CITY OF SANTA ANA EXHIBIT 2

PROPOSAL
PROJECT NO.: 23-7539

TRAFFIC SIGNAL MODIFICATION AT WARNER AVENUE AND WRIGHT STREET (CDBG)

BID PROPOSAL

TO CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: Elecnor Belco Electric, Inc.

REQUIREMENT:

The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with said plans (if any) and the specifications for the unit price(s) or lump sums) set forth in the following schedule:

Item Description Qty Unit Unit Price Amount
1 Traffic Signal Modification at Warner Ave LS
and Wright St 151,000 $ 151,000
2 Install Video Detection System at Warner EA
Ave and Wright St $ 40,624 $ 40,634
3 Temporary Overhead Wiring at Warner 1 LS
Ave and Wright St 59,464- 9,464-
4 Install 2" PVC Conduit 100 LF $
66- 6,600 -
5 * Install 3" PVC Conduit 1500 LF $ $
16- 114,000
6 * Install 4" PVC Conduit 500 LF $
$ 55,500-
7 No. 6 Pull Box 7 EA $ $
1,023 7,161
8 No. 6E Pull Box 6 EA $ $
1,245 7,470
9 LIP Communication System at Warner Ave LS $ $
and Wright St 11,396- 11,396
10 P Communication System at Warner Av 1 LS
nd Pullman S 11,396 11,396
Install 12 Strand SMFO Cable 100 LF $ $

2.20 220-
12 *Install 24 Strand SMFO Cable 2200 LF $ $

2.70 5,940
13 *Install 96 Strand SMFO Cable 1300 LF $ $
5,200-
P-1 of P-19

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-7539

TRAFFIC SIGNAL MODIFICATION AT WARNER AVENUE AND WRIGHT STREET (CDBG)
Item Description Qty Unit Unit Price Amount
14 Fusion Splice Strands of SMFO 60 EA $
44- 1,640-
15 Fiber Optic Splice Enclosure 2 EA $ $
1,526 3,052-
16 Signing and Striping LS $ $
19,254 19,254
17 Pothole Pole Locations for Utility Conflicts 3 EA $ S 850- 2,550
18 Pothole Utilities Not Shown on Plan 5 EA $ $
850- 4,250
19 *PCC Curb Ramp 900 SF $
68- 61,200
20 Project Advertising Sign(s) 2 EA $
1,100 2,200-
21 Construction Permit LS $5,200 $
5,200
P-2 of P-19

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-7539

TRAFFIC SIGNAL MODIFICATION AT WARNER AVENUE AND WRIGHT STREET (CDBG)
TOTAL BASE BID-BID ITEMS 1-21 $ 526,327-

ADD ALTERNATE BID
Item Description Qty Unit Unit Price Amount
22 Install APS System at Wamer Ave and 1 EA $ $
Wright St 19,487 19,487-
23 Install GTT Opticom GPS EVP at Warner 1 EA $
Ave and Wright St $7,054 17,054-
TOTAL ADD ALTERNATE - BID ITEMS 22-23 36,541 -
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add-alternate bid items (if any). * The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the "25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly. + This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications.

TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, within SIXTY (60) working days after the commencement date stated in the Notice to Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place order for long-lead time items (i.e. Traffic Signal Poles).

The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard Specifications, shall be $3,600 per calendar day.

Name of Firm Elechor Belco Electric, Inc.

Signature of BIDDER , John Wong
Title Vice President
(If an individual, so state a him or co-partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) Alberto Garcia de Los Angeles / President John Wong / Vice President Jeroni Gervilla / Chief Financial Officer