYRAMID RAIN CAP
SECURE W/ SELF-TAPPING SCREW 7' MIN TO BOTTOM OF LOWEST SIGN 2" X 2" 14 GA SIGN POST 8/17/2026
STANDARD SIGN POST
T-1
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
210 of 833
STREET NAME
STREET NAME SIGN NOTES:
1. WHEREVER PRACTICAL STREET NAME SIGNS SHALL BE INSTALLED ON ELECTROLIER POLES.
2. SIGN HARDWARE SHALL BE HAWKINS "SLOTTED-LOCK" OR EQUAL.
3. SIGN FACES SHALL BE BLACK LETTERING ON SILVER REFLECTIVE SHEETING PER CITY STANDARD SPECIFICATIONS FOR TRAFFIC SIGNS.
STREET NAME
ON ELECTROLIER ON SIGN POST
STREET NAME SIGN
STREET NAME
ADJACENT
SURFACE 8'-6"ELECTROLIER
SIGN FOR
CROSS STREET 9" 6"
SIGN BRACKET
9"
12"
24" OR 36"
ADJACENT
SURFACE
STANDARD
SIGN POST 8'-6"
0.080" ALUMINUM
ALLOY 6061-T6
SIGN BRACKET
AFFIX SIGN ON TOP
OF SIGN POST
SIGN FOR
CROSS STREET
8/17/2026
STREET NAME SIGN
T-2
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
211 of 833
8/17/2026
INTERNALLY ILLUMINATED
STREET NAME SIGN T-3
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
RESERVED
8/1/2026
DATE
212 of 833
HIGH-VISIBILITY CROSSWALK
CONTINENTAL
STANDARD CROSSWALK
BASIC
CROSSWALK NOTES: 1. CROSSWALK STRIPING SHALL BE WHITE THERMOPLASTIC PAINT WITH GLASS BEADING. WHERE CROSSWALK IS ADJACENT TO A K-12 SCHOOL OR ON A DESIGNATED SCHOOL ROUTE, CROSSWALK SHALL BE YELLOW. ALL CROSSWALKS IN THE SAME INTERSECTION SHALL BE YELLOW WHENEVER ONE CROSSWALK IS DESIGNATED AS YELLOW.
2. HIGH-VISIBILITY CROSSWALKS SHALL BE USED IN DESIGNATED MID-BLOCK CROSSINGS, HIGH-PEDESTRIAN AREAS, CORRIDORS, OR AS DIRECTED BY THE PUBLIC WORKS DIRECTOR. HIGH-VISIBILITY CROSSWALKS SHALL ONLY BE CONTINENTAL PATTERNED.
3. CONTINENTAL CROSSWALKS SHALL BE INSTALLED WITH BARS PARALLEL TO THE DIRECTION OF VEHICULAR TRAFFIC. STAGGERED CROSSWALKS SHALL BE INSTALLED TO PLACE VEHICLE WHEEL PATHS BETWEEN THE PAINTED BARS.
4. WHERE EXISTING BASIC CROSSWALKS ARE BEING RETROFITTED TO HIGH-VISIBILITY, THE EXISTING BASIC CROSSWALK LINES SHALL BE ALLOWED TO REMAIN.
3'-5'
GAPS
CROSSWALK
STRIPING
NOTE 1
11' TYPICAL
(6' MIN) CROSSWALK
STRIPING
NOTE 1
1'
1'
2'
BARS
LANE LINES
L (LANE WIDTH)
L/2
11' TYPICAL
(6' MIN)
8/17/2026
CROSSWALKS
T-4
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
213 of 833
8/17/2026
RAISED CROSSWALK
T-5
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
RESERVED
8/1/2026
DATE
214 of 833
SPEED CUSHION
SECTION B-B
PARABOLIC SECTION
SPEED CUSHIONS LAYOUT
SECTION A-A
PLAN VIEW
NOTES: 1. REMOVE 2-INCHES OF PAVEMENT 18-INCHES BEYOND SPEED CUSHION AND UP TO THE LIP OF GUTTER.
2. SPEED CUSHION SHALL BE CONSTRUCTED IN 3 LIFTS OF CLASS 3 8" ASPHALT
MIX. 1ST LIFT SHALL BE 2-INCHES. 2ND AND 3RD LIFTS SHALL BE 1.5-INCHES.
3. SPEED CUSHION CHEVRON SHALL BE INSTALLED ON THE SIDE FACING THE FLOW OF TRAFFIC AND CENTERED ON THE TRAVEL LANE.
4. WHERE BICYCLE LANES MAY CROSS AND THE OUTSIDE SPEED CUSHION WIDTH EXCEEDS 6.5-FT, TRANSITION OUTSIDE CUSHION EDGE TO TERMINATE AT THE BICYCLE LANE STRIPE.
5. SIGNAGE SHALL BE INSTALLED PER DTL T-6B.
6. ALL STRIPING SHALL BE WHITE THERMOPLASTIC PAINT WITH GLASS BEADING.
7. ADVANCED SPEED CUSHION WARNING STRIPING SHALL BE INSTALLED AT THE DIRECTION OF THE PUBLIC WORKS DIRECTOR, PER DTL T-6B
8. SPEED CUSHIONS SHALL NOT BE INSTALLED WITHIN 5-FT OF A CATCH BASIN.
PLAN VIEW 3"
14'
B B
1'
7'
1' 1' 1' 1' 1' 1'
0.8"1.5" 2.0" 2.4" 2.8" 2.9" 3.0"
PARABOLIC
SECTION
2' VARIES 2' 6'
℄
2'
℄
2' 6' 2'
A A
9'MIN
VARIES
9' MIN
FC
SPEED CUSHION
CHEVRON, TYP
DIAMOND
SYMBOL
VARIES 2'
9'MIN
2' VARIES
9' MIN
2'
SIDE TAPER
12" WIDE MAX
SAWCUT 18" BEYOND
SPEED CUSHION
CONSTRUCT
IN 3 LIFTS
NOTE 2
LG
SPEED CUSHION
8/17/2026
SPEED CUSHION
T-6A
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
215 of 833
ADVANCED SPEED CUSHION WARNING
SPEED
HUMP
AHEAD
SPEED
HUMP
W17-1 OVER
W16-9P
W17-1 OVER
W16-7P (L)
SPEED CUSHION CHEVRON DIAMOND SYMBOL
NOTES: 1. ALL STRIPING SHALL BE WHITE THERMOPLASTIC PAINT WITH GLASS BEADING.
A= 12 SF A= 10.5 SF
20' 18' 16' 14' 12' 10' 8' 2' 1' 2' 3' 4' 5' 6' 7' 8'
1' WHITE STRIPE TYP
(36 SF TOTAL)
SPEED CUSHION
& CHEVRON
SIGN POST
W17-1 OVER W16-7P(L)
40'-50'
SIGN POST
W17-1 OVER W16-9P 12'
3'-3"
6" WHITE STRIPE
1' WHITE STRIPE
WHITE STRIPE 6'
6'
℄ OF TRAVEL
LANE
℄
℄
℄ OF STREET
℄ OF
CUSHION 6'
EDGE OF 2'
SPEED CUSHION
8/17/2026
SPEED CUSHION DETAILS
T-6B
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
216 of 833
TYPICAL BIKE LANE LAYOUTS
BIKE LANE
BEGIN END
BIKE LANE BEGIN
BIKE LANE
BIKE LANE END
BIKE LANES NOTES: 1. ALL WHITE STRIPING SHALL BE THERMOPLASTIC WITH GLASS BEADING. ALL GREEN STRIPING SHALL BE CYCLEGRIP MMAX OR APPROVED EQUAL NON-SLIP HIGH VISIBILITY TREATMENT.
2. BIKE LANES CONSIST OF A 6" WHITE STRIPE PER CALTRANS DETAIL 39. BIKE LANE STANDARD WIDTH IS 6' MEASURED FROM FACE OF CURB TO MIDDLE OF WHITE STRIPE.
3. FULLY PAINTED GREEN LANES SHALL ONLY BE INSTALLED AS REQUIRED BY PUBLIC WORKS DIRECTOR.
4. BIKE LANE APPROACHES TO AN INTERSECTION, THROUGH A DRIVEWAY, OR ANY OTHER MOTOR VEHICLE TO CYCLIST CONFLICT ZONE SHALL PROVIDE CONFLICT MARKINGS.
CONFLICT MARKINGS SHALL BE PROVIDED THROUGH INTERSECTIONS AS DIRECTED BY PUBLIC WORKS DIRECTOR. SINGLE FAMILY RESIDENTIAL AND MULTI-FAMILY RESIDENTIAL (10 UNITS OR LESS) DRIVEWAYS ARE EXEMPT FROM CONFLICT MARKINGS.
5. BIKE LANES SHALL HAVE BIKE LANE MARKINGS (GREEN BACKED ARROW AND BIKE SYMBOL) AT BEGINNING OF EACH BLOCK, EVERY 300'-400', OR AFTER AN INTERSECTION.
6. BIKE LANES SHALL HAVE "BIKE LANE BEGIN" AND "BIKE LANE END" SIGNAGE FOR EACH BLOCK.
7. ALL MARKINGS AND SIGNAGE ARE BASED ON CALTRANS STANDARD PLANS.
8. ALL CATCH BASINS ALONG BIKE LANES SHALL HAVE A BIKE SAFE GRATE.
BIKE LANE CONFLICT MARKINGS
DETAIL 39A (CL2 MOD)
BIKE LANE LINE
CALTRANS DETAIL 39
BIKE LANE MARKING
BIKE LANE END
SIGNAGE
DTL 39 TYP
BIKE LANE END
SIGNAGE
BIKE LANE BEGIN
SIGNAGE
BIKE LANE BEGIN
SIGNAGE
DTL 39A(CL2 MOD)
DTL 39A(CL2 MOD)
WHEN CROSSING DWY
NOTE 4
DTL 39A(CL2 MOD)
GREEN LANES WHEN
REQUIRED BY
PUBLIC WORKS DIRECTOR
DWY
100'
100' 8'
R81(CA)
R81B(CA)
R81(CA)
R81A(CA)
4' 8'
FULL DRIVEWAY WIDTH OR
100' TO INTERSECTION
GREEN BARS TYP
22 SF EACH 6' OR MATCH LANE WIDTH
6" WHITE STRIPE
BIKE LANE MARKING
NOTE 5
6" WHITE
STRIPE TYP
BIKE LANE MARKING
NOTE 5 5' 6' 6'-6" 6' 6'-6"
BIKE LANE
ARROW
BIKE LANE SYMBOL
W/ PERSON
GREEN
BACKING
GUTTER
OR CURB
LANE
LINE
OMIT EDGE STRIPE
IF AGAINST CURB OR GUTTER
8/17/2026
BIKE LANES
T-7
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
217 of 833
GREEN BACKED SHARROW
BIKE LANES NOTES: 1. BIKE ROUTES SHALL BE IDENTIFIED WITH BIKE BOULEVARD MARKING AND SHOULD BE USED WHERE PHYSICAL CONSTRAINTS PREVENT USING BIKE LANES. BIKE ROUTES SHALL NOT BE INSTALLED ON ROADS WITH 35 MPH OR GREATER POSTED SPEED LIMITS UNLESS APPROVED BY PUBLIC WORKS DIRECTOR.
2. SHARROWS (CALTRANS SHARED ROADWAY BICYCLE MARKINGS CENTERED WITHIN A 4' BY 10' GREEN BACKING) SHALL BE PROVIDED PER CA-MUTCD PLACEMENT GUIDANCE. INTERVALS ARE SUBJECT TO ENGINEERING DIVISION PLACEMENT.
3. WHERE TRAVEL LANE WIDTH IS 14' OR LESS, SHARROWS SHALL BE INSTALLED CENTERED IN THE TRAVEL LANE.
4. WHERE TRAVEL LANE WIDTH IS MORE THAN 14', SHARROWS SHALL BE INSTALLED 5' FROM THE CURB OR 5' FROM THE PARKING STALLS PER CASE 2.
5. BIKE LANES SHALL HAVE BIKE ROUTE SIGNAGE AT THE BEGINNING AND END FOR EACH BLOCK.
6. ALL MARKINGS AND SIGNAGE ARE BASED ON CALTRANS STANDARD PLANS.
TYPICAL BIKE BOULEVARD LAYOUTS STOP
BIKE BOULEVARD MARKING
WHITE A= 11.5 SF
GREEN A= 41.5 SF
4' 6"X6" GRID 10'
BIKE ROUTE
SIGNAGE
BIKE ROUTE
SIGNAGE
BIKE ROUTE
SIGNAGE
BIKE ROUTE
SIGNAGE
200'-250' INTERVALS
GREEN BACKED SHARROW
TYP
GREEN BACKING
WHITE BIKE
WHITE CHEVRONS
20'
TYP
STOP SIGN 139" 72" 751
2" 40" 53" 40"
BIKE LANE
ARROW
BIKE LANE SYMBOL
W/ PERSON
ARROW
BIKE BOULEVARD MARKING
8/17/2026
BIKE ROUTES
T-8A
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
218 of 833
BIKE ROUTE SIGN
BIKE ROUTE
12" 3
4" 24"
GREEN BACKGROUND
COLOR HEX #4CC500
5 8" TYP
R 11
2" TYP 141
2" 18" 3
1 2"
TEXT FONT: HIGHWAY GOTHIC
WIDTH FACTOR: 1
HEIGHT: 2"
8/17/2026
BIKE ROUTE SIGNS
T-8B
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
219 of 833
BIKE BOULEVARD SIGN
NOTES: 1. WAYFINDING SIGN CONTENT SHALL BE PROVIDED AS A SEPARATE PROJECT SPECIFIC TABLE AND APPROVED BY THE TRAFFIC DIVISION.
Xxxxxxxx Xxxxxxxxx
BIKE BOULEVARD
Xxxxxxxx Xxxxxxxxx
X.X miles X mins
X.X miles X mins
X.X miles X mins
Xxxxxxxx Xxxxxxxxx
Xxxxxxxx Xxxxxxxxx
12" 3
4" 24"
GREEN BACKGROUND
COLOR HEX #4CC500
5 8" TYP
R 11
2" TYP 141
2" 18" 3
1 2"
TEXT FONT: HIGHWAY GOTHIC
WIDTH FACTOR: 1
HEIGHT: 2"
R 11
2" 18" 2"
DISTANCES
TEXT FONT: HIGHWAY GOTHIC
WIDTH FACTOR: 1
HEIGHT: 1"
TIMES
TEXT FONT: HIGHWAY GOTHIC
WIDTH FACTOR: 1
HEIGHT: 1" 3" TYP
DESTINATIONS
TEXT FONT: HIGHWAY GOTHIC
WIDTH FACTOR: 1
HEIGHT: 1.3"1
4" TYP
8/17/2026
BIKE BOULEVARD SIGNS
T-8C
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
220 of 833
BUFFERED BIKE LANE LAYOUT
BIKE BUFFER NOTES: 1. BUFFER SHALL BE 24" MINIMUM INCLUDING THE WIDTH OF THE PARALLEL WHITE LINES.
2. ALL BUFFER STRIPING SHALL BE THERMOPLASTIC WITH GLASS BEADING. FOR GREEN SKIPS REFER TO CITY DETAIL A-7A.
3. K71 BOLLARDS SHALL BE BRIGHT GREEN WITH WHITE REFLECTIVE COLLARS UNLESS DIRECTED OTHERWISE BY THE PUBLIC WORKS DIRECTOR.
4. K71 BOLLARDS SHALL BE PLACED AT THE BEGINNING, BETWEEN DIAGONAL STRIPES, AND AT THE ENDS OF BUFFERED BIKE LANES. FOR 2' TO 4' BUFFERS, PLACE K71 BOLLARD CENTERED IN THE BUFFER, OR FOR WIDER BUFFERS, PLACE 2' FROM THE BIKE LANE EDGE.
4. BUFFERED BIKE LANE APPROACHES TO AN INTERSECTION, THROUGH A DRIVEWAY, OR ANY OTHER MOTOR VEHICLE TO CYCLIST CONFLICT ZONE SHALL PROVIDE CONFLICT MARKINGS. CONFLICT MARKINGS SHALL BE PROVIDED THROUGH INTERSECTIONS AS DIRECTED BY PUBLIC WORKS DIRECTOR. SINGLE FAMILY RESIDENTIAL AND MULTI-FAMILY RESIDENTIAL (10 UNITS OR LESS) DRIVEWAYS ARE EXEMPT FROM CONFLICT MARKINGS.
GREEN SKIPS NOTES: A. SPACING SHALL BE 8' BETWEEN BARS FOR INTERSECTION APPROACHES AND 4' BETWEEN BARS FOR DRIVEWAY CROSSINGS.
B. OMIT RIGHT EDGE STRIPE IF AGAINST CURB OR GUTTER.
BIKE LANE CONFLICT MARKINGS
DETAIL 39A (CL2 MOD) BIKE LANE 6' STANDARD BUFFER NOTE 1
CONFLICT MARKINGS
DETAIL 39A (CL4 MOD)
CALTRANS
DETAIL 39
4" DIAGONAL
WHITE STRIPES
EVERY 24'
CURB OR
EDGE OF PAVEMENT
TURN LANE
100' TO INTERSECTION
VEHICLE TRAVEL LANE
45°
K71 BOLLARD
NOTE 3 & 4
4' NOTE A
FULL DRIVEWAY WIDTH OR
100' TO INTERSECTION
GREEN BARS TYP
22 SF EACH 6' OR MATCH LANE WIDTH
6" WHITE
STRIPE TYP BUFFER WIDTH
NOTE B
8/17/2026
BUFFERED BIKE LANES
T-9
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
221 of 833
ELECTRICAL NOTES:
1. ALL MATERIAL SUBMITTALS SHALL BE APPROVED BY THE TRANSPORTATION DIVISION PRIOR TO ORDERING MATERIALS.
2. STREET LIGHT CIRCUITS SHALL OPERATE AT 240 VAC IN STANDARD PARALLEL CONFIGURATION.
CONDUIT AND CONDUCTOR INSTALLATION NOTES:
1. SPLICE STREETLIGHT CIRCUIT IN STANDARD PARALLEL.
2. LEAVE 3-FT OF SLACK FOR ALL CONDUCTORS IN PULL BOXES.
3. LEAVE 2-FT OF SLACK FOR ALL PULL TAPES IN PULL BOXES AND SECURE ENDS TO PREVENT UNINTENTIONAL PULL THROUGH.
4. CLAMP CONDUCTOR TO ROD IN POLE OR INSTALL GROUNDING NUT.
5. WHERE DIRECT BURIAL SECONDARY IS NOT AVAILABLE, PROVIDE CONDUIT AND CABLE TO THE NEAREST SECONDARY SERVICE POINT PROVIDED BY PG&E.
6. WHEN INSTALLING FUSE HOLDERS, COVER CRIMP TERMINAL WITH VINYL ELECTRICAL TAPE TO ENSURE WATERPROOF CONNECTIONS.
STREETLIGHT CIRCUIT FUSE SPECIFICATIONS:
1. 30A AND 10A FUSES USED IN STREETLIGHT CIRCUITS SHALL BE 13 32" X 1 1 2" SIZE WITH MELAMINE BODIES AND NICKEL OR COPPER ALLOY ENDS CAPS.
2. FUSES SHALL BE FAST ACTING TYPE RATED FOR 600V WITH AN AC INTERRUPTING CURRENT OF 100KA.
3. FUSES SHALL BE UL-248-14 LISTED, CSA CERTIFIED, AND ROHS COMPLIANT. TYPICAL APPLICATIONS LISTED FOR FUSES SHALL INCLUDE LIGHTING OR STREET LIGHTING. EXAMPLES OF ACCEPTABLE FUSES INCLUDE EATON BUSSMAN KTK SERIES AND LITTELFUSE KLK SERIES.
4. FUSE HOLDERS FOR STREETLIGHT CIRCUITS SHALL BE NON-BREAKAWAY, IN-LINE, SINGLE-POLE, SUBMERSIBLE TYPE.
5. FUSE HOLDERS SHALL BE RATED FOR 600V, UP TO 30A, LIMITED BY CONDUCTOR SIZE, AND SCCR = 200KA RMS SYM (DEPENDENT ON FUSE INTERRUPTING RATING).
6. FUSE HOLDER TERMINALS SHALL BE COPPER CRIMP TYPE.
8/17/2026
ELECTRICAL SPECIFICATIONS
E-1
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
222 of 833
CIRCUIT CONDUCTOR
PULL TAPE
BARE COPPER GROUND
CONDUCTOR LEGEND
ELEVATION
PLAN
STREETLIGHT
NOTES:
1. REFER TO DETAIL E-1 FOR CONSTRUCTION SPECIFICATIONS.
2. PULL BOX LOCATION MAY VARY. PREFERRED LOCATION IS ADJACENT TO THE POLE BASE PARALLEL TO THE STREET AS SHOWN.
TO NEXT PULL
BOX (TYP)
TO NEXT PULL
BOX (TYP)
PAVEMENT
CONC
GUTTER
CURB
NO. 3-1/2 PULL BOX
"STREETLIGHT" ON COVER
FACE AT BASE
OF POLE OR
BASE COVER
BOW
1.5" TYPE 3 CONDUIT
TO ELECTROLIERS
1.5" TYPE 3 CONDUIT
24" TO 36" COVER
8' GROUND ROD (5/8" DIAMETER) WITH
SCREW CLAMP FOR NO. 8 AWG BARE
CONDUITS TO NEXT PULL BOXES
SEE TYPICAL CONDUIT SECTION
TERMINATE ALL CONDUITS MIN 3"
ABOVE FLOOR OF PULL BOX WITH
BELL ENDS
CALTRANS STD NO. 3-1/2 OR NO. 3-1/2 (T)
PULL BOX WITH "STREETLIGHT" ON COVER
TYPICAL POLE
ACTUAL POLE MAY VARY
(2) 10A FUSES AND FUSE HOLDERS
FOUNDATION
STD E-1
LG
BC FC
TYPICAL 2"
TYPE 3 CONDUIT
12" MIN
36" MAX
12" MIN
36" MAX
12" BASE
3 4" AB
8/17/2026
TYPICAL ELECTROLIER PULL BOX
E-2
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
223 of 833
TYPICAL MID-RUN PULL BOX
TYPICAL JUNCTION PULL BOX
NOTE:
1. REFER TO DETAIL E-1 FOR CONSTRUCTION SPECIFICATIONS.
2. PULL BOXES SHALL BE TRAFFIC RATED WHEN LOCATED IN THE ROADWAY OR VEHICULAR PATHS.
CIRCUIT CONDUCTOR
PULL TAPE
BARE COPPER GROUND
CONDUCTOR LEGEND
TYPICAL CONDUIT
RESTORE SIDEWALK
PER DTL C-4C
PULL CONDUCTORS THROUGH WITHOUT SPLICE
CALTRANS STD NO. 3-1/2 OR NO. 3-1/2 (T)
PULL BOX WITH "STREETLIGHT" ON COVER
TERMINATE ALL CONDUITS MIN 3" ABOVE
FLOOR OF PULL BOX WITH BELL ENDS
SPLICE CONDUCTORS IN PULL BOX
CALTRANS STD NO. 5 OR NO. 5 (T) PULL BOX
WITH "STREETLIGHT" ON COVER
TERMINATE ALL CONDUITS MIN 3" ABOVE FLOOR OF
PULL BOX WITH BELL ENDS
CONDUCTOR (GROUND)
BARE #8 AWG
CONDUCTOR (120 V HOT)
#8 AWG
CONDUCTOR (120 V HOT)
#8 AWG
5/8" PULL TAPE
POLYETHYLENE
2" CONDUIT
PVC SHC80
RESTORE SIDEWALK
PER CITY DETAIL R-X
3 4" AB
3 4" AB
12"
COVER
24" TO 36"
12"
COVER
24" TO 36"
8/17/2026
TYPICAL PULL BOX AND CONDUIT
E-3
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
224 of 833
NOTES:
1. REFER TO DETAIL E-1 FOR CONSTRUCTION SPECIFICATIONS.
2. LOCATION OF EQUIPMENT MAY VARY.
3. MAXIMUM DISTANCE BETWEEN PULL BOXES SHALL BE 200-FT.
4. PULL BOXES SHALL BE NO.3-1/2 AND NO.5 PULL BOXES PER CALTRANS STANDARD PLANS. USE TRAFFIC RATED PULL BOXES AND LIDS IF LOCATED IN THE ROADWAY.
5. PULL BOX SIZES SHALL BE AS SHOWN UNLESS OTHERWISE SPECIFIED ON THE PROJECT PLANS OR A SUBSTITUTION IS APPROVED BY THE CITY.
NOTE 3
TYPICAL CIRCUIT LAYOUT
STREETLIGHT
SEE DETAIL E-1
JUNCTION
SEE DETAIL E-3
STREETLIGHT
SEE DETAIL E-1
MID-RUN
SEE DETAIL E-3
PG&E SECONDARY ELECTRIC
UNDERGROUND ENCLOSURE OR AS
SPECIFIED BY PG&E DESIGN DRAWINGS
UTILITY POLE
240 VAC,
SINGLE PHASE,
2-WIRE ELEC SERVICE
TO ADDITIONAL
STREETLIGHTS
FC
FC
BW
ROADWAY
SIDEWALK
8/17/2026
TYPICAL UNMETERRED CIRCUIT
LAYOUT E-4
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
225 of 833
FOUNDATION NOTES:
1. BASE PLATE SHALL BE LEVELED USING 2" MAXIMUM GROUT AND INCLUDE BOLT COVERS.
2. CLAMP CONDUCTOR TO ROD IN POLE OR INSTALL GROUNDING NUT.
3. WHEN NEW FOUNDATION IS INSTALLED, THE ENTIRE SIDEWALK PANEL SHALL BE REPLACED.
FOUNDATION SECTION
MAINTENANCE PAD
PAD NOTES:
1. WHERE STREETLIGHTS ARE LOCATED IN LANDSCAPE AREA, PROVIDE A 30"X60" CONCRETE FOUNDATION CAP PAD AROUND LIGHT FLUSH TO ADJACENT SIDEWALK OR 2-INCHES ABOVE ADJACENT GRADE. INCLUDE THE ASSOCIATED PULL BOX IN PAD
2" MAX GROUT
2 NUTS AND 2 WASHERS
PER BOLT
GROUND ROD
3 4"X8' COPPER BASE PLATE
NOTE 5
TOP OF FOUNDATION,
FLUSH TO SIDEWALK
NOTE 6
34" DIA 42"
CLASS A
CONCRETE
4 ANCHOR BOLTS
1"X40" GALVANIZED
W/ 4" BENDS 1
1 2" CONDUIT
TO PULL BOX
STD E-4
#3 REBAR
ALL AROUND ANCHORS
#3 REBAR
ALL AROUND ANCHORS 30"
60"
CONCRETE PAD
STREETLIGHT
PULL BOX
STREETLIGHT
LANDSCAPE
AREA BACK OF WALK
8/17/2026
STANDARD STREETLIGHT
FOUNDATION E-5
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
226 of 833
ONE-SIDED LIGHTING LAYOUT
STAGGERED LIGHTING LAYOUT
OPPOSITE LIGHTING LAYOUT
STREET LIGHT LOCATION NOTES:
1. STREET LIGHT LAYOUT AS DETERMINED BY PUBLIC WORKS.
2. SEE STREET LIGHT SHEETS FOR "L" TYPICAL STREET LIGHT SEPARATION LENGTH.
3. STREET LIGHTING SHALL ALSO BE PROVIDED AT:
A. INTERSECTIONS
B. NEAR END OF CUL-DE-SACS
C. ABRUPT CHANGE IN STREET ALIGNMENT, GRADE, OR OTHER UNUSUAL CONDITIONS L L/2
L
L
8/17/2026
STREETLIGHT LAYOUTS
E-6A
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
227 of 833
POLE PLACEMENT PREFERENCES
LOCATION 1
LANDSCAPE STRIP
LOCATION 2
AMENITY ZONE
LOCATION 3
BACK OF WALK
PLACEMENT NOTES:
1. THE PREFERRED LOCATION OF STREETLIGHTS IS LOCATION 1 OR 2 IN THE LANDSCAPE/AMENITY ZONE.
2. WHERE SIDEWALK WIDTH IS LIMITED, PROVIDE STREET LIGHT AT THE BACK OF WALK AS SHOWN IN LOCATION 3.
3. WHERE NEITHER LOCATIONS 1, 2, OR 3 ARE AVAILABLE, PLACE STREETLIGHT POLE CLOSEST TO THE BACK OF WALK AS TECHNICALLY FEASIBLE FOR THE STREETLIGHT OR OTHERWISE PROVIDE ACCESSIBLE COMPLIANT SIDEWALK CLEARANCE.
4. WHERE STREETLIGHTS ARE LOCATED IN LANDSCAPE AREA, PROVIDE A 30"X60" CONCRETE FOUNDATION CAP PAD AROUND LIGHT FLUSH TO ADJACENT SIDEWALK OR 2-INCHES ABOVE ADJACENT GRADE. INCLUDE THE ASSOCIATED PULL BOX IN PAD.
LOCATION 4
WITHIN SIDEWALK
CONC PAD
NOTE 4
CONC PAD
NOTE 4
ADA COMPLIANT
CLEARANCE
MINIMUM
LANDSCAPE AMENITY ZONE
STRIP
18" MIN CLEAR
TO FACE OF CURB
18" MIN CLEAR
TO FACE OF CURB
8/17/2026
STREETLIGHT PLACEMENT
E-6B
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
228 of 833
STREET LIGHTING FIXTURE TABLE
STREET CLASS
(ROAD WIDTH)
LIGHT
LAYOUT
"L"
SPACING
(FT)
MOUNTING
HEIGHT
(FT)
LUMINAIRE TYPE
BY PEDESTRIAN ACTIVITY LEVEL
LOW MED HIGH
LOCAL
(25' - 30')
ONE-SIDED 100
25 CH-40 CH-60 CH-6000
STAGGERED 150 CH-4000 CH-4000 CH-6000
COLLECTOR
(35 '- 45')
STAGGERED 150
30 CH-4000 CH-6000 CH-7500
OPPOSITE 150 CH-4000 CH-6000 CH-7500
ARTERIAL
(50' - 60')
STAGGERED 150
30 CH-7500 CH-10000 CH-12000
OPPOSITE 150 CH-7500 CH-10000 CH-12000
LUMINAIRE CONFIGURATION
NOTES:
1. POLES SHALL BE SPUN ALUMINUM 6063-T6, 0.188" NOMINAL WALL THICKNESS OR EQUAL. 2. LUMINAIRE ARMS SHALL BE TAPERED ELLIPTICAL ALUMINUM 6063-T6 ABLE TO ACCOMMODATE 2" SLIPFITTER TYPE
LUMINAIRES.
BOLT DIAMETERS
STREET CLASS BOLT DIA
LOCAL 10"
COLLECTOR
11"
ARTERIAL
BASE PLATE
STANDARD LUMINAIRE TYPES
TYPE OUTPUT
(lm) DISTRIBUTION
COLOR
TEMP
(K)
COLOR
INDEX
(CRI)
B/U/G
RATING
POWER
(W) MAKE ORDERING SPECIFICATIONS
CH-4000 3,750 TYPE III MID 4000 70 1/0/1 26 CREE GWYS-A-4L-40K7-3M-UL-GY-Q9 CH-6000 5,625 TYPE III MID 4000 70 1/0/1 38 CREE GWYS-A-6L-40K7-3M-UL-GY-Q9 CH-7500 7,500 TYPE III MID 4000 70 2/0/2 50 CREE GWYS-A-8L-40K7-3M-UL-GY-Q9 CH-10000 10,175 TYPE III MID 4000 70 2/0/2 64 CREE GWYS-A-13L-40K7-3M-UL-GY-Q5 CH-12000 12,600 TYPE III MID 4000 70 2/0/2 81 CREE GWYS-A-13L-40K7-3M-UL-GY-Q9
STANDARD
LUMINAIRE
OPTIONAL
DUAL-ARM IN MEDIANS 6' 25'-30' MOUNTING HEIGHT 4 SLOTTED
BOLT HOLES
1 1
4"X134" BOLTING DIA
10" OR 11"
MAST ARM
NOTE 2
HANDHOLE
4"X61
2" MIN
BASE W/ BOLT COVERS
NOTE 4
ALUMINUM POLE
NOTE 1
POLE ID STICKER
8' ARM LENGTH
POLE FOUNDATION
8/17/2026
STANDARD ELECTROLIER
(COBRA HEAD) E-7A
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
229 of 833
6" TAPERED (0.14"/FT.) ALUMINUM POLE SHAFT 8"X4.29"X26.5'; 8 SHARP FLUTE 18' MOUNTING HEIGHT 30" 27' MOUNTING HEIGHTPOLE TOP TENON
POLE ELEVATION
NOTES:
1. LUMINAIRE MODELS SHALL BE PER THE TRANSPORTATION DIVISION.
2. REFER TO STD E-1 FOR FOUNDATION AND ANCHORING.
3. ALL STEEL ASSEMBLIES GALVANIZED TO ASTM A123
4. ALL WELDS SHALL BE IN ACCORDANCE WITH AWS D1.1.
5. ALL MATERIAL FINISH COATS SHALL BE COLOR RAL-6012.
6. ALL MATERIAL SUBMITTALS TO BE APPROVED BY THE
TRANSPORTATION DIVISION PRIOR TO ORDERING MATERIALS.
GFCI RECEPTACLE OPTIONAL
POLE TOP TENON
LOWER ARM OPTIONAL
2.875" O.D. X 5" LONG
POLE TOP TENON
0.19 PER AWS D.1.1
0.19 PER AWS D.1.1
LUMINAIRE
TYP, NOTE 1
8/17/2026
DECORATIVE STREETLIGHT
(PENDANT) E-7B
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
230 of 833
14' TAPERED (0.14"/FT.) ALUMINUM POLE SHAFT 8"X4.29"X26.5'; 8 SHARP FLUTE 27.5" 13.5'' 17" NOMINAL
16.625" ACTUAL
NOTES:
1. LUMINAIRE MODELS SHALL BE PER THE TRANSPORTATION DIVISION.
2. REFER TO STD E-1 FOR FOUNDATION AND ANCHORING.
3. ALL STEEL ASSEMBLIES GALVANIZED TO ASTM A123
4. ALL WELDS SHALL BE IN ACCORDANCE WITH AWS D1.1.
5. ALL MATERIAL FINISH COATS SHALL BE COLOR RAL-6012.
6. ALL MATERIAL SUBMITTALS TO BE APPROVED BY THE TRANSPORTATION DIVISION PRIOR TO ORDERING MATERIALS.
POLE ELEVATION
5" SHAFT TOP DIAMETER
16 SHARP FLUTED
ALUMINUM TAPERED POLE
6.6875" SHAFT
BASE DIAMETER
POST TOP LUMINAIRE
NOTE 1
8/17/2026
DECORATIVE STREETLIGHT
(POST TOP) E-7C
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
231 of 833
URBAN ACCESSORIESURBAN ACCESSORIES
NOTES:
1. STANDARD TREE GRATE SHALL BE BY URBAN
ACCESSORIES, OT SERIES, TITLE 24, 4' X 4' SQUARE
WITH 3/8" OR LESS SLOTS. SEMI-GLOSS BLACK
POWDER COATING.
2. OT SERIES, TITLE 24 4' ROUND, IF APPROVED BY
PUBLIC WORKS DIRECTOR.
3. TRAFFIC RATED GRATES REQUIRED BETWEEN CURB
AND BACK OF SIDEWALK. IF INSTALLED BEHIND
SIDEWALK, PEDESTRIAN RATED ALLOWED IF
APPROVED BY PUBLIC WORKS DIRECTOR.
4. STAKE OPENINGS ARE REQUIRED. LIGHT PORTS
AND IRRIGATION ACCESS CUTOUTS IF NECESSARY.
5. FOR INSTALLATION INTO EXISTING SIDEWALK,
REFER TO URBAN ACCESSORIES FRAME SPECS
TYPE R (IN CONCRETE) AND TYPE PA (IN PAVERS).
MANUFACTURER
URBAN ACCESSORIES:
465 EAST 15TH STREET, TACOMA, WA, 98421 PLAN VIEW (253) 572-1112
NEW CONSTRUCTION
CONCRETE SIDEWALK
NEW CONSTRUCTION
PAVER SIDEWALK
6" MIN 6" MIN
EMBEDMENT ANCHOR
#3 REBAR
6" OVERALL LENGTH
TYPE S FRAME
PER MFR
GRATE
CONCRETE
SLAB
45°
6" MIN
CONCRETE
SUB SLAB
SETTING BED
PAVERS
TYPE PA FRAME
PER MFR
GRATE
EMBEDMENT ANCHOR
#3 REBAR
6" OVERALL LENGTH
CONTINUOUS FLAT BAR 3"
45°
48" 48"11"
8/17/2026
TREE GRATE
TR-1
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
232 of 833
NOTES:
1. ROOT BARRIER SHALL BE BLACK, INJECTION MOLDED PANELS OR LINEAR ROLL WITH 90° DEFLECTING RIBS. ROOT BARRIER SHALL BE MANUFACTURED WITH 50% POST CONSUMER POLYPROPYLENE PLASTIC WITH ADDED ULTRAVIOLET INHIBITORS AND SHALL BE RECYCLABLE.
2. ROOT BARRIER SHALL HAVE A MINIMUM WALL THICKNESS OF 0.06" (60 mil) & RIB THICKNESS OF 0.08" (80 mil).
3. VERTICAL ROOT DEFLECTING RIBS SHALL BE FACING INWARD TO THE ROOT BALL.
4. ROOT BARRIER SHALL BE MINIMUM 15' LONG AND 7.5' O.C. FROM TREE UNLESS APPROVED OTHERWISE BY PUBLIC WORKS DIRECTOR.
5. ROOT BARRIER SHALL BE INSTALLED VERTICALLY IN TRENCH ADJACENT TO SIDEWALK AND CURB AT GRADE.
6. PRIOR TO CUTTING ANY ROOTS FOR PROTECTED TREES (DEFINED IN S.M.M.C. CHAPTER 13.40), A TREE PERMIT SHALL BE OBTAINED FROM THE DEPARTMENT OF PARKS & RECREATION.
ROOT BARRIER SECTION
ROOT BARRIER PLAN
ADJACENT SIDEWALK ADJACENT CURB & GUTTER
EXISTING TREE
GRADE
NATIVE BACKFILL, TYP
ROOT BARRIER, TYP 24" ROOT BARRIER TYP
4"-6"
TRENCH
TYP
REMOVE EXISTING ROOTS
ROOT BARRIER, TYP
BACK OF CURB
FACE OF CURB
SIDEWALK
EXISTING TREE
7.5' O.C.
EACH SIDE OF TREE
15' MIN ROOT BARRIER
BACK OF WALK
REMOVE EXISTING ROOTS
8/17/2026
TREE ROOT BARRIER
TR-2
A
C
C
A M
E
O
T Y IT
FO
S N
I FOR
LA
NIA
DEPARTMENT OF PUBLIC WORKS
SHEET
DATE
7/20/2026
DATE
8/1/2026
DATE
233 of 833
CITY OF SAN MATEO
CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 12 Section Name: CONSENT CALENDAR Account Number: 34-3133 File ID: 26-11386 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: Community Development Department
MEETING DATE: July 20, 2026
SUBJECT:
Below Market Rental Rates, Sales Prices and Unit Community Priorities — Adoption RECOMMENDATION:
Adopt a Resolution to establish 2026 maximum rental rates and sales prices for affordable housing, as required by the City of San Mateo's Below Market Rate (BMR) housing program; and establish Community Priority for units containing three or more bedrooms, which may allow a developer to provide fewer BMR units in exchange for units with more bedrooms, as long as all other BMR program provisions are followed.
BACKGROUND:
In November 1992, the City Council established a Below Market Rate (BMR) housing program that required new housing developments of 11 or more units to include a certain percentage of the units as "affordable.” The affordable housing targets have been revised periodically over the years. As of February 2020, a rental project must include 15 percent of the units in a new housing development as affordable to lower-income households, defined as households whose incomes do not exceed 80 percent of the Area Median Income (AMI). For owner-occupied housing, 15 percent of the units must be affordable to moderate-income households, defined as households whose incomes do not exceed 120 percent of AMI. These are the minimum requirements; and developers may elect to utilize State Density Bonus provisions to provide deeper affordability in exchange for development concessions as provided by State Law.
The City receives updated median income figures from the U. S. Department of Housing and Urban Development (HUD) and the California Department of Housing and Community Development (HCD) each spring. In 2026, the AMI for a family of four in San Mateo County is $200,800, an increase of 7.6 percent from 2025. State income limits, which follow the definitions in the California Health & Safety Code Sec. 50079.5 and 50093, are shown below. 2026 State Income Limits – San Mateo County
Household Size Extremely Low
Income
Very Low Income Low Income Median Income Moderate
Income
1 44,150 73,550 117,700 140,550 156,750
2 50,450 84,050 134,500 160,650 179,100
3 56,750 94,550 151,300 180,700 201,500
4 63,050 105,050 168,100 200,800 223,900
5 68,100 113,500 181,550 216,850 241,800
6 73,150 121,900 195,000 232,950 259,700
7 78,200 130,300 208,450 249,000 277,650
8 83,250 138,700 221,900 265,050 295,550
Source: California Department of Housing and Community Development 234 of 833
CITY OF SAN MATEO
All BMR units are subject to maximum rental rates and sales prices that are revised by the City Council on an annual basis to reflect changes in the Area Median Income (AMI), in addition to mortgage interest rates and other monthly ownership housing costs.
BMR Rental Rates
Per the BMR Guidelines (Section V(a) - Rental Rates), the City Council annually adopts maximum allowable rental rates, adjusted by unit size, via resolution. These rental rates may not exceed 30 percent of the gross monthly income for households earning between 50 and 70 percent of AMI, adjusted for household size, and in no event may they exceed four percent from the prior year. Note that the maximum BMR rent figures include the cost of gas and electric utilities, garbage collection, and water. Maximum rents for 2026 are shown below:
Maximum Rents for City BMR Units - 2026
Unit Type Very Low Income Low Income
Studio $1,424 $1,697
1BR $1,614 $1,944
2BR $1,821 $2,190
3BR $2,026 $2,436
4BR $2,190 $2,628
With this four percent increase, the City’s maximum BMR rents remain well below current market rents and 30 percent of gross monthly income for households earning 50-70 percent of AMI.
BMR Sales Prices
Maximum sales prices for condominiums and townhouses are established by first determining an affordable monthly housing payment. This is defined as follows for very low-, low- and moderate-income households:
• Very Low Income: 30 percent of 50 percent of AMI
• Low Income: 30 percent of 70 percent of AMI
• Moderate Income Townhome/Condominium: 30 percent of 100 percent of AMI • Moderate Income Single Family: 35 percent of 110 percent of AMI An allowance for property taxes, insurance, and homeowners’ association dues is factored into the monthly payment. The sales price is then calculated, assuming a five percent downpayment and a mortgage interest rate based on the 15-year average for a 30-year, fixed-rate mortgage, as published by Freddie Mac (4.51 percent in 2026). The maximum sales prices for 2026 are shown below.
Maximum Sales Prices for City BMR Units - 2026
VERY LOW INCOME
STUDIO $211,000
1 BEDROOM $225,000
2 BEDROOM $258,000
3 BEDROOM $292,000
4 BEDROOM $328,000
LOW INCOME
STUDIO $335,000
1 BEDROOM $366,000
2 BEDROOM $418,000
3 BEDROOM $469,000
4 BEDROOM $519,000
235 of 833
CITY OF SAN MATEO
MODERATE INCOME - CONDO OR TOWNHOME
STUDIO $521,000
1 BEDROOM $579,000
2 BEDROOM $657,000
3 BEDROOM $735,000
4 BEDROOM $806,000
MODERATE INCOME - SINGLE FAMILY DETACHED
1 BEDROOM $779,000
2 BEDROOM $882,000
3 BEDROOM $986,000
4 BEDROOM $1,077,000
Please note that City Council reserves the right to change the prices at any time, in the event of significant changes in the market, interest rates or other conditions.
Community Priority
BMR program revisions effective January 1, 2010 included flexibility in the bedroom count of the BMR units based on City Council adoption of community priorities. An applicant may propose a different bedroom mix in the BMR units other than a straight pro rata of the market rate units, as long as the total bedroom count is the same or more, and that the total number of BMR units equal to at least 10 percent of the project.
In previous years, Council adopted a Community Priority in annual resolutions establishing Below Market Rental Rates and Sale Prices. For 2026, the staff recommendation is to continue to adopt a Community Priority for large units consisting of three or more bedrooms, based on the shortage of those units currently in the BMR inventory. For example, a 40-unit complex consisting of all two-bedroom units could provide the City with four three-bedroom units (10 percent), instead of the standard requirement of six two-bedroom units (15 percent). Council has the ability to change this priority in future years, if change is needed. It is anticipated that this requirement will be incorporated into an updated BMR Ordinance in the near future, when the Ordinance is updated to meet Housing Element commitments.
BUDGET IMPACT:
Adoption of this Resolution has no impact on the General Fund.
ENVIRONMENTAL DETERMINATION:
This Resolution is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b)(5).)
STRATEGIC PLAN ALIGNMENT
This staff report supports the Housing initiative.
NOTICE PROVIDED:
All meeting noticing requirements were met.
ATTACHMENTS
Att 1 – Proposed Resolution
STAFF CONTACT
Van Diggans, Housing Specialist II
[email protected]
(650) 522-7229
236 of 833
CITY OF SAN MATEO
RESOLUTION NO. (2026)
ESTABLISHING THE 2026 MAXIMUM RENTAL RATES AND SALES PRICES FOR THE BELOW MARKET RATE
HOUSING PROGRAM, AND ESTABLISHING COMMUNITY PRIORITY FOR LARGER BMR UNITS WHEREAS, the Below Market Rate Housing Program (BMR Program) was established in 1992, and is reviewed by the Council annually to establish maximum rental rates and sales prices for affordable housing; and WHEREAS, a revision to the BMR Program, effective in January 2010, included flexibility in how an applicant can satisfy the City’s BMR requirement, based on total bedroom count and adopted community priorities for the number of bedrooms in each unit; and WHEREAS, the City annually revises the rental rates and sales prices for the BMR Program based on median income data provided by the United States Department of Housing & Urban Development (HUD) and the California Department of Housing & Community Development (HCD); and WHEREAS, staff has reviewed the rental rates and sales prices for the BMR Program and recommends that the City Council adopt the rates set forth in Exhibit A attached to this Resolution; and WHEREAS, there is a shortage of units consisting of three or more bedrooms in the City’s BMR inventory;
WHEREAS, establishing a Community Priority for units consisting of three or more bedrooms, will allow an applicant to provide fewer BMR units in exchange for units with three or more bedrooms, as long as all other BMR program requirements are followed.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN MATEO, CALIFORNIA, HEREBY RESOLVES that:
1. The establishment of the 2026 maximum rental rates and sales prices for affordable housing and establishment of a Community Priority is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b)(5)).
2. The 2026 maximum rental rates, including utilities, and sales prices for BMR units are established at the rates set forth in Exhibit A.
3. The establishment of a Community Priority need for units containing three bedrooms or more is approved. An applicant may propose a different bedroom mix in the BMR units, as long as the applicant provides BMR units with three or more bedrooms, such that the total bedroom count is equal to or higher than what would otherwise be required pursuant to the BMR Guidelines, the total number of BMR units is 10 percent or more of the project, and all other BMR program provisions are followed. Exhibit B sets out the methodology to calculate the equivalency. 237 of 833
EXHIBIT A
MAXIMUM RENT AND MAXIMUM SALES PRICES FOR BELOW MARKET RATE UNITS Maximum Rents for City BMR Units – Effective July 20, 2026 UNIT TYPE VERY LOW INCOME LOW INCOME
Studio $1,424 $1,697
1BR $1,614 $1,944
2BR $1,821 $2,190
3BR $2,026 $2,436
4BR $2,190 $2,628
Maximum Sales Prices for City BMR Units – Effective July 20, 2026
VERY LOW INCOME
STUDIO $211,000
1 BEDROOM $225,000
2 BEDROOM $258,000
3 BEDROOM $292,000
4 BEDROOM $328,000
LOW INCOME
STUDIO $335,000
1 BEDROOM $366,000
2 BEDROOM $418,000
3 BEDROOM $469,000
4 BEDROOM $519,000
MODERATE INCOME - CONDO OR TOWNHOME
STUDIO $521,000
1 BEDROOM $579,000
2 BEDROOM $657,000
3 BEDROOM $735,000
4 BEDROOM $806,000
MODERATE INCOME – SINGLE-FAMILY DETACHED
1 BEDROOM $779,000
2 BEDROOM $882,000
3 BEDROOM $986,000
4 BEDROOM $1,077,000
238 of 833
EXHIBIT B
BELOW MARKET RATE ALTERNATIVE
FOR VARIATION OF THE BEDROOM COUNT IN BMR UNITS
Based on City Council approval of a Community Priority, an applicant may propose a different bedroom mix in the BMR units, as long as the applicant provides BMR units with three or more bedrooms such that the total bedroom count is equal to or higher than what would otherwise be required pursuant to the BMR Guidelines, the total number of BMR units is 10% or more for the project, and all other BMR Program provisions are followed.
When the Community Priority is for larger units with 3 or more bedrooms, the following methodology is used to calculate the required number of BMR units:
Calculate the pro rata number of Market Rate units by bedroom type by multiplying .15 times the number of units for each bedroom size to establish the baseline. Calculate the total number of bedrooms in the baseline BMR units. Use .75/unit for studio units. Applicant may propose a different mix of bedrooms if it increases the number of units with 3 or more bedrooms, provides an equivalent bedroom count the same or greater than the baseline, and provides a total BMR unit count of at least 10% of the project size. 239 of 833
CITY OF SAN MATEO
CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 13 Section Name: CONSENT CALENDAR Account Number: 10-4661 File ID: 26-11387 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: Public Works Department
MEETING DATE: July 20, 2026
SUBJECT:
19th Avenue / Fashion Island Blvd Multimodal Improvements Project – Adoption RECOMMENDATION:
Adopt a Resolution authorizing the City to request to the One Bay Area Grant (OBAG) 3 Regional Discretionary Funding for the 19th Avenue and Fashion Island Boulevard Multimodal Improvements Project (Project) to allocate grant funding in the amount of $3,375,000 to the construction phase and to act as the implementing agency for the Project by updating the original OBAG 3 application.
BACKGROUND:
The City of San Mateo is advancing the 19th Avenue and Fashion Island Boulevard Multimodal Improvements Project (Project), which aims to improve traffic congestion while enhancing safety, connectivity, and access for people walking, biking, driving, and taking transit along the corridor from Pacific Boulevard to Mariners Island Boulevard.
As part of the project delivery assistance it provides to local agencies, the San Mateo County Transportation Authority (SMCTA) has served as the implementing agency for the planning and design phases of the Project. Working closely with the City throughout project development, SMCTA administered grant funding and submitted the OBAG 3 grant funding application on the project‘s behalf in 2023-2024. The City strongly supported the application, including providing a signed letter of support from the Mayor. The Project was subsequently awarded $3,375,000 for construction of the Project.
As the project advances toward construction, SMCTA and the City have determined that the City should serve as the implementing agency for the construction phase. As the project sponsor and local jurisdiction, the City can most effectively oversee construction, coordinate with partner agencies (including Caltrans and SMCTA), manage delivery, and administer the associated grant funding.
This change requires MTC Commission approval to revise the OBAG 3 award recipient, update the original appplication and a corresponding update to the 2027 Transportation Improvement Program (TIP) to identify the City as the implementing agency for the OBAG 3 construction funds.
MTC requires a Resolution of Local Support from the new implementing agency before programming the funds through the 2027 TIP. The attached resolution (Attachment A) satisfies this requirement and confirms the City's commitment to deliver the Project and comply with applicable funding and program requirements.
BUDGET IMPACT:
Approval of the resolution is an administrative requirement necessary to transfer implementing agency responsibilities for the construction phase from SMCTA to the City of San Mateo. The action does not affect the amount of OBAG 3 funding previously awarded to the Project, does not require any additional local matching funds beyond those already identified 240 of 833
CITY OF SAN MATEO
for the Project, and does not create any new financial obligations for the City. Rather, it enables MTC to program the previously awarded construction funds under the City's sponsorship and management.
ENVIRONMENTAL DETERMINATION:
The proposed resolution authorizing a request for Project funding is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b)(5).) CEQA review of the Project itself will take place when a construction contract is awarded.
STRATEGIC PLAN ALIGNMENT
This report supports the Transportation initiative.
NOTICE PROVIDED
All meeting noticing requirements were met.
ATTACHMENTS
Att 1 – Proposed Resolution
STAFF CONTACT
Ella Phillips, Assistant Transportation Planner
[email protected]
(650) 522-7326
Bethany Lopez, Senior Engineer
[email protected]
(650) 522-7313
241 of 833
CITY OF SAN MATEO
RESOLUTION NO. ____ (2026)
AUTHORIZING THE FILING OF AN UPDATED APPLICATION FOR FUNDING ASSIGNED TO MTC AND
COMMITTING ANY NECESSARY MATCHING FUNDS AND STATING ASSURANCE TO COMPLETE THE PROJECT WHEREAS, City of San Mateo, as the new project sponsor, (herein referred to as APPLICANT) is updating the application to the Metropolitan Transportation Commission (MTC) for $3,375,000 in funding assigned to MTC for programming discretion, which includes federal funding administered by the Federal Highway Administration (FHWA) and federal or state funding administered by the California Transportation Commission (CTC) such as Surface Transportation Block Grant Program (STP) funding, Congestion Mitigation and Air Quality Improvement Program (CMAQ) funding, Carbon Reduction Program (CRP) funding, Transportation Alternatives (TA) set-aside/Active Transportation Program (ATP) funding, and Regional Transportation Improvement Program (RTIP) funding (herein collectively referred to as REGIONAL DISCRETIONARY FUNDING) for the 19th Avenue/Fashion Island Boulevard Complete Street Class IV Bikeway Project (herein referred to as PROJECT) for One Bay Area 3 Grant Program (herein referred to as PROGRAM); and WHEREAS, the United States Congress from time to time enacts and amends legislation to provide funding for various transportation needs and programs, (collectively, the FEDERAL TRANSPORTATION ACT) including, but not limited to the Surface Transportation Block Grant Program (STP) (23 U.S.C. § 133), the Congestion Mitigation and Air Quality Improvement Program (CMAQ) (23 U.S.C. § 149), the Carbon Reduction Program (CRP) (23 U.S.C. § 175), and the Transportation Alternatives (TA) set-aside (23 U.S.C. § 133); and WHEREAS, state statutes, including California Streets and Highways Code §182.6, §182.7, and §2381(a)(1), and California Government Code §14527, provide various funding programs for the programming discretion of the Metropolitan Planning Organization (MPO) and the Regional Transportation Planning Agency (RTPA); and
WHEREAS, pursuant to the FEDERAL TRANSPORTATION ACT, and any regulations promulgated thereunder, eligible project sponsors wishing to receive federal or state funds for a regionally-significant project shall submit an application first with the appropriate MPO, or RTPA, as applicable, for review and inclusion in the federal Transportation Improvement Program (TIP); and
WHEREAS, MTC is the MPO and RTPA for the nine counties of the San Francisco Bay region; and WHEREAS, MTC has adopted a Regional Project Funding Delivery Policy (MTC Resolution No. 3606, revised) that sets out procedures governing the application and use of REGIONAL DISCRETIONARY FUNDING; and
WHEREAS, APPLICANT is an eligible sponsor for REGIONAL DISCRETIONARY FUNDING; and WHEREAS, as part of the application for REGIONAL DISCRETIONARY FUNDING, MTC requires a resolution adopted by the responsible implementing agency stating the following:
● the commitment of any required matching funds; and
● that the sponsor understands that the REGIONAL DISCRETIONARY FUNDING is fixed at the programmed amount, and therefore any cost increase cannot be expected to be funded with additional REGIONAL DISCRETIONARY FUNDING; and
● that the PROJECT will comply with the procedures, delivery milestones and funding deadlines specified in the Regional Project Funding Delivery Policy (MTC Resolution No. 3606, revised); and 242 of 833
● the assurance of the sponsor to complete the PROJECT as described in the application, subject to environmental clearance, and if approved, as included in MTC's federal Transportation Improvement Program (TIP); and
● that the PROJECT will have adequate staffing resources to deliver and complete the PROJECT within the schedule submitted with the project application; and ● that the PROJECT will comply with all project-specific requirements as set forth in the PROGRAM; and
● that APPLICANT has assigned, and will maintain a single point of contact for all FHWA- and CTCfunded transportation projects to coordinate within the agency and with the respective County Transportation Agency (CTA), MTC, Caltrans, FHWA, and CTC on all communications, inquires or issues that may arise during the federal programming and delivery process for all FHWA- and CTCfunded transportation and transit projects implemented by APPLICANT; and ● in the case of a transit project, the PROJECT will comply with MTC Resolution No. 3866, revised, which sets forth the requirements of MTC’s Transit Coordination Implementation Plan to more efficiently deliver transit projects in the region; and ● in the case of a highway project, the PROJECT will comply with MTC Resolution No. 4104, which sets forth MTC’s Traffic Operations System (TOS) Policy to install and activate TOS elements on new major freeway projects; and
● in the case of an RTIP project, state law requires PROJECT be included in a local congestion management plan, or be consistent with the capital improvement program adopted pursuant to MTC’s funding agreement with the County Transportation Agency (CTA); and WHEREAS, that APPLICANT is authorized to update the application for REGIONAL DISCRETIONARY FUNDING for the PROJECT; and
WHEREAS, there is no legal impediment to APPLICANT making applications for the funds; and WHEREAS, there is no pending or threatened litigation that might in any way adversely affect the proposed PROJECT, or the ability of APPLICANT to deliver such PROJECT; and WHEREAS, APPLICANT authorizes its Executive Director, General Manager, City Manager, or designee to execute and update the application with MTC for REGIONAL DISCRETIONARY FUNDING for the PROJECT as referenced in this resolution; and
WHEREAS, MTC requires that a copy of this resolution be transmitted to the MTC in conjunction with the updating the application.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN MATEO, CALIFORNIA, HEREBY RESOLVES that:
1. The request for funding is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b)(5).) CEQA review of the PROJECT will take place when a construction contract is awarded.
2. The APPLICANT is authorized to execute and update the application for funding for the PROJECT for REGIONAL DISCRETIONARY FUNDING under the FEDERAL TRANSPORTATION ACT or continued funding;
3. APPLICANT will provide any required matching funds;
4. APPLICANT understands that the REGIONAL DISCRETIONARY FUNDING for the project is fixed at the 243 of 833
MTC approved programmed amount, and that any cost increases must be funded by the APPLICANT from other funds, and that APPLICANT does not expect any cost increases to be funded with additional REGIONAL DISCRETIONARY FUNDING;
5. APPLICANT understands the funding deadlines associated with these funds and will comply with the provisions and requirements of the Regional Project Funding Delivery Policy (MTC Resolution No. 3606, revised) and APPLICANT has, and will retain the expertise, knowledge and resources necessary to deliver federally-funded transportation and transit projects, and has assigned, and will maintain a single point of contact for all FHWA- and CTC-funded transportation projects to coordinate within the agency and with the respective County Transportation Agency (CTA), MTC, Caltrans, FHWA, and CTC on all communications, inquires or issues that may arise during the federal programming and delivery process for all FHWA- and CTC-funded transportation and transit projects implemented by APPLICANT;
6. PROJECT will be implemented as described in the complete application and in this resolution, subject to environmental clearance, and, if approved, for the amount approved by MTC and programmed in the federal TIP;
7. APPLICANT has reviewed the PROJECT and has adequate staffing resources to deliver and complete the PROJECT within the schedule submitted with the project application;
8. PROJECT will comply with the requirements as set forth in MTC programming guidelines and project selection procedures for the PROGRAM;
9. In the case of a transit project, APPLICANT agrees to comply with the requirements of MTC’s Transit Coordination Implementation Plan as set forth in MTC Resolution No. 3866, revised;
10. In the case of a highway project, APPLICANT agrees to comply with the requirements of MTC’s Traffic Operations System (TOS) Policy as set forth in MTC Resolution No. 4104;
11. In the case of an RTIP project, PROJECT is included in a local congestion management plan, or is consistent with the capital improvement program adopted pursuant to MTC’s funding agreement with the County Transportation Agency (CTA);
12. APPLICANT is an eligible sponsor of REGIONAL DISCRETIONARY FUNDING funded projects;
13. APPLICANT is authorized to submit an update to the application for REGIONAL DISCRETIONARY FUNDING for the PROJECT;
14. There is no legal impediment to APPLICANT making applications for the funds;
15. There is no pending or threatened litigation that might in any way adversely affect the proposed PROJECT, or the ability of APPLICANT to deliver such PROJECT;
16. APPLICANT authorizes its Executive Director, General Manager, City Manager, or designee to execute and update the application with MTC for REGIONAL DISCRETIONARY FUNDING for the PROJECT as referenced in this resolution;
17. A copy of this resolution will be transmitted to the MTC in conjunction with the updating the application; and
18. The MTC is requested to support the application for the PROJECT described in the resolution, and if approved, to include the PROJECT in MTC's federal TIP upon submittal by the project sponsor for TIP programming.
244 of 833
CITY OF SAN MATEO
CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 14 Section Name: CONSENT CALENDAR Account Number: File ID: 26-11406 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: Public Works Department
MEETING DATE: July 20, 2026
SUBJECT:
Monitoring, Reporting, and Regulatory Compliance Services at the East Third Avenue Landfill – Agreement RECOMMENDATION:
Approve an agreement with Stearns, Conrad and Schmidt Consulting, Inc. (SCS) for Monitoring, Reporting, and Regulatory Compliance Services at the East Third Avenue Landfill in the amount of $108,875 for a two-year term; and authorize the Public Works Director to execute the agreement in substantially the form presented.
BACKGROUND:
The City uses professional services for environmental monitoring and reporting services at the closed East Third Avenue Landfill to fulfill post-closure monitoring requirements. Waste Discharge Requirements require monitoring and reporting for 30 years following the closure of the landfill. SCS will provide groundwater and leachate monitoring and reporting, landfill cover inspections, landfill gas monitoring and reporting, operation and maintenance of the landfill combustible gas monitoring system, and on-call additional consulting services, as needed.
A Request for Proposals (RFP) was issued on April 22, 2026. In addition to the published notice, the RFP was posted on the City website and provided to interested parties. The RFP required each consultant to provide a description of the methods and approach for meeting the City’s post-closure monitoring requirements. Staff received and reviewed proposals from the following consultants:
Company Proposal Amount
Stearns, Conrad and Schmidt Consulting, Inc. $108,875
BioGas Engineering $107,734
Based on the evaluation of proposals, staff recommends awarding the agreement to SCS Engineers. SCS has provided landfill monitoring and reporting services for the City for the past eight (8) years and has consistently met regulatory requirements and reporting deadlines. The firm has helped reduce landfill monitoring costs and liabilities by securing reductions in landfill gas monitoring frequency and financial assurance reserve amounts. In addition, SCS has consistently demonstrated a high level of responsiveness, technical expertise, and client advocacy.
BUDGET IMPACT:
At the time of the budget development process for FY 2026-27, the cost of these services was estimated to be slightly lower than the proposals received. The two-year agreement total is for an amount not to exceed $108,875. If additional funding is required beyond the approved budget, staff will return to the City Council to request more funding. 245 of 833
CITY OF SAN MATEO
ENVIRONMENTAL DETERMINATION:
This Monitoring, Reporting, & Regulatory Compliance Services is categorically exempt from CEQA as an “existing facility,” because it consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of existing or former use. (CEQA Guidelines Section 15301.)
STRATEGIC PLAN ALIGNMENT
This work supports the Infrastructure initiative.
NOTICE PROVIDED
All meeting noticing requirements were met.
ATTACHMENTS
Att 1 – Agreement
STAFF CONTACT
Sven Edlund, Regulatory Compliance Manager
[email protected]
(650) 522-7296
246 of 833
AGREEMENT WITH STEARNS, CONRAD, SCHMIDT CONSULTING, INC.
FOR PROFESSIONAL CONSULTANT SERVICES
FOR
POST-CLOSURE MONITORING, REPORTING AND REGULATORY COMPLIANCE SERVICES
AT THE EAST THIRD AVENUE LANDFILL
This Agreement, made and entered into this day of ____________________, by and between the CITY OF SAN MATEO, a municipal corporation existing under the laws of the State of California (“CITY”), and Stearns, Conrad, Schmidt Consulting Inc., a corporation (“CONSULTANT”), whose address is 4683 Chabot Drive, Suite 200, Pleasanton, CA 94588.
RECITALS:
A. CITY desires certain professional services hereinafter described.
B. CITY desires to engage CONSULTANT to provide these professional services by reason of its qualifications and experience for performing such services and CONSULTANT has offered to provide the required services on the terms and in the manner set forth herein.
NOW, THEREFORE, IT IS AGREED as follows:
SECTION 1 - SCOPE OF SERVICES
The scope of services to be performed by CONSULTANT under this Agreement is as described in Exhibit A to this Agreement, attached and incorporated by reference.
SECTION 2 - DUTIES OF CONSULTANT
CONSULTANT shall be responsible for the professional quality, technical accuracy and coordination of all work furnished by CONSULTANT under this Agreement. CONSULTANT shall, without additional compensation, correct or revise any errors or deficiencies in its work.
CONSULTANT represents that it is qualified to furnish the services described under this Agreement.
CONSULTANT shall be responsible for employing or engaging all persons necessary to perform the services of CONSULTANT.
CONSULTANT agrees to comply with the City’s minimum wage ordinance as codified in Municipal Code Chapter 5.92, which differs from the state minimum wage and includes a Consumer Price Index escalator.
SECTION 3 - DUTIES OF CITY
CITY shall provide pertinent information regarding its requirements for the project.
CITY shall examine documents submitted by CONSULTANT and shall render decisions pertaining thereto promptly, to avoid unreasonable delay in the progress of CONSULTANT's work. 247 of 833
SECTION 4 - TERM
The services to be performed under this Agreement shall commence on July 20, 2026 and be completed on July 15, 2028.
SECTION 5 - PAYMENT
Payment shall be made by CITY only for services rendered and upon submission of a payment request upon completion and CITY approval of the work performed. In consideration for the full performance of the services set forth in Exhibit A, CITY agrees to pay CONSULTANT a fee in an amount of $108,875, pursuant to rates stated in Exhibit B to this Agreement, attached and incorporated by reference.
SECTION 6 - TERMINATION
Without limitation to such rights or remedies as CITY shall otherwise have by law, CITY shall have the right to terminate this Agreement or suspend work on the Project for any reason, upon ten (10) days' written notice to CONSULTANT. CONSULTANT agrees to cease all work under this Agreement upon receipt of said written notice.
Upon termination and upon CITY's payment of the amount required to be paid, documents become the property of CITY, and CONSULTANT shall transfer them to CITY upon request without additional compensation.
SECTION 7 - OWNERSHIP OF DOCUMENTS
All documents prepared by CONSULTANT in the performance of this Agreement, although instruments of professional service, are and shall be the property of CITY, whether the project for which they are made is executed or not.
SECTION 8 - CONFIDENTIALITY
All reports and documents prepared by CONSULTANT in connection with the performance of this Agreement are confidential until released by CITY to the public. CONSULTANT shall not make any such documents or information available to any individual or organization not employed by CONSULTANT or CITY without the written consent of CITY before any such release.
SECTION 9 - INTEREST OF CONSULTANT
CONSULTANT covenants that it presently has no interest, and shall not acquire any interest, direct or indirect, financial or otherwise, which would conflict in any manner or degree with the performance of the services under this Agreement.
248 of 833
SECTION 10 - CONSULTANT'S STATUS
It is expressly agreed that in the performance of the professional services required under this Agreement, CONSULTANT shall at all times be considered an independent contractor as defined in Labor Code Section 3353, under control of the CITY as to the result of the work but not the means by which the result is accomplished. Nothing herein shall be construed to make CONSULTANT an agent or employee of CITY while providing services under this Agreement.
SECTION 11 - INDEMNITY
CONSULTANT agrees to hold harmless and indemnify CITY, its elected and appointed officials, employees, and agents from and against any and all claims, loss, liability, damage, and expense arising out of CONSULTANT’s performance of this Agreement, except those claims arising out of CITY’s sole negligence or willful misconduct. CONSULTANT agrees to defend City, its elected and appointed officials, employees, and agents against any such claims. The CONSULTANT’S duty to indemnify shall survive expiration or early termination of this Agreement.
SECTION 12 - INSURANCE
CONSULTANT shall procure and maintain for the duration of the contract and three years thereafter (five years for building or major improvements) the insurance specified in Exhibit C to this Agreement.
SECTION 13 - NON-ASSIGNABILITY
Both parties hereto recognize that this Agreement is for the personal services of CONSULTANT and cannot be transferred, assigned, or subcontracted by CONSULTANT without the prior written consent of CITY.
SECTION 14 - RELIANCE UPON PROFESSIONAL
SKILL OF CONSULTANT
It is mutually understood and agreed by and between the parties hereto that CONSULTANT is skilled in the professional calling necessary to perform the work agreed to be done under this Agreement and that CITY relies upon the skill of CONSULTANT to do and perform the work in the most skillful manner, and CONSULTANT agrees to thus perform the work. The acceptance of CONSULTANT's work by CITY does not operate as a release of CONSULTANT from said obligation. 249 of 833
SECTION 15 - WAIVERS
The waiver by either party of any breach or violation of any term, covenant, or condition of this Agreement or of any provisions of any ordinance or law shall not be deemed to be a waiver of such term, covenant, condition, ordinance or law or of any subsequent breach or violation of the same or of any other term, condition, ordinance, or law. The subsequent acceptance by either party of any fee or other money which may become due hereunder shall not be deemed to be a waiver of any preceding breach or violation by the other party of any term, covenant, or condition of this Agreement or of any applicable law or ordinance.
SECTION 16 - SEVERABILITY
If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect.
SECTION 17 - COSTS AND ATTORNEY FEES
Attorney fees in total amount not exceeding $5000, shall be recoverable as costs (by the filing of a cost bill) by the prevailing party in any action or actions to enforce the provisions of this Agreement. The above $5000 limit is the total of attorney fees recoverable whether in the trial court, appellate court, or otherwise, and regardless of the number of attorneys, trials, appeals, or actions. It is the intent of this Agreement that neither party shall have to pay the other more than $5000 for attorney fees arising out of an action, or actions to enforce the provisions of this Agreement.
SECTION 18 - NON-DISCRIMINATION
CONSULTANT warrants that it is an Equal Opportunity Employer and shall comply with applicable regulations governing equal employment opportunity. Neither CONSULTANT nor any of its subcontractors shall discriminate in the employment of any person because of race, color, national origin, ancestry, physical handicap, medical condition, marital status, sex, or age, unless based upon a bona fide occupational qualification pursuant to the California Fair Employment and Housing Act.
SECTION 19 - MEDIATION
Should any dispute arise out of this Agreement, any party may request that it be submitted to mediation. The parties shall meet in mediation within 30 days of a request. The mediator shall be agreed to by the mediating parties; in the absence of an agreement, the parties shall each submit one name from mediators listed by either the American Arbitration Association, the State Mediation and Conciliation Service, or other agreed-upon service. The mediator shall be selected by a blind draw.
The cost of mediation shall be borne equally by the parties. Neither party shall be deemed the prevailing party. No party shall be permitted to file a legal action without first meeting in mediation and making a good faith attempt to reach a mediated settlement. The mediation process, once commenced by a meeting with the mediator, shall last until agreement is reached by the parties but not more than 60 days, unless the maximum time is extended by the parties. 250 of 833
SECTION 20 - LITIGATION
CONSULTANT shall testify at CITY'S request if litigation is brought against CITY in connection with CONSULTANT's services under this Agreement. Unless the action is brought by CONSULTANT, or is based upon CONSULTANT's wrongdoing, CITY shall compensate CONSULTANT for preparation for testimony, testimony, and travel at CONSULTANT's standard hourly rates at the time of actual testimony.
SECTION 21 - NOTICES
All notices hereunder shall be given in writing and mailed, postage prepaid, addressed as follows:
To CITY: Sven Edlund
City of San Mateo
1949 Pacific Blvd.
San Mateo, CA 94403
To CONSULTANT: SCS Engineers
Attn: Anton Svorinich
4683 Chabot Drive, Suite 200
Pleasanton, CA 94588
SECTION 22 - AGREEMENT CONTAINS ALL
UNDERSTANDINGS; AMENDMENT
This document represents the entire and integrated agreement between CITY and CONSULTANT and supersedes all prior negotiations, representations, and agreements, either written or oral.
This document may be amended only by written instrument, signed by both CITY and CONSULTANT.
251 of 833
SECTION 23 - CONFLICTS
In the event of any conflict between the provisions of this Agreement and any other referenced exhibit or document attached to this Agreement, the language and terms of this Agreement shall control.
SECTION 24 - AUTHORITY TO ENTER INTO AGREEMENT
CONSULTANT has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and to bind each respective party.
SECTION 24 - GOVERNING LAW AND VENUE
This Agreement shall be governed by the laws of the State of California and, in the event of litigation, venue will be in the County of San Mateo.
[SIGNATURE PAGE FOLLOWS]
252 of 833
IN WITNESS WHEREOF, CITY OF SAN MATEO and SCS ENGINEERS have executed this Agreement the day and year first above written.
CITY OF SAN MATEO CONSULTANT
Matt Fabry, PE
Public Works Director
Date Anton Svorinich
Its Authorized Agent
VP, Regional OM&M Manager
If a Corporation, can be either 1)
President or 2) Vice President
plus an additional corporate
officer (i.e., Secretary, Treasurer)
who shall sign below.
Date
APPROVED AS TO FORM ADDITIONAL CORPORATE
OFFICER
(if necessary per the above)
Linh P. Nguyen
Assistant City Attorney
Date Curtis P. Jang,
Treasurer/Chief Financial Officer
Date
Attachments:
Exhibit A: Scope of Services
Exhibit B: Payment Rates
Exhibit C: Insurance Requirements
253 of 833
EXHIBIT A
SCOPE OF SERVICES
Task 1 – Project Management
SCS will develop and maintain a master project schedule, including timelines for review of major deliverables. Upon award, SCS will lead a kick-off meeting to discuss project goals and schedule. We will host Semi-Annual (three additional after the kick-off) meetings or as needed to update the City on new findings, analytical results, timelines, and project status. SCS will prepare an agenda and provide meeting minutes afterwards.
SCS will manage all work outlined in the scope, including coordinating project activities, managing staff, and subconsultants hired under our scope. We will monitor all project activities and implement quality assurance and quality control standards through our Quality Management System (QMS).
SCS will assemble and maintain project files within the document gallery of SCSeTools® and provide City personnel with access. These files shall consist of, but not be limited to, all documentation and data resulting from, or related to services for the project, survey files, documented assumptions, working drawings, meeting minutes, correspondence, video libraries, etc.
Anticipated Deliverables – Contract Years 1 and 2 = Project Schedule, and Meeting Minutes Task 2 – Water Quality Monitoring, Sampling, and Reporting SCS will perform water quality monitoring, sampling, and analysis in accordance with the current San Francisco Regional Water Quality Control Board (RWQCB) WDRs for the site (Order No. 95-056, hereinafter “WDRs”) and the monitoring plan revision described in the Data Analysis Plan (Kleinfelder, 2000, and amended February 13, 2004) and applicable industry standards. There have been indications that the RWQCB will be issuing a new WDR and associated monitoring and reporting program (MRP). If the RWQCB does issue a new or revised WDR/MRP, the scope of work and costs described herein may not be applicable. SCS and the City should work together to revise the scope as needed.
Scheduled monitoring at the City site occurs semi-annually. The following will be conducted before the start of each round of monitoring:
• SCS will contract with Pace-Bakersfield, a California State-certified laboratory, to perform the laboratory analysis.
Before each sampling event, SCS will coordinate with the project laboratory to have the appropriate bottles, labels, and chain-of-custody forms delivered to SCS or another designated location. SCS will request the receipt of laboratory analytical results within 15 days following the sampling event. Pace and the lab project manager (Vanessa Sandoval) have been providing analytical services for this Site for over a decade. • At the beginning of each sampling day, SCS will calibrate the field instruments used for measurement of monitoring parameters (pH, specific conductance, turbidity, temperature, and dissolved oxygen). Field parameter measures will be collected at each point where groundwater and leachate samples are collected.
On a quarterly basis, groundwater and leachate elevations will be measured. This is per 27 CCR requirements (sampling is semi-annually per the WDRs). When samples are collected, the elevations will be measured before the start of sampling.
Elevation measurements will be provided to the Project Manager on the same day to allow for data checks before the beginning of sampling.
Semi-annually, samples will be collected from Groundwater Monitoring Well Nos. MW-1 through MW-4 and Leachate Well Nos. LW-1 through LW-5. One duplicate sample will be collected during each sampling event from one of the groundwater wells. Groundwater monitoring wells will be purged and monitored for field parameters - pH, electrical conductivity, temperature, turbidity, and dissolved oxygen. These parameters, purge rates, and volumes will be recorded on field data sheets. Purge water will be discharged to the ground surface consistent with past events, which show no evidence of chemical contamination. After the field parameters stabilize, the groundwater sample will be collected. Leachate will be collected as grab samples from the leachate monitoring wells (no purge water is generated). Field sampling sheets (through SCS Mobile Tools®) are automatically emailed to the Project Manager after each well is sampled, allowing for almost immediate quality checks.
254 of 833
For each semi-annual sampling event, groundwater and leachate samples will be submitted to a state-certified laboratory for analysis of the following parameters:
• Total Organic Carbon (TOC, EPA Method 415.3 or 5310B). • Total Nitrogen (sum of nitrate plus nitrite as nitrogen and total Kjeldahl nitrogen (EPA Methods 300.1 or 353.2 and 351.2).
• Bicarbonate and Carbonate Alkalinity (EPA Method 310.1 or SM2320B). • Volatile Organic Compounds (VOCs) (EPA Method 8260B).
For the second sampling event of 2026, groundwater and leachate samples will also be submitted for analysis of 5-year constituents of concern:
• 40 CFR Subtitle D Appendix II VOCs (EPA Method 8260B). • 40 CFR Subtitle D Appendix II Semi-Volatile Organic Compounds (SVOCs) (EPA Method 8270C). • Organophosphorus Pesticides (EPA Method 8141B).
• Polychlorinated Biphenyls (PCBs) (EPA Method 8082).
• Chlorinated Herbicides (EPA Method 8151A).
• Metals (Arsenic, Cadmium, Chromium, Copper, Lead, Mercury, Nickel, Selenium, Silver, and Zinc) (EPA Method 200.8 and 245.1).
Reporting
Semiannual laboratory analytical results will be reviewed and statistically evaluated by the intrawell tolerance interval method. Reports will be prepared in accordance with the reporting requirements described in Part A, Section F of WDR Order No. 95-056. A draft report will be submitted electronically to the City for review around July 7 for the January - June sampling event, and around January 7 for the July - December sampling event. This second report will include the annual compliance summary in accordance with WDR Order No. 95- 056, Part A, Section F-3.
After receipt of the City’s comments, one electronic copy of the final report will be submitted to the City by July 15 and January 15 for distribution to appropriate regulatory agencies and uploading to the RWQCB Geotracker database. At a minimum, the report will include a groundwater contour map, tabulated analytical results, time-series graphs of water levels and monitoring-parameter concentrations, a discussion of the monitoring event results, intrawell statistical analyses, a summary of any well replacements/repairs, and an evaluation of field and laboratory QC data. In addition, each report will include all backup data such as field data sheets, chain-of-custody documentation, and certified analytical reports. SCS understands that the City will provide monthly measurements of groundwater and leachate elevations and V- and P-station observations as required by DWR Discharge Monitoring Program Part B to SCS, for inclusion in the semi-annual monitoring reports.
SCS will upload a PDF copy of all groundwater monitoring reports and electronic data files (EDF) of groundwater/leachate analytical data to the State GeoTracker database.
This task also includes the management of repair activities associated with this monitoring system. Since the nature of the landfill is to settle, the site has experienced periodic breakage of wells, and well or casing replacement is sometimes necessary. While costs to repair wells will be covered under Task 6 Additional Services if approved by the City, there is an expectation that SCS will identify and recommend cost-effective solutions to well system problems as they occur.
Anticipated Deliverables – Contract Year 1 = 4 quarterly elevation events and 2 sampling/reporting events; Contract Year 2 = 4 quarterly elevation events and 2 sampling/reporting events.
Task 3 – Semi-Annual Facility Inspections/Cover Assessment SCS will conduct a visual inspection and assessment of the structural condition of the landfill cover on a semi-annual basis.
The inspection will be performed by SCS professional staff familiar with landfill post-closure care requirements. The assessment will include cover components as follows:
• Condition of the drainage system - are the open channels and drain inlets functioning properly, the presence of obstructions (vegetative debris, sediment accumulation)? • Standing water, identify areas lacking free drainage as a result of inadequate slope of surface grade. 255 of 833
• Erosion of vegetative cover, identify and prioritize locations where portions of the vegetative cover (erosionresistant layer) require re-grading/repair/re-seeding. • Exposed geosynthetic clay liner (GCL), inspect for locations where the low-hydraulic conductivity layer is exposed and/or needs repair/replacement.
• Areas damaged by equipment operation or by burrowing animals.
For each inspection, SCS will prepare a brief assessment checklist/report that will include, at a minimum, a description of the inspection activities, a discussion of the findings, and any recommendations for repairs to cover components or modifications to the cover maintenance program. The semi-annual reports will be separate from the groundwater/leachate monitoring reports described in Task 1, prepared solely for City review. The semi-annual reports will be submitted to the City by the 15th day of the month following the end of each semi-annual period (typically by April 15 and October 15).
Anticipated Deliverables – Contract Year 1 = 2 inspection/reporting events; Contract Year 2 = 2 inspection/reporting events.
Task 4 – Annual Landfill Gas Probe Monitoring
SCS will conduct annual monitoring as close as possible to low tide at the landfill soil-gas probes LGW1, LGW2, LGW3, LGW4, LGW5, LGW6, and the gas well groundwater assessment (GWA), pursuant to regulations and methods adopted by CalRecycle, as described in 27 CCR and the landfill post-closure maintenance plan (Kleinfelder 2000, amended August 2004).
SCS will also use field instruments to measure and document instantaneous gas concentrations within four (4) building structures, 2 park restrooms (near the dog park and bridge), the park ranger office/garage, and the entrance Kiosk, where gas infiltration might occur. Measurements will include the passive vent risers for each structure.
Methane, carbon dioxide, oxygen, and balance gases and subsurface pressures will be measured at each probe, large utility vault, and vent riser locations. Methane will be recorded as percent methane and percent Lower Explosive Limit (LEL). Atmospheric pressure and weather conditions will also be recorded at the time of sample measurement. The City will be notified immediately if the LEL for methane (5 percent by volume) is exceeded at any perimeter gas probe/well or if it exceeds 25 percent LEL in any structure on the landfill. Annual LFG Monitoring reports will be prepared and will include, at a minimum, a description of the monitoring activity, a discussion of the results, and any recommendations for modifications to the monitoring program or on-site structures to prevent gas build-up. The annual report will be submitted to the City for review by the 15th day of the month following the end of the annual event.
Anticipated Deliverables – Contract Year 1 = 1 monitoring/reporting event; Contract Year 2 = 1 monitoring/reporting event Task 5 – Operation and Maintenance of Combustible Gas Monitoring System SCS understands that automated combustible gas sensor/alarm systems are currently operating in the LF office/maintenance buildings (a total of two systems). SCS will maintain and calibrate two sensor/control panel systems (Scott Quadscan Model 7400 sensors) in accordance with the manufacturer’s specified maintenance and calibration procedures.
Semi-Annual Inspection and Calibration
The calibration procedure consists of applying gases of known concentrations, noting the system’s response, and adjusting the sensors accordingly. A certificate of calibration will be provided for each sensor calibrated.
Action levels will be set as follows:
Note: LEL – Lower Explosive Limit
Warning and alarm levels established by CalRecycle and Cal-OSHA The LEL is defined for methane gas as 5 percent methane by volume in air. In accordance with CCR Title 27 Division 2, Section 20921, the allowable level of methane gas in site structures is 25 percent of the LEL, or 1.25 percent methane by volume in air. The LFG monitoring system provides redundancies and early warnings to detect gas infiltration and notify occupants of a possible hazard.
General Inspection
Monitor Action Level (%LEL)
Warning 10% LEL
Ground Floor
Alarm 20% LEL
256 of 833
During the calibration event, the following additional items will be performed:
• The control panels and sensors will be visually inspected to determine if dust is building up. If necessary, the dust will be removed per the manufacturer’s recommendations. •Wiring that can be visually inspected shall be checked for damage and/or corrosion. •The sensors will be inspected periodically for moisture or water accumulation. • Perform visual alarm and relay check per System Maintenance Section of the Scott Instruments Combustible Gas Transmitter Operations and Maintenance (O&M) Manual on a semi-annual basis. • The subsurface enclosures will be inspected for proper seal around the top portion and on the seal of the impermeable membrane.
System Repairs
If any of the above-mentioned items are in need of repair or replacement, the City will be notified to enable repairs in accordance with the manufacturer’s recommendations. Any problems found, including bad sensors or alarm functions, will be reported to the City immediately, and a quote for emergency repair will be submitted. Routine maintenance may include repair or replacement of system components when necessary. SCS will recommend and perform repair or replacement of sensor heads, battery, or system components on an as-needed basis or per manufacturer’s recommendations.
Reporting
A report will be prepared documenting calibration, inspection, and maintenance activities. The report will include the details of all necessary repairs required or performed. These reports will be maintained at the landfill during the entire post-closure period.
Anticipated Deliverables – Contract Year 1 = 2 inspection/calibration/reporting events; Contract Year 2 = 2 inspection/calibration/reporting events.
Task 6 – Additional Services as Requested
If VOCs, elevated COCs, or statistical exceedances are identified, SCS will notify the City within 48 hours of receiving the applicable laboratory report(s) or statistical documents. SCS’s notification to the City will include information that can be used for the City report to the RWQCB of the applicable initial VOC or statistical exceedance, as required by the WDR. SCS will perform resampling if directed and approved by the City.
Other Services
Other services that SCS can provide, if requested, include:
• Respond to regulatory agency inquiries or directives affecting LFG and water quality monitoring, new requirements for PFAS, or other post-closure maintenance issues.
• Assist in negotiating new WDRs, if scheduled for updating by the RWQCB. • Respond to combustible gas sensor alarm events, including follow-up monitoring for the presence of LFG in on-site structures using field instruments, and identify LFG-related safety hazards. • As-needed post-closure maintenance, including repairs of monitoring wells, combustible gas alarm sensor switchouts, etc. • General consulting services.
• Aerial topographic and monitoring well elevation survey, and preparation of an iso-settlement map to depict current topography versus previously surveyed grades. This was last performed in 2018. • Assist with the interpretation of rules and regulations, as requested. • Attend meetings with the City or regulatory agencies as requested.
The City may request Additional Services on an as-needed basis, subject to the City’s approval of a written scope of services and cost proposal. Work for Additional Services will not proceed until authorized in writing by the City. 257 of 833
EXHIBIT B
PAYMENT RATES
258 of 833
EXHIBIT C
INSURANCE REQUIREMENTS
MINIMUM SCOPE OF INSURANCE
Coverage shall be at least as broad as:
1. Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 12 07 covering CGL on an “occurrence” basis, including products-completed operations, personal & advertising injury, with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.
2. Automobile Liability: ISO Form Number CA 00 01 covering any auto (Code 1), or if CONSULTANT has no owned autos, hired, (Code 8) and non-owned autos (Code 9), with limit no less than $1,000,000 per accident for bodily injury and property damage.
3. Workers’ Compensation: as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.
4. Professional Liability (Errors and Omissions): Insurance appropriate to the CONSULTANT’s profession, with limit no less than $1,000,000 per occurrence or claim, $2,000,000 aggregate.
If the CONSULTANT maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the CONSULTANT.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status
The City, its elected and appointed officials, employees, and agents are to be covered as insureds on the auto policy for liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the CONSULTANT; and on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the CONSULTANT including materials, parts or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the CONSULTANT’s insurance (at least as broad as ISO Form CG 20 10, 11 85 or both CG 20 10 and CG 20 37 forms if later revisions used).
Primary Coverage
For any claims related to this contract, the CONSULTANT’s insurance coverage shall be primary insurance as respects the City, its elected and appointed officials, employees, and agents. Any insurance or self-insurance maintained by the City, its elected and appointed officials, employees, or agents shall be excess of the CONSULTANT’s insurance and shall not contribute with it.
Notice of Cancellation
Each insurance policy required above shall provide that coverage shall not be canceled, except after thirty (30) days’ prior written notice (10 days for non-payment) has been given to the City. 259 of 833
Waiver of Subrogation
CONSULTANT hereby grants to City a waiver of any right to subrogation which any insurer of said CONSULTANT may acquire against the City by virtue of the payment of any loss under such insurance.
CONSULTANT agrees to obtain any endorsement that may be necessary to effect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.
Deductibles and Self-Insured Retentions
Any deductibles or self-insured retentions must be declared to and approved by the City. The City may require the CONSULTANT to purchase coverage with a lower deductible or retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention.
Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City.
Verification of Coverage
CONSULTANT shall furnish the City with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the CONSULTANT’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. 260 of 833
CITY OF SAN MATEO
CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 15 Section Name: CONSENT CALENDAR Account Number: 10-4679 File ID: 26-11408 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: Public Works Department
MEETING DATE: July 20, 2026
SUBJECT:
Storm Drain Master Plan Update — Agreement
RECOMMENDATION:
Approve an agreement with Schaaf & Wheeler for the Storm Drain Master Plan Update in the amount not to exceed $129,770; establish a contingency reserve of $13,000; and authorize the Public Works Director to execute the agreement in substantially the form presented and issue amendments within the contingency reserve.
BACKGROUND:
In January 2024, staff issued a Request for Proposals (RFP) for the Storm Drain Master Plan update (SDMP Update), with two proposals submitted by qualified engineering consulting firms. After evaluating the proposals and interviewing the consultant teams, staff selected Schaaf & Wheeler (S&W) to provide services for the SDMP Update. Staff determined S&W was best qualified for this project due to their technical expertise and in-depth experience completing master plans for neighboring jurisdictions.
The approved scope of the SDMP Update included collection of bathymetric data of Marina Lagoon, performing an existing conditions assessment of key elements of the storm drain infrastructure, updating the hydrologic and hydraulic model of the City's stormwater, identifying capital improvement projects to address system deficiencies, and prioritizing the capital improvement projects based on a set of scoring factors.
Over the course of preparing the SDMP Update, the City identified additional scope items which were above and beyond the original scope of the SDMP Update. The additional scope items included additional pump station assessments, design of improvements at 2nd Avenue and Delaware Street, additional meetings with both City staff and external stakeholders (including OneShoreline, San Francisco Public Utilities Commission, and neighboring cities), advancement of six projects to 10% design for inclusion in future grant applications, and additional analysis to support as-needed tasks related to the SDMP Update following report finalization.
S&W’s agreement has expired; a new agreement is required to complete the additional tasks for the SDMP Update. The scope of work in this agreement continues work from the previous agreement (e.g., updating and finalizing the SDMP Update report) and includes the additional scope items (e.g., additional pump station assessments, design of improvements at 2nd Avenue and Delaware Street, etc.). Based on the above, staff recommends approval of this agreement and associated contingency reserve for any potential unforeseen issues.
BUDGET IMPACT:
Currently, there is sufficient budget in the Stormwater System Management and Improvement Program (46W002) to 261 of 833
CITY OF SAN MATEO
accommodate the additional budget and scope.
ENVIRONMENTAL DETERMINATION:
This Project is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b)(5).) STRATEGIC PLAN ALIGNMENT:
This staff report support the Infrastructure initiative.
NOTICE PROVIDED
All meeting noticing requirements were met.
ATTACHMENTS
Att 1 – Agreement
STAFF CONTACT
James Yang, Senior Engineer
[email protected]
(650) 522-7575
262 of 833
Design Professional Services 2024 Page 1 of 12
Rev 4/26
AGREEMENT WITH SCHAAF & WHEELER CONSULTING CIVIL ENGINEERS
FOR DESIGN PROFESSIONAL SERVICES FOR STORMWATER MASTER PLAN UPDATE This Agreement, made and entered into this day of ____________________, by and between the CITY OF SAN MATEO, a municipal corporation existing under the laws of the State of California (“CITY”), and SCHAAF & WHEELER CONSULTING CIVIL ENGINEERS, a corporation, (“CONSULTANT”), whose address is 4699 Old Ironsides Dr., Suite 350, Santa Clara, California 95054:
RECITALS:
A. CITY desires certain stormwater master planning services hereinafter described.
B. CITY desires to engage CONSULTANT to provide these stormwater master planning services by reason of its qualifications and experience for performing such services and CONSULTANT has offered to provide the required services on the terms and in the manner set forth herein.
NOW, THEREFORE, IT IS AGREED as follows:
SECTION 1 - SCOPE OF SERVICES
The scope of services to be performed by CONSULTANT under this Agreement is as described in Exhibit A to this Agreement, attached and incorporated by reference.
SECTION 2 - DUTIES OF CONSULTANT
CONSULTANT shall be responsible for the professional quality, technical accuracy and coordination of all work furnished by CONSULTANT under this Agreement. CONSULTANT shall, without additional compensation, correct or revise any errors or deficiencies in its work.
CONSULTANT represents that it is qualified to furnish the services described under this Agreement.
CONSULTANT shall be responsible for employing or engaging all persons necessary to perform the services of CONSULTANT.
CONSULTANT agrees to comply with the City’s minimum wage ordinance as codified in Municipal Code Chapter 5.92, which differs from the state minimum wage and includes a Consumer Price Index escalator.
SECTION 3 - DUTIES OF CITY
CITY shall provide pertinent information regarding its requirements for the project.
CITY shall examine documents submitted by CONSULTANT and shall render decisions pertaining thereto promptly, to avoid unreasonable delay in the progress of CONSULTANT's work. 263 of 833
Design Professional Services 2024 Page 2 of 12
Rev 4/26
SECTION 4 - TERM
The services to be performed under this Agreement shall commence on upon execution of this agreement and be completed on June 30, 2027. The term of this Agreement may be extended by written amendment executed by the Director of Public Works and a duly authorized representative of CONSULTANT.
SECTION 5 - PAYMENT
Payment shall be made by CITY only for services rendered and upon submission of a payment request upon completion and CITY approval of the work performed. In consideration for the full performance of the services set forth in Exhibit A, CITY agrees to pay CONSULTANT a fee in an amount of $129,770, pursuant to rates stated in Exhibit B to this Agreement, attached and incorporated by reference.
Cost adjustment for the second and subsequent year’s annual fixed amounts will be made using annual indexes of the “Consumer Price Index for All Urban Consumers,” Bay Area City Average, all items (1967=100) as published in the Monthly Review by the U.S. Department of Labor, (CPI). The annual increase in rates is not to exceed CPI or 3%, whichever is lower.
SECTION 6 - TERMINATION
Without limitation to such rights or remedies as CITY shall otherwise have by law, CITY shall have the right to terminate this Agreement or suspend work on the Project for any reason, upon ten (10) days' written notice to CONSULTANT. CONSULTANT agrees to cease all work under this Agreement upon receipt of said written notice.
Upon termination and upon CITY's payment of the amount required to be paid, documents become the property of CITY, and CONSULTANT shall transfer them to CITY upon request without additional compensation.
SECTION 7 - OWNERSHIP OF DOCUMENTS
All documents prepared by CONSULTANT in the performance of this Agreement, although instruments of professional service, are and shall be the property of CITY, whether the project for which they are made is executed or not.
SECTION 8 - CONFIDENTIALITY
All reports and documents prepared by CONSULTANT in connection with the performance of this Agreement are confidential until released by CITY to the public. CONSULTANT shall not make any such documents or information available to any individual or organization not employed by CONSULTANT or CITY without the written consent of CITY before any such release. 264 of 833
Design Professional Services 2024 Page 3 of 12
Rev 4/26
SECTION 9 - INTEREST OF CONSULTANT
CONSULTANT covenants that it presently has no interest, and shall not acquire any interest, direct or indirect, financial or otherwise, which would conflict in any manner or degree with the performance of the services under this Agreement.
SECTION 10 - CONSULTANT'S STATUS
It is expressly agreed that in the performance of the professional services required under this Agreement, CONSULTANT shall at all times be considered an independent CONSULTANT as defined in Labor Code Section 3353, under control of the CITY as to the result of the work but not the means by which the result is accomplished. Nothing herein shall be construed to make CONSULTANT an agent or employee of CITY while providing services under this Agreement.
SECTION 11 - INDEMNITY
Indemnity for Design Professional Services.
CONSULTANT agrees to hold harmless and indemnify CITY, its elected and appointed officials, employees, and agents from and against any and all claims, loss, liability, damage, and expense arising out of CONSULTANT’s negligence, recklessness or willful misconduct in the performance of its design professional services under this Agreement. To the maximum extent permitted by law and Civil Code section 2782.8, CONSULTANT agrees to defend CITY, its elected and appointed officials, employees, and agents against any such claims.
Indemnity for Activities Other Than Design Professional Services.
CONSULTANT agrees to hold harmless and indemnify CITY, its elected and appointed officials, employees, and agents from and against any and all claims, loss, liability, damage, and expense arising out of CONSULTANT’s performance of non-design professional services under this Agreement, except for those claims arising out of CITY’s sole negligence or willful misconduct. CONSULTANT agrees to defend City, its elected and appointed officials, employees, and agents against any such claims.
The CONSULTANT’S duty to indemnify shall survive expiration or early termination of this Agreement.
SECTION 12 - INSURANCE
CONSULTANT shall procure and maintain for the duration of the contract and three years thereafter (five years for building or major improvements) the insurance specified in Exhibit C to this Agreement.
265 of 833
Design Professional Services 2024 Page 4 of 12
Rev 4/26
SECTION 13 - NONASSIGNABILITY
Both parties hereto recognize that this Agreement is for the personal services of CONSULTANT and cannot be transferred, assigned, or subcontracted by CONSULTANT without the prior written consent of CITY.
SECTION 14 - RELIANCE UPON PROFESSIONAL
SKILL OF CONSULTANT
It is mutually understood and agreed by and between the parties hereto that CONSULTANT is skilled in the professional calling necessary to perform the work agreed to be done under this Agreement and that CITY relies upon the skill of CONSULTANT to do and perform the work the work consistent with the professional skill and care ordinarily provided CONSULTANTS practicing at the same time in the same or similar locale under the same or similar circumstances and CONSULTANT agrees to thus perform the work. The acceptance of CONSULTANT's work by CITY does not operate as a release of CONSULTANT from said obligation.
SECTION 15 - WAIVERS
The waiver by either party of any breach or violation of any term, covenant, or condition of this Agreement or of any provisions of any ordinance or law shall not be deemed to be a waiver of such term, covenant, condition, ordinance or law or of any subsequent breach or violation of the same or of any other term, condition, ordinance, or law. The subsequent acceptance by either party of any fee or other money which may become due hereunder shall not be deemed to be a waiver of any preceding breach or violation by the other party of any term, covenant, or condition of this Agreement or of any applicable law or ordinance.
SECTION 16 – SEVERABILITY
If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect.
SECTION 17 - COSTS AND ATTORNEY FEES
Attorney fees in total amount not exceeding $5000, shall be recoverable as costs (by the filing of a cost bill) by the prevailing party in any action or actions to enforce the provisions of this Agreement. The above $5000 limit is the total of attorney fees recoverable whether in the trial court, appellate court, or otherwise, and regardless of the number of attorneys, trials, appeals, or actions. It is the intent of this Agreement that neither party shall have to pay the other more than $5000 for attorney fees arising out of an action, or actions to enforce the provisions of this Agreement. 266 of 833
Design Professional Services 2024 Page 5 of 12
Rev 4/26
SECTION 18 - NON-DISCRIMINATION
CONSULTANT warrants that it is an Equal Opportunity Employer and shall comply with applicable regulations governing equal employment opportunity. Neither CONSULTANT nor any of its sub-consultants shall discriminate in the employment of any person because of race, color, national origin, ancestry, physical handicap, medical condition, marital status, sex, or age, unless based upon a bona fide occupational qualification pursuant to the California Fair Employment and Housing Act.
SECTION 19 - MEDIATION
Should any dispute arise out of this Agreement, any party may request that it be submitted to mediation. The parties shall meet in mediation within 30 days of a request. The mediator shall be agreed to by the mediating parties; in the absence of an agreement, the parties shall each submit one name from mediators listed by either the American Arbitration Association, the State Mediation and Conciliation Service, or other agreed-upon service. The mediator shall be selected by a blind draw.
The cost of mediation shall be borne equally by the parties. Neither party shall be deemed the prevailing party. No party shall be permitted to file a legal action without first meeting in mediation and making a good faith attempt to reach a mediated settlement. The mediation process, once commenced by a meeting with the mediator, shall last until agreement is reached by the parties but not more than 60 days, unless the maximum time is extended by the parties.
SECTION 20 - LITIGATION
CONSULTANT shall testify at CITY's request if litigation is brought against CITY in connection with CONSULTANT's services under this Agreement. Unless the action is brought by CONSULTANT, or is based upon CONSULTANT's wrongdoing, CITY shall compensate CONSULTANT for preparation for testimony, testimony, and travel at CONSULTANT's standard hourly rates at the time of actual testimony.
SECTION 21 - NOTICES
All notices hereunder shall be given in writing and mailed, postage prepaid, addressed as follows:
To CITY: Jimmy Vo
City of San Mateo
330 W 20th Ave
San Mateo, CA 94403
To CONSULTANT: Schaaf & Wheeler Consulting Civil
Engineers
Attn: Chuck Anderson
4699 Old Ironsides Dr., Suite 350
Santa Clara, CA 95054
267 of 833
Design Professional Services 2024 Page 6 of 12
Rev 4/26
SECTION 22 - AGREEMENT CONTAINS ALL
UNDERSTANDINGS; AMENDMENT
This document represents the entire and integrated agreement between CITY and CONSULTANT and supersedes all prior negotiations, representations, and agreements, either written or oral.
This document may be amended only by written instrument, signed by both CITY and CONSULTANT.
SECTION 23 - AUTHORITY TO ENTER INTO AGREEMENT
CONSULTANT has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and to bind each respective party.
SECTION 24 - GOVERNING LAW AND VENUE
This Agreement shall be governed by the laws of the State of California and, in the event of litigation, venue will be in the County of San Mateo.
[SIGNATURE PAGE FOLLOWS]
268 of 833
Design Professional Services 2024 Page 7 of 12
Rev 4/26
IN WITNESS WHEREOF, CITY and CONSULTANT have executed this Agreement the day and year first above written.
CITY OF SAN MATEO CONSULTANT
Alex Khojikian
City Manager
Date Charles D. Anderson
Its Authorized Agent
President
If a Corporation, can be either 1)
President or 2) Vice President plus
an additional corporate officer
(i.e., Secretary, Treasurer) who
shall sign below.
Date
APPROVED AS TO FORM
Linh Nguyen
Assistant City Attorney
Date
Attachments:
Exhibit A: Scope of Services
Exhibit B: Payment Rates
Exhibit C: Insurance Requirements
269 of 833
Design Professional Services 2024 Page 8 of 12
Rev 4/26
EXHIBIT A
SCOPE OF SERVICES
Task 1: Project Management
This task includes additional coordination with City staff and other stakeholders to advance the work, management strategies, budgeting, invoicing, schedule tracking and quality control. Specific tasks include:
▪ Project status meetings
▪ Project schedules and updates
▪ Monthly billing and reporting
Task 2: Develop Draft and Final Stormwater Master Plan Update Documents The Stormwater Master Plan documents will summarize the existing storm system, outline the system’s current performance, detail areas currently subject to flooding, list and prioritize improvement projects, include a cost estimate for all improvements, and summarize all technical methodologies and model results. The report will include both the operations needs and the condition assessment needs. A draft schedule of CIPs and a funding strategy will be included.
Consultant will submit a Draft Stormwater Master Plan to the City for their review prior to hosting a meeting with the City to review comments and record feedback. This meeting may need to be broken into sessions to ensure critical staff can attend.
The City will provide one consolidated list of comments to Consultant, who will address said comments and finalize the Stormwater Master Plan document. Consultant will also provide a signed and stamped Final Engineer’s Report for use in financial program analysis if requested.
In addition, the Final Stormwater Master Plan will define the purpose, scope, and limitations of the update, and it will include a list of all supporting material. The Stormwater Master Plan update shall incorporate the technical memos developed under preceding tasks into the master plan document text.
Consultant will present summaries of findings at one Council meeting and four (4) community meetings and/or workshops.
Task 2: Deliverables:
▪ Draft and Final Stormwater Master Plan
▪ Council and community meeting/workshop materials.
Task 3: Pump Station Assessments
Each of the 10 stormwater pump stations will be visited by the project team, along with City operations staff. The team will perform a detailed evaluation of the effectiveness and capacity of the current stormwater pump stations and develop future improvements, including recommended replacement intervals. Climate change analysis will also be performed. A draft list of detailed prioritized CIPs will be developed and discussed with City staff. Cost estimates for each CIP will be developed. A final pump station assessment section of the master plan will be developed. Pump CIPs will be integrated with the overall master plan prioritization.
Task 4: 2nd and Delaware Construction Design
Construction develop documents for drainage improvements at 2nd Avenue and Delaware Street will be developed. This intersection has experienced repetitive drainage issues during recent winters. Work 270 of 833
Design Professional Services 2024 Page 9 of 12
Rev 4/26
includes 65%, 95%, and a final bid set. Review meetings for each set is included. Bid and construction support, including responding to RFIs, is limited to 32 hours.
Task 5: 10 Percent Designs
10 percent design drawings and cost estimates for up to five (5) high priority projects will be developed.
These documents will help the City prioritize and schedule storm drainage CIPs for the next few years.
Each set of drawings will include plan view layouts with known utility locations, and a cost estimate.
Response to one set of review comments is included. The follow is a list of proposed projects. • 4000 Pacific Pump Station Upgrades
• 4000 Pacific Piping Upgrades
• Grant at Sunnybrae
• Norton Street
• 42nd Ave and Bettina
Task 6: Additional Analysis
Additional analysis may be required to perform tasks such as development of 10 percent designs of additional projects, provide support for grant applications, and other unforeseen tasks. This Task is established to address those items related to the Stormwater Master Plan Update following finalization of the report.
271 of 833
Design Professional Services 2024 Page 10 of 12
Rev 4/26
EXHIBIT B
PAYMENT RATES
272 of 833
Design Professional Services 2024 Page 11 of 12
Rev 4/26
EXHIBIT C
INSURANCE REQUIREMENTS
MINIMUM SCOPE OF INSURANCE
Coverage shall be at least as broad as:
1. Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 12 07 covering CGL on an “occurrence” basis, including products-completed operations, personal & advertising injury, with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.
2. Automobile Liability: ISO Form Number CA 00 01 covering any auto (Code 1), or if CONSULTANT has no owned autos, hired, (Code 8) and non-owned autos (Code 9), with limit no less than $1,000,000 per accident for bodily injury and property damage.
3. Workers’ Compensation: as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.
4. Professional Liability (Errors and Omissions): Insurance appropriate to the CONSULTANT’s profession, with limit no less than $1,000,000 per occurrence or claim, $2,000,000 aggregate If the CONSULTANT maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the CONSULTANT.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status
The City, its elected and appointed officials, employees, volunteers, and agents are to be covered as insureds on the auto policy for liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the CONSULTANT; and on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the CONSULTANT including materials, parts or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the CONSULTANT’s insurance (at least as broad as ISO Form CG 20 10, 11 85 or both CG 20 10 and CG 20 37 forms if later revisions used).
Primary Coverage
For any claims related to this contract, the CONSULTANT’s insurance coverage shall be primary insurance as respects the City, its elected and appointed officials, employees, volunteers, and agents.
Any insurance or self-insurance maintained by the City, its elected and appointed officials, employees, volunteers, or agents shall be excess of the CONSULTANT’s insurance and shall not contribute with it.
Notice of Cancellation
Each insurance policy required above shall provide that coverage shall not be canceled, except after thirty (30) days’ prior written notice (10 days for non-payment) has been given to the City. If a Notice 273 of 833
Design Professional Services 2024 Page 12 of 12
Rev 4/26
of Cancellation endorsement is not available, CONSULTANT shall ensure the requisite Notice of Cancellation is specified in the Certificate of Insurance. In the event the Notice of Cancellation is not specified in the Certificate of Insurance, Consultant shall be responsible for providing the City the requisite notice as specified in this Exhibit C.
Waiver of Subrogation
CONSULTANT hereby grants to City a waiver of any right to subrogation which any insurer of said CONSULTANT may acquire against the City by virtue of the payment of any loss under such insurance.
CONSULTANT agrees to obtain any endorsement that may be necessary to effect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.
Deductibles and Self-Insured Retentions
Any deductibles or self-insured retentions must be declared to and approved by the City. The City may require the CONSULTANT to purchase coverage with a lower deductible or retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention.
Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City.
Verification of Coverage
CONSULTANT shall furnish the City with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the CONSULTANT’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. 274 of 833
CITY OF SAN MATEO
CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 16 Section Name: CONSENT CALENDAR Account Number: 10-6661 File ID: 26-11431 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: Library Department
MEETING DATE: July 20, 2026
SUBJECT:
San Mateo Public Library Main Branch Cafe Operating Lease — Agreement RECOMMENDATION:
Approve a Property Lease and Operating Agreement with Henok Getahun for operation of the PLUR Cafe at the Main Library Branch for two years commencing on July 22, 2026, through July 21, 2028, in accordance with Municipal Code Section 3.62.030(b); and authorize its execution by the City Librarian.
BACKGROUND:
When the new Main Library opened in 2006, a cafe space was included on the third floor in response to public feedback gathered during meetings held to inform the design of the new library building. Between 2006 and 2015, two vendors operated cafe establishments in the space. The first exercised their option to terminate their lease in 2008, and the second operated from 2008 until 2015, at which point their lease was not renewed by the City. Due to a strong desire on the part of the public and staff to maintain a cafe presence, the Library issued a third Request for Proposals (RFP) for cafe operation in February 2016. At the conclusion of the selection process, Rafat Haddad of 3 Bees Coffee was selected as the new cafe operator. Mr. Haddad operated the cafe at the Main Library from 2016 until December 2022, when he exercised his option to terminate the lease. The public continued to express a strong desire for a coffee shop, and in February 2026, the Library launched a fourth RFP for cafe operation.
Two vendors submitted proposals and participated in the selection process, which identified Mr. Henok Getahun as the new cafe operator. Mr. Getahun has operated three cafe locations, including cafes in hospitals and local government buildings throughout Santa Clara County, over the past five years. His business has earned a strong reputation, and Mr.
Getahun has demonstrated a commitment to providing high-quality products and excellent customer service, which he will bring to the Library. The City now wishes to enter into a lease agreement with Mr. Getahun from July 22, 2026, through July 21, 2028.
BUDGET IMPACT:
The City receives 10% of gross sales for months in which the gross sales exceed $10,000. Rent is waived if the gross sales do not exceed $10,000 to support the sustainability of the cafe service in the Library. The estimated annual revenue to the City will be within the range of $6,000 - $12,000.
ENVIRONMENTAL DETERMINATION:
This Lease Agreement is categorically exempt from CEQA as an “existing facility,” because it consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of existing or former use. (CEQA Guidelines Section
15301.)
275 of 833
CITY OF SAN MATEO
STRATEGIC PLAN ALIGNMENT
This staff report supports the Infrastructure initiative.
NOTICE PROVIDED
All meeting noticing requirements were met.
ATTACHMENTS
Att 1 – Lease Agreement
STAFF CONTACT
Marcia Mendonca, Senior Management Analyst
[email protected]
(650) 522-7805
276 of 833
1 COMMERCIAL PROPERTY LEASE AGREEMENT
BETWEEN THE CITY OF SAN MATEO AND
HENOK GETAHUN FOR THE PLUR CAFE OPERATION
This lease ("Lease") is made and entered into this ___ day of _____, 2026, by and between the City of San Mateo ("City"), San Mateo, California, a municipal corporation, and Henok Getahun, ("Lessee"), collectively the "Parties."
RECITALS
A. The San Mateo Public Library includes a Cafe space.
B. City desires to lease the operation of the Cafe to Lessee and, Lessee desires to lease the Cafe space from the City.
C. The Parties have specified terms and conditions under which the Cafe located in the library facility shall be leased and operated as follows.
Lessee and City agree as follows:
AGREEMENT
1. PREMISES
City hereby Leases to Lessee, and Lessee leases from City, certain real property located in the City of San Mateo, County of San Mateo, State of California, commonly known as the Cafe located at 55 West Third Avenue, San Mateo, California 94403 (the “Premises") and more particularly described in Exhibit A attached hereto and incorporated herein by reference. The Premises consists of a Public Cafe area 8' x 14' (112 sq. ft.) with a fully constructed Cafe, which includes the Cafe structure itself, a refrigerated display case, back-bar refrigerator, sink, floor drain and consumer condiment area and menu board; and a Commissary Room, 10' x 8'6" (85 sq. ft) for food preparation and distribution that includes a three compartment sink, 6' x 3' x 1' open steel shelving, 2' x 4' stainless steel prep table, glass door refrigerator and a floor drain. City shall provide tables and chairs for a seating area and patio for Lessee's and City Library's use. Lessee will provide all required additional fixtures and equipment necessary to operate the Cafe, including, but not limited to: all coffee making supplies and equipment, and all other related furnishings and supplies; all of which shall meet with the City's design approval. An inventory of Fixtures and Equipment is set forth in Exhibit D, which is attached and incorporated by reference.
2. TERM
2.1 Initial Term of Lease. The initial term of this Lease is for a period of two (2) years, commencing on the 22nd day of July 2026 and terminating on the 21st day of July 2028. Lessee shall, at the expiration of the term of this Lease, or upon its earlier termination, surrender the Premises in its original condition, excepting reasonable wear and tear.
2.2 Renewal. If during the initial term of this Lease, LESSEE has performed to the City's satisfaction, the CITY shall have the option, if it determines in its sole discretion that LESSEE has satisfied 277 of 833
2 both the performance criteria and the terms of this Lease, to renew this Lease for two (2) additional two (2) year periods.
2.2.1 CITY and LESSEE shall execute an amendment to this Lease reflecting the extension, which shall be executed prior to the expiration of the prior term.
3. RENT
3.1 Base Rent. Monthly rent payments will be due for months in which the gross sales exceed $10,000. The rent to be paid by Lessee shall be in the amount of 10% of gross sales paid on a monthly basis and due 31 days after the expiration of each month and shall be paid to: San Mateo Public Library, 55 West Third Avenue, San Mateo, CA 94402. Attn: Library Administrative Office.
3.2 Gross Sales Report. Lessee shall provide a verifiable gross sales report including separate totals for Cafe and Catering sales on a monthly basis which shall be due with the monthly rent. "Gross Sales" means consideration of any kind including cash receipts, credits, reimbursements, rebates, bartered goods and services from all sources generated at the Premises, including, but not limited to: all receipts from retail sales; all proceeds from the sale of food and drink; catering proceeds; and the actual payments received by Lessee in connection with any advertising. Gross Sales shall not include the following: (i) any tax, fee, assessment or charge collected as payment to any Governmental Authority, whether imposed by present or future federal, state or local law, (iii) any proceeds of the sale of Lessee's furnishing , fixtures and equipment; (v) returns of merchandise by Lessee to manufacturers or shippers for credit, (vi) sums and credits received in settlement of claims for loss of or damage to merchandise.
3.3 Records and Audits.
3.3.1 Records. Lessee shall install one or more cash registers of a type approved by City, which shall be equipped with a scaled cumulative totaling device and a daily dated continuous, non-reversible duplicate tape on which all Gross Sales shall be recorded and imprinted. Lessee shall maintain and make available within five (5) days, true, accurate and complete books, records and accounts of all Gross Sales, including (i) true copies of any sales and other excise tax report; (ii) Federal and State Tax returns; (iii) sales slips and checks; (iv) bank records; (v) cash register tapes; and (vi) sales journals, books of account, general ledgers and purchase journals. Such books, records and accounts shall be maintained in such manner, and include such records, as would be required by a certified public accountant to perform an audit to determine or produce an audited statement of Gross Sales. Lessee shall keep accurate records of all Gross Sales in accordance with recognized accepted standard accounting practices. Lessee shall make available for review by City an itemized statement of Gross Sales for each Lease Year.
3.3.2 Audits. Once every 12 months City may perform an audit of Lessee's Gross Sales records for the Premises. City shall provide 20 days advance written notice of such audit. All audits shall be performed during City's usual business hours and without interference with the conduct of business at the place where the audit is made. City shall provide Lessee with a copy of the audit. If the audit reveals that Gross Sales were under reported by more than five percent in Lessee's annual Gross Sales statement, then 278 of 833
3 Lessee shall pay to City the reasonable cost of such audit; otherwise, City shall pay all cost of such audit. In addition, Lessee shall immediately pay to City any additional Percentage Rent owed based on the audited Gross Sales figure. City's audit shall be conclusive and binding upon Lessee unless, within 30 days after receipt of the audit, Lessee shall notify City in writing that it disputes the findings of City's audit. If such dispute shall not be settled by written agreement within 30 days after Lessee's notice of dispute is received by City, then City and Lessee shall select an independent certified public accountant licensed to practice in California and qualified to mediate the disagreement. If the dispute is determined in City's favor, Lessee shall forthwith pay an additional Percentage Rent due to City. Until said final determination is made, Lessee need not make any disputed Percentage Rent payments to Landlord; however, Lessee shall pay City all undisputed amounts when due, including interest. The Lessee's monthly, quarterly and annual statement of Gross Sales and any audit thereof shall be treated as confidential to the extent permitted by the state Public Records Act.
3.4 Late Charge. Lessee acknowledges that late payment by Lessee to City of rent will cause City to incur costs not contemplated by this Lease, the exact amount of such costs being extremely difficult and impracticable to fix. Such costs include, without limitation, processing, accounting and late charges that may be imposed on City. Therefore, if City does not receive any installment of rent due from Lessee within fifteen days after the due date, Lessee shall pay to City an additional sum of ten percent (10%) of the overdue rent as a late charge. The Parties agree this late charge represents a fair and reasonable estimate of the costs City will incur by reason of late payment by Lessee. Acceptance of any late charge shall not constitute a waiver of Lessee's default with respect to the overdue amount, nor prevent City from exercising any of its other rights and remedies.
3.5 Security Deposit. Lessee shall provide City with a $2,000 security deposit at the time of lease execution. Should Lessee fail to proceed with the lease based upon Lessee's own default after lease execution, then no part of the deposit shall be refunded. Upon opening for business, $1,000 of the security deposit shall be refunded to Lessee.
3.6. Failure. Rental payments and all other charges or obligations not paid within 10 days after the date due shall bear a late charge as described above. In addition, on all amounts unpaid for more than 30 days from the due date, interest shall accrue from the due date until it is received at the rate of one and one-half percent (1 1/2 %) per month. Failure by Lessee to pay rent or charges when due, or to comply with any other condition, shall terminate this Lease at the option of City. In such event, upon written notice to quit or surrender the Premises, City may enter and retain possession of the Premises, exclude Lessee, and re-let the Premises. Should City enter the Premises as stated, Lessee shall be held liable as follows:
3.6.1 For all installments of rent and other charges when the Premises remain vacant, for the remainder of the term of the Lease. Such installments and charges shall be payable as they become due.
3.6.2 For all expenses which City may incur for re-letting the Premises. 279 of 833
4 3.6.3 For any deficiency in the installments on any Lease, or Leases, made by City for Lessee of the Premises during the term of this Lease. Any deficiency in installments shall be paid as it falls due.
4. USE
4.1 Permitted Uses. Premises will be used for a Cafe featuring fresh brewed coffee, specialty coffee, tea, non-alcoholic beverages, pre-made sandwiches and salads, baked goods and fresh fruit. Special attention should be given to including healthy menu items as recommended by the President's Council on Fitness, Sports and Nutrition (fitness.gov). Lessee shall make its best effort to provide foods prepared as freshly as possible and whenever possible prepared fresh daily. Lessee will provide City with a main menu for City's written approval. Lessee may vary menu to include daily specials.
4.2 Prohibited Uses. Lessee shall not: use Premises for any purpose not expressly permitted in this Lease; create, cause, maintain or permit any nuisance or waste in, on or about the Premises or permit or allow the Premises to be used for any unlawful or immoral purpose; do or permit to be done anything in any manner which unreasonably disturbs Library users, including causing any unreasonable odors or noise to emanate from the Premises; use Premises in a manner that increases the risk of fire, cost of fire insurance or improvements thereon; place any sign or placard in or on the Premises without City's prior written approval; store any bicycles or other means of transportation anywhere on the Premises; utilize the Premises for any offsite catering unrelated to the City, unless the food is to be served at a City function and at a City facility; install new locks on any doors (but may request a change of locks from the City); use the image of the Premises, the name of City or any other identifying sign or symbol associated with the Premises or City to undertake any action or representation other than those specifically assigned to Lessee under this Lease, without City's prior written approval; remodel or make any interior renovation or any major changes to the Premises or remove any objects, which are not the property of Lessee without the prior written consent of City; sell, dispense or allow alcohol to be consumed on the Premises.
5. DUTIES OF LESSEE
5.1 Management of Cafe. Lessee shall manage the Cafe and all operations therein.
5.2 Hours of Operation. The Cafe shall operate during Library hours, and must be open every day the Library is open. The lessee will determine a set Cafe operating schedule that will be subject to Library approval. The Library's hours of operation are as follows:
10AM-8PM - Monday-Thursday
10AM-5PM - Friday and Saturday
11AM-5PM - Sunday
The Cafe will close at such times as the library is not open to the public. Any changes to the hours shall be subject to prior Library approval , which shall not be unreasonably withheld. 280 of 833
5 5.3 Maintenance. Lessee shall protect and maintain the Premises. Lessee shall assume responsibility for the guarding and safekeeping of all of the City property located at the Premises.
5.4 Rules. Lessee will abide by the rules of operational conduct that are consistent with Library operational procedures as provided in Exhibit C, attached hereto and incorporated by reference.
5.5 Use of Cafe Space. Lessee shall use the Cafe space and Commissary Room for food preparation and the Cafe space for food consumption or sale. Any changes to Cafe space are subject to City's prior written approval.
5.6 Cafe Name. The name of the cafe shall be the choice of the Lessee subject to approval by the City, which shall not be unreasonably withheld.
5.7 Lessee shall hire an adequate number of persons in order to provide food services in a prompt and timely manner under this Lease and agrees to comply with the City’s minimum wage ordinance as codified in Municipal Code Chapter 5.92, which differs from the state minimum wage and includes a Consumer Price Index escalator.
5.8 Payment of Lessee's Employees; Status of Lessee. Lessee shall pay all persons hired as required by law including but not limited to income tax withholding and social security payments. Neither Lessee nor any employee of Lessee shall be considered an employee of City and nothing herein shall be construed to make Lessee or Lessee's employee(s) and agent or employee of City while operating under this Lease.
5.9 Price of Food. All food sold shall be sold at reasonable prices as determined by Lessee, and in consultation with the City. In no instance shall food prices exceed those charged by comparable, retail non-subsidized coffee vendors.
5.10 Quality of Food. All food and presentation shall be high quality and comparable to or exceeding that of other retail, non-subsidized Cafes. Food shall meet or exceed the following standards:
5.10.1 Coffee should be ground on demand from whole beans from a quality roaster, competitive in quality with the best roasters in the Bay Area for a balance of flavor, body, aroma and acidity. Beans for espresso should be appropriate for industryrecognized professional espresso use.
5.10.2 Retail whole bean coffee should be valve packaged and should be sold within two months.
5.10.3 Opened packages of coffee beans should be used within 10 days.
5.10.4 Butter, milk, and milk products shall be USDA Grade "A" and kept refrigerated.
5.10.5 Pastries and all baked goods shall be fresh daily from a quality bakery. Whole fruit should be fresh, clean and attractively displayed.
281 of 833
6 5.10.6 Pre-prepared and/or packaged foods shall display an expiration and/or packaging date, and in no instance shall such foods be offered for sale after the stated expiration date.
5.11 Cleanliness of Premises. The highest standard of cleanliness and sanitation on the Premises and in the course of food preparation shall be maintained without exception. Display cases shall be clean and free of crumbs and signage and menu boards shall be professional in appearance.
5.12 Cross Contamination. Every effort shall be made to avoid cross contamination of foods and food borne illness. Employees with any communicable disease shall not work in areas where contamination can occur. Lessee shall maintain at least one employee trained in the avoidance of cross contamination as required by law. Lessee shall maintain and prepare food in a manner and at appropriate temperatures that meet or exceed County Health or other relevant food preparation and storage guidelines.
5.13 Refrigeration. Lessee shall monitor refrigerators and freezers and periodically, no less than once per week measure the temperature within each refrigerator or freezer to determine if appropriate temperatures are being maintained. Lessee shall adjust all refrigerators and freezers to maintain adequate temperature. In the event that any refrigerator or freezer cannot maintain an adequate temperature level, the City shall be informed immediately, and the unit shall be taken out of service.
5.14 Equipment Maintenance. Lessee shall clean all equipment daily and perform routine maintenance upon all City and Lessee equipment. Lessee shall inform City within 24-hours of discovering any broken or malfunctioning equipment.
5.15 Equipment Repair and Replacement. If any equipment furnished by the City, listed in Section 1, Premises, fails to operate properly, Lessee shall notify City and attempt to have the equipment repaired. The cost to repair the equipment shall be paid by the City except for the repair to equipment caused by any act, omission or negligence of Lessee or its responsible employees, agents, or sub-Lessees, in which case the Lessee shall be solely responsible for the cost of repair.
5.16 Refuse. Lessee shall properly and promptly place all garbage, refuse, compostables and recyclables in the appropriate containers.
5.17 Uniforms/Clothing. Lessee and all employees shall wear clean, professional, and safe clothing at all times.
5.18 Quality of Service. The Library has high standards for excellent customer service and it is expected that service from all Cafe staff should be timely, attentive, courteous and friendly.
5.19 Service to All. Every Cafe patron shall be served without regard to race, gender or ethnicity.
5.20 Custodial Services. Lessee will provide basic custodial services for the Cafe and interior and exterior tables, chairs, and floor of the Premises. Lessee shall be responsible for all clean-up relating to its business. Tables shall be clean and cleared at all times when not in use. Spills on floors and tables in Cafe area and Terrace shall be cleaned when they occur. 282 of 833
7 5.21 Failure to Comply. Failure to comply with any of the Duties can result in a fine of $50 per violation if such violations persist, or continue to occur within seven (7) days of receiving a written notice ("Failure to Comply Notice") of such violation from the City. Should a violation persist, or similar violations continue to occur after written notice of a Failure to Comply has been issued, then Lessee shall be deemed in Default.
6. CITY'S DUTIES
6.1 Vendor is Exclusive Food Provider. Lessee has the exclusive right and privilege to operate the Cafe within San Mateo Main Library and to sell and dispense food within the Premises.
Notwithstanding this right, City may: install or place vending machines in staff areas; and to contract for or allow third parties to contract for catering to be conducted in any part of the San Mateo Public library. City will not promote the usage of other caterers or food operators and will include Lessee's catering menu in City's marketing information as it relates to renting the conference facilities or renting or using the Library where food and beverages will be served.
City will not allow other vendors to sell food or beverage on site, except in the event of a 'user' who rents or otherwise is allowed to use conference room facilities.
6.2 Utilities. City is responsible for the following utilities associated with the operation of the Premises: water, sewer, electricity, garbage pickup and disposal.
6.3 Telephone Expenses. A telephone jack will be installed in the Cafe area. Vendor is responsible for hook-up and ongoing line charges.
6.4 Computer Expenses. The City will not set up or manage the computer/network system for the Lessee. The Lessee will be responsible for all computer hardware/software acquisition, installation, maintenance and removal.
6.5 Repairs. City shall have no obligation to repair and maintain the Premises or its Improvements and facilities, except that City will maintain and repair supporting structural, water, plumbing and power which supplies the operation of the Premises and is responsible for actual damage to equipment or loss of supplies. Lessee expressly waives the benefit of any statute now or hereinafter in effect, which would otherwise afford Lessee the right to make repairs at City's expense or to terminate this Lease because of City's failure to keep Premises in good order, condition and repair.
7. CITY'S ACCESS
7.1 Access for Inspection. City and City's agents may enter the Premises at reasonable times, upon not less than 48 hours prior written notice to Lessee, to inspect it, show it to prospective lessees, and make such alterations, repairs, improvements or additions to the Premises as City may deem necessary provided, however, that all such work shall be done promptly and entries shall cause as little interference to Lessee as possible. City may at any time during the last 120 days of the term place on or about the Premises any ordinary "For Lease" signs, all without rebate of rent or liability to Lessee.
7.2 No Warranty. Neither the City nor any employees or agents of the City have made any oral or written warranties or representations to Lessee relative to the condition or use by Lessee of said 283 of 833
8 Premises and Lessee acknowledges that Lessee assumes all responsibility regarding Occupational Safety and Health Act compliance, the legal use and adaptability of the Premises and compliance with all applicable laws and regulations.
7.3 Security Measures. City may require Lessee to install and use a reasonable security system, device, operation or plan to protect the Premises. Should City, in its sole discretion, require Lessee to install such a security system, Lessee agrees to bear the sole cost and expense of its installation and implementation. Lessee shall obtain City's prior approval before installing or implementing any security system, device, operation or plan.
8. HAZARDOUS MATERIALS
8.1 Compliance with Laws. Lessee shall not cause or permit any hazardous material (as defined in state law) to be brought upon, kept or used in or about the Premises.
9. TAXES
9.1 Revenue and Taxation Code. Pursuant to Revenue and Taxation Code of California, section 107.6, notice is hereby given that Lessee is responsible for any possessory interest taxes that may be imposed as a result of, or related to, this Agreement.
Upon submission of proof of payment, Lessee may deduct any annual possessory interest tax payment in an amount exceeding $500 from rent paid to City in subsequent month(s) until fully reimbursed.
10. HOLD HARMLESS AND INDEMNIFICATION
10.1 Indemnification. Lessee agrees to protect, defend, hold harmless and indemnify City, its officers, agents, volunteers, and employees from and against any claim, injury, liability, loss, cost, and/or expense or damage arising from Lessee's activities pursuant to this Lease, including all costs and reasonable attorney's fees, excepting claims resulting from the City's sole negligence or willful misconduct. Lessee shall give City immediate notice of any claim or liability hereby indemnified against.
10.2 Waiver of Claims. Lessee waives any claims against City for injury to Lessee's business or any loss of income therefrom, for damage to Lessee's property, or for injury or death of any person in or about the Premises, unless caused by City's active negligence or willful misconduct.
11. INSURANCE
Lessee, at its sole cost and expense shall purchase and maintain in full force and effect during the term of this Lease, insurance coverage in an amount(s) and in a form acceptable to City as set forth in Exhibit B attached and incorporated by reference. Said policies shall be maintained with respect to Lessee's employees, if any, and all vehicles operated on the Premises. The policies shall include the required endorsements, certificates of insurance and coverage verifications as described in Exhibit B. Lessee also agrees to secure renter's liability insurance.
12. DAMAGE, DESTRUCTION AND TERMINATION
284 of 833
9 12.1 If the Premises are damaged by fire, earthquake, act of God, the elements or other casualty, and in City's opinion (a) such repairs can be made within 120 days from the date of occurrence, and (b) insurance proceeds sufficient to pay the repair cost are available, City shall repair the same, and this Lease shall remain in full force and effect except that an abatement of rent shall be allowed Lessee for such part of the Premises as shall be rendered unusable by Lessee in the conduct of its business during the time such part is damaged.
12.2 If in City's opinion, (a) such repairs cannot be made within 120 days or (b) insurance proceeds sufficient to pay for such work are not available, City may elect, upon notice to Lessee within 30 days after the date of such fire or other casualty, to repair or restore the damage, in which case this Lease shall continue in full force and effect, but the rent shall be partially abated as herein above provided. If City does not so elect to make such repairs, this Lease shall terminate as of the date of such fire or other casualty. If City does not elect to terminate this Lease, or is not eligible to do so, City shall give Lessee written notice thereof within 30 days following the casualty. If the repairs are not made within 120 days, Tenant shall have the right to terminate this Lease.
12.3 Waiver. City and Lessee waive the provisions of any statutes that relate to termination of Leases when Leased property is destroyed and agree that such event shall be governed by the terms of this Lease.
13. DEFAULTS; REMEDIES
13.1 Defaults. The occurrence of any one or more of the following events shall constitute a material default or breach of this Lease by Lessee:
13.1.1 Abandonment of the Premises by Lessee as defined by California Civil Code §1951.3;
13.1.2 Failure by Lessee to make any payment of rent or any other payment required to be made by Lessee hereunder, as and when due, where such failure shall continue for a period of ten (10) business days after mailing by City of written notice thereof from City to Lessee. In the event City serves Lessee with a Notice to Pay Rent or Quit pursuant to applicable Unlawful Detainer statutes, such Notice to Pay Rent or Quit shall also constitute the notice required by this subparagraph;
13.1.3 Failure by Lessee in any material respect to observe or perform any of the Duties enumerated in Section 5 "Duties of Lessee" where such failure shall continue, or similar failures continue to occur after written notice of a Failure to Comply is mailed from City to Lessee.
13.1.4 Lessee's failure in any material respect to observe or perform any of the covenants, conditions or provisions of this Lease to be observed or performed by Lessee where such failure shall continue for a period of 30 days after written notice thereof is mailed from City to Lessee; provided, however, that if the nature of Lessee's default is such that more than 30 days are reasonably required for its cure, then Lessee shall not be deemed to be in default if Lessee commenced such cure within said 30 day period and thereafter diligently prosecutes such cure to completion;
285 of 833
10 13.1.5 Making by Lessee of any general arrangement or assignment for the benefit of creditors; Lessee's becoming a "debtor" as defined in 11 U.S.C. §101 or any successor statute thereto (unless, in the case of a petition filed against Lessee, the same is dismissed within 60 days); the appointment of a bankruptcy trustee or receiver to take possession of all or substantially all of Lessee's assets located at or on the Premises or of Lessee's interest in this Lease where possession is not restored to Lessee within 30 days; or the attachment, execution or other judicial seizure of all or substantially all of Lessee's assets located at or on the Premises, or of Lessee's interest in this Lease, where such seizure is not discharged within 30 days.
13.2 Remedies. In the event of any material default or breach by Lessee, City may at any time thereafter, following any notice required by statute, and without limiting City in the exercise of any right or remedy which City may have by reason of such default or breach:
13.2.1 Terminate Lessee's right to possession of the Premises by any lawful means, in which case this Lease shall terminate and Lessee shall immediately surrender possession of the Premises and Improvements to City. In such event, City shall be entitled to recover from Lessee all damages incurred by City by reason of Lessee's default including, but not limited to, the cost of recovering possession of the Premises and Improvements, expenses of re-letting, including necessary renovation and alteration of the Premises and Improvements, reasonable attorney's fees, the value at the time of the termination of the unpaid rent that had been earned at the time of termination of this Lease.
13.2.2 Maintain Lessee's right to possession, in which case this Lease shall continue in effect whether or not Lessee shall have abandoned the Premises. In such event, City shall be entitled to enforce all of City's rights and remedies under this Lease, including the right to recover rent as it becomes due hereunder.
13.2.3 Pursue any other remedy now or hereafter available to City under the laws or judicial decisions of the State of California.
13.3 No Relief from Forfeiture After Default Lessee waives all rights of redemption or relief from forfeiture under California Code of Civil Procedure §§1174 and 1179, and any other present or future law, in the event Lessee is evicted or City otherwise lawfully takes possession of the Premises by reason of any default or breach of this Lease by Lessee.
14. TERMINATION PROVISIONS
14.1 Either party, for breach of the Lease may terminate this Lease, in writing, upon 30 calendar days notice.
Upon termination, Lessee agrees to vacate the Premises before 5:00 P.M. on the 30th calendar day following notice.
14.2 Fixtures. Upon termination of the Lease, City or subsequent Lessee will have the option to buy any equipment and fixtures owned by Lessee from the Lessee at the fair market value of the items at the Premises; if City declines option, Lessee may hold a Public Auction at the Premises to sell all equipment 286 of 833
11 and fixtures located in the Premises. An inventory of Lessee's Fixtures and Equipment is attached to this lease as Exhibit D.
15. DISPUTE RESOLUTION
15.1 Unless otherwise agreed, any controversies between Lessee and City regarding the construction or application of this Lease, and claims arising out of this Lease or its breach shall be submitted to mediation within 30 days of service of a written request by one Party to the other Party.
15.2 The Parties will agree on a mediator. The mediation meeting shall not exceed one day (eight (8) hours). The Parties may agree to extend the time allowed for mediation by amending this Lease.
15.3 The costs of mediation shall be borne by the Parties equally.
15.4 Mediation under this section is a condition precedent to filing an action in any court. In the event of litigation arising out of any dispute related to this Lease, the Parties shall each pay their respective attorney's fees, expert witness costs and cost of suit, regardless of the outcome of the litigation.
16. PAYMENTS/PARTIAL PAYMENTS
City may apply any payment received from Lessee at any time against any obligation due and owing by Lessee under this Lease, regardless of any statement appearing on or referred to in any remittance from Lessee or any prior application of such payments. Acceptance by City of a partial payment of rent or other charges shall not be considered or construed to waive any right of or affect any notice of legal proceedings, unless both Parties shall agree otherwise in writing. The receipt by City of a partial payment of any amount due to City endorsed as payment in full will be deemed to be a partial payment only, and any endorsements or statements on the check or any letter accompanying the check shall not be deemed an accord and satisfaction, and, notwithstanding said endorsements, City may accept and deposit said check without prejudice to its right to recover the balance. Lessee's obligation (without prior notice or demands) to pay rent and all other amounts due hereunder shall be absolute and unconditional, and not subject to any abatement, set off, defense, recoupment or reduction.
17. NON-DISCRIMINATION
Lessee covenants that it shall not discriminate based upon race, color, creed, religion, sex, marital status, age, handicap, national origin or ancestry in any activity pursuant to this Agreement.
18. INDEPENDENT CONTRACTOR
It is agreed that Lessee shall act and be an independent contractor and not an agent nor employee of City or San Mateo Public Library.
19. CONFLICT OF INTEREST
287 of 833
12 Lessee shall at all times avoid conflict of interest or appearance of conflict of interest in performance of this agreement.
20. ASSIGNMENT AND SUBLETTING
City's Consent Required. Lessee may not assign this Lease or sublet or encumber the Premises, or allow or permit any other person(s) to occupy or use the Premises, without the prior written consent of City, which shall not be unreasonably withheld. This Lease shall be binding upon any permitted assignee or successor of Lessee. Consent by City to one assignment, subletting, occupation or use by another person shall not be deemed to be consent to any subsequent assignment, subletting, occupation or use by another person. No assignment, subletting, or encumbrance by Lessee shall release it from or in any way alter any of Lessee's obligations under this Lease.
21. LIENS
Lessee agrees at its sole cost and expense to keep the Property free and clear of any and all claims, levies, liens, encumbrances, or attachments.
22. HOLDOVER/EXTENSION
After the term has expired, and until the Parties execute a written extension to the Lease, or Lessee surrenders the Premises to the City, this Lease shall continue on a month-to-month basis subject to all terms and conditions of this Lease. The rent under a month to month tenancy shall increase to 15% of gross sales.
23. VACATING
Upon termination of the tenancy, Lessee shall completely vacate the Premises by 5 P.M. on the day of termination, including the removal of any and all of its property. Before departure, Lessee shall return keys and City property to City in good, clean and sanitary condition, reasonable wear and tear excepted.
Lessee shall allow City to inspect the Premises to verify the condition of the Premises and its contents.
24. ABANDONMENT
Lessee's absence from the Premises for fourteen (14) consecutive days, without prior notice, during which time rent or other charges are delinquent, shall be deemed abandonment of the Premises. Such abandonment will be deemed cause for immediate termination after five (5) days written notice. City shall thereupon be authorized to enter and take possession and to remove and dispose of the property of Lessee or its guests without any liability whatsoever to City.
25. NOTICES
All notices to the Parties shall, unless otherwise requested in writing, be sent to City addressed as follows:
288 of 833
13 To City: City of San Mateo
San Mateo Public Library
Attention: Rukshana Singh
55 West Third Avenue
San Mateo, CA 94402
and to Lessee addressed as
follows:
Henok Getahun
PLUR Cafe
78 Bentley Ave #10
Los Gatos, CA 95030
Notices may be served upon Lessee in person, or by first class mail, or by certified mail to Lessee whether or not said mailing is accepted by Lessee. The above addresses shall be used for service of process.
26. TIME
Time shall be of the essence in this Lease.
27. MISREPRESENTATIONS
Any statements submitted to City in the Vendors Written Proposal by Lessee are considered inducements to execute this Lease. Misrepresentations shall entitle City to terminate this Lease at any time.
28. REMEDIES OF CITY
In addition to any other remedy provided herein, City shall have all remedies provided by law and equity.
29. SERVICE CHARGE
A service charge of twenty dollars ($20.00) will be made for each check that must be resubmitted for payment.
30. SIGNING AUTHORITY
If this Lease is not signed by all Lessees named herein, the person actually signing warrants that he/she has the authority to sign for the others.
31. CAPTIONS
The captions of the various sections, paragraphs and subparagraphs of this Lease are for convenience only and shall not be considered or referred to in resolving questions of interpretation.
32. SURRENDER OF LEASE NOT MERGER
289 of 833
14 The voluntary or other surrender of this Lease by Lessee, or a mutual cancellation thereof, shall not work a merger, and shall, at the option of City, terminate all or any existing leases or sub-tenancies, or may, at the option of City, operate as an assignment to it of any and all such leases or sub-tenancies.
33. INTEGRATED DOCUMENT
This Lease, including any exhibits attached hereto, embodies the entire agreement between City and Lessee and its terms and conditions. No other understanding, agreements, conversations or otherwise, with any officer, agent or employee of City prior to execution of this Lease shall affect or modify any of the terms or obligations contained in any documents comprising this Lease. Any such verbal agreement shall be considered as unofficial information and in no way binding upon City. This Lease may be modified only by a written amendment duly executed by the Parties to this Lease.
34. WAIVER
Waiver by City of one or more conditions of performance or any breach or condition under this Lease shall not be construed as a waiver(s) of any other condition of performance or subsequent breaches or conditions. The subsequent acceptance by a Party of the performance of any obligation or duty by another Party shall not be deemed to be a waiver of any term or condition of this Lease. The City's failure to exercise any remedy, right, option or privilege at law or equity, or otherwise which City may have, shall not be construed as a waiver.
35. INTERPRETATIONS
In construing or interpreting this Lease, the word "or" shall not be construed as exclusive and the word "including" shall not be limiting. The Parties agree that this Lease shall be fairly interpreted in accordance with its terms without any strict construction in favor of or against any other Party.
36. SEVERABILITY CLAUSE
If any provision of this Lease is held to be illegal, invalid or unenforceable in full or in part, for any reason, then such provision shall be modified to the minimum extent necessary to make the provision legal, valid and enforceable, and the other provisions of this Lease shall not be affected.
37. GOVERNING LAW
This Lease shall be governed and construed in accordance with the statutes and laws of the State of California.
38. VENUE
In the event that suit shall be brought by any Party to this Lease, the Parties agree that venue shall be exclusively vested in the State courts of the County of San Mateo. [SIGNATURE PAGE FOLLOWS:]
290 of 833
15 39. COMPLIANCE WITH LAWS
The Parties hereto shall comply with all applicable laws, ordinances, codes and regulations of the federal, state and local governments in the performance of their rights, duties and obligations under this Lease, including all applicable laws, ordinances, codes and regulations pertaining to the storage, handling, preparation and service of food.
CITY OF SAN MATEO LESSEE
Rukshana Singh
City Librarian
Date Henok Getahun Date
APPROVED AS TO FORM
Prasanna W. Rasiah
City Attorney
291 of 833
16 EXHIBIT A
SITE PLAN OF SUBJECT PREMISES
. ----
-. --
---
-
\
----
.::..i
292 of 833
17 EXHIBIT B
INSURANCE REQUIREMENTS FOR LESSEES
Lessee shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the Lessee’s operation and use of the leased premises. The cost of such insurance shall be borne by the Lessee.
MINIMUM SCOPE AND LIMIT OF INSURANCE
Coverage shall be at least as broad as:
1. Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.
2. Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limits of no less than $1,000,000 per accident for bodily injury or disease. (This applies to lessees with employees).
3. Property insurance against all risks of loss to any tenant improvements or betterments, at full replacement cost with no coinsurance penalty provision.
If the Lessee maintains broader coverage and/or higher limits than the minimums shown above, the Entity requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Lessee. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the Entity.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status
The Entity, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out the lease of the subject property including damage caused in whole or in part by Lessee or by those working on your behalf. General liability coverage can be provided in the form of an endorsement to the Lessee’s insurance, at least as broad as ISO Form CG 20 11 12 19 or if not available, CG 20 43 12 19.
Primary Coverage
For any claims related to this contract, the Lessee’s insurance coverage shall be primary and non-contributory and at least as broad as ISO CG 20 01 12 19 as respects the Entity, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the Entity, its officers, officials, employees, or 293 of 833
18 volunteers shall be excess of the Lessee’s insurance and shall not contribute with it. This requirement shall also apply to any Excess or Umbrella liability policies.
Legal Liability Coverage
The property insurance is to be endorsed to include Legal Liability Coverage (ISO Form CP 00 40 04 02 or equivalent) with a limit equal to the replacement cost of the leased property on all real property being leased, including improvements and betterments owned by the Entity, and shall name the Entity as a Loss Payee.
Loss Payee Endorsement
Lessee’s property and legal liability coverages required herein shall be endorsed to name Entity as a Loss Payee as to its interests in any covered property.
Interruption of Business Insurance
Lessee shall, at its sole cost and expense, maintain business interruption insurance by which the minimum monthly rent will be paid to Lessor for a period of up to one (1) year if the premises are destroyed or rendered inaccessible by a risk insured against by a policy of standard commercial special form or “all risk” property insurance.
Notice of Cancellation
Each insurance policy required above shall provide that coverage shall not be canceled, except with notice to the Entity.
Waiver of Subrogation
Lessee hereby grants to Entity a waiver of any right to subrogation which any insurer of said Lessee may acquire against the Entity by virtue of the payment of any loss under such insurance. Lessee agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation and provide a copy to the Entity, but this provision applies regardless of whether or not an endorsement has been issued.
Self-Insured Retentions
Self-insured retentions must be declared to and approved by the Entity. The Entity may require the Lessee to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or Entity.
Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the Entity.
Verification of Coverage
Lessee shall furnish the Entity with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All required documents are to be received 294 of 833
19 and approved by the Entity before lease commences. However, failure to obtain the documents prior to the lease beginning shall not waive the Lessee’s obligation to provide them. The Entity reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.
Special Risks or Circumstances
Entity reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances. 295 of 833
20 EXHIBIT C
RULES AND REGULATIONS
1. All areas of the San Mateo Public Library not leased shall not be obstructed by Lessee or used by it for any purpose other than for ingress or egress from the Premises, except that lessee shall have the right to use the indoor and outdoor eating areas. City shall in all cases retain the right to control and prevent access to the Premises of all persons whose presence in the judgment of the City would be prejudicial to the safety, character, reputation and interests of the Library, provided that nothing herein contained shall be construed to prevent such access to persons with whom Lessee normally deals in the ordinary course of its business, unless such persons are engaged in illegal activities. Lessee shall not go upon the roof of the building.
2. The Premises shall not be used for lodging or sleeping.
3. City will furnish Lessee with two (2) keys and three (3) card keys to the Premises, free of charge. No additional locking devices shall be installed without the prior written consent of the City. City may make reasonable charge to lessee for any additional lock or any bolt installed on any door of the Premises without the prior written consent of the City. Lessee shall in each case furnish City with a key for any such lock. Lessee, upon the termination of its tenancy, shall deliver to the Landlord all keys to doors in the Building and the Premises that shall have been furnished to Lessee.
4. In case of invasion, mob, riot, public excitement or other circumstances rendering such action advisable in the City's opinion, City reserved the right to prevent access to the Premises during continuance of same by such action as City may deem appropriate, including closing entrances to the Building. Lessee's rent shall be abated during such periods of closure.
5. The toilet rooms, toilets, urinals, wash bowls and other apparatus shall not be used for any purpose other than that for which they were constructed; no foreign substance of any kind whatsoever shall be deposited therein and any repairs of damage resulting to same from lessee's misuse shall be paid by Lessee.
6. Except with the prior consent of City, Lessee shall not sell, or permit the sale from the Premises of, or use or permit the use of any Common Area adjacent to the Premises for the sale of newspapers, magazines, periodicals, theatre tickets or any other goods, merchandise or service, nor shall lessee carry on, or permit or allow any employee or other person to carry on, business in or from the Premises for the service or accommodation of occupants of any other portion of the Building, nor shall the Premises be used for manufacturing of any kind, or for any business activity other than specifically provided for in the Lease.
7. Lessee shall not install any radio or television antenna, loudspeaker or other device on the roof or exterior walls of the Building.
8. Lessee shall not use in any space, or in the Common Areas of the Building, any hand trucks except those equipped with rubber tires and side guards or such other material handling equipment as City may approve.
9. Lessee shall store all its trash and garbage within the Premises until daily removal of same by the Library's custodians to the dumpster provided by City for disposal thereof. No material shall be placed in 296 of 833
21 the Building trash boxes or receptacles if such material is of such nature that it may not be disposed of in the ordinary and customary manner of removing and disposing of trash and garbage in the City of San Mateo without being in violation of any law or ordinance governing such disposal. Lessee shall sort trash into provided receptacles for garbage, mixed recyclables, and compostables.
10. All loading and unloading of merchandise, supplies, materials, garbage and refuse and delivery of same to the Premises shall be made only through such entryways and elevators and at such times as City shall designate. In its use of the loading areas on the first floor, Lessee shall not obstruct or permit the obstruction of said loading areas, and at no time shall Lessee park vehicles therein except for loading and unloading.
11. Canvassing, soliciting, peddling or distribution of handbills or any other written material in the Building is prohibited and lessee shall cooperate to prevent same.
12. Lessee shall not permit the use of the operation of any coin operated machines on the Premises, including, without limitation, vending machines, video games, pinball machines, or pay telephones without the prior written consent of City.
13. City may direct the use of all pest extermination and scavenger contractors at such intervals as City may require.
14. The requirements of Lessee will be attended to only upon application by telephone or in person at the Library Administration Office. Employees of City shall not perform any work or do anything outside of their regular duties.
15. City may waive any one or more of these Rules and Regulations for the benefit of any particular Lessee or Lessees, but no such waiver by City shall be construed as a waiver of these Rules and Regulations in favor of any other Lessee or Lessees, nor prevent City from thereafter enforcing any such Rules and Regulations against any or all Lessees of the Building.
16. These Rules and Regulations are in addition to and shall not be construed in any way to modify, alter or amend, in whole or part, the terms, covenants, agreements and conditions of any lease of Premises in the Library.
17. City reserves the right to make such other reasonable rules and regulations as in its judgment may, from time to time, be needed for the safety, care, and cleanliness of the Library, and for the preservation of good order therein provided that any such rules shall not materially impair Lessee's rights in the Premises or increase any burdens upon Lessee in connection therewith.
18. Lessee shall have the right to connect the telephone system in the Premises to the telephone cable distribution system serving the Library at the location of the telephone cable terminal on the floor on which the Premises are situated, provided that no connection shall be made and no work otherwise affecting the telephone cable terminal or distribution system shall be undertaken without reasonable prior notice to, and approval of, the City. City shall have responsibility for maintenance of the telephone distribution system and may require supervision of the connection by City, and may impose such other reasonable conditions as may be necessary to protect the telephone cable terminal or distribution system. Any damage to the telephone cable terminal or distribution system caused by the act or omission of Lessee shall be repaired at expense of Lessee. 297 of 833
22 298 of 833
23 EXHIBIT D
INVENTORY OF FIXTURES AND EQUIPMENT
• Display Case: manufacturer True; model TDM-R-48-GE/GE-B-S; serial number 10524057 • Backwall Refrigerator: manufacturer True; model GDM-12; serial number 1-4584320 • Vertical Refrigerator: manufacturer True; model TBB-24GAL-48-HC; serial number 10497672 • Ice Maker: manufacturer Manitowoc; model QM304; serial number 310333921 • Stainless Steel Sink: manufacturer Universal
• Stainless Steel Shelves: manufacturer E-Z Shelving Systems • Wooden cabinets and shelves
299 of 833
CITY OF SAN MATEO
CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 17 Section Name: CONSENT CALENDAR Account Number: 18-6113 File ID: 26-11482 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: Parks and Recreation Department
MEETING DATE: July 20, 2026
SUBJECT:
Youth and Adult Tennis and Pickleball Recreation Programs — Amendment RECOMMENDATION:
Approve Amendment No. 1 with Todd Dissly Athletics, LLC (TDA) to make a one-time payment of $20,171.04 for services already rendered, to increase annual compensation from $300,000 to up to $350,000 annually, with a $25,000 contingency, resulting in the overall six (6) years $2,050,000; and authorize the Director of Parks & Recreation to execute the amendment and change orders in substantially the form presented.
BACKGROUND:
The Parks and Recreation Department contracts with TDA to provide youth and adult tennis classes, and camps. The original agreement, approved on June 6, 2022, established a two-year term with two (2) automatic two-year extensions for a total contract length of up to six years, expiring in 2028. At that time City Council approved the agreement with annual compensation of up to $300,000 and authority for change orders up to $25,000 per year.
Participation in tennis programming and the program enhancement of adding pickleball, has grown significantly since the agreement was executed. Enrollment, number of class offerings, and overall revenue have all increased, resulting in higher payouts to TDA, who is compensated based on a percentage of gross course revenue minus the administrative service fee.
During Fiscal Year 2025–2026, participation in City recreation programs exceeded projections, resulting in instructor service costs surpassing the original annual contract limit of $300,000 and fully consume the $25,000 contingency previously authorized. This resulted in a remaining balance of $20,171.04 owed to TDA for services already rendered.
Amendment No. 1 authorizes a one-time payment of this amount, ensuring the City meets its contractual obligations for FY 2025–26 and establishes a revised not-to-exceed amount of $341,630.70 for that fiscal year.
Amendment No. 1 also increases the annual compensation amount to $350,000 for future fiscal years left in the current contract, while maintaining authority for change orders up to $25,000 annually. This adjustment increases the overall contract maximum from $1,950,000 to $2,050,000 and provides financial capacity to deliver recreation services consistent with community demand.
Annual compensation to TDA has increased due to sustained demand notably from 2023 to current, with an increase of 34% in enrollment.
Year Revenue Payments to TDA Enrollment
FY 22/23 $352,617.09 $256,143.00 1,809
FY 23/24 $307,113.96 $275,862.13 1,640
FY 24/25 $415,854.23 $316,408.93 2,038
FY 25/26 $458,386.18 $346,441.04 2,201
300 of 833
CITY OF SAN MATEO
The current agreement compensation split paid to the contractor from total revenue collected is 80 % for fall classes and 75% for spring, summer and winter classes. Total contract payouts to date: $1,194,855.10 This upward trend demonstrates the continued popularity of tennis instruction within the community and aligns with the City's long-term recreation participation goals.
BUDGET IMPACT:
All compensation to the Contractor is covered by course registration fees paid by the participants.
ENVIRONMENTAL DETERMINATION:
This Amendment No. 1 is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b)(5).)
STRATEGIC PLAN ALIGNMENT
This staff report supports the Healthy Community for All Ages initiative.
NOTICE PROVIDED
All meeting noticing requirements were met.
ATTACHMENTS
Att 1 – Amendment No. 1 Todd Dissly Athletics, LLC
STAFF CONTACT
Tracy Brumett, Community Services Section Manager
[email protected]
(650) 522-7443
301 of 833
Contract Amendment Page 1 of 2
CAO Approved June 2024
AMENDMENT NO.1 TO THE AGREEMENT
BETWEEN THE CITY OF SAN MATEO AND
TODD DISSLY ATHLETICS, LLC FOR
RECREATION INSTRUCTOR SERVICES
($1,950,000 to $2,050,000)
This Amendment No. 1 is made and entered into this day of _____________ by and between the CITY OF SAN MATEO, a municipal corporation existing under the laws of the State of California ("CITY"), and Todd Dissly Athletics, LLC ("CONTRACTOR").
WHEREAS, City and Todd Dissly Athletics, LLC entered into an agreement on June 8, 2022 for Recreation Instructor Services, for an initial term of June 15, 2022 to June 14, 2024, and two (2) two (2) year extension terms, for a total of six years; and
WHEREAS, City Council approved the agreement on June 6, 2022, with an annual compensation of $300,000 and provided the Director of Parks and Recreation with the authority to sign change orders of up to $25,000 per year; and
WHEREAS, the second such extension term began on June 14, 2026 and will be completed on June 14, 2028; and
WHEREAS, compensation for the 2025-2026 fiscal year has exceeded the original $300,000 amount and the $25,000 contingency was exhausted, leaving a remaining amount of $20,171.04 due to the Contractor for that fiscal year; and
WHEREAS, annual compensation for the remainder of the agreement shall be up to $350,000 annually, with a $25,000 contingency, for a total not to exceed amount of $2,050,000 for the six-year term.
NOW, THEREFORE, the Parties agree as follows:
1. Section 8(a)(1) shall be added to Exhibit A of the Agreement to read:
City shall make a one-time payment to Contractor in the amount of $20,171.04 for services rendered during Fiscal Year 2025-2026.
2. The remaining terms of the Agreement remain in full force and effect. [SIGNATURE PAGE FOLLOWS]
302 of 833
Contract Amendment Page 2 of 2
CAO Approved June 2024
IN WITNESS WHEREOF, CITY OF SAN MATEO and TODD DISSLY ATHLETICS, LLC have executed this Amendment on ___________________.
CITY OF SAN MATEO CONTRACTOR
Marie Silva
Acting Director, Parks &
Recreation
Date Todd Dissly
Manager
Date
APPROVED AS TO FORM
Mazarin Vakharia
Assistant City Attorney
Date
303 of 833
CITY OF SAN MATEO
CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 18 Section Name: CONSENT CALENDAR Account Number: 25-3112 File ID: 26-11486 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: Community Development Department
MEETING DATE: July 20, 2026
SUBJECT:
Citywide Commercial Economic Assessment Services — Appropriation and Agreement RECOMMENDATION:
Adopt a Resolution to appropriate $114,868 from the Advance Planning Fund to the Citywide Economic Assessment project; adopt a resolution authorizing Retail Real Estate Resources, LLC to examine sales or transactions and use tax records for all sales and transactions and use taxes; approve an agreement with Retail Real Estate Resources, LLC to support preparation of a Citywide Commercial Economic Assessment and authorize the City Manager to execute the agreement in substantially the form presented.
BACKGROUND:
As part of the City Council Blue Sky Workshop on February 7, 2026 to set priorities for the upcoming fiscal year, Council identified a need to assess citywide economic conditions and business retention issues, with a focus on how to maintain a full range of commercial services to support the community and support businesses displaced by new development. To implement this priority, SMART Activity No. 56 was added to the City’s Fiscal Year 2026-27 Priority List and approved as part of the City’s FY 26-27 Business Plan this past June. This SMART Activity description is as follows: “Work with the City’s economic consultant to conduct a citywide economic assessment of the City's commercial retail and service areas and nodes, with a focus on how to maintain a full range of community serving businesses and services around the City, assess commercial displacement, and identify options for supporting small businesses when they are displaced due to redevelopment. Present findings at a study session in May 2027.” To support completion of this SMART Activity, a highly qualified retail consultant with applicable knowledge and experience in the field, and local knowledge of the specific issues present on the Peninsula and in San Mateo is necessary to support City staff. Currently, retail consultant Retail Real Estate Resources (RRER), which is led by Christine Firstenberg, a retail real estate professional with 30 years of experience, has been working with the City to provide retail feasibility assessment services by reviewing proposed mixed-use development applications when they include a ground floor commercial component. This work, which has been going on for the past year, supports a previously identified Council priority to ensure that new mixed-use development includes commercial spaces can be effectively occupied and viably used by retail commercial businesses once built to help avoid prolonged vacancies and empty storefronts. As part of this work, RRER has demonstrated a strong understanding of the local economic issues present in San Mateo and brings a unique combination of real-world experience in retail design, leasing strategies, and retail/commercial economic development programs that strongly align with the qualifications the City is seeking to support development of a Citywide Commercial Economic Assessment. Based on this professional and technical experience, local knowledge and prior work for the City, staff is recommending that RRER be used to support this project. 304 of 833
CITY OF SAN MATEO
The Work Plan to prepare the Citywide Commercial Economic Assessment includes seven tasks as follows:
1. Project Initiation and Baseline Data Collection
2. Existing Conditions and Market Assessment
3. Community Serving Business Analysis
4. Commercial Displacement and Redevelopment Pressure Assessment
5. Stakeholder and Business Engagement
6. Best Practices and Comparative Case Studies
7. Strategic Recommendations and Policy Suggestions
This task will include Business Retention Strategies, Commercial Preservation Tools, Redevelopment Mitigation Strategies, Economic Development Strategies and Hospitality Asset Retention and Conversion Considerations.
The more detailed Work Plan and Budget from RRER are included as Exhibit A and Exhibit B in Attachment 2. As outlined in the SMART Activity, a draft Citywide Commercial Economic Assessment with findings will be presented to the City Council at a study session by May 2027 for public and Council input and direction.
As part of the work to prepare the Citywide Economic Analysis, RRER will need access to certain types of sales tax and user tax data. Since sales tax data is confidential, the City must formally delegate this authority to a third party via a Resolution (Attachment 3) that it files with the California Department of Tax and Fee Administration (CDTFA). Once approved, the City will file the Resolution with CDTFA to formally delegate this authority to RRER and allow them to access San Mateo’s records as a third-party consultant that is providing economic analysis services to the City.
BUDGET IMPACT:
The budget appropriation of $114,868 (Attachment 1) is proposed to be funded by the Advance Planning Fund (Fund 225) and would not have an impact on the City's General Fund. At the end of FY 25-26, the Advance Planning Fund had an estimated fund balance of approximately $6.4 million. The budget appropriation would be for a professional services agreement with RRER for $99,868 and a 15 percent contingency in the amount of $15,000 to cover additional services that may be necessary during the course of the project.
ENVIRONMENTAL DETERMINATION:
Approval of the budget appropriation and professional services agreement with RRER is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b)(5).)
Approval of the Resolution to authorize examination of sales or transactions and use tax records is not a project subject to CEQA, because it consists of a government fiscal activity which does not involve any commitment to any specific project which may result in a potentially significant physical impact on the environment. (CEQA Guidelines Section 15378(b)(4).) STRATEGIC PLAN ALIGNMENT:
This staff report supports the Economic Development initiative.
NOTICE PROVIDED:
All meeting noticing requirements were met.
ATTACHMENTS
Att 1 – Proposed Resolution for Appropriation
Att 2 – Professional Services Agreement with Retail Real Estate Resources Att 3 – Proposed Resolution for Tax Records Review Authorization 305 of 833
CITY OF SAN MATEO
STAFF CONTACT
Jennifer Rosas, Business Manager
[email protected]
(650) 522-7164
306 of 833
CITY OF SAN MATEO
RESOLUTION NO. ____ (2026)
APPROPRIATING FUNDS FOR TASKS AND SUPPORT RELATED TO A CITYWIDE ECONOMIC ASSESSMENT WHEREAS, as part of the adopted City Business Plan for Fiscal Year 2026-27, the City Council prioritized the preparation of a Citywide Economic Analysis of the City's commercial retail and service areas and nodes, with a focus on how to maintain a full range of community serving businesses and services around the City, assess commercial displacement, and identify options for supporting small businesses when they are displaced due to redevelopment (SMART Activity No. 56); and
WHEREAS, retail consultant Retail Real Estate Resources, LLC has demonstrated a strong understanding of local economic issues present in San Mateo and brings a unique combination of real-world experience in retail design, commercial tenant leasing, and implementation of economic development programs that make them uniquely qualified to provide the technical expertise needed to support development of a Citywide Commercial Economic Assessment for the City of San Mateo; and
WHEREAS, the proposal from Retail Real Estate Resources, LLC to support preparation of a Citywide Commercial Economic Assessment is for an amount of $99,867.50; and WHEREAS, a 15% contingency, in the amount of $15,000, is included in the event that additional services are required during the course of the project.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN MATEO, CALIFORNIA, HEREBY RESOLVES that:
1. This fund appropriation is not a project of CEQA because it is an organizational or administrative activity that will not impact the environment (CEQA Guidelines Section 15378(b)(5).
2. The appropriation of $114,867.50 from the Advance Planning Fund (Fund 225) to the Citywide Economic Analysis project is approved.
307 of 833
Professional Consultant Services Page 1 of 21
Rev 4/26
AGREEMENT WITH RETAIL REAL ESTATE RESOURCES
FOR PROFESSIONAL CONSULTANT SERVICES
FOR
COMMERCIAL ECONOMIC ASSESSMENT SERVICES
This Agreement, made and entered into this day of ____________________, by and between the CITY OF SAN MATEO, a municipal corporation existing under the laws of the State of California (“CITY”), and RETAIL REAL ESTATE RESOURCES, an individual consultant (“CONSULTANT”), whose address is 3527 Mt. Diablo Blvd #487 Lafayette, CA 94549.
RECITALS:
A. CITY desires certain Commercial Economic Assessment services hereinafter described.
B. CITY desires to engage CONSULTANT to provide these Commercial Economic Assessment services by reason of its qualifications and experience for performing such services and CONSULTANT has offered to provide the required services on the terms and in the manner set forth herein.
NOW, THEREFORE, IT IS AGREED as follows:
SECTION 1 - SCOPE OF SERVICES
The scope of services to be performed by CONSULTANT under this Agreement is as described in Exhibit A to this Agreement, attached and incorporated by reference.
SECTION 2 - DUTIES OF CONSULTANT
CONSULTANT shall be responsible for the professional quality, technical accuracy and coordination of all work furnished by CONSULTANT under this Agreement. CONSULTANT shall, without additional compensation, correct or revise any errors or deficiencies in its work.
CONSULTANT represents that it is qualified to furnish the services described under this Agreement.
CONSULTANT shall be responsible for employing or engaging all persons necessary to perform the services of CONSULTANT.
CONSULTANT agrees to comply with the City’s minimum wage ordinance as codified in Municipal Code Chapter 5.92, which differs from the state minimum wage and includes a Consumer Price Index escalator.
SECTION 3 - DUTIES OF CITY
CITY shall provide pertinent information regarding its requirements for the project. 308 of 833
Professional Consultant Services Page 2 of 21
Rev 4/26
CITY shall examine documents submitted by CONSULTANT and shall render decisions pertaining thereto promptly, to avoid unreasonable delay in the progress of CONSULTANT's work.
SECTION 4 - TERM
The services to be performed under this Agreement shall commence on July 21, 2026 and be completed on June 30, 2027.
SECTION 5 - PAYMENT
Payment shall be made by CITY only for services rendered and upon submission of a payment request upon completion and CITY approval of the work performed. In consideration for the full performance of the services set forth in Exhibit A, CITY agrees to pay CONSULTANT a fee in an amount of $99,868, with $14,980 contingency (15%), for a total agreement about not to exceed $114,848, pursuant to rates stated in Exhibit B to this Agreement, attached and incorporated by reference.
SECTION 6 - TERMINATION
Without limitation to such rights or remedies as CITY shall otherwise have by law, CITY shall have the right to terminate this Agreement or suspend work on the Project for any reason, upon ten (10) days' written notice to CONSULTANT. CONSULTANT agrees to cease all work under this Agreement upon receipt of said written notice.
Upon termination and upon CITY's payment of the amount required to be paid, documents become the property of CITY, and CONSULTANT shall transfer them to CITY upon request without additional compensation.
SECTION 7 - OWNERSHIP OF DOCUMENTS
All documents prepared by CONSULTANT in the performance of this Agreement, although instruments of professional service, are and shall be the property of CITY, whether the project for which they are made is executed or not.
SECTION 8 - CONFIDENTIALITY
All reports and documents prepared by CONSULTANT in connection with the performance of this Agreement are confidential until released by CITY to the public. CONSULTANT shall not make any such documents or information available to any individual or organization not employed by CONSULTANT or CITY without the written consent of CITY before any such release.
SECTION 9 - INTEREST OF CONSULTANT
CONSULTANT covenants that it presently has no interest, and shall not acquire any interest, direct or indirect, financial or otherwise, which would conflict in any manner or degree with the performance of the services under this Agreement.
309 of 833
Professional Consultant Services Page 3 of 21
Rev 4/26
SECTION 10 - CONSULTANT'S STATUS
It is expressly agreed that in the performance of the professional services required under this Agreement, CONSULTANT shall at all times be considered an independent contractor as defined in Labor Code Section 3353, under control of the CITY as to the result of the work but not the means by which the result is accomplished. Nothing herein shall be construed to make CONSULTANT an agent or employee of CITY while providing services under this Agreement.
SECTION 11 - INDEMNITY
CONSULTANT agrees to hold harmless and indemnify CITY, its elected and appointed officials, employees, volunteers, and agents from and against any and all claims, loss, liability, damage, and expense arising out of CONSULTANT’s performance of this Agreement, except those claims arising out of CITY’s sole negligence or willful misconduct. CONSULTANT agrees to defend City, its elected and appointed officials, employees, volunteers, and agents against any such claims. The CONSULTANT’S duty to indemnify shall survive expiration or early termination of this Agreement.
SECTION 12 - INSURANCE
CONSULTANT shall procure and maintain for the duration of the contract and three years thereafter (five years for building or major improvements) the insurance specified in Exhibit C to this Agreement.
SECTION 13 - NON-ASSIGNABILITY
Both parties hereto recognize that this Agreement is for the personal services of CONSULTANT and cannot be transferred, assigned, or subcontracted by CONSULTANT without the prior written consent of CITY.
SECTION 14 - RELIANCE UPON PROFESSIONAL
SKILL OF CONSULTANT
It is mutually understood and agreed by and between the parties hereto that CONSULTANT is skilled in the professional calling necessary to perform the work agreed to be done under this Agreement and that CITY relies upon the skill of CONSULTANT to do and perform the work in the most skillful manner, and CONSULTANT agrees to thus perform the work. The acceptance of CONSULTANT's work by CITY does not operate as a release of CONSULTANT from said obligation. 310 of 833
Professional Consultant Services Page 4 of 21
Rev 4/26
SECTION 15 - WAIVERS
The waiver by either party of any breach or violation of any term, covenant, or condition of this Agreement or of any provisions of any ordinance or law shall not be deemed to be a waiver of such term, covenant, condition, ordinance or law or of any subsequent breach or violation of the same or of any other term, condition, ordinance, or law. The subsequent acceptance by either party of any fee or other money which may become due hereunder shall not be deemed to be a waiver of any preceding breach or violation by the other party of any term, covenant, or condition of this Agreement or of any applicable law or ordinance.
SECTION 16 - SEVERABILITY
If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect.
SECTION 17 - COSTS AND ATTORNEY FEES
Attorney fees in total amount not exceeding $5000, shall be recoverable as costs (by the filing of a cost bill) by the prevailing party in any action or actions to enforce the provisions of this Agreement. The above $5000 limit is the total of attorney fees recoverable whether in the trial court, appellate court, or otherwise, and regardless of the number of attorneys, trials, appeals, or actions. It is the intent of this Agreement that neither party shall have to pay the other more than $5000 for attorney fees arising out of an action, or actions to enforce the provisions of this Agreement.
SECTION 18 - NON-DISCRIMINATION
CONSULTANT warrants that it is an Equal Opportunity Employer and shall comply with applicable regulations governing equal employment opportunity. Neither CONSULTANT nor any of its subcontractors shall discriminate in the employment of any person because of race, color, national origin, ancestry, physical handicap, medical condition, marital status, sex, or age, unless based upon a bona fide occupational qualification pursuant to the California Fair Employment and Housing Act.
SECTION 19 - MEDIATION
Should any dispute arise out of this Agreement, any party may request that it be submitted to mediation. The parties shall meet in mediation within 30 days of a request. The mediator shall be agreed to by the mediating parties; in the absence of an agreement, the parties shall each submit one name from mediators listed by either the American Arbitration Association, the State Mediation and Conciliation Service, or other agreed-upon service. The mediator shall be selected by a blind draw.
The cost of mediation shall be borne equally by the parties. Neither party shall be deemed the prevailing party. No party shall be permitted to file a legal action without first meeting in mediation and making a good faith attempt to reach a mediated settlement. The mediation process, once commenced by a meeting with the mediator, shall last until agreement is reached by the parties but not more than 60 days, unless the maximum time is extended by the parties. 311 of 833
Professional Consultant Services Page 5 of 21
Rev 4/26
SECTION 20 - LITIGATION
CONSULTANT shall testify at CITY'S request if litigation is brought against CITY in connection with CONSULTANT's services under this Agreement. Unless the action is brought by CONSULTANT, or is based upon CONSULTANT's wrongdoing, CITY shall compensate CONSULTANT for preparation for testimony, testimony, and travel at CONSULTANT's standard hourly rates at the time of actual testimony.
SECTION 21 - NOTICES
All notices hereunder shall be given in writing and mailed, postage prepaid, addressed as follows:
To CITY: Zachary Dahl
City of San Mateo
330 W. 20th Ave
San Mateo CA, 94403
To CONSULTANT: Retail Real Estate Resources
Attn: Christine Firstenberg
3527 Mt. Diablo Blvd
Lafayette, CA 94549
SECTION 22 - AGREEMENT CONTAINS ALL
UNDERSTANDINGS; AMENDMENT
This document represents the entire and integrated agreement between CITY and CONSULTANT and supersedes all prior negotiations, representations, and agreements, either written or oral.
This document may be amended only by written instrument, signed by both CITY and CONSULTANT.
312 of 833
Professional Consultant Services Page 6 of 21
Rev 4/26
SECTION 23 - CONFLICTS
In the event of any conflict between the provisions of this Agreement and any other referenced exhibit or document attached to this Agreement, the language and terms of this Agreement shall control.
SECTION 24 - AUTHORITY TO ENTER INTO AGREEMENT
CONSULTANT has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and to bind each respective party.
[SIGNATURE PAGE FOLLOWS]
313 of 833
Professional Consultant Services Page 7 of 21
Rev 4/26
SECTION 24 - GOVERNING LAW AND VENUE
This Agreement shall be governed by the laws of the State of California, and, in the event of litigation, venue will be in the County of San Mateo.
IN WITNESS WHEREOF, CITY OF SAN MATEO and RETAIL REAL ESTATE RESOURCES have executed this Agreement the day and year first above written.
CITY OF SAN MATEO CONSULTANT
Alex Khojikian
City Manager
Date Christine Firstenberg
Its Authorized Agent
President
Date
APPROVED AS TO FORM
Prasanna W. Rasiah
City Attorney
Date
Attachments:
Exhibit A: Scope of Services
Exhibit B: Fee Rates
Exhibit C: Insurance Requirements
314 of 833
Professional Consultant Services Page 8 of 21
Rev 4/26
EXHIBIT A
SCOPE OF SERVICES
Citywide Economic Assessment Scope of Work
State Law Requirements (Rev. & Tax §7056(b)):
Consultant shall disclose information contained in, or derived from, those sales or transactions and use tax records accessible to Consultant under this Agreement only to an officer or employee of the City who is authorized by Council resolution to examine the information. Consultant is prohibited from performing consulting services for a retailer during the term of this Agreement.
Consultant is further prohibited from retaining the information contained in, or derived from, those sales or transactions and use tax records accessible to Consultant under this Agreement after this Agreement has expired. Information obtained by Consultant’s examination of sales or transactions and use tax records shall be used only for the purposes set forth in this Agreement.
Task 1- Project Initiation, Baseline Data
Kick off and Review of City documents:
A project kickoff meeting will be conducted to confirm roles and responsibilities, communication protocols, decision-making milestones, and deliverable expectations.
Retail Real Estate Resources (“Consultant”) will compile and review existing data, plans, reports, and policies relevant to retail and hospitality within the City including The General Plan 2040, Downtown Area Plan, the Economic Development Work Plan, and any MixedUse Development Policies. This review will help identify existing policies that may influence or be affected by the Commercial Economic Assessment on How to Economically Encourage Whole Communities
• Deliverables: Kickoff meeting recap memo.
Task 2- Existing Conditions and Market Assessment
All of the tasksin Section 2 will look at city-wide economic and demographicsindicatorsto establish baseline market conditions in the City.
Task 2.a- Citywide Demographic Analysis
Consultant will prepare a citywide demographic analysis to create a profile of San Mateo’s residents and identify the economic trends influencing commercial, retail, and hospitality activity throughout San Mateo.
A demographic profile will include; a profile of the City’s population and household trends along with income characteristics, and daytime employment and a consumer spending analysisshowing the local retail spending with retail leakage. The retail leakage report will identify retail categoriesthat may be underrepresented in the City.
Lastly, a review of national trends affecting office leasing and the neighborhoodserving type tenants that could be possible future tenants in San Mateo will be completed.
315 of 833
Professional Consultant Services Page 9 of 21
Rev 4/26
• Deliverables: A demographic summary and retail leakage document with a list of retail categories that are underrepresented in San Mateo.
Task 2.b- Commercial Market Assessment
• This assessment is a deep dive into the commercial marketsin San Mateo looking for answers to questions like: What are the unique pressures/attributesthat affect vacanciesin office, retail and hospitality in San Mateo? Are the retail vacancies on target for the Bay Area? Are there any rent trends that should be looked at, that could affect future City policy? How do these unique characteristics affect the retail, restaurants and service uses in San Mateo? Are the City’s mixed-use design guidelines up -o-date for creating mixed use (retail on the ground floor) projectsthat are leasable?
Using sales tax data made available by the City, Consultant will look at the retail performance of the top 20 retail sales tax generators to determine if their sales performance indicates a risk of closure.
• Deliverables: Vacancy and rent trends memo for retail (including restaurant and service tenants) and office. Mixed -use ground floor design guideline suggestions. A list of retail sales tax generators that could be at risk for closure due to poor sales performance, contingent upon City sales tax availability.
Task 2.c- Commercial District and Node Inventory
Consultant will tour the City’s primary commercial districts to identify commercial/retail activity nodes. The commercial districts will include; (i) Downtown San Mateo, (ii) El Camino Real Corridor, (iii) 25th Ave corridor, (iv) grocery anchored neighborhood shopping centers, and (v) 2 community commercial nodes. This city-wide tour will determine for each center/area, if there is a higher-than-normal vacancy; if there is deferred maintenance issues or physical deterioration; observable public realm conditions affecting commercial vitality; tenant composition; and possible redevelopment conditions.
• Deliverables: Retail Node Map.
Task 2.d – City of San Mateo Current Hotel Review
Consultant will begin the City’s hotel review by reviewing hotel TOT tax generated in the City limits, contingent upon receipt of City’s sales and hotel tax information. Upon review Consultant will identify the top 6 hotel properties. Consultant will tour these properties and provide a general overview of these properties position in the local hospitality industry, and an opinion as to each property’s vulnerability to redevelopment. • Deliverables: an opinion as to each property’s vulnerability to Task 2.e – Review of San Mateo Event Center Information City staff will provide information on the San Mateo Event Center. Consultant will suggest how the event center can be better incorporated into the City’s hotel and commercial tenant cross marketing for the purpose of improving sales in both categories.
Task 3- Community Serving Business Analysis
316 of 833
Professional Consultant Services Page 10 of 21
Rev 4/26
Task 3.a- Community Serving Business Categories
Consultant will create a category list of community and local-serving retail businesses as is normally used in the retail industry. Consultant will work with City staff to determine if this category list effectively reflects the City’s understanding of its local serving retail. • Deliverables: Local Serving Retail Category list.
Task 3.b- Business Access Evaluation
To ensure the City has community serving businesses spread throughout the City in a manner that provides access to most of the City’s constituents, Consultant will evaluate where the concentration of these businesses exists and determine if this is in line with normal retail type location patterns, or if new or revised policy is needed to create new areas for local serving businesses allowing for better constituent access.
• Deliverables: Map of the City where access to community-serving businesses may be limited
Task 4- Commercial Displacement and Redevelopment Pressure Assessment Task 4.a- Redevelopment Pressure and Displacement Conditions Analysis Consultant will review the submitted applications for housing on commercial sites in the City.
Consultant will drive all of the proposed housing sites to evaluate the commercial displacement.
While touring the City, Consultant will also identify commercial areas that appear to be ripe for a change of use.
If the City provides sales tax data, Consultant will estimate the potential loss of sales tax revenue associated with commercial areas that are proposed to transition to housing. In addition, Consultant will identify (with the help of City staff) the proposed housing development sites where the developer has waived the construction of retail on site using the State’s Housing Density Bonus Law.
Regarding calculating the possible sales tax loss on identified Housing Element commercial sites within San Mateo, this calculation will be done at a later time with the Community Development Department.
• Deliverables: (i) a City map showing the commercials sites with housing proposals along with other commercial areas that appear ripe for change; The map will include the identification of the housing sites where developers have asked for a waiver of retail based on the State Housing Density Bonus Law. (ii) If City sales tax information is available, a memo outlining potential sales tax loss when housing is built on submitted sites will be completed.
Task 5- Stakeholder & Business Engagement
Task 5.a- Stakeholder Interviews
Consultant will conduct stakeholder outreach, (using a stakeholder list provided by the City) to better understand the local market conditions in San Mateo. Questions for stakeholders will revolve around business challenges; local business climate (including City permit process); redevelopment trends; and opportunities for commercial preservation.
Stakeholder categories should include; local property owners; commercial brokers; developers building in San Mateo; small business operators; Community organizations; Chamber of Commerce and/or the Downtown Association representatives; and City staff involved in permitting and regulation of businesses. Identified stakeholders to date include 317 of 833
Professional Consultant Services Page 11 of 21
Rev 4/26
John Hutar of the San Mateo County Convention and Visitors Bureau and the owner of Peter Pan Motors, the BMW auto dealer located in the City of San Mateo. • Deliverables: A summary memo listing comments from stakeholders.
Task 5.b- Business Survey
Consultant will prepare (with the help of the City to translate the survey into Spanish and Mandarin) a business survey. Consultant will coordinate with City technology staff to upload the business survey on a City sponsored webpage.
The purpose of the survey is to gather direct feedback regarding commercial conditions and business retention and expansion concerns. Consultants will review and disseminate the results.
• Deliverables: A memo recapping the survey responses with copy of the surveys attached.
Task 5.c – Hotel General manager Interviews
Outreach will be conducted to the general managers of the top 6 hotels in the City identified in Task 2.d. This is to gain a better understanding of the hotel’s annual occupancy and operational challenges, if any.
Topics to be discussed during the meetings/interviews will include the following:
• Percentage breakdown of customers from business, tourism, general visitors, and special events, conferences (ex. Sporting, personal growth, health care, etc). • Current operating challenges, if any
• Performance for last five years
o Changes in the local market conditions since COVID that have affected occupancy and operations.
o Opportunities to increase room stays
o Perspective/opinion on San Mateo Convention and Visitors Bureau’s marketing efforts.
o Other marketing/promotion do the hotels use
o What resources and assistance would be helpful for addressing challenges and opportunities?
o What can the City do to assist with other challenges and opportunities? • Deliverables: A memo summarizing the overall feedback from the focus groups and interviews in relation to the hotel’s performance within the City of San Mateo.
Task 5.d – San Mateo Event Center Interview
One 30 min interview will be conducted with Dana Stoher of the San Mateo Event Center determine the current operating challenges and opportunities that impact the capacity for additional events/programs. Consultant will ask about any opportunities for increasing synergy and partnerships with the City and cross marketing opportunities with hotels, restaurants, and other local entities.
• Deliverables: A short memo that provides an overview of the interview and the feedback received.
318 of 833
Professional Consultant Services Page 12 of 21
Rev 4/26
Task 6- Best Practices & Comparative Case Studies
Task 6. National Best Practices
Consultant will contact the ICSC Community Advancement Services to request examples of national programs for strengthening locally serving commercial tenants/districts to determine their inclusions; their effectiveness; and the participation of the cities. • Deliverables: a summary of the list of national cities that have implemented programs for the purpose of strengthening locally serving tenants and districts, and a recap of activities that the corresponding city had to take to bring about such solutions.
Task 7- Strategic Recommendations & Policy Suggestions
Consultant will write a summary memorandum, with the top 10 recommendations, using the previous deliverables as exhibits, and outlining suggested strategies and tools including:
• Business Retention Strategies- Implementation-oriented strategies to support small businesses and neighborhood serving retail uses.
• Commercial Preservation Tools- Consultant will evaluate current policy tools in the City of San Mateo, intended to preserve locally serving retail uses. • Redevelopment Mitigation Strategies- In this environment of State housing laws, there are very few redevelopment mitigation strategiesthat do not include financial compensation to the tenants needing to move. But Consultant will speak with other cities to determine if any city hasfound other ways in which to effectively help tenants relocate when redevelopment occurs at their site.
• Economic Development Work Plan Coordination - Consultant will coordinate findings and suggestions with the current ED Workplan.
• Economic Development Strategies- Consultant will evaluate economic development policies and practices intended to support long-term business attraction, retention and commercial vitality that are relevant to San Mateo businesses.
This will include suggestions on how to incorporate the San Mateo Event Center’s marketing events into programs to improve occupancy and sales volumes at City hotels and retail tenants.
• Hospitality Asset Retention and Conversion Considerations– Consultant will identify hotel properties that may be candidates for conversion to housing.
Consultant can provide proactive ideas and actions the City could initiate to retain hotels considering conversion to housing.
319 of 833
Professional Consultant Services Page 13 of 21
Rev 4/26
EXHIBIT B
FEE RATES
City of San Mateo Scope Matrix Hours $250.00 $195.00
SC-
$95/HR
Task 1 - Project Initiation, Baseline Data
In person Kick-off Meeting 6 hrs 2 2 2
Review existing data/plans/reports/etc as outlined in
scope
15 hrs 5 5 5
Review City policies that could affect small business
in the future. 8 hrs 3 4 1
Compile notes and relevant information for recap into
a memo. 2 hrs 0 0 2
write memo . 8 hrs 4 3 1
SUB-TOTAL OF HRS- 39 14 14 11
Deliverables: Kickoff meeting recap memo
Meetings: 1
Task 2 - Existing Conditions and Market Assessment
2.a - Citywide Demographic Analysis
Gather and analyze demographic reports for office,
retail and hospitality 6 hrs 3 1 2
Run Placer ai reports for consumer spending/leakage 8 hrs 4 4 Calculate leakage spend for retail tenant store
formation 6 hrs 6
Identify retail categories underrepresented in the City to identify leakage 7 hrs 3 1 3
Research national trends for office and neighborhood
serving retail leasing, along with hospitality trends.
Identify how these trend might affect the commercial
(Office, retail and hotel) landscape in the future. 10 hrs 3 3 4 SUB-TOTAL OF HRS 37 19 5 13
Deliverables:
A Demographic summary and retail leakage report
with a list of retail categories that are
underrepresented in San Mateo.
Meetings: 00 hrs
2.b - Commercial Market Assessment
320 of 833
Professional Consultant Services Page 14 of 21
Rev 4/26
Research commercial markets in San Mateo - Identify vacancies, rent trends, other unique characteristics
20 hrs 8 6 6
Determine how the various conditions of the commercial market will affect commercial uses in San Mateo. 6 hrs 5 1
Review City's mixed-use design guidelines 2 hrs 2 0 0
Determine if current mixed-use guidelines for the retail spaces will result in leasable retail in mixed use projects. 1 hr 1 Prepare an office and retail vacancy and rent trends memo 7 hrs 4 1 2 **Review provided data to examine retailer performance of top 20 retail sales tax generators 5 hrs 2.5 2.5 0
**Analyze top 20 retail tenants to determine if at risk of closure based on sales performance 6 hrs 3 3 0
**Provide a list of retailers at risk of closure due to poor sales performance for the memo. 1 hr 1 0 0
SUB-TOTAL OF HRS
48 HRS 26.5 13.5 8
Deliverables:
Vacancy and Rent Trends memo for retail (including restaurant and service tenants) and office. Mixed-Use Ground Floor Design guideline suggestions. List of retail sales tax generators that could be at risk for closure due to poor sales performance, contingent upon sales tax availability.
*** Sales tax data must be made available for these tasks.
2.c - Commercial District and Node Inventory
Tour City's primary commercial districts to identify retail nodes. 10 hrs 4 3 3
Gather information on the City's 6 primary commercial districts identified in scope
15 hrs 4 4 7
Run at least 2 Placer ai reports for each node to determine typical activity performance of the retail nodes
15 hrs 0 015
Compile and analyze information obtained for nodes, retail districts and Placer.ai data for proper listing of retail nodes 8 hrs 4 4 0 Develop and Prepare Retail Node Map 7 hrs 2 0 4
SUB-TOTAL OF HRS 54 14 1129
321 of 833
Professional Consultant Services Page 15 of 21
Rev 4/26
Deliverables: Retail Node Map.
2.d - City of San Mateo Current Hotel Review
Review annual hotel TOT tax generated w/in city limits for past three years.
7 hrs 3.5 3.5 0
After review , Consultant will research the top 6 hotel properties. 10 hrs 2 2 6
Tour the 6 hotels and gather necessary information and data 9 hrs 3 3 3
Analyze the information and provide a general overview of each hotel within the local hospitality industry.
15 hrs 7 8 0
Determine property's vulnerability for redevelopment.
15 hrs 5 5 3
write opinion memo
6 hrs 4 1 1
SUB-TOTAL OF HRS 60 24.5 22.513
Deliverables:
An opinion as to each property's vulnerability to redevelopment with an overall view of the current hotel market in the Bay Area.
2.e - Review of San Mateo Event Center Information
Review of City provided info on Event Center 1 2 1
Identification of ideas for cross marketing Event Center with local hotels and tenants. 2 3 1
Write short memo 2 3 1
SUB-TOTAL HRS 16 5 8 3
Deliverables:
short memo on possible cross marketing between event center and City's hotels and retail tenants.
Task 3 - Community Serving Business Analysis
3.a - Community Serving Business Categories
Pull industry data for retail categories
4 hrs 2 0 2
Create a category list of types of community and local-serving retail businesses based on the research
5 hrs 2 0 3
Review prepared category list with City staff to determine if it reflects City's understanding of its local serving retail
3 hrs 1 2 0
Prepare final list
3 hrs 1 0 2
322 of 833
Professional Consultant Services Page 16 of 21
Rev 4/26
SUB-TOTAL HRS
15 HRS 6 2 7
Deliverables: Local Serving Retail Category List.
3.b - Business Access Evaluation
Once city staff and Consultant approve definition of locally serving retail desired, Consultant will research the location of such tenants within the city
12 hrs 4 2 6
Map the concentration of these businesses 8 hrs 1 0 7
Determine if it aligns with normal patterns or if policy makers should focus on this. 3 hrs 3 0 0
Identify areas where the concentration of these businesses is abnormally low 8 hrs 2 2 4
Highlight the map where the concentration of these businesses are limited 4 hrs 0 0 2
SUB-TOTAL HRS 33 10 419
Deliverables:
Map of the City where access to community-serving businesses may be limited.
Task 4 - Commercial Displacement and Redevelopment Pressure Assessment
4.a - Redevelopment Pressure and Displacement Conditions Analysis
Review all submitted applications for housing on commercial sites in City 6 hrs 5 0 1
Physically visit all of the proposed housing sites 9 hrs 3 3 0 With information gathered on the tour, evaluate potential commercial displacement
10 hrs 2 2 5
Identify commercial areas primed for change of use 2 hrs 2 0 0 Prepare a map identifying transitioning commercial areas based on the gathered info
12 hrs 4 0 8
**If City authorizes sales tax review, Consultant will estimate the potential loss of sales tax revenue on the sites with housing applications submitted.
15 hrs 7 5 3
**Prepare a memo with the associated findings of sales tax loss for commercial area conversions
12 hrs 9 3 1
SUB-TOTAL HRS 65 341318
323 of 833
Professional Consultant Services Page 17 of 21
Rev 4/26
Deliverables:
(i) A city map showing the commercial sites with housing proposals along with other commercial areas that appear ripe for change; On such map, identification of the housing sites wherein developers have asked for a waiver of retail based on the State Housing Density Bonus Law. **(ii) Using sales tax information, a memo outlining potential sales tax loss when housing is built on the submitted sites.
Task 5 - Stakeholder & Business Engagement
5.a - Stakeholder Interviews
Review stakeholder outreach list provided by the City (to be limited to 15 contacts)
2 hrs 1 1 0
Schedule stakeholder outreach calls/appointments
10 hrs 0 07.5
Prepare questions for stakeholders around topics outlined in the Scope and get City staff approval
10 hrs 5 5
Stakeholder Outreach
15 hrs 7 8 0
Prepare Summary Memo
10 hrs 2 7 1
SUB-TOTAL HRS 44.5 15218.5
Deliverables: A summary memo listing comments from stakeholders.
5.b - Business Survey
0 Prepare a business survey to help gather direct feedback on commercial conditions and business retention concerns
8 hrs 2 5 1
Coordination with City technology staff for loading of the survey onto a City sponsored webpage.
7 hrs 0 3 4
Review results and follow up with business person for any clarifications where possible.
5 hrs 1 3 1
Summarize the feedback received from the business survey. 4 hrs 1 2 1
Write a recap memo on the survey responses with the completed surveys attached.
8 hrs 2 5 1
SUB-TOTAL HRS 32 618 8
Deliverables:A memo recapping the survey responses with copy of the surveys 324 of 833
Professional Consultant Services Page 18 of 21
Rev 4/26
attached.
5.c - Hotel General Manager
Interviews
Research and identify the general
managers of the top 6 hotels within the
City based on TOT generation. 6 hrs 1 1 3
Outreach to managers of the 6 hotels to
set up meetings and interviews 4 hrs 0 0 3
Conduct meetings and interviews with
the hotel managers to gain a deeper and
direct understanding of how the hotels
are performing in the City based on the
topics outlined in the scope. 6 hrs 3 3 0
Summarize and analyze the information
received from the hotel managers. 6 hrs 3 3 0
Based on the comments received - write
a summarizing memo outlining feedback
from hotel general managers. 8 hrs 3 4 1
SUB-TOTAL HRS 28 10 11 7
Deliverables:
A memo summarizing the overall
feedback from the focus groups and
interviews in relation to the hotels
performance within the City of San
Mateo.
5.d - San Mateo Event Center
Interview
Review of questions for Event Center
General Manager with City Staff 2 hrs 1 1 0
Set up and hold Interview with Dana
Stoher of Event Center 3 hrs 1 1 1
Write Memo 2 hrs 1 1 0
SUB-TOTAL HRS 7hrs 3 3 1
Deliverables:
Memo providing an overview of interview
with Danda Stoher.
Task 6 - Best Practices & Comparative Case
Studies
6.- National Best Practices
Contact ICSC Community Advancement
Services to request examples of national
programs for strengthening locally
serving commercial tenants/districts 2 hrs 2 0 0
Research and outreach to the identified
cities 10 hrs 5 3 2
325 of 833
Professional Consultant Services Page 19 of 21
Rev 4/26
Prepare a summary memo identifying
the cities with Community Advancement
Programs, what the programs included
and if they were successful in
strengthening the locally serving retail
tenants as intended by the cities. 10 3 3 1
SUB-TOTAL HRS 19 10 6 3
Deliverables: