STATEMENT OF QUALIFICATIONS

GEOTECHNICAL AND MATERIAL TESTING

ON-CALL PROFESSIONAL SERVICES

DEPARTMENT OF PUBLIC WORKS

ENGINEERING DIVISION
1000 GATEWAY AVENUE
SAN PABLO, CA 94806
Submitted on March 29, 2023 by:
399 Lindbergh Avenue, Livermore, CA 94551
P: (925) 315-3151
DIR #100003557
Primary Point of Contact/Project Manager:

Mr. Cristiano Melo, PE, GE
925-315-3151 ext. 110
[email protected]
Environmental, Geotechnical, Construction Services, Analytical Testing Statement of Qualifications BSK Proposal No. Z00000890
On-Call Professional Services March 29, 2023
(Geotechnical and Material Testing)
San Pablo, California

TABLE OF CONTENTS
SECTION 1. LETTER OF INTEREST / COVER LETTER ............................................................................... 1 SECTION 2. FIRM STATEMENT OF QUALIFICATIONS ............................................................................ 2

2.1 Description of BSK Associates ................................................................................................... 2

2.2 Geotechnical Engineering Services ........................................................................................... 2

2.2.1 Local Geotechnical and Geological Knowledge .................................................................. 2

2.3 Special Testing and Inspection Services .................................................................................... 3

2.4 Experience Working with Federally Funded Projects ................................................................ 4

2.5 On-Call Experience ................................................................................................................... 4 SECTION 3. STAFF STATEMENT OF QUALIFICATIONS OR RESUMES ...................................................... 5

3.1 Professional Staff ..................................................................................................................... 5

3.2 Certified Field Staff ................................................................................................................... 8

3.3 BSK’s Subcontractors ................................................................................................................ 8 SECTION 4. REFERENCES ..................................................................................................................... 9 SECTION 5. PROJECT APPROACH ....................................................................................................... 11

5.1 Approach to Geotechnical Services ........................................................................................ 11

5.2 Approach to Material Testing Services.................................................................................... 12 SECTION 6. APPROACH TO SCHEDULE OF WORK ............................................................................... 12 SECTION 7. RATE SCHEDULE ............................................................................................................. 13 Appendix A – Resumes
399 Lindbergh Avenue
Livermore CA 94551
P 925.315.3151
www.bskassociates.com 1
Environmental, Geotechnical, Construction Services, Analytical Testing - An Employee-Owned Company SECTION 1. LETTER OF INTEREST / COVER LETTER
March 29, 2023 BSK Proposal No. Z00000890
City of San Pablo
Department of Public Works – Engineering Division
1000 Gateway Avenue, San Pablo, CA 94806
SUBJECT: Statement of Qualifications for On-Call Professional Services (Geotechnical and Material Testing)
San Pablo, California
BSK Associates (BSK) is pleased to provide our Statement of Qualifications (SOQ) in response to the City of San Pablo’s (City) Request for Proposals (RFP) and Statement of Qualifications for On-Call Professional Services dated March 1, 2023 as well as Addendums #1, #2, and #3 to RFP released on March 2, 16, and 22, 2023, respectively. We understand that the City is seeking qualified firms to provide engineering and professional services for a variety of projects on an on-call basis. BSK is well qualified and interested in providing on-call geotechnical and material testing services (listed as Disciplines #5 and #7 in the RFQ) to the City, including foundation engineering, geotechnical engineering, geotechnical peer revie, GHAD engineering support, concrete mix testing, and compaction testing . BSK’s Department of Industrial Relations (DIR) registration number is 1000003557.

As a company, BSK brings over 56 years of experience in Northern California supporting public agencies.

Locally, our Bay Area team is particularly adept at providing geotechnical and material testing services to Cities and Counties through on-call agreements. About 75 percent of our Bay Area projects belong to public agencies. BSK currently holds on-call contracts with municipal and public agency clients throughout the San Francisco Bay Area including the Cities of Alameda, Belmont, Berkeley, Brentwood, Dublin, El Cerrito, Fremont, Livermore, Oakley, Pacifica, Pleasanton, San Ramon, Vallejo, and Walnut Creek, as well as Alameda and Contra Costa Counties . We also currently hold on-call contracts with the Central Contra Costa Sanitary and Hayward Area Recreation and Park Districts.

BSK’s services for this contract will be provided by our Bay Area office and laboratory located at 399 Lindbergh Avenue in Livermore, California in Alameda County. BSK’s primary point of contact and project manager for this contract will beMr. Cristiano Melo, PE, GE, who currently serves as theBranch Manager of our Bay Area office and laboratory. He has been practicing geotechnical engineering in the Bay Area for nearly 23 years and manages various on-call contracts for BSK with public agencies. Mr. Melo is authorized to negotiate and sign an agreement with the City on BSK’s behalf. Mr. Melo can be reached at 925-765- 9483 or at [email protected].

BSK has reviewed Exhibit 1 of the RFP (Template Consultant Agreement) and agrees to sign the agreement without modifications upon award of this contract. BSK is also able to meet the insurance requirements listed in Exhibit 1. We are truly excited to be considered for this contract and we are committed to providing the City with our services in a professional, cost-effective, and timely manner. If there are any questions regarding our submittal, please contact Mr. Melo. Thank you for your consideration.

Respectfully submitted,
BSK Associates
Omar K. Khan, GIT Cristiano Melo, PE, GE
Project Geologist Primary Point of Contact/Project Manager Statement of Qualifications for Geotechnical and Material Testing BSK Proposal No. Z00000890 On-Call Professional Services March 29, 2023
San Pablo, California Page 2
SECTION 2. FIRM STATEMENT OF QUALIFICATIONS

2.1 Description of BSK Associates
BSK Associates is a 100 percent employee-owned California S corporation that provides geotechnical engineering, environmental consulting, construction observation/materials testing/special inspection, and analytical laboratory services. BSK’s California Corporate number isC0514527. Founded in 1966, BSK is a California-grown company with nearly a 39-year presence in the Bay Area (Pleasanton & Livermore) since 1984. Over 75 percent of the projects BSK supports in the Bay Area are in the public sector through various on-call geotechnical and materials testing contracts. Many of our existing on-call contracts with Bay Area municipalities and public agencies have been held continuously over multiple qualification periods. Our extensive and successful public works experience is a testament to our team’s ability to be responsive to the needs of our municipal clients.

BSK currently employs a staff of approximately 200 with offices and laboratories throughout California (Livermore, Tracy, Rancho Cordova, Fresno, San Bernardino, and Bakersfield) as well as a laboratory in Vancouver, Washington. BSK is a registered public works contractor with the Department of Industrial Relations (DIR) – registration number 1000003557. BSK provides the following services, but are in no way limited to:

This contract will be serviced from our Bay Area office and laboratory located at 399 Lindbergh Avenue in Livermore, California, which staffs a total of approximately 25 employees, including 3 registered civil engineers (2 of which are also registered geotechnical engineers), 2 registered professional geologists, 2 engineers-in-training, 2 geologists-in-training, and 19 certified special inspectors and engineering technicians.

2.2 Geotechnical Engineering Services
BSK’s team of geotechnical engineers, geologists, and support staff has the technical capability to provide creative, practical, and technologically sound recommendations within a reasonable budget. We are well- equipped to provide cost-effective investigations and recommendations for many types of engineering improvement projects, ranging from independent review of geotechnical and soils reports, geotechnical engineering investigations, repair of landslide and erosion failures, to levee improvements. Our geotechnical design and recommendations experience encompasses, but is not exclusive to the following:
 Geotechnical engineering
 Foundation engineering
 Geotechnical Peer Reviews
 GHAD Support Services
 Emergency response for landslides, utility
failures, and similar improvements
 AC and concrete pavement design
 Slope stability analysis
 Retaining walls
 Geologic and seismic hazard evaluations
 General and specialized earthwork
 Hillside grading
 Site drainage
 Subgrade stabilization
 Liquefaction mitigation
 Percolation testing

2.2.1 Local Geotechnical and Geological Knowledge
Based on our prior experience at Contra Costa College and surrounding areas, the low-lying areas of the City are mainly underlain by Holocene alluvial and fluvial deposits with some older Pleistocene alluvial deposits. The hilly portion of the City is underlain by the Orinda Formation, which consists of interbedded sandstone, claystone, and conglomerate. The Orinda Formation includes materials that are weak, compressible, and are prone to landsliding and erosion. Young, unconsolidated Holocene deposits are susceptible to liquefaction during a significant seismic event along the active Hayward Fault, which runs Statement of Qualifications for Geotechnical and Material Testing BSK Proposal No. Z00000890 On-Call Professional Services March 29, 2023
San Pablo, California Page 3
along the eastern limits of the City in northwest/southeast direction, and other faults in the greater San Francisco Bay Area. Major geotechnical and geological concerns within the City limits include significant ground shaking, ground ruptures along the Hayward Fault, very high to moderate liquefaction, expansive soils, and potential for landsliding.

2.3 Special Testing and Inspection Services
Often BSK’s construction inspection and materials testing services are called on by our municipal clients to support a wide range of projects; however, the projects typically focus on roadway or underground utility/infrastructure projects as well as public facilities, such as water/wastewater treatment and conveyance facilities and public buildings. These projects generally require services such as compaction testing of subgrade, aggregate base and paving materials, and may also include special inspection of reinforced concrete, masonry, steel items, and welding – all services that we offer with our in-house staff.

As a result of our team’s broad experience, we can assist our clients by contributing knowledge and expertise to the construction quality assurance team and streamlining materials testing coordination efforts, thereby reducing the need for management by our client and eliminating costly delays that can result when materials testing personnel are unfamiliar with construction materials and/or methods.

Our Bay Area materials laboratory will provide the primary laboratory testing support for this contract and maintains accreditations throughAASHTO (AMRL/CCRL), USACE, DSA and Caltrans. Our Construction Services Group provides quality assurance/quality control observation, monitoring and testing of construction materials in accordance with the International Building Code (IBC) and California Building Code (CBC) Section 1704A.1.1. We are very knowledgeable of construction materials including soils, aggregates, asphalt, reinforcing steel, concrete, masonry, wood products, structural steel, fireproofing, and are very familiar with construction processes and methods. Our laboratory and construction services team are certified by multiple agencies including:
 American Concrete Institute (ACI)  American Welding Society (AWS)  CA Department of Transportation
(Caltrans)
 Office of Statewide Health Planning & Development
(OSHPD) CA Division of the State Architect (DSA)  International Code Council (ICC)  U.S. Army Corps of Engineers  American Society for Non-Destructive Testing (ASNT)  U.S. Bureau of Reclamation  AASHTO Materials Reference Laboratory (AMRL) BSK maintains certified and accredited materials testing laboratories in Livermore, Fresno, Rancho Cordova, and Bakersfield. Our project and contract exposure have provided our staff with extensive experience referencing Caltrans design methodology as well as Caltrans Standard Specifications and Test Methods, in addition to AASHTO and ASTM methodologies. Over the past few years, our Livermore laboratory has procured the equipment, staff and accreditations to support the testing of hot mix asphalt in accordance with Superpave methodology and the 2015/2018 Caltrans Specifications, making BSK one of the few firms in Northern California with this capability. As a result, BSK’s Bay Area office and laboratory currently holds an on-call contract with Caltrans District 4 to support their quality assurance materials testing needs.

The list below summarizes some of the standard set of tests our facilities perform, but are not limited to, in accordance with ASTM and Caltrans Test Methods.
o Soil, Aggregate, Asphalt
 Maximum dry density
 Expansion Index
 R-Value
 Plasticity index
o Masonry
 Grouted prism
 Mortar compression
 Grout compression
 Anchor pull-out
Statement of Qualifications for Geotechnical and Material Testing BSK Proposal No. Z00000890 On-Call Professional Services March 29, 2023
San Pablo, California Page 4
 Sand equivalent
 Sieve analysis
 Hveem stability
 Superpave Testing
 Hamburg Wheel Track
 Gyratory Compaction
 Asphalt content
 Hardness and abrasion
o Reinforcing Steel
 Tensile strength
 Bend test
 Sample and tag specimens
o Coatings
 Paint thickness testing
 Holiday testing
 Block compression
 Block measurement
 Block moisture/absorption
 Shrinkage
 Efflorescence
o Structural Steel
 Bolt and washer hardness
 Fireproofing density
 Bolt bend/tensile
 Weld procedures
 Charpy impact
o Concrete
 Cylinder/core compression strength
 Anchor pull-out
 Concrete cylinder/core sampling

2.4 Experience Working with Federally Funded Projects
BSK is very familiar with Caltrans Standard Plans and Specifications. Because BSK provides engineering and testing services for projects receiving federal funding on a regular basis, our systems fully comply with CFR requirements; specifically, 48 CFR Part 16.301-3. 49 CFR Part 18, and 48 CFR Part 31. BSK has the ability to conform to a Caltrans pre-award audit. BSK also has experience working with Disadvantage Business Enterprises (DBE) subcontractors, such as private utility locators, traffic control subcontractors, drillers, laboratories, soil disposal contractors, special testing and inspection subconsultants, and materials laboratory subconsultants. Therefore, we should be able to meet DBE goals, if any, specific to City projects should the need arise.

2.5 On-Call Experience
BSK has built a reputation for partnering with Public Agencies from design through construction, allowing us to identify issues and address solutions before they impact a project, saving our clients time and money.

Through our large amount of recent, local experience with other municipal and County clients providing similar on-call services, we have demonstrated our ability to provide exceptional geotechnical engineering services throughout a large service area. Further,these projects have been serviced by the same BSK key team members that we are proposing to utilize for this contract. We have provided brief descriptions of several recent projects performed through these on-call contracts below:

Since 2017, BSK has supported the City of El Cerrito with on-call services on multiple projects, including materials testing services for patch paving work as well as investigative and materials testing services for existing pavement/roadway investigations. Projects to date have included the Ohlone Greenway Improvements Project, 2018 Slurry Seal Program, Centennial Park Phase 1, Arlington/Brewster Safety Improvements, 2017 Patch Paving Project, and pavement investigations for Central / Carlson, Eureka / Lexington Streets, B Street, El Dorado Street, Richmond Street, and Gladys Avenue. REFERENCE: Gerardo Avila, Consultant Project Manager, City of El Cerrito, 925-890-9796,[email protected].

Since 2013, BSK has provided theCity of Brentwoodwith on-call geotechnical engineering services, which have included the geotechnical investigation for their Municipal Services Building, geotechnical peer review of several large residential subdivisions associated with mitigation of soil expansion distress , and materials testing services for various task orders. BSK's construction services have included observation of foundation excavations, observation and compaction testing of subgrade materials, aggregate base, and hot mix asphalt paving, as well as associated laboratory testing. Work was performed Statement of Qualifications for Geotechnical and Material Testing BSK Proposal No. Z00000890 On-Call Professional Services March 29, 2023
San Pablo, California Page 5
in accordance with the City's Quality Assurance Plan (QAP) requirements and project special provisions.

BSK was also retained by the City of Brentwood to assist in updating their QAP in accordance with the current Caltrans Local Assistance Procedures Manual. Early in 2019 and 2022, our on-call contract with the City of Brentwood came up for renewal through an RFQ process. As a testament to our performance, the City awarded BSK another on-call contract for a period of up to 3 years each time. REFERENCE: Jigar Shah, PE, Engineering Manger, City of Brentwood, 925-516-5307, [email protected].

Since 2015/2016, BSK has supported the Contra Costa County Public Works Department (Contra Costa County) with separate on-call contracts for geotechnical and materials testing services on projects ranging from emergency roadway embankment repairs associated with landslides and erosional failures, forensic evaluations of existing facilities, geotechnical investigations for new facilities (including a large jail facility), and materials testing of pavement overlay projects ( rehabilitation of San Pablo Dam Road ), new subdivision infrastructure, park improvements, replacement bridges, and multiple projects at a County airport (Buchannan Field). Both of our on-call contracts with Contra Costa County came up for renewal in 2018, 2019, 2021, and 2022 through separate RFQ processes. As a testament to our performance, Contra Costa County awarded us both on-call contracts again each time for a period of 3 years.

REFERENCE: Jenna Caldwell, PE, Senior Civil Engineer, Contra Costa County, 925-313-2020, [email protected].

In 2019, BSK was awarded an on-call geotechnical and materials testing contract with the City of Vallejo.

Since then, we have assisted the City with street overlay projects, including coring of existing pavement sections in preparation for construction bit documents as well as compaction and materials testing during construction as well as periodic compaction testing of trench backfill for water main replacement projects.

We have also been awarded a separate, project-specific contract to perform the geotechnical investigation for the City’s new Police Headquarters which is considered an Essential Services Facility.

More recently, we have assisted the City with the geotechnical investigation for a homeless shelter project. REFERENCE: Melissa Tigbao, PE,QSD/QSP, Public Works Director, City of Vallejo, 70-648-1085, [email protected].

BSK continues to work with theCity of Pleasanton through anon-call consulting services agreement (2000 to 2010, and 2013 to present). In 2018, BSK performed a peer review of the geotechnical investigation report for the City of Pleasanton for a 52-acre property that is being developed into a residential subdivision that will include 181 single-family homes. Our largest project with the City of Pleasanton was the Bernal Community Park, which is a 60-acre park that includes 3 artificial turf fields, a paved plaza, play areas, trails, drainage swales and parking and driveways. In our role as the Geotechnical Engineer-of- Record for the project, BSK provided construction observation and materials testing support in addition to geotechnical and environmental engineering. Other projects have included support forstorm damage repairs, water and sewer pipelines, roadway improvements, dog parks, and tennis and basketball courts.

REFERENCE: Adam Nelkie, PE, Assistant Director of Engineering, City of Pleasanton, 925-931-5675, [email protected].

SECTION 3. STAFF STATEMENT OF QUALIFICATIONS OR RESUMES

3.1 Professional Staff
BSK’s Bay Area personnel are highly experienced at providing on-call consulting services to municipalities and public agencies. In this section, we are providing our project team qualifications, including professional registrations, certifications, and experience and education for each team member. The team presented herein represents our key personnel; however, several additional staff members are available Statement of Qualifications for Geotechnical and Material Testing BSK Proposal No. Z00000890 On-Call Professional Services March 29, 2023
San Pablo, California Page 6
to support the contract as needed. Resumes of our key team members providing their project-specific experience are provided in Appendix A of this SOQ.

Cristiano Melo, PE, GE – Primary Point of Contact/Project Manager Years of Experience 22+ Years
Years with BSK 9+ Years
Education MS, Civil Engineering
University of Idaho, 2000
BS, Civil Engineering
University of Idaho, 1997
Professional
Registrations
Registered Geotechnical Engineer, California, No. 2756
Registered Civil Engineer, California, No. 64025
Registered Civil Engineer, Nevada, No. 27349
Key Qualifications Experience with support and oversight of geotechnical engineering and materials testing on-call agreements.

Mr. Cristiano Melo will serve as the Primary Point of Contact and Project Manager for this contract. He will be responsible for allocating the appropriate resources of BSK’s Bay Area office and laboratory to meet the demands for all services for this contract. He will work closely with each team member and will also be responsible for the quality and delivery of projects. Mr. Melo is very familiar with on-call services with municipal clients, serving as BSK’s main point of contact for BSK’s current on-call contracts with the Cities of Alameda, Belmont, Berkeley, Brentwood, Dublin, Pacifica, Oakley, and Vallejo, Contra Costa County, the Central Contra Costa Sanitary District, and the Hayward Area Recreation and Park District.

He has over 22 years of geotechnical engineering and materials testing experience supporting projects ranging from design of shallow and deep foundations to retaining walls, geotechnical peer reviews , pavement evaluation and rehabilitation studies, earthwork, hillside grading, site drainage, subgrade stabilization, slope stability analysis, and GHAD support. He is also experienced in managing construction observation and testing services. Refer to his resume for additional details.

Carrie Foulk, PE, GE – Senior Geotechnical Engineer/Senior Geotechnical Reviewer Years of Experience 22+ Years
Years with BSK 9+ Years
Education MS, Civil Engineering
University of California, Berkeley, 2002
BS, Civil Engineering
University of Washington, 1996
Professional
Registrations
Registered Geotechnical Engineer, California, No. 3016
Registered Civil Engineer, California, No. 62240
Key Qualifications Experience with support and oversight of geotechnical engineering and materials testing on-call agreements.

Ms. Carrie Foulk will assist Mr. Melo with geotechnical tasks and serve as secondary reviewer for all deliverables. Refer to her resume for additional details.

Richard Johnson, PG, CEG, HG – Principal Engineering Geologist/Geology Support Years of Experience 39 Years
Years with BSK 32 Years
Education BA, Geology
California State University, Chico, California, 1984

Statement of Qualifications for Geotechnical and Material Testing BSK Proposal No. Z00000890 On-Call Professional Services March 29, 2023
San Pablo, California Page 7
Professional
Registrations
Registered Geologist, California, No. 4611
Certified Engineering Geologist, California, No. 1452
Certified Hydrogeologist, California, No. 92
Key Qualifications Experience with geology/engineering geology support for on-call agreements.

Mr. Richard Johnson will provide as-needed geology support and oversight for this contract. Refer to his resume for additional details.

Michael Kibbey, EIT – Materials Testing Task Manager
Years of Experience 15 Years
Years with Firm 2+ Years
Education BS, Civil Engineering, California Polytechnic State University, San Luis Obispo, 2008
Professional
Registrations
Engineer-in-Training (E.I.T.), California, No. 128476
Nuclear Moisture/Density Gauge
Key Qualifications Experienced with management and support of special inspection, source inspections, and construction
materials testing projects.

Mr. Michael Kibbey will manage and coordinate material testing field services for the BSK team on this contract, including concrete mix testing and compaction testing, with duties that include coordination of administrative functions (daily field reports and document control) while serving as liaison to BSK’s office and laboratory testing staff. Refer to his resume for additional details.

James Auser, PE – Senior Materials Engineer/Responsible Materials Engineer Years of Experience 28+ Years
Years with Firm 13 Years
Education BS, Civil Engineering, California State University, Chico, 1994
Professional
Registrations
Civil Engineer, California, No. 59941
ACI Field Testing Technician Grade I
ICC - Reinforced Concrete, Structural Masonry,
Prestressed Concrete
Nuclear Moisture/Density Gauge
Key Qualifications Materials Engineer specializing in concrete construction and their constituents. Soils and Materials Laboratory
Manager
Mr. James Auser will serve as the Responsible Materials Engineer for this contract, providing primary oversight for BSK’s technical staff in the field and laboratory.Refer to his resume for additional details.

Randy Cortez – Materials Laboratory Manager
Years of Experience 16+ Years
Years with BSK 5+ Years
Education Antelope Valley College, Lancaster, California, 2000-2003 California State University, Northridge, California, 2003-2004 Professional
Registrations
Various NICET Certifications
ACI -Concrete Field Testing
ACI -Strength Testing

Statement of Qualifications for Geotechnical and Material Testing BSK Proposal No. Z00000890 On-Call Professional Services March 29, 2023
San Pablo, California Page 8
OSHA 10-hour Construction
Various Caltrans Test Methods, and Superpave AAHSTO
and ASTM test methods
Key Qualifications Experienced in laboratory testing of soils, asphalt, concrete and steel materials. Very experienced with
Caltrans test methods and Superpave methodology.

Mr. Randy Cortez will be responsible for oversight, execution, and the timely delivery of all materials laboratory testing for this contract. Refer to his resume for additional details.

3.2 Certified Field Staff
Provided below is a matrix showing our certified field staff’s capabilities for our Bay Area office. Their qualifications and resumes are available upon request.

INSPECTOR
EAR
HMA
ACI
RC
MAS
PC
CWI
SSW
SSB
FP
Tim Rodriguez X X X X X X X
James Auser, PE X X X X X X
Randy Cortez X X X
Matt Lagerstrom X X
David Eckhardt X X
Dennis Ness X X X X X X X X
Keven Evans X X X X X
Ken Clark X X X
Scott Orr X X X
Michael Romero, PG X X
Kou Yang, GIT X X X
Omar Khan, GIT X
Don Steckbar X X X X
Marvin Pohl X X X X X X
Legend: EAR = Earthwork/Soil
HMA = Hot Mix Asphalt/AC
Pavement
ACI = Concrete
Sampling/Testing
MAS = Masonry
CWI = AWS Certified Welding Inspector
SSW = Structural Steel Welding
SSB = Structural Steel Bolting
FP = Fireproofing
RC = Reinforced Concrete
PC = Pre-stressed Concrete

3.3 BSK’s Subcontractors
The table below lists most of the subcontractors we anticipate using for geotechnical investigation-related services for this contract. BSK has a good working relationship and many years of experience successfully working with the subcontractors listed below. We anticipate performing all our materials testing services in-house. We do not anticipate using any subconsultants for geotechnical, special testing, and inspection services for this contract unless we are required to do so to meet project-specific DBE goals.

Statement of Qualifications for Geotechnical and Material Testing BSK Proposal No. Z00000890 On-Call Professional Services March 29, 2023
San Pablo, California Page 9
SECTION 4. REFERENCES
As requested in the RFQ, below are five projects in progress or completed that BSK has worked on in the past 5 years, which include geotechnical, material testing, or both disciplines.

OAKHURST GEOLOGICAL HAZARD ABATEMENT DISTRICT (GHAD), CLAYTON, CA Discipline: Geotechnical
Client: Theis Engineering & Associates
Owner: City of Clayton
BSK Project Manager: Cristiano Melo, PE, GE
BSK Key Team Members: Cristiano Melo, Richard Johnson, and Carrie Foulk
Project Type: GHAD geological and geotechnical services Project Dates: 2022 - Present
Reference: Theis Engineering & Associates (City of Clayton Engineer), Larry Theis, PE, President, 4309 Rose Lane, Concord, CA 94518, 925-890-9732, larry@theis- engineering.com
Brief Project Description:

BSK is currently providing geological and geotechnical support services for the Oakhurst GHAD to the City of Clayton. In 2022, BSK took over the role from the previous geotechnical firm. To date, we have reviewed numerous existing geological and geotechnical data that the GHAD has on file, conducted a site reconnaissance of the GHAD areas in early Decemeber 2022 prior to recent winter storms, subsequent site reconnaissances of select areas in January and March 2023 after winter storms, and presented to the City Council about our initial findings, observations, and recommendations.

STORM DAMAGE EMERGENCY RESPONSE, MULTIPLE SITES, BELMONT, CA Discipline: Geotechnical
Client/Owner: City of Belmont
BSK Project Manager: Cristiano Melo, PE, GE
BSK Key Team Members: Cristiano Melo, Richard Johnson, and Carrie Foulk Project Type: Emergency response geological/geotechnical services Project Dates: January 2023 to present
Reference: City of Belmont (Client), Mr. Peter Brown, Director of Public Works, 1 Twin Pines Lane, Belmont, CA 94002, 650-595-7459, [email protected] Supporting Subcontractors and Respective Roles California Entity Number DIR Number
Taber Drilling – Drilling and CPT Services C3049687 1000010556 Exploration GeoServices – Drilling Services C1278437 1000030055 Middle Earth Geo Testing – CPT Services C2945659 1000016730 Statewide Traffic Safety and Signs – Traffic Control Services C3490603 1000001109 1st Call Utility Locating – Utility Locating Services 201522910104 1000063966 Geotech Utility Locating – Utility Locating Services 200413910194 1000021395 Cooper Testing Laboratory – Laboratory Testing and Analyses C1679629 N/A CERCO Analytical – Laboratory Corrosivity Testing C1769681 N/A

Statement of Qualifications for Geotechnical and Material Testing BSK Proposal No. Z00000890 On-Call Professional Services March 29, 2023
San Pablo, California Page 10
Brief Project Description:

BSK staff visited multiple sites throughout the City of Belmont affected by storm damage during the January 2023 storms. The visits were performed immediately after the damage occurred and included visited performed on weekends and holidays. The sites visited included residential areas and a trail impacted by slope debris and earth flows. Temporary repair recommendations addressed protection against further damage, such as use of k-rails, plastic tarps, and sandbags and long-term repair recommendations, such as improving site drainage, installing retaining walls, and slope protection.

CITY OF DUBLIN ON-CALL SERVICES GEOTECHNICAL/MATERIALS TESTING, DUBLIN, CA Discipline: Geotechnical and Material Testing
Client/Owner: City of Belmont
BSK Project Manager: Cristiano Melo, PE, GE
BSK Key Team Members: Cristiano Melo, Carrie Foulk, Michael Kibbey, James Auser, and Randy Cortez
Project Type: Roadways and parks
Project Dates: 2004 to present
Reference: City of Dublin (Client), Ms. Rosemary Alex, Parks and Facilities Development Coordinator, 100 Civic Plaza, Dublin, CA 94568, 925-833-6646, [email protected]
Brief Project Description: BSK has held an on-call contract with the City of Dublin since 2007, Representative projects and services performed under the contract have included theAnnual City Street Overlay Programs in 2015, 2018, 2020, and 2022 where BSK provided subgrade, aggregate base compaction testing and observation, laboratory testing of import fills and asphalt, and hot-mix asphalt acceptance testing per Caltrans standard processes, construction observation/materials testing services for significant roadway improvements, such as Dougherty Valley Road in 2015, other storm drain system improvements, additional parks and slope repair types of projects, such as the Emerald Glen Aquatic Center (now known as The Wave) in 2015-2017, the Sean Diamond Park Improvements in 2018, the Clover Park in 2019-2020; and foundation construction, anchor installation and welding inspection for multiple art sculptures.

CITY OF WALNUT CREEK ON-CALL YGNACIO VALLEY ROAD REHABILITATION, WALNUT CREEK, CA Discipline: Material Testing
Client/Owner: City of Walnut Creek
BSK Project Manager: Michael Kibbey
BSK Key Team Members: Michael Kibbey, James Auser, and Randy Cortez Project Type: Roadway Rehabilitation
Project Dates: July 2021 to January 2022
Reference: City of Walnut Creek (Client), Alex Wong, PE, Associate Civil Engineer, 1666 North Main Street, Walnut Creek, CA 94596, 925-943-5899, ext. 2239, wong@walnut- creek.org
Brief Project Description: BSK provided Quality Assurance (QA) testing services as part of our City of current Walnut Creek on-call contract. For the rehabilitation project of Ygnacio Valley Road, services included observation, sampling, and field density testing during subgrade preparation and placement of aggregate base, cold in-place recycling of asphalt pavement, hot mix asphalt (HMA). All work was performed in accordance with Caltrans specifications and the Cities Quality Assurance Plan.

Statement of Qualifications for Geotechnical and Material Testing BSK Proposal No. Z00000890 On-Call Professional Services March 29, 2023
San Pablo, California Page 11
PHASE 1 – WATER TRANSMISSION MAINS & PUMP STATION IMPROVEMENTS, PHASE 2 – WASTEWATER

TREATMENT PLANT EFFLUENT OUTFALL PIPELINE, TRACY, CA
Discipline: Special Inspections/Material Testing
Project Type: Pipelines/wastewater treatment plant
Client/Owner: City of Tracy
Contact Person: Kul Sharma, PE, Director of Utilities, 333 Civic Center Plaza, Tracy, CA 95376, 209-831-6338, [email protected]
BSK Project
BSK Key Team Members: Jim Auser and Randy Cortez
Project Timeline: Phase I: January 2019 – March 2020, Phase II: May 2020 – May 2022.

Project Description: BSK’s scope supports $24 million of improvements to include within and connections to the City’s wastewater treatment plant, across roadways, agricultural and unimproved and unincorporated property. For BSK, it involves a combination of specification and test requirements (ASTM and Caltrans). Phase 1 of this project included the installation of approximately 6,000 linear feet of 30- inch diameter pipe and 17,500 linear feet of 25-inch diameter pipe from the recycled water pump station within the City’s wastewater treatment plant, across agricultural and unimproved property and roads (owned by the City and County). Phase 2 (underway) includes the installation of an additional 10,000 linear feet of 24-inch diameter pipe.

SECTION 5. PROJECT APPROACH
BSK understands that the City is looking for a Consultant that will be on-call, part of the team, and able to work with City project managers and the City inspectors. The specific purpose of the selected consultant’s services is to providegeotechnical and material testing support on City capital improvement projects and private developments where public improvements are being constructed to assure performance in accordance with City plans and specifications, Caltrans Standard Specifications and Test methods, or other appropriate standards as identified for each specific project. We understand that due to the nature of the various projects anticipated by the City, flexibility and responsiveness are imperative for project success.

We also understand that BSK must be able to provide properly trained, experienced and credentialed individuals, likely with short notice, for each of the anticipated project types. BSK’s administrative processes, including dispatch, client communication, reporting and accounting must meet the needs of the City, and State or Federal guidelines, as needed, to accomplish the work for the City. We do a significant amount of research for our projects to make sure that we are providing a comprehensive yet cost-effective scope of services. For example, prior to providing a geotechnical investigation proposal, we review available geologic maps, seismic hazard maps, seismic accelerations, groundwater information, aerial photographs, and previous geotechnical investigation reports when available. For a materials testing and inspection proposal, we will carefully review the project plans and attempt to obtain a project schedule in order to provide a fee estimate that is as accurate as possible.

5.1 Approach to Geotechnical Services
A typical geotechnical investigation will include similar items regardless of the project being investigated.

All projects will start with a proposal and cost estimate, during which we will work closely with City staff to understand the requested scope of services to provide a cost effective yet thorough investigation. After notice to proceed our approach and work plan will include:
 Project Set-up, Data Review, Site Reconnaissance and Permitting  Subsurface Investigation and Laboratory Testing

Statement of Qualifications for Geotechnical and Material Testing BSK Proposal No. Z00000890 On-Call Professional Services March 29, 2023
San Pablo, California Page 12
 Analysis and Report Preparation
BSK sometimes issues a technical memorandum presenting our initial findings and preliminary design recommendations within one to two weeks of performing our geotechnical investigations. Thisallows our clients and the rest of the design team to continue moving forward with their projects to meet the project’s schedule, while at the same time allowing them an opportunity to provide input on our final recommendations before we issue our final reports. We often follow our reports with post-report consultation services to provide additional input during the design phase of our projects.

5.2 Approach to Material Testing Services
BSK understands that the City is looking for an inspections firm that will be on-call and responsive, part of the team working with City personnel to provide onsite and offsite materials testing and special inspections to assure quality in compliance with all appropriate standards as identified for each specific project. Each task order will be estimated and proposed to the appropriate City representative upon request and will typically follow the methodology outlined below.  Proposal and Cost Estimate – Work closely with City staff to understand scope of services to provide complete testing and special inspection services in accordance with the Quality Assurance Plan (QAP)/Project requirements in a cost-effective manner.  Project Set-up and Coordination – Participate in the project pre-construction meeting, as appropriate; brief field and laboratory technical staff of project requirements and communication lines; set-up project in BSK’s automated report processing and distribution system – MetaField ©.  Observation and Testing Services – Respond to service request with 1-Day notice for materials testing services.
o Materials Sampling (Plant and/or Field) -- Coordinate materials sampling with project team and suppliers, as needed.
o Compaction Testing and Observation Services – Provide testing in accordance with Caltrans or ASTM standards, as required, on subgrade, aggregate base, HMA pavement, cement-treated base, concrete and lime-treatment.
 Laboratory Testing Services -- Provide comprehensive materials testing in accordance with project requirements and material standards and provide test reports within 1 day of test completion (during construction) and engineering review.  Reporting – Provide daily field reports onsite, preferably in a digital format to the designated project representative.

SECTION 6. APPROACH TO SCHEDULE OF WORK
We realize the importance of timely service – from a quick response to requests for cost or scope of services for a Task Order -- through prompt and accurate dispatch, reporting of test results, and addressing any non-conformance items. For service requests, many agencies choose to issue service requests for task orders on a day-to-day basis. When this is the case, our management team will work with our dispatcher to coordinate staffing as service requests are made. We typically request a 24-hour lead time for scheduling requests but are often able to support “emergency” requests with as little as a 4-hour notice.

As an example, we were contacted by the City of Belmont in the evening of 12/31/2022 (a Saturday) to perform an emergency site visit the next morning to observe and provide repair recommendations for storm-related damages. Our representative was on-site by 7:00 am the next day (1/1/2023, a Sunday).

Statement of Qualifications for Geotechnical and Material Testing BSK Proposal No. Z00000890 On-Call Professional Services March 29, 2023
San Pablo, California Page 13
For each task order that is assigned to our team, we will maintain a master list of inspectors or technicians who are cleared for the contract and for what purposes. At other times, agencies may request, or specific projects may require, that a regular presence with the project team be maintained by particular materials testers and/or special inspectors. When this is the case, service coordination can be completed through our field personnel, if acceptable to the City. In either case, our team strives to dispatch the same project team members to a given project for greater efficiency. Field personnel are available by smart phones and carry tablets, therefore they will be able to access documents sent by our dispatcher and project management team to support their field work via our cloud-based field/lab database, MetaField ©.

It has been our experience with public works projects that the volume and pace of work rise and fall over the course of the year. Although the potential for emergency work is present throughout the year, projects that have longer durations, have been in planning for a significant time, or may be sensitive to poor weather tend to begin earlier in the year and extend into or through the summer months. Late summer and fall months lend themselves to the “paving season” and often result in an increase in service needs. The service needs required for the materials testing and inspection services for the City will be truly dependent on the types of projects, pace of work, and quantity of concurrent task orders issued. Our experience with the City of Pleasanton and similar public agency on-call contracts is that service needs may require anywhere from 1 to 3 staff members at any given time. BSK is prepared to support this workload with additional staff as required.

As an example of our attention to schedule, we can fast-track our geotechnical projects, by scheduling our drilling operation and beginning the drilling permit process as soon as possible after we are given authorization to proceed, as these two items can hold up the geotechnical investigation if not started immediately. In addition, we often provide a preliminary technical design memorandum shortly after field exploration is completed so that the design team can move forward with certain aspects of the project without waiting for finalized laboratory testing and a formal report. When the project requires laboratory testing, BSK can be extremely responsive as we maintain AASHTO / Caltrans-approved laboratories in Livermore, Fresno, and Bakersfield.

SECTION 7. RATE SCHEDULE
BSK’s proposed rate schedule for this contract is presented below. The schedule includes our job titles, with hourly rates, test and equipment fees, other fees, and subcontractor/vendor markup. Our rates will be valid through June 30, 2024. They will then be increased yearly thereafter by 3 percent or the Consumer Price Index (CIP) for the San Francisco Bay, whichever is higher.

Statement of Qualifications for Geotechnical and Material Testing BSK Proposal No. Z00000890 On-Call Professional Services March 29, 2023
San Pablo, California Page 14

Statement of Qualifications for Geotechnical and Material Testing BSK Proposal No. Z00000890 On-Call Professional Services March 29, 2023
San Pablo, California Page 15

Statement of Qualifications for Geotechnical and Material Testing BSK Proposal No. Z00000890 On-Call Professional Services March 29, 2023
San Pablo, California

APPENDIX A

RESUMES
Cristiano Melo, PE, GE – Primary Point of Contact/Project Manager Professional Background:

Mr. Cristiano Melo will serve as the Primary Point of Contact/Project Manager for BSK’s services for this contract. He is a licensed Civil and Geotechnical Engineer in the State of California with over 22 years of engineering experience throughout the San Francisco Bay Area and Central Valley, supporting projects from design of shallow and deep foundations to retaining walls, pavement rehabilitation studies, earthwork, hillside grading, site drainage, subgrade stabilization, geotechnical peer reviews, and slope stability analysis.Mr. Melo currently manages BSK’s on-call geotechnical engineering services contracts with the Cities of Dublin, Alameda, Belmont, Berkeley, Brentwood, Oakley, Walnut Creek, and Vallejo, and with Central Contra Costa Sanitary District, the Contra Costa County Public Works Department, and the Hayward Area Recreation and Park District. His experience also includes geotechnical investigations and materials testing for numerous public works/capital improvements projects.

Relevant Project Experience:

City of Clayton, Oakhurst Geological Hazard Abatement District (GHAD), Clayton, CA – Project manager and lead geotechnical engineer for providing geological and geotechnical services to the Oakhurst GHAD.

City of Oakley, Geotechnical Peer Reviews, Oakley, CA – Project manager and lead geotechnical engineer for the geotechnical peer review of numerous projects, including large residential subdivisions, levees, commercial facilities, and public facilities.

City of Belmont, Storm Damage Emergency Response, Belmont, CA – Project manager and lead geotechnical engineer for BSK’s storm damage emergency response to multiple sites at the City of Belmont during the January 2023 storms.

City of Oakley, Oakley Recreation Center, Oakley, CA – Project manager and lead geotechnical engineer for the geotechnical investigation and construction monitoring services for a new recreation center in Oakley. The project included two approximately 10,000-square foot buildings, an amphitheater, an athletic field with natural turf, hardscape, bleachers, and other associated improvements.

City of Brentwood, Sand Creek Road Extension, Brentwood, CA– Mr. Melo serves as geotechnical engineer-of-record and Project Manager for the City of Brentwood’s extension of Sand Creek Road. The geotechnical engineering for the initial phase of this project included subsurface investigation for approximately 0.5 miles of roadway extension, underground utilities to include a roadway sewer line, multiple water lines, as well as geotech investigation for a single-span vehicular bridge over Sand Creek which will be wide enough to accommodate two traffic lanes and a bike lane in each direction of traffic.

City of Brentwood, Municipal Service Center/Public Works Administration Building, Brentwood, CA – Mr. Melo served as Project Manager for the bridging documents of a new administration building. The project consisted of an approximately 14,000 square foot, 1-story, L-shaped building with a slab-on-grade floor. BSK also provided geotechnical observation and testing services during construction of the new building.

City of Brentwood, Lone Tree Way Improvements, Brentwood, CA– Mr. Melo served as Project Manager and geotechnical engineer-of-record for this project of which expands Lone Tree Way from an existing 2 Qualifications
Registrations:
- Geotechnical Engineer,
California, No. 2756,
2007
- Civil Engineer,
California, No. 64025,
2002
- Civil Engineer, Nevada,
No. 27349, 2020
Education:
- MS, Civil Engineering,
University of Idaho, 2000
- BS, Civil Engineering,
University of Idaho, 1997
Experience:
- BSK Associates
Livermore, California
2013 to present
- Kleinfelder
Pleasanton, California
2000 to 2013
- Idaho Transportation
Department
Caldwell, Idaho

Cristiano Melo, PE, GE – Primary Point of Contact/Project Manager lane to 4 lane arterial roadway.BSK’s scope also included a subsurface investigation for widening a portion of Smith Road from one to two lanes and widening a portion of O’Hara Lane.

City of Brentwood, Geotechnical Peer Review for Shea Homes and Shea Trilogy Subdivisions, Brentwood, CA – Mr. Melo performed a peer review of the soil/bedrock expansion mitigation for two subdivisions as part of BSK’s on-call geotechnical on-call contract with the City. The objective of the peer review was to provide an independent assessment of the mitigation measures recommended by the Geotechnical Engineers-of-Record for the two subdivisions. The mitigation measures included overexcavation of surficial expansive soils and replacement with less expansive soils, proper moisture conditioning, and use of mat foundations and post-tensioned slabs designed to resist soil expansion.

City of Vallejo, New Police Headquarters, Vallejo, California – Mr. Melo served as the Project Manager and lead geotechnical engineer for the geotechnical investigation for this project. An existing 15-year-old 2-story commercial building having a footprint area of approximately 30,000 square feet is being seismically-retrofit to a Risk Category IV, Essential Services Building. Site challenges include shallow groundwater and long-term settlement associated with Bay Mud. To address these challenges, the new building additions will be supported on deep foundations consisting of drilled piers and raising site grade via placement of new fill will be kept to a minimum.

Contra Costa County, Happy Valley Road Embankment Repair, Contra Costa County, CA– Mr. Melo was the lead geotechnical engineer and project manager for the geotechnical investigation for this project. A landslide removed the asphalt-paved shoulder and a portion of the northbound lane on Happy Valley Road adjacent to an intermittent creek located approximately 1,000 feet southeast of the intersection with Bear Creek Road in unincorporated Contra Costa County. Slope stability analyses were performed for various repair options.

Contra Costa County Public Works Department, Alhambra Valley Road Embankment Repair, Contra Costa County, CA – Mr. Melo was the lead geotechnical engineer for the geotechnical investigation for this project. A landslide removed the asphalt-paved shoulder and a portion of the eastbound lane on Alhambra Valley Road. BSK conducted a field investigation to explore and evaluate the surface and subsurface conditions at the project site to provide geotechnical recommendations for the repair of the roadway segment damaged by the landslide. Slope stability analyses were performed for various repair options. BSK also provided construction observation and testing services during construction of the repair, which consisted of realigning the roadway segment away from the landslide in order to reestablish the roadway alignment.

City of Benicia Park Road Improvements, Benicia, CA – Mr. Melo is the lead geotechnical engineer and project manager for the geotechnical investigation for this project. The project is located within an approximately 5,800-foot segment of Park Road extending between I-780 and Bayshore Road in Benicia, California. The planned improvements include construction of a bicycle lane parallel to the roadway, an approximately 80-foot-long pre-manufactured pedestrian/bicycle bridge, new storm drain facilities for the new bicycle facility, and pavement rehabilitation.

City of Tracy, El Pescadero Park Multi-Generational Recreation Center, Tracy, CA – Mr. Melo serves as Project Manager for the one-story, 30,000 sf facility planned on a 15-acre site at El Pescadero Park. It is anticipated that the project will include a gymnasium/multi-purpose court; outdoor recreation opportunities (i.e., lighted sport courts, skate park, inclusive playground); multi-purpose space(s); library and technology/education space(s); teaching (commercial) kitchen; and natural and artificial turf fields.

BSK’s geotechnical investigation consisted of performing subsurface explorations to characterize the soils conditions to include addressing liquefaction potential. BSK’s scope also included conducting percolation tests and testing the existing soils for future landscaping.

Carrie L. Foulk, PE, GE – Senior Geotechnical Engineer/Reviewer Professional Background:

Ms. Carrie Foulk will serve as the senior geotechnical engineer for BSK’s services for this contract, assisting Mr. Melo with geotechnical reviews and project scopes.

She is a licensed Geotechnical Engineer in the State of California with over 22 years of geotechnical experience in the San Francisco Bay Area, providing geotechnical engineering consulting for public and private sector clients, including cities, counties, municipalities, and school districts. Her expertise covers many levels of project responsibility including scoping, conducting field and laboratory investigations, performing engineering analyses, preparing reports, and coordinating and providing construction services. She has been the main point of contact for BSK’s on-call contracts with Cities of Pleasanton and Livermore and Alameda County Public Works Agency.

Relevant Project Experience:

City of Livermore On-Call Geotechnical and Materials Testing –Ms. Foulk is the project manager of the On-Call Geotechnical Engineering and Materials Testing and Inspection Contract with the City of Livermore. The contract consists of providing materials testing and inspection, geotechnical engineering investigations, and environmental consultation.

City of Brentwood, Municipal Services Center, Brentwood, CA – Ms. Foulk served as the senior reviewer for the geotechnical investigation for this project, which included the construction of an approximately 14,000 square-foot, 1-story, L-shaped administration building. Prior to the start of construction, a 1-story, approximately 2,000 square foot building located within the footprint of the new building had to be demolished. BSK provided construction testing services for this project.

Central Contra Costa Sanitary District, Plant Operations Building, Server Room Addition, Martinez, CA – Ms. Foulk conducted a geotechnical investigation for the construction of a new server room on the south side of the existing building at the Central San facility measuring approximately 39 feet by 21½ feet. The geotechnical investigation only consisted of a single soil boring while using existing available data on-site.

City of Pleasanton, West Las Positas Boulevard Pavement Investigation, Pleasanton, CA – Ms. Foulk was the lead geotechnical engineer and project manager for this project to determine potential reasons behind the settlement and cracking experienced along the roadway. BSK conducted a field investigation that included drilling 19 soil borings to variable depths throughout the roadway to characterize the subsurface conditions.

Various laboratory tests were also carried out on the soil sampled. Selective mitigation measures were provided to address the settlement and cracking.

City of Pleasanton, All Abilities Playground at Ken Mercer Sports Park, Pleasanton, CA – Ms. Foulk is the lead geotechnical engineer and project manager for this project during the geotechnical investigation for the planned improvements at the park. The all-abilities playground will be approximately 1½ acres consisting of shade structures, playground equipment, a restroom building, picnic areas, and associated flatwork.

City of Pleasanton, Independent Geotechnical Peer Review, Kiewit Property, Pleasanton, California –Ms.

Foulk conducted a geotechnical peer review of the project for the City of Pleasanton, as part of BSK’s geotechnical on-call contract with the City, for 181 single-family residential development and associated improvements. The City was concerned because the site included up to 40 feet of soft, undocumented clay fill within a previous quarry. BSK’s peer review included reviewing previous and current geotechnical Qualifications
Registrations:
- Geotechnical
Engineer, California,
No. 3016, 2013
- Civil Engineer,
California, No. 62240,
2001
Education:
- MS, Civil
Engineering,
University of
California, Berkeley,
2002
- BS, Civil Engineering,
University of
Washington, 1996
Experience:
- BSK Associates,
Livermore, California
2013 to Current
- Kleinfelder,
Pleasanton, California
2011 to 2013
- Independent
Consultant,
Livermore, California
2006 to 2011
- Kleinfelder,
Pleasanton, California
1998 to 2006

Carrie L. Foulk, PE, GE – Senior Geotechnical Engineer/Reviewer reports for the site as well as recommendations for mitigation of the soft clay fill, such as mitigating differential fill across individual mat foundations.

Stanislaus County Public Works, Warnerville Road and Bentley Road, Full-Depth Reclamation Design Project, Stanislaus County, CA – Ms. Foulk conducted a geotechnical investigation for Stanislaus County Department of Public Works to provide recommendations for full-depth reclamation of 9 miles of roadway.

The subsurface investigation consisted of a combination of borings, test pits, and dynamic cone penetration tests. Ms. Foulk directed lab testing that included R-Value testing and cement-treated soil compression tests to provide the full-depth reclamation design. Complications included large gravels and cobbles underlying a significant portion of Warnerville Road.

Alameda County Public Works, Crow Canyon Culvert Replacements, Alameda County, CA – Ms. Foulk conducted a geotechnical investigation for the replacement of three culverts underlying Crow Canyon Road in an unincorporated area near Castro Valley. The investigation consisted of drilling six borings and recommendations included pipe foundation/backfill and pipe settlement, as well as temporary shoring and dewatering recommendations.

Alameda County Public Works, Crow Canyon Road Shoulder Repair, Alameda County, CA – Ms. Foulk conducted a geotechnical investigation for the mitigation of a slope failure along the shoulder of Crow Canyon Road in Alameda County. BSK’s investigation consisted of a boring within the roadway and a geologic site visit. Recommendations included a soldier pile and lagging wall or embankment reconstruction.

Old Alameda Creek, South Levee Floodwall Improvements Between Union Pacific Railroad and Union City Boulevard, Union City, CA – Ms. Foulk conducted a geotechnical investigation for Alameda County Flood Control and Water Conservation District to provide recommendations for an approximately 1,100 feet long floodwall along Old Alameda Creek. The geotechnical investigation consisted of drilling three soil borings using a combination of hollow stem and rotary wash drilling methods.

Alameda County Flood Control and Water Conservation District, Water Channel Zone 12, Line M Improvements, Oakland, CA – Ms. Foulk conducted a geotechnical investigation for the widening of a trapezoidal-shaped, unlined channel. The widening will be achieved through the use of cantilever walls.

Challenges for the project included liquefiable layers throughout the subsurface, as well as nearby existing buildings that increased the axial and lateral design loads on the proposed wall. The project will include construction of a prefabricated bridge adjacent to existing UPRR tracks . BSK is the prime design consultant on this project. BSK’s team of worked closely with the District, UPRR, and the adjacent property owners while also addressing the difficult subsurface conditions.

City of Daly City, Sewer Replacement Project, Daly City, CA – Ms. Foulk conducted a geotechnical investigation for the installation of approximately ½ mile of new sewer pipe within four different City streets. The investigation consisted of drilling borings within City streets which requires an encroachment permit and traffic control. Recommendations for both cut-and-cover and trenchless methods were provided.

Contra Costa Water District Pumping Plants 2, 3, & 4 Improvements, Oakley and Antioch, CA– Ms. Foulk conducted a geotechnical investigation for new equipment pads, designed to support large excavators, at three pumping plants within the Contra Costa Water District. The pads were constructed on sloping ground and the design took into consideration the adjacent pumping plants and existing canal walls, as well as loose sands and expansive near surface soils.

Richard Johnson, PG, CEG, HG – Principal Engineering Geologist PROFESSIONAL BACKGROUND:

Mr. Johnson will provide geology support for this contract. He has nearly 40 years of experience practicing engineering geology in northern California. His professional expertise ranges from assessment and mitigation of slope instability and erosion problems associated with hillside grading, through environmental assessment, regulatory compliance and implementation of site clean-up and site closure. He is very familiar with the geological formations and related geohazards throughout Bay Area. Mr. Johnson is currently the principal engineering geologist for BSK as BSK provides services to the City of Clayton’s Oakhurst Geological Hazard Abatement District (GHAD) . He has also recently provided emergency response services to the City of Belmont as part of BSK’s on-call geotechnical contract with the City.

RECENT RELEVANT EXPERIENCE:

City of Pleasanton, Yolanda Court Storm Drain Outfall Repairs, Pleasanton, CA – Mr.

Johnson was the lead engineering geologist for the project. An 18-foot-high scarp was created due to erosion along the slope near the storm drain outfall because of heavy rainfall, damaging an existing 36-inch corrugated metal pipe. BSK provided emergency repair recommendations for the project.

City of San Ramon, Old Ranch Road Pavement Distress, San Ramon, CA – Mr. Johnson was the lead engineering geologist for this project. The City requested BSK to evaluate the potential causes of pavement distress along a segment of Old Ranch Road slightly south of the intersection with Bent Creek Drive. The distress in the pavement included a depression with longitudinal cracking up to about ½-inch wide and up to about 1-inch vertical offset. Additionally, a screen wall located at the crest of the slope was showing signs of movement.

City of Berkeley, Wildcat Canyon Road Slope Failures, Berkeley, CA – Mr. Johnson was the lead engineering geologist for this project. BSK conducted a geotechnical investigation for the City to provide emergency repair recommendations for various locations along Wildcat Canyon Road where slope failures occurred due to heavy rainfall in the area. Mr. Johnson conducted a geologic site reconnaissance of the slope failures.

Alameda County Public Works Agency, Crow Canyon Road MM 3.2 Shoulder Repair, Alameda County, CA – Mr.

Johnson is the lead engineering geologist for this project where a landslide has impacted the shoulder of the roadway, removing approximately 4 feet of the shoulder. The landslide measures approximately 45 feet in length along its head scarp and extending all the way down to Crow Creek. BSK is providing geotechnical and geological services for re-establishing the roadway shoulder affected by the landslide.

Contra Costa County Public Works, San Pablo Dam Road Rehabilitation Project, Contra Costa County, CA – Mr.

Johnson was the lead engineering geologist for this project that extends about 4.5 miles between the intersection with Wildcat Canyon Road/Bear Creek Road to the south and City of Richmond city limits to the north. At several locations along this alignment, the roadway embankment exhibits local slope failures and local pavement distress along its eastern embankment. The County intends to rehabilitate the roadway’s pavement surface and perform roadway embankment repairs based on the findings and recommendations of our investigation. Field investigation included pavement survey, geologic reconnaissance, geotechnical borings, and deflection testing.

Contra Costa County Public Works Department, Alhambra Valley Road Embankment Repair, Contra Costa County, CA – Mr. Johnson was the lead engineering geologist for the geotechnical investigation for this project. A landslide removed the asphalt-paved shoulder and a portion of the eastbound lane on Alhambra Valley Road. BSK conducted a field investigation to explore and evaluate the surface and subsurface conditions at the project site to provide geotechnical recommendations for the repair of the roadway segment damaged by the landslide. Slope stability analyses were performed for various repair options. The roadway segment was realigned away from the landslide.

BSK provided limited construction observation and testing services during realignment of the roadway.

Qualifications
Registrations:

Certified Engineering
Geologist, CA No. 1452
Certified Hydrogeologist, CA
No. 92
Registered Geologist, CA No.
4611
Education:

BS, Geology, California State
University, Chico, 1984
Experience:

BSK Associates, 1990 –
Present
Dames & Moore, 1989 –
1990
Seidelman Associates, 1983
– 1989

Michael Kibbey –Materials Testing Task Manager
Professional Background:

Mr. Kibbey will serve as the Materials Task Manager for this contract. Mr. Kibbey joined the BSK team as a senior materials project manager and is now serving as the Livermore Construction Services Group Manager and has nearly 15 years of experience in materials testing and special inspection services involving pavement, masonry, pre-cast concrete, earthwork, foundations, reinforcing steel, concrete, load testing of post-installed anchors/dowels, structural steel, and welding, to name a few. His portfolio of projects includes Caltrans projects, roadways/highways, bridges, rail, soil nail, tie-back, and gravity walls, mass grading, deep and shallow foundations, and hot mix asphalt pavements.

Select Project Experience:

City of San Ramon, On-Call Materials Testing & Construction Inspection Consulting Services, San Ramon, CA – Mr. Kibbey is serving as a Project Manager providing on-call materials testing and construction inspection consulting services for the City of San Ramon through various task orders. Services include grading, paving, minor concrete work, installation and backfill of utilities, welding inspection, and full-depth reclamation (FDR). All work was performed in accordance with Caltrans project special provision requirements, and the City’s Quality Assurance Program (QAP). Projects included the San Ramon Annual Pavement Rehabilitation projects for 2021 and 2022 (completed), Alcosta Boulevard Pavement Rehabilitation (completed), and Crow Canyon Road Widening (ongoing).

City of Orinda, 2021 Annual Pavement Rehabilitation, Materials Testing Services, Orinda, CA –Mr. Kibbey served as the materials testing Project Manager for the City of Orinda 2021 pavement rehabilitation program. BSK was part of the Construction Management Team and worked with the Resident Engineer to provide onsite and offsite testing and inspection to assure quality for the City in compliance with the project plans and specifications. Materials testing consisted of compaction testing and laboratory testing for base repair, overlay, and micro- seal placement
City of San Mateo, Construction Management (CM) On-Call Materials Testing Services, Various Locations, San Mateo, CA – Mr. Kibbey served as Project Manager to provide materials testing services as part of the City of San Mateo CM On-Call. Services included performing compaction testing and observation of subgrade materials, full-depth reclamation (FDR) testing, aggregate base, and hot-mix-asphalt (HMA) paving, HMA batch plant sampling, as well as structural concrete sampling.

City of Walnut Creek On-Call, Ygnacio Valley Road Rehabilitation Project, Walnut Creek, CA - Mr. Kibbey served as Project Manager providing Quality Assurance (QA) testing services as part of our City of Walnut Creek On-Call. For the rehabilitation project of Ygnacio Valley Road. Services include observation, sampling, and field density testing during subgrade preparation and placement of aggregate base, cold in-place recycling of asphalt pavement, hot mix asphalt (HMA). All work is performed in accordance with Caltrans specifications and the Cities Quality Assurance Plan.

Castro Ranch Road Rehabilitation Project, Richmond, CA - Mr. Kibbey served as Project Manager providing Quality Assurance (QA) testing services as part of the Construction Management team for this pavement rehabilitation project of Castro Ranch Road from Olinda Road to the City Limit. Services include observation, sampling, and field density testing during subgrade preparation and placement of aggregate base, cold in- place recycling of asphalt pavement, hot mix asphalt (HMA), as well as special inspection and testing services Qualifications
Registrations /
Certificates:

Engineer-in-Training
(E.I.T.), No. 128476, CA
Nuclear Density Gauge
Education:

BS, Civil Engineering,
California Polytechnic
State University, San Luis
Obispo, 2008
Experience:

BSK Associates,
Livermore, California
2021 to Current
Kleinfelder Inc.,
Pleasanton, California
2008 to 2021

Michael Kibbey – Materials Testing Task Manager
during reinforced concrete construction. All work was performed in accordance with Caltrans and project special provision requirements.

Stanislaus County, Crows Landing Road Bridge Replacement Project, Stanislaus County, CA -Mr. Kibbey is currently serving as Project Manager providing Quality Assurance (QA) testing services as part of the Construction Management team for the Crows Landing Road Bridge Replacement project over the San Joaquin River located near the unincorporated town of Crows Landing. The new bridge structure will have two 12-foot travel lanes, with 4-foot shoulders, and a 12-foot center median lane to accommodate safe turning movements. The proposed 5-span structure will be a cast-in-place concrete box girder bridge, constructed in two-stages to maintain two lanes of travel during construction. Services include observation, sampling, and field density testing of native subgrade, embankment/structural backfill, and aggregate base, concrete sampling and testing, hot mix asphalt (HMA) sampling and testing, as well as assist with source inspection coordination and testing. All work will be performed in accordance with Caltrans and project special provision requirements.

Holman Road Bridge Over Bear Creek, Stockton, CA - Constructed in accordance with the 2018 Caltrans Standard Plans and Specifications, Mr. Kibbey serves as the project manager for BSK on the Holman Road Bridge over Bear Creek Project providing materials testing and source inspection services. The project is a privately funded project that includes construction of a new 3 span cast-in-place, prestressed slab bridge, supported by cast-in-drilled-hole concrete piles.

Stanislaus County, Crows Landing Road Bridge Replacement Project, Stanislaus County, CA -Mr. Kibbey is currently serving as Project Manager providing Quality Assurance (QA) testing services as part of the Construction Management team for the Crows Landing Road Bridge Replacement project over the San Joaquin River located near the unincorporated town of Crows Landing. The new bridge structure will have two 12-foot travel lanes, with 4-foot shoulders, and a 12-foot center median lane to accommodate safe turning movements. The proposed 5-span structure will be a cast-in-place concrete box girder bridge, constructed in two-stages to maintain two lanes of travel during construction. Services include observation, sampling, and field density testing of native subgrade, embankment/structural backfill, and aggregate base, concrete sampling and testing, hot mix asphalt (HMA) sampling and testing, as well as assist with source inspection coordination and testing. All work will be performed in accordance with Caltrans and project special provision requirements.

Valley Transportation Authority, US 101/Blossom Hill Road Interchange Improvements, San Jose, CA– Mr.

Kibbey served as Quality Assurance (QA) Materials Testing Task Manager in support of BSK’s project manager, Mr. Tim Rodriguez. This project will improve vehicular traffic on the US 101 and local roadways and improve bicycle and pedestrian travel along Blossom Hill Road and surrounding areas. In addition to constructing a new bridge over US 101, a new eastbound lane and widening of the US 101 southbound off ramp, the project also included the construction of a Class I Bicycle/Pedestrian path through the interchange, a retaining wall, and a mechanically stabilized earth wall. BSK is supporting the project Resident Engineer with quality assurance materials testing and source inspection services to include quality assurance inspection and testing of hot-mix asphalt, structural concrete, earthwork, and field/shop welding, as well as source inspection of elastomeric bearing pads, pipe piles, welding rebar, prefabricated steel, and precast concrete.

James Auser, PE – Senior Materials Engineer
Professional Background:

Mr. Jim Auser will serve as the Senior Materials Engineer and Responsible Materials Engineer for this contract. He is a licensed Civil in the State of California and has developed a significant amount of hands-on experience during his nearly 29-year career in the construction industry. As a registered civil engineer, he provides significant levels of support to our clients in his role as project manager and responsible engineer. His project specific duties cover a wide range of services, including mix design preparation, job specification review and review of project construction submittals. He provides engineering oversight for BSK’s field inspectors/technicians. Mr. Auser specializes in concrete construction and their constituents, as well as in the development of specialty load test applications. He is flexible, creative and cost conscious in his engineering approach, and consistently works cooperatively with project teams at all levels.

Relevant Project Experience:

City of Pleasanton, On-Call Geotechnical Engineering and Special Inspection Services, Pleasanton, CA – As senior materials engineer, Mr. Auser has served as the responsible engineer with BSK’s current on-call geotechnical engineering, materials testing/special inspection services contract with the City. Mr. Auser has served in this role through multiple contract periods, beginning in 2008 to the current fiscal year.

City of Livermore, On-Call Materials Testing and Special Inspection, Dalton Reservoir Replacement Task Order, Livermore, CA – Mr. Auser served as the Materials Engineer. BSK provided support for coating inspections, special inspection and materials testing services to the project owner, the City of Livermore, coordinating directly with the City’s project team. As a task order to an on-call environmental/geotechnical and materials testing contract with the City of Livermore, this project replaced the existing 2-million-gallon steel water reservoir (Dalton Reservoir) with a new 3.41-million-gallon steel reservoir on a 5.7-acre site.

Dublin San Ramon Services District, Pump Stations 200 and 300A, San Ramon and Dublin, CA – Serving in the roles of Laboratory Manager, Materials Tester, and Responsible Engineer, Mr. Auser provided special inspection and materials testing services during construction of the reinforced concrete foundation for Water Pump Stations 200 and 300A. His responsibilities included monitoring concrete temperature, slump, and consolidation; preparing test specimens; storing the cylinders in environmentally controlled facilities; and compression testing as required. During masonry block construction, he prepared mortar test specimens; performing slump tests as required for the grout; and prepared, tested, and reported grout specimens.

City of Pinole, Pinole-Hercules Water Pollution Control Plant Upgrades and Expansion, Pinole, CA – The $48 million project provided a substantial upgrade to the existing plant and included relocation/expansion of the solids handling facility, expansion of the aeration basins, relocation of the dewatering centrifuge, upgrades to the secondary clarifier, construction of a new headworks and grit structure. BSK served as special inspection and materials testing quality assurance firm. Mr.

Auser’s responsibilities as Responsible Engineer included oversight for BSK’s technical staff in the field and laboratory, as well as reviewing laboratory results.

Qualifications
Registrations /
Certificates:

Civil Engineer,
California, 59941
Radiation Safety and Use
of Nuclear Gauges
ACI Field Testing
Technician Grade I
ICC
Reinforced Concrete
Structural Masonry
Prestressed Concrete
Education:

B.S. Civil Engineering,
California State
University, Chico, 1994
Experience:

BSK Associates,
Materials Laboratory
Manager-2008 to
Current
Engeo Inc., Field &
Project Engineer,
Laboratory Manager-
1996 to 2008
A. Teichert & Son Inc.,
Readymix Division-
Quality Assurance Field
Technician-1995 to 1996
Construction Testing &
Engineering Inc., Field
Engineer-1994 to 1995
California Army
National Guard, Combat
Engineer-1988 to 1996

Randy Cortez – Materials Laboratory Manager
Professional Background:

Mr. Cortez will serve as the Materials Laboratory Manager for this contract.His nearly 17-year experience in laboratory testing encompasses a wide range of work including soils, asphalt, concrete, and steel. His number of certifications speak for themselves. His lab management experience includes various mobile laboratories in project ranging from district Caltrans labs to on-site airport laboratories. He has worked through Marshall testing, Hveem, and gyratory compaction efforts. He served on the pilot program in California to help to introduce Superpave pavement technology to California.

Relevant Project Experience:

City of Pleasanton, On-Call Geotechnical Engineering and Special Inspection Services, Pleasanton, CA – Mr. Cortez serves as the laboratory manager with BSK’s current on-call geotechnical engineering, materials testing/special inspection services contract with the City.

City of Livermore, On-Call Geotechnical and Materials Testing Services, Dalton Reservoir Replacement Task Order, Livermore, CA – Mr. Cortez served as the Laboratory Manager for this multi-faceted contract consisting of numerous infrastructure projects for the City of Livermore ranging in construction cost from $200,000 to $8.5 million. Laboratory support includes soils, structural concrete and asphalt concrete sampling and testing. Task orders have included airport improvements, new road construction, street improvement/widening, slurry seal, and new bridge construction. The Dalton Reservoir Replacement project replaced the aged/existing 2-million-gallon potable water storage tank with a new 3.4-million- gallon steel reservoir.

City of Fremont, On-Call Materials Testing Services, Fremont, CA – As part of an on- call services agreement and in support of the City’s own quality assurance staff and Materials Laboratory, BSK provides ongoing Materials Laboratory and field-testing support for soils, aggregates, and hot-mix asphalt products, including support for Superpave QA in accordance with the Caltrans 2015 Standard Specifications.

Significant testing performed to complement the City’s Materials Laboratory have included R-Value testing, concrete compressive strength testing, and all hot mix asphalt testing for assigned projects. Task orders have included: Downtown Bike & Pedestrian Improvements Phase II, Warm Springs Blvd. Improvements, and the summer pavement rehabilitation programs 2016-current.

Caltrans On-Call Materials Laboratory Support – District 4, North Bay and South Bay Regions, CA – Testing under this contract is performed in accordance with Caltrans test methods and extends to native soils, aggregate base and hot mix asphalt constituents.

Delta Diablo, Pump Station Assessment and Upgrades, Pittsburg and Antioch, CA – Mr. Cortez served as the Laboratory Manager for improvements at four pump stations and diversion facilities in Antioch and Pittsburg. The projects consisted of site improvements including flood protection. BSK’s scope of work included assessing consolidation settlement resulting from placing fill on sites underlain by Bay Mud.

Caltrans, Meridian Road Overcrossing Seismic Retrofit / Midway Road Overcrossing Reconstruction, Solano County, CA – Laboratory Manager for the $11.8 million Caltrans project to seismically upgrade the Meridian Road Overcrossing and Midway Road Overcrossing on Interstate 80 near Vacaville. All materials testing work was performed in accordance with Caltrans specifications.

Qualifications
Qualifications
Certifications:

NICET Materials Soil
NICET Materials Concrete
NICET Materials Asphalt
NICET Geo Generalist
NICET Geo Construction
NICET Geo Laboratory
NICET Highway Materials
ACI -Concrete Field
Testing
ACI -Strength Testing
Nuclear Moisture/Density
Gauge
Nuclear Gauge Radiation
Safety Officer
OSHA 10-hour
Construction
Caltrans: 105, 106, 125,
201, 202, 204, 205, 206,
207, 211, 216, 217, 226,
227, 229, 234, 235, 301,
304, 308, 309, 366,367,
368, 370, 371, 382, 504,
518, 521, 523, 533, 539,
540, 543, 556, 557, LP-1,
LP-2, LP-3, LP-4, LP-5, LP-
6, LP-7, LP-9, and
Superpave AAHSTO and
ASTM test methods
Experience:

BSK Associates, 2016 to
Present
2014 – 2015, MTGL,
Anaheim Lab Manager,
2005 – 2013, Earth
Systems.