On-Call Professional Services
City of San Pablo – Public Works Department

1 | P a g e

Proposal for

On-Call Professional Services

March 29, 2023

On-Call Professional Services
City of San Pablo – Public Works Department

2 | P a g e
March 29, 2023
Chiara Hanna
City of San Pablo
1000 Gateway Avenue
San Pablo, CA, 94806

Subject: STATEMENT OF QUALIFICATIONS FOR ON-CALL PROFESSIONAL SERVICES SNG & Associates, Inc. (SNG) is excited to present our qualifications to provide On-call Professional Services to City of San Pablo. Since 1999, SNG has been providing on -call services exclusively to public agencies for Land Development, design and construction management of CIP projects in the Bay Area and the Central Valley. Proof of our success in providing exceptional quality of on-call services is demonstrated by the trust our long-term clients have placed in us, as evident by the fact that they have contracted with SNG for 10 or more years.

SNG has put together project team with extensive experience in working with public agencies and would like to be considered for the Civil Engineering and Civil Plan Review.

SNG is uniquely qualified and most suited to provide requested services for the following reasons:
➢ SNG has been providing on -call engineering services and more importantly, exactly the types of services requested in the RFQ for over 2 2 years to agencies in the Bay Area and Central Valley.
➢ We have worked hard to earn and keep the trust of our long-term clients such as City of Dublin, City of Tracy and City of Livingston each for over 10 years. These and other agencies prefer SNG because we are experts in integrating all stakeholder interests into a successful project outcome.
➢ We fully understand land development review process and are consistently able to achieve the optimal balance between City, public and developer interests. We understand complexities of land development, financing of public infrastructure, and the importance of role of Engineering in accomplishing City’s goals. ➢ We have extensive experience in design of capital improvement projects, coordination and oversight of consultants, contractors, and inspectors. SNG staff has managed numerous infrastructure projects for local agencies form planning and scoping stages to final acceptance by City Councils.
➢ SNG provided City Engineer services for cities and provided design and construction oversight for numerous projects funded by local, State and Federal funding sources. ➢ SNG staff has prepared hundreds of staff reports and resolutions for City Councils and has provided staff representations at Planning Commission and City Council meetings. ➢ SNG has a select number of loyal clients, and hence can provide high level of attention and responsiveness.

On-Call Professional Services
City of San Pablo – Public Works Department

3 | P a g e
➢ SNG commits Project Director’s close involvement providing oversight of work by Project Managers and sub-consultants for entire duration of contract. ➢ Commitment to adherence to agreed -upon schedules and timelines. We have demonstrated ability to ensure projects are completed within budget and on schedule.
➢ Established Quality Assurance procedures that are time -tested and implemented by the Project Team members.

The sample Professional Services Agreement is acceptable as-is. Should you have any questions or need additional information, please do not hesitate to contact me by phone at 925-251-0100 or e-mail at [email protected]

Sincerely,
SNG & ASSOCIATES, INC.

Nanda Gottiparthy, P.E.

President

On-Call Professional Services
City of San Pablo – Public Works Department

4 | P a g e

TABLE OF CONTENTS

1. Letter of Interest / Cover Letter

2. Statement of Qualifications & Experiences………………………….5

3. Staff Statement of Qualifications or Resumes…………………....15

4. References…………………………………….……………………………………17

5. Project Approach………………………………………………………………..19

6. Approach to Schedule of Work……………………………………………23

7. Rate Schedule……………………………………………………………………..23

8. Appendix……………………………………………………………………………..24

a. Resumes

On-Call Professional Services
City of San Pablo – Public Works Department

5 | P a g e

STATEMENT OF QUALIFICATIONS & EXPERIENCES

On-Call Professional Services
City of San Pablo – Public Works Department

6 | P a g e

SNG & Associates, Inc. (SNG) , a California corporation located in Pleasanton, CA was established in 1999, and has been assisting local agencies in municipal engineering with a primary focus in land development, capital improvement project design and construction management. SNG has been providing services that cover all aspects of engineering review, design, project management and administration, bid services, construction inspections, and construction management for local agencies. Our services have been well received and rec ognized by citizens, city councils and management.

We firmly believe that our team’s extensive expertise and experience providing exactly the scope of services being requested by City of San Pablo, for over 20 years makes us uniquely qualified to provide the services. With this experience, we have m astered the logistics of coordination, communications and optimization of effort thereby increasing the productivity and responsiveness. Our intimate knowledge of public agency processes and procedures ensures adherence to City, State and Federal requirements for projects as applicable. Our team members can provide support in almost all aspects of design, review, construction and grant management for Capital Improvement projects and land development projects. We differentiate ourselves from rest of the engineering firms with unparalleled understanding of processes, procedures, and legal requirements of land development projects, and hence we are able to offer full range of support services to City staff.

SNG’s clients have included the following cities:

Current City Contracts Previous City Contracts City of Dublin City of San Leandro
City of Tracy City of Livingston
City of Newark City of Patterson
City of Atwater City of Brentwood
City of Union City City of Lathrop
Mountain House CSD City of Vallejo
City of Livermore City of Hayward
City of San Rafael City of Oakdale
City of Fremont City of Lodi
City of San Bruno City of Ione
City of Modesto
City of Turlock
City of South Lake Tahoe

On-Call Professional Services
City of San Pablo – Public Works Department

7 | P a g e
SNG prides itself in providing comprehensive civil engineering and construction management services that cover the following areas:
• City Engineer Services
• Specific Plans, Master Plans, Feasibility
Analyses
• Tentative Maps, Site Development Reviews
• CEQA support, oversight of engineering
studies, reports, Impact Analyses, Mitigation
Measures
• Planning applications/Building Permit review
• Right-of-way vacation, right-of-way acquisition,
Grant Deed documents
• Review of Pre-application, Entitlements and
Construction submittals
• Improvement Plan Checking and Project
Management
• Storm Water Quality Plan Review • Final Maps Review
• Development Agreements, Subdivision and
Reimbursement Agreements
• Representation at Design Review Committees,
Planning Commission and City Council
• Conditions of Approval • Project Close-out
• Landscape design and plan review services • Staff Reports to City Council • Public Works Inspections and Construction
Management
• Federal and State Grant projects management

We understand that types of services and workload may vary, and we are prepared to provide qualified managers and engineers that are committed to providing the most responsive professional support throughout the duration of contract.

On-Call Professional Services
City of San Pablo – Public Works Department

8 | P a g e
SNG & Associates, Inc. SNG has extensive experience offering on -call engineering and staff support services to Cities. The range of services we provide to our client cities include all tasks involved in CIP projects from project planning and design to cons truction, and in private development review from entitlement phase to final acceptance and bond release project close - out.

In addition to providing design and plan review services, we have been assisting agencies’ staff in managing technical studies, EIRs, preparation of Engineering Conditions of Approval, City Council staff reports and resolutions, negotiating Development Agreements, Right- of-way acquisitions/abandonments, finance plans, subdivision agreements, engineering inspections and staff augmentation.

Following is a partial list of on -call Engineering Services to local agencies:

CITY OF TRACY - Engineering Staff Support Services
(2000 - 2010); (2014 to Present)
SNG has been providing plan review and project management services for numerous land development projects including identifying the scope of technical studies, reviewing the reports, identifying mitigations, preparing conditions of approval, agreements, review of maps and final project acceptance. For all projects, SNG staff has been responsible to coordinate with City departments, and City Attorney’s Office.

Residential Developments: Managed and coordinated work of City consultants and provided review services for several large residential projects such as West Tracy (330 acres), East Lake (150 acres), West Corral Hollow (234 acres), Cheng Property (293 acres) and Souza Citation project (137 acres) for which complex advance planning of infrastructure and financing, preparation of various technical studies and Impact and Burden Analyses were completed.

SNG is currently managing and providing all review and processing services for Tracy Hills project, a master planned community consisting of 5500 homes and 680 acres of commercial and industrial areas. SNG provided review and project management services for approval of Tracy Hills Specific Plan, EIR, Development Agreement, Vesting Tentative Maps, & Final Maps for 1200 lots.

Retail Commercial Developments: Development of the Tracy Ma ll project, Shopping Centers, Tracy Auto Mall, Several offices, hospital buildings.

SNG provided plan review services for the Tracy Gateway Project, a 536-acre Business Park with office, hotel, and commercial land uses, and a 9-hole golf course and ponds. SNG staff assisted in preparation

On-Call Professional Services
City of San Pablo – Public Works Department

9 | P a g e
of Development Agreement, reviewed improvement plans, final maps and bonding.

Industrial Developments: SNG is currently providing project management and review services for Cordes Ranch (International Park of Commerce) consisting of 1780 acres of industrial and commercial areas. SNG staff is responsible for technical analyses, Conditions of approval, agreements, improvement plan review for major infrastructure improvements for water, wastewater and
transportation.

CITY OF DUBLIN - On-Call Engineering Services (2000 - Present):

SNG has been providing development and CIP project review services to City of Dublin for almost 20 years. SNG provides support in reviewing all types of development applications and permits including preparation of conditions of approval for planning applications, review of permit applications from Building Department for engineering requirements, plan review of residential and commercial developments, preparation of agreements, staff reports to City Council and project close -out. Numerous projects requiring compliance with Stormwater regulations C.3 and C.10, Title 24 accessibility regulations and complex hydraulic design issues have been reviewed.

An example of a recent subdivision is Schaefer Ranch, a Residential project consisting of 480 homes that require d extensive hillside grading, storm drainage detention and water quality basins, establishment of Geological Hazard Abatement District (GHAD).

SNG is currently providing project management and plan review services for AT -DUBLIN, a mixed -Use project (1200 r esidential units and commercial) and IKEA Center with multi -level parking lot and several retail and commercial businesses.

SNG has assisted the City in review of CIP projects for several parks, Aquatic Park, Fire Safety Building, and Public Works Mainte nance Facility.

CITY OF LIVINGSTON- On-Call Engineering/City Engineer (2003 - 2013)
SNG provided City Engineer and full staffing needed to provide all engineering functions for the City of Livingston for over 10 years.

Range of services provided include development plan review, design and construction management for capital projects, proces sing encroachment permits, development applications, preparation of agreements, City Council reports and resolutions, property acquisition, and inspection of private development projects and public infrastructure projects.

On-Call Professional Services
City of San Pablo – Public Works Department

10 | P a g e
SNG staff prepared numerous succ essful grant applications for State and Federal Grants, processed Grant Agreements, prepared PS&E, provided bidding and contract administration, inspections and reimbursement processing. SNG staff helped establish procedures to plan and execute federal and state grant funded projects successfully.

Partial List of Federal and State Grant Projects included:
• Bird Bridge HBRRP Project
• B St. at Winton Parkway Traffic Signal (HES)
• Safe Routes to Schools projects Federal Cycle 2
• PROP 13 City-wide Water Infrastructure Improvements
• CMAQ Sidewalk Installation 2012 Project, 2013
• Safe Routes to Schools projects Cycle 3, Cycle 6, Cycle 8 • LWCF Picnic Shelter & Restroom Facility
• HWY 99 Sewer Lift Station
Residential projects included Gallo PUD (1600 lots), Ranchwood (1800 lots), Sun Valley Estates (180 lots), Kishi Subdivision (159 lots), Davante Villas (152 lots), Bear River Crossing (120 lots) and numerous minor subdivisions.

Industrial/Commercial projects included Foster Farms Cold Distribution Storage Plant, Winton Parkway Commercial Center, Travel Centers of America, and Blueberry Crossing Commercial Center.

CITY OF PATTERSON– On-call Engineering Services (2007-2014) SNG provided on-call design engineering, surveying, and engineering inspection services for numerous capital improvement projects, and assisted in preparation of Subdivision Agreements and
Reimbursement Agreements for residential and commercial developments. SNG worked closely with staff in scoping and developing cost estimates and budgets for CIPs and provided support services from inception to final close out of projects. Partial list of projects completed includes:
• CDBG Water and Sewer Line Replacement Project 2008
• City-wide Curb, Gutter and Sidewalk Replacement – 2008 • El Circulo Utility Upgrades
• Old Towne Utility Replacement Project
• Plaza Circle ADA Improvements

CITY OF LIVERMORE - On-call Engineering Services (2014 to Present) SNG has been providing a wide range of civil engineering services including development plan review, capital project design review, ADA

On-Call Professional Services
City of San Pablo – Public Works Department

11 | P a g e

compliance review, final/parcel map review, hydrology and hydraulics review, hydromodification review and BAHM analysis, C.3 compliance, stormwater treatment management plan review and implementation, erosion control and stormwater pollution prevention plan review, and water and wastewater system review and analysis, condition of approval compliance review and entitlements. Partial list of projects reviewed include:

Brisa Station, Vasco Road, 531 units of multi and single-family housing subdivision of 37.5 acres of property located east of Vasco Road.

Shea Homes Tract 8121, Portola Avenue, a commercial and residential development (164 multi -family units) located on south of Portola Avenue.

Planning Entitlements Review: SNG has provided full support in review and processing of Site Design Review (SDR), Conditional Use Permits, Tentative Maps, Zoning Applications, Initial Study documents, specific plans, Planned Developments, plot plans, tenant improvements review and other types of applications.

Livermore Valley Charter School, Independence Drive: Engineering review of expansion of the Tri-Valley Learning Facility/Campus.

MOUNTAIN HOUSE COMMUNITY SERVICES DIST (2017 to Present) SNG provides on-call engineering services that include private development review and Capital improvement projects. SNG provided project management and inspection services for the following projects:

Grant Line Road Widening Project
Central Pkwy Phase 3 project

SNG staff assisted District staff in finalizing improvement plans for three phases of Grant Line Road and helped in competing the project to meet District’s aggressive schedule. Throughout the project duration, SNG staff worked to find solutions, seek appropriate direction from District staff and communicate decisions to the design engineers. Critical issues involved project phasing to minimize impacts to commuters, and major offsite drainage flows through the projec t site.

CITY OF ATWATER – City Engineer Services (2006-2009, 2020-Present) SNG provided City Engineer and staff support services and provided support in all functions of Engineering department. Provided services for processing of private developments, managed design and

On-Call Professional Services
City of San Pablo – Public Works Department

12 | P a g e
construction of capital improvement projects. Several grant a nd local funded capital projects totaling in construction costs of more than $35Million were designed and constructed. SNG staff reviewed numerous residential subdivisions, processed project closeouts, reimbursements, and assisted staff in setting up assessment and benefit districts.

Capital Improvement Projects include:
• Overhead Water Tank Repainting, Repairs
• Memorial Park Renovations
• Atwater Blvd/Winton Avenue Intersection Improvements
• Santa Fe/Bellevue At-grade Crossing
• Cedar Avenue Waterline Improvements
• Broadway Avenue Sidewalk Improvements
• Bellevue Ave and Buhach Road Widening Project
Residential & Commercial Land Development Projects:
• Atwater Marketplace Commercial Center
• Prime Shine Express Car Wash
• The Reserve
• Castle Gardens
• Camilia Meadows
• Meadow View Estates

CITY OF SAN RAFAEL – Land Development Engineering & Staff Support Services (2020- Present)
SNG is providing a wide range of civil engineering services in their land development department including Planning and Building to review new projects and prepare engineering conditions of approval, develop frontage improvement requirements, approve Grading, Drainage and Stormwater Quality plans as well as inspect engineering improvements prior to occupancy.

Partial list of projects reviewed include:
• Mission Street – Senior Healthcare Facility Master Plan – SNG provided DPW comments to Planning for frontage improvements, C3 and stormwater management, undergrounding of overhead lines, as we ll as construction management staging for these 4 phases, 6 building, 5-acre reconstruction and major remodel. • New Industrial Building – SNG provided DPW comments to planning for a Pre -Application to replace an existing building.

Comments included frontage improvements,
• C3 & stormwater management, undergrounding, as well as traffic evaluation to determine impact fees.
• Single Family Residence and a Lot Line Adjustment - SNG provided DPW comments to planning for Planning Commission Review of a complicated new residence in a Hillside with debris flow. The Team

On-Call Professional Services
City of San Pablo – Public Works Department

13 | P a g e

recommended third party Geotechnical Peer Review, added hydrology reports and more detailed grading and drainage plan.

Other Projects include:
• 46 Room Hotel
• 190+ Apartments, Ground up
• Single Family and Lot Line Adjustment
• Hampton Hotel 185 rooms-Parcel map
• Northgate Town Square Redevelopment Project

CITY OF TURLOCK – Acting City Engineer Services (2022 – Present) SNG is providing City Engineer services which include oversight of design and construction of CIP projects, review of private development applications for residential, commercial, and industrial developments.

List of CIP projects:
• SW Quadrant Road Rehab
• Surface Water Distribution System Improvements
• SS Lift Stations 9, 42, and 55
• Wayside Drive Reconstruction & Sewer Replacement Project • City-wide Street Rehabilitation Packages 1 & 3
• Washington Road Bridge Railing Replacement Project
• SRTS Pedestrian Improvements
List of private development projects:
• Marriott Towneplace
• Monte Vista Apartments
• VTSM 2022-02 (Piro Enterprises)
• Tegner Townhomes
• Turlock RV Storage
• G3 Warehouses
CITY OF SAN BRUNO - On-call Engineering Services (2022 to Present) SNG provides full support for plan review and project management of land development projects for City of City of San Bruno.

Southline Project
SNG is providing plan review and project management of the Southline Project, a 28-acre transit- oriented project that proposes to construct 6 six-story R&D/office buildings, 1 amenity building, and 2 large parking garages. As part of offsite improvements, the project will realign the intersection of Sneath Lane and Huntington Avenue. The project will also reconstruct Tanforan Ave and construct a 1-acre parklet to provide landscape buffer between the residential and industrial uses. Other offsite improvements will include infrastructure upgrades to wastewater trunk system and completion of cycle track project connecting the San Bruno BART station with the Centennial trail in South San Francisco. SNG is reviewing on behalf of the City of San

On-Call Professional Services
City of San Pablo – Public Works Department

14 | P a g e
Bruno and coordinating with City of South San Francisco and other stakeholders.

840 San Bruno West
SNG is providing plan review for Transit -Oriented Development / affordable housing planning application for a 10-story, 445 units multi- family residential project in San Bruno. SNG is reviewing on behalf of public works department and coordinating technical studies with City’s On-call consultants.

CITY OF SOUTH LAKE TAHOE - On-call Design Services (2022 - Present) Barton Avenue & 2 nd Street Drainage Improvements and Street Rehabilitation Project
SNG is preparing PS&E for Barton Avenue & 2nd Street Project in area subject to localized stormwater flooding during high intensity storms and during a warm rain on snow event. Project improve ments include construction of storm drain conveyance system, stormwater treatment basin on 2nd Street, and an outfall into Johnson Meadows within the Silvertip Avenue public right-of-way, street overlay and reconstruction.

Additionally, SNG provided On-call services similar in scope described above to the following agencies:

CITY OF NEWARK - On-call Engineering Services (2018 to Present) CITY OF BRENTWOOD - On-call Engineering Services
(2005-2007 and 2013 -2017)
CITY OF LODI: Staff Support Services (2001-2005 and 2013 -2019) CITY OF VALLEJO - On-call Engineering Services (2005 - 2008) CITY OF SAN LEANDRO: Staff Support Services (2001-2003)

On-Call Professional Services
City of San Pablo – Public Works Department

15 | P a g e

STAFF STATEMENT OF QUALIFICATIONS OR RESUMES

On-Call Professional Services
City of San Pablo – Public Works Department

16 | P a g e

CITY OF SAN PABLO
Public Works Department

SNG Engineering Team

Project Director
Nanda Gottiparthy, P.E.

Civil Engineering Services
David Caneer, P.E.
(Project Manager)
Civil Review Services
Michael O’Connor, P.E.
(Project Manager)

Jimmy Lagpacan, P.E. (Senior Engineer)
Mojgan Osooli, P.E. (Senior Engineer)
Doug Rodgers (Senior Engineer)
Casey Barkman (Senior Civil Designer)
Bruce Jacks, P.E. (QA/QC Manager)

Mojgan Osooli, P.E. (Senior Engineer)
Doug Rodgers (Senior Engineer)
Bruce Jacks, P.E. (QA/QC Manager)
Casey Barkman (Senior Civil Designer)

Mr. Nanda Gottiparthy, P.E., will serve as the Project Director working closely with City staff and Project Managers.

Mr. David Caneer, P.E. will serve as a Project Manager for CIP Project Engineering and Review , and will be supported by Jimmy Lagpacan, P.E., Mojgan Osooli, P.E., Doug Rodgers, Casey Barkman and Bruce Jacks, P.E.

Mr. Michael O’Connor, P.E. will serve as Project Manage r to provide entitlement review, plan check and mapping services, coordinate with Planning and other departments and outside agencies as needed and will be supported by Mojgan Osooli, P.E., Doug Rodgers, Bruce Jacks, P.E., and Casey Barkman.

Each of the Senior Engineers have 20 -30 years’ experience providing services to public agencies; depending on the workloads and priorities of the City, appropriate staff will be assigned to stay with the project through completion.

Condensed resumes for key project team members are included in the ‘Appendix’ section.

On-Call Professional Services
City of San Pablo – Public Works Department

17 | P a g e

REFERENCES

On-Call Professional Services
City of San Pablo – Public Works Department

18 | P a g e
Ne
war
k.
o
.

City of Turlock – City Engineer Services (2022 – Present) Contact: Erik Schulze, Public Works Director
Phone: (209) 668-5469
Email: [email protected]
SNG has been providing City Engineer services that include project management and construction management for several capital projects and private development projects.

City of South Lake Tahoe– Design Services (2022 – Present) Contact: Anush Nejad, Public Works Director
Phone: (530) 542-6031
Email: [email protected]
SNG has been providing On-call Design services for capital improvement projects. SNG recently completed PS&E documents for Barton Avenue & 2nd Street Project in area subject to localized stormwater flooding during high intensity storms and during a warm rain on snow event.

City of Tracy – Engineering Staff Support Services
Contact: Koosun Kim, City Engineer
Phone: (209) 831-6452
Email: [email protected]

SNG has been providing full support for the Land Development section for over 20 years. SNG staff acts as Project Managers for the assigned projects and process projects from pre - application stage to final construction and acceptance.

City of Dublin – Engineering Staff Support Services
Contact: Kan Xu
Phone: (925) 833-6630
Email: [email protected]
SNG has been providing land development, project management, reviewing permits and support of processing all land development applications.

City of San Bruno – On- Call Engineering Services (2021- Present) Contact: Hae Won Ritchie, Deputy Director of Public Works Phone: (650) 616-7067
Email: [email protected]
SNG provides full support for plan review, project management of land development and capital projects for City of San Bruno.

On-Call Professional Services
City of San Pablo – Public Works Department

19 | P a g e

PROJECT APPROACH

On-Call Professional Services
City of San Pablo – Public Works Department

20 | P a g e
SNG & Associates, Inc. presents a collaborative approach to work in close partnership with the city to provide Acting City Engineer services in a seamless fashion. Mr. Gottiparthy and the Project Managers are available to provide support to City staff in all functions of Engineering division. SNG will provide full support of all projects which may include, but not limited to, review of private development/ land development, civil, traffic, water, stormwater improvements, sewer improvements, landscaping, street infrastructure, project management, construction management and inspection services. We will also work collaboratively with various municipal and outside agencies as needed.

The PM will also be accessible to the City at all times by e-mail, phone and cell phones. Since we are conveniently located in Pleasanton and many of our staff members live locally, we can be very responsive in attending meetings or field reviews at a short notice. We use the e -mail communications most effectively supported by formal communications wh ere needed to keep all parties informed in a timely fashion. We have developed and have been using project log and tracking systems that enable our Project Manager and engineers to readily access project information to ensure prompt and timely response to our clients.

Summarized below are more in -depth descriptions of the most common services we anticipate during this contract.

Civil Engineering Services: Due to SNG staff’s extensive background in providing on-call engineering and staff support services to many agencies, we are uniquely suited to provide engineering services for all tasks that are typically performed by Engineering Departments. We understand process and procedures of public agencies and can execute projects with complete compliance with codes, policies and laws that govern capital projects , land development projects and have the knowledge of construction support service related to civil engineering work.

Capital Improvement Design: SNG staff has extensive experience preparing PS&E, cost estimates, bid and contract documents for capital improvement projects involving street improvements, storm drainage, water lines, sewer mains, parks, parking lots etc. Our experience with local agencies over the past 20 years consists of preparing proje ct scopes, feasibility and cost analyses and all phases from design to final construction and project acceptance.

The project team members have managed large infrastructure projects for storm drainage facilities including detention basins, pump stations, several miles of master plan sewer and water infrastructure improvements, bridges, planning and design of parks, preparation of grant applications and grant management. SNG staff has coordinated and conducted public outreach for several complex projects such as master planning of parks, precise plan lines, roadway widening and right-of-way acquisitions.

Civil Design/Project Management:

Our experienced project managers and staff are available to complete projects which may include preparation of PS&E d ocuments for roadways, water, wastewater, storm drainage and related improvements, engineering studies, coordination with other agencies

On-Call Professional Services
City of San Pablo – Public Works Department

21 | P a g e
and utilities. In addition, our services include peer review, bid assistance, responding to contractor RFIs, contract award, project accounting, and closeout procedures.

At the beginning of the project, Mr. Gottiparthy and the Project Managers assigned for the project will meet with City staff, and identify overall procedures and processes for communications, critical items such as project schedules, critical path items, right -of-way constraints, input or approvals needed from external agencies, potential utility conflicts, impacts to businesses or residents, traffic control, CEQA/NEPA documentation where required, project budget, etc.

Before proceeding with detailed design documents, effort is made to identify and eliminate or minimize impacts of the above-mentioned items typical of most projects. We implement optimal solutions by value engineering and a methodical approach to new and rehabilitation projects.

Attention to detail, timely coordination with appropriate parties, documentation, and above all, keeping excellent communication with City’s project manager, have enabled us to execute many projects within budget, schedule and within scope.

Feasibility Studies, Cost/Benefit Analysis: SNG staff has provided preliminary / feasibility studies for projects that included new roadway alignments, street widening and rehabilitation projects, major water, was tewater, and storm drainage infrastructure projects. We provided feasibility analyses, cost estimates, and made presentations to City Council and other agencies. Our staff will identify potential issues early in the process and provide recommendations to City staff for the most optimal solutions with City’s priorities and preferences in focus.

Project Records and Schedules : Our staff required to maintain detailed project records on a continuous basis, and the details of the events and decisions or direc tives will be recorded to aid in reimbursements, fee credits and project close -outs. Project Schedules will be prepared and continuously updated and reported to City staff at project status meetings.

Civil Plan Review and Permitting Services: All our senior engineering project team members have at least 20 years of experience in review of Tentative Maps, Site Development Reviews, Conditional Use Permits, Parcel Maps and Final Maps.

SNG staff will work closely with Planning, Public Works, Fire and Police Departments’ staff and other agencies in providing engineering review for all types of entitlement/planning applications, prepared conditions of approval and staff reports for City Councils. SNG staff will review tentative maps to make sure that roadways , storm drainage infrastructure comply with City’s Master Plans, Specific Plans and Design Standards.

The plans and supporting documents to be reviewed include demolition plans, grading plans, parking and circulation, lighting, landscape plans, erosion and sedimentation control plans, traffic signal plans, hydrology and hydraulic calculations, retention/de tention basin designs, water, sewer, storm drainage plans/ capacity review, perform traffic studies as may be required, review of bikeway /pedestrian systems, cost estimates of public improvements, utility letters, soils report, approved tentative map/con ditions of approval, joint trench plans, approved environmental documents, including mitigation measures, storm water treatment plans, easements, dedications and legal descriptions. SNG will prepare clear and concise plan check comments in an organized

On-Call Professional Services
City of San Pablo – Public Works Department

22 | P a g e
manner and provide comments on each plan sheet in red -lined form and in an accompanying letter/ memo format.

Planning Entitlements Review : SNG staff has extensive experience working with planning and building departments in processing of various types of project entitlements and permits. SNG can assist in review and provide support in processing of Site Development Review (SDR), Development Review Applications, Conditional Use Permits, Tentative Maps, Lot Line Adjustments, Zoning Applications, Initial Study documents, Specific Plans, Specific Plan Amendments, Planned Developments, plot plans, tenant improvements review and other types of applications. We provide review of ADA accessibility, Roadway Precise Plans, storm water treatment, trash capture requirements as part of the permit applications and other entitlement applications.

Civil Plan Review: SNG has provided full support in review of civil improvement plans for private developments, final map review, and review of referrals from Planning and Building Departments.

Submittals will be reviewed for ADA, traffic circulation, frontage improvements, parking, site lighting, compliance with Municipal Regional Permit for stormwater treatment requirements, utilities, landscaping, and related improvement s. We understand the role each department plays in the review of these applications, and when it is appropriate or critical for engineering staff to coordinate its comments with other departments such as Environmental, Planning, Building, Fire and Police, and outside agencies.

The plans and supporting documents to be reviewed include: On-site Grading and Drainage plans; Off-site Civil Improvement Plans, Off -site landscape and irrigation plans; Traffic signal plans; and Final Maps. Plans will be checked against Design Standards and Specifications, the Subdivision Map Act, Municipal Code, Conditions of approval; approved environmental documents (including mitigation measures, if applicable);
SNG will SNG will coordinate and set up meetings as needed with City staff, developers, engineers, and other agency staff. SNG will prepare meeting agenda, conduct meetings as required by the City, follow-up with meeting notes distribution and action items. Meetings will be set up only when required -- we strive to resolv e issues and coordinate tasks using e -mails and phone calls to the extent possible. We find that SNG’s procedures for efficient documentation and dissemination of information make coordination of approval process streamlined and very efficient.

Storm Water Quality Control Review: Our staff are well versed in review of compliance with storm water quality (C.3) requirements of the Municipal Regional Permit (MRP) including Source control, Low Impact Development, use of BAHM software and review of calcula tions, treatment and erosion control measures and Trash Capture requirements. SNG staff has reviewed numerous projects and provided inspections to monitor compliance during construction.

Streetscape and Landscape Improvements : SNG will provide r eview and construction management for Public and Private neighborhood parks, streetscape master plans, Institutional and Educational Facilities, and Recreation Facilities.

Final Map Review: SNG will provide review of final maps, parcel maps, right -of-way dedications, right-of-way vacations, grant deeds and lot line adjustments.

On-Call Professional Services
City of San Pablo – Public Works Department

23 | P a g e

APPROACH TO SCHEDULE OF WORK
For Civil:

For typical design projects, SNG will submit 30%, 60%, 90% and final Bid document submittals. The schedules will be determined in collaboration with City staff during the initial meetings. SNG will adhere to the schedules and make complete submittals at each phase.

For Plan Check:

SNG will complete plan reviews bas ed on the following typical turnaround times for various submittals:

1st plan review: 2-3 weeks
2nd Plan review: 1-2 weeks
3rd and subsequent plan reviews: 1 week

RATE SCHEDULE

Position Hourly Rate

Principal Engineer 245.00
Senior Project Manager 215.00
Project Manager 205.00
Senior Engineer 190.00
Construction Manager 190.00
Associate Engineer II 165.00
Associate Engineer I 155.00
Assistant Engineer 145.00
Senior Engineering Inspector 155.00
Engineering Inspector 145.00
Engineering Technician/CAD Drafting 135.00
Licensed Land Surveyor 245.00
Licensed landscape Architect 185.00
Clerical/ Admin Support 95.00

Note: Rates valid through December 31, 2023. Rates will be adjusted annually every January 1st. Mileage to billed at $0.55 per mile.

On-Call Professional Services
City of San Pablo – Public Works Department

24 | P a g e

APPENDIX

RESUMES
Proposal for On-Call Consulting Services – Acting City Engineer City of Turlock

27 | P a g e
NANDA GOTTIPARTHY, P.E.

PRINCIPAL IN-CHARGE
Professional Registration:

Civil Engineer - CA No. 52308

Education:

MS – Civil Engineering
Indian Institute of Technology
Chennai, India

Management Highlights
& Capabilities
• 25 + Years of Civil and
Municipal Engineering &
Management Experience
• 10+ Years City Engineer
Experience
• Review and approval of
Land Development Projects
Development Agreements,
Subdivision Agreements
and City Council Reports
• Capital Improvement
Projects Planning, Design
and Construction
Management
• Managed federal and
State grant-funded
projects
• Infrastructure CIP and
Budget Preparation

Mr. Gottiparthy has nearly 30 years of experience in municipal engineering and management of large development and capital improvement projects from inception to completion. He served as a Senior Civil Engineer for the City of Tracy and City of San Leandro and was responsible for managing all functions of the land development sections.

Mr. Gottiparthy served as the Contract City Engineer for the City of Livingston, City of Atwater and City of Oakdale. As a Consultant, he has assisted City of Dublin, City of Tracy, City of Lodi, City of Vallejo, City of San Leandro, City of Lathrop, City of Atwater, City of Patterson, City of Brentwood, and City of Livingston in processing of land development projects and design and construction of capital improvement projects. Representative projects are listed below:

City of Tracy - On-Call Development Review and Staff Support Services (2000-2010 and 2014 to Present)
Mr. Gottiparthy provided review and project management and oversight for many large specific plan areas from master planning of infrastructure to processing of final maps and project close -outs.

Examples include:

Tracy Hills Specific Plan: Tracy Hills Is a master planned community in southwest Tracy that consists of 6,175 acres with 5,400 residential units and approximately 600 acres of commercial, industrial, office, and retail land uses
Cordes Ranch (International Park of Commerce) Specific Plan: The International Park of Commerce is an 1,800 -acre Master -Planned Business Park in Tracy; at full build -out, 1 9 million square feet of warehouse and office space will be constructed.

I-205 Specific Plan: Mr. Gottiparthy provided engineering review and processing services from preliminary planning stages to project closeout for most of the projects within the I -205 Specific Plan consisting of West Valley Mall with a leasable area of 835,000 SF,

3.0 million SF of commercial and 1.7 million SF of Industrial developments.

Tracy Gateway Business Park : A 335 -acre business park development designed to accommodate 5.8 million SF of floor area, a six-story hotel, and recreational facilities that include a nine-hole, championship level golf course and a series of stormwater management ponds.

City of Dublin - On-Call Development Review Services
Mr. Gottiparthy has been working with the City since 2000 providing plan review services for residential and commercial development projects, review of Tenant Improvements and other Planning and Proposal for On-Call Consulting Services – Acting City Engineer City of Turlock

28 | P a g e
Mr. Nanda Gottiparthy
Selected Experience
(continued)

Building Department referrals, preparation of Conditions of Approval, agreements, Council Communications, assist in Updating Traffic Impact Fees (TIF) and project closures.

Project examples include residential projects such as California Highlands, Park Sierra, Arroyo Vista, Grafton Plaza, Nielsen Residential Development and Schaeffer Ranch with extensive hillside grading, stormwater detention and sedimentation basins and coordination with multiple agencies.

Commercial projects such as Opus Buildings B & C, Marriott - Springhill Suites, Koll Center, Arco AM/PM, Retail Shops at Waterford, Tralee, and other projects.

Mr. Gottiparthy also assisted City staff in coordinating the approvals for I -580/Tassajara Road Interchange, I -580/Fallon Road interchange, Dublin Boulevard/Dougherty Road widening project, Funding Options an d TIF for Transit Center, agreements and grant deeds.

City of Livingston - Department of Public Works
Contract City Engineer and Staff Support Services (2003 - 2013) Mr. Gottiparthy served as the Contract City Engineer from 2003 to 2013. He managed staff o f SNG & Associates and City’s
engineering/Public Works in all functions of the engineering division.

He managed RFP/RFQs for consultant services, Master Plans for Roadway, Water, Wastewater, Storm Drainage and Parks, review and approval of land developmen t projects, Grant Applications, and oversight of design, review and project/construction management of CIP projects.

Mr. Gottiparthy initiated and assisted City of Livingston in adoption of policies and procedures for improved efficiency in processing of development applications, and compliance with local and State regulations per the Subdivision Map Act and RWQCB and NPDES permit requirements. Representative State and Federal grant projects managed by Mr. Gottiparthy include the following:
❖ Bird Bridge HBRRP Project
❖ B St. at Winton Parkway Traffic Signal (HES)
❖ Safe Routes to Schools projects - Federal Cycle 2
❖ PROP 13 City-wide Water Infrastructure Improvements
❖ CMAQ Sidewalk Installation 2012 Project, 2013
❖ Safe Routes to Schools projects Cycle 3, Cycle 6, Cycle 8 ❖ LWCF Basketball Courts, Picnic Shelter & Restroom Facility ❖ HWY 99 Sewer Lift Station.

DAVID CANEER, P.E., QSD

PROJECT MANAGER

Professional Registration
Professional Civil Engineer

California 1982(C34408);
Idaho, 1994 (7426);
Washington, 1995 (32385);
Oregon,1997 (19433); Hawaii,
1999 (9689); Nevada, 2007
(18914);
Delaware, 2013 (18582).

Certifications
Qualified SWPPP Developer
(QSD),
Qualified SWPPP Practitioner
(QSP), 2011 (#00421)
Caltrans Resident Engineer
Academy Certificate, March 2016

Education
BS, Civil Engineering /
Transportation
California Polytechnic State
University, San Luis Obispo, 1977

Professional Affiliations
• Member, American Public
Works Association (APWA)
• Fellow, American Society of
Civil Engineers (F.ASCE),
San Francisco Section –
Golden Gate Branch

Mr. David Caneer is a Professional Civil Engineer with 44 years of professional engineering experience (24 yrs. working in the San Francisco Bay Area, 7 yrs. in Idaho, & 13 yrs. in the Monterey Bay Area/Santa Cruz) in public and private site development, public works infrastructure, storm drainage, sanitary sewer and water systems designs, transportation, street and highway engineering, surveying, and construction management.

Areas of design emphasis include hydrology, stormwater retention/ detention and percolation ponds, roadway, traffic signal and striping, utility, street lighting, grading storm water treatment, Storm Water Pollution Prevention Plans (SWPPP), creek channel stabilization and restor ation, wetlands mitigation, water line, sanitary sewer/septic system and flood plain design, and construction management on a variety of public works.

Representative projects include:

Streets and Highways
• I-880 to Mission Blvd. East -West Connector Project, Alameda County Transportation Commission (ACTC), Freemont & Union City, California:

Project Manager responsible for managing the design consultants on the $230 million arterial complete street project wit h 4.85 miles of new and existing roadway improvements for ACTC. Prepared the Project Initiation Document (PID) in accordance with the Caltrans Project Development Procedures Manual (PDPM). The project includes six (6) bridges (one flood control channel, t wo creeks, two Union Pacific Railroad underpasses, and one Bay Area Rapid Transit (BART) underpass), on - and off -site environmental and stormwater quality treatment mitigation, 35 permits, Design, Construction & Maintenance Cooperative Agreements and Memorandums of Understanding (MOU’s), and right -of-way acquisition services for 52 parcels (23 private/29 public agencies, including Caltrans).

Coordinated environmental permitting with the RWQCB, DTSC, USFWS, CDFW, USACOE and SHPO.
• I-80/Gilman St. Interchange Improvement Project, Alameda County Transportation Commission (ACTC), Berkeley, California: Project Manager responsible for managing the environmental planning and preliminary design consultants on the PA/ED phase of this $34 million interchange improvement project to prepare a Combined PSR/PR to secure Caltrans’ environmental approval for ACTC.
• State Route 237/Interstate 880 (SR237/I -880) Express Connectors Project, Milpitas and San Jose, Santa Clara Co unty: Served as the Deputy Project Manager from 50% design through construction for this $2.5 million design fee freeway improvement project proposed by the Santa Clara Valley Transportation Authority (VTA) to relieve congestion and maximize the efficiency of connecting ramps at the SR 237/I -880 interchange by the conversion of the existing high occupancy vehicle (HOV) connectors to single occupancy toll or express lanes. Coordinated improvement plan and specification reviews, preparation of Electrical and Lighting Plans, Construction Cost Estimate, Traffic Management Plans (TMP), Non-Standard Caltrans Design Exceptions, Construction Zone Enhanced Enforcement David Caneer
Project Manager
(continued)

Program (COZEEP), Storm Water Data Report (SWDR), P reliminary Environmental Analysis Report (PEAR), Cultural Resources, Geotechnical and Air Quality Study, and project scheduling between the Design Team, VTA and Caltrans District 4.
• State Route 237/Interstate 880 (SR237/I -880) Express Connectors Project, Milpitas and San Jose, Santa Clara County: Served as the Deputy Project Manager for design through construc tion of this $2.5 million design fee freeway improvement project proposed by the Santa Clara Valley Transportation Authority (VTA) to relieve congestion and maximize the efficiency of connecting ramps at the SR 237/I -880 interchange by the conversion of the existing high occupancy vehicle (HOV) connectors to single occupancy toll or express lanes. Coordinated improvement plan and specification reviews, preparation of Electrical and Lighting Plans, Construction Cost Estimate, Traffic Management Plans (TMP), Non-Standard Caltrans Design Exceptions, Construction Zone Enhanced Enforcement Program (COZEEP), Storm Water Data Report (SWDR), Preliminary Environmental Analysis Report (PEAR).
• 12th Street/Imjin Parkway, 2nd Avenue, Lightfighter Drive, and State Route 1, 3+ Mi. Roadway Improvements, Marina & Seaside, California: Project Manager for the planning, PS&E and construction manag ement phases of these two multi -million dollar roadway realignment and widening projects within the former Fort Ord Army Base. Prepared the Caltrans Project Summary Report (PSR) for the Hwy. 1/Imjin Parkway on - & off-ramps, and performed the construction administration through project completion.

Coordinated Caltrans right-of-way and District 5 Encroachment Permits.

Public Works/Utilities
• Hwy 1. Sanitary Sewer Force Main, Monterey County, California:

Administered the preparation of the improvement plans, specifications and construction estimate and provided construction administration for the highway improvements associated with this14,400 L.F. force main. • MCWD Recycled Water System Mapping, Fort Ord, Seaside and Marina, California: Served as utility and surveying subconsultant to provide existing utility mapping and topography along the proposed ±20 mile recycled water alignment from the Monterey Regional Water Pollution Control Agency (MRWPCA) wastewater treatment plant in Marina, through the former Fort Ord Army Base, to downtown Monterey.
• Carmel Valley Road Water Main Upgrades, Monterey County, California:

Assisted in the construction document preparation for this 3+ mile long, 30” dia. water main pipeline upgrade project designed to California American Water (CAW) standards. Served as Construction Project Manager for CAW overseeing the inspecting to ensure the contractor’s compliance with the contract documents.
• Big Willow Creek Flood Plain Extension, Sandy, Utah, and Arrowhead Canyon & Pierce Park Gulch Flood Plain Extensions, Boise, ID: Project Engineer in charge of managing the surveying of creek cross -sections and oversaw the data input into HEC-2 hydraulic modeling to establish 100-yr. water surface elevations impacting abutting developments.
• Ord Military Community (OMC) Percolation Pond Sizing, Seaside, CA:

Prepared seven (7) preliminary percolation pond design options to terminate discharge into Monterey Bay from this ± 1,300-acre tributary drainage area at the former Fort Ord Army Base to facilitate development of new streets to serve the addition of military housing rental units.

Transit
• Bay Area Rapid Transit (BART) Daly City Turnback, Daly City and San Mateo County, California: Senior Civil Engineer responsible for the preparation of the plans, specifications and estimates (PS&E’s) for this multi -million-dollar heavy rail extension from San Francisco to the Daly City transit station, and to a maintenance, storage, and turnaround yard in San Mateo County.

Performed track horizontal and vertical control and hydrologic and hydraulic calculations and coordinated underground utility relocati ons with the City and local public utility companies.
• San Francisco Municipal Railway (SF MUNI) 19th Avenue Trackway Improvements, San Francisco, California: Senior Civil Engineer for the redesign of the double track section of this 2+ mile segment of the SF MUNI light rail system located in the median of the 6-lane arterial, 19th Avenue.

Schools/Public Facilities/Churches
• Moscone Convention Center Expansion, San Francisco, California: Senior Supervising Civil Engineer responsible for the civil (underg round) engineering covering Schematic Design (SD), Design Development (DD), Construction Documents (CD), Bid Support (BD), and Construction Administration (CA) for this $320M project that will add a gross area of 371,000 SF to the existing Moscone Convention Center.
• Pebble Beach Community Services District (PBCSD) Headquarters Upgrades and Fire Protection Facilities Expansion, Pebble Beach, California: Oversaw the site survey and prepared the site improvement plans (horizontal control, grading, paving, drainage, fire & domestic water and sewer system services) for the new fire engine service bays, parking lot and Administration and Fire Department Building expansions. Performed the construction administration to review and respond to contractor materials submittals, RFI’s, and CCO’s and ensure compliance with the contract documents. • Seaside Public Works Corporation Yard, ±12 Ac., Seaside, California:

Performed a preliminary 4 -site assessment to arrive at the preferred site location. Managed the site topographic, boundary and utility survey for this ±12 acre project on the south side of Gigling Rd.
• CSUMB Library, 4-Story, ±200,000 S.F., Seaside, California: Managed the site topographic, boundary and utility survey for this ± 5-acre project at the corner of 5th Ave. and A St. Evaluated stormwater quality/ BMPs design options to secure LEED certification. Provided construction administration services including responding to contractor request for information (RFI’s), materials submittals review, and plan addenda through construction.

Parking Structures
• University Avenue Lot J Parking Structure, Palo Alto, California: Senior Civil Engineer for structure and site drainage, driveway plan/profiles, and infrastructure connections to the abutting public streets. • Boise Air Terminal Parking Structure, Site Improvements and Utility Relocations, Boise, ID

On-Call Entitlement Development Application Review &
Public Works Engineering Plan Review Services
City of San Bruno– Public Works Department

36 5776 Stoneridge Mall Road, Suite 365, Pleasanton, CA 94588 Phone: 925-251-0100 Fax: 925-242-5894

MICHAEL O’CONNOR, P.E

SENIOR CIVIL ENGINEER
Professional Registration
Professional Civil Engineer
California No 58144

Education
BS, Civil Engineering
Santa Clara University

Management Highlights
& Capabilities
• 30 Years of Civil
Engineering Experience
• 15 Years of Municipal
Engineering Experience
• Capital Improvement
Engineering Experience
• Staff Augmentation for
Local Municipalities
• Managed Federal and
State Grant Funded
Projects

Mr. O’Connor has over 30 years of professional engineering experience working on all types of public works infrastructure projects including transportation projects, water, sewer and storm infrastructure projects, and master plan CIP projects.

Mr. O’Connor has been providing review and processing of development projects for several public agencies in the Bay Area and Central Valley, including the cities of Tracy, Dublin, Hayward, and Livingston.

Plan Review/Staff Support
City of Tracy – Development Engineering Services
Cordes Ranch (International Park of Commerce): Mr.

O’Connor provided review and processing of the development applications for several developments in the Cordes Ranch Specific Plan area, including Amazon Building 1, F edEx, MedLine, Building 6, Building 12, Building 25, and Buildings 22 and 23. Mr. O’Connor checked onsite and offsite Improvement Plans for all of the Phase 1 Cordes Ranch projects for
conformance to City Design Standards, project Conditions of Approval, and City Master Plans.

Ridgeline Properties Pescadero Ave: Mr. O’Connor prepared the Conditions of Approval for the 380,000 SF Distribution Warehouse in the Northeast Industrial Specific Plan area and reviewed the onsite and offsite improvement plans.

DCT Industrial Properties Arbor Ave: Mr. O’Connor prepared the Conditions of Approval for the 750,000 SF Distribution Warehouse in the I -205 Specific Plan area and reviewed the onsite and offsite improvement plans, including a regional detention basin and associated pump station.

Ellis Phase 2 Gardens: Mr. O’Connor prepared the Conditions of Approval for the 170-acre, 356 residential lot subdivision for the Ellis Gardens projects in the Ellis Specific Plan Area. He also reviewed the onsite grading and impro vement plans and
processed Subdivision Improvement Agreements.

Tracy Village Project – Valpico Road Widening Project: Plan review and coordination of offsite improvements for 594 - lot residential subdivision, including coordination with Rule 20 Undergrounding Project.

On-Call Entitlement Development Application Review &
Public Works Engineering Plan Review Services
City of San Bruno– Public Works Department

37 5776 Stoneridge Mall Road, Suite 365, Pleasanton, CA 94588 Phone: 925-251-0100 Fax: 925-242-5894

Michael G. O’Connor
Senior Civil Engineer
(continued)

Plan Review/Staff Support
City of Dublin – Public Works Department
Plan Review processing of proposed improvements for private development tenant improvements; site development review referrals for conditions of approval, and site work permit inspections. Review improvement plans, grading plans and conduct site inspections for ADA accessibility compliance, for Storm Water C.3 treatment requirements.
• Reviewed various Tenant Improvements projects for
commercial buildings in City of Dublin.
• Reviewed Building permits for Developments and
Additions for various residential units.
• Reviewed Encroachment Permit plans for any work in
public right -of-way for both commercial and residential units.
• Worked on Site Development Review projects an d
planning applications for conditional use permits.

City of Pleasant Hill
Reviewed site improvement plans for a Fountainhead
Montessori preschool project in City of Pleasant Hill.

City of Hayward
Acting Development Review Engineer
Mr. O’Connor assisted the Planning Department of the City of Hayward as Contract Acting Development Review Engineer.

Mr. O’Connor reviewed all applications for private
development projects in the City and coordinated with the Public Works, Utilities, Building, and Fire Department staff for various site development review referrals for conditions & site work permits.

City of Livingston
Provided staff support services in all aspects including preparation of conditions of approval, agreements, design of capital improvement projects, construction management and final project acceptance.

Sacramento County
Project Manager, Project Engineer, Resident Engineer for Sacramento County Dept. of Transportation CIP projects
• Macready Avenue Reconstruction Project
• Phase 3 & Phase 4 ADA Intersections Improvement
projects

JIMMY C. LAGPACAN
SR. CIVIL ENGINEER

Education
BS, Civil Engineering
University of Hawaii-Manoa

Management Highlights
& Capabilities
• Civil Engineering Experience
• Project Management
Experience
• Construction Manager
Experience

Mr. Jimmy C Lagpacan has o ver 45 years of civil engineering and project management experience in a variety of settings including partnering, fast track and design/build projects. He has e xtensive experience in the civil design, specifications and cost estimates of site development and public works projects for federal, state and local government agencies as well as for private sector firms. Mr. Lagpacan has extensive experience as a construction manager for public projects, residential, commercial and industrial projects.

Representative projects include:

Mr. Lagpacan prepared cost estimates for repair & replacement of public buildings and infrastructure facilities that were damaged by Hurricane Maria. Performed QC of scopes of work & cost estimates prepared by other Project Specialists. Performed site inspections to validate hurricane related damages and prepared the site inspection reports for the following Puerto Rico Dept. of Corrections and Rehabilitation Facilities:
• Bayamon Correctional, Bayamon
• Guerrero Correctional, Aguadilla
• Las Cucharas Correctional, Ponce
• Western Detention Center, Mayaguez

Mr. Lagpacan prepared plans, specifications and cost estimates for site, grading, storm drainage, sanitary sewer, underground utilities, pavement, and roadway plan and profile. managed civil engineering design work and staff for civil site development, transportation and commercial projects. Supervised engineers, designers, and CADD technicians. Performed QA/QC and Constructability Review for civil projects. Coordinated work with clie nts, consultants, regulatory agencies, and contractors. Performed topographic surveys with total station instrument.
• Chevron General Engineering Contract Projects, Richmond Refinery
• SFMTA Radio Repair Project, San Francisco
• SFPUC Sunnydale Sewer Tunnel Project, SFO
• TJPA Bus Storage, San Francisco
• LAVTA Bus Storage Facility, Livermore
• BART Central Contra Costa County Crossover, Walnut Creek • BART Hayward Main Repair Shop Renovation, Hayward
• Stanford Linear Accelerator Center, Stanford

Mr. Lagpacan has assisted in the preparation of the Conceptual Infrastructure Plan report for the Treasure Island Redevelopment Project, SFO, CA. Prepared conceptual design & cost estimates for the roadway, storm drain, potable and fire water, sanitary sewer, and dry utilities (telecom, electrical, and natural gas) systems for Treasure Island and Yerba Buena Island. QA/QC of civil projects. Coordinated work wi th cl ient and re gulatory agencies. Supervised engineers, designers, and CADD technicians. He has Supervised engineering and

Jimmy C. Lagpacan
Senior Civil Engineer
(continued)

surveying staff, QA/QC of civil projects , Site development, Prepared construction drawings, specifications, and cost estimates. • Abel Street Improvements, City of Milpitas
• Milpitas Sports Center, City of Milpitas
• New Hogan High School, Vallejo
• Healdsburg High School Gym & Classroom Additions, Healdsburg

As a Senior Civil Engineer, he has supervised HNTB’s civil department.

Site development design for the San Bruno and South San Francisco BART Stations and line and track projects. Civil design of the UPRR Relocation and FOC Duct bank Relocation Projects, San Jose, CA. GIS & Utility Coordinator for the PCJPB. Prepared plans, specifications and cost estimates.

As a Project Manager , he has Co-ordinated the site development design of the South San Francisco BART Station and Parking Structure between the different disciplines. Coordinated work with the contractor, BART and various regulatory agencies.

As a Construction Project Engineer, his responsibility is to design site development for the Millbrae BART Station and Parking Structure.

Prepared specifications and cost estimates

As an Assistant Construction Manager , he assisted the Construction Manager for the US Postal Service New Carrier Annex at the Honolulu International Airport. Inspected the work of the design/build contractor. Prepared daily i nspection reports, field trouble reports, non-compliance notices and change orders.

As a Senior Civil Engineer, he has supervised engineers and designers.

Site development design including site plans, drainage, sewers, water lines, grading, pavement
As a Project Manager, he has performed SABER Construction Services for Hickam AFB. Prepared plans, specifications and cost estimates, selected contractors and managed construction of various building and public works projects on base and other off -base facilities.

Reviewed and approved progress payments to contractors.

Coordinated work with USAF contracting and construction personnel.

• As a Staff Civil Engineer, he worked on following projects:
• Uranium Mill Tailings Remedial Action Program, DOE
• TRW Manufacturing and Office Facility, Redondo Beach, CA • EG&G Geophysical Logging Support Facility, No. Las Vegas, NV • EWC Facility Building, McClellan AFB, CA
As a Sr Civil Engineer, he has worked on Civil site design including site plans, grading, roadways, drainage, sewers, waterlines and fire water systems. Designed surface and underground coal mining plans.

Prepared construction drawings, specifications, and cost estimates.

As a Civil Engineer IV, he has reviewed public works and subdivision construction plans. Supervised building renovations, demolition projects and bridge inventory and inspection. Designed roadway horizontal and vertical alignments, site and drainage structures, building modifications and relocations. Prepared specifications and cost estimates.

MOJGAN OSOOLI, P.E.

SENIOR CIVIL ENGINEER

Professional Registration
Professional Civil Engineer
California No 88505

QSD/QSP License No.26572

Education
BS, Civil Engineering
Iran National University

Management Highlights
& Capabilities
• 15 Years of Civil
Engineering Experience
• 2 Years of Municipal
Engineering Experience
• 1.5 Capital Improvement
Engineering Experience
• 5 Years Caltrans
Transportation Experience
• 8 Years of Water
Resources and Water
Transfer
• Managed about 10 staff
and led professional
Teams

Mrs. Osooli has over 15 years of professional engineering experience working on projects pertaining to highway drainage design, On-site and off -site developments for residential and commercial projects, water transfer, Sewer and Storm Water design, storm water detention and retention facilities.

As Senior Transportation Engineer/Branch Chief at Caltrans, Mrs.

Osooli designed, checked, and reviewed plans, cost estimate and specifications. She prepared technical report and engineering calculations, also provided storm water design, treatment BMP, temporary stream diversion, dewatering, access roads, SWPPP and construction BMPs, hydrology report and summer flow calculation for various capital and maintenance projects including items below:
• Alameda Bridge replacement, Change of alignment,
• Alemany Bridge Improvement in 101 HWY storm water
pollution control
• Hopper Slough Bridge replacement in Napa County
• Sulphur Creek and York Creek Bridge Rails replacement Napa County
• Trash Capture Design in Several locations in Contra Costa County route 80.

Mrs. Osooli has completed several oversight reviews for public agencies projects in Caltrans R/W including below:
• Reconstructing I -880 Whipple and Industrial parkway
interchange, a $120 million project with City of Hayward. • San Mateo HWY-1 Over Crossing with City of Pacifica
• I-680 interchange improvement with City of Fremont
As a Project Engineer at BKF Engineers , Mrs. Osooli Prepared construction documents for residential and commercial
developments, worked on designing Infrastructure, pump stations and utilities such as water, fire and storm. Prepared planning and entitlement applications, and on-site and off -site improvement plans, Specs and cost estimates.
• Station 1300 improvement, Menlo Park
• San Francisco University Housing
• Salinas Commuter Rail Station and Layover Facility
• Treasure and Yerba Buena Islands improvements.

Mojgan Osooli
Senior Civil Engineer
(continued)

• Vallejo Gordon Water Main repair at Ledgewood Creek.
• Candlestick Point, Gilman Ave Auxiliary Water Supply
System.
• Hillsborough 30-year Storm Water Master plan.
• Stanford in Redwood City, Fire Water Network Modeling • 3 Large Trash Capture devises in City of San Jose
• San Mateo Sewer Main and Manhole Rehabilitation
• South San Francisco Sewer Main and Manhole
Rehabilitation
• Vallejo Frey and Madigan Dams

With Iran Water Resources Management, Mrs. Osooli Worked on designing a complex inter -basin water transfer between Mazandaran and Golestan, a huge plan with approximately 3 billion dollars estimated cost.

Participated in project scoping, preliminary and detailed design and coordinated permits and environmental approvals.

DOUGLAS J. RODGERS

SENIOR ENGINEER

Education:

Chabot Community College
Hayward, California
Mathematics, Science,
Civil Engineering and
Land Surveying courses

Management Highlights
& Capabilities
• Over 40 Years of Civil
Engineering, Land Surveying,
and Land Planning
experience
• Designing, drafting and
overseeing the production of
a wide range of civil plans
and survey maps.
• Performing, directing and
reviewing all essential office
and field work in support of
engineering, surveying and
planning projects
• Plan review for public
agencies including
engineering design review of
subdivision and Capital
Improvement Program
improvement plans
• Project management and
administration for public
agencies involving the
review, approval and
permitting of both private
sector development and
public capital improvement
projects

Mr. Doug Rodgers has over 40 years of experience in the field of civil engineering, including extensive work in land surveying, land use planning, and entitlement processing in public and private sectors.

Mr. Rodgers’s experience as a Project Engineer and Project Manager includes tec hnical design engineering, plan review, surveying, and planning functions for a variety of residential, commercial and industrial site developments, as well as transportation and capital improvement projects, including the preparation of street improvement plans, grading and drainage plans, stormwater quality control plans, utility plans, topographic surveys and performing field inspections of construction work.

Selected Experience
Plan Review & Project Management
Mr. Rodgers provided plan review and project management services on several large and complex residential and
commercial development projects involving both public
infrastructure and private site improvements , including the following:

City of Dublin – Public Works Department
• Grafton Plaza – 12-acre Mixed-Use Development with
hotel, commercial and townhouses, including public street widening.
• Kaiser Dublin Medical Center – 220,000 SF Medical Office Building with extensive off -site public street widening and storm drainage improvements.
• Tassajara Highlands – 48-lot Residential Development with private streets. Off -site public street widening, extensive grading and coordination in sensitive creek basin.
• IKEA – 432,099 sq. ft. commercial development on 24. 75 acres, anchored by a 339,099 sq. ft. IKEA store and including 93,000 sq. ft. of retail/restaurant uses.
• At-Dublin - 76-acre Mixed Use Multi -Phase Development Project consisting of 680 residential units and 454,500 SF of Commercial.
• AVESTA Senior Housing – 66,787 sq. ft., four story building containing 35 senior apartments, 13 high -acuity assisted living units, and 32 memory care units on a one-acre site.

Douglas Rodgers
Senior Engineer
(continued)

City of Tracy – Development Services Division
• Tracy Hills – 2,732-acre Master Planned Community
consisting of 5,499 residential units, mixed-use business park, commercial and industrial space, 3 public schools, fire station, numerous parks, open space and conservation
easement areas, with extensive on-site and off-site public roadway improvements and utility infrastructure.

City of Pleasant Hill – Engineering Division
• Greyson Place Subdivision No. 9469 – a 38-lot single family residential infill subdivision, including grading and on-site & off-site public street, utility, and storm drainage
improvements.

City of Emeryville – Public Works Department
• Marketplace Redevelopment Project – 15-acre Mixed Use Development with commercial, retail, and residential,
including extensive on-site & off-site public street, utility and storm drainage improvements and relocation of
existing public street.

City of Brentwood – Engineering Division
• Sellers Pointe – 84 lot residential development including 1/3-mile-long widening of adjacent existing Public Street with extension of sanitary sewer, water, and storm
drainage facilities.

Mountain House Community Services District
• College Park – 815-acre mixed-use master planned
community consisting of 2,240 residential units, 1.8 million square feet of commercial, office and industrial property, 47 acres of parks, two schools and community college.
• Neighborhood J – 315-acre, mixed single family and active adult community consisting of 1,124 residential units and extensive park, open space and detention pond network.

Proposal for On-Call Consulting Services – Acting City Engineer City of Turlock

35 | P a g e
BRUCE JACKS. P.E.

SENIOR ENGINEER

Management Highlights
& Capabilities
• Over 40 Years of Civil
Engineering, Land
Surveying and Land
Planning experience
• Designing, overseeing the
production of a wide range
of civil plans and survey
maps.
• Performing, directing and
reviewing all essential
office and field work in
support of engineering,
surveying and planning
projects
• Plan review for public
agencies including
engineering design review
of subdivision and Capital
Improvement Program
improvement plans
• Project management and
administration for public
agencies involving the
review, approval and
permitting of both private
sector development and
public capital improvement
projects
• Project and QC Manager
• Tentative Map processing
• Specific Plans
• Master Plans

Mr. Bruce Jacks has over 40 years of experience in the field of civil engineering, including extensive work in land surveying, land use planning and entitlement processing in both the public and private sectors. Mr. Jacks’ specialty is single family small lot subdivisions, multi-family and commercial developments. He has designed or been the responsible engineer in charge for over 100,000 single family lots plus numerous multi -family residential, commercial, and indu strial projects throughout northern California.

Mr. Jacks’ experience as a Project Engineer and Project Manager includes technical design engineering, plan review, surveying and planning functions for a variety of residential, commercial and industrial sit e developments, as well as transportation and capital improvement projects. He provided QC review of street
improvement plans, grading and drainage plans, stormwater quality control plans, utility plans, managed topographic surveys, field inspections and provided construction management for large construction projects.

Mr. Bruce Jacks’ extensive experience in working with public agencies and developers enables him to provide a balanced and efficient approach to processing of variety of development projects, provide review and timely resolution of issues.

Selected Experience
Cunningham Engineering - Davis, California
Prudler Property, Woodland: Resolved multiple development issues for an approved 38 acres / 183 units single -family Tentative Map.

Provided QC and improved grading design by reducing imported dirt volume to near zero.

East St Widening, Woodland: Provided design services to widen East St from County Fair Mall south to the Community Center. Uncovered multiple overlooking pre -design considerations and conflicts which modified the original plan lines for the widening.

Sutter Park, Sacramento: Designed the final improvement plans for the redevelopment of Sutter Memorial Hospital in East Sacramento into a mixed-use residential community.

West Yost Associates - Davis, California
Fort Bragg : Performed conceptual design for site grading and a master wastewater master plan for a 400-acre redevelopment of the Georgia Pacific Lumber Mill.

City of Vacaville: Performed QC review for plans to expand the Easterly Wastewater Treatment Plant.

City of Vacaville : Prepared Pre-design of a trunk relief sewer for a local sewer shed in Vacaville.

Proposal for On-Call Consulting Services – Acting City Engineer City of Turlock

36 | P a g e
Bruce Jacks
Senior Engineer
(continued)

Woodland/Davis Clean Water Authority: Prepared the preliminary cost estimate for 13.5 miles of 36 and 42 inch raw and finished water pipelines for the Woodland Davis Clean Water Agency.

Mac Kay & Somps Civil Engineers (Engineering Manager)
Sacramento, Placer, Yuba, and Sutter County: Worked as QC and Engineering Manager for multiple large and high -profile projects in these counties. Significant responsibilities during this period included: budget man hours for new projects, contract negotiation, resolve engineering issues at the entitlement phase, master plans to quantify Specific Plan Finance requirements, project management and design.

Solano County: Worked as Design Engineer, Project Manager, and Engineering Manager for numerous large developments, p ublic works, and assessment district projects in Solano County.

Responsibilities:

Mass Grading and Earthwork Review: Developed unique and cost - effective estimating tools to evaluate site balance and mass haul evaluation.

Local agency contract assistance : Reviewed and provided input for many Development Agreements and other agreements.

Specific Plans and Tentative Map Processing : Evaluated project constraints, review of Development Agreement, Specific Plan, Tentative Map, and Parcel Maps.

Constructability review : Evaluated project design for constructability and compliance with agency standards. Provided value engineering and construction inspections.

Quality control: Provided project QC review of design from conceptual through approved construction documents.

Construction Oversight, Inspections: Worked proactively with contractors during the construction phase to monitor compliance.

Project scheduling, job -site visits, and thorough knowledge of the construction documents and the local agency standards h elp to identify and/or resolve construction issues quickly and efficiently.

CASEY BARKMAN
Senior Civil Designer
Education:

AA, Drafting,
Universal Technical Institute,
Phoenix, Arizona
Management Highlights
& Capabilities
• 20 + Years of Civil & Municipal
Engineering and Project
Management
• Land Development and
Construction Management
• Capital Improvement
Management
• Value Engineering
• Clean water & NPDES
Compliance Review
• 3rd party engineering review
• Drafting

Casey Barkman has more than 20 years of experience in roadway design, land development engineering, and project and construction management. His experience includes drafting, project design, project management, planning and engineering, quality control, and coordination among public agencies, developers, sub-consultants, and surveyors.

Mr. Barkman has been involved in several highways, urban, and residential projects in the Central Valley. For these projects, Mr. Barkman was responsible for the grading, dr ainage, sanitary sewer, storm drain, water system and pavement design. Casey also prepared the improvement plans and engineer’s estimates and provided construction administration services. Partial list of projects includes the following:

Cannery Park, Stockton, California (Project Manager/Designer) Cannery Park is a 965-unit multipurpose community featuring residential, commercial, and industrial uses. The project consisted of more than 10 miles of new road ways and the widening and reconstruction of more than 2 miles of existing roadways. The development also included the design of a bike path, bridge, a drainage basin, undergrounding of irrigation ditches, Caltrans off ramp and frontage road improvements.

Rite Aid, Rio Linda, California (Project Manager/Designer) Casey prepared site development plans for the 2.5-acre site including the new Rite Aid building. Plans included ADA accessibility design, grading, earthwork analysis, drainage, sanitary sewer, potable water, and fire protection water.

Fullerton Ranch, Lincoln, California (Project Manager/Designer) Casey provided design services for the planning and construction of a 19- acre, 81-lot community. He was responsible for the grading, drainage, sanitary sewer, storm drain, water system, and pa vement design. Casey also prepared the improvement plans and processed through approvals and the engineers estimates for construction costs. The development was designed to save as many oak trees as possible. The project also had a stormwater detention basin.

Bonita Ranch, Keyes, California (Project Manager/Designer) Mr. Barkman provided design services for the planning and construction of a 99-acre, 390-lot community. He was responsible for the grading, drainage, sanitary sewer, storm drain, water system and pavement design.

Casey prepared the improvement plans and engineers estimates for construction costs. The development also included in -tract interior roadways and arterial roadway widening, a stormwater detention basin/park. Additionally, Casey provi ded construction administration services for the developer.