11+00
12+00
13+00
14+00
15+00
10+0011+0012+00
A181.66AC
BMP 1:UNDERGROUND INFILTRATION SYSTEM 1VOLUME PROVIDED: 34,535-CUFT96" DIA. CMP 24" PIPE
BMP 6:HYDRODYNAMIC SEPARATOR(PRETREATMENT)
BMP 3:BIO-RETENTION BASINW/ NO UNDERDRAIN 1VOLUME PROVIDED: 1,194 CU-FT.DETAIL HEREON 14' WIDE SIDE OPENINGCURB INLET CATCH BASIN
3.5' WIDE SIDE OPENINGCURB INLET CATCH BASIN
BMP 2:UNDERGROUND INFILTRATION SYSTEM 2VOLUME PROVIDED: 20,248-CUFT60" DIA. CMP
OPEN CULVERT INLETTO BIO-RETENTION BASIN
CURB-O-LET OUTLETFROM BIO-RETENTION BASIN
DUCKBILL BACKFLOW VALVE
DUCKBILL BACKFLOWVALVE
24" PIPE
6" PIPE 6" PIPE
6" PIPE
6" PIPE6" PIPE
6" PIPE
6" PIPE
24" PIPE
18" PIPE
BMP 4:BIO-RETENTION BASINW/ NO UNDERDRAIN 2
BMP 5:BIO-RETENTION BASINW/ NO UNDERDRAIN 3
Save Date: Plot Date: 4/24/2024 2:29 PM4/24/2024 2:49 PMBy: NJiaZ:\21395\03 Project Info\Files In\01 City Of Santa Ana\14 OCTA Grants\24-04-18 Updated Design And Cost\WQMP Exhibit - Standard\WQMP Exhibit.dwgNan Jia - CWEBy: File:
PROJECT NO.DRAWN BY:DESIGNED BY:DATE:REVIEWED BY:DATENO.REVISIONCKBY FIRST SUBMITTAL DATE:
SHEET NO.
CHECKED BY:
®
17542 E. 17th StreetTustin, CA 92780Phone: 714.665.4559 A11.0AC
WQMP EXHIBITCITY OF SANTA ANAOFFSITE WQMP EXHIBIT
RKMO REVIEW BYDATE
RK
SUBMITTAL TYPE10TH AND FLOWER PARK
PERMITTING AGENCY: CITY OF SANTA ANASTATE: CALIFORNIA
04/17/24CSAN000000041 OF 1SUBMITTAL STATUS