CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BRI
STOL-TOLLIVER STREET URBAN GREENING PROJECT
P-1 of P-23
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM:
REQ
UIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following schedule:
Item Description Qty
Unit Unit Price Amount
1 Remove CMU Wall and Foundation
20 LF
$ $
2 Remove Decorative Chain-link Fence
615 LF
$ $
3 Protect, Modify, and Adjust to Grade
Existing Irrigation System 1 LS
$ $
4 Remove and Reinstall Existing Sign on
Fence 1 EA
$ $
5 Remove Existing Sign and Post
2 EA
$ $
6 Clearing and Grubbing
50,200 SF
$ $
7 Unclassified Excavation and Export*
1,820 CY
$ $
8 Unclassified Excavation, Stockpile, and
Reuse for Backfill* 1,295 CY
$ $
9 Imported Fill*
100 CY
$ $
10 Remove Pedestrian Light Pole and
Foundation. Salvage and deliver pole to
City.
7 EA
$ $
11 Remove Pedestrian Lighting Conduit and
Wire 1 LS
$ $
12 Locate, Cut and Cap Existing Sanitary
Sewer Lateral 10 EA
$ $
13 Adjust Utility Surface Feature to Grade
(Water Meter, Gas Valve, or Electrical
Pullbox)
3 EA
$ $
Legion Contractors, Inc.
200.25 4,005.00
15 9,225
16,000 16,000
2,000 2,000
500 1,000
2 100,400
110 200,200
65 84,175.00
200 20,000
500 3,500
10,000 10,000
2,500 25,000
6,000 18,000
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
B
RISTOL-TOLLIVER STREET URBAN GREENING PROJECT
P-2 of P-23
Item Description Q ty Unit Unit Price Amount
14 Remove and Replace Water Valve Frame
and Cover. Adjust to Grade. 1 EA
$ $
15 Install 8” Dual Wall HDPE Pipe
Including Trenching, Removal, Bedding,
and Backfill (Mod C.S.A. STD PLAN
1150)
190 LF
$ $
16 Install 4” Dual Wall HDPE Pipe
Including Trenching, Removal, Bedding,
and Backfill (Mod C.S.A. STD PLAN
1150)
55 LF
$ $
17 Install Hydrodynamic Separator
Including Excavation, Removal, and
Backfill
1 EA
$ $
18 Construct 16"x16" Curbside Grating
Catch Basin with Insert Filter and No
Dumping Stencil Incl. Excavation,
Removals, and Backfill
2 EA
$ $
19 Construct 24"x24" Junction Box with
Orifice Plate Incl. Excavation, Removals,
and Backfill
2 EA
$ $
20 Construct 7.5' Long Slot Drain with No
Dumping Stencil and Including 4' Lateral
Connection to Structure
1 LS
$ $
21 Construct Low Flow Diversion Culvert
120 SF
$ $
22 Install Underground Stormwater Cistern
Including Risers, Collars, Manifold
Piping, Excavation, Shoring, Removals,
Bedding, Geotextiles, and Backfill
1 LS
$ $
23 Install Underground Storage Cistern
Pump, Mechanical Skid, Appurtenances,
and Concrete Pad
1 LS
$ $
24 Construct 2" Sch 80 PVC Pipe (Cistern
Pump to Skid) Incl. Trenching,
Removals, Bedding, and Backfill
45 LF
$ $
25 Construct 4" Sch 80 PVC Pipe (Skid to
Basin) Incl. Trenching, Removals,
Bedding, and Backfill
65 LF
$ $
26 Install 2" Isolation Valve in Valve Box 2 EA
$ $
27 Construct Bioretention Basin with
Underdrains Including Excavation,
Geotextiles, Removals, Underdrains,
Cleanouts, Soil, Stone, and Riprap Inlet
Protection
1 LS
$ $
28 Construct 24”x24” Grated Catch Basin
with Inlet Filter and No Dumping Stencil 1 EA
$ $
29 Install Submersible Pumps, Duplex
Control Panel with Enclosure, Precast
Manhole, Vent, and Appurtenances Incl.
1 LS
$ $
3,000 3,000
300 57,000
220 12,100
75,000 75,000
8,500 17,000
11,500 23,000
23,000 23,000
220 26,400
160,000 160,000
140,000 140,000
270 12,150
200 13,000
3,500 7,000
95,000 95,000
8,500 8,500
95,000 95,000
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
B
RISTOL-TOLLIVER STREET URBAN GREENING PROJECT
P-3 of P-23
Item Description Q ty Unit Unit Price Amount
Excavation, Removals, Bedding, and
Backfill
30 Construct 3" Sch 80 PVC Pipe (Pump
Manhole to Curb) Incl. Trenching,
Removals, Bedding, and Backfill
80 LF
$ $
31 Install 6" Perforated Single Wall HDPE
Pipe Incl. Filter Sock, Drainage Stone,
and Non-Woven Geotextile
145 LF
$ $
32 Install Shallow 6" Dual Wall HDPE Pipe
Incl. Trenching, Removals, Bedding, and
Backfill (Detail E, Sheet DD-06)
400 LF
$ $
33 Install Shallow 8" Dual Wall HDPE Pipe
Incl. Trenching, Removals, Bedding, and
Backfill (Detail E, Sheet DD-06)
60 LF
$ $
34 Install Shallow 12" Dual Wall HDPE
Pipe Incl. Trenching, Removals,
Bedding, and Backfill (Detail E, Sheet
DD-06)
420 LF
$ $
35 Install Underdrain Cleanout in Paved
Area Including Cast Iron Frame and
Cover
9 EA
$ $
36 Install 1" Water Service (Water Main
Point of Connection to Meter) 1 LS
$ $
37 Install 2" Water Service (Water Main
Point of Connection to Meter) 1 LS
$ $
38 Construct 1" Sch 80 PVC Water Line
Including Trenching, Removals,
Bedding, and Backfill
415 LF
$ $
39 Construct 2" Sch 80 PVC Water Line
Including Trenching, Removals,
Bedding, and Backfill
115 LF
$ $
40 Install 1" Pressure Reducing Valve in
Vault 1 EA
$ $
41 Install Make-up Water Trough Valve
1 EA
$ $
42 Install 2" Backflow Prevention Assembly
with Enclosure 1 EA
$ $
43 Construct 12"X12" Catch Basin with
Atrium Grate (NDS or Approved Equal).
Incl. Excavation, Removals, Backfill,
and Risers
13 EA
$ $
44 Construct Venting Catch Basin and
Piping Incl. Trenching, Removals,
Bedding, and Backfill
1 LS
$ $
45 Install Drinking Fountain, 3/4" Service
Lateral with Valve, and Drainage Sump
with Access Box and Overflow Piping
2 EA
$ $
46 Construct Asphalt Concrete Pavement
485 SF
$ $
160 12,800
110 15,950
200 80,000
300 18,000
180 75,600
2,500 22,500
18,000 18,000
22,000 22,000
75 31,125
95 10,925
5,000 5,000
12,000 12,000
10,000 10,000
3,000 39,000
40,000 40,000
12,500 25,000
15 7,275
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BRISTOL-TOLLIVER STREET URBAN GREENING PROJECT
P-4 of P-23
Item Description Qty Unit Unit Price Amount
47 2” Cold Mill and Overlay
3,470 SF
$ $
48 Install Detectable Warning Surface at
Alley 60 SF
$ $
49 Construct 8" Thick PCC Alley,
Driveway, Curb, and Gutter Pavement
per C.S.A Plan No. 1111
2,450 SF
$ $
50 Construct 8" Thick PCC Longitudinal
Gutter 40 SF
$ $
51 Construct 4" Thick PCC Sidewalk with
Integral Color 8,460 SF
$ $
52 Construct 8" Thick PCC Vehicular Rated
Sidewalk with Integral Color, Curb, and
Curb Opening
490 SF
$ $
53 Construct PCC Curb Ramp Incl. Curb,
Gutter, and Detectable Warning Surface 260 SF
$ $
54 Install Continental Crosswalk Striping.
Remove and Reinstall Stop Bar, Stop
Marking, and Turn Arrow.
1 LS
$ $
55 Construct Crushed Miscellaneous Base
163 CY
$ $
56 Construct 6" Wide Concrete Header
480 LF
$ $
57 Construct Poured-In-Place Rubber
Surfacing Incl. Base Courses 3,640 SF
$ $
58 Construct Interlocking Concrete Pavers
Incl. Base Courses 1,680 SF
$ $
59 Install Interpretive Signage
3 EA
$ $
60 Install Entry Signage
2 EA
$ $
61 Install General Park Signage
1 LS
$ $
62 Construction Permit
1 LS
$19,410 $19,410
63 SWPPP Preparation (Risk Level 2) and
Implementation 1 LS
$ $
64 Urban Greening Program Funding
Acknowledgement Sign 1 EA
$ $
65 Construct Removeable Bollard
3 EA
$ $
66 Install Bench
10 EA
$ $
9 31,230
150 9,000
45 110,250
200 8,000
24 203,040
45 22,050
140 36,400
20,000 20,000
120 19,560
75 36,000
27.50 100,100
40 67,200
4,000 12,000
12,500 25,000
10,000 10,000
30,000 30,000
10,000 10,000
3,000 9,000
3,000 30,000
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BR
ISTOL-TOLLIVER STREET URBAN GREENING PROJECT
P-5 of P-23
Item Description Qt y Unit Unit Price Amount
67 Install Picnic Table
4 EA
$ $
68 Install Waste Receptacles (Includes
Trash and Recycle; Furnished by City;
Install Only) 5 EA
$ $
69 Construct Playground Equipment and
Shade Structure 1 LS
$ $
70 Construct Workout Equipment and
Shade Structure 1 LS
$ $
71 Install Architectural Fencing
488 LF
$ $
72 Electrical Trenching Incl. Bedding and
Backfill 1 LS
$ $
73 Install Electrical Conduit, Wiring, and
Pullboxes 1 LS
$ $
74 Install 200A NEMA 3R Meter Pedestal,
Lighting Control Panel in NEMA 3R
Enclosure, NEMA 3R Enclosure for
Security Camera System, and Concrete
Pad
1 LS
$ $
75 Install 14' Light Pole (includes post,
footing, luminaire, excavation, and
removals)
14 EA
$ $
76 Install 30' Camera Pole (includes post,
footing, luminaire, cameras, excavation,
and removals)
2 EA
$ $
77 Install 30' Sports Lighting Pole (includes
post, footing, luminaires, excavation, and
removals)
2 EA
$ $
78 Install Security Camera System
Infrastructure Including Deferred System
Design by Contractor
1 LS
$ $
79 Install Landscaping Including Turf,
Trees, Shrubs, Mulch, Soil Conditioning,
Topsoil, Amendments, Fertilizers,
Agronomic Testing, Supports, and Root
Barriers
1 LS
$ $
80 Install Landscape Boulders
19 EA
$ $
81 Install Irrigation System Including
Piping, Tubing, Sleeves, Bubblers,
Control Wiring, Valve Boxes,
Controllers, Valves, Sensors, Quick
Couplers, Drip Rings, Etc.
1 LS
$ $
82 Plant Establishment (90 Days)
1 LS
$ $
4,500 18,000
1,000 5,000
265,000 265,000
75,000 75,000
285 139,080
75,000 75,000
85,000 85,000
35,000
35,000
12,000 168,000
20,000 40,000
19,000 38,000
55,000 55,000
85,000 85,000
350 6,650
195,000 195,000
5,000 5,000
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BR
ISTOL-TOLLIVER STREET URBAN GREENING PROJECT
P-6 of P-23
Item Description Qt y Unit Unit Price Amount
83 As-Built Plans
1 LS
$5,000 $5,000
Bid Alternates
1 Construct Skate Park Elements and
Paving 1 LS
$ $
2 Construct 4" Thick Asphalt Concrete
Basketball Court Including Striping,
Colored Surface, and Perimeter Edging.
Includes Basketball Hoop and
Foundation
1 LS
$ $
TOT
AL BASE BID $
TOTAL ADD ALTERNATE BID $
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add-alternate bid items (if any). * The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the “25%” limit as stated in Section 7-3.5 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly. † This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown abo
ve, within one hundred and sixty (160) working days after the commencement date stated in the Notice to Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place order for long-lead time items (i.e. precast structures, electrical equipment, light poles, playground and fitness equipment, shade structures, fabricated equipment). Work shall be completed by January 31, 2026.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard Specifications, shall be $5,200 per calendar day.
545,000 545,000
235,000 235,000
3,808,800.00
780,000.00
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BRISTOL-
TOLLIVER STREET URBAN GREENING PROJECT
P-7 of P-23
Name of Firm
Signature of BIDDER
Title
(If an individual, so state. If a firm or co-partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) Legion Contractors, Inc.
President
Amir Movafegh
Legion Contractors, Inc. - CA Corporation
Amir Movafegh - President, Treasurer and Manager
Saba Khoubanshargh - Secretary
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BRISTO
L-TOLLIVER STREET URBAN GREENING PROJECT
P-8 of P-23
BIDDER’S STATEMENT
BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent Construction Contract Agreement shall constitute the entire agreement between BIDDER and the AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the Council with her signature and official seal noting hereon the action of approval of the Council, signed by the Public Works Agency Executive Director or his/her duly authorized agent, and signed by the City Attorney, denoting his approval of the form of this document, and its execution, and when it or an exact copy of it has been either delivered to BIDDER or deposited with the United States Postal Service properly addressed to the BIDDER with the correct postage affixed thereto.
BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she will furnish AGENCY all required bonds and certificate of liability insurance within ten (10) business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof accompanying this proposal shall become the property of the AGENCY and shall be considered as payment of damages due to the delay and other causes suffered by AGENCY because of the failure to furnish the necessary bonds and because it is distinctly agreed that the proof of damages actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER’S bond substituted in lieu thereof shall be returned to the undersigned.
BIDDER understands that a bid is required for the entire work, the estimated quantities set forth in the bid schedule are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. The BIDDER also certifies that the bid is a balanced bid.
In accordance with Section 7028.15 of the California Business and Professions Code, the undersigned certifies under penalty of perjury that the foregoing is true and correct.
Name of Firm
Signature of BIDDER
Title
(If an individual, so state. If a firm or co-partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) Legion Contractors, Inc.
President, Treasurer and Manager
Amir Movafegh
Saba Khoubanshargh - Secretary & Vice President
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BRI
STOL-TOLLIVER STREET URBAN GREENING PROJECT
P-9 of P-23
CONTRACTOR’S LICENSING AND REGISTRATION STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that he/she and all his/her subcontractors are registered with the State of California Department of Industrial Relations (DIR), and that the following is true and correct.
Contractor’s Name:
Business Address:
Business E-Mail Address:
Telephone:
State Contractor’s License No. and Class:
License Expiration Date:
State Dept. of Industrial Relations (DIR)
Registration No.:
State Dept. of Industrial Relations (DIR)
Registration Expiration Date:
Signed:
Title:
Legion Contractors, Inc.
445 S. Figueroa St., Ste 2580, Los Angeles, CA 90071
[email protected]
310-740-6640
1061257 - Class: A, B, C-15, C-36, C61/D12, C61/D34
12/31/2025
1000543172
06/30/2027
President
Amir Movafegh
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BR
ISTOL-TOLLIVER STREET URBAN GREENING PROJECT
P-10 of P-23
PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT
Contractor is aware of the requirements of California Labor Code Section 1720, et seq., as well as California Code of Regulations, Title 8, Section 16,000, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. Since the services are being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws.
City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the services available to interested parties upon request, and shall post copies at the Contractor’s principal place of business and at the project site.
Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.
The undersigned certifies that the foregoing is true and correct.
Name of Firm
Signature of BIDDER
Title
(if an individual, so state)
Legion Contractors, Inc.
President
Amir Movafegh
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BRISTOL-TOLLI
VER STREET URBAN GREENING PROJECT
P-13 of P-23
LIST OF SUB-CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all subcontract work exceeding the following amount:
o Streets, highways including bridge projects: ½% of the bid or $10,000, whichever is greater o Buildings, parks, or other projects: ½% of the bid
Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State Department of Industrial Relations (DIR).
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
Name Name
License #/Exp. License #/Exp.
DIR Reg. #/Exp. DIR Reg. #/Exp.
Location Location
Phone Phone
Type Of Work Type Of Work
Amount $ Amount $
Name Name
License #/Exp. License #/Exp.
DIR Reg. #/Exp. DIR Reg. #/Exp.
License # License #
Location Location
Phone Phone
Type Of Work Type Of Work
Amount $ Amount $
Name Name
License #/Exp. License #/Exp.
DIR Reg. #/Exp. DIR Reg. #/Exp.
License # License #
Location Location
Phone Phone
Type Of Work Type Of Work
Amount $ Amount $
Signature of Bidder
Amir Movafegh, President
Robertson Industries, Inc.
1000002700 / Exp. 06/30/2025
667261 / Exp. 03/31/2025
Tempe, AZ
(800) 858-0519
Safety Surfacing
Dotz, Inc.
1033830 / Exp. 12/31/2025
1000709093 / Exp. 06/30/2025
Van Nuys, CA
424-278-8008
Electrical
$119,000
$99,526
Team West Contracting Corporation
Bloomington, CA
(909) 421-4450
934352 / Exp. 06/30/2025
1000768825 / Exp. 06/30/2025
934352 / Exp. 06/30/2025
Fencing
$116,144
California Skateparks
962150 / Exp. 06/30/2025
962150 / Exp. 06/30/2025
1000016308 Exp. 06/30/2025
Upland, CA
(909) 949-1601
Skate Park
$ 335,000
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BRISTOL-TO
LLIVER STREET URBAN GREENING PROJECT
P-14 of P-23
REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for which the BIDDER has performed similar work within the past three years.
1. Name and Address of Owner.
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work Date Completed
2. Name and Address of owner.
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work Date Completed
3. Name and Address of owner.
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work Date Completed
The f
ollowing are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance and bonds.
City of Santa Ana: 20 Civic Center Plaza, Santa Ana, CA 92702 Alex Olmos - Ph:714-824-1439
12/02/2024
Park Renovation
$3,500,000
City of Placentia: 401 E. Chapman Ave., Placentia, CA 92870 Raquel Garcia - Ph: 714-993-8128
$2,860,000
12/31/2023
Park Renovation
City of Huntington Beach - 2000 Main Street, Huntington beach, CA 92648 Danny Kaye - Ph: 818-986-9870
$3,500,000
Park Renovation
11/30/2022
Surety: Great Midwest Insurance Company - 800 Gessner Rd., Suite 600, Houston, TX 77024 Agent: R S Bonding & Insurance Agency, Inc. - 1633 E. 4th St., Suite 228, Santa Ana, CA 92701 Contact: Randy Spohn - (714) 541-4700
Insurance: Palomar Specialty Insurance Company - 7979 Ivanhoe Avenue, Suite 500 , La Jolla, CA 92037 Agent: Garrett/Mosier Insurance Services, Inc. - 6201 Oak Canyon, Suite 100, Irvine, CA 92618 Contact: Paul Bland - (949) 559-3374
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BR
ISTOL-TOLLIVER STREET URBAN GREENING PROJECT
P-15 of P-23
ADDITIONAL REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for which the BIDDER or Subcontractor has performed similar work in the past five years.
1. Name and Address of Owner.
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work Date Completed
2. Name and Address of owner.
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work Date Completed
3. Name and Address of owner.
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work Date Completed
The
following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance and bonds.
Surety: Great Midwest Insurance Company - 800 Gessner Rd., Suite 600, Houston, TX 77024 Agent: R S Bonding & Insurance Agency, Inc. - 1633 E. 4th St., Suite 228, Santa Ana, CA 92701 Contact: Randy Spohn - (714) 541-4700
Insurance: Palomar Specialty Insurance Company - 7979 Ivanhoe Avenue, Suite 500 , La Jolla, CA 92037 Agent: Garrett/Mosier Insurance Services, Inc. - 6201 Oak Canyon, Suite 100, Irvine, CA 92618 Contact: Paul Bland - (949) 559-3374
Buena Park School District - 6885 Orangethorpe Avenue, Buena Park,CA 90620 Jeffery Thomas - Ph: 714-315-2299
10/31/2023
$1,680,000
Camp Fire Angeles (City of Long Beach) - 7070 E. Carson St., Long Beach, CA 90808 Danny Kaye - Ph: 310-351-0138
$1,750,000
Park Renovation
01/20/2023
San Jose Unified School District - 855 Lenzen Ave., San Jose, CA 95126 Mohammad Mhanna - Ph: 650-440-8861
School & Playground Modernization
School & Playground Modernization
$3,400,000
11/30/2021
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BRISTOL-TOLLIVER STREET URBAN GREENING PROJECT
P-17 of P-23
NON-DISCRIMINATION CERTIFICATE
The undersigned contractor or corporate officer, during the performance of this contract, certifies as follows:
1. The Contractor shall not discriminate against any e mployee or applicant for employment because of race, color, religion, sex, or national origin. The Contractor shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without, regard to their race, color, re ligion, sex, or national origin. Such action shall include, but not be limited to, the following : employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; l ayoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin.
3. The Contractor shall send to each labor union or re presentative of workers with which he/she has a collective bargaining agreement or other cont ract or understanding, a notice to be provided advising the said labor union or workers’ representatives of the Contractor’s commitments under this section, and shall post copi es of the notice in conspicuous places available to employees and applicants for employment.
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Contractor shall furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his/her books, r ecords, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders.
6. In the event of the Contractor’s non-compliance wit h the nondiscrimination clauses of this contract or with any of the said rules, regulations , or orders, the contract may be canceled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Execution Order 11246 of S eptember 24, 1965, and such other sanctions may be imposed and remedies invoked as pr ovided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law.
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BRI
STOL-TOLLIVER STREET URBAN GREENING PROJECT
P-18 of P-23
7. The Contractor shall include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract or purchase order as the administering agency may direct as means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency, the Contractor may request that the United States enter into such litigation to protect the interests of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as amended, no discrimination shall be made in the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided in Section 1420, and any contractor of public works violating this Section is subject to all the penalties imposed for a violation of the Chapter.
Signed:
Title:
Firm:
Date:
President
Legion Contractors, Inc.
Amir Movafegh
January 23, 2025
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
B
RISTOL-TOLLIVER STREET URBAN GREENING PROJECT
P-19 of P-23
STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor Code regarding employment of apprentices, and understands that contractors on contracts exceeding $30,000 or 20 working days shall:
1. Apply to the joint apprenticeship committee administering the apprenticeship standards of the craft or trade in the area of the site of the public work for a certificate approving the contractor under the apprenticeship standards for the employment and training of apprentices in the area or industry affected.
2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the apprenticeship standards.
3. Contribute to the fund or funds in each craft or trade in which he/she employs journeymen or apprentices on the public work, in the same amount or upon the same basis and in the same manner as the other contractors, except contractors not signatory to the trust agreement shall pay a like amount to the California Apprenticeship Council.
Signed:
Title:
Firm:
Date:
Amir Movafegh
President
Legion Contractors, Inc.
January 23, 2025
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
B
RISTOL-TOLLIVER STREET URBAN GREENING PROJECT
P-20 of P-23
STATEMENT REGARDING “ANTI-KICKBACK” REQUIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by these bid documents, agrees to comply with the Copeland “Anti-Kickback” Act (18 USC 74) as supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that each contractor or subcontractor shall be prohibited from inducing, by any means, any person employed in the construction or repair of public work, to give up any part of the compensation to which he/she is otherwise entitled.
Signed:
Title:
Firm:
Date:
President
Legion Contractors, Inc.
January 23, 2025
Amir Movafegh
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BRIS
TOL-TOLLIVER STREET URBAN GREENING PROJECT
P-21 of P-23
FLEET COMPLIANCE CERTIFICATION
Bidder hereby acknowledges that they have reviewed the California Air Resources Board’s policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder’s fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct:
The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto.
The Fleet is exempt from the Regulation under section 2449.1(f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto.
Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids).
The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4).
The Fleet does not fall under the Regulation or are otherwise exempted and a detailed reasoning is attached hereto.
Name of Bidder: ________________________________________ Signature: _____________________________________________ Name: ________________________________________________ Title: _________________________________________________ Date: _________________________________________________
Legion Contractors, Inc.
Amir Movafegh
President
January 23, 2025
X
We will use the rental company equipments and they have the certificate. Please see attached.
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BRISTOL-TOLLIVER STREET URBAN GREENING PROJECT
P-22 of P-23
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE
In conformance with Public Contract Code Section 10162, the BIDDER shall complete, under penalty of perjury, the following questionnaire:
Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a proprietary interest in the BIDDER, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation?
Yes No
If the answer is yes, explain the circumstances in the following space.
X
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BR
ISTOL-TOLLIVER STREET URBAN GREENING PROJECT
P-23 of P-23
STATEMENT REGARDING COMMUNITY WORKFORCE AGREEMENT (CWA)
REQUIREMENTS
This is to certify that the undersigned BIDDER, and subcontractors, have read and understood the CWA entered into by and between the City of Santa Ana, the Los Angeles/Orange Counties Building and Construction Trades Council, and the signatory Craft Councils and Local Unions, effective as of June 6, 2023. The CWA is available at:
https://www.santa-ana.org/documents/community-workforc
e-agreement/
The undersigned BIDDER hereby agrees to comply with all terms and conditions of the CWA, and is capable of completing construction of the project continuously, and without interruptions or delays. If awarded any work covered by the CWA, BIDDER will also be required to sign the Letter of Assent that appears as Attachment A to the CWA.
The undersigned BIDDER has reviewed the Public Works Construction Permit and required deposit described in Section 2-2a and the Notice of Inviting Bids.
Signed:
Title:
Firm:
Date:
President
Legion Contractors, Inc.
January 23, 2025
Amir Movafegh
CITY OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO.: 24-6600
BRISTOL-TOLLIVER STREET URBAN GREENING PROJECT
xi
INSTRUCTIONS TO BIDDERS FOR PROPOSAL SUBMISSION
INTENT OF PROPOSAL
The purpose of this Proposal is to identify a Prime Contractor to enter into a contract with the City of Santa Ana, referred to as AGENCY, to complete the Work shown on the Contract Documents.
PROPOSAL
The Proposal shall be submitted in accordance with the Notice Inviting Bids and shall be accompanied by the following documents:
1. Bid Proposal
2. Bidder’s Statement
3. Contractor’s Licensing and Registration Statement
4. Prevailing Wage Compliance and Monitoring Statement
5. Ownership Affidavit
6. Bid Bond
7. List of Sub-Contractors
8. References
9. Additional References
10. Non-Collusion Affidavit
11. Non-Discrimination Certificate
12. Statement Regarding Apprenticeship Requirements
13. Statement Regarding “Anti-Kickback” Requirements
14. FLEET COMPLIANCE CERTIFICATION
15. Bidder hereby acknowledges that they have reviewed the California Air Resources Board’s policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder’s fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct:
The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto.
The Fleet is exempt from the Regulation under section 2449.1(f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto.
Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids).
The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4).
CITY OF SANTA ANA
INSTRUCTIONS TO BIDDERS
PROJECT NO.: 24-6600
BRIS
TOL-TOLLIVER STREET URBAN GREENING PROJECT
xii
The Fleet does not fall under the Regulation or are otherwise exempted and a detailed reasoning is attached hereto.
Name of Bidder: ________________________________________ Signature: _____________________________________________ Name: ________________________________________________ Title: _________________________________________________ Date: _________________________________________________
16. Public Contract Code Section 10162 Questionnaire
17. Statement Regarding Community Workforce Agreement (CWA) Requirements The Proposal may be considered non-responsive if any of these documents or forms is not included. The bid package shall be submitted as instructed in the Notice Inviting Bids. It is the BIDDER’S responsibility to ensure submittal of their Proposal on PlanetBids.
CALIFORNIA STATE LABOR CODE
As outlined in the Notice Inviting Bids, this project is subject to compliance monitoring and enforcement by the State of California Department of Industrial Relations, per Section 1771.4.a.1.
BIDDERS are required to inform themselves fully of the conditions relating to construction and labor under which the work will be performed. Any contract entered into pursuant to this notice will incorporate the provisions of the California State Labor Code. Per Section 1771.4.a.2, Contractors are required to post job site notices, as prescribed by regulation.
EXAMINATION OF CONTRACT DOCUMENTS AND PROJECT SITE
BIDDERS shall satisfy themselves by personal examination of the work site, Contract Documents including the Plans and Specifications (and by any other means as they believe necessary) as to the actual physical conditions, requirements, and difficulties under which work must be performed.
DISCREPANCIES AND MISUNDERSTANDINGS
No BIDDER shall at any time after submission of a proposal make any claim or assertion that there was any misunderstanding or lack of information regarding the nature or amount of work necessary for the satisfactory completion of the job. Any errors, omissions, or discrepancies found in the Contract Documents including the Plans and Specifications shall be called to the attention of the AGENCY as a Request for Clarification and addressed prior to the submission of bid proposals.
REQUESTS FOR INTERPRETATION OF CONTRACT DOCUMENTS
Requests for interpretation must be submitted online through PlanetBids. Any interpretation or correction of the documents will be made only by an Addendum.
Legion Contractors, Inc.
Amir Movafegh
President
January 23, 2025
X
BA20241055397
Entity Details
Corporation Name LEGION CONTRACTORS, INC
Entity No. 4282259
Formed In CALIFORNIA
Street Address of Principal Office of Corporation
Principal Address 445 S. FIGUEROA ST.2580LOS ANGELES, CA 90071 Mailing Address of Corporation
Mailing Address 445 S. FIGUEROA ST.2580LOS ANGELES, CA 90071 Attention
Street Address of California Office of Corporation
Street Address of California Office 445 S. FIGUEROA ST.2580LOS ANGELES, CA 90071 Officers
Officer Name Officer Address Position(s)
+ Amir Movafegh 445 S. FIGUEROA ST.2580LOS ANGELES, CA 90071 Chief Executive Officer, Chief Financial Officer
+ Saba Khoubanshargh 445 S. FIGUEROA ST.2580LOS ANGELES, CA 90071 Secretary
Additional Officers
Officer Name Officer Address Position Stated Position
None Entered
Directors
The number of vacancies on Board of Directors is: 0
Director Name Director Address
+ Amir Movafegh 445 S. FIGUEROA ST.2580LOS ANGELES, CA 90071 Agent for Service of Process
Agent Name AMIR MOVAFEGH
Agent Address 445 S. FIGUEROA ST.2580LOS ANGELES, CA 90071 Type of Business
Type of Business CONSTRUCTION
STATE OF CALIFORNIAOffice of the Secretary of StateSTATEMENT OF INFORMATIONCORPORATION California Secretary of State
1500 11th Street
Sacramento, California 95814
(916) 657-5448
B2781-6912 05/31/2024 12:48 PM Received by California Secretary of State
For Office Use Only
-FILED-
File No.: BA20241055397
Date Filed: 5/31/2024
Email Notifications
Opt-in Email Notifications Yes, I opt-in to receive entity notifications via email.
Labor Judgment
No Officer or Director of this Corporation has an outstanding final judgment issued by the Division of Labor Standards Enforcement or a court of law, for which no appeal therefrom is pending, for the violation of any wage order or provision of the Labor Code.
Electronic Signature
By signing, I affirm that the information herein is true and correct and that I am authorized by California law to sign.
Amir Movafegh
Signature
05/31/2024
Date
B2781-6913 05/31/2024 12:48 PM Received by California Secretary of State
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
B
RISTOL-TOLLIVER STREET URBAN GREENING PROJECT
P-21 of P-23
FLEET COMPLIANCE CERTIFICATION
Bidder hereby acknowledges that they have reviewed the California Air Resources Board’s policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder’s fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct:
The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto.
The Fleet is exempt from the Regulation under section 2449.1(f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto.
Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids).
The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4).
The Fleet does not fall under the Regulation or are otherwise exempted and a detailed reasoning is attached hereto.
Name of Bidder: ________________________________________ Signature: _____________________________________________ Name: ________________________________________________ Title: _________________________________________________ Date: _________________________________________________
Robertson Industries, Inc.
William Stafford
GM
1-23-25
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BRISTOL-TOLLIVER STREET URBAN GREENING PROJECT
P-23 of P-23
STATEMENT REGARDING COMMUNITY WORKFORCE AGREEMENT (CWA)
REQUIREMENTS
This is to certify that the undersigned BIDDER, and subcontractors, have read and understood the CWA entered into by and between the City of Santa Ana, the Los Angeles/Orange Counties Building and Construction Trades Council, and the signatory Craft Councils and Local Unions, effective as of June 6, 2023. The CWA is available at:
https://www.santa-ana.org/documents/community-workfo
rce-agreement/
The undersigned BIDDER hereby agrees to comply with all terms and conditions of the CWA, and is capable of completing construction of the project continuously, and without interruptions or delays. If awarded any work covered by the CWA, BIDDER will also be required to sign the Letter of Assent that appears as Attachment A to the CWA.
The undersigned BIDDER has reviewed the Public Works Construction Permit and required deposit described in Section 2-2a and the Notice of Inviting Bids.
Signed:
Title:
Firm:
Date:
GM
Robertson Industries, Inc.
1-23-25
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BRISTOL-
TOLLIVER STREET URBAN GREENING PROJECT
P-21 of P-23
FLEET COMPLIANCE CERTIFICATION
Bidder hereby acknowledges that they have reviewed the California Air Resources Board’s policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder’s fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct:
The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto.
The Fleet is exempt from the Regulation under section 2449.1(f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto.
Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids).
The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4).
The Fleet does not fall under the Regulation or are otherwise exempted and a detailed reasoning is attached hereto.
Name of Bidder: ________________________________________ Signature: _____________________________________________ Name: ________________________________________________ Title: _________________________________________________ Date: _________________________________________________ Dotz, Inc.
Amin Parvin
Manager
01/23/2025
Amin Parvin
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
B
RISTOL-TOLLIVER STREET URBAN GREENING PROJECT
P-23 of P-23
STATEMENT REGARDING COMMUNITY WORKFORCE AGREEMENT (CWA)
REQUIREMENTS
This is to certify that the undersigned BIDDER, and subcontractors, have read and understood the CWA entered into by and between the City of Santa Ana, the Los Angeles/Orange Counties Building and Construction Trades Council, and the signatory Craft Councils and Local Unions, effective as of June 6, 2023. The CWA is available at:
https://www.santa-ana.org/documents/community-workfor
ce-agreement/
The undersigned BIDDER hereby agrees to comply with all terms and conditions of the CWA, and is capable of completing construction of the project continuously, and without interruptions or delays. If awarded any work covered by the CWA, BIDDER will also be required to sign the Letter of Assent that appears as Attachment A to the CWA.
The undersigned BIDDER has reviewed the Public Works Construction Permit and required deposit described in Section 2-2a and the Notice of Inviting Bids.
Signed:
Title:
Firm:
Date:
Manager
Dotz, Inc.
01/23/2025
Amin Parvin
Vehicle Compliance Certification
Issue Date: 10/3/2024
Start Date: 12/30/2024
Expiration Date: 6/30/2025 Certification ID: VCC1001418964 Vehicle Information
Vehicle Identification Number (VIN): 1FDUF5GT3GEC76811
Vehicle License Plate: 15717Z1
Vehicle Make:
Vehicle Model Year: 2016
Vehicle Model:
Business Information
Company/Entity Name: TEAM WEST CONTRACTING CORPORATION
Entity ID: E128067
Primary Address: 2733 Vista Avenue, Bloomington, CA 92316, USA CARB reserves the right to invalidate this certificate if the vehicle is found violating the Clean Truck Check requirements prior to the certificate expiration date.
Future certificates may be denied if the vehicle has any outstanding CARB Enforcement actions.
Non-compliant vehicles could also have their registration denied by the Department of Motor Vehicles.
This compliance certificate does not exempt the vehicle from emissions-related inspection or audit.
For more information on Clean Truck Check, visit https://ww2.arb.ca.gov/cleantruckcheck.
To verify this certification: https://cleantruckcheck.arb.ca.gov.
CARB's Clean Truck Check team can be reached at [email protected].
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BRISTOL-TOLLIVER STREET URBAN GREENING PROJECT
P-23 of P-23
STATEMENT REGARDING COMMUNITY WORKFORCE AGREEMENT (CWA)
REQUIREMENTS
This is to certify that the undersigned BIDDER, and subcontractors, have read and understood the CWA entered into by and between the City of Santa Ana, the Los Angeles/Orange Counties Building and Construction Trades Council, and the signatory Craft Councils and Local Unions, effective as of June 6, 2023. The CWA is available at:
https://www.santa-ana.org/documents/community-workfo
rce-agreement/
The undersigned BIDDER hereby agrees to comply with all terms and conditions of the CWA, and is capable of completing construction of the project continuously, and without interruptions or delays. If awarded any work covered by the CWA, BIDDER will also be required to sign the Letter of Assent that appears as Attachment A to the CWA.
The undersigned BIDDER has reviewed the Public Works Construction Permit and required deposit described in Section 2-2a and the Notice of Inviting Bids.
Signed:
Title:
Firm:
Date:
Estimator
California Skateparks
1/21/2025
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6600
BRISTOL-TO
LLIVER STREET URBAN GREENING PROJECT
P-21 of P-23
FLEET COMPLIANCE CERTIFICATION
Bidder hereby acknowledges that they have reviewed the California Air Resources Board’s policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder’s fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct:
The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto.
The Fleet is exempt from the Regulation under section 2449.1(f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto.
Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids).
The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4).
The Fleet does not fall under the Regulation or are otherwise exempted and a detailed reasoning is attached hereto.
Name of Bidder: ________________________________________ Signa
ture: _____________________________________________
Name: ___________ ____________________
California Skateparks
_________Greg Ramos
Title: _______________Estimator__________________________ Date: ___________________1/7/2025______________________________ Reason: Our company only rent and do not own equipments.