Cities Index.
7.a-San-Quentin-Pump-Station

San Rafael City Council
January 18, 2022

Document
7.a-San-Quentin-Pump-Station
Meeting
January 18, 2022
Body
San Rafael City Council
Original file
2.1 MB
Text extracted from the city's file for reading and search. Open the original on storage.googleapis.com. That file is the official record.

____________________________________________________________________________________

FOR CITY CLERK ONLY
Council Meeting:

Disposition:

Agenda Item No: 7.a
Meeting Date: January 18, 2022

SAN RAFAEL CITY COUNCIL AGENDA REPORT
Department: Public Works
Prepared by: Bill Guerin,
Director of Public Works
City Manager Approval: __________
TOPIC: SAN QUENTIN PUMP STATION
SUBJECT: INFORMATIONAL REPORT REGARDING THE SAN QUENTIN PUMP

STATION RECONSTRUCTION PROJECT AND FUNDING
RECOMMENDATION:

Accept the informational report.

BACKGROUND:

The San Quentin Pump Station was constructed in 1972 and is located in the saltwater marsh wetland and detention pond behind Target and Home Depot off Shoreline Parkway. The pump station conveys stormwater from the detention pond into the San Rafael Bay through a 960-foot outfall pipe that goes underneath the levee along the San Francisco Bay Trail. The existing pump station building is approximately 720 square feet in size and consists of a wet well, pressure vault, associated controls, and two vertical pumps.

After almost 50 years of operation, both the pump station and outfall pipe are beyond their useful life and need to be replaced. Without a functioning pump station at this location, stormwater would overflow from the detention pond into the neighboring industrial areas and inundate Interstate 580. Additionally, climate change is anticipated to result in larger storm events and rising sea levels therefore requiring an improved, more powerful pump station in place of the existing one. The new pump station will have additional pumping capacity and will also be more energy efficient than the existing facility. Staff is also studying the feasibility of an in-line trash capture device that will filter any debris running through the system. Staff is seeking State funding for the trash capture device with the intention of installing it soon after the pump station is completed.

On December 18, 2017, the City Council approved an agreement with CSW/Stuber-Stroeh Engineering Group, Inc. for preliminary engineering services resulting in a Basis of Design/Feasibility Study. After amending the agreement on October 1, 2018, the design consultant commenced environmental studies and construction drawings. As required by CEQA, on January 21, 2020, Council adopted the Mitigated Negative Declaration for this project and directed staff to proceed with final design and pursue regulatory environmental permits.

SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2
That effort is nearing completion we expect to obtain the necessary permits to construct this project this spring.

ANALYSIS:

Construction of the San Quentin Pump Station is estimated to cost $3.2 million. Additional costs related to construction including contingency, construction management, and inspection costs will also be needed. The average annual Stormwater Fee funds available for CIP projects is only $500,000. Therefore, City staff has been actively pursuing grant funding to support the construction effort. In December 2019, staff applied to the FEMA Hazard Mitigation Grant Program to obtain $2.4 million of federal funds, but that grant application was unsuccessful. In August 2020, staff also applied to the State’s Urban Flood Protection Grant Program to obtain $1.5 million and that grant application was also unsuccessful. At this point, staff does not have a funding alternative for this important climate change-related infrastructure project that would be superior to using the American Rescue Plan Act (ARPA) funding.

In 2021, the City received funding through ARPA that can be used for CIP projects, and ARPA specifically calls out water infrastructure projects as eligible. City staff recommends that ARPA funds be used for the construction of this project. This project directly or indirectly touches on all of the City Council’s key focus areas for 2021/22, with a particular concentration on the key focus area of “Sustainability, Climate Change, and Disasters.” It is also a very significant infrastructure project that has been planned for many years without an available alternative funding source.

In addition to presenting the funding plan, this item is being brought forward to the City Council as an informational report at this time to raise awareness of a very significant infrastructure project, in the millions of dollars, prior to it coming to the City Council for formal bid award.

FISCAL IMPACT:

There is no fiscal impact for the acceptance of this informational report. City staff will proceed to advertise and award the construction project and will recommend appropriation of the ARPA funds at a future Council meeting once a construction contractor is identified.

OPTIONS:

The City Council has the following options to consider relating to this matter:

1. Accept the informational report as presented.

2. Do not accept the informational report

3. Direct staff to return with more information.

RECOMMENDED ACTION:

Accept the report.

ATTACHMENT:

1. Excerpts from the 60% planset that depict the overall project and existing condition.

PROJECT
SITE

EAST FRANCISCO SANITARY
& SEWER PUMP STATION
~ ..<-- 1601 E. FRANCISCO BLVD.
~-1~
0/&

DRAKE BLVD

VICINITY MAP
SCALE: NTS

SAN QUENTIN
S.W. PUMP

STATOIN
(E) PUMP STATION
(SEE SITE PLAN AND SECTION

VIEW, THIS SHEET)

WETLANDS AREA

WETLANDS AREA

LANDS OF KERNER BLVD LLC
APN 00901023

WETLANDS AREA
60" RCP (PRESSURIZED)
CP5
CP4
CP2
CP3
25'

WETLANDS LIMIT

WETLANDS LIMIT

RIPRAP ROCK

RIPRAP ROCK

PUMP STATION

PUMP STATION

PUMP STATION
100' BCDC BAY

JURISDICTIONAL

BOUNDARY SETBACK
LANDS OF TARGET CORP.
125 SHORELINE PKWY
APN 00932051

LANDS OF

THE CITY OF SAN RAFAEL
APN 00901025
Begin 37' Sag
TOP=20"
TOP=32"
End 37' Sag
TOP=24"
TOP=37"
TOP=42"
Begin 56' Sag
TOP=32"
56' SAG
TOP=42"
End 56' Sag
TOP=32"
8'
52' SAG
Begin 56' Sag
TOP=22"
End 56' Sag
TOP=42"
8'
TOP=50"
TOP=36"
37' SAG
10'

BCDC BAY

JURISDICTIONAL

BOUNDARY
B1 GEOTECH BORING
CP7
CP12
CP13
CP14
CP6
A
--

PRESSURE CHAMBER

EXISTING

PRESSURE
VAULT
EXISTING 63" O.D.

SPRINGLINE OF HDPE DISCHARGE

HDPE PIPE
(E) BAY MUD
(E) 3' ± BAY MUD

DIRT / AC PAVEMENT SURFACE
(DEPTH UNKNOWN)

UNABLE TO CONFIRM EXACT CONFIGURATION
OF THIS CONNECTION. DRAWING DEPICTS
AVAILABLE RECORDS.

FILTER FABRIC
(E) 12" WIDE

CONCRETE
WALL
8" PVC PRESSURE RELIEF
LAGOON

CONCRETE

PATHWAY
24" ACCESS

MANHOLE

CONTOLS

CONTOLS

DIRT/GRAVEL/AC ROADWAY

WET WELL
(2) EXISTING

VERTICAL
PUMPS

WET WELL

BAR SCREEN

VERTICAL
PUMP, TYP.

EXISTING

PRESSURE
VAULT

FRANCISCO
BLVD
580

SHORELINE
PKWY
TARGET

HOME DEPOT
LAGOON

LEVEE (GRAVEL) ROAD
BAY
B1

SEE EXISTING

SITE PLAN
CITY PROJECT NO.:

DRAWING: OF DESIGNED DRAWN CHECKED APPROVED

DATE DATE
NO. PROJECT NAME

SAN RAFAEL COUNTY OF MARIN CALIFORNIA
SHEET NO.:

DRAWING NAME
DATE:

SCALE: REVISION BY DATE CSW/StuberStroeh
45 Leveroni Court
Novato, CA 94949
tel: 415.883.9850
fax: 415.883.9835
Engineering Group, Inc.

Civil & Structural Engineers
Surveying & Mapping
Environmental Planning
Land Planning
Construction Management
November 14, 2018

RJSSASRJS
11334
 65% CD 80219
2 C2.0
as shown
Graphic Scale (in feet)
0 1 inch = 40 ft.
40 PROPERTY MAP
1 inch = 300 ft.

EXISTING SITE PLAN
N.T.S.

EXISTING PUMP STATION SITE PLAN & SECTION VIEW
1 inch = 10 ft.

A SECTION VIEW

PLAN VIEW

CONTROL POINTS
POINT NO. NOTHING EASTING ELEVATION DESCRIPTION
2 2176656.299812 5987083.060150 3.96 CP 60D
3 2176573.533388 5987065.644983 4.35 CP 60D
4 2176735.928568 5987055.085624 4.12 CP 60D
5 2176714.591922 5987030.066885 4.80 CP 60D
6 2176734.340642 5987484.616836 3.54 CP 60D
7 2176911.145372 5987954.962687 9.13 CP 60D
12 2176830.111457 5987951.950462 9.54 CP 60D
13 2176781.163349 5987678.220722 2.81 CP 60D
14 2176720.821334 5987403.134558 3.88 CP 60D
11 /
r
\
I
I
I
I
I
I
I
I
. '. ' I: . • ·1
·(
. :I~
:i...:,. . : . .•
pp
• I
'
. ' .I
·.:,
V
\
\
\< l ______ l_ ------ r _/
I
~
- ,
I
I
I
I
I
I
~□~~~ ' ' ---\_-- --------- j n& 1...3--,
I ------ >--~
) Ir--~ ~-
\ 1 ---\.._ ' I\ \ /
I\ I /
~. \ _ _,-<-,\
\ \ \ \
\ I \
\, \ \ 4 \
\ \ \ \ \
\ \ \ \ 4
\ \~ \,,
\\ \\ \, \ . \ \
\\"-. \
'\ \
I
\
Q,____
I
I
- I
I
\
I
I
\
----~
BASIS OF BEARINGS IS N76·59•41"E BASED ON

S FOR THIS MAP THE OTHER
:~!D
0 [. ~R~:
1 N;,PES ONE B~fJ£JcfiPiil~l1~E CORNERS OF
HAVING AN ILLEGIBLE [T~f MARIN COUNTY RECORDS. LOT 6, 2012 PM 96 91, LEGEND
0 •
I
I
I
- _\ /4/ - . .....:::::=-~ . J -----~ .l . . .:..-- ---==-- _-; -\_.,?-- \
\
~~~°;::f REBAR CAP PLS 9387

FOUND MONUMENT
\
\
\
\
\
( \
I
I
/ \ I \ t I I \
I I
{~ f:?J \
)
\
\
\
\
\
\
\
C'II
Ien
3:
en
(.)
ZtOo
-w
Sa
CIJ a:
a. a.
~z
:,O
a. i=
zO
-:>
I- a:

ZtW CIJ
:,z
Oo
zO
ceW
CIJ a:

Cl
z
:5
a.

CIJ
z
0 E
C
z
0 0
"
z
~
~

PRESSURE
VAULT
(E) BAY MUD
(E) 3' ± BAY MUD
FS 8.0
(3) 100 CFS
FS 5.0
FS 9.0
FS 16.0
FS 4.0
22' 5'
8'
FS 5.0 ±
FL 4.0
TYP. OF 3

BYPASS FLAP GATE
27 28
1 21
19 22
10'
23'
10' 10'
5'

5.73'

6.03'

19.83'
2'

7.32'

43.33'

25.5'

4.51'
15'

5.99'
21'
5' 8'
4'
3'
3'
3'
4'
1 TYP.
21 TYP.

PRESSURE VAULT
5 6
9 7
3 8
4 8 10 10
23 BAY #1 BAY #2 BAY #3
24 25
27 CITY PROJECT NO.:

DRAWING: OF DESIGNED DRAWN CHECKED APPROVED

DATE DATE
NO. PROJECT NAME

SAN RAFAEL COUNTY OF MARIN CALIFORNIA
SHEET NO.:

DRAWING NAME
DATE:

SCALE: REVISION BY DATE CSW/StuberStroeh
45 Leveroni Court
Novato, CA 94949
tel: 415.883.9850
fax: 415.883.9835
Engineering Group, Inc.

Civil & Structural Engineers
Surveying & Mapping
Environmental Planning
Land Planning
Construction Management
November 14, 2018

RJSSASRJS
11334
 65% CD 80219 RJS
as shown

PUMP STATION SECTION VIEW
1 inch = 10 ft.

PUMP STATION SITE PLAN
1 inch = 10 ft.

KEYNOTES

NEW VERTICAL PUMPING UNIT
NEW 5HP SUBMERSIBLE PUMPING UNIT

NEW MOTOR CONTROL CENTER

NEW PLC CONTROL

NEW AUTOMATIC TRANSFER SWITCH

MAIN SWITCHBOARD
NEW SWITCHBOARD MS1

PORTABLE GENERATOR (NIC)

NEW TRANSFORMER & PAD
NEW 4' WIDE PEDESTRIAN OR 12' WIDE VEHICULAR
GATE (SEE DETAILS, SHEET C6.1)

BOLTED DOWN MANHOLE LID

PROTECT IN PLACE EXISTING STORM DRAIN TURNING

STRUCTURE

PROTECT IN PLACE EXISTING UTILITY POLE & METER

PROTECT IN PLACE EXISTING PUMP STATION &

FENCING

WETLANDS LIMITS
18" STORM DRAIN PIPE  SEE PLAN & PROFILE SHEET
C3.0 AND DETAIL SHEET C6.1
STORM DRAIN MANHOLE (UCS DWG #205, TYPE "A")
12" NOMINAL Ø RIPRAP ROCK (10 TONS)  SEE DETAIL,
SHEET C6.1
48" STORM DRAIN PIPE (OPEN TRENCH) SEE PLAN &
PROFILE SHEET C3.0  3.1 AND DETAIL SHEET C6.1)
48" STORM DRAIN PIPE (SLIP LINE) SEE PLAN & PROFILE
SHEET C3.0  3.1)
FLAP GATE (SEE DETAIL, SHEET C6.3)
8" PRESSURE RELIEF LINE
CONCRETE SLAB (SEE DETAILS, SHEET C6.0)

PREFABRICATED PEDESTRIAN STAIRWAY
OVERFLOW PIPE AND FLAP GATE WITH FL ELEV = 4.0

REMOVE & DISPOSE EXISTING PUMP STATION, SEE
DEMOLITION PLANS C2.1
BAR SCREEN (SEE DETAILS, SHEET C6.2)
CATWALK (SEE DETAILS, SHEET C6.2)

NEW SS HAND RAILING
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 PUMP STATION LAYOUT
1 inch = 10 ft.
6 C4.0
5 11
□
□
□
□
□
□
□
□
□
□
----.,,,_......,/

WETLANDS AREA

LANDS OF

THE CITY OF SAN RAFAEL
APN 009-010-25
□
□
□
□
□
□
□
□
□
□
□
~-- ~ ------------- 3

LANDS OF KERNER BLVD LLC /
APN 009-010-23
I
' I
□
□
□
□
□
□
□
□
I
I
I
I
I
I
q_<I.

OH---OH---OH__;::.~~--13

GRADING LIMITS
APPROXIMATE _./

WETLANDS LIMIT
I
I
LANDS OF TARGET CORP.
125 SHORELINE PKWY
APN 009-320-51
\ --- EXISTING STORM

DRAINAGE INLET
25LF 16
,{
.f
g~ -
, l
. . .. : . . . . j
::Ell' ' . ·, .. ..'·.· :1 : Le-·.

I • • I
Zt- z
Oo
-w :5
Sa a.

ICl) a: :::J
a. a. 0
~z ; :::J 0
a. i= z zO 0 - :::J I- a:
~ Ztw Cl)
:::J z Cl)
Oo a. zO ~ <( w :::J Cl) a: a.
: ___PRELIMINAR~) ~-
('I
1--
en
3:
en
(.)
...:I
r,;:i
<
r...
< I:, 00
Cl ~ 0 ~ ... ~
z Z 0 < 1:1 Ii=
r:n ~ t.)
e;l ::J r... p:i
0 ~ ~ 1:1 ~
>< ~ E-<
-
u
U.S.A. NOTIFICATION SERVICE

← All documents from this meeting