Att C - Geosyntec Consultant proposal for Amendment No.6.pdf

San Pablo City Council
May 6, 2024

Document
Att C - Geosyntec Consultant proposal for Amendment No.6.pdf
Meeting
May 6, 2024
Body
San Pablo City Council
Pages
4
Original file
170 KB
Text extracted from the city's file for reading and search. Open the original on sanpablo.legistar1.com. That file is the official record.

1340 Treat Blvd
2nd Floor
Walnut Creek, CA 94597

PH 925.357.6197
www.geosyntec.com

April 5, 2024

Mr. Jimmy Zhou, P.E.

Associate Engineer
City of San Pablo, CA

Sent via email

Subject:

Amendment for Support During Construction - Sutter Ave. Urban Greening Project, San Pablo, California
Dear Jimmy:

Geosyntec Consultants (Geosyntec) is pleased to provide this propo sal to the City of San Pablo (City) for a contract amendment to conduct additional tasks during the construction phase of the Sutter Ave Urban Greening Project, Phase 1 (Project). At the request of the City, we are providing this amendment to the original co ntract for the Project. The presen ted scope of services is based on email correspondence and a telephone call on March 25, 2024 and will be performed under our existing contract terms and conditions.

SCOPE OF WORK
The following sections describe the additional e ffort that will be a dded to Task 1 Project Management, Task 3 Public Outreach, and Task 7 Construction Support, respectively, or as directed by the City.

Task 1.3 – Additional Project Management and Coordination during the Construction Phase Geosyntec will provide coordinated project mana gement to effectively meet construction milestones and delivery schedules internally and with our subcontractors. This task includes:
 Monthly Progress Meetings – one half-hour progress meetings will be conducted each month for the duration of the construction phase. A standard agenda will be provided one day in advance and can be modified by the City as needed.  Subcontractor coordination and project management during the construction phase.

ASSUMPTIONS
Mr. Jimmy Zhou
April 5, 2024

Page 2 ends

 6 month construction phase duration.
 An agenda and draft meeting minutes will be provided for all meetings unless directed otherwise by the City.
 All meetings will be virtual via Teams, Skype, or Zoom with the exeption of the site visit..

DELIVERABLES
 Meeting agenda and notes.

Task 1.4 – Project Performance Monitoring and Evaluation Geosyntec will review the tentatively approved Project Assessment and Evaluation Plan (PAEP) and provide recommendations for revisions. We will measure, evaluate, and document Project performance based on the effectiveness criteria in the approved PAEP, excluding those performed by the City staff. We will also provide the performance assessment results, including the support data and analysis.

ASSUMPTIONS
 Pollutant Load Reduction data will be provided through the Municipal Regional Stormwater NPDES Permit, (MRP), monitoring by others and used to determine and report average annual removal of PCBs and Mercury for the Project.  Runoff volume data will be provided through MRP monitoring by others and will be used to determine annual runoff captured and treated by the Project.  Trash load reduction values will be determined through On-land Visual Trash Assessment, OVTA, monitoring. Three separate onsite assessments will be conducted as part of this task. One monitoring event will be conducted prior to construction (baseline), one will be conducted after construction is completed, and the final will be conducted one year after construction is completed.
 Respond to one round of comments on the draft PAEP.

DELIVERABLES
 Submit a draft PAEP.
 Submit a final draft PAEP.

Task 3.2 – Outreach and Education
Geosyntec and its consulta nt, the Watershed Group, will design a flyer or a mail er to educate residents on the benefits of Green Stormwater Infrastructure (GSI). Prepare a letter, from the City Mr. Jimmy Zhou
April 5, 2024

Page 3 ends

to educate and to remind resident s not to park vehicles on top of the curb and gutters, sidewalks, GSI, and ADA grates.

ASSUMPTIONS
 All outreach and educational documents will be provided electronically.  One round of review comments by the City.

DELIVERABLES
 Submit a draft design of the flyer or mailer to the City staff for review.  Submit a final design of the flyer or mailer to the City staff for review.  Print and mail flyers to up to 200 addresses. City to provide the list of names and addresses.
 Submit a draft design of the interpretive elements for review and approval.  Submit a final design of the interpretive elements for the City Contractor to install.

Task 7.2 – Engineering Support for Construction
Geosyntec will provide engineering support suppor t including responding to bidder request-for- information (RFIs), Construction Submittal reviews, modify plan s and specifications, and issue addendums during the bidding phase as-needed. In addition, Geosyntec will review East Bay Municipal Utility District’s (EBMUD) main wa ter line relocation plan and provide utility surveying services for marking key utility conflict points. A surv ey drawing will be provided to the City for review.

During construction, Geosyntec will review and respond to Contract or RFIs, perform as needed field investigations to identify potential constr uction issues and provide engineering support.

Geosyntec will Coordinate with the City’s Construction Manager and Contractor to resolve design- related issues on an as-needed basis. If requ ested by the City, Geosyntec can prepare as-built drawings in CAD and PDF based on Contractor redlines and on-site observatios.

ASSUMPTIONS
Due to the nature of the scope described above it is not feasible to predict effort needed to complete this task, therefore, it will be conducted as time and materials basis, and not exceed the amount listed in the fee table.

DELIVERABLES
 Submittal review ledger.

Mr. Jimmy Zhou
April 5, 2024

Page 4 ends

 As needed Design Modifications and Construction Bulletins.  As-built drawings in CAD and PDF if requested by the City.

SCHEDULE

Geosyntec will commence work upon receipt of a Notice to Proceed (NTP) from the City.

COST ESTIMATE AND AGREEMENT

Geosyntec proposes to complete the scope of serv ices presented herein on a time and materials basis, not to exceed $129,577. A summary of our es timated budget is provided below. A detailed fee estimate with hours and billing rates is provided in Attachment A.

Description Total Cost
Task 1.3 Additional Project Management and Coordination during the Construction Phase $20,448
Task 1.4 Project Performance Monitoring and Evaluation $24,998 Task 3.2 Outreach and Education $39,286
Task 7.2 Engineering Support for Construction $44,845
Total $129,577

Geosyntec appreciates the opportunity to provide ongoing support to the City, and we look forward to continuing working with you. If you have que stions regarding the scope of our proposal or estimated costs or require addi tional information, please cont act Mike Rudd at 925-408-3547 or Horacio Urias at 510-285-2658.

Sincerely,

Attachment A – Detailed Fee Estimate
Horacio Urias, PE
Professional
Michael Rudd , PE
Senior Principal