Giant Road Cycletrack and
Pavement Repair Project
San Pablo City Council
February 22, 2022
City Project Team:

Ronalyn Nonato, Associate Engineer
Leck Soungpanya, Public Works Inspector
Sarah Kolarik, Environmental Program Analyst
Project Background
San Pablo General Plan 2030 (adopted 2011)
Bicycle and Pedestrian Master Plan
(adopted 2017)
 Improve health through active transportation
 Improve pedestrian & bicyclist safety
 Improve air quality & reduce greenhouse gas
emissions
 Increase mobility and livability for residents
Bicycle and Pedestrian Corridor Study
(ongoing)

Project
Summary

1. San Pablo Avenue
(Evans Ave to Rheem Ave)

2. San Pablo Avenue
(Road 20 to Rumrill Blvd)

3. Broadway Avenue

4. El Portal Drive

5. Road 20 (San Pablo Ave
to El Portal Dr)

6. Church Lane (at San
Pablo Ave)

7. San Pablo Dam Road
(Morrow Dr to Amador St)

8. Giant Road
10 9
5 6
3 2
8 1
7 4
Giant Road
Existing Conditions

Existing Conditions
Proposed Conditions

 San Pablo General Plan 2030 (2011)
 San Pablo Bicycle and Pedestrian Master
Plan (2017)
 San Pablo Bicycle and Pedestrian Corridor
Study (pending Council adoption)
 Custom mailers for online workshop
 Sidewalk stickers on Giant Road
 Targeted outreach to:
• Giant Road Trade Center
• West Contra Costa Unified School District / Lake
Elementary School
• Giant Road Apartments (East Bay Asian Local
Development Corporation, EBALDC)
• Devon Square HOA
• Checkers Towing
• BNSF Railroad / California Public Utilities Commission • City of Richmond
Community Engagement

Project Budget
 One Bay Area Grant (OBAG) 2:
 $618,000 (for pavement maintenance/repair)
 $700,000 (for cycletrack)
 Transportation Development Act 3 (TDA 3):
 $150,000 (for cycletrack)
 City of San Pablo
 $90,000 (General Fund, FY22 adopted CIP budget)
 $20,780 (General Fund Designated Reserve, transferred from Vale Rd CIP) Total Project Funding: ~$1,580,000
Schedule
Design:
 Concept Design: Complete
Presentation to the Public Safety Standing
Committee (Xavier & Cruz) on 10/05/21
 Final Design: In progress
Includes coordination with BNSF Railroad,
California Public Utilities Commission, City
of Richmond
Construction:
 Bid: End of 2022
 Construction: Spring 2023

Questions?
Ronalyn Nonato
[email protected]
(510) 215-3065