EXHIBIT 2

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 25-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 24-25

BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: ONYX PAVING COMPANY, INC.

REQUIREMENT:

The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following schedule:

Item Description Qty Unit Unit Price Amount
1 Unclassified Excavation* 1,050 CY 5148
$ 155,400
2 Asphalt Concrete (AC)* 1,940 TN $171 $ 331,740
3 Asphalt Rubber Hot Mix (ARHM)* 4,060 $ 645,540
159
4 Cold Mill (2")* 370,000 SF 50.42 $ 155,400
5 Rubberized Emulsion Aggregate Slurry 900 ELI $ 630
(REAS) Type II $747,000
Crack Seal 1 LS $ 77,000
$77,000
7 PCC Sidewalk (T=4")* 15,700 SE
$172,700
8 PCC Driveway Approach (T=6")* 1,000 SF
$ 20 $ 20,000
9 PCC Alley Apron* 200 SF $
33 $ 6,600
10 PCC Curb Ramp* 300 SF $33 $9,900
11 PCC Curb and Gutter (Type A-2-6 1,300 LF 569
and/or Match Existing)* $89,700
12 PCC Curb (SPPWC Type A1-6 and/or 120 LF $ 66
Match Existing)* $ 7.920
13 PCC Cross-Gutter (Local Street)* 600 SP $33
$ 19,800
14 Root Shave 75 EA
370 27,750
P-1 of P-19

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 25-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 24-25
Item Description Qty Unit Unit Price Amount
15 Protection of Surface Utility Frames & 1 LS 5|500
Covers 5,500 5160000
Furnish and Install New Water Valv 60 EA
rame and Cover to Finished Grad 1,300 18,000
17 Furnish and Install New Water Meter 10 EA
Frame and Cover 1,300 13,000
Furnish and Install New Manhole Fram 55 EA
¿ Cover to Finished Grade 1,300 71,500
19 Adjust Survey Monument to Finished 6 EA
Grade 1,300 7,800
20 Furnish and Install Traffic Loops Type F 4 EA
600 21400
21 Furnish and Install Traffic Loops Type E 10 EA
575 5,750
22 Project Advertisement Sign 2 EA
2,800 5,600
23 / Signing & Striping 1 LS
323,000 323,000
24 Construction Permit 1 LS $9,000 $9,000
P-2 of P-19

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 25-6907
LOCAL STREET PREVENTATIVE MAINTENANCE FY 24-25
TOTAL BASE BID $2,988,000
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add-alternate bid items (if any). * The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the "25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly.

TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, within number (65) working days after the commencement date stated in the Notice to Proceed. Slurry seal must be completed by September 30, 2025. All slurry seal work must meet slurry seal weather condition requirements. If slurry seal is not completed by September 30, 2025, liquidated damages will be placed on the contractor.

The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard Specifications, shall be $6,500 per calendar day.

Name of Firm _ONYX PAVING COMPANY, INC.

Signature of BIDDER
Title COREY R. KIRSCHNER - CEO
(If an individual, so state. If a firm or co-partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) P-3 of P-19