CONSULTANT AGREEMENT BETWEEN THE CITY OF SANTA ANA AND
LEIGHTON CONSULTING, INC. TO PROVIDE ON-CALL GEOTECHNICAL

ENGINEERING SERVICES
THIS AGREEMENT is made and entered into on this 21st day of November, 2023 by and between Leighton Consulting, Inc. (“Consultant”), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (“City”).

RECITALS
A. On August 2, 2023 the City issued Request for Proposal (“RFP”) No. 23-123 by which it desired to retain a consultant having special skill and knowledge in the field of geotechnical engineering services on an on-call basis for the City’s Public Works Agency.

B. Consultant submitted a responsive proposal that was among those selected by the City.

Consultant represents that it is able and willing to provide such services described in the scope of work that was included in the RFP No. 23-123.

C. In undertaking the performance of this Agreement, Consultant represents that it is knowledgeable in its field and that any services performed by Consultant under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional consulting firm in the field.

NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows:

1. SCOPE OF SERVICES
Consultant shall perform the services that were described in the scope of work included in the RFP No. 23-123, during the term of this Agreement, the tasks and obligations including all labor, materials, tools, equipment, and incidental customary work required to fully and adequately complete the services described and set forth in “Scope of Services - Exhibit A” attached hereto and incorporated by reference , and as further described in Consultant’s Proposal, attached hereto and incorporated herein by this reference as “Consultant’s Proposal - Exhibit B.”

2. COMPENSATION
a. City neither warrants nor guarantees any minimum or maximum compensation to Consultant under this Agreement. Consultant shall be paid only for actual services performed under this Agreement at the rates and charges identified in Consultant’s Fee Proposal, which is attached hereto and fully incorporated herein by this reference as “Compensation - Exhibit C.” Consultant is one of five (5) separate consultants selected to provide services on an on -call basis under RFP 23-123. The total compensation for services provided by all consultants selected under RFP 23-123 shall not exceed the shared aggregate amount of $ 2,000,000.00 during the term of this Agreement, including any extension periods, as set forth in Section 3, below.

EXHIBIT 5

Page 2 of 10 ends

b. Payment by City shall be made within forty-five (45) days following receipt of proper invoice evidencing work performed, subject to City accounting procedures. Payment need not be made for work which fails to meet the standards of performance set forth in the Recitals which may reasonably be expected by City. c. Notwithstanding any contrary terms contained within Consultant’s Fee Proposal, Consultant’s fees shall not increase by more than 3% annually over the term of this Agreement, including any extension pe riods, unless directly affected by Prevailing Wage laws, if applicable.

3. TERM
This Agreement shall commence on November 21, 2023 and end on November 20, 2026, with the option for the City to grant up to one (1), two (2) year extension, exercisable by a writing by the City Manager and the City Attorney, unless terminated earlier in accordance with Section 16, below.

4. PREVAILING WAGES
Consultant is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as C alifornia Code of Regulations, Title 8, Section 16000, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. If the services being performed are part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and the total compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage Laws. Consultant shall defend, indemni fy and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

5. INDEPENDENT CONTRACTOR
Consultant shall, during the entire term of this Agreement, be construed to be an independent contractor and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer -employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Consultant performs the services which are the subject matter of this Agreement; however, the services to be provided by Consultant shall be provided in a manner consistent with all applicable standards and regulations governing such services. Consultant shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes.

6. OWNERSHIP OF MATERIALS
This Agreement creates a non -exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property

Page 3 of 10 ends

embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement (“Documents & Data”). Consultant shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement.

Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City’s sole risk , and City agrees that
Consultant shall not be liable to City or any other third party for any such use.

7. INSURANCE
Consultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder and the results of that work by the Consultant, its agents, representatives, employees or subcontractors.
a. Consultant shall not commence work for the City until it has provided evidence satisfactory to the City that it has secured all insurance required under this Section. In addition, Consultant shall not allow any subconsultant to commence work on any subcontract until it has secured all insurance required under this Section. b. Insurance coverage shall be at least as broad as:
(i) Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an
“occurrence” basis, including products and completed
operations, property damage, bodily injury and personal & advertising injury with limits no
less than $2,000,000.00 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.
(ii) Automobile Liability: Insurance Services Office Form CA 0001 covering Code 1 (any auto), with limits no less than $1,000,000.00 per accident for bodily injury and property damage.
(iii) Workers’
Compensation insurance as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than
$1,000,000.00 per accident for bodily injury or disease. (iv) Professional Liability Insurance with limits no less than $2,000,000 per occurrence or claim, and $2,000,000 policy aggregate.
(v) If the Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader

Page 4 of 10 ends

coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.
c. Other Insurance Provisions. The insurance policies are to contain, or be endorsed to contain, the following provisions:
(i) Additional Insured Statu s. The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Consultant including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Consultant’s insurance (at least as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used). (ii) Primary Coverage. For any claims related to this contract, the Consultant’s insurance coverage shall be primary insurance primary coverage at least as broad as ISO CG 20 01 04 13 as respects the City, its officers, officials, employees, and volunteers. Any insurance or self -insurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Consultant’s insurance and shall not contribute with it. (iii)Notice of Cancellation. Each insurance policy required above shall state that coverage shall not be canceled, except with notice to the City. (iv) Waiver of Subrogation. Consultant hereby grants to City a waiver of any right to subrogation which any insurer of said Consultan t may acquire against the City by virtue of the payment of any loss under such insurance. Consultant agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer. (v) Self-Insured Retentions. Self-insured retentions must be declared to and approved by the City. The City may require the Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention.

The policy language shall provide, or be endorsed to provide, that the self - insured retention may be satisfied by either the named insured or City. (vi) Acceptability of Insurers. Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City.
(vii) Claims Made Policies. If any of the required policies provide coverage on a claims-made basis:

Page 5 of 10 ends

• The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work.
• Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work.
• If coverage is canceled or non -renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective date, the Consultant must purchase “extended reporting” coverage for a minimum of five (5) years after completion of contract work.
(viii) Verification of Coverage. Consultant shall furnish the City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City before work begins. However, failure to obtain the required documents prior to the work beginning shall not waive the Consultant’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. (ix) Subcontractors. Consultant shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Consultant shall ensure that City is an additional insured on insurance required from subcontractors.
(x) Special Risks or Circumstances. City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.

8. INDEMNIFICATION
Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers, agents, employees, contractors, special counsel, and representatives from liability: (1) for personal injury, damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Consultant, its subcontractors, agents, employees, or other persons acting on its behalf which relates to the services described in section 1 of this Agreement; and (2) from any claim that personal injury, damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in this Section or by reason of the terms of, or effects, arising from this Agreement. The Consultant further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including fees and costs for special counsel to be selected by the City, regarding any action by a third party

Page 6 of 10 ends

challenging the validity of this Agreement, or asserting that personal injury, damages, just compensation, restitution, judicial or equitable relief due to personal or property rights arises by reason of the terms of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding. Notwithstanding the foregoing, to the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent r equired by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

9. INTELLECTUAL PROPERTY INDEMNIFICATION
Consultant shall defend and indemnify the City, its officers, agents, representatives, and employees against any and all liability, including costs, for infringement of any United States’ letters patent, trademark, or copyright infringement, including costs, contained in the work product or documents provided by Consultant to the City pursuant to this Agreement.

10. RECORDS
Consultant shall keep records and invoices in connection with the work to be performed under this Agreement. Consultant shall maintain complete and accu rate records with respect to the costs incurred under this Agreement and any services, expenditures, and disbursements charged to the City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable. Consultant shall allow a representative of the City to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement during regular business hours. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement for a period of three (3) years from the date of final payment to Consultant under this Agreement.

11. CONFIDENTIALITY
If Consultant receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Consultant agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance, but in no event less than reasonable care. “Confidential Information” shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed to either party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the Consultant disclosed in a publicly available source; (c) is in rightful possession of the Consultant without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e) is independently developed by the Consultant without reference to information disclosed by City.

Page 7 of 10 ends

12. CONFLICT OF INTEREST CLAUSE
Consultant covenants that it presently has no interests and shall not have interests, direct or indirect, which would conflict in any manner with performance of services specified under this Agreement.

13. NON-DISCRIMINATION
Consultant shall not discriminate because of race, color, creed, religion, sex, marital status, sexual orientation, gender identity, gender expression, gender, medical conditions, genetic information, or military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization, promotion, termination or other employment related activities or any services provided under this Agreement. Consultant affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations.

14. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and Consultant, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail. This Agreement may not be modified except by written instrument signed by the City and by an authorized representative of Consultant. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Consultant or the City. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which is not embodied herein.

15. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Consultant, Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City’s ability to have any of the services which are the subject to this Agreement performed by City personnel or by other consultant and/or contractors retained by City.

16. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of termination. In such event, Consultant shall be entitled to receive and the City shall pay Consultant compensation for all services performed by Consultant prior to receipt of such notice of termination, subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Consultant to deliver to the City all work product(s) completed as of such date, and in such case

Page 8 of 10 ends

such work product shall be the property of the City unless prohibited by law, and Consultant consents to the City's use thereof for such purposes as the City deems appropriate.
b. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement.

17. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving the breach, failure, right or remedy. No waiver of any breach, failure or right, or remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies.

18. JURISDICTION - VENUE
This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. Both parties further agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement.

19. PROFESSIONAL LICENSES
Consultant shall, throughout the term of this Agreement, maintain all necessary lic enses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement.

20. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by fax or other telegraphic communicatio n in the manner provided in this Section, to the following persons:

To City:

Jennifer L. Hall
City Clerk
City of Santa Ana
20 Civic Center Plaza (M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
Fax: 714- 647-6956

Page 9 of 10 ends

With courtesy copies to:

Nabil Saba
Executive Director, Public Works Agency
City of Santa Ana
20 Civic Center Plaza
P.O. Box 1988
Santa Ana, California 92702
To Consultant:

A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by fax, communi cation shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded.

21. MISCELLANEOUS PROVISIONS
a. Neither Party shall be liable to the other under any legal theory, whether in tort, in contract, or otherwise, for any incidental, consequential, punitive, or other indirect damages with respect to any claim of matter arising out of or relating to the Services, this Agreement.
b
. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and attorney’s fees, for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn. c. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement.
[signatures contained on following page]
Kristen Williams, PG
Area Leader
Leighton Consulting, Inc.
2600 Michelson Drive, Suite 400
Irvine, CA 92612

Page 10 of 10 ends

SIGNATURE PAGE TO CONSULTANT AGREEMENT BETWEEN THE CITY OF SANTA ANA AND LEIGHTON CONSULTING, INC. TO PROVIDE ON-CALL

GEOTECHNICAL ENGINEERING SERVICES
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written.

ATTEST: CITY OF SANTA ANA
JENNIFER L. HALL KRISTINE RIDGE
City Clerk City Manager
APPROVED AS TO FORM: CONSULTANT:

SONIA R. CARVALHO
City Attorney
By:

JONATHAN T. MARTINEZ
Assistant City Attorney
RECOMMENDED FOR APPROVAL:

NABIL SABA
Executive Director
Public Works Agency
By:

Title:

LEIGHTON CONSULTING, INC.

Kristen Williams
Area Leader

EXHIBIT A

SCOPE OF SERVICES
City of Santa Ana RFP 23-123
Page A1-1
Appendix
ATTACHMENT 1

SCOPE OF WORK

CITY OF SANTA ANA

REQUEST FOR PROPOSALS
FOR

ON-CALL GEOTECHNICAL ENGINEERING SERVICES
RFP NO. 23-123
Introduction / Background
The City of Santa Ana intends to retain Geotechnical Engineering Consultants on an as-needed or “on-call” basis. A Professional Services Agreement will be entered into with several of the qualified firms/consultant(s) to provide geotechnical engineering services for a variety of projects on an on-call basis. On an on-call, as-needed basis, the selected firm(s) may be asked to provide professional services on specific, project-by-project basis, based on an agreed-upon specific scope of services and fees.

In general, work consists of general geotechnical engineering services for Public Works Projects and or related to City facilities. The funding sources for each project may vary for each project/task order assignment shall comply with the funding agency’s requirements.

The consultant shall be able to assist the City through this contract to provide the necessary services. The consultant shall utilize in -house staff and/or sub -consultants to complete the assignments to meet the City standards. For specialized work for which the prime consultant shall require a sub-consultant, the prime consultant shall serve as an administrative liaison between the City and the sub-consultant.

Prime consultant mark-ups for sub-consultant work will not be allowed.

All proposals, plans, drawings, specifications, estimates, grant applications, and/or studies will be subject to the final approval and satisfaction of the City of Santa Ana.

Scope of Services
On as needed basis, the selected firm/s shall provide the City with th e following services as described herein.

The consulting firm/s are responsible for any damage to utilities during the locating efforts.

The consulting firm/s selected for these services shall demonstrate the ability and experience in the following types or work and not limited to:
• Soil Classification and Analysis
• Material Testing
• Ground Water- Dewatering and Seepage Control Analysis • Seismic Stability
• Soil Liquefaction

City of Santa Ana RFP 23-123
Page A1-2

• Slope Stability and Protection
• Construction Inspection
• Open and Braced Excavations (shallow)
• Grading and Site Clearing
• Pavement Design
• Foundation Design
• Retaining Structures- submerged and partially submerged • Fill Compaction
• Special Inspections
• Subsurface Geotechnical Investigation
• Infiltration Testing

The Consultant/s shall also provide services such as: field exploration, laboratory testing and instrumentation. If there are any exceptions to the core of requested services, proposers shall list said exceptions in their proposal (matrix form). For specialized work for which the prime consultant shall require a sub-consultant, the prime consultant shall serve as an administrative liaison between the City and the sub -consultant. The selected consultants must have the expertise, experience, and demonstrated resources available to perform the work described in this RFP.

General Requirements and Project Deliverables
The Consultant’s services for the project preparation, special studies/investigations shall include and in be in conformance with the latest editions of the following: The City of Santa Ana Municipal Code (SAMC), professional Standards established by the City, and or federal, state and local guidelines established in the project.

The Consultant shall have complete responsibility for the accuracy and completeness of all documents and plans prepared. The plans will be reviewed by the City of Santa Ana for conformity with the requirements of the Agreement. Reviews by the City of Santa Ana do NOT include detailed review or checking of design or the accuracy with which such designs are depicted in the documents and the plans. The documents and plans furnished under the Agreement shall be of a quality acceptable to the City of Santa Ana. The criteria for acceptance shall be a product of neat appearance, well organized, technically and grammatically correct, checked, and dated and having the maker and checker identified.

The Consultant shall have project management control procedures in effect during the entire time work is being performed under the Agreement. This task shall include the following:

• Project Management Plan- the consultant shall provide a detail management plan including information and coordination with other agencies to ensure compliance and completion of the tasks. This plan shall include all milestones and task breakdown for each of the tasks and subtasks included therein. The project management shall be submitted to the Project Manager for review and within 15 calendar days of the issued Notice to Proceed • Deliverables
• Quality Control/Quality Assurance (QA/QC) Plan
• Project Schedule/Invoicing
• Project Correspondence

City of Santa Ana RFP 23-123
Page A1-3

In case of conflict, ambiguities, discrepancies, errors, or omissions, the consultant shall submit the matter to the City for clarification.

However, work tasks may include studies or a variet y of engineering tasks. If requested by the City, the Consultant shall provide a Work Plan which includes a detailed schedule of the assigned project prior to the issuance of Notice to Proceed and/or Task Order. Specific Task Orders with Notices to Proceed (“NTPs”) will be provided for project(s) at the discretion of the City. Work required per Task Order shall comply with the Scope of Services and additional provisions in each Task Order and this agreement.

The following services/items shall include, but are not be limited to:

1. Research existing records of utility companies and agencies and coordinate with the involved parties.

2. City may opt to receive only PDF versions of the plans, reports, and studies for reviewing purposes. If so, the Consultant team will provided plans and/or specifications accordingly.

3. The Consultant shall monitor the project progress, maintain project files, and control the quality of the work performed by in -house staff and/or sub -consultants. Incomplete (not meeting targeted completion) or poor quality work will not be accepted. The Consultant shall revise the documents within a revised schedule set by the City, which may require overtime.

No additional compensation necessary for the consultant to complete this work to the satisfaction of the City shall be approved by the City for the required revisions. It is the responsibility of the Consultant to produce a professional-level quality of work product.

4. If included in the on-call project scope, attend meetings with the City staff as required.

5. If included in the on-call project scope, the Consultant shall coordinate permits and any other issues with the City, other Agencies, and all utility companies as required. At the direction of the City, the Consultant shall be the liaison with affected agencies.

6. If included in the on-call project scope, the Consultant shall be responsible for reviewing and approving addenda and clarifications.

All information regarding the plans and specifications and or documentation related to the project and approved by the City, will then become property of the City.

A more detailed scope of work will be provided when/if a specific project or Task Order proposal is requested of a consultant. All tasks orders shall include the staff title, hours, hourly ra te and totals as related to the project.

Project Schedule and Progress:

Progress review meetings shall be held at intervals deemed appropriate by the City. The Consultant shall furnish two copies of all completed work or partially completed update/status since the last progress review meeting. Progress reports shall be submitted monthly in electronic format indicating achievements and project schedule progress.

City of Santa Ana RFP 23-123
Page A1-4

City Responsibilities:

The City will provide information in its possession relevant to the prep aration of the required information in the RFP. The City will provide only the staff assistance and the documentation specifically in referred to herein.
• Furnish scope of work and provide general direction as needed for the assigned project • All reporting and coordination within the City
• Advertise, award, and administer of construction contract • Electronic files (sample plans & specifications, City of Santa Ana’s CADD Standards) • Electronic files for title sheets and sheet borders
• Facilitate meeting space and coordination and City facilities Fee Proposal:

In addition to Section IV.B.3 (Submittal Requirements: Fee Proposal) fee schedule shall be structured as follows:

The fee proposal shall include the firm’s standard hourly fee schedule, and/or project fee schedule where applicable and as outlined in this this documents. A list of all positions and hourly rates required to perform the services described herein. A more detailed scope of work will be provided when/if a specific project or Task Order proposal is requested of a consultant.

Other Terms and Conditions:

1. The project will be implemented in compliance with the City of Santa Ana’s policies, as well as Prevailing Wages and State/Federal Requirements.

2. The City regards the inclusion of California based des igns, engineering, and construction professionals, facilities, and services as part of the Team to be highly desirable, but not mandatory.

3. The City reserves the right to amend this Request for Proposal by addendum prior to the final dates of submission.

4. All reports, proposals, or other data or materials which are submitted shall become the sole property of the City of Santa Ana with the exception of the confidential Financial Capacity information and sealed fee proposals which will be returned to all propos ers after award of contract to the selected Team.

5. All products used or developed in the execution of any contract resulting from this request will remain in the public domain at the completion of this project.

6. The City has an affirmative action program. The purpose of the affirmative action program is to encourage certified minority business enterprises and women business enterprises. All submitting firms must have established affirmative action pr ograms approvable by the City.

During the RFP stage, all firms will need to complete a “Certification of Non -Discrimination by Contractors” for each firm on their team.

EXHIBIT B

CONSULTANT’S PROPOSAL

SOLUTIONS YOU CAN BUILD ON
www.leightongroup.com
Prepared for
Proposal to Provide
On-Call Geotechnical
Engineering Services
RFP No. 23-123
The City of Santa Ana
Public Works Agency

ORIGINAL

SECTION 1: STATEMENT OF QUALIFICATIONS
a. Cover Letter ..................................................................................... 1 b. Contract Agreement Statement ........................................................ 2 c. Firm and Team Experience .............................................................. 2 d. Understanding of Need .................................................................... 5 e. Relevant Project Experience ............................................................ 7 f. Willingness to Comply with Agreement Terms ................................. 10 g. References ....................................................................................... 10

SECTION 2: SCOPE OF SERVICES
SECTION 3: FEE PROPOSAL
SECTION 4: CERTIFICATIONS
APPENDIX A: TEAM RESUMES

TABLE OF CONTENTS

SECTION 1: STATEMENT OF QUALIFICATIONS

2600 Michelson Drive, Suite 400, Irvine, CA 926121 T: 949.250.1421 www.leightongroup.com
a. COVER LETTER
August 28, 2023
Gilbert Castillo
City of Santa Ana
Public Works Agency; M-36
20 Civic Center Plaza; Ross Annex
Santa Ana, CA 92701
Subject: Proposal to Provide On-Call Geotechnical Engineering Services for the City of Santa Ana, RFP No. 23-123
The City of Santa Ana (The City) Public Works Agency is charged with providing efficient public services to ensure public safety, a prosperous environment, and a high quality of life for its 300,000 residents, as well as local business owners and annual visitors. Leighton Consulting, Inc. (Leighton) stands ready and capable to provide the Geotechnical Engineering services in support of the City’s mission. We are confident that our qualifications and experience providing similar services throughout Orange County and directly for the City provide us the edge in delivering high quality and cost-efficient services.

Over the years, Leighton has successfully managed more than 150 on-call public agency contracts for cities, counties, and public agencies across southern California. City clients include Anaheim, Newport Beach, Huntington Beach, Costa Mesa, Irvine, Mission Viejo, Lake Forest, and Los Angeles. We have also had the distinct privilege on working for the City of Santa Ana for more than a decade on projects such as the Bristol Corridor Street Widening, the Warner Industrial Park Pavement Rehabilitation.

Leighton’s services will be mobilized primarily from our Irvine office, fewer than 10 miles from City Hall.

Leading our team as Project Manager and primary point of contact to the City will be Christian Delgadillo, PE, GE. Supporting Christian with oversight and quality assurance as required will be Principal-in-Charge, Djan Chandra, PE, GE. Their contact information is as follows:

Christian Delgadillo, PE, GE
Project Manager | Associate Engineer
949.68.4218 | [email protected]
Djan Chandra, PE, GE
Principal in Charge | Sr. Principal Engineer
949.681.4267 | [email protected]

Project Office: 2600 Michelson Drive, Suite, 400, Irvine, CA 92612

We have both the experience and operating procedures in place to provide you with the services you need in an efficient and economical manner. Supporting our staff are three in-house laboratories holding certifications from Caltrans, AASHTO, DSA, NICET, LADBS and other local agencies. We provide both standard ASTM and Caltrans testing and can respond with additional testing methods modified to meet specific field and/or contract conditions.

As the Area Leader, I am duly authorized to contractually bind the firm. Leighton appreciates the opportunity to serve the City of Santa Ana. If you have any questions or need additional information regarding how we can be of service, please feel free to contact us at your convenience.

Respectfully submitted,
LEIGHTON CONSULTING, INC.

Kristen Williams, PG
Area Leader
b. Contract Agreement Statement:

Leighton has reviewed the Agreement (Attachment 2 of the RFP) and concurs with any and all provisions contained within.
c. F irm and T eam Experience
For more than 60 years, Leighton Consulting, Inc. (Leighton) has leveraged our experience and expertise to assist public agency clients in meeting the needs of its growing communities, which require improvement to and maintenance of critical public infrastructure. Our ability to provide efficient and expeditious geotechnical, environmental, and materials testing services lies with our experience and depth of staff. Our goal is to support and strengthen our client’s efforts by supplying experienced staff and resources that will provide reliable results, efficiently coordinated and reported to you and your staff while ensuring that public resources and taxpayer dollars are protected and well spent.

Why Leighton?
We know the City of Santa Ana. In addition to our
more than 60 years of experience as a firm, our team
has served the City of Santa Ana for more than a
decade. During this time, our staff have gained insight into your preferences and processes, including the City of Santa Ana Municipal Code (SAMC) and other
professional Standards established by the City, state,
and federal guidelines. We understand your dedication
to providing efficient, innovative and effective services to your community and are honored to have assisted
with that mission. We are confident that our continued
partnership would support the City’s overall goal of
creating a safe environment that allows your
community to realize a higher quality of life.

We’re local. Our local office and laboratory are 10
miles from Santa Ana City Hall, allowing for convenient, timely services when you need them. Additionally, we
have decades of experience serving nearby agencies,
including the Orange County Public Works Department, and the cities of Anaheim, Yorba Linda, Brea, and Newport Beach. Leighton has completed thousands of projects in the region, giving us an incomparable history and basis for understanding a variety of site issues and constraints throughout Orange County.

We offer a broad range of expertise. Leighton has nine offices in Southern California, staffed with more than 180 professionals, including geotechnical and civil engineers, professional geologists, certified engineering geologists and certified field technicians and inspectors. While we have curated a team to best fit your needs, the full range of our team’s expertise is always available to the City.

We provide testing and inspection services on an accelerated schedule. Your projects will be completed safely on time and on-budget due to Leighton’s continuously improving ability to properly staff and structure our project teams to respond to public projects requiring as-needed consulting services. We also offer a local management team with experience and autonomy to make onsite decisions and maintain project budgets and timelines.

T

HE BEST CHOICE FOR

SANTA ANA
62 Years
of Industry Experience,
incorporated in 1961
10 Miles
distance between
our HQ and City Hall
18 0 Professionals
offering a variety of specializations
8 Office Locations
Irvine HQ | Irvine Lab | Palm Desert
Rancho Cucamonga | San Diego + Lab
Santa Clarita | Temecula + Lab |
Ventura
Our Project Manager
Christian Delgadillo, PE, GE
Associate Engineer
949.68.4218 |
[email protected]
2 The Leighton Team
We believe that having a dedicated team gives us the ability to be responsive and available when performing and completing services. Because of our vast experience, our project managers are able to anticipate and accommodate fluctuations in personnel needs before they affect your projects and tasks.

Leading our team is Christian Delgadillo, PE, GE, who will serve as Project Manager and the primary point of contact to the City. Christian has more than 13 years of experience providing geotechnical engineering services in southern California, with an emphasis in serving cities and municipalities in Orange County.

Christian will be supported by Djan Chandra, PE, GE, serving in the role of Principal in Charge and supporting Quality Assurance. With 35 years of experience, as well as direct experience working with the City of Santa Ana, Djan is a true expert of Geotechnical Engineering. This duo has successfully worked together on dozens of On-Call contracts for local public agencies and look forward to bringing this expertise to the City.

Resumes for our complete and carefully selected project team, which includes the availability % for each member, are provided in the Appendix A at the end of this proposal.

PROJECT MANAGER/PRINCIPAL AGENT | Will provide contract administration, senior oversight, and corporate coordination to ensure all Work Orders are adequately staffed and continuity is maintained. He will be directly responsible for the execution and results of scope of work.

EDUCATION
• MS, Civil Engineering
• BS, Civil Engineering

PROFESSIONAL LICENSE
• CA Geotechnical Engineer
– 3144
• CA Civil Engineer – 83331

YEARS OF EXPERIENCE
• 13 total
• 10 years w/firm

OFFICE LOCATION
Irvine
Christian Delgadillo, PE, GE
Associate Geotechnical Engineer
• Experienced providing all the Geotechnical Engineering tasks listed in the RFP
• Experienced in geotechnical investigations, from the proposal stage through site investigation, testing, analysis and completion of reports, for various types of public works, transportation, governmental and utility projects
• Areas of expertise include drilling and sampling of soil and rock using various techniques. in-situ permeability testing, field instrumentation, and interpretation of results from SPT, CPT, and geophysical surveys
• Skilled in slope stability analysis, seismic hazard analysis, ground motion study, liquefaction analysis, deep and shallow foundation design, pavement design, retaining wall design, and other computer applications

QUALITY ASSURANCE/PRINCIPAL IN CHARGE | Responsible for verifying that our deliverables meet project requirements and provide technical quality review of geotechnical reports. Understands the critical importance of timely, accurate, and fully vetted geotechnical information.

EDUCATION
• MS, Civil Engineering
• BS, Civil Engineering

PROFESSIONAL LICENSE
• CA Geotechnical
Engineer – 2376
• CA Civil Engineer –
50068

YEARS OF EXPERIENCE
• 35 years total
• 35 years with firm

OFFICE LOCATION
Irvine
Djan Chandra, PE, GE
Principal in Charge / Quality Assurance
• Vast experience in developing practical solutions for complex geologic conditions and geotechnical issues in Orange
County
• Extensive knowledge of geotechnical field investigative techniques, laboratory testing procedures, and field instrumentation • Expertise in computer software for geotechnical engineering applications, including FLAC and Plaxis
• Project manager for multiple on-call contracts for various municipalities:
– County of Orange, Public Works Department
– Cities of Santa Ana, Anaheim, Huntington Beach, Irvine, Lake Forest, Mission Viejo, Newport Beach
– Irvine Ranch Water District, Yorba Linda Water District, Moulton Niguel Water District
3 We are accustomed to responding to rigorous demands in the field, laboratory and office. We know our staff and their individual strengths and personalities. Our objective is to provide you with the well-qualified and capable staff members who can effectively execute your project, and who fit well with your task-specific team. 
Organizational Chart
The organizational chart below illustrates our team structure and the roles they will assume for the contract.

Project Highlights: Experience with the City of Santa Ana

BRISTOL STREET WIDENING PROJECT
Leighton performed a geotechnical investigation for Phase I of the Bristol Street Widening Project, extending from Pine Street to McFadden Avenue, a 4,300-foot-long segment consisting of at least two lanes in each direction. Leighton’s subsurface investigation involved hollow-stem auger borings drilled to a maximum exploration depth of 5.5 feet below the existing pavement surface. Bulk soil, asphalt, and aggregate base samples were collected. Laboratory tests consisted of R-value and moisture & density, and were performed in conformance with ASTM procedures.

WARNER INDUSTRIAL PARK AREA 1 AND AREA 2 PAVEMENT REHABILITATION Leighton completed a geotechnical exploration for pavement rehabilitation of 17,800 linear feet of primary two-lane streets within the Warner Industrial Park. The exploration consisted of 20 borings, pavement condition surveys, and non-destructive pavement deflection testing.

Laboratory testing program included tests on representative samples for in-place dry density and moisture content and R-value. Based on the results of our exploration, laboratory testing and geotechnical analyses, we recommended three alternatives for pavement reconstruction.

Personnel Firm
CA Engineers + Geologists 65
GIS/AutoCAD 3
Lab Testing Technicians 14
Field Technicians 53
Special Inspectors 12
Materials Engineering Team 4

4 d. Understanding of Need
Our goal for every project is to deliver a technically excellent work product that achieves optimal benefits for the City. Key to achieving this goal is effective communication with the City and all stakeholders throughout the course of the project. We find that client input is invaluable in streamlining our processes and developing recommendations that attain a client-specific balance between what is ideal and what is cost-effective. As such, we will initiate and maintain close coordination with the City and, if desired, ensure that all work products are initially submitted in draft form to solicit input from City staff before finalization.

Effective Communications and Staffing Cost Controls
The Leighton Team will hold internal weekly management meetings to forecast our personnel resource utilization. We discuss current workload and anticipated “notices to proceed” for all on-going and new contracts. As part of this management, we will be communicating with the City so we understand and anticipate specific task orders. This allows us to ensure staff continuity through each project as we greatly understand the value of personnel continuity for each specific project.

All of our offices are interconnected Microsoft Teams to allow for all of our staff to work effectively on projects regardless of where the work is. GIS/CADD functions are centralized for improved productivity and reduced costs. This benefits the City in that we can efficiently work on your projects regardless of location, and we can quickly mobilize to meet your schedules. Further, data can be rapidly posted on our secure web-based client portals.

Supported with our deep bench of California-licensed professionals here in southern California, we will also be prepared to respond to your needs on short notice -- such as natural disasters and emergencies; as we have in the past. We can provide the City a specific on-call 24/7 telephone number.

Using real-time accounting, our Project Managers can have a snapshot of costs at any time (typically daily).

Project Managers will work closely with the City to manage costs, and keep City personnel informed about our progress and remaining budget for a given project. We will not exceed an agreed-upon budget without prior written notice from appropriate City personnel. To the extent desired by the City, we will also communicate with you to keep you aware of our progress on Task Orders, including schedule and budget projections (as appropriate).

Project Management
Leighton uses MetaField as a networked and integrated Field Information Management System (FIMS) and Laboratory Information Management System (LIMS). This eliminates the need for paper in the field, laboratory and/or office; although we produce printed copies of any documents you need or want, at any time. Our field staff is equipped with company-provided cell phones, networked laptops, tablets and wireless (Bluetooth®) printers for those regulators and clients who still require paper. This system allows us in real time to email data typically as a PDF, or post data on a web page for your independent and secure access.

Field staff will be mobilized from our nearby Irvine office, with support from our other Southern California offices, as needed. Field staff personnel are dispatched using MetaField, which e-mails their assignments to their phone and/or tablet, so they can see the site location, site-specific contact persons, and prior data acquired for that site. All data acquisition is stored and transmitted electronically, using a secure cellular network and the Cloud. Field staff either accepts or declines assignments based on their current work backlog, and scheduling is viewed on a MetaField calendar for project managers to review and coordinate.

Quality Control/Quality Assurance
Diligent quality control and quality assurance are essential for the technical excellence of engineering services and reports. Leighton’s quality assurance program consists ultimately of principal review of all deliverables before submittal to our clients, a practice long proven to be successful. Accordingly, the success of our quality Leighton uses MetaField to
eliminate unnecessary paper
and provide you real time
data from the field, all in one
secure location.
5 control program rests upon the integrity of our principal engineers and geologists. In this regard, our bench of principal professionals has demonstrated unwavering commitment to quality and professional integrity through their long tenure with Leighton.

On each project, Leighton employs several layers of quality assurance procedures to ensure adherence to the project’s goals, budgets, and schedules, and to maintain the highest quality technical data. Budget status, work progress, and the results of data collected in the field are conveyed in regular communication from Leighton’s Project Manager to the City’s designated point(s) of contact. Through constant monitoring of project costs, schedule, and results, and through clear communication with the City, Leighton minimizes change orders throughout the duration of each project to its completion.

Documents for agency submittal, including their associated tables and figures, undergo a two- to three- tiered internal review, depending on size and complexity. Data tables and figures are initially drafted by junior staff under the guidance of the Project Manager. Once complete, these work products are combined with the report text to form a complete document for review by the Principal in Charge. The QC officer checks both the data points and the broader conclusions of the report prior to submitting a draft report to the City for review.

Our quality control approach includes the following steps as illustrated in the accompanying flowchart. • Identification of specified task objectives
• Selection of qualified personnel for specified tasks
• Compliance with field procedures, as documented in Leighton field procedures manual • Selection and application of systematic data acquisition and analysis techniques • Review of data during the project to conform appropriateness and adequacy of techniques in meeting task objectives
• Application of quality control measures during data collection and analysis • Formal project review in which conduct and the work products are critically reviewed and evaluated by senior personnel who have extensive experience and seasoned judgment • Documentation of the Above Terms
• Documentation of the above items

The Geotechnical Process
6 e. Relevant Project Experience
Leighton has provided On-Call services for Geotechnical Engineering Services for various cities and public agencies across southern California. The list below highlights some of this experience in the past five years.

Client Reference information for all of the client projects listed below are provided in section “g. References.” Various Geotechnical Engineering Services
ORANGE COUNTY PUBLIC WORKS | SANTA ANA, CA
BREA BOULEVARD CORRIDOR IMPROVEMENTS | 2017 -
PRESENT: Leighton was selected competitively to provide geologic and geotechnical services for the widening of Brea Boulevard through Brea Canyon. The road widening will
extend approximately 1.75 miles from Canyondale Drive to the Los Angeles County line.

The project includes replacing three bridges; construction of earth retaining systems; extending several culverts; and construction new pavement sections. Bridge design was
performed in accordance with AASHTO LRFD Bridge Design
Specifications with Caltrans Amendments along with Caltrans Seismic Design Criteria. Earth retaining systems include conventional semi-gravity cantilever walls, internally reinforced systems including mechanically stabilized earth (MSE), earth anchor, soil nail and segmental block walls. Alignment of the road will also require the evaluation of slope stability for temporary excavations and permanent cuts. Pavement section design will be performed in accordance with the Orange County Highway Design Manual.

ORANGE COUNTY ZOO LARGE MAMMAL EXHIBIT | 2021 -
2022: Located towards the back of the zoo in the new Oak Woodlands habitat, the new large mammal exhibit consists of three new buildings: the Holding Building, Auxiliary Holding Building, and LSS-Kitchen Building.

Working closely with the architect, our field exploration consisted of six borings to a maximum depth of 22 feet, a geophysical survey to support liquefaction analysis of the site, and a field percolation testing. We evaluated the soil characteristics, including expansion potential, corrosivity, shear strength and shear wave velocity, and geologic hazards at the site such as ground rupture, lateral spreading, and seismically induced settlement. Based on results of our analyses, we developed recommendations for design and construction of the project.

During construction, we provided geotechnical observation and testing to confirm that placed fill was suitable for the support of foundations and floor slabs of the buildings and for the bioswale/filtration basin. We met with the general contractor, the County’s arborist, and the grading operator when it was discovered that existing tree roots were in the path of proposed overexcavations, and that building and retaining wall footings would encroach underground drip lines for two oak trees and one pine tree.

Special inspection and materials testing were performed during construction of the three buildings, bridge, cages, and canopy. Our tasks included special inspection and testing of reinforcing steel, concrete and masonry, ACI certified shotcrete, high-strength grout, ICC field welds, high-strength bolting, material identification verification of hardware, anchors and epoxied anchors and dowels, and shop NDT ultrasonic for complete joint penetration (CJP) welds.

7 Central Jail Complex – Multiple Projects
ORANGE COUNTY SHERIFF -CORONER DEPARTMENT | ORANGE , CA Working under an on-call contract with OCPW, Leighton provided geotechnical and/or materials testing services for a number of Orange County Sheriff-Coroner Department’s (OCSD) projects at the Central Jail Complex (CJX) in Santa Ana.

We provided on-call geotechnical engineering support, and observation and testing to confirm that placed fill materials including soils and aggregate base were suitable for the support of foundations, floor slabs, and new vehicular/pedestrian pavements. Observation and testing services were also provided during utility trench backfill operations and during asphalt paving operations. Engineering support and consultation provided by our onsite soils technician included remedial grading recommendations where loose or unsuitable soils for improvement support were encountered.

Katella Facility Upgrades
ORANGE COUNTY SHERIFF’S DEPARTMENT | SANTA ANA, CA
| 2019 – 2020: The Katella Range Upgrades project
encompassed construction of a roof over the uncovered
portion of the Range as well as expanding the Range to the north and south of the existing building footprint. The roof structure was constructed of structural steel with tapered steel girders and wide flange beams. The expanded area was
enclosed by concrete masonry unit (CMU) walls, supported by reinforced concrete footings.

Leighton performed a geotechnical exploration for the
proposed improvements to evaluate the subsurface soil
conditions of the site and percolation testing to assess infiltration rates of the soils for design of an onsite stormwater infiltration system. Because the site is located within an area identified by CGS as being potentially susceptible to the occurrence of liquefaction, we performed evaluations for liquefaction potential and provided in our report results of the analyses, including susceptibility of the site to liquefaction and seismically induced settlement. Leighton’s geotechnical design recommendations were provided for construction earthwork, slab- on-grade and conventional shallow foundations, seismic design parameters in accordance with the California Building Code, lateral earth pressure parameters for retaining wall backfill, and setbacks of the stormwater infiltration system. Leighton also provided pavement design specifications for asphalt concrete and Portland cement concrete (PCC).

Additionally, Leighton performed a geotechnical review to verify that geotechnical recommendations were properly implemented into the foundation and grading plans and water quality management plan. In support of construction, we conducted geotechnical observation and testing of earthwork operations as well as materials testing and inspection, including concrete sampling, structural steel welds, and plant tag and sample for rebar and masonry units.

When asbestos containing materials, lead-based paint, and lead-contaminated items were removed from the project site, Leighton managed the air monitoring, sampling and testing services performed by Cal OSHA certified asbestos technicians and verified that removal and containment of hazardous materials were performed properly in accordance with applicable regulations.

8 Yorba Linda Water District Headquarters PFAS Treatment Facility

YORBA LINDA, CA
The Yorba Linda Water District Headquarters PFAS Treatment Facility is one of the largest PFAS Systems of its kind to be installed in the nation, with a plant that can produce 25 million gallons of treated groundwater per day. Leighton provided geotechnical engineering services for a PFAS treatment facility for Wells 1, 5, 7, 10, 12, 18, and 19 at the District’s headquarters that consists of 6 pre-treatment vessels and 22 new ion exchange (IX) vessels.

Leighton developed geotechnical recommendations for the project, including mitigation measures for liquefaction potential, prepared a geotechnical exploration report, and provided inspection and testing services during construction. This project was awarded both “Outstanding Water Project” and “Project of the Year” at the 2022 American Society of Civil Engineers Orange County (ASCE OC) awards ceremony.

City of Anaheim

ANAHEIM, CA
IMPERIAL HIGHWAY AND BIG SKY LANE WATER MAIN REPLACEMENT | 2021 – 2022: This project consisted of a Design-Build Water main replacement of approximately 5,000 linear feet of existing pipeline along a portion of Imperial Highway and Big Sky Lane in Anaheim Hills. Leighton performed subsurface exploration along the pipeline alignment and provided geotechnical recommendations for excavation, shoring, backfill, and pavement placement.

DWYER DRIVE, LINCOLN AVENUE AND DAHLIA DRIVE WATER MAIN REPLACEMENT | 2022 – ONGOING: Design-Build Water main replacement of existing water main alignments at two locations within residential neighborhoods in Anaheim. The project involves replacement of approximately 4,700 linear feet of water main with 6-inch to 8-inch diameter ductile iron pipe. Leighton performed subsurface exploration along the pipeline alignment and provided geotechnical recommendations for excavation, shoring, backfill, and pavement placement.

City of Newport Beach

NEWPORT BEACH, CA
JAMBOREE ROAD PAVEMENT REHABILITATION AND RECLAIMED WATER CONVERSION PROJECT | 2021 – PRESENT: Leighton is providing geotechnical observation and testing, material testing, and special inspection services on this Pavement Rehabilitation and Reclaimed Water Conversion Project, spanning an approximate 1-mile section of Jamboree Road, a major vehicular artery between Coast Highway and Ford Road. Our team supports construction elements including cold milling of existing asphalt pavement and overlaying for a majority of the east and westbound lanes of Jamboree; full-depth asphalt concrete repair in localized sections of pavement; concrete sidewalk removal and reconstruction; concrete median curb and gutter removal and reconstruction; and new storm drainage infrastructure.

ANNUAL SLURRY SEAL PROGRAM | 2021 – PRESENT: Leighton provided materials testing & special inspection services as part of the City of Newport Beach’s 2021-2022 Citywide Slurry Seal Program. Project areas included East and West Newport Heights, Cliffhaven, Westcliff Villas, and the John Wayne Park Parking Lot. The project entailed application of 2,900,000 square-feet of Type I Emulsion-Aggregate Slurry (EAS) and CQS-1h quickset emulsifier at identified locations throughout the City. Our team is provided field inspections during EAS placement, preparation of daily reports, collection of samples, laboratory conformance testing, final close-out report preparation along with management and quality control support. 9 f. Willingness to Comply with Agreement Terms
Leighton has reviewed the provided Master Service Agreement and does not have any exceptions at this time. g. References
We believe the leading indicator of a firm’s ability and management commitment to successful project completions is past performance. We encourage you to contact the following references to discuss our attentiveness to project budget, schedule, and scope.

City of Corona
400 S. Vicentia Avenue, Corona, CA 92882
Contact: Kenny Nguyen, PE | 951.817.5765
Services Provided: Geotechnical and Testing Services

Orange County Sheriff’s Department
550 N. Flower Street, Santa Ana, CA 92703
Contact: Greg Yi | 714.935.8479| [email protected]
Services Provided: Geotechnical and Testing Services

Yorba Linda Water District
1717 E. Miraloma Avenue, Placentia, CA 92870
Contact: Anmar Tohmeh, PE | 714.701.3109 | [email protected] Services Provided: Geotechnical Engineering Services

Orange County Public Works
601 N. Ross Street | Santa Ana, CA 92701
Contact: Austin Morgan | 714.647.3961 | [email protected] Services Provided: Geotechnical exploration and design

City of Anaheim
201 S. Anaheim Boulevard, Anaheim, CA 92805
Contact: Cesar Morales | 714.765.5286 | [email protected] Services Provided: Geotechnical and Environmental Consulting Services

City of Newport Beach
100 Civic Center Drive | Newport Beach, CA 92660
Contact: Michael Sinacori | 949.644.3342 | [email protected] Services Provided: Geotechnical observation and testing; materials testing and special inspection

10 SECTION 2: SCOPE OF WORK
SECTION 2: SCOPE OF WORK
The Leighton team will work closely with your staff, appropriate regulatory agencies and other stakeholders to ensure your priorities and expectations are fully realized. Through previous successful as-needed contracts, we have found the most important management tool to ensure project success is proactive communication.

Depending on the scope identified in the specific project, we will likely recommend a project kickoff meeting so we can establish a full understanding of your goals and confirm expected work product deliverables, and introduce key project participants. Project priorities including budget, scope, value engineering, and milestones for deliverables will be identified and committed to by our project team. While all projects are uniquely different, Leighton anticipates the scope of work requested by the City may include the following task items presented from design phase investigations and on through completion of construction:

Geotechnical Investigation
Our geotechnical investigations will be mobilized and managed out of our Irvine Headquarters. We will prepare a detailed proposal that will be tailored to meet each individual project’s goals. The proposal will present our proposed scope of work, the anticipated schedule, and a breakdown associated fees. Each proposal will be crafted with a focus on providing expedient and cost-effective engineering solutions.

RESEARCH AND STUDIES
A task that begins during proposal preparation, our initial Research and Studies for the project will consist of performing a review of existing available documents, geologic maps, and plans relevant to the project that will provide a useful understanding of existing site conditions and site history. In addition, we may review historical stereoscopic aerial photographs and topographic maps to determine approximate existing cut and fill conditions, pre-existing development conditions, and utility conditions that may also impact the design of the project from both a field and construction perspective.

FIELD EXPLORATION
Prior to executing our field investigation scope as generally summarized below, a member of the Leighton technical staff under the direct supervision of a California-licensed Geotechnical Engineer or Certified Engineering Geologist will visit the site ascertain equipment access and determine suitable exploration methods. Our field exploration program will typically include the following scope:
• Perform a geotechnical reconnaissance of the project site including marking out of exploration locations; observation and geologic mapping of existing slopes, utility trench cuts and boxes, access constraints and geologic observation of site geology and adjacent geology where visible • Prior to our proposed subsurface exploration, we will notify Underground Service Alert ( DigAlert) to screen the proposed exploration locations for the presence of subsurface public utilities. We will also coordinate boring locations with site facilities personnel and may have our exploration locations cleared by a private underground utility subcontractor
• Acquire any necessary permits, such as a Los Angeles County Public Health Well Permit, if needed • We will perform our subsurface evaluation program that may consist of, but is not limited to, a combination of geotechnical borings, Cone Penetrometer Test soundings (CPTs) , test pits, and/or geophysical surveys. The exploration method will be selected on a project specific basis based on our understanding of the proposed development and existing site conditions . • Perform field percolation testing to support the design of proposed stormwater infiltration devices , if any. The field percolation testing will be performed in accordance with the latest Los Angeles County guidelines.
• At the completion of our field investigation, the explorations will be backfilled in accordance with County guidelines and patched to match existing surface conditions. Drill cuttings may need to be stored temporarily on- site, in clearly labeled 55-gallon drums, pending soil characterization and disposal at an appropriate receiving facility.

LABORATORY TESTING
Leighton has three laboratories (Irvine, Temecula and San Diego) with an extensive inventory of equipment and cross-trained staff that can handle many types of samples and tests. Our ability to load-level our tests between laboratories allows us to accept large volumes of samples and be more responsive to our client’s needs when rapid turn-around times are needed.

We perform a full spectrum of geotechnical soil testing in-house, including, but not limited to:
 Moisture/Density  Direct Shear  Compaction
 Specific Gravity  Triaxial Shear  Expansion Index
 Particle Size Analyses  Consolidation/Swell  Falling/Constant Head Permeability  Atterberg Limits  Stabilometer (R-value)  Corrosivity

The following is a list of common tests for aggregate, hot mix asphalt (HMA) and Portland cement concrete (PCC) that Leighton performs in our laboratories on a regular basis.

AGGREGATE (HMA & PCC) HOT MIX ASPHALT & PORTLAND CEMENT CONCRETE  Sieve Analysis  Maximum Density - Hveem
 Specific Gravity (Coarse/Fine)  Concrete Cylinder Compression  Sand Equivalent  Flexural Strength of Concrete
 Durability  Bulk specific Gravity of Compacted HMA
 LA Rattler  Asphalt Extraction by Ignition
 Soundness (Sodium/Magnesium)  Theoretical Maximum Density/Specific Gravity  Organic Impurities  Wet Track Abrasion of Slurry Seal

The quality of our laboratory is controlled using certification programs from the City of Los Angeles Department of Building and Safety (LADBS), AASHTO Materials Reference Laboratory (AMRL), California Division of the State Architect (DSA), Caltrans (various districts), among others. The quality of our analyses is controlled using verification forms that require stand-alone, fully reviewed engineering calculation packages to support design recommendations.

REPORT AND FINDINGS
We will prepare a geotechnical design report in accordance with the 2022 California Building Code and appropriate regulatory agencies guidelines and requirements. The report will contain graphics and discussions presenting our findings, conclusions, and recommendations for the project. The report will be signed by a California-licensed Geotechnical Engineer (GE) from our firm. Generally, our report will provide the following:

Subsurface Conditions: A discussion regarding the encountered subsurface soils conditions including soil type, in-situ moisture content and density, and depth to groundwater Geologic Hazards: We will discuss potential geologic hazards at this site, including potential for surface fault rupture, ground shaking, liquefaction, lateral spreading and differential seismic settlement, and potential flood hazards at the site using available data.

Seismicity: We will provide a regional fault map showing the proximity of this site to major faults identified by the California Geological Survey within a 100-kilometer radius of the site. We will also perform a site-specific ground motion analysis to obtain site-specific seismic coefficients in accordance with ASCE 7-16 and the 2022 California Building Code (CBC).

Grading and Earthwork: We will present earthwork criteria, including recommendations for new footing subgrade preparation, recommendations for removal of unsuitable soil or fill, utility trench backfill, surface drainage, and landscaping considerations, as necessary. Recommendations for import soil engineering and compaction criteria will also be provided.

Foundations: Utilizing data collected during our exploration, we will recommend allowable vertical and lateral bearing pressures for use in designing new spread-footing foundations. We will also provide foundation design criteria including recommendations for minimum size, embedment depth, allowable vertical and lateral capacities, and expected total and differential settlements. In addition, foundation recommendations for light poles footings, fence post footings, and other free-standing canopy structures will be provided.

Lateral Earth Pressures: Recommended lateral earth pressures for active, at-rest and passive conditions, and soil friction will be provided for use in retaining wall design.

Slabs-On-Grade: We will present concrete slab-on-grade design criteria, including recommendations for subgrade preparation, moisture vapor mitigation and if necessary, non-expansive fill.

Asphalt Concrete and Portland Cement Concrete Pavements: We will provide recommendations for AC and PCC pavement sections based on assumed traffic indices. We will also provide recommendations for permeable and precast pavers.

Temporary Excavations: Utilizing the data collected during our exploration, we will present temporary excavation guidelines (construction site safety is the responsibility of the contractor).

POST-REPORT SUBMITTAL SERVICES
A/E Team Coordination and Review: We will provide geotechnical support for the design team during preparation of the project drawings and specifications. We will review the project drawings and specifications for compliance with our geotechnical recommendations.

General Contractor Bidding Phase Services: Respond to bid questions including requests for information (RFIs) as they relate to geotechnical items; and attend project meetings and participate in conference calls with the design team.

SCHEDULE
Upon receipt of a written notice-to-proceed Leighton is prepared to immediately commence project planning and scheduling. California law requires that Underground Service Alert (USA) be provided at least two working days advanced notice to locate registered public utilities at the project site before exploration can begin.

Depending on potential site access constraints, weather and exploration equipment availability, field exploration may begin five to ten working days after receipt of notice to proceed. Depending on project specific scope details, our field exploration can be completed in one or more days. In general, geotechnical laboratory testing will require approximately two weeks to complete after the conclusion of field exploration. Geotechnical analyses and report preparation will then require an additional 2 weeks after completion of lab testing. We anticipate we can provide our geotechnical report within approximately 4 weeks after field exploration. We can provide preliminary results upon request in a technical memorandum as site-specific information becomes available.

Geotechnical Observation and Testing Services
The purpose of our geotechnical field observation and testing during construction will be to document that the work performed by the contractor is in compliance with the applicable plans and specifications and in accordance with applicable sections of the 2022 California Building Code. Our geologist and/or soils technician will inspect all excavations to verify the conditions anticipated in the approved project geotechnical report have been encountered and to provide corrective recommendations as deemed appropriate. It is not our intent to provide supervision or direction of the contractor or the contractor’s subcontractors.

We will dispatch to the project site qualified engineering technicians to perform field observation and testing of earthwork operations. Our field testing and observation activities will be performed on an “on-call” basis upon request by the project superintendent at the appropriate times during construction. However, we do require that our field representative be present continuously during the earthwork associated with remedial grading and/or preparation of building pads so that we may properly document the depth overexcavation and geotechnical characteristics of the compaction of the fill.

Based on our understanding of the proposed projects, the anticipated tasks for our scope of services will consist of the following field, laboratory and office work, generally presented in chronological order:
 Pre-Construction Plan Review: We will perform technical review of the grading plans and foundation plans for the project by our Geotechnical Engineer (GE) and Certified Engineering Geologist (CEG). We will prepare a letter documenting our review of each plan set, including signature and stamp, as needed. In addition, we will provide response to contractor’s requests for information (RFI’s) as requested.  Pre-Construction Meeting: Our project manager and field operations manager will attend a pre- construction meeting with representatives of the contractors/sub-contractors and construction management team to establish any site access restrictions, points of contact, protocol for scheduling our services, and distribution list for DFRs and test results.
 Field Observation and Testing: We will provide a soil technician for periodic and continuous geotechnical observation and testing during site preparation, overexcavation, and fill placement during earthwork construction, and general site grading. The frequency of observation and testing required will be established by the governing agency and the project inspector at the pre- construction meeting. In- situ density testing will be performed using a nuclear moisture/density gauge (ASTM D 6938).  Geotechnical Laboratory Testing: Geotechnical (soil) testing may include, but not li mited to, modified Proctor (ASTM D 1557) maximum dry density and optimum moisture content compaction curves, gradation, sand equivalent, corrosivity, expansion and R-Value.  On-call Engineering Support: We will respond to requests for information (RFIs), attend meetings, and support value engineering efforts on an as-needed basis.  Project Management: This scope of work will consist of reviewing DFRs and laboratory test results and preparing these reports for distribution. Geotechnical concerns encountered in the field and noted in the daily reports, and any material tested and found to not conform to project specifications, will be brought to the attention of your designated representative (s). Supervision, quality control and project management will be provided by our Geotechnical Engineer.
 Compacted Fill Report: We will prepare a compacted fill report summarizing our test results and observations made during construction.

Materials Testing and Special Inspection Services
Our scope of services for the proposed projects will consist of materials testing and special inspection during construction. Our understanding of the proposed projects will be based on the project plan sets and specifications provided by the City. The anticipated tasks for our scope of services will consist of the following field, laboratory and office work, generally presented in chronological order.  Reinforcing Steel Source Sampling: We will pick up reinforcing steel samples and “tag” source materials for site delivery identification. Sampled reinforcing steel will be tested in accordance with ASTM A370, and A615 or A706.
 Fresh Concrete Sampling, Batch Plant, and Testing: We will provide a technician certified by ACI for reinforced concrete sampling and testing. The work will consist of sampling reinforcing steel and concrete during construction. Our field technicians will sample fresh concrete, perform slump tests (ASTM C 143) and (if requested) air content tests (ASTM C 173 or C 231) when requested by your designated field representative. Air content tests will only be performed if specifically requested (not expected to be required where there is no frost). We will mold at least four concrete compression test cylinders for each 50 cubic-yards of concrete, or at least one set of four each day concrete is placed. We will also provide an ACI technician during concrete batch plant operations. Our batch plant visits will consist of checking batch weights, aggregate stockpiles and cement bins.
 Post-Installed Anchors/Epoxy Dowels Special Inspection: We will provide a special inspector that has been certified by the International Code Council (ICC) to observe installation of powder driven anchors, expansion anchors, adhesive anchors and dowels. Our special inspector will view installation of these anchors in accordance with ICC/ESR requirements, specific to anchors used. O ur special inspector will also evaluate drill bit compliance, hole depth and cleanliness, rod diameter, length of embedment, ambient temperature, material condition, product description and name, and adhesive shelf life and condition of packaging. If required, we will also provide pull/torque and/or proof testing of post-installed anchors.  Structural Steel (Field Welding): We will provide an American Welding Society (AWS) Certified Welding Inspector (CWI) to inspect structural steel welding and high-strength bolting on site. Their work will consist of periodic inspection of all single- pass fillet welds less-than (<) 5/16-inch-thick; and continuous inspection for all multi- pass fillet -welds greater -than (>) 5/16- inch-thick plus all complete penetration welds made during structural steel erection on site. Our CWI will also tabulate/record all inspected welds, including listing defective welds and documenting correction of defects. Our CWI will also check material, equipment, details of construction and procedures. They will also check ability of the welder. Upon completion of all welding for this project, a verified report will be provided to document that inspected welding was proper and completed in accordance with approved structural plans and specifications.  Nondestructive Testing (NDT): We will provide an NDT Technician to perform ultrasonic testing and magnetic particle testing as required by the approved plans.  High-Strength Bolting and Testing: We will provide a special inspector to inspect tightening or torqueing of high- strength bolts during construction. Samples of the bolt assembly (bolt, washer and nut) will be tested in the laboratory, as applicable, for hardness, proof load and wedge tensile.  Structural Steel Shop Welding: We will prov ide an American Welding Society (AWS) Certified Welding Inspector (CWI) with ICC structural steel and bolting to verify and inspect steel during shop fabrication and construction in the field. Their work will consist of periodic and/or continuous inspection of:
 Material identification
 Steel frame joint details for conformance with approved structural plans  Welded connection of structural steel and cold-formed steel deck, and reinforcing steel, if required.

Our CWI will also tabulate/record inspected welds, including listing defective welds and documenting correction of defects. Our CWI will also check weld filler materials, equipment, welding procedure specifications, and ability of the welder, as necessary. Our inspector may use non-destructive testing such as magnetic particle, ultrasonic or any other aid in addition to visual inspection that he or she may deem necessary to assure the adequacy of the welding per approved structural plans and job specifications.

Also, we will provide an NDT Technician to perform ultrasonic testing and magnetic particle testing as required by the approved plans as needed.
 Masonry Special Inspection: We will provide an ICC structural masonry inspector during construction of the masonry (CMU) walls. We will sample and compression -test grout, mortar and block. When directed by the Project Inspector, we will extract a core from the constructed walls for laboratory compression testing.
 Masonry Veneer Field Testing: We will provide an ICC structural masonry inspector to perform field test of adhered masonry veneer. Our inspector will use calibrated shear testing equipment to perform the shear testing per project approved documents.
 Structural Wood Framing Special Inspection: Our services will consist of periodic inspection o f nailing, bolting, anchor and other fastening of shearwall, blocked floor and roof diaphragm, drag strut, seismic brace, shear panel and hold down assembly. We will provide an inspector that has been certified to observe the installation of fasteners. O ur inspector will inspect the installation of these fasteners in accordance with structural plans and specifications.
 Materials Laboratory Testing: Our services will consist of testing of the following materials in our laboratory:
 Reinforcing Steel: Tensile and bend tests will be performed in accordance with ASTM A615 or A706.  Concrete: Concrete laboratory curing and compressive strength testing of field- molded concrete test cylinders will be performed in general accordance with ASTM C31 and C39, r espectively. Verbal and/or e- mail reports will be provided for 7 -day breaks. We will provide a final one -page report summarizing compressive strength tests results for a given set of cylinders (four cylinders, plus one hold) after the 28-day breaks are completed.
 High Strength Grout : Compression testing of grout prisms molded by our representative will be performed in accordance with ASTM C109.
 Masonry: Compression testing of mortar cylinders and grout prism test specimens molded by our representative will be performed in accordance to ASTM C270 and C1019. Concrete masonry units will be tested in accordance with ASTM C140 (compression, moisture content, absorption & unit weight).

Masonry core-drilled samples will be tested in accordance with CBC 2105A.4.  Post-Installed Anchors: We will perform tensile testing of the anchors. Verbal and/or e- mail reports will be provided. We will provide a final on-page report summarizing the test results.  High Strength Bolts: We will perform tensile testing of the high strength bolts. Verbal and/or e- mail reports will be provided. We will provide a final on-page report summarizing the test results.  Project Management and Reporting: This scope of work will consist of reviewing DFRs and laboratory test results, and preparing these reports for distribution. Special Inspection/Materials concerns encountered in the field and noted in the daily reports, and any material tested and found to not conform to project specifications, will be brought to the attention of your designated representative (s) . Supervision, quality control and project management will be provided by our Geotechnical Engineer.  Project Closeout: we will prepare a final affidavit summarizing the material testing and special inspection provided during construction.

Scheduling and Dispatching
Leighton is prepared to begin our work immediately upon receipt of your written authorization to proceed. We would appreciate at least three working days advance notice for scheduling our field personnel on the first day you require our services. Work thereafter may be scheduled with a full (24 hours) one working day advance notice. We will rely on your field representative to contact us to schedule all fieldwork, and to help us avoid unproductive site visits. Contact on the weekends and holidays are not addressed until the first following working day, without prior arrangement. We request that you “partner- with-us” to manage our budget, by avoiding unnecessary trips to the site. We will work with your field representative to reduce standby time and/or unnecessary trips to the site.

OTHER CONSULTING SERVICES
In addition to the core geotechnical services described above that are expected to be provided as part of the on-call contract, we understand that other consulting services associated with geotechnical and geologic consulting services may be required. These services might include:

Landslide Repair Design: For more than 60 years, Leighton has been providing the integrated geotechnical engineering and engineering geology services required for landslide repairs. In addition to our experience with site characterization and mitigation design concepts, our Geotechnical Engineers (GEs) prepare assessment and mitigation reports and prepare repair grading plans and specifications, including remedial earthwork, soil nail and/or earth anchor (“tie-back”) design, conventional shoring to reestablish roadways, safe utility corridors or to support existing structures with underpinning. For more complex shoring designs, we will consult with an experienced Structural Engineer (SE) who has experience focused on shoring.

Remedial Grading Plan Preparation: Although geotechnical engineers provide essential input for all grading plans, such plans are more routinely prepared by general-practice Civil Engineering firms. On occasion, however, grading consists only of geotechnical remediation earthwork, such as for landslide stabilization. In these cases, Leighton has and will assume the lead on designing slope stabilization buttresses and/or other remedial earthwork and will prepare final design stabilization grading plans in house, possibly with assistance from a civil engineering subconsultant for Professional Land Surveying (PLS) services and minor general civil engineering support to establish property boundaries and easements.

Peer Review: Leighton will provide Third Party review services to assist the City in the evaluation of geotechnical reports prepared by others. We do this routinely for our other clients. Based upon our review, we will provide written comments and recommendations to the City for additional analysis, if needed. In addition, we will attend meetings with the technical team to discuss project priorities and progress. For Third Party reviews to add value, a mentorship attitude, rather than competitive attitude, is required. We only provide comments that are necessary to ensure compliance and result in enhanced public safety, avoiding any real or perceived bias against other involved professionals.

Value Engineering (VE): Leighton will evaluate several alternatives for geotechnical design to ensure appropriate cost-effective measures are implemented when appropriate.

Drafting Services: Leighton has full in-house drafting capabilities utilizing AutoCAD Civil 3D, MicroStation, and analytical/visualization tools such as ArcGIS, Modflow, Rockworks, and gINT software. We possess the full array of information technology and field equipment necessary to successfully support large-scale, geospatial data-intensive projects such large pipeline in complex geologic areas.

Additionally, we can use computer graphics to visually convey the results of our studies. Illustrations and report graphics are developed utilizing a variety of data imaging and geospatial analysis software. Boundaries, delineations, visualizations and proposed land uses are compiled and viewed in a GIS platform, using ArcGIS,

Contact Leighton Dispatch
(866) LEIGHTON
[email protected]
AutoCAD Map and other leading geospatial software. Maps, site plans and GIS platforms are created in ArcGIS 10.x and AutoCAD Map.

Environmental Investigation: Leighton has supported development plans for more than 2,000 sites throughout California, determining viability through a range of specialized environmental engineering and consulting services. Should these services be required by the City, Leighton can offer the following services:
• Phase I Environmental Site Assessments (ESAs)
• Phase II ESAs, including carefully planned and executed subsurface investigations • Performance-based remediation design, implementation and management • Litigation Support
• Remedial Excavation
• Soil Vapor/dual phase extraction
• In-Situ chemical oxidation/reduction
• Preparation and management of environmental compliance plans • CUPA Hazardous Material Management Plan (HMMP)
• Hazardous Material Inventory Statements (HMIS)
• Underground Storage Tank Program audits

SECTION 3: FEE PROPOSAL
Per instruction in the RFP, Leighton’s Fee Proposal is provided in a separately sealed envelope / in a separate file.

SECTION 4: CERTIFICATIONS
Attachment 3-1 Non-Collusion Affidavit
Attachment 3-2: Non-Lobbying Certification
Attachment 3-3: Non-Discrimination Certifications

EXHIBIT C

COMPENSATION
Consultant’s Fee Proposal including hourly rates, if applicable

Fee 8/2023 www.leightongroup.com Page 1 of 4

FEE SCHEDULE FOR THE CITY OF SANTA ANA
RATES EFFECTIVE FROM 11/19/2023 - 11/18/2026

GEOTECHNICAL LABORATORY TESTING

LABOR RATES
METHOD $/TEST

CLASSIFICATION & INDEX PROPERTIES
Photograph of sample ....................................................................................15 Moisture content (ASTM D2216) ........................................................................25 Moisture & density (ASTM D2937) ring samples ................................................35 Moisture & density (ASTM D2937) Shelby tube or cutting .................................45 Atterberg limits 3 points (ASTM D4318): ..........................................................160 - Single point, non-plastic ............................................................................90 - Atterberg limits (organic ASTM D2487 / D4318) .............................................195 - Visual classification as non-plastic (ASTM D2488).......................................15 Particle size: ....................................................................................................... - Sieve only 1½ inch to #200 (AASHTO T27/ASTM C136/ASTM D6913/CTM 202) ...145 - Large sieve 6 inch to #200 (AASHTO T27/ASTM C136/ASTM D6913/CTM 202) ...190 - Hydrometer only (ASTM D7928) ................................................................120 - Sieve + hydrometer ≤3 inch sieve, (ASTM D7928) ....................................200 - Percent passing #200 sieve, wash only (ASTM D1140) ...............................75 Specific gravity and absorption of fine aggregate
(AASHTO T84/ASTM C128/ASTM D854/CTM 207) ..............................................140 Specific gravity and absorption of coarse aggregate
(AASHTO T85/ASTM C127/CTM 206) ............................................................... 110 - Total porosity - on Shelby tube sample (calculated) ...............................180 - Total porosity - on other sample (calculated) ..........................................165 Shrinkage limits wax method (ASTM D4943) ...................................................135 Pinhole dispersion (ASTM D4647) ...................................................................225 Dispersive characteristics (double hydrometer ASTM D4221) ..............................215 As-received moisture & density (chunk/carved samples) ...............................65 Sand Equivalent (AASHTO T176/ASTM D2419/CTM 217) .................................... 115

SHEAR STRENGTH
Pocket penetrometer ......................................................................................20 Direct shear (ASTM D3080, mod., 3 points):

Consolidated undrained - 0.05 inch/min (CU) ..............................................305 Consolidated drained - <0.05 inch/min (CD) ................................................370 Residual shear EM 1110-2-1906-IXA (price per each additional pass after shear)....55 Remolding or hand trimming of specimens (3 points) ....................................95 Oriented or block hand trimming (per hour) ....................................................70 Single point shear ......................................................................................... 115 Torsional shear (ASTM D6467 / ASTM D7608) ....................................................880 METHOD $/TEST

COMPACTION & PAVEMENT SUBGRADE TESTS
Standard Proctor compaction, 4 points (ASTM D698)
- 4 inch diameter mold (Methods A & B) ...................................................170 - 6 inch diameter mold (Method C) ...........................................................230 Modified Proctor compaction 4 points (ASTM D1557):
- 4 inch diameter mold Methods A & B ......................................................235 - 6 inch diameter mold Method C ..............................................................265 Check point (per point) ...................................................................................70 Relative compaction of untreated/treated soils/aggregates (CTM 216) ..........270 Relative density 0.1 ft mold (ASTM D4253, D4254) ...........................................250 California Bearing Ratio (ASTM D1883)
- 3 point .....................................................................................................535 - 1 point .....................................................................................................200 R-Value untreated soils/aggregates (AASHTO T190/ASTM D2844/CTM 301) .......335 R-Value lime or cement treated soils/aggregates (AASHTO T190/ASTM D2844/CTM 301) ..........................................................................................365

SOIL CHEMISTRY & CORROSIVITY
pH Method A (ASTM D4972 or CTM 643) .............................................................50 Electrical resistivity – single point – as received moisture ..............................50 Minimum resistivity 3 moisture content points (ASTM G187/CTM 643) ...............95 pH + minimum resistivity (CTM 643) ...............................................................140 Sulfate content - gravimetric (CTM 417 B Part 2) ................................................75 Sulfate content - by ion chromatograph (CTM 417 Part 2) .................................85 Sulfate screen (Hach®) ....................................................................................35 Chloride content (AASHTO T291/CTM 422) .........................................................75 Chloride content – by ion chromatograph (AASHTO T291/CTM 422)...................85 Corrosion suite: minimum resistivity, sulfate, chloride, pH (CTM 643) ............285 Organic matter content (ASTM D2974) ..............................................................70

CONSOLIDATION & EXPANSION/SWELL TESTS
Consolidation (ASTM D2435): ..........................................................................210 Each additional time curve .............................................................................50 Each additional load/unload w/o time reading ................................................45 Expansion Index (ASTM D4829) ......................................................................140 Single load swell/collapse - Method B (ASTM D4546-B, seat, load & inundate only) .... 115 Swell collapse Method A up to 10 load/unloads w/o time curves (ASTM D4546-A) ..........................................................................................310 CLASSIFICATION $/HR
Technician I ...................................................................................................100 Technician II / Special Inspector ................................................................... 110 Senior Technician / Senior Special Inspector ...............................................130 Prevailing Wage (field soils / materials tester) * ...........................................178 Prevailing Wage (Special Inspector) * ..........................................................183 Prevailing Wage (On site Source Inspector, NDT and soil remediation O&M)* .......................................................................................................188 System Operation & Maintenance (O&M) Specialist ....................................165 Non Destructive Testing (NDT) .....................................................................175 Deputy Inspector ..........................................................................................130 Field / Laboratory Supervisor .......................................................................165 Source Inspector ..........................................................................................150 City of Los Angeles Deputy Building (including Grading) Inspector .............175 * See Prevailing Wages in Terms and Conditions
CLASSIFICATION $/HR
Project Administrator/Word Processor/Dispatcher .........................................90 Information Specialist ...................................................................................130 CAD Operator ...............................................................................................155 GIS Specialist ...............................................................................................155 GIS Analyst ..................................................................................................180 Staff Engineer / Geologist / Scientist ............................................................170 Senior Staff Engineer / Geologist / Scientist / ASMR ...................................185 Operations / Laboratory Manager .................................................................205 Project Engineer / Geologist / Scientist ........................................................215 Senior Project Engineer / Geologist / Scientist / SMR ..................................235 Associate ......................................................................................................260 Principal ........................................................................................................290 Senior Principal ............................................................................................345

FEE SCHEDULE

Page 2 of 4 ends

CONSTRUCTION MATERIALS LABORATORY TESTING
METHOD $/TEST

TRIAXIAL TESTS
Unconfined compression strength of cohesive soil (with stress/strain plot, ASTM D2166) ..................................................................................................................145 Unconsolidated undrained triaxial compression test on cohesive soils (UU, ASTM D2850, USACE Q test, per confining stress) ..........................................185 Consolidated undrained triaxial compression test for cohesive soils, (CU, ASTM D4767, USACE R-bar test) with back pressure saturation & pore water pressure measurement (per confining stress) ........................................400 Consolidated drained triaxial compression test (CD, USACE S), with volume change measurement. Price per soil type below EM 1110-2-1906(X):

Sand or silty sand soils (per confining stress) .........................................400 Silt or clayey sand soils (per confining stress) ........................................535 Clay soils (per confining stress) ..............................................................755 Three-stage triaxial (sand or silty sand soils) ..........................................700 Three-stage triaxial (silt or clayey sand soils) .........................................935 Three-stage triaxial (clay soils) .............................................................1,320 Remolding of test specimens ....................................................................70 METHOD $/TEST

HYDRAULIC CONDUCTIVITY TESTS
Triaxial permeability in flexible-wall permeameter with backpressure saturation at one effective stress
(EPA 9100/ASTM D5084, falling head Method C): ................................................335 Each additional effective stress ....................................................................130 Hand trimming of soil samples for horizontal K ..............................................65 Remolding of test specimens .........................................................................70 Permeability of granular soils (ASTM D2434) ..................................................145 Soil suction (filter paper method, ASTM D5298) ....................................................430

SOIL-CEMENT
Moisture-density curve for soil-cement mixtures (ASTM D558) .......................260 Wet-dry durability of soil-cement mixtures (ASTM D559) ¹ ...........................1,290 Compressive strength of molded soil-cement cylinder (ASTM D1633)¹ .............65 Soil-cement remolded specimen (for shear strength, consolidation, etc.) ¹ ............250 ¹ Compaction (ASTM D558 maximum density) should also be performed – not included in above price
METHOD $/TEST

CONCRETE STRENGTH CHARACTERISTICS
Concrete cylinders compression (ASTM C39) (6” x 12” and 4” x 8”) ................40 Compression, concrete or masonry cores (testing only) ≤6 inch (ASTM C42) ......45 Trimming concrete cores (per core) ...............................................................25 Flexural strength of concrete (simple beam-3rd pt. loading, ASTM C78/CTM 523) .....90 Flexural strength of concrete (simple beam-center pt. loading, ASTM C293/CTM 523) ...90 Non shrink grout cubes (2 inch, ASTM C109/C1107) ............................................30 Drying shrinkage - four readings, up to 90 days, 3 bars (ASTM C157) ...........430 Length of concrete cores (CTM 531) .................................................................45

HOT MIX ASPHALT (HMA)
Resistance of compacted HMA to moisture-induced damage
(AASHTO T283/CTM 371) ...........................................................................2,250 Hamburg Wheel, 4 briquettes (modified) (AASHTO T324) ...............................965 Superpave gyratory compaction (AASHTO T312/ASTM D6925) .........................375 Extraction by ignition oven, percent asphalt
(AASHTO T308/ASTM D6307/CTM 382) ............................................................160 Ignition oven correction/correlation values
(AASHTO T308/ASTM D6307/CTM 382) .........................................................1,445 Extraction by centrifuge, percent asphalt (ASTM D2172) ................................160 Gradation of extracted aggregate (AASHTO T30/ASTM D5444/CTM 202) ............145 Stabilometer, S-Value (ASTM D1560/CTM 366) .................................................285 Bituminous mixture preparation (AASHTO R30/CTM 304) ...................................85 Moisture content of HMA (AASHTO T329/ASTM D6037/CTM 370) .........................65 Bulk specific gravity of compacted HMA, molded specimen or cores, uncoated (AASHTO T166/ASTM D2726/CTM 308) ..............................................55 Bulk specific gravity of compacted HMA, molded specimen or cores, paraffin-coated (AASHTO T275/ASTM D1188/CTM 308) .....................................60 Maximum density - Hveem (CTM 308) ............................................................215 Theoretical maximum density and specific gravity of HMA (AASHTO T209/ ASTM D2041/CTM 309) .................................................................................140 Thickness or height of compacted bituminous paving mixture specimens (ASTM D3549) ...............................................................................................45 Wet track abrasion of slurry seal (ASTM D3910) .............................................160 Rubberized asphalt (add to above rates) ........................................................+25% BRICK
Compression - cost for each, 5 required (ASTM C67) .......................................55 Absorption - cost for each, 5 required (ASTM C67) ...........................................55 METHOD $/TEST

AGGREGATE PROPERTIES
Bulk density and voids in aggregates (AASHTO T19/ASTM C29/ CTM 212) ............55 Organic impurities in fine aggregate sand (AASHTO T21/ASTM C40/CTM 213) ....65 LA Rattler-smaller coarse aggregate <1.5” (AASHTO T96/ASTM C131/ CTM 211) ...215 LA Rattler-larger coarse aggregate 1-3” (AASHTO T96/ASTM C535/CTM 211) ....270 Apparent specific gravity of fine aggregate (AASHTO T84/ASTM C128/ CTM 208)...140 Specific gravity and absorption of coarse aggregate (ASTM C127/CTM 206) >#4 retained .............................................................................................110 Clay lumps, friable particles (AASHTO T112/ASTM C142) ..................................190 Durability Index (AASHTO T210/ASTM D3744/CTM 229) ......................................215 Moisture content of aggregates by oven drying
(AASHTO T255/ASTM C566/CTM 226) ...............................................................45 Uncompacted void content of fine aggregate
(AASHTO T304/ ASTM C1252/ CTM 234) ..........................................................140 Percent of crushed particles (AASHTO T335/ASTM D5821/CTM 205) ..................145 Flat & elongated particles in coarse aggregate (ASTM D4791/CTM 235) ..........230 Cleanness value of coarse aggregate (CTM 227) ...........................................225 Soundness, magnesium (AASHTO T104/ASTM C88/CTM 214) ...........................240 Soundness, sodium (AASHTO T104/ASTM C88/CTM 214) ..................................695

MASONRY
Mortar cylinders 2” x 4” (ASTM C780) ...............................................................35 Grout prisms 3” x 6” (ASTM C1019) ...................................................................35 Masonry cores compression, ≤6” diameter - testing only (ASTM C42) .............45 Masonry core shear testing (Title 24) .............................................................85 Veneer bond strength, cost for each - 5 required (ASTM C482) ........................60 CMU compression to size 8” x 8” x 16” - 3 required (ASTM C140) ....................60 CMU moisture content, absorption & unit weight - 6 required (ASTM C140) .....55 CMU linear drying shrinkage (ASTM C426) .....................................................190 CMU grouted prisms compression test ≤8” x 8” x 16” (ASTM C1314) .............215 CMU grouted prisms compression test > 8” x 8” x 16”(ASTM C1314) .............270

BEARING PADS/PLATES AND JOINT SEAL
Elastomeric bearing pads (Caltrans SS 51-3) .................................................1060 Elastomeric bearing pad with hardness and compression tests (Caltrans SS 51-3) ......................................................................................1,315 Type A Joint Seals (Caltrans SS 51-2) ...........................................................1,735 Type B Joint Seals (Caltrans SS 51-2) ...........................................................1,640 Bearing plates (A536) .....................................................................................770

FEE SCHEDULE

Page 3 of 4 ends

EQUIPMENT LIST
METHOD $/TEST

REINFORCING STEEL AND PRESTRESSING STRANDS
Rebar tensile test, ≤ up to No. 11 (ASTM A370) ................................................70 Rebar tensile test, ≥ No. 14 & over (ASTM A370) ...........................................215 Rebar bend test, up to No. 11 (ASTM A370) ......................................................70 Rebar bend test, ≥ No. 14 & over (ASTM A370) ..............................................215 Resistance butt-welded hoops/bars, tensile test, ≤ up to No. 10 (CTM 670) ....70 Resistance butt-welded hoops/bars, tensile test, ≥ No. 11 & over (CTM 670) ...90 Mechanical rebar splice, tensile test, ≤ up to No. 11 (CTM 670).......................70 Mechanical rebar splice, slip test, ≤ up to No. 11 (CTM 670)............................45 Mechanical rebar splice, tensile test, ≥ No. 14 & over (CTM 670) ..................215 Mechanical rebar splice, slip test, ≥ No. 14 & over (CTM 670) .......................215 Headed rebar splice, tensile test, ≤ up to No. 11 (CTM 670) ............................70 Headed rebar splice, tensile test, ≥ No. 14 & over (CTM 670) .......................215 Epoxy coated rebar/dowel film thickness (coating) test (ASTM A775/A934) .......50 Epoxy coated rebar/dowel continuity (Holiday) test (ASTM A775/A934) .............70 Epoxy coated rebar flexibility/bend test, up to No. 11 (ASTM A775/A934) ..........50 Prestressing wire, tension (ASTM A416) .........................................................190 Sample preparation (cutting) .........................................................................55 METHOD $/TEST

STREET LIGHTS/SIGNALS
LED Luminaires / Signal Modules / Countdown Pedestrian Signal Face Modules (Caltrans RSS 86)........................................................................1,390

SPRAY APPLIED FIREPROOFING
Unit weight (density, ASTM E605) ........................................................................65

FASTENERS / BOLTS / RODS
F3125 GR A307, A325 Bolts, tensile test, ≤ up to 1-1/4” diameter, plain (ASTM A370) .................................................................................................70 F3125 GR A307, A325 Bolts, tensile test, ≤ up to 1-1/4” diameter, galvanized (ASTM A370) ...............................................................................80 A490 Bolts, tensile test, ≤ up to 1-1/4” diameter, plain (ASTM A370) ................70 A490 Bolts, tensile test, ≤ up to 1-1/4” diameter, galvanized (ASTM A370) ......80 A593 Bolts, tensile test, ≤ up to 1-1/4” diameter, stainless steel (ASTM A370) ...70 F1554 Bolts, tensile test, ≤ up to 1-1/4” diameter, plain (ASTM A370) ............110 F1554 Bolts, tensile test, ≤ up to 1-1/4” diameter, galvanized (ASTM A370) ...130

SAMPLE TRANSPORT
Pick-up & delivery (weekdays, per trip, <50 mile radius from Leighton office) ...95 ITEM $ UNIT
1/4 inch Grab plates ................................................................................5 each 1/4 inch Tubing (bonded) ....................................................................0.60 foot 1/4 inch Tubing (single) ......................................................................0.40 foot 3/8 inch Tubing, clear vinyl ................................................................0.60 foot 4-Gas meter (RKI Eagle or similar)/GEM 2000 ...................................140 day Air flow meter and purge pump (200 cc/min) .........................................55 day Box of 24 soil drive-sample rings .........................................................130 box Brass sample tubes ...............................................................................11 each Caution tape (1000-foot roll) ..................................................................22 each Combination lock or padlock ................................................................. 15 each Compressed air tank and regulator .......................................................55 day Concrete coring machine (≤6-inch-dia) ...............................................160 day Consumables (gloves, rope, soap, tape, etc.) .......................................40 day Core sample boxes ................................................................................30 each Crack monitor Two-Dimensional ............................................................30 each Crack monitor Thee-Dimensional ..........................................................40 each Cutoff saws, reciprocating, electric (Sawzall®) .....................................80 day D-Meter Walking Floor Profiler ............................................................ 110 day Disposable bailers .................................................................................25 each Disposable bladders ..............................................................................20 each Dissolved oxygen meter ........................................................................50 day DOT 55-gallon containment drum with lid .............................................85 drum Double-ring infiltrometer ......................................................................135 day Dual-stage interface probe ....................................................................85 day Dynamic Cone Penetrometer ..............................................................430 day Generator, portable gasoline fueled, 3,500 watts ..................................90 day Global Positioning System/Laser Range Finder ....................................80 day Hand auger set ......................................................................................90 day HDPE safety fence (≤100 feet) .............................................................40 roll Horiba U-51 water quality meter ..........................................................135 day Light tower (towable vertical mast) ......................................................150 day Magnehelic gauge .................................................................................15 day Manometer ............................................................................................25 day Mileage (will adjust with IRS published rate) .....................................0.655 mile ITEM $ UNIT
Moisture test kit (excludes labor to perform test, ASTM E1907) ...........65 test Nuclear moisture and density gauge ....................................................88 day Electrical moisture and density gauge ..................................................88 Day Pachometer ...........................................................................................50 day Particulate Monitor ...............................................................................135 day pH/Conductivity/Temperature meter ......................................................60 day Photo-Ionization Detector (PID) ...........................................................130 day Pump, Typhoon 2 or 4 stage .................................................................55 day QED bladder pump w/QED control box ...............................................175 day Quire fee – Phase I only ......................................................................250 each Resistivity field meter and pins ............................................................200 day Slip / threaded cap, 2-inch or 4-inch diameter, PVC Schedule 40 .........20 each Slope inclinometer ...............................................................................250 day Soil sampling T-handle (Encore) ...........................................................10 day Soil sampling tripod ...............................................................................40 day Speedy (R) moisture tester ....................................................................10 day Stainless steel bailer ..............................................................................60 day Submersible pump with controller .......................................................180 day Submersible pump/transfer pump, 10-25 gpm ......................................65 day Support service truck usage (well installation, etc.) .............................250 day Survey/fence stakes ..............................................................................10 each Tedlar® bags .........................................................................................25 each Traffic cones (≤25)/barricades (single lane) .......................................... 55 day Turbidity meter ......................................................................................80 day Tyvek® suit (each) .................................................................................25 each Vapor sampling box ...............................................................................65 day Vehicle usage (carrying equipment) ......................................................20 hour VelociCalc ..............................................................................................40 day Visqueen (20 x 100 feet) .....................................................................130 roll Water level indicator (electronic well sounder) <300 feet deep well ....100 day ZIPLEVEL® ...........................................................................................40 day Other specialized geotechnical and environmental testing and monitoring equipment are available, and priced per site
Fee/2023 www.leightongroup.com Page 4 of 4

FEE SCHEDULE

TERMS AND CONDITIONS
z Proposal Expiration: Proposals are valid for at least 30 days, subject to change after 30 days; unless
otherwise stated in an attached proposal.
z Prevailing Wages: Our fees for prevailing wage work
are based upon California prevailing wage laws and
wage determinations. Unless specifically indicated in
our proposal, costs for apprentice are not included. If we are required to have an apprentice on your project,
additional fees will be charged. Prevailing wage rates
will increase by $8 on July 1st of each year.
z Overtime: Standard overtime rate is per California
Labor Law and is billed at 1.5 or 2 times their hourly
billing rate. Overtime rate for non-exempt field
personnel working on a Leighton observed holiday
is billed at 2 times their hourly billing rate. Overtime rate for Prevailing wage work is per the California
Department of Industrial Relations (DIR) determination
and is multiplied at 1.5 to 2 times their hourly billing rate for overtime and double-time, respectively.
z Expert Witness Time: Expert witness deposition and
testimony will be charged at 2 times hourly rates listed on the previous pages, with a minimum charge of four
hours per day.
z Minimum Field Hourly Charges: For Field
Technicians, Special Inspectors or any on-site (field)
materials testing services:
4 hours: 4-hour minimum charge up to the first
four hours of work.
8 hours: 8-hour minimum charge for over four
hours of work, up to eight hours.

Project time accrued includes portal to portal
travel time.
z Insurance & Limitation of Liability: These rates are predicated on standard insurance coverage and a limit
of Leighton’s liability equal to our total fees for a given project.
z Outside Direct Costs: Heavy equipment,
subcontractor fees and expenses, project-specific
permits and/or licenses, project-specific supplemental
insurance, travel, subsistence, project-specific
parking charges, shipping, reproduction, and other
reimbursable expenses will be invoiced at cost plus
20%, unless billed directly to and paid by client.
z Invoicing: Invoices are rendered monthly, payable
upon receipt in United States dollars. A service
charge of 1½-percent per month will be charged for
late payment.
z Client Disclosures: Client agrees to provide all
information in Client’s possession about actual or
possible presence of buried utilities and hazardous
materials on the project site, prior to fieldwork, and
agrees to reimburse Leighton for all costs related to
unanticipated discovery of utilities and/or hazardous
materials. Client is also responsible for providing safe and legal access to the project site for all Leighton
field personnel.
z Earth Material Samples: Quoted testing unit
rates are for soil and/or rock (earth) samples free of
hazardous materials. Additional costs will accrue
beyond these standard testing unit rates for handling,
testing and/or disposing of soil and/or rock containing hazardous materials. Hazardous materials will be
returned to the site or the site owner’s designated
representative at additional cost not included in
listed unit rates. Standard turn-around time for
geotechnical-laboratory test results is 10 working
days. Samples will be stored for 2 months following
completion of assigned tests, after which they will be
discarded. Prior documented notification is required
if samples need to be stored for a longer time. A
monthly storage fee of $15 per bag and $6 per sleeve
or tube will be applied. Quoted unit rates are only for earth materials sampled in California. There may be
additional cost for handling imported samples.
z Construction Material Samples: After all
designated breaks for a given sample set meet
specified compressive at design age or other client-
designated strength, all “hold” cylinders or specimens
will be automatically disposed of, unless specified in
writing prior to the 28-day break. Unless specifically requested otherwise, all other construction materials
will be disposed of after completion of testing and
reporting.