DATE Estimator
3/17/2026 Mario Saucedo
Company: Project Name:
Address: Address:
Attn: Project Contact:
Phone # Phone Number:
Email:
Item Amount Break Down
prep/demo/install 3,183.00 SF
carpet tile 35.88 SY
carpet tile 17.94 SY
adhesive 2 units
Rubber Roll Goods 2,959.00 SF
welding rod 6 spools
adhesive 6 units
wall base 512.00 LF
adhesive 25 tubes
prep material 25 bags
**Base Bid Total 87,700.00$
Inclusions:
Harry L. Murphy Floor Coverings | 42 Bonaventura Dr. , CA 95134| p. 408-955-1111 When the Owner/Owners Representative signs this proposal it will be treated as a binding contract. Once Harry L.
Murphy, Inc. receives this signed document, we will begin the submittal and ordering process. By signing this proposal, the owner/owners representative agrees to the invoice terms of NET 30 DAYS.
Terms & Conditions: Payment and Performance Bond is excluded. HLM flooring Warranty is only for one year Our insurance is GL$2M Auto$2M WIC$1M only. Our Proposal is part of the contract.
UNION SHOP * BONDABLE PRICES * PRICE GOOD FOR 60 DAYS INTERFACE Come and Go: Open Road color TBD
NORA matching color
XL BRANDS STIX 2230
NORA ACMR96
SCOPE OF WORK
Description
TARKETT MillWorks Mandalay 6 inch color TBD
MAPEI ECO 5757
We propose to demo existing materials / furnish and install materials in areas specified by project Priority areas: Building entrance, Reception, Restroom Hallway, Multi-Purpose Room, Meeting Room, Library and Exit Hallway.
Note: Noraplan Dariva is a rool / sheet product size 4 feet in width & 39 feet in length Note: Proposal is based on CMAS contract
Note: Material must be paid in full upon orderingNoraplan Dariva: color TBD 4'x39' roll goods CONTRACTORS LICENSE # C-15 145985
CUSTOMER PROJECT
[email protected]
DIR # 1000004204 Exp. 6/30/2026
Work Proposal
City of San Pablo Public Works
510.215.3069
Jimmie Zhou
1000 Gateway Avenue, San Pablo, CA 94806
510.215.3069
San Pablo Senior Center
1943 Church Ln, San Pablo, CA 94806
LABOR / Travel
Authorization of the proposal:
Moisture BARRIER /abnormal and or unforeseen subfloor preparation, ramping, floating, leveling, grinding, sealing. Furniture moving additional cleaning caulking, finished floor protection Janitorial Services: vacuuming, mopping, waxing, polishing, sealing. Overtime Labor, out of sequence work and added material cost due to Tariffs.Exclusions:
ARDEX FEATHER FINISH
Alternate : Add to Base Bid Total to include Stage & Pool Room areas $31,300.00 INTERFACE SR999: Step Repeat color TBD
Jimmie Zhou
Moisture TESTING / Minor floor prep included (expansion joints, filling hairline cracks), Regular Hours (7am-3:30pm)