Cities Index.
Attachment A - Proposed Fee Schedule

San Pablo City Council
June 6, 2022

Document
Attachment A - Proposed Fee Schedule
Meeting
June 6, 2022
Body
San Pablo City Council
Pages
7
Original file
802 KB
Text extracted from the city's file for reading and search. Open the original on sanpablo.legistar1.com. That file is the official record.

FY 2022 2.6% ECI December 2020FY 2023
Service Name Fee Description Base Fee Base Fee
Assembly (1,000 sf) Sq Ft 2,788$ plus 0.14$ per sq ft over 1,000 2,860$ plus 0.14$ per sq ft over 1,000 Assembly (5,000 sf) Sq Ft 3,337$ plus 0.18$ per sq ft over 5,000 3,423$ plus 0.18$ per sq ft over 5,000 1 Assembly (10,000 sf) Sq Ft 4,225$ plus 0.30$ per sq ft over 10,000 4,334$ plus 0.30$ per sq ft over 10,000 Assembly (20,000 sf) Sq Ft 7,182$ plus 0.18$ per sq ft over 20,000 7,368$ plus 0.19$ per sq ft over 20,000 Assembly (50,000 sf) Sq Ft 12,675$ plus 0.18$ per sq ft over 50,000 13,004$ plus 0.19$ per sq ft over 50,000 Business (1,000 sf) Sq Ft 2,554$ plus 0.13$ per sq ft over 1,000 2,620$ plus 0.13$ per sq ft over 1,000 Business (5,000 sf) Sq Ft 3,057$ plus 0.16$ per sq ft over 5,000 3,136$ plus 0.17$ per sq ft over 5,000 2 Business (10,000 sf) Sq Ft 3,870$ plus 0.27$ per sq ft over 10,000 3,970$ plus 0.28$ per sq ft over 10,000 Business (20,000 sf) Sq Ft 6,579$ plus 0.17$ per sq ft over 20,000 6,750$ plus 0.17$ per sq ft over 20,000 Business (50,000 sf) Sq Ft 11,611$ plus 0.17$ per sq ft over 50,000 11,912$ plus 0.17$ per sq ft over 50,000 Educational (1,000 sf) Sq Ft 2,022$ plus 0.27$ per sq ft over 1,000 2,074$ plus 0.27$ per sq ft over 1,000 Educational (2,500 sf) Sq Ft 2,420$ plus 0.26$ per sq ft over 5,000 2,482$ plus 0.26$ per sq ft over 5,000 3 Educational (5,000 sf) Sq Ft 3,064$ plus 0.43$ per sq ft over 10,000 3,143$ plus 0.44$ per sq ft over 10,000 Educational (10,000 sf) Sq Ft 5,208$ plus 0.27$ per sq ft over 20,000 5,343$ plus 0.27$ per sq ft over 20,000 Educational (25,000 sf) Sq Ft 9,192$ plus 0.27$ per sq ft over 50,000 9,430$ plus 0.27$ per sq ft over 50,000 Factory Industrial (1,000 sf) Sq Ft 2,298$ plus 0.11$ per sq ft over 1,000 2,357$ plus 0.12$ per sq ft over 1,000 Factory Industrial (5,000 sf) Sq Ft 2,751$ plus 0.15$ per sq ft over 5,000 2,822$ plus 0.15$ per sq ft over 5,000 4 Factory Industrial (10,000 sf) Sq Ft 3,483$ plus 0.24$ per sq ft over 10,000 3,573$ plus 0.25$ per sq ft over 10,000 Factory Industrial (20,000 sf) Sq Ft 5,921$ plus 0.15$ per sq ft over 20,000 6,074$ plus 0.15$ per sq ft over 20,000 Factory Industrial (50,000 sf) Sq Ft 10,449$ plus 0.15$ per sq ft over 50,000 10,720$ plus 0.15$ per sq ft over 50,000 High Hazard Group (1,000 sf) Sq Ft 2,192$ plus 0.11$ per sq ft over 1,000 2,248$ plus 0.11$ per sq ft over 1,000 High Hazard Group (5,000 sf) Sq Ft 2,624$ plus 0.14$ per sq ft over 5,000 2,692$ plus 0.14$ per sq ft over 5,000 5 High Hazard Group (10,000 sf) Sq Ft 3,322$ plus 0.23$ per sq ft over 10,000 3,408$ plus 0.24$ per sq ft over 10,000 High Hazard Group (20,000 sf) Sq Ft 5,647$ plus 0.14$ per sq ft over 20,000 5,793$ plus 0.15$ per sq ft over 20,000 High Hazard Group (50,000 sf) Sq Ft 9,966$ plus 0.14$ per sq ft over 50,000 10,225$ plus 0.15$ per sq ft over 50,000 Institutional (1,000 sf) Sq Ft 2,511$ plus 0.12$ per sq ft over 1,000 2,576$ plus 0.13$ per sq ft over 1,000 Institutional (5,000 sf) Sq Ft 3,006$ plus 0.16$ per sq ft over 5,000 3,084$ plus 0.16$ per sq ft over 5,000 6 Institutional (10,000 sf) Sq Ft 3,805$ plus 0.27$ per sq ft over 10,000 3,903$ plus 0.27$ per sq ft over 10,000 Institutional (20,000 sf) Sq Ft 6,469$ plus 0.16$ per sq ft over 20,000 6,637$ plus 0.17$ per sq ft over 20,000 Institutional (50,000 sf) Sq Ft 11,417$ plus 0.16$ per sq ft over 50,000 11,713$ plus 0.17$ per sq ft over 50,000 Mercantile (1,000 sf) Sq Ft 2,618$ plus 0.13$ per sq ft over 1,000 2,686$ plus 0.13$ per sq ft over 1,000 Incremental Fee

CITY OF SAN PABLO COMMUNITY DEVELOPMENT

BUILDING FEES NEW CONSTRUCTION (INSPECTION)
Incremental Fee

Page 1 ends

FY 2022 2.6% ECI December 2020FY 2023
Service Name Fee Description Base Fee Base Fee Incremental Fee

CITY OF SAN PABLO COMMUNITY DEVELOPMENT

BUILDING FEES NEW CONSTRUCTION (INSPECTION)
Incremental Fee
Mercantile (5,000 sf) Sq Ft 3,134$ plus 0.17$ per sq ft over 5,000 3,215$ plus 0.17$ per sq ft over 5,000 7 Mercantile (10,000 sf) Sq Ft 3,967$ plus 0.28$ per sq ft over 10,000 4,070$ plus 0.28$ per sq ft over 10,000 Mercantile (20,000 sf) Sq Ft 6,744$ plus 0.17$ per sq ft over 20,000 6,919$ plus 0.18$ per sq ft over 20,000 Mercantile (50,000 sf) Sq Ft 11,901$ plus 0.17$ per sq ft over 50,000 12,210$ plus 0.18$ per sq ft over 50,000 Residential - Hotels/Motels (2,000 sf) Sq Ft 3,448$ plus 0.08$ per sq ft over 2,000 3,537$ plus 0.09$ per sq ft over 2,000 Residential - Hotels/Motels (10,000 sf) Sq Ft 4,127$ plus 0.11$ per sq ft over 10,000 4,234$ plus 0.11$ per sq ft over 10,000 8 Residential - Hotels/Motels (20,000 sf) Sq Ft 5,224$ plus 0.18$ per sq ft over 20,000 5,359$ plus 0.19$ per sq ft over 20,000 Residential - Hotels/Motels (40,000 sf) Sq Ft 8,882$ plus 0.17$ per sq ft over 40,000 9,112$ plus 0.17$ per sq ft over 40,000 Residential - Hotels/Motels (80,000 sf) Sq Ft 15,674$ plus 0.17$ per sq ft over 80,000 16,081$ plus 0.17$ per sq ft over 80,000 Residential - Multi-Family (2,000 sf) Sq Ft 3,384$ plus 0.17$ per sq ft over 2,000 3,471$ plus 0.17$ per sq ft over 2,000 Residential - Multi-Family (6,000 sf) Sq Ft 4,051$ plus 0.12$ per sq ft over 6,000 4,156$ plus 0.12$ per sq ft over 6,000 9 Residential - Multi-Family (15,000 sf) Sq Ft 5,128$ plus 0.24$ per sq ft over 15,000 5,261$ plus 0.25$ per sq ft over 15,000 Residential - Multi-Family (30,000 sf) Sq Ft 8,718$ plus 0.15$ per sq ft over 30,000 8,944$ plus 0.15$ per sq ft over 30,000 Residential - Multi-Family (75,000 sf) Sq Ft 15,384$ plus 0.15$ per sq ft over 75,000 15,783$ plus 0.15$ per sq ft over 75,000 R-3 Custom (1,000 sf) Sq Ft 1,783$ plus 0.32$ per sq ft over 1,000 1,829$ plus 0.32$ per sq ft over 1,000 10 R-3 Custom (2,500 sf) Sq Ft 2,257$ plus 0.98$ per sq ft over 2,500 2,315$ plus 1.00$ per sq ft over 2,500 R-3 Custom (4,000 sf) Sq Ft 3,725$ plus 0.98$ per sq ft over 4,000 3,821$ plus 1.00$ per sq ft over 4,000 R-3 Models, First Master Plan (1,000 sf) Sq Ft 1,817$ plus 0.32$ per sq ft over 1,000 1,864$ plus 0.33$ per sq ft over 1,000 11 R-3 Models, First Master Plan (2,500 sf) Sq Ft 2,300$ plus 1.00$ per sq ft over 2,500 2,359$ plus 1.02$ per sq ft over 2,500 R-3 Models, First Master Plan (4,000 sf) Sq Ft 3,795$ plus 1.00$ per sq ft over 4,000 3,893$ plus 1.02$ per sq ft over 4,000 R-3 Production Phase (1,000 sf) Sq Ft 1,715$ plus 0.30$ per sq ft over 1,000 1,759$ plus 0.31$ per sq ft over 1,000 12 R-3 Production Phase (2,500 sf) Sq Ft 2,171$ plus 0.94$ per sq ft over 2,500 2,227$ plus 0.97$ per sq ft over 2,500 R-3 Production Phase (4,000 sf) Sq Ft 3,582$ plus 0.94$ per sq ft over 4,000 3,675$ plus 0.97$ per sq ft over 4,000 R-3 New ADU (1,000 sf) Sq Ft 1,664$ plus 0.29$ per sq ft over 1,000 1,707$ plus 0.30$ per sq ft over 1,000 13 R-3 New ADU (2,500 sf) Sq Ft 2,106$ plus 0.91$ per sq ft over 2,500 2,160$ plus 0.94$ per sq ft over 2,500 R-3 New ADU (4,000 sf) Sq Ft 3,476$ plus 0.91$ per sq ft over 4,000 3,566$ plus 0.94$ per sq ft over 4,000 R-3 Room Addition (100 sf) Sq Ft 872$ plus 1.13$ per sq ft over 100 894$ plus 1.16$ per sq ft over 100 14 R-3 Room Addition (500 sf) Sq Ft 1,322$ plus 1.72$ per sq ft over 500 1,356$ plus 1.76$ per sq ft over 500 R-3 Room Additions (1,000 sf) Sq Ft 2,181$ plus 1.72$ per sq ft over 1,000 2,237$ plus 1.76$ per sq ft over 1,000 Residential - Assisted Living (1,000 sf) Sq Ft 3,299$ plus 0.16$ per sq ft over 1,000 3,384$ plus 0.17$ per sq ft over 1,000 Residential - Assisted Living (5,000 sf) Sq Ft 3,949$ plus 0.21$ per sq ft over 5,000 4,051$ plus 0.22$ per sq ft over 5,000

Page 2 ends

FY 2022 2.6% ECI December 2020FY 2023
Service Name Fee Description Base Fee Base Fee Incremental Fee

CITY OF SAN PABLO COMMUNITY DEVELOPMENT

BUILDING FEES NEW CONSTRUCTION (INSPECTION)
Incremental Fee
15 Residential - Assisted Living 6-16 persons
(10,000 sf) Sq Ft 4,999$ plus 0.35$ per sq ft over 10,000 5,128$ plus 0.36$ per sq ft over 10,000 Residential - Assisted Living (20,000 sf) Sq Ft 8,498$ plus 0.22$ per sq ft over 20,000 8,718$ plus 0.22$ per sq ft over 20,000 Residential - Assisted Living (50,000 sf) Sq Ft 14,997$ plus 0.22$ per sq ft over 50,000 15,386$ plus 0.22$ per sq ft over 50,000 Storage (1,000 sf) Sq Ft 2,007$ plus 0.10$ per sq ft over 1,000 2,059$ plus 0.10$ per sq ft over 1,000 Storage (5,000 sf) Sq Ft 2,403$ plus 0.13$ per sq ft over 5,000 2,465$ plus 0.13$ per sq ft over 5,000 16 Storage (10,000 sf) Sq Ft 3,042$ plus 0.21$ per sq ft over 10,000 3,121$ plus 0.22$ per sq ft over 10,000 Storage (20,000 sf) Sq Ft 5,171$ plus 0.13$ per sq ft over 20,000 5,305$ plus 0.14$ per sq ft over 20,000 Storage (50,000 sf) Sq Ft 9,126$ plus 0.13$ per sq ft over 50,000 9,363$ plus 0.14$ per sq ft over 50,000 Accessory (1,000 sf) Sq Ft 1,239$ plus 0.33$ per sq ft over 1,000 1,271$ plus 0.34$ per sq ft over 1,000 17 Accessory (2,000 sf) Sq Ft 1,568$ plus 0.51$ per sq ft over 2,000 1,608$ plus 0.52$ per sq ft over 2,000 Accessory (4,000 sf) Sq Ft 2,588$ plus 0.51$ per sq ft over 4,000 2,655$ plus 0.52$ per sq ft over 4,000 Shell Buildings (1,000 sf) Sq Ft 1,873$ plus 0.09$ per sq ft over 1,000 1,921$ plus 0.09$ per sq ft over 1,000 Shell Buildings (5,000 sf) Sq Ft 2,242$ plus 0.12$ per sq ft over 5,000 2,300$ plus 0.12$ per sq ft over 5,000 18 Shell Buildings (10,000 sf) Sq Ft 2,838$ plus 0.20$ per sq ft over 10,000 2,911$ plus 0.20$ per sq ft over 10,000 Shell Buildings (20,000 sf) Sq Ft 4,825$ plus 0.12$ per sq ft over 20,000 4,950$ plus 0.13$ per sq ft over 20,000 Shell Buildings (50,000 sf) Sq Ft 8,514$ plus 0.12$ per sq ft over 50,000 8,735$ plus 0.13$ per sq ft over 50,000 Tenant Improvement: Non Structural (500 sf) Sq Ft 840$ plus 1.13$ per sq ft over 500 861$ plus 1.16$ per sq ft over 500 Tenant Improvement: Non Structural (1,000 sf) Sq Ft 1,404$ plus 0.07$ per sq ft over 1,000 1,440$ plus 0.07$ per sq ft over 1,000 Tenant Improvement: Non Structural (5,000 sf) Sq Ft 1,681$ plus 0.09$ per sq ft over 5,000 1,724$ plus 0.09$ per sq ft over 5,000 19 Tenant Improvement: Non Structural (10,000 sf Sq Ft 2,128$ plus 0.15$ per sq ft over 10,000 2,183$ plus 0.15$ per sq ft over 10,000 Tenant Improvement: Non Structural (20,000 sf Sq Ft 3,618$ plus 0.09$ per sq ft over 20,000 3,712$ plus 0.09$ per sq ft over 20,000 Tenant Improvement: Non Structural (50,000 sf Sq Ft 6,386$ plus 0.09$ per sq ft over 50,000 6,552$ plus 0.09$ per sq ft over 50,000 Tenant Improvement: Structural (500 sf) Sq Ft 993$ plus 1.33$ per sq ft over 500 1,018$ plus 1.37$ per sq ft over 500 Tenant Improvement: Structural (1,000 sf) Sq Ft 1,660$ plus 0.08$ per sq ft over 1,000 1,703$ plus 0.08$ per sq ft over 1,000 Tenant Improvement: Structural (5,000 sf) Sq Ft 1,987$ plus 0.11$ per sq ft over 5,000 2,038$ plus 0.11$ per sq ft over 5,000 20 Tenant Improvement: Structural (10,000 sf) Sq Ft 2,515$ plus 0.18$ per sq ft over 10,000 2,580$ plus 0.18$ per sq ft over 10,000 Tenant Improvement: Structural (20,000 sf) Sq Ft 4,276$ plus 0.11$ per sq ft over 20,000 4,387$ plus 0.11$ per sq ft over 20,000 Tenant Improvement: Structural (50,000 sf) Sq Ft 7,547$ plus 0.11$ per sq ft over 50,000 7,743$ plus 0.11$ per sq ft over 50,000 Footnotes
For Construction Types I-A,II-A,III-A, I-B,II-B,III-B and I-V an additional 20% will be added to the fee total as determined by the Building Official due to the complexity of the project.

Page 3 ends

2.6% ECI December 2020
FY 2022 FY 2023
ITEM/DESCRIPTION Building
Plan Check
Planning Plan
Check
Public Works
Plan Check
Building
Inspection Total Fee Plan Check
Building
Plan Check
Planning
Plan Check
Public Works
Building
Inspection SUM
Record
Retention
Surcharge (4%)
Technology
Enhancement
Surcharge (5%)
Total Fee
MASONRY FENCES/BLOCK WALLS/RETAINING WALLS 0.04 0.05
Masonry Wall -City Standard -First 100 lineal feet $0 $68 $0 $193 $256 $0 $69 $0 $198 $267 $10 $13 $290 each additional 100 ft $0 $0 $0 $45 $44 $0 $0 $0 $46 $46 $1 $2 $49 Masonry Wall -Special Design- ≤ 6ft high-First 100 lineal feet $198 $68 $0 $322 $576 $203 $69 $0 $330 $602 $24 $30 $656 each additional 100 ft $49 $0 $0 $64 $112 $50 $0 $0 $65 $115 $4 $5 $124 Retaining Wall-City Standard -First 100 lineal ft $0 $68 $0 $258 $319 $0 $69 $0 $264 $333 $13 $16 $362 each additional 100 ft $0 $0 $0 $90 $88 $0 $0 $0 $92 $92 $3 $4 $99 Retaining Wall-Special Design-≤6 ft high-First 100 lineal feet $297 $136 $139 $258 $813 $304 $139 $142 $264 $849 $33 $42 $924 each additional 100 ft $49 $0 $0 $96 $143 $50 $0 $0 $98 $148 $5 $7 $160 Retaining wall-Special design-over 6 ft up to 10 feet high per 100 lineal feet $397 $136 $139 $516 $1,162 $407 $139 $142 $529 $1,217 $48 $60 $1,325 each additional 100 ft $99 $0 $0 $64 $160 $101 $0 $0 $65 $166 $6 $8 $180

FIREPLACES
Fireplace - Special Design - Freestanding $397 $136 $0 $387 $920 $407 $139 $0 $397 $943 $37 $47 $1,027 Factory built fireplace $397 $136 $0 $322 $855 $407 $139 $0 $330 $876 $35 $43 $954

PATIOS RESIDENTIAL/NON RESIDENTIAL
Residential Patio Cover-City Std-lattice First 500 sq ft $0 $136 $0 $387 $523 $0 $139 $0 $397 $536 $21 $26 $583
each additional 500 sq ft $0 $0 $0 $64 $64 $0 $0 $0 $65 $65 $2 $3 $70 Residential Patio Cover City Std-Solid roof-first 500 sq ft $0 $136 $0 $387 $523 $0 $139 $0 $397 $536 $21 $26 $583 each additional 500 sq ft $0 $0 $0 $77 $77 $0 $0 $0 $79 $79 $3 $3 $85 Residential Patio Cover Special Design-Lattice-first 500 sq ft $595 $136 $0 $387 $1,118 $610 $139 $0 $397 $1,146 $45 $57 $1,248 each additional 500 sq ft $49 $0 $0 $77 $126 $50 $0 $0 $79 $129 $5 $6 $140 Residential Patio Cover Special Design-Solid roof-first 500 sq ft $595 $136 $0 $387 $1,118 $610 $139 $0 $397 $1,146 $45 $57 $1,248 each additional 500 sq ft $49 $0 $0 $96 $145 $50 $0 $0 $98 $148 $5 $7 $160 Commercial Patio Cover Special Design-Lattice-first 500 sq ft $595 $136 $0 $387 $1,118 $610 $139 $0 $397 $1,146 $45 $57 $1,248

CITY OF SAN PABLO COMMUNITY DEVELOPMENT

BUILDING MISCELLANEOUS FEES

Page 1 ends

ITEM/DESCRIPTION Building
Plan Check
Planning Plan
Check
Public Works
Plan Check
Building
Inspection Total Fee Plan Check
Building
Plan Check
Planning
Plan Check
Public Works
Building
Inspection SUM
Record
Retention
Surcharge (4%)
Technology
Enhancement
Surcharge (5%)
Total Fee
each additional 500 sq ft $49 $0 $0 $77 $126 $50 $0 $0 $79 $129 $5 $6 $140 Commercial Patio Cover Special Design-Solid roof-first 500 sq ft $595 $136 $0 $387 $1,118 $610 $139 $0 $397 $1,146 $45 $57 $1,248 each additional 500 sq ft $49 $0 $0 $96 $145 $50 $0 $0 $98 $148 $5 $7 $160 Patio Enclosure First 500 sq ft - ICC $297 $136 $0 $322 $755 $304 $139 $0 $330 $773 $30 $38 $841 each additional 500 sq ft $0 $0 $0 $96 $96 $0 $0 $0 $98 $98 $3 $4 $105 Patio Enclosure First 500 sq ft - Conventional/Special Design $794 $136 $279 $516 $1,725 $814 $139 $286 $529 $1,768 $70 $88 $1,926 each additional 500 sq ft $0 $0 $0 $96 $96 $0 $0 $0 $98 $98 $3 $4 $105 Balcony -Special Design-first 500 sq ft $595 $136 $139 $516 $1,386 $610 $139 $142 $529 $1,420 $56 $71 $1,547 each additional 500 sq ft $49 $0 $0 $64 $113 $50 $0 $0 $65 $115 $4 $5 $124

NEW GARAGE/CARPORTS
Residential Garage - wood frame -first 500 sq ft $794 $204 $419 $709 $2,126 $814 $209 $429 $727 $2,179 $87 $108 $2,374 each additional 500 sq ft $49 $0 $0 $258 $307 $50 $0 $0 $264 $314 $12 $15 $341 SFR Carport - City Standard - Solid Roof- first 500 sq ft $198 $204 $139 $387 $928 $203 $209 $142 $397 $951 $38 $47 $1,036 each additional 500 sq ft $0 $0 $0 $77 $77 $0 $0 $0 $79 $79 $3 $3 $85 SFR Carport - Special Design - first 500 sq ft $397 $272 $139 $387 $1,195 $407 $279 $142 $397 $1,225 $49 $61 $1,335 each additional 500 sq ft $49 $0 $0 $64 $113 $50 $0 $0 $65 $115 $4 $5 $124 MFR/Comm Carport - first 500 sq ft $595 $272 $139 $387 $1,393 $610 $279 $142 $397 $1,428 $57 $71 $1,556 each additional 500 sq ft $49 $0 $0 $64 $113 $50 $0 $0 $65 $115 $4 $5 $124 Wood frame first 500 sq ft $595 $272 $69 $516 $1,452 $610 $279 $70 $529 $1,488 $59 $74 $1,621 each additional 500 sq ft (any material) $49 $0 $0 $64 $113 $50 $0 $0 $65 $115 $4 $5 $124 Masonry $595 $272 $69 $516 $1,452 $610 $279 $70 $529 $1,488 $59 $74 $1,621 Metal/other $595 $272 $69 $387 $1,323 $610 $279 $70 $397 $1,356 $54 $67 $1,477 Loft - Special Design - first 500 sq ft $794 $272 $0 $516 $1,582 $814 $279 $0 $529 $1,622 $64 $81 $1,767 each additional 500 sq ft $0 $0 $0 $96 $96 $0 $0 $0 $98 $98 $3 $4 $105

GARAGE CONVERSIONS
Garage Conversion into bedroom/bathroom not ADU - Conventional Construction- First 500 sq ft $794 $272 $139 $516 $1,721 $814 $279 $142 $529 $1,764 $70 $88 $1,922 each additional 500 sq ft $0 $34 $0 $96 $130 $0 $34 $0 $98 $132 $5 $6 $143 Garage Conversion into bedrooms/bathrooms not ADU- Special Design - first 500 sq ft
$794 $272 $139 $516 $1,721 $814 $279 $142 $529 $1,764 $70 $88 $1,922 each additional 500 sq ft $0 $34 $0 $96 $130 $0 $34 $0 $98 $132 $5 $6 $143

Page 2 ends

ITEM/DESCRIPTION Building
Plan Check
Planning Plan
Check
Public Works
Plan Check
Building
Inspection Total Fee Plan Check
Building
Plan Check
Planning
Plan Check
Public Works
Building
Inspection SUM
Record
Retention
Surcharge (4%)
Technology
Enhancement
Surcharge (5%)
Total Fee
Existing Garage Conversion into Accessory Dwelling Unit ADU $1,191 $544 $139 $1032 $2,906 $1,221 $558 $142 $1,058 $2,979 $119 $148 $3,246 Each Additional 500 sq ft $0 $81 $34 $96 $211 $0 $83 $34 $98 $215 $8 $10 $233 New Accessory Dwelling Unit ADU (fee as a new SFD per sq. ft.) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

SWIMMING POOLS
Swimming Pool-Private-First 800 sq ft $496 $136 $139 $774 $1,545 $508 $139 $142 $794 $1,583 $63 $79 $1,725 each additional 500 sq ft $24 $0 $0 $193 $217 $24 $0 $0 $198 $222 $8 $11 $241 Swimming Pool Fiberglass / Vinyl $397 $136 $139 $516 $1,188 $407 $139 $142 $529 $1,217 $48 $60 $1,325 Swimming Pool-Public-First 800 Sq ft $794 $136 $139 $903 $1,972 $814 $139 $142 $926 $2,021 $80 $101 $2,202 each additional 500 sq ft $24 $0 $0 $193 $217 $24 $0 $0 $198 $222 $8 $11 $241 Swimming pool grotto or additional structural/water features - each $198 $0 $0 $258 $456 $203 $0 $0 $264 $467 $18 $23 $508 Swimming pool misc structure or code upgrade/modifications $99 $0 $0 $258 $357 $101 $0 $0 $264 $365 $14 $18 $397 Ponds/Fountains 200 sq ft or less $99 $0 $0 $322 $421 $101 $0 $0 $330 $431 $17 $21 $469

MISCELLANEOUS INSPECTION HOURS
Room Addition Single Family Dwelling - first 500 sq ft
$992 $272 $139 $903 $2,306 $1,017 $279 $142 $926 $2,364 $94 $118 $2,576 each additional 500 sq ft $99 $0 $0 $258 $357 $101 $0 $0 $264 $365 $14 $18 $397 Foundation Repair /seismic upgrade/per 200 lineal ft of foundation $198 $0 $0 $387 $585 $203 $0 $0 $397 $600 $24 $30 $654 Window Residential-new/changeout/skylights 1 to 10 $49 $0 $0 $258 $307 $50 $0 $0 $264 $314 $12 $15 $341 Window Residential-new/changeout/skylights additional each 10 $0 $0 $0 $193 $193 $0 $0 $0 $198 $198 $7 $9 $214 Window Non-Residential-new/changeout/skylights (Each storefront) $297 $204 $0 $258 $759 $304 $209 $0 $264 $777 $31 $38 $846 RE-ROOF RESIDENTIAL COMP OVER 1 EXISTING LAYER
first 3,000 sq ft.
$0 $0 $0 $258 $258 $0 $0 $0 $264 $264 $10 $13 $287

RE-ROOF RESIDENTIAL COMP TEAR OFF AND
RESHEATH/SHEATING REPAIR $0 $0 $0 $322 $322 $0 $0 $0 $330 $330 $13 $16 $359 each additional 1500 sq ft $0 $0 $0 $32 $32 $0 $0 $0 $32 $32 $1 $1 $34

RE-ROOF RESIDENTIAL SPECIAL DESIGN TILE ETC
first 3000 sq ft $99 $0 $0 $258 $357 $101 $0 $0 $264 $365 $14 $18 $397 each additional 1500 sq ft $19 $0 $0 $12 $31 $19 $0 $0 $12 $31 $1 $1 $33

RE-ROOF MULTI-FAMILY RESIDENTIAL AND COMMERICAL
first 20,000 sq ft
$198 $0 $0 $516 $714 $203 $0 $0 $529 $732 $29 $36 $797
each additional 20,000 sq ft $9 $0 $0 $96 $105 $9 $0 $0 $98 $107 $4 $5 $116

Page 3 ends

ITEM/DESCRIPTION Building
Plan Check
Planning Plan
Check
Public Works
Plan Check
Building
Inspection Total Fee Plan Check
Building
Plan Check
Planning
Plan Check
Public Works
Building
Inspection SUM
Record
Retention
Surcharge (4%)
Technology
Enhancement
Surcharge (5%)
Total Fee
STORAGE RACKS 6FT AND HIGHER - INTERIOR
first 500 lineal ft $794 $0 $0 $387 $1,181 $814 $0 $0 $397 $1,211 $48 $60 $1,319 each additional 500 ft $49 $0 $0 $96 $145 $50 $0 $0 $98 $148 $5 $7 $160 STORAGE RACKS 6FT AND HIGHER - EXTERIOR
first 500 lineal ft $595 $272 $0 $387 $1,254 $610 $279 $0 $397 $1,286 $51 $64 $1,401 each additional 500 ft $49 $34 $0 $64 $147 $50 $34 $0 $65 $149 $5 $7 $161 Cell Site/commercial antenna structure-each (NEW) $794 $272 $279 $774 $2,119 $814 $279 $286 $794 $2,173 $86 $108 $2,367 Cell Site/commercial antenna structure-each (MODIFICATION TO EXISTING SITE) $595 $136 $0 $258 $989 $610 $139 $0 $264 $1,013 $40 $50 $1,103 Flag pole - Special Design - each $198 $68 $0 $193 $459 $203 $69 $0 $198 $470 $18 $23 $511 Silo - Per 5000 Cu ft volume $794 $136 $0 $387 $1,317 $814 $139 $0 $397 $1,350 $54 $67 $1,471 Miscellaneous - includes 3 plan checks/inspections only $595 $544 $0 $645 $1,784 $610 $558 $0 $661 $1,829 $73 $91 $1,993

COMMERCIAL/INDUSTRIAL CANOPY
first 1000 sq ft $595 $272 $279 $516 $1,662 $610 $279 $286 $529 $1,704 $68 $85 $1,857 each additional 1000 sq ft $99 $68 $0 $96 $263 $101 $69 $0 $98 $268 $10 $13 $291 Fueling Station Canopy per 2000 sq ft $794 $272 $279 $645 $1,990 $814 $279 $286 $661 $2,040 $81 $102 $2,223 SIGN- NON-ELECTRICAL 200 SQ FT OR LESS
Sign - Non-Electrical 200 sq ft or less refacing only
$0 $68 $0 $258 $326 $0 $69 $0 $264 $333 $13 $16 $362
Wall mounted $99 $68 $0 $193 $360 $101 $69 $0 $198 $368 $14 $18 $400 monument 6 ft high or less $198 $68 $0 $258 $524 $203 $69 $0 $264 $536 $21 $26 $583 Pole sign 200 sq ft or less and 20 ft high or less $297 $136 $0 $258 $691 $304 $139 $0 $264 $707 $28 $35 $770 each additional 200 sq ft and/or each additional 20 ft height $49 $34 $0 $64 $147 $50 $34 $0 $65 $149 $5 $7 $161

SITE ACCESSIBILITY IMPROVEMENTS
per ramp
$397 $0 $0 $193 $590 $407 $0 $0 $198 $605 $24 $30 $659
per stairway $397 $0 $0 $387 $784 $407 $0 $0 $397 $804 $32 $40 $876 per Accessible parking $397 $0 $0 $258 $655 $407 $0 $0 $264 $671 $26 $33 $730 per elevator/lift $794 $0 $0 $774 $1,568 $814 $0 $0 $794 $1,608 $64 $80 $1,752 parking lot restripe per 100 parking spaces $198 $68 $0 $129 $395 $203 $69 $0 $132 $404 $16 $20 $440

DEMOLITION
Pool Demo without Compaction Report
$49 $0 $0 $193 $242 $50 $0 $0 $198 $248 $9 $12 $269

Page 4 ends

ITEM/DESCRIPTION Building
Plan Check
Planning Plan
Check
Public Works
Plan Check
Building
Inspection Total Fee Plan Check
Building
Plan Check
Planning
Plan Check
Public Works
Building
Inspection SUM
Record
Retention
Surcharge (4%)
Technology
Enhancement
Surcharge (5%)
Total Fee
Pool Demo with Compaction report $198 $0 $0 $193 $391 $203 $0 $0 $198 $401 $16 $20 $437 Residential Demo (Interior Only) $198 $0 $0 $322 $520 $203 $0 $0 $330 $533 $21 $26 $580 Residential Demo $198 $0 $0 $387 $585 $203 $0 $0 $397 $600 $24 $30 $654 Non-Res Demo (Interior Only) up to 20,000 square feet $397 $0 $0 $387 $784 $407 $0 $0 $397 $804 $32 $40 $876 Non-Res Demo whole structure $198 $0 $0 $258 $456 $203 $0 $0 $264 $467 $18 $23 $508

MANUFACTURED HOME NEW INSTALLATION OR

REPLACEMENT
first Section 12'x60' (720 sq ft) $397 $0 $0 $387 $784 $407 $0 $0 $397 $804 $32 $40 $876 each additional section $49 $0 $0 $32 $81 $50 $0 $0 $32 $82 $3 $4 $89

MANUFACTURED HOME FOUNDATION SYSTEM HCD

APPROVED ONLY
first Section 12'x60' (720 sq ft) $198 $0 $0 $193 $391 $203 $0 $0 $198 $401 $16 $20 $437 each additional section $49 $0 $0 $32 $81 $50 $0 $0 $32 $82 $3 $4 $89 VAULT
underground $397 $0 $0 $387 $784 $407 $0 $0 $397 $804 $32 $40 $876 above ground $397 $0 $0 $387 $784 $407 $0 $0 $397 $804 $32 $40 $876 Bleachers per 1000 sq ft $595 $136 $0 $516 $1,247 $610 $139 $0 $529 $1,278 $51 $63 $1,392 CASP Review - Per Hour $0 $0 $0 $258 $258 $0 $0 $0 $264 $264 $10 $13 $287 Code Compliance Inspection, Stop Work Order Fine per hour $0 $0 $0 $129 $129 $0 $0 $0 $132 $132 $5 $6 $143 Stand Alone Plan Check -per hour plus permit tech processing fee $198 $0 $0 $0 $198 $203 $0 $0 $0 $203 $8 $10 $221 Investigation Inspection residential single family dwelling $0 $0 $0 $516 $516 $0 $0 $0 $529 $529 $21 $26 $576 Investigation Inspection residential Multifamily up to 20 units $0 $0 $0 $774 $774 $0 $0 $0 $794 $794 $31 $39 $864 Investigation Inspection non-residential $0 $0 $0 $645 $645 $0 $0 $0 $661 $661 $26 $33 $720

SINGLE FAMILY DWELLING AND GARAGE FIRE DAMAGE
Up to 30% Fire Damage Miscellaneous - includes 3 plan
checks/inspections only $595 $0 $0 $774 $1,369 $610 $0 $0 $794 $1,404 $56 $70 $1,530 Up to 30%-70% Fire Damage $794 $136 $0 $1032 $1,962 $814 $139 $0 $1,058 $2,011 $80 $100 $2,191 Up to 70%-100% Fire Damage (Fee for new single family dwelling and new garage will apply) $0 $0 $0 $0 $0

STUCCO/SIDING
Repair up to 500 square feet $0 $0 $0 $387 $387 $0 $0 $0 $397 $397 $15 $19 $431 Additional square feet up to 1,500 $0 $0 $0 $193 $193 $0 $0 $0 $198 $198 $7 $9 $214

Page 5 ends

ITEM/DESCRIPTION Building
Plan Check
Planning Plan
Check
Public Works
Plan Check
Building
Inspection Total Fee Plan Check
Building
Plan Check
Planning
Plan Check
Public Works
Building
Inspection SUM
Record
Retention
Surcharge (4%)
Technology
Enhancement
Surcharge (5%)
Total Fee
Replacement up to 2000 square feet $0 $0 $0 $645 $645 $0 $0 $0 $661 $661 $26 $33 $720

PERMIT AND PLAN CHECK ESTENSIONS
Permit/Plan Check Renewal within 6 months after permit expiration $0 $0 $0 $129 $129 $0 $0 $0 $132 $132 $5 $6 $143 Permit/Plan Check Renewal after 6 months- staff time plus outstanding inspections/plan check $0 $0 $0 $129 $129 $0 $0 $0 $132 $132 $5 $6 $143

DRYROT/TERMITE REPAIR
Dryrot/Termite Repair value of <$10,000 like for like $0 $0 $0 $516 $516 $0 $0 $0 $529 $529 $21 $26 $576 Dryrot/Termite Repair value of <$10,000 with plan check $397 $0 $0 $516 $913 $407 $0 $0 $529 $936 $37 $46 $1,019 Balcony Repair per unit like for like $0 $0 $0 $645 $645 $0 $0 $0 $661 $661 $26 $33 $720 Balcony Repair per unit with plan check $397 $0 $0 $645 $1,042 $407 $0 $0 $661 $1,068 $42 $53 $1,163

DECK/STAIRS REPAIR
Walkway including decking, guard rails. Like for like (First walkway up to 500 square feet) $0 $0 $0 $645 $645 $0 $0 $0 $661 $661 $26 $33 $720 Like for like (each additional deck) $0 $0 $0 $129 $129 $0 $0 $0 $132 $132 $5 $6 $143 Stairs and hand/guard rails. Like for like (First flight of stairs) $0 $0 $0 $516 $516 $0 $0 $0 $529 $529 $21 $26 $576 Like for like (each additional flight of stairs) $0 $0 $0 $129 $129 $0 $0 $0 $132 $132 $5 $6 $143 Walkway including decking, guard rails. With Plan Check (First walkway up to 500 square feet) $397 $0 $0 $516 $913 $407 $0 $0 $529 $936 $37 $46 $1,019 Each additional deck $99 $0 $0 $258 $357 $101 $0 $0 $264 $365 $14 $18 $397 Stairs and hand/guard rails. With Plan Check (First flight of stairs) $397 $0 $0 $258 $655 $407 $0 $0 $264 $671 $26 $33 $730 Each additional flight of stairs $0 $0 $0 $129 $129 $0 $0 $0 $132 $132 $5 $6 $143

OTHER PROCESSES
Refunds 80% of inspection/Plan check fees if no inspections/plan check was performed $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 New Construction Certificate of Occupancy or duplication/Issuance after special Occupancy Inspection $198 $0 $0 $387 $585 $203 $0 $0 $397 $600 $24 $30 $654 Occupancy Inspection for business license $198 $0 $0 $129 $327 $203 $0 $0 $132 $335 $13 $16 $364 Double fees Double the permit fees for work performed prior to obtaining the required permit
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Duplication of job cards/documents $0 $0 $0 $64 $64 $0 $0 $0 $65 $65 $2 $3 $70 Duplication of plans –fee +28% $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Research fee hourly minimum 1 hour $0 $0 $0 $129 $129 $0 $0 $0 $132 $132 $5 $6 $143 sheds over 120 square feet up to 500 square feet $595 $272 $139 $516 $1,522 $610 $279 $142 $529 $1,560 $62 $78 $1,700

Page 6 ends

ITEM/DESCRIPTION Building
Plan Check
Planning Plan
Check
Public Works
Plan Check
Building
Inspection Total Fee Plan Check
Building
Plan Check
Planning
Plan Check
Public Works
Building
Inspection SUM
Record
Retention
Surcharge (4%)
Technology
Enhancement
Surcharge (5%)
Total Fee

DEFERRED SUBMITTAL PLANCHECKS
Residential Trusses (Hourly minimum 2 hours) $397 $0 $0 $0 $397 $407 $0 $0 $0 $407 $16 $20 $443 Non Residential Trusses (Hourly Minimum 2 hours) $397 $0 $0 $0 $397 $407 $0 $0 $0 $407 $16 $20 $443 Alternate means and methods review (Hourly 2 hours minimum) $397 $0 $0 $0 $397 $407 $0 $0 $0 $407 $16 $20 $443 Technology enhancement fee 5% of permit fee $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Document archive fee/ scanning per page $1 $0 $0 $0 $1 $1 $0 $0 $0 $1 $0 $0 $1

RESIDENTIAL HEALTH AND SAFETY
Rental/Re-Sale Property Application/Inspection
SFR/Condo/TH/Duplex - Section 15.52 $0 $0 $0 $438 $438 $0 $0 $0 $449 $449 $17 $22 $488 Rental Re-Sale Property Application/Inspection Multi-family up to 10 Units - Section 15.52 $0 $0 $0 $627 $627 $0 $0 $0 $643 $643 $25 $32 $700 Additional Per Dwelling Units (Rental/Re-sale) Duplex/Multiple Units - Section 15.52 $0 $0 $0 $74 $74 $0 $0 $0 $75 $75 $3 $3 $81 Re-inspection per hour $0 $0 $0 $129 $129 $0 $0 $0 $132 $132 $5 $6 $143

PLANNING FINAL INSPECTION FOR BUILDING
Minor (SFR & Duplex) $0 $204 $0 $0 $204 $0 $209 $0 $0 $209 $8 $10 $227 Major (all others) $0 $408 $0 $0 $408 $0 $418 $0 $0 $418 $16 $20 $454 Footnotes

4. For projects involving buildings or structures that are installed specifically for solar energy applications, fees will be charged based upon the type and/or size of the underlying building or structure in addition to the solar energy fees.

5. Where plans are incomplete or changed so as to require additional plan checking, an additional plan check fee shall be charged at the rate established by the Fee schedule and the minimum hours as determined by the Building Official.

6. Over the counter permits and permits requiring plan review approval by Planning will be charged an additional hourly fee as determined by the Planning Manager.

7. A permit issuance fee of $129 is applicable to all permits

1. The plan check fee includes 3 reviews. Should there be more than 3 reviews, additional hourly fees will be charged based on current billable hourly rates for City of San Pablo reviewers or actual hourly contracted rates for consultant reviews.

2. The above schedule covers most common and straight forward permit types. Fees for projects outside of the listed items shall be estimated by the Building Official based on degree of complexity and size.

3. Where no fee is specified or there is an unusual circumstance, that fee shall be determined by the Building Official.

Page 7 ends

FY 2022 2.6% ECI December 2020 FY 2023
ITEM/DESCRIPTION Inspection Fee Plan Check Fee Total Fee Inspection Fee Plan Check Fee SUM Record
Retention
Surcharge
(4%)
Technology
Enhancement
Surcharge (5%)
Total Fee
ELECTRICAL 0.04 0.05
Stand Alone Plan Check -per hour $0 $199 $199 $0 $205 $205 $8 $10 $223 Single Family Residential
New Service-Single Family Dwelling 225 amp
or less service (includes Circuits, Outlets, Switches, etc no sub-panels included) $258 $297 $555 $264 $304 $568 $22 $28 $618 Sub-Panels-Single family Single phase 225 amps or less $129 $99 $228 $132 $101 $233 $9 $11 $253 New Service-Single Family Single phase Services 400 amps or less $258 $198 $456 $264 $203 $467 $18 $23 $508 Service Change-Out -Single Family Single phase $129 $0 $129 $132 $0 $132 $5 $6 $143 Residential rewire without panel change out minimum fee from 500 to 3,000 square feet (includes Circuits, Outlets, Switches, etc and 1 sub-panels included) $322 $0 $322 $330 $0 $330 $13 $16 $359 Residential rewire with panel change out minimum fee from 500 to 3,000 square feet (includes Circuits, Outlets, Switches, etc and (1) sub-panels included) $387 $0 $387 $397 $0 $397 $15 $19 $431 Residential rewire with panel change out minimum fee from 3,500 to 5,000 square feet (includes Circuits, Outlets, Switches, etc and 1 sub-panels included) $451 $0 $451 $462 $0 $462 $18 $23 $503
400 Amps $129 $297 $426 $132 $304 $436 $17 $21 $474
600 Amps $193 $397 $590 $198 $407 $605 $24 $30 $659
Commercial/Industrial and all three phase - "service only" change out 225 Amps or less $129 $99 $228 $132 $101 $233 $9 $11 $253 400 Amps $129 $198 $327 $132 $203 $335 $13 $16 $364
600 Amps $193 $198 $391 $198 $203 $401 $16 $20 $437
800 Amps $258 $198 $456 $264 $203 $467 $18 $23 $508
1000 Amps $387 $397 $784 $397 $407 $804 $32 $40 $876
1200 Amps $516 $397 $913 $529 $407 $936 $37 $46 $1,019
1600 Amps $516 $496 $1,012 $529 $508 $1,037 $41 $51 $1,129 each 1000 Amps over 1600 $129 $198 $327 $132 $203 $335 $13 $16 $364 Sub-Panels, motor control panels etc. Commercial/Industrial all three phase, includes all circuits

CITY OF SAN PABLO COMMUNITY DEVELOPMENT

MECHANICAL, PLUMBING & ELECTRICAL PERMITS
BUILDING FEES:

Page 1 ends

ITEM/DESCRIPTION Inspection Fee Plan Check Fee Total Fee Inspection Fee Plan Check Fee SUM Record
Retention
Surcharge
(4%)
Technology
Enhancement
Surcharge (5%)
Total Fee
225 Amps or less $258 $397 $655 $264 $407 $671 $26 $33 $730 400 Amps $258 $397 $655 $264 $407 $671 $26 $33 $730
600 Amps $387 $397 $784 $397 $407 $804 $32 $40 $876
800 Amps $387 $595 $982 $397 $610 $1,007 $40 $50 $1,097 1000 Amps $516 $595 $1,111 $529 $610 $1,139 $45 $56 $1,240 1200 Amps $516 $595 $1,111 $529 $610 $1,139 $45 $56 $1,240 1600 Amps $516 $595 $1,111 $529 $610 $1,139 $45 $56 $1,240 each 1000 Amps over 1600 $129 $297 $426 $132 $304 $436 $17 $21 $474 Other Misc Electrical Items
Transformer - each $64 $198 $262 $65 $203 $268 $10 $13 $291 Generator - Permanent - Each under 400 lbs $193 $297 $490 $198 $304 $502 $20 $25 $547 Generator - Permanent - Each over 400 lbs $258 $397 $655 $264 $407 $671 $26 $33 $730 Generator - Permanent - Large Commercial Standby $387 $794 $1,181 $397 $814 $1,211 $48 $60 $1,319 Generator - Temp - more than 8kW $129 $49 $178 $132 $50 $182 $7 $9 $198 Solar - Photovotaic - Residential 15 kW or Less $177 $273 $450 $177 $273 $450 $0 $0 $450 Solar - Photovotaic - Residential ea adtl. 15 kW $32 $49 $80 $32 $49 $80 $0 $0 $80 Solar - Photovotaic - Commercial 15 kW or Less $252 $485 $737 $252 $485 $737 $0 $0 $737 Solar - Photovotaic - Commercial ea adtl. 15 kW $32 $49 $80 $32 $49 $80 $0 $0 $80 Solar - Photovotaic - Residential Load Center Subpanel - 200 amps or less $63 $97 $160 $63 $97 $160 $0 $0 $160 Solar - Photovotaic - Residential Storage Batteries systems - 200 amps or less $63 $97 $160 $63 $97 $160 $0 $0 $160 Temporary Power Pole $64 $49 $113 $65 $50 $115 $4 $5 $124 Temporary Power Pole - Addtl receptable pole $25 $49 $74 $25 $50 $75 $3 $3 $81 Light Stand - First 5 poles $258 $297 $555 $264 $304 $568 $22 $28 $618 Each Addtl 5 Poles $64 $99 $163 $65 $101 $166 $6 $8 $180 Electrical Sign-Per Sign 200 sq ft or less/ includes 2 sign transformers Wall mounted 200 sq ft or less $129 $347 $476 $132 $356 $488 $19 $24 $531
Monument 6 ft high or less and 200 sq ft or less $258 $297 $555 $264 $304 $568 $22 $28 $618 Pole/Monument sign 200 sq ft or less and 20 ft high or less $258 $496 $754 $264 $508 $772 $30 $38 $840

Page 2 ends

ITEM/DESCRIPTION Inspection Fee Plan Check Fee Total Fee Inspection Fee Plan Check Fee SUM Record
Retention
Surcharge
(4%)
Technology
Enhancement
Surcharge (5%)
Total Fee
Each addtl 200 sq ft and/or 20 ft $64 $99 $163 $65 $101 $166 $6 $8 $180 Hazardous Locations Misc Electrical $258 $397 $655 $264 $407 $671 $26 $33 $730 Fuel Cell - Power Generating System, each 200 amp ac $258 $397 $655 $264 $407 $671 $26 $33 $730 Electrical Vehicle Charging Station:

Commercial $258 $595 $853 $264 $610 $874 $34 $43 $951
Residential $129 $198 $327 $132 $203 $335 $13 $16 $364
EV- only Main Service Panel $129 $198 $327 $132 $203 $335 $13 $16 $364 Electrical Meter Reset $193 $0 $193 $198 $0 $198 $7 $9 $214 Misc Electrical circuits-Residential $258 $198 $456 $264 $203 $467 $18 $23 $508 Misc Electrical circuits- Non Residential $258 $397 $655 $264 $407 $671 $26 $33 $730 Swimming pool pump motor $129 $99 $228 $132 $101 $233 $9 $11 $253

PLUMBING
Stand Alone Plan Check Per Hour $0 $198 $198 $0 $203 $203 $8 $10 $221
Plumbing fixtures (each)water closet, lavatories, tubs, dishwasher, urinals, showers, floor drains, etc. $25 $0 $25 $25 $0 $25 $1 $1 $27 Water Heater-storage tank 100 Gal or less $64 $0 $64 $65 $0 $65 $2 $3 $70 Water Heater-storage tank over 100 Gal $64 $198 $262 $65 $203 $268 $10 $13 $291 Water Heater-Gas-instantaneous 199,000 btu or less $129 $198 $327 $132 $203 $335 $13 $16 $364 Water Heater-Electrical instantaneous (intsa hot) $25 $0 $25 $25 $0 $25 $1 $1 $27 Each Gas Outlet $25 $0 $25 $25 $0 $25 $1 $1 $27
Hose Bibb $25 $0 $25 $25 $0 $25 $1 $1 $27
Lawn Sprinkler valve/Backflow device $25 $0 $25 $25 $0 $25 $1 $1 $27 Building Sewer/Trailer park sewer-per unit $64 $0 $64 $65 $0 $65 $2 $3 $70 Septic Tank Demolition $129 $49 $178 $132 $50 $182 $7 $9 $198 Interceptor-Grease, oil, sand etc $193 $397 $590 $198 $407 $605 $24 $30 $659 Water Softener $25 $0 $25 $25 $0 $25 $1 $1 $27
Water Repipe-Single Family Dwelling $258 $99 $357 $264 $101 $365 $14 $18 $397 Misc piping per 300 lineal ft $64 $49 $113 $65 $50 $115 $4 $5 $124 Medical Gas/Air outlets each $32 $198 $230 $32 $203 $235 $9 $11 $255

Page 3 ends

ITEM/DESCRIPTION Inspection Fee Plan Check Fee Total Fee Inspection Fee Plan Check Fee SUM Record
Retention
Surcharge
(4%)
Technology
Enhancement
Surcharge (5%)
Total Fee
Gray Water System $193 $198 $391 $198 $203 $401 $16 $20 $437 Roof Drains - per building $193 $198 $391 $198 $203 $401 $16 $20 $437 Commercial Reclaimed water system $193 $198 $391 $198 $203 $401 $16 $20 $437 Water Service $25 $0 $25 $25 $0 $25 $1 $1 $27
Pressure Regulator $25 $0 $25 $25 $0 $25 $1 $1 $27
Hot Water Recirculation System $25 $0 $25 $25 $0 $25 $1 $1 $27 Solar or Hydronic systems Residential up to 10kWth $193 $297 $490 $198 $304 $502 $20 $25 $547 Backflow valves $64 $99 $163 $65 $101 $166 $6 $8 $180
Sump Pump - Per Building $129 $397 $526 $132 $407 $539 $21 $26 $586 Sewage Ejection System/Grinder Pump - Per Site $129 $397 $526 $132 $407 $539 $21 $26 $586 Swimming pool misc piping/retrofit/repair $129 $49 $178 $132 $50 $182 $7 $9 $198 Above Ground Storage Tank Install (0-660 gallons) $258 $397 $655 $264 $407 $671 $26 $33 $730 Above Ground Storage Tank Install (661+ gallons) $258 $595 $853 $264 $610 $874 $34 $43 $951

MECHANICAL
Stand Alone Plan Check-Per Hour $0 $198 $198 $0 $203 $203 $8 $10 $221 A/C Unit ≤ 100,000 BTU $129 $198 $327 $132 $203 $335 $13 $16 $364 A/C Unit >100,000 BTU $129 $297 $426 $132 $304 $436 $17 $21 $474 A/C Unit >100,000 BTU Roof Top Unit over 400 lbs (each) $193 $397 $590 $198 $407 $605 $24 $30 $659 FAU Furnace or Heat Pump<100,000 BTU $64 $198 $262 $65 $203 $268 $10 $13 $291 FAU Furnace or Heat Pump>100,000 BTU $64 $198 $262 $65 $203 $268 $10 $13 $291 Refrigeration Unit $51 $99 $150 $52 $101 $153 $6 $7 $166 Condensors $51 $79 $130 $52 $81 $133 $5 $6 $144
Boilers 100,000 BTU or less $129 $397 $526 $132 $407 $539 $21 $26 $586 Boilers 500,000 BTU or less $193 $397 $590 $198 $407 $605 $24 $30 $659 Boilers 1,000,000 BTU or less $258 $595 $853 $264 $610 $874 $34 $43 $951 Boilers 1,750,000 BTU or less $322 $595 $917 $330 $610 $940 $37 $47 $1,024 Boilers over 1,750,000 BTU $387 $595 $982 $397 $610 $1,007 $40 $50 $1,097 Compressors $64 $99 $163 $65 $101 $166 $6 $8 $180

Page 4 ends

ITEM/DESCRIPTION Inspection Fee Plan Check Fee Total Fee Inspection Fee Plan Check Fee SUM Record
Retention
Surcharge
(4%)
Technology
Enhancement
Surcharge (5%)
Total Fee
Evaporative Coolers-Residential $129 $148 $277 $132 $151 $283 $11 $14 $308 Evaporative Coolers-Commercial/Industrial $129 $198 $327 $132 $203 $335 $13 $16 $364 Air Handling Unit $64 $297 $361 $65 $304 $369 $14 $18 $401 Environmental Air Duct/Vent Fan single duct/Res range exhaust $25 $49 $74 $25 $50 $75 $3 $3 $81 Type 1 or 2 Hood/Duct system $387 $397 $784 $397 $407 $804 $32 $40 $876 Miscellaneous Duct Work $64 $99 $163 $65 $101 $166 $6 $8 $180 Special Equipment-Spray Booth (Exterior of Bldg) $387 $794 $1,181 $397 $814 $1,211 $48 $60 $1,319 Special Equipment-Spray Booth (Interior of Bldg) $387 $794 $1,181 $397 $814 $1,211 $48 $60 $1,319 Unlisted Equipment(Minimum or by the hour) $129 $198 $327 $132 $203 $335 $13 $16 $364 Wall Heater $129 $198 $327 $132 $203 $335 $13 $16 $364
Commercial Unit Heater $193 $198 $391 $198 $203 $401 $16 $20 $437 Cooling Tower/Chiller $387 $595 $982 $397 $610 $1,007 $40 $50 $1,097 Dryer Duct $25 $99 $124 $25 $101 $126 $5 $6 $137
Fueling Station Dispenser/Equipment $193 $397 $590 $198 $407 $605 $24 $30 $659 Underground Storage Tank (1 tank) $258 $595 $853 $264 $610 $874 $34 $43 $951 Underground Storage Tank (2 tanks) $258 $595 $853 $264 $610 $874 $34 $43 $951 Underground Storage Tank (3 tanks) $258 $595 $853 $264 $610 $874 $34 $43 $951 Underground Storage Tank (add'l tank over 3) $32 $49 $81 $32 $50 $82 $3 $4 $89 Above Ground Storage Tank Install (0-660 gallons) $258 $496 $754 $264 $508 $772 $30 $38 $840 Above Ground Storage Tank Install (661+ gallons) $258 $595 $853 $264 $610 $874 $34 $43 $951 Package wall unit heat /cooling ≤ 100,000 BTU $129 $198 $327 $132 $203 $335 $13 $16 $364 Fireplace-Listed Mechanical per unit $129 $198 $327 $132 $203 $335 $13 $16 $364 Decorative Gas Appliance $129 $198 $327 $132 $203 $335 $13 $16 $364 Product -Conveying Duct System-Dust, Vapor, Central Vacuum system (PC based on dust collection) $387 $992 $1,379 $397 $1,017 $1,414 $56 $70 $1,540

Page 5 ends

ITEM/DESCRIPTION Inspection Fee Plan Check Fee Total Fee Inspection Fee Plan Check Fee SUM Record
Retention
Surcharge
(4%)
Technology
Enhancement
Surcharge (5%)
Total Fee
Fan - coil unit - residential $64 $198 $262 $65 $203 $268 $10 $13 $291 Fan - Whole House $129 $198 $327 $132 $203 $335 $13 $16 $364 Dust Collection System $258 $794 $1,052 $264 $814 $1,078 $43 $53 $1,174 Process piping system - 0-500 ft $258 $397 $655 $264 $407 $671 $26 $33 $730 Process piping system - 501-1,000 ft $387 $397 $784 $397 $407 $804 $32 $40 $876 Process piping system - 1,000+ ft $774 $992 $1,766 $794 $1,017 $1,811 $72 $90 $1,973 Solar or Hydronic systems $0 $0 $0 $0 $0 $0 $0 $0 $0
Swimming Pool Solar System $193 $297 $490 $198 $304 $502 $20 $25 $547 Residential FAU Change out (Same Location) $129 $99 $228 $132 $101 $233 $9 $11 $253 Residential A/C Condenser Change Out (same location) $129 $99 $228 $132 $101 $233 $9 $11 $253 Combo: Residential FAU and/or A/C Condenser Change Out (Same Location) $129 $0 $129 $132 $0 $132 $5 $6 $143 Non-Residential FAU Change out (Same Location) $129 $99 $228 $132 $101 $233 $9 $11 $253 Non-Residential A/C Condenser Change Out (same location) $129 $99 $228 $132 $101 $233 $9 $11 $253 Swimming pool Heater $129 $49 $178 $132 $50 $182 $7 $9 $198 Industrial Ovens $258 $595 $853 $264 $610 $874 $34 $43 $951 Thermal Energy Storage System up to 10kWth $181 $279 $460 $185 $286 $471 $18 $23 $512 Additional kilowatt thermal above 10kWth $15 $0 $15 $15 $0 $15 $0 $0 $15 Solar or Hydronic systems Commercial up to 30 kWth $387 $595 $982 $397 $610 $1,007 $40 $50 $1,097 Additional kilowatt thermal 30 kWth between 30 to 260 kWth $7 $0 $7 $7 $0 $7 $0 $0 $7 Additional kilowatt thermal above 260 kWth $5 $0 $5 $5 $0 $5 $0 $0 $5 Inspections outside of normal business hours, 0-2 hours (minimum charge) $258 $0 $258 $264 $0 $264 $10 $13 $287 Inspections outside of normal business hours, 0-4 hours (minimum charge) $516 $0 $516 $529 $0 $529 $21 $26 $576 Reinspection Fee (per hour) $129 $0 $129 $132 $0 $132 $5 $6 $143 Inspections for which no fee is specifically indicated, per hour (minimum charge = 1 hour) $129 $0 $129 $132 $0 $132 $5 $6 $143

Page 6 ends

ITEM/DESCRIPTION Inspection Fee Plan Check Fee Total Fee Inspection Fee Plan Check Fee SUM Record
Retention
Surcharge
(4%)
Technology
Enhancement
Surcharge (5%)
Total Fee
Additional Plan Review required by changes, additions, or revisions to approved plans, per hour (minimum charge = 1 hour) $0 $198 $198 $0 $203 $203 $8 $10 $221 Footnotes
If fee < $129
‐
Staff will charge $129
If fee > $129
‐
Staff will charge fee
Minimum permit fee issuance is $129 * All stand alone (over the counter) permits will be charged minimum permit issuance plus inspection fee Minimum Plan Check fee is $198
Plan check fee on this schedule is for stand alone MEP items. New construction and tenant improvement projects will be charged the Inspection fee only

Page 7 ends

FY 2022 2.6% ECI December 2020 FY 2023
Service Name Fee Description Base Fee Base Fee
Assembly (1,000 sf) Sq Ft 5,371$ plus 0.26$ per sq ft over 1,000 5,510$ plus 0.27$ per sq ft over 1,000 Assembly (5,000 sf) Sq Ft 6,429$ plus 0.34$ per sq ft over 5,000 6,596$ plus 0.35$ per sq ft over 5,000 1 Assembly (10,000 sf) Sq Ft 8,138$ plus 0.57$ per sq ft over 10,000 8,349$ plus 0.58$ per sq ft over 10,000 Assembly (20,000 sf) Sq Ft 13,835$ plus 0.35$ per sq ft over 20,000 14,194$ plus 0.36$ per sq ft over 20,000 Assembly (50,000 sf) Sq Ft 24,416$ plus 0.35$ per sq ft over 50,000 25,050$ plus 0.36$ per sq ft over 50,000 Business (1,000 sf) Sq Ft 4,585$ plus 0.23$ per sq ft over 1,000 4,704$ plus 0.23$ per sq ft over 1,000 Business (5,000 sf) Sq Ft 5,488$ plus 0.29$ per sq ft over 5,000 5,630$ plus 0.30$ per sq ft over 5,000 2 Business (10,000 sf) Sq Ft 6,947$ plus 0.49$ per sq ft over 10,000 7,127$ plus 0.50$ per sq ft over 10,000 Business (20,000 sf) Sq Ft 11,811$ plus 0.30$ per sq ft over 20,000 12,118$ plus 0.31$ per sq ft over 20,000 Business (50,000 sf) Sq Ft 20,843$ plus 0.30$ per sq ft over 50,000 21,384$ plus 0.31$ per sq ft over 50,000 Educational (1,000 sf) Sq Ft 3,668$ plus 0.48$ per sq ft over 1,000 3,763$ plus 0.49$ per sq ft over 1,000 Educational (2,500 sf) Sq Ft 4,390$ plus 0.47$ per sq ft over 5,000 4,504$ plus 0.48$ per sq ft over 5,000 3 Educational (5,000 sf) Sq Ft 5,558$ plus 0.78$ per sq ft over 10,000 5,702$ plus 0.80$ per sq ft over 10,000 Educational (10,000 sf) Sq Ft 9,448$ plus 0.48$ per sq ft over 20,000 9,693$ plus 0.49$ per sq ft over 20,000 Educational (25,000 sf) Sq Ft 16,674$ plus 0.48$ per sq ft over 50,000 17,107$ plus 0.49$ per sq ft over 50,000 Factory Industrial (1,000 sf) Sq Ft 4,519$ plus 0.22$ per sq ft over 1,000 4,636$ plus 0.23$ per sq ft over 1,000 Factory Industrial (5,000 sf) Sq Ft 5,410$ plus 0.29$ per sq ft over 5,000 5,550$ plus 0.30$ per sq ft over 5,000 4 Factory Industrial (10,000 sf) Sq Ft 6,848$ plus 0.48$ per sq ft over 10,000 7,026$ plus 0.49$ per sq ft over 10,000 Factory Industrial (20,000 sf) Sq Ft 11,642$ plus 0.30$ per sq ft over 20,000 11,944$ plus 0.30$ per sq ft over 20,000 Factory Industrial (50,000 sf) Sq Ft 20,545$ plus 0.30$ per sq ft over 50,000 21,079$ plus 0.30$ per sq ft over 50,000 High Hazard Group (1,000 sf) Sq Ft 4,683$ plus 0.23$ per sq ft over 1,000 4,804$ plus 0.24$ per sq ft over 1,000 High Hazard Group (5,000 sf) Sq Ft 5,606$ plus 0.30$ per sq ft over 5,000 5,751$ plus 0.31$ per sq ft over 5,000 5 High Hazard Group (10,000 sf) Sq Ft 7,096$ plus 0.50$ per sq ft over 10,000 7,280$ plus 0.51$ per sq ft over 10,000 High Hazard Group (20,000 sf) Sq Ft 12,064$ plus 0.31$ per sq ft over 20,000 12,377$ plus 0.32$ per sq ft over 20,000 High Hazard Group (50,000 sf) Sq Ft 21,289$ plus 0.31$ per sq ft over 50,000 21,842$ plus 0.32$ per sq ft over 50,000 Institutional (1,000 sf) Sq Ft 6,550$ plus 0.32$ per sq ft over 1,000 6,720$ plus 0.33$ per sq ft over 1,000 Institutional (5,000 sf) Sq Ft 7,840$ plus 0.42$ per sq ft over 5,000 8,043$ plus 0.43$ per sq ft over 5,000 6 Institutional (10,000 sf) Sq Ft 9,925$ plus 0.69$ per sq ft over 10,000 10,183$ plus 0.71$ per sq ft over 10,000 Institutional (20,000 sf) Sq Ft 16,872$ plus 0.43$ per sq ft over 20,000 17,310$ plus 0.44$ per sq ft over 20,000 Institutional (50,000 sf) Sq Ft 29,775$ plus 0.43$ per sq ft over 50,000 30,549$ plus 0.44$ per sq ft over 50,000 Mercantile (1,000 sf) Sq Ft 4,683$ plus 0.23$ per sq ft over 1,000 4,804$ plus 0.24$ per sq ft over 1,000 Mercantile (5,000 sf) Sq Ft 5,606$ plus 0.30$ per sq ft over 5,000 5,751$ plus 0.31$ per sq ft over 5,000 Incremental Fee

CITY OF SAN PABLO COMMUNITY DEVELOPMENT

BUILDING FEES NEW CONSTRUCTION (PLAN CHECK)
Incremental Fee

Page 1 ends

FY 2022 2.6% ECI December 2020 FY 2023
Service Name Fee Description Base Fee Base Fee Incremental Fee

CITY OF SAN PABLO COMMUNITY DEVELOPMENT

BUILDING FEES NEW CONSTRUCTION (PLAN CHECK)
Incremental Fee
7 Mercantile (10,000 sf) Sq Ft 7,096$ plus 0.50$ per sq ft over 10,000 7,280$ plus 0.51$ per sq ft over 10,000 Mercantile (20,000 sf) Sq Ft 12,064$ plus 0.31$ per sq ft over 20,000 12,377$ plus 0.32$ per sq ft over 20,000 Mercantile (50,000 sf) Sq Ft 21,289$ plus 0.31$ per sq ft over 50,000 21,842$ plus 0.32$ per sq ft over 50,000 Residential - Hotels/Motels (2,000 sf) Sq Ft 7,467$ plus 0.18$ per sq ft over 2,000 7,661$ plus 0.19$ per sq ft over 2,000 Residential - Hotels/Motels (10,000 sf) Sq Ft 8,938$ plus 0.24$ per sq ft over 10,000 9,170$ plus 0.24$ per sq ft over 10,000 8 Residential - Hotels/Motels (20,000 sf) Sq Ft 11,314$ plus 0.40$ per sq ft over 20,000 11,608$ plus 0.41$ per sq ft over 20,000 Residential - Hotels/Motels (40,000 sf) Sq Ft 19,235$ plus 0.37$ per sq ft over 40,000 19,735$ plus 0.38$ per sq ft over 40,000 Residential - Hotels/Motels (80,000 sf) Sq Ft 33,944$ plus 0.37$ per sq ft over 80,000 34,826$ plus 0.38$ per sq ft over 80,000 Residential - Multi-Family (2,000 sf) Sq Ft 6,812$ plus 0.34$ per sq ft over 2,000 6,989$ plus 0.34$ per sq ft over 2,000 Residential - Multi-Family (6,000 sf) Sq Ft 8,154$ plus 0.24$ per sq ft over 6,000 8,366$ plus 0.25$ per sq ft over 6,000 9 Residential - Multi-Family (15,000 sf) Sq Ft 10,322$ plus 0.48$ per sq ft over 15,000 10,590$ plus 0.49$ per sq ft over 15,000 Residential - Multi-Family (30,000 sf) Sq Ft 17,547$ plus 0.30$ per sq ft over 30,000 18,003$ plus 0.31$ per sq ft over 30,000 Residential - Multi-Family (75,000 sf) Sq Ft 30,966$ plus 0.30$ per sq ft over 75,000 31,771$ plus 0.31$ per sq ft over 75,000 R-3 Custom (1,000 sf) Sq Ft 2,822$ plus 0.50$ per sq ft over 1,000 2,895$ plus 0.51$ per sq ft over 1,000 10 R-3 Custom (2,500 sf) Sq Ft 3,573$ plus 1.55$ per sq ft over 2,500 3,665$ plus 1.59$ per sq ft over 2,500 R-3 Custom (4,000 sf) Sq Ft 5,895$ plus 1.55$ per sq ft over 4,000 6,048$ plus 1.59$ per sq ft over 4,000 R-3 Models, First Master Plan (1,000 sf) Sq Ft 3,567$ plus 0.63$ per sq ft over 1,000 3,659$ plus 0.65$ per sq ft over 1,000 11 R-3 Models, First Master Plan (2,500 sf) Sq Ft 4,515$ plus 1.96$ per sq ft over 2,500 4,632$ plus 2.01$ per sq ft over 2,500 R-3 Models, First Master Plan (4,000 sf) Sq Ft 7,451$ plus 1.96$ per sq ft over 4,000 7,644$ plus 2.01$ per sq ft over 4,000 R-3 Production Phase (1,000 sf) Sq Ft 862$ plus 0.15$ per sq ft over 1,000 884$ plus 0.16$ per sq ft over 1,000 12 R-3 Production Phase (2,500 sf) Sq Ft 1,091$ plus 0.47$ per sq ft over 2,500 1,119$ plus 0.49$ per sq ft over 2,500 R-3 Production Phase (4,000 sf) Sq Ft 1,801$ plus 0.47$ per sq ft over 4,000 1,847$ plus 0.49$ per sq ft over 4,000 R-3 New ADU (1,000 sf) Sq Ft 3,293$ plus 0.58$ per sq ft over 1,000 3,378$ plus 0.60$ per sq ft over 1,000 13 R-3 New ADU (2,500 sf) Sq Ft 4,168$ plus 1.81$ per sq ft over 2,500 4,276$ plus 1.85$ per sq ft over 2,500 R-3 New ADU (4,000 sf) Sq Ft 6,878$ plus 1.81$ per sq ft over 4,000 7,056$ plus 1.85$ per sq ft over 4,000 R-3 Room Addition (100 sf) Sq Ft 1,506$ plus 1.94$ per sq ft over 100 1,545$ plus 1.99$ per sq ft over 100 14 R-3 Room Addition (500 sf) Sq Ft 2,282$ plus 2.97$ per sq ft over 500 2,341$ plus 3.04$ per sq ft over 500 R-3 Room Additions (1,000 sf) Sq Ft 3,766$ plus 2.97$ per sq ft over 1,000 3,863$ plus 3.04$ per sq ft over 1,000 Residential - Assisted Living (1,000 sf) Sq Ft 6,550$ plus 0.32$ per sq ft over 1,000 6,720$ plus 0.33$ per sq ft over 1,000 Residential - Assisted Living (5,000 sf) Sq Ft 7,840$ plus 0.42$ per sq ft over 5,000 8,043$ plus 0.43$ per sq ft over 5,000 15 Residential - Assisted Living 6-16 persons (10,000 sf) Sq Ft 9,925$ plus 0.69$ per sq ft over 10,000 10,183$ plus 0.71$ per sq ft over 10,000 Residential - Assisted Living (20,000 sf) Sq Ft 16,872$ plus 0.43$ per sq ft over 20,000 17,310$ plus 0.44$ per sq ft over 20,000

Page 2 ends

FY 2022 2.6% ECI December 2020 FY 2023
Service Name Fee Description Base Fee Base Fee Incremental Fee

CITY OF SAN PABLO COMMUNITY DEVELOPMENT

BUILDING FEES NEW CONSTRUCTION (PLAN CHECK)
Incremental Fee
Residential - Assisted Living (50,000 sf) Sq Ft 29,775$ plus 0.43$ per sq ft over 50,000 30,549$ plus 0.44$ per sq ft over 50,000 Storage (1,000 sf) Sq Ft 3,832$ plus 0.19$ per sq ft over 1,000 3,931$ plus 0.19$ per sq ft over 1,000 Storage (5,000 sf) Sq Ft 4,586$ plus 0.24$ per sq ft over 5,000 4,705$ plus 0.25$ per sq ft over 5,000 16 Storage (10,000 sf) Sq Ft 5,806$ plus 0.41$ per sq ft over 10,000 5,956$ plus 0.42$ per sq ft over 10,000 Storage (20,000 sf) Sq Ft 9,870$ plus 0.25$ per sq ft over 20,000 10,126$ plus 0.26$ per sq ft over 20,000 Storage (50,000 sf) Sq Ft 17,418$ plus 0.25$ per sq ft over 50,000 17,870$ plus 0.26$ per sq ft over 50,000 Accessory (1,000 sf) Sq Ft 2,234$ plus 0.59$ per sq ft over 1,000 2,292$ plus 0.61$ per sq ft over 1,000 17 Accessory (2,000 sf) Sq Ft 2,828$ plus 0.92$ per sq ft over 2,000 2,901$ plus 0.94$ per sq ft over 2,000 Accessory (4,000 sf) Sq Ft 4,667$ plus 0.92$ per sq ft over 4,000 4,788$ plus 0.94$ per sq ft over 4,000 Shell Buildings (1,000 sf) Sq Ft 4,061$ plus 0.20$ per sq ft over 1,000 4,166$ plus 0.21$ per sq ft over 1,000 Shell Buildings (5,000 sf) Sq Ft 4,861$ plus 0.26$ per sq ft over 5,000 4,987$ plus 0.27$ per sq ft over 5,000 18 Shell Buildings (10,000 sf) Sq Ft 6,153$ plus 0.43$ per sq ft over 10,000 6,312$ plus 0.44$ per sq ft over 10,000 Shell Buildings (20,000 sf) Sq Ft 10,461$ plus 0.27$ per sq ft over 20,000 10,732$ plus 0.27$ per sq ft over 20,000 Shell Buildings (50,000 sf) Sq Ft 18,461$ plus 0.27$ per sq ft over 50,000 18,940$ plus 0.27$ per sq ft over 50,000 Tenant Improvement: Non Structural (500 sf) Sq Ft 1,509$ plus 2.03$ per sq ft over 500 1,548$ plus 2.08$ per sq ft over 500 Tenant Improvement: Non Structural (1,000 sf) Sq Ft 2,522$ plus 0.12$ per sq ft over 1,000 2,587$ plus 0.13$ per sq ft over 1,000 Tenant Improvement: Non Structural (5,000 sf) Sq Ft 3,018$ plus 0.16$ per sq ft over 5,000 3,096$ plus 0.16$ per sq ft over 5,000 19 Tenant Improvement: Non Structural (10,000 sf) Sq Ft 3,821$ plus 0.27$ per sq ft over 10,000 3,920$ plus 0.27$ per sq ft over 10,000 Tenant Improvement: Non Structural (20,000 sf) Sq Ft 6,496$ plus 0.17$ per sq ft over 20,000 6,664$ plus 0.17$ per sq ft over 20,000 Tenant Improvement: Non Structural (50,000 sf) Sq Ft 11,463$ plus 0.17$ per sq ft over 50,000 11,761$ plus 0.17$ per sq ft over 50,000 Tenant Improvement: Structural (500 sf) Sq Ft 1,783$ plus 2.39$ per sq ft over 500 1,829$ plus 2.46$ per sq ft over 500 Tenant Improvement: Structural (1,000 sf) Sq Ft 2,980$ plus 0.15$ per sq ft over 1,000 3,057$ plus 0.15$ per sq ft over 1,000 Tenant Improvement: Structural (5,000 sf) Sq Ft 3,567$ plus 0.19$ per sq ft over 5,000 3,659$ plus 0.19$ per sq ft over 5,000 20 Tenant Improvement: Structural (10,000 sf) Sq Ft 4,515$ plus 0.32$ per sq ft over 10,000 4,632$ plus 0.32$ per sq ft over 10,000 Tenant Improvement: Structural (20,000 sf) Sq Ft 7,677$ plus 0.20$ per sq ft over 20,000 7,876$ plus 0.20$ per sq ft over 20,000 Tenant Improvement: Structural (50,000 sf) Sq Ft 13,547$ plus 0.20$ per sq ft over 50,000 13,899$ plus 0.20$ per sq ft over 50,000 Footnotes
For Construction Types I-A,II-A,III-A, I-B,II-B,III-B and I-V an additional 20% will be added to the fee total as determined by the Building Official due to the complexity of the project.

Page 3 ends

FY 2022 2.6% ECI December 2020 FY 2023
ITEM/DESCRIPTION NOTES Application
Fee
Record
Retention
Surcharge
(4%)
Technology
Enhancement
Surcharge (5%)
Total Fee Application
Fee
Record
Retention
Surcharge
(4%)
Technology
Enhancement
Surcharge (5%)
Total Fee
CITY COUNCIL Requires City Council review and approval 0.04 0.05 General Plan Amendment Fee + Actual Cost $10,870 $435 $544 $11,848 $11,152 $446 $557 $12,155 Specific Plan Amendment Fee + Actual Cost $9,317 $373 $466 $10,156 $9,559 $382 $477 $10,418 Zoning Amendment Fee + Actual Cost $7,764 $311 $388 $8,463 $7,965 $318 $398 $8,681 Development Agreement Fee + Actual Cost $10,870 $435 $544 $11,848 $11,152 $446 $557 $12,155 Tentative Subdivision Map - Major (Tract Map up to 30 lots including Vesting Map) Flat Fee - up to 30 lots $9,317 $373 $466 $10,156 $9,559 $382 $477 $10,418 Tentative Subdivision Map - (each additional lot, including Vesting Map)
Per addtl lot $1552 $62 $78 $1,692 $1,592 $63 $79 $1,734 Final Subdivision Map Flat Fee $6,211 $248 $311 $6,770 $6,372 $254 $318 $6,944 PLANNING COMMISSION Requires Planning Commission review and approval Entertainment Permit Flat Fee $3,105 $124 $155 $3,384 $3,185 $127 $159 $3,471 Major Design Review Flat Fee $3,682 $147 $184 $4,013 $3,777 $151 $188 $4,116 Revisions to Approved Plans-Major Flat Fee $3,105 $124 $155 $3,384 $3,185 $127 $159 $3,471 Variance Flat Fee $4,603 $184 $230 $5,017 $4,722 $188 $236 $5,146 Conditional Use Permit Flat Fee $4,347 $174 $217 $4,738 $4,460 $178 $223 $4,861 Amendment to Conditional Use Permit Flat Fee $3,273 $131 $164 $3,568 $3,358 $134 $167 $3,659 Subdivision Flat Fee $6,211 $248 $311 $6,770 $6,372 $254 $318 $6,944 ZONING ADMINISTRATOR Requires Z. A. (or authorized representative) review and approval
Home Occupation Permit Flat Fee $465 $19 $23 $507 $477 $19 $23 $519 Certificate of Compliance (including Conditional) Flat Fee + Filing Fees $2,484 $99 $124 $2,708 $2,548 $101 $127 $2,776 Pre-Application Review Flat Fee $776 $31 $39 $846 $796 $31 $39 $866 Administrative Use Permit Flat Fee $2,557 $102 $128 $2,787 $2,623 $104 $131 $2,858 Amendment to Administrative Use Permit Flat Fee $1,708 $68 $85 $1,862 $1,752 $70 $87 $1,909 Temporary Use Permit Flat Fee $460 $18 $23 $501 $471 $18 $23 $512

CITY OF SAN PABLO COMMUNITY DEVELOPMENT

PLANNING & ZONING FEES

Page 1 ends

ITEM/DESCRIPTION NOTES Application
Fee
Record
Retention
Surcharge
(4%)
Technology
Enhancement
Surcharge (5%)
Total Fee Application
Fee
Record
Retention
Surcharge
(4%)
Technology
Enhancement
Surcharge (5%)
Total Fee
Zoning Verification Letter Flat Fee $931 $37 $47 $1,015 $955 $38 $47 $1,040 Similar Use Determination Flat Fee $1,242 $50 $62 $1,354 $1,274 $50 $63 $1,387 Minor Adjustment Flat Fee $1,242 $50 $62 $1,354 $1,274 $50 $63 $1,387 Pre-Construction Meeting Flat Fee $621 $25 $31 $677 $637 $25 $31 $693 Minor Design Review Flat Fee $1,708 $68 $85 $1,862 $1,752 $70 $87 $1,909 Revisions to Approved Plans-Minor Flat Fee $931 $37 $47 $1,015 $955 $38 $47 $1,040 Official Code Interpretation Flat Fee $1,242 $50 $62 $1,354 $1,274 $50 $63 $1,387 Sign Single - Major Flat Fee $310 $12 $16 $338 $318 $12 $15 $345 Sign Single - Minor Flat Fee $310 $12 $16 $338 $318 $12 $15 $345 Sign Single -Resubmittal Flat Fee $310 $12 $16 $338 $318 $12 $15 $345 Sign - Overall Complex Flat Fee $621 $25 $31 $677 $637 $25 $31 $693 FEMA Flood Zone Review Flat Fee $621 $25 $31 $677 $637 $25 $31 $693 Nonconforming Parcel, Use or Building Flat Fee $1,242 $50 $62 $1,354 $1,274 $50 $63 $1,387 Lot Line Adjustment/Parcel Map Flat Fee $1,863 $75 $93 $2,031 $1,911 $76 $95 $2,082 Lot Merger Flat Fee $1,863 $75 $93 $2,031 $1,911 $76 $95 $2,082 ADU / SB 9 Flat Fee $1,087 $43 $54 $1,185 $1,115 $44 $55 $1,214 Tree Removal Permit Flat Fee $621 $25 $31 $677 $637 $25 $31 $693 Landscape Plan Check & Inspection-Minor (NO WELO) Flat Fee $1,552 $62 $78 $1,692 $1,592 $63 $79 $1,734 Wireless Communication Facilities Flat Fee $2,484 $99 $124 $2,708 $2,548 $101 $127 $2,776 Extensions Flat Fee $621 $25 $31 $677 $637 $25 $31 $693 Expedited Fee Flat Fee Original Fee +
50% Original Fee + 50% Original Fee + 50% Original Fee + 50% Planning Hourly Rate* Flat Fee $155 $6 $8 $169 $159 $6 $7 $172

ENVIRONMENTAL REVIEW FEES
Categorical Exemption Flat Fee $1,242 $50 $62 $1,354 $1,274 $50 $63 $1,387 Categorical Exemption - Expanded Flat Fee $2,484 $99 $124 $2,708 $2,548 $101 $127 $2,776 Initial Study (IS) Fee + Consult + 17% $3,727 $149 $186 $4,062 $3,823 $152 $191 $4,166 IS/Negative Declaration Fee + Consult + 17% $3,727 $149 $186 $4,062 $3,823 $152 $191 $4,166 IS/Mitigated Negative Declaration Fee + Consult + 17% $4,969 $199 $248 $5,416 $5,098 $203 $254 $5,555

Page 2 ends

ITEM/DESCRIPTION NOTES Application
Fee
Record
Retention
Surcharge
(4%)
Technology
Enhancement
Surcharge (5%)
Total Fee Application
Fee
Record
Retention
Surcharge
(4%)
Technology
Enhancement
Surcharge (5%)
Total Fee
Addendum to an EIR Fee + Consult + 17% $6,211 $248 $311 $6,770 $6,372 $254 $318 $6,944 EIR Fee + Consult + 17% $9,317 $373 $466 $10,156 $9,559 $382 $477 $10,418 Environmental Studies Fee + Consult + 17% $3,105 $124 $155 $3,384 $3,185 $127 $159 $3,471 Notice of Exemption Flat Fee $621 $25 $31 $677 $637 $25 $31 $693 Notice of Determination Flat Fee $621 $25 $31 $677 $637 $25 $31 $693 Notice of Intent Flat Fee $621 $25 $31 $677 $637 $25 $31 $693 DiMinimus Certificate Flat Fee $931 $37 $47 $1,015 $955 $38 $47 $1,040

MAPS/COPIES
Zoning Map Actual Cost Actual Cost Actual Cost Actual Cost Actual Cost Zoning Ordinance Actual Cost Actual Cost Actual Cost Actual Cost Actual Cost Housing Element Actual Cost Actual Cost Actual Cost Actual Cost Actual Cost General Plan Actual Cost Actual Cost Actual Cost Actual Cost Actual Cost General Plan Map - Color Actual Cost Actual Cost Actual Cost Actual Cost Actual Cost

BUSINESS LICENSE AUTHORIZATION
Zoning Clearence Fee
New Fee $621 $25 $31 $677 $637 $25 $31 $693

APPEALS
Appeal to City Council
Flat Fee $3,727 $149 $186 $4,062 $3,823 $152 $191 $4,166 Appeal to Planning Commission Flat Fee $3,727 $149 $186 $4,062 $3,823 $152 $191 $4,166 All Other Appeals Flat Fee $3,727 $149 $186 $4,062 $3,823 $152 $191 $4,166

MISCELLANEOUS FEES
Consultant Management 17% of contract cost 17% of contract cost 17% of contract cost 17% of contract
cost 17% of contract cost
Legal Noticing Flat Fee $931 $37 $47 $1,015 $955 $38 $47 $1,040 Research Fee Per Hour $155 $6 $8 $169 $159 $6 $7 $172
Footnotes:

The Environmental Review fees that include a consultant cost include a flat application fee and a 17% consultant administration fee.

ADUs applicable for streamlined approval are reviewed as part of the Plan Check process, as under the Building Fee Schedule All services not identified above will be charged on an hourly rate basis at the Planning Managers discretion.

Page 3 ends

FY 2023
FY 2023
Fee. No. ITEM/DESCRIPTION NOTES Application
Fee
Record
Retention
Surcharge
(4%)
Technology
Enhancement
Surcharge
(5%)
Total Fee Account Code Application
Fee
Record
Retention
Surcharge (4%)
Technology
Enhancement
Surcharge (5%)
Total
Fee
1 ENTITLEMENTS 0.04 0.05
Design Review:
1-1 Basic Residential Projects Per Review $142 $6 $7 $155 $142 $6 $7 $155 1-2 Commercial / Multi-Family Projects 2 Reviews $596 $24 $30 $650 $596 $24 $30 $650 1-3 Subdivision Projects 2 Reviews $738 $30 $37 $805 $738 $30 $37 $805 2 MAPPING REVIEW
2-1 Final Subdivision Map (Tract Map - up to 30 lots) Consultant Cost + 17% $4,000 Deposit + Consultant Cost + 17%
2-2 Final Subdivision Map (each additional lot) Consultant Cost + 17% $65 Deposit/lot + Consultant Cost + 17%
2-3 Parcel Map Consultant Cost + 17% $2,000 Deposit +
Consultant Cost + 17%
2-4 Lot Line Adjustment Consultant Cost + 17% $2,000 Deposit + Consultant Cost + 17%
2-5 Lot Merger Consultant Cost + 17% $2,000 Deposit +
Consultant Cost + 17%
2-6 Recording Fee County Cost County Cost 100-3310-22918 3 ENCROACHMENT PERMITS AND INSPECTIONS
3-1 Dumpster, Container, etc. (per site, per week) Per Site, Per Week $209 $8 $10 $227 33% PC 100-3310-34104 67% INSP 100-3310-34102 $209 $8 $10 $227
3-2 Driveway, Sidewalk, Curb and Gutter Per Site $548 $22 $27 $597 43% PC 100-3310-34104 57% INSP 100-3310-34102 $548 $22 $27 $597
3-3 Potholing Per Site $504 $20 $25 $549 43% PC 100-3310-34104 57% INSP 100-3310-34102 $504 $20 $25 $549
3-4 Minor traffic control only (local streets, pedestrian traffic controls, traffic controls limited to one day) Per Day $281 $11 $14 $306 50% PC 100-3310-34104 50% INSP 100-3310-34102 $281 $11 $14 $306
3-5 Traffic control only (collector and arterial streets) Per Week $700 $28 $35 $763 40% PC 100-3310-34104 60% INSP 100-3310-34102 $700 $28 $35 $763
3-6 Street Excavation (includes up to 2 inspections during encroachment work plus final inspection) Per Site $776 $31 $39 $846 27% PC 100-3310-34104 73% INSP 100-3310-34102 $776 $31 $39 $846
3-7 Major Encroachment/Street Excavation (for encroachment work longer than 3 days or requires more than 3 inspections) Deposit + $150 per work day Deposit + $150 per work
day
User Enter
Create Liability Acct
100-3310-22902
+Task code
3-8 Revocable / Long Term Encroachment Permit Review Fee (Every 2 years)
2 Reviews $771 $31 $39 $841 50% PC 100-3310-34104
50% INSP 100-3310-34102 $771 $31 $39 $841
4 IMPROVEMENT PERMITS - NEW FEE SECTION
Plan Check:
4-1
Projects with major site improvement (including but not limited to Stormwater Treatment and Flow Control/C3, SWPPP, grading, commercial development, etc. )
Deposit Deposit
Create Liability Acct
100-3310-22902
+Task code

CITY OF SAN PABLO PUBLIC WORKS FEE SCHEDULE
100-3310-32021
User Enter
Create Liability Acct
100-3310-22902
+Task code

4-2 Expedited Plan Check Fee Original Cost +50% Original Cost +50% 100-3310-34104 Inspection:
4-3
Projects with major site improvement (including but not limited to Stormwater Treatment and Flow Control/C3, C3 signage at cost, SWPPP, grading, commercial and multi-family development, etc.) Deposit Deposit

USER ENTER
Create Liability Acct
100-3310-22902
+Task code
4-4 C3 O&M Verification Inspection As Needed Per Water Board Regulations $1,031 $41 $52 $1,124 $1,031 $41 $52 $1,124 4-5
Fee for each additional inspections (Fee for additional Inspections, excluding Major Encroachment and Major Site Improvement Inspection)
Per Each Addtl Inspection $138 $6 $7 $151 $138 $6 $7 $151 4-6 Fee for no-show inspection or work without scheduling inspection Penalty $138 $6 $7 $151 $138 $6 $7 $151 4-7 Fee for work without permit - Work underway Penalty 2x Fee 2x Permit Fee 4-8 Fee for work without permit - Work completed Penalty 3x Fee 3x Permit Fee 4-9 Fee for work outside of normal business hours 20% Permit Fee 20% of Permit Fee 4-10 Expedited Inspection Fee Original Cost +50% Original Cost +50% Transportation Permit:
4-11 Single Trip Per Trip $16 $1 $1 $17
4-12 Annual Per Year $90 $4 $5 $98
5 ENVIRONMENTAL PROGRAMS
5-1 Creek Zone Review / Evaluation Staff Hourly Rate or Consultant Rate + 17%
Staff Hourly Rate or
Consultant Rate + 17%
5-2 Groundwater Permit Staff Hourly Rate or
Consultant Rate + 17%
Staff Hourly Rate or
Consultant Rate + 17%
6 MISCELLANEOUS FEES
Document Copying Fees:
6-1 Standard Sizes (8.5 x 11, 8.5 x 14, 11 x 17) - per sheet Per Sheet $0.05 $0.05 6-2 Large Sizes (18 x 26, 24 x 36) - first sheet First Sheet $5 $0.20 $0.25 $5.45 6-3 Large Sizes (18 x 26, 24 x 36) - ea. Additional sheet Each Addtl Sheet $2 $0.08 $0.10 $2.18 Scanning / Imaging Fee:
6-4 Standard Sizes (8.5 x 11, 8.5 x 14, 11 x 17) Per Sheet $0.05 $0.05 6-5 Large Sizes (18 x 26, 24 x 36) First Sheet $5 $0.20 $0.25 $5.45 6-6 Large Sizes (18 x 26, 24 x 36) - ea. Additional sheet Each Addtl Sheet $2 $0.08 $0.10 $2.18 6-7 Technology Enhancement Fee 5% Surcharge 5% Surcharge 100-3310-32013 6-8 Record Retention Fee 4% Surcharge 4% Surcharge 100-3310-32012 6-9 First Page First Page County Cost 100-3310-32017
6-10
If any of the above services requires the use of outside consultants, the City shall charge a review fee based on the actual cost of the consultant plus 17% adminstrative fee and require a $2,500 deposit; such services may include review of a drainage study, geotechnical study, traffic/circulation study, surveyor’s report, and environmental program inspections and expedition of any of the above processes.

Staff time will be charged based on the staff hourly rates listed.

Consultant Cost + 17% Consultant Cost + 17%
User Enter
Create Liability Acct
100-3310-22902
+Task code
6-11 Fully Burdened Hourly Rate Per Hour $165 $7 $8 $180 100-3310-34104 $165 $7 $8 $180 100-3310-32017
100-3310-32017
255-3310-34105
100-3310-34102
100-3310-32019
All encroachments may require the submittal of a 100% performance bond at the discretion of the City Engineer, in order to obtain PW signoff of any encroachment permit, materials testing results will be required or extension of the performance bond to a term determined by the city will be required. **Note: Fees listed as “Deposits” represent the minimum amount due at application submittal. Deposited funds are charged against time and materials.

When consultants are required, the fee amount is the consultant cost plus 17% administrative fee. Engineering service deposit amounts are determined by the City Engineer to ensure 100% cost recovery, and will also include any directly charged staff time.

FOOTNOTES
Public works services requiring less than 15 minutes will not be charged a fee. Services requiring more than 15 minutes will be charged a fee based on the fully burdened hourly rate.

If there is a no notification fee and future offenses occur, an administrative citation will be initiated for future offenses.

Any work that does not have the required permit may be shut down until such permit is obtained.

← All documents from this meeting