EXHIBIT 3
ADDENDUM No. ONE
CITY OF SANTA ANA
Project 11-6741
PROPOSAL Project 19-6499
PROJECT NO.: 11-6741 - BRISTOL STREET IMPROVEMENTS FROM WARNER
AVENUE TO SAINT ANDREW PLACE
PROJECT NO.: 19-6499 - BRISTOL STREET (PHASE 4) WATER MAIN IMPROVEMENTS
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: Sully-Miller Contracting Company
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed worish all material an examined work retract Do coments in is and wey an erdance poses id plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following schedule:
Item Description Qty Unit Unit Price Amount
1 Unclassified Excavation* 22,740 CY $
72.00 1,637,280.00
2 Clearing and Grubbing 1 LS $ $
925000.00 925000.00
3 Asphalt Concrete Pavement (AC)* 18,676 TN $ $
140.00 2,614,640.00
4 Cold Mill (3") 10,741 SF $
6.00 64,446.00
5 Asphalt Rubber Hot Mix (ARHM) 3,922 TN $ $
134.00 525,548.00
6 Crushed Aggregate Base - Class II (CAB)* 1,500 CY $
125.00 187,500.00
7 PCC Sidewalk (T=4") 56,120 SF $ $
6.50 364,780.00
PCC Driveway Approach (Commercial = 8") 3,680 SF $ $
12.50 46,000.00
PCC Driveway Approach (Residential = 6") 1,955 SF $ $
18.75 36,656.25
10 PCC Curb Ramp 3,680| SF $ $
22.00 80,96.00
11 PCC Curb and Gutter (Type A-2-8) 5,290 LF $ $
36.00 190,440.00
P-1 of P-23
CITY OF SANTA ANA ADDENDUM No. ONE
Project 11-6741
PROPOSAL Project 19-6499
PROJECT NO.: 11-6741 - BRISTOL STREET IMPROVEMENTS FROM WARNER
AVENUE TO SAINT ANDREW PLACE
PROJECT NO.: 19-6499 - BRISTOL STREET (PHASE 4) WATER MAIN IMPROVEMENTS Item Description Qty Unit Unit Price Amount
12 PCC Curb and Gutter (Type A-2-6) 1,035 LF $ $
47.50 49,162.50
13 PCC Curb (Type B-1) 4,945 LF $ $
33.00 163,185.00
14 PCC Median Curb (4") 460 LF $ $
32.00 14,720.00
15 Colored Concrete for Median Turn Pocket - 2,875 SF $ $ Brick Red, Topcast Exposed Aggregate
Finish (T=4") 13.50 38,812.50
16 Colored Concrete - Brick Red, Topcast 3,740 SF $ $
Exposed Aggregate Finish (T=6") 23.0 86,020.00
17 Concrete Bus Pad 8,970 SF $ $
14.00 125,580.00
18 Concrete Bus Pad - with Dowels 552 SF $ $
36.00 19,872.00
19 PCC Protected Bike Lane (6") 805| LF $ $
32.00 25,760.00
20 Adjust Manhole Frame and Cover to Finished 17 EA $ $ Grade
2,100.00 35,700.00
21 Furnish and Install New Water Valve Frame 7 EA $ $
and Cover
2,800.00 19,600.00
22 Furnish and Install Survey Monument to 1 EA $ $
Finished Grade 2,200.00 2,200.00
23 Adjust Manhole Frame & Cover per OC San 2 EA $ $
Std.
4,300.00 8,600.00
24 Traffic Signal Modification at Bristol St and 1 LS $ Warner Ave 154,000.00 154,000.00
25 Traffic Signal Modification at Bristol St and 1 LS $ $ Glenwood Pl. 418,000.00
418,000.00
26 Traffic Signal Modification at Bristol St and 1 LS $ $ St. Andrew Pl. 167,000.00
167,000.00
27 Install 2" PVC Conduit per Plan 250 LF $ $
100.00 25,000.00
28 Install 3" PVC Conduit per Plan 3,000 LF $ $
65.00 195,000.00
P-2 of P-23
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 11-6741 - BRISTOL STREET IMPROVEMENTS FROM WARNER
AVENUE TO SAINT ANDREW PLACE
PROJECT NO.: 19-6499 - BRISTOL STREET (PHASE 4) WATER MAIN IMPROVEMENTS Item Description Qty Unit Unit Price Amount
29 Install 4" PVC Conduit per Plan 440 LF $ $
100.00 44,000.00
30 Install No. 6 Pull Box 20 EA $
2,500.00 50,000.00
31 Install No. 6E Pull Box 8 EA $ $
2,500.00 20,000.00
32 Install SCE Pull Box 1 EA $
5,000.00 5,000.00
33 Install Traffic Signal Loop Detector (Type E 12 EA $ $ Loop)
1,000.00 12,000.00
34 Install CCTV & IP Communication System 1 LS $
35,000.00 35,000.00
35 Install 144 Strand SMFO Cable 3,700 LF $ $
10.00 37,000.00
36 Install 12 Strand SMFO Cable 200| LF $ $
10.00 2,000.00
37 Fusion Splice 1 Strand of Single Mode Fiber 156 EA $ $ (SMFO) 100.00 15,600.00
38 Install Fiber Optic Splice Closure 1 EA $ $
5,000.00 5,000.00
39 Pothole Traffic Signal Pole Location for 12 EA $ $
Utility Conflicts 3,000.00 36,000.00
40 | Temporary Overhead Wiring at Traffic 1 LS $ $
Signals 45,000.00
45,000.00
41 Street Lighting Installation 1 LS $ $ 747,000.00
747,000.00
42 | 8" PVC Class 305 (DR 14) C900 Pipe 1,300 LF $ $
350.00 455,000.00
43 12" PVC Class 305 (DR 14) C900 Pipe 2,700 LF $ $
435.00 1,174,500.00
44 1" Copper Water Service 14 EA $
7,000.00 98,000.00
45 2" Copper Water Service 1 EA $ $
21,000.00 21,000.00
P-3 of P-23
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 11-6741 - BRISTOL STREET IMPROVEMENTS FROM WARNER
AVENUE TO SAINT ANDREW PLACE
PROJECT NO.: 19-6499 - BRISTOL STREET (PHASE 4) WATER MAIN IMPROVEMENTS Item Description Qty Unit Unit Price Amount
46 6" Fire Service I EA $ $
48,000.00 48,000.00
47 Fire Hydrant 11 EA $ $
24,000.00 264,000.00
48 | 8" Resilient Wedge Gate Valve 12 EA $
4,500.00 54,000.00
49 12" Resilient Wedge Gate Valve 7 EA $
6,700.00 46,900.00
50 Steel Casing 150 LF $ $
310.00 46,500.00
51 Abandon Existing Water Service 30 EA $ $
310.00 9,300.00
52 Abandon Existing Fire Service 1 EA $ $
2,500.00 2,500.00
53| Abandon Existing Sewer Lateral 34 EA $ $
2,600.00 88,400.00
CCTV Inspection of Existing Sewer Main 6,000 LF $ $
5.00 30,000.00
55 CCTV Inspection of Existing Sewer Laterals 40 EA $
1,300.00 52,000.00
56 Vertical Offset Type 1 (As-Needed)* 4 EA $ $
7,700.00 30,800.00
57| Vertical Offset Type 2 3 EA $ $
18,400.00 55,200.00
58 Additional Potholing (As-Needed)* 13 EA $ $
2,300.00 29,900.00
59 8' High Sound Wall (including footing) 2,750 LF $ $
438.00 1,204,500.00
60 Ornamental Wall (including footing) 500 LF $ $
1,000.00 500,000.00
61 2222 S. Bristol St. - Wall Reconstruction 1| LS $ $
7,500.00 7,500
62 1306 W. Saint Anne Pl. - Wall 1 LS $ $
Reconstruction 7,500.00 7,500.00
P-4 of P-23
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 11-6741 - BRISTOL STREET IMPROVEMENTS FROM WARNER
AVENUE TO SAINT ANDREW PLACE
PROJECT NO.: 19-6499 - BRISTOL STREET (PHASE 4) WATER MAIN IMPROVEMENTS Item Description Qty Unit Unit Price Amount
63 Trench Shoring & Plating 1 LS $
1,150,000.00 1,150,000.00
64 18" RCP SD (2500-D) per City Standard Plan 310 LF
500.00 $ 217,000.00
65 24" RCP SD (2500-D) per City Standard 40 LF $ $
Plan 1150 1,000.00 40,000.00
66 30" RCP SD (2500-D) per City Standard Plan 60 LF $ $ 1150 1,000.00 60,000.00
67 48" RCP SD (1750-D) per City Standard Plan 2,520 LF $ $ 1150
925.00 2,331,000.00
68 Reinforced Concrete Collar (D=18") per City 3 EA $ $ Standard Plan 320 1,300.00 3,900.00
69 Reinforced Concrete Collar (D=24") per City 1 EA $ $ Standard Plan 320 1,300.00 1,300.00
70 Junction Chamber Type 'B' per City Standard 12 EA $ $240000.00 Plan 307 20,000.00
71 Catch Basin Type 'B' (W=7) including Local 9 EA $ $
Depression per City Standard Plan 302 and
305 16,000.00 144,000.00
72 Catch Basin Type 'B' (W=21) including 2 EA $ $
Local Depression per City Standard Plan 303
and 305 28,000.00 56,000.00
73 Concrete Pipe Support per SPPWC Standard 2 EA $ $
Plan 224-2 (Case I - 36" MWD) 4,000.00 8,000.00
74 Wrap Proposed 18" Diameter Pipe with 24 200 LF 200.00 $ Mil Polyethylene Liner 40,000.00
75 A bandon Existing 24" Storm Drain anc 90 LF $ $
Backfill per STD 121
62.00 5,580.00
76 Remove Existing 21" Storm Drain Line 20 ILF 300.00 $ 6,000.00
77 | Remove Existing Manhole Structure and 2 EA $ $
Junction Box - Backfill per STD. 1150 10,000.00 20,000.00 78 | Remove Existing 21'x3' Catch Basin T EA $ $
11,200.00 11,200.00
79 Remove Existing 9'x4' Catch Basin 1 EA 8,500.00 $
6,500.00
80 Transition Structure 2 EA $ $
44,000.00 88,000.00
P-5 of P-23
ADDENDUM No. ONE
CITY OF SANTA ANA Project 11-6741
PROPOSAL Project 19-6499
PROJECT NO.: 11-6741 - BRISTOL STREET IMPROVEMENTS FROM WARNER
AVENUE TO SAINT ANDREW PLACE
PROTECT NO.: 19-6499 - BRISTOL STREET (PHASE 4) WATER MAIN IMPROVEMENTS Item Description Qty Unit Unit Price Amount
81 Install French Drain 94 LF $270.00 $
25,380.00
82 Construct Parkway Culvert Type "A" per 20 LF 500.00 $ City Standard Plan 318 Case II 12,000.00
83 Construct Parkway Culvert Type "B" per 120 ILF $ $
City Standard Plan 319 Case II 100.00 12,000.00
84 Curb Inlet 30 EA $ $
1,200.00 36,000.00
85 Retaining Curb 79 LF $ $
75.00 5,925.00
86 Signing and Striping 1 LS $ $
68,500.00 68,500.00
87 Landscaping 1 LS $ $
445,000.00 445,000.00
88 | Irrigation 1 LS $ $
410,000.00 410,000.00
89| 24" Box - Coast Live Oak 69 EA $ $
775.00 53,475.00
90 25' BTH - Date Palm 34 EA S4,400.00 $
149,600.00
91 Re-configure Existing Irrigation at 2222 S 1 LS $ $
ristol Stree 6,700.00 6,700.00
92 Re-configure Existing Irrigation at 2200 S. 1 $ 8,800.00 $ Bristol Street 8,800.00
93 1-Year Landscaping & Irrigation 1 LS $ $
Maintenance Period 31,000.00 31,000.00
94 Furnish and Install Bus Shelter Unit (12' AD 4 EA $ $ Sunset Shelter) 37,000.00 148,000.00
95 Bus Island Railing 470 ILF $ $
291.00 136,770.00
96| Filterra Offline (FT0612) - 12'x6' by Contech 5 EA $ $ or Approved Equal 84,000.00 420,000.00
97 Filterra Offline (FT0806) - 8'x6' by Contech 2 EA $ $ or Approved Equal 56,000.00 112,000.00
98 Utility Undergrounding 1 LS $ $
2,007,000.00 2,007,000.00
99 Stormwater Pollution Prevention Plan 1 LS $ $
(SWPPP) - Risk Level 2 250,000.00 250,000.00
100 Project Advertisement Sign 2 EA $ $
4,500.00 9,000.00
P-6 of P-23
CITY OF SANTA ANA ADDENDUM No. ONE
Project 11-6741
PROPOSAL Project 19-6499
PROJECT NO.: 11-6741 - BRISTOL STREET IMPROVEMENTS FROM WARNER
AVENUE TO SAINT ANDREW PLACE
PROJECT NO.: 19-6499 - BRISTOL STREET (PHASE 4) WATER MAIN IMPROVEMENTS Item Description Qty Unit Unit Price Amount
101 Construction Permit 1 LS $45,300 $
45,300.00
102 Re-configure Existing Fire Protection 1 LS $33,000.00 $ Backflow Assembly at 2222 S. Bristol Street* 33,000.00
TOTAL BASE BID $ 22,354,492.25
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add-alternate bid items (if any). * The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the "25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly. † This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, within number (368) working days after the commencement date stated in the Notice to Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place order for long-lead time items.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard Specifications, shall be $11,420 per calendar day.
Name of Firm Sully-Miller Contracting Company
Signature of BIDDER Subalterio JeIl Gallerio
Title Assistant Secretary
(If an individual, so state. If a firm or co-partnership, state the firm name and give the names of I individual co-parents Composing the fier a If a corporation, state legal name of corporation ind names of President, Secretary,
SEAL
1997
"DELAWARE
P-7 of P-23