City of San Ramon
INFRASTRUCTURE COMMITTEE
AGENDA
Mark Armstrong, Chair • Scott Perkins, Vice Chair
TELECONFERENCE Regular Meeting
4:00 PM
March 30, 2022
AGENDA QUESTIONS: PLEASE CALL THE PUBLIC WORKS DEPARTMENT AT (925) 973-2670 Documents received after publication of this Agenda and considered by the Infrastructure Committee in its deliberation will be available for inspection only via electronic document transfer, due to COVID-19. See the COVID-19 provisions outlined below. Please call or email the Public Works Department during normal business hours if you require access to any such documents.
COVID-19 ADVISORY AND MEETING PROCEDURE
Assembly Bill 361 suspends certain provisions of the Brown Act, allowing public meetings to be held by teleconference. As a precaution to protect the health and safety of staff, officials, and the general public. Committee members will not be physically in attendance, but will be available via video conference.
There will be no physical location for members of the public to participate in the meeting. We encourage members of the public to access the meeting online using Zoom. It is recommended that anyone wishing to view and/or participate in the meeting, download the Zoom application, www.zoom.us, before the start of the meeting. Zoom participants will have the opportunity to speak during Public Comment (for topics not on the agenda), in addition to each of the agendized items.
If you are submitting public comment via email, please do so by 3:00 p.m. on Wednesday, March 30, 2022, to [email protected]. Please include “Public Comment 3/30/2022” in the subject line. In the body of the email please include your name and the item you wish to comment on. Written comments submitted will be provided to the Committee prior to the start of the meeting. Written public comment will not be read aloud during the meeting. If you wish to make your comments heard, you must participate in the Zoom meeting.
There will be zero tolerance for any person addressing the Committee making profane, offensive and disruptive remarks, or engaging in loud, boisterous, or other disorderly conduct, that disrupts the orderly conduct of the public meeting.
2 Infrastructure Committee Meeting – March 30, 2022
HOW TO VIEW OR PARTICIPATE IN THE MEETING REMOTELY:
1. To view or participate in the meeting through Zoom
Livestream online at: https://cityofsanramon.zoom.us/j/96460693873 Webinar ID: 964 6069 3873
Use the “Raise Your Hand” button to request to speak when Public Comment is being taken on the Agenda item. You will then be unmuted when it is your turn to make your comment for up to three minutes. After the allotted time, you will then be re-muted.
2. To view the meeting live online at: www.sanramon.ca.gov/YouTube
3. To listen or participate in the meeting by telephone, dial: +1 (669) 900-6833 Webinar ID: 964 6069 3873
Use *9 on your telephone to raise your hand and request to speak when Public Comment is being taken on the Agenda item. You will then be unmuted when it is your turn to make your comment for up to three minutes. After the allotted time, you will then be re-muted.
3 Infrastructure Committee Meeting – March 30, 2022
1. CALL TO ORDER
2. MINUTES APPROVAL
2.1 Infrastructure Committee - Regular Meeting - February 28, 2022 3:00 PM
3. PUBLIC COMMENT
Members of the audience are encouraged to address the Infrastructure Committee on any nonagenda item. Members of the public who are participating via Zoom will have the opportunity to make comments to the Committee live through the Zoom application.
Comments from the public under Public Comment may also be submitted by email to [email protected]. No Committee action can be taken at this meeting on issues raised during Public comment, whether submitted by email or Zoom.
4. NEW BUSINESS
4.1 Five-Year Pavement Management Plan Update
Recommendation: Receive the Report and Provide Comments to Staff
5. COMMITTEE MEMBER COMMENTS
6. UNFINISHED BUSINESS
7. ADJOURNMENT
I hereby certify that the attached Infrastructure Committee Meeting Agenda was posted 72 hours before the noted meeting.
Dated: March 24, 2022
MINUTES OF THE
CITY OF SAN RAMON INFRASTRUCTURE COMMITTEE
February 28, 2022
1. CALL TO ORDER
Attendee Name Title Status Arrived
Mark Armstrong Chair Present
Scott Perkins Vice Chair Present
Attendees: Joe Gorton, City Manager; Maria Fierner, Public Works Director; Scott Rennicks, Division Manager; Sandy Martin, Program Manager; and Debbie Hince, Office Specialist
2. MINUTES APPROVAL
2.1 Infrastructure Committee - Regular Meeting - May 10, 2021 4:00 PM Minutes of the May 10, 2021 regular meeting, approved as written (Perkins/Armstrong). Passed unanimously 2-0.
RESULT: ACCEPTED [UNANIMOUS]
MOVER: Scott Perkins, Vice Chair
SECONDER: Mark Armstrong, Chair
AYES: Armstrong, Perkins
3. PUBLIC COMMENT
None.
4. NEW BUSINESS
4.1 San Ramon Community Center Renovation - Phase 2 Exterior Recommendation: Receive the Report and Provide Feedback Ms. Martin presented to the Committee the exterior renovations that are being recommended for SRCC, including: power washing and painting of stucco; cleaning, repairing grout as needed, and re-sealing of the granite; scraping and painting of metal building caps and HVAC cover screen; replace railing on 2nd floor balcony of Terrace Room or adding an additional railing to meet ADA compliance standards; and a shade structure for the Terrace Room patio area.
The Committee took a tour of the exterior of the building and the proposed renovation areas.
Mr. Perkins recommended that the shade sails would be a better fit for the patio area, providing better coverage than a retractable awning, and that 80-90% coverage would be ideal. Also the shade structure should provide full coverage from rainfall and drain to the storm drain inlets in the patio surface. Mr. Perkins
2.1 Packet Pg. 3
Minutes Acceptance: Minutes of Feb 28, 2022 3:00 PM (Minutes Approval) 2Infrastructure Committee Meeting – February 28, 2022
also recommended that accordion doors replace one or two of the large Terrace Room windows in order to provide better access to the patio.
Chair Armstrong also recommended the shade sails as the most appropriate option for the patio area and that they should be overlapped to keep the sun from breaking through between sails. The fabric should be stain resistant from the falling fronds from the adjacent redwood trees. It was also recommended to add some sort of stacked stones or surface around the poles of the shade sails that could be used for a table as a place to put plates or cups.
Mr. Perkins asked what the lifespan of the shade sails and Ms. Martin stated that the sails are made up of UV resistant fabric and have a 15-year life expectancy.
Mr. Perkins also stated that the installation of the shade sails would provide another shaded area for the participants of Camp Central.
Mr. Perkins also would like staff to check on the usefulness of the antenna that is attached to the HVAC cover screen. If it is no longer in use, he suggested that it be removed.
Mr. Gorton recommended that a gas fireplace be added to the patio area in front of the rock wall, if the budget allows.
Chair Armstrong asked what other committees these renovations would be presented to. Ms. Martin stated that this item would also be presented to the Parks Commission for their recommendations and approval.
RESULT: RECEIVED
5. COMMITTEE MEMBER COMMENTS
None.
6. UNFINISHED BUSINESS
None.
7. ADJOURNMENT
Chair Armstrong adjourned the meeting at 3:33 p.m.
The next meeting of the Infrastructure Committee to be determined.
2.1 Packet Pg. 4
Minutes Acceptance: Minutes of Feb 28, 2022 3:00 PM (Minutes Approval)
INFRASTRUCTURE COMMITTEE
DATE: March 30, 2022
TO: Infrastructure Committee/City Manager
FROM: Maria Fierner, Public Works Director
By: Robin Bartlett, Division Manager/District Engineer
SUBJECT: Five-Year Pavement Management Plan Update
EXECUTIVE SUMMARY
The Five-Year Pavement Management Plan provides a list of streets anticipated to be treated in San Ramon over the next five years. The Plan is based on the available Five-Year Pavement Management Program Budget (including SB-1, Refuse Vehicle Impact Fee, 2019 Certificate of Participation (COP) Debt Service Financing, and savings from previous pavement projects). This Plan was developed using the “critical point” pavement management approach, and the goal to prioritize and treat all low PCI streets in the City within the Five-Year Plan. The City’s current overall average Pavement Condition Index (PCI) is 78. Based on proposed funding, the PCI is anticipated to rise to 79 by the end of 2022, drop gradually to 75 by the end of 2027, and down to 71 by the end of 2031. Factors influencing the PCI and discussion of areas to be treated over the next five years are discussed below.
RECOMMENDED ACTION
Staff recommends that the Infrastructure Committee review the Five-Year Pavement Management Plan Update and provide comments to staff.
BACKGROUND
Pavement Condition Index (PCI)
The City uses a Pavement Management Program (PMP) to assist with prioritizing streets to include in maintenance and rehabilitation projects. As part of this Program, the City is required to regularly inventory the condition of the streets and assign each a rating from 0 to 100. This rating is referred to as the Pavement Condition Index (PCI).
PCI is an objective and rational, although not perfectly precise, basis for determining pavement condition and establishing maintenance priorities. The method is based on a visual survey of various types of distresses in a pavement on selected parts of a given street. The result of the
4.1 Packet Pg. 5
survey is a numerical value between 0 and 100 for a specific street section, with 0 representing the worst possible condition and 100 representing the best possible condition. PCI is a budgeting and planning tool, not a design tool.
The City utilizes an independent engineering consultant to perform the Pavement Condition Survey every two years to determine the condition of all pavement sections throughout the City.
Staff then utilizes the Metropolitan Transportation Commission’s Pavement Management System (MTC-PMS) StreetSaver software to help prepare a Five-Year Pavement Management Plan, which identifies likely repair locations and types. The StreetSaver software incorporates data gathered from most agencies in the Bay Area as well as many other agencies in other locations. As such, it provides a powerful tool for predicting pavement life and treatment costs.
In November 2018, staff applied for a grant through the Pavement Management Technical Assistance Program (P-TAP) Round 20. The City received Surface Transportation Program (STP) funding for $56,800. With this grant, plus the City's local matching funds of $14,200, MTC and City staff jointly retained Pavement Engineering, Inc. (PEI) to perform the 2019 Pavement Condition Survey of the City’s roadways. As part of the Survey, an updated PCI was assigned to each pavement section. The overall average PCI was calculated based on the updated survey of each street section. This was the last PCI survey performed in the City. In 2020, the City did not receive a P-TAP grant for street analysis since the City received one last year to conduct a drainage inventory assessment. In February 2022, City staff applied for the next cycle of P-TAP grant (Round 23) for a total of $67,900. The City will be required to provide a local match of $16,975, for grand total of $84,875. Staff expects to receive approval of this grant in the spring of 2022.
Per roadway classification, and based on the survey results and extrapolation using the StreetSaver software, the estimated overall PCI is summarized below.
Current Conditions
The current data and condition of the City’s streets are as follows:
Total centerline miles 242.50
Total lane miles 508.17
Total pavement area 43.8 million square feet
Parking Lot area 1.1 million square feet
System Replacement value $705.7 million
Current Average PCI 78
Current Average PCI Arterials 76 (27% of total pavement area) Current Average PCI Collectors 78 (13% of total pavement area) Current Average PCI Residential 79 (57% of total pavement area) Current Average PCI Other 76 (3% of total pavement area) This is the same average PCI as last year.
4.1 Packet Pg. 6
Critical Point Approach and Implementation Strategies
In 2018, based on staff’s recommendation, the City adopted a “critical point” approach to pavement maintenance. The “critical point” refers to implementing a pavement preservation or rehabilitation on a given street just prior to that street’s condition deteriorating to the point where it requires the next most expensive treatment. This method maximizes the useful life obtained from the original pavement and each successive treatment while minimizing the cost of each successive treatment. Key recommendations for the new approach include:
1. Maximizing the use of a “critical point” strategy to get the most life out of a given pavement prior to it requiring more substantial and costly rehabilitation treatment.
2. Continuing to use a modified “pave by area” approach to help contain costs by concentrating the work into selected locations, but with larger areas and with only select streets subject to treatment.
3. Combining critical point analysis and identifying select “low PCI” streets and “special case” streets to address those streets in the worst condition or with special problems.
Low PCI streets have been defined as follows:
Functional Classification (FC) Low PCI Defined
Arterials (A) PCI less than 50
Collectors (C) PCI less than 45
Residential/Local Streets (R) PCI less than 30
4. Undertaking an extensive preventative maintenance program on newer streets, predominantly within the Dougherty Valley, that are approaching the critical point to where low-cost preventative maintenance treatments will no longer be effective.
In addition, staff began implementing new strategies to improve cost-effectiveness, including, when possible:
Preparing plans, specifications, and engineer’s estimates (PS&Es) in-house, whenever possible, reducing the design costs;
Obtaining separate bids for asphalt concrete (AC) and preventative maintenance treatments;
Minimizing concrete work done as subcontractor work to the paving contractors and combining it with sidewalk projects;
Moving streets previously done within the Stop Gap Program into the Pavement Management Project, to the extent practical;
Enhancing coordination between Public Services and Engineering staff to improve efficient provisions of in-house Stop Gap work (pothole repair, crack sealing, and minor patching);
Writing bid documents with more flexibility in terms of working hours and lane closures, to pavement contractors, as long as it does not affect construction safety; Increasing the amount of preventive maintenance done as a portion of the whole including increasing crack sealing operations; and
4.1 Packet Pg. 7
Evaluating paving technologies that have not been used in the City to determine if they can provide better solutions. A product of such evaluations will be the increased use of Rubberized Cape Seals on residential streets throughout the City.
These approaches and strategies have been applied to the last three pavement projects and have contributed to cost savings of approximately $3.4M.
Pavement Funding
Projected Five-Year Pavement Management Program Budget
Funding for Pavement Management is provided by several sources, which are summarized below and shown on the projected Five-Year Pavement Management Program (PMP) Budget in Attachment A. The attachment shows projected Federal, State, and Local funds per fiscal year.
The anticipated funding sources are:
Highway Users Tax Account (HUTA) or Gas Tax, that includes the Road Repair and Accountability Act of 2017 (SB-1);
City’s Refuse Vehicle Impact Fee (RVIF); and
Reallocated General Fund and 2019 Certificate of Participation (COP) Debt Service Financing
o available due to the State Transportation Improvement Fund (STIP) from the Contra Costa Transportation Agency (CCTA) becoming available for the Bollinger Canyon Road Iron Horse Trail Overcrossing.
The deductions shown in Attachment A, account for administrative and General Fund overhead per fiscal year, as well as a set-aside contingency of 20% of the combination of upcoming fiscal year’s Gas Tax and Measure J Funds to secure proper cash flow and variance in forecasted revenue projections. After deductions are applied, the table shows the projected distribution of the available funds per year into the different City programs and/or projects.
Contra Costa County Return to Source Measure J
Measure J is the Contra Costa County’s half-cent transportation sales tax through Year 2034. For the City, Measure J represents approximately $1M for different City programs and/or projects.
This source of funding has been eliminated in order to pay back a $9.2M State Transportation Improvement Fund (STIP) loan to help pay for the Bollinger Canyon Road/Iron Horse Trail Bicycle Pedestrian Overcrossing Project (CIP 905530).
Refuse Vehicle Impact Fee (RVIF)
The purpose of the RVIF is to recoup the costs associated with impacts to the pavement by heavy refuse collection trucks. These vehicles account for approximately 46% of vehicle loads on residential pavements. The Pavement Management Program started to receive RVIF funds in FY 2018/19 in an amount of $1.369M. The Fee resulted in the addition of $1.529M in FY2019/20, and a projected flat fee of $1.5M annually starting in FY2020/21, subject to an inflation
4.1 Packet Pg. 8
adjustment, for the Pavement Management Program only.
In June 2021, City Council approved an Amendment to the contract with Alameda County Industries of San Ramon, Inc. (ACI) for solid waste collection services. With the onset of the COVID-19 Pandemic, ACI sustained large reductions in services, particularly from commercial enterprises with commensurate loss in revenue. This loss in revenue occurred while residential waste generation increased. This resulted in a substantial financial impact to ACI, estimated at more than $1.5M from March 2020 through June 2021. As a result, ACI requested an “extraordinary rate increase”. ACI and City staff discussed the situation and arrived at an agreement, which avoided the need for an extraordinary rate increase and the complex process that it would have entailed.
Under this agreement, ACI will be able to avoid operating at a loss, but with little or no profit until businesses restore their service levels to pre-COVID levels. This agreement will use $750,000 of existing reserves in the Solid Waste Fund and defer payment of $750,000 in Refuse Vehicle Impact Fees (RVIF), rather than an increase to customer rates, to resolve ACI’s claim.
ACI will pay back the RVIF over a three-year period, starting July 1, 2022.
Tri-Valley Transportation Council (TVTC)
Staff understands that consideration is being given by the TVTC to award the Bollinger Overcrossing a grant of up to $2M to help complete the construction of the project. If these funds are received, then the funds or a portion of them, may become available to help pay back the STIP loan. This would then make an equivalent amount of Measure J funding available for pavement management. In order to be conservative, the benefits of this funding have not be incorporated into the analysis. However, staff anticipates that such funding could have the effect of an increase to the City’s PCI by up to one (1) point over a two-year period relative to what it would otherwise be.
Savings from the Pavement Management 2020 Project (CIP 000001), Pavement Management 2021 Project (CIP 000003), and Alcosta Blvd Pavement Rehabilitation Project (CIP 905602) As a result of implementing the new strategies to improve cost-effectiveness described previously in this report, the City started to receive savings from these three pavement projects:
1. Pavement Management 2020 Project (CIP 000001), approximately $120,000 in savings;
2. Pavement Management 2021 Project (CIP 000003), approximately $1,750,000 in savings; and
3. Alcosta Blvd. Pavement Rehabilitation Project (CIP 905602), approximately $1,550,000 in savings.
These cost savings are being returned to the Gas Tax/Measure J funding account to treat more streets and as a buffer to construction cost increases due to current local and global events that are affecting the cost of oil and its derivative products, such as asphalt.
DISCUSSION
4.1 Packet Pg. 9
Pavement Management 2022 Project (CIP 000005) and 2023 Project (CIP 000008) The Pavement Management 2022 Project (CIP 000005) and Pavement Management 2023 Project (CIP 000008) are being coordinated to minimize costs and maximize efficiencies. The 2022 PMP is primarily focused on the use of hot mix asphalt concrete. This includes pavement treatment of low PCI streets and streets that require heavy maintenance or light rehabilitation treatments such as overlays, while undertaking the asphalt concrete work (primarily local dig-out repairs needed for PMP 2023 streets). The Pavement Management 2023 Project (CIP 000008) will focus on a combination of slurry, microsurfacing, and rubberized cape seals, which can be completed by one contractor.
The Pavement Management 2022 Project (CIP 000005) includes the treatment of two arterial streets: Bollinger Canyon Road, between Canyon Lakes Drive and the northern intersection with Dougherty Road; and Dougherty Road, between Crow Canyon Road and the northern intersection with Bollinger Canyon Road. CIP 000005 also includes the treatment of residential streets such as Anza Court, Arlewood Court, and Kinvarra Court; and localized base repairs of all streets programmed under the Pavement Management 2023 Project (CIP 000008).
CIP 000005 and CIP 000008 include the following low PCI streets, or streets that will fall into this category in the next five years if untreated:
Street Functional
Class
Current
PCI
Bollinger Canyon Road (EB)
Canyon Lakes Drive to South
Gale Ridge Road
A 58
Derby Road R 38
Dougherty Road A 56
Millbridge Place R 33
Omega Road C 41
Ryegate Place R 30
Sage Circle R 37
Scarboro Place R 36
Seneca Lane R 30
Wilton Place R 34
The Pavement Management 2023 Project (CIP 000008) incorporates the treatment of:
Dougherty Road, between Old Ranch Road and City Limit; Stagecoach Road, between Alcosta Blvd. and City Limit; Bollinger Canyon Road, between Crow Canyon Road and San Ramon Valley Blvd.; Various residential streets west of Bollinger Canyon Road, between Crow Canyon Road and San Ramon Valley Blvd.;
Various residential streets east of Bollinger Canyon Road, between Norris Canyon Road and
4.1 Packet Pg. 10
San Ramon Valley Blvd.;
Various residential streets west of Morgan Drive, between Arapaho Circle and Bollinger Canyon Road;
Various residential streets in the Richard Fahey Village Green Park area; Various residential streets in the neighborhood of Hidden Hill Elementary School; Various residential streets south of Windemere Parkway, between Bollinger Canyon Road and Albion Road; and
Areas where utility companies would have performed pavement cuts and paid the City an inlieu fee for the City to treat the roadways, if these streets have not been treated previously under the Stop Gap Program or by separate contract.
The bid opening for the Pavement Management 2022 Project (CIP 000005) is expected in May 2022, with award of the Project by City Council in June or July 2022. The target date for start of construction is July 2022. The list of streets and location map for Pavement Management 2022 Project (CIP 000005) and Pavement Management 2023 Project (CIP 000008) are shown on Attachment C.
Crow Canyon Road - west of Bollinger Canyon Road (CIP 000009) Not part of the Pavement Management 2023 Project (CIP 000008), but scheduled to take place in 2023, is the treatment of Crow Canyon Road, between Bollinger Canyon Road and the City Limit. This section of Crow Canyon Road was originally scheduled for pavement treatment in 2020. However, due to lack of sufficient funds, the treatment of this section was rescheduled to 2024. Since early 2021, City staff has been coordinating with Alameda County engineering staff to incorporate this section of Crow Canyon Road into Alameda County’s upcoming pavement project along Crow Canyon Road that ends at the County/City limit. The construction of Alameda County’s pavement project is anticipated for summer of 2023.
The pavement design consultant for Alameda County is one of the City’s on-call pavement consultants. The City and Alameda County have agreed to extend this pavement improvement from the County/City limit to Bollinger Canyon Road, providing better coordination between the two agencies, less traffic disruptions to San Ramon residents, and cost savings by economy of scale. The City would provide the funds to cover this work to Alameda County, which would bid out and administrate construction. The City can afford to pay for this work a year early due to savings from the Pavement Management 2020 Project (CIP 000001), Pavement Management 2021 Project (CIP 000003), and Alcosta Blvd. Pavement Rehabilitation Project (CIP 905602), as previously discussed. A new project for this (CIP 000009) is being proposed for FY 2022/23 as part of the Draft Five-Year 2022-2027 Capital Improvement Program review.
Other Upcoming Projects
Pavement Management Projects 2024 - 2027
Streets selected for treatment between 2024 and 2027 are shown in Attachment C and listed in Attachment D. These are aggressive scenarios for the four years that staff put together based on the overall projected Five-Year Pavement Management Program Budget shown in Attachment
4.1 Packet Pg. 11
A. This list will be subject to yearly revisions based on observations of the actual condition of the street, analysis of its rate of deterioration, selection of other streets in the area, market conditions, cash flow strategies, and other factors. Most low PCI streets within the timeframe of this Study will be treated with PMP 2022. Most of the remaining low PCI streets will be completed with the Crow Canyon Road Widening Project.
Crow Canyon Widening
The widening of Crow Canyon Road, between City limits with the Town of Danville (Danville) and the I-680 Freeway, from two lanes to three lanes in each direction, is a requirement of the Agreement to Settle Litigation Relating to the Dougherty Valley (Settlement Agreement) signed in 1994. It is also included in the City’s General Plan and the Tri-Valley Transportation Plan.
Roadway widening was completed between Alcosta Boulevard and the I-680 Freeway in 2008, and between the Danville town limits and Indian Rice Road in 2011.
The Crow Canyon Widening Project (CIPs 905312 and 905328) will complete the widening from Alcosta Boulevard to St. George Road, from two lanes to three lanes in each direction. As part of the Project, the existing pavement will be repaved. This Project was awarded on February 22, 2022 for a total contract amount not to exceed $14,296,956. It will take approximately two years to complete. The Project is funded by the Southern Contra Costa JEPA (SCCJEPA) Regional Impact Fees Fund and Traffic Improvement Fund.
City-Owned Parking Lots and Other Projects
In addition to maintaining streets in the public right-of-way, funds from Measure J and Gas Tax also pave parking lots, repair sidewalks, replace curb ramps, and undertake “stop gap” work. The City currently owns 32 parking lots, approximately 1.1 million square feet, located at various facilities. The parking lots are included in the Pavement Condition Survey. The weighted average PCI of all the parking lots is currently 76. Staff schedules work on an as-needed basis and on those years where the PMP project heavily contains preventative treatments such as slurry seal or microsurfacing. The following City-owned parking lots are targeted for treatment under this Five-Year Pavement Management Plan Update:
Parking Lot Treatment Year Current PCI
Dougherty Station Community Center 2023 76
East Branch Park 2023 75
Hidden Valley Park 2023 83
Village Green Park 2023 75
Arlington Park 2025 79
San Ramon Sports Park 2025 83
Six Pillars Park 2025 81
Athan Downs Park 2027 78
Long-Term Projections
4.1 Packet Pg. 12
Projected PCI
With the implementation of the “critical point” approach, the sustainment of SB-1 funding, the implementation of the RVIF, and the reallocation of $1.0M of General Funds and $3.6M of COP Funds to pavement management, it is estimated that the City will maintain an overall average PCI of 78 or above until 2023. The PCI will drop gradually to 75 by the end of 2027, as shown on the graph of Attachment B, and is expected to be 71 within 10 years.
Other Impacts
In recent years, the City’s Pavement Management Program has been funding other elements not directly related with roadway pavement treatments. This has reduced the available funds from the Program and has the potential to reduce funds further in the coming years. These other elements include: 1) curb ramp construction for compliance with the Americans with Disabilities Act (ADA); 2) sidewalk repairs; and 3) bike lanes and green conflict zone markings. The costs of ADA compliance and restriping for accommodation of new bike lane standards (with some limitations) have been included in the current five-year analysis. Other elements, such as Green Infrastructure (GI) have not been included, and the extent to which they impact the available funds will result in reductions in the number of streets treated and commensurate reductions in the City’s PCI. Each of these elements are discussed briefly below.
1. ADA Compliance
In 2013, the Department of Justice and the Department of Transportation issued ADA requirements to provide or upgrade curb ramps when streets, roads, or highways are altered through resurfacing. For the Pavement Management 2022 Project (CIP 000005) and Pavement Management 2023 Project (CIP 000008) alone, the cost of ADA curb ramps could be as high as 7.5% of the total cost of the projects.
2. Bicycle Master Plan
One element competing for funds from the Pavement Management Program is funding the restriping to comply with and implement the Bicycle Master Plan (BMP) and current standards for bicycle lanes, including green bike lanes. Green bike lanes have a significant cost due to the preferable thermoplastic application rather than paint.
Staff is analyzing the most effective way to combine COP funds from the Bicycle Network Improvements and Enhancements Project (CIP 905613) with the Five-Year PMP plan and budget. The goal is to schedule, during the same year, elements of CIP 905613 as part of the PMP Projects. This way, COP funds would be spent, as programmed, on bike lane and green conflict zone markings without utilizing PMP funds. The Pavement Management 2022 Project (CIP 000005) brings forward the treatment of sections of Dougherty Road and Bollinger Canyon Road to accommodate the usage of COP funds.
However, this has resulted in delaying other pavement work including preventative maintenance in the Dougherty Valley.
4.1 Packet Pg. 13
3. Green Infrastructure
Green infrastructure is intended to treat stormwater at its source to eliminate pollutants while delivering environmental and social benefits. The RWQCB is currently working on a new Permit - MRP 3.0. As currently proposed, MRP 3.0 will require the City of San Ramon to treat a minimum of approximately 6 acres of impervious surface and treat the runoff from any new pavement projects that add significant impermeable surface, or reconstruct a road, or repave a road with asphalt concrete overlays or inlays. The cost implications of these requirements are difficult to predict as they depend on numerous factors - terrain, available land or right-of-way to provide treatment areas, conflicts with bicycle lanes, minimum road and travel lane widths, traffic volumes, utilities, and other factors.
Target PCI and Alternative Funding
The long-term projections indicate that the City’s pavements will continue a gradual decline from the current high end of “good” condition (PCI 78) to the low end over the next 10 years. A “good” condition is a PCI between 70 and 79; between 60 and 69 is a “fair” condition. The shortfall in spending to maintain the pavement in its current condition is approximately $2M per year. As the City is challenged to balance the costs to deliver needed and desired services with available funding, finding the money necessary to maintain the pavement is an additional challenge that will not be solved easily or quickly.
Fortunately, the deterioration in overall pavement quality is a gradual process and some decline in overall PCI can be borne without widespread impacts. However, it must be kept in mind that the cheapest pavement to maintain is a good pavement. Therefore, as the City’s overall PCI lowers, the cost to maintain that pavement at the new lower level will actually be higher than current requirements. In addition, as the overall PCI deteriorates, a progressively larger number of streets will fall into one of the “low PCI” categories. This will limit flexibility in determining the best use of funding resulting in lower efficiency and yet higher costs. In addition, the requirement of MRP 3.0 as discussed above poses a major new threat to pavement management, especially when streets deteriorate to the point that asphalt concrete overlays or inlays, or pavement reconstruction is required.
The costs to restore the City’s overall pavement condition to the current levels will also increase with time. Staff estimates that it would cost between $30M and $40M to return the City’s PCI to 78, once it reaches 70 (not including Green Infrastructure). This level of new funding would result in a major burden to the City’s budget.
Based on the above logic, staff recommends that the Infrastructure Committee and City Council consider setting a target range of 75 to 80 for the City’s overall PCI and incorporate this target into the City’s annual goals and objectives, as well as establish a mechanism to evaluate funding alternatives in the near future. Setting the target as a range will help with maintaining the flexibility that will facilitate the continued use of the critical point method.
4.1 Packet Pg. 14
The most likely funding mechanisms to help maintain the current PCI include: 1) a parcel tax measure; 2) a sales tax measure; or 3) allocations from the General Fund, which would require offsetting budget reductions, fee increases, or other funding mechanisms to compensate. If recommended by the Infrastructure Committee, staff can begin exploring options in greater detail. This would be expected to culminate in the hiring of consultants to provide detailed recommendations to the City regarding the best options and timing for any action. At the Committee’s recommendation, staff will begin exploring financing options.
FISCAL ANALYSIS
The Projected Five-Year PMP budget is shown in Attachment A. The Five-Year Pavement Management Plan is primarily funded by the Highway Users Tax Account (HUTA) or Gas Tax (including SB-1), the Refuse Vehicle Impact Fee (RVIF), and the STIP loan that allowed the reallocation of $1.0M of General Fund and $3.6M of COP to pavement management.
NEXT STEPS
1. Staff will incorporate comments from the Infrastructure Committee and include any recommendations into the Five-Year 2022/23 - 2026/27 CIP.
2. Staff will continue to seek grant funding for Pavement Management Projects.
3. Staff will provide updates during FY 2022/23 on the Pavement Management Program and will update the Five-Year Pavement Management Plan in 2023.
ATTACHMENT:
A: Projected Five-Year PMP Budget
B: 5-Year Pavement Condition Index (PCI) Projections
C: Five-Year Pavement Management Plan - Maps
D: List of Streets and Street Sections to be treated between 2022 and 2027
4.1 Packet Pg. 15
Fiscal Year 2021/2022 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 Project Totals PMP CIP Number 000005 000008 5614 5617 5618 5624
Construction Year 2022 2023 2024 2025 2026 2027
(A) Total Available Regular Funds $1,827,921 $5,016,864 $6,217,080 $6,265,537 $6,315,447 $6,116,855 Measure J $0 $0 $0 $0 $0 $0
Gas Tax (Highway Users Tax Account ‐ HUTA) $2,189,870 $2,440,231 $2,440,231 $2,440,231 $2,440,231 $2,440,231 Gas Tax (TCRF Loan Repayment)
Gas Tax (SB‐1) $1,737,012 $1,911,629 $1,911,629 $1,911,629 $1,911,629 $1,911,629 Gas Tax (source: CaliforniaCityFinance.com as Jan 2022 for 2021/2022) $3,926,882 $4,351,860 $4,351,860 $4,351,860 $4,351,860 $4,351,860 Total Gas Tax/Measure J $3,926,882 $4,351,860 $4,351,860 $4,351,860 $4,351,860 $4,351,860 Refuse Vehicle Impact Fee (RVIF) $1,549,497 $750,000 $1,865,220 $1,913,677 $1,963,587 $1,764,995 General Fund $0 $0 $0 $0 $0 $0
Measure J Balance Forward $600,000 $0 $0 $0 $0 $0
Gas Tax Balance Forward $463,800 $785,376 $870,372 $870,372 $870,372 $870,372 Total Measure J/Gas Tax Balance Forward $1,063,800 $785,376 $870,372 $870,372 $870,372 $870,372 20% cash flow withholding ‐ Measure J $0 $0 $0 $0 $0 $0 20% cash flow withholding ‐ Gas Tax $785,376 $870,372 $870,372 $870,372 $870,372 $870,372 Total Measure J/Gas Tax ‐ 20% cash flow withholding $785,376 $870,372 $870,372 $870,372 $870,372 $870,372 (B) Other Funds $4,116,343 $4,766,148 $286,207 $726,532 $1,212,848 $1,535,036 PG&E In‐Lieu Pavement Payment $200,000
Comcast In‐Lieu Pavement Payment $182,100
CalRecycle Grant $142,438
Reimbursements from EBMUD, CCCSD, and DSRSD $66,926
2019 Certificate of Participation (COP) $3,601,000
Balance from Pavement Management 2020 Project (CIP 000001) $123,879 Balance from Pavement Management 2021 Project (CIP 000003) $1,750,000 Balance from Alcosta Blvd Pavement Rehabiliation Project (CIP 905602) $1,548,818 Balance Forward from Projects (See row K) $1,267,330 $286,207 $726,532 $1,212,848 $1,535,036 (C) = (A) + (B) Total Funds $5,944,264 $9,783,012 $6,503,287 $6,992,069 $7,528,295 $7,651,891 (D) Deductions $425,934 $429,712 $433,603 $437,611 $441,740 $445,992 General Fund Overhead $300,000 $300,000 $300,000 $300,000 $300,000 $300,000 ADMIN $125,934 $129,712 $133,603 $137,611 $141,740 $145,992 (E) = (C) ‐ (D) Available for Projects * $5,518,330 $9,353,300 $6,069,684 $6,554,457 $7,086,555 $7,205,899 (F) Programs/Projects * $4,251,000 $9,067,093 $5,343,152 $5,341,609 $5,551,519 $5,274,995 Sidewalk Repairs ‐ On‐Call Concrete $230,000 $230,000 $230,000 Sidewalk Repairs ‐ Materials for City Crew $20,000 $20,000 $20,000 (G) Sidewalk Repairs $250,000 $0 $250,000 $0 $250,000 $0 $750,000 Stop Gap ‐ On‐Call Crack Sealing Contract $50,000 $50,000 $50,000 Stop Gap ‐ On‐Call Asphalt Repairs Contract $350,000 $330,000 $330,000 Stop Gap ‐ Materials for City Crew $20,000 $20,000
(H) Stop Gap $400,000 $0 $400,000 $0 $400,000 $0 $1,200,000 (I) Traffic Calming $10,000 $10,000 $10,000 $10,000 $40,000 Crow Canyon Rd ‐ Bollinger Canyon Rd/City Limits ‐ CIP 000009 $435,000 $435,000 PMP 2022 Allocations $3,601,000 $3,833,243 $7,434,243
PMP 2023 Allocations $4,798,850 $1,865,220 $6,664,070
PMP 2024 Allocations $2,817,932 $1,913,677 $4,731,609
PMP 2025 Allocations $3,417,932 $1,963,587 $5,381,519
PMP 2026 Allocations $2,927,932 $1,764,995 $4,692,927
PMP 2027 Allocations $3,500,000 $3,500,000
(J) PMP Total $3,601,000 $9,067,093 $4,683,152 $5,331,609 $4,891,519 $5,264,995 (K) Balance Forward after Projects: (E) ‐ (F) $1,267,330 $286,207 $726,532 $1,212,848 $1,535,036 $1,930,904
ALLOCATIONS
PROJECTED 5‐YR PMP FUNDING and EXPENDITURE
4.1.a
Packet Pg. 16
Attachment: A: Projected Five-Year PMP Budget (3551 : Five-Year PMP Update) City of San Ramon
3/30/2022
78 79 79
78 77
76 75
6570758085
2020 2021 2022 2023 2024 2025 2026 2027 2028
PCI Range
Year
Scenario Projection
PCI RANGE
4.1.b
Packet Pg. 17
Attachment: B: 5-Year Pavement Condition Index (PCI) Projections (3551 : Five-Year PMP Update)
4.1.c
Packet Pg. 18
Attachment: C: Five-Year Pavement Management Plan - Maps (3551 : Five-Year PMP Update)
4.1.c
Packet Pg. 19
Attachment: C: Five-Year Pavement Management Plan - Maps (3551 : Five-Year PMP Update)
4.1.c
Packet Pg. 20
Attachment: C: Five-Year Pavement Management Plan - Maps (3551 : Five-Year PMP Update)
4.1.c
Packet Pg. 21
Attachment: C: Five-Year Pavement Management Plan - Maps (3551 : Five-Year PMP Update)
4.1.c
Packet Pg. 22
Attachment: C: Five-Year Pavement Management Plan - Maps (3551 : Five-Year PMP Update)
4.1.c
Packet Pg. 23
Attachment: C: Five-Year Pavement Management Plan - Maps (3551 : Five-Year PMP Update)
4.1.c
Packet Pg. 24
Attachment: C: Five-Year Pavement Management Plan - Maps (3551 : Five-Year PMP Update)
4.1.c
Packet Pg. 25
Attachment: C: Five-Year Pavement Management Plan - Maps (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, and Alphabetical Order)
YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT
PCI
AFTER
STREETSAVER
EST.
COST/STREET
2022 ANZA CT 10550 BOLLINGER CYN RD END R 66 LIGHT REHABILITATION 100 $28,624 2022 ARLEWOOD CT 30090 KENWICK DR END R 70 LIGHT REHABILITATION 100 $34,785 2022 BOLLINGER CYN RD (EB) 23470E CANYON LAKES CIR S GALE RIDGE RD A 58 LIGHT REHABILITATION 100 $920,416 2022 BOLLINGER CYN RD (EB) 23480E S GALE RIDGE RD DOUGHERTY RD (N) A 65 LIGHT REHABILITATION 100 $449,405 2022 BOLLINGER CYN RD (WB) 23570W DOUGHERTY RD (N) N GALE RIDGE RD A 71 LIGHT REHABILITATION 100 $460,928 2022 BOLLINGER CYN RD (WB) 23580W N GALE RIDGE RD CANYON LAKES DR A 67 LIGHT REHABILITATION 100 $907,452 2022 BRYCE CANYON CT 11830 CANYON CREST AVE END R 74 LIGHT MAINTENANCE 83 $2,324 2022 BRYCE CANYON PL 11840 CANYON CREST AVE END R 76 LIGHT MAINTENANCE 85 $2,823 2022 CANYON CREST AVE 12170 CANYON CREST DR 1000' E/O CYN CREST R 74 HEAVY MAINTENANCE 83 $71,984 2022 CANYON CREST AVE 31050 1000' E/O CANYON CREST END R 74 HEAVY MAINTENANCE 83 $23,179 2022 CANYON CREST CT 12180 CANYON CREST DR END R 76 LIGHT MAINTENANCE 85 $1,497 2022 CANYON CREST DR 12210 710' W/O RIO GRANDE PL CROW CANYON RD (E) R 68 HEAVY MAINTENANCE 77 $137,058 2022 CANYON CREST DR 12190 CROW CANYON RD (W) CANYON CREST RD R 76 LIGHT MAINTENANCE 85 $10,396 2022 CANYON CREST DR 12200 CANYON CREST RD 710' W/O RIO GRANDE PL R 76 LIGHT MAINTENANCE 85 $22,611 2022 CANYON CREST RD (E) 12220 CANYON CREST DR HIDDEN CANYON CT R 60 HEAVY MAINTENANCE 70 $17,492 2022 CANYON CREST RD (E) 12225 HIDDEN CANYON CT END R 76 LIGHT MAINTENANCE 85 $4,099 2022 CANYON CREST RD (W) 12230 CANYON CREST DR END R 73 LIGHT MAINTENANCE 82 $25,314 2022 DOUGHERTY RD (NB) 13790N BOLLINGER CYN RD (N) N MONARCH RD A 62 LIGHT REHABILITATION 100 $369,518 2022 DOUGHERTY RD (NB) 13800N N MONARCH RD RED WILLOW RD A 68 LIGHT REHABILITATION 100 $810,424 2022 DOUGHERTY RD (NB) 13810N RED WILLOW RD CROW CANYON RD A 66 LIGHT REHABILITATION 100 $196,781 2022 DOUGHERTY RD (SB) 13820S CROW CANYON RD RED WILLOW RD A 56 LIGHT REHABILITATION 100 $172,183 2022 DOUGHERTY RD (SB) 13830S RED WILLOW RD N GALE RIDGE RD A 61 LIGHT REHABILITATION 100 $849,016 2022 DOUGHERTY RD (SB) 13840S N GALE RIDGE RD BOLLINGER CYN RD (N) A 62 LIGHT REHABILITATION 100 $457,604 2022 HIDDEN CANYON CT 14850 CANYON CREST RD END R 76 LIGHT MAINTENANCE 85 $2,564 2022 JAMAICA DR 15080 BARBADOS DR END R 79 LIGHT MAINTENANCE 87 $10,236 2022 KINVARRA CT 30450 KENWICK DR END R 73 LIGHT REHABILITATION 100 $30,508 2022 LAKE MEAD CT 15260 CANYON CREST RD END R 76 LIGHT MAINTENANCE 85 $2,516 2022 LAKE MEAD PL 15270 CANYON CREST RD END R 76 LIGHT MAINTENANCE 85 $3,097 2022 LAVA FALLS CT 15370 CANYON CREST AVE END R 76 LIGHT MAINTENANCE 85 $2,281 2022 LAVA FALLS PL 15380 CANYON CREST AVE END R 76 LIGHT MAINTENANCE 85 $1,772 2022 MARBLE CANYON CT 15810 CANYON CREST DR END R 71 HEAVY MAINTENANCE 81 $25,507 2022 MARBLE CANYON LN 15820 CANYON CREST DR END R 76 LIGHT MAINTENANCE 85 $4,138 2022 MARBLE CANYON PL 15830 CANYON CREST DR END R 75 HEAVY MAINTENANCE 84 $89,425 2022 MILLBRIDGE PL 16210 MILO WAY END R 33 LIGHT REHABILITATION 100 $50,812 2022 OMEGA RD 16975 330 FT N/O DEERWOOD RD FARIA PRESERVE PKWY C 41 LIGHT REHABILITATION 100 $66,199 2022 OMEGA RD 16980 FARIA PRESERVE PKWY 660 FT N/O FARIA PRESERVE PKWY C 46 LIGHT REHABILITATION 100 $101,289 2022 PLACID CT 17300 CANYON CREST RD END R 76 LIGHT MAINTENANCE 85 $2,318 2022 QUARTERMSTR CYN RD 17450 CANYON CREST DR END R 74 HEAVY MAINTENANCE 83 $55,038 2022 RIO GRANDE CT 17590 CANYON CREST DR END R 76 LIGHT MAINTENANCE 85 $3,459 2022 RIO GRANDE PL 17600 CANYON CREST DR END R 74 LIGHT MAINTENANCE 83 $3,831 2022 RYEGATE PL 17760 MILO WAY END R 30 LIGHT REHABILITATION 100 $42,837 2022 TAHITI DR 18970 BARBADOS DR CROW CANYON RD R 77 LIGHT MAINTENANCE 85 $33,644 $6,507,385
2023 ADRIATIC CT 20500 AYERS WAY END R 77 LIGHT MAINTENANCE 84 $6,583 2023 ALBION RD 011 WINDEMERE PKWY 710 FT N OF WINDEMERE PKWY C 71 LIGHT MAINTENANCE 78 $18,447 2023 ALBION RD 015 360 FT EAST OF SILVA WAY HARCOURT WAY C 71 LIGHT MAINTENANCE 78 $46,638 2023 ALORA CT 10440 DURANGO LN END R 79 LIGHT MAINTENANCE 86 $2,088 2023 ANDORA LN 10512 BOLLINGER CYN RD GALICIA CT R 82 LIGHT MAINTENANCE 88 $7,704 2023 ANDORA LN 10514 GALICIA CT END R 66 HEAVY MAINTENANCE 75 $82,738 2023 ARAGON LN 10590 TWIN CREEKS DR END R 81 LIGHT MAINTENANCE 88 $21,948 2023 ARANDA DR 10610 BOLLINGER CYN RD MARSH DR R 52 HEAVY MAINTENANCE 63 $163,741 2023 ARAPAHO CT 10620 MORGAN DR END R 56 HEAVY MAINTENANCE 67 $19,093 2023 ARAPAHO CIR 10630 MORGAN DR (N) MORGAN DR (S) R 78 HEAVY MAINTENANCE 85 $138,597 2023 ARENAS CT 10650 SANTANDER DR END R 79 LIGHT MAINTENANCE 87 $2,930 2023 ASCENSION DR 10670 BOLLINGER CYN RD PALMIRA PL R 83 LIGHT MAINTENANCE 90 $23,097 Red = Low PCI Street
Purple = Low PCI during plan period
3/21/2022 1 of 11
4.1.d
Packet Pg. 26
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, and Alphabetical Order)
YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT
PCI
AFTER
STREETSAVER
EST.
COST/STREET
2023 ASCENSION DR 10680 PALMIRA PL CAMINO DE JUGAR R 82 LIGHT MAINTENANCE 89 $10,029 2023 ASHBROOK LN 010 ALBION RD SILVA WAY R 79 LIGHT MAINTENANCE 85 $11,681 2023 ASHBROOK LN 020 SILVA WAY VERITAS WAY R 83 LIGHT MAINTENANCE 89 $4,664 2023 AVALON CT 22060 LONGLEAF CIR (N) END R 69 HEAVY MAINTENANCE 77 $48,949 2023 AVALON WAY 22050 LONGLEAF CIR (N) LONGLEAF CIR (S) R 62 HEAVY MAINTENANCE 71 $75,956 2023 AYAMONTE CT 10820 SANTANDER DR END R 74 LIGHT MAINTENANCE 81 $6,039 2023 AYERS WAY 20580 VERITAS CT SILVA WAY R 82 HEAVY MAINTENANCE 88 $35,223 2023 BAGADO CT 10840 ASCENSION DR END R 84 LIGHT MAINTENANCE 91 $3,262 2023 BARRANCA CT 10940 ASCENSION DR END R 81 LIGHT MAINTENANCE 88 $5,933 2023 BELEM CT 10970 ASCENSION DR END R 82 LIGHT MAINTENANCE 89 $3,429 2023 BELLO CT 11050 BOLLINGER CYN RD END R 84 LIGHT MAINTENANCE 91 $3,841 2023 BETHANY RD 22080 WINDEMERE PKWY (N) WINDEMERE PKWY (S) R 68 HEAVY MAINTENANCE 76 $125,749 2023 BOLLINGER CYN RD (NB) 23650N ANDORA LN NORRIS CANYON RD A 73 LIGHT MAINTENANCE 80 $56,907 2023 BOLLINGER CYN RD (NB) 23660N NORRIS CANYON RD ASCENSION DR A 77 LIGHT MAINTENANCE 84 $18,679 2023 BOLLINGER CYN RD (NB) 23670N ASCENSION DR CREEKSIDE DR A 80 LIGHT MAINTENANCE 87 $45,479 2023 BOLLINGER CYN RD (NB) 23680N CREEKSIDE DR CROW CANYON RD A 79 LIGHT MAINTENANCE 85 $22,815 2023 BOLLINGER CYN RD (SB) 23370S CROW CANYON RD COBBLESTONE DR A 76 LIGHT MAINTENANCE 83 $18,244 2023 BOLLINGER CYN RD (SB) 23380S COBBLESTONE DR ASCENSION DR A 75 HEAVY MAINTENANCE 82 $276,276 2023 BOLLINGER CYN RD (SB) 23390S ASCENSION DR NORRIS CANYON RD A 73 LIGHT MAINTENANCE 81 $15,478 2023 BOLLINGER CYN RD (SB) 23410S MORGAN DR SR VALLEY BLVD A 76 LIGHT MAINTENANCE 83 $62,076 2023 BOLLINGER CYN RD (WB) 23640N SR VALLEY BLVD ANDORA LN A 77 LIGHT MAINTENANCE 84 $57,192 2023 BOWEN CT 22100 WATERVALE WAY S END R 73 LIGHT MAINTENANCE 80 $4,754 2023 BRONCO CT 11800 CORRAL CIR END R 75 LIGHT MAINTENANCE 82 $2,277 2023 BURGOS CT 11860 SANTANDER DR END R 79 LIGHT MAINTENANCE 87 $2,179 2023 CAMINO DE JUGAR 12030 BOLLINGER CYN RD END R 78 LIGHT MAINTENANCE 85 $20,156 2023 CAMINO VENADILLO 12100 CAMINO DE JUGAR END R 83 LIGHT MAINTENANCE 90 $14,007 2023 CANTAS PL 12240 LORETO DR END R 63 HEAVY MAINTENANCE 72 $12,496 2023 CARDONA CIR 12270 TALAVERA DR (S) TALAVERA DR (N) R 74 LIGHT MAINTENANCE 82 $24,923 2023 CARTAGENA LN 12320 ARAGON LN NORRIS CANYON RD R 82 LIGHT MAINTENANCE 88 $6,331 2023 CASTLETON CT 12390 SR VALLEY BLVD END R 80 LIGHT MAINTENANCE 87 $17,847 2023 CHEROKEE CT 12520 ARAPAHO CIR END R 80 LIGHT MAINTENANCE 87 $2,235 2023 COLMA CT 12700 SANTANDER DR END R 75 LIGHT MAINTENANCE 82 $2,186 2023 CONDADO CT 12740 SANTANDER DR END R 75 LIGHT MAINTENANCE 82 $2,851 2023 CORRAL CIR 12800 PADDOCK DR (E) PADDOCK DR (W) R 79 LIGHT MAINTENANCE 86 $19,092 2023 CROW CANYON RD (EB) 12950E CITY LIMIT BOLLINGER CYN RD A 62 HEAVY REHABILITATION 100 $218,955 2023 CROW CANYON RD (WB) 13220W BOLLINGER CYN RD CITY LIMITS (W) A 57 HEAVY REHABILITATION 100 $181,006 2023 CUENCA CT 13230 SANTANDER DR END R 75 LIGHT MAINTENANCE 82 $2,920 2023 CUENCA DR 13240 SANTANDER DR WESTVALE CT R 83 LIGHT MAINTENANCE 89 $3,558 2023 CUENCA DR 13250 WESTVALE CT CASTLETON CT R 80 LIGHT MAINTENANCE 87 $5,449 2023 CULLENS CT 22310 WATERVALE WAY N END R 76 LIGHT MAINTENANCE 83 $5,845 2023 DAVALOS CT 13280 SANTANDER DR END R 78 LIGHT MAINTENANCE 85 $2,641 2023 DERBY CT 13570 WILDHORSE DR END R 69 HEAVY MAINTENANCE 77 $16,988 2023 DERBY DR 13580 WILDHORSE DR GAIT CT R 54 LIGHT REHABILITATION 100 $600,178 2023 DERBY DR 13590 GAIT CT MORGAN DR R 38 LIGHT REHABILITATION 100 $146,837 2023 DOGIE CT 13630 PADDOCK DR END R 79 LIGHT MAINTENANCE 86 $2,831 2023 DOUGHERTY RD (NB) 13760N CITY LIMIT (S) OLD RANCH RD A 70 HEAVY MAINTENANCE 78 $466,409 2023 DOUGHERTY RD (SB) 13870S OLD RANCH RD CITY LIMIT (S) A 66 HEAVY MAINTENANCE 74 $462,028 2023 DROMANA CT 22320 HARCOURT WAY END R 74 LIGHT MAINTENANCE 81 $6,519 2023 DURANGO LN 13940 TWIN CREEKS DR END R 80 LIGHT MAINTENANCE 87 $15,912 2023 DURLINGTON CT 22330 WATERVALE WAY N END R 71 LIGHT MAINTENANCE 79 $5,484 2023 ENSENADA DR 14050 ALCOSTA BLVD GRANADA DR R 60 HEAVY MAINTENANCE 69 $106,845 2023 ENSENADA DR 14060 GRANADA DR MANGOS DR R 64 HEAVY MAINTENANCE 73 $82,201 2023 FERROL CT 14240 SANTANDER DR END R 70 LIGHT MAINTENANCE 78 $1,280 2023 FIELDVIEW TERR 14260 BOLLINGER CYN RD END R 77 LIGHT MAINTENANCE 84 $11,521 2023 GAIT CT 14520 DERBY DR END R 65 HEAVY MAINTENANCE 74 $20,096 Red = Low PCI Street
Purple = Low PCI during plan period
3/21/2022 2 of 11
4.1.d
Packet Pg. 27
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, and Alphabetical Order)
YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT
PCI
AFTER
STREETSAVER
EST.
COST/STREET
2023 GALICIA CT 14540 ANDORA CT END R 80 LIGHT MAINTENANCE 87 $2,634 2023 GALISTEO CT 14550 MARSH DR END R 62 HEAVY MAINTENANCE 71 $33,527 2023 GAUCHO CT 14560 DURANGO LN END R 80 LIGHT MAINTENANCE 87 $3,712 2023 GREYLYN DR 14690 SHAVANO WAY GREYLYN DR R 68 LIGHT MAINTENANCE 76 $19,133 2023 GUAYMAS CT 14700 MARSH DR END R 80 LIGHT MAINTENANCE 87 $3,454 2023 HARCOURT WAY 020 WINDEMERE PKWY S BELLINGHAM WAY C 65 HEAVY MAINTENANCE 73 $153,377 2023 HARCOURT WAY 030 S BELLINGHAM WAY BOLLINGER CYN RD C 66 HEAVY MAINTENANCE 74 $190,573 2023 HOPI CT 14940 ARAPAHO CIR END R 80 LIGHT MAINTENANCE 87 $2,100 2023 JASPER HILL CT 22420 JASPER HILL DR END R 74 HEAVY MAINTENANCE 81 $17,872 2023 JASPER HILL DR 22430 HARCOURT WAY PEMBERTON DR R 69 HEAVY MAINTENANCE 77 $80,788 2023 KARINA CT 22440 N END S END R 74 LIGHT MAINTENANCE 81 $11,545 2023 KELLYBROOK WAY 30430 HARCOURT WAY END R 58 HEAVY MAINTENANCE 68 $64,351 2023 KENWICK DR 30440 KELLYBROOK WAY KIRKSTONE CT R 65 HEAVY MAINTENANCE 74 $50,907 2023 KIRKSTONE CT 30460 N END S END R 66 HEAVY MAINTENANCE 75 $57,227 2023 LADERA CORTE 15230 CAMINO DE JUGAR END R 82 LIGHT MAINTENANCE 89 $5,915 2023 LANGHORNE DR 22500 JASPER HILL DR PEMBERTON DR R 64 HEAVY MAINTENANCE 73 $80,788 2023 LANGTON CT 30470 LANGTON DR END R 64 HEAVY MAINTENANCE 73 $40,105 2023 LANGTON DR 30480 KELLYBROOK WAY LANGTON CT R 63 HEAVY MAINTENANCE 72 $62,053 2023 LAREDO CT 15350 DURANGO LN END R 80 LIGHT MAINTENANCE 87 $4,426 2023 LASSO CIR 15360 PADDOCK DR WILDHORSE DR R 71 LIGHT MAINTENANCE 78 $12,354 2023 LATERA CT 30490 LANGTON DR END R 52 HEAVY MAINTENANCE 64 $45,276 2023 LONGLEAF CIR 22510 WINDEMERE PKWY (N) WINDEMERE PKWY (S) R 69 HEAVY MAINTENANCE 77 $258,250 2023 LORCA CT 15600 CARDONA CIR END R 68 LIGHT MAINTENANCE 77 $2,087 2023 LORETO DR 15610 SANTA ROSA AVE (N) SANTA ROSA AVE (S) R 74 LIGHT MAINTENANCE 82 $32,339 2023 MACEDON CT 22520 TAMBURLAINE DR END R 76 LIGHT MAINTENANCE 83 $6,519 2023 MADRID PL 15690 ENSENADA DR END R 65 LIGHT MAINTENANCE 73 $6,101 2023 MALAGA CT 15710 TOLTEC CIR END R 70 LIGHT MAINTENANCE 78 $1,227 2023 MANACOR CT 15720 ARANDA DR END R 80 HEAVY MAINTENANCE 87 $48,330 2023 MARE LN 15860 MORGAN DR END R 73 LIGHT MAINTENANCE 81 $12,673 2023 MARICAIBO PL 15870 CAMINO DE JUGAR END R 80 LIGHT MAINTENANCE 87 $8,432 2023 MARSH DR 040 NORRIS CANYON RD ARANDA DR R 81 LIGHT MAINTENANCE 88 $45,182 2023 MARSH DR 050 ARANDA DR BOLLINGER CYN RD R 62 HEAVY MAINTENANCE 71 $44,084 2023 MESA VISTA CT 16130 SANTANDER DR END R 79 LIGHT MAINTENANCE 87 $7,885 2023 MESA VISTA DR 16140 MARSH DR SANTANDER DR R 81 LIGHT MAINTENANCE 88 $6,359 2023 MESQUITE LN 16150 SAGE CIR END R 82 LIGHT MAINTENANCE 89 $3,693 2023 MIDDLEBROOKE WAY 22560 SILVA WAY SANDALFORD WAY R 76 HEAVY MAINTENANCE 83 $53,616 2023 MINTARO CT 20940 VERITAS WAY END R 81 LIGHT MAINTENANCE 88 $2,185 2023 MOLINA CT 16280 SANTANDER DR END R 69 LIGHT MAINTENANCE 77 $1,157 2023 MONASTERIO CT 16300 SANTANDER DR END R 79 LIGHT MAINTENANCE 86 $5,005 2023 MURINDO PL 16470 CAMINO VENADILLO END R 84 LIGHT MAINTENANCE 91 $7,196 2023 PADDOCK DR 17010 BOLLINGER CYN RD END R 79 LIGHT MAINTENANCE 86 $33,112 2023 PALAMOS CT 17020 SANTANDER DR END R 79 LIGHT MAINTENANCE 86 $5,005 2023 PALMIRA CT 17040 PALMIRA PL END R 82 LIGHT MAINTENANCE 89 $3,725 2023 PALMIRA PL 17050 ASCENSION DR END R 84 LIGHT MAINTENANCE 91 $14,328 2023 PAMPLONA CT 17070 VALDIVIA CIR END R 69 LIGHT MAINTENANCE 77 $6,309 2023 PEMBERTON DR 22590 HARCOURT WAY JASPER HILL DR R 72 HEAVY MAINTENANCE 80 $56,830 2023 PIPERS BROOK CT 22620 HARCOURT WAY END R 78 LIGHT MAINTENANCE 85 $8,081 2023 PONY CT 17350 PADDOCK DR END R 78 LIGHT MAINTENANCE 85 $2,523 2023 POSADA CT 17400 TOLTEC CIR END R 75 LIGHT MAINTENANCE 82 $2,782 2023 RIVERLAND CT 22650 HARCOURT WAY END R 76 LIGHT MAINTENANCE 83 $5,840 2023 RIVENELL WAY 22640 SANDALFORD WAY ALBION RD R 72 HEAVY MAINTENANCE 80 $9,135 2023 ROATAN CT 17640 CARDONA CIR END R 73 LIGHT MAINTENANCE 80 $2,703 2023 ROMA PL 17660 SANTA ROSA AVE END R 74 HEAVY MAINTENANCE 82 $36,754 2023 ROSARIO CT 17670 MARSH DR END R 74 LIGHT MAINTENANCE 81 $12,218 2023 ROSEMOUNT LN 22700 LONGLEAF CIR (N) LONGLEAF CIR (S) R 70 HEAVY MAINTENANCE 78 $75,460 Red = Low PCI Street
Purple = Low PCI during plan period
3/21/2022 3 of 11
4.1.d
Packet Pg. 28
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, and Alphabetical Order)
YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT
PCI
AFTER
STREETSAVER
EST.
COST/STREET
2023 ROTHBURY WAY 40510 HARCOURT WAY END R 75 LIGHT MAINTENANCE 82 $7,216 2023 ROUBAUD CT 22670 N END S END R 74 LIGHT MAINTENANCE 81 $5,840 2023 ROVERTON CT 22680 HARCOURT WAY END R 76 LIGHT MAINTENANCE 83 $7,063 2023 RUTHERGLEN DR 22720 ROUBAUD CT RUTHBURY CT R 74 LIGHT MAINTENANCE 81 $4,278 2023 SABA CT 17770 CARDONA CIR END R 71 LIGHT MAINTENANCE 79 $2,494 2023 SAGE CIR 17790 DERBY DR MORGAN DR R 37 HEAVY MAINTENANCE 56 $135,483 2023 SALAMANCA CT 17800 TOLTEC CIR END R 80 LIGHT MAINTENANCE 87 $4,345 2023 SANDALFORD WAY 22730 SILVA WAY RIVENELL WAY R 77 HEAVY MAINTENANCE 84 $54,013 2023 SANDALFORD WAY 23320 RIVENELL WAY ASHBROOK LN R 78 LIGHT MAINTENANCE 85 $8,693 2023 SANTANDER DR 18230 TALAVERA DR (S) TALAVERA DR (N) R 76 LIGHT MAINTENANCE 84 $66,658 2023 SANTA ROSA AVE 18290 EL SUYO DR ENSENADA DR R 71 HEAVY MAINTENANCE 79 $70,257 2023 SCARBORO PL 18330 MILLBRIDGE DR END R 36 HEAVY MAINTENANCE 55 $34,697 2023 SEGOVIA CT 18410 ARANDA DR END R 79 LIGHT MAINTENANCE 86 $5,915 2023 SENECA LN 18430 MORGAN DR END R 30 HEAVY MAINTENANCE 53 $54,835 2023 SEVILLE PL 18440 LORETO DR END R 74 LIGHT MAINTENANCE 82 $3,168 2023 SHAWNEE CT 18530 ARAPAHO CIR END R 78 HEAVY MAINTENANCE 85 $14,558 2023 SHAVANO WAY 18580 VILLAGE PKWY TRIANA WAY R 66 LIGHT MAINTENANCE 75 $12,396 2023 SILK HILL CT 22740 TAMBURLAINE DR END R 76 LIGHT MAINTENANCE 83 $7,606 2023 SILVA WAY 22750 ALBION RD MIDDLEBROOK WAY R 76 LIGHT MAINTENANCE 83 $11,137 2023 SILVA WAY 23330 MIDDLEBROOK WAY WINDEMERE PKWY R 79 LIGHT MAINTENANCE 85 $5,025 2023 SILVA WAY 23360 WINDEMERE PKWY WATERVALE WAY R 76 LIGHT MAINTENANCE 83 $5,917 2023 SIOUX LN 18590 ARAPAHO CIR END R 83 LIGHT MAINTENANCE 89 $4,739 2023 STAGECOACH RD 18710 ALCOSTA BLVD CITY LIMIT C 67 LIGHT MAINTENANCE 75 $31,613 2023 STANFORTH CT 22790 HARCOURT WAY END R 74 LIGHT MAINTENANCE 81 $6,519 2023 TALAVERA DR 18980 BOLLINGER CYN RD SR VALLEY BLVD R 69 HEAVY MAINTENANCE 77 $351,739 2023 TAMBURLAINE DR 22810 HARCOURT WAY MACEDON CT R 69 LIGHT MAINTENANCE 77 $6,248 2023 TAMWORTH LN 22820 BETHANY RD (N) BETHANY RD (S) R 73 LIGHT MAINTENANCE 80 $14,575 2023 TEWKSBURY CT 22830 TEWKSBURY WAY END R 76 LIGHT MAINTENANCE 83 $4,414 2023 TEWKSBURY WAY 22840 HARCOURT WAY END R 76 LIGHT MAINTENANCE 83 $5,297 2023 TOLLEY CT 22850 WATERVALE WAY S END R 73 LIGHT MAINTENANCE 80 $4,754 2023 TOLTEC CIR 19230 MARSH DR (N) MARSH DR (S) R 79 LIGHT MAINTENANCE 86 $23,657 2023 TOTANA CT 19290 ARANDA DR END R 80 LIGHT MAINTENANCE 87 $2,203 2023 TRIANA WAY 19320 VILLAGE PKWY TRIANA WAY R 61 HEAVY MAINTENANCE 70 $158,441 2023 TREYBURN CR 19330 SHAVANO WAY (S) SHAVANO WAY (N) R 69 HEAVY MAINTENANCE 77 $49,312 2023 TWIN CREEKS DR 19370 NORRIS CANYON RD CASTLETON CT C 80 LIGHT MAINTENANCE 87 $10,085 2023 TYLERTON CT 22860 HARCOURT WAY END R 76 LIGHT MAINTENANCE 83 $3,192 2023 VALDIVIA CIR 19390 TALAVERA DR (S) TALAVERA DR (N) R 71 LIGHT MAINTENANCE 79 $25,506 2023 VERITAS CT 21100 AYERS WAY END R 74 LIGHT MAINTENANCE 82 $5,253 2023 VERITAS WAY 21110 WINDEMERE PKWY AYERS WAY R 79 LIGHT MAINTENANCE 86 $9,398 2023 VIA CORDOBA 19460 ASCENSION DR END R 84 LIGHT MAINTENANCE 91 $6,065 2023 VINDARA LN 22870 SILVA WAY MIDDLEBROOK WAY R 72 HEAVY MAINTENANCE 80 $54,857 2023 WATERVALE WAY 22880 KARINA CT BETHANY RD (N) R 71 LIGHT MAINTENANCE 79 $14,431 2023 WATERVALE WAY 23340 BETHANY RD (N) BETHANY RD (S) R 79 LIGHT MAINTENANCE 85 $9,019 2023 WESTVALE CT 19560 CUENCA DR END R 80 LIGHT MAINTENANCE 87 $7,466 2023 WILDHORSE DR 19620 MORGAN DR DERBY DR R 81 HEAVY MAINTENANCE 88 $92,808 2023 WILDHORSE DR 19640 DERBY DR PADDOCK DR R 72 HEAVY MAINTENANCE 80 $114,023 2023 WILTON PL 19660 MILLBRIDGE DR END R 34 HEAVY MAINTENANCE 54 $35,101 2023 YUCCA CT 17795 SAGE CIR END R 49 HEAVY MAINTENANCE 62 $16,258 $7,296,144
2024 ALCOSTA BLVD (NB) 10195N VERACRUZ DR CANYON HILLS RD A 54 HEAVY REHABILITATION 100 $72,480 2024 ALCOSTA BLVD (NB) 10200N CANYON HILLS RD MARKET PL A 67 HEAVY MAINTENANCE 74 $285,821 2024 ALCOSTA BLVD (NB) 10220N MARKET PL BOLLINGER CYN RD A 75 HEAVY MAINTENANCE 81 $98,199 2024 CROW CANYON RD (EB) 12970E BOLLINGER CYN RD TWIN CREEKS DR A 56 LIGHT REHABILITATION 100 $1,003,383 2024 CROW CANYON RD (EB) 12980E TWIN CREEKS DR SR VALLEY BLVD A 57 LIGHT REHABILITATION 100 $128,943 2024 CROW CANYON RD (EB) 13020E CAMINO RAMON ALCOSTA BLVD A 59 HEAVY REHABILITATION 100 $578,415 Red = Low PCI Street
Purple = Low PCI during plan period
3/21/2022 4 of 11
4.1.d
Packet Pg. 29
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, and Alphabetical Order)
YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT
PCI
AFTER
STREETSAVER
EST.
COST/STREET
2024 CROW CANYON RD (WB) 13150W ALCOSTA BLVD CAMINO RAMON A 55 LIGHT REHABILITATION 100 $335,059 2024 CROW CANYON RD (WB) 13210W SR VALLEY BLVD BOLLINGER CYN RD A 60 HEAVY REHABILITATION 100 $1,271,940 2024 MARKETPL 15890 BOLLINGER CYN RD ALCOSTA BLVD R 43 HEAVY REHABILITATION 100 $624,672 2024 PINE VALLEY CT 17210 ALCOSTA BLVD END R 44 HEAVY REHABILITATION 100 $58,524 2024 PINE VALLEY RD 17275 SR VALLEY BLVD WESTSIDE DRIVE C 72 LIGHT REHABILITATION 100 $81,653 $4,539,089
2025 ADAMS PL 10030 PINE VALLEY RD END R 77 LIGHT MAINTENANCE 83 $6,305 2025 ALCOSTA CT 10410 ALCOSTA BLVD END R 82 LIGHT MAINTENANCE 86 $6,671 2025 ALDERWOOD LN 10420 OLD RANCH ESTATE DR END R 42 HEAVY MAINTENANCE 56 $44,245 2025 ALDGATE WAY 40200 SHERWOOD WAY PAIGE WAY R 80 LIGHT MAINTENANCE 85 $3,476 2025 ALDWYCH WAY 22000 BARONS LN ENFIELD ST R 79 LIGHT MAINTENANCE 83 $10,266 2025 ALVO CT 40290 ENFIELD ST END R 79 LIGHT MAINTENANCE 84 $3,244 2025 AMES WAY 40000 WINDEMERE PKWY EMERSON LN R 71 LIGHT MAINTENANCE 76 $11,797 2025 ARDEN CT 22380 WYCLIFFE LN END R 79 LIGHT MAINTENANCE 84 $2,865 2025 ARGYLE CT 22010 KNIGHTSBRIDGE WAY END R 79 LIGHT MAINTENANCE 83 $8,595 2025 ARLINGTON WAY 22030 MONTROSE WAY E BRANCH PKWY R 78 LIGHT MAINTENANCE 82 $2,549 2025 ARLINGTON WAY 23280 E BRANCH PKWY THURLOW WAY R 79 LIGHT MAINTENANCE 83 $14,206 2025 ARLINGTON WAY 40240 THURLOW WAY PERCY LN R 80 LIGHT MAINTENANCE 85 $21,528 2025 AVERY CT 22020 ENFIELD ST END R 78 LIGHT MAINTENANCE 82 $4,536 2025 BAKER WAY 22300 MORNINGTON LN SHERWOOD WAY R 79 LIGHT MAINTENANCE 84 $17,668 2025 BANBURY DR 22290 WYCLIFFE LN CHANCERY WAY R 78 LIGHT MAINTENANCE 83 $22,921 2025 BANCROFT PL 10890 OLD RANCH ESTATE DR END R 44 HEAVY MAINTENANCE 56 $51,112 2025 BARONS LN 22070 ENFIELD ST (S) ENFIELD ST (N) R 79 LIGHT MAINTENANCE 83 $24,234 2025 BLACKTHORNE CT 11190 OLD RANCH ESTATE DR END R 46 HEAVY MAINTENANCE 57 $40,449 2025 BALMORAL CT 40050 KENNARD LN END R 80 LIGHT MAINTENANCE 85 $9,269 2025 BALMORAL WAY 40110 BENNINGTON WAY EMERSON LN R 79 LIGHT MAINTENANCE 83 $12,514 2025 BALMORAL WAY 40120 EMERSON LN HOLBORN WAY R 79 LIGHT MAINTENANCE 83 $22,200 2025 BALMORAL WAY 40130 HOLBORN WAY PENZANCE WAY R 80 LIGHT MAINTENANCE 85 $18,376 2025 BALMORAL WAY 40140 PENZANCE WAY KENNARD RD R 80 LIGHT MAINTENANCE 85 $30,542 2025 BLUE MOUND CT 11250 BLUE MOUND DR END R 74 LIGHT MAINTENANCE 80 $4,696 2025 BLUE MOUND DR 11260 BURNING TREE DR PINE VALLEY RD R 77 LIGHT MAINTENANCE 83 $33,740 2025 BENNINGTON WAY 40010 MURDOCK WAY KINGS RD R 79 LIGHT MAINTENANCE 83 $15,225 2025 BOCA RATON CT 11270 OLYMPIC FIELDS DR END R 75 LIGHT MAINTENANCE 80 $4,492 2025 BRIDLE CT 30180 OLD RANCH RD END R 79 LIGHT MAINTENANCE 84 $79,809 2025 BRIDGE CREEK DR 11620 STONEY CREEK DR (N) STONEY CREEK DR (S) R 57 HEAVY MAINTENANCE 65 $104,801 2025 BRYN MAWR CT 11850 OLYMPIA FIELDS DR END R 75 LIGHT MAINTENANCE 80 $4,288 2025 BURNING TREE CT 11880 BURNING TREE DR END R 74 LIGHT MAINTENANCE 79 $3,494 2025 BURNING TREE DR 11890 ALCOSTA BLVD THUNDERBIRD DR R 71 LIGHT MAINTENANCE 76 $29,986 2025 CARRINGTON CT 22280 BAKER WAY END R 78 LIGHT MAINTENANCE 83 $12,057 2025 CHANCERY WAY 22120 E BRANCH PKWY YORK LN R 70 LIGHT MAINTENANCE 75 $17,071 2025 CHANCERY WAY 22130 YORK LN SHERWOOD WAY R 79 LIGHT MAINTENANCE 83 $14,087 2025 CHANCERY WAY 22140 WYCLIFFE LN E BRANCH PKWY R 74 LIGHT MAINTENANCE 79 $13,132 2025 CHERRY HILLS CT 12500 CHERRY HILLS LN END R 77 LIGHT MAINTENANCE 83 $3,698 2025 CHERRY HILLS LN 12510 OLYMPIA FIELDS DR N OLYMPIA FIELDS DR S R 75 LIGHT MAINTENANCE 81 $36,521 2025 CLIFTON CT 22270 BAKER WAY END R 80 LIGHT MAINTENANCE 85 $9,908 2025 COLONIAL CT 12710 THUNDERBIRD PL END R 73 LIGHT MAINTENANCE 79 $4,899 2025 COUNTRY CREEK CT 12840 STONEY CREEK DR END R 57 HEAVY MAINTENANCE 65 $21,471 2025 DALTON WAY 30290 SHERWOOD WAY END R 80 LIGHT MAINTENANCE 85 $15,016 2025 DAWES CT 40030 KINGS RD END R 79 LIGHT MAINTENANCE 83 $12,282 2025 EAST BRANCH PKWY (EB) 30810E BOLLINGER CYN RD CHANCERY WAY A 77 HEAVY MAINTENANCE 81 $321,235 2025 EAST BRANCH PKWY (EB) 30820E CHANCERY WAY SHERWOOD WAY A 76 HEAVY MAINTENANCE 80 $140,292 2025 EAST BRANCH PKWY (EB) 30830E SHERWOOD WAY ENFIELD ST A 82 LIGHT MAINTENANCE 86 $19,325 2025 EAST BRANCH PKWY (EB) 30840E ENFIELD ST ARLINGTON WAY A 76 LIGHT MAINTENANCE 80 $27,415 2025 EAST BRANCH PKWY (EB) 30850E ARLINGTON WAY WINDEMERE PKWY A 76 HEAVY MAINTENANCE 80 $72,430 2025 EAST BRANCH PKWY (WB) 30910W WINDEMERE PKWY ARLINGTON WAY A 81 LIGHT MAINTENANCE 83 $16,432 Red = Low PCI Street
Purple = Low PCI during plan period
3/21/2022 5 of 11
4.1.d
Packet Pg. 30
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, and Alphabetical Order)
YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT
PCI
AFTER
STREETSAVER
EST.
COST/STREET
2025 EAST BRANCH PKWY (WB) 30920W ARLINGTON WAY ENFIELD ST A 82 LIGHT MAINTENANCE 86 $25,729 2025 EAST BRANCH PKWY (WB) 30930W ENFIELD ST SHERWOOD WAY A 82 LIGHT MAINTENANCE 86 $21,088 2025 EAST BRANCH PKWY (WB) 30940W SHERWOOD WAY CHANCERY WAY A 80 LIGHT MAINTENANCE 84 $28,967 2025 EAST BRANCH PKWY (WB) 30950W CHANCERY WAY BOLLINGER CYN RD A 80 HEAVY MAINTENANCE 84 $268,323 2025 EDGEWARE CT 22340 MONTROSE WAY END R 79 LIGHT MAINTENANCE 83 $10,505 2025 EMBLETON LN 30330 MORNINGTON LN VERNON WAY R 80 LIGHT MAINTENANCE 85 $6,720 2025 EMERSON LN 40080 KEARNY WAY MURDOCK WAY R 82 LIGHT MAINTENANCE 87 $16,801 2025 EMERSON LN 40090 MURDOCK WAY HOLBORN WAY R 79 LIGHT MAINTENANCE 83 $28,063 2025 EMERSON LN 40100 HOLBORN WAY BALMORAL WAY R 79 LIGHT MAINTENANCE 83 $26,279 2025 ENFIELD ST 22350 E BRANCH PKWY BARONS LN R 78 LIGHT MAINTENANCE 82 $26,263 2025 ENFIELD ST 23290 E BRANCH PKWY THURLOW WAY R 76 LIGHT MAINTENANCE 80 $15,063 2025 ENFIELD ST 40230 THURLOW WAY PAIGE WAY R 79 LIGHT MAINTENANCE 84 $33,138 2025 FENWICK WAY 40260 ENFIELD ST ARLINGTON WAY R 80 LIGHT MAINTENANCE 85 $9,269 2025 FIRCREST LN 14310 ALCOSTA BLVD WINGED FOOT PL R 66 LIGHT MAINTENANCE 72 $10,523 2025 FARRINGDON WY 40270 ENFIELD ST LAMBETH WAY R 80 LIGHT MAINTENANCE 85 $6,373 2025 GLENCOE CIR 22260 HASTINGS WAY YORK LN R 79 LIGHT MAINTENANCE 84 $35,455 2025 GOSHEN CT 14600 E END W END R 73 LIGHT MAINTENANCE 77 $13,834 2025 GOSHEN PL 14610 GOSHEN CT PINE VALLEY RD R 74 LIGHT MAINTENANCE 78 $5,014 2025 HALIFAX WAY 22360 ENFIELD ST HOSKINS LN R 77 LIGHT MAINTENANCE 81 $28,314 2025 HARDING PL 14730 BURNING TREE DR END R 72 LIGHT MAINTENANCE 77 $9,250 2025 HARLOW LN 22250 MORNINGTON LN BAKER WAY R 79 LIGHT MAINTENANCE 84 $18,539 2025 HASTINGS WAY 22370 YORK LN (W) YORK LN (E) R 77 LIGHT MAINTENANCE 81 $42,807 2025 HAWTHORN CT 14780 OLD RANCH ESTATE DR END R 72 LIGHT MAINTENANCE 78 $3,343 2025 HEATHER RIDGE CT 14800 OLD RANCH ESTATE DR END R 51 HEAVY MAINTENANCE 61 $46,867 2025 HIGHBURY WAY 22390 MONTROSE WAY KNIGHTSBRIDGE WAY R 81 LIGHT MAINTENANCE 84 $9,311 2025 HILLTOP CT 14900 WOODVIEW TERR DR END R 82 LIGHT MAINTENANCE 86 $5,775 2025 HOLBROOK PL 14910 OLD RANCH ESTATE DR END R 44 HEAVY MAINTENANCE 56 $45,370 2025 HOLBORN WAY 22400 KNIGHTSBRIDGE WAY WINDEMERE PKWY R 82 LIGHT MAINTENANCE 87 $35,687 2025 HOLBORN WAY 40160 WINDEMERE PKWY KENNARD LN R 80 LIGHT MAINTENANCE 85 $20,175 2025 HOSKINS LN 22410 ENFIELD ST HALIFAX WAY R 79 LIGHT MAINTENANCE 83 $42,140 2025 INGLETON WAY 22240 WYCLIFFE LN E BRANCH PKWY R 80 LIGHT MAINTENANCE 85 $4,632 2025 JAMIE CT 22230 STONEHENGE WAY END R 79 LIGHT MAINTENANCE 84 $4,298 2025 JAMIE PL 22220 SHERWOOD WAY STONEHENGE WAY R 77 LIGHT MAINTENANCE 82 $16,355 2025 KEARNY WAY 31060 WINDEMERE PKWY MURDOCK WAY R 76 LIGHT MAINTENANCE 81 $30,496 2025 KEARNY WAY 31070 WINDEMERE PKWY KEATS LN R 74 LIGHT MAINTENANCE 79 $8,690 2025 KEATS LN 22470 ENFIELD ST HALIFAX WAY R 77 LIGHT MAINTENANCE 81 $45,003 2025 KINGS RD 40040 EMERSON WAY BENNINGTON WAY R 79 LIGHT MAINTENANCE 83 $12,236 2025 KNIGHTSBRIDGE CT 22480 HIGHBURY WAY END R 79 LIGHT MAINTENANCE 83 $5,133 2025 KNIGHTSBRIDGE WAY 22490 BARONS LN MONTROSE WAY R 79 LIGHT MAINTENANCE 83 $10,983 2025 KNIGHTSBRIDGE WAY 23300 MONTROSE WAY HIGHBURY WAY R 79 LIGHT MAINTENANCE 83 $15,877 2025 KNOLLCREST CT 15220 N END BLACKTHORN CT R 47 HEAVY MAINTENANCE 58 $57,784 2025 KENNARD LN 40060 KINGS RD HOLBORN WAY R 79 LIGHT MAINTENANCE 83 $9,918 2025 KENNARD LN 40070 HOLBORN WAY BALMORAL WAY R 83 LIGHT MAINTENANCE 88 $18,655 2025 LAMBETH WAY 40250 THURLOW WAY FENWICK WAY R 79 LIGHT MAINTENANCE 84 $17,380 2025 LANSFORD CT 15300 WOODVIEW TERR DR END R 82 LIGHT MAINTENANCE 86 $8,300 2025 LEIGH CT 15410 LYNNBROOK DR END R 77 LIGHT MAINTENANCE 82 $3,718 2025 LINDA VISTA CT 15450 SUMMIT VIEW DR END R 66 LIGHT MAINTENANCE 72 $4,116 2025 LONE PINE CT 15560 WOODVIEW TERR DR END R 82 LIGHT MAINTENANCE 87 $10,866 2025 LONGWOOD CT 15590 WOODVIEW TERR DR END R 82 LIGHT MAINTENANCE 86 $10,805 2025 LYNNBROOK CT 15640 WOODVIEW TERR DR END R 82 LIGHT MAINTENANCE 86 $3,609 2025 LYNNBROOK DR 15650 WOODLAND DR WOODVIEW TERR DR R 79 LIGHT MAINTENANCE 84 $11,221 2025 MANDY WAY 22210 STONEHENGE WAY CHANCERY WAY R 81 LIGHT MAINTENANCE 86 $23,899 2025 MELBOURNE WAY 30520 SHERWOOD WAY MORNINGTON LN R 80 LIGHT MAINTENANCE 85 $16,569 2025 MILTON CT 22200 WYCLIFFE LN END R 80 LIGHT MAINTENANCE 85 $3,258 2025 MONTROSE CT 22570 KNIGHTSBRIDGE WAY END R 82 LIGHT MAINTENANCE 85 $9,101 Red = Low PCI Street
Purple = Low PCI during plan period
3/21/2022 6 of 11
4.1.d
Packet Pg. 31
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, and Alphabetical Order)
YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT
PCI
AFTER
STREETSAVER
EST.
COST/STREET
2025 MONTROSE WAY 22580 KNIGHTSBRIDGE WAY EDGEWATER CT R 81 LIGHT MAINTENANCE 84 $20,055 2025 MORNINGTON LN 30580 SHERWOOD WAY HARLOW LN R 79 LIGHT MAINTENANCE 84 $40,421 2025 MORNINGTON LN 30581 HARLOW LN BAKER WAY R 80 LIGHT MAINTENANCE 85 $6,446 2025 MORNINGTON CT 22190 BAKER WAY END R 79 LIGHT MAINTENANCE 84 $7,760 2025 MURDOCK WAY 40180 KEARNY WAY EMERSON LN R 78 LIGHT MAINTENANCE 83 $25,491 2025 MURDOCK WAY 40190 EMERSON LN BENNINGTON WAY R 72 LIGHT MAINTENANCE 77 $11,934 2025 OAK VALLEY DR 16850 SUMMIT VIEW DR DOUGHERTY RD R 63 HEAVY MAINTENANCE 69 $42,344 2025 OLD RANCH ESTATES DR 16880 BLACKTHORN CT OLD RANCH RD R 72 HEAVY MAINTENANCE 77 $272,315 2025 OLIVIA CT 40150 BALMORAL WAY END R 80 LIGHT MAINTENANCE 85 $3,476 2025 OLYMPIA FIELDS CT 16930 OLYMPIA FIELDS DR END R 75 LIGHT MAINTENANCE 81 $3,474 2025 OLYMPIA FIELDS DR 16940 ALCOSTA BLVD THUNDERBIRD DR R 66 LIGHT MAINTENANCE 72 $63,397 2025 OVERLOOK CT 16990 WOODVIEW TERR DR END R 82 LIGHT MAINTENANCE 86 $7,820 2025 OVERLOOK DR 17000 WOODVIEW TERR DR ALCOSTA BLVD R 82 LIGHT MAINTENANCE 86 $8,908 2025 PAIGE CT 40220 KEARNY WAY END R 80 LIGHT MAINTENANCE 85 $9,410 2025 PAIGE WAY 40210 ENFIELD ST KEARNY WAY R 76 LIGHT MAINTENANCE 81 $38,699 2025 PEACEFUL VALLEY DR 17100 SUMMIT VIEW DR (N) SUMMIT VIEW DR (S) R 50 HEAVY MAINTENANCE 60 $87,957 2025 PEBBLE CT 17110 PEBBLE PL END R 75 LIGHT MAINTENANCE 81 $5,612 2025 PEBBLE PL 17120 THUNDERBIRD PL SCIOTA AVE R 72 LIGHT MAINTENANCE 77 $19,442 2025 PEBBLE PL 17130 SCIOTA AVE PEBBLE CT R 72 LIGHT MAINTENANCE 77 $24,935 2025 PEBBLE PL 17140 PEBBLE CT PEBBLE PL R 75 LIGHT MAINTENANCE 81 $19,141 2025 PEMBROKE CT 22600 HOLBORN WAY END R 81 LIGHT MAINTENANCE 84 $4,494 2025 PEMBROKE WAY 22610 HOLBORN WAY (W) PEMBROKE CT R 81 LIGHT MAINTENANCE 84 $21,966 2025 PENZANCE WAY 40170 BALMORAL WAY EMERSON LANE R 82 LIGHT MAINTENANCE 87 $6,025 2025 PERCY LN 40560 ENFIELD ST KEATS LN R 79 LIGHT MAINTENANCE 84 $14,089 2025 PINE VALLEY RD 17220 ALCOSTA BLVD THUNDERBIRD DR C 71 LIGHT MAINTENANCE 73 $33,205 2025 PINE VALLEY RD 17230 THUNDERBIRD DR IRON HORSE TRAIL C 70 LIGHT MAINTENANCE 72 $32,738 2025 PINE VALLEY RD 17240 IRON HORSE TRAIL BROADMOOR DR C 71 HEAVY MAINTENANCE 73 $125,363 2025 PINE VALLEY RD 17250 BROADMOOR DR DAVONA DR C 69 LIGHT MAINTENANCE 71 $53,160 2025 PINE VALLEY RD 17260 DAVONA DR TAREYTON AVE C 70 LIGHT MAINTENANCE 72 $16,343 2025 PINE VALLEY RD 17270 TAREYTON AVE SR VALLEY BLVD C 70 LIGHT MAINTENANCE 72 $5,586 2025 POCONO MANOR PL 17340 BURNING TREE DR END R 74 LIGHT MAINTENANCE 80 $12,170 2025 PRESTWICK CT 22630 KNIGHTSBRIDGE WAY END R 78 LIGHT MAINTENANCE 82 $9,192 2025 QUIMBY CT 22180 CHANCERY WAY END R 77 LIGHT MAINTENANCE 82 $4,298 2025 REGENCY CT 17550 W END OLD RANCH ESTATE DR R 74 LIGHT MAINTENANCE 78 $7,458 2025 RIDGEPOINT CT 17570 OLD RANCH ESTATE DR END R 66 LIGHT MAINTENANCE 72 $8,686 2025 RIDGEVIEW CT 17580 WOODVIEW TERR DR END R 82 LIGHT MAINTENANCE 86 $10,561 2025 RIVIERA PL 17620 PINE VALLEY RD END R 79 LIGHT MAINTENANCE 84 $10,391 2025 RODRIGUEZ CT 22660 HASTINGS WAY END R 78 LIGHT MAINTENANCE 82 $9,311 2025 ROYAL COACH CT 17700 OLD RANCH ESTATE DR END R 58 HEAVY MAINTENANCE 66 $33,652 2025 SALISBURY WAY 30630 MORNINGTON LN MELBOURNE WAY R 80 LIGHT MAINTENANCE 85 $15,410 2025 SCIOTA AVE 18340 PEBBLE PL THUNDERBIRD DR R 79 LIGHT MAINTENANCE 83 $6,581 2025 SCIOTA PL 18350 PEBBLE PL END R 67 LIGHT MAINTENANCE 73 $4,533 2025 SHADY VALLEY CT 18520 SUMMIT VIEW DR END R 62 HEAVY MAINTENANCE 68 $44,799 2025 SHERWOOD CT 22170 SHERWOOD WAY END R 74 LIGHT MAINTENANCE 79 $7,401 2025 SHERWOOD WAY 31000 WINDEMERE PKWY MORNINGTON LN C 73 LIGHT MAINTENANCE 76 $41,935 2025 SHERWOOD WAY 31010 MORNINGTON LN E BRANCH PKWY C 73 LIGHT MAINTENANCE 76 $46,586 2025 SHERWOOD WAY 31020 STONEHENGE WAY CHANCERY WAY R 79 LIGHT MAINTENANCE 84 $19,100 2025 SHERWOOD WAY 31030 CHANCERY WAY E BRANCH PKWY R 79 LIGHT MAINTENANCE 84 $27,696 2025 SHIREOAKS PL 18570 W END OLD RANCH ESTATE DR R 42 HEAVY MAINTENANCE 56 $42,180 2025 SPALDING CT 40020 BENNINGTON WAY END R 82 LIGHT MAINTENANCE 87 $6,952 2025 SPRINGBROOK DR 18670 STONEY CREEK DR (N) STONEY CREEK DR (S) R 52 HEAVY MAINTENANCE 61 $108,708 2025 STONEY CREEK DR 18760 OLD RANCH RD BENT CREEK DR (N) R 64 HEAVY MAINTENANCE 70 $214,592 2025 STONEHENGE WAY 22800 YORK LN JAMIE PL R 78 LIGHT MAINTENANCE 82 $38,201 2025 SUMMER VALLEY CT 18860 SUMMIT VIEW DR END R 70 LIGHT MAINTENANCE 75 $4,227 2025 SUMMIT VIEW DR 18870 OLD RANCH RD SHADY VALLEY CT R 51 HEAVY MAINTENANCE 61 $151,477 Red = Low PCI Street
Purple = Low PCI during plan period
3/21/2022 7 of 11
4.1.d
Packet Pg. 32
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, and Alphabetical Order)
YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT
PCI
AFTER
STREETSAVER
EST.
COST/STREET
2025 SUMMIT VIEW DR 18880 SHADY VALLEY CT LINDA VISTA CT R 54 HEAVY MAINTENANCE 62 $62,610 2025 SUNNYSIDE PL 18910 OLD RANCH ESTATE DR END R 34 HEAVY MAINTENANCE 52 $45,819 2025 SUN RIDGE DR 18920 SUMMIT VIEW DR (N) SUMMIT VIEW DR (S) R 63 HEAVY MAINTENANCE 69 $116,522 2025 THUNDERBIRD DR 19150 PINE VALLEY RD BURNING TREE DR R 75 LIGHT MAINTENANCE 81 $57,109 2025 THUNDERBIRD DR 19160 BURNING TREE DR ALCOSTA BLVD R 73 LIGHT MAINTENANCE 79 $24,683 2025 THUNDERBIRD PL 19170 THUNDERBIRD DR END R 67 LIGHT MAINTENANCE 73 $36,594 2025 THURLOW WAY 40280 ENFIELD ST ARLINGTON WAY R 80 LIGHT MAINTENANCE 85 $13,848 2025 TOM CT 19260 PINE VALLEY RD END R 70 LIGHT MAINTENANCE 76 $3,528 2025 TRIPOLI CT 19310 BLUE MOUND DR END R 74 LIGHT MAINTENANCE 79 $3,515 2025 VERNON WAY 30750 MELBOURNE WAY MORNINGTON LN R 80 LIGHT MAINTENANCE 85 $14,530 2025 WINGED FOOT CT 19690 WINGED FOOT PL END R 57 HEAVY MAINTENANCE 65 $23,425 2025 WINGED FOOT PL 19700 FIRCREST LN WINGED FOOT CT R 54 HEAVY MAINTENANCE 63 $47,114 2025 WINGED FOOT PL 19710 WINGED FOOT CT END R 57 LIGHT REHABILITATION 100 $73,291 2025 WOODLAND CT 19810 WOODLAND DR END R 82 LIGHT MAINTENANCE 86 $5,091 2025 WOODLAND DR 19820 ALCOSTA BLVD END R 79 LIGHT MAINTENANCE 84 $28,788 2025 WOODLAND VALLEY DR 19830 SUMMIT VIEW DR (N) SUMMIT VIEW DR (S) R 63 HEAVY MAINTENANCE 69 $93,654 2025 WOODVIEW CIR 19840 WOODVIEW TERR DR OVERLOOK DR R 82 LIGHT MAINTENANCE 86 $16,839 2025 WOODVIEW CT 19850 WOODVIEW CIR END R 82 LIGHT MAINTENANCE 86 $4,044 2025 WOODVIEW TERR DR (NB) 19860N OVERLOOK DR LYNNBROOK DR R 78 LIGHT MAINTENANCE 83 $17,462 2025 WOODVIEW TERR DR (SB) 19870S LYNNBROOK DR OVERLOOK DR R 78 LIGHT MAINTENANCE 83 $17,292 2025 WYCLIFFE CT 22160 INGLETON WAY END R 80 LIGHT MAINTENANCE 85 $9,073 2025 WYCLIFFE LN 22150 INGLETON WAY CHANCERY WAY R 79 LIGHT MAINTENANCE 84 $23,637 2025 YORK LN 21160 STONEHENGE WAY GLENCOE CIR R 78 LIGHT MAINTENANCE 82 $36,649 $5,378,482
2026 SAN RAMON VLY BLVD (NB) 17950N ALCOSTA BLVD 680 RAMP A 75 HEAVY MAINTENANCE 77 $73,719 2026 SAN RAMON VLY BLVD (NB) 17960N 680 RAMPS PINE VALLEY RD A 65 HEAVY MAINTENANCE 68 $518,237 2026 SAN RAMON VLY BLVD (NB) 17975N PINE VALLEY RD WESTSIDE DR A 69 HEAVY MAINTENANCE 72 $364,494 2026 SAN RAMON VLY BLVD (NB) 17985N WESTSIDE DR MONTEVIDEO DR A 68 HEAVY MAINTENANCE 71 $84,359 2026 SAN RAMON VLY BLVD (NB) 18040N NORRIS CANYON RD CROW CANYON RD A 75 HEAVY MAINTENANCE 78 $252,057 2026 SAN RAMON VLY BLVD (NB) 18060N CROW CANYON RD FOSTORIA WAY A 70 HEAVY MAINTENANCE 71 $171,905 2026 SAN RAMON VLY BLVD (NB) 18080N FASTORIA WAY CITY LIMIT A 66 HEAVY MAINTENANCE 70 $373,126 2026 SAN RAMON VLY BLVD (SB) 18090S CITY LIMIT DEERWOOD RD A 63 HEAVY MAINTENANCE 66 $373,126 2026 SAN RAMON VLY BLVD (SB) 18100S DEERWOOD RD CROW CANYON RD A 63 HEAVY MAINTENANCE 66 $203,710 2026 SAN RAMON VLY BLVD (SB) 18180S MONTEVIDEO DR WESTSIDE DR A 67 HEAVY MAINTENANCE 68 $84,359 2026 SAN RAMON VLY BLVD (SB) 18185S WESTSIDE DR PINE VALLEY RD A 67 HEAVY MAINTENANCE 68 $366,369 2026 SAN RAMON VLY BLVD (SB) 18210S PINE VALLEY RD 680 RAMP A 69 HEAVY MAINTENANCE 72 $498,320 2026 SAN RAMON VLY BLVD (SB) 18220S 680 RAMPS ALCOSTA BLVD A 69 HEAVY MAINTENANCE 72 $66,237 2026 WINDEMERE PKWY (EB) 20110E ROCKHAMPTON RD BOLLINGER CYN RD A 76 HEAVY MAINTENANCE 77 $37,002 2026 WINDEMERE PKWY (EB) 20120E BOLLINGER CYN RD S BELLINGHAM WAY A 72 HEAVY MAINTENANCE 73 $135,500 2026 WINDEMERE PKWY (WB) 20240W S BELLINGHAM WAY BOLLINGER CYN RD A 67 HEAVY MAINTENANCE 70 $128,146 $3,730,666
2027 ALTON PL 10460 WESTCHESTER DR END R 73 LIGHT MAINTENANCE 76 $6,994 2027 AMHERST CT 10480 NORTHLAND AVE END R 82 LIGHT MAINTENANCE 84 $10,866 2027 ANDOVER PL 10520 TAREYTON AVE END R 75 LIGHT MAINTENANCE 77 $3,311 2027 APTOS CT 10570 APTOS WAY END R 87 LIGHT MAINTENANCE 89 $4,756 2027 APTOS WAY 10580 MARLBORO WAY DAVONA DR R 89 LIGHT MAINTENANCE 89 $14,070 2027 BALTUSROL CT 10870 BALTUSROL PL END R 70 LIGHT MAINTENANCE 72 $4,718 2027 BALTUSROL PL 10880 BROADMOOR DR END R 69 LIGHT MAINTENANCE 71 $11,494 2027 BATH CT 10950 BIDDLEFORD DR END R 75 LIGHT MAINTENANCE 79 $3,474 2027 BELFAST PL 10980 WESTCHESTER DR END R 69 LIGHT MAINTENANCE 73 $6,252 2027 BELINDA CT 10990 CORRINNE ST END R 70 LIGHT MAINTENANCE 74 $3,396 2027 BELLE MEADE DR 11000 BROADMOOR DR (N) BROADMOOR DR (S) R 63 HEAVY MAINTENANCE 66 $214,198 2027 BELLE MEADE DR 11010 BROADMOOR DR ALCOSTA BLVD R 45 HEAVY REHABILITATION 100 $156,449 2027 BELLE MEADE PL 11020 BELLE MEADE DR END R 53 HEAVY MAINTENANCE 60 $71,218 2027 BERNARD AVE 11110 BROADMOOR DR KITTERY AVE R 59 HEAVY MAINTENANCE 64 $115,436 Red = Low PCI Street
Purple = Low PCI during plan period
3/21/2022 8 of 11
4.1.d
Packet Pg. 33
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, and Alphabetical Order)
YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT
PCI
AFTER
STREETSAVER
EST.
COST/STREET
2027 BIDDLEFORD DR 11140 WESTCHESTER DR (E) WESTCHESTER DR (W) R 69 LIGHT MAINTENANCE 73 $50,855 2027 BIGELOW PL 11150 TAREYTON AVE END R 76 LIGHT MAINTENANCE 78 $3,779 2027 BLUE FOX WAY 11220 KENT PL DAVONA DR R 87 LIGHT MAINTENANCE 88 $4,698 2027 BLUE FOX WAY 11230 DAVONA DR NORTHLAND AVE R 63 HEAVY MAINTENANCE 67 $193,908 2027 BOWLIN AVE 11540 DAVONA DR TAREYTON AVE R 68 HEAVY MAINTENANCE 70 $39,071 2027 BRAEBURN CT 11560 BROADMOOR DR END R 45 HEAVY REHABILITATION 100 $44,228 2027 BREVENSVILLE DR 11570 WESTSIDE DR END (CDS) R 83 LIGHT MAINTENANCE 83 $14,182 2027 BREWIN CT 11580 BREWIN LN END R 82 LIGHT MAINTENANCE 83 $4,449 2027 BREWIN LN 11590 WESTSIDE DR FOSTER DR R 79 LIGHT MAINTENANCE 80 $14,511 2027 BRIAN CT 11600 CORRINNE ST END R 71 LIGHT MAINTENANCE 75 $10,459 2027 BRIDGEPORT AVE 11610 TAREYTON AVE DAVONA DR R 61 HEAVY MAINTENANCE 64 $41,083 2027 BROADMOOR CT 11640 BROADMOOR DR END R 41 HEAVY REHABILITATION 100 $99,418 2027 BROADMOOR DR 11650 DUNBARTON CIR (N) ASCOT DR (S) C 68 HEAVY MAINTENANCE 65 $177,712 2027 BROADMOOR DR 11660 ASCOT DR MONTEVIDEO DR C 76 HEAVY MAINTENANCE 77 $89,319 2027 BROADMOOR DR 11670 MONTEVIDEO DR ST DENIS DR C 75 LIGHT MAINTENANCE 72 $38,692 2027 BROADMOOR DR 11680 ST DENIS DR MILLBRIDGE DR C 75 LIGHT MAINTENANCE 76 $35,250 2027 BROADMOOR DR 11690 MILLBRIDGE DR WESTCHESTER DR C 69 LIGHT MAINTENANCE 66 $19,586 2027 BROADMOOR DR 11700 WESTCHESTER DR SPRINGDALE LN C 71 LIGHT MAINTENANCE 73 $28,125 2027 BROADMOOR DR 11710 SPRINGDALE LN PINE VALLEY RD C 75 LIGHT MAINTENANCE 77 $27,085 2027 BROADMOOR DR 11760 BELLE MEADE DR (N) BELLE MEADE DR (S) C 76 LIGHT MAINTENANCE 73 $28,896 2027 BROADMOOR DR 11770 BELLE MEADE DR (S) ALCOSTA BLVD C 69 HEAVY MAINTENANCE 66 $25,515 2027 BROCKTON AVE 11780 BLUE FOX WAY INTERLACHEN AVE R 85 LIGHT MAINTENANCE 88 $20,300 2027 BROCKTON AVE 11790 INTERLACHEN AVE ALCOSTA BLVD R 88 LIGHT MAINTENANCE 91 $6,205 2027 BRUNSWICK CT 11810 ST DENIS DR END R 63 HEAVY MAINTENANCE 67 $82,118 2027 BRUNSWICK WAY 11820 MILLBRIDGE DR ST DENIS DR R 62 HEAVY MAINTENANCE 65 $147,319 2027 CALAIS DR 010 WESTCHESTER DR COLL CT R 63 HEAVY MAINTENANCE 66 $82,877 2027 CALAIS DR 020 COLL CT MENNET WAY R 61 HEAVY MAINTENANCE 64 $60,974 2027 CALAIS DR 030 MENNET WAY GORHAM PL R 72 LIGHT MAINTENANCE 73 $17,549 2027 CALAIS DR 040 GORHAM PL DAVONA DR R 68 LIGHT MAINTENANCE 70 $5,563 2027 CASSANDRA PL 12380 BROCKTON AVE END R 82 LIGHT MAINTENANCE 85 $14,504 2027 CENTURY OAKS CT 30200 WESTSIDE DR END R 81 LIGHT MAINTENANCE 84 $23,510 2027 CHAPPARAL CT 30210 WESTSIDE DR END R 73 LIGHT MAINTENANCE 74 $20,963 2027 CHRISTOPHER WAY 12550 WINDSOR WAY MAVIS PL R 78 LIGHT MAINTENANCE 81 $11,818 2027 CHRISTOPHER WAY 12560 MAVIS PL BROADMOOR DR R 82 LIGHT MAINTENANCE 86 $8,165 2027 CINDY CT 12570 APTOS WAY END R 82 LIGHT MAINTENANCE 84 $7,954 2027 CIRCLE E RANCH PL 30220 WESTSIDE DR END R 74 LIGHT MAINTENANCE 75 $11,080 2027 COMSTOCK CT 12620 CENTENNIAL WAY END R 83 LIGHT MAINTENANCE 83 $5,856 2027 CENTENNIAL WAY 12630 WESTSIDE DR (W) WESTSIDE DR (E) R 83 LIGHT MAINTENANCE 83 $31,979 2027 COLL CT 12690 CALAIS DR END R 73 LIGHT MAINTENANCE 75 $4,757 2027 CONNICK CT 12750 FOSTER DR END R 83 LIGHT MAINTENANCE 83 $12,629 2027 CORRINNE CT 12810 CORRINNE PL END R 68 HEAVY MAINTENANCE 71 $43,145 2027 CORRINNE PL 12820 DAVONA DR END R 68 HEAVY MAINTENANCE 71 $109,262 2027 CORRINNE ST 12830 DAVONA DR BROCKTON AVE R 70 LIGHT MAINTENANCE 74 $25,097 2027 CRESTWOOD PL 12900 SPRINGDALE LN END R 71 LIGHT MAINTENANCE 74 $4,818 2027 CRESTED OAK CT 30270 WESTSIDE DR END R 76 LIGHT MAINTENANCE 77 $8,381 2027 DAVONA DR 010 MONTEVIDEO DR YARMOUTH WAY C 87 LIGHT MAINTENANCE 89 $25,750 2027 DAVONA DR 020 YARMOUTH WAY WESTCHESTER DR C 87 LIGHT MAINTENANCE 89 $50,434 2027 DAVONA DR 030 WESTCHESTER DR PINE VALLEY RD C 80 LIGHT MAINTENANCE 78 $43,095 2027 DAVONA DR 080 NORTHLAND AVE MAY WAY C 86 LIGHT MAINTENANCE 86 $14,862 2027 DAVONA DR 090 MAY WAY BLUE FOX WAY C 86 LIGHT MAINTENANCE 86 $32,010 2027 DAVONA DR 100 BLUE FOX WAY ALCOSTA BLVD C 86 LIGHT MAINTENANCE 86 $47,028 2027 DEVON CT 13600 NORTHLAND AVE END R 83 LIGHT MAINTENANCE 86 $7,555 2027 DEXTER PL 13620 MILO WAY END R 37 HEAVY REHABILITATION 100 $110,166 2027 DIAMOND RANCH CT 20300 HENRY RANCH DR END R 81 LIGHT MAINTENANCE 82 $7,045 2027 DUKE WAY 13890 CORRINNE PL DAVONA DR R 70 LIGHT MAINTENANCE 74 $5,417 Red = Low PCI Street
Purple = Low PCI during plan period
3/21/2022 9 of 11
4.1.d
Packet Pg. 34
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, and Alphabetical Order)
YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT
PCI
AFTER
STREETSAVER
EST.
COST/STREET
2027 DUNCAN HILL CT 13920 WESTSIDE DR E END R 81 LIGHT MAINTENANCE 82 $3,599 2027 ELISHA LN 14010 MINERVA WAY W END R 75 LIGHT MAINTENANCE 76 $8,925 2027 ERNWOOD PL 14070 BLUE FOX WAY END R 71 LIGHT MAINTENANCE 74 $10,825 2027 ETHAN CT 14110 DAVONA DR END R 74 LIGHT MAINTENANCE 77 $5,091 2027 FOSTER DR 14340 WESTSIDE DR BREWIN LN R 83 LIGHT MAINTENANCE 83 $24,859 2027 FOUR OAKS HOLLOW 14420 WESTSIDE DR W END R 81 LIGHT MAINTENANCE 82 $11,752 2027 FOXBORO CT 14430 TODD WAY END R 74 LIGHT MAINTENANCE 78 $5,836 2027 FOXCROFT PL 14480 BIDDLEFORD DR END R 69 LIGHT MAINTENANCE 73 $6,779 2027 GORHAM PL 14590 CALAIS DR WESTCHESTER DR R 70 HEAVY MAINTENANCE 72 $74,352 2027 GREGG PL 14680 KITTERY AVE END R 75 LIGHT MAINTENANCE 79 $8,512 2027 HARDWICK PL 14740 MILLBRIDGE DR END R 39 HEAVY REHABILITATION 100 $63,240 2027 HENRY RANCH DR 20310 WINDING CREEK WAY W END R 81 LIGHT MAINTENANCE 82 $21,727 2027 HERITAGE PL 14840 KITTERY AVE END R 75 LIGHT MAINTENANCE 78 $4,983 2027 HUNTINGTON PL 14960 BROADMOOR DR END R 75 LIGHT MAINTENANCE 78 $4,688 2027 HURST CT 14970 PALMER ST END R 81 LIGHT MAINTENANCE 82 $18,863 2027 KENT PL 15110 S END KENT WAY R 80 LIGHT MAINTENANCE 83 $19,290 2027 KENT PL 15120 KENT WAY N END R 53 HEAVY MAINTENANCE 58 $31,128 2027 KINGSLEY PL 15190 SPRINGDALE LN END R 76 LIGHT MAINTENANCE 79 $4,879 2027 KITTERY AVE 15200 BROADMOOR DR (N) BROADMOOR DR (S) R 64 HEAVY MAINTENANCE 69 $323,930 2027 KITTERY PL 15210 KITTERY AVE END R 75 LIGHT MAINTENANCE 78 $9,868 2027 LEXINGTON PL 15430 KITTERY AVE END R 75 LIGHT MAINTENANCE 78 $6,467 2027 LINFORD PL 15470 SPRINGDALE LN END R 75 LIGHT MAINTENANCE 78 $4,859 2027 LONE TREE CT 20320 LONE TREE LN SR VALLEY BLVD R 79 LIGHT MAINTENANCE 80 $9,670 2027 LUDLOW PL 15620 MILLBRIDGE DR END R 54 HEAVY MAINTENANCE 60 $60,514 2027 MADELIA PL 15670 BROCKTON AVE END R 82 LIGHT MAINTENANCE 85 $16,561 2027 MADORA PL 15680 INTERLACHEN AVE END R 76 LIGHT MAINTENANCE 79 $13,656 2027 MAJESTIC OAK CT 30510 WESTSIDE DR END R 81 LIGHT MAINTENANCE 82 $17,023 2027 MARA PL 15800 TODD WAY END R 79 LIGHT MAINTENANCE 82 $6,761 2027 MARILYN PL 15880 SPRINGDALE LN END R 75 LIGHT MAINTENANCE 79 $5,062 2027 MAVIS PL (CDS) 16000 W END E END R 75 LIGHT MAINTENANCE 78 $9,311 2027 MAVIS PL 16010 CHRISTOPHER WAY MAVIS PL (CDS) R 79 LIGHT MAINTENANCE 82 $5,205 2027 MAY CT 16030 MAY WAY END R 73 LIGHT MAINTENANCE 76 $3,181 2027 MEDINAH CT 16080 BELLE MEADE DR END R 65 HEAVY MAINTENANCE 70 $17,704 2027 MENNET WAY 16100 WESTCHESTER DR CALAIS DR R 63 HEAVY MAINTENANCE 66 $81,693 2027 METAIRE CT 16160 BELLE MEADE DR END R 63 HEAVY MAINTENANCE 68 $17,787 2027 METAIRE PL 16170 BELLE MEADE DR END R 58 HEAVY MAINTENANCE 63 $61,531 2027 MILBURN CT 16190 BELLE MEADE DR END R 73 LIGHT MAINTENANCE 75 $5,137 2027 MILLBRIDGE DR 16200 BROADMOOR DR MILO WAY R 57 HEAVY MAINTENANCE 61 $209,947 2027 MILO PL 16230 MILO WAY END R 58 HEAVY MAINTENANCE 62 $44,290 2027 MILO WAY 16240 DAVONA DR BRUNSWICK WAY R 56 LIGHT REHABILITATION 100 $139,340 2027 MINERVA WAY 16250 WOODBOROUGH WAY END R 81 LIGHT MAINTENANCE 82 $20,346 2027 MONTCLAIR PL 16310 SPRINGDALE LN END R 76 LIGHT MAINTENANCE 79 $3,910 2027 MONTEVIDEO CT 16320 MONTEVIDEO DR END R 37 HEAVY REHABILITATION 100 $32,718 2027 MONTEVIDEO DR 16325 SR VALLEY BLVD TAREYTON AVE C 80 LIGHT MAINTENANCE 81 $7,015 2027 MONTEVIDEO DR 16330 TAREYTON AVE BROADMOOR DR C 79 LIGHT MAINTENANCE 82 $73,634 2027 MONTEVIDEO DR 16340 BROADMOOR DR IRON HORSE TRAIL C 73 HEAVY MAINTENANCE 75 $100,497 2027 MONTEVIDEO DR 16360 IRON HORSE TRAIL COLIMA AVE C 75 LIGHT MAINTENANCE 78 $56,771 2027 MONTEVIDEO DR 16370 COLIMA AVE MEADOWOOD CIR C 77 LIGHT MAINTENANCE 79 $10,674 2027 MONTEVIDEO DR 16380 MEADOWOOD CIR ALCOSTA BLVD C 75 HEAVY MAINTENANCE 78 $73,639 2027 NEAD PL 16500 TAREYTON AVE END R 72 LIGHT MAINTENANCE 76 $6,833 2027 NEWPORT AVE 16530 BROADMOOR DR RUTLAND CT R 45 HEAVY REHABILITATION 100 $71,128 2027 NEWPORT AVE 16540 RUTLAND CT BRUNSWICK WAY R 54 LIGHT REHABILITATION 100 $59,230 2027 NOB PL 16570 DAVONA DR END R 78 LIGHT MAINTENANCE 79 $3,413 2027 NORTHLAND PL 16780 MAY WAY END R 44 HEAVY REHABILITATION 100 $47,236 2027 NORTHLAND PL 16790 DAVONA DR MAY WAY R 66 HEAVY MAINTENANCE 69 $90,987 Red = Low PCI Street
Purple = Low PCI during plan period
3/21/2022 10 of 11
4.1.d
Packet Pg. 35
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, and Alphabetical Order)
YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT
PCI
AFTER
STREETSAVER
EST.
COST/STREET
2027 ONA CT 16980 BIDDLEFORD DR END R 75 LIGHT MAINTENANCE 79 $3,535 2027 PALMER ST 17060 STOW CT WESTSIDE DR R 83 LIGHT MAINTENANCE 83 $13,441 2027 PARLIN PL 17090 TAREYTON AVE END R 55 HEAVY MAINTENANCE 62 $16,419 2027 PETAR PL 17180 KITTERY AVE END R 73 LIGHT MAINTENANCE 76 $3,471 2027 PINE VALLEY PL 30600 WESTSIDE DR END C 81 LIGHT MAINTENANCE 79 $21,190 2027 POWNAL AVE 17410 TAREYTON AVE DAVONA DR R 72 LIGHT MAINTENANCE 73 $9,311 2027 PRENTISS PL 17420 BIDDLEFORD DR END R 69 LIGHT MAINTENANCE 73 $7,214 2027 RAMON PL 17480 BROADMOOR DR END R 75 LIGHT MAINTENANCE 79 $8,443 2027 RANDOLPH PL 17490 TAREYTON AVE END R 71 LIGHT MAINTENANCE 74 $5,666 2027 RIVIERA WY 17630 KITTERY AVE BROADMOOR DR R 75 LIGHT MAINTENANCE 79 $40,015 2027 SAND POINT DR 17850 BELLE MEADE DR NORTHLAND AVE R 70 LIGHT MAINTENANCE 74 $26,533 2027 SHAW PL 18540 WESTCHESTER DR END R 70 HEAVY MAINTENANCE 74 $57,081 2027 SPRINGDALE LN 18690 BROADMOOR DR DAVONA DR R 75 LIGHT MAINTENANCE 79 $43,520 2027 SPRINGDALE LN 18700 DAVONA DR TAREYTON AVE R 75 LIGHT MAINTENANCE 79 $11,077 2027 ST BENEDICT CT 18720 TAREYTON AVE END R 61 HEAVY MAINTENANCE 66 $33,283 2027 ST DENIS CT 18730 ST DENIS DR END R 61 HEAVY MAINTENANCE 65 $32,315 2027 ST DENIS DR 18740 DAVONA DR BROADMOOR DR R 87 LIGHT MAINTENANCE 89 $43,573 2027 ST MICHAEL CT 18750 TAREYTON AVE END R 75 LIGHT MAINTENANCE 77 $6,272 2027 STOW CT 18780 PALMER ST END R 81 LIGHT MAINTENANCE 82 $15,526 2027 ST PIERRE CT 18790 DAVONA DR END R 78 LIGHT MAINTENANCE 80 $11,559 2027 TALUS CT 30730 WESTSIDE DR END R 81 LIGHT MAINTENANCE 82 $5,916 2027 TAREYTON AVE 19035 MONTEVIDEO DR PINE VALLEY RD R 81 LIGHT MAINTENANCE 83 $100,492 2027 TERRACED HILLS WAY 20410 LA COUNT LN LONE TREE CT R 82 LIGHT MAINTENANCE 83 $28,030 2027 TODD WAY 19210 BROADMOOR DR WINDSOR WAY R 82 LIGHT MAINTENANCE 85 $18,909 2027 VAN BUREN PL 19410 BERNARD AVE VAN BUREN PL (CDS) R 74 HEAVY MAINTENANCE 78 $16,978 2027 VAN BUREN PL (CDS) 19420 E END W END R 75 LIGHT MAINTENANCE 79 $13,883 2027 VENTURA PL 19430 SPRINGDALE LN END R 73 LIGHT MAINTENANCE 76 $4,818 2027 WATERBURY PL 19510 TAREYTON AVE END R 69 HEAVY MAINTENANCE 73 $23,084 2027 WEATHERLY PL 19530 SPRINGDALE LN END R 75 LIGHT MAINTENANCE 78 $4,859 2027 WELFORD RANCH CT 20330 WESTSIDE DR N END (CDS) R 81 LIGHT MAINTENANCE 82 $5,976 2027 WESTCHESTER DR 19540 BROADMOOR DR CALAIS DR R 72 HEAVY MAINTENANCE 75 $29,480 2027 WESTCHESTER DR 19550 CALAIS DR DAVONA DR R 74 HEAVY MAINTENANCE 78 $129,125 2027 WESTSIDE CT 30790 WESTSIDE DR END R 82 LIGHT MAINTENANCE 83 $11,538 2027 WESTSIDE PL 30810 WESTSIDE DR END R 83 LIGHT MAINTENANCE 83 $2,895 2027 WINDING CREEK WAY 20340 WESTSIDE DR CITY LIMIT R 80 LIGHT MAINTENANCE 81 $43,215 2027 WINDMILL CT 20350 WESTSIDE DR N END (CDS) R 81 LIGHT MAINTENANCE 82 $4,637 2027 WINDSOR WAY 19670 N END S END R 75 LIGHT MAINTENANCE 77 $28,403 2027 WINSLOW PL 19730 TAREYTON AVE END R 68 HEAVY MAINTENANCE 71 $27,896 2027 WOODBOROUGH WAY 19800 WESTSIDE DR SR VALLEY BLVD R 76 LIGHT MAINTENANCE 77 $18,075 2027 WESTSIDE DR 19900 SR VALLEY BLVD SOUTHWICK DR C 79 LIGHT MAINTENANCE 77 $19,139 2027 WESTSIDE DR 19910 SOUTHWICK DR BREVENSVILLE DR C 78 LIGHT MAINTENANCE 75 $54,719 2027 WESTSIDE DR 19920 BREVENSVILLE DR PALMER ST C 79 LIGHT MAINTENANCE 77 $13,418 2027 WESTSIDE DR 19930 PALMER ST MAJESTIC OAK CT C 80 LIGHT MAINTENANCE 78 $62,614 2027 WESTSIDE DR 19940 MAJESTIC OAK CT WINDING CREEK WAY C 80 LIGHT MAINTENANCE 78 $36,081 2027 WESTSIDE DR 19950 WINDING CREEK WAY DUBERSTEIN DR C 80 LIGHT MAINTENANCE 78 $39,232 2027 WESTSIDE DR 19960 DUBERSTEIN DR WOODBOROUGH WAY C 81 LIGHT MAINTENANCE 79 $16,314 2027 WESTSIDE DR 19970 WOODBOROUGH WAY SR VALLEY BLVD C 79 LIGHT MAINTENANCE 77 $32,327 2027 YALE CT 16795 NORTHLAND PL END R 80 LIGHT MAINTENANCE 83 $3,270 2027 YARMOUTH WAY 19050 DAVONA DR TAREYTON AVE R 67 HEAVY MAINTENANCE 70 $59,525 $6,048,793
Red = Low PCI Street
Purple = Low PCI during plan period
3/21/2022 11 of 11
4.1.d
Packet Pg. 36
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, Functional Class, and PCI ‐ Low to High) YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT PCI AFTER
STREETSAVER
EST.
COST/STREET
2022 DOUGHERTY RD (SB) 13820S CROW CANYON RD RED WILLOW RD A 56 LIGHT REHABILITATION 100 $172,183 2022 BOLLINGER CYN RD (EB) 23470E CANYON LAKES CIR S GALE RIDGE RD A 58 LIGHT REHABILITATION 100 $920,416 2022 DOUGHERTY RD (SB) 13830S RED WILLOW RD N GALE RIDGE RD A 61 LIGHT REHABILITATION 100 $849,016 2022 DOUGHERTY RD (NB) 13790N BOLLINGER CYN RD (N) N MONARCH RD A 62 LIGHT REHABILITATION 100 $369,518 2022 DOUGHERTY RD (SB) 13840S N GALE RIDGE RD BOLLINGER CYN RD (N) A 62 LIGHT REHABILITATION 100 $457,604 2022 BOLLINGER CYN RD (EB) 23480E S GALE RIDGE RD DOUGHERTY RD (N) A 65 LIGHT REHABILITATION 100 $449,405 2022 DOUGHERTY RD (NB) 13810N RED WILLOW RD CROW CANYON RD A 66 LIGHT REHABILITATION 100 $196,781 2022 BOLLINGER CYN RD (WB) 23580W N GALE RIDGE RD CANYON LAKES DR A 67 LIGHT REHABILITATION 100 $907,452 2022 DOUGHERTY RD (NB) 13800N N MONARCH RD RED WILLOW RD A 68 LIGHT REHABILITATION 100 $810,424 2022 BOLLINGER CYN RD (WB) 23570W DOUGHERTY RD (N) N GALE RIDGE RD A 71 LIGHT REHABILITATION 100 $460,928 2022 OMEGA RD 16975 330 FT N/O DEERWOOD RD FARIA PRESERVE PKWY C 41 LIGHT REHABILITATION 100 $66,199 2022 OMEGA RD 16980 FARIA PRESERVE PKWY 660 FT N/O FARIA PRESERVE PKWY C 46 LIGHT REHABILITATION 100 $101,289 2022 RYEGATE PL 17760 MILO WAY END R 30 LIGHT REHABILITATION 100 $42,837 2022 MILLBRIDGE PL 16210 MILO WAY END R 33 LIGHT REHABILITATION 100 $50,812 2022 CANYON CREST RD (E) 12220 CANYON CREST DR HIDDEN CANYON CT R 60 HEAVY MAINTENANCE 70 $17,492 2022 ANZA CT 10550 BOLLINGER CYN RD END R 66 LIGHT REHABILITATION 100 $28,624 2022 CANYON CREST DR 12210 710' W/O RIO GRANDE PL CROW CANYON RD (E) R 68 HEAVY MAINTENANCE 77 $137,058 2022 ARLEWOOD CT 30090 KENWICK DR END R 70 LIGHT REHABILITATION 100 $34,785 2022 MARBLE CANYON CT 15810 CANYON CREST DR END R 71 HEAVY MAINTENANCE 81 $25,507 2022 CANYON CREST RD (W) 12230 CANYON CREST DR END R 73 LIGHT MAINTENANCE 82 $25,314 2022 KINVARRA CT 30450 KENWICK DR END R 73 LIGHT REHABILITATION 100 $30,508 2022 BRYCE CANYON CT 11830 CANYON CREST AVE END R 74 LIGHT MAINTENANCE 83 $2,324 2022 CANYON CREST AVE 12170 CANYON CREST DR 1000' E/O CYN CREST R 74 HEAVY MAINTENANCE 83 $71,984 2022 CANYON CREST AVE 31050 1000' E/O CANYON CREST END R 74 HEAVY MAINTENANCE 83 $23,179 2022 QUARTERMSTR CYN RD 17450 CANYON CREST DR END R 74 HEAVY MAINTENANCE 83 $55,038 2022 RIO GRANDE PL 17600 CANYON CREST DR END R 74 LIGHT MAINTENANCE 83 $3,831 2022 MARBLE CANYON PL 15830 CANYON CREST DR END R 75 HEAVY MAINTENANCE 84 $89,425 2022 BRYCE CANYON PL 11840 CANYON CREST AVE END R 76 LIGHT MAINTENANCE 85 $2,823 2022 CANYON CREST CT 12180 CANYON CREST DR END R 76 LIGHT MAINTENANCE 85 $1,497 2022 CANYON CREST DR 12190 CROW CANYON RD (W) CANYON CREST RD R 76 LIGHT MAINTENANCE 85 $10,396 2022 CANYON CREST DR 12200 CANYON CREST RD 710' W/O RIO GRANDE PL R 76 LIGHT MAINTENANCE 85 $22,611 2022 CANYON CREST RD (E) 12225 HIDDEN CANYON CT END R 76 LIGHT MAINTENANCE 85 $4,099 2022 HIDDEN CANYON CT 14850 CANYON CREST RD END R 76 LIGHT MAINTENANCE 85 $2,564 2022 LAKE MEAD CT 15260 CANYON CREST RD END R 76 LIGHT MAINTENANCE 85 $2,516 2022 LAKE MEAD PL 15270 CANYON CREST RD END R 76 LIGHT MAINTENANCE 85 $3,097 2022 LAVA FALLS CT 15370 CANYON CREST AVE END R 76 LIGHT MAINTENANCE 85 $2,281 2022 LAVA FALLS PL 15380 CANYON CREST AVE END R 76 LIGHT MAINTENANCE 85 $1,772 2022 MARBLE CANYON LN 15820 CANYON CREST DR END R 76 LIGHT MAINTENANCE 85 $4,138 2022 PLACID CT 17300 CANYON CREST RD END R 76 LIGHT MAINTENANCE 85 $2,318 2022 RIO GRANDE CT 17590 CANYON CREST DR END R 76 LIGHT MAINTENANCE 85 $3,459 2022 TAHITI DR 18970 BARBADOS DR CROW CANYON RD R 77 LIGHT MAINTENANCE 85 $33,644 2022 JAMAICA DR 15080 BARBADOS DR END R 79 LIGHT MAINTENANCE 87 $10,236 $6,507,385
2023 CROW CANYON RD (WB) 13220W BOLLINGER CYN RD CITY LIMITS (W) A 57 HEAVY REHABILITATION 100 $181,006 2023 CROW CANYON RD (EB) 12950E CITY LIMIT BOLLINGER CYN RD A 62 HEAVY REHABILITATION 100 $218,955 2023 DOUGHERTY RD (SB) 13870S OLD RANCH RD CITY LIMIT (S) A 66 HEAVY MAINTENANCE 74 $462,028 2023 DOUGHERTY RD (NB) 13760N CITY LIMIT (S) OLD RANCH RD A 70 HEAVY MAINTENANCE 78 $466,409 2023 BOLLINGER CYN RD (NB) 23650N ANDORA LN NORRIS CANYON RD A 73 LIGHT MAINTENANCE 80 $56,907 2023 BOLLINGER CYN RD (SB) 23390S ASCENSION DR NORRIS CANYON RD A 73 LIGHT MAINTENANCE 81 $15,478 2023 BOLLINGER CYN RD (SB) 23380S COBBLESTONE DR ASCENSION DR A 75 HEAVY MAINTENANCE 82 $276,276 2023 BOLLINGER CYN RD (SB) 23370S CROW CANYON RD COBBLESTONE DR A 76 LIGHT MAINTENANCE 83 $18,244 2023 BOLLINGER CYN RD (SB) 23410S MORGAN DR SR VALLEY BLVD A 76 LIGHT MAINTENANCE 83 $62,076 2023 BOLLINGER CYN RD (NB) 23660N NORRIS CANYON RD ASCENSION DR A 77 LIGHT MAINTENANCE 84 $18,679 2023 BOLLINGER CYN RD (WB) 23640N SR VALLEY BLVD ANDORA LN A 77 LIGHT MAINTENANCE 84 $57,192 2023 BOLLINGER CYN RD (NB) 23680N CREEKSIDE DR CROW CANYON RD A 79 LIGHT MAINTENANCE 85 $22,815 2023 BOLLINGER CYN RD (NB) 23670N ASCENSION DR CREEKSIDE DR A 80 LIGHT MAINTENANCE 87 $45,479 2023 HARCOURT WAY 020 WINDEMERE PKWY S BELLINGHAM WAY C 65 HEAVY MAINTENANCE 73 $153,377 2023 HARCOURT WAY 030 S BELLINGHAM WAY BOLLINGER CYN RD C 66 HEAVY MAINTENANCE 74 $190,573 2023 STAGECOACH RD 18710 ALCOSTA BLVD CITY LIMIT C 67 LIGHT MAINTENANCE 75 $31,613 Red = Low PCI Street
Purple = Low PCI Street during plan period
3/21/2022 1 of 11
4.1.d
Packet Pg. 37
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, Functional Class, and PCI ‐ Low to High) YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT PCI AFTER
STREETSAVER
EST.
COST/STREET
2023 ALBION RD 011 WINDEMERE PKWY 710 FT N OF WINDEMERE PKWY C 71 LIGHT MAINTENANCE 78 $18,447 2023 ALBION RD 015 360 FT EAST OF SILVA WAY HARCOURT WAY C 71 LIGHT MAINTENANCE 78 $46,638 2023 TWIN CREEKS DR 19370 NORRIS CANYON RD CASTLETON CT C 80 LIGHT MAINTENANCE 87 $10,085 2023 SENECA LN 18430 MORGAN DR END R 30 HEAVY MAINTENANCE 53 $54,835 2023 WILTON PL 19660 MILLBRIDGE DR END R 34 HEAVY MAINTENANCE 54 $35,101 2023 SCARBORO PL 18330 MILLBRIDGE DR END R 36 HEAVY MAINTENANCE 55 $34,697 2023 SAGE CIR 17790 DERBY DR MORGAN DR R 37 HEAVY MAINTENANCE 56 $135,483 2023 DERBY DR 13590 GAIT CT MORGAN DR R 38 LIGHT REHABILITATION 100 $146,837 2023 YUCCA CT 17795 SAGE CIR END R 49 HEAVY MAINTENANCE 62 $16,258 2023 ARANDA DR 10610 BOLLINGER CYN RD MARSH DR R 52 HEAVY MAINTENANCE 63 $163,741 2023 LATERA CT 30490 LANGTON DR END R 52 HEAVY MAINTENANCE 64 $45,276 2023 DERBY DR 13580 WILDHORSE DR GAIT CT R 54 LIGHT REHABILITATION 100 $600,178 2023 ARAPAHO CT 10620 MORGAN DR END R 56 HEAVY MAINTENANCE 67 $19,093 2023 KELLYBROOK WAY 30430 HARCOURT WAY END R 58 HEAVY MAINTENANCE 68 $64,351 2023 ENSENADA DR 14050 ALCOSTA BLVD GRANADA DR R 60 HEAVY MAINTENANCE 69 $106,845 2023 TRIANA WAY 19320 VILLAGE PKWY TRIANA WAY R 61 HEAVY MAINTENANCE 70 $158,441 2023 AVALON WAY 22050 LONGLEAF CIR (N) LONGLEAF CIR (S) R 62 HEAVY MAINTENANCE 71 $75,956 2023 GALISTEO CT 14550 MARSH DR END R 62 HEAVY MAINTENANCE 71 $33,527 2023 MARSH DR 050 ARANDA DR BOLLINGER CYN RD R 62 HEAVY MAINTENANCE 71 $44,084 2023 CANTAS PL 12240 LORETO DR END R 63 HEAVY MAINTENANCE 72 $12,496 2023 LANGTON DR 30480 KELLYBROOK WAY LANGTON CT R 63 HEAVY MAINTENANCE 72 $62,053 2023 ENSENADA DR 14060 GRANADA DR MANGOS DR R 64 HEAVY MAINTENANCE 73 $82,201 2023 LANGHORNE DR 22500 JASPER HILL DR PEMBERTON DR R 64 HEAVY MAINTENANCE 73 $80,788 2023 LANGTON CT 30470 LANGTON DR END R 64 HEAVY MAINTENANCE 73 $40,105 2023 GAIT CT 14520 DERBY DR END R 65 HEAVY MAINTENANCE 74 $20,096 2023 KENWICK DR 30440 KELLYBROOK WAY KIRKSTONE CT R 65 HEAVY MAINTENANCE 74 $50,907 2023 MADRID PL 15690 ENSENADA DR END R 65 LIGHT MAINTENANCE 73 $6,101 2023 ANDORA LN 10514 GALICIA CT END R 66 HEAVY MAINTENANCE 75 $82,738 2023 KIRKSTONE CT 30460 N END S END R 66 HEAVY MAINTENANCE 75 $57,227 2023 SHAVANO WAY 18580 VILLAGE PKWY TRIANA WAY R 66 LIGHT MAINTENANCE 75 $12,396 2023 BETHANY RD 22080 WINDEMERE PKWY (N) WINDEMERE PKWY (S) R 68 HEAVY MAINTENANCE 76 $125,749 2023 GREYLYN DR 14690 SHAVANO WAY GREYLYN DR R 68 LIGHT MAINTENANCE 76 $19,133 2023 LORCA CT 15600 CARDONA CIR END R 68 LIGHT MAINTENANCE 77 $2,087 2023 AVALON CT 22060 LONGLEAF CIR (N) END R 69 HEAVY MAINTENANCE 77 $48,949 2023 DERBY CT 13570 WILDHORSE DR END R 69 HEAVY MAINTENANCE 77 $16,988 2023 JASPER HILL DR 22430 HARCOURT WAY PEMBERTON DR R 69 HEAVY MAINTENANCE 77 $80,788 2023 LONGLEAF CIR 22510 WINDEMERE PKWY (N) WINDEMERE PKWY (S) R 69 HEAVY MAINTENANCE 77 $258,250 2023 MOLINA CT 16280 SANTANDER DR END R 69 LIGHT MAINTENANCE 77 $1,157 2023 PAMPLONA CT 17070 VALDIVIA CIR END R 69 LIGHT MAINTENANCE 77 $6,309 2023 TALAVERA DR 18980 BOLLINGER CYN RD SR VALLEY BLVD R 69 HEAVY MAINTENANCE 77 $351,739 2023 TAMBURLAINE DR 22810 HARCOURT WAY MACEDON CT R 69 LIGHT MAINTENANCE 77 $6,248 2023 TREYBURN CR 19330 SHAVANO WAY (S) SHAVANO WAY (N) R 69 HEAVY MAINTENANCE 77 $49,312 2023 FERROL CT 14240 SANTANDER DR END R 70 LIGHT MAINTENANCE 78 $1,280 2023 MALAGA CT 15710 TOLTEC CIR END R 70 LIGHT MAINTENANCE 78 $1,227 2023 ROSEMOUNT LN 22700 LONGLEAF CIR (N) LONGLEAF CIR (S) R 70 HEAVY MAINTENANCE 78 $75,460 2023 DURLINGTON CT 22330 WATERVALE WAY N END R 71 LIGHT MAINTENANCE 79 $5,484 2023 LASSO CIR 15360 PADDOCK DR WILDHORSE DR R 71 LIGHT MAINTENANCE 78 $12,354 2023 SABA CT 17770 CARDONA CIR END R 71 LIGHT MAINTENANCE 79 $2,494 2023 SANTA ROSA AVE 18290 EL SUYO DR ENSENADA DR R 71 HEAVY MAINTENANCE 79 $70,257 2023 VALDIVIA CIR 19390 TALAVERA DR (S) TALAVERA DR (N) R 71 LIGHT MAINTENANCE 79 $25,506 2023 WATERVALE WAY 22880 KARINA CT BETHANY RD (N) R 71 LIGHT MAINTENANCE 79 $14,431 2023 PEMBERTON DR 22590 HARCOURT WAY JASPER HILL DR R 72 HEAVY MAINTENANCE 80 $56,830 2023 RIVENELL WAY 22640 SANDALFORD WAY ALBION RD R 72 HEAVY MAINTENANCE 80 $9,135 2023 VINDARA LN 22870 SILVA WAY MIDDLEBROOK WAY R 72 HEAVY MAINTENANCE 80 $54,857 2023 WILDHORSE DR 19640 DERBY DR PADDOCK DR R 72 HEAVY MAINTENANCE 80 $114,023 2023 BOWEN CT 22100 WATERVALE WAY S END R 73 LIGHT MAINTENANCE 80 $4,754 2023 MARE LN 15860 MORGAN DR END R 73 LIGHT MAINTENANCE 81 $12,673 2023 ROATAN CT 17640 CARDONA CIR END R 73 LIGHT MAINTENANCE 80 $2,703 2023 TAMWORTH LN 22820 BETHANY RD (N) BETHANY RD (S) R 73 LIGHT MAINTENANCE 80 $14,575 Red = Low PCI Street
Purple = Low PCI Street during plan period
3/21/2022 2 of 11
4.1.d
Packet Pg. 38
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, Functional Class, and PCI ‐ Low to High) YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT PCI AFTER
STREETSAVER
EST.
COST/STREET
2023 TOLLEY CT 22850 WATERVALE WAY S END R 73 LIGHT MAINTENANCE 80 $4,754 2023 AYAMONTE CT 10820 SANTANDER DR END R 74 LIGHT MAINTENANCE 81 $6,039 2023 CARDONA CIR 12270 TALAVERA DR (S) TALAVERA DR (N) R 74 LIGHT MAINTENANCE 82 $24,923 2023 DROMANA CT 22320 HARCOURT WAY END R 74 LIGHT MAINTENANCE 81 $6,519 2023 JASPER HILL CT 22420 JASPER HILL DR END R 74 HEAVY MAINTENANCE 81 $17,872 2023 KARINA CT 22440 N END S END R 74 LIGHT MAINTENANCE 81 $11,545 2023 LORETO DR 15610 SANTA ROSA AVE (N) SANTA ROSA AVE (S) R 74 LIGHT MAINTENANCE 82 $32,339 2023 ROMA PL 17660 SANTA ROSA AVE END R 74 HEAVY MAINTENANCE 82 $36,754 2023 ROSARIO CT 17670 MARSH DR END R 74 LIGHT MAINTENANCE 81 $12,218 2023 ROUBAUD CT 22670 N END S END R 74 LIGHT MAINTENANCE 81 $5,840 2023 RUTHERGLEN DR 22720 ROUBAUD CT RUTHBURY CT R 74 LIGHT MAINTENANCE 81 $4,278 2023 SEVILLE PL 18440 LORETO DR END R 74 LIGHT MAINTENANCE 82 $3,168 2023 STANFORTH CT 22790 HARCOURT WAY END R 74 LIGHT MAINTENANCE 81 $6,519 2023 VERITAS CT 21100 AYERS WAY END R 74 LIGHT MAINTENANCE 82 $5,253 2023 BRONCO CT 11800 CORRAL CIR END R 75 LIGHT MAINTENANCE 82 $2,277 2023 COLMA CT 12700 SANTANDER DR END R 75 LIGHT MAINTENANCE 82 $2,186 2023 CONDADO CT 12740 SANTANDER DR END R 75 LIGHT MAINTENANCE 82 $2,851 2023 CUENCA CT 13230 SANTANDER DR END R 75 LIGHT MAINTENANCE 82 $2,920 2023 POSADA CT 17400 TOLTEC CIR END R 75 LIGHT MAINTENANCE 82 $2,782 2023 ROTHBURY WAY 40510 HARCOURT WAY END R 75 LIGHT MAINTENANCE 82 $7,216 2023 CULLENS CT 22310 WATERVALE WAY N END R 76 LIGHT MAINTENANCE 83 $5,845 2023 MACEDON CT 22520 TAMBURLAINE DR END R 76 LIGHT MAINTENANCE 83 $6,519 2023 MIDDLEBROOKE WAY 22560 SILVA WAY SANDALFORD WAY R 76 HEAVY MAINTENANCE 83 $53,616 2023 RIVERLAND CT 22650 HARCOURT WAY END R 76 LIGHT MAINTENANCE 83 $5,840 2023 ROVERTON CT 22680 HARCOURT WAY END R 76 LIGHT MAINTENANCE 83 $7,063 2023 SANTANDER DR 18230 TALAVERA DR (S) TALAVERA DR (N) R 76 LIGHT MAINTENANCE 84 $66,658 2023 SILK HILL CT 22740 TAMBURLAINE DR END R 76 LIGHT MAINTENANCE 83 $7,606 2023 SILVA WAY 22750 ALBION RD MIDDLEBROOK WAY R 76 LIGHT MAINTENANCE 83 $11,137 2023 SILVA WAY 23360 WINDEMERE PKWY WATERVALE WAY R 76 LIGHT MAINTENANCE 83 $5,917 2023 TEWKSBURY CT 22830 TEWKSBURY WAY END R 76 LIGHT MAINTENANCE 83 $4,414 2023 TEWKSBURY WAY 22840 HARCOURT WAY END R 76 LIGHT MAINTENANCE 83 $5,297 2023 TYLERTON CT 22860 HARCOURT WAY END R 76 LIGHT MAINTENANCE 83 $3,192 2023 ADRIATIC CT 20500 AYERS WAY END R 77 LIGHT MAINTENANCE 84 $6,583 2023 FIELDVIEW TERR 14260 BOLLINGER CYN RD END R 77 LIGHT MAINTENANCE 84 $11,521 2023 SANDALFORD WAY 22730 SILVA WAY RIVENELL WAY R 77 HEAVY MAINTENANCE 84 $54,013 2023 ARAPAHO CIR 10630 MORGAN DR (N) MORGAN DR (S) R 78 HEAVY MAINTENANCE 85 $138,597 2023 CAMINO DE JUGAR 12030 BOLLINGER CYN RD END R 78 LIGHT MAINTENANCE 85 $20,156 2023 DAVALOS CT 13280 SANTANDER DR END R 78 LIGHT MAINTENANCE 85 $2,641 2023 PIPERS BROOK CT 22620 HARCOURT WAY END R 78 LIGHT MAINTENANCE 85 $8,081 2023 PONY CT 17350 PADDOCK DR END R 78 LIGHT MAINTENANCE 85 $2,523 2023 SANDALFORD WAY 23320 RIVENELL WAY ASHBROOK LN R 78 LIGHT MAINTENANCE 85 $8,693 2023 SHAWNEE CT 18530 ARAPAHO CIR END R 78 HEAVY MAINTENANCE 85 $14,558 2023 ALORA CT 10440 DURANGO LN END R 79 LIGHT MAINTENANCE 86 $2,088 2023 ARENAS CT 10650 SANTANDER DR END R 79 LIGHT MAINTENANCE 87 $2,930 2023 ASHBROOK LN 010 ALBION RD SILVA WAY R 79 LIGHT MAINTENANCE 85 $11,681 2023 BURGOS CT 11860 SANTANDER DR END R 79 LIGHT MAINTENANCE 87 $2,179 2023 CORRAL CIR 12800 PADDOCK DR (E) PADDOCK DR (W) R 79 LIGHT MAINTENANCE 86 $19,092 2023 DOGIE CT 13630 PADDOCK DR END R 79 LIGHT MAINTENANCE 86 $2,831 2023 MESA VISTA CT 16130 SANTANDER DR END R 79 LIGHT MAINTENANCE 87 $7,885 2023 MONASTERIO CT 16300 SANTANDER DR END R 79 LIGHT MAINTENANCE 86 $5,005 2023 PADDOCK DR 17010 BOLLINGER CYN RD END R 79 LIGHT MAINTENANCE 86 $33,112 2023 PALAMOS CT 17020 SANTANDER DR END R 79 LIGHT MAINTENANCE 86 $5,005 2023 SEGOVIA CT 18410 ARANDA DR END R 79 LIGHT MAINTENANCE 86 $5,915 2023 SILVA WAY 23330 MIDDLEBROOK WAY WINDEMERE PKWY R 79 LIGHT MAINTENANCE 85 $5,025 2023 TOLTEC CIR 19230 MARSH DR (N) MARSH DR (S) R 79 LIGHT MAINTENANCE 86 $23,657 2023 VERITAS WAY 21110 WINDEMERE PKWY AYERS WAY R 79 LIGHT MAINTENANCE 86 $9,398 2023 WATERVALE WAY 23340 BETHANY RD (N) BETHANY RD (S) R 79 LIGHT MAINTENANCE 85 $9,019 2023 CASTLETON CT 12390 SR VALLEY BLVD END R 80 LIGHT MAINTENANCE 87 $17,847 2023 CHEROKEE CT 12520 ARAPAHO CIR END R 80 LIGHT MAINTENANCE 87 $2,235 Red = Low PCI Street
Purple = Low PCI Street during plan period
3/21/2022 3 of 11
4.1.d
Packet Pg. 39
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, Functional Class, and PCI ‐ Low to High) YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT PCI AFTER
STREETSAVER
EST.
COST/STREET
2023 CUENCA DR 13250 WESTVALE CT CASTLETON CT R 80 LIGHT MAINTENANCE 87 $5,449 2023 DURANGO LN 13940 TWIN CREEKS DR END R 80 LIGHT MAINTENANCE 87 $15,912 2023 GALICIA CT 14540 ANDORA CT END R 80 LIGHT MAINTENANCE 87 $2,634 2023 GAUCHO CT 14560 DURANGO LN END R 80 LIGHT MAINTENANCE 87 $3,712 2023 GUAYMAS CT 14700 MARSH DR END R 80 LIGHT MAINTENANCE 87 $3,454 2023 HOPI CT 14940 ARAPAHO CIR END R 80 LIGHT MAINTENANCE 87 $2,100 2023 LAREDO CT 15350 DURANGO LN END R 80 LIGHT MAINTENANCE 87 $4,426 2023 MANACOR CT 15720 ARANDA DR END R 80 HEAVY MAINTENANCE 87 $48,330 2023 MARICAIBO PL 15870 CAMINO DE JUGAR END R 80 LIGHT MAINTENANCE 87 $8,432 2023 SALAMANCA CT 17800 TOLTEC CIR END R 80 LIGHT MAINTENANCE 87 $4,345 2023 TOTANA CT 19290 ARANDA DR END R 80 LIGHT MAINTENANCE 87 $2,203 2023 WESTVALE CT 19560 CUENCA DR END R 80 LIGHT MAINTENANCE 87 $7,466 2023 ARAGON LN 10590 TWIN CREEKS DR END R 81 LIGHT MAINTENANCE 88 $21,948 2023 BARRANCA CT 10940 ASCENSION DR END R 81 LIGHT MAINTENANCE 88 $5,933 2023 MARSH DR 040 NORRIS CANYON RD ARANDA DR R 81 LIGHT MAINTENANCE 88 $45,182 2023 MESA VISTA DR 16140 MARSH DR SANTANDER DR R 81 LIGHT MAINTENANCE 88 $6,359 2023 MINTARO CT 20940 VERITAS WAY END R 81 LIGHT MAINTENANCE 88 $2,185 2023 WILDHORSE DR 19620 MORGAN DR DERBY DR R 81 HEAVY MAINTENANCE 88 $92,808 2023 ANDORA LN 10512 BOLLINGER CYN RD GALICIA CT R 82 LIGHT MAINTENANCE 88 $7,704 2023 ASCENSION DR 10680 PALMIRA PL CAMINO DE JUGAR R 82 LIGHT MAINTENANCE 89 $10,029 2023 AYERS WAY 20580 VERITAS CT SILVA WAY R 82 HEAVY MAINTENANCE 88 $35,223 2023 BELEM CT 10970 ASCENSION DR END R 82 LIGHT MAINTENANCE 89 $3,429 2023 CARTAGENA LN 12320 ARAGON LN NORRIS CANYON RD R 82 LIGHT MAINTENANCE 88 $6,331 2023 LADERA CORTE 15230 CAMINO DE JUGAR END R 82 LIGHT MAINTENANCE 89 $5,915 2023 MESQUITE LN 16150 SAGE CIR END R 82 LIGHT MAINTENANCE 89 $3,693 2023 PALMIRA CT 17040 PALMIRA PL END R 82 LIGHT MAINTENANCE 89 $3,725 2023 ASCENSION DR 10670 BOLLINGER CYN RD PALMIRA PL R 83 LIGHT MAINTENANCE 90 $23,097 2023 ASHBROOK LN 020 SILVA WAY VERITAS WAY R 83 LIGHT MAINTENANCE 89 $4,664 2023 CAMINO VENADILLO 12100 CAMINO DE JUGAR END R 83 LIGHT MAINTENANCE 90 $14,007 2023 CUENCA DR 13240 SANTANDER DR WESTVALE CT R 83 LIGHT MAINTENANCE 89 $3,558 2023 SIOUX LN 18590 ARAPAHO CIR END R 83 LIGHT MAINTENANCE 89 $4,739 2023 BAGADO CT 10840 ASCENSION DR END R 84 LIGHT MAINTENANCE 91 $3,262 2023 BELLO CT 11050 BOLLINGER CYN RD END R 84 LIGHT MAINTENANCE 91 $3,841 2023 MURINDO PL 16470 CAMINO VENADILLO END R 84 LIGHT MAINTENANCE 91 $7,196 2023 PALMIRA PL 17050 ASCENSION DR END R 84 LIGHT MAINTENANCE 91 $14,328 2023 VIA CORDOBA 19460 ASCENSION DR END R 84 LIGHT MAINTENANCE 91 $6,065 $7,296,144
2024 ALCOSTA BLVD (NB) 10195N VERACRUZ DR CANYON HILLS RD A 54 HEAVY REHABILITATION 100 $72,480 2024 CROW CANYON RD (WB) 13150W ALCOSTA BLVD CAMINO RAMON A 55 LIGHT REHABILITATION 100 $335,059 2024 CROW CANYON RD (EB) 12970E BOLLINGER CYN RD TWIN CREEKS DR A 56 LIGHT REHABILITATION 100 $1,003,383 2024 CROW CANYON RD (EB) 12980E TWIN CREEKS DR SR VALLEY BLVD A 57 LIGHT REHABILITATION 100 $128,943 2024 CROW CANYON RD (EB) 13020E CAMINO RAMON ALCOSTA BLVD A 59 HEAVY REHABILITATION 100 $578,415 2024 CROW CANYON RD (WB) 13210W SR VALLEY BLVD BOLLINGER CYN RD A 60 HEAVY REHABILITATION 100 $1,271,940 2024 ALCOSTA BLVD (NB) 10200N CANYON HILLS RD MARKET PL A 67 HEAVY MAINTENANCE 74 $285,821 2024 ALCOSTA BLVD (NB) 10220N MARKET PL BOLLINGER CYN RD A 75 HEAVY MAINTENANCE 81 $98,199 2024 PINE VALLEY RD 17275 SR VALLEY BLVD WESTSIDE DRIVE C 72 LIGHT REHABILITATION 100 $81,653 2024 MARKETPL 15890 BOLLINGER CYN RD ALCOSTA BLVD R 43 HEAVY REHABILITATION 100 $624,672 2024 PINE VALLEY CT 17210 ALCOSTA BLVD END R 44 HEAVY REHABILITATION 100 $58,524 $4,539,089
2025 EAST BRANCH PKWY (EB) 30820E CHANCERY WAY SHERWOOD WAY A 76 HEAVY MAINTENANCE 80 $140,292 2025 EAST BRANCH PKWY (EB) 30840E ENFIELD ST ARLINGTON WAY A 76 LIGHT MAINTENANCE 80 $27,415 2025 EAST BRANCH PKWY (EB) 30850E ARLINGTON WAY WINDEMERE PKWY A 76 HEAVY MAINTENANCE 80 $72,430 2025 EAST BRANCH PKWY (EB) 30810E BOLLINGER CYN RD CHANCERY WAY A 77 HEAVY MAINTENANCE 81 $321,235 2025 EAST BRANCH PKWY (WB) 30940W SHERWOOD WAY CHANCERY WAY A 80 LIGHT MAINTENANCE 84 $28,967 2025 EAST BRANCH PKWY (WB) 30950W CHANCERY WAY BOLLINGER CYN RD A 80 HEAVY MAINTENANCE 84 $268,323 2025 EAST BRANCH PKWY (WB) 30910W WINDEMERE PKWY ARLINGTON WAY A 81 LIGHT MAINTENANCE 83 $16,432 2025 EAST BRANCH PKWY (EB) 30830E SHERWOOD WAY ENFIELD ST A 82 LIGHT MAINTENANCE 86 $19,325 2025 EAST BRANCH PKWY (WB) 30920W ARLINGTON WAY ENFIELD ST A 82 LIGHT MAINTENANCE 86 $25,729 2025 EAST BRANCH PKWY (WB) 30930W ENFIELD ST SHERWOOD WAY A 82 LIGHT MAINTENANCE 86 $21,088 Red = Low PCI Street
Purple = Low PCI Street during plan period
3/21/2022 4 of 11
4.1.d
Packet Pg. 40
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, Functional Class, and PCI ‐ Low to High) YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT PCI AFTER
STREETSAVER
EST.
COST/STREET
2025 PINE VALLEY RD 17250 BROADMOOR DR DAVONA DR C 69 LIGHT MAINTENANCE 71 $53,160 2025 PINE VALLEY RD 17230 THUNDERBIRD DR IRON HORSE TRAIL C 70 LIGHT MAINTENANCE 72 $32,738 2025 PINE VALLEY RD 17260 DAVONA DR TAREYTON AVE C 70 LIGHT MAINTENANCE 72 $16,343 2025 PINE VALLEY RD 17270 TAREYTON AVE SR VALLEY BLVD C 70 LIGHT MAINTENANCE 72 $5,586 2025 PINE VALLEY RD 17220 ALCOSTA BLVD THUNDERBIRD DR C 71 LIGHT MAINTENANCE 73 $33,205 2025 PINE VALLEY RD 17240 IRON HORSE TRAIL BROADMOOR DR C 71 HEAVY MAINTENANCE 73 $125,363 2025 SHERWOOD WAY 31000 WINDEMERE PKWY MORNINGTON LN C 73 LIGHT MAINTENANCE 76 $41,935 2025 SHERWOOD WAY 31010 MORNINGTON LN E BRANCH PKWY C 73 LIGHT MAINTENANCE 76 $46,586 2025 SUNNYSIDE PL 18910 OLD RANCH ESTATE DR END R 34 HEAVY MAINTENANCE 52 $45,819 2025 ALDERWOOD LN 10420 OLD RANCH ESTATE DR END R 42 HEAVY MAINTENANCE 56 $44,245 2025 SHIREOAKS PL 18570 W END OLD RANCH ESTATE DR R 42 HEAVY MAINTENANCE 56 $42,180 2025 BANCROFT PL 10890 OLD RANCH ESTATE DR END R 44 HEAVY MAINTENANCE 56 $51,112 2025 HOLBROOK PL 14910 OLD RANCH ESTATE DR END R 44 HEAVY MAINTENANCE 56 $45,370 2025 BLACKTHORNE CT 11190 OLD RANCH ESTATE DR END R 46 HEAVY MAINTENANCE 57 $40,449 2025 KNOLLCREST CT 15220 N END BLACKTHORN CT R 47 HEAVY MAINTENANCE 58 $57,784 2025 PEACEFUL VALLEY DR 17100 SUMMIT VIEW DR (N) SUMMIT VIEW DR (S) R 50 HEAVY MAINTENANCE 60 $87,957 2025 HEATHER RIDGE CT 14800 OLD RANCH ESTATE DR END R 51 HEAVY MAINTENANCE 61 $46,867 2025 SUMMIT VIEW DR 18870 OLD RANCH RD SHADY VALLEY CT R 51 HEAVY MAINTENANCE 61 $151,477 2025 SPRINGBROOK DR 18670 STONEY CREEK DR (N) STONEY CREEK DR (S) R 52 HEAVY MAINTENANCE 61 $108,708 2025 SUMMIT VIEW DR 18880 SHADY VALLEY CT LINDA VISTA CT R 54 HEAVY MAINTENANCE 62 $62,610 2025 WINGED FOOT PL 19700 FIRCREST LN WINGED FOOT CT R 54 HEAVY MAINTENANCE 63 $47,114 2025 BRIDGE CREEK DR 11620 STONEY CREEK DR (N) STONEY CREEK DR (S) R 57 HEAVY MAINTENANCE 65 $104,801 2025 COUNTRY CREEK CT 12840 STONEY CREEK DR END R 57 HEAVY MAINTENANCE 65 $21,471 2025 WINGED FOOT CT 19690 WINGED FOOT PL END R 57 HEAVY MAINTENANCE 65 $23,425 2025 WINGED FOOT PL 19710 WINGED FOOT CT END R 57 LIGHT REHABILITATION 100 $73,291 2025 ROYAL COACH CT 17700 OLD RANCH ESTATE DR END R 58 HEAVY MAINTENANCE 66 $33,652 2025 SHADY VALLEY CT 18520 SUMMIT VIEW DR END R 62 HEAVY MAINTENANCE 68 $44,799 2025 OAK VALLEY DR 16850 SUMMIT VIEW DR DOUGHERTY RD R 63 HEAVY MAINTENANCE 69 $42,344 2025 SUN RIDGE DR 18920 SUMMIT VIEW DR (N) SUMMIT VIEW DR (S) R 63 HEAVY MAINTENANCE 69 $116,522 2025 WOODLAND VALLEY DR 19830 SUMMIT VIEW DR (N) SUMMIT VIEW DR (S) R 63 HEAVY MAINTENANCE 69 $93,654 2025 STONEY CREEK DR 18760 OLD RANCH RD BENT CREEK DR (N) R 64 HEAVY MAINTENANCE 70 $214,592 2025 FIRCREST LN 14310 ALCOSTA BLVD WINGED FOOT PL R 66 LIGHT MAINTENANCE 72 $10,523 2025 LINDA VISTA CT 15450 SUMMIT VIEW DR END R 66 LIGHT MAINTENANCE 72 $4,116 2025 OLYMPIA FIELDS DR 16940 ALCOSTA BLVD THUNDERBIRD DR R 66 LIGHT MAINTENANCE 72 $63,397 2025 RIDGEPOINT CT 17570 OLD RANCH ESTATE DR END R 66 LIGHT MAINTENANCE 72 $8,686 2025 SCIOTA PL 18350 PEBBLE PL END R 67 LIGHT MAINTENANCE 73 $4,533 2025 THUNDERBIRD PL 19170 THUNDERBIRD DR END R 67 LIGHT MAINTENANCE 73 $36,594 2025 CHANCERY WAY 22120 E BRANCH PKWY YORK LN R 70 LIGHT MAINTENANCE 75 $17,071 2025 SUMMER VALLEY CT 18860 SUMMIT VIEW DR END R 70 LIGHT MAINTENANCE 75 $4,227 2025 TOM CT 19260 PINE VALLEY RD END R 70 LIGHT MAINTENANCE 76 $3,528 2025 AMES WAY 40000 WINDEMERE PKWY EMERSON LN R 71 LIGHT MAINTENANCE 76 $11,797 2025 BURNING TREE DR 11890 ALCOSTA BLVD THUNDERBIRD DR R 71 LIGHT MAINTENANCE 76 $29,986 2025 HARDING PL 14730 BURNING TREE DR END R 72 LIGHT MAINTENANCE 77 $9,250 2025 HAWTHORN CT 14780 OLD RANCH ESTATE DR END R 72 LIGHT MAINTENANCE 78 $3,343 2025 MURDOCK WAY 40190 EMERSON LN BENNINGTON WAY R 72 LIGHT MAINTENANCE 77 $11,934 2025 OLD RANCH ESTATES DR 16880 BLACKTHORN CT OLD RANCH RD R 72 HEAVY MAINTENANCE 77 $272,315 2025 PEBBLE PL 17120 THUNDERBIRD PL SCIOTA AVE R 72 LIGHT MAINTENANCE 77 $19,442 2025 PEBBLE PL 17130 SCIOTA AVE PEBBLE CT R 72 LIGHT MAINTENANCE 77 $24,935 2025 COLONIAL CT 12710 THUNDERBIRD PL END R 73 LIGHT MAINTENANCE 79 $4,899 2025 GOSHEN CT 14600 E END W END R 73 LIGHT MAINTENANCE 77 $13,834 2025 THUNDERBIRD DR 19160 BURNING TREE DR ALCOSTA BLVD R 73 LIGHT MAINTENANCE 79 $24,683 2025 BLUE MOUND CT 11250 BLUE MOUND DR END R 74 LIGHT MAINTENANCE 80 $4,696 2025 BURNING TREE CT 11880 BURNING TREE DR END R 74 LIGHT MAINTENANCE 79 $3,494 2025 CHANCERY WAY 22140 WYCLIFFE LN E BRANCH PKWY R 74 LIGHT MAINTENANCE 79 $13,132 2025 GOSHEN PL 14610 GOSHEN CT PINE VALLEY RD R 74 LIGHT MAINTENANCE 78 $5,014 2025 KEARNY WAY 31070 WINDEMERE PKWY KEATS LN R 74 LIGHT MAINTENANCE 79 $8,690 2025 POCONO MANOR PL 17340 BURNING TREE DR END R 74 LIGHT MAINTENANCE 80 $12,170 2025 REGENCY CT 17550 W END OLD RANCH ESTATE DR R 74 LIGHT MAINTENANCE 78 $7,458 2025 SHERWOOD CT 22170 SHERWOOD WAY END R 74 LIGHT MAINTENANCE 79 $7,401 Red = Low PCI Street
Purple = Low PCI Street during plan period
3/21/2022 5 of 11
4.1.d
Packet Pg. 41
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, Functional Class, and PCI ‐ Low to High) YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT PCI AFTER
STREETSAVER
EST.
COST/STREET
2025 TRIPOLI CT 19310 BLUE MOUND DR END R 74 LIGHT MAINTENANCE 79 $3,515 2025 BOCA RATON CT 11270 OLYMPIC FIELDS DR END R 75 LIGHT MAINTENANCE 80 $4,492 2025 BRYN MAWR CT 11850 OLYMPIA FIELDS DR END R 75 LIGHT MAINTENANCE 80 $4,288 2025 CHERRY HILLS LN 12510 OLYMPIA FIELDS DR N OLYMPIA FIELDS DR S R 75 LIGHT MAINTENANCE 81 $36,521 2025 OLYMPIA FIELDS CT 16930 OLYMPIA FIELDS DR END R 75 LIGHT MAINTENANCE 81 $3,474 2025 PEBBLE CT 17110 PEBBLE PL END R 75 LIGHT MAINTENANCE 81 $5,612 2025 PEBBLE PL 17140 PEBBLE CT PEBBLE PL R 75 LIGHT MAINTENANCE 81 $19,141 2025 THUNDERBIRD DR 19150 PINE VALLEY RD BURNING TREE DR R 75 LIGHT MAINTENANCE 81 $57,109 2025 ENFIELD ST 23290 E BRANCH PKWY THURLOW WAY R 76 LIGHT MAINTENANCE 80 $15,063 2025 KEARNY WAY 31060 WINDEMERE PKWY MURDOCK WAY R 76 LIGHT MAINTENANCE 81 $30,496 2025 PAIGE WAY 40210 ENFIELD ST KEARNY WAY R 76 LIGHT MAINTENANCE 81 $38,699 2025 ADAMS PL 10030 PINE VALLEY RD END R 77 LIGHT MAINTENANCE 83 $6,305 2025 BLUE MOUND DR 11260 BURNING TREE DR PINE VALLEY RD R 77 LIGHT MAINTENANCE 83 $33,740 2025 CHERRY HILLS CT 12500 CHERRY HILLS LN END R 77 LIGHT MAINTENANCE 83 $3,698 2025 HALIFAX WAY 22360 ENFIELD ST HOSKINS LN R 77 LIGHT MAINTENANCE 81 $28,314 2025 HASTINGS WAY 22370 YORK LN (W) YORK LN (E) R 77 LIGHT MAINTENANCE 81 $42,807 2025 JAMIE PL 22220 SHERWOOD WAY STONEHENGE WAY R 77 LIGHT MAINTENANCE 82 $16,355 2025 KEATS LN 22470 ENFIELD ST HALIFAX WAY R 77 LIGHT MAINTENANCE 81 $45,003 2025 LEIGH CT 15410 LYNNBROOK DR END R 77 LIGHT MAINTENANCE 82 $3,718 2025 QUIMBY CT 22180 CHANCERY WAY END R 77 LIGHT MAINTENANCE 82 $4,298 2025 ARLINGTON WAY 22030 MONTROSE WAY E BRANCH PKWY R 78 LIGHT MAINTENANCE 82 $2,549 2025 AVERY CT 22020 ENFIELD ST END R 78 LIGHT MAINTENANCE 82 $4,536 2025 BANBURY DR 22290 WYCLIFFE LN CHANCERY WAY R 78 LIGHT MAINTENANCE 83 $22,921 2025 CARRINGTON CT 22280 BAKER WAY END R 78 LIGHT MAINTENANCE 83 $12,057 2025 ENFIELD ST 22350 E BRANCH PKWY BARONS LN R 78 LIGHT MAINTENANCE 82 $26,263 2025 MURDOCK WAY 40180 KEARNY WAY EMERSON LN R 78 LIGHT MAINTENANCE 83 $25,491 2025 PRESTWICK CT 22630 KNIGHTSBRIDGE WAY END R 78 LIGHT MAINTENANCE 82 $9,192 2025 RODRIGUEZ CT 22660 HASTINGS WAY END R 78 LIGHT MAINTENANCE 82 $9,311 2025 STONEHENGE WAY 22800 YORK LN JAMIE PL R 78 LIGHT MAINTENANCE 82 $38,201 2025 WOODVIEW TERR DR (NB) 19860N OVERLOOK DR LYNNBROOK DR R 78 LIGHT MAINTENANCE 83 $17,462 2025 WOODVIEW TERR DR (SB) 19870S LYNNBROOK DR OVERLOOK DR R 78 LIGHT MAINTENANCE 83 $17,292 2025 YORK LN 21160 STONEHENGE WAY GLENCOE CIR R 78 LIGHT MAINTENANCE 82 $36,649 2025 ALDWYCH WAY 22000 BARONS LN ENFIELD ST R 79 LIGHT MAINTENANCE 83 $10,266 2025 ALVO CT 40290 ENFIELD ST END R 79 LIGHT MAINTENANCE 84 $3,244 2025 ARDEN CT 22380 WYCLIFFE LN END R 79 LIGHT MAINTENANCE 84 $2,865 2025 ARGYLE CT 22010 KNIGHTSBRIDGE WAY END R 79 LIGHT MAINTENANCE 83 $8,595 2025 ARLINGTON WAY 23280 E BRANCH PKWY THURLOW WAY R 79 LIGHT MAINTENANCE 83 $14,206 2025 BAKER WAY 22300 MORNINGTON LN SHERWOOD WAY R 79 LIGHT MAINTENANCE 84 $17,668 2025 BARONS LN 22070 ENFIELD ST (S) ENFIELD ST (N) R 79 LIGHT MAINTENANCE 83 $24,234 2025 BALMORAL WAY 40110 BENNINGTON WAY EMERSON LN R 79 LIGHT MAINTENANCE 83 $12,514 2025 BALMORAL WAY 40120 EMERSON LN HOLBORN WAY R 79 LIGHT MAINTENANCE 83 $22,200 2025 BENNINGTON WAY 40010 MURDOCK WAY KINGS RD R 79 LIGHT MAINTENANCE 83 $15,225 2025 BRIDLE CT 30180 OLD RANCH RD END R 79 LIGHT MAINTENANCE 84 $79,809 2025 CHANCERY WAY 22130 YORK LN SHERWOOD WAY R 79 LIGHT MAINTENANCE 83 $14,087 2025 DAWES CT 40030 KINGS RD END R 79 LIGHT MAINTENANCE 83 $12,282 2025 EDGEWARE CT 22340 MONTROSE WAY END R 79 LIGHT MAINTENANCE 83 $10,505 2025 EMERSON LN 40090 MURDOCK WAY HOLBORN WAY R 79 LIGHT MAINTENANCE 83 $28,063 2025 EMERSON LN 40100 HOLBORN WAY BALMORAL WAY R 79 LIGHT MAINTENANCE 83 $26,279 2025 ENFIELD ST 40230 THURLOW WAY PAIGE WAY R 79 LIGHT MAINTENANCE 84 $33,138 2025 GLENCOE CIR 22260 HASTINGS WAY YORK LN R 79 LIGHT MAINTENANCE 84 $35,455 2025 HARLOW LN 22250 MORNINGTON LN BAKER WAY R 79 LIGHT MAINTENANCE 84 $18,539 2025 HOSKINS LN 22410 ENFIELD ST HALIFAX WAY R 79 LIGHT MAINTENANCE 83 $42,140 2025 JAMIE CT 22230 STONEHENGE WAY END R 79 LIGHT MAINTENANCE 84 $4,298 2025 KINGS RD 40040 EMERSON WAY BENNINGTON WAY R 79 LIGHT MAINTENANCE 83 $12,236 2025 KNIGHTSBRIDGE CT 22480 HIGHBURY WAY END R 79 LIGHT MAINTENANCE 83 $5,133 2025 KNIGHTSBRIDGE WAY 22490 BARONS LN MONTROSE WAY R 79 LIGHT MAINTENANCE 83 $10,983 2025 KNIGHTSBRIDGE WAY 23300 MONTROSE WAY HIGHBURY WAY R 79 LIGHT MAINTENANCE 83 $15,877 2025 KENNARD LN 40060 KINGS RD HOLBORN WAY R 79 LIGHT MAINTENANCE 83 $9,918 2025 LAMBETH WAY 40250 THURLOW WAY FENWICK WAY R 79 LIGHT MAINTENANCE 84 $17,380 Red = Low PCI Street
Purple = Low PCI Street during plan period
3/21/2022 6 of 11
4.1.d
Packet Pg. 42
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, Functional Class, and PCI ‐ Low to High) YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT PCI AFTER
STREETSAVER
EST.
COST/STREET
2025 LYNNBROOK DR 15650 WOODLAND DR WOODVIEW TERR DR R 79 LIGHT MAINTENANCE 84 $11,221 2025 MORNINGTON LN 30580 SHERWOOD WAY HARLOW LN R 79 LIGHT MAINTENANCE 84 $40,421 2025 MORNINGTON CT 22190 BAKER WAY END R 79 LIGHT MAINTENANCE 84 $7,760 2025 PERCY LN 40560 ENFIELD ST KEATS LN R 79 LIGHT MAINTENANCE 84 $14,089 2025 RIVIERA PL 17620 PINE VALLEY RD END R 79 LIGHT MAINTENANCE 84 $10,391 2025 SCIOTA AVE 18340 PEBBLE PL THUNDERBIRD DR R 79 LIGHT MAINTENANCE 83 $6,581 2025 SHERWOOD WAY 31020 STONEHENGE WAY CHANCERY WAY R 79 LIGHT MAINTENANCE 84 $19,100 2025 SHERWOOD WAY 31030 CHANCERY WAY E BRANCH PKWY R 79 LIGHT MAINTENANCE 84 $27,696 2025 WOODLAND DR 19820 ALCOSTA BLVD END R 79 LIGHT MAINTENANCE 84 $28,788 2025 WYCLIFFE LN 22150 INGLETON WAY CHANCERY WAY R 79 LIGHT MAINTENANCE 84 $23,637 2025 ALDGATE WAY 40200 SHERWOOD WAY PAIGE WAY R 80 LIGHT MAINTENANCE 85 $3,476 2025 ARLINGTON WAY 40240 THURLOW WAY PERCY LN R 80 LIGHT MAINTENANCE 85 $21,528 2025 BALMORAL CT 40050 KENNARD LN END R 80 LIGHT MAINTENANCE 85 $9,269 2025 BALMORAL WAY 40130 HOLBORN WAY PENZANCE WAY R 80 LIGHT MAINTENANCE 85 $18,376 2025 BALMORAL WAY 40140 PENZANCE WAY KENNARD RD R 80 LIGHT MAINTENANCE 85 $30,542 2025 CLIFTON CT 22270 BAKER WAY END R 80 LIGHT MAINTENANCE 85 $9,908 2025 DALTON WAY 30290 SHERWOOD WAY END R 80 LIGHT MAINTENANCE 85 $15,016 2025 EMBLETON LN 30330 MORNINGTON LN VERNON WAY R 80 LIGHT MAINTENANCE 85 $6,720 2025 FENWICK WAY 40260 ENFIELD ST ARLINGTON WAY R 80 LIGHT MAINTENANCE 85 $9,269 2025 FARRINGDON WY 40270 ENFIELD ST LAMBETH WAY R 80 LIGHT MAINTENANCE 85 $6,373 2025 HOLBORN WAY 40160 WINDEMERE PKWY KENNARD LN R 80 LIGHT MAINTENANCE 85 $20,175 2025 INGLETON WAY 22240 WYCLIFFE LN E BRANCH PKWY R 80 LIGHT MAINTENANCE 85 $4,632 2025 MELBOURNE WAY 30520 SHERWOOD WAY MORNINGTON LN R 80 LIGHT MAINTENANCE 85 $16,569 2025 MILTON CT 22200 WYCLIFFE LN END R 80 LIGHT MAINTENANCE 85 $3,258 2025 MORNINGTON LN 30581 HARLOW LN BAKER WAY R 80 LIGHT MAINTENANCE 85 $6,446 2025 OLIVIA CT 40150 BALMORAL WAY END R 80 LIGHT MAINTENANCE 85 $3,476 2025 PAIGE CT 40220 KEARNY WAY END R 80 LIGHT MAINTENANCE 85 $9,410 2025 SALISBURY WAY 30630 MORNINGTON LN MELBOURNE WAY R 80 LIGHT MAINTENANCE 85 $15,410 2025 THURLOW WAY 40280 ENFIELD ST ARLINGTON WAY R 80 LIGHT MAINTENANCE 85 $13,848 2025 VERNON WAY 30750 MELBOURNE WAY MORNINGTON LN R 80 LIGHT MAINTENANCE 85 $14,530 2025 WYCLIFFE CT 22160 INGLETON WAY END R 80 LIGHT MAINTENANCE 85 $9,073 2025 HIGHBURY WAY 22390 MONTROSE WAY KNIGHTSBRIDGE WAY R 81 LIGHT MAINTENANCE 84 $9,311 2025 MANDY WAY 22210 STONEHENGE WAY CHANCERY WAY R 81 LIGHT MAINTENANCE 86 $23,899 2025 MONTROSE WAY 22580 KNIGHTSBRIDGE WAY EDGEWATER CT R 81 LIGHT MAINTENANCE 84 $20,055 2025 PEMBROKE CT 22600 HOLBORN WAY END R 81 LIGHT MAINTENANCE 84 $4,494 2025 PEMBROKE WAY 22610 HOLBORN WAY (W) PEMBROKE CT R 81 LIGHT MAINTENANCE 84 $21,966 2025 ALCOSTA CT 10410 ALCOSTA BLVD END R 82 LIGHT MAINTENANCE 86 $6,671 2025 EMERSON LN 40080 KEARNY WAY MURDOCK WAY R 82 LIGHT MAINTENANCE 87 $16,801 2025 HILLTOP CT 14900 WOODVIEW TERR DR END R 82 LIGHT MAINTENANCE 86 $5,775 2025 HOLBORN WAY 22400 KNIGHTSBRIDGE WAY WINDEMERE PKWY R 82 LIGHT MAINTENANCE 87 $35,687 2025 LANSFORD CT 15300 WOODVIEW TERR DR END R 82 LIGHT MAINTENANCE 86 $8,300 2025 LONE PINE CT 15560 WOODVIEW TERR DR END R 82 LIGHT MAINTENANCE 87 $10,866 2025 LONGWOOD CT 15590 WOODVIEW TERR DR END R 82 LIGHT MAINTENANCE 86 $10,805 2025 LYNNBROOK CT 15640 WOODVIEW TERR DR END R 82 LIGHT MAINTENANCE 86 $3,609 2025 MONTROSE CT 22570 KNIGHTSBRIDGE WAY END R 82 LIGHT MAINTENANCE 85 $9,101 2025 OVERLOOK CT 16990 WOODVIEW TERR DR END R 82 LIGHT MAINTENANCE 86 $7,820 2025 OVERLOOK DR 17000 WOODVIEW TERR DR ALCOSTA BLVD R 82 LIGHT MAINTENANCE 86 $8,908 2025 PENZANCE WAY 40170 BALMORAL WAY EMERSON LANE R 82 LIGHT MAINTENANCE 87 $6,025 2025 RIDGEVIEW CT 17580 WOODVIEW TERR DR END R 82 LIGHT MAINTENANCE 86 $10,561 2025 SPALDING CT 40020 BENNINGTON WAY END R 82 LIGHT MAINTENANCE 87 $6,952 2025 WOODLAND CT 19810 WOODLAND DR END R 82 LIGHT MAINTENANCE 86 $5,091 2025 WOODVIEW CIR 19840 WOODVIEW TERR DR OVERLOOK DR R 82 LIGHT MAINTENANCE 86 $16,839 2025 WOODVIEW CT 19850 WOODVIEW CIR END R 82 LIGHT MAINTENANCE 86 $4,044 2025 KENNARD LN 40070 HOLBORN WAY BALMORAL WAY R 83 LIGHT MAINTENANCE 88 $18,655 $5,378,482
2026 SAN RAMON VLY BLVD (SB) 18090S CITY LIMIT DEERWOOD RD A 63 HEAVY MAINTENANCE 66 $373,126 2026 SAN RAMON VLY BLVD (SB) 18100S DEERWOOD RD CROW CANYON RD A 63 HEAVY MAINTENANCE 66 $203,710 2026 SAN RAMON VLY BLVD (NB) 17960N 680 RAMPS PINE VALLEY RD A 65 HEAVY MAINTENANCE 68 $518,237 2026 SAN RAMON VLY BLVD (NB) 18080N FASTORIA WAY CITY LIMIT A 66 HEAVY MAINTENANCE 70 $373,126 Red = Low PCI Street
Purple = Low PCI Street during plan period
3/21/2022 7 of 11
4.1.d
Packet Pg. 43
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, Functional Class, and PCI ‐ Low to High) YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT PCI AFTER
STREETSAVER
EST.
COST/STREET
2026 SAN RAMON VLY BLVD (SB) 18180S MONTEVIDEO DR WESTSIDE DR A 67 HEAVY MAINTENANCE 68 $84,359 2026 SAN RAMON VLY BLVD (SB) 18185S WESTSIDE DR PINE VALLEY RD A 67 HEAVY MAINTENANCE 68 $366,369 2026 WINDEMERE PKWY (WB) 20240W S BELLINGHAM WAY BOLLINGER CYN RD A 67 HEAVY MAINTENANCE 70 $128,146 2026 SAN RAMON VLY BLVD (NB) 17985N WESTSIDE DR MONTEVIDEO DR A 68 HEAVY MAINTENANCE 71 $84,359 2026 SAN RAMON VLY BLVD (NB) 17975N PINE VALLEY RD WESTSIDE DR A 69 HEAVY MAINTENANCE 72 $364,494 2026 SAN RAMON VLY BLVD (SB) 18210S PINE VALLEY RD 680 RAMP A 69 HEAVY MAINTENANCE 72 $498,320 2026 SAN RAMON VLY BLVD (SB) 18220S 680 RAMPS ALCOSTA BLVD A 69 HEAVY MAINTENANCE 72 $66,237 2026 SAN RAMON VLY BLVD (NB) 18060N CROW CANYON RD FOSTORIA WAY A 70 HEAVY MAINTENANCE 71 $171,905 2026 WINDEMERE PKWY (EB) 20120E BOLLINGER CYN RD S BELLINGHAM WAY A 72 HEAVY MAINTENANCE 73 $135,500 2026 SAN RAMON VLY BLVD (NB) 17950N ALCOSTA BLVD 680 RAMP A 75 HEAVY MAINTENANCE 77 $73,719 2026 SAN RAMON VLY BLVD (NB) 18040N NORRIS CANYON RD CROW CANYON RD A 75 HEAVY MAINTENANCE 78 $252,057 2026 WINDEMERE PKWY (EB) 20110E ROCKHAMPTON RD BOLLINGER CYN RD A 76 HEAVY MAINTENANCE 77 $37,002 $3,730,666
2027 BROADMOOR DR 11650 DUNBARTON CIR (N) ASCOT DR (S) C 68 HEAVY MAINTENANCE 65 $177,712 2027 BROADMOOR DR 11690 MILLBRIDGE DR WESTCHESTER DR C 69 LIGHT MAINTENANCE 66 $19,586 2027 BROADMOOR DR 11770 BELLE MEADE DR (S) ALCOSTA BLVD C 69 HEAVY MAINTENANCE 66 $25,515 2027 BROADMOOR DR 11700 WESTCHESTER DR SPRINGDALE LN C 71 LIGHT MAINTENANCE 73 $28,125 2027 MONTEVIDEO DR 16340 BROADMOOR DR IRON HORSE TRAIL C 73 HEAVY MAINTENANCE 75 $100,497 2027 BROADMOOR DR 11670 MONTEVIDEO DR ST DENIS DR C 75 LIGHT MAINTENANCE 72 $38,692 2027 BROADMOOR DR 11680 ST DENIS DR MILLBRIDGE DR C 75 LIGHT MAINTENANCE 76 $35,250 2027 BROADMOOR DR 11710 SPRINGDALE LN PINE VALLEY RD C 75 LIGHT MAINTENANCE 77 $27,085 2027 MONTEVIDEO DR 16360 IRON HORSE TRAIL COLIMA AVE C 75 LIGHT MAINTENANCE 78 $56,771 2027 MONTEVIDEO DR 16380 MEADOWOOD CIR ALCOSTA BLVD C 75 HEAVY MAINTENANCE 78 $73,639 2027 BROADMOOR DR 11660 ASCOT DR MONTEVIDEO DR C 76 HEAVY MAINTENANCE 77 $89,319 2027 BROADMOOR DR 11760 BELLE MEADE DR (N) BELLE MEADE DR (S) C 76 LIGHT MAINTENANCE 73 $28,896 2027 MONTEVIDEO DR 16370 COLIMA AVE MEADOWOOD CIR C 77 LIGHT MAINTENANCE 79 $10,674 2027 WESTSIDE DR 19910 SOUTHWICK DR BREVENSVILLE DR C 78 LIGHT MAINTENANCE 75 $54,719 2027 MONTEVIDEO DR 16330 TAREYTON AVE BROADMOOR DR C 79 LIGHT MAINTENANCE 82 $73,634 2027 WESTSIDE DR 19900 SR VALLEY BLVD SOUTHWICK DR C 79 LIGHT MAINTENANCE 77 $19,139 2027 WESTSIDE DR 19920 BREVENSVILLE DR PALMER ST C 79 LIGHT MAINTENANCE 77 $13,418 2027 WESTSIDE DR 19970 WOODBOROUGH WAY SR VALLEY BLVD C 79 LIGHT MAINTENANCE 77 $32,327 2027 DAVONA DR 030 WESTCHESTER DR PINE VALLEY RD C 80 LIGHT MAINTENANCE 78 $43,095 2027 MONTEVIDEO DR 16325 SR VALLEY BLVD TAREYTON AVE C 80 LIGHT MAINTENANCE 81 $7,015 2027 WESTSIDE DR 19930 PALMER ST MAJESTIC OAK CT C 80 LIGHT MAINTENANCE 78 $62,614 2027 WESTSIDE DR 19940 MAJESTIC OAK CT WINDING CREEK WAY C 80 LIGHT MAINTENANCE 78 $36,081 2027 WESTSIDE DR 19950 WINDING CREEK WAY DUBERSTEIN DR C 80 LIGHT MAINTENANCE 78 $39,232 2027 PINE VALLEY PL 30600 WESTSIDE DR END C 81 LIGHT MAINTENANCE 79 $21,190 2027 WESTSIDE DR 19960 DUBERSTEIN DR WOODBOROUGH WAY C 81 LIGHT MAINTENANCE 79 $16,314 2027 DAVONA DR 080 NORTHLAND AVE MAY WAY C 86 LIGHT MAINTENANCE 86 $14,862 2027 DAVONA DR 090 MAY WAY BLUE FOX WAY C 86 LIGHT MAINTENANCE 86 $32,010 2027 DAVONA DR 100 BLUE FOX WAY ALCOSTA BLVD C 86 LIGHT MAINTENANCE 86 $47,028 2027 DAVONA DR 010 MONTEVIDEO DR YARMOUTH WAY C 87 LIGHT MAINTENANCE 89 $25,750 2027 DAVONA DR 020 YARMOUTH WAY WESTCHESTER DR C 87 LIGHT MAINTENANCE 89 $50,434 2027 DEXTER PL 13620 MILO WAY END R 37 HEAVY REHABILITATION 100 $110,166 2027 MONTEVIDEO CT 16320 MONTEVIDEO DR END R 37 HEAVY REHABILITATION 100 $32,718 2027 HARDWICK PL 14740 MILLBRIDGE DR END R 39 HEAVY REHABILITATION 100 $63,240 2027 BROADMOOR CT 11640 BROADMOOR DR END R 41 HEAVY REHABILITATION 100 $99,418 2027 NORTHLAND PL 16780 MAY WAY END R 44 HEAVY REHABILITATION 100 $47,236 2027 BELLE MEADE DR 11010 BROADMOOR DR ALCOSTA BLVD R 45 HEAVY REHABILITATION 100 $156,449 2027 BRAEBURN CT 11560 BROADMOOR DR END R 45 HEAVY REHABILITATION 100 $44,228 2027 NEWPORT AVE 16530 BROADMOOR DR RUTLAND CT R 45 HEAVY REHABILITATION 100 $71,128 2027 BELLE MEADE PL 11020 BELLE MEADE DR END R 53 HEAVY MAINTENANCE 60 $71,218 2027 KENT PL 15120 KENT WAY N END R 53 HEAVY MAINTENANCE 58 $31,128 2027 LUDLOW PL 15620 MILLBRIDGE DR END R 54 HEAVY MAINTENANCE 60 $60,514 2027 NEWPORT AVE 16540 RUTLAND CT BRUNSWICK WAY R 54 LIGHT REHABILITATION 100 $59,230 2027 PARLIN PL 17090 TAREYTON AVE END R 55 HEAVY MAINTENANCE 62 $16,419 2027 MILO WAY 16240 DAVONA DR BRUNSWICK WAY R 56 LIGHT REHABILITATION 100 $139,340 2027 MILLBRIDGE DR 16200 BROADMOOR DR MILO WAY R 57 HEAVY MAINTENANCE 61 $209,947 2027 METAIRE PL 16170 BELLE MEADE DR END R 58 HEAVY MAINTENANCE 63 $61,531 Red = Low PCI Street
Purple = Low PCI Street during plan period
3/21/2022 8 of 11
4.1.d
Packet Pg. 44
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, Functional Class, and PCI ‐ Low to High) YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT PCI AFTER
STREETSAVER
EST.
COST/STREET
2027 MILO PL 16230 MILO WAY END R 58 HEAVY MAINTENANCE 62 $44,290 2027 BERNARD AVE 11110 BROADMOOR DR KITTERY AVE R 59 HEAVY MAINTENANCE 64 $115,436 2027 BRIDGEPORT AVE 11610 TAREYTON AVE DAVONA DR R 61 HEAVY MAINTENANCE 64 $41,083 2027 CALAIS DR 020 COLL CT MENNET WAY R 61 HEAVY MAINTENANCE 64 $60,974 2027 ST BENEDICT CT 18720 TAREYTON AVE END R 61 HEAVY MAINTENANCE 66 $33,283 2027 ST DENIS CT 18730 ST DENIS DR END R 61 HEAVY MAINTENANCE 65 $32,315 2027 BRUNSWICK WAY 11820 MILLBRIDGE DR ST DENIS DR R 62 HEAVY MAINTENANCE 65 $147,319 2027 BELLE MEADE DR 11000 BROADMOOR DR (N) BROADMOOR DR (S) R 63 HEAVY MAINTENANCE 66 $214,198 2027 BLUE FOX WAY 11230 DAVONA DR NORTHLAND AVE R 63 HEAVY MAINTENANCE 67 $193,908 2027 BRUNSWICK CT 11810 ST DENIS DR END R 63 HEAVY MAINTENANCE 67 $82,118 2027 CALAIS DR 010 WESTCHESTER DR COLL CT R 63 HEAVY MAINTENANCE 66 $82,877 2027 MENNET WAY 16100 WESTCHESTER DR CALAIS DR R 63 HEAVY MAINTENANCE 66 $81,693 2027 METAIRE CT 16160 BELLE MEADE DR END R 63 HEAVY MAINTENANCE 68 $17,787 2027 KITTERY AVE 15200 BROADMOOR DR (N) BROADMOOR DR (S) R 64 HEAVY MAINTENANCE 69 $323,930 2027 MEDINAH CT 16080 BELLE MEADE DR END R 65 HEAVY MAINTENANCE 70 $17,704 2027 NORTHLAND PL 16790 DAVONA DR MAY WAY R 66 HEAVY MAINTENANCE 69 $90,987 2027 YARMOUTH WAY 19050 DAVONA DR TAREYTON AVE R 67 HEAVY MAINTENANCE 70 $59,525 2027 BOWLIN AVE 11540 DAVONA DR TAREYTON AVE R 68 HEAVY MAINTENANCE 70 $39,071 2027 CALAIS DR 040 GORHAM PL DAVONA DR R 68 LIGHT MAINTENANCE 70 $5,563 2027 CORRINNE CT 12810 CORRINNE PL END R 68 HEAVY MAINTENANCE 71 $43,145 2027 CORRINNE PL 12820 DAVONA DR END R 68 HEAVY MAINTENANCE 71 $109,262 2027 WINSLOW PL 19730 TAREYTON AVE END R 68 HEAVY MAINTENANCE 71 $27,896 2027 BALTUSROL PL 10880 BROADMOOR DR END R 69 LIGHT MAINTENANCE 71 $11,494 2027 BELFAST PL 10980 WESTCHESTER DR END R 69 LIGHT MAINTENANCE 73 $6,252 2027 BIDDLEFORD DR 11140 WESTCHESTER DR (E) WESTCHESTER DR (W) R 69 LIGHT MAINTENANCE 73 $50,855 2027 FOXCROFT PL 14480 BIDDLEFORD DR END R 69 LIGHT MAINTENANCE 73 $6,779 2027 PRENTISS PL 17420 BIDDLEFORD DR END R 69 LIGHT MAINTENANCE 73 $7,214 2027 WATERBURY PL 19510 TAREYTON AVE END R 69 HEAVY MAINTENANCE 73 $23,084 2027 BALTUSROL CT 10870 BALTUSROL PL END R 70 LIGHT MAINTENANCE 72 $4,718 2027 BELINDA CT 10990 CORRINNE ST END R 70 LIGHT MAINTENANCE 74 $3,396 2027 CORRINNE ST 12830 DAVONA DR BROCKTON AVE R 70 LIGHT MAINTENANCE 74 $25,097 2027 DUKE WAY 13890 CORRINNE PL DAVONA DR R 70 LIGHT MAINTENANCE 74 $5,417 2027 GORHAM PL 14590 CALAIS DR WESTCHESTER DR R 70 HEAVY MAINTENANCE 72 $74,352 2027 SAND POINT DR 17850 BELLE MEADE DR NORTHLAND AVE R 70 LIGHT MAINTENANCE 74 $26,533 2027 SHAW PL 18540 WESTCHESTER DR END R 70 HEAVY MAINTENANCE 74 $57,081 2027 BRIAN CT 11600 CORRINNE ST END R 71 LIGHT MAINTENANCE 75 $10,459 2027 CRESTWOOD PL 12900 SPRINGDALE LN END R 71 LIGHT MAINTENANCE 74 $4,818 2027 ERNWOOD PL 14070 BLUE FOX WAY END R 71 LIGHT MAINTENANCE 74 $10,825 2027 RANDOLPH PL 17490 TAREYTON AVE END R 71 LIGHT MAINTENANCE 74 $5,666 2027 CALAIS DR 030 MENNET WAY GORHAM PL R 72 LIGHT MAINTENANCE 73 $17,549 2027 NEAD PL 16500 TAREYTON AVE END R 72 LIGHT MAINTENANCE 76 $6,833 2027 POWNAL AVE 17410 TAREYTON AVE DAVONA DR R 72 LIGHT MAINTENANCE 73 $9,311 2027 WESTCHESTER DR 19540 BROADMOOR DR CALAIS DR R 72 HEAVY MAINTENANCE 75 $29,480 2027 ALTON PL 10460 WESTCHESTER DR END R 73 LIGHT MAINTENANCE 76 $6,994 2027 CHAPPARAL CT 30210 WESTSIDE DR END R 73 LIGHT MAINTENANCE 74 $20,963 2027 COLL CT 12690 CALAIS DR END R 73 LIGHT MAINTENANCE 75 $4,757 2027 MAY CT 16030 MAY WAY END R 73 LIGHT MAINTENANCE 76 $3,181 2027 MILBURN CT 16190 BELLE MEADE DR END R 73 LIGHT MAINTENANCE 75 $5,137 2027 PETAR PL 17180 KITTERY AVE END R 73 LIGHT MAINTENANCE 76 $3,471 2027 VENTURA PL 19430 SPRINGDALE LN END R 73 LIGHT MAINTENANCE 76 $4,818 2027 CIRCLE E RANCH PL 30220 WESTSIDE DR END R 74 LIGHT MAINTENANCE 75 $11,080 2027 ETHAN CT 14110 DAVONA DR END R 74 LIGHT MAINTENANCE 77 $5,091 2027 FOXBORO CT 14430 TODD WAY END R 74 LIGHT MAINTENANCE 78 $5,836 2027 VAN BUREN PL 19410 BERNARD AVE VAN BUREN PL (CDS) R 74 HEAVY MAINTENANCE 78 $16,978 2027 WESTCHESTER DR 19550 CALAIS DR DAVONA DR R 74 HEAVY MAINTENANCE 78 $129,125 2027 ANDOVER PL 10520 TAREYTON AVE END R 75 LIGHT MAINTENANCE 77 $3,311 2027 BATH CT 10950 BIDDLEFORD DR END R 75 LIGHT MAINTENANCE 79 $3,474 2027 ELISHA LN 14010 MINERVA WAY W END R 75 LIGHT MAINTENANCE 76 $8,925 2027 GREGG PL 14680 KITTERY AVE END R 75 LIGHT MAINTENANCE 79 $8,512 Red = Low PCI Street
Purple = Low PCI Street during plan period
3/21/2022 9 of 11
4.1.d
Packet Pg. 45
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, Functional Class, and PCI ‐ Low to High) YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT PCI AFTER
STREETSAVER
EST.
COST/STREET
2027 HERITAGE PL 14840 KITTERY AVE END R 75 LIGHT MAINTENANCE 78 $4,983 2027 HUNTINGTON PL 14960 BROADMOOR DR END R 75 LIGHT MAINTENANCE 78 $4,688 2027 KITTERY PL 15210 KITTERY AVE END R 75 LIGHT MAINTENANCE 78 $9,868 2027 LEXINGTON PL 15430 KITTERY AVE END R 75 LIGHT MAINTENANCE 78 $6,467 2027 LINFORD PL 15470 SPRINGDALE LN END R 75 LIGHT MAINTENANCE 78 $4,859 2027 MARILYN PL 15880 SPRINGDALE LN END R 75 LIGHT MAINTENANCE 79 $5,062 2027 MAVIS PL (CDS) 16000 W END E END R 75 LIGHT MAINTENANCE 78 $9,311 2027 ONA CT 16980 BIDDLEFORD DR END R 75 LIGHT MAINTENANCE 79 $3,535 2027 RAMON PL 17480 BROADMOOR DR END R 75 LIGHT MAINTENANCE 79 $8,443 2027 RIVIERA WY 17630 KITTERY AVE BROADMOOR DR R 75 LIGHT MAINTENANCE 79 $40,015 2027 SPRINGDALE LN 18690 BROADMOOR DR DAVONA DR R 75 LIGHT MAINTENANCE 79 $43,520 2027 SPRINGDALE LN 18700 DAVONA DR TAREYTON AVE R 75 LIGHT MAINTENANCE 79 $11,077 2027 ST MICHAEL CT 18750 TAREYTON AVE END R 75 LIGHT MAINTENANCE 77 $6,272 2027 VAN BUREN PL (CDS) 19420 E END W END R 75 LIGHT MAINTENANCE 79 $13,883 2027 WEATHERLY PL 19530 SPRINGDALE LN END R 75 LIGHT MAINTENANCE 78 $4,859 2027 WINDSOR WAY 19670 N END S END R 75 LIGHT MAINTENANCE 77 $28,403 2027 BIGELOW PL 11150 TAREYTON AVE END R 76 LIGHT MAINTENANCE 78 $3,779 2027 CRESTED OAK CT 30270 WESTSIDE DR END R 76 LIGHT MAINTENANCE 77 $8,381 2027 KINGSLEY PL 15190 SPRINGDALE LN END R 76 LIGHT MAINTENANCE 79 $4,879 2027 MADORA PL 15680 INTERLACHEN AVE END R 76 LIGHT MAINTENANCE 79 $13,656 2027 MONTCLAIR PL 16310 SPRINGDALE LN END R 76 LIGHT MAINTENANCE 79 $3,910 2027 WOODBOROUGH WAY 19800 WESTSIDE DR SR VALLEY BLVD R 76 LIGHT MAINTENANCE 77 $18,075 2027 CHRISTOPHER WAY 12550 WINDSOR WAY MAVIS PL R 78 LIGHT MAINTENANCE 81 $11,818 2027 NOB PL 16570 DAVONA DR END R 78 LIGHT MAINTENANCE 79 $3,413 2027 ST PIERRE CT 18790 DAVONA DR END R 78 LIGHT MAINTENANCE 80 $11,559 2027 BREWIN LN 11590 WESTSIDE DR FOSTER DR R 79 LIGHT MAINTENANCE 80 $14,511 2027 LONE TREE CT 20320 LONE TREE LN SR VALLEY BLVD R 79 LIGHT MAINTENANCE 80 $9,670 2027 MARA PL 15800 TODD WAY END R 79 LIGHT MAINTENANCE 82 $6,761 2027 MAVIS PL 16010 CHRISTOPHER WAY MAVIS PL (CDS) R 79 LIGHT MAINTENANCE 82 $5,205 2027 KENT PL 15110 S END KENT WAY R 80 LIGHT MAINTENANCE 83 $19,290 2027 WINDING CREEK WAY 20340 WESTSIDE DR CITY LIMIT R 80 LIGHT MAINTENANCE 81 $43,215 2027 YALE CT 16795 NORTHLAND PL END R 80 LIGHT MAINTENANCE 83 $3,270 2027 CENTURY OAKS CT 30200 WESTSIDE DR END R 81 LIGHT MAINTENANCE 84 $23,510 2027 DIAMOND RANCH CT 20300 HENRY RANCH DR END R 81 LIGHT MAINTENANCE 82 $7,045 2027 DUNCAN HILL CT 13920 WESTSIDE DR E END R 81 LIGHT MAINTENANCE 82 $3,599 2027 FOUR OAKS HOLLOW 14420 WESTSIDE DR W END R 81 LIGHT MAINTENANCE 82 $11,752 2027 HENRY RANCH DR 20310 WINDING CREEK WAY W END R 81 LIGHT MAINTENANCE 82 $21,727 2027 HURST CT 14970 PALMER ST END R 81 LIGHT MAINTENANCE 82 $18,863 2027 MAJESTIC OAK CT 30510 WESTSIDE DR END R 81 LIGHT MAINTENANCE 82 $17,023 2027 MINERVA WAY 16250 WOODBOROUGH WAY END R 81 LIGHT MAINTENANCE 82 $20,346 2027 STOW CT 18780 PALMER ST END R 81 LIGHT MAINTENANCE 82 $15,526 2027 TALUS CT 30730 WESTSIDE DR END R 81 LIGHT MAINTENANCE 82 $5,916 2027 TAREYTON AVE 19035 MONTEVIDEO DR PINE VALLEY RD R 81 LIGHT MAINTENANCE 83 $100,492 2027 WELFORD RANCH CT 20330 WESTSIDE DR N END (CDS) R 81 LIGHT MAINTENANCE 82 $5,976 2027 WINDMILL CT 20350 WESTSIDE DR N END (CDS) R 81 LIGHT MAINTENANCE 82 $4,637 2027 AMHERST CT 10480 NORTHLAND AVE END R 82 LIGHT MAINTENANCE 84 $10,866 2027 BREWIN CT 11580 BREWIN LN END R 82 LIGHT MAINTENANCE 83 $4,449 2027 CASSANDRA PL 12380 BROCKTON AVE END R 82 LIGHT MAINTENANCE 85 $14,504 2027 CHRISTOPHER WAY 12560 MAVIS PL BROADMOOR DR R 82 LIGHT MAINTENANCE 86 $8,165 2027 CINDY CT 12570 APTOS WAY END R 82 LIGHT MAINTENANCE 84 $7,954 2027 MADELIA PL 15670 BROCKTON AVE END R 82 LIGHT MAINTENANCE 85 $16,561 2027 TERRACED HILLS WAY 20410 LA COUNT LN LONE TREE CT R 82 LIGHT MAINTENANCE 83 $28,030 2027 TODD WAY 19210 BROADMOOR DR WINDSOR WAY R 82 LIGHT MAINTENANCE 85 $18,909 2027 WESTSIDE CT 30790 WESTSIDE DR END R 82 LIGHT MAINTENANCE 83 $11,538 2027 BREVENSVILLE DR 11570 WESTSIDE DR END (CDS) R 83 LIGHT MAINTENANCE 83 $14,182 2027 COMSTOCK CT 12620 CENTENNIAL WAY END R 83 LIGHT MAINTENANCE 83 $5,856 2027 CENTENNIAL WAY 12630 WESTSIDE DR (W) WESTSIDE DR (E) R 83 LIGHT MAINTENANCE 83 $31,979 2027 CONNICK CT 12750 FOSTER DR END R 83 LIGHT MAINTENANCE 83 $12,629 2027 DEVON CT 13600 NORTHLAND AVE END R 83 LIGHT MAINTENANCE 86 $7,555 Red = Low PCI Street
Purple = Low PCI Street during plan period
3/21/2022 10 of 11
4.1.d
Packet Pg. 46
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update) City of San Ramon
5‐YR Pavement Management Plan
FY 2021/2022 ‐ 2026/2027
(Sorted by Construction Year, Functional Class, and PCI ‐ Low to High) YEAR ROAD NAME SECTION ID BEGIN LOCATION END LOCATION FC PCI STREETSAVER EST.
TREATMENT PCI AFTER
STREETSAVER
EST.
COST/STREET
2027 FOSTER DR 14340 WESTSIDE DR BREWIN LN R 83 LIGHT MAINTENANCE 83 $24,859 2027 PALMER ST 17060 STOW CT WESTSIDE DR R 83 LIGHT MAINTENANCE 83 $13,441 2027 WESTSIDE PL 30810 WESTSIDE DR END R 83 LIGHT MAINTENANCE 83 $2,895 2027 BROCKTON AVE 11780 BLUE FOX WAY INTERLACHEN AVE R 85 LIGHT MAINTENANCE 88 $20,300 2027 APTOS CT 10570 APTOS WAY END R 87 LIGHT MAINTENANCE 89 $4,756 2027 BLUE FOX WAY 11220 KENT PL DAVONA DR R 87 LIGHT MAINTENANCE 88 $4,698 2027 ST DENIS DR 18740 DAVONA DR BROADMOOR DR R 87 LIGHT MAINTENANCE 89 $43,573 2027 BROCKTON AVE 11790 INTERLACHEN AVE ALCOSTA BLVD R 88 LIGHT MAINTENANCE 91 $6,205 2027 APTOS WAY 10580 MARLBORO WAY DAVONA DR R 89 LIGHT MAINTENANCE 89 $14,070 $6,048,793
Red = Low PCI Street
Purple = Low PCI Street during plan period
3/21/2022 11 of 11
4.1.d
Packet Pg. 47
Attachment: D: List of Streets and Street Sections to be treated between 2022 and 2027 (3551 : Five-Year PMP Update)