AGREEMENT WITH CANNON CORPORATION TO PROVIDE ON-CALL ENGINEERING
PLAN CHECK SERVICES FOR THE CITY OF SANTA ANA
THIS AGREEMENT is made and entered into on this 16th day of Ju ly, 2024 by and between Cannon Corporation, a California corporation (“Contractor”), and the C ity of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (“City”).
RE
CITALS
A. On
March 19, 2024, the City issued Request for Proposal (“RFP”) No. 24-035, by which it sought qualified firms to provide on- call engineering plan check services for the City’s Public Works Agency.
B. C
ontractor submitted a responsive proposal that was among those selected by the City. Contractor represents that it is able and willing to provide the services described in the scope of work that was included in RFP 24-035.
C. I
n undertaking the performance of this Agreement, Contractor represents that it is knowledgeable in its field and that any services performed by Contractor under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional engineering firm in the field.
NO
W THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows:
1. S
COPE OF SERVICES
O
n an on -call basis, and at the City’s sole discretion, Contractor shall perform the services described in the scope of work that was included in RFP No. 24-035, which is attached as Exhibit A, and as more specifically delineated in Contractor’s proposal, which is attached as Exhibit B and incorporated in full.
2. CO
MPENSATION
a. C
ity neither warrants nor guarantees any minimum or maximum compensation to Contractor under this Agreement. Contractor shall be paid only for actual services performed u nder this Agreement at the rates and charges identified in Exhibit C. Contractor is one of five (5 ) contractors selected to provide engineering plan check services on an on-call basis under RFP 24-035. The total annual compensation for the services provided by all such contractors selected under RFP 24-035 shall not exceed the aggregate amount of Three Hundred Thousand Dollars and Zero Cents ($300,000). The total aggregate amount to be expended by all such contractors during the full term of the Agreement, including extension periods, if any, shall not not exceed One Million Five Hundred Thousand Dollars and Zero Cents ($1,500,000). b. P
ayment by City shall be made within 45 days (forty-five) days following receipt of proper EXHIBIT 5
invoice evidencing work performed, subject to City accounting procedures. Payment need not be made for work which fails to meet the standards of performance set forth in the Recitals which may reasonably be expected by City.
3. TERM
This Agreement shall commence on the date first written above for an initial three year term and terminate on June 30, 2027, unless terminated earlier in accordance with Section 16, below. The term of this Agreement may be extended for a single, two -year extension upon a writing executed by the City Manager and City Attorney.
4. PREVAILING WAGES
Contractor is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and th e performance of other requirements on “public works” and “maintenance” projects. If the services being performed are part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws.
Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.
5. INDEPENDENT CONTRACTOR
Contractor shall, during the entire term of this Agreement, be construed to be an independent contractor and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer -employee relationship, a joint venture relations hip, or to allow the City to exercise discretion or control over the professional manner in which Contractor performs the services which are the subject matter of this Agreement; however, the services to be provided by Contractor shall be provided in a manner consistent with all applicable standards and regulations governing such services. Contractor shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes.
6. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans , specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which a re prepared or caused to be prepared by Contractor under this Agreement (“Documents & Data”). Contractor shall require all subcontractors to agree in writing that City is granted a non -exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement. Contractor represents and warrants that Contractor has the legal right to license any and all Documents & Data. Contractor makes no such representation and warranty in regard to Documents & Data which were provided to Contractor by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City’s sole risk.
7. INSURANCE
Prior to undertaking performance of work under this Agreement, Contractor shall maintain and shall require its subcontractors, if any, to obtain and maintain insurance as described below for the entire Term of this Agreement against claims for injuries to persons or damage to property which may arise from or in connection with services, products and materials supplied to City. Total cost of such insurance shall be borne by Contractor.
a. Minimum Scope and Limit of Insurance
1. Commercial General Liability (CGL) : Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $1,000,000 per occurrence and $2,000,000 aggregate. Required policy limits can be met with primary and umbrella/excess insurance policies.
2. Automobile Liability: ISO Form Number CA 00 01 covering any auto (Code 1) with a limit no less than $1,000,000 combined single limits.
3. Workers’ Compensation: as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.
4. Professional Liability Insurance: with limits no less than $1,000,000 per occurrence or claim, and $2,000,000 aggregate.
5. Broader Coverage: if the Contractor maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.
b. Other Insurance Provisions
1. Additional Insured Status: The City, its City Council, its officers, officials, employees, and volunteers are to be covered as additional insureds on the Contractor’s CGL, Professional Liability, and Automobile Liability policies, with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations.
2. Waiver of Subrogation: Contractor hereby grants to City a waiver of any right to subrogation that any insurer of said Contractor may acquire against the City by virtue of the payment of any loss under such insurance. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer.
3. Primary Coverage: For any claims related to this contract, the Contractor’s insurance coverage shall be primary. Any insurance or self-insurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Contractor ’s insurance and shall not contribute with it.
4. Severability of Interest: A severability of interest provision must apply for all the additional insureds, ensuring that Contractor’s insurance shall apply separately to each insured against whom a claim is made or suit is brought, except with respect to the insurer’s limits of liability.
5. Notice of Cancellation: Each insurance policy required above shall provide that coverage shall not be canceled, voided, reduced in coverage or in limits, non- renewed by the carrier, or materially changed except after thirty (30) days prior writte n notice has been given to City. Ten (10) days prior written notice shall be provided to City for policy cancellation or non-renewal due to non-payment of premium.
6. Self-Insured Retentions: Self-insured retentions must be declared to and approved by the City. The City may require Contractor to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention.
7. Acceptability of Insurers: Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City.
8. Claims Made Policies: If any of the required policies provide coverage on a claims- made basis: (1) the Retroactive Date must be shown and must be before the date of the contract; (2) Insurance must be maintained and evidence of insurance must be provided for at least three years after completion of work; (3) If coverage is canc eled or non- renewed, and not replaced with another claims -made policy form with a Retroactive Date prior to the contract effective date, Contractor must purchase “extended reporting” coverage for a minimum of three years after completion of work.
9. Verification of Coverage: Contractor shall furnish the City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City before work begins. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them.
The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.
10. Subcontractors: Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors.
11. Special Risks or Circumstances: City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
8. INDEMNIFICATION
Contractor agrees to defend, and shall indemnify and hold harmless the City, its officers, agents, employees, contractors, special counsel, and representatives from liability: (1) for personal injury, damages, just compensation, restitution, judicial or equitable rel ief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Contractor, its subcontractors, agents, employees, or other persons acting on its behalf which relates to the services described in section 1 of this Agreement; and (2) from any claim that personal injury, damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in this Section or by reason of the terms of, or effects, arising from this Agreement. The Contractor further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including fees and costs for special counsel to be selected by the City, regarding any action by a third party challenging the validity of this Agreement, or asserting that personal injury, damages, just compensation, restitution, judicial or equitable relief due to personal or property rights arises by reason of the terms of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding. Notwithstanding the foregoing, to the extent Contractor’s services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor.
9. INTELLECTUAL PROPERTY INDEMNIFICATION
Contractor shall defend and indemnify the City, its officers, agents, representatives, and employees against any and all liability, including costs, for infringement of any United States’ letters patent, trademark, or copyright infringement, including costs, contained in the work product or documents provided by Contractor to the City pursuant to this Agreement.
10. RECORDS
Contractor shall keep records and invoices in connection with the work to be performed under this Agreement. Contractor shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures, and disbursements charged to the City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Contractor under this Agreement. All such records and invoices shall be clearly identifiable. Contractor shall allow a representative of the City to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement during regular business hours. Contractor shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement for a period of three (3) years from the date of final payment to Contractor under this Agreement.
11. CONFIDENTIALITY
If Contractor receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Contractor agrees that it shall not us e or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance, but in no event less than reasonable care. “Confidential Informat ion” shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed to either party by any s ubsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non- use and nondisclosure shall not apply to any information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the Co ntractor disclosed in a publicly available source; (c) is in rightful possession of the Contractor without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e) is independently developed by the Contractor without reference to information disclosed by the City.
12. CONFLICT OF INTEREST CLAUSE
Contractor covenants that it presently has no interests and shall not have interests, direct or indirect, which would conflict in any manner with performance of services specified under this Agreement.
13. NON-DISCRIMINATION
Contractor shall not discriminate because of race, color, creed, religion, sex, marital status, sexual orientation, gender identity, gender expression, gender, medical conditions, genetic information, or military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization, promotion, termination or other employment related activities or any services provided under this Agreement. Contractor affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations.
14. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and Contractor, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail.
This Agreement may not be modified except by written instrument signed by the City and by an authorized representative of Contractor. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Contractor or the City. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which is not embodied herein.
15. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Contractor , Contractor may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and a ny such assignment, transfer, delegation or subcontract without the City's prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City’s ability to have any of the services which are the subject to this Agreement performed by City personnel or by other contractors retained by City.
16. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of termination.
In such event, Contractor shall be entitled to receive and the City shall pay Contractor compensation for all services performed by Contractor prior to receipt of such notice of termination, subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Contractor to deliver to the City all work product (s) completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Contractor consents to the City's use thereof for such purposes as the City deems appropriate. b. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement.
17. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving the breach, failure, right or remedy. No waiver of any breach, failure or right, or remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies.
18. JURISDICTION - VENUE
This Agre ement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. Both parties f urther agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement.
19. PROFESSIONAL LICENSES
Contractor shall, throughout the term of this Agreement, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies. Contractor shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement.
20. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and attorney’s fees, for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn.
b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement.
21. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in the manner provided in this Section, to the following persons:
To City:
Clerk of the City Council
City of Santa Ana
20 Civic Center Plaza (M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
Fax: 714- 647-6956
With courtesy copies to:
Nabil Saba
Executive Director, Public Works Agency
City of Santa Ana
20 Civic Center Plaza (M-21)
P.O. Box 1988
Santa Ana, California 92702
Fax: 714-647-5635
To Contractor:
Gary Solsona, PE, QSD
16842 Von Karman Avenue, Suite 150
Irvine, CA 92606
[email protected]
A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by fax, communication shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written.
ATTEST: CITY OF SANTA ANA
Jennifer L. Hall Alvaro Nuñez
Clerk of the Council Acting City Manager
APPROVED AS TO FORM: CANNON CORPORATION:
SONIA R. CARVALHO
City Attorney
By:
Kyle Nellesen Name:
Assistant City Attorney Title:
RECOMMENDED FOR APPROVAL:
Nabil Saba
Executive Director
Public Works Agency
Nabil Saba
Digitally signed by Nabil Saba
Date: 2024.07.02 11:35:29
-07'00'
EXHIBIT A - SCOPE OF WORK
Proposal for Proposal for
On-Call Engineering Plan Check On-Call Engineering Plan Check ServicesServices
RFP #24-035RFP #24-035
Santa AnaSanta Ana
City ofCity of
Cannon
Reliable Responsive Solutions
EXHIBIT B - PROPOSAL
Table of Contents
Page
1. Statement of Qualifications
a. Cover Letter ......................................................................................................................................2 b. Contract Agreement Statement ................................................................................................3 c. Firm and Team Experience ..........................................................................................................4 d. Understanding of Need/Schedule of Delivery ....................................................................8 e. Relevant Project Experience .....................................................................................................11 f. References ........................................................................................................................................14
2. Scope of Services and Schedule
Scope of Services ..............................................................................................................................15 Schedule ...............................................................................................................................................18
3. Fee Proposal (Submitted as a Separate File)
Attachments:
• Key Personnel Resumes
• 3-1: Non-Collusion Affidavit
• 3-2: Non-Lobbying Certification
• 3-3: Non-Discrimination Certification
• 3-4: Fleet Compliance Certification
1. Statement of Qualifications
Cannon
Ehab Elias, PE Senior Civil Engineer
City of Santa Ana, Public Works Agency; M-93
20 Civic Center Plaza; Ross Annex, Santa Ana, CA 92701
Subject: On-Call Plan Check Services RFP No: 24-035
Dear Mr. Elias and Proposal Review Committee:
The City of Santa Ana (City) is seeking a dependable civil engineering firm to provide engineering plan check services on an as-needed, on-call basis. The plan check team will review commercial, industrial, and residential development plans for compliance with City, County, and State engineering codes and requirements.
Cannon has assisted many cities and counties with civil plan check services for development and capital improvement projects. Our interest in this RFP stems from our history delivering successful on-call projects for the City. Our goals align with the City’s vision to conserve its neighborhoods, enhance the community, and provide high quality of life for current and future generations. Cannon brings the following benefits to the City:
Experienced and Customer-Service-Focused Plan Check Team: Cannon’s team is led by development plan check manager and main point of contact, Gary Solsona, PE, QSD, who has more than 22 years of engineering experience. Our four, lead senior plan check engineers, Jay Kanani, PE; Bijan Yazdani, PE; Feldro Esperanza, PE; and Miles Safa, PE have over 100 cumulative years of plan check experience in grading, drainage, hydrology and hydraulic studies, and Water Quality Management Plans (WQMP) for residential, commercial, and industrial land development projects.
Specialized Subconsultants: We have selected four subconsultants to join our team. LOR Geotechnical Group, Inc. will provide review of geotechnical review; TJW will provide traffic review; BGB will provide landscape architectural and irrigation review, and ECORP will provide environmental review.
Local Experience and Knowledge: Our team brings local experience and knowledge of City and Orange County- based standards, including the requirements outlined as follows:
• Santa Ana Municipal Code (Section 8-813), City's Grading Plan and Street Improvement Plan Guidelines, City Ordinance No. 2947 (Sections 147.03.90, 14.03.20, 14.03.21, 14.03.23). • Latest editions of the California Building Code, California Plumbing Code, California Residential Code and California Green Code.
• Orange County Hydrology Manual, Local Drainage Manual, Model WQMP, and Technical Guidance Document.
We have also provided plan check services to the Cities of Fullerton, Chino, Diamond Bar, and El Monte. Past project descriptions and references can be found on pages 11-13.
On-Line/Electronic Plan Check Process: In addition to conducting plan review services via paper submissions, Cannon's plan check experience includes conducting on-line/electronic plan reviews via ProjectDox, e-PlanREVIEW (EPR) and Bluebeam Studio. We manage and coordinate our electronic submittals / file sharing based on the City’s preferred platform, such as ProjectDox, Sharepoint, Accela, Microsoft OneDrive, or Dropbox.
We look forward to the opportunity to work with the City to achieve its goals and objectives. I am available at the contact methods provided below should you require additional information or have any questions.
Sincerely,
April 9, 2024
Gary Solsona, PE, QSD
Public Works Manager/Senior Project Manager
16842 Von Karman Avenue, Suite 150
Irvine, CA 92606
( 949.777.1580, * [email protected]
Larry P. Kraemer, PE
Director, Public Infrastructure
1050 Southwood Drive,
San Luis Obispo, CA 93401
( 805.503.4542, * [email protected]
Cannon
3 On-Call Engineering Plan Check Services RFP #24-035
We have reviewed Attachment 2, Standard Agreement and accept all provisions.
A California Corporation Providing Reliable Responsive Solutions since 1976A California Corporation Providing Reliable Responsive Solutions since 1976 Contract Agreement Statementbb
Cannon
4 On-Call Engineering Plan Check Services RFP #24-035
Point-of-Contact
For any questions concerning this proposal submittal, please contact Mr. Solsona at the phone numbers or email provided below:
Gary Essex A. Solsona, PE, QSD
Public Works Manager/Senior Project Manager
16842 Von Karman Avenue,150 Suite Irvine, CA 92606
( 949.777.1580, 909.234.7857, * [email protected]
Financial Stability
As a growing, financially stable organization, we are
proud of the good credit rating we have earned from
Dunn & Bradstreet in an industry dominated by fair
and poor ratings. Cannon has not been debarred,
suspended, or otherwise declared ineligible to contract by any Federal, State, or local public agency, and has
not had a contract terminated for breach with a client.
Cannon has the financial resources and regular
staffing to provide Reliable Responsive Services to
the City of Santa Ana. We are able to maintain our
proposed project team (including subconsultants) to
facilitate the timely and continuous performance of
work.
Firm and Team Experiencecc
Firm Background
As a full-service engineering, surveying, and
construction management firm, we take pride in our
ability to offer clients a broad range of services. Our commitment to providing clients Reliable Responsive
Solutions, whether the project scope is expansive or
more specialized, spans 47 years.
Our staff of professionals includes registered civil,
structural, mechanical, and electrical engineers;
licensed land surveyors; construction managers;
funding administrators; instrumentation and controls
(SCADA) specialists; Geographic Information
System (GIS) specialists; and planners. In addition,
we employ experts in 3D scanning and modeling,
permitting and compliance, Low Impact Development
(LID), and the LEED certification process.
With more than 135 professionals, we have extensive
experience in general civil plan checking services;
map check services; design; surveying services;
street rehabilitation, widening, and improvement
projects; and major street, storm drain, right-of-way,
water, sewer, and dry utility design.
Cannon provides preliminary engineering studies
and master planning for drainage facilities, hydrology
and hydraulics, water utilities, sewer, and dry utilities.
We have strong experience in the preparation of
engineering documents for each phase of design
and construction: conceptual design, preliminary
design, final engineering, construction documents,
construction support, and construction management.
Office Locations
Services for the City will be provided primarily from
our Irvine office with support from our other offices,
if needed. Cannon office locations include the
following:
Irvine
16842 Von Karman Ave.
Suite 150
Irvine, CA 92606
( 949.753.8111
Ventura
305 S Kalorama St.
Suite A
Ventura, CA 93001
( 805.544.7407
Los Angeles
11900 W Olympic Blvd.
Suite 530
Los Angeles, CA 90064
( 310.664.1166
San Luis Obispo
1050 Southwood Dr.
San Luis Obispo, CA
93401
( 805.544.7407
Cannon
5 On-Call Engineering Plan Check Services RFP #24-035
Subconsultants
Geotechnical
LOR Geotechnical Group, Inc. (LOR) is a multi-
disciplinary geotechnical, engineering, and consulting
firm providing sound solutions and innovative strategies in the geotechnical, geologic, environmental, and
construction inspection fields for their clients since
1988. Their experience includes planned communities,
commercial, industrial, and residential development
projects, as well as public infrastructure improvements.
John Leuer, GE
6121 Quail Valley Court
Riverside, California 92507
( 951.653.1760 * [email protected]
Environmental
Established in 1987, ECORP Consulting, Inc. (ECORP)
specializes in assisting government agencies and
private clients with a wide range of environmental
services. ECORP is a financially sound firm with five
offices (Santa Ana, Redlands, Rocklin, San Diego,
and Chico) serving clients throughout California.
ECORP provides support over the life of a project,
from initial baseline studies; to environmental planning, documentation, and review; permit negotiation, liaison
with resource agencies, and mitigation design; and
through to construction monitoring and compliance
reporting. ECORP brings an experienced team of more
than 120 CEQA and NEPA specialists, terrestrial and
aquatic biologists, wetlands specialists, paleontologists, archaeologists/cultural resource specialists, air quality/ greenhouse gas specialist, noise analysis specialists,
geographic information systems (GIS) specialists, and
unmanned aerial systems (UAS) pilots.
Jesus “Freddie” Olmos
Principal Environmental Planner
215 North 5th Street, Redlands, CA 92374
( 9 09.307.0046 * [email protected]
Landscape Architecture and Irrigation
Founded in 1979 and incorporated in 1998, BGB
Design Group (BGB) has a balance of both public
and private clients. Award-winning public projects
have included the Avalon Waterfront Urban Design on
Catalina Island, the Esplanade in Redondo Beach, the
City of Laguna Beach Landscape Resource Document,
and the San Clemente Pedestrian Beach Trail. Other
noted public projects include parks, creek restoration, trails, libraries, civic centers, and related public
facilities.
Arthur Guy, ASLA
President
3185 C1 Airway Avenue
Costa Mesa, CA 92626
( 714. 545.2898 * [email protected]
Traffic Plan Check
Established in 2010, TJW, a California Corporation, is
a Small Business Enterprise (SBE) consulting firm that
specializes in traffic engineering and transportation
planning services. Their team of 14 employees, located
in California and Idaho, is comprised of experienced
engineers, planners and staff that have extensive
knowledge of standards, specifications, and guidelines.
Through their project experience, they can effectively
provide thorough and comprehensive services for
innovative traffic engineering and transportation
planning solutions to meet the needs of their clients,
stakeholders and the community.
Gene Kim, PE, TE
Principal Engineer
9841 Irvine Center Dr. #200
Irvine, California 92618
( 949.878.3509 * [email protected]
Resumes for our key personnel are
included as an Attachment.
Cannon
6 On-Call Engineering Plan Check Services RFP #24-035
Organization Chart
Our key personnel will be principally responsible for working with the City. As Senior Project Manager, Gary Solsona will conduct the presentation if the firm is selected to interview.
Alternate Point-of-Contact
If Mr. Solsona is unavailable to perform as the main point-of-contact, Mr. Kraemer will be available to manage the plan checking team and tasks for the City.
Larry Kraemr, PE Principal-in-Charge
1050 Southwood Drive, San Luis Obispo, CA 93401
( 805.503.4542, * [email protected]
Principal-in-Charge
Larry Kraemer, PE
Point-of-Contact /
Senior Project Manager
Gary Solsona, PE, QSD
Key Personnel
Land Survey and
Map Checks
Ned Reynolds, PLS
Williams Baega, PE, PLS
SUBCONSULTANTS
Geotechnical
LOR Geotechnical Group
John Leuer, PE, GE
Andrew Tardie, GE
Landscape and
Irrigation Review
BGB
Art Guy, ASLA
Environmental
ECORP
Freddie Olmos
Traffic Plans
TJW Engineering
Gene Kim
Plan Checkers
Jay Kanani, PE - Grading/Hydrology/WQMP
Bijan Yazdani, PE - Grading/Street Improvement Plans
Feldro Esperanza, PE - Grading/Hydrology/WQMP
Miles Safa, PE, QSD - Grading/Hydrology/WQMP
Karena Diep, EIT - Grading/Street Improvement Plans
Kaitlin Grabiec, EIT - Grading/Street Improvement Plans Alex Maestre, PE - Street Light Plans
Erin Deviny - Engineering Assistant
Cannon
7 On-Call Engineering Plan Check Services RFP #24-035
Current Workload and Staff Availability
Cannon’s current and anticipated workload allows us to completely and comprehensively fulfill on-call services that may be assigned by the City of Santa Ana as a result of this proposal. As an on-call service provider for many clients throughout Southern California, we understand the importance of meeting project schedules and deliverable deadlines.
Tasks requiring the specialized technical services of our subconsultants will be performed under Cannon’s direction under a documented Work Plan.
Our plan checking team of experienced engineers and land surveyors are supported by qualified, technical staff that will provide needed reviews in an efficient, timely, cost-effective manner. The table below illustrates our key personnel’s current workload, and availability.
Key Team Members / Role Current Project Workload % Available Gary Solsona, PE, QSD
Point-of-Contact / Senior Project Manager
Plan check services for Cities of
Santa Ana, Diamond Bar,
Fullerton, and Chino
50%
Jay Kanani, PE
Grading/Hydrology/WQMP 80%
Bijan Yazdani, PE
Grading/Street Improvement Plans 80%
Miles Safa, PE, QSD
Grading/Hydrology/WQMP 80%
Feldro Esperanza, PE
Grading/Hydrology/WQMP 80%
Karena Diep, EIT
Grading/Street Improvement Plans 50%
Kaitlin Grabiec, EIT
Grading/Street Improvement Plans 50%
Ned Reynolds, PLS
Land Survey and Map Checks
Directing Various Land Development and
Public Works Projects 50%
Williams Baega, PE, PLS
Land Survey and Map Checks
Various Land Development and Public
Works Projects 50%
Alex Maestre, PE
Street Light Plans
Various Land Development and Public
Works Projects 50%
Erin Deviny
Engineering Assistant
Various Land Development and Public
Works Projects 50%
John Leuer, PE, GE (LOR)
Geotechnical Review
Various Land Development and Public
Works Projects 35%
Jesus “Freddie” Olmos (ECORP)
Environmental
Various Land Development and Public
Works Projects 35%
Art Guy, ASLA (BGB)
Landscape Architecture and Irrigation Review
Various Land Development and Public
Works Projects 35%
Gene Kim, PE, TE (TJW)
Traffic Review
Various Land Development and Public
Works Projects 35%
Understanding of Need/Schedule of Delivery
dd
Cannon
8 On-Call Engineering Plan Check Services RFP #24-035
Project Understanding
The City of Santa Ana (City) is seeking an engineering
consultant to provide complete plan check services
on an on-call, as needed basis. The services include
review of civil related improvement plans, studies, and reports, including grading, sewer, storm drain, water
quality management plans (WQMP), drainage, and
erosion control.
We have built our team around the understanding
that plan check services should be provided by or
under the responsible charge of a California Licensed
Professional Engineer and Land Surveyor.
Our team’s plan check experience includes rough
grading, precise grading, hydrology and hydraulics,
street improvements, street lighting, erosion control,
WQMP, survey maps and easement plans, lot line
adjustments, utility easements, and map recordation.
We’ve developed a comprehensive and dynamic
program to successfully deliver on-call plan checking
review services for our clients. We understand
the importance of proactive communication,
responsiveness, and flexibility. We are accustomed to
being ready when called upon for specific assignments
to meet your expectations. Our team has the proven
ability to streamline the plan check review process
based on the systems and templates we’ve created
(such as our plan check log [Figure 1.]) to confirm
quality and promptness. Cannon is strongly committed
to serving our clients by truly listening to their project objectives, producing quality work, and completing plan check reviews on time or early, and within budget.
Figure 1. Sample of Cannon Plan Check Log
Approach
Cannon’s approach to provide plan check and map
check services to the City includes the following key
components:
• Communication Strategy
• Experienced Plan Check Team
• Plan Check Conformance
• Facilitating the Plan Check Process
• Electronic Development Plan Checking
• Record Keeping and Reporting
• Turnaround Time
Communication Strategy
At the top of this list of key components that will lead to project success is effective communication between
our internal review team and the City’s Project Manager and Staff. This will confirm we provide the City with
the support they are looking for to reduce the impact
to politically sensitive areas or disruption to the public.
The closest possible rapport will be developed with the City’s Project Manager to understand special budget
constraints, time schedules, and associated impacts.
By building on excellent communications, we will more
easily define problem areas, technical requirements,
and facilitate a smoother plan check review and
approval process.
Experienced Plan Check Team
Within our highly skilled staff of engineers, project
managers, quality assurance / quality control (QA/QC)
team, and constructability reviewers are personnel
that take their chosen profession very seriously. This
team strives for the highest quality of service for each project review. Because our plan check engineers
have extensive design experience using local, regional, and other applicable design standards on a day-to-
day basis, we can confirm the improvement plans and
associated reports and documents will meet the current
applicable codes and standards.
We have also structured our team to have flexibility
with meeting varying workload sizes. In addition to
our key personnel, Cannon is home to comprehensive
engineering staff who are ready to commence project
work immediately, should the need arise. We can meet
short-term workload needs by temporarily bringing in
other personnel and, with the City’s approval, meet
long-term needs with the addition or removal of other
trained staff.
Plan Check Conformance
Cannon also understands that, at a minimum, plan
check services will be provided in conformance with
the most current version of the following documents
and standards as applicable:
• Grading Plan Guidelines
• Street Improvement Guidelines
• Conditions of Approval and Title Reports
• City of Santa Ana Standard Plans
• Master Plans
• Municipal Code
• Grading Ordinance and Grading Plan Check
Requirements
• California Building Codes Chapters 18, 33, and
Appendix J
• APWA Standard Plans and Standard Specification
(Greenbook) for Improvements in Public R/W
• Caltrans Standard Plans
• Orange County Public Works Standard Plans
• Approved Specific Plans, Site Plans,
Environmental Documents, and/or Tentative and
Final Maps
• Grants, easements, or vacations as applicable
• Traverse, Lot and Tract Boundary Closures for
final or parcel maps Subdivision Map Act
• Model WQMP
• Orange County Technical Guidance Document
• CA MUTCD and WATCH
Facilitating the Plan Check Process
We understand the concern, need, and desire to
approve the plan check package at the first submittal.
It has been our experience that when plan checks
extend three review cycles, there is potentially an
issue or concern that has not been addressed up front
or there has been a breakdown in communication.
We have experienced success in the past by
implementing the following approach:
• Timely and complete technical reviews of the
submitted plans and associated reports.
• Sound record keeping and documentation of
when plan reviews are submitted and returned,
correspondence files, meeting minutes (if
necessary), plan check mark-ups, and reference
materials. When plan corrections are required, a
written plan correction list will be provided to the
applicant, or the applicant’s agent(s).
• With the City’s permission, communication
between plan reviewer(s) and the engineer/
architect of record through phone calls, e-mails,
faxes and/or plan check review meetings, as
needed. Keeping our client and the project owners
informed through CC’s of review memos, e-mails
and plan check logs.
On-line/Electronic Plan Review
We are committed to sustainable business practices,
as we’ve been performing electronic plan check
reviews for the past five years. Our objective with this process is to reduce waste and paper consumption
and save money, resources, and time by eliminating
mail or courier delivery services for hard copy pack-
ages, therefore reducing vehicle emissions.
We are aware the City utilizes ProjectDox to perform
plan check review of improvement plans, technical
studies and other documents. Our plan check team is
adept with ProjectDox having received formal training
on this cloud-based software alongside City staff
and we are currently licensed users with the City. We
are familiar with navigating through this cloud-based
software, such as:
• Reviewing open projects and accepting "my
tasks."
• Adding plan check comments using Changemark
tools and Simple Markup tools, basic markup
tools (highlighting, measurement, text box,
Ehab Elias, Senior Civil Engineer
City of Santa Ana
Thank you Gary and Jay for your
diligence on this plan check.
Cannon
9 On-Call Engineering Plan Check Services RFP #24-035
etc.), response functionality, standard Library
Comments.
• Reviewing prior comments to check if they've
been resolved.
• Resolving prior comments through the Review
Comments page.
• Using the Compare Files tool to compare
resubmittals with prior submittals.
• Completing plan check reviews in the E-form
window by changing Review Status to "Approved"
or "Corrections Required" and filling out the
Timesheet Log.
Already having experience with navigating and
utilizing ProjectDox allows our plan check team to “hit the ground running” on performing plan check reviews
with zero learning curve. Figure 2 below is a sample
of our on-line/electronic plan check comments.
Record Keeping and Reporting
Through years of experience, we have developed
streamlined procedures that produce timely,
accurate, and consistent plan reviews. Submitted
improvement plans will be logged into a plan check
log. The plan check log (see Figure 1 on page 7)
tracks the engineer of record, types of improvement
plans submitted, date submitted, due date to be
completed, and any significant comments or submittal
requirements outstanding for that plan review. Cannon
will provide regular updates (and as requested by the
City) of the status of plan reviews to report progress
and anticipated return dates of outstanding plan check
projects.
As part of our project controls, Cannon will keep a
record of when plans are received and returned in
our plan check log. Excellent communications will
allow us to define questionable areas, technical
requirements, and to facilitate a smooth review and
approval process.
Turnaround Time
We take no exception to the turnaround time as
outlined in the City’s RFP. If expedited reviews are
requested, we are open to having discussions with the
City and implementing these types of reviews.
Figure 2. Sample of On-line/Electronic Plan Check Comments Cannon
10 On-Call Engineering Plan Check Services RFP #24-035
Cannon
11 On-Call Engineering Plan Check Services RFP #24-035
Relevant Project Experienceee
On-Call Plan Check Services
Santa Ana, California
Cannon is currently performing numerous broad-
based Entitlement and plan checking duties for the
City of Santa Ana. Typical Plan Check services
include grading, drainage, hydrology reports, WQMPs,
and street improvement plans. Project types include
residential, commercial, and industrial.
Key Project Team Members
• Gary Solsona, PE, QSD Senior Project Manager
• Jay Kanani, PE Senior Plan Checker
• Bijan Yazdani, PE Senior Plan Checker
• Feldro Esperanza, PE Grading/Hydrology/WQMP
• Miles Safa, PE, QSD Grading/Hydrology/WQMP
• Alex Maestre, PE Street Light Plans
• Karena Diep, EIT Plan Checker
• Kaitlin Grabiec, EIT Grading/Street Improvement Plans • LOR Geotechnical Review
Reference: Ehab Elias, PE Senior Civil Engineer
City of Santa Ana
20 Civic Center Plaza, M-93, Santa Ana, CA 92701
( 714.647.5627 * [email protected]
Fees: $ 1,947,132
Project Dates: July 2019 - In Progress
On-Call Professional
Engineering Services Private
Development Plan Check
Fullerton, California
Cannon is currently providing entitlement review
services and plan checking duties for residential,
commercial, and industrial projects for the City
of Fullerton. Our plan check services include
grading, storm drain, hydrology reports, and street
improvement plans.
Key Project Team Members
• Gary Solsona, PE, QSD Senior Project Manager
• Jay Kanani, PE Senior Plan Checker
• Bijan Yazdani, PE Senior Plan Checker
• Miles Safa, PE, QSD Grading/Hydrology/WQMP
• Karena Diep, EIT Plan Checker
• Kaitlin Grabiec, EIT Grading/Street Improvement Plans • LOR Geotechnical Review
Reference: Juan Zavala, PE
City of Fullerton
303. W. Commonwealth Ave., Fullerton, CA 92832
( 714.738.6322 * [email protected]
Fees: $865,341
Project Dates: December 2018 - In Progress
Cannon
12 On-Call Engineering Plan Check Services RFP #24-035
Plan Check Services
Lancaster, California
Cannon provided on-call civil engineering plan
check and map check services on more than 100+
development projects for the City of Lancaster. As
part of our on-call contract with the City, Cannon
reviewed grading and drainage plans, erosion control
plans, hydrology and hydraulic reports, storm drain
improvement plans, street improvement plans, water
improvement plans, sewer area studies, sewer
improvement plans, landscaping and irrigation plans
within a landscape maintenance district (LMD), street
light improvement plans and voltage drop calculations,
soil/geotechnical reports, bond estimates, final
mapping, and other documents.
Cannon’s Plan Check Team reviewed the conditions
of approval, reference material, City standard plans,
plan checklist requirements and accessibility for
projects constructed in the City for conformance with
City Codes and ordinances, including the County
Grading Code and Manual, “Greenbook” Standard
Specifications for Public Works Construction, County
Standards and Design Manual, California Building
Codes, Los Angeles County Hydrology Manual and
Los Angeles County Flood Control Hydraulic Design
Manual. Extensive coordination was required between
the different City departments and engineer of record
to confirm quick turnaround times.
Cannon provided reviews in Bluebeam Revu and
transmitted plan check submittals using the City’s
Accela website.
Key Project Team Members
• Gary Solsona, PE, QSD Senior Project Manager
• Jay Kanani, PE Senior Plan Checker
• Bijan Yazdani, PE Senior Plan Checker
• Miles Safa, PE, QSD Grading/Hydrology/WQMP
• Karena Diep, EIT Plan Checker
• Kaitlin Grabiec, EIT Grading/Street Improvement Plans • LOR Geotechnical Review
Reference: Stephen Carillo, PE Senior Engineer
City of Lancaster
44933 Fern Avenue, Lancaster, CA 93534
( 661.723.5845 * [email protected]
Fees: $688,000
Project Dates: September 2016 - In Progress
City of El Monte As-Needed
Plan Check Services
El Monte, California
Cannon provided broad-based plan checking duties
for the City of El Monte. Plan check services include
grading, soils report reviews, storm drain, hydrology
reports, LID reports, street improvement plans, parcel/ tract maps, condominium plans, easements, and lot
line adjustments.
Key Project Team Members
• Gary Solsona, PE, QSD Senior Project Manager
• Jay Kanani, PE Senior Plan Checker
• Bijan Yazdani, PE Senior Plan Checker
• Feldro Esperanza, PE Grading/Hydrology/WQMP
• Miles Safa, PE, QSD Grading/Hydrology/WQMP
• Karena Diep, EIT Plan Checker
• Kaitlin Grabiec, EIT Grading/Street Improvement Plans • LOR Geotechnical Review
Reference: Kevin Ko, PE Project Manager
City of El Monte
City Hall West, 2nd Fl, 11333 Valley Blvd.
El Monte, CA 91731
( 626.580.2000 * [email protected]
Fees: $220,460
Project Dates: October 2019 - In Progress
Cannon
13 On-Call Engineering Plan Check Services RFP #24-035
On-Call Civil Plan Check
Services
Chino, California
Cannon provided plan check services for the City of
Chino. Plan check services included grading, soils
report reviews, sewer, water, storm drain, hydrology
reports, WQMPs, street improvement plans, signing
and striping plans, street lighting, parcel/tract maps, easements, and lot line adjustments. Project types
include residential, commercial, and industrial. Our
survey team has acquired and reviewed record maps
(tract maps, parcel maps, and record of surveys)
adjacent to the annexation boundary and selected
the most pertinent to create the annexation parcel.
Deliverables included a plat and legal description per
LAFCO standards.
Key Project Team Members
• Gary Solsona, PE, QSD Senior Project Manager
• Jay Kanani, PE Senior Plan Checker
• Bijan Yazdani, PE Senior Plan Checker
• Feldro Esperanza, PE Grading/Hydrology/WQMP
• Miles Safa, PE, QSD Grading/Hydrology/WQMP
• Alex Maestre, PE Street Light Plans
• Karena Diep, EIT Plan Checker
• Kaitlin Grabiec, EIT Grading/Street Improvement Plans • LOR Geotechnical Review
Reference: Jesus Plasencia, PE Assistant City Engineer City of Chino
13220 Central Avenue, Chino, CA 91710
( 909.334.3417 * [email protected]
Fees: $693,090
Project Dates: July 2020 - In Progress
Cannon
14 On-Call Engineering Plan Check Services RFP #24-035
The following is a list of clients we’ve worked with in the recent past who can attest to our commitment to excellence, reliability, and responsiveness. Please feel free to contact them as you see fit.
Ehab Elias, PE
Senior Civil Engineer
City of Santa Ana
20 Civic Center Plaza
Santa Ana CA 92701
( 714.647.5400
* [email protected]
Juan Zavala, PE
Principal Civil Engineer
City of Fullerton
303 W. Commonwealth Avenue
Fullerton, CA 92832
( 714.738.6322
* [email protected]
Stephen Carillo, PE
Senior Engineer
City of Lancaster
44933 Fern Avenue
Lancaster, CA 93534
( 661.723.5845
* [email protected]
Referencesff
2. Scope of Services and Schedule
Scope Of Services
The scope for potential tasks includes the following:
Street Improvement Plans
Cannon will review street improvement plans, utilizing
the City's street improvement plan guidelines, provide
comments and recommend for approval. We will
check for compliance with City adopted standard
drawings, specifications, ADA standards, and
applicable regulations using Cannon’s in-house plan
check list or as provided by City staff. Services will
include initial and subsequent reviews, full or partial plan review services, interaction with the City and
recommendations to the City staff for final approval.
To confirm adequate document preparation, we will
attend project status meetings with the City staff (upon request) and with others as required to discuss status
and/or details of the project.
We will verify code compliance of street geometrics,
typical sections showing cross slopes, centerline,
right-of-way, dimensions and applicable construction
notes, verify minimum/maximum street profile
grades, grade breaks, vertical curve info, review
street profiles of centerline, left and right curbs,
confirm AC/AB pavement structural section complies
with City standard and/or geotechnical report
recommendations, station/elevations at key locations,
curb ramp details, driveway details, working design
sections, proposed drainage devices such as catch
basins with local depressions, and review “join”
conditions at limits of work. For any work within
Caltrans Right-of-Way (intersecting Interstate 5 and
State Routes 55 and 22), we will verify compliance
with the Caltrans Standard Plans and Standard
Specifications.
Grading Plans
Cannon will review rough grading plans for substantial
conformance to the approved documents from the
entitlement process, including but not limited to
tentative map, drainage concepts (hydrology and
hydraulics), and preliminary WQMP.
Review of precise grading plans consists of
verification of detailed finish grade elevations to show drainage patterns, flow lines for lot drainage, proposed paving, and that grading plans are signed and sealed
by a registered civil engineer. The review may include
identifying previous preliminary grading permits issued for the project site.
Hydrology Studies and Hydraulics
Calculations
Cannon will provide preliminary design review of
hydrology/hydraulics technical reports for proposed
private development projects and attend City design
review meetings as necessary. Cannon will apply our
current plan check experience on drainage projects
with the City’s specific requirements, such as 1)
verifying the new site development will not place
additional stress on the existing drainage system, 2)
verify storm frequency of 100 years will not exceed
the ultimate street right-of-way and 3) sump conditions will carry a 100-year storm frequency and have a
secondary “emergency overflow” outlet. Additionally,
we will verify the proposed finished floor elevation of residential buildings are minimum of one foot higher
than 100-year flood.
Water Quality Management Plans
Cannon will review the WQMP Report submittals to
confirm compliance with the 2011 Orange County
Model WQMP, the 2013 Orange County Technical
Guidance Document (TGD) and local jurisdictional
runoff management program. Our review of each
WQMP submittal will consist of identifying the process
that Permittees will employ for developing a Water
Quality Management Plan for new development and
significant redevelopment projects.
We review each project proponent to implement a
program that requires structural Best Management
Practices (BMPs) on Priority Development Projects
to be designed, constructed, and maintained to
remove pollutants in storm water to meet the criteria
set forth in the TGD, and existing Hydromodification
Management Plan (HMP).
Cannon
15 On-Call Engineering Plan Check Services RFP #24-035
Our review will include the following:
• Verify accuracy of project address, description,
site information, the owner’s information, or the
person for signing the certification of ownership.
• Verify the condition of approval is addressed in the
proposed WQMP Report.
• Confirm if Hydrologic Condition of Concern
(HCOC) exists and verify the receiving waters.
• Verify the Potential Stormwater Pollutants on the
project.
• Verify low-impact-development (LID) best
management practices (BMP) selection and
project conformance analysis.
• Conform LID BMPs follow the hierarchy of
infiltration, evapotranspiration, harvest/re-use, and
biotreatment.
• Verify that non-structural and structural source
control BMPs are incorporated in the report and
onto WQMP Site Plan.
• Verify if project qualifies for Water Quality Credits. • Confirm that BMP inspection and maintenance
schedule are listed, and the responsible party and
the minimum frequency of activities are tabulated
in the report.
• Confirm the that Operations and Maintenance
Plan is prepared and included
• Verify the final submittal for recordation of WQMP
Report includes necessary documents.
Geotechnical Reports
LOR Geotechnical Group, Inc. (LOR), will provide the
following scope items:
• Review geotechnical plans, and/or reports
prepared by others and submitted to the City.
• Generate geotechnical review comments based
on current City, County, and/or State standards.
• Prepare written comments or approvals by a state
licensed Geotechnical Engineer.
Land Surveying, Legal Description of
Dedication and Final Map Plan Check
Cannon’s Survey Team is experienced in
processing and reviewing tract and parcel maps,
legal descriptions for easements, dedications,
abandonments, and lot line adjustments. Cannon
will review provided title reports and documents,
and research previously filed maps in the area of the
applicant’s submittal for existing conditions to be taken into consideration by the applicant. The application will be reviewed for technical correctness and standard
of care. Drafting standards will be reviewed for
compliance with Subdivision Map Act requirements
and clarity, along with survey calculations and spell
checking. Recommendations will be made on all of
the above in written format. Direct interaction with
the Applicant during the plan check process can
be helpful to ensure a timely plan check review. We
encourage the city to consider authorizing such
coordination.
Landscape Architectural and Irrigation
Our team will review landscape and irrigation plans,
which include water use calculations, to confirm the
plan is prepared by a licensed landscape architect,
includes an irrigation system layout with the location
of controllers and points of connection with data
on valve sizes and gallons per minute (GPM), the
size and location of sleeves and all spray heads,
including the location of conventional systems and
drip systems; an irrigation legend with complete
specifications; irrigation notes and construction details of all assemblies and components; a recommended
irrigation schedule, preferably on an annual basis; and a summary block on the initial page of submitted plans
that will present information clearly and accurately. We will review that the landscape plan includes a Plant
Legend containing; plant symbol, scientific name of
plant material, common name of plant material, plant
container size, and plant spacing. We will confirm
that proposed landscaping shall be compliant with the
City of Santa Ana’s Landscape Water Conservation
Ordinance Chapter 41, Article XVI of the Santa Ana
Municipal Code and Water Efficient Landscape
(“Guidelines”) Appendix A.
Cannon
16 On-Call Engineering Plan Check Services RFP #24-035
Environmental
ECORP will provided the following environmental
scope items:
• Review project plans, specifications,
environmental documentation, and relevant
permits to understand the proposed development's
scope and potential environmental impacts.
• Confirm compliance with local, state, and federal
environmental regulations, including, but not
limited to, the California Environmental Quality
Act (CEQA), Clean Water Act (CWA), Endangered
Species Act (ESA), and air quality regulations.
• Provide an environmental plan check report
documenting findings, mitigation measures, and
recommended conditions of approval.
• Confirm plans and specifications align with the
City's commitment to sustainable development
and environmental stewardship, aiming to protect
natural resources.
Transportation/Traffic Studies
We will verify conformance to specific circulation
plans, including transportation management plans,
master plans of streets and highways, general
circulation plans and coordination of these plans
with those developed by metropolitan planning
organizations.
Signing and Striping and Traffic Signal
Plans
Cannon will verify conformance with applicable traffic
engineering design standards, such as California
MUTCD, Caltrans Traffic Manual, Caltrans Highway
Design Manual, American Association of State
Highway, Work Area Traffic Control Manual, and
National Association of City Transportation Officials
Bikeway Design guide for bicycle facilities.
Our review will also assess various Intelligent
Transportation System (ITS) component designs
(including changeable message signs, closed circuit
television, etc.), traffic safety studies, speed zone
surveys, “red light” camera investigations, parking
studies, demonstration projects, bicycle studies
and facilities design, transit studies, truck studies,
traffic studies for new development, and traffic signal coordination timing development.
We will verify that striping construction notes are
referencing the appropriate Caltrans Standard Plans
A20A through A20G for striping and A24A through
A24H for pavement markings. We will also verify other
traffic related items meet minimum standards, such as
lane widths, taper lengths, sign placement, crosswalk
width, etc.
Street Lighting Plans
Cannon will provide plans review for street lighting and voltage drop calculations in compliance with the City's Lighting Standards. Work will include public street
lighting plan checking and voltage drop calculation
services in the City. There will be coordination
with client and utility consultant to verify electrical service pedestal locations and street light standard
specification.
Voltage drop calculation services will include verifying voltage drop for branch circuits and adequate wire and
conduit sizing for the street lighting project. Plan check requirements, specific City design guidelines for street lighting and conformance of current electrical, state,
and jurisdictional standards/codes will be verified.
Cannon
17 On-Call Engineering Plan Check Services RFP #24-035
City issues
approved grading
permit
Workflow Chart
City of Santa Ana
Assigns Project
Cannon Plan
Checker Reviews
WPR process is
completed
Cannon Logs
in Systems
If no further comments
recommend for
permit approval
If changes
are required:
repeat review process
Quality Assurance / Quality Control
Program
Cannon has earned a strong reputation for product
delivery and professional service. We have built and
continue to develop internal control processes that
incorporate peer review and progress reporting to
help projects meet established design and review
guidelines, remain within budget, and stay on
schedule. We take a proactive approach to project
management, with an emphasis on project and review
process familiarity, open communication, quality
and cost control, and project scheduling. Processes
include a Work Product Review (WPR) Program,
project “Look Backs,” Project Progress Reviews, plan
check checklists, and an Earned Value Analysis (EVA)
program.
In addition, we employ cost savings strategies that
have been effective in managing projects for public
and private industry clients. These strategies may
include: cost benefit analysis and value engineering
reviews; alternative technologies review or innovative
approach analysis; and the use of plan check review
control logs.
Our work-flow incorporates quality review processes
to confirm compliance with standards, and that our
engineering services are accurate, efficient, and fully meet our clients’ expectations. We place an emphasis
on “getting it right the first time.”
Deliverables
We recognize the importance of providing accurate,
detailed, and high-quality deliverables. It is critical that plan check redlines and the comment letter clearly
illustrate the necessary information to produce a
successful project. Many of our Cannon design staff
have also worked in our Construction Management
Department, gaining meaningful insight on the
importance of well-defined plans, specifications, and
bid item quantities. Our Project “Look Backs” are
not only conducted from the designer perspective,
but also from our managers perspective, to further
develop our design team’s accuracy in work products.
We have illustrated our plan check work-flow process
below.
Schedule
We will comply with the guidelines stated in
Attachment 1 of the RFP, confirming the initial plan
review will be completed within a maximum of four
weeks, followed by a two-week period for the second
review, and a one-week turnaround time for further
reviews, if necessary.
Cannon
18 On-Call Engineering Plan Check Services RFP #24-035
Attachments
Key Personnel Resumes
3-1: Non-Collusion Affidavit
3-2: Non-Lobbying Certification
3-3: Non-Discrimination Certification
3-4: Fleet Compliance Certification
Mr. Solsona has 22 years of civil engineering experience with on-call contracts for public works, consisting of plan check and map check assignments, civil engineering design, award-winning roadway widening, street rehabilitation and intersection improvements, sound wall and retaining wall design, and preparation of traffic control plans and project study reports. He is recognized in the industry as an ADA design specialist. His proactive approach is carried out seamlessly through project management, engineering design development, and construction support services to public agencies throughout Southern California.
Mr. Solsona has a proven track record in providing innovative, cost-saving, and sustainable solutions (such as alternative pavement rehabilitation methods, including full depth reclamation and cold-in-place recycling) on numerous street improvement projects for major arterials and residential streets.
Select Relevant Experience
• City of Santa Ana Development Plan Check Services, Santa Ana, California
• City of Fullerton Private Development Plan Check Services, Fullerton, California
• City of Chino Development Plan Check and Map Check Services, Chino, California
• City of Lancaster Permit Plan Check Services, Lancaster, California • City of Huntington Beach, Plan Check Services, Huntington Beach, California
• City of El Monte As-Needed Plan Check Services, El Monte, California Professional Registration
• Civil Engineer, California,
No. 68420
• Qualified SWPPP
Developer – Practitioner
#234666
Education
• Bachelor of Science, Civil
Engineering, California
State Polytechnic
University, Pomona,
California
Professional Affiliations
• Member – ASCE, ACEC
and APWA
• Past Board Member
– Filipino American
Society of Architects and
Engineers
Office: Irvine, California
Gary Solsona has led our General Civil Plan Check team to successfully complete more than 700 general civil plan check and subdivision map check assignments over the past two years.
Gary Solsona, PE, QSD Point-of-Contact / Senior Project Manager CannonOn-Call Engineering Plan Check Services RFP #24-035 Licenses and Certifications
• Professional Civil Engineer,
California No. 68211
Education
• Bachelor of Science, Civil
Engineering, West Virginia
University, West Virginia
• U.S. Army Corp of
Engineers Contractor Health
and Safety – Construction
Safety Hazard Awareness
EM 385 1-1 and OSHA 30
Hours
Office: Irvine, California
Jay Kanani, PE Grading/Hydrology/WQMP
Mr. Kanani has more than 28 years of experience as a senior civil engineer providing general plan check services, design and QA/QC for capital improvement and various residential and commercial land development projects. He confirms compliance with Department of Public Works/Engineering standards and design policies, as well as conditions of approval for development projects. Mr. Kanani has four years of experience working in the public sector and has provided plan check services of grading plans and WQMPs. His experience includes storm drain, sanitary sewer, water system, open channel, and FEMA detention basin and flood study.
Select Relevant Experience
• City of Santa Ana Development Plan Check Services, Santa Ana, California • City of Fullerton Private Development Plan Check Services, Fullerton, California
• City of Chino Development Plan Check and Map Check Services, Chino, California
• City of Diamond Bar Plan Check, Map Check, and Inspection Services, Diamond Bar, California
• City of El Monte As-Needed Plan Check Services, El Monte, California • City of Corona Plan Check Services, Corona, California Licenses and Certifications
• Professional Civil Engineer,
California No. 48353
Education
• Bachelor of Science, Civil
Engineering, University
of Oklahoma, Oklahoma /
Advanced Concrete Design
/ Advanced Hydrology
Office: Irvine, California
Bijan Yazdani, PE Grading/Street Improvement Plans
Mr. Yazdani has more than 35 years of experience as a senior civil engineer providing QA/QC and general plan check services for capital improvement and land development projects to confirm adherence to the Departments of Public Works/Engineering standards and design policies and conditions of approval for development projects. Mr. Yazdani’s project experience includes roadway design, drainage design, right-of-way, grading plans, storm drain plans, street improvement plans, signing and striping plans, and water and sewer plans as well as checking of tract and parcel maps, lot line adjustments, and easement documents.
Select Relevant Experience
• City of Santa Ana Development Plan Check Services, Santa Ana, California • City of Fullerton Private Development Plan Check Services, Fullerton, California
• City of Chino Development Plan Check and Map Services, Chino, California • City of Lancaster Permit Plan Check Services, Lancaster, California • City of Diamond Bar Plan Check, Map Check, and Inspection Services, Diamond Bar, California
• City of El Monte As-Needed Plan Check Services, El Monte, California • City of Menifee Civil Plan Check Services, Menifee, California CannonOn-Call Engineering Plan Check Services RFP #24-035 Ned Reynolds, PLS Survey and Map Checks
Mr. Reynolds brings more than 35 years of experience in the surveying field working with a variety of survey equipment such as manual and robotic total stations, static, RTK, and network GPS. As a land surveyor, he has served in the field and office on numerous public infrastructures, land development, industrial, residential, and commercial construction projects.
As a mapping specialist his responsibilities include directing field crews, establishing boundaries and annotation using AutoCAD Civil 3d for Subdivision, Record of Survey and ALTA Survey. He prepares Tract Maps, Lot Line Adjustments, Legal Descriptions for Easement Deeds, and Certificates of Correction and Condominium Plans.
Select Relevant Experience
• Alta Survey, followed by Tract No. 17747, Lighthouse project for Taylor Morrison, City of Costa Mesa, California
• Field surveying, boundary resolution, and topographic surveying Tract Nos. 77096 and 77097, Edgewood project for City Ventures Homebuilding, City of Long Beach, California
• Field surveying, boundary resolution, and topographic surveying for an ALTA survey followed by Lot Line Adjustment No. LL 0000795 and Tract No. 19021, Nolin project on Lincoln Avenue (East of Beach Blvd.) for Landsea Homes, City of Anaheim, California
Professional Registration
• Registered Civil Engineer,
California, No. 34996
• Registered Geotechnical
Engineer, California,
No. 2030
Education
• Bachelor of Science, Civil
Engineering, Cal State
University at Northridge,
California
Office: Riverside, California
John Leuer, PE, GE Geotechnical Review
Mr. Leuer has over 35 years of professional experience in the geotechnical and civil engineering field. In this time, Mr. Leuer has developed an extensive knowledge of the many technical considerations involved in construction in the southern California area. Mr. Leuer is highly experienced in each aspect of soil and foundation engineering for a wide variety of projects ranging from multi- story commercial and industrial structures to several thousand acre planned community developments. Mr. Leuer has substantial experience coordinating projects for many city, county, and state agencies as well as in the public sector, gaining a reputation for being responsive to clients needs while providing strong technical expertise.
Select Relevant Experience
• City of Santa Ana Development Plan Check Services, Santa Ana, California • City of Fullerton Private Development Plan Check Services, Fullerton, California
• City of Chino Development Plan Check and Map Check Services, Chino, California
• City of El Monte As-Needed Plan Check Services, El Monte, California Professional Registration
• Professional Land
Surveyor, California, No.
7725
Professional Affiliations
• California Land
Surveyors Association –
State Chapter
Softward Skills
• AutoCAD (Civil 3D, Map)
• Trimble Business Center
• Trimble Access
• Legal-Aid
Office: Irvine, California
CannonOn-Call Engineering Plan Check Services RFP #24-035 CannonOn-Call Engineering Plan Check Services RFP #24-035 Jesus “Freddie” Olmos Environmental
Mr. Olmos’ professional experience involves CEQA and NEPA analysis and document preparation for government agencies and private clients. He has prepared and managed a variety of environmental documents, including Initial Studies/Mitigated Negative Declarations (IS/MNDs), Environmental Impact Reports (EIRs), Environmental Impact Statements (EISs), Environmental Assessments (EAs), and Findings of No Significant Impact (FONSIs), including Addendum CEQA/NEPA documentation. While his experience focuses on environmental report writing and permit preparation, he also has experience with biological resources monitoring and surveying for public facilities construction and research projects.
Select Project Experience Summary
• On-Call Environmental Services, City of Costa Mesa, Costa Mesa, California
• Santa Ana River Trunk Sewer Replacement (SARTS) Project, Riverside, California
• Modjeska Park Underground Stormwater Detention and Infiltration System Project, Anaheim, California
• Environmental Permitting and CEQA Document Processing Services, Multiple Counties, Golden State Water Company, California • On-Call Environmental Services, Riverside County Flood Control and Water Conservation District, Riverside, California
Licenses & Certifications
• Advanced NEPA Workshop,
National Association
of Environmental
Professionals, 2020
• Caltrans Environmental
Compliance Training
Course
Education
• Bachelor of Arts,
Environmental Analysis
and Design, with a Minor
in Urban and Regional
Planning, University of
California, Irvine
Arthur Guy, ASLA, CLIA
Landscape Architecture and Irrigation
Professional Registration
• Registered Landscape
Architect, California, No.
2214
Education
• Bachelor of Science,
Landscape Architecture
Professional Affiliations
• American Society of
Landscape Architects, Full
Member
Arthur Guy has over 40 years of landscape architecture and irrigation design experience; the previous 20 years as Principal with BGB. Mr. Guy directs a comprehensive approach to irrigation design the firm and serves as the technical liaison pertaining to water management issues which arise during the planning, design, and implementation phases of projects. Mr. Guy’s knowledge of horticulture extends from high desert to tropical bioregions, enabling him to effectively design planting and irrigation systems appropriate to individual environmental requirements. Additionally, Mr. Guy provides landscape and irrigation plan check services relating to the City of Rancho Santa Margarita’s Water Conservation Landscape Ordinance. Recent projects include a one- mile Class I Bike Trail, “Smart Street” improvement project for N. El Camino Real, City of San Clemente, and as an on-call consultant for the City of Newport Beach; median / parkway renovation projects for a one-mile reach of West PCH and a turf replacement median project along Jamboree Blvd.
Currently, BGB is an on-call consultant for the City of Gardena involved in park renovation master planning for the city.
CannonOn-Call Engineering Plan Check Services RFP #24-035 Gene Kim, PE, TE Traffic Review
Mr. Gene Kim, PE, TE is a licensed Civil and Traffic Engineer in the State of California with over 16 years of traffic engineering experience in both private and public agencies. Most recently, he served a 7-year tenure as a public agency City Traffic Engineer where he was involved in various aspects of the traffic engineering field including municipal and community engineering and outreach, engineering design/ analysis, consultant staff oversight, CIP project management, traffic engineering and transportation planning plan check and study review, and administrative involvement in the Public Works Commission and City Council. He also has design-build experience (MOT design and traffic analysis lead) that he gained while working on the SR-91 Corridor Improvement Design Build project.
Select Relevant Experience
• City of Beaumont Beaumont Avenue Traffic Signal Mod Projects • City of Beaumont Transportation Planning and Engineering Review • Pacific Square Mixed-use Project Engineering Design, San Gabriel Professional Registration
• Registered Civil
Engineer, CA, No.
C83175
• Registered Traffic
Engineer, CA, No.
TR2684
Professional Affiliations
• Bachelor of Science, Civil
Engineering
Cannon Corporation
Gary Solsona, PE, QSD
April 9, 2024
Public Works Manager
Public Works Manager
Cannon Corporation
April 9, 2024
Cannon Corporation
Gary Solsona, PE, QSD
Public Works Manager
April 9, 2024
Cannon’s vehicles are California DMV Certified and Smog Tested. Cannon’s vehicles do not use diesel.
Gary Solsona, PE, QSD
Public Works Manager/Senior Project Manager
16842 Von Karman Avenue, Suite 150
Irvine, CA 92606
( 949.777.1580, * [email protected]
Larry P. Kraemer, PE
Director, Public Infrastructure
1050 Southwood Drive
San Luis Obispo, CA 93401
( 805.503.4542, * [email protected]
City of Santa Ana
RFP No. 24-035
On-Call Engineering Plan Check Services
PROPOSER FEE RATE SCHEDULE
Cannon
April 9, 2024
Title Billing Rate ($/hr)
Street Improvement Plan $130-$170
Grading Plan $130-$170
Water Quality Management Plan (WQMP) $130-$190
Geotechnical Report $160-$210
Land Surveying Documents $180-$220
Legal Description of Dedication $180-$220
Landscape Irrigation Plans* $130-$220
Environmental Documents* $160-$270
Transportation/Traffic Studies* $140-$260
Signing and Striping Plans $120-$160
Traffic Signal Plans* $140-$260
Street Lighting Plans $130-$170
Miscellaneous Plan Check $130-$170
*Note: includes Cannon’s 10% markup on subconsultant reviews
EXHIBIT C - FEE PROPOSAL
2023/2024 Fee Schedule
Bill Rate Ranges
Subject to change
Assistant Resident Engineer 150$ - 197$ Project Designer 122$ - 169$ Associate Engineer 168$ - 230$ Project Engineer 151$ - 199$ Associate Land Surveyor 205$ 223$ Resident Engineer 191$ - 235$ Associate Landscape Architect 169$ - 204$ Sr. Associate Architect 209$ 249$ Automation Specialist 157$ - 200$ Sr. Associate Engineer 173$ - 265$ Automation Technician 121$ - 142$ Sr. Automation Specialist 172$ - 213$ CAD Tech 101$ - 136$ Sr. Automation Technician 142$ - 180$ CAD Manager 128$ - 159$ Sr. CAD Tech 113$ - 145$ Construction Inspector I - III 119$ - 191$ Sr. Consultant / Principal-in-Charge 266$ - 333$ Design Engineer 139$ - 184$ Sr. Land Surveyor 203$ - 263$ Director/ Department Manager 200$ - 297$ Sr. Landscape Architect 183$ - 221$ Dry Utilities Coordinator I - II 165$ - 190$ Sr. Plan Check Engineer 172$ 217$ Engineer Tech 110$ - 144$ Sr. Principal Designer 139$ - 212$ Engineering Assistant I - II 113$ - 139$ Sr. Principal Engineer 210$ - 305$ Grant Funding Manager I - II 151$ - 204$ Sr. Project Designer 122$ - 182$ I&E Services Coordinator 108$ - 138$ Sr. Project Engineer 157$ - 215$ Information Systems Admin/Manager 128$ - 159$ Sr. Resident Engineer 196$ - 246$ Land Surveyor 187$ - 225$ Survey Assistant 113$ - 142$ Landscape Architect 125$ - 156$ Survey Technician I - V 139$ - 208$ Landscape Designer I - II 103$ - 142$ Technical Writer I - IV 113$ - 139$ Lead Automation Specialist 167$ - 209$
Lead Automation Technician 127$ - 164$ Survey Crew Rates - Regular Lead Designer 133$ - 175$ One-Man Field 207$ 222$ Office Engineer / Document Control I-III 114$ - 164$ Two-Man Field 289$ 304$ Plan Check Engineer I - II 131$ - 192$ Three-Man Field 380$ 395$ Planner I - III 121$ - 168$ Two-Man - HDS 332$ 347$ Planning Assistant 98$ - 138$
Principal Automation Specialist 176$ - 219$ Survey Crew Rates - Prevailing Wage Principal Designer 127$ - 189$ One-Man Field 255$ 271$ Principal Engineer 198$ - 277$ Two-Man Field 367$ 389$ Three-Man Field 523$ 539$
Other Direct Charges
Black Line Plots $2.00 per page Electrical - Prevailing Wage Outside Reproduction Cost + 15% Electrician 197$ 240$ Mylar Plots $12.00 per sheet
Automation & Electrical Materials Cost + 25% (+tax) Building and Construction Inspector - Prevailing Wage Subconsultant Fees Cost + 10% BCI Construction Inspector 160$ 190$ Technology Fee $30/Day Forensics Engineering / Expert Testimony Fee Schedule Available Upon Request.
Color Plots $5.00 per page
Travel and Related Subsistence Cost + 15%
Standard Mileage Rate IRS Rate per mile
Airplane Mileage Rate GSA Rate per mile
(effective 10/1/2023)
Expenses, such as special equipment, shipping costs, travel other than by automobile, parking expenses, and permit fees will be billed at the actual cost plus 15%.
If the client requests, or the client’s schedule requires work to be done on an overtime basis, a multiplier of 1.5 will be applied to the stated rates for weekdays for daily hours in excess of 8 as well as weekends, and a multiplier of 2.0 for daily hours in excess of 12 and holidays. If the client requests field services to be provided outside of normal working hours, a multiplier of 1.5 will be applied to the stated rates. For prevailing wage projects, if the client requests field services to be provided on any given Sunday, a multiplier of 2.0 will be applied to the stated rates; on or around an observed holiday, other rates may be applied. Survey Crews and Automation Field staff are billed portal to portal. A minimum charge of four hours will be charged for any Automation Field Service calls outside of normal working hours. The stated rates are subject to change, typically on an annual basis.
CITY OF SANTA ANA RFP 24-001 HOURLY SERVICES SCHEDULE
Principal: $180.00/hr.
Sr. Project Manager: $140.00/hr.
Landscape Architect: $140.00/hr.
Senior Landscape Designer: $120.00/hr.
Associate Landscape Designer: $100.00/hr.
Office Staff $ 75.00/hr.
• The City would normally not be billed overtime rates for BGB staff time during normal business hours.
• Weekend / Emergency rates outside of normal business hours would be billed at 1.5 times the standard billing rate.
• Reproduction and other approved reimbursable expenses will be billed at cost plus 10% overhead.
• No mileage reimbursement is requested as a part of this proposal.
• The current rates will be valid until January 24, 2027.
www.ecorpconsulting.com
FEE SCHEDULE FOR PROFESSIONAL SERVICES
ECORP Consulting, Inc. – 2024 Rates1
Principal V ........................................................................................................................................ $400 Principal IV ....................................................................................................................................... $335 Principal III ....................................................................................................................................... $285 Principal II ........................................................................................................................................ $245 Principal I ......................................................................................................................................... $230 Professional XI .................................................................................................................................. $245 Professional X ................................................................................................................................... $225 Professional IX .................................................................................................................................. $205 Professional VIII ................................................................................................................................ $190 Professional VII ................................................................................................................................ . $175 Professional VI.................................................................................................................................. $165 Professional V................................................................................................................................... $155 Professional IV.................................................................................................................................. $145 Professional III .................................................................................................................................. $135 Professional II ................................................................................................................................... $125 Professional I .................................................................................................................................... $115 Technician IV .................................................................................................................................... $110 Technician III .................................................................................................................................... $105 Technician II ....................................................................................................................................... $95 Technician I ........................................................................................................................................ $85 Project Admin III ............................................................................................................................... $125 Project Admin II ................................................................................................................................ $105 Project Admin I ................................................................................................................................... $95 1Technical and Professional classifications include biologists, regulatory permitting specialists, archaeologists, architectural historians, paleontologists, air quality/greenhouse gas specialists, noise specialists, planners, CEQA/NEPA specialists, UAS pilots, and other technical professionals.
Expense Reimbursement/Other:
1. Computers, facsimile, and telephone are included in the billing rates, and there is no additional charge.
2. Reproduction, equipment and other direct expenses are reimbursed at cost plus a 14% administrative handling charge (excluding mileage).
3. The hourly rates for Subconsultants will be billed at the hourly rate indicated, plus a 12% administrative handling charge.
4. Mileage will be billed at the current IRS rate, adjusted annually.
5. Per Diem, depending upon location, may be charged where overnight stays are required.
6. Expert Witness Testimony, including Depositions, is billed at time and a half.
7. Non-standard invoicing will be billed at the hourly rates for support personnel.
9841 Irvine Center Drive, Suite 200 | Irvine, California 92618 | t: (949) 878-3509 www.tjwengineering.com
TJW ENGINEERING, INC.
STANDARD COMPENSATION SCHEDULE
(Effective January 2024)
Classification Hourly Rate
Principal $260.00
Principal Traffic Engineer/Planner $235.00
Senior Engineer/Planner $175.00 - $200.00
Project Engineer/Planner $125.00 - $175.00
Asst. Project Engineer/Planner $100.00 - $150.00
Technician $100.00 - $125.00
Administration $85.00 - $125.00
Aide $65.00 - $85.00
GENERAL PROVISIONS OF AGREEMENT
1. The above schedule is for straight time. Overtime will be charged at 1.5 times the standard hourly rate. Hourly rates apply to work time as well as travel time and waiting time, which occur at meetings and public hearings.
2. Unless otherwise stated in the contract, project -related travel, reproduction, and supply costs are billed at cost. Mileage will be billed at prevailing standard mileage rate as determined by the IRS.
Subcontractors and other project-related expenses will be billed at cost plus 15%.
3. Unless otherwise stated in the contract, invoice will be submitted monthly for work in progress and/or upon completion of TJW Engineering’s (TJW) scope of work. Progress invoices are payable within 30 days of the invoice date or upon completion of the scope of work . Any unpaid invoice after 30 days shall incur a late fee service charge of the maximum interest rate allowed by law or two (2) percent per month whichever is less.
4. Client hereby agrees that the balance in a billing statement is correct and binding unless the client notifies the consultant in writing within fifteen (15) days of the date of billing and informs consultant of the alleged incorrect item.
5. All documents produced as a result of this agreement may be used by TJW Engineering (TJW) without consent from the client.
6. TJW makes no warranty as to its findings except that the work is performed using generally accepted methods.
7. Unless otherwise stated in the contract, the clien t agrees to limit TJW’s liability to the client, due to professional negligent acts, errors, or omissions by the consultant, to the consultant’s fee.
8. Any controversy or claim arising out of or relating to this contract, or the breach thereof, shall be settled by arbitration in accordance with the rules of the American Arbitration Association, and Judgment upon the award rendered by the arbitration may be entered in any court having jurisdiction thereof.
FEE SCHEDULE
OCTOBER 2023
SERVICES
Geotechnical Engineering
LOR Geotechnical Group, Inc. provides geotechnical engineering services, including: preliminary geotechnical investigations, foundation investigations, percolation feasibility investigations, liquefaction evaluation investigations, as well as grading observation materials testing services.
Geological
LOR Geotechnical Group, Inc. provides geological services, engineering geology investigations, seismic setting studies, slope stability investigations, liquefaction susceptibility investigations, hydrology/water resource studies, and bedrock rippability evaluations.
Environmental
LOR Geotechnical Group, Inc. provides, environmental site assessments, underground storage tank investigations and remediation investigations, groundwater monitoring systems, soil and groundwater sampling and analysis, and environmental studies for property transfers.
All costs for Geotechnical Engineering, Geological, and Environmental Services are based on the site and investigative parameters requested.
FEES
The hourly personnel charges and laboratory test unit rates are as follows:
Personnel Charges-Hourly
Principal Engineer.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $330.00 Project Engineer/Geologist. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $180.00 Staff Engineer/Geologist. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $155.00 Soil Technician/Deputy Inspector (Field or Laboratory) 1. . . . . . . . . . . . . . . . . . . . . . . . . . . $115.00 Soil Technician/Deputy Inspector (Prevailing Wage) 1, 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . $145.00 Soil Technician/Deputy Inspector (CBA) 1, 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $155.00 Traffic Control (Prevailing Wage) 1, 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $135.00 Drafting.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $105.00 Clerical. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $90.00 Laboratory Testing Charges - Unit Costs
CT 202: Sieve Analysis (Soil). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $120.00 CT 202: Sieve Analysis (Aggregate). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $155.00 CT 202: #200 Sieve Wash. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $70.00 CT 205: Crushed Particle Analysis. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $155.00 CT 206 Specific Gravity + Absorption of Coarse Aggregate. . . . . . . . . . . . . . . . . . . . . . . . . $125.00 CT 207: Specific Gravity + Absorption of Fine Aggregate.. . . . . . . . . . . . . . . . . . . . . . . . . . $165.00 CT 211: LA Rattler. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $275.00 CT 213: Organic Impurities. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $90.00 CT 217: Sand Equivalent. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $130.00 CT 217: Sand Equivalent -QC.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $145.00 CT 226: Moisture Content.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35.00 CT 227: Cleanness Value. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $145.00 CT 229: Durability Index Fine/Coarse. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $285.00 CT 235: Percentage of Flat and Elongated Particles in Coarse Aggregate. . . . . . . . . . . . . $110.00 CT 301: R-Value. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $385.00 CT 305: Swell. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $110.00 CT 307: Moisture Vapor Susceptibility. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $195.00 CT 308 & CT 366: Asphalt Concrete Density & Stability/Rubberized. . . . . . . . . . . $240.00/$295.00 CT 308: Asphalt Concrete Density/Rubberized.. . . . . . . . . . . . . . . . . . . . . . . . . . . $145.00/$210.00 CT 309: Asphalt Concrete Theoretical Maximum Density .. . . . . . . . . . . . . . . . . . . . . . . . . . $195.00 CT 329: Asphalt Moisture .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35.00 CT 366: Asphalt Concrete Stability/Rubberized. . . . . . . . . . . . . . . . . . . . . . . . . . . $220.00/$275.00 CT 382: Asphalt Extraction & Gradation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $285.00 CT 382: Slurry Extraction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $175.00 CT 521: Concrete Cylinder Compressive Strength. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $40.00 CT 523: Beam Cylinder . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $85.00 Concrete & Beam Cylinder Hold. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $12.00 ASTM D6913/7928: Mechanical Analysis. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $240.00 ASTM D1557: (Modified)/ ASTM D698: (Standard) Proctor (4"). . . . . . . . . . . . . . . . . . . . . . $210.00 ASTM D1557: (Modified)/ ASTM D698: Proctor (6" or Cal-216). . . . . . . . . . . . . . . . . . . . . . $240.00 ASTM D2434: Permeability. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $440.00 ASTM D2435: Consolidation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $265.00 ASTM D5333: Collapse Potential. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $220.00 ASTM D2216: Moisture Content. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $35.00 ASTM D221/D2937: Moisture/Unit Weight (Ring). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $45.00 ASTM D2974: Organic Matter Test. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100.00 ASTM D4318: Atterberg Limits. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $240.00 ASTM D4829: Expansion Index. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $210.00 ASTM D3080: Direct Shear.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $295.00 CT 3910 Wet Track Abrasion. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $180.00 Soluble Sulfate: (Test Kit SF-1).. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $90.00 1 10% field supervision and equipment/vehicle charge will be added to all field services. 2 Rate based on current State determined prevailing wage rates as of the date of this document. Adjustments to our rates may be necessary based on the actual State determined prevailing wage rates at the time of our work.
TERMS
Reimbursable Expenses
Outside services performed by others and direct costs expended on the client's behalf are charged at cost plus twenty percent. These expenses include rental of drill rigs, bulldozers, backhoes, travel and subsistence, permits, reproduction costs, etc.
Travel Time
Travel time required to provide professional or technical services will be charged at the appropriate hourly rates.
Overtime
An overtime rate of 1.5 times the standard rate will be used for time in excess of 8 hours per day and Saturdays.
An overtime rate of 2.0 times the standard rate will be added for work on Sundays, official company holidays, and on all work in excess of 12 hours per day.
Prepayments
A retainer of fifty percent of the total fee is required for all field studies. The balance of the fee must be paid at the time the report is released to the client.
Billing
Billings will be provided periodically and will be classified by fee categories set forth above or as given by proposal.
Terms of Payment
Invoices rendered for professional services are due upon presentation. A service charge of 1.5 percent, per month, may be charged on accounts not paid within thirty days to cover additional processing and carrying costs. Any attorney's fees or other costs incurred in collecting any delinquent account will be paid by the client.