EXHIBIT 1

City of Santa Ana RFP 23-182

Page 2 ends

NOTICE INVITING PROPOSALS
NOTICE IS HEREBY GIVEN that proposals will be received from qualified firms for On-Call Emergency Asphalt Concrete, Concrete and Storm Drain Repair Services.

Responses to this Request for Proposals (RFP) must be submitted electronically to the PlanetBids system no later than January 30, 2024 at 2:00 p.m. Proposals received after this date/time will not be considered. It is the responsibility of the proposer to ensure that any proposals submitted have sufficient time to be received by the City of Santa Ana prior to this proposal due date and time.

Additionally, it is a requirement that hard copy proposals also be sent by courier service, mailed, or hand delivered in an enclosed sealed envelope and marked clearly with the following:
“SEALED PROPOSAL FOR

ON-CALL EMERGENCY ASPHALT CONCRETE, CONCRETE AND STORM DRAIN

REPAIR SERVICES
RFP NO. 23-182

IN THE CITY OF SANTA ANA
DO NOT OPEN WITH REGULAR MAIL.”

City of Santa Ana
Attn.: Edward Torres
Public Works Agency; M-22
20 Civic Center Plaza; Ross Annex
Santa Ana, CA 92701
For hard copy drop offs, visitors will be routed to deliver in the blue drop box on the 1st floor of Ross Annex across from the Public Works Counter. Gentle note: staff will not timestamp or sign any hard copy deliveries as the electronic submittal by the deadline is suffice. For further instructions regarding hard copy submission of proposals, refer to PlanetBids.

All notifications, requests for information, updates and addenda will be posted online on PlanetBids at https://www.planetbids.com/portal/portal.cfm?CompanyID=20137. Proposers shall be responsible for monitoring the site to obtain information regarding this solicitation. Failure to respond to required updates may result in a determination of a nonresponsive qualification.

City of Santa Ana RFP 23-182

Page 3 ends

TABLE OF CONTENTS

I. INTRODUCTION / PROJECT DESCRIPTION 4

II. INSTRUCTIONS TO PROPOSERS 6 A. CITY RESPONSIBILITIES
B. PROPOSER RESPONSIBILITIES
C. REQUEST FOR INFORMATION OR CLARIFICATION
D. ADDENDA
E. LICENSES & PERMITS
F. INSURANCE
G. PAYMENT INFORMATION PACKET
H. PRE-PROPOSAL MEETING
I. CITY RIGHT TO REJECT
J. BID PROTESTS

III. SUBMITTAL REQUIREMENTS 8
A. GENERAL
B. PROPOSAL CONTENTS

1. STATEMENT OF QUALIFICATIONS

2. FEE PROPOSAL

3. CERTIFICATIONS

IV. PROPOSAL REVIEW (CONSULTANT SELECTION) 10 A. EVALUATION AND RATING
B. SELECTION

V. CONTRACT AWARD 10
A. REQUEST FOR COUNCIL ACTION
B. EXECUTION OF AGREEMENT

VI. IMPLEMENTATION 11
A. NOTICE TO PROCEED

VII. PUBLIC RECORDS 11

VIII. APPENDIX
ATTACHMENT 1: SCOPE OF WORK
ATTACHMENT 2: STANDARD AGREEMENT
ATTACHMENT 3: CERTIFICATION
ATTACHMENT 4: CITY OF SANTA ANA STANDARD PLANS
ATTACHMENT 5: FEE SCHEDULE (UNDER SEPARATE SEALED COVER)

City of Santa Ana RFP 23-182

Page 4 ends

I. INTRODUCTION / PROJECT DESCRIPTION
Nature of Work:

The City of Santa Ana is seeking qualified construction companies to be ON-CALL using a Task Order process to provide on-call and/or emergency services to augment the City’s capacity to restore pavement, sidewalk, curb and gutter, grading, underground, and/or storm drain systems and structures in the event of failures or other urgent tasks within the public right of way. The City intends to enter into on-call agreements with three (3) selected contractors in the total aggregate amount not to exceed $3,000,000. The City will solicit quotes from the selected contractors for work on an as-needed, Task-Order basis.

Any approved Task Orders will be based upon each contractor’s schedule of hourly billing rates provided with their proposal submittal and on time and materials (or lump sum basis) as appropriate per Task Order issued. The City reserves the right to enter into fewer, or more agreements, and to issue several or no task orders to each firm, as determined by the City’s needs. Attachment 1 includes a detailed Scope of Work in this RFP’s Appendix
Number of Proposals and Signature:

Five (5) hard copies are required to accompany an electronic submittal of the complete proposal package on PlanetBids. One of the hard copies shall be marked as “ORIGINAL” and be signed by a company official with the power to bind the company, and submitted to the City of Santa Ana. Please be explicit in identifying the appropriate person with legal authority to bind the company.

The Statement of Qualifications shall be limited to a maximum of (10) double-sided pages (excluding front and back covers, section dividers and attachments such as resumes and forms). Font size shall be minimum 11-point Arial. Proposal exhibits shall be maximum 11” x 17”.

Proposal Evaluation and Rating:

The criteria for evaluating the RFP submitted will take the following items into consideration:
 Firm/Team Experience 30%
 Understanding of Need 30%
 Relevant Project Experience 30%
 References 10%
The City has established a proposal review committee to evaluate proposers based on the response to this RFP, which includes adherence to outlined directions and format, and the

City of Santa Ana RFP 23-182

Page 5 ends

City evaluation criteria set forth above. A final score will be calculated for each submitted proposal and used to rank the proposers.

Project Funding:

Funding sources for each project may vary and shall comply with the funding agency’s requirements. Special conditions may apply. Refer to Attachment 1 (Scope of Work) in the Appendix of this RFP.

Prevailing Wages:

In accordance with the California State Labor Code, prevailing wage rates apply. Copies of the prevailing rate of per diem wages are on file with the Public Works Agency and shall be made available to any interested party on request.

Term of Contract Agreement:

The City desires to enter into a contract with the selected companies for an initial three (3) year term with a City option for one (1) two (2) year extension period. This term is outlined in the Standard Consultant Agreement, as contained in the Appendix of this RFP as Attachment 2.

City of Santa Ana RFP 23-182

Page 6 ends

II. INSTRUCTIONS TO PROPOSERS

A. CITY RESPONSIBILITIES
The City will provide information in its possession relevant to preparation of required information in this RFP. The City will provide only the staff assistance and documentation specifically referred to herein.

B. PROPOSER RESPONSIBILITIES
Point of Contact: The selected proposer will assume responsibilities for all services in its proposal. The selected proposer shall identify a sole point of contact with the greatest knowledge concerning the required service operations and contractual matters, including payment of all charges resulting from the Agreement. Contact information such as email and phone number must be included into the proposal.

Evidence of Financial Capacity: Proposer may be requested to submit its most recent audited financial statement, evidencing proposer’s financial capacity to fully perform the required services, including provision of equipment and personnel expenses over a ninety (90) day period. If said financial statement does not reflect full ninety (90) day operational capacity, proposer may include a letter of credit as evidence of supplemental capacity.

C. REQUEST FOR INFORMATION OR CLARIFICATION
All questions or requested clarifications shall be made only in writing to the Q&A section located in PlanetBids no fewer than five (5) calendar days prior to the date and time set for opening of proposals. No verbal requests or responses will be accepted. Significant interpretations or clarifications will be addressed via addenda to this RFP.

D. ADDENDA
Any changes in RFP from the date of release to date of submittal will result in an addendum or amendment. Notification of such addendum or amendment shall be posted on PlanetBids at https://www.planetbids.com/portal/portal.cfm?CompanyID=20137 as set forth in the Notice Inviting Proposals. Addenda shall become part of the agreement documents.

E. LICENSES & PERMITS
The selected proposer shall be required to obtain a City of Santa Ana Business license within ten (10) business days of selection and must provide a copy to the City’s project manager or designee prior to commencing any work in Santa Ana.

Additionally, Proposer will be responsible for obtaining any licenses/permits required by the Scope of Work.

City of Santa Ana RFP 23-182

Page 7 ends

F. INSURANCE
The Selected Proposer shall provide the required evidence of insurance coverage as set forth in the Scope of Work within ten (10) business days after receipt of notice that the contract has been awarded. Failure to provide the required insurance certificates shall be cause for the annulment of the award and the forfeiture of the proposal guaranty. The City will provide the Selected Proposer with a “New Vendor Checklist”, which outlines insurance requirements.

G. PAYMENT INFORMATION PACKET
The selected proposer shall return a completed payment information packet within ten (10) business days after the successful proposer has received notice that the contract has been awarded.

H. PRE-PROPOSAL MEETING
Should a pre-proposal meeting be scheduled, the date, time, and location is identified on the cover page of this RFP. The meeting will include discussion of the project scope and a question-and-answer session. It is highly recommended that the Proposer’s key team members attend this meeting. Significant interpretations or clarifications will be addressed via addenda to this RFP, as described above in “Section D: Addenda.”

I. CITY RIGHT TO REJECT
The City reserves the right to reject any or all proposals submitted and no representation is made hereby that any contract will be awarded pursuant to this RFP or otherwise.

The City reserves the right to accept or reject the combined or separate components of this proposal in part or in its entirety or to waive any minor inconsistency, informality or technical defect in the proposal.

The City reserves the right to reject, replace, and approve any and all subcontractors. All subcontractor(s) shall be identified in response to this RFP. Subcontractors shall be the responsibility of the successful proposer and the City shall assume no liability of such subcontractors.

J. BID PROTESTS
Proposers with concerns or rebuttal of any staff determination of non-responsiveness or non- responsibility may submit, in writing within five (5) business days, to the Project Manager, any concerns regarding the RFP process or staff determination. Such writing shall be considered by the City Manager or her designated representative, and may be acted upon within five (5) business days. If no action is taken within such time, there shall be no change to the staff determination. The exercise by the Proposer of its right to submit written concerns shall be a condition precedent to seeking judicial review of any award of a contract hereunder.

City of Santa Ana RFP 23-182

Page 8 ends

III. SUBMITTAL REQUIREMENTS

A. GENERAL

1. The number of Proposal Copies and signature is specified in:

RFP SECTION I - INTRODUCTION / PROJECT DESCRIPTION

2. Deadline:

Proposals are due to the City of Santa Ana at the date, time, and location specified in the Notice Inviting Proposals.

B. PROPOSAL CONTENTS

The proposal format and page limitation, if any, is specified in:

RFP SECTION I - INTRODUCTION / PROJECT DESCRIPTION

1. STATEMENT OF QUALIFICATIONS

a. Cover Letter:

Proposals shall include a letter signed by a principal or authorized representative who can make legally binding commitments for the entity.

b. Contract Agreement Statement:

Proposal shall include a statement outlining your concurrence or concerns with any and all provisions contained in the Agreement attached herein as Attachment 2 in the Appendix.

c. Firm and Team Experience:

Proposal shall include a profile of the firm’s experience. Include resumes of project team/sub-consultants that will be providing services which outline their technical experience. At a minimum, this should include the project manager/principal agent, associates in charge when project manager/principal agent is unavailable, key personnel, firm size, and an organization chart identifying only those who will perform work. The project manager/principal agent shall be the primary contact person to represent your firm and include any relevant on-call or emergency contracts with other local agencies.

d. Understanding of Need:

City of Santa Ana RFP 23-182

Page 9 ends

Proposal shall include an outline which demonstrates the firm’s understanding of the scope of services and relevant experience performing relative tasks.

This outline should include anticipated approach, tasks necessary for successful completion, deliverables, and suggestions or special concerns that the City should be made aware of. Identify any assumptions and/or exclusions used in preparation of the scope of work and associated fee estimate.

e. Relevant Project Experience:

Proposal shall include a list of relevant projects, which your firm or personnel have completed within the last 5 years, including significant work with public agencies. Project information should include project description, project location, year completed, client name along with a person to contact and their telephone number/email address.

f. References:

Proposals shall include a listing of relevant projects with references for three public entities with valid current emails for which Proposer has performed similar work within the past five (5) years.

2. FEE PROPOSAL:

The fee proposal shall be submitted separate and concurrently with the technical proposal, both submitted electronically in PlanetBids and as a hard copy in a separately sealed envelope, clearly labeled as “Fee Proposal.” This shall include the firm’s Standard Hourly Fee Schedule, a table outlining the tasks and team hourly effort for each of the major tasks, and a Project Fee Schedule as outlined in the Scope of Work, and as outlined in Attachment 5: Fee Schedule.

Fees are NOT included as part of evaluation criteria. The fee proposal will not be opened until the proposals have been evaluated by the proposal selection committee. The City will select the consultant based on qualifications, and then negotiate a contract price based on available funding.

3. CERTIFICATIONS:

The following forms, included in Attachment 3: Certifications shall be signed and included as part of the proposal submittal package:
 Non-Collusion Affidavit
 Non-Lobbying Certification
 Non-Discrimination Certification
 Contractor’s Licensing and Registration Statement

City of Santa Ana RFP 23-182

Page 10 ends

 Prevailing Wage Compliance and Monitoring Statement
 Ownership Affidavit
 List of Sub-Contractors (If Included)
 References
 Statement Regarding Apprenticeship Requirements
 Statement Regarding “Anti-Kickback” Requirements
 Public Contract Code Section 10162 Questionnaire
 Statement Regarding Community Workforce Agreement (CWA) Requirements

IV. PROPOSAL REVIEW (CONSULTANT SELECTION)

A. EVALUATION AND RATING
The criteria for evaluating the proposals are specified in:

RFP SECTION I - INTRODUCTION / PROJECT DESCRIPTION.

B. SELECTION
The selection committee will be comprised of at least (3) City staff from multiple departments. The committee may or may not interview the top-ranking proposers. The City will recommend award of contracts to the proposers who will provide the best quality and value to the City. The City reserves the right to begin negotiations and enter into a contract without interview or further discussions.

V. CONTRACT AWARD

A. REQUEST FOR COUNCIL ACTION
Following evaluation and rating by the proposal review committee, the Executive Director will recommend award contracts to the three top-ranking proposers that will provide the best quality and value to the City.

B. EXECUTION OF AGREEMENT
The Scope of Services, Schedule, and Fees submitted in the proposal will be the basis of any negotiation of final terms, which will lead to a completed agreement ready for execution based on the standard Agreement attached herein as Attachment 2 in the Appendix. “Proposer” will hereinafter be referred to as “Contractor” in the standard agreement. The term of the agreement will begin after the agreement is full executed, and all required insurance and documents and contents of the vendor registration and payment information packet have been received and approved.

City of Santa Ana RFP 23-182

Page 11 ends

VI. IMPLEMENTATION

A. NOTICE TO PROCEED
Prior to issuance of a formal Notice to Proceed (NTP), Consultants shall provide all required bonds, insurance documents, and contents of the Information Packet for review and approval by the City.

For “On-Call” contracts, individual City Project Managers will request project/task specific proposals from Consultants on an as-needed basis. Proposals will then be evaluated by City staff and written NTPs will be issued accordingly per each task order.

VII. PUBLIC RECORDS

All data, documents and other products used, developed, or produced during response preparation of this RFP will become property of the City. All responses to this RFP shall become property of the City. Proposer information identified as proprietary information be maintained confidential, to the extent allowed under the California Public Records Act.

Proposals will become public record after award of contract. Proposer information identified as proprietary information shall be maintained confidential, to the extent allowed under the California Public Records Act.

City of Santa Ana RFP 23-182
Page A1-1

Appendix
ATTACHMENT 1

SCOPE OF WORK

CITY OF SANTA ANA

REQUEST FOR PROPOSALS
FOR

ON-CALL EMERGENCY

ASPHALT CONCRETE, CONCRETE AND STORM DRAIN SERVICES
RFP NO. 23-182

INTRODUCTION/BACKGROUND

The City of Santa Ana (City) desires to enter into an agreement with a qualified construction company for the repair of roadway asphalt concrete and concrete, underground, street lighting and/or electrical conduit installation, storm drain, and/or other infrastructure within the public right of way (with the exception of water and sanitation systems) that may experience failures within the term of the agreement on an on-call and emergency work for general improvements, on an as needed, Task Order basis. Ancillary related work includes, but is not limited to, occasional replacement traffic pavement markings and sign replacements and related support services and paid for as described in Section I “Nature of Work.”

The purpose of this request for proposals is to obtain qualified construction firms to augment the City’s capacity to perform emergency roadway and storm drain repair water service in the event of system failures.

DESCRIPTION OF WORK

On an on-call, as needed basis, the selected firm(s) may be asked to provide professional services on specific, project-by-project basis, based on an agreed-upon specific scope of services and fees.

The scope of work will vary per Task Order within the public right-of-way. It may include, but not be limited to, the procurement and/or removal of materials, excavation, installation, backfill, compaction, grading, sidewalk and paving, curb and gutter, fencing, guardrail, barrier, catch basins, removing and/or replacing pipe and related appurtenances, street lighting, electrical conduits, wiring, and pavement markings, signs, sign posts and miscellaneous other street furniture, and repairing various items within the public right-of-way, traffic control, mobilization, compliance with this agreement and all other work necessary to complete on-call emergency Task Orders specified per incident. The work completed shall be in compliance with the City’s Standard Plans, Caltrans Standard Plans and the “Greenbook” and Caltrans’ Standard Specifications and as specified in this agreement. Work shall also be in compliance with the City’s Standard Plan No. 1160, “Street Work and Utility Permit General Provisions.”

City of Santa Ana RFP 23-182
Page A1-2

QUANTITIES FOR FEE SCHEDULE (UNDER SEPARATE COVER)

For the purposes of providing a Fee Schedule based on the below Sample Task Orders, the following work items and quantities are provided. The Fee Schedule in Attachment 5:

Each Fee Schedule shall include a schedule of the hourly billing rates for ALL contractor and subcontractor staff and labor personnel. Additionally, for each discipline that a company seeks to be considered, the below table(s) shall be completed. For example, if a General Contractor is submitting for Asphalt Concrete and Concrete Work, Sample Task Orders A and B would both be required to be completed as part of the Fee Schedule. Each table shall include the filling in of the last two columns for the relevant sample task orders for whichever category(ies) are being submitted for consideration. However, actual work will be paid for as described in Section I “Nature of Work.” Sample Task Orders for Asphalt Concrete, Concrete Paving, Stormdrain, and Street Lighting within the public right-of-way related work are, respectively:

Sample Task Order A – Asphalt Concrete
Item Description Qty Unit Unit Price Total
1 Unclassified Excavation 550 CY
2 AC Pavement 130 TN
3 Furnish and Install #6 Pullbox 4 EA
4 Adjust Manhole to Finished Grade 5 EA
5 PCC Curb & Gutter (Type A-2-8) 100 LF
6 Signing & Srtiping 1 LS
7 Traffic Control Work 1 LS

Sample Task Order B – Concrete Paving
Item Description Qty Unit Unit Price Total
1 Unclassified Excavation 550 CY
2 PCC Sidewalk (T=4”) 2,500 SF
3 PCC Curb Ramp 3,000 SF
4 PCC Curb & Gutter (Type A-2-8) 100 LF
5 Furnish and Install #6 Pullbox 4 EA
6 Adjust Manhole to Furnished Grade 5 EA
7 Catch Basin (Type “B”, W=10’) 1 EA
8 Remove and Replace 30” Reinforced Concrete
Pipe
75 LF
9 Guard Rail Replacement (Caltrans RSP A77N4) 50 LF
10 Guard Rail Replacement (Caltrans) 1 EA
11 Remove and Replace Chain Link R/W Fence 50 LF
12 Concrete Barrier Type 83 (Caltrans) 50 LF
13 Traffic Control Work 1 LS
City of Santa Ana RFP 23-182
Page A1-3

Sample Task Order C – Stormdrain
Item Description Qty Unit Unit Price Total
1 Unclassified Excavation 550 CY
2 AC Pavement 130 TN
3 Remove & Replace 18” Corrugated Metal Pipe (CMP) 75 LF 4 Remove & Replace 18” Reinforced Concrete Pipe (RCP) 75 LF 5 Remove & Replace 30” Reinforced Concrete Pipe (RCP) 75 LF 6 Catch Basin (Type “B”, W=10’) 1 EA
7 Traffic Control Work 1 LS

Sample Task Order D – Street Lighting
Description Qty Unit Unit Price Total
Furnish and Install Streetlight Pole 10 EA
Remove Existing Wooden Pole 5 EA
Remove Existing Steel Pole 5 EA
Install Electrical Meter Pedestal 1 EA
Install 2” PVC Conduit 4000 LF
Install No. 5 Pull Box 3 EA
Pothole Street Light Pole Location 10 EA
Traffic Control Work 1 LS

SURETY BOND
For each Task Order Issued by Public Works Agency, the Contractor shall provide cash deposit or surety “Payment” and “Performance” bonds in the amounts specified by the “Greenbook” and City of Santa Ana upon approval of the proposed itemized cost estimate for each approved on- call or emergency Task Order which will be based upon the City’s Standard Plans, As-Built Plans, or other direction from the Public Works Agency. The cash deposit or the surety bonds shall guarantee the construction of all necessary improvements for the Task Order, however, Bid Bonds shall not be required at the time of the submittal of RFP Proposal. The City also reserves the right to retain 10% of progress pay amounts for the one-year warranty work. The cash deposit shall be released approximately 135 days after all related permits and/or other approvals required are signed off by the City’s Construction Inspector, and the passage of any lien periods. In the event the work is not completed within one year of the date that a street work permit or Task Order is signed, applicant agrees that the City may apply the cash deposit to the cost of completing the work and such work may be completed at the sole convenience of the City of Santa Ana. The deposit amount will be determined based upon the surface drainage and street improvement plans.

City of Santa Ana RFP 23-182
Page A1-4

CONTRACTOR RESPONSIBLITIES
Contractor must be able to respond to City’s request for emergency repair work on a timely and urgent manner. The contractor shall be available on an on-call basis, 24/7, and ready to respond in the event of an emergency. Service calls shall be responded within one hour. Contractor’s repair crews must be able to arrive at job site within 8 hours of approval from City to commence work.

Regular business hours are considered from 7:00 am to 5:00 pm (Monday through Friday).

Anytime outside of business hours of operation may be considered after hours/weekends.

The Contractor shall, prior to award of contract and without additional expense to the City, possess all licenses and permits (unless waived by the City) required for the performance of the work required by this contract, including but not limited to a California Class (A, C-8 or C34) Contractor’s license and a City of Santa Ana Business License.

1. Street work shall be required to be performed by a licensed contractor for any and all the work in the public right of way. The contractor must provide the following prior to initiating Task Order work.

a. A City of Santa Ana business license.

b. A Certificate of Insurance of general liability containing requirements as set forth by the City Attorney and per the Standard Agreement.

c. A Contractors license (with appropriate classification).

d. Proof of Worker’s Compensation Insurance.

2. Provide BMPs and/or erosion control plans for planned Task Order work unless directed otherwise by the City:

3. If required, the Contractor shall submit, for review and approval, a surface drainage/grading/erosion control plan, prepared by a registered civil engineer, showing the direction and means of flow within the street.

SUBCONTRACTORS

Any Subcontractors intended to be used, shall be listed in the proposal. Any additional subcontractors that may become necessary, shall require approval by the City prior to start of any assigned work. When a Subcontractor performs all or any part of the work, a markup shall be applied to the Subcontractor’s actual cost of such work. The Contractor may add a markup of 10 percent on the first $5,000 of the subcontracted portion of the extra work and a markup of 5 percent on work added in excess of $5,000 of the subcontracted portion of the work may be added by the Contractor.

City of Santa Ana RFP 23-182
Page A1-5

PAYMENT AND INVOICING:

Selected Contractor shall invoice the City based on time and material according to the City’s standard invoice template. Tasks and hours shall be clearly identified and all rates must match those included in the approved agreement. City shall retain ten percent (10%) of the invoice amount from each payment until the completed Project has been accepted by the City.

CITY RESPONSIBILITIES:

The City will provide information in its possession relevant to the preparation of the required information in the RFP. The City will provide only the staff assistance and the documentation specifically, in referred to herein.
 Furnish scope of work and provide general direction as needed for any assigned Task Orders
 All plan check coordination within the City
 Construction administration
 Electronic files (sample plans & specifications, City of Santa Ana’s CADD Standards), if needed
 Electronic files for title sheets and sheet borders, if needed

DEFINITION OF ITEMS (SAMPLE TASK ORDERS A, B, C, & D):

The unit prices paid for the items listed in the Contractor’s Proposal as defined herein include full compensation for furnishing all labor, materials, tools, and equipment, and doing all work involved in furnishing and installing the materials complete and in place, in accordance with the details shown in the Task Order, Standard Plans, Sketch, Other Plans, as directed by the Engineer.

All incidental work which is not otherwise specified, and which is necessary to complete the improvements shall be furnished and installed as though such work was specified, and no additional compensation would be allowed therefore. If not stated otherwise, work shall be in conformance to the “Greenbook” Standard Specifications for Public Works Construction, 2018 Edition.

Each Sample Task Order’s work items include, but are not limited to, the following listed below for the Fee Schedule Submittal. Actual Task Order work, if granted, will generally be on a Time and Materials basis in accordance with labor rates for the type of work and material required per Task Order granted and according to the schedule of rates provided as part of this proposal. The Sample Task Order information provided will primarily be used to compare various proposals.

City of Santa Ana RFP 23-182
Page A1-6

Sample Task Order A Items of Work

Item No. 1 - Unclassified Excavation

Payment for Unclassified Excavation shall be at the contract unit price per Cubic Yard listed in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.

Payment for unclassified fill, if any, is considered as included in the unit price paid for unclassified excavation.

Payment for over-excavation shall be paid for at the unit price for unclassified excavation.

Item No. 2 - Asphalt Concrete (AC) Pavement

Payment for Asphalt Concrete (AC) Pavement shall be at the contract unit price bid per Ton as listed in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.

Payment for asphalt concrete pavement used in areas of over-excavation to mitigate unsuitable subgrade materials shall be paid for at the contract unit price bid per ton.

Item No. 3- Furnish and Install New #6 Pull Box

The work under this item for Furnish and Install New #6 Pull Box shall be in accordance with the latest CA MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents to be provided for each Task Order Work. The assumed material for placement shall be concrete and any removal of an existing pull box shall be included in the price paid to furnish and install a new pull box and no additional payment will be allowed therefore.

Payment for Furnish and Install New #6 Pull Box shall be at the contract unit price paid per Each as listed in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.

Item No. 4 - Adjust Manhole to Finished Grade

Payment for Adjust Manhole to Finished Grade shall be at the contract unit price bid per Each as listed in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.

City of Santa Ana RFP 23-182
Page A1-7

Item No. 5 - PCC Curb & Gutter (A-2-8)

The work under this item consists of grading, compacting subgrade, constructing 12” wide by 12” deep AC Hot Mix on compacted subgrade, and constructing PCC Curb & Gutter (outside of the curb ramp footprint, beyond the BCR or ECR) in accordance with the provisions of Section 301-1, “Subgrade Preparation,” and Section 303-5, “Concrete Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways” and any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents provided by the City for each Task Order.

Payment for PCC Curb & Gutter (A-2-8) shall be at the contract unit price bid per Linear Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.

Item No. 6 - Signing & Striping

The work under this item for Signing and Striping shall be in accordance with the latest CA MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents to be provided for each Task Order Work.

Payment for Signing & Striping shall be at the contract Lump Sum listed in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, disposal of all removed materials and incidentals as required and no additional compensation will be allowed therefore.

Item No. 7 – Traffic Control

The work under this item for Signing and Striping shall be in accordance with the latest Watch Manual, CA MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents to be provided for each Task Order Work.

Payment for Traffic Control shall be at the contract unit price per Lump Sum (LS) as listed in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.

City of Santa Ana RFP 23-182
Page A1-8

Sample Task Order B Items of Work

Item No. 1 - Unclassified Excavation

Payment for Unclassified Excavation shall be at the contract unit price per Cubic Yard listed in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.

Payment for unclassified fill, if any, is considered as included in the unit price paid for unclassified excavation.

Payment for over-excavation shall be paid for at the unit price for unclassified excavation.

Item No. 2 - PCC Sidewalk (T=4”)

The work under this item consists of grading, compacting subgrade, and constructing 4-inch thick PCC Sidewalk shall be in accordance with the provisions of Section 301-1, “Subgrade Preparation,” and Section 303-5, “Concrete Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways,” of the Standard Specifications, plans, and contract document specifications.

Payment for PCC Sidewalk (T=4”) shall be at the contract unit price bid per Square Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore. Payment for thickness (T=6”) shall be paid 1.5 times the unit price.

Item No. 3 - PCC Curb Ramp

The work under this item consists of saw-cutting, removing, grading, compacting subgrade, constructing 12” wide by 12” deep AC Hot Mix on compacted subgrade, and constructing PCC Curb & Gutter and shall be in accordance with the provisions of Section 301-1, “Subgrade Preparation,” and Section 303-5, “Concrete Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways” and any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents provided by the City for each Task Order.

Payment for PCC Curb Ramp shall be at the contract unit price bid per Square Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore. The area included in this bid item shall be measured from the gutter lip to the back of walk, from BCR to ECR.

Item No. 4 - PCC Curb & Gutter (A-2-8)

City of Santa Ana RFP 23-182
Page A1-9

The work under this item consists of grading, compacting subgrade, constructing 12” wide by 12” deep AC Hot Mix on compacted subgrade, and constructing PCC Curb & Gutter (outside of the curb ramp footprint, beyond the BCR or ECR) in accordance with the provisions of Section 301-1, “Subgrade Preparation,” and Section 303-5, “Concrete Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways” and any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents provided by the City for each Task Order.

Payment for PCC Curb & Gutter (A-2-8) shall be at the contract unit price bid per Linear Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.

Item No. 5- Furnish and Install New #6 Pull Box

The work under this item for Furnish and Install New #6 Pull Box shall be in accordance with the latest CA MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents to be provided for each Task Order Work. The assumed material for placement shall be concrete and any removal of an existing pull box shall be included in the price paid to furnish and install a new pull box and no additional payment will be allowed therefore.

Payment for Furnish and Install New #6 Pull Box shall be at the contract unit price paid per Each as listed in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.

Item No. 6 - Adjust Manhole to Finished Grade

Payment for Adjust Manhole to Finished Grade shall be at the contract unit price bid per Each as listed in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.

Item No. 7- Catch Basin (Type “B,” W=10’)

The work under this item consists of grading, compacting subgrade, and constructing Catch Basin and shall be in accordance with the provisions of Section 301-1, “Subgrade Preparation,” and Section 303-1, “Concrete Structures” and any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents provided by the City for each Task Order.

Payment for Catch Basin (Type “B,” W=10’) shall be at the contract unit price paid per Each as listed in the Fee Proposal, and shall include full compensation for doing all work, including removal or replacement of existing catch basins and/or other appurtenances, including furnishing all materials, labor, equipment, tools, and incidentals as required to construct a new catch basin, soil preparation and compaction, and no additional compensation will be allowed therefore.

City of Santa Ana RFP 23-182
Page A1-10

Item No. 8 – Remove and Replace 30” Reinforced Concrete Pipe

The work under this item consists of grading, compacting subgrade, and constructing Remove and Replace 30” Reinforced Concrete Pipe and shall be in accordance with the provisions of Section 306, “Underground Conduit Construction” and any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents provided by the City for each Task Order.

Payment for Remove and Replace 30” Reinforced Concrete Pipe shall be at the contract unit price paid per Linear Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, including removal or replacement of existing pipe, furnishing all materials, labor, equipment, tools, and incidentals as required to install new pipe, bedding preparation, and no additional compensation will be allowed therefore.

Item No. 9 – Guard Rail Replacement (Caltrans RSP A77N4)

The work under this item consists of grading, compacting subgrade, and constructing Guard Rail Replacement (Caltrans RSP A77N4) and shall be in accordance with the provisions of Section 301-1, “Subgrade Preparation,” with the provisions of Section 204, “Lumber and Treatment with Preservatives,” Section 304-2.2 “Flexible Metal Guard Rail,” any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents provided by the City for each Task Order.

Payment for Guard Rail Replacement (Caltrans RSP A77N4) shall be at the contract unit price paid per Linear Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, including removal or replacement of existing guard rail, furnishing all materials, labor, equipment, tools, and incidentals as required to install new guardrail, foundation preparation, and no additional compensation will be allowed therefore.

Item No. 10 - Guard Rail Replacement Termination (Caltrans)

The work under this item consists of grading, compacting subgrade, and constructing Guard Rail Replacement Termination (Caltrans) and shall be in accordance with the provisions of Section 301-1, “Subgrade Preparation,” with the provisions of Section 204, “Lumber and Treatment with Preservatives,” Section 304-2.2 “Flexible Metal Guard Rail,” any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents provided by the City for each Task Order.

Payment for Guard Rail Replacement Termination (Caltrans) shall be at the contract unit price paid per Each as listed in the Fee Proposal, and shall include full compensation for doing all work, including removal or replacement of existing guard rail termination, furnishing all materials, labor, equipment, tools, and incidentals as required to install new guardrail termination, foundation preparation, and no additional compensation will be allowed therefore.

Item No. 11 – Remove and Replace Chain Link R/W Fence
City of Santa Ana RFP 23-182
Page A1-11

The work under this item consists of grading, compacting subgrade, and construction of foundations to support the posts for Remove and Replace Chain Link Fence and shall be in accordance with the provisions of Section 301-1, “Subgrade Preparation,” and Section 303-5, “Concrete Curb, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways” and Section 304-3 “Chain Link Fence” of the Standard Specifications any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents provided by the City for each Task Order.

Payment for Remove and Replace Chain Link R/W Fence shall be at the contract unit price bid per Square Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, including removal or replacement of existing chain link fence (and posts/foundations), furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.

Item No. 12 –Concrete Barrier Type 836 (Caltrans)

The work under this item consists of grading, compacting subgrade, and removing and/or construction Concrete Barrier Type 836 (Caltrans) and shall be in accordance with the provisions of Section 301-1, “Subgrade Preparation,” Caltrans Standard Specifications, any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents provided by the City for each Task Order.

Payment for Concrete Barrier Type 836 (Caltrans) shall be at the contract unit price bid per Lineal Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, including removal or replacement of existing concrete barrier or other appurtenances, furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.

Item No. 13 – Traffic Control

The work under this item for Signing and Striping shall be in accordance with the latest Watch Manual, CA MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents to be provided for each Task Order Work.

Payment for Traffic Control shall be at the contract unit price per Lump Sum (LS) as listed in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.

City of Santa Ana RFP 23-182
Page A1-12

Sample Task Order C Items of Work

Item No. 1 - Unclassified Excavation

Payment for Unclassified Excavation shall be at the contract unit price per Cubic Yard listed in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.

Payment for unclassified fill, if any, is considered as included in the unit price paid for unclassified excavation.

Payment for over-excavation shall be paid for at the unit price for unclassified excavation.

Item No. 2 - Asphalt Concrete (AC) Pavement

Payment for Asphalt Concrete (AC) Pavement shall be at the contract unit price bid per Ton as listed in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.

Payment for asphalt concrete pavement used in areas of over-excavation to mitigate unsuitable subgrade materials shall be paid for at the contract unit price bid per ton.

Item No. 3 – Remove and Replace 18” Corrugated Metal Pipe (CMP)

The work under this item consists of grading, compacting subgrade, and constructing Remove and Replace 18” Corrugated Metal Pipe (CMP) and shall be in accordance with the provisions of Section 306, “Underground Conduit Construction” and any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents provided by the City for each Task Order.

Payment for Remove and Replace 18” Corrugated Metal Pipe (CMP) shall be at the contract unit price paid per Linear Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, including removal or replacement of existing pipe, furnishing all materials, labor, equipment, tools, and incidentals as required to install new pipe, bedding preparation, and no additional compensation will be allowed therefore.

Item No. 4 – Remove and Replace 18” Reinforced Concrete Pipe

The work under this item consists of grading, compacting subgrade, and constructing Remove and Replace 18” Reinforced Concrete Pipe and shall be in accordance with the provisions of Section 306, “Underground Conduit Construction” and any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents provided by the City for each Task Order.

City of Santa Ana RFP 23-182
Page A1-13

Payment for Remove and Replace 18” Reinforced Concrete Pipe shall be at the contract unit price paid per Linear Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, including removal or replacement of existing pipe, furnishing all materials, labor, equipment, tools, and incidentals as required to install new pipe, bedding preparation, and no additional compensation will be allowed therefore.

Item No. 5 – Remove and Replace 30” Reinforced Concrete Pipe

The work under this item consists of grading, compacting subgrade, and constructing Remove and Replace 30” Reinforced Concrete Pipe and shall be in accordance with the provisions of Section 306, “Underground Conduit Construction” and any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents provided by the City for each Task Order.

Payment for Remove and Replace 30” Reinforced Concrete Pipe shall be at the contract unit price paid per Linear Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, including removal or replacement of existing pipe, furnishing all materials, labor, equipment, tools, and incidentals as required to install new pipe, bedding preparation, and no additional compensation will be allowed therefore.

Item No. 6- Catch Basin (Type “B,” W=10’)

The work under this item consists of grading, compacting subgrade, and constructing Catch Basin and shall be in accordance with the provisions of Section 301-1, “Subgrade Preparation,” and Section 303-1, “Concrete Structures” and any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents provided by the City for each Task Order.

Payment for Catch Basin (Type “B,” W=10’) shall be at the contract unit price paid per Each as listed in the Fee Proposal, and shall include full compensation for doing all work, including removal or replacement of existing catch basins and/or other appurtenances, including furnishing all materials, labor, equipment, tools, and incidentals as required to construct a new catch basin, soil preparation and compaction, and no additional compensation will be allowed therefore.

Item No. 7 – Traffic Control

The work under this item for Signing and Striping shall be in accordance with the latest Watch Manual, CA MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents to be provided for each Task Order Work.

Payment for Traffic Control shall be at the contract unit price per Lump Sum (LS) as listed in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.

City of Santa Ana RFP 23-182
Page A1-14

Sample Task Order D Items of Work

Item No. 1 – Furnish and Install Streetlight Pole

This work consists of furnishing and installing Ameron 4B127 Street Light Pole including foundation, 2” PVC (stub out) conduits, Grout cap, 8’ Clamp-On Arm Assembly, Overhead Pin & Insulator, LED Luminaire, 8-8 Bard Duplex Aluminum Conductor wiring, and any other work required to provide the intended operation at the locations shown on the project plans per City of Santa Ana Special Provisions and Standard Plans 1126H-3 and 1126H-2 and 1104.

The unit price for each Street Light Pole shall be considered full compensation for furnishing all labor, materials, tools, equipment, removals, excavation, landscape repair, turf repair, hardscape repair, irrigation repair, root shaving, tree trimming, sidewalk restoration, and appurtenances for all related items of work necessary for the installation. No additional compensation will be allowed therefore.

Item No. 2 – Remove Existing Wooden Pole

This work consists of removing and discarding Street Light Pole including luminaire arm, existing overhead wiring, and any other appurtenances. Salvage equipment as directed by Engineer.

The unit price for each removed Street Light Pole shall be considered full compensation for all labor, materials, tools, equipment, removals, excavation, paving, landscape repair, turf repair, hardscape repair, irrigation repair, sidewalk restoration, and appurtenances for all related items of work necessary for the removal. No additional compensation will be allowed therefore.

Item No. 3 – Remove Existing Steel Pole

This work consists of removing and discarding Street Light Pole including foundation, luminaire arm, overhead wiring, and any other appurtenances. Salvage equipment as directed by Engineer.

The unit price for each removed Street Light Pole shall be considered full compensation for all labor, materials, tools, equipment, removals, excavation, paving, landscape repair, turf repair, hardscape repair, irrigation repair, sidewalk restoration, and appurtenances for all related items of work necessary for the removal. No additional compensation will be allowed therefore.

Item No. 4 – Install Electrical Meter Pedestal

This work consists of furnishing and installing Electrical Meter Pedestal including foundation, circuit breakers, photocell, contactors, conduits, wiring, SCE coordination, electrical permit and any other work required to provide the intended operation at the location required per City of Santa Ana Special Provisions, Standard Plan 1126M and any approved Southern California Edison Design Plans.

City of Santa Ana RFP 23-182
Page A1-15

The unit price for each Install Electrical Meter Pedestal shall be considered full compensation for furnishing all labor, materials, tools, equipment, removals, paving, landscape repair, irrigation repair, root shaving, sidewalk restoration, and appurtenances for all related items of work necessary for the installation. No additional compensation will be allowed therefore.

Item No. 5 – Install 2” PVC Conduit

This work consists of furnishing and installing Polyvinylchloride (PVC) street lighting conduit including pull tape, ground wire, fittings, duct seal, utility potholing, concrete or asphalt restoration and appurtenances complete and in place, of the size indicated on the plans.

The unit price bid per linear foot of PVC Conduit shall be considered full compensation for furnishing all labor, materials, tools, equipment, removals, paving, landscape repair, irrigation repair, root shaving, sidewalk restoration, pothole and/or trench backfill per City Std. Plan 1150, permanent asphalt replacement, permanent PCC replacement, striping and appurtenances for all related items of work necessary for the installation. No additional compensation will be allowed therefore.

Item No. 6 – Install No. 5 Pull Box

This work consists of furnishing and installing and/or replacing pull box including Concrete Lid, the removal and/or modification of any interfering portions of existing pull box, conduit, PCC, concrete and asphalt restoration, as indicated on plans and directed by the Engineer.

The unit price for each Pull Box shall be considered full compensation for furnishing all labor, materials, tools, equipment, removals, paving, landscape repair, irrigation repair, root shaving, sidewalk restoration, and appurtenances for all related items of work necessary for the installation. No additional compensation will be allowed therefore.

Item No. 7 – Pothole Street Light Pole Location

Payment for Pothole Street Light Pole Location shall be considered full compensation for furnishing all labor, materials, tools, equipment, removals, excavation, paving, landscape repair, irrigation repair, root shaving, sidewalk restoration, pothole and trench backfill per City Std. Plan 1150, permanent asphalt replacement, permanent PCC replacement and appurtenances for all related items of work necessary for the installation. No additional compensation will be allowed therefore.

Item No. 8 – Traffic Control Work

The work under this item for Signing and Striping shall be in accordance with the latest Watch Manual, CA MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City’s Special Provisions/Contract Documents to be provided for each Task Order Work.

City of Santa Ana RFP 23-182
Page A1-16

Payment for Traffic Control shall be at the contract unit price per Lump Sum (LS) as listed in the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as required and no additional compensation will be allowed therefore.

Page 1 of 10 ends

City of Santa Ana RFP 23-182
Page A2 - 1

Appendix
ATTACHMENT 2

STANDARD AGREEMENT

CONSULTANT AGREEMENT

CITY OF SANTA ANA

CITY OF SANTA ANA

REQUEST FOR PROPOSALS
FOR

ON-CALL EMERGENCY

ASPHALT CONCRETE, CONCRETE AND STORM DRAIN SERVICES
RFP NO. 23-182

THIS AGREEMENT is made and entered into on this day of , 2024 by and between ___________________________________________________________, (“Contractor”), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (“City”).

RECITALS

A. The City desires to retain a Consultant having special skill and knowledge in the field of:

On-Call Emergency services for a variety of projects on an “on-call” or “task order” basis.

B. Consultant represents that Consultant is able and willing to provide such services to the City.

C. In undertaking the performance of this Agreement, Consultant represents that it is knowledgeable in its field and that any services performed by Consultant under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional consulting firm in the field.

NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows:

Page 2 of 10 ends

City of Santa Ana RFP 23-182
Page A2 - 2

1. SCOPE OF SERVICES

Consultant shall perform during the term of this Agreement, the tasks and obligations including all labor, materials, tools, equipment, and incidental customary work required to fully and adequately complete the services described and set forth in Scope of Services - Exhibit A, attached hereto and incorporated by reference.

2. COMPENSATION

a. City agrees to pay, and Consultant agrees to accept as total payment for its services for City, the rates and charges identified in Compensation - Exhibit B. The total amount to be expended during the term of this Agreement shall not exceed $3,000,000 during the term of this Agreement, including any extension periods exercised under Section 3.

b. Payment by City shall be made within forty-five (45) days following receipt of proper invoice evidencing work performed, subject to City accounting procedures. Payment need not be made for work which fails to meet the standards of performance set forth in the Recitals which may reasonably be expected by City. City has the right and shall retain ten percent (10%) of the invoice amount from each payment until the completed Project has been accepted by the City.

3. TERM

This Agreement shall commence on the date first written above for a three (3) year term with the option for the City to grant up to one (1), two (2)-year renewal, exercisable by a writing by the City Manager and the City Attorney, unless terminated earlier in accordance with Section 16, below.

4. PREVAILING WAGES

Consultant is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. If the services being performed are part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and the total compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage Laws. Consultant shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

5. INDEPENDENT CONTRACTOR

Page 3 of 10 ends

City of Santa Ana RFP 23-182
Page A2 - 3

Consultant shall, during the entire term of this Agreement, be construed to be an independent Consultant and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer-employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Consultant performs the services which are the subject matter of this Agreement; however, the services to be provided by Consultant shall be provided in a manner consistent with all applicable standards and regulations governing such services.

Consultant shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes.

6. OWNERSHIP OF MATERIALS

This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement (“Documents & Data”). Consultant shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City’s sole risk.

7. INSURANCE

Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder and the results of that work by the Contractor, his agents, representatives, employees or subcontractors.

MINIMUM SCOPE OF INSURANCE
Coverage shall be at least as broad as:

1. Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.

Page 4 of 10 ends

City of Santa Ana RFP 23-182
Page A2 - 4

2. Automobile Liability: ISO Form Number CA 00 01 covering any auto (Code 1), or if Contractor has no owned autos, hired, (Code 8) and non-owned autos (Code 9), with limit no less than $1,000,000 per accident for bodily injury and property damage.

3. Workers’ Compensation: as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.

If the Contractor maintains broader coverage and/or higher limits than the minimums shown above, the Entity requires and shall be entitled to the broader coverage and/or the higher limits maintained by the contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the Entity.

Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:

Additional Insured Status
The Entity, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 if a later edition is used).

Primary Coverage
For any claims related to this contract, the Contractor’s insurance coverage shall be primary coverage at least as broad as ISO CG 20 01 04 13 as respects the Entity, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the Entity, its officers, officials, employees, or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it.

Notice of Cancellation
Each insurance policy required above shall provide that coverage shall not be canceled, except with notice to the Entity.

Waiver of Subrogation
Contractor hereby grants to Entity a waiver of any right to subrogation which any insurer of said Contractor may acquire against the Entity by virtue of the payment of any loss under such insurance. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the Entity has received a waiver of subrogation endorsement from the insurer.

Self-Insured Retentions
Self-insured retentions must be declared to and approved by the Entity. The Entity may require the

Page 5 of 10 ends

City of Santa Ana RFP 23-182
Page A2 - 5

Contractor to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or Entity.

Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the Entity.

Verification of Coverage
Contractor shall furnish the Entity with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to Entity before work begins. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them.

The Entity reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.

Special Risks or Circumstances
Entity reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.

8. INDEMNIFICATION

Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers, agents, employees, contractors, special counsel, and representatives from liability: (1) for personal injury, damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Contractor, its subcontractors, agents, employees, or other persons acting on its behalf which relates to the services described in section 1 of this Agreement; and (2) from any claim that personal injury, damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in this Section or by reason of the terms of, or effects, arising from this Agreement. The Consultant further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including fees and costs for special counsel to be selected by the City, regarding any action by a third party challenging the validity of this Agreement, or asserting that personal injury, damages, just compensation, restitution, judicial or equitable relief due to personal or property rights arises by reason of the terms of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding.

Notwithstanding the foregoing, to the extent Contractor’s services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code

Page 6 of 10 ends

City of Santa Ana RFP 23-182
Page A2 - 6

Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor.

9. INTELLECTUAL PROPERTY INDEMNIFICATION

Consultant shall defend and indemnify the City, its officers, agents, representatives, and employees against any and all liability, including costs, for infringement of any United States’ letters patent, trademark, or copyright infringement, including costs, contained in the work product or documents provided by Consultant to the City pursuant to this Agreement.

10. RECORDS

Consultant shall keep records and invoices in connection with the work to be performed under this Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures, and disbursements charged to the City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable. Consultant shall allow a representative of the City to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement during regular business hours. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement for a period of three (3) years from the date of final payment to Consultant under this Agreement.

11. CONFIDENTIALITY

If Consultant receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Consultant agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance, but in no event less than reasonable care. “Confidential Information” shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed to either party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the Consultant disclosed in a publicly available source; (c) is in rightful possession of the Consultant without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e) is independently developed by the Consultant without reference to information disclosed by the City.

12. CONFLICT OF INTEREST CLAUSE

Page 7 of 10 ends

City of Santa Ana RFP 23-182
Page A2 - 7

Consultant covenants that it presently has no interests and shall not have interests, direct or indirect, which would conflict in any manner with performance of services specified under this Agreement.

13. NON-DISCRIMINATION

Consultant shall not discriminate because of race, color, creed, religion, sex, marital status, sexual orientation, gender identity, gender expression, gender, medical conditions, genetic information, or military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization, promotion, termination or other employment related activities or any services provided under this Agreement. Consultant affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations.

14. EXCLUSIVITY AND AMENDMENT

This Agreement represents the complete and exclusive statement between the City and Contractor, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail. This Agreement may not be modified except by written instrument signed by the City and by an authorized representative of Contractor. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Consultant or the City. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which is not embodied herein.

15. ASSIGNMENT

Inasmuch as this Agreement is intended to secure the specialized services of Contractor, Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior written consent shall be considered null and void.

Nothing in this Agreement shall be construed to limit the City’s ability to have any of the services which are the subject to this Agreement performed by City personnel or by other Contractors retained by City.

16. TERMINATION

This Agreement may be terminated by the City upon thirty (30) days written notice of termination. In such event, Consultant shall be entitled to receive and the City shall pay Consultant compensation for all services performed by Consultant prior to receipt of such notice of termination, subject to the following conditions:

Page 8 of 10 ends

City of Santa Ana RFP 23-182
Page A2 - 8

a. As a condition of such payment, the Executive Director may require Consultant to deliver to the City all work product(s) completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Consultant consents to the City's use thereof for such purposes as the City deems appropriate.
b. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement.

17. WAIVER

No waiver of breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving the breach, failure, right or remedy. No waiver of any breach, failure or right, or remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies.

18. JURISDICTION - VENUE

This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. Both parties further agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement.

19. PROFESSIONAL LICENSES

Consultant shall, throughout the term of this Agreement, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement.

20. NOTICE

Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in the manner provided in this Section, to the following persons:

Page 9 of 10 ends

City of Santa Ana RFP 23-182
Page A2 - 9

To City:

Clerk of the City Council
City of Santa Ana
20 Civic Center Plaza (M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
Fax: 714- 647-6956

With courtesy copies to:

Nabil Saba
Executive Director, Public Works Agency
City of Santa Ana
20 Civic Center Plaza (M-21)
P.O. Box 1988
Santa Ana, California 92702
Fax:

To Contractor:

A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by fax, communication shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded.

21. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and attorney’s fees, for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn.

First & Last Name
Title
Consultant Firm Name
Address
City, State, Zip
Fax:

Page 10 of 10 ends

City of Santa Ana RFP 23-182
Page A2 - 10

b. The Agreement is the final and complete agreement and any prior or contemporaneous agreements for similar services between the parties is superseded by this Agreement. This shall not apply where the Parties are currently engaged and Consultant is providing services not contemplated by this Agreement. c. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement.

IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written.

ATTEST: CITY OF SANTA ANA

Jennifer L. Hall Tom Hatch
City Clerk Interim City Manager

APPROVED AS TO FORM:

SONIA R. CARVALHO CONSULTANT:

City Attorney

By:

Assistant City Attorney (title)
Tax ID#

RECOMMENDED FOR APPROVAL:

Nabil Saba
Executive Director
Public Works Agency

(name)
(title)

EXHIBIT A

SCOPE OF SERVICES

EXHIBIT B

COMPENSATION
Fee Proposal including hourly rates if applicable

Appendix
ATTACHMENT 3-1: NON-COLLUSION AFFIDAVIT

CERTIFICATIONS

City of Santa Ana RFP 23-182
Page A3-1

NON-COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and
Public Contract Code Section 7106)

To the CITY OF SANTA ANA DEPARTMENT OF PUBLIC WORKS

In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.

Note: The above Non-collusion Affidavit is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Non-collusion Affidavit. BIDDERS are cautioned that making a false certification may subject the certifier to criminal prosecution.

Signed

State of California
County of
Subscribed and sworn to (or affirmed) before me on this day of , 20 , by

before me.
, proved to me on the basis of satisfactory evidence to be the person(s) who appeared

Notary Public Signature Notary Public Seal
Appendix
ATTACHMENT 3-2: NON-LOBBYING CERTIFICATION

CERTIFICATIONS

City of Santa Ana RFP 23-182
Page A3-2

The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:

1. No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any federal contract, the making of any federal grant, the making of any federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any federal contract, grant, loan, or cooperative agreement.

2. If any funds other than federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence any officer or employee of any federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this federal contract, grant loan, loan or cooperative agreement, the undersigned shall complete and submit a “Disclosure of Lobbying Activities”.

This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U. S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such sub recipients shall certify and disclose accordingly.

Firm
Signed and Printed Name:

Title
Date
Appendix
ATTACHMENT 3-3: NON-DISCRIMINATION CERTIFICATION

CERTIFICATIONS

City of Santa Ana RFP 23-182
Page A3-3

The undersigned consultant or corporate officer, during the performance of this contract, certifies as follows:

1. The Consultant shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Consultant shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without, regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Consultant agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause.

2. The Consultant shall, in all solicitations or advertisements for employees placed by or on behalf of the Consultant, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin.

3. The Consultant shall send to each labor union or representative of workers with which he/she has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers’ representatives of the Consultant’s commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.

4. The Consultant shall comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.

5. The Consultant shall furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders.

6. In the event of the Consultant’s non-compliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or suspended in whole or in part and the Consultant may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Execution Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law.

7. The Consultant shall include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted

City of Santa Ana RFP 23-182
Page A3-4
by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract or purchase order as the administering agency may direct as means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Consultant becomes involved in, or is threatened with, litigation with a sub-consultant or vendor as a result of such direction by the administering agency, the Consultant may request that the United States enter into such litigation to protect the interests of the United States.

8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as amended,

No discrimination shall be made in the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided in Section 1420, and any consultant of public works violating this Section is subject to all the penalties imposed for a violation of the Chapter.

Signed:

Title:

Firm:

Date:

City of Santa Ana RFP 23-182
Page A3-5
CONTRACTOR’S LICENSING AND REGISTRATION STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that he/she and all his/her subcontractors are registered with the State of California Department of Industrial Relations (DIR), and that the following is true and correct.

Contractor’s Name:

Business Address:

Business E-Mail Address:

Telephone:

State Contractor’s License No. and Class:

License Expiration Date:

State Dept. of Industrial Relations (DIR)
Registration No.:

State Dept. of Industrial Relations (DIR)
Registration Expiration Date:

Signed:

Title:

City of Santa Ana RFP 23-182
Page A3-6

PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT
Contractor is aware of the requirements of California Labor Code Section 1720, et seq., as well as California Code of Regulations, Title 8, Section 16,000, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. Since the services are being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws.

City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the services available to interested parties upon request, and shall post copies at the Contractor’s principal place of business and at the project site.

Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

The undersigned certifies that the foregoing is true and correct.

Name of Firm

Signature of BIDDER

Title
(if an individual, so state)

City of Santa Ana RFP 23-182
Page A3-7

OWNERSHIP AFFIDAVIT

STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS:

CITY OF SANTA ANA )

, being duly sworn, deposes and says:

 INDIVIDUAL That he/she is the party making the foregoing proposal:

 PARTNERSHIP That he/she is a member of the co-partnership firm designated as:

and who has been and is duly vested with the authority to make and execute instruments for the co- partnership by:

who constitute the other members of the co-partnership.

 CORPORATION That he is of:

a corporation which is making the foregoing proposal:

 JOINT VENTURE That he is of:

one of the parties making the foregoing proposal as a joint venture, and the he/she has been and is duly vested with the authority to execute instruments for an on behalf of the parties making said bid who are:

that such a bid is genuine and not collusive or sham, and has not in any manner sought by collusion to secure any advantage against the City of Santa Ana or any person interested in the proposed contract, for himself or any other person.

Signature of Bidder
Subscribed and sworn to before me this day of 20

Signature of officer Administering Oath (Notary Public)

City of Santa Ana RFP 23-182
Page A3-8

LIST OF SUB-CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all subcontract work exceeding the following amount:
o Streets, highways including bridge projects: ½% of the bid or $10,000, whichever is greater o Buildings, parks, or other projects: ½% of the bid
Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State Department of Industrial Relations (DIR).

BIDDER proposes to subcontract certain portions of the work to the firms listed below:

Name Name
License #/Exp. License #/Exp.

DIR Reg. #/Exp. DIR Reg. #/Exp.

Location Location
Phone Phone
Type Of Work Type Of Work
Amount $ Amount $

Name Name
License #/Exp. License #/Exp.

DIR Reg. #/Exp. DIR Reg. #/Exp.

License # License #
Location Location
Phone Phone
Type Of Work Type Of Work
Amount $ Amount $

Name Name
License #/Exp. License #/Exp.

DIR Reg. #/Exp. DIR Reg. #/Exp.

License # License #
Location Location
Phone Phone
Type Of Work Type Of Work
Amount $ Amount $

City of Santa Ana RFP 23-182
Page A3-9

REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for which the BIDDER has performed similar work within the past three years.

1. Name and Address of Owner.

Name and Telephone Number of person familiar with project.

Contract Amount Type of Work Date Completed

2. Name and Address of owner.

Name and Telephone Number of person familiar with project.

Contract Amount Type of Work Date Completed

3. Name and Address of owner.

Name and Telephone Number of person familiar with project.

Contract Amount Type of Work Date Completed

The following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance and bonds.

City of Santa Ana RFP 23-182
Page A3-10

ADDITIONAL REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for which the BIDDER or Subcontractor has performed similar work in the past five years.

1. Name and Address of Owner.

Name and Telephone Number of person familiar with project.

Contract Amount Type of Work Date Completed

2. Name and Address of owner.

Name and Telephone Number of person familiar with project.

Contract Amount Type of Work Date Completed

3. Name and Address of owner.

Name and Telephone Number of person familiar with project.

Contract Amount Type of Work Date Completed

The following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance and bonds.

City of Santa Ana RFP 23-182
Page A3-11

STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor Code regarding employment of apprentices, and understands that contractors on contracts exceeding $30,000 or 20 working days shall:

1. Apply to the joint apprenticeship committee administering the apprenticeship standards of the craft or trade in the area of the site of the public work for a certificate approving the contractor under the apprenticeship standards for the employment and training of apprentices in the area or industry affected.

2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the apprenticeship standards.

3. Contribute to the fund or funds in each craft or trade in which he/she employs journeymen or apprentices on the public work, in the same amount or upon the same basis and in the same manner as the other contractors, except contractors not signatory to the trust agreement shall pay a like amount to the California Apprenticeship Council.

Signed:

Title:

Firm:

Date:

City of Santa Ana RFP 23-182
Page A3-12
STATEMENT REGARDING “ANTI-KICKBACK” REQUIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by these bid documents, agrees to comply with the Copeland “Anti-Kickback” Act (18 USC 74) as supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that each contractor or subcontractor shall be prohibited from inducing, by any means, any person employed in the construction or repair of public work, to give up any part of the compensation to which he/she is otherwise entitled.

Signed:

Title:

Firm:

Date:

City of Santa Ana RFP 23-182
Page A3-13
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE
In conformance with Public Contract Code Section 10162, the BIDDER shall complete, under penalty of perjury, the following questionnaire:

Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a proprietary interest in the BIDDER, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation? Yes No
If the answer is yes, explain the circumstances in the following space.

City of Santa Ana RFP 23-182
Page A3-14

STATEMENT REGARDING COMMUNITY WORKFORCE AGREEMENT (CWA) REQUIREMENTS This is to certify that the undersigned BIDDER, and subcontractors, have read and understood the CWA entered into by and between the City of Santa Ana, the Los Angeles/Orange Counties Building and Construction Trades Council, and the signatory Craft Councils and Local Unions, effective as of June 6, 2023.

The undersigned BIDDER hereby agrees to comply with all terms and conditions of the CWA, and is capable of completing construction of the project continuously, and without interruptions or delays. If awarded any work covered by the CWA, BIDDER will also be required to sign the Letter of Assent that appears as Attachment A to the CWA.

The undersigned BIDDER has reviewed the Public Works Construction Permit and required deposit described in Section 2-2a and the Notice of Inviting Bids.

Signed:

Title:

Firm:

Date:

City of Santa Ana RFP 23-182
Page A4-1
Appendix

ATTACHMENT 4

City of Santa Ana Standard Plans

Standard Plans

https://www.santa-ana.org/engineering-standards-and-plans/

City of Santa Ana RFP 23-182
Page A5-1
Appendix

ATTACHMENT 5

FEE SCHEDULE

(UNDER SEPARATE SEALED COVER)

← All documents from this meeting