INTERFACEENGINEERING | 3
March 29, 2023
Chiara Hanna
Management Analyst
City of San Pablo
Dear Chiara:
Interface Engineering is very pleased to submit our Statement of Qualifications in response to the City of San Pablo On- Call Professional Services - Electrical Engineering Services. Vizion Utility Partners will be joining us as a subconsultant to provide Traffic Signals and Street Lighting as part of the electrical engineering services.
Since our founding in 1969, we’ve earned a reputation for creative thinking and deep expertise in electrical engineering, and we offer a diverse range of capabilities for almost any electrical engineering project imaginable. To build on that repu- tation, we invest heavily in professional development and technology, allowing us to remain on the leading edge of design.
Interface has assembled a strong electrical team that can stand alone or work collaboratively as a team with other con- sultants. Alternatively, the electrical team can be united with the other Interface disciplines to provide a single source for MEP needs. The business systems within the firm have been developed to be flexible to accommodate both scenarios to suite our client’s needs.
Electrical Engineering Capabilities:
The sample Professional Services Agreement is acceptable as-is. Interface also acknowledges the release of three addenda.
You will find several key points in our submittal which include our team’s experience on a variety of public projects and public bid experience on complex projects requiring tight agency coordination. This makes our firm and our slated team well qualified to provide the strongest electrical engineering services required for these types of projects.
Thank you for the opportunity to present our qualifications. We believe the combination of our experience, broad capabil- ity located in the San Francisco and Oakland offices, and commitment to sustainable building practices ensures that the City of San Pablo will be well served by choosing Interface Engineering.
If you have any questions, please contact me directly.
Sincerely,
WESLEY LAU, PE, LEED AP
Principal
[email protected]
415.489.7257
• Site Utilities
• Power Distribution System
• Lighting and Associated Controls
• Electrical Distribution System
Studies
• Feasibility Studies
• Due Diligence Reports
• Fire Alarm System
• Emergency Systems (generator/ups)
• Systems Commissioning
• Campus Master Plans
• On-Site Renewable Energy
• Building Technologies
Cover Letter01
4 | INTERFACEENGINEERING
Firm’s Statement of Qualifications 02
Project Name Berkeley Energy Assurance Transformation (BEAT) Project
BERKELEY, CALIFORNIA
Date 2019
Client City of Berkeley
Description of Work
Performed
Analyzed and illustrated the regulatory, operational, financial, and technological feasibility of Clean Energy Microgrid Community, and based on that analysis, developed a case study and shovel-ready Downtown Berkeley CEMC Pilot Plan.
Total Project Cost $13 million
Key Personnel Joel D. Cruz, Westley Anastasio, Wesley Lau Client Contact
Information
Joe Enke, Vice President
City of Berkeley
Public Works Department - Engineering Division
1947 Center Street, 4th Floor
Berkeley, CA 94704
510.981.6411
Our dedicated team has the expertise, background, and knowledge to provide engineering services for the City of San Pablo.
For all our projects, the Project Manager is directly responsible for managing the project, client communication, and multi-disciplinary staff member resources. This Interface structure ensures proactive and consistent project delivery as well as an extraordinary level of vision and innovation through the participation of our Principal leaders, who are afforded the opportunity to influence every project, as a direct result of developing the supporting technical team and expert team structure.
Our team structure ensures proactive and consistent project delivery as well as an extraordinary level of vision and inno- vation through the participation of our principal leaders, which are afforded the opportunity to influence every project, as a direct result of developing the supporting technical team and expert team structure.
SELECT SIMILAR EXPERIENCE
INTERFACEENGINEERING | 5
Project Name Corporate Yard Maintenance Building Electrical Distribution and Telecommunication Systems Scoping Assessment Study + Construction Documentation
BERKELEY, CALIFORNIA
Date 2019
Client City of Berkeley
Description of Work
Performed
The initial phase of the project consisted of a scoping assessment study of the existing electri- cal distribution and telecommunication systems serving the building to determine the extent of work required for the replacement of the systems based on the Planning & Schematic Scope Worksheet prepared by Kitchell. Interface’s scope of work was to review and assess the electrical distribution and telecommunication systems and provide design recommendations as required to determine the scope of work and project construction budget. The project also entailed the preparation of construction documents for the upgrade of the existing electrical distribution systems.
Total Project Cost N/A
Key Personnel Joel D. Cruz, Westley Anastasio, Wesley Lau Client Contact
Information
Ingrid Lin, Assistant Civil Engineer
City of Berkeley
Public Works Department
1947 Center Street
Berkeley, CA 94704
510.981.6300
Project Name Marina Corporate Yard Maintenance Building Electrical Distribution and Telecommunication Systems Scoping Assessment Study + Construction Documentation
BERKELEY, CALIFORNIA
Date 2019
Client City of Berkeley
Description of Work
Performed
The initial phase of the project consisted of a scoping assessment study of the existing electri- cal distribution and telecommunication systems serving the building to determine the extent of work required for the replacement of the systems based on the Planning & Schematic Scope Worksheet prepared by Kitchell. Interface’s scope of work was to review and assess the electrical distribution and telecommunication systems and provide design recommendations as required to determine the scope of work and project construction budget. The project also entailed the preparation of construction documents for the upgrade of the existing electrical distribution systems.
Total Project Cost N/A
Key Personnel Joel D. Cruz, Westley Anastasio
Client Contact
Information
Ingrid Lin, Assistant Civil Engineer
City of Berkeley
Public Works Department
1947 Center Street
Berkeley, CA 94704
510.981.6300
6 | INTERFACEENGINEERING
Qualifications /Resumes 03
Wesley Lau has over 13 years of professional experience in electrical engineering and proj- ect management. He also has previous experience working in the solar industry designing renewable energy systems. In addition to his engineering design experience, he has very strong team leadership and problem-solving skills.
Joel has over 39 years of experience in electrical engineering design, for a variety of project types and is a Principal and Project Manager at Interface. With a focus on proj- ect management, Joel works closely with architects, owners, and contractors in various phases of the project, from conceptualization and design, to production and construction administration.
Education
Bachelor of Science with
High Honors, Mechanical
Engineering, University of
California, Berkeley
Registration
Electrical Engineer:
California - E22027
Education
Bachelor of Science
Architecture
Far Eastern University Manila,
Philippines
Associate of Science
Telecommunication
Technology. Skyline College
San Bruno, California
1600 Los Gamos On Call
Engineering
SAN RAFAEL, CALIFORNIA
Marin County Sheriff’s
Office Emergency
Electrical Study
SAN RAFAEL, CALIFORNIA
Livermorium Park
LIVERMORE, CALIFORNIA
San Francisco International
Airport CUP Performance
and Technical Study
SAN FRANCISCO, CALIFORNIA
China Beach Bathhouse
Renewal / LEED Gold Goal
SAN FRANCISCO, CALIFORNIA
Shoreline Rec and Aquatics
Center / LEED Gold Goal
SHORELINE, WASHINGTON
City of Berkeley
BERKELEY, CALIFORNIA
» Berkeley Energy Assurance
Transformation (BEAT)
Project
» Corporate Yard
Maintenance Building
Electrical Distribution
and Telecommunication
Systems Scoping
Assessment Study
» Corporate Yard
Maintenance Building
Electrical Distribution
System Construction
Documentation
County of Alameda
General Services
ALAMEDA COUNTY, CALIFORNIA
» 1111 Jackson Street Tenant
Improvements / LEED
Silver Goal
Wesley Lau pe, leed ap
Joel Cruz
PRINCIPAL-IN-CHARGE / PROJECT MANAGER
ADVISING PRINCIPAL
INTERFACEENGINEERING | 7
Thomas Jun has over 18 years of experience in electrical engineering, project manage- ment and construction management. Through years of experience, he has been accus- tomed to an agile environment where multiple projects require concurrent attention and task management.
Education
Bachelor of Science,
Electrical Engineering,
University of California, Santa
Cruz
Registration
Electrical PE: California
- E19320
Improve Peralta Oaks
North Public Safety
and Administrative
Headquarters
OAKLAND, CALIFORNIA
Sunnyvale Water
Pollution Control Plant
Administration-Laboratory
Building / LEED Goal
SUNNYVALE, CALIFORNIA
Cow Creek Admin Office
(CC50) Systems Repair
DEATH VALLEY, CALIFORNIA
Contra Costa County 2380
Bisso Lane HSD IT Data
Center
CONCORD, CALIFORNIA
Diversion Valve Rector
Reservoir
YOUNTVILLE, CALIFORNIA
Thomas Jun pe
LEAD ELECTRICAL
Darlene has an extensive knowledge of PG&E standards and practices which she applies to Vizion projects. She is adept in electrical and gas design including master planning.
Darlene has extensive experience with projects involving Rule 20 undergrounding, com- mercial, residential, industrial as well as complex projects.
Registration
Distribution Engineer (ADE)
Industrial Power Engineer
Chase Center
SAN FRANCISCO, CALIFORNIA
Stanford Crossings
LATRHOP, CALIFORNIA
Cruise Automation
SAN FRANCISCO, CALIFORNIA
Google Landings
MOUNTAIN VIEW, CALIFORNIA
Forbes
SAN FRANCISCO, CALIFORNIA
620 Folsom
SAN FRANCISCO, CALIFORNIA
Gateway Village
SANTA CLARA, CALIFORNIA
Darlene Hayes
PRESIDENT/CEO (TRAFFIC SIGNALS AND STREET LIGHTING)
8 | INTERFACEENGINEERING
04References
Marna Schwartz
Sustainability Coordinator
City of Berkeley
510.981.7315
Project: Berkeley Energy Assurance Transformation Microgrid » Services: Electrical Engineering
» Owner: City of Berkeley
» Completion: 2018
» Description: Interface provided Electrical Engineering service for Berkeley Energy Assurance Transformation (BEAT) project. The BEAT project analyzed how to create a microgrid in downtown Berkeley to provide solar power to key City facilities for daily use and to be used as clean back-up power, if power were to be disrupted.
Brian Laczko
Project Manager
Alameda County General Services Administration
510.272.3753 TIE:23753
[email protected]
Project: Alameda County 1111 Jackson Street Tenant Improvement » Services: MEP Engineering, Fire/Life Safety, Energy Services, Building Technologies, Commissioning » Building Size: 149,000 sf
» Completion: 2016
» Project Cost: $18 million
» Description: The project entailed the tenant improvements of an 8-story building, approximately 149,000 square feet, to house the new offices for Alameda County’s Social Services Administration and Probation Department. Offices (open and private offices) are on each floor with administrative support functions.
Ingrid Lin, PE
Project Manager
Assistant Civil Engineer
City of Berkeley
510.981.6300
[email protected]
Project: Corporate Yard Maintenance Building Electrical Distribution and Telecommunication Systems Scoping Assessment Study + Construction Documentation
» Services: MEP Engineering, Fire/Life Safety, Energy Services, Building Technologies, Commissioning » Completion: 2019
» Description: The initial phase of the project consisted of a scoping assessment study of the existing electrical distribution and telecommunication systems serving the building to determine the extent of work required for the replacement of the systems based on the Planning & Schematic Scope Worksheet prepared by Kitchell. Interface’s scope of work was to review and assess the electrical distribution and telecommunication systems and provide design recommendations as required to determine the scope of work and project construction budget. The project also entailed the preparation of construction documents for the upgrade of the existing electrical distribution systems.
INTERFACEENGINEERING | 9
Project Approach 05
DESIGN APPROACH
Interface’s design approach is based on the philosophy of integrated design. Effective communication between all team members is essential in this philosophy. The integrated design process used, in which goal setting for design challenges starts early in the process, during programming and conceptual design and involves the entire design team and allows the most of the innovative strategies to develop when it is the most economical to integrate them into the building design.
Interface Engineering has been very effective in fulfilling its clients’ goals by using the integrated design process and used this approach to design energy efficient buildings and complicated projects within the project budget.
We also plan to participate in several schematic design meetings with the owner to discuss the findings in the report as well as document the direction and/or decisions in regard to the general design direction.
Interface also proposes that the schematic design phase include a focus on MEP design coordination, including energy efficiency targets, as well as a detailed discussion with the owner in regard to the building operations and system mainte- nance expectations to develop the owner’s project requirements.
Our approach to developing schematic documents includes:
Develop the Basis of Design and Performance Specifications: Interface is a strong believer in developing a detailed Basis of Design, where all parameters of each system are written in a narrative format, prior to starting any drawings. Interface will review this document with the Owner to make sure all items are understood. This makes sure that there is no misun- derstanding of expected system performance and design/operational objectives.
Concept Design Drawings: Interface will provide conceptual level schematic drawing to guide and enhance design crite- ria. Conceptual drawings will include:
» Major equipment locations and type
» One-line major duct and pipe distributions
» Electrical service and one-line diagrams
» Preliminary mechanical and electrical rooms layout
» Conceptual plumbing drawings
CONSTRUCTION ADMINISTRATION
The construction administration phase will include internal detailed tracking of field questions and product submittals in order to assure the quick and timely turn around of this information. One part that differentiates Interface from others is that we set our own standard for Construction Administration responsiveness in lieu of letting the client tell us. We have a very strict turnaround standard of five days for submittals. We have always felt that being responsive and timely with the contractor assists in developing a strong working relationship as well as trust in our partnership to build a great project for our clients.
It is critical to ensure that the contractor is providing a quality installation that is compliant with the construction draw- ings and specifications. To that end, Interface is a local firm that is able to provide thorough and timely site visits during construction. We are also available to come to the field to address thorny issues that may be inefficient and ineffective to address through remote tools.
10 | INTERFACEENGINEERING
PROJECT MANAGEMENT
Interface’s approach to projects involves a great deal of communication between owner and design team and the design team consultants. This helps all participants ensure requirements are not only met but exceeded.
In order to properly manage this communication, Interface has one project manager assigned to the project that oversees all engineering disciplines within our scope of work including base services for mechanical, plumbing, electrical, fire pro- tection, fire alarm, as well as our sub-consultants. This project manager remains the main point of contact from concept phase all the way through the completion of construction. We also endeavor to maintain the discipline lead engineers throughout the project. This allows us to properly manage and oversee every aspect of the design as well as construction administration to ensure the owner’s project requirements are maintained.
Interface’s design approach is based on the philosophy of integrated design. Effective communication between all team members is essential in this philosophy. The integrated design process used, in which goal setting for design challeng- es starts early in the process, during programming and conceptual design and involves the entire design and ownership team, allows the most innovated strategies to develop when it is the most economical to integrate them into the project design.
We understand that generator projects impact the most critical systems within a building. We have experience designing projects with phased and make-ready work in order to minimize disruptions to the building. For example, Interface used a phased approach to provide normal power in a segregated panel in the first phase, and then to provide a generator with an automatic transfer switch to serve the same panel in the second phase. This allowed the client to operate on normal power until the generator, permitting, and air quality management district approvals could be procured.
BUDGET & SCHEDULE CONTROL
We pride ourselves on our lengthy track record of excellent client satisfaction. A satisfied client is not only one who ap- proves of the quality of our work, but has experienced our sensitivity to budget constraints. We understand that project parameters must change at times, and we accommodate. Our first goal for each project is to meet the goals for timely completion, functionality and budget. Budget control is achieved through:
» Focus on reducing material consumption throughout the design, from placing electrical rooms to shorten feeder runs to giving lighting control options that reduce wiring while not sacrificing function, and “real” sizing rather than “over” sizing equipment;
» Creating a living Basis of Design Document with Value Engineering incorporated at the Schematic Design Phase; » Utilizing an integrated design philosophy;
» Incorporating additive and deductive alternates into the project’s Construction and Bid Documents; » Avoiding costly change orders through our QC program; » Avoiding costly delays through our Construction Administration protocols.
Approach to Schedule of Work 06
INTERFACEENGINEERING | 11
Rate Schedule
INTERFACE ENGINEERING
Senior Principal: $375/Hour
Principal: $325/Hour
Associate Principal: $265/Hour
Associate / Project Manager: $245/Hour
Sr. Engineer / Designer: $210/Hour
Engineer / Designer: $165/Hour
Project Designer / Drafter: $145/Hour
Administrative: $115/Hour
*Annual rate changes are expected to be 4% per year
VIZION UTILITY PARTNERS
Principal: $225/Hour
Senior Project Manager: $175/Hour
Civil Engineer: $150/Hour
Electrical Engineer: $150/Hour
Senior AutoCAD Drafter: $125/Hour
Photometrics Operator: $125/Hour
Clerical / Administrative: $75/Hour
Reproduction – Bond: $0.50 per square foot
Reproduction - Mylar: $3.50 per square foot
Reproduction/Outside Services/Courier: Cost plus 15%
Travel = Portal to Portal : Per IRS schedule
Expert Witness: $500 per hour – 2- hour minimum
07