Proposal and Statement of
Qualifications for On-Call
Professional Services
City of San Pablo Department Public Works Engineering Division → The Power of CommitmentMarch 29, 2023
© GHD 2023
This document is and shall remain the property of GHD. The document may only be used for the purpose of assessing our offer of services and for inclusion in documentation for the engagement of GHD. Unauthorized use of this document in any form whatsoever is prohibited.

Contents

1. Letter of Interest / Cover Letter 01

2. Firm(s) Statement of Qualifications 02

3. Staff Statement of Qualifications or Resumes 03
Contract Manager / Project Director Personnel Bios 04
Civil Personnel Bios 04
Construction Management Personnel Bios 05
Civil Plan Review Personnel Bios 08
Environmental Personnel Bios 10
Electrical Personnel Bios 13
Transportation Personnel Bios 14

4. References 15

5. Project Approach 25

6. Approach to Schedule of Work 30

7. Rate Schedule 35
→ The Power of Commitment
GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 1 March 29, 2023 Proposal No. 12608363
Chiara Hanna
City of San Pablo Department of Public Works, Engineering Division 1000 Gateway Ave
San Pablo, CA 94806
RE: Request for Proposals and Statement of Qualifications for On-Call Professional Services Dear Ms. Hanna and Selection Committee,
Through this On-Call Professional Services contract and 9 individual disciplines, the City of San Pablo (City) will be setting the stage for a robust team of resources to comprehensively support its capital improvement projects (CIP) and operational needs over the next five (5) years. It is our understanding that this agreement is to begin July 1, 2023.

We would like to be considered for the following disciplines under this On-Call contract:

1. Civil 2. Construction Management 3. Civil Plan Review 4. Environmental 6. Electrical 9. Transportation GHD is a full-service transportation planning and traffic engineering firm with numerous On-Call contracts throughout California, specifically experience working with the City on various On-Call engineering and project management services since 2008. We realize how important it is to have a familiar, reliable, and responsive consultant you can trust and we assure you that the City will have our continued commitment to provide quality service on time and within budget as they are accustomed to receiving since 2008.

Our proposed team members have worked successfully on multidisciplinary projects throughout the Bay Area. Our team will be led by Contract Manager, Frank Penry, PE, TE, PTOE, who will be supported by Project Director, Kamesh Vedula, PE, TE. Frank has been a city traffic engineer and traffic consultant, and has been assisting Bay Area communities with traffic engineering design and transportation planning services for nearly 25 years. He is thoroughly familiar with the services you are looking for and will utilize key leads and surround them with experienced staff members, depending on the task, to help the City deliver the best product possible. Kamesh will lend support to our team in facilitating overall communication with the City as needed.

GHD is confident that we bring optimal resources to the City and that we are an ideal firm for this type of assignment.

Collectively, the following are highlights of GHD’s differential offering to the City:
− Established City relationships through our Contract Manager/Civil Lead, Traffic Lead, Drainage Lead – three key core disciplines within the CIP. GHD and the Contract Manager have served the City with On-Call engineering and project management services since 2008.
− Proven track record performing City On-Call services across the Bay Area and beyond – many contracts which have run over 10 years.
− Our local experts are backed by a global firm as they work with you in addressing your on-call needs – Our support services are nearly 100% municipal in nature with our core clients primarily being vibrant cities. We work locally and act locally. Put simply, we work where our clients are.
− Depth of resources - 430+ staff in California, and 11,000+ globally. − Coverage for 6 of 9 disciplines, with additional expertise in areas beyond those 9.

We have read the sample Professional Services Agreement provided with the RFP and confirm it is acceptable as-is.

We are confident that this proposal demonstrates our relevant experience, our understanding of the services you are seeking and our commitment to meeting your project needs. We strongly urge you to check our references as testament to our work and dedication to clients and strongly believe this proposal will motivate you to select us. If you have any questions or need further information, please feel free to contact us.

Sincerely,
Frank Penry, PE, TE, PTOE Kamesh Vedula, PE, TE
Contract Manager Project Director
+1.707.540.9019 | [email protected] +1.916.918.0622 | [email protected] GHD
2235 Mercury Way, Suite 150
Santa Rosa, CA 95407 USA
www.ghd.com

1. | Letter of Interest / Cover Letter

GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 2

2. | Firm(s) Statement of Qualifications
GHD is one of the world’s leading professional services companies operating in the global markets of water, energy and resources, environment, property and buildings, and transportation. We provide engineering, environmental, and construction services to private and public sector clients.

Established in 1928 and privately owned by our people, GHD operates across five continents. We employ more than 11,000 people in 200+ offices to deliver projects with high standards of safety, quality and ethics across the entire asset value chain. Committed to sustainable development, GHD improves the physical, natural, and social environments of the many communities in which we operate. We are guided by a Practice Quality Management System, ISO 9001:2015 and an Environmental Management System, ISO 14001:2004 which are third party certified.

On-Call Experience
Driven by a client-
service led culture,
we connect the
knowledge, skill and
experience of our people
with innovative practices,
technical capabilities,
and robust project delivery
systems to create lasting
community benefits. We know that
to deliver on this commitment we
must earn the role of trusted advisor to our clients and partner with them to create solutions that will serve
the public’s interests over the life of the projects we help implement. Balancing economic, environmental,
operational, and social interests is becoming ever
more important as a measure of success and requires
not only a broad range of technical expertise, but also a comprehensive understanding of governance and
funding processes.

GHD’s extensive experience in a broad array of
transportation planning, design, and construction
management coupled with our team's environmental
and permitting services makes us ideally suited to
provide the City with the professional services needed
for these On-Call project.

GHD holds
85+
On-Call
contracts
throughout
California
Bay Area On-Call Contracts (partial list)
→ Contra Costa County
Transportation Authority
→ City of Vallejo
→ City of American Canyon
→ City of Concord
→ Sonoma Marin Area Rail
Transit (SMART)
→ Marin County
→ City of San Rafael
→ City of Napa
→ Napa County
→ City of Novato
→ City of San Francisco
Public Works
→ City of Dublin
→ City of Vacaville
→ City of Sonoma
→ City of Petaluma
→ City of Cotati
→ City of Rohnert Park
→ City of Newark
→ City of Santa Rosa
→ Alameda County Water District
→ City of Millbrae
→ Sonoma County Water Agency
→ Town of Windsor
→ City of Sebastopol
→ City of Healdsburg
→ City of Mountain View
→ City of San Jose
Relevant
City of
San Pablo
Project
Experience

PROJECT NAME

PROJECT MANAGEMENT

OUTREACH

FUNDING

CIVIL DESIGN

CONSTRUCTION MGMT

CIVIL PLAN REVIEW

ENVIRONMENTAL

ELECTRICAL

TRANSPORTATION
Corporation Yard
Remediation
Project

X X X X
San Pablo Avenue
Rehabilitation
Project

X X X X X X X X
El Portal Drive
Corridor Study
Project
X X X
On-Call Traffic
Engineering
Contract

X X X X X X
Traffic
Engineering
Speed Surveys
Project
X X
Neighborhood
Traffic Calming
Program

X X X X
Rumrill Bridge
Replacement
Project
X X
Old Town
Traffic Study
Implementation
Project

X X X X X
23rd Street
Traffic Calming
Project

X X X X X X X
Broadway
Traffic Calming
& Resurfacing
Project

X X X X X X
GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 3

3. | Staff Statement of Qualifications or Resumes
GHD offers a cohesive team that has worked together on numerous On-Call projects. Our extensive experience allows the team to bring a comprehensive understanding of City standards, specifications, and design and construction project techniques. This allows us to anticipate needs and minimize schedule and budget impacts.

The GHD team has been carefully assembled to bring the City the right technical capabilities, resources, and approach to meet your needs. Our team is configured to maximize success and is presented in the Organizational Chart below. Also provided are short descriptions of our key personnel's roles for this contract sorted by discipline.

Full resumes are provided in the Appendix section for reference.

TRANSPORTATION LEAD
Peter Galloway
Traffic Signals
Byung Lee, PE, TE
Complete Streets
T odd Tregenza, AICP
Railroad Crossings
Frank Penry, PE, TE, PTOE
Signal Timing
Kamesh Vedula, PE, TE
Transportation Impact Studies
and Peer Review
Don Hubbard, TE, AICP

9. TRANSPORTATION

ELECTRICAL LEAD
Byung Lee, PE, TE
Solar Power Systems
Chris Richards, EE
Emergency Backup Power Systems
Rick Guggiana, EE, LEED AP , CDT
Electric Vehicle Charging
Erick Osorno, EE

6. ELECTRICAL

ENVIRONMENTAL LEAD
Brian Bacciarini, CDT
QA/QC
Charles Smith, AICP , LEED AP BD+C
California Environmental Quality Act
Chryss Meier
Andrea Hilton
Kerry McNamee
Environmental Services & Permitting
Kristine Gaspar
Sam Moose
Miles Hartnett
Clean Water, MS4 Phase II Compliance
Erik Fanselau, PE, CFM, LEED AP
Hazardous Materials/
Fueling Systems/UST Removal
Jacquelyn England, PG, LG

4. ENVIRONMENTAL

CIVIL PLAN REVIEW LEAD
Brad Swearingen, PE, LEED AP
Civil Plan Review (Land Development–Tentative/
Final Maps, Improvement Plans; Plan Check–Grading
Permits, Encroachment Permits, C.3)
Senior Plan Review
Pat Tortora, PE, LEED AP
Carl Moore, PE, QSD, LEED AP
Plan Review
Kerry Flynn, PE, QSD
Stormwater Review
Greg Garrison, PE
Nathan T owlerton, PE, QSD/P , QISP
Map Review
Richard Maddock, PLS
Jackie Bohannon

3. CIVIL PLAN REVIEW

CIVIL LEAD
Jeremy Schmal, PE
Roadways & Pathways
Roman Beltran, PE
Pavement Management
Matt Wargula, PE, TE, QSD/QSP , LEED AP
Utilities
Eric Fanselau, PE, CFM, LEED AP

1. CIVIL
CONSTRUCTION MGMT. LEAD; QA/QC
Jane Rozga, PE, CDT, CCS, CCCA
Task Manager
Jim Winter, PE, QSD
Construction Managers
Tim Dillenburg, CCM, QSD/P
Andrea Santilena
Construction Inspection Services
Eric Leitz, Q S P, C DT
Rod Wood
Crystal Prairie
Karl Meyers
Charlie Williamson, Jr.

Special Inspection Services
Tim Dillenburg, CCM, QSD/P
Steve Burns, PE, SE, ME, LEED AP
Rick Guggiana, EE, LEED AP , CDT
Erick Osorno, EE
Constructability, Scheduling &
Cost Estimating
Eric Leitz, Q S P, C DT
Project Coordinators
Crystal Prairie Nicole Garza

2. CONSTRUCTION MGMT.

Project Director
Kamesh Vedula, PE, TE
Contract Manager
Frank Penry, PE, TE, PTOE

9. TRANSPORTATION6. ELECTRICAL4. ENVIRONMENTAL3. CIVIL PLAN REVIEW1. CIVIL 2. CONST. MGMT.KEY:

CIVIL LEAD
Jeremy Schmal, PE
CONSTRUCTION MGMT. LEAD; QA/QC
Jane Rozga, PE, CDT, CCS, CCCA

CIVIL PLAN REVIEW LEAD
Brad Swearingen, PE, LEED AP

ENVIRONMENTAL LEAD
Brian Bacciarini, CDT

ELECTRICAL LEAD
Byung Lee, PE, TE

TRANSPORTATION LEAD
Peter Galloway
GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 4 Contract Manager and Key Personnel Bios
– BS, Civil Engineering, California State University,
Chico, CA, 1996
– Civil Engineer, CA #62785, OR #84632, Commonwealth of the Northern Mariana Islands (CNMI) #418
– Traffic Engineer, CA #2304
– Professional Traffic Operations Engineer #1603
– MS, Transportation, Kansas State University, Manhattan, KS, 2004
– BS, Civil Engineering, Nagarjuna University, Bapatla, India, 2000
– Civil Engineer, CA #79926
– Traffic Engineer, CA #2546

FRANK PENRY, PE, TE, PTOE
Roles: Contract Manager and Railroad Crossings
Years of Experience: 26

KAMESH VEDULA, PE, TE
Roles: Project Director and Signal Timing
Years of Experience: 21
Frank has 26 years of experience in transportation planning and traffic engineering design. He has managed numerous transportation studies and design projects from small
development impact studies to major roadway improvements.

Frank has served as the Traffic Engineer for the City of San Pablo over several years, as well as the Cities of
Petaluma, Cotati, Sonoma, Windsor,
Fortuna and the County of Marin,
providing the administration and
development of Municipal Traffic
Engineering Programs. He is
well-versed in a wide range
of traffic engineering design
standards and encroachment
requirements, traffic signals,
roundabouts, traffic calming
and streetscapes, construction
traffic handling, detour,
and control plans
for a variety of
civil engineering
projects.
– BS, Civil Engineering, California State University Fresno, Fresno, CA, 2012 – Civil Engineer, CA #87192
Jeremy has over 17 years of experience in civil engineering working with the public sector. He has performed project management and project engineer duties on numerous multi-million-dollar public works transportation improvement projects including roundabouts, roadway widening, utility relocation, intersection improvements and traffic signals, and pedestrian improvement projects. Jeremy also has experience in construction management, where he has acted as Resident Engineer and Lead Inspector. Other experience includes traffic engineering, analysis and planning, federal aid funding, high visibility pedestrian projects and construction and bid support.

JEREMY SCHMAL, PE
Role: Civil Lead | Years of Experience: 17
– BS, Civil Engineering, California State University, Sacramento, CA, 2017 – AS, Mathematics, Engineering, and Physics, College of the Sequoias, Visalia, CA, 2014 – Civil Engineer, CA #92303
Roman is a transportation engineer and project manager with experience with a variety of public works projects for local agencies. Through the preparation of exhibits, plans, cost estimates, quantity calculations, alternative analyses, technical memoranda, and other project studies, Roman provides engineering design and technical support for civil and transportation projects. He often assumes the role of assistant project manager and lead designer within the project team he is a part of, as he possesses knowledge of current engineering codes and standards, including Caltrans Highway Design Manual (HDM), Americans with Disabilities Act (ADA)/Public Rights of Way Accessibility Guidelines (PROWAG), American Association of State Highway and Transportation Officials (AASHTO) Roadside Design Guide, and California Manual on Uniform Traffic Control Devices (CA MUTCD).

ROMAN BELTRAN, PE
Role: Roadways & Pathways | Years of Experience: 17

9. TRANSPORTATION6. ELECTRICAL4. ENVIRONMENTAL3. CIVIL PLAN REVIEW1. CIVIL 2. CONST. MGMT.KEY:

Kamesh has over 21 years in the disciplines of transportation engineering, planning, and modeling. He oversees
the workload balance of the transportation planning/
engineering group and coordinates with other groups and regions to level staff resources. Kamesh is an Intersection Control Evaluation (ICE) specialist, completing numerous ICE projects within most Caltrans Districts and conducting ICE analyses training classes in Caltrans
District 11 and Headquarters. His
project management experience
includes Caltrans Project Study
Report-Project Development
Support (PSR-PDS), Project
Approval/Environmental
Documents (PA/ED), ICE studies,
roundabout planning/design,
advanced roundabout operations
analyses/design, complete streets
studies, corridor studies,
traffic impact studies,
and traffic safety
studies.

GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 5

9. TRANSPORTATION6. ELECTRICAL4. ENVIRONMENTAL3. CIVIL PLAN REVIEW1. CIVIL 2. CONST. MGMT.KEY:
– BS, Civil Engineering, Michigan Technological University, Houghton, MI, 2003 – Civil Engineer, CA #76103, NV #27840
– Traffic Engineer, CA #2749
– Qualified Stormwater Pollution Prevention Plan (SWPPP) Developer/Practitioner #01146 – Leadership in Energy and Environmental Design Accredited Professional (LEED® AP), US Green Building Council Matt is proficient in the design and construction of a variety of civil infrastructure projects, including traffic signals, pedestrian, and bicycle facilities; striping and signing plans; site development; stormwater management plans; underground utilities; water pipelines and pump stations; and traffic control systems for construction. His experience includes a broad range of services including developing Synchro, Vistro, and Traffix traffic models/simulations for preparation of traffic impact studies, signal timing, and coordination to developing open channel system hydraulic models using HEC-RAS, HEC-HMS, and StormCAD. His construction experience includes field engineering, surveying, scheduling, project controls and administrative work; he prepared quantity take-offs, applied labor, equipment, and material cost rates; analyzed construction methods and coordinated with material suppliers and subcontractors in assembling construction estimates. Matt is engaged in the design of civil engineering infrastructure and has prepared planning level studies and reports, design reports, technical memoranda, and construction documents, including plans, specifications, and construction estimates for various projects.

MATT WARGULA, PE, TE, QSD/QSP, LEED AP
Role: Pavement Management | Years of Experience: 19 – MBA, Business Administration, University of California, Berkeley, CA, 1990 – BS, Civil Engineering, Stanford University, Palo Alto, CA 1984 – Civil Engineer, CA # 39887
– Construction Documents Technology (CDT®), Certified Construction Specifier (CCS®), Certified Construction Contract Administrator (CCCA®), Construction Specification Institute Jane has over 40 years of broad experience in all aspects of infrastructure engineering, including construction management, project management, planning, and design services. She has special expertise in construction of infrastructure and facilities and the preparation of construction specifications, project delivery, scheduling, and permitting in support of infrastructure projects.

Jane is recognized for construction management of complex and controversial projects with environmental, political, regulatory, and technical challenges.

JANE ROZGA, PE, CDT, CCS, CCCA
Roles: Construction Management Lead and QA/QC | Years of Experience: 40 Contract Manager and Key Personnel Bios (continued)
– BS, Civil Engineering, California State University, Chico, CA, 1984 – Civil Engineer, CA #44268
– Qualified Stormwater Pollution Prevention Plan (SWPPP) Developer #22642 Jim Winter has been with GHD since 1988 working in all aspects of the municipal market and has been involved all phases of a project. His experience includes utilities systems, sewer system rehabilitation, project funding, permitting, and overall project management. He has been responsible for scheduling, coordination, cost control, and quality assurance for many multi-disciplinary engineering projects involving daily communication with GHD's civil, structural, electrical, mechanical, and environmental engineering staff, surveying, and CAD technicians, as well as coordination with geotechnical and other subconsultants. Jim’s construction management/inspection experience is extensive.

JIM WINTER, PE, QSD
Role: Task Manager | Years of Experience: 38
– BS, Civil Engineering, California State University, Sacramento, CA, 1999 – Civil Engineer, CA #64814, CO #40007, AZ #78220
– Certified Floodplain Manager #US-11-06045
– Leadership in Energy and Environmental Design Accredited Professional (LEED AP) #10591588 Erik Fanselau has over 24 years of experience in civil engineering experience, including design, project management, construction management, and utility coordination. Expertise includes drainage, hydrology and hydraulics, water quality design, roadway design, utility coordination, pipeline rehabilitation, pump station design, and erosion control plans.

ERIK FANSELAU, PE, CFM, LEED AP
Roles: Utilities and Clean Water, MS4 Phase II Compliance | Years of Experience: 24 GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 6

9. TRANSPORTATION6. ELECTRICAL4. ENVIRONMENTAL3. CIVIL PLAN REVIEW1. CIVIL 2. CONST. MGMT.KEY:
– Certified Construction Manager (CCM)
– Qualified Stormwater Pollution Prevention Plan (SWPPP) Developer/Practitioner #7859 – Certificate, Caltrans Local Agency Resident Engineer (RE) – Certificate, Professional of Erosion and Sediment Control With over 21 years as a construction manager/RE and inspector, Tim has a vast experience with street resurfacing and underground projects, having worked with Caltrans, and nearly all of the various agencies in Sonoma, Napa, and Mendocino Counties. He is adept at prioritizing and coordinating tasks and specialty inspections, delegating responsibilities, and communicating effectively to keep projects on schedule and ensure that his clients’ objectives are achieved.

Tim is Caltrans certified as a Local Agency Resident Engineer, so he is very familiar with Caltrans’ Standard Specifications and Federal project requirements. Having been through many Caltrans audits, he has developed an ability to produce a very complete and thorough set of federally compliant project files.

TIM DILLENBURG, CCM, QSD/P
Roles: Construction Manager and Construction Inspection | Years of Experience: 21 – BS, Civil Engineering, San Francisco State University, San Francisco, CA, 2015 Andrea has over seven years of experience as an attentive construction manager and project inspector. She possesses excellent communication skills and is extremely detail oriented. With her background as a project superintendent, Andrea works well within a team while effectively achieving the client’s goals. She has had experience working and building strong relationships with multiple public entities simultaneously.

ANDREA SANTILENA
Role: Construction Manager | Years of Experience: 7 – American Construction Inspectors Association (ACIA) Certified Public Works Construction Inspector – Qualified Stormwater Pollution Prevention Plan (SWPPP) Practitioner – Construction Documents Technology (CDT), Construction Specification Institute – Asphalt Paving Seminar
– Confined Space Training
Eric has extensive experience in inspection of road and utility improvements, including field verification of existing utilities and structures, coordination with stakeholders to minimize construction impacts, coordination with government agencies and utility companies, quality control of materials and construction methods, contractor submittal reviews, quantity take-offs and construction surveying and staking. He is skilled at identifying potential issues and working with stakeholders to devise alternative solutions and contingency plans.

ERIC LEITZ, QSP, CDT
Roles: Construction Inspection and Constructability, Scheduling & Cost Estimating | Years of Experience: 30
Contract Manager and Key Personnel Bios (continued)
Rod is an accomplished and respected project inspector and supervisor with 35 years of experience and success managing major commercial and residential construction projects. His experience includes the installation of street construction, water mains, sanitary sewer systems, and storm drainage systems. He has excellent planning skills and an established record of successful relations with regulatory agencies. A strong leader, focused on teamwork, and adept at project management, Rod has a sound reputation for commitment to the highest professional standards.

E. RODNEY (ROD) WOOD
Role: Construction Inspection | Years of Experience: 35 GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 7

9. TRANSPORTATION6. ELECTRICAL4. ENVIRONMENTAL3. CIVIL PLAN REVIEW1. CIVIL 2. CONST. MGMT.KEY:
– 20 Years Administrative Experience
– 14 Years Public Sector Projects
With over 21 years as a construction manager/RE and inspector, Tim has a vast experience with street resurfacing and underground projects, having worked with Caltrans, and nearly all of the various agencies in Sonoma, Napa, and Mendocino Counties. He is adept at prioritizing and coordinating tasks and specialty inspections, delegating responsibilities, and communicating effectively to keep projects on schedule and ensure that his clients’ objectives are achieved. Tim is Caltrans certified as a Local Agency Resident Engineer, so he is very familiar with Caltrans’ Standard Specifications and Federal project requirements. Having been through many Caltrans audits, he has developed an ability to produce a very complete and thorough set of federally compliant project files.

CRYSTAL PRAIRIE
Roles: Construction Inspection and Project Coordinator | Years of Experience: 20 – BA, Zoology, San Diego State University, San Diego, CA – State General Engineering Licenses: Arizona (#878626); California (#304560); Idaho (#029931); Nevada (#80920); Oregon (#20464); Utah (#9707576-5551); Washington (#603-518-297) With 40 years of experience in the transportation Industry, Karl has a long history of working on street resurfacing projects, from the most sensitive and quiet residential neighborhoods to the busiest of freeways. His various roles in the paving business over the years has left him with a strong understanding of Caltrans’ Standard Specifications, materials production, and quality control testing requirements and procedures. As a former paving contractor himself, he knows the “tricks of the trade”, and is able to coordinate the best quality project capable in any given situation. Karl is a very interesting and personable guy, and he is able to communicate well with the public to alert them of upcoming work and help them avoid any unnecessary inconveniences.

KARL MEYERS
Role: Construction Inspection | Years of Experience: 40 Contract Manager and Key Personnel Bios (continued)
– D-1 Water Distribution Operator
– AASHTO Pavement Rehabilitation 2019 Series
– 40 Hr Hazwoper Training & C-4 Refresher
Charlie provides 40 years of experience in construction including 10 years of experience as a resident inspector. He excels in quality control of materials and construction methods, traffic control, field verification of existing utilities and structures, and coordination with government agencies and utility companies. Charlie has extensive underground and road reconstruction experience and is dedicated to minimizing impacts to residents and the traveling public while assuring that the project is built in accordance with the Contract Documents.

CHARLIE WILLIAMSON, JR.

Role: Construction Inspection | Years of Experience: 41 – MS, Structural Engineering, University of California, Berkeley, CA, 1991 – BS, Engineering, San Francisco State University, San Francisco, CA, 1980 – Civil Engineer, CA #51369
– Structural Engineer, CA #4229
– Mechanical Engineer, CA #26600
– Leadership in Energy and Environmental Design Accredited Professional (LEED AP), US Green Building Council – Construction Documents Technologist (CSI)
Steve is a professional engineer with over 40 years of experience in the design and analysis of building, civil, and bridge structures.

Steve has extensive experience with both new construction and repair/retrofit. In the building industry, he has performed new building design, as well as seismic retrofit for concrete, steel, masonry, and wood structures.

STEVE BURNS, PE, SE, ME, LEED AP (Structural)
Role: Special Inspection | Years of Experience: 42 GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 8

9. TRANSPORTATION6. ELECTRICAL4. ENVIRONMENTAL3. CIVIL PLAN REVIEW1. CIVIL 2. CONST. MGMT.KEY:
– BS, Electrical Engineering, California State University, Fresno, CA, 2019 – Electrical Engineer, CA #23831
Erick is an electrical engineer with four years of experience in electrical system design, including medium and low voltage design for industrial educational and commercial power, power generation, lighting and lighting controls design, lighting analysis and modelling, telecommunications, motor controls, pump controls, Supervisory Control and Data Acquisition (SCADA) systems, construction cost estimates, load calculations, and drafting of construction documents. His background includes clients in municipal, private industrial, and federal.

ERICK OSORNO, EE (Electrical)
Roles: Special Inspection and Electric Vehicle Charging | Years of Experience: 4 – BS, Psychology, Sonoma State University, Rohnert Park, CA, 2002 – Construction Documents Technology (CDT) Certified, Construction Specification Institute – Occupational Safety and Health Administration (OSHA) 10-Hour Certified – Completed Construction Law Course, Sonoma State University, Rohnert Park, CA – Notary Public, 20+ Years
Nicole has been in the construction management field for over 15 years, managing multi-million-dollar projects in both the private and public sector. Her experience has been acquired through a variety of positions, including everything from administrative support to serving as a project manager. Holding all of these roles has strengthened Nicole’s qualifications, as she’s been exposed to many different roles, responsibilities and aspects of the construction industry. Nicole is the Procore Application Manager for GHD worldwide and has been using the product for 15 years.

NICOLE GARZA, CDT
Role: Project Coordinator | Years of Experience: 15 Contract Manager and Key Personnel Bios (continued)
– Bachelor of Arts International Relations, University of California, Davis – Associate of Science Civil Engineering Technology, Santa Rosa Jr. College – Professional Engineer, Oregon, No. 83790
– Professional Engineer, Washington, No. 48243
– LEED Accredited, Professional (LEED AP)
– Certified Erosion and Sediment Control Lead (CESCL)
Brad is a senior civil engineer and project manager with more than 26 years of experience in both public and private civil engineering and urban design projects. Brad’s diverse engineering background includes commercial and residential development, transit and transportation infrastructure, roadway design, underground utility systems, city and state parks, and urban creek restoration. He has extensive experience leading design teams in feasibility and preliminary design studies, final engineering design, and preparation and delivery of final plans, specifications, and cost estimates. Brad is a registered Professional Engineer in the States of Oregon and Washington, as well as a LEED Accredited Professional with experience in low-impact design and sustainable infrastructure.

BRAD SWEARINGEN, PE, LEED AP
Role: Civil Plan Review Lead | Years of Experience: 26 – BS, Electrical Engineering Technology, California State Polytechnic University, Pomona, CA, 1983 – Electrical Engineer, CA #15580, AZ #34069, CO #34471, IL #062-053426, TX #86009, WA #36259 – Leadership in Energy and Environmental Design Accredited Professional (LEED AP), US Green Building Council – Construction Documents Technologist (CDT), Construction Specifications Institute Rick is a licensed electrical engineer with over 34 years of experience in the electrical, controls, and instrumentation fields, for federal, military, municipal, and private industrial clients. He has extensive experience with water treatment, storage, and pumping systems, wastewater collection and treatment systems, pumping controls, SCADA systems, low and medium-voltage power generation, microgrids, and waterfront electrical distribution. Rick has led large-scale coordination and arc flash studies, desktop radio path modeling, photometric analyses, forensic studies, feasibility studies, condition assessments, construction cost estimates, and engineering services during construction.

RICK GUGGIANA, EE, LEED AP, CDT
Roles: Special Inspection and Emergency Backup Power Systems | Years of Experience: 34 GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 9

9. TRANSPORTATION6. ELECTRICAL4. ENVIRONMENTAL3. CIVIL PLAN REVIEW1. CIVIL 2. CONST. MGMT.KEY:
– BS, Civil Engineering, Santa Clara University, Santa Clara, CA, 1998 – Civil Engineer, CA #62181, NV #25638
– Qualified Stormwater Pollution Prevention Plan (SWPPP) Developer – Leadership in Energy and Environmental Design Accredited Professional (LEED AP), US Green Building Council
Carl has over 24 years of civil engineering leadership and expertise in planning, design, and construction administration services for public and private clients in various market segments including military, transportation, civic, commercial, corporate, K-12 schools, and higher education. His technical background includes preparation and review of civil engineering design calculations, reports, master plans, improvement plan sets, engineering estimates, specifications, SWPPP and water quality management plan documentation, and LEED certification and credit documentation. Carl routinely interacts directly with clients, consultants, agencies, and other team members, ensuring that critical path items are addressed in a timely manner. He mentors staff in AutoCAD use, engineering design, and plan production. Carl has a wide range of project management experience including the development of project budgets and schedules for new projects; budget tracking; verification of project compliance with Caltrans, California Building Code, National Fire Prevention Association, Americans with Disabilities Act (ADA), Division of the State Architect, state, county, city, and other regulations and requirements; and the management of each project’s engineering and support team toward the timely and economic production of technical reports and deliverables. Carl is a Qualified SWPPP Developer for stormwater planning (California Construction General Permit).

CARL MOORE, PE, QSD, LEED AP
Role: Senior Plan Review | Years of Experience: 24 Contract Manager and Key Personnel Bios (continued)
– BS, Civil Engineering, California Polytechnic State University, San Luis Obispo, CA, 2004 – Civil Engineer, CA #73137
– Qualified Stormwater Pollution Prevention Plan (SWPPP) Developer (QSD) #25359 Kerry has over 17 years of civil engineering experience that includes engineering with an emphasis in planning, design and construction support services for site infrastructure and site development and municipal infrastructure including site paving and grading, land development, roadway design, water, sewer, and storm drain utility projects.

KERRY FLYNN, PE, QSD
Role: Plan Review | Years of Experience: 17
– BS, Environmental Resources Engineering, Humboldt State University, Arcata, CA, 2009 – Civil Engineer, CA #83350
Greg has over 15 years of experience in a variety of civil and environmental engineering projects, working primarily on water resource and restoration engineering projects for public clients. His project experience includes the design and/or analysis of open channel hydraulics (including 1D and 2D hydraulic and hydrologic modeling), pump stations, diversion structures, tide gates and tidally influenced channels, stormwater management, flood analysis, scour analysis, fish passage, bridge placement, grading, infrastructure analysis, ecosystem restoration, and construction management. Greg has also served as a project manager, responsible for developing, reviewing, monitoring, and meeting budgets and project schedules. Specializing in hydraulics and hydrology, he is highly proficient with a variety of water-related computer applications including US Army Corps of Engineers' (USACE) Hydrologic Engineering Center software (HEC-RAS, HEC-HMS, HEC-FDA), DHI Mike Flood (Mike 11 and Mike 21) DHI Mike Urban, HydroCAD, and Bentley Culvert Master.

GREG GARRISON, PE
Role: Stormwater Review | Years of Experience: 15 – BS, Civil Engineering, Oregon State University, Portland, OR, 1993 – Civil Engineer, CA #80067, WA #42517, OR #50400, ID #17342, GU #1873 – Leadership in Energy and Environmental Design Accredited Professional (LEED AP), US Green Building Council
For more than 25 years, Pat T ortora has served as a project engineer or project manager on multi-disciplinary projects providing planning, design, and construction engineering solutions to communities and public agencies, both large and developing, throughout the Western United States, with an emphasis on K-12 schools site design. Pat has successfully led civil site infrastructure improvements that attend to stormwater quality concerns, utility infrastructure, pedestrian and vehicular safety measures, site safety, and sustainably.

PAT TORTORA, PE, LEED AP
Role: Senior Plan Review | Years of Experience: 25 GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 10

9. TRANSPORTATION6. ELECTRICAL4. ENVIRONMENTAL3. CIVIL PLAN REVIEW1. CIVIL 2. CONST. MGMT.KEY:
– General Courses, Land Surveying and Business Management, Solano Community College, Fairfield, CA, 1985-1989
– Professional Land Surveyor, CA #8131
Richard is a California-registered professional land surveyor with over 30 years of experience in all aspects of land surveying. He is an experienced party chief working on projects varying from winery construction staking to subdivisions. With the budget and timeline in mind, Richard delivers a superior product for the client. In the field, Richard acts as the Party Chief of the primary survey crew. Being the Party Chief provides him with first-hand knowledge of the site, the condition of the existing monuments and other important information critical to producing accurate survey performance areas.

Richard has extensive experience producing and reviewing tentative and final maps and other legal survey instruments.

RICHARD MADDOCK, PLS
Role: Map Review | Years of Experience: 30
Contract Manager and Key Personnel Bios (continued)
– AS, Mechanical Drafting, Pueblo Community College, Pueblo, CO, 1991 – Surveying Certificate, Pueblo Community College, Pueblo, CO Jackie is a lead survey technician and drafter. She has over 17 years of experience in legal descriptions, topographic mapping, monumentation, records of survey, right of way exhibits, public utility and temporary construction easements, and calculation of the points for construction staking for civil engineering, surveying, and engineering design on roadway, interchanges, roundabouts, residential, and commercial/office facilities projects for public agencies and private projects throughout Northern California. At the start of each project, she performs the project deed research, confirms property boundaries, prepares the necessary calculations, performs all field preparation duties, and confirms all aspects of the work to be provided.

JACKIE BOHANNON
Role: Map Review | Years of Experience: 17
– BS, Environmental Studies, Sonoma State University, Sonoma, CA, 2001 – Construction Document Technician (CDT) Certification
– Occupational Safety and Health Administration (OSHA) 40-Hour HAZWOPER Certification – OSHA 8-Hour Annual HAZWOPER Certification
– Construction Site Planning and Management Certification Brian specializes in CEQA and NEPA compliance, natural resource agency permitting, stormwater management, and hazardous materials remediation. Brian manages environmental reviews for a wide spectrum of local, state, federal, and private clients. He has extensive experience with public works projects that require compliance with CEQA as well as federal funding programs, including project compliance with Caltrans’ Local Assistance Procedures for transportation projects, State Revolving Fund requirements for water and wastewater utility projects, and FEMA, Cal OES, and EPA requirements for disaster recovery and emergency projects.

Brian will lead GHD's environmental documentation services, such as CEQA/NEPA documentation and federal-aid funding program compliance.

BRIAN BACCIARINI, CDT
Role: Environmental Lead | Years of Experience: 20 – BS, Chemical Engineering (Environmental Process), Oregon State University, Corvallis, OR, 2006 – Civil Engineer, CA #81643
– Qualified Stormwater Pollution Prevention Plan (SWPPP) Developer/Practitioner, CA #26239 – Qualified Industrial Stormwater Practitioner (QISP)
Nathan is a licensed professional engineer with extensive experience on a variety of water quality, flood control, and integrated water management projects throughout California. His experience includes hydraulic & hydrologic analysis, green streets/complete streets design, MS4 compliance program improvement, Water Quality Management Plans (WQMP’s) and SWPPP development, regional Best Management Practice (BMP) implementation, land development, and structural BMP design. He specializes in water quality with particular emphasis on MS4 and Industrial General Permit compliance.

NATHAN TOWLERTON, PE, QSD/P, QISP
Role: Stormwater Review | Years of Experience: 12 GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 11

9. TRANSPORTATION6. ELECTRICAL4. ENVIRONMENTAL3. CIVIL PLAN REVIEW1. CIVIL 2. CONST. MGMT.KEY:
– MPl, Urban and Regional Planning, University of Southern California, Los Angeles, 1990 – BS, Business Administration, University of Southern California, Los Angeles, 1984 – American Institute of Certified Planners (AICP) #011766 – Leadership in Energy and Environmental Design Accredited Professional (LEED AP) Building Design and Construction (BD+C), US Green Building Council
Charles has over 30 years of experience in environmental impact assessment services for planning, development, and public works infrastructure projects. He has held leadership roles in project/program management, operations management, business development, and corporate programs in education/professional development. Charles' professional interests include California Environmental Quality Act (CEQA)/National Environmental Policy Act (NEPA) compliance, public works infrastructure, land use planning, and sustainable development. He has extensive experience managing large as-needed contracts for public agencies.

CHARLES SMITH, AICP, LEED AP BD+C
Role: On-Call | Years of Experience: 30
– BA, Geography, California State University, Fresno, CA, 2004 Chryss is an experienced environmental scientist with a specialty in air quality and greenhouse analysis and preparation of documents for CEQA/NEPA compliance. She has prepared environmental documentation and technical analysis for a variety of projects, including general and specific plans, schools, multi-use development, planned communities, redevelopment, industrial and warehouse, airport infrastructure, Sphere of Influence and incorporation proposals, transportation and transit improvements, and other infrastructure. In addition, she has been involved in the management and preparation of combined EIR/Environmental Assessments, transportation conformity analyses, and air quality and Greenhouse Gas (GHG) technical reports.

CHRYSS MEIER
Role: CEQA Compliance | Years of Experience: 15
– MS, Natural Resources (Watershed Management), Humboldt State University, Arcata, CA, 2006 – BA, Environmental Studies, Bard College, Dutchess County, NY , 1999 Andrea is an environmental planner with 21 years of experience and an extensive technical background in hydrology and streamflow management, with an emphasis on management for special-status anadromous fish species. Her professional experience has focused on planning, implementing, and monitoring ecosystem restoration projects; collaborative resource management planning and negotiation; and regulatory oversight. Her portfolio of restoration projects includes channel rehabilitation designs implemented on the Trinity River, fish passage improvement on Trinity basin streams, landscape-scale restoration planning on the Klamath River in both Oregon and California, coastal wetland and salt marsh enhancement, and wetland and cultural restoration in Humboldt Bay and the Eel River estuary. Andrea frequently conducts regulatory permitting, CEQA, and National Environmental Policy Act (NEPA) support for a wide variety of projects, including public access facilities, trails, and public infrastructure improvements, among others.

ANDREA HILTON
Role: CEQA Compliance | Years of Experience: 21
– BS, Natural Resource Planning (Emphasis: Geographic Information System (GIS)/Soil Science), Humboldt State University, Arcata, CA, 2013
Kerry has nine years of experience in environmental compliance, project management, environmental restoration design, and conservation planning. She is proficient in conducting wetland delineations and completing associated reporting and coordination with the US Army Corps of Engineers (USACE) under Section 404 of the Clean Water Act and with the California Coastal Commission under the Coastal Act (for one-parameter wetlands). Kerry has co-managed and has been lead author for several CEQA documents that include both development, habitat enhancement and infrastructure improvement. Kerry has completed thorough agricultural impact analysis, land use analysis, preparation and project management of Initial Studies, Negative Declarations, Environmental Impact Reports (EIR’s), thoroughly responded to comments for permit applications and CEQA documents and is experienced working in the Coastal Zone.

KERRY McNAMEE
Role: CEQA Compliance | Years of Experience: 9
Contract Manager and Key Personnel Bios (continued)
GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 12

9. TRANSPORTATION6. ELECTRICAL4. ENVIRONMENTAL3. CIVIL PLAN REVIEW1. CIVIL 2. CONST. MGMT.KEY:
– MPA, Public Administration, California State University, Sonoma, CA, 1995 – BA, Environmental Studies and Planning, California State University, Sonoma, CA, 1992 Kristine has 27 years of experience which includes environmental planning, CEQA compliance, resource agency permitting, data research and analysis, grant writing, and community surveys. She has been involved in environmental analysis and resource agency permitting on a wide variety of projects from private development to infrastructure projects, including water and wastewater projects, recreational facilities, roadways, and ports and harbor projects. Kristine’s projects are often complex, involving multiple agencies and requiring “outside the box” problem solving for permit acquisition.

KRISTINE GASPAR
Role: Environmental Services & Permitting | Years of Experience: 27 – BS, Environmental Science and Management, University of California, Davis, CA, 2018 Sam’s experience includes four years of working on a variety of different civil and agricultural projects that met the highest private industry standards and client demands, all while ensuring local, state, and federal application and permitting requirements are met. Sam has worked in all phases of these projects from field surveying and preliminary review, design, permitting, and all steps in between. Sam most recently served as the primary Quality Control Reviewer of engineering plans, applications, permit, and design specifications for over 50 civil and agricultural engineering designs.

SAM MOOSE
Role: Environmental Services & Permitting | Years of Experience: 4 – BS, Environmental Science (Ecological Restoration), Cal Poly Humboldt, Arcata, CA, 2011 – California Red-Legged Frog - Level II Workshop, The Wildlife Project, Sacramento, CA, 2022 – Special Status Herps from California, The Wildlife Project, Baja California, MX, 2022 – Wildlife Biologist Construction Awareness Training, The Wildlife Society-Western Section, Albany, CA, 2022 – Basic Wetland Delineation Training, Wetland Training Institute, Sacramento, CA, 2020 Miles is a wildlife biologist with a background in aquatic biology, restoration ecology, botany, and wetland science. He has completed biological, botanical, and wetland field investigations along with surveys for nesting birds, and special status species. Miles also has experience in environmental permitting, including Lake and Streambed Alteration Agreements (1600 permits) with the California Department of Fish and Wildlife (CDFW), Regional Board Clean Water Act Section 401 water quality certifications, US Army Corps of Engineers (USACE) Clean Water Act Section 404 permits, and California Coastal Commission (CCC) Coastal Development Permits.

MILES HARTNETT
Role: Environmental Services & Permitting | Years of Experience: 8 Contract Manager and Key Personnel Bios (continued)
– BS, Civil Engineering, California State University, Sacramento, CA, 1999 – Civil Engineer, CA #64814, CO #40007, AZ #78220
– Certified Floodplain Manager #US-11-06045
– Leadership in Energy and Environmental Design Accredited Professional (LEED AP) #10591588 Erik Fanselau has over 24 years of experience in civil engineering experience, including design, project management, construction management, and utility coordination. Expertise includes drainage, hydrology and hydraulics, water quality design, roadway design, utility coordination, pipeline rehabilitation, pump station design, and erosion control plans.

ERIK FANSELAU, PE, CFM, LEED AP
Roles: Utilities and Clean Water, MS4 Phase II Compliance | Years of Experience: 24 GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 13

9. TRANSPORTATION6. ELECTRICAL4. ENVIRONMENTAL3. CIVIL PLAN REVIEW1. CIVIL 2. CONST. MGMT.KEY:
– BS, Geology, University of California, Los Angeles, CA, 1996 – Professional Geologist, CA #8468
– Licensed Geologist, WA #3302
Jacquelyn is a professional/licensed geologist with 24 years of experience managing environmental projects.

Her project experience includes Phase I and Phase II assessments for a variety of constituents, hazardous materials sampling and assessment, conceptual site model development, remedial planning and implementation, and case closure evaluations. She has completed projects for a wide range of clients, including major oil companies, independent oil and gas clients, municipalities, manufacturing groups, and small business owners. Jacquelyn carefully manages her projects in a cost effective and efficient manner, recommending innovative and optimizing ideas, within client specific frameworks.

JACQUELYN ENGLAND, PG, LG
Role: Hazardous Materials/Fueling Systems/UST Removal | Years of Experience: 24 – BS, Electrical Engineering, California Polytechnic State University, San Luis Obispo, CA, 2002 – Electrical Engineer, CA #17660
– Construction Documents Technologist, Construction Specifications Institute Chris has 20 years of experience in the design and implementation of electrical systems. His design experience includes medium- and low-voltage design for industrial, educational, laboratory, commercial, and residential power, power generation, photovoltaic generation, cleanroom applications, data and server rooms, lighting, telecommunications, security, audio/visual, and fire alarm systems, power and lighting system analysis and modeling, arc flash and coordination studies, LEED credit-driven design and documentation, and California Title 24 lighting efficiency and lighting control measures.

CHRIS RICHARDS, EE
Role: Solar Power Systems | Years of Experience: 20 Contract Manager and Key Personnel Bios (continued)
– MS, Civil & Environmental Engineering, University of California, Berkeley, CA, 1999 – Civil Engineer, CA, #90221
– Traffic Engineer, CA #2908
Byung is registered as both a traffic engineer and a civil engineer in the state of California. He has 21 years of experience providing traffic operations, traffic engineering design, and Intelligent Transportation System (ITS) engineering design for projects throughout the State. His experience covers a wide range of project types including signal design, lighting design, signing and striping plans, traffic operations, and safety analyses. Byung has extensive hands-on experience in traffic operations/micro simulation models, including Synchro, SimTraffic, and VISSIM.

BYUNG LEE, PE, TE
Roles: Electrical Lead and Traffic Signals | Years of Experience: 21 – BS, Electrical Engineering, California State University, Fresno, CA, 2019 – Electrical Engineer, CA #23831
Erick is an electrical engineer with four years of experience in electrical system design, including medium and low voltage design for industrial educational and commercial power, power generation, lighting and lighting controls design, lighting analysis and modelling, telecommunications, motor controls, pump controls, Supervisory Control and Data Acquisition (SCADA) systems, construction cost estimates, load calculations, and drafting of construction documents. His background includes clients in municipal, private industrial, and federal.

ERICK OSORNO, EE (Electrical)
Roles: Electric Vehicle Charging and Special Inspection | Years of Experience: 4 – BS, Electrical Engineering Technology, California State Polytechnic University, Pomona, CA, 1983 – Electrical Engineer, CA #15580, AZ #34069, CO #34471, IL #062-053426, TX #86009, WA #36259 – Leadership in Energy and Environmental Design Accredited Professional (LEED AP), US Green Building Council – Construction Documents Technologist (CDT), Construction Specifications Institute Rick is a licensed electrical engineer with over 34 years of experience in the electrical, controls, and instrumentation fields, for federal, military, municipal, and private industrial clients. He has extensive experience with water treatment, storage, and pumping systems, wastewater collection and treatment systems, pumping controls, SCADA systems, low and medium-voltage power generation, microgrids, and waterfront electrical distribution. Rick has led large-scale coordination and arc flash studies, desktop radio path modeling, photometric analyses, forensic studies, feasibility studies, condition assessments, construction cost estimates, and engineering services during construction.

RICK GUGGIANA, EE, LEED AP, CDT
Roles: Emergency Backup Power Systems and Special Inspection | Years of Experience: 34 GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 14 – BS, Natural Resource Planning and Interpretation, California State University, Humboldt, CA, 1982 Peter is a project manager with 37 years of experience managing or participating in traffic engineering, civil engineering, and transportation planning projects. He is responsible for quality control, project management, project design, contracts, subconsultant coordination, public meetings, and ensuring project goals are met within budget and on schedule. Peter conducts traffic engineering analyses and prepares technical reports for public agencies and private development. Many of these projects have involved multiple alternative scenarios in order to evaluate specific circulation impacts. One of his main focus areas are winery entitlement projects, working with Napa and Sonoma County staff and winery clients to ensure an efficient analysis and review process.

PETER GALLOWAY
Role: Transportation Lead | Years of Experience: 37 – BS, Community and Regional Development, University of California, Davis, CA, 2007 – American Institute of Certified Planners #29678
T odd has 15 years of experience in transportation planning projects, assisting dozens of agencies throughout central and northern California in short- and long-range programming, including the development of travel demand models, general plan circulation elements, specific and master plans, corridor studies, capital improvement programs, nexus and fee studies, transportation operational analyses, and impact analyses.

This experience spans public and private sectors, extending into On-Call contracts and arrangements with municipalities, where T odd prepares transportation studies and grant applications, performing peer reviews of impact studies and developing California Environmental Quality Act (CEQA) impact analyses for development projects of all sizes.

TODD TREGENZA, AICP
Role: Complete Streets | Years of Experience: 15

9. TRANSPORTATION6. ELECTRICAL4. ENVIRONMENTAL3. CIVIL PLAN REVIEW1. CIVIL 2. CONST. MGMT.KEY:

Contract Manager and Key Personnel Bios (continued)
– MS, City and Regional Planning, Harvard University, Cambridge, MA, 1985 – BS, Engineering Science, Northwestern University, Evanston, IL, 1979 – Traffic Engineer, CA #2260
– American Institute of Certified Planners (AICP) Certified Planner #018133 Don is a senior transportation planner and traffic engineer with extensive experience in travel demand forecasting and transportation policy. He is a rare combination of a “big-picture” regional planner and a detail-oriented traffic engineer. Don specializes in highly defensible transportation analyses for projects with a strong likelihood of litigation. This requires a thorough understanding of the relevant legal framework (CEQA, NEPA, Mitigation Fee Act, etc.), attention to detail, mastery of the modeling and analytical techniques involved, and strong understanding of the political issues surrounding transportation networks. He also developed new techniques for improved modeling. For example, the “4D’s” post-processor he developed to account for smart growth characteristics is now used in models across the country. Similarly, his “dynamic validation” technique to assess model performance is now standard practice for many agencies.

DON HUBBARD, TE, AICP
Role: Transportation Impact Studies and Peer Review | Years of Experience: 42 See page 4 for FRANK PENRY and KAMESH VEDULA bios
– MS, Civil & Environmental Engineering, University of California, Berkeley, CA, 1999 – Civil Engineer, CA, #90221
– Traffic Engineer, CA #2908
Byung is registered as both a traffic engineer and a civil engineer in the state of California. He has 21 years of experience providing traffic operations, traffic engineering design, and Intelligent Transportation System (ITS) engineering design for projects throughout the State. His experience covers a wide range of project types including signal design, lighting design, signing and striping plans, traffic operations, and safety analyses. Byung has extensive hands-on experience in traffic operations/micro simulation models, including Synchro, SimTraffic, and VISSIM.

BYUNG LEE, PE, TE
Roles: Traffic Signals and Electrical Lead | Years of Experience: 21 GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 15

4. | References
GHD has gained a reputation among our clients for responsive services, technical excellence, and overall quality of work.

Our clients will attest to the quality of our work on these similar projects with similar scopes of work in the recent past.

1. CIVIL Project References
The Downtown Streetscape and
Road Diet project included the
design of new streetscape and utility
improvements along State Street
from Mill Street to Henry Street,
approximately nine city blocks.

Sidewalk improvements, ranging
from 8 feet to 15 feet, were designed
to ADA accessible standards and
included bulb-outs. The widened
sidewalks include new planter areas,
street trees, tree grates, street
furnishings (benches, recycling and
trash containers, bicycle racks, signage, bollards, streetlights etc.). Other components of the project included relocation of drain inlets and pipes, construction of LID stormwater enhancement features, installation of new streetlights, and an RRFB.

The road diet portion was designed to maintain and enhance the State Street corridor vehicular capacity, reduce intersection congestion by providing turn pockets that allow left turning vehicles to move out of the main flow of traffic. Utility improvements on State Street included approximately 2,700 LF of new, 8-inch PVC sanitary sewer line, complete with new manholes, service laterals and cleanouts, and approximately 2,700 LF of new 12-inch PVC water main line, complete with new water valves, fire hydrants, and water service lines with meter boxes.

The roundabout at Southwest Blvd.
and Commerce Blvd. is the first
roundabout to be constructed
in the City of Rohnert Park. GHD
completed a citywide roundabout
circulation study in 2017, which
included 15% level design for this
intersection. The design team took
the 15% design, refined it and carried
the critical elements forward through
bid documents.

The improvements included the full removal and reconstruction of the roadway structural section through the project limits, new curb and gutter, specialty curbs at bioswales, and pedestrian sidewalks with enhanced crossings. The work also included a new water main and storm drain upgrades, bioretention areas and a new irrigation system and landscaping, and a new street lighting system. The landscaping is water-conscious and low maintenance.

A unique bicycle safety enhancement is the separated bike lane, through the intersection.

Other safety features such as green bike lanes and signage upgrades were also installed.

The project has improved the flow of traffic, improved safety, reduced emissions, and was a great aesthetic upgrade for the neighborhood. The roundabout is the crown jewel and focal point for the on-going Southwest Blvd Complete Streets Project and has inspired discussions with the City regarding other roundabout suitable locations.

Location
Ukiah, CA
Reference Name/Contact Info
City of Ukiah
Jason Benson, Senior Engineer
T 707.463.6284
Type of Project/Work
Civil; Construction Management;
Environmental; Electrical;
Transportation
Client Type
Municipal
Project Size and Scale
Phase 1: Contract $750K, Const. $11M
Phase 2: Contract $650K, Const. $12M
Current Status
Phase 1 – Constructed 2021
Phase 2 – Design Ongoing
Location
Rohnert Park, CA
Reference Name/Contact Info
City of Rohnert Park
Vanessa Garrett,
Director of Public Works
T 707.588.2251
Type of Project/Work
Civil; Construction Management;
Environmental; Electrical;
Transportation
Client Type
Municipal
Project Size and Scale
Contract $414K, Const. $1.5M
Current Status
Constructed 2022
Downtown Streetscape, Road Diet and Utilities Project
Southwest/Commerce Roundabout Project

GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 16

1. CIVIL Project References (continued)
The Segment H extension of Devlin Road includes
2,900 feet of new 3-lane industrial collector
roadway, relieving traffic on Highway 29 and serving
various commercial and industrial developments
in the City of American Canyon. The new roadway,
constructed through a greenfield, terminates as a
roundabout in the north and a new 3-way stop at
heavily traveled Green Island Road to the south.

GHD provided intersection control evaluation
analysis, and developed preliminary roundabout
geometric layout for the intersection
Principal elements of the design include drainage, roadway lighting, and traffic control. GHD’s approach to the design also includes “complete streets” concepts for pedestrian and bicycle design, including the adjacent Vine Trail Extension, which is a Class I multi-use pathway within the City’s right-of-way along the east side of the new industrial collector corridor.

GHD completed full environmental review for the project, including preparation of an IS- MND and resource agency permitting, including Section 404 and 401. The biological effort included plant and fairy shrimp surveys, full wetlands delineation and coordination with the Army Corps and Water Quality Regional Board. The design effort included preliminary engineering for the new roadway extension, including roadway alignment and cross section study, hydrology and hydraulics reports, utility extensions budgetary construction cost and preparation of plans, specifications and estimate for construction.

The Lucas Valley Curve, at
mile post 5.08 in Marin County,
is, according to the Marin
Independent Journal, a “notorious
trucker trap” with a severely small
radius, “where big-rigs often
slip off the road and down an
embankment.”
T o further prevent such costly
incidents, the County of Marin
desired to improve the roadway
geometrics to the maximum extent
feasible by implementing a downhill
retaining wall on the northeast side
of the roadway. So, in 2017 the
County selected GHD to complete
the environmental, permitting,
and design for the Lucas Valley
Curve Realignment project at mile
post 5.08. The project is federally
funded by the Highway Safety Improvement Program (HSIP), with federal-aid funds administered by Caltrans District 4 Local Assistance.

GHD presented several design alternatives using a variety of different solutions— Tire Derived Aggregate (TDA), soldier-piles with tiebacks, and other non-standard methodologies—to come up with the most cost-effective, constructible design possible.

The result: a 30-foot-tall soldier pile wall with tiebacks and concrete lagging, storm drain culvert reconstruction, and extension and roadway construction and overlay. GHD also developed staged construction plans to allow at least one lane of traffic through the area during construction. During construction GHD provided insight and solutions to questions that came about at various stages and developed guardrail solutions that fit within the constraints of the site and met all State and Federal regulations.

Location
American Canyon, CA
Reference Name/Contact Info
City of American Canyon
Ron Ranada, Senior Civil Engineer
T 707.647.4559
Type of Project/Work
Civil; Transportation
Client Type
Municipal
Project Size and Scale
Contract $800K, Const. $8M
Current Status
Constructed 2022
Location
Marin County, CA
Reference Name/Contact Info
County of Marin
Rachel Calvert, Principal Engineer
T 415.246.5017
Type of Project/Work
Civil; Transportation
Client Type
Municipal
Project Size and Scale
Contract $320K, Const. $3M
Current Status
Constructed 2022
Devlin Road (Segment G) and Vine Trail Extension Project Lucas Valley Road Curve MP 5.08 Realignment Project

GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 17

2. CONSTRUCTION MANAGEMENT Project References
GHD provided construction
management services for this $14M
project which rehabilitated 28 miles
of County roads, including 7.0 miles
of FDR. Work at the 10 project sites
scattered across the County also
included sections requiring removal
and replacement of the road section
and asphalt concrete overlay pavement
treatments. Other contract work
included culvert replacements,
Americans with Disability Act (ADA)
sidewalk and curb ramp installation,
traffic striping and markings, and
associated roadway work. Challenges
included concurrent work at six or more
locations, including some remote sites
without reliable cell service. Traffic control was a priority everywhere but was especially challenging on narrow, windy roadways in proximity to schools.

GHD's proactive and collaborative management of this project resulted in minimal disruption to County traffic, while completing the improvements. This project was completed within budget.

GHD provided construction management and inspection services for the first roundabout in the City of Rohnert Park. The project scope included the full rehabilitation of the roadway to install the new roundabout with new curb and gutter, specialty curbs at bioswales, and pedestrian sidewalks with enhanced crossings. The work also included a new water main and storm drain upgrades, bioretention areas and a new irrigation system and landscaping, as well as a new street lighting system. A new separated bike lane, green bike lanes, and signage upgrades were other safety upgrades to the intersection.

The project improved the flow of traffic, improved safety, reduces emissions, and was a great aesthetic upgrade for the neighborhood.

Location
Sonoma County, CA
Reference Name/Contact Info
County of Sonoma
Anthony Moore,
Construction Engineer
T 707.565.2958
Type of Project/Work
Civil; Transportation
Client Type
Municipal
Project Size and Scale
Contract was $1.1M, Const. $13.5M
Current Status
Completed 2022
Location
Rohnert Park, CA
Reference Name/Contact Info
City of Rohnert Park
T errie Zwillinger, Project Manager
T 707. 565.2958
Type of Project/Work
Civil; Construction Management;
Environmental; Electrical;
Transportation
Client Type
Municipal
Project Size and Scale
Contract $414K, Const. $1.5M
Current Status
Constructed 2022
2021 Sonoma County Pavement Preservation Program
Southwest and Commerce Roundabout Project

GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 18

2. CONSTRUCTION MANAGEMENT Project References (continued)

3. CIVIL PLAN REVIEW Project References
GHD is providing construction
management services for the Browns
Valley Trunk and West Napa Pump Station
Projects; two projects funded under a
single State Revolving Fund Contract,
designed by two firms, being constructed
by two contractors, but in close proximity
and physically connected.

The Browns Valley Trunk project
was designed by GHD and includes
approximately 16,000 feet of pipe raging
in size from 48 to 15 inches in diameter
and trenchless crossings of Hwy 29 and
the Laurel/Kilburn intersection with Freeway Drive.

The West Napa Pump Station project was designed by Hazen & Sawyer and replaces an existing pump station. Construction includes a new 30-foot deep wet well with two 200 HP submersible pumps with variable frequency drives, a valve vault, new electrical building and primary electrical service, an emergency generator, odor control, demolition of the existing pump station, and installation of a solar array. West Napa Pump Station work included relocation of the forcemain between the existing pump station and the treatment plant. Through close coordination with the Contractor and NapaSan operations staff, GHD spearheaded a change to the bypass plan which allowed work to proceed approximately one month earlier than planned, reduced bypassing costs and improved reliability.

GHD has provided municipal
engineering and professional services
to the Town of Windsor under an On-
Call contract since 2016. Services
included coordinating with Town
departments and other agencies,
preparing department reports
including Council agenda packets,
performing studies, and design and
environmental review of CIP projects.

A summary of the CIP Projects and
other related services that we have
provided include:
− Shiloh Road Emergency Repair (Design) − Sewer Master Planning (Study) − Windsor SWMP FY11/12 (Study) − East Shiloh Road Storm Drain (Design) − Windsor River Road Pavement Repair
(Design/ Environmental) − OBAG Applications (Funding)
− Lytton Springs Sewer Assessment
(Study)
− SCWA Sewer Maintenance
Agreements (PM)
− Windsor Planning Maps (Mapping) − RW Users Agreement (PM) − Caltrans Processing (PM) − EV Charging Station (PM/Design) Location
Sonoma County, CA
Reference Name/Contact Info
Napa Sanitation District
Andrew Damron, District Engineer
T 707.258.6007
Type of Project/Work
Civil; Construction Management;
Environmental; Transportation
Client Type
Municipal
Project Size and Scale
Contract $980K, Const. $15M
Current Status
Construction Ongoing
(estimated March 2023)
Location
Windsor, CA
Reference Name/Contact Info
T own of Windsor
Alejandro Perez, Senior Civil Engineer
T 707.838.5318
Type of Project/Work
Civil; Construction Management;
Civil Plan Review; Environmental;
Electrical; Transportation
Client Type
Municipal
Project Size and Scale
Project exists over many years,
Task Orders, Development Projects
and Capital Improvement Plans
Current Status
Ongoing
Browns Valley Trunk and West Napa Pump Station Projects Windsor On-Call Engineering & Professional Services

GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 19

3. CIVIL PLAN REVIEW Project References (continued)
GHD holds an on-going City
engineering contract to provide
On-Call services, including general
engineering, development review,
water engineering, groundwater
engineering, and traffic engineering
support. Development review consists
of development plan check, mapping
review and review of supporting
documentation.

Development Plan Check Review:
− St. Helena Montessori School & Nimbus Art
Center
− New Residence, 1814 Spring St.
− Redmon Ranch Winery − Private Residence Addition,
1727 Scott St.
− Private Residence Addition,
376 Pratt Ave.
− Hunter Residential Subdivision (51 unit)
− McCorkle Apartments City Traffic Engineering Support:
− Private Residence Swimming Pool
Application, 1706 Spring Street
− Traffic Calming/Safety Enhancements on
Hwy 29 & Pratt Ave.

GHD has provided municipal
engineering and professional services
to the City of Petaluma for many years.

The internal City support work has
slowed in recent years and the focus
shifted to CIP project design. Over the
life of the contract, services included
coordinating with City departments
and other agencies, preparing
department reports including Council
agenda packets, development review from concept-level phase through construction, design of CIP projects and inspection of City facilities and infrastructure. A summary of the CIP Projects and other related services that we have provided include:
− On-Call Traffic Engineering Assignments
(Design)
− Riverfront Mixed-Use Development
(Review)
− Wilmington Sewer Pump Station (Design/
Construction Services)
− Petaluma Complete Streets (Design)
− East Washington Park Project Scoping
(Design)
− 2022 Pavement Rehab Program – Howard St
(Design)
− East Washington Pedestrian Crossing (Design) − Brody Residential Development (Review) − Railroad Trestle Rehabilitation (Design) − North Bank Development (Review) − Schollenberger Park Dredge Material Handling
Program (Environmental/Design)
− Riverfront Ph 3 - North Point Development
(Review)
− Mountain View Sewer Rehabilitation/CIPP
Project (Design)
− Riverfront Comstock Development (Review)
− Caulfield Lane RR Xing (Environmental) − Signal Timing Review/Audit and Coordination Location
St. Helena, CA
Reference Name/Contact Info
City of St. Helena
Mark Rincon-Ibarra,
Public Works Director/City Engineer
T 707.968.2629, x540
Type of Project/Work
Civil; Civil Plan Review;
Environmental; Electrical;
Transportation
Client Type
Municipal
Project Size and Scale
Contract $100K
Current Status
Ongoing
Location
Petaluma, CA
Reference Name/Contact Info
City of Petaluma
Jeff Stutsman,
City Engineer
T 707.776.3673
Type of Project/Work
Civil; Construction Management;
Civil Plan Review; Environmental;
Electrical; Transportation
Client Type
Municipal
Project Size and Scale
Project exists over many years,
Task Orders, and Capital
Improvement Plans
Current Status
Ongoing
St. Helena On-Call Engineering Services Contract
Petaluma On-Call Engineering Services Contract

GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 20

4. ENVIRONMENTAL Project References
GHD evaluated several alternative
approaches to manage peak wastewater
flows in West Napa, including alignment
alternatives and handling of peak flows
within the collection system and at
the West Napa Pump Station. Detailed
evaluation for the Browns Valley Trunk
included an alignment study and
hydraulic assessment that resulted in
the selection of the preferred alignment.

Design included trenchless crossing
of Caltrans Highway 29 right-of-way, groundwater evaluation and constructability review, Caltrans permitting, and coordination with various stakeholders.

GHD delivered the plans, specifications, and estimate (PS&E) for the project, as well as the environmental documentation. GHD prepared the Initial Study/MND for the project pursuant to the California Environmental Quality Act, evaluating complex issues surrounding the project’s undercrossing of Highway 29, the use of construction equipment near residences at night, the need for extensive tree pruning and removal along residential streets, and other concerns. GHD also completed an Addendum to the MND to cover additional pump station modifications made at a later date of the design, as well as a Financial Assistance Package for the project pursuant to the Clean Water State Revolving Fund Water Recycling Funding Program. The project is currently under construction, and the Napa Sanitation District selected GHD as the Prime Construction Manager for the project.

The objective of the project is to rehabilitate an existing 1936 concrete bridge to re- establish the viability, safety, and capacity of the structure. The project would improve streetscape conditions, widen the existing bridge, and provide scour mitigation in Novato Creek to protect bridge foundations. The project includes grant authorization from the Caltrans Highway Bridge Replacement and Rehabilitation program for partial federal funding, and the City of Novato wished to identify the most beneficial CEQA and NEPA compliance strategy, including consideration of a joint CEQA/NEPA document.

GHD worked with the City of Novato and Caltrans District 4 staff and completed the CEQA and NEPA review for the project. GHD completed the necessary technical studies in support of a Caltrans NEPA Categorical Exclusion finding, including a Natural Environment Study,
Biological Assessment,
Archaeological
Study Report,
Historic Resources
Evaluation Report,
and multiple technical
memorandums. GHD
also completed a
CEQA IS/MND for the
project, and permitting
applications for a
Section 404 Nationwide
Permit, Section
401 Water Quality
Certification, and
Section 1602 Streambed
Alteration Agreement.

Location
Sonoma County, CA
Reference Name/Contact Info
Napa Sanitation District
Andrew Damron, District Engineer
T 707.258.6007
Type of Project/Work
Civil; Construction Management;
Environmental, Transportation
Client Type
Municipal
Project Size and Scale
Contract $980K, Const. $15M
Current Status
Completed 2020
Location
Novato, CA
Reference Name/Contact Info
City of Novato
Gosia Woodfin,
Project Engineer
T 415.899.8991
Type of Project/Work
Civil; Environmental
Client Type
Municipal
Project Size and Scale
Contract $490K, Const. TBD
Current Status
Design Completed 2019
Construction Ongoing
Browns Valley Trunk Sewer PA/ED & PS&E Project
Grant Avenue Bridge Rehabilitation Project

GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 21

4. ENVIRONMENTAL Project References (continued)
GHD was retained to conduct a wetlands
delineation and habitat assessment, prepare
CEQA documentation, assist the City with
AB52 consultation with Native American
Tribes, and prepare permit applications
required by the Corps, Regional Board,
USFWS, and CDFW. The engineering team
required accurate and verifiable mapping of
wetlands and habitat onsite, so they could
avoid impacts to the extent feasible, and the
City can plan for mitigation costs for the unavoidable impacts.

The City received a request for consultation from the Federated Indians of the Graton Rancheria under AB52, and, as a result, required additional archaeological studies in response to the Tribe’s questions and requests. As this was the first Public Works or Water Department project that had undertaken an AB52 consultation, it was important to develop standard procedures, establish good relationships with the Tribes, and minimize costs.

In addition to use of the IRWP Program EIR for CEQA, GHD completed the wetlands delineation and habitat assessment and provided a preliminary evaluation of mitigation credits. GHD also assisted the City with AB52 consultation with the Federated Indians of Graton Rancheria. As part of the CEQA within-the-scope documentation, GHD revised the IRWP Mitigation Monitoring Program so that mitigation requirements are updated per current regulations and are targeted to the Disinfection and Diversion projects at the LTP. The CEQA and permitting tasks are pending information from the engineering design process.

The Fulton Road Widening Improvement Project is
a City of Santa Rosa Capital Improvement Project
funded by Measure M that will reconstruct and
rehabilitate Fulton Road between Guerneville Road
and Piner Road to a four-lane Regional/Arterial
Street as envisioned in the Santa Rosa General
Plan. The Project would include roadway widening,
new vehicle travel lanes, bicycle lanes, sidewalks,
bioretention areas, bus stops, landscaping, utility
undergrounding, storm water facilities, and property
acquisitions and easements.

GHD prepared environmental documentation and
preliminary engineering design plans the project.

Project components included coordination with
PG&E for Rule 20A undergrounding relocation of
overhead utilities lines, drainage improvements, low
impact development, traffic signals, miscellaneous
utilities, and public outreach.

GHD completed the full environmental review for the project, including preparation of a CEQA Initial Study/MND and technical studies for traffic, wetlands, cultural resources, and roadway traffic noise. GHD completed the full range of resource agency permitting for the project, including a Section 404 Nationwide Permit; 401 Water Quality Certification; 1602 Streambed Alternation Agreement, and Section 2081 Incidental Take Permit. The biological effort included rare plant surveys, full wetlands delineation, Biological Assessment, and extensive coordination with regulatory resource agencies.

Location
Santa Rosa, CA
Reference Name/Contact Info
City of Santa Rosa
Mark Kasraie
T 707.543.3857
Type of Project/Work
Environmental
Client Type
Municipal
Project Size and Scale
Contract $204K
Current Status
Completed 2021
Location
Santa Rosa, CA
Reference Name/Contact Info
City of Santa Rosa
Chris Catbagan, PE,
Associate Engineer
T 707.543.4521
Type of Project/Work
Civil; Construction Management;
Environmental; Electrical;
Transportation
Client Type
Municipal
Project Size and Scale
Contract $588K, Const. $10.4M
Current Status
Design Completed 2021
Construction Ongoing
CEQA & Permitting Services for Disinfection and
Diversion Improvements Project
Fulton Road Widening Improvements, Phase I (PA/ED)

GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 22

6. ELECTRICAL Project References
GHD initiated traffic engineering
services for the design and
implementation of systemic safety
improvements at existing traffic
signals along two arterial corridors,
which included a total of 21
signalized intersections.

GHD is preparing design for
construction of accessible
pedestrian features,
implementation of advanced
dilemma zone detection and
intersection traffic signals
modifications including installation
of accessible pedestrian
countdown heads and push buttons, installation of retroreflective borders for signal back plates, and replacement of 8” signal heads with 12” signal heads at the subject intersections.

GHD also developed a procedure to increase efficiency, safety and uniformity in traffic signal installations which include vehicle detection. The evaluation considers the pros and cons of loop versus video detection or the possibility of using video and loop detection together. Comparing items such as accuracy, flexibility, installation, trouble response and maintenance cost.

The Smith River Community Services
District (SRCSD) provides water to
approximately 1,500 customers. The
District's water source is from four
(4) 40-foot wells that are set back
approximately 100 feet from Rowdy
Creek. The well pumps move water to
a series of five (5) pump stations and
eventually eight (8) water storage tanks
within the District.

This project involves adding up to four
(4) permanently mounted generators
to mitigate the loss of power during
severe storms, earthquakes, and
other hazards. The District received
funding from the Department of
Water Resources (DWR) Proposition
1 Integrated Regional Water Management Plan Program, administered by the County of Humboldt. The scope of work below will be reimbursed through this grant program.

The scope of work is to add a combination of permanently mounted and mobile generators at the main control building and five (5) of the high priority pump stations where no emergency power currently exists. These locations were identified to be critical infrastructure. The project includes installation of the following: One (1) 80 kW generator at the Main Control Building; and − Up to four (4) 30-40kW generators at priority SRCSD pump stations.

Location
Vacaville, CA
Reference Name/Contact Info
City of Vacaville
Gwen Owens, City Traffic Engineer
T 707.449.5174
Type of Project/Work
Civil; Electrical; Transportation
Client Type
Municipal
Project Size and Scale
Contract $394K, Const. $1.5M
Current Status
Design Completed 2022
Construction Ongoing
Location
Santa Rosa, CA
Reference Name/Contact Info
Smith River Community Services
District
Jeff Beard, General Manager
T 707.487.5381
Type of Project/Work
Electrical; Environmental
Client Type
Municipal
Project Size and Scale
Contract $68K
Current Status
Ongoing
Corridor-Wide Systemic Safety Improvements on
Alamo Drive and Peabody Road Project
Smith River Community Services District Generator Project

GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 23

6. ELECTRICAL Project References (continued)

9. TRANSPORTATION Project References
GHD initiated traffic engineering services to
the City of San Luis Obispo under an On-
Call Traffic Engineering and Transportation
Planning Services Contract. Under this
Contract, GHD provided services for the
Transit Yard Solar Array, EV Charging, and
Bus Bay Parking Optimization Study. The
goal being the development of a solar array
solution that blends current operational needs, future fleet expansion, and electric charging infrastructure to achieve long term effectiveness of the facility for a 100% zero- emission battery electric bus (BEB) fleet.

City of San Luis Obispo has managed short and long-term transit planning for the expansion of its transit fleet from the current 17 revenue vehicles to no less than 25 vehicles, in an effort to support expanded transit operations over the next 10-15 years.

In addition, the City adopted Major City Goals, which would require the transit fleet to be 100% zero-emission by 2035, exceeding the California Air Resource Board adopted Innovative Clean Transit (ICT) fleet rule deadline of 2040.

GHD reviewed the initial site operations through collaboration and coordination with City’s Transit Manager and the City’s Onsite Operations & Maintenance Contractor, First Transit. The goal being to understand and document the operational knowledge, site circulation, and workflow process for dispatching vehicles throughout the day.

GHD developed alternatives for circulation, parking layout, and preliminary restriping plans needed to accommodate the larger fleet size within the constraints of the City’s new solar arrays and electric vehicle charging infrastructure. Through review of the constrained site, tandem parking was recommended within the limits of the solar array canopies, and charging infrastructure placed within the protection of the structure’s post system.

GHD provided consultation as part of the optimization parking layout analysis, considering electric charger venders, charger locations, and electric vehicle infrastructure upgrades as part of the readiness program. GHD also provided a review of the City’s participation in the PG&E’s EV Fleet Program, detailing the City’s responsibilities to EV infrastructure.

Location
San Luis Obispo, CA
Reference Name/Contact Info
City of San Luis Obispo
Brian Rodriguez, Project Manager
T 805.781.7226
Type of Project/Work
Civil; Electrical; Transportation
Client Type
Municipal
Project Size and Scale
Contract $100K
Current Status
Completed 2022
Transit Yard Solar Array, Zero-Emission Bus (ZEB) EV
Charging and Bus Bay Parking Optimization Study Project In Fall 2021, the County of Marin
selected GHD to provide ongoing
traffic engineering services over
the next two (2) years—with the
possibility for extensions—in support
of specific design and construction
projects, safety analyses, and grant
applications.

In only a short time, we have led
such task orders as ICE at Seminary-
Ricardo Intersection and College-
Kent-Woodlands intersections (with
roundabout concepts prioritized
and developed), preparation of the County’s Traffic Impact Fees, detailed GIS parking assessments for both the Bolinas and Stinson Beach areas, and the Point San Pedro Road Diet Pilot Project, an Active Transportation project, to be implemented this spring.

Location
Marin County, CA
Reference Name/Contact Info
County of Marin
Dan Dawson, Principal Planner, Interim
Transportation Division Manager
T 415.473.6530
Type of Project/Work
Civil; Electrical; Transportation
Client Type
Municipal
Project Size and Scale
Contract $500K
Current Status
Ongoing
Marin County On-Call Traffic Engineering Contract
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS Plot Date: 31 March 2022 - 8:00 AM C:\Users\rperfecto\Desktop\College-Kent Intersection\SHEETS\College Kent Exhibit_recover.dwgPlotted By: Roxannabelle Perfecto 0 Drafting Check Project Manager
Project Director
Project No. Date Scale
ARCH D
Size
Project
Client
Bar is one inch on
original size sheet
1"
IssueNo. Checked Approved Date
Author
Designer Design Check
Filename:

This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD. This document may only be used by GHD’s client (and any other person who GHD has agreed can use this document) for the purpose for which it was prepared and must not be used by any other person or for any other purpose. www.ghd.com
Conditions of Use
Sheet No.

Title

PRELIMINARY
GHD Inc.
4080 Plaza Goldorado Circle Suite B
Cameron Park California 95682 USA
T 1 530 677 5515
0 40'20'10'
N
GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 24

9. TRANSPORTATION Project References (continued)
The Imola Avenue Corridor
extends 3.5 miles and
includes alignments within
Caltrans right of way (as
SR 121) and through both
City and County of Napa
jurisdictions. The goal of
the corridor plan is to meet
the diverse needs of the
residential neighborhoods,
businesses, and destinations
along Imola Avenue.

GHD developed a
multimodal study for
NVTA to document the
current challenges and
opportunities on the Imola
Avenue corridor and recommend achievable solutions to implement the community vision for a vibrant, complete street.

The Imola Avenue Corridor Complete Streets Improvement Plan provides NVTA, the City, and County of Napa, and Caltrans with a flexible and implementable road map to create a safer, more accessible multimodal corridor for the Napa community. The corridor plan presents a graphically rich layout that walks readers through the corridor, with visuals that provide examples, explain tradeoffs, and show typical cross-sections to make the plan legible to the broader community.

The County was looking
for a consultant that could
bring a blend of extensive
On-Call experience on
transportation projects
and knowledge of Federal
Highway Administration
programs, Caltrans Local
Assistance Procedures
Manual and Program
Guidelines, CEQA, and
NEPA.

GHD’s scope of services
include environmental,
surveying, right of
way, permits, utilities,
design/engineering, as well as provide bidding assistance and design support during construction. This contract has led to several significant projects, including Traffic Engineering Studies, the 2019 Speed Zone Survey Update, and a Systemic Safety Analysis Report.

Services provided thus far include Engineering Studies (2016-20); Speed Zone Surveys (2019); Systemic Safety Analysis Report (SSAR) (2019-Ongoing).

Location
Napa, CA
Reference Name/Contact Info
Napa Valley Transportation
Authority
Diana Meehan, Sr. Program Planner-
Administrator
T 707.259.8327
Type of Project/Work
Civil; Electrical; Transportation
Client Type
Municipal
Project Size and Scale
Contract $255K
Current Status
Completed 2020
Location
Monterey County, CA
Reference Name/Contact Info
County of Monterey
Randy Ishii, Public Works Chief
T 831.784.5647
Type of Project/Work
Civil; Electrical; Transportation
Client Type
Municipal
Project Size and Scale
Project exists over many years,
Task Orders, and Capital
Improvement Plans
Current Status
Ongoing
Imola Avenue Corridor Complete Streets Improvement Plan Monterey County On-Call Civil Engineering for
Transportation Projects Contract
GHD County of Marin On- Call Traffic Engineering Consultant Services 13 Contracting Agency
County of Monterey
Contracting Agency Contact
Information
Randy Ishii, Chief Public Works,
County of Monterey
1441 Schilling Place, 2nd Floor-
South, Salinas, CA 93901
831.784.5647
[email protected] .ca.us
Contract Amount
Varies per project
Consultant Project Manager &
Contact Information
Jay Walter , 805.858.3141
[email protected]
Date of Completion
2016 - Ongoing
Project Description
GHD is working with the County on
a three-year contract that began in
2016 and will go to 2021, with the
option to extend the Agreement.

The County was looking for a
consultant that could bring a blend
of extensive On-Call experience
on transportation projects and
knowledge of Federal Highway
Administration programs, Caltrans
Local Assistance Procedures
Manual and Program Guidelines,
CEQA, and NEPA.

Project Objective
GHD’s scope of services include
environmental, surveying, right
of way , permits, utilities, design/
engineering, as well as provide
bidding assistance and design
support during construction.

This contract has led to several
significant projects, including Traffic
Engineering Studies, the 2019
Speed Zone Survey Update, and a
Systemic Safety Analysis Report.

Project Outcome
Traffic Engineering Studies: GHD
has performed Traffic Engineering
Studies at the following locations:
− Salinas Road at Fruitland Avenue
and Salinas Road at Werner Road
− Atherton Drive Corridor from Rio
Road to Cabrillo Highway
− State Highway 1 and 3rd Avenue
− Spreckels Boulevard between
Nacional Avenue and Railroad
Avenue
2019 Speed Zone Survey Update:

GHD is preparing the update
to the speed zone surveys for
a list of roads that were last
surveyed in 2013. This update
is for 107 roadway segments
within the County jurisdiction.

The study consists of collecting
and analyzing relevant speed and
safety related data in order to set
appropriate vehicle speed limits.

Input from County representatives
regarding recommendations will be
considered before establishing the
final speed limits.

Systemic Safety Analysis Report:

GHD prepared a SSAR that consisted
of detailed historical collision
analysis and field visit observations,
which led to the identification of
key safety issues for eleven (11)
roadway segments and four (4)
unsignalized intersections. These
safety issues were then matched
to a set of countermeasures
which were intended to increase
safety in the areas of concern. The
countermeasures were grouped into
safety projects with high benefit-
to-cost ratios and intended to be
organized as candidates for funding
from the HSIP .

Monterey County On-Call Civil
Engineering for Transportation Projects
GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 25

9. TRANSPORTATION Project References (continued)
For the 2.2-mile extension project,
the route utilizes the inactive SMART-
owned railroad right-of-way and makes
use of the recently rehabilitated Cal
Park Hill Tunnel, a portion of which
is dedicated for use by bicycles and
pedestrians.

GHD was part of the team that
developed preliminary engineering
documents that served as baseline
documents for the design-build construction contract. GHD provided environmental compliance and permitting services, civil engineering, CAD drafting, hydraulics, traffic engineering, utilities design, and coordination with the California Public Utilities Commission (CPUC).

This gap closure project connects multi-modal transit from the Larkspur Ferry Terminal to Northern Santa Rosa.

SMART was extending its service from the downtown San Rafael Transit Center to the Larkspur Ferry Terminal in Marin County. GHD was an integral part of the design of the civil, roadway, traffic, utilities, and related improvements for this mission critical project.

The team’s responsibilities included coordination with the San Rafael Transit Center, design of four at-grade crossings, civil and traffic engineering with CPUC for relocation of a new road crossing and to remove one crossing, civil design of the Larkspur station, coordination with the existing tunnel, utilities design, and the design of multiple bridges.

Location
Sonoma and Marin Counties, CA
Reference Name/Contact Info
Sonoma-Marin Area Rail Transit
(SMART)
John Riley, PE, Principal Engineer
T 707.794.3070
Type of Project/Work
Civil; Electrical; Transportation
Client Type
Municipal
Project Size and Scale
Contract $490K, Const. $55M
Current Status
Design Completed
Construction Completed 2019
SMART - San Rafael Extension Project

5. | Project Approach
GHD provides high quality Civil Engineering Design services from project outset through construction. Since 1952,
GHD has earned a reputation for planning, designing, and delivering high quality and smoothly operating projects of all types in California. We specialize in all aspects of transportation design engineering, from conceptual to final design and design support services through to construction support and administration.

Our staff are well-versed in local standards and policies (past work with the City of San Pablo, West Contra Costa Transportation Advisory Committee, Contra Costa County, other cities within Contra Costa County, and the County), Caltrans Highway Design Manual, American Association
of State Highway and Transportation Officials (AASHTO)
Policy Manual, California Manual on Uniform Traffic Control Devices (MUTCD), California Disabled Accessibility
Guidebook (CalDAG), Bay Area Stormwater Management
Agencies Association (BASMAA), and Title 24.

We prepare detailed designs with strict attention to the overall context of the project including the purpose and need, operational needs, potential users, connectivity, best and highest use of right of way, conserving natural environment and more. In order to provide context sensitive

1. CIVIL ENGINEERING SERVICES
solutions our team considers all intersection and roadway elements, including grading, drainage, water quality, sight distances, ADA conformity, active transportation, complete streets, transit erosion control, pavement design, utilities, signing and striping, stage construction, traffic handling, intersection control, lighting, and more.

In addition to providing accurate capital costs estimates for your projects, our team will be mindful that the lowest capital cost alternative for a project may not be the lowest lifecycle cost for the County. We will utilize our experience to estimate reasonable operations and maintenance costs that will provide a more realistic picture of decisions that will be made during the project.

We also work with utility companies and the right of way acquisition team to identify utility relocation costs, permitting costs and property/easement acquisition costs in order to identify all costs associated with constructing the project.

CONSTRUCTION MANAGEMENT
The success of a construction project is directly tied to the effectiveness of the Construction Management Team, acting in partnership with the owner. GHD provides construction

2. CONSTRUCTION MANAGEMENT SERVICES
GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 26 inspection and management to meet funding programs and
prevailing wage requirements. GHD can provide inspectors for prevailing wage and non-prevailing wage projects,
augmenting city staff, providing third-party inspections of designs by others, and providing inspections of projects we design for the District to provide turn-key services.

Jane Rozga will oversee these services for our team. GHD’s approach emphasizes:
− Project communication and tracking › GHD utilizes Procore to assure that all project team members have access to
current documentation and know the status of submittals and RFI’s so that communications and decisions are based on an accurate understanding of conditions.
− Task planning and problem avoidance › GHD spends
time before new tasks to evaluate potential challenges
and work with the Contractor to identify alternatives and develop a proactive approach to issues.
− Problem-solving › GHD’s Construction Management
Team takes an active role in diagnosing and solving
problems. Initiating discussions on potentially
contentious issues as soon as they arise can allow
potential resolution of issues before parties become
entrenched. GHD fosters a team approach to problem-
solving so that challenges are less likely to result in adversarial relationships and have a long-term impact on project success.
− Critical response › When a project is threatened by an urgent issue, GHD has the ability to tap additional resources as needed to assist with both solving the problem and
minimizing collateral schedule and cost impacts.

Constructability and Peer Reviews
GHD has experience performing peer review,
constructability, and value engineering workshops for
various project types and delivery methods. These reviews can add value to projects which may be complex or where project cost estimates are greater than the available budget.

For design/build projects we often write the RFP and review the designs at each stage of development for the owner, acting as the owner’s technical representative.

GHD dedicates teams of seasoned professionals to
review the design documents for constructability reviews.

Reviews generally follow the GHD Constructability Process, which is based on the Construction Industry Institute’s Constructability Implementation Guide.

Construction Cost Control
GHD will take a proactive approach to deliver a project that is high quality, on time, and budget. For many construction projects, change is inevitable; however, the key is identifying how change can be mitigated with proper planning and
communication. Tools and techniques to mitigate change
orders include:

Accurate baseline schedule with detailed activity
breakdowns, realistic durations, and the correct
sequencing to construct the Project.

Productive on-site weekly meetings including review of
the three week look ahead schedules with County staff.

Documentation of issues and actively engaging with the
responsible party to address them.

Leveraging our team’s experience and insight in the
design and construction of similar projects constantly
looking ahead, anticipating issues, and engaging with the right people for timely resolution.

Development of a professional working relationship with the Contractor. Our team has experience on all sides
of construction (Contractor, CM, and Design Team).

We understand the criticality of having a good working
relationship and a feeling of teamwork.

Familiarity with contract drawings and specifications.

GHD’s Team is always well-versed in the contract
documents and does not take anything for granted without reviewing the language of the contract.

Use of project controls specialists to support our team with defensible cost data.

Documentation of site activities including work activities, issues and delays, and weather. As much as the GHD Team works to collaborate with the Contractor, we recognize that accurate documentation is critical for protecting against unwarranted claims and resolving misunderstandings.

INSPECTION
Teamwork. GHD achieves effective QA on our inspection
projects by, when possible, working in partnership with the contractor, which improves efficiency and reduces required staff time for quality assurance. Open communications
and a team approach toward project success reduces
the distraction of adversarial relationships and facilitates collaboration in resolving project challenges.

Problem-Solving Approach. GHD inspectors study the
project documents, along with submittals and any RFI's, to be familiar with project requirements. Looking ahead to future activities allows us to identify and address potential challenges.

Minimizing Punchlists. When we can, we help the
Contractor avoid potential rework (also saving re-
inspections). Our team identifies potential issues early whenever possible and informs the Contractor's crew of
items in need of attention to reduce the number and scope of punch list items.

Documentation. GHD uses web-based document
management systems to provide project team members with 24-7 access to project information. Inspection staff post daily reports and photographs each day so that project stakeholders have immediate access to the most current information.

Safety. For each of our projects, GHD establishes specific objectives and measures for success, communicated to all involved in the Project. In pursuit of our vision of zero harm to people, property, and the environment, we adhere to the following principles:
− Prevention of injuries, illness, incidents, and fatalities as a valued business practice of what we do, we have a behavior based safety program that incorporates the following:
• Empower all to use Stop Work Authority when there is
a perceived unsafe act or condition
• Perform Positive Interaction by peers to evaluate
each other’s safety performance
GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 27 • Conduct on-site safety inspections to identify and
mitigate hazards
• Train employee specific to the task being performed
Approach: The GHD CM Team will adhere to GHD’s safety
principles, participate fully in the City’s site safety program, and, if necessary, use their Stop Work Authority if a
hazardous condition is recognized.

Result: The project will align with the City’s safety culture.

Top 10 Keys to Effective, Efficient Quality Assurance
1 Dedication to project success
2 Apply practical knowledge based on related
experience
3 Know Contract Documents
4 Recognize potential issues inherent in work
5 Understand construction crew skills, limitations and
challenges
6 Understand site conditions
7 Prioritize focus based on risk and timing
8 Proactive contingency planning
9 Make use of resources - personnel & technology
10 Clear, timely communication
GHD has been performing development review services for municipalities for decades. We have developed a dynamic and experienced stable of review staff that can assist with timely development review and plan processing. GHD’s core development review team works together from our Bay Area offices located in Santa Rosa, Concord, and San Francisco.

Through our current development review contracts with
multiple other local agencies, we understand the nature and the nuances of the plan and map check components of the development review process very intimately.

Specifically, we are familiar with the needs of San Pablo, and have worked as part of the development review team for the neighboring Bay Area communities of American Canyon, St.

Helena, Petaluma, Windsor, Santa Rosa, Rohnert Park and Sebastopol. As well, we are very familiar with the entire lifespan of the development process, from complying with mitigation measures from the environmental documentation, Conditions of Approval and Tentative Map to the final Parcel Map and Improvement Plans for construction. We have an intimate knowledge of City Ordinances, Design and Construction
Standards, ADA and mobility compliance, Floodplain
Ordinances, Water Quality Control Board, and Caltrans

3. CIVIL PLAN REVIEW SERVICES
Standard Plans and Specifications. Having performed these services for numerous jurisdictions throughout the Bay Area, we will be able to understand the City’s development review program, how you like the comments to be developed, and who all the key players are within the City. In short, we will be fully informed and ready to perform.

The development review process requires a great deal of due diligence, care and regulatory expertise in order to maximize response to the community’s and department’s needs. With our extensive in-house civil, survey, transportation, traffic, geotechnical, electrical, and structural expertise coupled with our municipal design and development review On-
Call experience, we are well equipped to provide the most expedient and efficient review of development proposals.

Our in-house survey team is equipped to expediently
provide parcel map review, while our civil team is prepared to oversee the review of improvement plan. Additional support resources will provide input on geotechnical, civil, structural, stormwater, transportation, and traffic.

Approach to Scope of Services
Sample Plan and Map Check (Development Review)
Work Plan:

1. (Optional – Large/Complex Projects) Pre-Application
Meeting. We have found that our clients and project
teams are most successful when we jointly prepare a clear and detailed project scope for large and/or complicated projects, where we meet with City staff to have a clear understanding and alignment of goals. This would usually occur directly after meeting with the development team
at a pre-application meeting. (Lead Reviewer)

2. (Typical start) Background, Data Collection and Project Kick-off. Upon formal application, we will coordinate
with City staff regarding dissemination of background
information. (Lead Reviewer)

3. First Review. Review plans for general compliance with accepted engineering best practices. Review plans
for strict conformance with applicable Subdivision
Map Act, building codes, regulations, ordinances,
stormwater, floodplain, LID, and building codes. Issue
first set of comments in letter format to developer’s
design engineer, signed and stamped to be tracked
by Public Works Department. (Lead Reviewer and
discipline specific support staff)

4. Meet with Staff and/or Applicant. If required.

5. Second Review. Review comment responses from
design engineer and back-check to ensure completion
of acceptable modification/clarification. Review plans
again for strict conformance with applicable codes,
regulations, ordinances, stormwater, floodplain, LID,
and building codes. Issue 2nd set of comments in letter format to design engineer, signed and stamped – to be
tracked by Public Works Department. (Lead Reviewer
and support staff)

6. Meet with Staff and/or Applicant. If required.

GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 28

7. Subsequent Reviews. Review comment responses from
design engineer and back-check to ensure completion
of acceptable modification/clarification to City and
applicable standards.

8. Recommendation for Approval. Send authorized letter
to City Engineer recommending approval of plans and
map (if accepted). (Lead Reviewer)
GHD’s environmental services team includes experienced
planners, environmental scientists, biologists, hazardous material specialists, hydrologists, transportation planners, noise analysts, and air quality specialists to assist clients in the preparation of CEQA and NEPA documents, resource
agency permit applications, environmental documentation to support federal grant funding requirements, and
supporting technical studies and public outreach.

Our staff have worked together for years, providing On-Call environmental consulting services for public works projects including building and property renovations, bridges, pump stations, utility undergrounding, water and wastewater
systems, roadways, drainage improvements, pedestrian
and bicycle trails, and river, creek and stream enhancement and restoration projects. We have extensive staff resources in multiple Bay Area and Northern California offices,
and trusted relationships with federal-aid and resource protection agencies to leverage on the City’s behalf.

CEQA/NEPA Compliance
GHD has over 25 years of
experience specializing in CEQA
and NEPA compliance and our
team’s expertise and ability to
execute complex projects is
well established. GHD produces
the full range of compliance
documents for a wide variety of
federal, state, and local agencies,
and is thoroughly experienced
in producing documentation
for federally funded projects involving Caltrans oversight.

GHD team members have a complete understanding of
current CEQA and NEPA regulations and guidelines, and
the components of the preparation, noticing, and approval process that are critical to keeping projects on track.

Permitting
The GHD Team’s resource agency permitting staff offers
local resource knowledge, along with the ability to work constructively with regulatory staff to facilitate timely approval of permits. Agencies with whom we routinely work (associated regulatory permits) include the US Army Corps of Engineers (Section 404, 408), the US Fish and Wildlife Service (Section 7 Consultation), the California Department of Transportation (encroachment permits), the California Department of Fish and Wildlife (Section 1602, Incidental Take Permits), and the Regional Water Quality Control Board (WDR, Section 401).

Clean Water and Hazardous Materials Management
Since 1951, GHD’s California and west coast offices have

4. ENVIRONMENTAL SERVICES
provided exceptional multidisciplinary engineering services to municipal, state, and federal. GHD’s engineering team provides a broad range of planning, design, and construction support services for buildings, utilities, and other infrastructure systems, including storm water/LID permit compliance,
hazardous materials management, and fueling system/
underground storage tank site remedial actions and closures.

Strategies for Successful Environmental Compliance
Our approach to environmental planning is focused on
helping clients obtain all necessary environmental approvals as efficiently and expeditiously as possible. This begins with our team evaluating the potential for projects to qualify for various CEQA and NEPA exemptions, identifying strategies for successful and efficient review, and advising clients on any practical ways to reduce permitting and mitigation requirements. At the beginning of a project, we prepare a detailed review schedule and make it a top priority to respond quickly to requests and to communicate resolution of issues.

Environmental permitting and environmental remediation are often a critical factor in moving our clients’ projects toward successful implementation. Our staff offers local resource knowledge, along with the ability to work constructively with regulatory staff to facilitate timely approval of permits.

These relationships help us facilitate the early involvement of agency staff. From our experience, this is crucial to gaining agency cooperation and input, ensuring that the project is more likely to be approved, and avoiding costly delays.

Traffic Signal Design, Timing Optimization and Coordination Traffic signal design, street lighting design and signal timing has long been an integral specialty of GHD. Our long-
standing reputation for completing complicated traffic signal projects makes us especially qualified for any signalization, optimization, and coordination projects within the County.

GHD provides traffic and electrical engineering services such as reviewing and preparing Plans, Specifications, and Estimate (PS&E) for traffic signal and street lighting projects (both new installations and retrofits), signal interconnect systems, signal timing plans, in-roadway illuminated
pedestrian crosswalks, pedestrian hybrid beacons,
emergency vehicle preemption and priority systems, and
parking lot lighting, as well as other traffic engineering functions related to traffic operations and safety.

We have prepared PS&E for over 200 California traffic
signal installations, including preliminary impact and signal warrants evaluation, traffic engineering studies, design and preparation of PS&E, project bidding services, contract management, and construction inspections, requiring
the work to conform to various local, state, and national standards for clients, including local and state agencies, as well as private developers.

Intelligent Transportation Systems Networks
The existing arterial and collector network within the County presents many opportunities for Intelligent Transportation Systems (ITS) improvements that can increase
responsiveness to issues, safety, reduce congestion, and improve operational service levels. ITS improvements can increase safety, reduce congestion, improve transit service levels, and position corridors as future-ready for “Smart City” strategies down the road.

6. ELECTRICAL SERVICES
GHD has a history
of preparing
successful
environmental
documents, none
of which have
been overturned
by the courts.

GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 29 GHD understands the programs, projects, and technical
architecture necessary to achieve higher customer service with updated equipment, communication, Advanced Traffic Management System (ATMS), and management at Traffic
Operations Center (TOC). ITS systems considered in the
County will need to conform with the ITS Policy and the Regional ITS Architecture (i.e., Bay Area ITS Architecture (BAITSA) as updated by MTC). Our engineers and planners are consistently on top of the next set of innovative technologies, to enable our clients to stay ahead of the regulatory
and technological conditions, and thereby plan and/or
incorporate those elements into project planning and design.

Electric Charging Infrastructure Projects
GHD has delivered multiple projects in the past decade on thousands of projects in transportation, energy, including alternate and future energy alternatives, permitting, design and construction services. Assisting our clients with
preparing for the future of transportation in California. We work closely with the local agencies, utility purveyors, and landowners to provide the space and infrastructure for the future sustainable electric fleet of America. We look forward to assisting the City to meet statewide and local goals for electric charging infrastructure.

Zero Emission Fleet & Service Assessment
Fleet Assessment through our proprietary Zero Emission
Vehicle Optimization (ZEVO) involves collecting, auditing, and processing fleet asset metrics (such as odometer,
maintenance cost, fuel efficiency, and carbon intensity) from the existing fleet to develop a fleet attrition plan. GHD's proprietary statistical model evaluates each asset's operational viability and helps identify 'easy targets' within the existing fleet to transition away from fossil fuel into ZEV technologies.

Service Assessment involves collecting and processing GPS data that maps out the activity performed by the assets. This assessment allows validating the specification of ZEVs within the context of the energy and power requirements currently being expended by fossil fuel assets. ZEVO performs the Service Assessment using a proprietary physics model,
which considers elevation, local climate, duty cycle, stop events, speed, and other relevant on-road factors.

Traffic Operations
With an increasing programming emphasis and funding
priority towards active transportation and transit
improvements, today’s traffic analyses also need to help quantify trade-offs between transportation modes when
vehicular capacity may be reduced to improve safety and operations of bicycle, pedestrian, and transit modes. Prior to developing an analysis model, GHD collects field data along study corridors by collecting counts by mode and
classification, observing queues, saturated flow rates, and performing floating car travel time runs. Additionally, we often supplement field data with available “Big Data” from free sources (NPMRDS, PeMS, LEHD) and commercial
sources (INRIX, Here, StreetLight, BlueFax, AirSage,
Streetlytics, etc.) based on project needs.

Traffic Signal Design, Timing Optimization, and Coordination Traffic signal design, street lighting design, and signal timing has long been an integral specialty of GHD. Our
long-standing reputation for completing complicated
traffic signal projects makes us especially qualified for

9. TRANSPORTATION SERVICES
the anticipated signalization and signal modifications, optimization, and coordination projects anticipated in
the City. GHD provides traffic and electrical engineering services such as reviewing and preparing PS&E for traffic signal and street lighting projects (both new installations and retrofits), signal interconnect systems, signal timing plans, in-roadway illuminated pedestrian crosswalks, pedestrian hybrid beacons, emergency vehicle preemption and priority systems, and parking lot lighting, as well as other traffic engineering functions related to traffic operations and safety.

Active Transportation and Complete Streets Operation
We believe in the principles of Complete Streets, Road Diets, and Green Streets, and adapt to the emerging guidance and standards being developed for active transportation modes.

However, we understand that active transportation planning must consider operational impacts to vehicular modes of transportation. Typical active transportation roadway and infrastructure improvements are implemented to increase safety, connectivity, and predictability for people traveling by foot and bicycle, including increased pedestrian crossing times, leading pedestrian intervals, protected bike lanes and intersections, wider bicycle lanes and sidewalks, bulbouts, and median refuges.

Bike/Pedestrian Safety Education/Safe Routes to School
Safe Routes to School (SRTS) is a part of the Transportation Planning field which focuses on increasing safety of students and families walking and bicycling to school through a set of methods referred to as the “5 Es” — Engineering, Education, Enforcement, Encouragement, Emerging Technologies.

GHD staff bring diverse experience throughout California developing SRTS Plans and Programs, including context-
appropriate application of all five “Es” from the school to the County level. Further, our staff have helped design infrastructure improvement plans and safety education,
encouragement, and enforcement programming for a range
of communities.

Railroad Coordination and Working with the California
Public Utilities Commission (CPUC)
The City has several open at-grade rail crossings, some separated by as little as 300 feet within a little the downtown core. Along with the design elements along the Sonoma
Marin Area Rail Transit (SMART) alignment, GHD has
prepared operational analysis and preliminary design of the rail grade crossings and adjacent City traffic signal network in Downtown San Rafael. Coordinating with SMART, particularly with at-grade crossings is something the GHD Team has been doing since prior to the inception of SMART, at many of the North Coast Rail Authority crossings. The GHD team has designed both roundabout and signalized
intersections in coordination with and for SMART and local agencies. Working with both the CPUC and stakeholders to gain roadway crossing consensus and regulatory approval, from the initial diagnostic review and General Order (GO) 88-B. Are working relationship with Dave Stewart, the
CPUC’s Rail Crossing and Engineering Branch staff assigned to Sonoma County. GHD staff has worked through crossing improvements in all of Sonoma County with Mr. Stewart,
but also Sonoma, Mendocino, and Humboldt Counties. We
believe this relationship is key to working through solutions with rail safety requirements and roadway operations in mind.

GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 30

6. | Approach to Schedule of Work
Management Approach
GHD recognizes the value of having immediate access
to pre-qualified consultants to eliminate the cost and
delays inherent in the consultant selection process.

GHD’s job as a consultant is to maximize the value of
your dollars by minimizing the disruption to staff by
providing outstanding project coordination.

GHD is aware that scopes, schedules, cost, and
duration will vary with each project, and proposals will be developed for each specific project assignment.

GHD’s approach is to provide a complete “turn-key”
service to the City for each of your specialty areas.

This effort on your behalf will provide a complete array of “staff services” that will act as an extension of the City’s existing work force.

We have assembled a GHD team with a wide range of
qualifications and experience to meet all the potential projects and tasks as listed in the RFQ. Your On-
Call staff will be based primarily in our Santa Rosa
office with support from all adjacent offices, but will draw on other company expertise as needed. The
subconsultants we have supporting us are all experts in their fields.

Implementation Plan
Below we outlined an implementation plan that describes in detail GHD’s Control Methods, stakeholder and public outreach process and techniques we use to manage On-
Call projects.

Control Methods
Project Management Plan
GHD will develop a detailed Project Management Plan
(PMP) for each project that is shared with all team
members including the City. This document provides
a detailed plan for the execution of the project. It shall also include the roles and responsibilities of each team member and an independent Quality Management
Plan (QMP) for each task. The PMP will also include
the project Communication Plan intended to ensure
proper and efficient communication protocol within
the project team. As part of GHD’s standard for
collaboration, the Contract Manager, in collaboration
with the GHD assigned task manager, will coordinate
with the City during the PMP development and prior to
implementation. The PMP is a living document and will
be updated as required by the project needs.

Scope and Define Required Services Determining
The scope of work before project initiation is critical.

Proper identification of all aspects needs to be
considered prior to the initial work. By carefully and
properly defining the required services early, we are
able to efficiently complete a more accurate process.

Budget Management
If you are not paying adequate attention, it is easy to overspend the project allocation. We start each project with a clear understanding of expenditure expectations.

As projects progress, we keep our Budget Tracking
Spreadsheet up to date. The spreadsheet will track
ongoing quantity over and underruns, potential changes, approved change orders, etc.

Stakeholders / Public Outreach
Maximizing Public and Stakeholders Involvement
Our team understands that we are serving the traveling
public and working in someone’s “front yard”. We’ll
identify opportunities to minimize impacts and make
sure fronting businesses and residents get the extra
TLC they deserve during the project planning and/or
design phase. We’ll reach out to local stakeholders,
affected local agency personnel and service providers
to build effective relationships and ensure that our
project staff have current contact lists.

Community Outreach
Transportation planning cannot be successfully
completed without community participation. The
transportation system is designed for those that live
in the community, and their input is invaluable. GHD
understands that public outreach is an important
element for any project. For that reason, we have
developed extensive educational outreach programs, as
well as an educational tool for agency staff and councils.

We have developed informational campaigns to assist
GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 31 in obtaining concept approval and educating the public
on project recommendations. We ensure that the public
is informed and have the opportunity to express their
concerns and offer suggestions in a “one-on-one”
environment to be held with each of the potentially
effected businesses. Our community outreach
programs are always tailored to the specific needs and
desires of the local agency and gauged based on type of project/potential for public concern.

Techniques for Successful On-Call Contracts
Scope Verification and Control
The team understands that the scope verification
process is very important to ensure that project
deliverables are formally accepted. This will be
achieved through the use of a well-defined scope of
work for the project and by having each team lead
develop and agree to the scope. GHD will define the
deliverables for each task in the scope.

Any issues that arise during the execution of the
project will be addressed by the team. Our solutions
and recommendations will be available for input by the
City. This is part of the normal design development;
however, any issues that could potentially require
adjustments to scope will be communicated
immediately to the City’s Project Manager along with
our recommended solutions and a plan to recover
schedule or budget, if required.

Schedule Control
The schedule prepared as part of the PMP will
integrate the work of all subconsultants and will include milestones and sub tasks, preparation and processing,
in-house Quality Control and City or agency reviews.

Once the detailed scope is established, our Contract
Manager will prepare a Critical Path Method (CPM)
based schedule using MS Project. As work proceeds
and progresses, the project schedule will be closely
monitored and tracked to assure timely adjustments
are made. If schedule recovery is re-quired, we are
experienced in a number of different techniques and
will select the most appropriate to the situation to
recover the schedule. The project schedule will be
updated and maintained monthly to ensure that it
remains current and accurate and monthly updates will
be furnished to the City Project Manager.

Cost Control
Our Project/Program Manager will track the cost
and expenditure for each task order, using our in-
house cost control tools. Prior to each invoice, GHD’s
Project/Program Manager will review the progress
for consistency with the PMP and ensure that the
billing does not exceed the estimated fee in the PMP
for services rendered to date. This cost control plan
ensures that our fee will always be properly tracked
with the progress of work.

Providing Solutions
There’s nothing worse than having your consultant
drop problems on your lap. When problems arise, we’ll
research, analyze, and propose effective solutions. It is our job to perform complete and comprehensive work,
and make sure we provide you with what you need.

Meeting Project Specific Goals
Every project has a unique history, set of expectations, constraints, and political context. Our Contract
Manager and engineers will spend time with the
City and stakeholders developing an understanding
of the project specific issues and goals. In some
cases, meeting a project deadline will be the most
important project goal. In other cases, aesthetics
and/or community amenities may represent the most
important project goals. In this case, we’ll put extra
energy into aesthetics and amenities while balancing
any impacts on costs and schedule.

GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 32 Making the City Look Good
As previously stated, the City will have to live with the negative or positive impressions that are formed around a project. By working hard to meet the above goals, the City and its staff will be looked upon favorably by other agencies, citizens, stakeholders, etc.

Overall Timelines
Schedule Management
For some companies, uncertainty has the potential to
create difficulties in delivering projects within the time frame. Scheduling our diversified staff on a weekly
basis, our internal project development, and filing
processes allow us the flexibility to shift personnel
time as needed to accommodate new projects and
schedules. With these practices, we are always able to
meet project deadlines.

Upon written or verbal request and depending
on the type of project, meetings can generally be
scheduled within the week following. For larger
projects, formal schedules will be created using
Microsoft Project to identify critical path tasks and
resource requirements. From the kick-off date, mile-
stones are set for each project task for peer review
of project deliverables. As the project advances, it is watched closely so that the items are completed within
the time required.

City Involvement
GHD is aware that the City's involvement will vary for
every project. Specific Tasks or items that are required on one project, may not be needed on another project.

When each proposal or scope is developed, GHD’s
Contract Manager will go over the document with the
Public Works Director to discuss the items or tasks we
feel are best led by the City instead of GHD and why.

We will make sure the City is aware of every item that will include them and that there is a full understanding of the project and requirements before beginning the work.

Quality Assurance/Quality Control
GHD has established and maintains a fully documented
in-house Practice Quality Management System. This
system is third party approved and certified by Lloyd’s Register to the requirements of ISO 9001:2008 quality
systems for design development, project installation,
and servicing, to the extent that they apply to the
professional services provided by the practice. GHD’s
Quality Procedures are also compliant with federal
guidelines and GHD has successfully undergone
federal audits with respect to Quality documentation.

Our team understands that quality management is
essential to the success of any project. As an integral part of our Project Management Plan (PMP), we will
abide by a Quality Management Plan (QMP) for each
task order. No matter the delivery method, all of our
task leaders and our Contract Manager will work with
their project delivery teams and your staff to achieve
the highest quality deliverables. Our Contract Manager
and Project Director will serve as our lead QA/QC
Managers, and will coordinate with our Task Leads
to coordinate appropriate development of the QMP,
denote additional On-Call personnel depending on
the task order request, and develop project specific
review schedule. The fundamental driver of the QMP
is to provide set design or planning documents which
are consistent with good engineering professional
practices and meet the City’s requirements. Utilizing
our QMP will cultivate the smooth flow of design
information and document control specific to each
project’s/task order’s needs and requirements (i.e.,
design-build, design-engineering, studies with design
elements, etc.). Each plan, at a minimum, will include:
− A central point of contact;
− Quality Team organization, responsibilities,
purpose, scope, lines of authority, and
communication;
− Design checks (plans, specifications, calculations,
reports, programs/modeling, cost estimates, etc.);
− Project schedule of On-Call reviews; and
− Standardized procedures and documentation.

Budget, Cost & Management
Controls
GHD stresses “hands-on” project management,
clear communications and effective stakeholder
coordination, schedule adherence, efficient team
management, tight control over costs, and high
standards of quality control. GHD professionals take
pride in the creativity of the firm and in its commitment to meet our client’s needs and objectives. This
approach has established GHD as a leader in planning
and managing projects.

Our general approach to tracking projects is to meet
with staff on a weekly basis, review project status,
update a project status table, and establish/review
priority of tasks. This approach ensures that we have a clear understanding of deliverables as well as schedules and budget. We have taken this approach with tailored
progress reports included with every invoice, which
detail project or task budgets, remaining tasks, and if any contractual (or budget) issues have arisen.

GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 33 While this approach may seem simple and straightforward, it is critical to track budgets and control costs. Frank Penry, our Contract Manager, is local to the Bay Area and has worked on many projects in San Pablo through the
years, and is therefore acquainted with the community,
staff and stakeholder groups.

Following are specific management functions that
Frank will perform:
− Supervise, coordinate and monitor project delivery
products/reports for conformance with City
standards and policies
− Assure compliance with other codes and standards
as acceptable to the City
− Coordinate project efforts and budgets with all team
members
− Prepare and monitor progress schedule and
budgets
− Attend meetings and perform meeting related
functions such as preparing agendas, meeting
minutes and three-week horizon schedule
− Prepare monthly progress reports, budgets and
invoices
− Prepare correspondence and memos
− Establish and implement a Quality Assurance
and Quality Control (On-Call) program related to
project activities
Response Time and Point of Contact
GHD has a long history of serving the needs of
municipalities and public agencies with on-going
engineering, review, planning, design, and other On-
Call services of varying scopes and sizes. Feedback
from our clients indicates our technical expertise,
responsiveness, and customer service have been key
benefits of our services.

Our senior staff provide hands-on management of our
On-Call contracts; our On-Call practice is not merely
an opportunity for junior staff to gain experience.

We offer tools and protocols specifically designed
to deliver expert service quickly, with added value.

Because most problems crop up in these ongoing
services as a result of communication issues, our
teams stress clarity and responsiveness. We return
phone calls promptly. We respond in person the same
day whenever possible.

GHD has come to know some City staff by first name
and have an understanding of their styles, drivers, and needs. Because of these relationships, we know who to
speak to about specific project issues and how to best
resolve potential challenges.

Our proximity and familiarity with City systems and
history, this will allow us to quickly recognize the overall project needs and drivers.

Through our experience with the City and other
agencies, the following will allow us to respond to
requests in a timely manner. Our commitment to
the City on assignments from this contract includes
the following proposed response times for typical
activities and tasks:

Type of Task Response Time
Telephone Calls 1 Business Day
Emails 1 Business Day
Letters 1 Week
Request for Information 2 Business Days
Meetings
Task/Project Kick-Off Meeting
Frank will schedule a kick-off meeting that will be
attended by the GHD project team and representatives
from the Department of Public Works. Based on the
discussions at the kick-off meeting, additional special meetings will be scheduled to discuss the project
further as necessary.

Project Development Progress/Trend Meetings
GHD staff will attend progress/trend meetings with the
City as necessary.

GHD will prepare agenda and minutes of progress/
trend meetings in a format approved by the City. GHD
will also distribute the minutes to Staff, other attendees and/or stakeholders as required.

Public Meetings and Hearings
GHD staff will attend and render assistance at hearings and other public meetings in support of the Staff as
necessary. GHD will prepare the necessary information
handouts and presentation materials for the meetings.

Approach for Potential Scope of Services
GHD has prepared simplified scopes below for typical
work noted, however we are also providing detailed
scope of services of more extensive tasks, like ATP
project development, PS&E, Traffic Impact Analysis,
grant writing, and speed surveys.

Here are a few items of note that we provide on our
various On-Call contracts.

GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 34 Addressing Issues with the Public
GHD will provide management of public concerns,
including intake, management, coordination, review,
and resolution, as required with City Staff. This may
include development and use of a City specific
database to maintain proper logging and resolution to
preserve public relations.

Take In and Address Issues
GHD staff have experience working in the public sector
and understand that comments and concerns can
be taken from a wide variety of avenues, from email,
phone, City Board of Supervisors members, or even
Staff. Regardless of the avenue, it is important to log and respond with a personal conversation whenever
possible. When a phone call or meeting cannot be
had with the public, a “like” response will be prepared and copied to the appropriate Staff. All comments
will be logged either in the City’s Customer Relations
Management System or through a spreadsheet. GHD
will review the list of calls with Staff, marking items as closed or requiring further action.

Follow Up Comments
GHD intends to address traffic related issues with the
public by understanding the concern or issue and
responding with further information or education
about particular issues. In many situations, there is
likely corrective action that must be reviewed and
or prepared. In these cases, GHD will prepare the
potential response, including analysis, design, work
orders, and coordinate with Staff.

GHD further understands that with many communities,
traffic calming requests make up a bulk of the public
concerns. GHD has prepared Traffic Calming Programs
and standardized literature for many jurisdictions.

These programs are envisioned to limit the comments
received through varied avenues and standardize
response measures.

Respond
In those circumstances where further information
or corrective action is needed, and in many cases
requires other resources to complete, GHD will
prepare further response to the public regarding issue
resolution. It is important to respond to the public after a decision or action has been developed regarding
issues. However, in cases where the issues have long
lead times, GHD will keep contact with the public
throughout the process.

Final Striping of San Pablo Avenue Project | San Pablo, CA GHD City of San Pablo Department of Public Works Engineering Division On-Call Professional Services 35

7. | Rate Schedule
Standard
Rate
Discounted
Rate
Standard
Rate
Discounted
Rate
A001 Senior Technical Director 1 $375 $338 C003 Senior Admin Officer 1 $200 $180 A002 Senior Technical Director 2 $350 $315 C004 Senior Admin Officer 2 $170 $153 A003 Senior Technical Director 3 $315 $284 C005 Admin Officer 1 $150 $135 A004 Technical Director 1 $290 $261 C006 Admin Officer 2 $140 $126 A005 Technical Director 2 $265 $239 C007 Admin Officer 3 $90 $81 A006 Senior Professional 1 $240 $216 S001 Senior Construction Manager $345 $311 A007 Senior Professional 2 $220 $198 S002 Construction Manager $295 $266 A008 Professional 1 $210 $189 S003 Lead Site Engineer/Supervisor $260 $234 A009 Professional 2 $180 $162 S004 Senior Site Engineer $235 $212 A010 Professional 3 $155 $140 S005 Site Engineer $215 $194 A011 Vacationer / Intern $145 $131 S006 Lead Inspector $205 $185 V001 Executive Consultant 1 $470 $423 S007 Senior Inspector $155 $140 V002 Exectutive Consultant 2 $430 $387 S008 Inspector / Specialist 1 $130 $117 V003 Senior Consultant 1 $350 $315 S009 Inspector / Specialist 2 $120 $108 V004 Senior Consultant 2 $310 $279 S010 Clerk / Specialist 3 $115 $104 V005 Consultant 1 $260 $234 S011 Senior Site Manager 1 $140 $126 V006 Consultant 2 $210 $189 S012 Senior Site Manager 2 $125 $113 V007 Consultant 3 $170 $153 S013 Senior Site Manager 3 $115 $104 B001 Lead Design Technician 1 $350 $315 S014 Senior Site Manager 4 $105 $95 B002 Lead Design Technician 2 $320 $288 S015 Operator/Labourer 1 $95 $86 B003 Lead Design Technician 3 $285 $257 S016 Operator/Labourer 2 $90 $81 B004 Senior Design Technician 1 $260 $234 S017 Operator/Labourer 3 $70 $63 B005 Senior Design Technician 2 $240 $216 D001 Business Services Manager 1 $375 $338 B006 Design Technician 1 $215 $194 D002 Business Services Manager 2 $350 $315 B007 Design Technician 2 $205 $185 D003 Senior Admin Officer 1 $300 $270 B008 Drafting/Design 1 $190 $171 D004 Senior Admin Officer 2 $260 $234 B009 Drafting/Design 2 $165 $149 D005 Admin Officer 1 $235 $212 B010 Drafting/Design 3 $150 $135 D006 Admin Officer 2 $215 $194 B011 Drafting/Design 4 $140 $126 D007 Admin Officer 3 $195 $176 B012 Intern Drafting/Design $125 $113 D008 Admin Officer 4 $170 $153 C001 Business Services Manager 1 $310 $279 D009 Admin Officer 5 $150 $135 C002 Business Services Manager 2 $265 $239 D010 Admin Officer 6 $90 $81 Finance Class Code Finance Class Code Standard
Rate
Discounted
Rate
Standard
Rate
Discounted
Rate
A001 Senior Technical Director 1 $375 $338 C003 Senior Admin Officer 1 $200 $180 A002 Senior Technical Director 2 $350 $315 C004 Senior Admin Officer 2 $170 $153 A003 Senior Technical Director 3 $315 $284 C005 Admin Officer 1 $150 $135 A004 Technical Director 1 $290 $261 C006 Admin Officer 2 $140 $126 A005 Technical Director 2 $265 $239 C007 Admin Officer 3 $90 $81 A006 Senior Professional 1 $240 $216 S001 Senior Construction Manager $345 $311 A007 Senior Professional 2 $220 $198 S002 Construction Manager $295 $266 A008 Professional 1 $210 $189 S003 Lead Site Engineer/Supervisor $260 $234 A009 Professional 2 $180 $162 S004 Senior Site Engineer $235 $212 A010 Professional 3 $155 $140 S005 Site Engineer $215 $194 A011 Vacationer / Intern $145 $131 S006 Lead Inspector $205 $185 V001 Executive Consultant 1 $470 $423 S007 Senior Inspector $155 $140 V002 Exectutive Consultant 2 $430 $387 S008 Inspector / Specialist 1 $130 $117 V003 Senior Consultant 1 $350 $315 S009 Inspector / Specialist 2 $120 $108 V004 Senior Consultant 2 $310 $279 S010 Clerk / Specialist 3 $115 $104 V005 Consultant 1 $260 $234 S011 Senior Site Manager 1 $140 $126 V006 Consultant 2 $210 $189 S012 Senior Site Manager 2 $125 $113 V007 Consultant 3 $170 $153 S013 Senior Site Manager 3 $115 $104 B001 Lead Design Technician 1 $350 $315 S014 Senior Site Manager 4 $105 $95 B002 Lead Design Technician 2 $320 $288 S015 Operator/Labourer 1 $95 $86 B003 Lead Design Technician 3 $285 $257 S016 Operator/Labourer 2 $90 $81 B004 Senior Design Technician 1 $260 $234 S017 Operator/Labourer 3 $70 $63 B005 Senior Design Technician 2 $240 $216 D001 Business Services Manager 1 $375 $338 B006 Design Technician 1 $215 $194 D002 Business Services Manager 2 $350 $315 B007 Design Technician 2 $205 $185 D003 Senior Admin Officer 1 $300 $270 B008 Drafting/Design 1 $190 $171 D004 Senior Admin Officer 2 $260 $234 B009 Drafting/Design 2 $165 $149 D005 Admin Officer 1 $235 $212 B010 Drafting/Design 3 $150 $135 D006 Admin Officer 2 $215 $194 B011 Drafting/Design 4 $140 $126 D007 Admin Officer 3 $195 $176 B012 Intern Drafting/Design $125 $113 D008 Admin Officer 4 $170 $153 C001 Business Services Manager 1 $310 $279 D009 Admin Officer 5 $150 $135 C002 Business Services Manager 2 $265 $239 D010 Admin Officer 6 $90 $81 Finance Class Code Finance Class Code

Rate Schedule Notes GHD 2023

2023 Rate Schedule Notes

1) Rates are for employees of GHD companies.
2) An administration fee will apply to all invoices to cover in-house disbursements (Associated Project Costs) on a project. This will be charged at a rate of either:
• 6% of total professional fees
• Hourly rate of CAD $7.50 or USD $6.50
3) All travel will be invoiced at economy class rates. Lodging and meal expenses will be at cost plus agreed markup unless a per diem rate is negotiated. 4) All other project related disbursements, expenses and subcontractor costs will be invoiced with a markup of 15%.
5) Fee schedule is subject to change annually.
6) Leased and personnel vehicles, field equipment and disposable field supplies will be invoiced at established rates. Personal vehicle milage rates will be charged in accordance with government regulated standard rates.

Rate Schedule Notes GHD 2023

2023 Rate Schedule Notes

1) Rates are for employees of GHD companies.
2) An administration fee will apply to all invoices to cover in-house disbursements (Associated Project Costs) on a project. This will be charged at a rate of either:
• 6% of total professional fees
• Hourly rate of CAD $7.50 or USD $6.50
3) All travel will be invoiced at economy class rates. Lodging and meal expenses will be at cost plus agreed markup unless a per diem rate is negotiated. 4) All other project related disbursements, expenses and subcontractor costs will be invoiced with a markup of 15%.
5) Fee schedule is subject to change annually.
6) Leased and personnel vehicles, field equipment and disposable field supplies will be invoiced at established rates. Personal vehicle milage rates will be charged in accordance with government regulated standard rates.

→ ghd.com

← All documents from this meeting