Cities Index.
Exh A - Recommended Cit-wide User Fees

San Pablo City Council
November 17, 2025

Document
Exh A - Recommended Cit-wide User Fees
Meeting
November 17, 2025
Body
San Pablo City Council
Original file
2.4 MB
Text extracted from the city's file for reading and search. Open the original on sanpablo.legistar1.com. That file is the official record.

GENERAL FEES AND CHARGES
# Title
Current
Fee/Charge Unit Notes Full Cost
Subsidy
%
Suggested
Fee Fee Δ
1 Copying Charges
2 Public Records & Other Public Documents $0.10 Per page $0.25 0% $0.25 $0.15 3 Copies of Maps $0.10 Per page $0.25 0% $0.25 $0.15
4 Certification Fee $0.10 Per document $0.25 0% $0.25 $0.15 5 Microfilm Reproductions $0.10 Per page $0.25 0% $0.25 $0.15 6 Pre-Printed Documents (Budgets, ACFR) Cost
Recovery Each NA NA Cost
Recovery $0
7 Reproduced Documents (i.e. Ordinance, Resolutions, as long as supplies are available) $0.10 Per page $0.25 0% $0.25 $0.15
8 State Mandated Forms as Supplied by State (i.e. FPPC Requirements) $0.10 Per page $0.25 0% $0.25 $0.15 9 City Municipal Code Book $0.10 Per page $0.25 0% $0.25 $0.15 10 Note: City Manager and/or City Clerk may at their sole discretion, distribute documents for dissemination of general information when found to be in the best interests of the City and its citizens.
11 Garage Sale Permits $5.00 Each NA NA $5.00 $0
12 City Overhead Charge 28% of
direct cost 40% 0% 40% of
direct cost 12%
13 Computer Time/Reports/Labels $60.00 Per hour NA NA $60.00 $0 14 Return Check Processing $20.00 Per check NA NA $20.00 $0 15 Notary Fee $15.00 NA NA $15.00 $0
16 Civil Subpoena Witness Fee $275.00 per day
payable as a deposit against actual
costs pursuant to Government Code
Section 68096.1
NA NA $275.00 $0
1 Comprehensive User Fee Study

POLICE SERVICES AND CODE ENFORCEMENT
# Title
Current
Fee/Charge Unit Full Cost
Subsidy
%
Suggested
Fee Fee Δ
1 Police Services and Permits
2 Applicant Fingerprinting (per set) $35.00 Per Set $44.23 43% $25.00 -$10 3 Miscellaneous Fingerprinting $10.00 Each $44.23 43% $25.00 $15 4 Records Search & Letter for passport &
Immigration Naturalization $10.00 Each $44.23 43% $25.00 $15 Police Reports/ Requests $10.00 $44.23 43% $25.00 $15
5 Stored Vehicle Releases
6 Regular $125.00 Each $213.37 27% $156.00 $31
7 Repo Verification $15.00 $22.12 1% $22.00 $7
8 Felony/DUI $300.00 Each NA NA $300.00 $0
9 Special Events $200.00 Each $396.34 50% $200.00 $0
10 Taxicabs and Vehicle for Hire
11 Vehicle Permit $100.00 Each NA NA $100.00 $0
12 Reinspection $50.00 Each NA NA $50.00 $0
13 Driver Permit $70.00 Each NA NA $70.00 $0
14 Code Enforcement
15 Tow Operator Permit $262.00 Each $264.35 0% $264.00 $2 16 Abatement of Public Nuisance
17 Basic $321.00 Each $329.13 0% $329.00 $8
18 Substandard $1,423.00 Each NA NA $1,423.00 $0
19 Inspection Warrant $250.00 Each $660.00 53% $312.00 $62 20 BUSINESS PERMITS
21 Cabaret
22 New $996.00 Each NA NA $996.00 $0
23 Renewal $50.00 Each $187.11 67% $62.00 $12
24 Sound Amplifier $50.00 $396.34 50% $200.00 $150
2 Comprehensive User Fee Study

POLICE SERVICES AND CODE ENFORCEMENT
# Title
Current
Fee/Charge Unit Full Cost
Subsidy
%
Suggested
Fee Fee Δ
25 Patrol Services
26 Per Employer $227.00 Each $187.11 0% $187.00 -$40 27 False Alarm Response by Officer - 1st offense $0.00 Each $117.83 100% $0.00 $0 28 False Alarm Response by Officer - 2nd and
subsequent offenses $0.00 Each $117.83 15% $100.00 $100 29 Citation/Ticket Sign-Off by Officer $0.00 Each $73.42 66% $25.00 $25 30 Per Employee $227.00 Each $187.11 0% $187.00 -$40 31 Massage Parlor
32 Operator - New $366.00 Each NA NA $366.00 $0
33 Operator - Renewal $101.00 Each NA NA $101.00 $0
34 Employee - New $366.00 Each NA NA $366.00 $0
35 Employee - Renewal $101.00 Each NA NA $101.00 $0
36 Peddlers & Solicitors
37 New $225.00 Each NA NA $225.00 $0
38 Renewal $49.00 Each NA NA $49.00 $0
39 Fortunetellers
40 New $317.00 Each NA NA $317.00 $0
41 Renewal $135.00 Each NA NA $135.00 $0
42 Tobacco Retailers
43 New $196.00 Each $271.75 10% $245.00 $49
44 Renewal $196.00 Each $271.75 10% $245.00 $49
3 Comprehensive User Fee Study

PUBLIC WORKS
# Title Current Fee/Charge Unit
Record Retention and
Technology
Enhancement
Surcharges Apply Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 ENTITLEMENTS AND PRELIMINARY ENGINEERING REVIEW
2 Design Review:
3 Basic Residential Projects $188.00 Per Review ** $181.09 0% $181.00 -$7 4 Commercial / Multi-Family Projects $685.00 2 Reviews ** $767.95 0% $767.00 $82 5 Subdivision Projects $844.00 2 Reviews ** $949.04 0% $949.00 $105 6 Additional Planning review by Engineering Hourly Rate New ** $213.83 0% $213.00 NA 7 MAPPING REVIEW
8 Final Subdivision Map (Tract Map - up to 30 lots) $4,000.00 + Consultant Cost + 30% NA NA $4,000.00 $0
9 Final Subdivision Map (each additional lot) $65.00 per lot + Consultant Cost + 30% NA NA $65.00 $0
10 Parcel Map $2,000.00 + Consultant
Cost + 30% NA NA $2,000.00 $0
11 Lot Line Adjustment $2,000.00 + Consultant
Cost + 30% NA NA $2,000.00 $0
12 Lot Merger $2,000.00 + Consultant
Cost + 30% NA NA $2,000.00 $0
13 ENCROACHMENT PERMITS AND INSPECTIONS
14 Dumpster, Container, etc. (per site, per week) $238.00 Per Site, Per Week ** $146.27 0% $146.00 -$92 15 Driveway, Sidewalk, Curb and Gutter $625.00 Per Site ** $690.42 17% $574.00 -$51 16 Potholing $575.00 Per Site ** $861.99 0% $861.00 $286 17 Minor traffic control (local streets, pedestrian traffic control on sidewalk, traffic controls limited to one day) $320.00 Per Day ** $355.96 0% $355.00 $35 18 Traffic control (lane closure, lane shift or detour on colelctor and arterial streets) $801.00 Per Week ** $622.01 0% $622.00 -$179 19 Traffic control each additional day New Additional per day ** $223.37 0% $223.00 NA 20 Street Excavation (includes up to 2 inspections during encroachment work plus final inspection) $888.00 Per Site ** $838.75 32% $574.00 -$314 21 Major Encroachment and Street Excavation (first 5 working days including up to 3 inpsections or site meetings) New ** $1,342.37 0% $1,342.00 NA 22 Each subsequent work day New ** $218.48 0% $218.00 NA 23 Tree planting or landscaping improvement at Residential Frontage (Public ROW) New ** $268.11 100% $0.00 NA 24 For other hardscaping improvement at Residential Frontage (Public ROW), see Sidewalk permit type above.
4 Comprehensive User Fee Study

PUBLIC WORKS
# Title Current Fee/Charge Unit
Record Retention and
Technology
Enhancement
Surcharges Apply Notes Full Cost Subsidy % Suggested Fee Fee Δ 25 Fee for work without permit - Work underway Penalty 2x Fee NA NA Penalty 2x Fee $0 26 Fee for work without permit - Work completed Penalty 3x Fee NA NA Penalty 3x Fee $0 27 Fee for work outside of normal business hours 20% Permit Fee NA NA 20% Permit Fee $0 28 One-time inspection or site meeting (up to an hour) New Per inspection ** $178.70 0% $178.00 NA 29 Additional Permit Review by Engineering Tech Hourly Rate New Per Hour ** $195.10 0% $195.00 NA 30 Additional Inspection by Inspection Hourly Rate New Per Hour ** $218.48 0% $218.00 NA 31 PUBLIC WORKS PERMITS
32 Plan Check:
33 Residential Interior Remodel, Minor Addition (less than 500 SF), Minor Site Improvement with less than 2,500 SF of new or replaced impervious surfaces New ** $293.99 0% $293.00 NA 34 Residential JADU & ADU, Site Improvement with between 2,500 SF to 5,000 SF of new or replaced impervious surface New ** $860.11 0% $860.00 NA 35 Residential New Construction SFH with less than 10,000 SF of new or replaced impervious surface New ** $1,360.81 0% $1,360.00 NA
36 Residential New Construction 2 Units with less than 5,000 SF of new or replace impervious surface New ** $1,837.08 0% $1,837.00 NA
37 Commercial Interior Remodel or Tenant Improvement, Minor Site Improvement less than 2,500 SF of new or replaced impervious surface New ** $525.13 0% $525.00 NA 38 Commercial Site Improvement, Parking Lot Striping and Traffic Circulation Plan, Landscape or Hardscape, Site Improvement with between 2,500 SF to 5,000 SF of new or replaced impervious surface
New ** $1,001.40 0% $1,001.00 NA
39 Commercial Site Improvement for C3 regulated Project with over 5,000 SF 40 First 5,000 SF of new or replace impervious surface New ** $3,249.02 0% $3,249.00 NA 41 Subsequent every 1,000 SF of any improvement (pervious and impervious surface) from 5,001 SF to 20,000 SF New $634.59 0% $634.00 NA
42 Subsequent every 1,000 SF of any improvement (pervious and impervious surface) from 20,001 SF to 1 acre New $247.91 0% $247.00 NA
43 Subsequent every 1,000 SF over 1 acre New ** $269.93 0% $269.00 NA 44 Public Works Plan Check by Consultant New ** 58% 48% Consultant Cost + 30% NA 45 Additional Plan Check Review by Engineering Hourly Rate New ** $212.85 0% $212.00 NA 46 Expedited Plan Check Fee Original Cost + 50% NA NA Original Cost + 50% $0 5 Comprehensive User Fee Study

PUBLIC WORKS
# Title Current Fee/Charge Unit
Record Retention and
Technology
Enhancement
Surcharges Apply Notes Full Cost Subsidy % Suggested Fee Fee Δ 47 Inspection:
48 Residential Interior Remodel, Minor Addition (less than 500 SF), Minor Site Improvement with less than 2,500 SF of new or replaced impervious surfaces New ** $183.58 0% $183.00 NA 49 Residential JADU & ADU, Site Improvement with between 2,500 SF to 5,000 SF of new or replaced impervious surface New ** $621.25 0% $621.00 NA 50 Residential New Construction SFH with less than 10,000 SF of new or replaced impervious surface New ** $1,381.22 0% $1,381.00 NA
51 Residential New Construction 2 Units with less than 5,000 SF of new or replace impervious surface New ** $1,580.15 0% $1,580.00 NA
52 Commercial Interior Remodel or Tenant Improvement, Minor Site Improvement less than 2,500 SF of new or replaced impervious surface New ** $621.25 0% $621.00 NA 53 Commercial Site Improvement, Parking Lot Striping and Traffic Circulation Plan, Landscape or Hardscape, Site Improvement with between 2,500 SF to 5,000 SF of new or replaced impervious surface
New ** $1,242.49 0% $1,242.00 NA
54 Commercial Site Improvement for C3 regulated Project with over 5,000 SF 55 First 5,000 SF of new or replace impervious surface New ** $5,329.39 0% $5,329.00 NA 56 Subsequent every 1,000 SF of any improvement (pervious and impervious surface) from 5,001 SF to 20,000 SF New ** $934.47 0% $934.00 NA 57 Subsequent every 1,000 SF of any improvement (pervious and impervious surface) from 20,001 SF to 1 acre New ** $491.67 0% $491.00 NA
58 Subsequent every 1,000 SF over 1 acre New ** $268.30 0% $268.00 NA 59 Public Works Inspection by Consultant New ** NA NA Consultant Cost + 30% NA 60 Additional inspection by Public Works Inspection by Hourly Rate New Per hour ** $218.48 0% $218.00 NA Stormwater and C.3. Compliance:
61 C3 O&M Verification (Initial Inspection & one re-inspection) $1,179.00 ** As needed
per Water
Board
Regulations
$912.07 0% $912.00 -$267
62 C3 O&M Verification (Additional Inspection) New ** $489.51 0% $489.00 NA Misc. permit fees:
63 Fee for no-show inspection or work without scheduling inspection $156.00 ** $178.70 0% $178.00 $22 64 Fee for work without permit - Work underway Permit fee + Penalty 1x Permit Fee NA NA Permit fee + Penalty 1x
Permit Fee $0
65 Fee for work without permit - Work completed Permit fee + Penalty 2x Permit Fee NA NA Permit fee + Penalty 2x
Permit Fee $0
66 Fee for work outside of normal business hours 20% Permit Fee NA NA 20% Permit Fee $0 67 Expedited Inspection Fee Original Cost + 50% NA NA Original Cost + 50% $0 68 Transportation Permit:
69 Single Trip $16.00 Per Trip ** Set by DOT NA NA $16.00 $0 70 Annual $90.00 Per Year ** Set by DOT NA NA $90.00 $0 6 Comprehensive User Fee Study

PUBLIC WORKS
# Title Current Fee/Charge Unit
Record Retention and
Technology
Enhancement
Surcharges Apply Notes Full Cost Subsidy % Suggested Fee Fee Δ 71 ENVIRONMENTAL PROGRAMS
72 Creek Zone Review / Evaluation Staff Hourly Rate or
Consultant Rate + 17% 58% 48% Staff Hourly Rate or
Consultant Rate + 30% 13%
73 Groundwater Permit Staff Hourly Rate or
Consultant Rate + 17% 58% 48% Staff Hourly Rate or
Consultant Rate + 30% 13%
74 Title 24 CalGREEN C&D Debri Review New Per project ** $158.46 0% $158.00 NA 75 SWPPP monthly inpection (Project > 1 acre) New Per inspection ** $211.28 0% $211.00 NA 76 MISCELLANEOUS FEES
77 Document Copying Fees:
78 Standard Sizes (8.5 x 11, 8.5 x 14, 11 x 17) - per sheet $0.05 Per Sheet $0.25 0% $0.25 $0 79 Scanning/Imaging Fee:
80 Standard Sizes (8.5 x 11, 8.5 x 14, 11 x 17) $0.05 Per Sheet $0.25 0% $0.25 $0 81 County Recording Fee County Cost NA NA County Cost $0 82 ** SURCHARGES
83 Technology Enhancement Fee 5.00% Surcharge NA NA 5.00% $0 84 Record Retention Fee 4.00% Surcharge NA NA 4.00% $0
85 86
If any of the above services requires the use of outside consultants, the City shall charge a review fee based on the actual cost of the consultant plus an adminstrative fee and require a $2,500 deposit; such services may include review of a drainage study, geotechnical study, traffic/circulation study, surveyor’s report, and environmental program inspections and expedition of any of the above processes.

Staff time will be charged based on the staff hourly rates listed.

Consultant Cost + 17% 58% 48% Consultant Cost + 30% 13% 87 Engineering General Hourly Rate New Per Hour ** $212.85 0% $212.00 NA 88 Engineering Tech Hourly Rate New Per Hour ** $177.35 0% $177.00 NA 89 Environmental General Hourly Rate New Per Hour ** $225.41 0% $225.00 NA 90 Public Works Inspection Hourly Rate New Per Hour ** $218.48 0% $218.00 NA Note: Fees listed as “Deposits” represent the minimum amount due at application submittal. Deposited funds are charged against time and materials. When consultants are required, the fee amount is the consultant cost plus an administrative fee. Engineering service deposit amounts are determined by the City Engineer to ensure 100% cost recovery, and will also include any directly charged staff time.

FOOTNOTES
Public works services requiring less than 15 minutes will not be charged a fee. Services requiring more than 15 minutes will be charged a fee based on the fully burdened hourly rate.

If there is a no notification fee and future offenses occur, an administrative citation will be initiated for future offenses.

Any work that does not have the required permit may be shut down until such permit is obtained.

All encroachments may require the submittal of a 100% performance bond at the discretion of the City Engineer, in order to obtain PW signoff of any encroachment permit, materials testing results will be required or extension of the performance bond to a term determined by the city will be required.

Any requests for expedited service will be charged at 100% of the existing fee or rate. 7 Comprehensive User Fee Study

COMMUNITY SERVICES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Youth and Adult Programs
2 Pre-K Programming School Year Programs
3 Resident $3.63 per hour NA NA $3.99 $0.36
4 Non-Resident 25% additional NA NA 25% additional $0
5 Leader In Training Program Leader In Training (LIT)
6 Resident $28.00 per week session NA NA $30.00 $2
7 Non-Resident 25% additional NA NA 25% additional $0
8 Extended Care Extended AM / PM Care For Camps
9 Resident $1.10 per hour NA NA $1.32 $0.22
10 Non-Resident 25% additional NA NA 25% additional $0
11 Youth Camps Ages 3-12 weekly Tiny, Kiddie, Junior, Senior, Sports, Holiday Camps
12 Resident $2.75 per hour NA NA $3.03 $0.28
13 Non-Resident 25% additional NA NA 25% additional $0
14 Teen Camps Ages 12-15 weekly Teen Camp
15 Resident $3.30 per hour NA NA $3.63 $0.33
16 Non-Resident 25% additional NA NA 25% additional $0
17 Contracts for instructors are negotiated yearly.
(Staff continuously searches for new program offerings, working with contract instructors to set price ranges for programs. Staff is recommending a PRICE RANGE for all new contracted program offerings to allow for flexibility in pricing as opposed to approving each individual contract instructor prices.)
18 Resident $0 - $250 per month NA NA $0 - $250 $0
19 Non-Resident $5.00 per month additional NA NA $5.00 $0 20 Cancellation / Transfer Fee-All refunds and/or transfers initiated by the customer will be charged a fee.
21 More than two week before program start date $10.00 per transaction NA NA $10.00 $0 22 Less than two weeks before program start date $10.00 per transaction NA NA $25.00 $15 23 Late Pick Up Fee- charge $5 every 10 minutes after scheduled program end time a parent/guardian is late picking up a participant from a youth program - City Staff Run programs only.
$5.00 per 10 minutes NA NA $5.00 $0
24 Summer Camp deposit New per session per child NA NA $25.00 NA 25 Community Events
26 Informational Vendor Non-Profit (event over 1,000 in attendance) $20.00 Table Vendor for Community Event NA NA $20.00 $0 27 Informational Vendor For Profit (event over 1,000 in attendance) $30.00 Table Vendor for Community Event NA NA $30.00 $0 28 Merchandise Vendor Non-Profit (event over 1,000 in attendance) $40.00 Table Vendor for Community Event NA NA $40.00 $0 29 Merchandise Vendor For Profit (event over 1,000 in attendance) $50.00 Table Vendor for Community Event NA NA $50.00 $0 30 Food Vendor Non-Profit $60.00 Food Vendor for Community Event NA NA $60.00 $0 31 Food Vendor For Profit $125.00 Food Vendor for Community Event NA NA $125.00 $0 32 Event Sponsorship $400.00 unlimited NA NA $400.00 $0 33 Event Entrance Fees $0 - $5 per person NA NA $0 - $5 $0 34 Event Raffle Tickets $1 - $5 per ticket NA NA $1 - $5 $0 8 Comprehensive User Fee Study

COMMUNITY SERVICES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 35 Transporation Programs and Services (non general-fund) 36 Door to Door Shuttle Daily Shuttle Transportation Service 37 Resident $2 - $3 per way NA NA $2 - $3 $0
38 Non-Resident $4 - $5 per way NA NA $4 - $5 $0
39 Door to Door Shuttle w/ Premium Serivces Carrying packages to door, assisting rider to door of residence
40 Resident $1 - $5 per way NA NA $1 - $5 $0
41 Non-Resident $2 - $6 per way NA NA $2 - $6 $0
42 East Bay Paratransit Tickets Sell at face value NA NA Sell at face value $0 43 Brown Bag Program Transportation for Program Offered by the Food Bank
44 Resident $2.00 per way NA NA $2.00 $0
45 Non-Resident $3.00 per way NA NA $3.00 $0
46 Extended Ride Services More than 10 miles
47 Resident $20.00 round trip NA NA $20.00 $0
48 Non-Resident $25.00 round trip NA NA $25.00 $0
49 Senior Division Programs and Services
All Senior Program Fees
are based on Member /
Non-Member
50 Senior Center Membership Annual Senior Center Membership (January-December)
51 Resident $5.00 NA NA $5.00 $0
52 Non-Resident $10.00 NA NA $10.00 $0
53 Replacement Card $5.00 Senior Center Membership Card Replacement NA NA $5.00 $0
54 Senior Breakfast Program Program Includes a beverage and 1 food item.
55 Member $1 - $3 NA NA $1 - $3 $0
56 Non Member $2 - $5 NA NA $2 - $4 -$1
57 Bingo Snacks $0.50 - $5 per item NA NA $0.50 - $5 $0 58 General Activities and Classes
59 Member $1 - $4 per class NA NA $1 - $4 $0
60 Non Member $3 - $6 per class NA NA $3 - $6 $0
61 Casino Trips
62 Member $25 - $40 per trip NA NA $25 - $40 $0
63 Non Member $5.00 additional per trip NA NA $5.00 $0
64 Senior Special Events
65 Member $5 - $35 per event NA NA $5-$75 $40
66 Non Member 50% additional per event, not
to exceed $20 NA NA 50% $0
67 Special Celebration Luncheons
68 Member $5 - $20 NA NA $5-$50 $30
69 Non Member $7 - $23 NA NA $7-$55 $32
70 Social Trips
71 Member $5 - $250 NA NA $5 - $250 $0
9 Comprehensive User Fee Study

COMMUNITY SERVICES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 72 Non Member $10 - $350 NA NA $10 - $350 $0
73 Nutrition Program** $3 - $6
** Nutrition Program funded by Contra
Costa County. Seniors 60 years and older
pay a suggested donation of $3; ages 59
and younger pay $6.

NA NA $3 - $6 $0
74 Contracts for instructors are negotiated yearly.
(Staff continuously searches for new program offerings, working with contract instructors to set price ranges for programs. Staff is recommending a PRICE RANGE for all new contracted program offerings to allow for flexibility in pricing as opposed to approving each individual contract instructor prices.)
$0 - $250 NA NA $0 - $250 $0
75 San Pablo Senior Advisory Board (SPSAB) sponsored special events, programs and service fees to be determined by the
SPSAB.
76 Facility Location
77 Maple Hall-Includes Kitchen (per hour)±
78 City
79 Resident No Charge per hour NA NA No Charge $0
80 Non-Resident No Charge per hour NA NA No Charge $0
81 Non-Profit Governmental
82 Resident $100.00 per hour NA NA $100.00 $0
83 Non-Resident $120.00 per hour NA NA $120.00 $0
84 Private
85 Resident $200.00 per hour NA NA $200.00 $0
86 Non-Resident $240.00 per hour NA NA $240.00 $0
87 For Profit
88 Resident $300.00 per hour NA NA $300.00 $0
89 Non-Resident $360.00 per hour NA NA $360.00 $0
90 Church Lane Senior Center (per hour)± includes Kitchen 91 City
92 Resident No Charge per hour NA NA No Charge $0
93 Non-Resident No Charge per hour NA NA No Charge $0
94 Non-Profit Governmental
95 Resident $80.00 per hour NA NA $80.00 $0
96 Non-Resident $96.00 per hour NA NA $96.00 $0
97 Private
98 Resident $160.00 per hour NA NA $160.00 $0
99 Non-Resident $192.00 per hour NA NA $192.00 $0
100 For Profit
101 Resident $240.00 per hour NA NA $240.00 $0
102 Non-Resident $288.00 per hour NA NA $288.00 $0
103 Davis Park Senior Center (per hour)±
104 City
105 Resident No Charge per hour NA NA No Charge $0
106 Non-Resident No Charge per hour NA NA No Charge $0
10 Comprehensive User Fee Study

COMMUNITY SERVICES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 107 Non-Profit Governmental
108 Resident $28.00 per hour NA NA $28.00 $0
109 Non-Resident $33.00 per hour NA NA $33.00 $0
110 Private
111 Resident $55.00 per hour NA NA $55.00 $0
112 Non-Resident $66.00 per hour NA NA $66.00 $0
113 For Profit
114 Resident $83.00 per hour NA NA $83.00 $0
115 Non-Resident $99.00 per hour NA NA $99.00 $0
116 Davis Park Multi-Purpose Room (per hour)±
117 City
118 Resident No Charge per hour NA NA No Charge $0
119 Non-Resident No Charge per hour NA NA No Charge $0
120 Non-Profit Governmental
121 Resident $35.00 per hour NA NA $35.00 $0
122 Non-Resident $42.00 per hour NA NA $42.00 $0
123 Private
124 Resident $70.00 per hour NA NA $70.00 $0
125 Non-Resident $84.00 per hour NA NA $84.00 $0
126 For Profit
127 Resident $105.00 per hour NA NA $105.00 $0
128 Non-Resident $126.00 per hour NA NA $126.00 $0
129 Wildcat Creek Community Room (per hour)±
130 City
131 Resident No Charge per hour NA NA No Charge $0
132 Non-Resident No Charge per hour NA NA No Charge $0
133 Non-Profit Governmental
134 Resident $40.00 per hour NA NA $40.00 $0
135 Non-Resident $48.00 per hour NA NA $48.00 $0
136 Private
137 Resident $80.00 per hour NA NA $80.00 $0
138 Non-Resident $96.00 per hour NA NA $96.00 $0
139 For Profit
140 Resident $120.00 per hour NA NA $120.00 $0
141 Non-Resident $144.00 per hour NA NA $144.00 $0
142 San Pablo Community Center (SPCC)
143 Community Hall-Includes Kitchen (per hour)±
144 City
145 Resident No Charge per hour NA NA No Charge $0
146 Non-Resident No Charge per hour NA NA No Charge $0
147 Non-Profit Governmental
148 Resident $63.00 per hour NA NA $63.00 $0
149 Non-Resident $75.00 per hour NA NA $75.00 $0
150 Private
151 Resident $125.00 per hour NA NA $125.00 $0
152 Non-Resident $150.00 per hour NA NA $150.00 $0
11 Comprehensive User Fee Study

COMMUNITY SERVICES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 153 For Profit
154 Resident $188.00 per hour NA NA $188.00 $0
155 Non-Resident $225.00 per hour NA NA $225.00 $0
156 Community Room-West (per hour)±
157 City
158 Resident No Charge per hour NA NA No Charge $0
159 Non-Resident No Charge per hour NA NA No Charge $0
160 Non-Profit Governmental
161 Resident $38.00 per hour NA NA $38.00 $0
162 Non-Resident $45.00 per hour NA NA $45.00 $0
163 Private
164 Resident $75.00 per hour NA NA $75.00 $0
165 Non-Resident $90.00 per hour NA NA $90.00 $0
166 For Profit
167 Resident $113.00 per hour NA NA $113.00 $0
168 Non-Resident $135.00 per hour NA NA $135.00 $0
169 Community Room-East (per hour)±
170 City
171 Resident No Charge per hour NA NA No Charge $0
172 Non-Resident No Charge per hour NA NA No Charge $0
173 Non-Profit Governmental
174 Resident $38.00 per hour NA NA $38.00 $0
175 Non-Resident $45.00 per hour NA NA $45.00 $0
176 Private
177 Resident $75.00 per hour NA NA $75.00 $0
178 Non-Resident $90.00 per hour NA NA $90.00 $0
179 For Profit
180 Resident $113.00 per hour NA NA $113.00 $0
181 Non-Resident $135.00 per hour NA NA $135.00 $0
182 Activity Room 2 (per hour)±
183 City
184 Resident No Charge per hour NA NA No Charge $0
185 Non-Resident No Charge per hour NA NA No Charge $0
186 Non-Profit Governmental
187 Resident $22.00 per hour NA NA $22.00 $0
188 Non-Resident $26.00 per hour NA NA $26.00 $0
189 Private
190 Resident $44.00 per hour NA NA $44.00 $0
191 Non-Resident $53.00 per hour NA NA $53.00 $0
192 For Profit
193 Resident $66.00 per hour NA NA $66.00 $0
194 Non-Resident $79.00 per hour NA NA $79.00 $0
195 Activity Room 3 (per hour)±
196 City
197 Resident No Charge per hour NA NA No Charge $0
198 Non-Resident No Charge per hour NA NA No Charge $0
199 Non-Profit Governmental
12 Comprehensive User Fee Study

COMMUNITY SERVICES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 200 Resident $28.00 per hour NA NA $28.00 $0
201 Non-Resident $33.00 per hour NA NA $33.00 $0
202 Private
203 Resident $55.00 per hour NA NA $55.00 $0
204 Non-Resident $66.00 per hour NA NA $66.00 $0
205 For Profit
206 Resident $83.00 per hour NA NA $83.00 $0
207 Non-Resident $99.00 per hour NA NA $99.00 $0
208 Commercial Kitchen (per hour)±
209 City
210 Resident No Charge per hour NA NA No Charge $0
211 Non-Resident No Charge per hour NA NA No Charge $0
212 Non-Profit Governmental
213 Resident $19.00 per hour NA NA $19.00 $0
214 Non-Resident $23.00 per hour NA NA $23.00 $0
215 Private
216 Resident $38.00 per hour NA NA $38.00 $0
217 Non-Resident $46.00 per hour NA NA $46.00 $0
218 For Profit
219 Resident $57.00 per hour NA NA $57.00 $0
220 Non-Resident $68.00 per hour NA NA $68.00 $0
221 Fitness Room (per hour)±
222 City
223 Resident No Charge per hour NA NA No Charge $0
224 Non-Resident No Charge per hour NA NA No Charge $0
225 Non-Profit Governmental
226 Resident $22.00 per hour NA NA $22.00 $0
227 Non-Resident $26.00 per hour NA NA $26.00 $0
228 Private
229 Resident $44.00 per hour NA NA $44.00 $0
230 Non-Resident $53.00 per hour NA NA $53.00 $0
231 For Profit
232 Resident $66.00 per hour NA NA $66.00 $0
233 Non-Resident $79.00 per hour NA NA $79.00 $0
234 Vendor Kiosk (per month, per kiosk) includes kitchen 235 City
236 Resident No Charge per month, per kiosk NA NA No Charge $0 237 Non-Resident No Charge per month, per kiosk NA NA No Charge $0 238 Non-Profit Governmental
239 Resident $147.00 per month, per kiosk NA NA $147.00 $0 240 Non-Resident $176.00 per month, per kiosk NA NA $176.00 $0 241 Private
242 Resident $293.00 per month, per kiosk NA NA $293.00 $0 243 Non-Resident $352.00 per month, per kiosk NA NA $352.00 $0 244 For Profit
245 Resident $440.00 per month, per kiosk NA NA $440.00 $0 246 Non-Resident $527.00 per month, per kiosk NA NA $527.00 $0 13 Comprehensive User Fee Study

COMMUNITY SERVICES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 247 Sports Fields & Facilities
248 Davis Park Sport Field (per hour)
249 City
250 Resident No Charge per hour NA NA No Charge $0
251 Non-Resident No Charge per hour NA NA No Charge $0
252 Non-Profit Governmental
253 Resident $13.00 per hour NA NA $13.00 $0
254 Non-Resident $18.00 per hour NA NA $18.00 $0
255 Private
256 Resident $28.00 per hour NA NA $28.00 $0
257 Non-Resident $33.00 per hour NA NA $33.00 $0
258 For Profit
259 Resident $38.00 per hour NA NA $38.00 $0
260 Non-Resident $43.00 per hour NA NA $43.00 $0
261 Park Storage (per day)
262 City
263 Resident No Charge per day NA NA No Charge $0
264 Non-Resident No Charge per day NA NA No Charge $0
265 Non-Profit Governmental
266 Resident $2.00 per day NA NA $2.00 $0
267 Non-Resident $3.00 per day NA NA $3.00 $0
268 Private
269 Resident $4.00 per day NA NA $4.00 $0
270 Non-Resident $5.00 per day NA NA $5.00 $0
271 For Profit
272 Resident $6.00 per day NA NA $6.00 $0
273 Non-Resident $7.00 per day NA NA $7.00 $0
274 Rumrill Sports Park
275 Field 1, 2, or 3-Youth League (per hour, per field) 276 City
277 Resident No Charge per hour, per field NA NA No Charge $0 278 Non-Resident No Charge per hour, per field NA NA No Charge $0 279 Non-Profit Governmental
280 Resident $17.00 per hour, per field NA NA $17.00 $0 281 Non-Resident $22.00 per hour, per field NA NA $22.00 $0 282 Private
283 Resident $22.00 per hour, per field NA NA $22.00 $0 284 Non-Resident $28.00 per hour, per field NA NA $28.00 $0 285 For Profit
286 Resident $33.00 per hour, per field NA NA $33.00 $0 287 Non-Resident $39.00 per hour, per field NA NA $39.00 $0 288 Field 1, 2, or 3-Adult League (per hour, per field) 289 City
290 Resident No Charge per hour, per field NA NA No Charge $0 291 Non-Resident No Charge per hour, per field NA NA No Charge $0 14 Comprehensive User Fee Study

COMMUNITY SERVICES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 292 Non-Profit Governmental
293 Resident $39.00 per hour, per field NA NA $39.00 $0 294 Non-Resident $44.00 per hour, per field NA NA $44.00 $0 295 Private
296 Resident $44.00 per hour, per field NA NA $44.00 $0 297 Non-Resident $49.00 per hour, per field NA NA $49.00 $0 298 For Profit
299 Resident $64.00 per hour, per field NA NA $64.00 $0 300 Non-Resident $74.00 per hour, per field NA NA $74.00 $0 301 Practice Field-Youth League (per hour)
302 City
303 Resident No Charge per hour NA NA No Charge $0
304 Non-Resident No Charge per hour NA NA No Charge $0
305 Non-Profit Governmental
306 Resident $12.00 per hour NA NA $12.00 $0
307 Non-Resident $17.00 per hour NA NA $17.00 $0
308 Private
309 Resident $17.00 per hour NA NA $17.00 $0
310 Non-Resident $22.00 per hour NA NA $22.00 $0
311 For Profit
312 Resident $27.00 per hour NA NA $27.00 $0
313 Non-Resident $32.00 per hour NA NA $32.00 $0
314 Practice Field-Adult League (per hour)
315 City
316 Resident No Charge per hour NA NA No Charge $0
317 Non-Resident No Charge per hour NA NA No Charge $0
318 Non-Profit Governmental
319 Resident $28.00 per hour NA NA $28.00 $0
320 Non-Resident $33.00 per hour NA NA $33.00 $0
321 Private
322 Resident $33.00 per hour NA NA $33.00 $0
323 Non-Resident $38.00 per hour NA NA $38.00 $0
324 For Profit
325 Resident $48.00 per hour NA NA $48.00 $0
326 Non-Resident $53.00 per hour NA NA $53.00 $0
327 Rumrill Sports Park Light Youth League (per hour)
328 City
329 Resident No Charge per hour NA NA No Charge $0
330 Non-Resident No Charge per hour NA NA No Charge $0
331 Non-Profit Governmental
332 Resident $7.00 per hour NA NA $7.00 $0
333 Non-Resident $7.00 per hour NA NA $7.00 $0
334 Private
335 Resident $7.00 per hour NA NA $7.00 $0
336 Non-Resident $7.00 per hour NA NA $7.00 $0
337 For Profit
338 Resident $9.00 per hour NA NA $9.00 $0
15 Comprehensive User Fee Study

COMMUNITY SERVICES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 339 Non-Resident $10.00 per hour NA NA $10.00 $0
340 Rumrill Sports Park Light Adult League (per hour)
341 City
342 Resident No Charge per hour NA NA No Charge $0
343 Non-Resident No Charge per hour NA NA No Charge $0
344 Non-Profit Governmental
345 Resident $14.00 per hour NA NA $14.00 $0
346 Non-Resident $14.00 per hour NA NA $14.00 $0
347 Private
348 Resident $14.00 per hour NA NA $14.00 $0
349 Non-Resident $14.00 per hour NA NA $14.00 $0
350 For Profit
351 Resident $18.00 per hour NA NA $18.00 $0
352 Non-Resident $20.00 per hour NA NA $20.00 $0
353 Banner (per month, per spot)
354 City
355 Resident No Charge per month, per spot NA NA No Charge $0 356 Non-Resident No Charge per month, per spot NA NA No Charge $0 357 Non-Profit Governmental
358 Resident $35.00 per month, per spot NA NA $35.00 $0 359 Non-Resident $75.00 per month, per spot NA NA $75.00 $0 360 Private
361 Resident $85.00 per month, per spot NA NA $85.00 $0 362 Non-Resident $100.00 per month, per spot NA NA $100.00 $0 363 For Profit
364 Resident $125.00 per month, per spot NA NA $125.00 $0 365 Non-Resident $150.00 per month, per spot NA NA $150.00 $0 366 Vendor Kiosk (storage only, per month per kiosk)
367 City
368 Resident No Charge per month, per kiosk NA NA No Charge $0 369 Non-Resident No Charge per month, per kiosk NA NA No Charge $0 370 Non-Profit Governmental
371 Resident $175.00 per month, per kiosk NA NA $175.00 $0 372 Non-Resident $200.00 per month, per kiosk NA NA $200.00 $0 373 Private
374 Resident $225.00 per month, per kiosk NA NA $225.00 $0 375 Non-Resident $250.00 per month, per kiosk NA NA $250.00 $0 376 For Profit
377 Resident $300.00 per month, per kiosk NA NA $300.00 $0 378 Non-Resident $400.00 per month, per kiosk NA NA $400.00 $0 379 Additional Fees
380 Sport Field Concession Stand / Kiosk Rental Monthly 381 City
382 Resident No Charge Monthly NA NA No Charge $0
383 Non-Resident No Charge Monthly NA NA No Charge $0
384 Non-Profit Governmental
16 Comprehensive User Fee Study

COMMUNITY SERVICES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 385 Resident $200.00 Monthly NA NA $200.00 $0
386 Non-Resident $250.00 Monthly NA NA $250.00 $0
387 Private
388 Resident $300.00 Monthly NA NA $300.00 $0
389 Non-Resident $350.00 Monthly NA NA $350.00 $0
390 For Profit
391 Resident $450.00 Monthly NA NA $450.00 $0
392 Non-Resident $525.00 Monthly NA NA $525.00 $0
393 Sport Field Concession Stand / Kiosk Rental Daily
394 City
395 Resident No Charge Daily NA NA No Charge $0
396 Non-Resident No Charge Daily NA NA No Charge $0
397 Non-Profit Governmental
398 Resident $35.00 Daily NA NA $35.00 $0
399 Non-Resident $40.00 Daily NA NA $40.00 $0
400 Private
401 Resident $45.00 Daily NA NA $45.00 $0
402 Non-Resident $50.00 Daily NA NA $50.00 $0
403 For Profit
404 Resident $70.00 Daily NA NA $70.00 $0
405 Non-Resident $80.00 Daily NA NA $80.00 $0
406 Deposit for facilities event rentals or commercial kitchen (refundable)+ 407 City
408 Resident $0.00 NA NA $0.00 $0
409 Non-Resident $250.00 NA NA $250.00 $0
410 Non-Profit Governmental
411 Resident $250.00 NA NA $250.00 $0
412 Non-Resident $250.00 NA NA $250.00 $0
413 Private
414 Resident $400.00 NA NA $400.00 $0
415 Non-Resident $400.00 NA NA $400.00 $0
416 For Profit
417 Resident $400.00 NA NA $400.00 $0
418 Non-Resident $400.00 NA NA $400.00 $0
419 Deposit for Maple Hall event rentals (refundable)+
420 City
421 Resident $0.00 NA NA $0.00 $0
422 Non-Resident $315.00 NA NA $315.00 $0
423 Non-Profit Governmental
424 Resident $315.00 NA NA $315.00 $0
425 Non-Resident $315.00 NA NA $315.00 $0
426 Private
427 Resident $500.00 NA NA $500.00 $0
428 Non-Resident $500.00 NA NA $500.00 $0
429 For Profit
430 Resident $500.00 NA NA $500.00 $0
17 Comprehensive User Fee Study

COMMUNITY SERVICES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 431 Non-Resident $500.00 NA NA $500.00 $0
432 Deposit for meeting rentals (refundable)+
433 City
434 Resident $0.00 NA NA $0.00 $0
435 Non-Resident $50.00 NA NA $50.00 $0
436 Non-Profit Governmental
437 Resident $50.00 NA NA $50.00 $0
438 Non-Resident $50.00 NA NA $50.00 $0
439 Private
440 Resident $50.00 NA NA $50.00 $0
441 Non-Resident $50.00 NA NA $50.00 $0
442 For Profit
443 Resident $50.00 NA NA $50.00 $0
444 Non-Resident $50.00 NA NA $50.00 $0
445 Deposit for fields (refundable)+
446 City
447 Resident $0.00 NA NA $0.00 $0
448 Non-Resident $250.00 NA NA $250.00 $0
449 Non-Profit Governmental
450 Resident $250.00 NA NA $250.00 $0
451 Non-Resident $250.00 NA NA $250.00 $0
452 Private
453 Resident $250.00 NA NA $250.00 $0
454 Non-Resident $250.00 NA NA $250.00 $0
455 For Profit
456 Resident $250.00 NA NA $250.00 $0
457 Non-Resident $250.00 NA NA $250.00 $0
458 Deposit for key for sport fields only (refundable)+ 459 City
460 Resident $300.00 NA NA $300.00 $0
461 Non-Resident $300.00 NA NA $300.00 $0
462 Non-Profit Governmental
463 Resident $300.00 NA NA $300.00 $0
464 Non-Resident $300.00 NA NA $300.00 $0
465 Private
466 Resident $300.00 NA NA $300.00 $0
467 Non-Resident $300.00 NA NA $300.00 $0
468 For Profit
469 Resident $300.00 NA NA $300.00 $0
470 Non-Resident $300.00 NA NA $300.00 $0
471 Audio/Visual Equipment Rental (per event)
472 City
473 Resident No Charge NA NA No Charge $0
474 Non-Resident No Charge NA NA No Charge $0
475 Non-Profit Governmental
476 Resident $75.00 NA NA $75.00 $0
477 Non-Resident $75.00 NA NA $75.00 $0
18 Comprehensive User Fee Study

COMMUNITY SERVICES
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 478 Private
479 Resident $75.00 NA NA $75.00 $0
480 Non-Resident $75.00 NA NA $75.00 $0
481 For Profit
482 Resident $75.00 NA NA $75.00 $0
483 Non-Resident $75.00 NA NA $75.00 $0
484 Alcohol Beverage Fee (non-refundable)+
485 City
486 Resident $75.00 NA NA $75.00 $0
487 Non-Resident $75.00 NA NA $75.00 $0
488 Non-Profit Governmental
489 Resident $75.00 NA NA $75.00 $0
490 Non-Resident $75.00 NA NA $75.00 $0
491 Private
492 Resident $75.00 NA NA $75.00 $0
493 Non-Resident $75.00 NA NA $75.00 $0
494 For Profit
495 Resident $75.00 NA NA $75.00 $0
496 Non-Resident $75.00 NA NA $75.00 $0
497 Application Fee (non-refundable)+
498 City
499 Resident $50.00 NA NA $50.00 $0
500 Non-Resident $50.00 NA NA $50.00 $0
501 Non-Profit Governmental
502 Resident $50.00 NA NA $50.00 $0
503 Non-Resident $50.00 NA NA $50.00 $0
504 Private
505 Resident $50.00 NA NA $50.00 $0
506 Non-Resident $50.00 NA NA $50.00 $0
507 For Profit
508 Resident $50.00 NA NA $50.00 $0
509 Non-Resident $50.00 NA NA $50.00 $0
510 Unscheduled Rental Time (1 hour increments)+ Base Hourly Fee NA NA Base Hourly Fee $0 511 Plus: $40.00 per hour NA NA $40.00 $0
512 Insufficient Funds/Returned Check Fee+ $20.00 per check NA NA $20.00 $0 513 Security Fees $35.00 per guard, per hour
(minimum of 5 hours) $38.00 0% $38.00 $3
514 Rental Changes
515 After Booking $25.00 NA NA $25.00 $0
516 For 30 days or less prior to event $75.00 NA NA $75.00 $0 517 Maintenance Fee for indoor facility rentals (per hour) + $5.00 NA NA $8.00 $3 +Not eligible for fee waiver. Rumrill Sports Park Field 3 is not eligible for any fee waiver. ±Hourly facility rental fees include one Building Attendant @ $24/hour - This portion of fee is not eligible for a fee waiver Indoor Facility Hourly Rates will reflect the addtional $8 hourly maintenance fee on all promtotional materials and City website.

N/P rate = 50% of PRR; F/P Rate = 1 1/2 times PRR; N/R Rate = Resident Rate + 20% 19 Comprehensive User Fee Study

COMMUNITY DEVELOPMENT - PLANNING & ZONING FEES
# Title Current Fee/Charge Unit
Record Retention and
Technology Enhancement
Surcharges Apply Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 CITY COUNCIL Requires City Council review
and approval
2 General Plan Amendment $12,773.00 ** $13,219.21 0% $13,219.00 $446 3 Specific Plan Amendment $10,949.00 ** $13,219.21 0% $13,219.00 $2,270 4 Zoning Amendment $9,123.00 ** $10,169.54 0% $10,169.00 $1,046 5 Development Agreement $12,773.00 ** $12,678.24 0% $12,678.00 -$95 6 Tentative Subdivision Map - Major (Tract Map up to 30 lots including Vesting Map) $10,949.00 up to 30 lots ** $11,023.39 0% $11,023.00 $74 7 Tentative Subdivision Map - (each additional lot, including Vesting Map) $1,823.00 Per addtl lot ** $2,118.71 0% $2,118.00 $295 8 Final Subdivision Map $7,298.00 ** $7,353.28 0% $7,353.00 $55 9 PLANNING COMMISSION
Requires Planning
Commission review and
approval
10 Entertainment Permit $3,648.00 ** $3,843.45 0% $3,843.00 $195 11 Major Design Review $4,326.00 ** $4,410.10 0% $4,410.00 $84 12 Revisions to Approved Plans-Major $3,648.00 ** $3,843.45 0% $3,843.00 $195 13 Variance $5,407.00 ** $5,969.67 0% $5,969.00 $562
14 Conditional Use Permit $5,107.00 ** $4,906.56 0% $4,906.00 -$201 15 Amendment to Conditional Use Permit $3,845.00 ** $3,607.76 0% $3,607.00 -$238 16 Subdivision $7,298.00 ** $7,504.16 0% $7,504.00 $206 17 ZONING ADMINISTRATOR
Requires Z. A. (or authorized
representative) review and
approval
18 Home Occupation Permit $545.00 ** $251.01 0% $251.00 -$294 19 Certificate of Compliance (including Conditional) $2,917.00 plus filing fees ** $2,762.64 0% $2,762.00 -$155 20 Pre-Application Review $911.00 ** $852.28 0% $852.00 -$59 21 Administrative Use Permit $3,003.00 ** $2,743.88 0% $2,743.00 -$260 22 Amendment to Administrative Use Permit $2,005.00 ** $1,937.55 0% $1,937.00 -$68 23 Temporary Use Permit $539.00 ** $308.30 0% $308.00 -$231 24 Zoning Verification Letter $1,093.00 ** $1,160.58 0% $1,160.00 $67 25 Similar Use Determination $1,458.00 ** $1,593.68 0% $1,593.00 $135 26 Minor Adjustment $1,458.00 ** $1,501.76 0% $1,501.00 $43 27 Pre-Construction Meeting $729.00 ** $1,006.43 0% $1,006.00 $277 28 Minor Design Review $2,005.00 ** $2,065.05 0% $2,065.00 $60 29 Revisions to Approved Plans-Minor $1,093.00 ** $1,006.43 0% $1,006.00 -$87 30 Official Code Interpretation $1,458.00 ** $1,366.91 0% $1,366.00 -$92 31 Sign Single $362.00 ** $324.58 0% $324.00 -$38
32 Sign Single -Resubmittal $362.00 ** $324.58 0% $324.00 -$38 33 Sign - Overall Complex $729.00 ** ( 2 signs or more) $649.16 0% $649.00 -$80 34 Nonconforming Parcel, Use or Building $1,458.00 ** $1,521.06 0% $1,521.00 $63 35 Lot Line Adjustment/Parcel Map $2,188.00 ** $2,182.62 0% $2,182.00 -$6 36 Lot Merger $2,188.00 ** $1,638.63 0% $1,638.00 -$550 20 Comprehensive User Fee Study

COMMUNITY DEVELOPMENT - PLANNING & ZONING FEES
# Title Current Fee/Charge Unit
Record Retention and
Technology Enhancement
Surcharges Apply Notes Full Cost Subsidy % Suggested Fee Fee Δ 37 ADU / SB 9 $1,275.00 ** $766.35 0% $766.00 -$509
38 Tree Removal Permit $729.00 ** $698.13 0% $698.00 -$31 39 Landscape Plan Check & Inspection-Minor (NO WELO) $1,823.00 ** $1,786.10 0% $1,786.00 -$37 40 Wireless Communication Facilities $2,917.00 ** $3,107.06 0% $3,107.00 $190 41 Extensions $729.00 ** $698.13 0% $698.00 -$31
42 Expedited Fee Original Fee + 50% NA NA Original Fee + 50% $0 43 Planning Hourly Rate* $180.00 ** $163.04 0% $163.00 -$17 44 ENVIRONMENTAL REVIEW FEES
45 Categorical Exemption $1,458.00 ** $1,447.91 0% $1,447.00 -$11 46 Categorical Exemption - Expanded $2,917.00 ** $2,968.97 0% $2,968.00 $51 47 Initial Study (IS) $4,378.00 Fee + Consult + 17% ** $4,211.09 0% $4,211.00 -$167 48 IS/Negative Declaration $4,378.00 Fee + Consult + 17% ** $4,981.84 0% $4,981.00 $603 49 IS/Mitigated Negative Declaration $5,838.00 Fee + Consult + 17% ** $5,795.80 0% $5,795.00 -$43 50 Addendum to an EIR $7,298.00 Fee + Consult + 17% ** $7,844.91 0% $7,844.00 $546 51 EIR $10,949.00 Fee + Consult + 17% ** $11,154.61 0% $11,154.00 $205 52 Environmental Studies $3,648.00 Fee + Consult + 17% ** $4,166.13 0% $4,166.00 $518 53 Notice of Exemption $729.00 ** $661.56 0% $661.00 -$68 54 Notice of Determination $729.00 ** $661.56 0% $661.00 -$68 55 Notice of Intent $729.00 ** $661.56 0% $661.00 -$68
56 DiMinimus Certificate $1,093.00 ** $1,359.69 0% $1,359.00 $266 57 MAPS/COPIES
58 Zoning Map Actual Cost NA NA Actual Cost $0
59 Zoning Ordinance Actual Cost NA NA Actual Cost $0
60 Housing Element Actual Cost NA NA Actual Cost $0
61 General Plan Actual Cost NA NA Actual Cost $0
62 General Plan Map - Color Actual Cost NA NA Actual Cost $0 63 BUSINESS LICENSE AUTHORIZATION
64 Zoning Clearence Fee $729.00 ** $698.13 0% $698.00 -$31 65 APPEALS
66 Appeal to City Council $4,378.00 ** $4,238.61 0% $4,238.00 -$140 67 Appeal to Planning Commission $4,378.00 ** $4,238.61 0% $4,238.00 -$140 68 All Other Appeals $4,378.00 ** $4,238.61 0% $4,238.00 -$140 69 MISCELLANEOUS FEES
70 Consultant Management 17% of contract cost NA NA 17% of contract cost $0 71 Research Fee $180.00 Per Hour ** $163.04 0% $163.00 -$17 72 Public Art Fee
1% of project value for
commercial projects for
projects with a valuation
of $250k or greater
NA NA
1% of project value for
commercial projects
for projects with a
valuation of $250k or
greater
$0.00
73 SURCHARGES
74 Record Retention Surcharge (4%) 4.00% NA NA 4.00% $0 75 Technology Enhancement Surcharge (5%) 5.00% NA NA 5.00% $0 21 Comprehensive User Fee Study

COMMUNITY DEVELOPMENT - PLANNING & ZONING FEES
# Title Current Fee/Charge Unit
Record Retention and
Technology Enhancement
Surcharges Apply Notes Full Cost Subsidy % Suggested Fee Fee Δ 76 GENERAL PLAN UPDATE
77 General Plan Update Fee New percentage of
building fees 18% 62% 7% NA
78 REFUNDS
79 Refund Schedule Percent Withdrawn
80 Application made and withdrawn 95% of amount paid
81 Application file number assigned 90% of amount paid 82 Agency Referral 75% of amount paid
83 Legal Notice prepared 50% of amount paid
84 Staff Report prepared 25% of amount paid
85 Placed on Commission Agenda 5% of amount paid
The Environmental Review fees that include a consultant cost include a flat application fee and a 17% consultant administration fee.

ADUs applicable for streamlined approval are reviewed as part of the Plan Check process, as under the Building Fee Schedule.

All services not identified above will be charged on an hourly rate basis at the Planning Managers discretion.

Actual Attorney costs will be collected in addition to the above fees, if applicable.

Footnotes:
22 Comprehensive User Fee Study

BUILDING MISCELLANEOUS FEES
# Title
Plan Check
Building
Plan Check
Planning
Plan Check
Public
Works
Building
Inspection
Total Current
Fee/Charge Unit
Record Retention
and Technology
Enhancement
Surcharges Apply
Full Cost
Plan Check
Building
Full Cost
Plan Check
Planning
Full Cost
Plan Check
Public
Works
Full Cost
Building
Inspection
Full Cost
Total
Subsidy
%
Plan Check
Building
Suggested
Fee
Plan Check
Planning
Suggested
Fee
Plan Check
Public
Works
Suggested
Fee
Building
Inspection
Suggested
Fee
Suggested Fee
Total Fee Δ
1 MASONRY FENCES/BLOCK WALLS/RETAINING WALLS
2 Masonry Wall -City Standard -First 100 lineal feet $0.00 $89.00 $0.00 $225.00 $314.00 ** $0.00 $98.50 $0.00 $249.00 $347.50 0% $0.00 $98.00 $0.00 $249.00 $347.00 $33 3 each additional 100 ft $0.00 $0.00 $0.00 $52.00 $52.00 ** $0.00 $0.00 $0.00 $57.55 $57.55 1% $0.00 $0.00 $0.00 $57.00 $57.00 $5 4 Masonry Wall -Special Design- ≤ 6ft high-First 100 lineal feet $236.00 $89.00 $0.00 $377.00 $702.00 ** $261.18 $98.50 $0.00 $417.22 $776.90 0% $261.00 $98.00 $0.00 $417.00 $776.00 $74 5 each additional 100 ft $56.00 $0.00 $0.00 $74.00 $130.00 ** $61.97 $0.00 $0.00 $81.89 $143.87 1% $61.00 $0.00 $0.00 $81.00 $142.00 $12 6 Retaining Wall-City Standard -First 100 lineal ft $0.00 $89.00 $0.00 $300.00 $389.00 ** $0.00 $98.50 $0.00 $332.01 $430.50 0% $0.00 $98.00 $0.00 $332.00 $430.00 $41 7 each additional 100 ft $0.00 $0.00 $0.00 $104.00 $104.00 ** $0.00 $0.00 $0.00 $115.10 $115.10 0% $0.00 $0.00 $0.00 $115.00 $115.00 $11 8 Retaining Wall-Special Design-≤6 ft high-First 100 lineal feet $346.00 $180.00 $188.00 $300.00 $1,014.00 ** $382.91 $199.20 $208.06 $332.01 $1,122.18 0% $382.00 $199.00 $208.00 $332.00 $1,121.00 $107 9 each additional 100 ft $56.00 $0.00 $0.00 $110.00 $166.00 ** $61.97 $0.00 $0.00 $121.74 $183.71 1% $61.00 $0.00 $0.00 $121.00 $182.00 $16 10 Retaining wall-Special design-over 6 ft up to 10 feet high per 100 lineal feet $465.00 $180.00 $188.00 $604.00 $1,437.00 ** $514.61 $199.20 $208.06 $668.44 $1,590.31 0% $514.00 $199.00 $208.00 $668.00 $1,589.00 $152 11 each additional 100 ft $117.00 $0.00 $0.00 $74.00 $191.00 ** $129.48 $0.00 $0.00 $81.89 $211.38 1% $129.00 $0.00 $0.00 $81.00 $210.00 $19 12 FIREPLACES
13 Fireplace - Special Design - Freestanding $465.00 $180.00 $0.00 $453.00 $1,098.00 ** $514.61 $199.20 $0.00 $501.33 $1,215.14 0% $514.00 $199.00 $0.00 $501.00 $1,214.00 $116 14 Factory built fireplace $465.00 $180.00 $0.00 $377.00 $1,022.00 ** $514.61 $199.20 $0.00 $417.22 $1,131.04 0% $514.00 $199.00 $0.00 $417.00 $1,130.00 $108 15 PATIOS RESIDENTIAL/NON RESIDENTIAL
16 Residential Patio Cover-City Std-lattice First 500 sq ft $0.00 $180.00 $0.00 $453.00 $633.00 ** $0.00 $199.20 $0.00 $501.33 $700.53 0% $0.00 $199.00 $0.00 $501.00 $700.00 $67 17 each additional 500 sq ft $0.00 $0.00 $0.00 $74.00 $74.00 ** $0.00 $0.00 $0.00 $81.89 $81.89 1% $0.00 $0.00 $0.00 $81.00 $81.00 $7 18 Residential Patio Cover City Std-Solid roof-first 500 sq ft $0.00 $180.00 $0.00 $453.00 $633.00 ** $0.00 $199.20 $0.00 $501.33 $700.53 0% $0.00 $199.00 $0.00 $501.00 $700.00 $67 19 each additional 500 sq ft $0.00 $0.00 $0.00 $88.00 $88.00 ** $0.00 $0.00 $0.00 $97.39 $97.39 0% $0.00 $0.00 $0.00 $97.00 $97.00 $9 20 Residential Patio Cover Special Design-Lattice-first 500 sq ft $697.00 $180.00 $0.00 $453.00 $1,330.00 ** $771.36 $199.20 $0.00 $501.33 $1,471.90 0% $771.00 $199.00 $0.00 $501.00 $1,471.00 $141 21 each additional 500 sq ft $56.00 $0.00 $0.00 $88.00 $144.00 ** $61.97 $0.00 $0.00 $97.39 $159.36 1% $61.00 $0.00 $0.00 $97.00 $158.00 $14 22 Residential Patio Cover Special Design-Solid roof-first 500 sq ft $697.00 $180.00 $0.00 $453.00 $1,330.00 ** $771.36 $199.20 $0.00 $501.33 $1,471.90 0% $771.00 $199.00 $0.00 $501.00 $1,471.00 $141 23 each additional 500 sq ft $56.00 $0.00 $0.00 $110.00 $166.00 ** $61.97 $0.00 $0.00 $121.74 $183.71 1% $61.00 $0.00 $0.00 $121.00 $182.00 $16 24 Commercial Patio Cover Special Design-Lattice-first 500 sq ft $697.00 $180.00 $0.00 $453.00 $1,330.00 ** $771.36 $199.20 $0.00 $501.33 $1,471.90 0% $771.00 $199.00 $0.00 $501.00 $1,471.00 $141 25 each additional 500 sq ft $56.00 $0.00 $0.00 $88.00 $144.00 ** $61.97 $0.00 $0.00 $97.39 $159.36 1% $61.00 $0.00 $0.00 $97.00 $158.00 $14 26 Commercial Patio Cover Special Design-Solid roof-first 500 sq ft $697.00 $180.00 $0.00 $453.00 $1,330.00 ** $771.36 $199.20 $0.00 $501.33 $1,471.90 0% $771.00 $199.00 $0.00 $501.00 $1,471.00 $141 27 each additional 500 sq ft $56.00 $0.00 $0.00 $110.00 $166.00 ** $61.97 $0.00 $0.00 $121.74 $183.71 1% $61.00 $0.00 $0.00 $121.00 $182.00 $16 28 Patio Enclosure First 500 sq ft - ICC $346.00 $180.00 $0.00 $377.00 $903.00 ** $382.91 $199.20 $0.00 $417.22 $999.34 0% $382.00 $199.00 $0.00 $417.00 $998.00 $95 29 each additional 500 sq ft $0.00 $0.00 $0.00 $110.00 $110.00 ** $0.00 $0.00 $0.00 $121.74 $121.74 1% $0.00 $0.00 $0.00 $121.00 $121.00 $11 30 Patio Enclosure First 500 sq ft - Conventional/Special Design $931.00 $180.00 $327.00 $604.00 $2,042.00 ** $1,030.33 $199.20 $361.89 $668.44 $2,259.86 0% $1,030.00 $199.00 $361.00 $668.00 $2,258.00 $216 31 each additional 500 sq ft $0.00 $0.00 $0.00 $110.00 $110.00 ** $0.00 $0.00 $0.00 $121.74 $121.74 1% $0.00 $0.00 $0.00 $121.00 $121.00 $11 32 Balcony -Special Design-first 500 sq ft $697.00 $180.00 $188.00 $604.00 $1,669.00 ** $771.36 $199.20 $208.06 $668.44 $1,847.06 0% $771.00 $199.00 $208.00 $668.00 $1,846.00 $177 33 each additional 500 sq ft $56.00 $0.00 $0.00 $74.00 $130.00 ** $61.97 $0.00 $0.00 $81.89 $143.87 1% $61.00 $0.00 $0.00 $81.00 $142.00 $12 34 NEW GARAGE/CARPORTS
35 Residential Garage - wood frame -first 500 sq ft $931.00 $238.00 $491.00 $831.00 $2,491.00 ** $1,030.33 $263.39 $543.38 $919.66 $2,756.76 0% $1,030.00 $263.00 $543.00 $919.00 $2,755.00 $264 36 each additional 500 sq ft $56.00 $0.00 $0.00 $300.00 $356.00 ** $61.97 $0.00 $0.00 $332.01 $393.98 0% $61.00 $0.00 $0.00 $332.00 $393.00 $37 37 SFR Carport - City Standard - Solid Roof- first 500 sq ft $236.00 $238.00 $188.00 $453.00 $1,115.00 ** $261.18 $263.39 $208.06 $501.33 $1,233.96 0% $261.00 $263.00 $208.00 $501.00 $1,233.00 $118 38 each additional 500 sq ft $0.00 $0.00 $0.00 $88.00 $88.00 ** $0.00 $0.00 $0.00 $97.39 $97.39 0% $0.00 $0.00 $0.00 $97.00 $97.00 $9 39 SFR Carport - Special Design - first 500 sq ft $465.00 $318.00 $188.00 $453.00 $1,424.00 ** $514.61 $351.93 $208.06 $501.33 $1,575.92 0% $514.00 $351.00 $208.00 $501.00 $1,574.00 $150 40 each additional 500 sq ft $56.00 $0.00 $0.00 $74.00 $130.00 ** $61.97 $0.00 $0.00 $81.89 $143.87 1% $61.00 $0.00 $0.00 $81.00 $142.00 $12 41 MFR/Comm Carport - first 500 sq ft $697.00 $318.00 $188.00 $453.00 $1,656.00 ** $771.36 $351.93 $208.06 $501.33 $1,832.68 0% $771.00 $351.00 $208.00 $501.00 $1,831.00 $175 42 each additional 500 sq ft $56.00 $0.00 $0.00 $74.00 $130.00 ** $61.97 $0.00 $0.00 $81.89 $143.87 1% $61.00 $0.00 $0.00 $81.00 $142.00 $12 43 Wood frame first 500 sq ft $697.00 $318.00 $93.00 $604.00 $1,712.00 ** $771.36 $351.93 $102.92 $668.44 $1,894.65 0% $771.00 $351.00 $102.00 $668.00 $1,892.00 $180 44 each additional 500 sq ft (any material) $56.00 $0.00 $0.00 $74.00 $130.00 ** $61.97 $0.00 $0.00 $81.89 $143.87 1% $61.00 $0.00 $0.00 $81.00 $142.00 $12 45 Masonry $697.00 $318.00 $93.00 $604.00 $1,712.00 ** $771.36 $351.93 $102.92 $668.44 $1,894.65 0% $771.00 $351.00 $102.00 $668.00 $1,892.00 $180 46 Metal/other $697.00 $318.00 $93.00 $453.00 $1,561.00 ** $771.36 $351.93 $102.92 $501.33 $1,727.54 0% $771.00 $351.00 $102.00 $501.00 $1,725.00 $164 47 Loft - Special Design - first 500 sq ft $931.00 $318.00 $0.00 $604.00 $1,853.00 ** $1,030.33 $351.93 $0.00 $668.44 $2,050.69 0% $1,030.00 $351.00 $0.00 $668.00 $2,049.00 $196 48 each additional 500 sq ft $0.00 $0.00 $0.00 $110.00 $110.00 ** $0.00 $0.00 $0.00 $121.74 $121.74 1% $0.00 $0.00 $0.00 $121.00 $121.00 $11 49 GARAGE CONVERSIONS
50 Garage Conversion into bedroom/bathroom not ADU - Conventional Construction- First 500 sq ft $931.00 $318.00 $188.00 $604.00 $2,041.00 ** $1,030.33 $351.93 $208.06 $668.44 $2,258.75 0% $1,030.00 $351.00 $208.00 $668.00 $2,257.00 $216 51 each additional 500 sq ft $0.00 $37.00 $0.00 $110.00 $147.00 ** $0.00 $40.95 $0.00 $121.74 $162.68 1% $0.00 $40.00 $0.00 $121.00 $161.00 $14 52 Garage Conversion into bedrooms/bathrooms not ADU- Special Design - first 500 sq ft $931.00 $318.00 $188.00 $604.00 $2,041.00 ** $1,030.33 $351.93 $208.06 $668.44 $2,258.75 0% $1,030.00 $351.00 $208.00 $668.00 $2,257.00 $216 53 each additional 500 sq ft $0.00 $37.00 $0.00 $110.00 $147.00 ** $0.00 $40.95 $0.00 $121.74 $162.68 1% $0.00 $40.00 $0.00 $121.00 $161.00 $14 54 Existing Garage Conversion into Accessory Dwelling Unit ADU $1,397.00 $638.00 $188.00 $1,210.00 $3,433.00 ** $1,546.04 $706.07 $208.06 $1,339.09 $3,799.26 0% $1,546.00 $706.00 $208.00 $1,339.00 $3,799.00 $366 55 Each Additional 500 sq ft $0.00 $94.00 $37.00 $110.00 $241.00 ** $0.00 $104.03 $40.95 $121.74 $266.71 1% $0.00 $104.00 $40.00 $121.00 $265.00 $24 23 Comprehensive User Fee Study

BUILDING MISCELLANEOUS FEES
# Title
Plan Check
Building
Plan Check
Planning
Plan Check
Public
Works
Building
Inspection
Total Current
Fee/Charge Unit
Record Retention
and Technology
Enhancement
Surcharges Apply
Full Cost
Plan Check
Building
Full Cost
Plan Check
Planning
Full Cost
Plan Check
Public
Works
Full Cost
Building
Inspection
Full Cost
Total
Subsidy
%
Plan Check
Building
Suggested
Fee
Plan Check
Planning
Suggested
Fee
Plan Check
Public
Works
Suggested
Fee
Building
Inspection
Suggested
Fee
Suggested Fee
Total Fee Δ
56 New Accessory Dwelling Unit ADU (fee as a new SFD per sq. ft.) $0.00 $0.00 $0.00 $0.00 $0.00 ** $0.00 $0.00 $0.00 $0.00 $0.00 0% $0.00 $0.00 $0.00 $0.00 $0.00 $0 57 SWIMMING POOLS
58 Swimming Pool-Private-First 800 sq ft $580.00 $180.00 $188.00 $908.00 $1,856.00 ** $641.88 $199.20 $208.06 $1,004.87 $2,054.01 0% $641.00 $199.00 $208.00 $1,004.00 $2,052.00 $196 59 each additional 500 sq ft $27.00 $0.00 $0.00 $225.00 $252.00 ** $29.88 $0.00 $0.00 $249.00 $278.89 0% $29.00 $0.00 $0.00 $249.00 $278.00 $26 60 Swimming Pool Fiberglass / Vinyl $465.00 $180.00 $188.00 $604.00 $1,437.00 ** $514.61 $199.20 $208.06 $668.44 $1,590.31 0% $514.00 $199.00 $208.00 $668.00 $1,589.00 $152 61 Swimming Pool-Public-First 800 Sq ft $931.00 $180.00 $188.00 $1,059.00 $2,358.00 ** $1,030.33 $199.20 $208.06 $1,171.98 $2,609.57 0% $1,030.00 $199.00 $208.00 $1,171.00 $2,608.00 $250 62 each additional 500 sq ft $27.00 $0.00 $0.00 $225.00 $252.00 ** $29.88 $0.00 $0.00 $249.00 $278.89 0% $29.00 $0.00 $0.00 $249.00 $278.00 $26 63 Swimming pool grotto or additional structural/water features - each $236.00 $0.00 $0.00 $300.00 $536.00 ** $261.18 $0.00 $0.00 $332.01 $593.18 0% $261.00 $0.00 $0.00 $332.00 $593.00 $57 64 Swimming pool misc structure or code upgrade/modifications $117.00 $0.00 $0.00 $300.00 $417.00 ** $129.48 $0.00 $0.00 $332.01 $461.49 0% $129.00 $0.00 $0.00 $332.00 $461.00 $44 65 Ponds/Fountains 200 sq ft or less $117.00 $0.00 $0.00 $377.00 $494.00 ** $129.48 $0.00 $0.00 $417.22 $546.70 0% $129.00 $0.00 $0.00 $417.00 $546.00 $52 66 MISCELLANEOUS INSPECTION HOURS
67 Room Addition Single Family Dwelling - first 500 sq ft $1,163.00 $318.00 $188.00 $1,059.00 $2,728.00 ** $1,287.08 $351.93 $208.06 $1,171.98 $3,019.05 0% $1,287.00 $351.00 $208.00 $1,171.00 $3,017.00 $289 68 each additional 500 sq ft $117.00 $0.00 $0.00 $300.00 $417.00 ** $129.48 $0.00 $0.00 $332.01 $461.49 0% $129.00 $0.00 $0.00 $332.00 $461.00 $44 69 Foundation Repair /seismic upgrade/per 200 lineal ft of foundation $236.00 $0.00 $0.00 $453.00 $689.00 ** $261.18 $0.00 $0.00 $501.33 $762.51 0% $261.00 $0.00 $0.00 $501.00 $762.00 $73 70 Window Residential-new/changeout/skylights 1 to 10 $56.00 $0.00 $0.00 $300.00 $356.00 ** $61.97 $0.00 $0.00 $332.01 $393.98 0% $61.00 $0.00 $0.00 $332.00 $393.00 $37 71 Window Residential-new/changeout/skylights additional each 10 $0.00 $0.00 $0.00 $225.00 $225.00 ** $0.00 $0.00 $0.00 $249.00 $249.00 0% $0.00 $0.00 $0.00 $249.00 $249.00 $24 72 Window Non-Residential-new/changeout/skylights (Each storefront) $346.00 $238.00 $0.00 $300.00 $884.00 ** $382.91 $263.39 $0.00 $332.01 $978.31 0% $382.00 $263.00 $0.00 $332.00 $977.00 $93 73 RE-ROOF RESIDENTIAL COMP OVER 1 EXISTING LAYER
74 first 3,000 sq ft. $0.00 $0.00 $0.00 $300.00 $300.00 ** $0.00 $0.00 $0.00 $332.01 $332.01 0% $0.00 $0.00 $0.00 $332.00 $332.00 $32 75 RE-ROOF RESIDENTIAL COMP TEAR OFF AND RESHEATH/SHEATING REPAIR $0.00 $0.00 $0.00 $377.00 $377.00 ** $0.00 $0.00 $0.00 $417.22 $417.22 0% $0.00 $0.00 $0.00 $417.00 $417.00 $40 76 each additional 1500 sq ft $0.00 $0.00 $0.00 $35.00 $35.00 ** $0.00 $0.00 $0.00 $38.73 $38.73 2% $0.00 $0.00 $0.00 $38.00 $38.00 $3 77 RE-ROOF RESIDENTIAL SPECIAL DESIGN TILE ETC
78 first 3000 sq ft $117.00 $0.00 $0.00 $300.00 $417.00 ** $129.48 $0.00 $0.00 $332.01 $461.49 0% $129.00 $0.00 $0.00 $332.00 $461.00 $44 79 each additional 1500 sq ft $19.00 $0.00 $0.00 $12.00 $31.00 ** $21.03 $0.00 $0.00 $13.28 $34.31 1% $21.00 $0.00 $0.00 $13.00 $34.00 $3 80 RE-ROOF MULTI-FAMILY RESIDENTIAL AND COMMERICAL
81 first 20,000 sq ft $236.00 $0.00 $0.00 $604.00 $840.00 ** $261.18 $0.00 $0.00 $668.44 $929.62 0% $261.00 $0.00 $0.00 $668.00 $929.00 $89 82 each additional 20,000 sq ft $9.00 $0.00 $0.00 $110.00 $119.00 ** $9.96 $0.00 $0.00 $121.74 $131.70 1% $9.00 $0.00 $0.00 $121.00 $130.00 $11 83 STORAGE RACKS 6FT AND HIGHER - INTERIOR
84 first 500 lineal ft $931.00 $0.00 $0.00 $453.00 $1,384.00 ** $1,030.33 $0.00 $0.00 $501.33 $1,531.66 0% $1,030.00 $0.00 $0.00 $501.00 $1,531.00 $147 85 each additional 500 ft $56.00 $0.00 $0.00 $110.00 $166.00 ** $61.97 $0.00 $0.00 $121.74 $183.71 1% $61.00 $0.00 $0.00 $121.00 $182.00 $16 86 STORAGE RACKS 6FT AND HIGHER - EXTERIOR
87 first 500 lineal ft $697.00 $318.00 $0.00 $453.00 $1,468.00 ** $771.36 $351.93 $0.00 $501.33 $1,624.62 0% $771.00 $351.00 $0.00 $501.00 $1,623.00 $155 88 each additional 500 ft $56.00 $37.00 $0.00 $74.00 $167.00 ** $61.97 $40.95 $0.00 $81.89 $184.82 2% $61.00 $40.00 $0.00 $81.00 $182.00 $15 89 CELL SITE/ANTENNA NEW & MODIFICATION
90 Cell Site/commercial antenna structure-each (NEW) $931.00 $318.00 $327.00 $908.00 $2,484.00 ** $1,030.33 $351.93 $361.89 $1,004.87 $2,749.01 0% $1,030.00 $351.00 $361.00 $1,004.00 $2,746.00 $262 91 Cell Site/commercial antenna structure-each (MODIFICATION TO EXISTING SITE) $697.00 $180.00 $0.00 $300.00 $1,177.00 ** $771.36 $199.20 $0.00 $332.01 $1,302.57 0% $771.00 $199.00 $0.00 $332.00 $1,302.00 $125 92 COMMERCIAL/INDUSTRIAL CANOPY
93 first 1000 sq ft $697.00 $318.00 $327.00 $604.00 $1,946.00 ** $771.36 $351.93 $361.89 $668.44 $2,153.62 0% $771.00 $351.00 $361.00 $668.00 $2,151.00 $205 94 each additional 1000 sq ft $117.00 $89.00 $0.00 $110.00 $316.00 ** $129.48 $98.50 $0.00 $121.74 $349.71 0% $129.00 $98.00 $0.00 $121.00 $348.00 $32 95 Fueling Station Canopy per 2000 sq ft $931.00 $318.00 $327.00 $756.00 $2,332.00 ** $1,030.33 $351.93 $361.89 $836.66 $2,580.80 0% $1,030.00 $351.00 $361.00 $836.00 $2,578.00 $246 96 SIGN- NON-ELECTRICAL 200 SQ FT OR LESS
97 Sign - Non-Electrical 200 sq ft or less refacing only $0.00 $89.00 $0.00 $300.00 $389.00 ** $0.00 $98.50 $0.00 $332.01 $430.50 0% $0.00 $98.00 $0.00 $332.00 $430.00 $41 98 Wall mounted $117.00 $89.00 $0.00 $225.00 $431.00 ** $129.48 $98.50 $0.00 $249.00 $476.98 0% $129.00 $98.00 $0.00 $249.00 $476.00 $45 99 monument 6 ft high or less $236.00 $89.00 $0.00 $300.00 $625.00 ** $261.18 $98.50 $0.00 $332.01 $691.68 0% $261.00 $98.00 $0.00 $332.00 $691.00 $66 100 Pole sign 200 sq ft or less and 20 ft high or less $346.00 $180.00 $0.00 $300.00 $826.00 ** $382.91 $199.20 $0.00 $332.01 $914.12 0% $382.00 $199.00 $0.00 $332.00 $913.00 $87 101 each additional 200 sq ft and/or each additional 20 ft height $56.00 $37.00 $0.00 $74.00 $167.00 ** $61.97 $40.95 $0.00 $81.89 $184.82 2% $61.00 $40.00 $0.00 $81.00 $182.00 $15 102 SITE ACCESSIBILITY IMPROVEMENTS
103 per ramp $465.00 $0.00 $0.00 $225.00 $690.00 ** $514.61 $0.00 $0.00 $249.00 $763.61 0% $514.00 $0.00 $0.00 $249.00 $763.00 $73 24 Comprehensive User Fee Study

BUILDING MISCELLANEOUS FEES
# Title
Plan Check
Building
Plan Check
Planning
Plan Check
Public
Works
Building
Inspection
Total Current
Fee/Charge Unit
Record Retention
and Technology
Enhancement
Surcharges Apply
Full Cost
Plan Check
Building
Full Cost
Plan Check
Planning
Full Cost
Plan Check
Public
Works
Full Cost
Building
Inspection
Full Cost
Total
Subsidy
%
Plan Check
Building
Suggested
Fee
Plan Check
Planning
Suggested
Fee
Plan Check
Public
Works
Suggested
Fee
Building
Inspection
Suggested
Fee
Suggested Fee
Total Fee Δ
104 per stairway $465.00 $0.00 $0.00 $453.00 $918.00 ** $514.61 $0.00 $0.00 $501.33 $1,015.94 0% $514.00 $0.00 $0.00 $501.00 $1,015.00 $97 105 per Accessible parking $465.00 $0.00 $0.00 $300.00 $765.00 ** $514.61 $0.00 $0.00 $332.01 $846.62 0% $514.00 $0.00 $0.00 $332.00 $846.00 $81 106 per elevator/lift $931.00 $0.00 $0.00 $908.00 $1,839.00 ** $1,030.33 $0.00 $0.00 $1,004.87 $2,035.20 0% $1,030.00 $0.00 $0.00 $1,004.00 $2,034.00 $195 107 parking lot restripe per 100 parking spaces $236.00 $89.00 $0.00 $150.00 $475.00 ** $261.18 $98.50 $0.00 $166.00 $525.68 0% $261.00 $98.00 $0.00 $166.00 $525.00 $50 108 DEMOLITION
109 Pool Demo without Compaction Report $56.00 $0.00 $0.00 $225.00 $281.00 ** $61.97 $0.00 $0.00 $249.00 $310.98 0% $61.00 $0.00 $0.00 $249.00 $310.00 $29 110 Pool Demo with Compaction report $236.00 $0.00 $0.00 $225.00 $461.00 ** $261.18 $0.00 $0.00 $249.00 $510.18 0% $261.00 $0.00 $0.00 $249.00 $510.00 $49 111 Residential Demo (Interior Only) $236.00 $0.00 $0.00 $300.00 $536.00 ** $261.18 $0.00 $0.00 $332.01 $593.18 0% $261.00 $0.00 $0.00 $332.00 $593.00 $57 112 Residential Demo (Exterior Only) $236.00 $0.00 $0.00 $300.00 $536.00 ** $261.18 $0.00 $0.00 $332.01 $593.18 0% $261.00 $0.00 $0.00 $332.00 $593.00 $57 113 Residential Demo (Whole Structure) $236.00 $0.00 $0.00 $453.00 $689.00 ** $261.18 $0.00 $0.00 $501.33 $762.51 0% $261.00 $0.00 $0.00 $501.00 $762.00 $73 114 Non-Res Demo (Interior Only) up to 20,000 square feet $236.00 $0.00 $0.00 $300.00 $536.00 ** $261.18 $0.00 $0.00 $332.01 $593.18 0% $261.00 $0.00 $0.00 $332.00 $593.00 $57 115 Non-Res Demo whole structure $465.00 $0.00 $0.00 $453.00 $918.00 ** $514.61 $0.00 $0.00 $501.33 $1,015.94 0% $514.00 $0.00 $0.00 $501.00 $1,015.00 $97 116 Non-Residential Demo (Exterior Only) New $0.00 $0.00 $0.00 $473.58 $473.58 0% $0.00 $0.00 $0.00 $473.00 $473.00 NA 117 MANUFACTURED HOME NEW INSTALLATION OR REPLACEMENT
118 first Section 12'x60' (720 sq ft) PER HCD FEES NA NA NA NA NA NA PER HCD FEES $0 119 each additional section PER HCD FEES NA NA NA NA NA NA PER HCD FEES $0 120 MANUFACTURED HOME FOUNDATION SYSTEM HCD APPROVED ONLY 121 first Section 12'x60' (720 sq ft) PER HCD FEES NA NA NA NA NA NA PER HCD FEES $0 122 each additional section PER HCD FEES NA NA NA NA NA NA PER HCD FEES $0 123 Manufactured home set up fee/foundation/accessory (not in MHP) New $0.00 $0.00 $0.00 $933.94 $933.94 0% $0.00 $0.00 $0.00 $933.00 $933.00 NA 124 VAULT
125 underground $465.00 $0.00 $0.00 $453.00 $918.00 ** $514.61 $0.00 $0.00 $501.33 $1,015.94 0% $514.00 $0.00 $0.00 $501.00 $1,015.00 $97 126 above ground $465.00 $0.00 $0.00 $453.00 $918.00 ** $514.61 $0.00 $0.00 $501.33 $1,015.94 0% $514.00 $0.00 $0.00 $501.00 $1,015.00 $97 127 SINGLE FAMILY DWELLING AND GARAGE FIRE DAMAGE
128 Up to 30% Fire Damage Miscellaneous - includes 3 plan checks/inspections only $697.00 $0.00 $0.00 $908.00 $1,605.00 ** $771.36 $0.00 $0.00 $1,004.87 $1,776.23 0% $771.00 $0.00 $0.00 $1,004.00 $1,775.00 $170 129 Up to 30%-70% Fire Damage $931.00 $180.00 $0.00 $1,210.00 $2,321.00 ** $1,030.33 $199.20 $0.00 $1,339.09 $2,568.62 0% $1,030.00 $199.00 $0.00 $1,339.00 $2,568.00 $247 130 Up to 70%-100% Fire Damage (Fee for new single family dwelling and new garage will apply) $0.00 ** $0.00 $0.00 $0.00 $0.00 $0.00 0% $0.00 $0 131 STUCCO/SIDING
132 Repair up to 500 square feet $0.00 $0.00 $0.00 $453.00 $453.00 ** $0.00 $0.00 $0.00 $501.33 $501.33 0% $0.00 $0.00 $0.00 $501.00 $501.00 $48 133 Additional square feet up to 1,500 $0.00 $0.00 $0.00 $225.00 $225.00 ** $0.00 $0.00 $0.00 $249.00 $249.00 0% $0.00 $0.00 $0.00 $249.00 $249.00 $24 134 Replacement up to 2000 square feet $0.00 $0.00 $0.00 $756.00 $756.00 ** $0.00 $0.00 $0.00 $836.66 $836.66 0% $0.00 $0.00 $0.00 $836.00 $836.00 $80 135 PERMIT AND PLAN CHECK ESTENSIONS
136 Permit/Plan Check Renewal within 6 months after permit expiration $0.00 $0.00 $0.00 $150.00 $150.00 ** $0.00 $0.00 $0.00 $166.00 $166.00 0% $0.00 $0.00 $0.00 $166.00 $166.00 $16 137 Permit/Plan Check Renewal after 6 months- staff time plus outstanding inspections/plan check $0.00 $0.00 $0.00 $150.00 $150.00 ** $0.00 $0.00 $0.00 $166.00 $166.00 0% $0.00 $0.00 $0.00 $166.00 $166.00 $16 138 DRYROT/TERMITE REPAIR
139 Dryrot/Termite Repair value of <$10,000 like for like $0.00 $0.00 $0.00 $604.00 $604.00 ** $0.00 $0.00 $0.00 $668.44 $668.44 0% $0.00 $0.00 $0.00 $668.00 $668.00 $64 140 Dryrot/Termite Repair value of <$10,000 with plan check $465.00 $0.00 $0.00 $604.00 $1,069.00 ** $514.61 $0.00 $0.00 $668.44 $1,183.05 0% $514.00 $0.00 $0.00 $668.00 $1,182.00 $113 141 Balcony Repair per unit like for like $0.00 $0.00 $0.00 $756.00 $756.00 ** $0.00 $0.00 $0.00 $836.66 $836.66 0% $0.00 $0.00 $0.00 $836.00 $836.00 $80 142 Balcony Repair per unit with plan check $465.00 $0.00 $0.00 $756.00 $1,221.00 ** $514.61 $0.00 $0.00 $836.66 $1,351.27 0% $514.00 $0.00 $0.00 $836.00 $1,350.00 $129 143 DECK/STAIRS REPAIR
144 Walkway including decking, guard rails. Like for like (First walkway up to 500 square feet) $0.00 $0.00 $0.00 $756.00 $756.00 ** $0.00 $0.00 $0.00 $836.66 $836.66 0% $0.00 $0.00 $0.00 $836.00 $836.00 $80 145 Like for like (each additional deck) $0.00 $0.00 $0.00 $150.00 $150.00 ** $0.00 $0.00 $0.00 $166.00 $166.00 0% $0.00 $0.00 $0.00 $166.00 $166.00 $16 146 Stairs and hand/guard rails. Like for like (First flight of stairs) $0.00 $0.00 $0.00 $604.00 $604.00 ** $0.00 $0.00 $0.00 $668.44 $668.44 0% $0.00 $0.00 $0.00 $668.00 $668.00 $64 147 Like for like (each additional flight of stairs) $0.00 $0.00 $0.00 $150.00 $150.00 ** $0.00 $0.00 $0.00 $166.00 $166.00 0% $0.00 $0.00 $0.00 $166.00 $166.00 $16 148 Walkway including decking, guard rails. With Plan Check (First walkway up to 500 square feet) $465.00 $0.00 $0.00 $604.00 $1,069.00 ** $514.61 $0.00 $0.00 $668.44 $1,183.05 0% $514.00 $0.00 $0.00 $668.00 $1,182.00 $113 25 Comprehensive User Fee Study

BUILDING MISCELLANEOUS FEES
# Title
Plan Check
Building
Plan Check
Planning
Plan Check
Public
Works
Building
Inspection
Total Current
Fee/Charge Unit
Record Retention
and Technology
Enhancement
Surcharges Apply
Full Cost
Plan Check
Building
Full Cost
Plan Check
Planning
Full Cost
Plan Check
Public
Works
Full Cost
Building
Inspection
Full Cost
Total
Subsidy
%
Plan Check
Building
Suggested
Fee
Plan Check
Planning
Suggested
Fee
Plan Check
Public
Works
Suggested
Fee
Building
Inspection
Suggested
Fee
Suggested Fee
Total Fee Δ
149 Each additional deck $117.00 $0.00 $0.00 $300.00 $417.00 ** $129.48 $0.00 $0.00 $332.01 $461.49 0% $129.00 $0.00 $0.00 $332.00 $461.00 $44 150 Stairs and hand/guard rails. With Plan Check (First flight of stairs) $465.00 $0.00 $0.00 $300.00 $765.00 ** $514.61 $0.00 $0.00 $332.01 $846.62 0% $514.00 $0.00 $0.00 $332.00 $846.00 $81 151 Each additional flight of stairs $0.00 $0.00 $0.00 $150.00 $150.00 ** $0.00 $0.00 $0.00 $166.00 $166.00 0% $0.00 $0.00 $0.00 $166.00 $166.00 $16 152 OTHER PROCESSES
153 Permit Transfer New NA NA NA NA NA NA
10%*Original
Permit
including Plan
Check
NA
154 Change of Contractor New $282.56 $0.00 $0.00 $0.00 $282.56 0% $282.00 $0.00 $0.00 $0.00 $282.00 NA 155 Address Assignments Commercial $0.00 $0.00 $0.00 $750.00 $750.00 ** $0.00 $0.00 $0.00 $830.02 $830.02 0% $0.00 $0.00 $0.00 $830.00 $830.00 $80 156 Address Assignments Residential $0.00 $0.00 $0.00 $300.00 $300.00 ** $0.00 $0.00 $0.00 $332.01 $332.01 0% $0.00 $0.00 $0.00 $332.00 $332.00 $32 157 Refunds 80% of inspection/Plan check fees if no inspections/plan check was performed $0.00 $0.00 $0.00 $0.00 $0.00 ** $0.00 $0.00 $0.00 $0.00 $0.00 0% $0.00 $0.00 $0.00 $0.00 $0.00 $0 158 Temporary Certificate of Occupancy $236.00 $0.00 $0.00 $453.00 $689.00 ** $261.18 $0.00 $0.00 $501.33 $762.51 0% $261.00 $0.00 $0.00 $501.00 $762.00 $73 159 New Construction Certificate of Occupancy or duplication/Issuance after special Occupancy Inspection $236.00 $0.00 $0.00 $453.00 $689.00 ** $261.18 $0.00 $0.00 $501.33 $762.51 0% $261.00 $0.00 $0.00 $501.00 $762.00 $73 160 Occupancy Inspection for business license $236.00 $0.00 $0.00 $150.00 $386.00 ** $261.18 $0.00 $0.00 $166.00 $427.18 0% $261.00 $0.00 $0.00 $166.00 $427.00 $41 161 Double fees Double the permit fees for work performed prior to obtaining the required permit $0.00 $0.00 $0.00 $0.00 $0.00 ** $0.00 $0.00 $0.00 $0.00 $0.00 0% $0.00 $0.00 $0.00 $0.00 $0.00 $0 162 Duplication of job cards/documents $0.00 $0.00 $0.00 $74.00 $74.00 ** $0.00 $0.00 $0.00 $81.89 $81.89 1% $0.00 $0.00 $0.00 $81.00 $81.00 $7 163 Duplication of plans –fee +28% $0.00 $0.00 $0.00 $0.00 $0.00 ** $0.00 $0.00 $0.00 $0.00 $0.00 0% $0.00 $0.00 $0.00 $0.00 $0.00 $0 164 Research fee hourly minimum 1 hour $0.00 $0.00 $0.00 $150.00 $150.00 ** $0.00 $0.00 $0.00 $166.00 $166.00 0% $0.00 $0.00 $0.00 $166.00 $166.00 $16 165 Special Inspection and Testing Agency Approval ( approval for 2 years) $0.00 $0.00 $0.00 $300.00 $300.00 3 hours ** $0.00 $0.00 $0.00 $473.58 $473.58 0% $0.00 $0.00 $0.00 $473.00 $473.00 $173 166 sheds over 120 square feet up to 500 square feet $697.00 $318.00 $188.00 $604.00 $1,807.00 ** $771.36 $351.93 $208.06 $668.44 $1,999.79 0% $771.00 $351.00 $208.00 $668.00 $1,998.00 $191 167 Flag pole - Special Design - each $236.00 $89.00 $0.00 $225.00 $550.00 ** $261.18 $98.50 $0.00 $249.00 $608.68 0% $261.00 $98.00 $0.00 $249.00 $608.00 $58 168 Silo - Per 5000 Cu ft volume $931.00 $180.00 $0.00 $453.00 $1,564.00 ** $1,030.33 $199.20 $0.00 $501.33 $1,730.86 0% $1,030.00 $199.00 $0.00 $501.00 $1,730.00 $166 169 Miscellaneous - includes 3 plan checks/inspections only $697.00 $638.00 $0.00 $756.00 $2,091.00 ** $771.36 $706.07 $0.00 $836.66 $2,314.08 0% $771.00 $706.00 $0.00 $836.00 $2,313.00 $222 170 Bleachers per 1000 sq ft $697.00 $180.00 $0.00 $604.00 $1,481.00 ** $771.36 $199.20 $0.00 $668.44 $1,639.01 0% $771.00 $199.00 $0.00 $668.00 $1,638.00 $157 171 CASP Review - Per Hour $0.00 $0.00 $0.00 $300.00 $300.00 ** $0.00 $0.00 $0.00 $332.01 $332.01 0% $0.00 $0.00 $0.00 $332.00 $332.00 $32 172 Code Compliance Inspection, Stop Work Order Fine per hour $0.00 $0.00 $0.00 $150.00 $150.00 ** $0.00 $0.00 $0.00 $166.00 $166.00 0% $0.00 $0.00 $0.00 $166.00 $166.00 $16 173 Stand Alone Plan Check -per hour plus permit tech processing fee $236.00 $0.00 $0.00 $0.00 $236.00 ** $261.18 $0.00 $0.00 $0.00 $261.18 0% $261.00 $0.00 $0.00 $0.00 $261.00 $25 174 Investigation Inspection residential single family dwelling $0.00 $0.00 $0.00 $604.00 $604.00 ** $0.00 $0.00 $0.00 $668.44 $668.44 0% $0.00 $0.00 $0.00 $668.00 $668.00 $64 175 Investigation Inspection residential Multifamily up to 20 units $0.00 $0.00 $0.00 $908.00 $908.00 ** $0.00 $0.00 $0.00 $1,004.87 $1,004.87 0% $0.00 $0.00 $0.00 $1,004.00 $1,004.00 $96 176 Investigation Inspection non-residential $0.00 $0.00 $0.00 $756.00 $756.00 ** $0.00 $0.00 $0.00 $836.66 $836.66 0% $0.00 $0.00 $0.00 $836.00 $836.00 $80 177 Boarding New $0.00 $0.00 $0.00 $243.40 $243.40 0% $0.00 $0.00 $0.00 $243.00 $243.00 NA 178 Soils review processing by City staff New $0.00 $0.00 $0.00 $460.36 $460.36 0% $0.00 $0.00 $0.00 $460.00 $460.00 NA 179 Trash Enclosure New $0.00 $71.41 $63.69 $1,299.04 $1,434.14 0% $0.00 $71.00 $63.00 $1,299.00 $1,433.00 NA 180 FEMA flood review New $0.00 $0.00 $0.00 $460.36 $460.36 0% $0.00 $0.00 $0.00 $460.00 $460.00 NA 181 Additional plan review by consultant after the third re-check New NA NA NA NA NA NA Consultant Cost plus 30% NA
182 Commercial Vapor Recovery Systems New $0.00 $0.00 $0.00 $690.53 $690.53 0% $0.00 $0.00 $0.00 $690.00 $690.00 NA 183 Listed Factory Build Spa (each) New $0.00 $0.00 $0.00 $351.88 $351.88 0% $0.00 $0.00 $0.00 $351.00 $351.00 NA 184 Fire Hazard Severity Zone Review New $0.00 $0.00 $0.00 $230.18 $230.18 0% $0.00 $0.00 $0.00 $230.00 $230.00 NA 185 Water Efficient Landscape Review (MWELO) New $0.00 $0.00 $0.00 $460.36 $460.36 0% $0.00 $0.00 $0.00 $460.00 $460.00 NA 186 Construction Waste Management New $110.09 $0.00 $0.00 $121.70 $231.79 0% $110.00 $0.00 $0.00 $121.00 $231.00 NA 187 Hearing fee New NA NA NA NA NA NA Cost of Citation NA 188 Inspections outside of normal business hours, 0-4 hours (minimum charge) $0.00 $0.00 $0.00 $604.00 $604.00 ** $0.00 $0.00 $0.00 $668.44 $668.44 0% $0.00 $0.00 $0.00 $668.00 $668.00 $64 189 Reinspection Fee (per hour) $0.00 $0.00 $0.00 $150.00 $150.00 ** $0.00 $0.00 $0.00 $166.00 $166.00 0% $0.00 $0.00 $0.00 $166.00 $166.00 $16 190 Inspections for which no fee is specifically indicated, per hour (minimum charge = 1 hour) $0.00 $0.00 $0.00 $150.00 $150.00 ** $0.00 $0.00 $0.00 $166.00 $166.00 0% $0.00 $0.00 $0.00 $166.00 $166.00 $16 191 Additional Plan Review required by changes, additions, or revisions to approved plans, per hour (minimum charge = 1 hour) $236.00 $0.00 $0.00 $0.00 $236.00 ** $261.18 $0.00 $0.00 $0.00 $261.18 0% $261.00 $0.00 $0.00 $0.00 $261.00 $25 192 REMODEL
193 Kitchen/Bath Remodel/ non structural (per room) $0.00 $0.00 $0.00 $600.00 $600.00 ** $0.00 $0.00 $0.00 $664.01 $664.01 0% $0.00 $0.00 $0.00 $664.00 $664.00 $64 194 House Remodel/ plan check required(up to 3000sf) does not include M,P,E $1,616.00 $0.00 $0.00 $1,047.00 $2,663.00 ** $1,788.41 $0.00 $0.00 $1,158.70 $2,947.11 0% $1,788.00 $0.00 $0.00 $1,158.00 $2,946.00 $283 26 Comprehensive User Fee Study

BUILDING MISCELLANEOUS FEES
# Title
Plan Check
Building
Plan Check
Planning
Plan Check
Public
Works
Building
Inspection
Total Current
Fee/Charge Unit
Record Retention
and Technology
Enhancement
Surcharges Apply
Full Cost
Plan Check
Building
Full Cost
Plan Check
Planning
Full Cost
Plan Check
Public
Works
Full Cost
Building
Inspection
Full Cost
Total
Subsidy
%
Plan Check
Building
Suggested
Fee
Plan Check
Planning
Suggested
Fee
Plan Check
Public
Works
Suggested
Fee
Building
Inspection
Suggested
Fee
Suggested Fee
Total Fee Δ
195 DEFERRED SUBMITTAL PLANCHECKS
196 Residential Trusses (Hourly minimum 2 hours) $465.00 $0.00 $0.00 $0.00 $465.00 ** $514.61 $0.00 $0.00 $0.00 $514.61 0% $514.00 $0.00 $0.00 $0.00 $514.00 $49 197 Non Residential Trusses (Hourly Minimum 2 hours) $465.00 $0.00 $0.00 $0.00 $465.00 ** $514.61 $0.00 $0.00 $0.00 $514.61 0% $514.00 $0.00 $0.00 $0.00 $514.00 $49 198 Alternate means and methods review (Hourly 2 hours minimum) $465.00 $0.00 $0.00 $0.00 $465.00 ** $514.61 $0.00 $0.00 $0.00 $514.61 0% $514.00 $0.00 $0.00 $0.00 $514.00 $49 199 Technology enhancement fee 5% of permit fee 5% of permit fee NA NA NA NA NA NA 5% of permit
fee $0
200 Document archive fee/ scanning per page $1.00 $0.00 $0.00 $0.00 $1.00 ** $1.11 $0.00 $0.00 $0.00 $1.11 0% $1.11 $0.00 $0.00 $0.00 $1.11 $0.11 201 RESIDENTIAL HEALTH AND SAFETY
202 Rental/Re-Sale Property Application/Inspection SFR/Condo/TH/Duplex - Section 15.52 $0.00 $0.00 $0.00 $514.00 $514.00 ** $0.00 $0.00 $0.00 $568.84 $568.84 0% $0.00 $0.00 $0.00 $568.00 $568.00 $54 203 Rental Re-Sale Property Application/Inspection Multi-family up to 10 Units - Section 15.52 $0.00 $0.00 $0.00 $735.00 $735.00 ** $0.00 $0.00 $0.00 $813.42 $813.42 0% $0.00 $0.00 $0.00 $813.00 $813.00 $78 204 Additional Per Dwelling Units (Rental/Re-sale) Duplex/Multiple Units - Section 15.52 $0.00 $0.00 $0.00 $84.00 $84.00 ** $0.00 $0.00 $0.00 $92.96 $92.96 1% $0.00 $0.00 $0.00 $92.00 $92.00 $8 205 Re-inspection per hour $0.00 $0.00 $0.00 $150.00 $150.00 ** $0.00 $0.00 $0.00 $166.00 $166.00 0% $0.00 $0.00 $0.00 $166.00 $166.00 $16 206 PLANNING FINAL INSPECTION FOR BUILDING
207 Minor (SFR & Duplex) $0.00 $238.00 $0.00 $0.00 $238.00 ** $0.00 $263.39 $0.00 $0.00 $263.39 0% $0.00 $263.00 $0.00 $0.00 $263.00 $25 208 Major (all others) $0.00 $477.00 $0.00 $0.00 $477.00 ** $0.00 $527.89 $0.00 $0.00 $527.89 0% $0.00 $527.00 $0.00 $0.00 $527.00 $50 209 PUBLIC WORKS FINAL INSPECTION FOR BUILDING
210 Minor (SFR & Duplex) New $0.00 $0.00 $198.94 $0.00 $198.94 0% $0.00 $0.00 $198.00 $0.00 $198.00 NA 211 Major (all others) New $0.00 $0.00 $397.88 $0.00 $397.88 0% $0.00 $0.00 $397.00 $0.00 $397.00 NA 212 SURCHARGES
213 Record Retention Surcharge (4%) 4.00% NA NA NA NA NA NA 4.00% $0 214 Technology Enhancement Surcharge (5%) 5.00% NA NA NA NA NA NA 5.00% $0 Footnotes

1. The plan check fee includes 3 reviews. Should there be more than 3 reviews, additional hourly fees will be charged based on current billable hourly rates for City of San Pablo reviewers or actual hourly contracted rates for consultant reviews.

2. The above schedule covers most common and straight forward permit types. Fees for projects outside of the listed items shall be estimated by the Building Official based on degree of complexity and size.

3. Where no fee is specified or there is an unusual circumstance, that fee shall be determined by the Building Official.

4. Where plans are incomplete or changed so as to require additional plan checking, an additional plan check fee shall be charged at the rate established by the Fee schedule and the minimum hours as determined by the Building Official.

5. Over the counter permits and permits requiring plan review approval by Planning will be charged an additional hourly fee as determined by the Planning Manager.

Permit Refunds: The Building Official shall not authorize the refunding of any fee paid except upon written application filed by the original permitee not later than 180 days after the date of fee payment. The Building Official may authorize the refunding of any fee paid hereunder which was erroneusly paid or collected. The Building Official may authorize the refunding of not more than 80 percent of the permit fee paid when no work has been done under a permit issued in accordance with this chapter. The Building Official may authorize the refunding of not more than 80 percent of the plan review fee paid when an application for a permit for which a plan review fee has been paid is withdrawn or canceled before any plan checking is done.

Permit Fee covers a maximum of two inspection trips to the property. Any additional inspections will be charged based on inspection hourly rate.

7. A permit processing fee of $150 is applicable to all permits 27 Comprehensive User Fee Study
BUILDING FEES: MECHANICAL, PLUMBING & ELECTRICAL PERMITS # Title Inspection Fee Plan Check Fee
Total Current
Fee/Charge Unit
Record Retention and
Technology
Enhancement
Surcharges Apply Notes
Full Cost
Inspection
Full Cost
Plan Check
Full Cost
Total
Subsidy %
Inspection
Suggested Fee
Plan Check
Suggested Fee
Suggested Fee
Total Fee Δ
1 ELECTRICAL
2 Stand Alone Plan Check -per hour $0.00 $236.00 $236.00 ** $0.00 $261.18 $261.18 0% $0.00 $261.00 $261.00 $25 3 Single Family Residential
4 New Service-Single Family Dwelling 225 amp or less service (includes Circuits, Outlets, Switches, etc no sub-panels included) $300.00 $346.00 $646.00 ** $332.01 $382.91 $714.92 0% $332.00 $382.00 $714.00 $68 5 Sub-Panels-Single family Single phase 225 amps or less $150.00 $117.00 $267.00 ** $166.00 $129.48 $295.49 0% $166.00 $129.00 $295.00 $28 6 New Service-Single Family Single phase Services 400 amps or less $300.00 $236.00 $536.00 ** $332.01 $261.18 $593.18 0% $332.00 $261.00 $593.00 $57 7 Service Change-Out -Single Family Single phase $150.00 $0.00 $150.00 ** $166.00 $0.00 $166.00 0% $166.00 $0.00 $166.00 $16 8 Residential rewire without panel change out minimum fee from 500 to 3,000 square feet (includes Circuits, Outlets, Switches, etc and 1 sub- panels included)
$377.00 $0.00 $377.00 ** $417.22 $0.00 $417.22 0% $417.00 $0.00 $417.00 $40 9 Residential rewire with panel change out minimum fee from 500 to 3,000 square feet (includes Circuits, Outlets, Switches, etc and (1) sub-panels included)
$453.00 $0.00 $453.00 ** $501.33 $0.00 $501.33 0% $501.00 $0.00 $501.00 $48 10 Residential rewire with panel change out minimum fee from 3,500 to 5,000 square feet (includes Circuits, Outlets, Switches, etc and 1 sub-panels included)
$527.00 $0.00 $527.00 ** $583.22 $0.00 $583.22 0% $583.00 $0.00 $583.00 $56 11 400 Amps $150.00 $346.00 $496.00 ** $166.00 $382.91 $548.92 0% $166.00 $382.00 $548.00 $52 12 600 Amps $225.00 $465.00 $690.00 ** $249.00 $514.61 $763.61 0% $249.00 $514.00 $763.00 $73 13 Commercial/Industrial and all three phase - "service only" change out 14 225 Amps or less $150.00 $117.00 $267.00 ** $166.00 $129.48 $295.49 0% $166.00 $129.00 $295.00 $28 15 400 Amps $150.00 $236.00 $386.00 ** $166.00 $261.18 $427.18 0% $166.00 $261.00 $427.00 $41 16 600 Amps $225.00 $236.00 $461.00 ** $249.00 $261.18 $510.18 0% $249.00 $261.00 $510.00 $49 17 800 Amps $300.00 $236.00 $536.00 ** $332.01 $261.18 $593.18 0% $332.00 $261.00 $593.00 $57 18 1000 Amps $453.00 $465.00 $918.00 ** $501.33 $514.61 $1,015.94 0% $501.00 $514.00 $1,015.00 $97 19 1200 Amps $604.00 $465.00 $1,069.00 ** $668.44 $514.61 $1,183.05 0% $668.00 $514.00 $1,182.00 $113 20 1600 Amps $604.00 $580.00 $1,184.00 ** $668.44 $641.88 $1,310.32 0% $668.00 $641.00 $1,309.00 $125 21 each 1000 Amps over 1600 $150.00 $236.00 $386.00 ** $166.00 $261.18 $427.18 0% $166.00 $261.00 $427.00 $41 22 Sub-Panels, motor control panels etc. Commercial/Industrial all three phase, includes all circuits
23 225 Amps or less $300.00 $465.00 $765.00 ** $332.01 $514.61 $846.62 0% $332.00 $514.00 $846.00 $81 24 400 Amps $300.00 $465.00 $765.00 ** $332.01 $514.61 $846.62 0% $332.00 $514.00 $846.00 $81 25 600 Amps $453.00 $465.00 $918.00 ** $501.33 $514.61 $1,015.94 0% $501.00 $514.00 $1,015.00 $97 26 800 Amps $453.00 $697.00 $1,150.00 ** $501.33 $771.36 $1,272.69 0% $501.00 $771.00 $1,272.00 $122 27 1000 Amps $604.00 $697.00 $1,301.00 ** $668.44 $771.36 $1,439.80 0% $668.00 $771.00 $1,439.00 $138 28 1200 Amps $604.00 $697.00 $1,301.00 ** $668.44 $771.36 $1,439.80 0% $668.00 $771.00 $1,439.00 $138 29 1600 Amps $604.00 $697.00 $1,301.00 ** $668.44 $771.36 $1,439.80 0% $668.00 $771.00 $1,439.00 $138 30 each 1000 Amps over 1600 $150.00 $346.00 $496.00 ** $166.00 $382.91 $548.92 0% $166.00 $382.00 $548.00 $52 31 Other Misc Electrical Items
32 Transformer - each $74.00 $236.00 $310.00 ** $81.89 $261.18 $343.07 0% $81.00 $261.00 $342.00 $32 33 Generator - Permanent - Each under 400 lbs $225.00 $346.00 $571.00 ** $249.00 $382.91 $631.92 0% $249.00 $382.00 $631.00 $60 34 Generator - Permanent - Each over 400 lbs $300.00 $465.00 $765.00 ** $332.01 $514.61 $846.62 0% $332.00 $514.00 $846.00 $81 35 Generator - Permanent - Large Commercial Standby $453.00 $931.00 $1,384.00 ** $501.33 $1,030.33 $1,531.66 0% $501.00 $1,030.00 $1,531.00 $147 36 Generator - Temp - more than 8kW $150.00 $56.00 $206.00 ** $166.00 $61.97 $227.98 0% $166.00 $61.00 $227.00 $21 37 Solar - Photovotaic - Residential (includes plan check and inspection fee) $177.00 $273.00 $450.00 ** NA NA NA NA $450.00 $0 38 Solar - Photovoltaic- Commercial up to 50kW (includes plan check and inspection fee) $252.00 $485.00 $737.00 ** NA NA NA NA $1,000.00 $263 39 plus $ per kW for each kW between 51kW and 250 kW (includes plan check and inspection fee) $32.00 $49.00 $81.00 ** NA NA NA NA $7.00 -$74 40 plus $ per kW for each kW for each kW above 250kW (includes plan check and inspection fee) $32.00 $49.00 $81.00 ** NA NA NA NA $5.00 -$76 41 Thermal systems up to 30 kWth (includes plan check and inspection fee) $211.00 $327.00 $538.00 ** NA NA NA NA $1,000.00 $462 42 plus $ per kWth for each kWth between 31kWth and 260kWth (includes plan check and inspection fee) $15.00 $0.00 $15.00 ** NA NA NA NA $7.00 -$8 28 Comprehensive User Fee Study
BUILDING FEES: MECHANICAL, PLUMBING & ELECTRICAL PERMITS # Title Inspection Fee Plan Check Fee
Total Current
Fee/Charge Unit
Record Retention and
Technology
Enhancement
Surcharges Apply Notes
Full Cost
Inspection
Full Cost
Plan Check
Full Cost
Total
Subsidy %
Inspection
Suggested Fee
Plan Check
Suggested Fee
Suggested Fee
Total Fee Δ
43 plus $ per kWth for each kWth above 260 kWth (includes plan check and inspection fee) $15.00 $0.00 $15.00 ** NA NA NA NA $5.00 -$10 44 Solar - Photovotaic - Residential Load Center Subpanel - 200 amps or less $63.00 $97.00 $160.00 ** $69.72 $107.35 $177.07 1% $69.00 $107.00 $176.00 $16 45 Solar - Photovotaic - Residential Storage Batteries systems - 200 amps or less $63.00 $97.00 $160.00 ** $69.72 $107.35 $177.07 1% $69.00 $107.00 $176.00 $16 46 Temporary Power Pole $74.00 $56.00 $130.00 ** $81.89 $61.97 $143.87 1% $81.00 $61.00 $142.00 $12 47 Temporary Power Pole - Addtl receptable pole $28.00 $56.00 $84.00 ** $30.99 $61.97 $92.96 2% $30.00 $61.00 $91.00 $7 48 Light Stand - First 5 poles $300.00 $346.00 $646.00 ** $332.01 $382.91 $714.92 0% $332.00 $382.00 $714.00 $68 49 Each Addtl 5 Poles $74.00 $117.00 $191.00 ** $81.89 $129.48 $211.38 1% $81.00 $129.00 $210.00 $19 50 Electrical Sign-Per Sign 200 sq ft or less/ includes 2 sign transformers 51 Wall mounted 200 sq ft or less $150.00 $406.00 $556.00 ** $166.00 $449.32 $615.32 0% $166.00 $449.00 $615.00 $59 52 Monument 6 ft high or less and 200 sq ft or less $300.00 $346.00 $646.00 ** $332.01 $382.91 $714.92 0% $332.00 $382.00 $714.00 $68 53 Pole/Monument sign 200 sq ft or less and 20 ft high or less $300.00 $580.00 $880.00 ** $332.01 $641.88 $973.89 0% $332.00 $641.00 $973.00 $93 54 Each addtl 200 sq ft and/or 20 ft $74.00 $117.00 $191.00 ** $81.89 $129.48 $211.38 1% $81.00 $129.00 $210.00 $19 55 Hazardous Locations Misc Electrical $300.00 $465.00 $765.00 ** $332.01 $514.61 $846.62 0% $332.00 $514.00 $846.00 $81 56 Fuel Cell - Power Generating System, each 200 amp ac $300.00 $465.00 $765.00 ** $332.01 $514.61 $846.62 0% $332.00 $514.00 $846.00 $81 57 Electrical Vehicle Charging Station:
58 Commercial $300.00 $697.00 $997.00 ** $332.01 $771.36 $1,103.37 0% $332.00 $771.00 $1,103.00 $106 59 Residential $150.00 $236.00 $386.00 ** $166.00 $261.18 $427.18 0% $166.00 $261.00 $427.00 $41 60 EV- only Main Service Panel $150.00 $236.00 $386.00 ** $166.00 $261.18 $427.18 0% $166.00 $261.00 $427.00 $41 61 Electrical Meter Reset $225.00 $0.00 $225.00 ** $249.00 $0.00 $249.00 0% $249.00 $0.00 $249.00 $24 62 Misc Electrical circuits-Residential $300.00 $236.00 $536.00 ** $332.01 $261.18 $593.18 0% $332.00 $261.00 $593.00 $57 63 Misc Electrical circuits- Non Residential $300.00 $465.00 $765.00 ** $332.01 $514.61 $846.62 0% $332.00 $514.00 $846.00 $81 64 Swimming pool pump motor $150.00 $117.00 $267.00 ** $166.00 $129.48 $295.49 0% $166.00 $129.00 $295.00 $28 65 PLUMBING
66 Stand Alone Plan Check Per Hour $0.00 $236.00 $236.00 ** $0.00 $261.18 $261.18 0% $0.00 $261.00 $261.00 $25 67 Plumbing fixtures (each)water closet, lavatories, tubs, dishwasher, urinals, showers, floor drains, etc. $28.00 $0.00 $28.00 ** $30.99 $0.00 $30.99 3% $30.00 $0.00 $30.00 $2 68 Water Heater-storage tank 100 Gal or less $74.00 $0.00 $74.00 ** $81.89 $0.00 $81.89 1% $81.00 $0.00 $81.00 $7 69 Water Heater-storage tank over 100 Gal $74.00 $236.00 $310.00 ** $81.89 $261.18 $343.07 0% $81.00 $261.00 $342.00 $32 70 Tankless Water Heater- 199,000 btu or less $150.00 $236.00 $386.00 ** $166.00 $261.18 $427.18 0% $166.00 $261.00 $427.00 $41 71 Water Heater-Electrical instantaneous (intsa hot) $28.00 $0.00 $28.00 ** $30.99 $0.00 $30.99 3% $30.00 $0.00 $30.00 $2 72 Each Gas Outlet $28.00 $0.00 $28.00 ** $30.99 $0.00 $30.99 3% $30.00 $0.00 $30.00 $2 73 Hose Bibb $28.00 $0.00 $28.00 ** $30.99 $0.00 $30.99 3% $30.00 $0.00 $30.00 $2 74 Lawn Sprinkler valve/Backflow device $28.00 $0.00 $28.00 ** $30.99 $0.00 $30.99 3% $30.00 $0.00 $30.00 $2 75 Building Sewer/Trailer park sewer-per unit $74.00 $0.00 $74.00 ** $81.89 $0.00 $81.89 1% $81.00 $0.00 $81.00 $7 76 Septic Tank Demolition $150.00 $56.00 $206.00 ** $166.00 $61.97 $227.98 0% $166.00 $61.00 $227.00 $21 77 Interceptor-Grease, oil, sand etc $225.00 $465.00 $690.00 ** $249.00 $514.61 $763.61 0% $249.00 $514.00 $763.00 $73 78 Water Softener $28.00 $0.00 $28.00 ** $30.99 $0.00 $30.99 3% $30.00 $0.00 $30.00 $2 79 Water Repipe-Single Family Dwelling $300.00 $117.00 $417.00 ** $332.01 $129.48 $461.49 0% $332.00 $129.00 $461.00 $44 80 Misc piping per 300 lineal ft $74.00 $56.00 $130.00 ** $81.89 $61.97 $143.87 1% $81.00 $61.00 $142.00 $12 81 Medical Gas/Air outlets each $35.00 $236.00 $271.00 ** $38.73 $261.18 $299.91 0% $38.00 $261.00 $299.00 $28 82 Gray Water System $225.00 $236.00 $461.00 ** $249.00 $261.18 $510.18 0% $249.00 $261.00 $510.00 $49 83 Roof Drains - per building $225.00 $236.00 $461.00 ** $249.00 $261.18 $510.18 0% $249.00 $261.00 $510.00 $49 84 Commercial Reclaimed water system $225.00 $236.00 $461.00 ** $249.00 $261.18 $510.18 0% $249.00 $261.00 $510.00 $49 85 Water Service $28.00 $0.00 $28.00 ** $30.99 $0.00 $30.99 3% $30.00 $0.00 $30.00 $2 86 Pressure Regulator $28.00 $0.00 $28.00 ** $30.99 $0.00 $30.99 3% $30.00 $0.00 $30.00 $2 87 Hot Water Recirculation System $28.00 $0.00 $28.00 ** $30.99 $0.00 $30.99 3% $30.00 $0.00 $30.00 $2 88 Solar or Hydronic systems Residential up to 10kWth $225.00 $346.00 $571.00 ** $249.00 $382.91 $631.92 0% $249.00 $382.00 $631.00 $60 89 Backflow valves $74.00 $117.00 $191.00 ** $81.89 $129.48 $211.38 1% $81.00 $129.00 $210.00 $19 90 Sump Pump - Per Building $150.00 $465.00 $615.00 ** $166.00 $514.61 $680.61 0% $166.00 $514.00 $680.00 $65 91 Sewage Ejection System/Grinder Pump - Per Site $150.00 $465.00 $615.00 ** $166.00 $514.61 $680.61 0% $166.00 $514.00 $680.00 $65 92 Swimming pool misc piping/retrofit/repair $150.00 $56.00 $206.00 ** $166.00 $61.97 $227.98 0% $166.00 $61.00 $227.00 $21 93 Above Ground Storage Tank Install (0-660 gallons) $300.00 $465.00 $765.00 ** $332.01 $514.61 $846.62 0% $332.00 $514.00 $846.00 $81 94 Above Ground Storage Tank Install (661+ gallons) $300.00 $697.00 $997.00 ** $332.01 $771.36 $1,103.37 0% $332.00 $771.00 $1,103.00 $106 29 Comprehensive User Fee Study
BUILDING FEES: MECHANICAL, PLUMBING & ELECTRICAL PERMITS # Title Inspection Fee Plan Check Fee
Total Current
Fee/Charge Unit
Record Retention and
Technology
Enhancement
Surcharges Apply Notes
Full Cost
Inspection
Full Cost
Plan Check
Full Cost
Total
Subsidy %
Inspection
Suggested Fee
Plan Check
Suggested Fee
Suggested Fee
Total Fee Δ
95 MECHANICAL
96 Stand Alone Plan Check-Per Hour $0.00 $236.00 $236.00 ** $0.00 $261.18 $261.18 0% $0.00 $261.00 $261.00 $25 97 A/C Unit ≤ 100,000 BTU $150.00 $236.00 $386.00 ** $166.00 $261.18 $427.18 0% $166.00 $261.00 $427.00 $41 98 A/C Unit >100,000 BTU $150.00 $346.00 $496.00 ** $166.00 $382.91 $548.92 0% $166.00 $382.00 $548.00 $52 99 A/C Unit >100,000 BTU Roof Top Unit over 400 lbs (each) $225.00 $465.00 $690.00 ** $249.00 $514.61 $763.61 0% $249.00 $514.00 $763.00 $73 100 FAU Furnace or Heat Pump<100,000 BTU $74.00 $236.00 $310.00 ** $81.89 $261.18 $343.07 0% $81.00 $261.00 $342.00 $32 101 FAU Furnace or Heat Pump>100,000 BTU $74.00 $236.00 $310.00 ** $81.89 $261.18 $343.07 0% $81.00 $261.00 $342.00 $32 102 Refrigeration Unit $58.00 $117.00 $175.00 ** $64.19 $129.48 $193.67 0% $64.00 $129.00 $193.00 $18 103 Condensors $58.00 $90.00 $148.00 ** $64.19 $99.60 $163.79 0% $64.00 $99.00 $163.00 $15 104 Boilers 100,000 BTU or less $150.00 $465.00 $615.00 ** $166.00 $514.61 $680.61 0% $166.00 $514.00 $680.00 $65 105 Boilers 500,000 BTU or less $225.00 $465.00 $690.00 ** $249.00 $514.61 $763.61 0% $249.00 $514.00 $763.00 $73 106 Boilers 1,000,000 BTU or less $300.00 $697.00 $997.00 ** $332.01 $771.36 $1,103.37 0% $332.00 $771.00 $1,103.00 $106 107 Boilers 1,750,000 BTU or less $377.00 $697.00 $1,074.00 ** $417.22 $771.36 $1,188.58 0% $417.00 $771.00 $1,188.00 $114 108 Boilers over 1,750,000 BTU $453.00 $697.00 $1,150.00 ** $501.33 $771.36 $1,272.69 0% $501.00 $771.00 $1,272.00 $122 109 Compressors $74.00 $117.00 $191.00 ** $81.89 $129.48 $211.38 1% $81.00 $129.00 $210.00 $19 110 Evaporative Coolers-Residential $150.00 $172.00 $322.00 ** $166.00 $190.35 $356.35 0% $166.00 $190.00 $356.00 $34 111 Evaporative Coolers-Commercial/Industrial $150.00 $236.00 $386.00 ** $166.00 $261.18 $427.18 0% $166.00 $261.00 $427.00 $41 112 Air Handling Unit $74.00 $346.00 $420.00 ** $81.89 $382.91 $464.81 0% $81.00 $382.00 $463.00 $43 113 Environmental Air Duct/Vent Fan single duct/Res range exhaust $28.00 $56.00 $84.00 ** $30.99 $61.97 $92.96 2% $30.00 $61.00 $91.00 $7 114 Type 1 or 2 Hood/Duct system $453.00 $465.00 $918.00 ** $501.33 $514.61 $1,015.94 0% $501.00 $514.00 $1,015.00 $97 115 Miscellaneous Duct Work $74.00 $117.00 $191.00 ** $81.89 $129.48 $211.38 1% $81.00 $129.00 $210.00 $19 116 Special Equipment-Spray Booth (Exterior of Bldg) $453.00 $931.00 $1,384.00 ** $501.33 $1,030.33 $1,531.66 0% $501.00 $1,030.00 $1,531.00 $147 117 Special Equipment-Spray Booth (Interior of Bldg) $453.00 $931.00 $1,384.00 ** $501.33 $1,030.33 $1,531.66 0% $501.00 $1,030.00 $1,531.00 $147 118 Unlisted Equipment(Minimum or by the hour) $150.00 $236.00 $386.00 ** $166.00 $261.18 $427.18 0% $166.00 $261.00 $427.00 $41 119 Wall Heater $150.00 $236.00 $386.00 ** $166.00 $261.18 $427.18 0% $166.00 $261.00 $427.00 $41 120 Commercial Unit Heater $225.00 $236.00 $461.00 ** $249.00 $261.18 $510.18 0% $249.00 $261.00 $510.00 $49 121 Cooling Tower/Chiller $453.00 $697.00 $1,150.00 ** $501.33 $771.36 $1,272.69 0% $501.00 $771.00 $1,272.00 $122 122 Dryer Duct $28.00 $117.00 $145.00 ** $30.99 $129.48 $160.47 1% $30.00 $129.00 $159.00 $14 123 Fueling Station Dispenser/Equipment $225.00 $465.00 $690.00 ** $249.00 $514.61 $763.61 0% $249.00 $514.00 $763.00 $73 124 Underground Storage Tank (1 tank) $300.00 $697.00 $997.00 ** $332.01 $771.36 $1,103.37 0% $332.00 $771.00 $1,103.00 $106 125 Underground Storage Tank (2 tanks) $300.00 $697.00 $997.00 ** $332.01 $771.36 $1,103.37 0% $332.00 $771.00 $1,103.00 $106 126 Underground Storage Tank (3 tanks) $300.00 $697.00 $997.00 ** $332.01 $771.36 $1,103.37 0% $332.00 $771.00 $1,103.00 $106 127 Underground Storage Tank (add'l tank over 3) $35.00 $56.00 $91.00 ** $38.73 $61.97 $100.71 2% $38.00 $61.00 $99.00 $8 128 Above Ground Storage Tank Install (0-660 gallons) $300.00 $580.00 $880.00 ** $332.01 $641.88 $973.89 0% $332.00 $641.00 $973.00 $93 129 Above Ground Storage Tank Install (661+ gallons) $300.00 $697.00 $997.00 ** $332.01 $771.36 $1,103.37 0% $332.00 $771.00 $1,103.00 $106 130 Package wall unit heat /cooling ≤ 100,000 BTU $150.00 $236.00 $386.00 ** $166.00 $261.18 $427.18 0% $166.00 $261.00 $427.00 $41 131 Fireplace-Listed Mechanical per unit $150.00 $236.00 $386.00 ** $166.00 $261.18 $427.18 0% $166.00 $261.00 $427.00 $41 132 Decorative Gas Appliance $150.00 $236.00 $386.00 ** $166.00 $261.18 $427.18 0% $166.00 $261.00 $427.00 $41 133 Product -Conveying Duct System-Dust, Vapor, Central Vacuum system (PC based on dust collection) $453.00 $1,163.00 $1,616.00 ** $501.33 $1,287.08 $1,788.41 0% $501.00 $1,287.00 $1,788.00 $172 134 Fan - coil unit - residential $74.00 $236.00 $310.00 ** $81.89 $261.18 $343.07 0% $81.00 $261.00 $342.00 $32 135 Fan - Whole House $150.00 $236.00 $386.00 ** $166.00 $261.18 $427.18 0% $166.00 $261.00 $427.00 $41 136 Dust Collection System $300.00 $931.00 $1,231.00 ** $332.01 $1,030.33 $1,362.33 0% $332.00 $1,030.00 $1,362.00 $131 137 Process piping system - 0-500 ft $300.00 $465.00 $765.00 ** $332.01 $514.61 $846.62 0% $332.00 $514.00 $846.00 $81 138 Process piping system - 501-1,000 ft $453.00 $465.00 $918.00 ** $501.33 $514.61 $1,015.94 0% $501.00 $514.00 $1,015.00 $97 139 Process piping system - 1,000+ ft $908.00 $1,163.00 $2,071.00 ** $1,004.87 $1,287.08 $2,291.95 0% $1,004.00 $1,287.00 $2,291.00 $220 140 Solar or Hydronic systems $0.00 $0.00 $0.00 ** $0.00 $0.00 $0.00 0% $0.00 $0.00 $0.00 $0 141 Swimming Pool Solar System $225.00 $346.00 $571.00 ** $249.00 $382.91 $631.92 0% $249.00 $382.00 $631.00 $60 142 Residential FAU Change out (Same Location) $150.00 $117.00 $267.00 ** $166.00 $129.48 $295.49 0% $166.00 $129.00 $295.00 $28 143 Residential A/C Condenser Change Out (same location) $150.00 $117.00 $267.00 ** $166.00 $129.48 $295.49 0% $166.00 $129.00 $295.00 $28 144 Combo: Residential FAU and/or A/C Condenser Change Out (Same Location) $150.00 $0.00 $150.00 ** $166.00 $0.00 $166.00 0% $166.00 $0.00 $166.00 $16 145 Non-Residential FAU Change out (Same Location) $150.00 $117.00 $267.00 ** $166.00 $129.48 $295.49 0% $166.00 $129.00 $295.00 $28 146 Non-Residential A/C Condenser Change Out (same location) $150.00 $117.00 $267.00 ** $166.00 $129.48 $295.49 0% $166.00 $129.00 $295.00 $28 147 Swimming pool Heater $150.00 $56.00 $206.00 ** $166.00 $61.97 $227.98 0% $166.00 $61.00 $227.00 $21 148 Industrial Ovens $300.00 $697.00 $997.00 ** $332.01 $771.36 $1,103.37 0% $332.00 $771.00 $1,103.00 $106 149 Mini Split Duct New ** $121.70 $0.00 $121.70 1% $121.00 $0.00 $121.00 NA 150 Mini Split Ductless New ** $121.70 $0.00 $121.70 1% $121.00 $0.00 $121.00 NA 30 Comprehensive User Fee Study
BUILDING FEES: MECHANICAL, PLUMBING & ELECTRICAL PERMITS # Title Inspection Fee Plan Check Fee
Total Current
Fee/Charge Unit
Record Retention and
Technology
Enhancement
Surcharges Apply Notes
Full Cost
Inspection
Full Cost
Plan Check
Full Cost
Total
Subsidy %
Inspection
Suggested Fee
Plan Check
Suggested Fee
Suggested Fee
Total Fee Δ
151 SURCHARGES
152 Record Retention Surcharge (4%) 4.00% NA NA NA NA 4.00% $0 153 Technology Enhancement Surcharge (5%) 5.00% NA NA NA NA 5.00% $0 Footnotes
If fee < $150 - Staff will charge $150; If fee > $150 - Staff will charge fee Plan check fee on this schedule is for stand alone MEP items. New construction and tenant improvement projects will be charged the Inspection fee only Minimum permit processing fee is $150 * All stand alone (over the counter) permits will be charged minimum permit processing plus inspection fee Minimum Plan Check fee is $261 (Full Cost Plan Check Fee) Permit Fee covers a maximum of two inspection trips to the property. Any additional inspections will be charged based on inspection hourly rate.

For projects involving buildings or structures that are installed specifically for solar energy applications, fees will be charged based upon the type and/or size of the underlying building or structure in addition to the solar energy fees.

Permit Refunds: The Building Official shall not authorize the refunding of any fee paid except upon written application filed by the original permitee not later than 180 days after the date of fee payment. The Building Official may authorize the refunding of any fee paid hereunder which was erroneusly paid or collected. The Building Official may authorize the refunding of not more than 80 percent of the permit fee paid when no work has been done under a permit issued in accordance with this chapter. The Building Official may authorize the refunding of not more than 80 percent of the plan review fee paid when an application for a permit for which a plan review fee has been paid is withdrawn or canceled before any plan checking is done.
31 Comprehensive User Fee Study

BUILDING FEES NEW CONSTRUCTION
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 PLAN CHECK
2 Assembly (1,000 sf) $6,151.00 $3,003.81 0% $3,003.81 -$3,147 3 plus, per sq ft over 1,000 $0.30 per sq ft $0.15 0% $0.15 $0 4 Assembly (5,000 sf) $7,363.00 $3,594.88 0% $3,594.88 -$3,768 5 plus, per sq ft over 5,000 $0.39 per sq ft $0.19 0% $0.19 $0 6 Assembly (10,000 sf) $9,321.00 $4,551.43 0% $4,551.43 -$4,770 7 plus, per sq ft over 10,000 $0.65 per sq ft $0.32 0% $0.32 $0 8 Business (1,000 sf) $5,251.00 $2,629.09 0% $2,629.09 -$2,622 9 plus, per sq ft over 1,000 $0.26 per sq ft $0.13 0% $0.13 $0 10 Business (5,000 sf) $6,285.00 $3,146.88 0% $3,146.88 -$3,138 11 plus, per sq ft over 5,000 $0.33 per sq ft $0.17 0% $0.17 $0 12 Business (10,000 sf) $7,957.00 $3,983.94 0% $3,983.94 -$3,973 13 plus, per sq ft over 10,000 $0.56 per sq ft $0.28 0% $0.28 $0 14 Educational (1,000 sf) $4,200.00 $2,094.73 0% $2,094.73 -$2,105 15 plus, per sq ft over 1,000 $0.55 per sq ft $0.27 0% $0.27 $0 16 Educational (2,500 sf) $5,028.00 $2,507.69 0% $2,507.69 -$2,520 17 plus, per sq ft over 2,500 $0.54 per sq ft $0.27 0% $0.27 $0 18 Educational (5,000 sf) $6,366.00 $3,175.23 0% $3,175.23 -$3,191 19 plus, per sq ft over 5,000 $0.89 per sq ft $0.44 0% $0.44 $0 20 Educational (10,000 sf) $10,821.00 $5,397.74 0% $5,397.74 -$5,423 21 plus, per sq ft over 10,000 $0.55 per sq ft $0.27 0% $0.27 $0 22 Factory Industrial (1,000 sf) $5,175.00 $2,508.96 0% $2,508.96 -$2,666 23 plus, per sq ft over 1,000 $0.26 per sq ft $0.12 0% $0.12 $0 24 Factory Industrial (5,000 sf) $6,196.00 $3,004.13 0% $3,004.13 -$3,192 25 plus, per sq ft over 5,000 $0.33 per sq ft $0.16 0% $0.16 $0 26 Factory Industrial (10,000 sf) $7,843.00 $3,802.95 0% $3,802.95 -$4,040 27 plus, per sq ft over 10,000 $0.55 per sq ft $0.27 0% $0.27 $0 28 Factory Industrial (20,000 sf) $13,334.00 $6,465.18 0% $6,465.18 -$6,869 29 plus, per sq ft over 20,000 $0.34 per sq ft $0.17 0% $0.17 $0 30 High Hazard Group (1,000 sf) $5,363.00 $2,529.04 0% $2,529.04 -$2,834 31 plus, per sq ft over 1,000 $0.26 per sq ft $0.12 0% $0.12 $0 32 High Hazard Group (5,000 sf) $6,420.00 $3,027.70 0% $3,027.70 -$3,392 33 plus, per sq ft over 5,000 $0.34 per sq ft $0.16 0% $0.16 $0 34 High Hazard Group (10,000 sf) $8,127.00 $3,832.59 0% $3,832.59 -$4,294 35 plus, per sq ft over 10,000 $0.57 per sq ft $0.27 0% $0.27 $0 36 High Hazard Group (20,000 sf) $13,818.00 $6,516.80 0% $6,516.80 -$7,301 37 plus, per sq ft over 20,000 $0.35 per sq ft $0.17 0% $0.17 $0 32 Comprehensive User Fee Study

BUILDING FEES NEW CONSTRUCTION
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 38 Institutional (1,000 sf) $7,501.00 $3,329.77 0% $3,329.77 -$4,171 39 plus, per sq ft over 1,000 $0.37 per sq ft $0.17 0% $0.17 $0 40 Institutional (5,000 sf) $8,980.00 $3,986.81 0% $3,986.81 -$4,993 41 plus, per sq ft over 5,000 $0.48 per sq ft $0.21 0% $0.21 $0 42 Institutional (10,000 sf) $11,368.00 $5,046.60 0% $5,046.60 -$6,321 43 plus, per sq ft over 10,000 $0.80 per sq ft $0.35 0% $0.35 $0 44 Mercantile (1,000 sf) $5,363.00 $2,688.67 0% $2,688.67 -$2,674 45 plus, per sq ft over 1,000 $0.26 per sq ft $0.13 0% $0.13 $0 46 Mercantile (5,000 sf) $6,420.00 $3,218.57 0% $3,218.57 -$3,201 47 plus, per sq ft over 5,000 $0.34 per sq ft $0.17 0% $0.17 $0 48 Mercantile (10,000 sf) $8,127.00 $4,074.75 0% $4,074.75 -$4,052 49 plus, per sq ft over 10,000 $0.57 per sq ft $0.29 0% $0.29 $0 50 Residential - Hotels/Motels (2,000 sf) $8,552.00 $4,015.80 0% $4,015.80 -$4,536 51 plus, per sq ft over 2,000 $0.21 per sq ft $0.10 0% $0.10 $0 52 Residential - Hotels/Motels (10,000 sf) $10,237.00 $4,806.66 0% $4,806.66 -$5,430 53 plus, per sq ft over 10,000 $0.27 per sq ft $0.13 0% $0.13 $0 54 Residential - Hotels/Motels (20,000 sf) $12,959.00 $6,085.04 0% $6,085.04 -$6,874 55 plus, per sq ft over 20,000 $0.45 per sq ft $0.21 0% $0.21 $0 56 Residential - Multi-Family (2,000 sf) $7,801.00 $3,752.29 0% $3,752.29 -$4,049 57 plus, per sq ft over 2,000 $0.38 per sq ft $0.18 0% $0.18 $0 58 Residential - Multi-Family (6,000 sf) $9,339.00 $4,492.17 0% $4,492.17 -$4,847 59 plus, per sq ft over 6,000 $0.28 per sq ft $0.13 0% $0.13 $0 60 Residential - Multi-Family (15,000 sf) $11,822.00 $5,686.74 0% $5,686.74 -$6,135 61 plus, per sq ft over 15,000 $0.55 per sq ft $0.26 0% $0.26 $0 62 R-3 Custom (1,000 sf) $3,232.00 $1,697.07 0% $1,697.07 -$1,535 63 plus, per sq ft over 1,000 $0.57 per sq ft $0.30 0% $0.30 $0 64 R-3 Custom (2,500 sf) $4,092.00 $2,148.58 0% $2,148.58 -$1,943 65 plus, per sq ft over 2,500 $1.77 per sq ft $0.93 0% $0.93 -$1 66 R-3 Custom (4,000 sf) $6,751.00 $3,545.49 0% $3,545.49 -$3,206 67 plus, per sq ft over 4,000 $1.77 per sq ft $0.93 0% $0.93 -$1 68 R-3 Models, First Master Plan (1,000 sf) $4,084.00 $1,980.98 0% $1,980.98 -$2,103 69 plus, per sq ft over 1,000 $0.72 per sq ft $0.35 0% $0.35 $0 70 R-3 Models, First Master Plan (2,500 sf) $5,171.00 $2,508.32 0% $2,508.32 -$2,663 71 plus, per sq ft over 2,500 $2.24 per sq ft $1.09 0% $1.09 -$1 72 R-3 Models, First Master Plan (4,000 sf) $8,534.00 $4,139.43 0% $4,139.43 -$4,395 73 plus, per sq ft over 4,000 $2.24 per sq ft $1.09 0% $1.09 -$1 74 R-3 Production Phase (1,000 sf) $986.00 $955.92 0% $955.92 -$30 75 plus, per sq ft over 1,000 $0.17 per sq ft $0.17 0% $0.17 $0 33 Comprehensive User Fee Study

BUILDING FEES NEW CONSTRUCTION
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 76 R-3 Production Phase (2,500 sf) $1,248.00 $1,210.19 0% $1,210.19 -$38 77 plus, per sq ft over 2,500 $0.54 per sq ft $0.53 0% $0.53 $0 78 R-3 Production Phase (4,000 sf) $2,062.00 $1,998.18 0% $1,998.18 -$64 79 plus, per sq ft over 4,000 $0.54 per sq ft $0.53 0% $0.53 $0 80 R-3 New ADU (1,000 sf) $3,771.00 $1,824.21 0% $1,824.21 -$1,947 81 plus, per sq ft over 1,000 $0.67 per sq ft $0.33 0% $0.33 $0 82 R-3 New ADU (2,500 sf) $4,773.00 $2,308.54 0% $2,308.54 -$2,464 83 plus, per sq ft over 2,500 $2.07 per sq ft $1.00 0% $1.00 -$1 84 R-3 New ADU (4,000 sf) $7,878.00 $3,811.24 0% $3,811.24 -$4,067 85 plus, per sq ft over 4,000 $2.07 per sq ft $1.00 0% $1.00 -$1 86 R-3 Room Addition (100 sf) $1,724.00 $875.30 0% $875.30 -$849 87 plus, per sq ft over 100 $2.22 per sq ft $1.13 0% $1.13 -$1 88 R-3 Room Addition (500 sf) $2,612.00 $1,326.49 0% $1,326.49 -$1,286 89 plus, per sq ft over 500 $3.40 per sq ft $1.73 0% $1.73 -$2 90 R-3 Room Additions (1,000 sf) $4,312.00 $2,190.00 0% $2,190.00 -$2,122 91 plus, per sq ft over 1,000 $3.40 per sq ft $1.73 0% $1.73 -$2 92 Residential - Assisted Living (1,000 sf) $7,501.00 $3,624.51 0% $3,624.51 -$3,876 93 plus, per sq ft over 1,000 $0.37 per sq ft $0.18 0% $0.18 $0 94 Residential - Assisted Living (5,000 sf) $8,980.00 $4,339.54 0% $4,339.54 -$4,640 95 plus, per sq ft over 5,000 $0.48 per sq ft $0.23 0% $0.23 $0 96 Residential - Assisted Living 6-16 persons (10,000 sf) $11,368.00 $5,493.65 0% $5,493.65 -$5,874 97 plus, per sq ft over 10,000 $0.80 per sq ft $0.39 0% $0.39 $0 98 Storage (1,000 sf) $4,387.00 $2,148.90 0% $2,148.90 -$2,238 99 plus, per sq ft over 1,000 $0.22 per sq ft $0.11 0% $0.11 $0 100 Storage (5,000 sf) $5,252.00 $2,572.69 0% $2,572.69 -$2,679 101 plus, per sq ft over 5,000 $0.28 per sq ft $0.14 0% $0.14 $0 102 Storage (10,000 sf) $6,650.00 $3,257.44 0% $3,257.44 -$3,393 103 plus, per sq ft over 10,000 $0.47 per sq ft $0.23 0% $0.23 $0 104 Storage (20,000 sf) $11,305.00 $5,537.94 0% $5,537.94 -$5,767 105 plus, per sq ft over 20,000 $0.29 per sq ft $0.14 0% $0.14 $0 106 Accessory (1,000 sf) $2,558.00 $1,278.38 0% $1,278.38 -$1,280 107 plus, per sq ft over 1,000 $0.68 per sq ft $0.34 0% $0.34 $0 108 Accessory (2,000 sf) $3,238.00 $1,618.05 0% $1,618.05 -$1,620 109 plus, per sq ft over 2,000 $1.05 per sq ft $0.53 0% $0.53 -$1 110 Accessory (4,000 sf) $5,345.00 $2,671.79 0% $2,671.79 -$2,673 111 plus, per sq ft over 4,000 $1.05 per sq ft $0.53 0% $0.53 -$1 112 Shell Buildings (1,000 sf) $4,650.00 $2,182.36 0% $2,182.36 -$2,468 113 plus, per sq ft over 1,000 $0.23 per sq ft $0.11 0% $0.11 $0 34 Comprehensive User Fee Study

BUILDING FEES NEW CONSTRUCTION
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 114 Shell Buildings (5,000 sf) $5,567.00 $2,612.84 0% $2,612.84 -$2,954 115 plus, per sq ft over 5,000 $0.30 per sq ft $0.14 0% $0.14 $0 116 Shell Buildings (10,000 sf) $7,047.00 $3,307.47 0% $3,307.47 -$3,740 117 plus, per sq ft over 10,000 $0.49 per sq ft $0.23 0% $0.23 $0 118 Shell Buildings (20,000 sf) $11,981.00 $5,623.97 0% $5,623.97 -$6,357 119 plus, per sq ft over 20,000 $0.31 per sq ft $0.14 0% $0.14 $0 120 Tenant Improvement: Non Structural (500 sf) $1,727.00 $864.15 0% $864.15 -$863 121 plus, per sq ft over 500 $2.32 per sq ft $1.16 0% $1.16 -$1 122 Tenant Improvement: Non Structural (1,000 sf) $2,888.00 $1,445.03 0% $1,445.03 -$1,443 123 plus, per sq ft over 1,000 $0.14 per sq ft $0.07 0% $0.07 $0 124 Tenant Improvement: Non Structural (5,000 sf) $3,455.00 $1,729.57 0% $1,729.57 -$1,725 125 plus, per sq ft over 5,000 $0.18 per sq ft $0.09 0% $0.09 $0 126 Tenant Improvement: Non Structural (10,000 sf) $4,376.00 $2,190.64 0% $2,190.64 -$2,185 127 plus, per sq ft over 10,000 $0.31 per sq ft $0.16 0% $0.16 $0 128 Tenant Improvement: Non Structural (20,000 sf) $7,440.00 $3,724.89 0% $3,724.89 -$3,715 129 plus, per sq ft over 20,000 $0.19 per sq ft $0.10 0% $0.10 $0 130 Tenant Improvement: Non Structural (50,000 sf) $13,130.00 $6,575.11 0% $6,575.11 -$6,555 131 plus, per sq ft over 50,000 $0.19 per sq ft $0.10 0% $0.10 $0 132 Tenant Improvement: Structural (500 sf) $2,041.00 $1,021.56 0% $1,021.56 -$1,019 133 plus, per sq ft over 500 $2.74 per sq ft $1.37 0% $1.37 -$1 134 Tenant Improvement: Structural (1,000 sf) $3,412.00 $1,708.22 0% $1,708.22 -$1,704 135 plus, per sq ft over 1,000 $0.17 per sq ft $0.09 0% $0.09 $0 136 Tenant Improvement: Structural (5,000 sf) $4,084.00 $2,044.70 0% $2,044.70 -$2,039 137 plus, per sq ft over 5,000 $0.22 per sq ft $0.11 0% $0.11 $0 138 Tenant Improvement: Structural (10,000 sf) $5,171.00 $2,588.94 0% $2,588.94 -$2,582 139 plus, per sq ft over 10,000 $0.36 per sq ft $0.18 0% $0.18 $0 140 Tenant Improvement: Structural (20,000 sf) $8,793.00 $4,402.63 0% $4,402.63 -$4,390 141 plus, per sq ft over 20,000 $0.22 per sq ft $0.11 0% $0.11 $0 142 Any Project Exceeding $1,000,000 in valuation: Base Fee New $6,746.06 0% $6,746.06 NA 143 plus $5.00 for each additional $1000 or fraction thereof up to $10,000,000 New per $1,000 in valuation $6.75 0% $6.75 NA 144 Any Project Exceeding $10,000,000 in valuation: Base Fee New $67,460.60 0% $67,460.60 NA 145 plus $5.00 for each additional $1000 or fraction thereof New per $1,000 in valuation $5.40 0% $5.40 NA 35 Comprehensive User Fee Study

BUILDING FEES NEW CONSTRUCTION
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 146 INSPECTION
147 Assembly (1,000 sf) $3,276.00 $5,542.85 0% $5,542.85 $2,267 148 plus, per sq ft over 1,000 $0.16 per sq ft $0.27 0% $0.27 $0 149 Assembly (5,000 sf) $3,919.00 $6,633.55 0% $6,633.55 $2,715 150 plus, per sq ft over 5,000 $0.21 per sq ft $0.35 0% $0.35 $0 151 Assembly (10,000 sf) $4,963.00 $8,398.66 0% $8,398.66 $3,436 152 plus, per sq ft over 10,000 $0.35 per sq ft $0.59 0% $0.59 $0 1 Business (1,000 sf) $3,000.00 $4,851.39 0% $4,851.39 $1,851 2 plus, per sq ft over 1,000 $0.15 per sq ft $0.24 0% $0.24 $0 3 Business (5,000 sf) $3,591.00 $5,806.86 0% $5,806.86 $2,216 4 plus, per sq ft over 5,000 $0.19 per sq ft $0.31 0% $0.31 $0 5 Business (10,000 sf) $4,546.00 $7,351.47 0% $7,351.47 $2,805 6 plus, per sq ft over 10,000 $0.32 per sq ft $0.52 0% $0.52 $0 1 Educational (1,000 sf) $2,374.00 $3,865.36 0% $3,865.36 $1,491 2 plus, per sq ft over 1,000 $0.31 per sq ft $0.51 0% $0.51 $0 3 Educational (2,500 sf) $2,842.00 $4,627.37 0% $4,627.37 $1,785 4 plus, per sq ft over 2,500 $0.30 per sq ft $0.49 0% $0.49 $0 5 Educational (5,000 sf) $3,599.00 $5,859.19 0% $5,859.19 $2,260 6 plus, per sq ft over 5,000 $0.50 per sq ft $0.82 0% $0.82 $0 7 Educational (10,000 sf) $6,119.00 $9,960.32 0% $9,960.32 $3,841 8 plus, per sq ft over 10,000 $0.31 per sq ft $0.51 0% $0.51 $0 1 Factory Industrial (1,000 sf) $2,699.00 $4,629.73 0% $4,629.73 $1,931 2 plus, per sq ft over 1,000 $0.13 per sq ft $0.23 0% $0.23 $0 3 Factory Industrial (5,000 sf) $3,232.00 $5,543.44 0% $5,543.44 $2,311 4 plus, per sq ft over 5,000 $0.17 per sq ft $0.29 0% $0.29 $0 5 Factory Industrial (10,000 sf) $4,092.00 $7,017.50 0% $7,017.50 $2,925 6 plus, per sq ft over 10,000 $0.29 per sq ft $0.49 0% $0.49 $0 7 Factory Industrial (20,000 sf) $6,956.00 $11,930.04 0% $11,930.04 $4,974 8 plus, per sq ft over 20,000 $0.18 per sq ft $0.31 0% $0.31 $0 1 High Hazard Group (1,000 sf) $2,574.00 $4,666.77 0% $4,666.77 $2,093 2 plus, per sq ft over 1,000 $0.13 per sq ft $0.23 0% $0.23 $0 3 High Hazard Group (5,000 sf) $3,082.00 $5,586.95 0% $5,586.95 $2,505 4 plus, per sq ft over 5,000 $0.16 per sq ft $0.29 0% $0.29 $0 5 High Hazard Group (10,000 sf) $3,901.00 $7,072.18 0% $7,072.18 $3,171 6 plus, per sq ft over 10,000 $0.27 per sq ft $0.49 0% $0.49 $0 7 High Hazard Group (20,000 sf) $6,634.00 $12,025.29 0% $12,025.29 $5,391 36 Comprehensive User Fee Study

BUILDING FEES NEW CONSTRUCTION
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 8 plus, per sq ft over 20,000 $0.17 per sq ft $0.31 0% $0.31 $0 1 Institutional (1,000 sf) $2,949.00 $6,144.35 0% $6,144.35 $3,195 2 plus, per sq ft over 1,000 $0.15 per sq ft $0.31 0% $0.31 $0 3 Institutional (5,000 sf) $3,532.00 $7,356.76 0% $7,356.76 $3,825 4 plus, per sq ft over 5,000 $0.19 per sq ft $0.39 0% $0.39 $0 5 Institutional (10,000 sf) $4,470.00 $9,312.37 0% $9,312.37 $4,842 6 plus, per sq ft over 10,000 $0.31 per sq ft $0.65 0% $0.65 $0 1 Mercantile (1,000 sf) $3,075.00 $4,961.35 0% $4,961.35 $1,886 2 plus, per sq ft over 1,000 $0.15 per sq ft $0.24 0% $0.24 $0 3 Mercantile (5,000 sf) $3,681.00 $5,939.15 0% $5,939.15 $2,258 4 plus, per sq ft over 5,000 $0.20 per sq ft $0.32 0% $0.32 $0 5 Mercantile (10,000 sf) $4,661.00 $7,519.04 0% $7,519.04 $2,858 6 plus, per sq ft over 10,000 $0.33 per sq ft $0.53 0% $0.53 $0 1 Residential - Hotels/Motels (2,000 sf) $4,051.00 $7,410.27 0% $7,410.27 $3,359 2 plus, per sq ft over 2,000 $0.10 per sq ft $0.18 0% $0.18 $0 3 Residential - Hotels/Motels (10,000 sf) $4,848.00 $8,869.63 0% $8,869.63 $4,022 4 plus, per sq ft over 10,000 $0.13 per sq ft $0.24 0% $0.24 $0 5 Residential - Hotels/Motels (20,000 sf) $6,138.00 $11,228.59 0% $11,228.59 $5,091 6 plus, per sq ft over 20,000 $0.21 per sq ft $0.39 0% $0.39 $0 1 Residential - Multi-Family (2,000 sf) $3,975.00 $6,924.01 0% $6,924.01 $2,949 2 plus, per sq ft over 2,000 $0.20 per sq ft $0.34 0% $0.34 $0 3 Residential - Multi-Family (6,000 sf) $4,759.00 $8,289.29 0% $8,289.29 $3,530 4 plus, per sq ft over 6,000 $0.14 per sq ft $0.25 0% $0.25 $0 5 Residential - Multi-Family (15,000 sf) $6,025.00 $10,493.62 0% $10,493.62 $4,469 6 plus, per sq ft over 15,000 $0.28 per sq ft $0.49 0% $0.49 $0 1 R-3 Custom (1,000 sf) $2,094.00 $3,131.56 0% $3,131.56 $1,038 2 plus, per sq ft over 1,000 $0.37 per sq ft $0.55 0% $0.55 $0 3 R-3 Custom (2,500 sf) $2,651.00 $3,964.73 0% $3,964.73 $1,314 4 plus, per sq ft over 2,500 $1.15 per sq ft $1.72 0% $1.72 $1 5 R-3 Custom (4,000 sf) $4,376.00 $6,542.41 0% $6,542.41 $2,166 6 plus, per sq ft over 4,000 $1.15 per sq ft $1.72 0% $1.72 $1 7 R-3 Models, First Master Plan (1,000 sf) $2,133.00 $3,655.45 0% $3,655.45 $1,522 8 plus, per sq ft over 1,000 $0.38 per sq ft $0.65 0% $0.65 $0 9 R-3 Models, First Master Plan (2,500 sf) $2,701.00 $4,628.55 0% $4,628.55 $1,928 10 plus, per sq ft over 2,500 $1.17 per sq ft $2.00 0% $2.00 $1 11 R-3 Models, First Master Plan (4,000 sf) $4,457.00 $7,638.40 0% $7,638.40 $3,181 12 plus, per sq ft over 4,000 $1.17 per sq ft $2.00 0% $2.00 $1 13 R-3 Production Phase (1,000 sf) $2,014.00 $1,763.93 0% $1,763.93 -$250 37 Comprehensive User Fee Study

BUILDING FEES NEW CONSTRUCTION
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 14 plus, per sq ft over 1,000 $0.36 per sq ft $0.31 0% $0.31 $0 15 R-3 Production Phase (2,500 sf) $2,550.00 $2,233.13 0% $2,233.13 -$317 16 plus, per sq ft over 2,500 $1.11 per sq ft $0.97 0% $0.97 $0 17 R-3 Production Phase (4,000 sf) $4,209.00 $3,687.20 0% $3,687.20 -$522 18 plus, per sq ft over 4,000 $1.11 per sq ft $0.97 0% $0.97 $0 19 R-3 New ADU (1,000 sf) $1,954.00 $3,366.17 0% $3,366.17 $1,412 20 plus, per sq ft over 1,000 $0.35 per sq ft $0.60 0% $0.60 $0 21 R-3 New ADU (2,500 sf) $2,472.00 $4,259.89 0% $4,259.89 $1,788 22 plus, per sq ft over 2,500 $1.07 per sq ft $1.85 0% $1.85 $1 23 R-3 New ADU (4,000 sf) $4,083.00 $7,032.79 0% $7,032.79 $2,950 24 plus, per sq ft over 4,000 $1.07 per sq ft $1.85 0% $1.85 $1 25 R-3 Room Addition (100 sf) $1,023.00 $1,615.17 0% $1,615.17 $592 26 plus, per sq ft over 100 $1.32 per sq ft $2.08 0% $2.08 $1 27 R-3 Room Addition (500 sf) $1,551.00 $2,447.75 0% $2,447.75 $897 28 plus, per sq ft over 500 $2.02 per sq ft $3.19 0% $3.19 $1 29 R-3 Room Additions (1,000 sf) $2,561.00 $4,041.16 0% $4,041.16 $1,480 30 plus, per sq ft over 1,000 $2.02 per sq ft $3.19 0% $3.19 $1 31 Residential - Assisted Living (1,000 sf) $3,874.00 $6,688.23 0% $6,688.23 $2,814 32 plus, per sq ft over 1,000 $0.19 per sq ft $0.33 0% $0.33 $0 33 Residential - Assisted Living (5,000 sf) $4,639.00 $8,007.65 0% $8,007.65 $3,369 34 plus, per sq ft over 5,000 $0.25 per sq ft $0.43 0% $0.43 $0 35 Residential - Assisted Living 6-16 persons (10,000 sf) $5,873.00 $10,137.30 0% $10,137.30 $4,264 36 plus, per sq ft over 10,000 $0.41 per sq ft $0.71 0% $0.71 $0 1 Storage (1,000 sf) $2,357.00 $3,965.31 0% $3,965.31 $1,608 2 plus, per sq ft over 1,000 $0.12 per sq ft $0.20 0% $0.20 $0 3 Storage (5,000 sf) $2,822.00 $4,747.32 0% $4,747.32 $1,925 4 plus, per sq ft over 5,000 $0.15 per sq ft $0.25 0% $0.25 $0 5 Storage (10,000 sf) $3,573.00 $6,010.88 0% $6,010.88 $2,438 6 plus, per sq ft over 10,000 $0.25 per sq ft $0.42 0% $0.42 $0 7 Storage (20,000 sf) $6,075.00 $10,219.03 0% $10,219.03 $4,144 8 plus, per sq ft over 20,000 $0.15 per sq ft $0.26 0% $0.26 $0 1 Accessory (1,000 sf) $1,454.00 $2,358.96 0% $2,358.96 $905 2 plus, per sq ft over 1,000 $0.39 per sq ft $0.63 0% $0.63 $0 3 Accessory (2,000 sf) $1,840.00 $2,985.74 0% $2,985.74 $1,146 4 plus, per sq ft over 2,000 $0.60 per sq ft $0.97 0% $0.97 $0 5 Accessory (4,000 sf) $3,040.00 $4,930.18 0% $4,930.18 $1,890 6 plus, per sq ft over 4,000 $0.60 per sq ft $0.97 0% $0.97 $0 7 Shell Buildings (1,000 sf) $2,199.00 $4,027.05 0% $4,027.05 $1,828 38 Comprehensive User Fee Study

BUILDING FEES NEW CONSTRUCTION
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 8 plus, per sq ft over 1,000 $0.11 per sq ft $0.20 0% $0.20 $0 9 Shell Buildings (5,000 sf) $2,633.00 $4,821.41 0% $4,821.41 $2,188 10 plus, per sq ft over 5,000 $0.14 per sq ft $0.26 0% $0.26 $0 11 Shell Buildings (10,000 sf) $3,333.00 $6,103.20 0% $6,103.20 $2,770 12 plus, per sq ft over 10,000 $0.23 per sq ft $0.42 0% $0.42 $0 13 Shell Buildings (20,000 sf) $5,669.00 $10,377.78 0% $10,377.78 $4,709 14 plus, per sq ft over 20,000 $0.14 per sq ft $0.26 0% $0.26 $0 1 Tenant Improvement: Non Structural (500 sf) $985.00 $1,594.59 0% $1,594.59 $610 2 plus, per sq ft over 500 $1.32 per sq ft $2.14 0% $2.14 $1 3 Tenant Improvement: Non Structural (1,000 sf) $1,647.00 $2,666.47 0% $2,666.47 $1,019 4 plus, per sq ft over 1,000 $0.08 per sq ft $0.13 0% $0.13 $0 5 Tenant Improvement: Non Structural (5,000 sf) $1,973.00 $3,191.54 0% $3,191.54 $1,219 6 plus, per sq ft over 5,000 $0.11 per sq ft $0.17 0% $0.17 $0 7 Tenant Improvement: Non Structural (10,000 sf) $2,499.00 $4,042.34 0% $4,042.34 $1,543 8 plus, per sq ft over 10,000 $0.18 per sq ft $0.29 0% $0.29 $0 9 Tenant Improvement: Non Structural (20,000 sf) $4,250.00 $6,873.45 0% $6,873.45 $2,623 10 plus, per sq ft over 20,000 $0.11 per sq ft $0.18 0% $0.18 $0 11 Tenant Improvement: Non Structural (50,000 sf) $7,505.00 $12,132.89 0% $12,132.89 $4,628 12 plus, per sq ft over 50,000 $0.11 per sq ft $0.18 0% $0.18 $0 13 Tenant Improvement: Structural (500 sf) $1,165.00 $1,885.05 0% $1,885.05 $720 14 plus, per sq ft over 500 $1.57 per sq ft $2.53 0% $2.53 $1 15 Tenant Improvement: Structural (1,000 sf) $1,949.00 $3,152.14 0% $3,152.14 $1,203 16 plus, per sq ft over 1,000 $0.10 per sq ft $0.16 0% $0.16 $0 17 Tenant Improvement: Structural (5,000 sf) $2,333.00 $3,773.05 0% $3,773.05 $1,440 18 plus, per sq ft over 5,000 $0.12 per sq ft $0.20 0% $0.20 $0 19 Tenant Improvement: Structural (10,000 sf) $2,954.00 $4,777.31 0% $4,777.31 $1,823 20 plus, per sq ft over 10,000 $0.21 per sq ft $0.34 0% $0.34 $0 21 Tenant Improvement: Structural (20,000 sf) $5,024.00 $8,124.07 0% $8,124.07 $3,100 22 plus, per sq ft over 20,000 $0.13 per sq ft $0.21 0% $0.21 $0 1 Any Project Exceeding $1,000,000 in valuation: Base Fee New $12,448.35 0% $12,448.35 NA 2 plus $5.00 for each additional $1000 or fraction thereof up to $10,000,000 New per $1,000 in valuation $12.45 0% $12.45 NA 3 Any Project Exceeding $10,000,000 in valuation: Base Fee New $124,483.47 0% $124,483.47 NA 4 plus $5.00 for each additional $1000 or fraction thereof New per $1,000 in valuation $9.96 0% $9.96 NA 39 Comprehensive User Fee Study

BUILDING FEES NEW CONSTRUCTION
# Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 5 Adidtional Plan Check Fees When Applicable
6 Mechnaical Plan Check New % of Building Plan check
and Permit fee 4% 0% 4% NA
7 Electrical Plan Check New % of Building Plan check
and Permit fee 4% 0% 4% NA
8 Plumbing Plan Check New % of Building Plan check
and Permit fee 4% 0% 4% NA
9 ADA New % of Building Plan check
and Permit fee 5% 0% 5% NA
10 Title 24 New % of Building Plan check
and Permit fee 4% 0% 4% NA
11 SURCHARGES
12 Record Retention Surcharge (4%) 4% NA NA 4% $0
13 Technology Enhancement Surcharge (5%) 5% NA NA 5% $0 Footnotes
For Construction Types I-A,II-A,III-A, I-B,II-B,III-B and I-V an additional 20% will be added to the fee total as determined by the Building Official due to the complexity of the project.

Permit Refunds: The Building Official shall not authorize the refunding of any fee paid except upon written application filed by the original permitee not later than 180 days after the date of fee payment. The Building Official may authorize the refunding of any fee paid hereunder which was erroneusly paid or collected. The Building Official may authorize the refunding of not more than 80 percent of the permit fee paid when no work has been done under a permit issued in accordance with this chapter. The Building Official may authorize the refunding of not more than 80 percent of the plan review fee paid when an application for a permit for which a plan review fee has been paid is withdrawn or canceled before any plan checking is done.

Permit Fee covers a maximum of two inspection trips to the property. Any additional inspections will be charged based on inspection hourly rate.
40 Comprehensive User Fee Study

← All documents from this meeting