Cities Index.
Exhibit 2

Santa Ana City Council
January 21, 2025

Document
Exhibit 2
Meeting
January 21, 2025
Body
Santa Ana City Council
Original file
3.2 MB
Text extracted from the city's file for reading and search. Open the original on santa-ana.primegov.com. That file is the official record.

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-6627

ROUSSELLE STREET FLOOD PROTECTION PROJECT

BIDDER'S STATEMENT
BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent Construction Contract Agreement shall constitute the entire agreement between BIDDER and the AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the Council with her signature and official seal noting hereon the action of approval of the Council, signed by the Public Works Agency Executive Director or his/her duly authorized agent, and signed by the City Attorney, denoting his approval of the form of this document, and its execution, and when it or an exact copy of it has been either delivered to BIDDER or deposited with the United States Postal Service properly addressed to the BIDDER with the correct postage affixed thereto.

BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she will furnish AGENCY all required bonds and certificate of liability insurance within ten (10) business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof accompanying this proposal shall become the property of the AGENCY and shall be considered as payment of damages due to the delay and other causes suffered by AGENCY because of the failure to furnish the necessary bonds and because it is distinctly agreed that the proof of damages actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER'S bond substituted in lieu thereof shall be returned to the undersigned.

BIDDER understands that a bid is required for the entire work, the estimated quantities set forth in the bid schedule are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. The BIDDER also certifies that the bid is a balanced bid.

In accordance with Section 7028.15 of the California Business and Professions Code, the undersigned certifies under penalty of perjury that the foregoing is true and correct.

Name of Firm MIKE BUBALO CONSTRUCTION CO., INC.

Signature of BIDDER -~ ........ """✓-J. ........ ·~-=-~...,c;.--===--· _______________ _ Title President
(If an individual, so state. If a firm or co-partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) Dave Sorem, President, Manager
Jason Bubalo, Secretary, Treasurer
P-5 of P-20

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-6627

ROUSSELLE STREET FLOOD PROTECTION PROJECT

CONTRACTOR'S LICENSING AND REGISTRATION STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that he/she and all his/her subcontractors are registered with the State of California Department of Industrial Relations (DIR), and that the following is true and correct.

Contractor's Name: MIKE BUBALO CONSTRUCTION CO., INC.

Business Address: 5102 GAYHURST AVENUE, BALDWIN PARK, CA 91706 Business E-Mail Address: [email protected]
---=---------------------
Telephone: 626 960-7787
State Contractor's License No. and Class: 771279 A
------------------
License Expiration Date: 11/30/25
-----------------------
State Dept. of Industrial Relations (DIR)
Registration No.:

State Dept. of Industrial Relations (DIR)
Registrati":n Date:

Signed:~~
Title: President
1000001341
06/30/25
P-6 of P-20

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-6627

ROUSSELLE STREET FLOOD PROTECTION PROJECT

PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT
Contractor is aware of the requirements of California Labor Code Section I 720, et seq., as well as California Code of Regulations, Title 8, Section 16,000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. Since the services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws.

City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the services available to interested parties upon request, and shall post copies at the Contractor's principal place of business and at the project site.

Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

The undersigned certifies that the foregoing is true and correct.

Name ofFirm Ml~ONSTRUCTIONCO., INC.

Signature of BID DE _ c;L
Title President
(if an individual, so state)
P-7 of P-20

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-6627

ROUSSELLE STREET FLOOD PROTECTION PROJECT

OWNERSHIP AFFIDA VII

STATE OF CALIFORNIA
LOS ANGELES COUNTY OF~
BALDWIN PARK CITY OF ~
)
) SS:
)
_______________ D_A_V_E_S_O_R_E_M_, being duly sworn, deposes and says:
□ INDIVIDUAL
0 PARTNERSHIP
~CORPORATION

D JOINT VENTURE
That he/she is the party making the foregoing proposal:

That he/she is a member of the co-partnership firm designated as:
and who has been and is duly vested with the authority to make and execute instruments for the co-partnership by:
who constitute the other members of the co-partnership.

That he is of: MIKE BUBALO CONSTRUCTION CO., INC.

President
a corporation which is making the foregoing proposal:

That he is of:
one of the parties making the foregoing proposal as a joint venture, and the he/she has been and is duly vested with the authority to execute instruments for an on behalf of the parties making said bid who are:
that such a bid is genuine and not collusive or sham, and has not in any manner sought by collusion to secure any advantage against the City of Santa Ana or any person interested in the proposed ract, ~ himself or any other person.

Subscribed and sworn to before me this __ 1_2_th __ day of November 20 24

SEE ATTACHED
Signature of officer Administering Oath (Notary Public) P-8 of P-20

CALIFORNIA JURAT
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfullness, accuracy, or validity of that document.

State of California
County of Los Angeles
Subscribed and sworn to (or affirmed) before me,
on this 12 TH , day of NOVEMBER, 2024
by Dave Sorem, proved to me on the basis of
satisfactory evidence to be the person(s) who
appeared before me.
i············l ANTOHBRKIC
: "' Notary Public • California z
~ Los Angeles County J
z Commission # 2499465 -
My Comm. Expires Sep 10, 2028
Notary Public (Notary Seal)

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-6627

ROUSSELLE STREET FLOOD PROTECTION PROJECT

BID BOND
KNOW ALL PRESENT that,
MIKE BUBALO CONSTRUCTION co., INC. , as BIDDER, and
NATIONWIDE MUTUAL INSURANCE COMPANY 'as SURETY,
are held and firmly bound unto the CITY OF SANTA ANA, as AGENCY, in the penal sum of_ TEN PERCENT OF AMOUNT BID Dollars($ 10% ), which is ten percent (10%) of the total amount bid by BIDDER to AGENCY for the above-stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents.

THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to AGENCY for the above-stated project, if said bid is rejected, or if said bid is accepted and a contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of AGENCY.

IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal this 6TH day of NOVEMBER , 20~.

CONSTRUCTION CO., INC. - 5102 GAYHURST AVE. BALDWIN PARK, CA 91706; 626-960-7787 SURETY*
MPANY - 534 E. BADILLO ST. COVINA, CA 91723; 626-859-1000 KEVIN VEGA, ATTORNEY-in-FACT
Subscribed and sworn to before me ______________ this ____ day of ________ ,20_.

Signature: ______________ _
Notary Public in and for the County of _______ , State of _________ _ * Provide BIDDER/ SURETY name, address, and telephone number and the name, title, address, and telephone number of authorized representative.

P-9 of P-20

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfullness, accuracy, or validity of that document.

State of California
County of Los Angeles
On NOVEMBER 12, 2024 , before me, Anton Brkic,
Notary Public, personally appeared Dave Sorem,
who proved to me on the basis of satisfactory
evidence to be the person whose name is
subscribed to the within instrument and
acknowledged to me that he executed the same in
his authorized capacity and that by his
signature on the instrument the person, or the
entity upon behalf of which the person acted,
executed the instrument.

I certify under PENALTY OF PERJURY under the
laws of the State of California that the
foregoing paragraph is true and correct.

Witness my hand and official seal.
~············~ ANTON BRKIC
: ;_., ... Notary Public - California z i ~ • ~ Los Angeles County J s Commission # 2499465 -
My Comm. Expires Sep 10, 2028
Notary Public (Notary Seal)
Power of Attorney
KNOW ALL MEN BY THESE PRESENTS THAT:

Nationwide Mutual Insurance Company, an Ohio corporation hereinafter referred to severally as the •company" and collectively as "the Companies" does hereby make, constitute and appoint:

PHILIP E VEGA, MYRNA F SMITH, KEVIN VEGA, BRITTON CHRISTIANSEN each in their individual capacity, its true and lawful attorney-in-fact, with full power and authority to sign, seal, and execute on its behalf any and all bonds and undertakings, and other obligatory instruments of similar nature, in penalties not exceeding the sum of

UNLIMITED
and to bind the Company thereby, as fully and to the same extent as if such instruments were signed by the duly authorized officers of the Company; and all acts of said Attorney pursuant to the authority given are hereby ratified and confirmed.

This power of attorney is made and executed pursuant to end by authority of the following resolution duly adopted by the board of directors of the Company:
"RESOLVED, that the president, or any vice president be, and each hereby is, authorized and empowered to appoint attorneys-in-fact of the Company, and to authorize them to execute and deliver on behalf of the Company any and all bonds, forms. applications, memorandums, undertakings, recognizances, transfers, contracts of indemnity, policies, contracts guaranteeing the fidelity of persons holding positions of public or private trust, and other writings obligatory In nature that the business of the Company may require; and to modify or revoke, with or without cause, any such appointment or authority; provided, however, that the authority granted hereby shall in no way limit the authority of other duly authorized agents to sign and countersign any of said documents on behalf of the Company."
•RESOLVED FURTHER, that such attomeys~in-fact shall have full power and authority to execute and deliver any and all such documents and to bind the Company subject to the terms and limitations of the power of attorney issued to them, and to affix the seal of the Company thereto; provided, however, that said seal shall not be necessary for the validity of any such documents." This power of attorney is signed and sealed under and by the following bylaws duly adopted by the board of directors of the Company.

Execution of Instruments. Any vice president, any assistant secretary or any assistant treasurer shall have the power and authority to sign or attest all approved documents, instruments, contracts, or other papers in connection with the operation of the business of the company In addition to the chairman of the board, the chief executive officer, president, treasurer or secretary; provided, however, the signature of any of them may be printed, engraved, or stamped on any approved document, contract, instrument, or other papers of the Company.

IN WITNESS WHEREOF, the Company has caused this instrument to be sealed and duly attested by the signature of its officer the 20th day of August, 2021.

Antonio C. Albanese, Vice President of Nationwide Mutual Insurance Company

ACKNOWLEDGMENT
STATE OF NEW YORK COUNTY OF NEW YORK: ss
On this 20th day of August, 2021, before me came the above-named officer for the Company aforesaid, to me personally known to be the officer described in and who executed the preceding instrument, and he acknowledged the execution of the same, and being by me duly sworn, deposes and says, that he is the officer of the Company aforesaid, that the seal affixed hereto Is the corporate seal of said Company, and the said corporate seal and his signature were duly affixed and subscribed to said instrument by the authority and direction of said Company.

Stephanie Rubino McA11hur
Notary Public. Slate of New YOfk
No. 02MC6270117
Quallf<ed In New Yonc County
Commissi011 Exoiros October 19 2024

CERTIFICATE
~~"m~
Noll<yP,,l>lo
My Comrni..ion Expim
Odober 11, 2024
I, Laura B. Guy, Assistant Secretary of the Company, do hereby certify that the foregoing is a full, true and correct copy of the original power of attorney issued by the Company; that the resolution included therein is a true and correct transcript from the minutes of the meetings of the boards of directors and the same has not been revoked or amended in any manner; that said Antonio C. Albanese was on the date of the execution of the foregoing power of attorney the duly elected officer of the Company, and the corporate seal and his signature as officer were duly affixed and subscribed to the said instrument by the authority of said board of directors; and the foregoing power of attorney is still in full force and effect.

IN WITNESS WHEREOF, I have hereunto subscribed my name as Assistant Secretary, and affixed the corporate seal of said Company this~ day of November 2024
Assistant Secretary
BDJ 1(08-21)00

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
A notary pubfic or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California }
} ss.

County of LOS ANGELES
on November 6th, 2024 before me, Philip Vega, Notary Public Here Insert Name and Title of the Officer
personally appeared Kevin Vega, Attorney-in-Fact
Place Nota,y Seal Above
Name(s) of Slgner(s)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name{s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENAL TY OF PERJURY under the laws of the State of California that the foregoing paragraph is e and correct.

WITNESS my hand and official
Si nature:

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and c and reattachment of this form to another document.

Description of Attached Document
Tille of Type of Document:

Document Date:

Signer(s) Other Than Named Above:

Capacity(ies) Claimed by Signer(s)
Signer's Name:

D Individual
D Corporate Officer Title(s):

D Partner - □ Limited □ General
D Attorney in Fact
□ Trustee
□ Guardian or Conservator
D Other:

Signer is Representing:

CAIOD\02000.50111\10151761.2
Bigbl IbYm!.!gda! 2f ~iSIC~c
To11 of thumb here
22 Number of Pages:

Signer's Name:
□ Individual
D Corporate Officer Title(s):
□ Partner - D Limited □ General
□ Attorney in Fact
□ Trustee
□ Guardian or Conservator
□ Other:

Signer is Representing:

Right Thumb12rint of Signer
To11 of thumb here
(UPDATED: 01-19)

REFERENCES

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-6627

ROUSSELLE STREET FLOOD PROTECTION PROJECT
The following are the names, addresses, and telephone numbers for THREE public agencies for which the BIDDER has performed similar work within the past three years.

1. SEE ATTACHED
Name and Address of Owner.

Name and Telephone Number of person familiar with project.

Contract Amount Type of Work Date Completed

2. SEE ATTACHED
Name and Address of owner.

Name and Telephone Number of person familiar with project.

Contract Amount Type of Work Date Completed

3. SEE ATTACHED
Name and Address of owner.

Name and Telephone Number of person familiar with project.

Contract Amount Type of Work Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance and bonds.

NATIONWIDE MUTUAL INSURANCE COMPANY
Contractors & Developers Bonding 534 East Badillo Street Covina, CA 91723 626-859-1000 P-11 of P-20
Mike Bubalo Construction Co., Inc.

CURRENT WORK REFERENCES
1 Agency Los Angeles County Department of Public Works
Address 900 S Fremont Ave, Alhambra, CA 91803
Contact Matt Jerge
email [email protected]
phone (626) 458-2593
Project As Needed Flood Maintenance Repairs
Original Value 5,000,000.00$
Current Value 1,690,873.00$
Type of Work Storm Drain
Date Completed CURRENT
2 Agency Sanitation Districts of Los Angeles County
Address 1955 Workman Mill Rd, Whittier, CA 90601
Contact Wayne A. Bamossy
email [email protected]
phone (562) 908-4288
Project As Needed Sewer Potholes
Original Value 500,000.00$
Current Value 455,504.00$
Type of Work Sewers
Date Completed CURRENT
3 Agency City of Montebello
Address 1600 W Beverly Blvd, Montebello, CA 90640
Contact James Enriquez
email [email protected]
phone (323) 887-1462
Project As Need Repairs and New Construction
Original Value Negotiated
Current Value 587,914.00$
Type of Work Sewers and Storm Drain
Date Completed CURRENT
4 Agency City of Los Angeles
Address 1149 S Broadway, Los Angeles, CA 90015
Contact Hector Hernandez
email [email protected]
phone (310) 974-0694
Project As Needed Sewer& Storm Drain Repairs
Original Value 25,000,000.00$
Current Value 3,934,807.20$
Type of Work Sewers and Storm Drain
Date Completed CURRENT

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-6627

ROUSSELLE STREET FLOOD PROTECTION PROJECT

ADDITIONAL REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for which the BIDDER or Subcontractor has performed similar work in the past five years.

I. SEE ATTACHED
Name and Address of Owner.

Name and Telephone Number of person familiar with project.

Contract Amount Type of Work Date Completed

2. SEE ATTACHED
Name and Address of owner.

Name and Telephone Number of person familiar with project.

Contract Amount Type of Work Date Completed

3. SEE ATTACHED
Name and Address of owner.

Name and Telephone Number of person familiar with project.

Contract Amount Type of Work Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance and bonds.

NATIONWIDE MUTUAL INSURANCE COMPANY
Contractors & Developers Bonding 534 East Badillo Street Covina, CA 91723 626-859-1000 P-12 of P-20
Type text here
BID PROPOSAL PACKAGE
PROJECT NO. 1
Contractor Name   Prime:   Sub:

Project Name
Project Address
Date of Completion
Project Description:

Project Owner Information:

Owner
Name of Contact
Title
Address
Phone Number
Email
MIKE BUBALO CONSTRUCTION CO., INC.

ESR-Workman Ave SWC04860
1800 Workman Ave., Los Angeles, CA
02/28/2019
Three spot repairs on existing 8" sewer main. One repair was done beneath an 18" high pressure gas main with less than 6" of clearance.

Wesley Luong. P.E.

Civil Engineer, Waste Water Conveyance Construction Division 1149 S. Broadway, 6th Floor, Los Angeles, CA 90015
[email protected]
213-485-1187
City of Long Beach
WD-67-22, Cathodic Protection Improvement of
Potable Water Systems Project – Phase 6
(EO-3557)
City of Los Angeles Bureau of Engineering
BID PROPOSAL PACKAGE
PROJECT NO. 2
Contractor Name   Prime:   Sub:

Project Name
Project Address
Date of Completion
Project Description:

Project Owner Information:

Owner
Name of Contact
Title
Address
Phone Number   Email
MIKE BUBALO CONSTRUCTION CO., INC.

Hornby Avenue Siphon
09/23/2021
27155 Hornby Ave., Santa Clarita, CA 91351
Los Angeles County Department of Public Works
Teagan Ferdinandsen
Civil Engineering Assistant
626-300-3376
[email protected]
900 S. Fremont Ave., Alhambra, CA 91803
Investigate blockage of sewer siphon crossing the Santa Clara River. Installed bypass pumping of the siphon.

Cleaned out (2) 8 inch DIP siphons and perform spot repairs cusing the blockages.

BID PROPOSAL PACKAGE
PROJECT NO. 3
Contractor Name   Prime:   Sub:

Project Name
Project Address
Date of Completion
Project Description:

Project Owner Information:

Owner
Name of Contact
Title
Address
Phone Number   Email
MIKE BUBALO CONSTRUCTION CO., INC.

ESR- Occidental Blvd. SZC13759
11/21/19
1342 N Occidental Blvd., Los Angeles, CA
Replaced 6" VCP Sewer with 8" VCP for about 150 LF. 100 LF was located in a residential backyard with a steep grade. No equipment was allowed on site and only hand digging was performed.

City of Los Angeles
1149 S. Broadway, 6th Floor, Los Angeles, CA 90015
Belal Tamimi
Environmental Engineering Associate
213-847-0296
[email protected]
BID PROPOSAL PACKAGE
PROJECT NO. 4
Contractor Name   Prime:   Sub:

Project Name
Project Address
Date of Completion
Project Description:

Project Owner Information:

Owner
Name of Contact
Title
Address
Phone Number   Email
MIKE BUBALO CONSTRUCTION CO., INC.

ESR- Elevado Street SZC13768
1566 Elevado St., Los Angeles, CA
3/18/20
Replaced 8" Sewer by means of pipe bursting. Work was inside a residentail rear yard and dismantle both upstream and downstream manholes and replace by hand with bricks. No equipment was allowed Work included excavation of a leaching pit.

City of Los Angeles Bureau of Engineering
Jorge De La Torriente
Construction Manager
1149 S. Broadway, 6th Floor, Los Angeles, CA 90015
213-458-5836
[email protected]
Mike Bubalo Construction Storm Drain Job History
00-1 Kendall Drive Storm Drain
$105,000.00
Owner:

City of San Gabriel
425 S. Mission Drive
San Gabriel, CA 91778-0130
(626) 308-2800
Engineer:

Norris-Repke, Inc.,
600 N. Tustin Avenue, Suite 250,
Santa Ana, CA 92705-3736
(714) 973-2230
Description:
500 feet of 36”, 24” & 18” RCP Storm Drain and appurtenant structures Date Completed:
8/00
Percent Completed:
100%
Contact:

Douglas Benash, P.E., Senior Civil Engineer
(626) 308-2800
00-5 Project 9037 Unit 2 Storm Drain
$117,720.00
Owner and Engineer:

Los Angeles County Department of Public Works Contract
Description:
815 feet of 24” RCP Storm Drain
Date Completed:
7/00
Percent Completed:
100%
Subcontract For:

Andrew Papac & Sons
Owner:

City of Manhattan Beach
3621 Bell Avenue
Manhattan Beach, CA 90266
(310) 802-5358
Description:
960 of 18” to 48” RCP and appurtenant structures
Date Completed:
11/01
Percent Completed:
100%
Contact:

Ed Kao, Project Engineer
City of Ma
nhattan Beach
3621 Bell Avenue
Manhattan Beach, CA 90266
(310) 802-5358
01-08 Live Oak Springs Canyon Drain Unit II
$2,166,260.00
Owner:

Los Angeles County Department of Public Works Contract
900 South Freemont Avenue
Alhambra, CA 91802-1460
(626) 458-3144
Description:
890 feet of RCB, 1,400 of 18” to 48” RCP and appurtenant structures Date Completed:
03/02
Percent Completed:
100%
Conta
ct:

Los Angele
s County Department of Public Works Contract
Mark Bruschaber, Project Inspector
900 South Freemont Avenue
Alhambra, CA 91802-1460
(626) 458-3100
02-03 Hermosa Avenue Storm Drain
$2,065,020.00
Owner:

City of Rancho Cucamonga
10500 Civic Center Drive
P.O. Box 807
Rancho Cucamonga, CA 91730
(909) 477-2700
Description:
1,200 feet of Reinforced Concrete Box and Pipe and related structures.

Date Completed:
12/02
01-07 21st Street Storm Drain
$190,664.00
Percent Completed:
100%
Contact:

Richard Car
illo, Sr. Inspector
City of Rancho Cucamonga
10500 Civic Center Drive
P.O. Box 807
Rancho Cucamonga, CA 91730
(909) 477-2700
02-05 Hollyhills Drain Unit 7
$6,998,871.00
Owner:

Los Angeles County Department of Public Works Contract
900 South Freemont Avenue
Alhambra, CA 91802-1460
(626) 458-3144
Description:
10,438 feet of RGRCP Pipe and related structures (18” Ø to 90” Ø) Date Completed:
6/04
Percent Completed:
100%
Contact:

Hector Hernandez, Office Engineer
Los Angele
s County Department of Public Works Contract
900 South Freemont Avenue
Alhambra, CA 91802-1460
(626) 458-3100
03-02 Hollyhills Drain Unit 8A
$6,878,505.00
Owner:

Los Angeles County Department of Public Works Contract
900 South Freemont Avenue
Alhambra, CA 91802-1460
(626) 458-3144
Description:
1,423 feet of RC Box Storm Drain and related structures (18” Ø to 108” Ø) Date Completed:

OPEN
Percent Completed:
100%
Contact:

Sam Assoum, Office Engineer
Los Angele
s County Department of Public Works Contract
900 South Freemont Avenue
Alhambra, CA 91802-1460
(626) 458-3197
03-06 20th Street / Walnut Ave. Pollution Trap
$409,925.00
Owner:

City of Long Beach Public Works,
(562) 570-6289
333 W. Ocean Blvd.

Long Beach
, CA 90802
Description:

Installation of a 27 foot deep, storm drain pollution trap manhole.

Date Completed:
7/04
Percent Completed:
100%
Contact:

Tony Arevalo, Project Engineer
(562) 570-6289
333 W. Ocean Blvd.

Long Beach
, CA 90802
03-09
Linden Avenue Storm Drain
$1,202,725.00
Owner:

San Bernardino County Flood Control District
(909) 387-7920
825
East 3rd Street Room 147
San Bernardi
no, CA 92415-0835
Description:

Installation of Reinforced Concrete Box Storm Drain and related structures.

Date Completed:
11/05/04
Percent Completed:
100%
Contact:

John Burrows, Project Engineer
(909) 387-7920
825
East 3rd Street Room 147
San Bernardi
no, CA 92415-0835
04-01
Storm Drain Rehab Various Locations
$32,360.00
Owner:

City of Costa Mesa
(562) 868-0511
77 Fair Drive, Room 101, Costa Mesa, California 92626.3 77 Fair Drive
Costa Mesa, CA 92626
Subcontract work for R. J. Noble Company
Description:

Installation and repairs of reinforced concrete pipe storm drain and related structures.

Date Completed:
3/04
Percent Completed:
100%
Contact:

Cara Thomas, Project Foreman
R. J. Noble Company
(800) 339-0362
PO Box 620
Orange, CA 9
2856
04-03 Eastvale MDP Line C Storm Drain
$1,168,965.00
Owner:

D. R. Horton d.b.a. Western Pacific Housing
(909) 442-6199
16755 Von K
arman Avenue, Suite 200
Irvine, CA 92606
Description:

Installation of a reinforced storm drain and related structures for Riverside County Transportation Dept.

Date Completed:
12/16/04
Percent Completed:
100%
Contact:

Scott Clark, VP of
Operations
(909) 442-6199
16755 Von K
arman Avenue, Suite 200
Irvine, CA 92606
04-04 Fairplex Drain, LA County Fairgrounds
$ 4,866,502.00
Date Completed:
10/31/05
Owner:

Los Angeles County Department of Public Works Contract
900 South Freemont Avenue
Alhambra, CA 91802-1460
(626) 458-3144
Description:

Percent Completed:
100%
Contact:

Hector Hernandez, Office Engineer
Los Angele
s County Department of Public Works Contract
900 South Freemont Avenue
Alhambra, CA 91802-1460
(626) 458-3144
04-06 Long Beach Police Station Storm Drain
$ 150,860.00
Owner:

City of Long Beach Dept. of Public Works
333 W. Ocean Blvd., 9th Floor
Long Beach, CA 90802
Description:

Date Completed:
12/6/04
Percent Completed:
100%
Contact:

Tony Arevalo, Project Engineer
(562) 570-6289
333 W. Ocean Blvd.

Long Beach
, CA 90802
04-09 Goodrich Rubid
oux Strom Drain
$ 299,420.00
Date Completed:
11/1/05
Owner:

City of Los Angeles
200 N. Spring St., Room 355
City Hall
Los Angeles, CA 90012
Description:

Date Completed:
11/1/05
Percent Completed:
100%
Conta
ct:

City of Los Angeles
Board of Public Works
200 N. Spring St., Room 355
City Hall
Los Angeles, CA 90012
04-14 Mill Lane Emergency RCB
$ 71,000.00
Date Completed:
12/6/04
Owner:

Los Angeles County Flood Control District
900 So. Fremont Ave., 8th Floor
Alhambra, CA 91803
Description:

Mill Ave Storm Drain-San Marino Emergency Repairs
Date Completed:
12/6/04
Percent Completed:
100%
Contact:

Jaime Engles, Office Engineer
Los Angeles County Flood Control District
900 So. Fremont Ave., 8th Floor
Alhambra, CA 91803
04-15 Reg Proj. # 1105
$107,000.00
Date Completed:
12/10/04
Owner:

Los Angeles County Department of Public Works Contract
900 South Freemont Avenue
Alhambra, CA 91802-1460
(626) 458-3197
Description:

Date Completed:
12/10/04
Percent Completed:
100%
Contact:

Los Angele
s County Department of Public Works Contract
900 South Freemont Avenue
Alhambra, CA 91802-1460
(626) 458-3197
05-07 San Dimas Repairs
Award Value: $713,250.00 Final Contract: $851,718.01
Progress: 100% Completion Date: Completed 9/2006
Scope: Repairs To San Dimas Dam
Owner: Fidelity and Deposit of Maryland/Zurich Surety
Contact: 801 No. Brand Blvd, Glendale, CA 91203
Phone:
818-621-1477 Phone:
05-08 Peck Road Channel
Award Value: $165,000.00 Final Contract: $ 143,045.80
Progress: 100% Completion Date: Completed 10/2005
Scope: Repairs & Maintenance to Peck Road Channel
Owner: City of Industry
Contact: Richard Walker
15651 East Strafford Street, City of Industry, CA 91744 Phone:
626-333-0336 Phone:
06-01 LACSD Storm Drain Repair
Award Value: $36,230.00 Final Contract: $ 36,230.00
Progress: 100% Completion Date: Completed 2/2006
Scope: Emergency Storm Drain Repairs
Owner: Los Angeles County Sanitation District
Contact: 1955 Workman Mill Road. Whittier, CA 90607
Phone:
(562) 699-7411 Phone:
06-04 16 th Street Drain
Award Value: $491,840.00 Final Contract: $ 509,029.25
Progress: 100% Completion Date: Completed 9/2006
Scope: Storm Drain Repair
Owner: Los Angeles County Dept of Public Works
Contact: 900 South Fremont Avenue, Alhambra, CA 91803-1331 Phone:
(626) 458-3144 Phone:
06-05
Mary Ellen Storm Drain
Award Value: $ 385,125.00 Final Contract: $ 435,774.99 Progress: 100% Completion Date: Completed 8/2006
Scope: Storm Drain Repair
Owner: Los Angeles County Dept of Public Works
Contact: 900 South Fremont Avenue, Alhambra, CA 91803-1331 Phone:
(626) 458-3144 Phone:
06-07 Sun Valley/Tuxford Drain
Award Value: $ 3,497690.00 Final Contract: $ 3,725,036.73 Progress: 100% Completion Date: Completed 3/2006
Scope: Storm Drain
Owner: Los Angeles County Dept of Public Works
Contact: Los Angeles County Dept. of Public Works
900 South Fremont Avenue, Alhambra, CA 91803-1331
Phone: (626) 458-31 44
Phone:
06-0
8 Dockweiler Beach Outlet
Award Value: $ 1,096,281.20 Final Contract: $ 1,235,652.03 Progress: 95% Completion Date: In Progress
Scope: Storm Drain Outlet to Ocean
Owner: Los Angeles County Dept of Public Works
Contact: Jimmy Chung
New Creation Builders, 17809 Clark Ave., Bellflower. CA 90706 Phone: 562-804-047 8
Phone:
06-09 Rosedale
Sewer, Water & Storm Drain Installation
Award Value: $ 2,888,604.00 Final Contract: $ 3,131,616.71 Progress: 95% Completion Date: In Progress
Scope: Sewer Water & Storm Drain Installation
Owner: Azusa Land Partners, LLC
Contact: Jeff Roulon
Azusa Land Partners LLC, 19 Corporate Plaza. Newport Beach, CA 92660 Phone: 949-721-977 7
Phone:
06-10
Strawberry Lane Storm Drain Improvements
Award Value: $ 580,800.00 Final Contract: $ 694,831.41 Progress: 95% Completion Date: In Progress
Scope: Rehabilitate Storm Drains near Strawberry Lane & Dobbin Lane, Rolling Hills Estates by Jacking
Owner: City of Rolling Hills Estates Funded Imp to County Drainage Facilities Contact: Lance Grindle, P.E., District Engineer, Road Maintenance Division Los Angeles County Department of Public Works
900 So. Fremont Ave, Alhambra, CA 91803-1331
Phone: (626) 458-31 44
Phone: (310) 348-6448
06-12 Marina Beach Water Quality Imp.

Award Value: $ 2,399,375.00 Final Contract: $ 2,134,640.02 Progress: 100 % Completion Date: October 2007
Scope: Install new HDPE storm drain to redi rect drainage away from public beach.

Owner: Los Angeles County Dept. of Public Works
Contact: Ali Zadeh,
900 So. Fremont Ave, Alhambra, CA 91803-1331
Phone: (626) 458-3144 Phone:

07-02 Joint Outfall H, Unit 9B, Steel Pipe Replacement
Award Value: $ 68,063.88 Fi nal Contract: $ 68,063.88
Progress: 100 % Completion Date: June 2008
Scope: Emergency repairs to an existing sewer structure.

Owner: Sanitation District of Los Angeles County
Contact: Tommy Sung,
1955 Workman Mill Road, Whittier CA 90607
Phone: (562) 699-7411 Fax: (562) 695-2897

07-04 San Antonio Ave Sewer & Storm Drain
Award Value: $ 4,889,250.00 Final Contract: $ 5,184,213.24 Progress: 100 % Completion Date: April 2008
Scope: Furnish and install storm drain facilities within street right-of-way. RCP from 90” to 18” and appurtenant structures.

Owner: City of Upland
Contact: Bob Critchfield, Senior Engineer
460 North Euclid Ave., Upland, CA 91786-4732
Phone: (909) 291-2946

08-02 11 th Street Reconstruction
Award Value: $ 3,541,345.00 Final Contract: $ 3,910,111.89 Progress: 100% Completion Date: 12/31/2008
Scope: Furnish and install storm drain facilities within street right-of-way. RCP from 90” to 18” and appurtenant structures.

Owner: City of Upland
Contact: Bob Critchfield, Senior Engineer
460 North Euclid Ave., Upland, CA 91786-4732
Phone: (909) 291-2946 Fax: (909) 291-2946

08-04 Storm Drain Modifications at Pomona Water Reclamation Plant Award Value: $ 103,000.00 Final Contract: $ 103,000.00 Orig. Duration: n/a Total Duration: 1 Month
Progress: 100 % Completion Date: July 2008
Scope: Reconstruction of an open grate storm drain trough and modification of an existing manhole.

Owner: Sanitation Districts of Los Angeles County
Contact: Tommy Sung,
1955 Workman Mill Road, Whittier CA 90607
Phone: (562) 699-74 11
Fax: (562) 695-28 97
08-06
Beryl Street Storm Drain Improvements
Award Value: $ 3,135,950.00 Final Contract: $ 3,318,379.22 Orig. Duration: 175 Cal Days. Total Duration: 175
Progress: 100 % Completion Date: October 2008
Scope: Construct new storm drain consisting of 90”, 72” reinforced concrete pipes, catch basins, manholes, and appurtenant structures. Work included installation within paved traffic lanes, storm water pollution control, water and sewer relocations and landscape and hardscape restorations.

Owner: City of Rancho Cucamonga, California
Contact: Romeo M. David, Associate Engineer
10500 Civic Center Drive, Rancho Cucamonga, CA 91729-0807 Phone: (909) 477-2740 ext. 407 0
Fax: (909) 477-28 49
08-1
3 Seven Facilities Storm Drain
Award Value: $ 588,339.76 Final Contract: $696,221.33
Orig. Duration: 12 Months Total Duration: 8 months
Progress: 100% Completion Date: May 2009
Scope: 2350 cubic yards of debris clean-out in storm drain facilities including the installation of access manholes.

Owner: L.A. County Dept of Public Work s
Contac
t: Daryl Hamilton
900 S. Fremont Ave. Alhambra, CA 91803
Phone: (626) 458-31 22
Fax: (626) 458-2197
08-14 Area 03 MH Access IMP3-54
Award Value: $ 305,500.00 Final Contract: $311,488.00
Orig. Duration: 3 Months Total Duration: 2 Months
Progress: 100 % Completion Date: July 2009

Scope: Manhole Access Improvements & Retaining Walls

Owner: Orange County Sanitation District
Contact: David May
1256 Magnolia Ave., Anaheim, CA 90801
Phone: (714) 593-7845 Fax:

09-01 Project 1225 Unit 2, Storm Drain Ext
Award Value: $ 298,659.00 Final Contract: $318,658.75
Orig. Duration: 4 Months Total Duration: 2 Months
Progress: 100% Completion Date: December 2009

Scope: Replace 12” Water main and Pressure Regulating Station

Owner: L.A. County Dept of Public Works
Contact: Johnny Oghoorian
900 S. Fremont Ave. Alhambra, CA 91803
Phone: (626) 458-3122 Fax: (626) 458-2197

09-06 Magnolia Channel Restoration
Award Value: $ 1,030,000.00 Final Contract: In Progress Orig. Duration: 9 Months Total Duration: In Progress
Progress: 90 % Completion Date:

Scope: Detention ponds and stream and channel restoration

Owner: Inland Empire Utilities District
Contact: Matt Poeske, P.E.,
6075 Kimball Avenue, Chino, CA 91710
Phone: (909) 993-1600 Fax: (909) 923-0468

10-05 Thompson Creek
Award Value: $ 995,000.00 Final Contract: $ 1,028,000.00 Orig. Duration: 6 Months Total Duration: 4 Months
Progress: 100 % Completion Date: September 30, 2010
Scope: Design and Build Conversion of Open Channel to Reinforced Concrete Box Owner: Fairplex
Contact: Bill Shacklett
1101 W. McKinley, Pomona, CA 91768
Phone: 909-865-4150 Fax: 909-865-6707
10-11 Eaton Canyon Golf Course Storm Drain
Award Value: $ 57,500.00 Final Contract: $ 57,500.00
Orig. Duration: 3 Months Total Duration: 3 Months
Progress: 100 % Completion Date: 2013
Scope: Remove 30” CMP and Replace it with 30” RCP and Replace Manhole at Riviera Dr Owner: Los Angeles County Dept of Parks and Recreation
DC Golf, Doug Colliflower, 1456 E. Mendocino St., Altadena, CA 91001 Contact: David Mesa
433 So. Vermont Ave., Los Angeles, CA 90020 (213)738-2951/fax 213-738-6444 Phone: 626-821-4647 Fax:

E Mail: [email protected]

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-6627

ROUSSELLE STREET FLOOD PROTECTION PROJECT

NON-COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and Public Contract Code Section 7 l 06) In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106 the BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any other BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.

Note: The above Non-collusion Affidavit is part of the Proposal. BIDDERS are cautioned tha a false ce • fication may subject the certifier to criminal prosecution.

Signed
State of California
County of LOS ANGELES
12th November 24
Subscribed and sworn to ( or affirmed) before me on this __ day of ___ , 20_, by Dave Sorem , proved to me on the basis of satisfactory evidence to be the person( s) who appeared before me

SEE ATTACHED
Notary Public Signature Notary Public Seal
P-13 of P-20

CALIFORNIA JURA T
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfullness, accuracy, or validity of that document.

State of California
County of Los Angeles
Subscribed and sworn to (or affirmed) before me,
on this 12 TH , day of NOVEMBER, 2024
by Dave Sorem, proved to me on the basis of
satisfactory evidence to be the person(s) who
appeared before me.
- • Notary Public • California f
f :;: Los Angeles County I
"' ., • Commission # 2499465 -
My Comm. Expires Sep 10, 2028
Notary Public (Notary Seal)

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-6627

ROUSSELLE STREET FLOOD PROTECTION PROJECT

NON-DISCRIMINATION CERTIFICATE
The undersigned contractor or corporate officer, during the performance of this contract, certifies as follows:

1. The Contractor shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Contractor shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without, regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause.

2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin.

3. The Contractor shall send to each labor union or representative of workers with which he/she has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.

4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.

5. The Contractor shall furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders.

6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Execution Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law.

P-14 of P-20

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-6627

ROUSSELLE STREET FLOOD PROTECTION PROJECT

7. The Contractor shall include the portion of the sentence immediately preceding paragraph (l) and the provisions of paragraphs ( 1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract or purchase order as the administering agency may direct as means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency, the Contractor may request that the United States enter into such litigation to protect the interests of the United States.

8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as amended, no discrimination shall be made in the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided in Section 1420, and any contractor of public works violating this Section is subject to all the penalties imposed for a violation of the ~\-
Signed: ~ ~-~
Title: President
Firm: MIKE BUBALO CONSTRUCTION CO., INC.

Date: 11/12/24
P-15 of P-20

CITY OF SANT A ANA

PROPOSAL
PROJECT NO.: 23-6627

ROUSSELLE STREET FLOOD PROTECTION PROJECT

ST A TEMENT REGARDING APPRENTICESHIP REQUIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777 .5 of the State Labor Code regarding employment of apprentices, and understands that contractors on contracts exceeding $30,000 or 20 working days shall:

1. Apply to the joint apprenticeship committee administering the apprenticeship standards of the craft or trade in the area of the site of the public work for a certificate approving the contractor under the apprenticeship standards for the employment and training of apprentices in the area or industry affected.

2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the apprenticeship standards.

3. Contribute to the fund or funds in each craft or trade in which he/she employs journeymen or apprentices on the public work, in the same amount or upon the same basis and in the same manner as the other contractors, except contractors not signatory to the trust agreement shall pay a like amoun~alifornia Apprenticeship Council.

Signed: ~~ ~
Title: President
Firm: MIKE BUBALO CONSTRUCTION CO., INC.

Date: 11/12/24
P-16 of P-20

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-6627

ROUSSELLE STREET FLOOD PROTECTION PROJECT
STATEMENT REGARDING "ANTI-KICKBACK" REQUIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by these bid documents, agrees to comply with the Copeland "Anti-Kickback" Act ( 18 USC 74) as supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that each contractor or subcontractor shall be prohibited from inducing, by any means, any person employed in the construction or repair of public work, to give up any part of the compensation to which he/she is otherwise enti~
Signed: ~ ~ ·-
Title: President
Firm: MIKE BUBALO CONSTRUCTION CO., INC.

Date: 11/12/24
P-17 of P-20

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-6627

ROUSSELLE STREET FLOOD PROTECTION PROJECT

FLEET COMPLIANCE CERTIFICATION
Bidder hereby acknowledges that they have reviewed the California Air Resources Board's policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the "Regulation"). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder's fleet, and/or that of their subcontractor(s) ("Fleet") is true and correct:

The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto.

The Fleet is exempt from the Regulation under section 2449 .1 ( f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto.

Bidder and/or their subcontractor is unable to procure R99 or RI 00 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids).

The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)( 4) because this Project has been deemed an Emergency, as defined under section 2449(c)(l8). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4).

The Fleet does not fall under the Regulation or are otherwise exempted and a detailed reasoning is attached hereto.

Dave Sorem
Title: President
---------------------
Date: 11/12/24
---------------------
P-18 of P-20

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23·6627

ROUSSELLE STREET FLOOD PROTECTION PROJECT

FLEET COMPLIANCE CERTIFICATION
Bidder hereby acknowledges that they have reviewed the California Air Resources Board's policies. rules and regulations and are familiar with the requirements of Title 13. California Code of Regulations. Division 3. Chapter 9. effective on January 1. 2024 (the ··Regulation"). Bidder hereby certifies. subject to penalty for perjury. that the option checked below relating to the Bidder's fleet. and/or that of their suhcontractor(s) (''Fleef') is true and correct:

The Fleet is subject to the requirements of the Regulation. and the appropriate Certificate(s) of Reported Compliance have been attached hereto.

The Fleet is exempt from the Regulation under section 2449.1 (t)(2). and a signed description of the subject vehicles. and reasoning for exemption has been attached hereto.

Bidder and/or their subcontractor is unable to procure R99 or RI 00 renewable diesel fuel as defined in the Regulation pursuant to section 2449.l(f)(3). Bidder shall keep detailed records describing the normal refueling methods. their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel ( i.e. third party correspondence or vendor bids).

The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency. as defined under section 2449( c )( 18 ). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained. pursuant to section 2449(i)(4).

The Fleet does not fall under the Regulation or are otherwise exempted and a detailed reasoning is attached hereto.

Name of Bidder: All American Asphalt
Signature: ___________________ _
Name: Edward J. Carlson
Title: Vice President
Date: __ J_I /_tz_.,_/2_'1..;;___ ________ _
P-18 of P•20

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-6627

ROUSSELLE STREET FLOOD PROTECTION PROJECT
Fl J�ET COMPLIANCE CERTIFIC/\TION
Bidder hereby acknowledges that they have rcvit:wcd the California /\ir Resources Board's policies, rules and regulations and arc familiar with the requirements of Title 13. California Code of Regulations, Division 3. Chapter 9, effective on January 1, 2024 (the "Regulation"). Bidder hereby certifies, subject to penalty for pc1:jury, that the option checked below relating to the Bidder's fleet and/or that of their subcontractor(s) ("Fleet") is true and correct:

The Fleet is subject lo the requirements ofthc Regulation, and the appropriate Ccrti lieatc(s) of Reported Compliance have hecn attached hereto.
'f
Thc Fleet is exempt from the Regulation under section 2449.1 (1)(2), and a signed description of the subject vehicles. and reasoning for exemption has been attached hereto.

Bidder and/or their subcontractor is unable to procure R99 or R 100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(1)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof thal shows they were not able lo procure renewable diesel (i.e. third party correspondence or vendor bids).

The Fleet is exempt from the requirements ol'thc Regulation pursuant to section 2449(i}(4) because this Project has been deemed an Emergency. as de lined under section 2449(c)( 18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)( 4 ).

The Fleet docs not fall under the Regulation or arc otherwise exempted and a detailed reasoning is attached hereto.

Name of Bidder: Chrisp Company
f"' 1 '
Signature: ,��'-1�
Name: Robert Chrisp
Title: President/CEO
Date: 11-12-2024
P-18 of P-20

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-6627

ROUSSELLE STREET FLOOD PROTECTION PROJECT
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE
In conformance with Public Contract Code Section 10162, the BIDDER shall complete, under penalty of perjury, the following questionnaire:

Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a proprietary interest in the BIDDER, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation?
Yes ___ _ No_X __
If the answer is yes, explain the circumstances in the following space.

P-19 of P-20

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-6627

ROUSSELLE STREET FLOOD PROTECTION PROJECT

STATEMENT REGARDING COMMUNITY WORKFORCE AGREEMENT (CWA)

REQUIREMENTS
This is to certify that the undersigned BIDDER, and subcontractors, have read and understood the CW A entered into by and between the City of Santa Ana, the Los Angeles/Orange Counties Building and Construction Trades Council, and the signatory Craft Councils and Local Unions, effective as of June 6, 2023.

The undersigned BIDDER hereby agrees to comply with all terms and conditions of the CW A, and is capable of completing construction of the project continuously, and without interruptions or delays. If awarded any work covered by the CW A, BIDDER will also be required to sign the Letter of Assent that appears as Attachment A to the CW A.

The undersigned BIDDER has reviewed the Public Works Construction Permit and required deposit described in Sectio - ami. the Notice of Inviting Bids.

Signed:

Title: President
Firm: MIKE BUBALO CONSTRUCTION CO., INC.

Date: 11/12/24
P-20 of P-20
Mike Bubalo Construction Co., Inc. began work under its present organization as a corporation in 1999. Presently we have multiple projects with government agencies.

Mike Bubalo, owner, and Dave Sorem, General Manager, have extensive underground construction experience.

Mike Bubalo Construction Company has been in business since 1974 as an individual general contractor and performing construction services for Steve Bubalo Construction Co., Inc. prior to incorporation.

Mike Bubalo was General Superintendent for Steve Bubalo Construction Co., Inc. whose responsibilities included supervision of construction projects that ranged in cost from $500,000 to $21,000,000. Mike Bubalo has owned and operated his company since 1974.

Dave Sorem is General Manager of MBC. Dave was also employed by Steve Bubalo Construction Co. Inc. as Project Manager from 1992 to 1999. His responsibilities included project management, estimating and engineering duties for all construction projects. Prior to employment with Steve Bubalo Construction Co., Inc. Dave Sorem worked for the Los Angeles County Department of Public Works, Design Division from 1982 to 1992 as a Civil Engineer III/Section Head.

Brian Rickey is Project Manager for MBC. and his responsibilities include project management and engineering duties for large construction projects. His vast experience comes from his many years working up the ranks (1986-2006) with Los Angeles County Dept. of Public Works.

Brad Sorem is Project Coordinator for MBC. His responsibilities include project scheduling, permit review, submittals, loss control and procurement for all construction projects.

Anton Brkic is Project Estimator for MBC. Anton was also employed by Steve Bubalo Construction Co. Inc. as Project Coordinator from 1993 to 1999. His responsibilities include project scheduling, permit review, submittals, and estimating.

Oscar Camerena is a Job Foreman for MBC. Oscar has had a specialized focus on sewer and storm drain construction for the majority of his career as a laborer. His responsibilities included plan review, subcontractor supervision, and management of the labor, equipment and material procurement for water construction projects

John Sarna is a Job Foreman for MBC. John has extensive experience in sewer and storm drain construction over the majority of his career as an operator. His responsibilities included plan review, subcontractor supervision, and management of the labor, equipment and material procurement for construction projects

Mike Bubalo Construction Co., Inc. has the unique ability to perform all of the required elements for a successful and prompt emergency repair “in-house”. We have the ability to provide civil engineering tasks that include:

Shoring design CPM Scheduling
(Primavera)
SWPPP Preparation
Utility conduit design Dewatering & Bypass
Design
Traffic Control Detour Plans
Value Engineering Quality Assurance Plans Hydraulic Calculation Underground structure
design
Site specific safety plans

In addition to these skills, we have assisted utility owners in liaison coordination and permit review. Emergency repairs that might require participation from agencies outside of the Owner’s control will benefit from our experience with various federal, state and local agencies.

Site Specific Emergency Response Details:

 Storm Water Compliance
We have in-house staff qualified and experienced in producing site specific SWPPP’s that will ensure compliance with permit conditions.  Shoring
We have in-house staff qualified and experienced in producing site specific Shoring plans that will ensure compliance with Cal-OSHA.  Hot-Taps and High-Lines
If existing water services must be maintained, the existing water mains can be hot-tapped to connect with the new water mains. The existing water services can be maintained with a temporary above ground supply line (high-lines).  Construction Sequencing
Schools – night time work to reduce impact on school traffic flow  Traffic Control

Whenever possible the staging and alignment of the repairs shall be arranged in such a manner as to minimize impacts to traffic congestion and limit the amount of disruption. We provide in house production of stamped traffic control plans.

 Utility Conflicts

Every effort will be made to locate utilities in advance of construction. We will make every effort to utilize all of the information and coordination resources available with DigAlert-811.

Our first order of work will be identifying and contacting all utility owners as soon as practicable. Initiating field meetings to identify conflicts and planned concurrent activities.

 Subcontractors

MBC self-performs earthwork, bypass pumping, shoring, dewatering, concrete, pipeline assembly, trench installation and equipment procurement and installation. We typically subcontract for rebar fabrication, traffic striping, paving & electrical (SCADA) installation.

Mike Bubalo Construction Co., Inc. has a proven record of appropriate business ethics toward subcontractors, including, but not limited to, the following:

a. Demonstrated knowledge of and compliance with federal, state and City of Los Angeles laws and regulations pertaining to utilization of subcontractors and business practices toward subcontractors;
b. Demonstrated commitment to practices of good faith and fair dealing toward subcontractors; and
c. Demonstrated record of satisfactory performance of contractual obligations owing to subcontractors, including timely payment.

The following subcontractors have performed satisfactory work on our previous projects:

Subcontractor Firm Work Performed
E-nor Innovations Pavement Delineation
Statewide Traffic Traffic Control Maintenance
LnA Concrete Concrete Structures/Flatwork
All American Asphalt Asphalt Paving
Beard Electric Electrical/SCADA instrumentation

Knowledge of Local Conditions
Mike Bubalo personnel have extensive first hand experience trenching utilities throughout the entire City of Los Angeles over the past 38 years. Our staff has a working relationship with various local public utilities as well as numerous state and federal authorities.

Safety:

Overall safety has improved on site over the last two years for our worksites. We have zero (0) hours of lost time reported on OSHA form 300 reports for the last two years and have had a successful voluntary review and inspection of our safety plan and implementation by Cal-OSHA staff. We also have regular satisfactory reviews of our safety procedures from our insurance underwriters.

On-Call Project History:

MBC’s has extensive experience responding to emergency repairs for various public agencies. MBC has encountered many challenges in all forms and manners of damages sustained by storm drain, sewer and waterlines and we have had considerable success and experience in quickly, safely and efficiently repairing broken pipes and damaged structures with our extensive history of work experience in underground utility construction. The majority of the emergencies that we have performed have resulted in positive benefits to the governing agency, the publics’ convenience and safety and more efficient system performance. All repairs, modifications and redesigns were completed in-house by MBC staff.

Listed below is a partial list of agencies that we have provided on-call services.

Inland Empire Utilities District
Chino Desalter Authority
Orange County Water District
Three Valleys Municipal Water District
City of Industry
City of Rancho Cucamonga
City of Upland
City of Long Beach
City of Anaheim
Los Angeles County Department of Public Works
Los Angeles County Sanitation District
Los Angeles Internal Services Department

This partial list is what we have accomplished over the last 13 plus years of providing construction services to agencies of Southern California. We work closely with agencies to solve problems, not create them. From this cooperative effort many agencies request us to perform emergency work when the need arises. On those occasions when we are called out to repair the infrastructure we provide our expertise for repair and reconstruction in the most efficient and equitable manner.

APPENDIX A: RESUMES

DAVID D. SOREM, P.E.

EDUCATION

University of Southern California, Los Angeles, CA
8/84 to 5/85, graduate courses, Advanced Steel and Concrete Design

California State University of Los Angeles, Los Angeles, CA 4/83 to 12/83, graduate courses, Engineering Application of Computers and Advance Structural Analysis.

North Dakota State University, Fargo, ND
Bachelor of Science, Civil Engineering, 11/81

Moorhead State University, Moorhead, MN
Pre-engineering, 8/77 to 8/80

EXPERIENCE

Mike Bubalo Construction Co., Inc.

1/00 to present Manager and Partner of Mike Bubalo Construction Co., Inc.

Responsibilities include management, estimating, engineering and general operation of the corporation.

Steve Bubalo Construction Co., Inc.

6/92 to 12/99 Project Manager
Responsibilities include staff support and estimating for the construction of sewers, storm drains and water lines.

Los Angeles County Department of Public Works (formerly Los Angeles County Flood Control District), Alhambra, CA

4/89 to 6/92 Section Head – Design Division, Contracting Section

Responsibilities include the supervision of engineering staff for the preparation of plans and specifications for Public Works projects, the review and selection of consultants and negotiating contracts for their engineering services. Additional responsibilities include providing technical assistance to County Counsel and the presentation of projects to County Administration and other agencies. Total construction dollar amount - $90 million.

4/88 to 4/89 Unit Head – Design Division, Contracting Unit

Same responsibilities listed above as Section Head. Total construction dollar amount - $20 million.

8/87 to 4/88 Project Engineer – Design Division, Technical Support section

Act as the Department’s Project Engineer/Manager for the planning and design of drainage and roadway projects. Encompasses instructing and advising Consultants that prepare construction drawings for the Department, Processing change orders and seeing that the overall project is on schedule. Partial list of projects as Project/Manager include:

-Lincoln-Pico-Kanter Low Flow Bypass
Department’s portion ($430,000)
-Harbor City Relief Drain ($8,300,000)

11/85 to 8/87 Project Engineer/Civil Engineer 1 – Design Division. Worked both in Structural Analysis Group and Technical Support Section.

Same responsibilities as described previously in Project Engineer – Design Division.

Technical Support Section with additional tasks of the Structural Analysis Group, which include analysis and preparation of construction drawings and specifications for Public Works projects. Worked as structural consultant to other Divisions and Administration within the Department. Performed structural review of permit submittals from private companies and public agencies. Partial list of projects as Project Engineer include:

-Adams Blvd. Drain, Unit 1 and 2 ($6,200,000)
-Poplink Drain, Unit 1 ($2,600,00)
-Adams Blvd. Drain, Unit 3 ($6,250,000)
-No. Torrance Relief Drain Concept Report
-Adams Blvd. Drain, Unit 4 Concept Report
-Little Tujunga Wash Bridge Stabilizer ($490,000)
-White Canyon Road; Phase 1 ($5,300,000)

12/83 to 11/85 Senior Civil Engineering Assistant, promoted to Civil Engineer 1, 2/85 – Design Division, Structural Analysis Group.

Same responsibilities as described above for the Structural Analysis Group

7/83 to 12/83 Senior Civil Engineering Assistant – Design Division, Project Design Section

Performed design work for flood control projects. Typical assignments consisted of alignment, grading, hydraulic and structural analysis for storm drains, channels, debris basin and other flood control facilities.

2/82 to 7/83 Civil Engineering Assistant, Operation and Maintenance Division.

Responsibilities included engineering for the maintenance and repair of dams, debris basins, spreading grounds, channels, and debris disposal areas.

Professional Affiliations:

1. American Society of Civil Engineers (ASCE)

2. Construction Institute of American Society of Civil Engineers

3. Engineering Contractors Association (E.C.A.) Board of Directors, Secretary 2010 & 2011, Vice President 2012. President 2013.

4. “Greenbook” Committee of Public Works Standards, Inc.

5. Construction Industry Coalition on Water Quality (CICWQ),Board of Directors

6. Rebuild SoCal Partnership, Board Member 2016-Present, Chairman 2018-2019

Technical Committee Involvement:

Standard Specifications for Public Works Construction (Greenbook) New Materials-Underground Precast Reinforced Concrete Box Standard Plans Rewriting Section 306-Underground Conduit Construction

Construction Industry Coalition on Water Quality (CICWQ) Low Impact Development (L.I.D.) Cost Estimates for Orange County Public Works

LICENSE
State of California, RCE No. 38784
K. BRIAN RICKEY, P.E.

EDUCATION

California State University of Long Beach, Long Beach, CA Bachelor of Science - Civil Engineering (BSCE) 1988
Masters of Science - Civil Engineering (MSCE) 1991
- Construction Management

EXPERIENCE

Mike Bubalo Construction Co, Inc. – Baldwin Park, CA

8/07- Present Project Manager

Responsibilities include project management and engineering of Public Works related projects.

Sully Miller Contracting Co. – Anaheim, CA

2/06 to 5/07 Quality Control Director

Responsible for all elements of the quality control department including daily oversight and materials testing/certification for construction, AC production, and aggregate crushing business units to ensure conformance with specifications.

Also provided technical analyses for materials related issues associated with bid estimating, ongoing construction projects, and material supply contracts.

Los Angeles County Department of Public Works

1/03 to 2/06 Section Head/Materials Engineer - Geotechnical & Materials Engineering Division, Materials Engineering Section
Responsibilities included the supervision of engineering and technical staff within the materials laboratory, materials analysis, and pavement management work groups including the coordination of services performed for contract cities. The materials laboratory provided quality assurance testing and analysis for rock products, asphalt, concrete, and also geotechnical analysis. Additional responsibilities included representing the Department on all materials related issues related to public works contracts including technical and forensic analyses for County Counsel.

7/02 - 1/03 Assistant Section Head - Construction Division, Contract Inspection II Section Responsibilities included supervision of contract administration and quality assurance inspection staff for Department administered storm drain and water conservation related capital improvement projects. Also provided technical and procedural oversight to meet field conditions and ensure conformance with project plans and specifications.

6/96 - 7/02 Supervising Civil Engineer I/Resident Engineer - Construction Division, Contract Inspection I Section

Responsibilities included the supervision of technical staff performing utility coordination, contract administration and contract compliance for the Alameda Street Ports Access Demonstration Projects.

Alameda Street projects (Phases I thru IIIB, Del Amo Grade Separation, and Sepulveda Grade Separation) Included: (3) grade separations, (6) miles of road reconstruction, traffic signals, storm drains, rail and (2) pump stations - total project value exceeding $100 million.

5/92 – 6/96 Principal Civil Engineering Assistant – Construction Division, Contract Inspection I Section

Provided quality assurance inspection for bridge retrofit projects to ensure conformance of materials and construction with plans and specifications.

Inspection included the preparation of daily work reports, analysis and processing of change orders, review of monthly pay estimates, claims review, negotiation, and coordinating work with utility agencies, and adjacent businesses.

1/89 to 5/92 Civil Engineering Assistant – Land Development Division, Road Sewer and Water Section

Performed engineering review of plans to ensure conformance with County standards in the design of roads associated with land development tracts and parcel maps.

3/86 to 1/89 Student Worker – Land Development Division, Road Sewer and Water Section

Responsible for mapping and maintaining wall sheets of tract and parcel maps recorded within Los Angeles County including annexations to cities.

PROFESSIONAL AFFILIATIONS

Association of Asphalt Paving Technologists (AAPT)
American Society of Civil Engineers (ASCE)

TECHNICAL COMMITTEE INVOLVEMENT

Caltrans
Section 39 Rewrite Task Group
Rock Products

Standard Specifications for Public Works Construction (Greenbook) New Material and Methods – Surface
AC Task Force
Slurry Seal Task Force: Past Chairman
Concrete Ad-Hoc

Asphalt Pavement Association (APA)
Los Angeles Technical Committee: Past Co-Chairman
Rubberized Concrete Committee: Past Co-Chairman

LICENSE State of California, RCE No. 54535

Brad Sorem
Education
March 2009 to
December 2013
California State Polytechnic University
Pomona
Pomona, CA

 Bachelor of Science, Construction Engineering Technology

Work Experience
June 2001 to Present Mike Bubalo Construction Co. Inc. Baldwin Park , CA Project Coordinator
 Laborer 2001 to 2005
 Project Coordinator/Project Manager 2005 to Present: responsible for take offs, estimating, coordination with subcontractors and material suppliers, change orders, submittals, permits, safety, project coordination and management, equipment management, air quality compliance, storm water pollution prevention plans, etc.

Project Experience
 Dover Drive Trunk Sewer Relief and Domestic Waterline Relocation – Orange County Sanitation District - 2013
o Project Coordinator - Construct 7,200 LF of VCP sewer and relocate 2,400 LF of 8-inch and 6-inch PVC waterline.

 Dana Point Town Center Infrastructure Improvements Phase II – South Coast Water District - 2014
o Project Manager – Construct 2,800 LF of 8-inch and 15-inch PVC sewer and 6,500 LF of 8-inch and 10-inch PVC waterline.

 Wineville Recycled Waterline Extension Segment B – Inland Empire Utilities Agency - 2014
o Project Coordinator – Construct 12,400 LF of 36-inch CML&C recycled waterline and 9 triple offset butterfly valves.

 Newport Ave. 16-Inch Watermain Valve Installation Project – City of Tustin - 2015
o Project Manager – Install three 16-inch gate valves with the use of line stops.

 Avenida Palizada Turnout Refurbishment – South Coast Water District - 2015 o Project Manager – Demolish three existing turnout vaults and 10-inch piping and consolidate new turnout and piping into one large vault.

 El Camino Real Improvements – Toll Brothers Inc. - 2015 o Project Manager – Construct 5,000 LF of 12-inch recycled waterline, 200 LF of 12-inch potable waterline, 500 LF of 8-inch PVC sewer and 5,200 LF of RCP ranging in size from 12-inches to 48-inches. Also the construction of 34 LF of double 4’x8’ RCB and 92 other concrete drainage structures.
 Los Cerritos Channel Sub Basin 4 Infiltration - City of Signal Hill – 2016 to 2019 o Assistant Project Manager – Design build project consisting of the construction of 31-acre-foot subterranean storm water infiltration basin, a storm water diversion inlet from the Los Cerritos Channel and two hydrodynamic separators capable of handling a total of 166 cubic feet per second of storm water.
 City of Los Angeles Emergency Sewer Repair Program – City of Los Angeles 2017 to Present
o Project Manager – Oversight of all tasks relating to emergency sewer repairs within the City of Los Angeles.
 City of Los Angeles Emergency Storm Drain Repair Program – City of Los Angeles 2017 to Present
o Project Manager – Oversight of all tasks relating to emergency storm drain repairs within the City of Los Angeles.

ANTON BRKIC

EDUCATION

California State Polytechnic University of Pomona, Pomona, CA Bachelor of Arts, Architecture, 8/95

EXPERIENCE

Mike Bubalo Construction Co., Inc.

1/00 to present Project Estimator
Responsibilities include project management, estimating, engineering and general management of main office and field operations.

Steve Bubalo Construction Co., Inc.

4/93 to 10/99 Project Coordinator
Responsibilities include project management, estimating, engineering and general management of main office and field operations.

Tomislav Gabric & Associates, Architects

6/92 to 4/93 Draftsman
Responsibilities include production of plans and specifications for various types of commercial and industrial building designs.

Loffredo & Volarich, Insurance Investigators

2/89 to 6/92 Field Agent
Responsibilities include sub-rosa investigations, process server, claims investigator, legal research, court records research and retrieval.

Operating Engineers, Local 12, Health and Welfare Trust Funds

6/87 to 9/88 File Clerk
Responsibilities include mail room duties and archival records research and retrieval.

Oscar Camarena, Foreman

2005 to Present Mike Bubalo Construction Co., Inc.
1989 to 2005 Precision Pipeline
Duties: Set up and coordinate public works projects. Oversee the installation of water lines, sewer lines, and recycled water lines. Potable water lines installed were from 8 to 48 inches in diameter. Installation of copper house connections, blow off assemblies, air vacuum assemblies and fire hydrants. Installation of valves includes inline gate valves, butterfly valves, check valves, cathodic protection and pressure reducing valves in various sizes. Also have completed hydrostatic testing, chlorination of potable water lines and worked with microbiology laboratories. Recycled water lines installed were from 8 to 60 inches in diameter. Completed the retrofitting and upgrading of existing and new pump stations.

Agencies Worked For: Inland Empire Utilities Agency, Eastern Municipal Water District, Central Basin Municipal Water District, City of Seal Beach, City of Anaheim Public Utilities Department, City of Chino Public Works, Los Angeles County Sanitation District, City of Glendora Water Division, City of Covina Public Works, City of Pico Rivera Water Division, City of Ontario Public Works, City of Montclair Public Works and Upper San Gabriel Valley Municipal Water District.

John Sarna

2010 to Present - Mike Bubalo Construction Co., Inc.

Upper San Gabriel Valley Municipal Water District – City of Industry Phase IIB Recycled Waterline
Inland Empire Utilities Agency – Turner Basin 16 inch Reclaimed Waterline Extension Foothill Transit – Parking Structure Fire Line Extension 2006 to 2009 – Surf City Construction
Desert Water Authority - 12 inch Mainline Extension and Hydrant Installations Coachella Valley Water – 16 inch Mainline Extension and Hydrant Installations Longs Drug – Fire Line Installations
Indio Water – Fantasy Springs 12 inch Bypass and Mainline 1998 to 2006 – JMS Excavating and Grading
Arizona Water Co. – Various watermain, hydrants and service connections installed as well as booster pumpstations.

Kachina Village Improvement District - Various watermain, hydrants and service connections installed and repairs to existing mainlines.

Munds Park Water Co. - Various watermain, hydrants and service connections installed.

Prescott Valley Water Co. - Various watermain, hydrants and service connections installed.

Williamson Valley Water - Various watermain, hydrants and service connections installed.

City of Phoenix - Various watermain, hydrants and service connections installed and booster pumpstation upgrades.
1996 to 1998 – Peter Kiewit
Pulliam Airport Waterline Improvements – 12 inch mainline with hydrants and service connections.
1982 to 1996 – MMW Equipment Rentals
Various Utility Projects

← All documents from this meeting