Cities Index.
PRS Corridor Study Adoption 022222

San Pablo City Council
February 22, 2022

Document
PRS Corridor Study Adoption 022222
Meeting
February 22, 2022
Body
San Pablo City Council
Original file
4.3 MB
Text extracted from the city's file for reading and search. Open the original on sanpablo.legistar1.com. That file is the official record.

San Pablo Bicycle and
Pedestrian Corridor Study
San Pablo City Council
February 22, 2022
City Project Team:

Sarah Kolarik, Karineh Samkian, Jimmy Zhou
Consultant Team:

Toole Design, Kimley-Horn
This Study was made possible by a Sustainable Communities Grant from Caltrans with SB1 (gas tax) funds.

Bicycle and Pedestrian Master Plan
Goals:
 Improve health through active transportation
 Improve pedestrian & bicyclist safety
 Improve air quality & reduce greenhouse gas emissions  Increase mobility and livability for residents
City Council adopted the Bicycle and Pedestrian Master
Plan in 2017

Other Council Priorities
City Council Priority Workplan FY 2021-23
(Adopted/Effective 03/15/21):

Build a Healthy Community
 103: Improve Connections to Healthy Eating and Active Living  109: Develop Public Facilities for Active Living
Enhance Community Resilience
 202: Develop and Implement Long-Term Environmental
Stewardship Goals
Improve Public Safety
 510.1: Improve Traffic and Pedestrian Safety through
Enforcement, Outreach, and Environmental Design
Childhood Obesity Prevention Task Force
Community Action Plan (2014):
 Policy and Program Priority of “Active Living”

Project
Summary

1. San Pablo Avenue
(Evans Ave to Rheem Ave)

2. San Pablo Avenue (Road
20 to Rumrill Blvd)

3. Broadway Avenue

4. El Portal Drive

5. Road 20 (San Pablo Ave
to El Portal Dr)

6. Church Lane (at San
Pablo Ave)

7. San Pablo Dam Road
(Morrow Dr to Amador St)

8. Giant Road
10 9
5 6
3 2
8 1
7 4
Shared-Use Paths:

9. Wanlass Trail
(through Wanlass
Park)

10. Princeton Plaza
Trail (between San
Pablo Dam Rd,
Brentz Ln and
Hillcrest Road)
10 9
5 6
3 2
8 1
7 4
Project
Summary
Project Timeline
•TAC #1
•Online Survey
•Community Meetings
•“Pop-up” Sidewalk Decals
•TAC #2
•Online Survey
•Community Workshop
•CBO “Pop-up” Bike Ride
•“Pop-up” Field Surveys
•TAC #3
•“Walk & Bike Broadway”
T
emporary Demonstration
•Public Agency Meetings
Community Engagement
Community Based Organizations
Community Engagement
Community Meetings

Online Survey & Map
Community Engagement
Sidewalk Decals

Mailers
Door Hangers
Community Engagement
Community Workshop
Community Engagement
Pop-Up Bike Ride
Community Engagement
Field Surveys

Community Engagement
Temporary Demonstration

Concept Designs
Broadway Avenue
Traffic Volume: Medium
Posted Speed Limit: 25 MPH
Existing Street

Broadway Avenue
Existing
Proposed

El Portal Drive
Traffic Volume: High
Posted Speed Limit: 25 MPH
Existing Street

El Portal Drive
Existing
Proposed –
Alt 1
Proposed –
Alt 2
5’ 5’12’ 12’
12’5’ 5’
San Pablo Avenue
(South)
Traffic Volume: Very High
Posted Speed Limit: 35 MPH
Existing Street

San Pablo Avenue (South)
Existing
Proposed
11’ 10’
10 9
5 6
3 2
8 1
7 4

Thank you!
Supplemental Slides
Giant Road
Traffic Volume: Medium
Posted Speed Limit: 30 to 35 MPH
Existing Street
Giant Road
Existing
Proposed
San Pablo Dam Road
Traffic Volume: Very High
Posted Speed Limit: 35 MPH
Existing Street

San Pablo Dam Road
Existing
Proposed
San Pablo Avenue
(North)
Traffic Volume: Very High
Posted Speed Limit: 35 MPH Existing Street

San Pablo Avenue (North)
Existing
Proposed
Church Lane
Traffic Volume: High
Posted Speed Limit: 30 MPH

Church Lane
Road 20
Traffic Volume: Medium
Posted Speed Limit: 25 MPH Existing Street

Road 20
Existing
Proposed

← All documents from this meeting