PART VIII: DETERMINATION OF INSUFFICIENT FUNDING
16-VIII.A. OVERVIEW
The HCV regulations allow PHAs to deny families permission to move and to terminate Housing Assistance Payments (HAP) contracts if funding under the consolidated ACC is insufficient to support continued assistance [24 CFR 982.354(e)(1) and 982.454]. If a PHA denies a family a portability move based on insufficient funding, the PHA is required to notify the local HUD office within 10 business days [24 CFR 982.354]. Insufficient funding may also impact the PHA’s ability to issue vouchers to families on the waiting list. This part discusses the methodology the PHA will use to determine whether or not the PHA has sufficient funding to issue vouchers, approve moves, and to continue subsidizing all families currently under a HAP contract. The PHA must identify in the administrative plan, in the event of insufficient funding, considering any cost saving measures taken by the PHA, a description of the factors the PHA will consider when determining which HAP contracts to terminate first. See Chapter 12 for a description of these factors.
16-VIII.B. METHODOLOGY
SAHA Policy
SAHA will determine whether there is adequate funding to issue vouchers, approve moves to higher cost units and areas, and continue subsidizing all current participants by comparing SAHA’s annual budget authority to the annual total HAP needs on a monthly basis. The total HAP needs for the calendar year will be projected by establishing the actual HAP costs year to date. To that figure, SAHA will add anticipated HAP expenditures for the remainder of the calendar year. Projected HAP expenditures will be calculated by multiplying the projected number of units leased per remaining months by the most current month’s average HAP. The projected number of units leased per month will take into account the average monthly turnover of participant families. If the total annual HAP needs equal or exceed the annual budget authority, or if SAHA cannot support the cost of the proposed subsidy commitment (voucher issuance or move) based on the funding analysis, SAHA will be considered to have insufficient funding. SAHA will complete this analysis using HUD’s Two-Year Forecasting Tool.

SAHA will determine whether there is sufficient funding to pay for currently assisted families according to the policies in Part VIII of Chapter 16. If SAHA determines there is a shortage of funding, prior to terminating any HAP contracts, SAHA will determine if any other actions can be taken to reduce program costs. Those include but are not limited to the following:
o Deny portability to higher payment standard areas
o Lower payment standards
o Request landlords to reduce or delay rent increase requests If after implementing all reasonable cost cutting measures there is not enough funding available to provide continued assistance for current participants, SAHA will terminate HAP contracts as a last resort.

EXHIBIT 1
City Council 5 – 721 7/15/2025

Page 16 ends

Prior to terminating any HAP contracts, SAHA will inform the local HUD field office.

SAHA will terminate the minimum number needed in order to reduce HAP costs to a level within SAHA’s annual budget authority.

If SAHA must terminate HAP contracts due to insufficient funding, SAHA will do so in accordance with the following criteria and instructions:

The following program-type priority order will first be applied:

1. Housing Choice Voucher (HCV), including Non-Elderly Disabled

2. Special Purpose Vouchers (FYI and VASH) Tenant-Based

3. Project-Based Vouchers including Special Purpose Vouchers For each program type the following order will then be followed:

1. SAHA will stop selection from the waiting list (or referral list), discontinue the issuance of initial vouchers, and put previously issued initial vouchers on hold until funding is available.

2. Families who have been assisted in the program the longest will be the first to be terminated, excluding elderly or disabled families, and families with minor children and disabled dependent.

3. SAHA will terminate participants based on highest income (lowest housing assistance needed), excluding elderly and disabled families and families with minor children and disabled dependent.

4. SAHA will terminate remaining participants based on highest income (lowest housing assistance needed), including families with minor children and disabled dependent, disabled, and then elderly families (in that order).

When SAHA resumes issuing vouchers, SAHA will issue vouchers first to the special purpose voucher families on its waiting list until it has reached the required number of special purpose vouchers, when applicable.

Due to contractual obligations, Project-Based Vouchers will be the last to be terminated due to insufficient funds.

EXHIBIT 1
City Council 5 – 722 7/15/2025

Page 16 ends

PART IX: VIOLENCE AGAINST WOMEN ACT (VAWA): NOTIFICATION,

DOCUMENTATION, CONFIDENTIALITY
16-IX.A. OVERVIEW
The Violence Against Women Act (VAWA) provides special protections for victims of domestic violence, dating violence, sexual assault, stalking, and human trafficking who are applying for or receiving assistance under the housing choice voucher (HCV) program. If your state or local laws provide greater protection for such victims, those laws apply in conjunction with VAWA.  Although the VAWA 2022 statute does not specifically include human trafficking in the list of victims protected under VAWA, in 2022 HUD began including human trafficking as part of the list of victims protected under VAWA (as seen in Notices PIH 2022-06, PIH 2022-22, and PIH 2022-24). In the absence of a final rule implementing VAWA 2022 and to mirror HUD’s recent usage, this policy includes human trafficking in addition to domestic violence, dating violence, sexual assault, and stalking anywhere such a list appears.

In addition to definitions of key terms used in VAWA, this part contains general VAWA requirements and PHA policies in three areas: notification, documentation, and confidentiality.

Specific VAWA requirements and PHA policies are located primarily in the following sections:
3-I.C, “Family Breakup and Remaining Member of Tenant Family”; 3-III.H, “Prohibition against Denial of Assistance to Victims of Domestic Violence, Dating Violence, Sexual Assault, Stalking and Human Trafficking”; 10-I.A, “Allowable Moves”; 10-I.B, “Restrictions on Moves”; 12-II.E, “Terminations Related to Domestic Violence, Dating Violence, Sexual Assault, Stalking, or Human Trafficking”; and 12-II.F, “Termination Notice.” 16-IX.B. DEFINITIONS [24 CFR 5.2003, 42 USC 13925]
As used in VAWA:
 The term affiliated individual means, with respect to a person:
- A spouse, parent, brother or sister, or child of that individual, or an individual to whom that individual stands in the position or place of a parent; or - Any other individual, tenant, or lawful occupant living in the household of the victim of domestic violence, dating violence, sexual assault, or stalking.  The term bifurcate means, with respect to a public housing or Section 8 lease, to divide a lease as a matter of law such that certain tenants can be evicted or removed while the remaining family members’ lease and occupancy rights are allowed to remain intact.  The term dating violence means violence committed by a person who is or has been in a social relationship of a romantic or intimate nature with the victim; and where the existence of such a relationship shall be determined based on a consideration of the following factors:
- The length of the relationship
- The type of relationship
- The frequency of interaction between the persons involved in the relationship EXHIBIT 1
City Council 5 – 723 7/15/2025

Page 16 ends

 The term domestic violence includes felony or misdemeanor crimes committed by a current or former spouse or intimate partner of the victim under the family or domestic violence laws of the jurisdiction receiving grant funding, and in the case of victim services, includes the user or attempted use of physical abuse or sexual abuse, or a pattern of any other coercive behavior committed, enabled, or solicited to gain or maintain power and control over a victim, including verbal, psychological, economic, or technological abuse that may or may not constitute criminal behavior, by a person who is:
- The current or former spouse or intimate partner of the victim, or person similarly situated to a spouse or intimate partner of the victim
- A person who is cohabitating or has cohabitated with the victim as a spouse or intimate partner
- A person with whom the victim shares a child in common - A person who commits acts against an youth or adult victim who is protected from those acts under the domestic or family violence laws of the jurisdiction  The term economic abuse means behavior that is coercive, deceptive, or unreasonably controls or restrains a person’s ability to acquire, use, or maintain economic resources to which they are entitled, including using coercion, fraud, and manipulation to:
- Restrict a person’s access to money, assets, credit, or financial information - Unfairly use a person’s personal economic resources, including money, assets, and credit, for one’s own advantage
- Exert undue influence over a person’s financial and economic behavior or decisions, including forcing default on joint or other financial obligations, exploiting powers of attorney, guardianship, or conservatorship, or to whom one has a fiduciary duty  The term sexual assault means:
- Any nonconsensual sexual act proscribed by federal, tribal, or state law, including when the victim lacks the capacity to consent
 The term stalking means:
- To engage in a course of conduct directed at a specific person that would cause a reasonable person to fear for their safety or the safety of others, or suffer substantial emotional distress.

EXHIBIT 1
City Council 5 – 724 7/15/2025

Page 16 ends

 The term technological abuse means an act or pattern of behavior that occurs within domestic violence, dating violence, sexual assault, or stalking and is intended to harm, threaten, intimidate, control, stalk, harass, impersonate, exploit, extort, or monitor another person, except as otherwise permitted by law, that occurs using any form of technology, including but not limited to:
- Internet enabled devices
- Online spaces and platforms
- Computers
- Mobile devices
- Cameras and imaging programs
- Apps
- Location tracking devices
- Communication technologies
- Any other emergency technologies
16-IX.C. NOTIFICATION [24 CFR 5.2005(a)]
Notification to Public
The PHA adopts the following policy to help ensure that all actual and potential beneficiaries of its HCV program are aware of their rights under VAWA.

SAHA Policy
SAHA will post the following information regarding VAWA in its offices and on its website. It will also make the information readily available to anyone who requests it.

A copy of Form HUD-5380, Notice of Occupancy Rights under VAWA, to housing choice voucher program applicants and participants who are or have been victims of domestic violence, dating violence, sexual assault, or stalking (Exhibit 16-1)
A copy of Form HUD-5382, Certification of Domestic Violence, Dating Violence, Sexual Assault, or Stalking and Alternate Documentation (Exhibit 16-2)
A copy of the PHA’s emergency transfer plan (Exhibit 16-3) A copy of Form HUD-5383, HUD’s Emergency Transfer Request for Certain Victims of Domestic Violence, Dating Violence, Sexual Assault, or Stalking (Exhibit 16-4)
The National Domestic Violence Hot Line: 1-800-799-SAFE (7233) or 1-800-787-3224 (TTY) (included in Exhibits 16-1 and 16-2) Contact information for local victim advocacy groups or service providers EXHIBIT 1
City Council 5 – 725 7/15/2025

Page 16 ends

Notification to Program Applicants and Participants [24 CFR 5.2005(a)(1)] PHAs are required to inform program applicants and participants of their rights under VAWA, including their right to confidentiality and the limits thereof, when they are denied assistance, when they are admitted to the program, and when they are notified of an eviction or termination of housing benefits.

SAHA Policy
SAHA will provide all applicants with information about VAWA at the time they request an application for housing assistance, as part of the written briefing packet, and at the time the family is admitted to the program. SAHA will also include information about VAWA in all notices of denial of assistance (see section 3-III.H).

SAHA will provide all participants with information about VAWA at the time of admission (see section 5-I.B) and at annual reexamination. SAHA will also include information about VAWA in notices of termination of assistance, as provided in section 12-II.F.

The VAWA information provided to applicants and participants will consist of the notices in Exhibits 16-1 and 16-2.

The PHA is not limited to providing VAWA information at the times specified in the above policy. If the PHA decides to provide VAWA information to a participant following an incident of domestic violence, Notice PIH 2017-08 cautions against sending the information by mail, since the abuser may be monitoring the mail. The notice recommends that in such cases the PHA make alternative delivery arrangements that will not put the victim at risk.

SAHA Policy
Whenever SAHA has reason to suspect that providing information about VAWA to a participant might place a victim of domestic violence at risk, it will attempt to deliver the information by hand directly to the victim or by having the victim come to an office or other space that may be safer for the individual, making reasonable accommodations as necessary. For example, SAHA may decide not to send mail regarding VAWA protections to the victim’s unit if SAHA believes the perpetrator may have access to the victim’s mail, unless requested by the victim.

When discussing VAWA with the victim, SAHA will take reasonable precautions to ensure that no one can overhear the conversation, such as having conversations in a private room.

The victim may, but is not required to, designate an attorney, advocate, or other secure contact for communications regarding VAWA protections.

EXHIBIT 1
City Council 5 – 726 7/15/2025

Page 16 ends

Notification to Owners and Managers
While PHAs are no longer required by regulation to notify owners and managers participating in the HCV program of their rights and obligations under VAWA, the PHA may still choose to inform them.

SAHA Policy
SAHA may provide owners and managers with information about their rights and obligations under VAWA when they begin their participation in the program. 16-IX.D. DOCUMENTATION [24 CFR 5.2007]
A PHA presented with a claim for initial or continued assistance based on status as a victim of domestic violence, dating violence, sexual assault, stalking, human trafficking, or criminal activity related to any of these forms of abuse may—but is not required to—request that the individual making the claim document the abuse. Any request for documentation must be in writing, and the individual must be allowed at least 14 business days after receipt of the request to submit the documentation. The PHA may extend this time period at its discretion. [24 CFR

5.2007(a)]
The individual may satisfy the PHA’s request by providing any one of the following three forms of documentation [24 CFR 5.2007(b)]:
(1) A completed and signed HUD-approved certification form (HUD-5382, Certification of Domestic Violence, Dating Violence, Sexual Assault, or Stalking), which must include the name of the perpetrator only if the name of the perpetrator is safe to provide and is known to the victim. The form may be filled out and submitted on behalf of the victim. (2) A federal, state, tribal, territorial, or local police report or court record, or an administrative record
(3) Documentation signed by a person who has assisted the victim in addressing domestic violence, dating violence, sexual assault, stalking, human trafficking, or the effects of such abuse. This person may be an employee, agent, or volunteer of a victim service provider; an attorney; a mental health professional; or a medical professional. The person signing the documentation must attest under penalty of perjury to the person’s belief that the incidents in question are bona fide incidents of abuse. The victim must also sign the documentation.

The PHA may not require third-party documentation (forms 2 and 3) in addition to certification (form 1), except as specified below under “Conflicting Documentation,” nor may it require certification in addition to third-party documentation [FR Notice 11/16/16].

SAHA Policy
Any request for documentation of domestic violence, dating violence, sexual assault, stalking, or human trafficking will be in writing, will specify a deadline of 14 business days following receipt of the request, will describe the three forms of acceptable documentation, will provide explicit instructions on where and to whom the documentation must be submitted, and will state the consequences for failure to submit the documentation or request an extension in writing by the deadline.

EXHIBIT 1
City Council 5 – 727 7/15/2025

Page 16 ends

SAHA may, in its discretion, extend the deadline for 14 business days. In determining whether to extend the deadline, SAHA will consider factors that may contribute to the victim’s inability to provide documentation in a timely manner, including cognitive limitations, disabilities, limited English proficiency, absence from the unit, administrative delays, the danger of further violence, and the victim’s need to address health or safety issues. Any extension granted by SAHA will be in writing.

Once the victim provides documentation, SAHA will acknowledge receipt of the documentation within 14 calendar days.

Conflicting Documentation [24 CFR 5.2007(e)]
In cases where the PHA receives conflicting certification documents from two or more members of a household, each claiming to be a victim and naming one or more of the other petitioning household members as the perpetrator, the PHA may determine which is the true victim by requiring each to provide acceptable third-party documentation, as described above (forms 2 and 3). The PHA may also request third-party documentation when submitted documentation contains information that conflicts with existing information already available to the PHA.

Individuals have 30 calendar days to return third-party verification to the PHA. If the PHA does not receive third-party documentation, and the PHA will deny or terminate assistance as a result, the PHA must hold separate hearings for the tenants [Notice PIH 2017-08].

The PHA must honor any court orders issued to protect the victim or to address the distribution of property.

SAHA Policy
If presented with conflicting certification documents from members of the same household, SAHA will attempt to determine which is the true victim by requiring each of them to provide third-party documentation in accordance with 24 CFR 5.2007(e) and by following any HUD guidance on how such determinations should be made.

When requesting third-party documents, SAHA will provide contact information for local domestic violence and legal aid offices. In such cases, applicants or tenants will be given 30 calendar days from the date of the request to provide such documentation.

If SAHA does not receive third-party documentation within the required timeframe (and any extensions) SAHA will deny VAWA protections and will notify the applicant or tenant in writing of the denial. If, as a result, the applicant or tenant is denied or terminated from the program, SAHA will hold separate hearings for the applicants or tenants.

Discretion to Require No Formal Documentation [24 CFR 5.2007(d)] The PHA has the discretion to provide benefits to an individual based solely on the individual’s statement or other corroborating evidence—i.e., without requiring formal documentation of abuse in accordance with 24 CFR 5.2007(b). HUD recommends documentation in a confidential manner when a verbal statement or other evidence is accepted.

SAHA Policy
If SAHA accepts an individual’s statement or other corroborating evidence (as determined by the victim) of domestic violence, dating violence, sexual assault, stalking, EXHIBIT 1
City Council 5 – 728 7/15/2025

Page 16 ends

or human trafficking, SAHA will document acceptance of the statement or evidence in the individual’s file.

EXHIBIT 1
City Council 5 – 729 7/15/2025

Page 16 ends

Failure to Provide Documentation [24 CFR 5.2007(c)]
In order to deny relief for protection under VAWA, a PHA must provide the individual requesting relief with a written request for documentation of abuse. If the individual fails to provide the documentation within 14 business days from the date of receipt, or such longer time as the PHA may allow, the PHA may deny relief for protection under VAWA. 16-IX.E. CONFIDENTIALITY [24 CFR 5.2007(b)(4)]
All information provided to the PHA regarding domestic violence, dating violence, sexual assault, stalking, or human trafficking, including the fact that an individual is a victim, must be retained in confidence. This means that the PHA (1) may not enter the information into any shared database, (2) may not allow employees or others to access the information unless they are explicitly authorized to do so and have a need to know the information for purposes of their work, and (3) may not provide the information to any other entity or individual, except to the extent that the disclosure is (a) requested or consented to by the individual in writing, (b) required for use in an eviction proceeding, or (c) otherwise required by applicable law.

SAHA Policy
If disclosure is required for use in an eviction proceeding or is otherwise required by applicable law, SAHA will inform the victim before disclosure occurs so that safety risks can be identified and addressed.

EXHIBIT 1
City Council 5 – 730 7/15/2025

Page 16 ends

EXHIBIT 16-1: SAMPLE NOTICE OF OCCUPANCY RIGHTS UNDER THE VIOLENCE AGAINST WOMEN ACT, FORM HUD-5380
[Insert Name of Housing Provider]
Notice of Occupancy Rights under the Violence Against Women Act1 To all Tenants and Applicants
The Violence Against Women Act (VAWA) provides protections for victims of domestic violence, dating violence, sexual assault, or stalking. VAWA protections are not only available to women, but are available equally to all individuals regardless of sex, gender identity, or sexual orientation.2 The U.S. Department of Housing and Urban Development (HUD) is the federal agency that oversees that the housing choice voucher program is in compliance with VAWA.

This notice explains your rights under VAWA. A HUD-approved certification form is attached to this notice. You can fill out this form to show that you are or have been a victim of domestic violence, dating violence, sexual assault, or stalking, and that you wish to use your rights under VAWA.”
Protections for Applicants
If you otherwise qualify for assistance under the housing choice voucher program, you cannot be denied admission or denied assistance because you are or have been a victim of domestic violence, dating violence, sexual assault, or stalking.

Protections for Tenants
If you are receiving assistance under the housing choice voucher program, you may not be denied assistance, terminated from participation, or be evicted from your rental housing because you are or have been a victim of domestic violence, dating violence, sexual assault, or stalking.

Also, if you or an affiliated individual of yours is or has been the victim of domestic violence, dating violence, sexual assault, or stalking by a member of your household or any guest, you may not be denied rental assistance or occupancy rights under the housing choice voucher program solely on the basis of criminal activity directly relating to that domestic violence, dating violence, sexual assault, or stalking.

Affiliated individual means your spouse, parent, brother, sister, or child, or a person to whom you stand in the place of a parent or guardian (for example, the affiliated individual is in your care, custody, or control); or any individual, tenant, or lawful occupant living in your household.

1 Despite the name of this law, VAWA protection is available regardless of sex, gender identity, or sexual orientation.
2 Housing providers cannot discriminate on the basis of any protected characteristic, including race, color, national origin, religion, sex, familial status, disability, or age. HUD-assisted and HUD-insured housing must be made available to all otherwise eligible individuals regardless of actual or perceived sexual orientation, gender identity, or marital status.

EXHIBIT 1
City Council 5 – 731 7/15/2025

Page 16 ends

Removing the Abuser or Perpetrator from the Household
The PHA may divide (bifurcate) your lease in order to evict the individual or terminate the assistance of the individual who has engaged in criminal activity (the abuser or perpetrator) directly relating to domestic violence, dating violence, sexual assault, or stalking.

If the PHA chooses to remove the abuser or perpetrator, the PHA may not take away the rights of eligible tenants to the unit or otherwise punish the remaining tenants. If the evicted abuser or perpetrator was the sole tenant to have established eligibility for assistance under the program, the PHA must allow the tenant who is or has been a victim and other household members to remain in the unit for a period of time, in order to establish eligibility under the program or under another HUD housing program covered by VAWA, or, find alternative housing.

In removing the abuser or perpetrator from the household, the PHA must follow federal, state, and local eviction procedures. In order to divide a lease, the PHA may, but is not required to, ask you for documentation or certification of the incidences of domestic violence, dating violence, sexual assault, or stalking.

Moving to Another Unit
Upon your request, the PHA may permit you to move to another unit, subject to the availability of other units, and still keep your assistance. In order to approve a request, the PHA may ask you to provide documentation that you are requesting to move because of an incidence of domestic violence, dating violence, sexual assault, or stalking. If the request is a request for emergency transfer, the housing provider may ask you to submit a written request or fill out a form where you certify that you meet the criteria for an emergency transfer under VAWA. The criteria are:

1. You are a victim of domestic violence, dating violence, sexual assault, or stalking.

If your housing provider does not already have documentation that you are a victim of domestic violence, dating violence, sexual assault, or stalking, your housing provider may ask you for such documentation, as described in the documentation section below.

2. You expressly request the emergency transfer. Your housing provider may choose to require that you submit a form, or may accept another written or oral request.

3. You reasonably believe you are threatened with imminent harm from further violence if you remain in your current unit. This means you have a reason to fear that if you do not receive a transfer you would suffer violence in the very near future.

OR
You are a victim of sexual assault and the assault occurred on the premises during the 90-calendar-day period before you request a transfer. If you are a victim of sexual assault, then in addition to qualifying for an emergency transfer because you reasonably believe you are threatened with imminent harm from further violence if you remain in your unit, you may qualify for an emergency transfer if the sexual assault occurred on the premises of the property from which you are seeking your transfer, and that assault happened within the 90-calendarday period before you expressly request the transfer.

EXHIBIT 1
City Council 5 – 732 7/15/2025

Page 16 ends

The PHA will keep confidential requests for emergency transfers by victims of domestic violence, dating violence, sexual assault, or stalking, and the location of any move by such victims and their families.

The PHA’s emergency transfer plan provides further information on emergency transfers, and the PHA must make a copy of its emergency transfer plan available to you if you ask to see it.

Documenting You Are or Have Been a Victim of Domestic Violence, Dating Violence, Sexual Assault or Stalking
The PHA can, but is not required to, ask you to provide documentation to “certify” that you are or have been a victim of domestic violence, dating violence, sexual assault, or stalking. Such request from the PHA must be in writing, and the PHA must give you at least 14 business days (Saturdays, Sundays, and federal holidays do not count) from the day you receive the request to provide the documentation. The PHA may, but does not have to, extend the deadline for the submission of documentation upon your request.

You can provide one of the following to the PHA as documentation. It is your choice which of the following to submit if the PHA asks you to provide documentation that you are or have been a victim of domestic violence, dating violence, sexual assault, or stalking.  A complete HUD-approved certification form given to you by the PHA with this notice, that documents an incident of domestic violence, dating violence, sexual assault, or stalking. The form will ask for your name, the date, time, and location of the incident of domestic violence, dating violence, sexual assault, or stalking, and a description of the incident. The certification form provides for including the name of the abuser or perpetrator if the name of the abuser or perpetrator is known and is safe to provide.  A record of a Federal, State, tribal, territorial, or local law enforcement agency, court, or administrative agency that documents the incident of domestic violence, dating violence, sexual assault, or stalking. Examples of such records include police reports, protective orders, and restraining orders, among others.
 A statement, which you must sign, along with the signature of an employee, agent, or vounteer of a victim service provider, an attorney, a medical professional or a mental helth professional (collectively, “professional”) from whom you sought assistance in addressing domestic violence, dating violence, sexual assault, or stalking, or the effects of abuse, and with the professional selected by you attesting under penalty of perjury that they believe that the incident or incidents of domestic violence, dating violence, sexual assault, or stalking are grounds for protection.
 Any other statement or evidence that the PHA has agreed to accept.

If you fail or refuse to provide one of these documents within the 14 business days, the PHA does not have to provide you with the protections contained in this notice.

If the PHA receives conflicting evidence that an incident of domestic violence, dating violence, sexual assault, or stalking has been committed (such as certification forms from two or more members of a household each claiming to be a victim and naming one or more of the other petitioning household members as the abuser or perpetrator), the PHA has the right to request that you provide third-party documentation within thirty 30 calendar days in order to resolve the conflict. If you fail or refuse to provide third-party documentation where there is conflicting evidence, the PHA does not have to provide you with the protections contained in this notice.

EXHIBIT 1
City Council 5 – 733 7/15/2025

Page 16 ends

Confidentiality
The PHA must keep confidential any information you provide related to the exercise of your rights under VAWA, including the fact that you are exercising your rights under VAWA.

The PHA must not allow any individual administering assistance or other services on behalf of the PHA (for example, employees and contractors) to have access to confidential information unless for reasons that specifically call for these individuals to have access to this information under applicable Federal, State, or local law.

The PHA must not enter your information into any shared database or disclose your information to any other entity or individual. The PHA, however, may disclose the information provided if:
 You give written permission to the PHA to release the information on a time limited basis.
 The PHA needs to use the information in an eviction or termination proceeding, such as to evict your abuser or perpetrator or terminate your abuser or perpetrator from assistance under this program.
 A law requires the PHA or your landlord to release the information.

VAWA does not limit the PHA’s duty to honor court orders about access to or control of the property. This includes orders issued to protect a victim and orders dividing property among household members in cases where a family breaks up.

Reasons a Tenant Eligible for Occupancy Rights under VAWA May Be Evicted or Assistance May Be Terminated
You can be evicted and your assistance can be terminated for serious or repeated lease violations that are not related to domestic violence, dating violence, sexual assault, or stalking committed against you. However, the PHA cannot hold tenants who have been victims of domestic violence, dating violence, sexual assault, or stalking to a more demanding set of rules than it applies to tenants who have not been victims of domestic violence, dating violence, sexual assault, or stalking.

The protections described in this notice might not apply, and you could be evicted and your assistance terminated, if the PHA can demonstrate that not evicting you or terminating your assistance would present a real physical danger that:

1. Would occur within an immediate time frame, and

2. Could result in death or serious bodily harm to other tenants or those who work on the property.

If the PHA can demonstrate the above, the PHA should only terminate your assistance or evict you if there are no other actions that could be taken to reduce or eliminate the threat.

Other Laws
VAWA does not replace any federal, state, or local law that provides greater protection for victims of domestic violence, dating violence, sexual assault, or stalking. You may be entitled to additional housing protections for victims of domestic violence, dating violence, sexual assault, or stalking under other Federal laws, as well as under State and local laws.

EXHIBIT 1
City Council 5 – 734 7/15/2025

Page 16 ends

Non-Compliance with The Requirements of This Notice
You may report a covered housing provider’s violations of these rights and seek additional assistance, if needed, by contacting or filing a complaint with [insert contact information for any intermediary, if applicable] or [insert HUD field office].

For Additional Information
You may view a copy of HUD’s final VAWA rule at: https://www.gpo.gov/fdsys/pkg/FR-2016- 11-16/pdf/2016-25888.pdf.

Additionally, the PHA must make a copy of HUD’s VAWA regulations available to you if you ask to see them.

For questions regarding VAWA, please contact [insert name of program or rental assistance contact information able to answer questions on VAWA].

For help regarding an abusive relationship, you may call the National Domestic Violence Hotline at 1-800-799-7233 or, for persons with hearing impairments, 1-800-787-3224 (TTY). You may also contact [Insert contact information for relevant local organizations].

For tenants who are or have been victims of stalking seeking help may visit the National Center for Victims of Crime’s Stalking Resource Center at https://www.victimsofcrime.org/ourprograms/stalking-resource-center.

For help regarding sexual assault, you may contact [Insert contact information for relevant organizations]
Victims of stalking seeking help may contact [Insert contact information for relevant organizations].

Attachment: Certification Form HUD-5382 [form approved for this program to be included] EXHIBIT 1
City Council 5 – 735 7/15/2025

Page 16 ends

EXHIBIT 16-2: CERTIFICATION OF DOMESTIC VIOLENCE, DATING VIOLENCE,

SEXUAL ASSAULT, OR STALKING AND ALTERNATE DOCUMENTATION, FORM HUD-5382
CERTIFICATION OF U.S. Department of Housing OMB Approval No. 2577-0286 DOMESTIC VIOLENCE, and Urban Development Exp. 06/30/2017

DATING VIOLENCE,

SEXUAL ASSAULT, OR STALKING,

AND ALTERNATE DOCUMENTATION
Purpose of Form: The Violence Against Women Act (“VAWA”) protects applicants, tenants, and program participants in certain HUD programs from being evicted, denied housing assistance, or terminated from housing assistance based on acts of domestic violence, dating violence, sexual assault, or stalking against them. Despite the name of this law, VAWA protection is available to victims of domestic violence, dating violence, sexual assault, and stalking, regardless of sex, gender identity, or sexual orientation.

Use of This Optional Form: If you are seeking VAWA protections from your housing provider, your housing provider may give you a written request that asks you to submit documentation about the incident or incidents of domestic violence, dating violence, sexual assault, or stalking.

In response to this request, you or someone on your behalf may complete this optional form and submit it to your housing provider, or you may submit one of the following types of third-party documentation:
(1) A document signed by you and an employee, agent, or volunteer of a victim service provider, an attorney, or medical professional, or a mental health professional (collectively, “professional”) from whom you have sought assistance relating to domestic violence, dating violence, sexual assault, or stalking, or the effects of abuse. The document must specify, under penalty of perjury, that the professional believes the incident or incidents of domestic violence, dating violence, sexual assault, or stalking occurred and meet the definition of “domestic violence,” “dating violence,” “sexual assault,” or “stalking” in HUD’s regulations at 24 CFR 5.2003.
(2) A record of a Federal, State, tribal, territorial or local law enforcement agency, court, or administrative agency; or
(3) At the discretion of the housing provider, a statement or other evidence provided by the applicant or tenant.

Submission of Documentation: The time period to submit documentation is 14 business days from the date that you receive a written request from your housing provider asking that you provide documentation of the occurrence of domestic violence, dating violence, sexual assault, or stalking. Your housing provider may, but is not required to, extend the time period to submit the documentation, if you request an extension of the time period. If the requested information is not received within 14 business days of when you received the request for the documentation, or any extension of the date provided by your housing provider, your housing provider does not need to grant you any of the VAWA protections. Distribution or issuance of this form does not serve as a written request for certification.

Confidentiality: All information provided to your housing provider concerning the incident(s) of domestic violence, dating violence, sexual assault, or stalking shall be kept confidential and such details shall not be entered into any shared database. Employees of your housing provider are not to have access to these details unless to grant or deny VAWA protections to you, and such employees may not disclose this information to any other entity or individual, except to the extent that disclosure is: (i) consented to EXHIBIT 1
City Council 5 – 736 7/15/2025

Page 16 ends

by you in writing in a time-limited release; (ii) required for use in an eviction proceeding or hearing regarding termination of assistance; or (iii) otherwise required by applicable law.

EXHIBIT 1
City Council 5 – 737 7/15/2025

Page 16 ends

TO BE COMPLETED BY OR ON BEHALF OF THE VICTIM OF DOMESTIC VIOLENCE,

DATING VIOLENCE, SEXUAL ASSAULT, OR STALKING

1. Date the written request is received by victim: _________________________________________

2. Name of victim: ___________________________________________________________________

3. Your name (if different from victim’s):________________________________________________

4. Name(s) of other family member(s) listed on the lease:___________________________________ ___________________________________________________________________________________

5. Residence of victim: ________________________________________________________________

6. Name of the accused perpetrator (if known and can be safely disclosed):____________________ __________________________________________________________________________________

7. Relationship of the accused perpetrator to the victim:___________________________________

8. Date(s) and times(s) of incident(s) (if known):___________________________________________ _________________________________________________________________

10. Location of incident(s):_____________________________________________________________ This is to certify that the information provided on this form is true and correct to the best of my knowledge and recollection, and that the individual named above in Item 2 is or has been a victim of domestic violence, dating violence, sexual assault, or stalking. I acknowledge that submission of false information could jeopardize program eligibility and could be the basis for denial of admission, termination of assistance, or eviction.

Signature __________________________________Signed on (Date) ___________________________ Public Reporting Burden: The public reporting burden for this collection of information is estimated to average 1 hour per response. This includes the time for collecting, reviewing, and reporting the data. The information provided is to be used by the housing provider to request certification that the applicant or tenant is a victim of domestic violence, dating violence, sexual assault, or stalking. The information is subject to the confidentiality requirements of VAWA. This agency may not collect this information, and you are not required to complete this form, unless it displays a currently valid Office of Management and Budget control number.

In your own words, briefly describe the incident(s):
______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ _____________________________________________________________________________ EXHIBIT 1
City Council 5 – 738 7/15/2025

Page 16 ends

EXHIBIT 16-3: EMERGENCY TRANSFER PLAN FOR VICTIMS OF DOMESTIC

VIOLENCE, DATING VIOLENCE, SEXUAL ASSAULT, OR STALKING
(HCV VERSION)
Attachment: Certification form HUD-5382
[Insert name of covered housing provider]
Emergency Transfer Plan for Victims of Domestic Violence, Dating Violence, Sexual Assault, or Stalking
Housing Choice Voucher Program
Emergency Transfers
The PHA is concerned about the safety of its tenants, and such concern extends to tenants who are victims of domestic violence, dating violence, sexual assault, or stalking. In accordance with the Violence Against Women Act (VAWA),
3 the PHA allows tenants who are victims of
domestic violence, dating violence, sexual assault, or stalking to request an emergency transfer from the tenant’s current unit to another unit. The ability to request a transfer is available regardless of sex, gender identity, or sexual orientation. 4 The ability of the PHA to honor such
request for tenants currently receiving assistance, however, may depend upon a preliminary determination that the tenant is or has been a victim of domestic violence, dating violence, sexual assault, or stalking, and on whether the PHA has another dwelling unit that is available and is safe to offer the tenant for temporary or more permanent occupancy.

This plan identifies tenants who are eligible for an emergency transfer, the documentation needed to request an emergency transfer, confidentiality protections, how an emergency transfer may occur, and guidance to tenants on safety and security. This plan is based on a model emergency transfer plan published by the U.S. Department of Housing and Urban Development (HUD), the federal agency that oversees that the public housing and housing choice voucher (HCV) programs are in compliance with VAWA.

Eligibility for Emergency Transfers
A tenant who is a victim of domestic violence, dating violence, sexual assault, or stalking, as provided in HUD’s regulations at 24 CFR part 5, subpart L, is eligible for an emergency transfer if the tenant reasonably believes that there is a threat of imminent harm from further violence if the tenant remains within the same unit. If the tenant is a victim of sexual assault, the tenant may also be eligible to transfer if the sexual assault occurred on the premises within the 90-calendarday period preceding a request for an emergency transfer.

3Despite the name of this law, VAWA protection is available to all victims of domestic violence, dating violence, sexual assault, and stalking, regardless of sex, gender identity, or sexual orientation. 4Housing providers cannot discriminate on the basis of any protected characteristic, including race, color, national origin, religion, sex, familial status, disability, or age. HUD-assisted and HUD-insured housing must be made available to all otherwise eligible individuals regardless of actual or perceived sexual orientation, gender identity, or marital status.

EXHIBIT 1
City Council 5 – 739 7/15/2025

Page 16 ends

A tenant requesting an emergency transfer must expressly request the transfer in accordance with the procedures described in this plan.

Tenants who are not in good standing may still request an emergency transfer if they meet the eligibility requirements in this section.

Emergency Transfer Request Documentation
To request an emergency transfer, the tenant shall notify the PHA’s management office and submit a written request for a transfer to any PHA office. The PHA will provide reasonable accommodations to this policy for individuals with disabilities. The tenant’s written request for an emergency transfer should include either:

1. A statement expressing that the tenant reasonably believes that there is a threat of imminent harm from further violence if the tenant were to remain in the same dwelling unit assisted under the PHA’s program; OR

2. A statement that the tenant was a sexual assault victim and that the sexual assault occurred on the premises during the 90-calendar-day period preceding the tenant’s request for an emergency transfer.

Confidentiality
The PHA will keep confidential any information that the tenant submits in requesting an emergency transfer, and information about the emergency transfer, unless the tenant gives the PHA written permission to release the information on a time-limited basis, or disclosure of the information is required by law or required for use in an eviction proceeding or hearing regarding termination of assistance from the covered program. This includes keeping confidential the new location of the dwelling unit of the tenant, if one is provided, from the person or persons that committed an act of domestic violence, dating violence, sexual assault, or stalking against the tenant. See the Notice of Occupancy Rights under the Violence against Women Act for All Tenants for more information about the PHA’s responsibility to maintain the confidentiality of information related to incidents of domestic violence, dating violence, sexual assault, or stalking.

Emergency Transfer Timing and Availability
The PHA cannot guarantee that a transfer request will be approved or how long it will take to process a transfer request. The PHA will, however, act as quickly as possible to move a tenant who is a victim of domestic violence, dating violence, sexual assault, or stalking to another unit, subject to availability and safety of a unit. If a tenant reasonably believes a proposed transfer would not be safe, the tenant may request a transfer to a different unit. If a unit is available, the transferred tenant must agree to abide by the terms and conditions that govern occupancy in the unit to which the tenant has been transferred. The PHA may be unable to transfer a tenant to a particular unit if the tenant has not or cannot establish eligibility for that unit.

If the PHA has no safe and available units for which a tenant who needs an emergency transfer is eligible, the PHA will assist the tenant in identifying other housing providers who may have safe and available units to which the tenant could move. At the tenant’s request, the PHA will also assist tenants in contacting the local organizations offering assistance to victims of domestic violence, dating violence, sexual assault, or stalking that are attached to this plan.

EXHIBIT 1
City Council 5 – 740 7/15/2025

Page 16 ends

Emergency Transfers: Housing Choice Voucher (HCV) Program Tenant-based assistance: If you are a participant in the tenant-based HCV program and request an emergency transfer as described in this plan, the PHA will assist you to move to a safe unit quickly using your existing voucher assistance. The PHA will make exceptions to program regulations restricting moves as required.

At your request, the PHA will refer you to organizations that may be able to further assist you.

Project-based assistance: If you are assisted under the project-based voucher (PBV) program, you may request an emergency transfer under the following programs for which you are not required to apply:
 Tenant-based voucher, if available
 Project-based assistance in the same project (if a vacant unit is available and you determine that the vacant unit is safe)
 Project-based assistance in another development owned by the PHA Emergency transfers under VAWA will take priority over waiting list admissions for these types of assistance.

You may also request an emergency transfer under the following programs for which you are required to apply:
 Public housing program
 PBV assistance in another development not owned by the PHA  [Insert other programs the PHA provides, such as LIHTC or HOME] Emergency transfers will not take priority over waiting list admissions for these programs. At your request, the PHA will refer you to organizations that may be able to further assist you.

Safety and Security of Tenants
Pending processing of the transfer and the actual transfer, if it is approved and occurs, the tenant is urged to take all reasonable precautions to be safe.

Tenants who are or have been victims of domestic violence are encouraged to contact the National Domestic Violence Hotline at 1-800-799-7233, or a local domestic violence shelter, for assistance in creating a safety plan. For persons with hearing impairments, that hotline can be accessed by calling 1-800-787-3224 (TTY).

Tenants who have been victims of sexual assault may call the Rape, Abuse, and Incest National Network’s National Sexual Assault Hotline at 1-800-656-HOPE, or visit the online hotline at:
https://ohl.rainn.org/online/.

Tenants who are or have been victims of stalking seeking help may visit the National Center for Victims of Crime’s Stalking Resource Center at: https://www.victimsofcrime.org/ourprograms/stalking-resource-center.

Attachment: Local organizations offering assistance to victims of domestic violence, dating violence, sexual assault, or stalking.

EXHIBIT 1
City Council 5 – 741 7/15/2025

Page 16 ends

EXHIBIT 16-4: EMERGENCY TRANSFER REQUEST FOR CERTAIN VICTIMS OF

DOMESTIC VIOLENCE, DATING VIOLENCE, SEXUAL ASSAULT, OR STALKING, FORM HUD-5383
EMERGENCY TRANSFER U.S. Department of Housing OMB Approval No. 2577-0286 REQUEST FOR CERTAIN and Urban Development Exp. 06/30/2017

VICTIMS OF DOMESTIC

VIOLENCE, DATING VIOLENCE,

SEXUAL ASSAULT, OR STALKING
Purpose of Form: If you are a victim of domestic violence, dating violence, sexual assault, or stalking, and you are seeking an emergency transfer, you may use this form to request an emergency transfer and certify that you meet the requirements of eligibility for an emergency transfer under the Violence Against Women Act (VAWA). Although the statutory name references women, VAWA rights and protections apply to all victims of domestic violence, dating violence, sexual assault or stalking. Using this form does not necessarily mean that you will receive an emergency transfer. See your housing provider’s emergency transfer plan for more information about the availability of emergency transfers.

The requirements you must meet are:
(1) You are a victim of domestic violence, dating violence, sexual assault, or stalking.

If your housing provider does not already have documentation that you are a victim of domestic violence, dating violence, sexual assault, or stalking, your housing provider may ask you for such documentation. In response, you may submit Form HUD-5382, or any one of the other types of documentation listed on that Form. (2) You expressly request the emergency transfer. Submission of this form confirms that you have expressly requested a transfer. Your housing provider may choose to require that you submit this form, or may accept another written or oral request. Please see your housing provider’s emergency transfer plan for more details. (3) You reasonably believe you are threatened with imminent harm from further violence if you remain in your current unit. This means you have a reason to fear that if you do not receive a transfer you would suffer violence in the very near future.

OR
You are a victim of sexual assault and the assault occurred on the premises during the 90-calendar-day period before you request a transfer. If you are a victim of sexual assault, then in addition to qualifying for an emergency transfer because you reasonably believe you are threatened with imminent harm from further violence if you remain in your unit, you may qualify for an emergency transfer if the sexual assault occurred on the premises of the property from which you are seeking your transfer, and that assault happened within the 90-calendar-day period before you submit this form or otherwise expressly request the transfer.

Submission of Documentation: If you have third-party documentation that demonstrates why you are eligible for an emergency transfer, you should submit that documentation to your housing provider if it is safe for you to do so. Examples of third party documentation include, but are not limited to: a letter or other documentation from a victim service provider, social worker, legal assistance provider, pastoral counselor, mental health provider, or other professional from whom you have sought assistance; a current restraining order; a recent court order or other court records; a law enforcement report or records; communication records from the perpetrator of the violence or family members or friends of the perpetrator of the violence, including emails, voicemails, text messages, and social media posts.

EXHIBIT 1
City Council 5 – 742 7/15/2025

Page 16 ends

Confidentiality: All information provided to your housing provider concerning the incident(s) of domestic violence, dating violence, sexual assault, or stalking, and concerning your request for an emergency transfer shall be kept confidential. Such details shall not be entered into any shared database.

Employees of your housing provider are not to have access to these details unless to grant or deny VAWA protections or an emergency transfer to you. Such employees may not disclose this information to any other entity or individual, except to the extent that disclosure is: (i) consented to by you in writing in a time-limited release; (ii) required for use in an eviction proceeding or hearing regarding termination of assistance; or (iii) otherwise required by applicable law.

TO BE COMPLETED BY OR ON BEHALF OF THE PERSON REQUESTING A TRANSFER

1. Name of victim requesting an emergency transfer: ______________________________________

2. Your name (if different from victim’s)_________________________________________________

3. Name(s) of other family member(s) listed on the lease:____________________________________ ___________________________________________________________________________________

4. Name(s) of other family member(s) who would transfer with the victim:____________________ ____________________________________________________________________________________

5. Address of location from which the victim seeks to transfer: _______________________________________

6. Address or phone number for contacting the victim:____________________________________

7. Name of the accused perpetrator (if known and can be safely disclosed):___________________

8. Relationship of the accused perpetrator to the victim:___________________________________

9. Date(s), Time(s) and location(s) of incident(s):___________________________________________ _____________________________________________________________________________________

10. Is the person requesting the transfer a victim of a sexual assault that occurred in the past 90 days on the premises of the property from which the victim is seeking a transfer? If yes, skip question 11. If no, fill out question 11. ______________

11. Describe why the victim believes they are threatened with imminent harm from further violence if they remain in their current unit.
___________________________________________________________________________________ _____________________________________________________________________________________

12. If voluntarily provided, list any third-party documentation you are providing along with this notice: ___________________________________________________________________ EXHIBIT 1
City Council 5 – 743 7/15/2025

Page 16 ends

This is to certify that the information provided on this form is true and correct to the best of my knowledge, and that the individual named above in Item 1 meets the requirement laid out on this form for an emergency transfer. I acknowledge that submission of false information could jeopardize program eligibility and could be the basis for denial of admission, termination of assistance, or eviction.

Signature __________________________________Signed on (Date) ___________________________ EXHIBIT 1
City Council 5 – 744 7/15/2025

Page 16 ends

EXHIBIT 16-5: MODEL OWNER NOTIFICATION OF RIGHTS AND OBLIGATIONS [Insert Name of Housing Provider]

NOTIFICATION OF YOUR RIGHTS AND OBLIGATIONS

UNDER THE VIOLENCE AGAINST WOMEN ACT (VAWA)
VAWA provides protections for Section 8 Housing Choice Voucher (HCV) and PBV applicants, tenants, and participants from being denied assistance on the basis or as a direct result of being a victim of domestic violence, dating violence, sexual assault, stalking and human trafficking.

Purpose
Many of VAWA’s protections to victims of domestic violence, dating violence, sexual assault stalking, and human trafficking involve action by the public housing agency (PHA), but some situations involve action by owners of assisted housing. The purpose of this notice (herein called “Notice”) is to explain your rights and obligations under VAWA, as an owner of housing assisted through [insert name of housing provider] HCV program. Each component of this Notice also provides citations to HUD’s applicable regulations.

Denial of Tenancy
Protections for applicants: Owners cannot deny tenancy based on the applicant having been or currently being a victim of domestic violence, dating violence, sexual assault, stalking, or human trafficking. However, the applicant must be otherwise eligible for tenancy. (See 24 Code of Federal Regulations (CFR) 982.452(b)(1).)
Eviction
Protections for HCV participants: Incidents or threats of domestic violence, dating violence, sexual assault, stalking, or human trafficking will not be considered a serious or repeated lease violation by the victim, or good cause to terminate the tenancy of the victim (see 24 CFR 5.2005(c)). Protection also applies to criminal activity related directly to domestic violence, dating violence, sexual assault, stalking, or human trafficking, conducted by a member of a tenant’s household or any guest or other person under the tenant’s control, if the tenant or an affiliated individual of the tenant is the victim or threatened victim of such domestic violence, dating violence, sexual assault, stalking, or human trafficking (24 CFR 5.2005(b)(2)).

Limitations of VAWA protections:
a. Nothing in VAWA limits the authority of an owner, when notified of a court order, to comply with a court order with respect to (24 CFR 5.2005(d)(1)):
1) The rights of access or control of property, including civil protection orders issued to protect a victim of domestic violence, dating violence, sexual assault, stalking, or human trafficking; or 2) The distribution or possession of property among members of a household in a case. b. Nothing in VAWA limits an owner from evicting a victim of domestic violence, dating violence, sexual assault, stalking, or human trafficking for a lease violation that is not premised on an act of domestic violence, dating violence, sexual assault, stalking, or human trafficking, as long as the owner does not subject the victim to more demanding standards than other tenants when deciding whether to evict. (See 24 CFR 5.2005(d)(2).)
EXHIBIT 1
City Council 5 – 745 7/15/2025

Page 16 ends

c. Nothing in VAWA limits an owner from evicting a tenant (including the victim of domestic violence, dating violence, sexual assault, stalking, or human trafficking) if the owner can demonstrate an actual and imminent threat to other tenants or those employed at or providing services to the HCV property would be present if the tenant or lawful occupant is not evicted. (See 24 CFR 5.2005(d)(3).) i. In this context, words, gestures, actions, or other indicators will be considered an “actual and imminent threat” if they meet the following standards: An actual and imminent threat consists of a physical danger that is real, would occur within an immediate time frame, and could result in death or serious bodily harm. In determining whether an individual would pose an actual and imminent threat, the factors to be considered include: the duration of the risk, the nature and severity of the potential harm, the likelihood that the potential harm will occur, and the length of time before the potential harm would occur. (See 24 CFR 5.2003.)
ii. Any eviction due to “actual and imminent threat” should be utilized by an owner only when there are no other actions that could be taken to reduce or eliminate the threat, including, but not limited to, transferring the victim to a different unit, barring the perpetrator from the property, contacting law enforcement to increase police presence or develop other plans to keep the property safe, or seeking other legal remedies to prevent the perpetrator from acting on a threat. Restrictions predicated on public safety cannot be based on stereotypes, but must be tailored to particularized concerns about individual residents. (See 24 CFR 5.2005(d)(4).)
Documentation of Domestic Violence, Dating Violence, Sexual Assault, Stalking, or Human Trafficking
If an applicant or tenant requests VAWA protection based on status as a victim of domestic violence, dating violence, sexual assault, stalking, or human trafficking, the owner has the option to request that the victim document or provide written evidence to demonstrate that the violence occurred.

However, nothing in HUD’s regulation requires a covered housing provider to request this documentation. (See 24 CFR 5.2007(b)(3).)
If the owner chooses to request this documentation, the owner must make such request in writing.

The individual may satisfy this request by providing any one document type listed under 24 CFR

5.2007(b)(1):
a. Form HUD-55383 (Self-Certification Form); or
b. A document: 1) Signed by an employee, agent, or volunteer of a victim service provider, an attorney, or medical professional or a mental health professional (collectively, “professional”) from whom the victim has sought assistance relating to domestic violence, dating violence, sexual assault, stalking, or human trafficking, or the effects of abuse:
2) Signed by the applicant or tenant; and
3) That specifies, under penalty of perjury, that the professional believes in the occurrence of the incident of domestic violence, dating violence, sexual assault, stalking, or human trafficking that is the ground for protection and remedies under 24 CFR part 5, subpart L, and that the incident meets the applicable definition of domestic violence, dating violence, sexual assault, stalking, or human trafficking under 24 CFR 5.2003; or
c. A record of a Federal, State, tribal, territorial or local law enforcement agency, court, or administrative agency; or
d. At the discretion of a covered housing provider, a statement or other evidence provided by the applicant or tenant.

EXHIBIT 1
City Council 5 – 746 7/15/2025

Page 16 ends

The owner must accept any of the above items (a – c). The owner has discretion to accept a statement or other evidence (d).

The owner is prohibited from requiring third-party documentation of the domestic violence, dating violence, sexual assault, stalking, or human trafficking, unless the submitted documentation contains conflicting information.

If the owner makes a written request for documentation, the owner may require submission of that documentation within 14 business days after the date that the individual received the written request for documentation. (24 CFR 5.2007(a)(2)). The owner may extend this time period at its discretion.

During the 14 business day period and any granted extensions of that time, no adverse actions, such as evictions or terminations, can be taken against the individual requesting VAWA protection.

Once a victim provides documentation of domestic violence, dating violence, sexual assault, stalking, or human trafficking, the owner is encouraged to acknowledge receipt of the documentation in a timely manner.

If the applicant or tenant fails to provide documentation that meets the criteria in 24 CFR 5.2007 within 14 business days after receiving the written request for that documentation or within the designated extension period, nothing in VAWA may be construed to limit the authority of the covered housing provider to:
a. Deny admission by the applicant or tenant to the housing or program; b. Deny assistance under the covered housing program to the applicant or tenant; c. Terminate the participation of the tenant in the covered housing program; or d. Evict the tenant, or a lawful occupant that commits a violation of a lease.

An individual’s failure to timely provide documentation of domestic violence, dating violence, sexual assault, stalking, or human trafficking does not result in a waiver of the individual’s right to challenge the denial of assistance or termination, nor does it preclude the individual’s ability to raise an incident of domestic violence, dating violence, sexual assault, stalking, or human trafficking at eviction or termination proceedings.

Owners may not coerce, intimidate, threaten, interfere with, or retaliate against any person who exercises or assists or encourages a person to exercise any rights or protections under VAWAs (See FR Notice 1/4/23.)
Moves
A victim of domestic violence, dating violence, sexual assault, stalking, or human trafficking may move in violation of their lease if the move is required to protect their safety. If a move results in the termination of the Housing Assistance Payment Contract, the lease is automatically terminated.

EXHIBIT 1
City Council 5 – 747 7/15/2025

Page 16 ends

Lease Bifurcation
Owners may choose to bifurcate a lease, or remove a household member from a lease in order to evict, remove, terminate occupancy rights, or terminate assistance to such member who engages in criminal activity directly relating to domestic violence, dating violence, sexual assault, stalking, or human trafficking against an affiliated individual or other individual. (See 24 CFR 5.2009(a).) If an owner chooses to bifurcate the lease, the owner must comply with the reasonable time to establish eligibility under the covered housing program or find alternative housing following lease bifurcation provision in 24 CFR 5.2009(b). VAWA protections, including bifurcation, do not apply to guests or unreported members of a household or anyone else residing in a household who is not a tenant.

Eviction, removal, termination of occupancy rights, or termination of assistance must be effected in accordance with the procedures prescribed by federal, state, or local law for termination of leases.

To avoid unnecessary delay in the bifurcation process, HUD recommends that owners seek court-ordered eviction of the perpetrator pursuant to applicable laws. This process results in the underlying lease becoming null and void once the owner regains possession of the unit.

The owner would then execute a new lease with the victim.

Evictions Due to “Actual and Imminent Threat” or Violations Not Premised on Abuse VAWA generally prohibits eviction on the basis or as a direct result of the fact that the applicant or tenant is or has been a victim of domestic violence, dating violence, sexual assault, stalking, or human trafficking, if the applicant or tenant otherwise qualifies for assistance, participation or occupancy. (See 24 CFR 5.2005.) However, VAWA does not prohibit an owner from evicting a tenant for any violation not premised on an act of domestic violence, dating violence, sexual assault, stalking, or human trafficking that is in question against the tenant or an affiliated individual of the tenant. Nor does VAWA prohibit an owner from evicting a tenant if the owner can demonstrate an actual and imminent threat to other tenants or those employed at or providing services to property of the owner would be present if that tenant or lawful occupant is not evicted or terminated from assistance. (See 5.2005(d)(2) and (3).)
In order to demonstrate an actual and imminent threat to other tenants or employees at the property, the covered housing provider must have objective evidence of words, gestures, actions, or other indicators that meet the standards in the following definition:

Actual and imminent threat refers to a physical danger that is real, would occur within an immediate time frame, and could result in death or serious bodily harm. In determining whether an individual would pose an actual and imminent threat, the factors to be considered include:
 The duration of the risk;
 The nature and severity of the potential harm;
 The likelihood that the potential harm will occur; and  The length of time before the potential harm would occur. (See 24 CFR 5.2003 and 5.2005(d)(2).)
EXHIBIT 1
City Council 5 – 748 7/15/2025

Page 16 ends

Confidentiality
Any information submitted to a covered housing provider under 24 CFR 5.2007, including the fact that an individual is a victim of domestic violence, dating violence, sexual assault, stalking, or human trafficking, must be maintained in strict confidence by the covered housing provider. (See 24 CFR 5.2007(c).)
Employees of the owner (or those within their employ, e.g., contractors) must not have access to the information unless explicitly authorized by the owner for reasons that specifically call for these individuals to have access to this information under applicable federal, state, or local law (e.g., the information is needed by an employee to provide the VAWA protections to the victim).

The owner must not enter this information into any shared database, or disclose this information to any other entity or individual, except to the extent that disclosure is:
a. Requested or consented to in writing by the individual (victim) in a time-limited release; b. Required for use in an eviction proceeding or hearing regarding termination of assistance from the covered program; or
c. Otherwise required by applicable law.

When communicating with the victim, owners must take precautions to ensure compliance with these confidentiality requirements.

Service Providers
[insert name of housing provider] has extensive relationships with local service providers. [insert name of housing provider] staff are available to provide referrals to shelters, counselors, and advocates. These resources are also provided in [insert name of housing provider] Annual and 5-Year Plan, Administrative Plan, VAWA Notice of Occupancy Rights, and Emergency Transfer Plan. A list of local service providers is attached to this Notice.

Definitions
Actual and imminent threat refers to a physical danger that is real, would occur within an immediate time frame, and could result in death or serious bodily harm. In determining whether an individual would pose an actual and imminent threat, the factors to be considered include: the duration of the risk, the nature and severity of the potential harm, the likelihood that the potential harm will occur, and the length of time before the potential harm would occur.

Affiliated individual, with respect to an individual, means:
(1) A spouse, parent, brother, sister, or child of that individual, or a person to whom that individual stands in the place of a parent or guardian (for example, the affiliated individual is a person in the care, custody, or control of that individual); or
(2) Any individual, tenant, or lawful occupant living in the household of that individual.

Bifurcate means to divide a lease as a matter of law, subject to the permissibility of such process under the requirements of the applicable HUD-covered program and State or local law, such that certain tenants or lawful occupants can be evicted or removed and the remaining tenants or lawful occupants can continue to reside in the unit under the same lease requirements or as may be revised depending upon the eligibility for continued occupancy of the remaining tenants and lawful occupants.

EXHIBIT 1
City Council 5 – 749 7/15/2025

Page 16 ends

Dating violence means violence committed by a person:
(1) Who is or has been in a social relationship of a romantic or intimate nature with the victim; and (2) Where the existence of such a relationship shall be determined based on a consideration of the following factors:
(i) The length of the relationship;
(ii) The type of relationship; and
(iii) The frequency of interaction between the persons involved in the relationship.

Domestic violence includes felony or misdemeanor crimes of committed by a current or former spouse or intimate partner of the victim under the family or domestic violence laws of the jurisdiction receiving grant funding, and in the case of victim services, includes the user or attempted use of physical abuse or sexual abuse, or a pattern of any other coercive behavior committed, enabled, or solicited to gain or maintain power and control over a victim, including verbal, psychological, economic, or technological abuse that may or may not constitute criminal behavior, by a person who is:
 The current or former spouse or intimate partner of the victim, or person similarly situated to a spouse or intimate partner of the victim
 A person who is cohabitating or has cohabitated with the victim as a spouse or intimate partner  A person with whom the victim shares a child in common  A person who commits acts against an youth or adult victim who is protected from those acts under the domestic or family violence laws of the jurisdiction Sexual assault means any nonconsensual sexual act proscribed by Federal, tribal, or State law, including when the victim lacks capacity to consent.

Stalking means engaging in a course of conduct directed at a specific person that would cause a reasonable person to:
(1) Fear for the person’s individual safety or the safety of others; or (2) Suffer substantial emotional distress.

VAWA means the Violence Against Women Act of 1994, as amended (42 U.S.C. 13925 and 42 U.S.C. 14043e et seq.).

Attached:

Legal services and the domestic violence resources for the Metro area Form HUD-5382 Certification of Domestic Violence, Dating Violence, Sexual Assault, or Stalking [insert name of housing provider] VAWA Notice of Occupancy Rights EXHIBIT 1
City Council 5 – 750 7/15/2025

Page 17 ends

Chapter 17

PROJECT-BASED VOUCHERS

INTRODUCTION
This chapter describes HUD regulations and PHA policies related to the project-based voucher (PBV) program in nine parts:

Part I: General Requirements. This part describes general provisions of the PBV program including maximum budget authority requirements, the cap on the number of assisted units in each project, relocation requirements, and equal opportunity requirements.

Part II: PBV Owner Proposals. This part includes policies related to the submission and selection of owner proposals for PBV assistance. It describes the factors the PHA will consider when selecting proposals, the type of housing that is eligible to receive PBV assistance, subsidy layering requirements, site selection standards, and environmental review requirements.

Part III: Dwelling Units. This part describes requirements related to inspections, the type and frequency of inspections, and housing accessibility for persons with disabilities.

Part IV: Rehabilitated and Newly Constructed Units. This part describes requirements and policies related to the development and completion of rehabilitated and newly constructed housing units that will be receiving PBV assistance.

Part V: Housing Assistance Payments Contract. This part discusses HAP contract requirements and policies including the execution, term, and termination of the HAP contract. In addition, it describes how the HAP contract may be amended and identifies provisions that may be added to the HAP contract at the PHA’s discretion.

Part VI: Selection of PBV Program Participants. This part describes the requirements and policies governing how the PHA and the owner will select a family to receive PBV assistance.

Part VII: Occupancy. This part discusses occupancy requirements related to the lease and describes under what conditions families are allowed or required to move.

Part VIII: Determining Rent to Owner. This part describes how the initial rent to owner is determined, and how rent will be redetermined throughout the life of the HAP contract.

Rent reasonableness requirements are also discussed.

Part IX: Payments to Owner. This part describes the types of payments owners may receive under this program.

EXHIBIT 1
City Council 5 – 751 7/15/2025

Page 17 ends

PART I: GENERAL REQUIREMENTS
17-I.A. OVERVIEW [24 CFR 983.5]
The project-based voucher (PBV) program allows a PHA that already administers a tenant-based voucher program under an annual contributions contract (ACC) with HUD to take up to 20 percent of its authorized units (plus an additional 10 percent for units meeting certain criteria) and attach the funding to specific units rather than using it for tenant-based assistance [24 CFR 983.6]. Assistance may be tied to a multifamily building or a single-family building. PHAs may only operate a PBV program if doing so is consistent with the PHA’s Annual Plan, and the goal of deconcentrating poverty and expanding housing and economic opportunities [42 U.S.C. 1437f(o)(13)]. A PHA has discretion whether to operate a PBV program. HUD approval is not required, except that the PHA must notify HUD of its intent to project-base its vouchers and when the PHA executes, amends, or extends a HAP contract. The PHA must also state in its administrative plan that it will engage in project-basing and must amend its administrative plan to include all PBV-related matters over which the PHA is exercising its discretion.

SAHA Policy
SAHA will operate a project-based voucher program.

The PHA may enter into a HAP contract for existing housing, newly constructed or rehabilitated housing (see definitions below). During the term of the HAP contract, the PHA makes housing assistance payments to the owner for units leased and occupied by eligible families.

EXHIBIT 1
City Council 5 – 752 7/15/2025

Page 17 ends

17-I.B. PBV DEFINITIONS [24 CFR 983.3]
The following terms apply to the PBV program and are used throughout this chapter:

Excepted units are units in a project not counted toward the project cap because they exclusively serve or are made available to certain families in accordance with 24 CFR 983.54(c)(2).

Excluded units are units in a project not counted toward the program cap or project cap because they meet certain criteria in accordance with 24 CFR 983.59.

Existing housing is a project that meets the following criteria:
 All the proposed contract units in the project either fully comply or substantially comply with HQS on the proposal or project selection date, as determined per 24 CFR 983.103(a). (The units must fully comply with HQS at the time required by 24 CFR 983.103(c). The units substantially comply with HQS if:
- The units only require repairs to current components or replacement of equipment and/or materials by items of substantially the same kind to correct deficiencies; and - The PHA determines all deficiencies can reasonably be corrected within a 30-day period, taking into consideration the totality of the deficiencies in the project.  The PHA determines the project is not reasonably expected to require substantial improvement and the owner certifies it has no plans to undertake substantial improvement from the proposal submission date (for projects subject to competitive selection) or the project selection date (for projects excepted from competitive selection) through the first two years of the HAP contract.
 The following units do not qualify as existing housing:
- Units for which rehabilitation or new construction began after proposal submission or the date of board resolution but prior to the effective date of an AHAP (if applicable); and - Units that were newly constructed or rehabilitated in violation of program requirements.

An independent entity is either:
 The unit of general local government; however, if the PHA itself is the unit of general local government or an agency of such government, then only the next level of general local government (or an agency of such government) or higher may serve as the independent entity; or
 A HUD-approved entity that is autonomous and recognized under state law as a separate legal entity from the PHA. The entity must not be connected financially (except regarding compensation for services performed for PHA-owned units) or in any other manner that could result in the PHA improperly influencing the entity.

An in-place family is a family residing in a proposed contract unit on the proposal or project selection date.

Newly constructed housing is a project containing housing units that do not exist on the proposal or project selection date and are developed after the date of selection for use under the PBV program.

EXHIBIT 1
City Council 5 – 753 7/15/2025

Page 17 ends

A PHA-owned unit is a dwelling unit in a project that is:
 Owned by the PHA (including having a controlling interest in the entity that owns the project);
 Owned by an entity wholly controlled by the PHA; or
 Owned by a limited liability company or limited partnership in which the PHA (or an entity wholly controlled by the PHA) holds a controlling interest in the managing member or general partner.
- A controlling interest is:
 Holding more than 50 percent of the stock of any corporation;  Having the power to appoint more than 50 percent of the members of the board of directors of a non-stock corporation (such as a nonprofit corporation);  Where more than 50 percent of the members of the board of directors of any corporation also serve as directors, officers, or employees of the PHA;  Holding more than 50 percent of all managing member interests in an LLC;  Holding more than 50 percent of all general partner interests in a partnership; or  Equivalent levels of control in other ownership structures.

A project can be a single building, multiple contiguous buildings, or multiple buildings on contiguous parcels of land. “Contiguous” in this definition includes “adjacent to,” as well as touching along a boundary or a point. A PHA may, in its administrative plan, establish the circumstances under which it will define a project as only one of the following: a single building, multiple contiguous buildings, or multiple buildings on contiguous parcels of land.

PHA Policy
SAHA will not define circumstances that limit the definition of the term project.

Rehabilitated housing is a project which is developed for use under the PBV program, in which all proposed contract units exist on the proposal or project selection date, but which does not qualify as existing housing.

A qualified census tract is any census tract (or equivalent geographic area defined by the Bureau of the Census) in which at least 50 percent of households have an income of less than 60 percent of Area Median Income (AMI), or where the poverty rate is at least 25 percent and where the census tract is designated as a qualified census tract by HUD.

EXHIBIT 1
City Council 5 – 754 7/15/2025

Page 17 ends

Substantial improvement is one of the following activities undertaken at a time beginning from the proposal submission date (for projects subject to competitive selection) or from the project selection date (for projects excepted from competitive selection), or undertaken during the term of the PBV HAP contract:
 Remodeling that alters the nature or type of housing units in a project;  Reconstruction; or
A substantial improvement in the quality or kind of equipment and materials. The replacement of equipment and/or materials rendered unsatisfactory because of normal wear and tear by items of substantially the same kind does not constitute substantial improvement.

EXHIBIT 1
City Council 5 – 755 7/15/2025

Page 17 ends

17-I.C. MAXIMUM NUMBER OF PBV UNITS (PERCENTAGE LIMITATION) [24 CFR 983.6]
Program Cap
If a PHA decides to operate a PBV program, the PHA’s PBV program is funded with a portion of appropriated funding (budget authority) available under the PHA’s voucher Annual Contributions Contract (ACC). Except for certain units discussed below, a PHA may commit project-based assistance to no more than 20 percent of its authorized voucher units, as adjusted, at the time of commitment, with the ability to project-base an additional 10 percent of units that meet certain requirements. An analysis of impact must be conducted if a PHA is project-basing 50 percent or more of the PHA’s authorized voucher units.

All PBV units which the PHA has selected (from the time of the proposal or project selection date) or which are under an Agreement to Enter into a HAP Contract (AHAP) or HAP contract for PBV assistance count toward the 20 percent maximum or increased cap. The PHA is responsible for determining the amount of budget authority that is available for project-based vouchers and for ensuring that the amount of assistance that is attached to units is within the amounts available under the ACC. Appendix I of Notice PIH 2017-21 contains a sample PBV program cap calculation worksheet. If PBV units are already selected for project-based assistance either under an AHAP or a HAP contract, the PHA is not required to reduce the number of units if the number of authorized units is subsequently reduced.

Increased Cap [24 CFR 983.6(d)]
The PHA may project-base an additional 10 percent of its authorized voucher units above the 20 percent program limit, provided the units meet requirements outlined in 24 CFR 983.6(d)(1) or (2). The units may be distributed among one, all, or a combination of the categories described below, as long as the total number of units does not exceed the 10 percent cap. The PBV HAP contract must specify, and the owner must set aside, the number of units meeting the conditions to qualify for the increased program cap. To qualify for the increased program cap, the unit must be occupied by the type of family specified in the applicable paragraph below.

For units under a HAP contract that was first executed on or after April 18, 2017, or added on or after that date to a current HAP contract entered into prior to April 19, 2017, units qualify under the increased program cap if the units meet one or more of the conditions below [24 CFR 983.6(d)(1)]:
 The units are specifically made available to house individuals and families that meet the definition of homeless under section 103 of the McKinney-Vento Homeless Assistance Act (42 U.S.C. 11302) and contained in the Continuum of Care Interim Rule at 24 CFR 578.3. - A family qualifies if they were homeless at the time the family first occupies the unit.  The units are specifically made available to house families that are comprised of or include a veteran at the time the family first occupies a unit.
- A veteran is person who served in the active military, naval, air, or space service, and who was discharged or released therefrom.

EXHIBIT 1
City Council 5 – 756 7/15/2025

Page 17 ends

 The units provide supportive housing to persons with disabilities or elderly persons as defined in 24 CFR 5.403.
- A disabled or elderly member of the family must be eligible for one or more of the supportive services at the time the family first occupies the unit. The member of the family may choose not to participate in the services.
- Supportive housing means that the project makes supportive services available for all of the assisted families in the project and provides a range of services tailored to the needs of the residents occupying such housing.
- Such supportive services need not be provided by the owner or onsite but must be reasonably available to the families receiving PBV assistance in the project. - The PHA’s administrative plan must describe the type and availability of supportive services the PHA will consider as qualifying for the 10 percent increased cap.  The units are located in areas where vouchers are difficult to use.  The units replace, on a different site, units listed in 24 CFR 983.59(b)(1) and (2) for which the PHA had authority under 24 CFR 983.59 to commit PBV assistance on the original site without the units counting toward the program cap or project cap.

The increased program cap also applies to units that are part of a HAP contract executed on or after December 27, 2020, or are added on or after that date to any current HAP contract, including a contract entered into prior to December 27, 2020, and meet the following requirements [24 CFR 983.6(d)(2)]:
 The units are exclusively made available to eligible youth receiving Family Unification Program (FUP) or Foster Youth to Independence (FYI) assistance; and  If the units exclusively made available to eligible youth use FUP assistance that is normally available for eligible families and youth, the PHA determines and documents that the limitation of the units to youth is consistent with the local housing needs of both eligible FUP populations (families and youth) and amends its administrative plan to specify that FUP PBV assistance is solely for eligible youth.

SAHA Policy
SAHA will not project-base units under the increased program cap.

EXHIBIT 1
City Council 5 – 757 7/15/2025

Page 17 ends

17-I.D. CAP ON NUMBER OF PBV UNITS IN EACH PROJECT [24 CFR 983.54] Project Cap [24 CFR 983.54(a)]
In general, the PHA may not select a proposal for units in a project or enter into an AHAP or a HAP contract to provide PBV assistance for units in a project if the total number of dwelling units in the project that will receive PBV assistance is more than the greater of 25 units or 25 percent of the number of dwelling units (assisted or unassisted, as adjusted) in the project.

Higher Project Cap [24 CFR 983.54(b)]
The PHA may provide PBV assistance to the greater of 25 units or 40 percent of the number of dwelling units (assisted and unassisted, as adjusted) in the project if the project is located in an area where vouchers are difficult to use [24 CFR 983.54(b)]. An area where a voucher is difficult to use is defined as:
 A census tract with a poverty rate of 20 percent or less, as determined by HUD;  A ZIP code area where the rental vacancy rate is less than 4 percent, as determined by HUD; or
 A ZIP code area where 90 percent of the Small Area FMR is more than 110 percent of the metropolitan area or county FMR.

Exceptions to the Project Cap [24 CFR 983.54(c)]
Certain units are removed from the number of dwelling units for purposes of calculating the project cap. These are known as excepted units, which are defined as units in a project not counted toward the project cap because they exclusively service or are made available to certain families.

The PHA determines the number of units in the project for which the PHA will provide projectbased assistance, including whether and how many units will be excepted. The PBV HAP contract must specify, and the owner must set aside, the number of excepted units made available for occupancy by families who qualify for the exception. For a unit to be considered excepted, it must be occupied by a family who qualifies for the exception.

Which units are considered excepted differs depending on when the HAP contract was executed.

Contracts executed prior to April 18, 2017, follow the “old” statutory PBV requirements for excepted units. Projects where the HAP contract was executed on or after April 18, 2017, follow new requirements. In this case, PBV units are not counted toward the project cap if the units are:
 Exclusively for elderly families;
 Exclusively made available to eligible youth receiving FUP or FYI assistance; or  For households eligible for supportive services available to all families receiving PBV assistance in the project.

EXHIBIT 1
City Council 5 – 758 7/15/2025

Page 17 ends

A project is not limited to a single exception category but may include excepted units from any of the exception categories.

SAHA Policy
SAHA will have excepted units in certain PBV projects for the following:

Supportive Services
SAHA will provide excepted units that offer optional supportive services available to all PBV-assisted families in a project. Families are not required to participate in services as a condition of living in excepted units. The exception applies to any household eligible for the supportive services and is not limited to households with a family member with a disability.

When families opt in to supportive services, such services will be made available to the family as quickly as reasonably practicable, but no longer than 120 calendar days from the family’s request.

A unit is excepted from the project cap if any member of the family is eligible for one or more of the supportive services, even if the family chooses not to participate in the services. If a family member chooses to participate in and successfully completes the supportive services, the unit continues to count as an excepted unit for as long as the family resides in the unit, even if the members that continue to reside in the unit are ineligible during tenancy for all available supportive services.

The unit loses its excepted status only if the entire family becomes ineligible during the tenancy for all supportive services available to the family. This provision does not apply where any member of the family has successfully completed the supportive services. A family cannot be terminated from the program or evicted from the unit because they become ineligible for all supportive services during the tenancy.

FUP/FYI Assistance
SAHA will provide excepted units made available exclusively for youth receiving FUP or FYI assistance.

SAHA has determined that the limitation of PBV units to youth is consistent with the local housing needs of both eligible FUP populations (families and youth).

A unit is excepted from the project cap or qualifies under the increased program cap, as applicable, if the unit is occupied by an eligible youth receiving FUP assistance.

The youth must vacate the unit once the FUP assistance has expired. The unit loses its excepted status or no longer qualifies under the increased program cap, as applicable, if the youth does not move from the unit upon the expiration of the FUP assistance.

Disabled Families
SAHA will provide excepted units for disabled families (which is defined as a family whose head, spouse, cohead or sole member is a person with disabilities).

SAHA will allow families who initially qualified to live in an excepted unit to remain when circumstances change due to circumstances beyond the remaining family members’ control.

EXHIBIT 1
City Council 5 – 759 7/15/2025

Page 17 ends

In all other cases, SAHA will provide written notice to the family and owner within 14 calendar days of making the determination. The family will be given 30 days from the date of the notice to move out of the PBV unit. If the family does not move out within this 30-day time frame, SAHA will terminate the housing assistance payments at the expiration of this 30-day period.

SAHA may make exceptions to this 30-day period if needed for reasons beyond the family’s control such as death, serious illness, or other medical emergency of a family member.

EXHIBIT 1
City Council 5 – 760 7/15/2025

Page 17 ends

Units that No Longer Qualify as Excepted Units or Units under the Increased Program Cap [24 CFR 983.262(b)]
In order to qualify as either excepted units or units under the increased program cap, units must be occupied by a family that meets the exception criteria applicable to the unit. Once the family vacates the unit, the PHA must select a new family from the waiting list via an admission preference, and the unit must be made available to and occupied by a family that meets the applicable exception.

The PHA must specify in its administrative plan which of the options below the PHA will take if a unit is no longer qualified due to circumstances beyond the control of the family (e.g., death of an elderly family member or long-term permanent hospitalization or nursing care).

The unit may continue to count as an excepted unit or unit on the increased program cap as long as the family resides in the unit. However, the requirements on wrong-sized units apply.

If the PHA chooses not to exercise this discretion, the unit is no longer considered excepted or a unit under the increased program cap (as applicable) and the family is not required to move from the unit. The PHA must specify which of the following actions it will take if the unit is no longer qualified:
 Substitute the unit for another unit if it is possible to do so in accordance with 24 CFR 983.207(a), so that the overall number of excepted units or units under the increased program cap in the project is not reduced. The PHA may, in conjunction with such substitution, add the original unit to the HAP contract if it is possible to do so in accordance with 24 CFR 983.207(b), including that such addition does not cause the PHA to exceed the program cap or become non-compliant with the project cap.
 Remove the unit from the PBV HAP contract. In conjunction with the removal, the PHA may provide the family with tenant-based assistance, if the family is eligible for tenant-based assistance. The family and the owner may agree to use the tenant-based voucher in the unit; otherwise, the family must move from the unit with the tenant-based voucher. If the family later vacates the unit, the PHA may add the unit to the PBV HAP contract in accordance with 24 CFR 983.207.

EXHIBIT 1
City Council 5 – 761 7/15/2025

Page 17 ends

 Change the unit’s status under the project cap or program cap, as applicable, provided that the change does not cause the PHA to exceed the program cap or become non-compliant with the project cap.

SAHA Policy
If, due to circumstances beyond the control of the family, the unit is no longer qualified as an excepted unit or unit under the increased program cap, the unit will continue to count as long as the family resides in the unit. However, requirements for wrong-sized units will apply.

EXHIBIT 1
City Council 5 – 762 7/15/2025

Page 17 ends

17-I.E. UNITS NOT SUBJECT TO THE PBV PROGRAM CAP OR PROJECT CAP [FR Notice 1/18/17 and 24 CFR 983.59]
For HAP contracts that first became effective on or after April 18, 2017, the PHA may commit project-based assistance to units that meet the requirements below without the units counting toward the program cap (including the 10 percent exception) or project cap. These are known as excluded units and fall into two different categories:
 Existing or Rehabilitation Units: In the five years prior to the request for proposals (RFP) or the proposal or project selection date (in the case of selection without RFP), these units fall into one of the categories described below, provided that the units are removed from all categories prior to the effective date of the HAP contract. These units include units that received one of the following forms of HUD assistance:
- Public Housing Capital or Operating Funds;
- Project-Based Rental Assistance (Section 8), including units assisted under Section 8 Moderate Rehabilitation (Mod Rehab) and Mod Rehab Single-Room Occupancy (SRO) programs;
- Housing for Elderly (Section 202);
- Housing for Persons with Disabilities (Section 811);
- Rental Assistance Program (RAP) (Section 236(f)(2) of the National Housing Act); or Flexible Subsidy Program (Section 201 of the Housing and Community Development Amendments of 1978).

Or the units have been subject to a federally required rent restriction under one of the following programs:
- The Low-Income Housing Tax Credit program (26 U.S.C. 42); - Section 515 Rural Rental Housing Loans (42 U.S.C. 1485); or - The following HUD programs:
- Section 236;
- Section 221(d)(3) Below Market Interest Rate;
- Housing For the Elderly (Section 202 of the Housing Act of 1959); - Housing for Persons with Disabilities (Section 811 of the Cranston-Gonzalez National Affordable Housing Act);
- Flexible Subsidy Program (Section 201 of the Housing and Community Development Amendments Act of 1978); or
- Any other program identified by HUD through Federal Register notice subject to public comment.

EXHIBIT 1
City Council 5 – 763 7/15/2025

Page 17 ends

 Replacement Units: Newly constructed units developed under the PBV program are also considered excluded units if the primary purpose of the newly constructed units is or was to replace units that meet the criteria listed above. The newly constructed unit must be located on the same site as the unit it is replacing; however, an expansion of or modification to the prior project’s site boundaries as a result of the design of the newly constructed project is acceptable as long as a majority of the replacement units are built back on the site of the original project and any replacement units that are not located on the existing site are part of a project that shares a common border with, are across a public right of way from, or touch that site. In addition, in order for the replacement units to be excluded from the program and project caps, one of the following must be true:
- Former residents of the original project must be provided with a selection preference that provides the residents with the right of first occupancy at the PBV newly constructed project when it is ready for occupancy; or
- Prior to the demolition of the original project, the PBV newly constructed project must have been identified as replacement housing for that original project as part of a documented plan for the redevelopment of the site.
17-I.F. PHA-OWNED UNITS [24 CFR 982.4 and 983.57]
For PHA-owned units (as defined in 24 CFR 982.4), an independent entity (as defined in 24 CFR 982.4) must perform the following functions:
 Determine rent to owner, including rent reasonableness and calculating any rent adjustments by HUD’s Operating Cost Adjustment Factor (OCAF) (where applicable), in accordance with 24 CFR 983.301 through 983.305;
 Perform unit inspections in accordance with 24 CFR 983.103(g);  When the owner carries out development activity or substantial improvement, the independent entity must review the evidence and work completion certification submitted by the owner and determine if the units are complete in accordance with 24 CFR 983.156; and  Determine whether to approve substantial improvement to units under a HAP contract in accordance with 24 CFR 983.212.

The PHA may only compensate the independent entity from PHA ongoing administrative fee income (including amounts credited to the administrative fee reserve). The PHA may not use other program receipts to compensate the independent entity for its services. The PHA and independent entity may not charge the family any fee for the appraisal, or the services provided by the independent entity.

EXHIBIT 1
City Council 5 – 764 7/15/2025

Page 17 ends

17-I.G. TENANT-BASED VS. PROJECT-BASED VOUCHER ASSISTANCE [24 CFR 983.2]
Much of the tenant-based voucher program regulations also apply to the PBV program.

Consequently, many of the PHA policies related to tenant-based assistance also apply to PBV assistance. The provisions of the tenant-based voucher regulations that do not apply to the PBV program are listed at 24 CFR 983.2(c).

SAHA Policy
Except as otherwise noted in this chapter, or unless specifically prohibited by PBV program regulations, SAHA policies for the tenant-based voucher program contained in this administrative plan also apply to the PBV program. 17-I.H. RELOCATION REQUIREMENTS [24 CFR 983.7]
Any persons displaced as a result of implementation of the PBV program must be provided relocation assistance in accordance with the requirements of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (URA)[42 U.S.C. 4201-4655] and implementing regulations at 49 CFR part 24.

The cost of required relocation assistance may be paid with funds provided by the owner, local public funds, or funds available from other sources. PHAs may not use voucher program funds to cover relocation costs, except that PHAs may use their administrative fee reserve to pay for relocation expenses after all other program administrative expenses are satisfied, and provided that payment of the relocation benefits is consistent with state and local law. Use of the administrative fee for these purposes must also be consistent with other legal and regulatory requirements, including the requirement in 24 CFR 982.155 and other official HUD issuances.

The acquisition of real property for a PBV project is subject to the URA and 49 CFR part 24, subpart B. It is the responsibility of the PHA to ensure the owner complies with these requirements.
17-I.I. EQUAL OPPORTUNITY REQUIREMENTS [24 CFR 983.8]
The PHA must comply with all equal opportunity requirements under federal law and regulations in its implementation of the PBV program. This includes the requirements and authorities cited at 24 CFR 5.105(a). In addition, the PHA must comply with the PHA Plan certification on civil rights and affirmatively furthering fair housing, submitted in accordance with 24 CFR 903.7(o).

EXHIBIT 1
City Council 5 – 765 7/15/2025

Page 17 ends

PART II: PROPOSAL AND PROJECT SELECTION
17-II.A. OVERVIEW
The PHA must include a description of the circumstances under which the PHA will use noncompetitive selection for PBV projects and competitive selection for PBV proposals, including the procedures for submission and selection of such proposals, in the administrative plan [24 CFR 983.10(b)(3)].

Before selecting a PBV proposal, the PHA must determine that the PBV proposal complies with HUD program regulations and requirements, including a determination that the property is eligible housing [24 CFR 983.52 and 983.53], complies with the cap on the number of PBV units per project [24 CFR 983.54], and meets the site selection standards [24 CFR 983.55]. The PHA may not commit PBVs until or unless it has followed the proposal selection requirements defined in 24 CFR 983.51.

The PHA may allow for entities that have site control to submit proposals provided the entity will be the owner prior to entering into the AHAP or HAP contract. An owner may submit, and a PHA may select, a single proposal covering multiple projects where each project consists of a single-family building, provided all projects are the same housing type (existing, rehabilitated, or newly constructed) [24 CFR 983.51(a)].

A PHA may not commit project-based assistance to a project if the owner or any principal or interested party is debarred, suspended subject to a limited denial of participation, or otherwise excluded under 2 CFR Part 2424 or is listed on the U.S. General Services Administration list of parties excluded from federal procurement or non-procurement programs. HUD approval of specific projects or owners is not required. For example, owner proposal selection does not require submission of form HUD-2530 (Previous Participation Certification) or other HUD previous participation clearance.

Selection of PHA-Owned Units [24 CFR 983.51(h)]
A PHA-owned unit (as defined in 24 CFR 982.4) may be assisted under the PBV program only if the HUD field office or HUD-approved independent entity reviews the selection process and determines that the PHA-owned units were appropriately selected based on the selection procedures specified in the PHA’s administrative plan.

With the exception of projects selected in accordance with 24 CFR 983.51(c) (projects that meet the criteria to be excepted from competitive selection), the PHA’s selection procedures must be designed in a manner that does not effectively eliminate the submission of proposals for nonPHA-owned units or give preferential treatment (e.g., additional points) to PHA-owned units.

EXHIBIT 1
City Council 5 – 766 7/15/2025

Page 17 ends

17-II.B. COMPETITIVE SELECTION OF PROPOSALS [24 CFR 983.51(b)] The PHA must select PBV proposals in accordance with the selection procedures in the PHA administrative plan. The PHA must select PBV proposals by either of the following two methods:
 PHA request for PBV Proposals. The PHA may solicit proposals by using a RFP to select proposals on a competitive basis in response to the PHA request. The PHA may not limit proposals to a single site or impose restrictions that explicitly or practically preclude owner submission of proposals for PBV housing on different sites. The PHA may establish selection procedures that combine or are in conjunction with other federal, state, or local government housing assistance, community development, or supportive services competitive selection processes. If the PHA selection process is combined and administered in conjunction with another RFP process, the PHA remains responsible for complying with proposal selection procedures as described in 24 CFR 983.51.
 The PHA may select, without issuing an RFP, proposals that were previously selected based on a competition. This may include selection of a proposal for housing assisted under a federal, state, or local government housing assistance, community development, or supportive services program that was subject to a competition in accordance with the requirements of the applicable program where the proposal has been selected in accordance with such program’s competitive selection requirements within three years of the PBV proposal selection date, and the earlier competition did not involve any consideration that the project would receive PBV assistance.

Solicitation and Selection of PBV Proposals [24 CFR 983.51(d)] PHA procedures for selecting PBV proposals must be designed and actually operated to provide broad public notice of the opportunity to offer PBV proposals for consideration by the PHA.

The public notice procedures may include publication of the public notice in a local newspaper of general circulation and other means designed and actually operated to provide broad public notice. The public notice of the PHA request for PBV proposals must specify the submission deadline. Detailed application and selection information must be provided at the request of interested parties.

EXHIBIT 1
City Council 5 – 767 7/15/2025

Page 17 ends

SAHA Policy
SAHA Request for Proposals for Rehabilitated, Newly Constructed Units, or Existing Housing
SAHA will advertise its request for proposals (RFP) for rehabilitated, newly constructed or existing housing in newspapers of general circulation (to be identified at the time of publication).

In addition, SAHA will post the RFP and proposal submission and rating and ranking procedures on its website. The advertisement will remain on SAHA’s website until such time as the application period is closed.

The advertisement will state the number of vouchers available to be project-based, the type of units that will be considered, the submission deadline, and will note how to obtain the full RFP with information on the application and selection process. Advertisements will also contain a statement that participation in the PBV program requires compliance with Fair Housing and Equal Opportunity (FHEO) requirements and that the Federal Labor Standard provisions may be applicable for new and rehabilitation projects.

SAHA will date and time stamp all applications upon receipt. Applications received after the published deadline date will not be accepted for consideration under the RFP process.

Postmarks are not acceptable.

In order for the proposal to be considered, the owner must submit the proposal to SAHA by the published deadline date, and the proposal must respond to all requirements as outlined in the RFP and be in compliance with all HUD program requirements.

Incomplete proposals will not be reviewed. SAHA reserves the right to reject applications at any time for misinformation, errors, or omissions of any kind.

SAHA may rate and rank proposals using the following criteria, including but not limited to:

Owner experience and capability to build or rehabilitate housing as identified in the RFP;
If applicable, the extent to which services for special populations are provided on site or in the immediate area for occupants of the property.

EXHIBIT 1
City Council 5 – 768 7/15/2025

Page 17 ends

SAHA Selection of Proposals Subject to a Previous Competition under a Federal, State, or Local Housing Assistance Program
SAHA will accept proposals for PBV assistance from owners that were competitively selected under another federal, state or local housing assistance program, including but not limited to projects that were competitively awarded Low-Income Housing Tax Credits (if the earlier competition did not involve any consideration that the project would receive PBV assistance), HOME Program, or another source of Federal, State or Local affordable funds on an ongoing basis.

EXHIBIT 1
City Council 5 – 769 7/15/2025

Page 17 ends

17-II.C. NON-COMPETITIVE PROJECT SELECTION [24 CFR 983.51(c)] The PHA may select units without a competitive selection process in certain circumstances described in 24 CFR 983.51(c) and FR Notice 8/13/24. Prior to selecting units based on the below criteria, the PHA must notify the public of its intent to noncompetitively select one or more projects for PBV assistance through its 5-Year Plan. If this requirement is not met, the PHA may not select units non-competitively.

The PHA may select units for PBV assistance without following a competitive process in the following circumstances:
 The PHA may select existing, newly constructed, or rehabilitated public housing projects where the PHA has an ownership interest or over which the PHA has control, when the PHA is engaged in an initiative to improve, develop, or replace a public housing property or site. - The public housing units may either currently be in the public housing inventory or may have been removed from the public housing inventory through any available legal removal tool within five years of the project selection date.  The PHA may select for future PBV assistance a project currently under the public housing program, or a project that is replacing the public housing project, in which a PHA has no ownership interest, or which a PHA has no control over, provided:
- The public housing project is either still in the public housing inventory or had been removed from the public housing inventory through any available legal removal tool within five years of the project selection date;
- The PHA that owned or owns the public housing project does not administer the HCV program;
- The project selected for PBV assistance was specifically identified as replacement housing for the impacted public housing residents as part of the public housing demolition/disposition application, voluntary conversion application, or any other application process submitted to and approved by HUD to remove the public housing project from the public housing inventory; and
- With respect to replacement housing, the PHA does not have to replace the housing on the same site as the original public housing, but the number of contract units in the replacement project may not exceed the number of units in the original public housing project by more than a de minimis amount for this exception to apply.  The PHA may select a project consisting of PHA-owned units as defined at 24 CFR 982.4. - The units must continue to meet the definition of PHA-owned for the initial two years of the HAP contract unless there is a transfer of ownership approved by HUD.  The PHA may select a project that underwent an eligibility event within five years of the project selection date, in which a family (or families) qualifies for enhanced voucher assistance and provided informed consent to relinquish its enhanced voucher for PBV assistance.

EXHIBIT 1
City Council 5 – 770 7/15/2025

Page 17 ends

 The PHA may select one or more PBV projects with units made exclusively available to VASH families on the site of a VA facility [FR Notice 8/13/24]. - The method of project selection must comply with all other requirements under 24 CFR 983.51, including that the PHA must notify the public of its intent to noncompetitively select one or more projects for PBV assistance through its 5-Year Plan and to ensure any project selection is consistent with the PHA administrative plan.

SAHA Policy
SAHA will not attach PBVs to projects as described above.

EXHIBIT 1
City Council 5 – 771 7/15/2025

Page 17 ends

17-II.D. PROJECT OR PROPOSAL SELECTION [24 CFR 983.51(f) and 24 CFR 983.153(c)(3)]
Inspections Required Prior to Project or Proposal Selection [24 CFR 983.51(e)] The PHA must examine the proposed site before the proposal or project selection date to determine whether the site complies with the site selection standards outlined in 24 CFR 983.55.

The PHA may execute a HAP contract for existing housing if:
 All proposed contract units in the project fully or substantially comply with housing quality standards on the proposal or project selection date, which the PHA must determine via inspection;
 The project meets the environmental review requirements at 24 CFR 983.56, if applicable; and
 The project meets the initial inspection requirements in accordance with 24 CFR 983.103(c).

PHA Written Notice of Proposal or Project Selection [24 CFR 983.51(f) and (h) and 24 CFR 983.153(c)(3)]
Regardless of the method of selection, the PHA is required to provide written notice of proposal or project selection, which must include:
 If the project contains PHA-owned units, the PHA must provide the written notice of proposal or project selection to the responsible PHA official, and that official must certify in writing that the PHA accepts the terms and requirements stated in the notice. The PHA must make documentation available for public inspection regarding the basis for the PHA selection of a PBV proposal.
 When an environmental review is required, if the review has not been conducted prior to the project or proposal selection date, the PHA’s written notice that the selection is subject to completion of a favorable environmental review and that the project or proposal may be rejected based on the results of the environmental review.  For newly constructed housing and rehabilitated housing in projects to which labor standards apply, the PHA’s written notice to the party that submitted the selected proposal or board resolution approving project-basing of assistance at the specific project must state that any construction contracts must incorporate a Davis-Bacon contract clause and the current applicable prevailing wage determination [24 CFR 983.153(c)(3)].

In addition to the requirements above, for selection of proposals through competitive methods, the PHA must give prompt written notice to the party that submitted a selected proposal and must also give prompt public notice of such selection. Public notice procedures may include publication of public notice in a local newspaper of general circulation and other means designed and actually operated to provide broad public notice. The proposal selection date is the date on which the PHA provides written notice to the party that submitted the selected proposal. The written notice of proposal selection must require the owner or party that submitted the selected proposal to provide a written response to the PHA accepting the terms and requirements stated in the notice. The PHA must make documentation available for public inspection regarding the basis for the PHA selection of a PBV proposal.

EXHIBIT 1
City Council 5 – 772 7/15/2025

Page 17 ends

SAHA Policy
If the project does not contain SAHA-owned units, SAHA will notify the selected owner in writing of the owner’s selection for the PBV program within 14 calendar days of SAHA making the selection. SAHA will also notify in writing all owners that submitted proposals that were not selected and advise such owners of the name of the selected owner.

If the project contains SAHA-owned units, within 14 calendar days of SAHA making the selection, SAHA will provide the written notice of proposal selection to the responsible SAHA official, and that official must certify in writing that SAHA accepts the terms and requirements stated in the notice within 14 calendar days of receiving SAHA’s written notice.

When an environmental review is required, if the review has not been conducted prior to the proposal selection date, SAHA’s written notice of proposal selection will state that the selection is subject to completion of a favorable environmental review and that the proposal may be rejected based on the results of the environmental review.

For any project to which labor standards apply, SAHA’s written notice will state that any construction contracts must incorporate a Davis-Bacon contract clause and the current applicable prevailing wage determination.

SAHA will make available to any interested party its rating and ranking sheets and documents that identify SAHA basis for selecting the proposal. These documents will be available for review by the public and other interested parties for one month after publication of the notice of owner selection. SAHA will not make available sensitive owner information that is privileged, such as financial statements and similar information about the owner.

SAHA will make these documents available for review at SAHA during normal business hours. The cost for reproduction of allowable documents will be based on the City of Santa Ana current copy rate.

The owner must submit a written response to SAHA accepting the terms and requirements stated in the notice within 14 calendar days of SAHA’s written notification to the owner.

EXHIBIT 1
City Council 5 – 773 7/15/2025

Page 17 ends

In addition to the requirements above, for projects selected under an exception to the competitive process under 24 CFR 983.51(c), the PHA must give prompt written notice of project selection to the owner following the PHA board’s resolution approving the project-basing of assistance at the specific project. The project selection date is the date of the PHA’s board resolution approving the project-basing of assistance at the specific project. The written notice of project selection must require the owner of the project selected to provide a written response to the PHA accepting the terms and requirements stated in the notice.

SAHA Policy
If the project contains SAHA-owned units, within 14 calendar days of the board’s resolution approving the project-basing of assistance at a specific project, SAHA will provide the written notice of project selection to the responsible SAHA official, and that official must certify in writing that SAHA accepts the terms and requirements stated in the notice within 14 calendar days of receiving SAHA’s written notice.

If the project does not contain SAHA-owned units, within 14 calendar days of the board’s resolution approving the project-basing of assistance at a specific project, SAHA will notify the owner in writing of the project’s selection. The owner must submit a written response to SAHA accepting the terms and requirements stated in the notice within 14 calendar days of SAHA’s written notification to the owner.

In addition, when an environmental review is required, if the review has not been conducted prior to the project selection date, SAHA’s written notice of project selection will state that the selection is subject to completion of a favorable environmental review and that the project may be rejected based on the results of the environmental review.

Further, for any project to which labor standards apply, SAHA’s written notice will state that any construction contracts must incorporate a Davis-Bacon contract clause and the current applicable prevailing wage determination.

EXHIBIT 1
City Council 5 – 774 7/15/2025

Page 17 ends

17-II.E. HOUSING TYPE [24 CFR 983.52]
The PHA must decide what housing type, new construction, rehabilitation, or existing housing, will be used to develop project-based housing. The PHA choice of housing type must be reflected in its solicitation for proposals. With certain exceptions, the PHA may not execute a HAP contract for units:
 On which construction or rehabilitation commenced after the date of proposal submission (for housing subject to competitive selection) or the date of the PHA’s board resolution approving the project-basing of assistance at the project (for housing excepted from competitive selection); and
 Prior to the effective date of an AHAP.

However, HUD makes an exception in the following circumstances:
 The PHA has exercised its discretion under 24 CFR 983.154(f) to undertake development activity without an AHAP; or
 The PHA has executed an AHAP after construction or rehabilitation that complied with applicable requirements of 24 CFR 983.153 has commenced; or  The PHA will undertake development activity after execution of the HAP contract as authorized under 24 CFR 983.157.

At HUD’s sole discretion, HUD may approve a PHA’s request for additional exceptions to this prohibition.

EXHIBIT 1
City Council 5 – 775 7/15/2025

Page 17 ends

17-II.F. PROHIBITION OF ASSISTANCE FOR CERTAIN UNITS
Ineligible Units [24 CFR 983.52]
A HAP contract must not be effective and no PBV assistance may be provided for any of the following: shared housing units; units on the grounds of a penal reformatory, medical, mental, or similar public or private institution; nursing homes or facilities providing continuous psychiatric, medical, nursing services, board and care, or intermediate care (except that assistance may be provided in assisted living facilities); units that are owned or controlled by an educational institution or its affiliate and are designated for occupancy by students; and transitional housing.

Manufactured homes are ineligible only if the manufactured home is not permanently affixed to a permanent foundation or the owner does not own fee title to the real property (land) on which the manufactured home is located.

In addition, the PHA may not attach or pay PBV assistance for a unit occupied by an owner of the housing. A member of a cooperative who owns shares in the project assisted under the PBV program is not considered an owner for purposes of participation in the PBV program.

Before a PHA places a specific unit under a HAP contract, the PHA must determine whether the unit is occupied and, if occupied, whether the unit’s occupants are eligible for assistance in accordance with 24 CFR 982.201. For a family to be eligible for assistance in the specific unit, the unit must be appropriate for the size of the family under the PHA’s subsidy standards and the total tenant payment (TTP) for the family must be less than the gross rent for the unit. The PHA must not enter into a HAP contract for a unit occupied by a family ineligible for participation in the PBV program.

However, unlike in the regular PBV program, the PHA may opt to select an occupied unit or admit a family to a unit if such unit is made exclusively available to VASH families if the PBV project is either on the grounds of a VA facility or there are VASH supportive services provided on-site at the project. See Chapter 19 for more information.

EXHIBIT 1
City Council 5 – 776 7/15/2025

Page 17 ends

Subsidized Housing [24 CFR 983.53]
A HAP contract must not be effective and no PBV assistance may be provided in any of the following types of subsidized housing:
 A public housing unit;
 A unit subsidized with any other form of Section 8 assistance;  A unit subsidized with any governmental rent subsidy (a subsidy that pays all or any part of the rent);
 A unit subsidized with any governmental subsidy that covers all or any part of the operating costs of the housing;
 A unit subsidized with rental assistance payments under Section 521 of the Housing Act of 1949, 42 U.S.C. 1490a (a Rural Housing Service Program). However, the PHA may attach assistance for a unit subsidized with Section 515 interest reduction payments (42 U.S.C. 1485);
 A Section 202 project for non-elderly with disabilities;  Section 811 project-based supportive housing for persons with disabilities;  Section 202 supportive housing for the elderly;
 A Section 101 rent supplement project;
 A unit subsidized with any form of tenant-based rental assistance; or  A unit with any other duplicative federal, state, or local housing subsidy, as determined by HUD or the PHA in accordance with HUD requirements. For this purpose, housing subsidy does not include the housing component of a welfare payment; a social security payment; or a federal, state, or local tax concession (such as relief from local real property taxes).

EXHIBIT 1
City Council 5 – 777 7/15/2025

Page 17 ends

17-II.G. SUBSIDY LAYERING REQUIREMENTS [24 CFR 983.11, 24 CFR 983.153(b), 24 CFR 4.13, Notice PIH 2013-11, and FR Notice 3/13/23] Development Activity Before HAP Contract [24 CFR 983.153(b)] As part of the PBV project or proposal selection process, the project owner must disclose information regarding all HUD and/or other federal, state, or local governmental assistance committed to the project, as well as other governmental assistance, using Form HUD-2880 (even if no other governmental assistance is received or anticipated) [FR Notice 3/3/23].

HUD requires a subsidy layering review (SLR) be conducted when new construction or rehabilitation housing will include PBVs in combination with other governmental housing assistance from federal, state, or local agencies, including assistance such as tax concessions or tax credits. The SLR must occur before the PHA attaches PBV assistance to a project. This means when an SLR is required, the PHA may not execute an AHAP or HAP contract until HUD or a HUD-approved housing credit agency (HCA) has conducted the required subsidy layering review and determined the project compliance with 24 CFR 4.13 and other related regulation requirements with regards to attaching PBV assistance. Subsidy layering requirements also do not apply to existing housing when PBV is the only governmental assistance.

Conducting the SLR [FR Notice 3/3/23 and Notice PIH 2023-15] PHAs request an SLR through their local HUD Field Office or, if eligible, through a participating HCA. The PHA is responsible for collecting all required documentation for the SLR from the project owner. Appendix A of FR Notice 3/23/23 contains a list of all required documentation. The owner must inform the PHA if any information changes during or after the application process. If new information becomes available after initial submission, the PHA is responsible for submitting updated information to HUD or the HCA.

If HUD completes the SLR and determines the PBV assistance complies with all requirements, HUD will notify the PHA in writing. If the SLR request is submitted to an approved HCA, and the proposed project-based voucher assistance meets HUD subsidy layering requirements, the HCA must submit a certification to HUD and notify the PHA. The PHA may proceed to execute an AHAP at that time if the environmental approval is received.

EXHIBIT 1
City Council 5 – 778 7/15/2025

Page 17 ends

Additional Assistance after HAP Contract [24 CFR 983.11(d)] The HAP contract must contain the owner’s certification that the project has not received and will not receive (before or during the term of the HAP contract) any public assistance for acquisition, development, or operation of the housing other than assistance disclosed in the subsidy layering review in accordance with HUD requirements, unless the owner discloses additional assistance in accordance with HUD requirements [24 CFR 983.11(d)].

For newly constructed or rehabilitated housing under a HAP contract, the owner must disclose to the PHA information regarding any additional related assistance from the federal government, a state, or a unit of general local government, or any agency or instrumentality thereof. Related assistance includes but is not limited to any loan, grant, guarantee, insurance, payment, rebate, subsidy, credit, tax benefit, or any other form of direct or indirect assistance. If the additional related assistance meets certain threshold and other requirements established by HUD, a subsidy layering review may be required to determine if it would result in excess public assistance to the project. The PHA must adjust the amount of the housing assistance payments to the owner to compensate in whole or in part for such related assistance.

EXHIBIT 1
City Council 5 – 779 7/15/2025

Page 17 ends

17-II.H. SITE SELECTION STANDARDS
Compliance with PBV Goals, Civil Rights Requirements, and Site and Neighborhood Standards [24 CFR 983.55(b)]
The PHA may not select a project or proposal for existing, newly constructed, or rehabilitated PBV housing on a site or enter into an AHAP or HAP contract for units on the site, unless the PHA has determined that PBV assistance for housing at the selected site is consistent with the goal of deconcentrating poverty and expanding housing and economic opportunities. The standard for deconcentrating poverty and expanding housing and economic opportunities must be consistent with the PHA Plan under 24 CFR 903 and the PHA administrative plan.

In addition, prior to selecting a proposal, the PHA must determine that the site is suitable from the standpoint of facilitating and furthering full compliance with the applicable Civil Rights Laws, regulations, and Executive Orders, and that the site meets the housing quality standards and neighborhood standards at 24 CFR 5.703.

SAHA Policy
It is SAHA goal to select sites for PBV housing that provide for deconcentrating poverty and expanding housing and economic opportunities. In complying with this goal SAHA will seek to limit approval of sites for PBV housing in census tracts that have poverty concentrations of 20 percent or less.

However, SAHA will grant exceptions to the 20 percent standard where SAHA determines that the PBV assistance will complement other local redevelopment activities designed to deconcentrate poverty and expand housing and economic opportunities in census tracts with poverty concentrations greater than 20 percent, such as sites in:

A census tract in which the proposed PBV development will be located in a HUDdesignated Enterprise Zone, Economic Community, Choice Neighborhood, or Renewal Community;
A census tract where the concentration of assisted units will be or has decreased as a result of public housing demolition and HOPE VI redevelopment; A census tract in which the proposed PBV development will be located is undergoing significant revitalization as a result of state, local, or federal dollars invested in the area;
A census tract where new market rate units are being developed where such market rate units will positively impact the poverty rate in the area; A census tract where there has been an overall decline in the poverty rate within the past five years; or
A census tract where there are meaningful opportunities for educational and economic advancement.

EXHIBIT 1
City Council 5 – 780 7/15/2025

Page 17 ends

SAHA will also consider whether the site is suitable from the standpoint of facilitating and furthering full compliance with the applicable provisions of Title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d-2000d(4)) and HUD’s implementing regulations at 24 CFR Part 1; Title VIII of the Civil Rights Act of 1968 (42 U.S.C. 3601-3629) and HUD’s implementing regulations at 24 CFR Parts 100 through 199; Executive Order 11063 (27 FR 11527; 3 CFR, 1959-1963 Comp., p. 652), and HUD’s implementing regulations at 24 CFR Part 107.

The site must also be suitable from the standpoint of facilitating and furthering full compliance with the applicable provisions of the Americans with Disabilities Act (42 U.S.C. 12131-12134) and implementing regulations (28 CFR Part 35), and Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and HUD’s implementing regulations at 24 CFR Part 8, including meeting the Section 504 site selection requirements described in 24 CFR 8.4(b)(5).

SAHA will also consider whether the site and neighborhood are reasonably free from disturbing noises and reverberations and other dangers to the health, safety, and general welfare of the occupants. The site and neighborhood may not be subject to serious adverse environmental conditions, natural or manmade, that could affect the health or safety of the project occupants, such as dangerous walks or steps; contamination; instability; flooding, poor drainage, septic tank back-ups or sewage hazards; mudslides; abnormal air pollution, smoke or dust; excessive noise, vibration or vehicular traffic; excessive accumulations of trash; vermin or rodent infestation; or fire hazards.

Existing and Rehabilitated Housing Site and Neighborhood Standards [24 CFR 983.55(d)] The PHA may not enter into an AHAP or HAP contract for existing or rehabilitated housing until it has determined that the site complies with the HUD required site and neighborhood standards.

The site must:
 Be adequate in size, exposure, and contour to accommodate the number and type of units proposed;
 Have adequate utilities and streets available to service the site;  Promote a greater choice of housing opportunities and avoid undue concentration of assisted persons in areas containing a high proportion of low-income persons;  Be accessible to social, recreational, educational, commercial, and health facilities and services and other municipal facilities and services equivalent to those found in neighborhoods consisting largely of unassisted similar units; and  Be located so that travel time and cost via public transportation or private automobile from the neighborhood to places of employment is not excessive.

EXHIBIT 1
City Council 5 – 781 7/15/2025

Page 17 ends

New Construction Site and Neighborhood Standards [24 CFR 983.55(e)] In order to be selected for PBV assistance, a site for newly constructed housing must meet the following HUD required site and neighborhood standards:
 The site must be adequate in size, exposure, and contour to accommodate the number and type of units proposed;
 The site must have adequate utilities and streets available to service the site;  The site must not be located in an area of minority concentration unless the PHA determines that sufficient, comparable opportunities exist for housing for minority families in the income range to be served by the proposed project outside areas of minority concentration or that the project is necessary to meet overriding housing needs that cannot be met in that housing market area;
 The site must not be located in a racially mixed area if the project will cause a significant increase in the proportion of minority to non-minority residents in the area.  The site must promote a greater choice of housing opportunities and avoid undue concentration of assisted persons in areas containing a high proportion of low-income persons;
 The neighborhood must not be one that is seriously detrimental to family life or in which substandard dwellings or other undesirable conditions predominate, unless there is actively in progress a concerted program to remedy the undesirable conditions;  The housing must be accessible to social, recreational, educational, commercial, and health facilities and services and other municipal facilities and services equivalent to those found in neighborhoods consisting largely of unassisted similar units; and  Except for housing designed for elderly persons, the housing must be located so that travel time and cost via public transportation or private automobile from the neighborhood to places of employment is not excessive.

EXHIBIT 1
City Council 5 – 782 7/15/2025

Page 17 ends

17-II.I. ENVIRONMENTAL REVIEW [24 CFR 983.56]
The PHA activities under the PBV program are subject to HUD environmental regulations in 24 CFR parts 50 and 58, other than where exceptions are provided in the PBV regulations.

For projects or proposals that were selected in accordance with the site selection standards at 24 CFR 983.55 in effect on or after June 6, 2024, no environmental review is required to be undertaken before entering into a HAP contract for existing housing, except to the extent a Federal environmental review is required by law or regulation relating to funding other than PBV.

When an environmental review is required, the responsible entity is responsible for performing the federal environmental review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.). If the review has not been conducted prior to the proposal or project selection date, then the PHA’s written notice of proposal or project selection must state that the selection is subject to completion of a favorable environmental review and that the project may be rejected based on the results of the environmental review. The PHA may not enter into an AHAP or HAP contract until the responsible entity has complied with the environmental review requirements.

The PHA may not enter into an AHAP or a HAP contract with an owner, and the PHA, the owner, and its contractors may not acquire, rehabilitate, convert, lease, repair, dispose of, demolish, or construct real property or commit or expend program or local funds for PBV activities under this part, until one of the following occurs:
 The responsible entity has determined that the activities to be undertaken are exempt under 24 CFR 85.34(a) or categorically excluded and not subject to compliance with environmental laws under 24 CFR 58.35(b);
 The responsible entity has completed the environmental review procedures required by 24 CFR Part 58, and HUD has approved the PHA’s Request for Release of Funds and Certification (form HUD-7015.15)
- HUD approves the Request for Release of Funds and Certification by issuing a Letter to Proceed or form HUD-7015.16, thereby authorizing the PHA to execute an AHAP or HAP contract, as applicable; or
 HUD has performed an environmental review under 24 CFR Part 50 and has notified the PHA in writing of environmental clearance.

The PHA must supply all available, relevant information necessary for the responsible entity to perform any required environmental review for any site. The PHA must require the owner to carry out mitigating measures required by the responsible entity (or HUD, if applicable) as a result of the environmental review.

EXHIBIT 1
City Council 5 – 783 7/15/2025

Page 17 ends

PART III: DWELLING UNITS
17-III.A. OVERVIEW
This part identifies the special housing quality standards that apply to the PBV program, housing accessibility for persons with disabilities, and special procedures for conducting inspections. 17-III.B. HOUSING QUALITY STANDARDS [24 CFR 983.101]
Housing quality standards for the tenant-based program, including those for special housing types, generally apply to the PBV program. Housing quality standards requirements for shared housing, and the homeownership option do not apply because these housing types are not assisted under the PBV program.

The owner is required to maintain and operate the contract units and premises in accordance with housing quality standards, including performance of ordinary and extraordinary maintenance.

The owner must provide all the services, maintenance, equipment, and utilities specified in the HAP contract with the PHA and in the lease with each assisted family. In addition, maintenance, replacement and redecoration must be in accordance with the standard practice for the building as established by the owner.

Lead-based Paint [24 CFR 983.101(c)]
The lead-based paint requirements for the tenant-based voucher program do not apply to the PBV program. Instead, the Lead-based Paint Poisoning Prevention Act (42 U.S.C. 4821-4846), the Residential Lead-based Paint Hazard Reduction Act of 1992 (42 U.S.C. 4851-4856), and implementing regulations at 24 CFR Part 35, Subparts A, B, H, and R, and 40 CFR 745.227, apply to the PBV program.

Housing Quality and Design Requirements [24 CFR 983.101(e) and 983.208(a)] The PHA may elect to establish additional requirements for quality, architecture, or design of PBV housing. Any such additional requirements must be specified in the AHAP and the HAP contract. These requirements must be in addition to, not in place of, compliance with housing quality standards. The PHA must specify the conditions under which it will require additional housing quality requirements in the administrative plan.

SAHA Policy
SAHA will identify the need for any special features on a case-by-case basis depending on the intended occupancy of the PBV project. SAHA will specify any special design standards or additional requirements in the invitation for PBV proposals (if applicable), the AHAP, and the HAP contract.

EXHIBIT 1
City Council 5 – 784 7/15/2025

Page 17 ends

17-III.C. HOUSING ACCESSIBILITY FOR PERSONS WITH DISABILITIES [24 CFR 983.102]
The housing must comply with program accessibility requirements of section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and implementing regulations at 24 CFR part 8.

SAHA must ensure that the percentage of accessible dwelling units complies with the requirements of section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794), as implemented by HUD’s regulations at 24 CFR 8, subpart C.

Housing first occupied after March 13, 1991, must comply with design and construction requirements of the Fair Housing Amendments Act of 1988 and implementing regulations at 24 CFR 100.205, as applicable. (24 CFR 983.102)
17-III.D. INSPECTING UNITS [24 CFR 983.103]
The PHA must inspect contract units whenever needed to determine that the contract units comply with housing quality standards and that the owner is providing maintenance, utilities, and other services in accordance with the HAP contract. The PHA must take into account complaints and any other information coming to its attention in scheduling inspections.

Pre-selection Inspection [24 CFR 983.103(a)]
If the units to be assisted already exist, the PHA must inspect all the units before the proposal selection date and must determine if the project meets the definition of existing housing. If the project is existing housing, the PHA may not execute the HAP contract until the units meet the initial inspection requirements in accordance with 24 CFR 983.103(c).

Initial Inspection: Newly Constructed and Rehabilitated Projects That Underwent Substantial Improvement [24 CFR 983.103(b)]
Following completion of work pursuant to 24 CFR 983.155, the PHA must complete the following inspections, as applicable:
 For rehabilitated housing that is developed prior to the HAP contract term or newly constructed housing, the PHA must inspect each proposed newly constructed and rehabilitated PBV unit before execution of the HAP contract. Each proposed PBV unit must fully comply with housing quality standards prior to HAP contract execution.  For rehabilitated housing that will undergo development activity after HAP contract execution, the PHA must conduct unit inspections in accordance with the requirements of 24 CFR 983.157.
 For units that underwent substantial improvement pursuant to 24 CFR 983.207(d) or 983.212, inspect each unit. Each PBV unit that underwent substantial improvement must fully comply with housing quality standards prior to the PHA adding the unit to the HAP contract, returning the unit temporarily removed to the HAP contract, allowing re-occupancy of the unit, and resuming housing assistance payments, as applicable.

EXHIBIT 1
City Council 5 – 785 7/15/2025

Page 17 ends

Initial Inspection: Existing Housing [24 CFR 983.103(c)] The PHA must inspect and determine that all of the proposed PBV units fully comply with housing quality standards before entering into the HAP contract, unless the PHA has adopted a policy to enter into a HAP contract for units that fail the initial inspection as a result of only nonlife-threatening conditions (NLT option), or if the unit passed an alternative inspection, or both.

The PHA must establish in its administrative plan the amount of time that may elapse between the initial inspection of existing housing and execution of a HAP contract for that unit.

SAHA Policy
SAHA will not provide assistance on behalf of the family until the unit fully complies with housing quality standards.

SAHA will not rely on alternative inspections for initial inspections.

The HAP contract for existing housing must be executed within 60 calendar days of the initial inspection.

Turnover Inspections [24 CFR 983.103(d)]
Before providing assistance to a new family in a contract unit, the PHA must inspect the unit.

The PHA may not provide assistance on behalf of the family until the unit fully complies with housing quality standards.

Periodic Inspections [24 CFR 983.103(e); FR Notice 6/25/14] At least once every 24 months during the term of the HAP contract (or at least triennially for small rural PHAs), the PHA must inspect a random sample consisting of at least 20 percent of the contract units in each building to determine if the contract units and the premises are maintained in accordance with housing quality standards. Turnover inspections are not counted toward meeting this inspection requirement.

SAHA Policy
SAHA will inspect on an annual basis 100 percent of the contract units in each building to determine if the contract units and the premises are maintained in accordance with housing quality standards.

For permanent supportive housing projects, SAHA may inspect 100 percent of the contract units in each build twice a year to determine if the contract units and the premises are maintained in accordance with housing quality standards If more than 20 percent of the sample of inspected contract units in a building fail the initial inspection, the PHA must reinspect 100 percent of the contract units in the building.

This requirement also applies in the case of a HAP contract that is undergoing development activity after HAP contract execution; however, if the periodic inspection occurs during the period of development activity covered by the rider and fewer than 20 percent of contract units in each building are designated in the rider as available for occupancy, the PHA is only required to inspect the units in that building that are designated as available for occupancy.

EXHIBIT 1
City Council 5 – 786 7/15/2025

Page 17 ends

Alternative Inspections for Periodic Inspections [24 CFR 983.103(g); Notice PIH 2016-05] In the case of mixed finance properties that are subject to alternative inspections, the PHA may rely upon an alternative inspection conducted at least triennially to demonstrate compliance with inspection requirements.

SAHA Policy
SAHA will not rely on alternative inspection standards.

Interim Inspections [24 CFR 983.103(f)]
If a participant or government official notifies the PHA of a potential deficiency in a PBV unit or development, the following applies:
 If the reported deficiency is life-threatening, the PHA must, within 24 hours of notification, both inspect the housing unit and notify the owner if the life-threatening deficiency is confirmed. The owner must then make the repairs within 24 hours of PHA notification.  If the reported deficiency is non-life-threatening, the PHA must, within 15 days of notification, both inspect the unit and notify the owner if the deficiency is confirmed. The owner must then make the repairs within 30 days of notification from the PHA or within any PHA-approved extension.

SAHA Policy
During an interim inspection, SAHA generally will inspect only those deficiencies that were reported. However, the inspector will record any additional deficiencies that are observed and will require the responsible party to make the necessary repairs.

If the periodic inspection has been scheduled or is due within 90 days of the date the special inspection is scheduled SAHA may elect to conduct a full inspection.

Follow Up Inspections [24 CFR 983103(f)(2)]
The PHA must conduct follow-up inspections needed to determine if the owner (or, if applicable, the family) has corrected a housing quality standards violation and must conduct inspections to determine the basis for exercise of contractual and other remedies for owner or family violations of housing quality standards.

Supervisory Quality Control Inspections [24 CFR 983.103(f)(3)] In conducting PHA supervisory quality control inspections, the PHA should include a representative sample of both tenant-based and project-based units.

Inspecting PHA-Owned Units [24 CFR 983.103(g)]
In the case of PHA-owned units, the inspections must be performed by an independent entity designated by the PHA and approved by HUD. The independent entity must furnish a copy of each inspection report to the PHA. The PHA must take all necessary actions in response to inspection reports from the independent entity, including exercise of contractual remedies for violation of the HAP contract by the PHA-owner.

EXHIBIT 1
City Council 5 – 787 7/15/2025

Page 17 ends

PART IV: REHABILITATED AND NEWLY CONSTRUCTED UNITS
17-IV.A. OVERVIEW [24 CFR 983.151 and 983.152]
There are specific requirements that apply to PBV assistance for newly constructed or rehabilitated housing that do not apply to PBV assistance in existing housing. This part describes the requirements unique to this type of assistance. Housing selected for this type of assistance may not at a later date be selected for PBV assistance as existing housing. 17-IV.B. AGREEMENT TO ENTER INTO HAP CONTRACT (AHAP) [24 CFR 983.154] Except where the PHA decides not to use an AHAP or chooses to execute an AHAP after construction or rehabilitation has commenced, the PHA and owner must enter into an AHAP that will govern development activity. In the AHAP, the owner agrees to develop the PBV contract units to comply with housing quality standards, and the PHA agrees that upon timely completion of development in accordance with the terms of the AHAP, the PHA will enter into a HAP contract with the owner for the contract units. The AHAP must cover a single project, except one AHAP may cover multiple projects that each consist of a single-family building.

The effective date of the AHAP must be on or after the date the AHAP is executed. The AHAP must be executed and effective prior to the commencement of development activity as described in 24 CFR 983.154(d), except where the PHA decides not to use an AHAP or chooses to execute an AHAP after construction or rehabilitation has commenced. The AHAP must be in the form required by HUD.

The PHA and owner may agree to amend the contents of the AHAP by executing an addendum, so long as such amendments are consistent with all PBV requirements. The PHA and owner may only execute an addendum affecting a unit prior to the PHA accepting the completed unit.

Development activity must not commence after the date of proposal submission (for housing subject to competitive selection) or the date of the PHA’s board resolution approving the projectbasing of assistance at the project (for housing excepted from competitive selection) and before the effective date of the AHAP, except where the PHA decides not to use an AHAP or chooses to execute an AHAP after construction or rehabilitation has commenced. In the case of new construction, development activity begins with excavation or site preparation (including clearing of the land). Rehabilitation begins with the physical commencement of rehabilitation activity on the housing.

PHA Discretion Not to Use an AHAP [24 CFR 983.154(f)]
The PHA may decide not to use an AHAP or may choose to execute an AHAP after construction or rehabilitation that complied with applicable requirements of 24 CFR 983.153 has commenced.

To do so, the PHA must explain the circumstances (if any) under which the PHA will enter into a PBV HAP contract for newly constructed or rehabilitated housing without first entering into an AHAP and under which the PHA will enter into an AHAP after construction or rehabilitation has commenced.

EXHIBIT 1
City Council 5 – 788 7/15/2025

Page 17 ends

SAHA Policy
SAHA may on a case-by-case basis exercise its discretion to not use an AHAP or to execute an AHAP after construction or rehabilitation for newly constructed or rehabilitated housing.

Content of the AHAP [24 CFR 983.154(e)]
At a minimum, the AHAP must describe the following features of the housing to be developed and assisted under the PBV program:
 Site and the location of the contract units;
 Number of contract units by area (square footage) and number of bedrooms and bathrooms;  Services, maintenance, or equipment to be supplied by the owner without charges in addition to the rent to owner;
 Utilities available to the contract units, including a specification of utility services to be paid by the owner (without charges in addition to rent) and utility services to be paid by the tenant;
 An indication of whether or not the design and construction requirements of the Fair Housing Act and section 504 of the Rehabilitation Act of 1973 apply to units under the AHAP. If applicable, any required work item resulting from these requirements must be included in the description of work to be performed under the AHAP;
 A description of any required work item if the requirement to install broadband infrastructure applies;
 Estimated initial rents to owner for the contract units;  Description of the work to be performed under the AHAP. - For rehabilitated units, the description must include the rehabilitation work write up and, where determined necessary by the PHA, specifications and plans. - For new construction units, the description must include the working drawings and specifications.
 The deadline for completion of the work to be performed under the AHAP; and  Any additional requirements for quality, architecture, or design over and above housing quality standards. The PHA must specify the conditions under which it will require additional housing quality requirements in the administrative plan.

Execution of the AHAP [FR Notice 11/24/08]
The AHAP must be executed promptly after PHA notice of proposal selection to the selected owner.

SAHA Policy
SAHA will enter into the AHAP with the owner after receiving both environmental approval and notice that subsidy layering requirements have been met, and before construction or rehabilitation work is started.

EXHIBIT 1
City Council 5 – 789 7/15/2025

Page 17 ends

17-IV.C. DEVELOPMENT REQUIREMENTS
Labor Standards [24 CFR 983.153(c)]
If an AHAP covers the development of nine or more contract units (whether or not completed in stages), the owner and the owner’s contractors and subcontractors must pay Davis-Bacon wages to laborers and mechanics employed in the development of housing.

Further, these Davis-Bacon requirements apply to existing PBV units when the nature of any work to be performed either before the execution of the HAP contract or within 18-months after execution constitutes project development. Any development initiated on existing units within 18-months after the effective date of the HAP contract on projects with nine or more contract units triggers Davis-Bacon requirements.

When the PHA exercises its discretion at 24 CFR 983.154(f) or 983.157(a) to allow the owner to conduct some or all development activity while the proposed PBV units are not under an AHAP or HAP contract, the applicable parties must comply with the labor standards outlined above from the date of proposal submission (for housing subject to competitive selection) or from the date of the PHA’s board resolution approving the project-basing of assistance at the project (for housing excepted from competitive selection).

The AHAP will include the labor standards clauses required by HUD, such as those involving Davis-Bacon wage rates. The addendum to the HAP contract, Form HUD-5679, also includes the required labor standards clauses.

The owner, contractors, and subcontractors must also comply with the Contract Work Hours and Safety Standards Act, Department of Labor regulations in 29 CFR part 5, and other applicable federal labor relations laws and regulations. The PHA must monitor compliance with labor standards.

For any project to which labor standards apply, the PHA’s written notice to the party that submitted the selected proposal or board resolution approving project-basing of assistance at the specific project must state that any construction contracts must incorporate a Davis-Bacon contract clause and the current applicable prevailing wage determination.

Development activity is also subject to the federal equal employment opportunity requirements of Executive Orders 11246 as amended (3 CFR, 1964-1965 Comp., p. 339), 11625 (3 CFR, 1971-1975 Comp., p. 616), 12432 (3 CFR, 1983 Comp., p. 198), and 12138 (3 CFR, 1977 Comp., p. 393).

Accessibility [24 CFR 983.153(e)]
As applicable, the design and construction requirements of the Fair Housing Act and implementing regulations at 24 CFR 100.205; the accessibility requirements of Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and implementing regulations at 24 CFR Part 8, including 8.22 and 8.23; and Title II of the Americans with Disabilities Act (42 U.S.C. 12131- 12134) and implementing regulations at 28 CFR Part 35, including 24 CFR 35.150 and 35.151, apply to development activity.

A description of any required work item resulting from these requirements must be included in the AHAP (if applicable) or HAP contract (if applicable).

EXHIBIT 1
City Council 5 – 790 7/15/2025

Page 17 ends

Broadband Infrastructure [24 CFR 983.153(f)]
Any development activity that constitutes substantial rehabilitation (as defined by 24 CFR 5.100) of a building with more than four rental units and where the proposal or project selection date or the start of the development activity while under a HAP contract is after January 19, 2017, must include installation of broadband infrastructure, as defined in 24 CFR 5.100, except where the owner determines and documents the determination that:
 The location of the new construction or substantial rehabilitation makes installation of broadband infrastructure infeasible;
 The cost of installing broadband infrastructure would result in a fundamental alteration in the nature of its program or activity or in an undue financial burden; or  The structure of the housing to be substantially rehabilitated makes installation of broadband infrastructure infeasible.

A description of any required work item resulting from this requirement must be included in the AHAP (if applicable) or HAP contract (if applicable).

Owner Disclosure [24 CFR 983.153(g)]
The AHAP and HAP contract must include a certification by the owner that the owner and other project principals are not on the U.S. General Services Administration list of parties excluded from federal procurement and non-procurement programs.

The owner must also disclose any possible conflict of interest that would be a violation of the AHAP, the HAP contract, or HUD regulations.

EXHIBIT 1
City Council 5 – 791 7/15/2025

Page 17 ends

17-IV.D. COMPLETION OF WORK [24 CFR 983.155]
Evidence of Completion [24 CFR 983.155]
The owner must submit evidence and certify to the PHA, in the form and manner required by the PHA’s administrative plan, that development activity or substantial improvement has been completed, and that all such work was completed in accordance with the applicable requirements. The PHA must review the evidence to determine whether the development activity or substantial improvement was completed in accordance with the applicable requirements.

In the case of PHA-owned units, the owner must submit evidence and certify to the independent entity, in the form and manner required by the PHA’s administrative plan, that development activity or substantial improvement has been completed, and that all such work was completed in accordance with the applicable requirements. The independent entity must review the evidence to determine whether the development activity or substantial improvement was completed in accordance with the applicable requirements.

SAHA Policy
At a minimum, the owner must submit the following evidence of completion to SAHA or independent entity, as applicable:

Owner certification that the work has been completed in accordance with housing quality standards and all requirements of the AHAP; and Owner certification that the owner has complied with labor standards and equal opportunity requirements in development of the housing.

At the discretion of SAHA, the AHAP may specify additional documentation that must be submitted by the owner as evidence of housing completion. For example, such documentation may include:

A certificate of occupancy or other evidence that the units comply with local requirements (such as code and zoning requirements); and An architect’s certification that the housing complies with:

HUD housing quality standards;
State, local, or other building codes;
Zoning;
The rehabilitation work write-up (for rehabilitated housing) or the work description (for newly constructed housing); or
Any additional design or quality requirements pursuant to the AHAP.

SAHA will determine the need for the owner to submit additional documentation as evidence of housing completion on a case-by-case basis depending on the nature of the PBV project. SAHA will specify any additional documentation requirements in the AHAP.

EXHIBIT 1
City Council 5 – 792 7/15/2025

Page 17 ends

PHA Acceptance of Completed Units [24 CFR 983.156(a) and (b)] After the PHA has received all required evidence of completion and the owner’s certification that all work was completed in accordance with the applicable requirements, the PHA must inspect to determine if the housing has been completed in accordance with the AHAP, including compliance with housing quality standards and any additional design, architecture, or quality requirements imposed under the AHAP. For PHA-owned units, the independent entity must perform the inspection. The PHA must also determine if the owner has submitted all required evidence of completion.

If the work has not been completed in accordance with the AHAP, the PHA must not enter into the HAP contract.

If the PHA determines the work has been completed in accordance with the AHAP and all applicable requirements and that the owner has submitted all required evidence of completion, the PHA must:
 For units which will not undergo development activity after HAP contract execution, submit the HAP contract for execution by the owner and then execute the HAP contract;  For rehabilitated housing projects for which development activity has commenced prior to HAP contract execution under 24 CFR 983.157(b), submit the HAP contract for execution by the owner and then execute the HAP contract;
 For development activity after the HAP contract execution, amend the HAP contract rider to designate the completed units as available for occupancy, or if the owner has completed all development activity as provided in the rider, amend the HAP contract to delete the rider; or  For units that underwent substantial improvement in order to be added to the HAP contract, amend the HAP contract to add the units to the HAP contract.

Staged Completion of Contract Units [24 CFR 983.156(c)] Contract units that will not undergo development activity after HAP contract execution may be placed under the HAP contract in stages commencing on different dates. In such a case, the PHA must determine separately for each stage whether the development activity was completed in accordance with the applicable requirements and that the units meet housing quality standards and any additional design, architecture, or quality requirements specified by the PHA. If the first stage is determined compliant, then the PHA must submit the HAP contract for execution by the owner and must execute the HAP contract for PBV rehabilitated housing and newly constructed housing projects. As each subsequent stage is determined compliant, the PHA and owner must amend the HAP contract to add the units to the HAP contract.

EXHIBIT 1
City Council 5 – 793 7/15/2025

Page 17 ends

PART V: HOUSING ASSISTANCE PAYMENTS (HAP) CONTRACT
17-V.A. OVERVIEW [24 CFR 983.202(a)]
The PHA must enter into a HAP contract with an owner for units that are receiving PBV assistance. The purpose of the HAP contract is to provide housing assistance payments for eligible families leasing PBV units during the term of the HAP contract. With some exceptions, a HAP contract must cover a single project. If multiple projects exist, each project is covered by a separate HAP contract. However, a PHA and owner may agree to place multiple projects, each consisting of a single-family building, under one HAP contract. The HAP contract must be in the form required by HUD.
17-V.B. HAP CONTRACT REQUIREMENTS
Contract Information [24 CFR 983.203]
The HAP contract must specify the following information:
 The total number of contract units by number of bedrooms;  The project’s name, street address, city or county, state and ZIP code, block and lot number (if known), and any other information necessary to clearly identify the site and the building;  The number of contract units in each building, the location of each contract unit, the area of each contract unit, and the number of bedrooms and bathrooms in each contract unit;  Services, maintenance, and equipment to be supplied by the owner and included in the rent to owner;
 Utilities available to the contract units, including a specification of utility services to be paid by the owner (included in rent) and utility services to be paid by the tenant;  Features provided to comply with program accessibility requirements of Section 504 of the Rehabilitation Act of 1973 and implementing regulations at 24 CFR part 8 and the Americans with Disabilities Act, as applicable;
 The HAP contract term;
 The number of units under the increased program cap or excepted from the project cap that will be set aside for occupancy by families who qualify for such a unit;  The initial rent to owner for the first 12 months of the HAP contract term; and  Whether the PHA has elected not to reduce rents below the initial rent to owner.

EXHIBIT 1
City Council 5 – 794 7/15/2025

Page 17 ends

Execution of the HAP Contract [24 CFR 983.204]
Before execution of the HAP contract, the PHA must determine that applicable pre-HAP contract housing quality standards requirements have been met in accordance with 24 CFR 983.103(b) or (c) as applicable. The PHA may not execute the HAP contract for any contract unit that does not meet the pre-HAP contract housing quality standards requirements. For existing housing, the HAP contract must be executed promptly after the PHA selects the owner proposal and the PHA determines that applicable pre-HAP contract housing quality standards requirements have been met. For newly constructed or rehabilitated housing that will not undergo development activity after HAP contract execution, the HAP contract must be executed promptly after the PHA has inspected the completed units and has determined that the units have been completed in accordance with the AHAP, and the owner furnishes all required evidence of completion. For rehabilitated housing that will undergo development activity after HAP contract execution, the HAP contract must be executed and effective promptly after all proposed PBV units are added to the contract at this time, including units that do not comply with HQS or that will undergo development activity.

SAHA Policy
For existing housing, the HAP contract will be executed within 14 calendar days of SAHA determining that all units pass inspection.

For rehabilitated or newly constructed housing, the HAP contract will be executed within 14 calendar days of SAHA determining that the units have been completed in accordance with the AHAP, all units meet housing quality standards, and the owner has submitted all required evidence of completion.

Effective Date of the HAP Contract [24 CFR 983.204(d)]
The effective date of the HAP contract must be on or after the date the HAP contract is executed.

The HAP contract must be effective before the effective date of the first lease covering a contract unit occupied by an assisted family, and the PHA may not pay any housing assistance payment to the owner until the HAP contract is effective.

EXHIBIT 1
City Council 5 – 795 7/15/2025

Page 17 ends

Term of HAP Contract [24 CFR 983.205, FR Notice 1/18/17, and Notice PIH 2017-21] The PHA may enter into a HAP contract with an owner for an initial term of no less than one year and no more than 20 years for each contract unit. The length of the term of the HAP contract for any contract unit may not be less than one year, nor more than 20 years.

SAHA Policy
The term of all PBV HAP contracts will be negotiated with the owner on a case-by-case basis.

The Housing Opportunity through Modernization Act of 2016 (HOTMA) changes the limitation on the initial term of the HAP contract from 15 years to 20 years. For PHAs and owners with HAP contracts in effect prior to the implementation of this provision of HOTMA (April 18, 2017), if contracts are still in the initial term, the term may be extended to a maximum initial term of 20 years by mutual consent, and then may subsequently be extended for additional 20 years, for a maximum of 40 years. PHAs and owners with HAP contracts that are no longer in the initial term may mutually agree to extend the contract for total extension term of 20 years.

The PHA and owner may agree at any time before expiration of the HAP contract to execute one or more extensions of the HAP contract term, but the following conditions apply:
 Each extension executed must have a term that does not exceed 20 years;  At no time may the total remaining term of the HAP contract, with extensions, exceed 40 years;
 Before agreeing to an extension, the PHA must determine that the extension is appropriate to continue providing affordable housing for low-income families or to expand housing opportunities; and
 Each extension must be on the form and subject to the conditions prescribed by HUD at the time of the extension.

SAHA Policy
When determining whether or not to extend an expiring PBV contract, SAHA will consider several factors including, but not limited to:

The cost of extending the contract and the amount of available budget authority; The condition of the contract units;
The owner’s record of compliance with obligations under the HAP contract and leases;
Whether the location of the units continues to support the goals of deconcentrating poverty and expanding housing opportunities; and Whether the funding could be used more appropriately for tenant-based assistance.

EXHIBIT 1
City Council 5 – 796 7/15/2025

Page 17 ends

17-V.C. TERMINATION OF THE HAP CONTRACT
Termination by Agreement of PHA and Owner [24 CFR 983.206(e)] The PHA and owner may agree to terminate the HAP contract prior to the end of the term. The owner is required to give notice in accordance 24 CFR 983.206(a) prior to termination, and families must be provided tenant-based assistance and may elect to remain in the project.

Termination by PHA [24 CFR 983.205(c)]
The HAP contract must provide that the PHA may terminate the contract for insufficient funding, subject to HUD requirements. The PHA has the option of terminating a PBV HAP contract based on “insufficient funding” only if:
 The PHA determines in accordance with HUD requirements that it lacks sufficient HAP funding (including HAP reserves) to continue to make housing assistance payments for all voucher units currently under a HAP contract;
 The PHA has taken cost-saving measures specified by HUD;  The PHA notifies HUD of its determination and provides the information required by HUD; and
 HUD determines that the PHA lacks sufficient funding and notifies the PHA it may terminate HAP contracts as a result.

If the PHA determines that the owner has breached the HAP contract, the PHA may exercise any of its rights or remedies under the HAP contract, including but not limited to contract termination. The provisions of 24 CFR 983.208 apply for HAP contract breaches involving failure to comply with housing quality standards. For any other contract termination due to breach, 24 CFR 983.206(b) on provision of tenant-based assistance applies.

Non-extension by Owner – Notice Requirements [24 CFR 983.206(a)] Not less than one year before the HAP contract terminates, the owner must notify the PHA and assisted tenants of the termination. The notice must be provided in the form prescribed by HUD.

The term termination for applicability of this notice requirement means the expiration of the HAP contract, termination of the HAP contract by agreement of PHA and owner, or an owner’s refusal to renew the HAP contract.

If the owner does not give timely notice, the owner must permit the tenants in assisted units to remain in their units for the required notice period with no increase in the tenant portion of their rent, and with no eviction as a result of the owner’s inability to collect an increased tenant portion of rent. An owner and the PHA may agree to renew the terminating contract for a period of time sufficient to give tenants one-year advance notice under such terms as HUD may require.

EXHIBIT 1
City Council 5 – 797 7/15/2025

Page 17 ends

Termination by Owner – Reduction Below Initial Contract Rent [24 CFR 983.206(d)] If the amount of the rent to owner for any contract unit, as adjusted, is reduced below the amount of the initial rent to owner, the owner may terminate the HAP contract, upon notice to the PHA no fewer than 90 calendar days prior to the planned termination, and families must be provided tenant-based assistance and may elect to remain in the project. The owner is not required to provide the one-year notice of the termination of the HAP contract to the family and the PHA when terminating the HAP contract due to rent reduction below the initial rent to owner.

Termination or Expiration without Extensions – Required Provision of Tenant-Based Assistance [24 CFR 983.206(b)]
Unless a termination or expiration without extension occurs due to a determination of insufficient funding or other extraordinary circumstances determined by HUD, upon termination or expiration of the contract, a family living at the property is entitled to receive a tenant-based voucher no fewer than 60 calendar days prior to the planned termination or expiration of the PBV HAP contract. However, the PHA is not required to issue the family a voucher if the PHA has offered the family an alternative housing option (e.g., an assisted unit in another PBV project), and the family chooses to accept the alternative housing option instead of the voucher.

Tenant-based assistance would not begin until the owner’s required notice period ends. The PHA must provide the family with a voucher and the family must also be given the option by the PHA and owner to remain in their unit with HCV tenant-based assistance subject to the following:
 The unit must comply with housing quality standards;
 The PHA must determine or have determined that the rent for the unit is reasonable;  The family must pay its required share of the rent and the amount, if any, by which the unit rent (including the amount allowed for tenant-based utilities) exceeds the applicable payment standard (the limitation at 24 CFR 982.508 regarding maximum family share at initial occupancy does not apply); and
EXHIBIT 1
City Council 5 – 798 7/15/2025

Page 17 ends

 The owner may not refuse to initially lease a unit in the project to a family that elects to use their tenant-based assistance to remain in the same project, except where the owner will use the unit for a purpose other than a residential rental unit. The owner may not later terminate the tenancy of such a family, except for the following grounds:
- The grounds in 24 CFR 982.310, except paragraphs 24 CFR 982.310(d)(1)(iii) and (iv); - The owner’s desire to use the unit for a purpose other than a residential rental unit; and - The owner’s desire to renovate the unit, subject to the following:
 The owner must consider whether a reasonable alternative to terminating the lease exists. If a reasonable alternative exists, the owner must not terminate the lease. The owner must consider the following alternatives:
- Completing renovations without the family vacating the unit, if the renovations can be completed in a manner that does not result in life-threatening conditions, does not result in deficiencies under housing quality standards that are not corrected within 30 days, and is mutually agreeable to the owner and the family; and
- Temporarily relocating the family to complete the renovations, if the relocation and renovations can be completed within a single calendar month (beginning no sooner than the first day of a month and ending no later than the last day of the same month) and the family can be relocated to a location and in a manner mutually agreeable to the owner and the family;
 If the owner terminates the lease for renovation, the owner must make every reasonable effort to make available and lease the family another unit within the project that meets the tenant-based voucher program requirements; and  If no other unit within the project is available for the family to lease during the renovation period or the family chooses to move from the project during the renovation period, the owner must make every reasonable effort to make available and lease the family a unit within the project upon completion of renovations.

The family has the right to remain in the project as long as the units are used for rental housing and are otherwise eligible for HCV assistance. Families that receive a tenant-based voucher at the expiration or termination of the PBV HAP contract are not new admissions to the PHA HCV tenant-based program and are not subject to income eligibility requirements or any other admission requirements. If the family chooses to remain in their unit with tenant-based assistance, the family may do so regardless of whether the family share would initially exceed 40 percent of the family’s adjusted monthly income.

The voucher issued to the family is the voucher attached to its unit under the expiring or terminating PBV contract. Consequently, if the family vacates the contract unit following the issuance of the tenant-based voucher and prior to the contract termination or expiration date, the PHA must remove the unit from the PBV HAP contract at the time the family vacates the unit.

The PBV HAP contract must provide that, if the units continue to be used for rental housing upon termination or expiration without extension of a PBV HAP contract, each assisted family may elect to use its tenant-based assistance to remain in the same project.

EXHIBIT 1
City Council 5 – 799 7/15/2025

Page 17 ends

Remedies for Housing Quality Standards Deficiencies [24 CFR 983.208] The following is applicable to HAP contracts executed or renewed June 5, 2024, or earlier:

The PHA may not make any HAP payment to the owner for a contract unit during any period in which the unit does not comply with housing quality standards. If the PHA determines that a contract does not comply with housing quality standards, the PHA may exercise any of its remedies under the HAP contract, for any or all of the contract units. Available remedies include termination of housing assistance payments, abatement or reduction of housing assistance payments, reduction of contract units, and termination of the HAP contract.

SAHA Policy
SAHA will abate and terminate PBV HAP contracts for noncompliance with housing quality standards in accordance with the policies used in the tenant-based voucher program. These policies are contained in Section 8-II.G., Enforcing Owner Compliance.

The following is applicable to HAP contracts executed or renewed June 6, 2024, or later.

Enforcement of Housing Quality Standards [24 CFR 983.208(b)] The PHA must vigorously enforce the owner’s obligation to maintain contract units in accordance with housing quality standards. If the owner fails to maintain the dwelling unit in accordance with housing quality standards, the PHA must take enforcement action. The unit is in noncompliance with housing quality standards if:
 The PHA or other inspector authorized by the state or local government determines the unit has housing quality standards deficiencies based upon an inspection;  The agency or inspector notifies the owner in writing of the unit housing quality standards deficiencies; and
 The deficiencies are not remedied within the following timeframes:
- For life-threatening deficiencies, the owner must correct the deficiency within 24 hours of notification;
- For other deficiencies, the owner must correct the deficiency within 30 calendar days of notification (or any reasonable PHA-approved extension).

In the case of a housing quality standards deficiency that the PHA determines is caused by the tenant, any member of the household, or any guest or other person under the tenant’s control, other than any damage resulting from ordinary use, the PHA may waive the owner’s responsibility to remedy the violation. Housing assistance payments to the owner may not be withheld or abated if the owner responsibility has been waived. However, the PHA may terminate assistance to a family because of a housing quality standards breach beyond damage resulting from ordinary use caused by any member of the household or any guest or other person under the tenant’s control, which may result in removing the unit from the HAP contract.

EXHIBIT 1
City Council 5 – 800 7/15/2025

Page 17 ends

SAHA Policy
SAHA will waive the owner’s responsibility for housing quality standards deficiencies that have been determined to have been caused by the tenant, any member of the household, or any guest or other person under the tenant’s control, to the extent the tenant can be held responsible for ensuring that the deficiencies are corrected: the tenant must take all necessary steps permissible under the lease and state and local law to remedy the deficiency. This may include paying the owner for the cost of the necessary repairs in accordance with the lease.

In the case of a housing quality standards deficiency that is caused by fire, natural disaster, or similar extraordinary circumstances, the PHA may permit the owner to undertake substantial improvement in accordance with 24 CFR 983.212. However, so long as the contract unit with deficiencies is occupied, the PHA must withhold or abate housing assistance payments and remove units from or terminate the HAP contract as described in this section.

In the case of a project that is undergoing development activity after HAP contract execution, the remedies of 24 CFR 983.208(d) do not apply to units designated as unavailable for occupancy during the period of development activity in accordance with the rider. However, in the case of any contract unit with deficiencies that is occupied, the PHA must withhold or abate housing assistance payments and remove units from or terminate the HAP contract as described in this section.

Family Obligation [24 CFR 983.208(c)]
The family may be held responsible for a breach of housing quality standards caused by any of the following:
 Tenant-paid utilities not in service;
 Failure to provide or maintain appliances owned by the family; and  Damage to the dwelling unit or premises caused by a household member or guest beyond ordinary wear and tear.

SAHA Policy
Damages beyond ordinary wear and tear will be considered to be damages which could be assessed against the security deposit under state law or in court practice.

If the PHA has waived the owner’s responsibility to remedy the violation, the following applies:
 If the housing quality standards breach caused by the family is life-threatening, the family must take all steps permissible under the lease and state and local law to ensure the deficiency is corrected within 24 hours of notification.  For other family-caused deficiencies, the family must take all steps permissible under the lease and state and local law to ensure the deficiency is corrected within 30 calendar days of notification (or any PHA-approved extension).

If the family has caused a breach of the housing quality standards, the PHA must take prompt and vigorous action to enforce the family obligations. The PHA may terminate assistance for the family in accordance with 24 CFR 982.552.

EXHIBIT 1
City Council 5 – 801 7/15/2025

Page 17 ends

PHA Remedies [24 CFR 983.208(d)]
The remedies listed below apply when housing quality standards deficiencies are identified as the result of an inspection other than a pre-selection, initial, or turnover inspection. The PHA must identify in its administrative plan the conditions under which it will withhold HAP and the conditions under which it will abate HAP or terminate the HAP contract for units other than the unit with housing quality standards deficiencies.

SAHA Policy
The owner and the family will be notified in writing of the results of all inspections.

When an inspection identifies housing quality standards failures, SAHA will determine (1) whether or not the failure is a life-threatening condition and (2) whether the family or owner is responsible.

SAHA will not withhold assistance payments upon notification to the owner of the deficiencies.

When life-threatening conditions are identified, SAHA will immediately notify both parties by telephone or email. The notice will specify who is responsible for correcting the violation. The corrective actions must be taken within 24 hours of SAHA’s notice.

When failures that are not life-threatening are identified, SAHA will send the owner and the family a written notification of the inspection results within five business days of the inspection. The written notice will specify who is responsible for correcting the violation, and the time frame within which the failure must be corrected. Generally, not more than 30 days will be allowed for the correction.

If the owner is responsible for correcting the deficiency, the notice of inspection results will inform the owner that if life-threatening conditions are not corrected within 24 hours, and non-life-threatening conditions are not corrected within the specified time frame (or any PHA-approved extension), the owner’s HAP will be abated.

Likewise, if the family is responsible for correcting the deficiency, the notice will inform the family that if corrections are not made within the specified time frame (or any PHAapproved extension, if applicable) the family’s assistance will be terminated in accordance with PHA policy (see Chapter 12).

EXHIBIT 1
City Council 5 – 802 7/15/2025

Page 17 ends

HAP Withholding [24 CFR 983.208(d)(1)
A PHA may withhold assistance payments for units that have housing quality standards deficiencies once the PHA has notified the owner in writing of the deficiencies. The PHA’s administrative plan must identify the conditions under which the PHA will withhold HAP. In this case, if the unit is brought into compliance during the applicable cure period, the PHA resumes assistance payments and provides assistance payments to cover the time period for which the payments were withheld.

SAHA Policy
SAHA will not withhold assistance payments upon notification to the owner of the deficiencies.

HAP Abatement [24 CFR 983.208(d)(2)]
The PHA must abate the HAP, including amounts that had been withheld, if the owner fails to make the repairs within the applicable cure period. The PHA may choose to abate payments for all units covered by the HAP contract due to a contract unit’s noncompliance with the housing quality standards, even if some of the contract units continue to meet housing quality standards.

In this case, the PHA must notify the family and the owner that it is abating payments and, if the unit does not meet housing quality standards within 60 days (or a reasonable longer period established by the PHA), the PHA will either terminate the HAP contract or remove the unit with deficiencies from the HAP contract, and any family residing in a unit that does not comply with housing quality standards will have to move if the family wishes to receive continued assistance.

The owner may not terminate the tenancy of any family due to the withholding or abatement of assistance.

SAHA Policy
SAHA will make all HAP abatements effective the first of the month following the expiration of SAHA-specified correction period (including any extension).

SAHA will abate payments only for those contract units that do not meet housing quality standards.

SAHA will inspect abated units within five business days of the owner’s notification that the work has been completed. Payment will resume effective on the day the unit passes inspection.

During any abatement period the family continues to be responsible for its share of the rent.

EXHIBIT 1
City Council 5 – 803 7/15/2025

Page 17 ends

Failure to Make Repairs
If an owner fails to make required repairs within 60 days (or a reasonable longer period established by the PHA) of the notice of abatement, the PHA must either remove the unit from the HAP contract or terminate the HAP contract in its entirety. The PHA must issue the family whose unit will be removed or all families residing in contract units, if the PHA is terminating the HAP contract, a tenant-based voucher to move at least 30 days prior to the removal of the unit from the HAP contract or termination of the HAP contract. A family may elect to remain in the project if the project contains a unit that meets the requirements of that section, with priority given to families who will remain in the same unit if there are insufficient units available to accommodate all families that wish to remain. The PHA must give any family residing in a unit that is either removed from the HAP contract or for which the HAP contract is terminated due to a failure to correct housing quality standards deficiencies at least 90 days or a longer period as the PHA determines is reasonably necessary following the termination of the HAP contract or removal of the unit from the HAP contract to lease a unit with tenant-based assistance.

SAHA Policy
SAHA will issue a family whose HAP contract is being terminated due to an owner failing to make required repairs within the required time frame a voucher no later than 30 days prior to the termination of the HAP contract. The initial term of the voucher will be 120 calendar days.

In order to receive tenant-based assistance under the HCV program, the family must submit a Request for Tenancy Approval and proposed lease within the 120-day period, unless SAHA grants an extension. SAHA will follow the policies set forth in Chapter 5 on voucher extension and expiration.

Offer of Public Housing [24 CFR 983.208(d)(6)(ii)]
If the family is unable to lease a new unit within the term of the voucher, and the PHA owns or operates public housing, the PHA must offer, and, if accepted, provide the family a selection preference for an appropriate-size public housing unit that first becomes available for occupancy after the time period expires.

SAHA Policy
SAHA does not operate any public housing units.

EXHIBIT 1
City Council 5 – 804 7/15/2025

Page 17 ends

Relocation Assistance [24 CFR 983.208(d)(6)(iii)]
PHAs may assist families relocating due to the HAP contract being terminated as a result of the owner failing to make required repairs within the required time frame in finding a new unit, including using up to two months of the withheld and abated assistance payments for costs directly associated with relocating to a new unit, including security deposits, temporary housing costs, or other reasonable moving costs as determined by the PHA based on their locality.

If the PHA uses withheld and abated payments to assist with relocation costs, the PHA must provide security deposit assistance to the family as necessary. The PHA must assist families with disabilities with locating available accessible units in accordance with 24 CFR 8.28 (a)(3). If the family receives security deposit assistance from the PHA for the new unit, the PHA may require the family to remit the security deposit returned by the owner of the new unit as such time that the lease is terminated, up to the amount of security deposit provided by the PHA for that unit.

SAHA Policy
SAHA will assist families with disabilities with locating available accessible units in accordance with program requirements.

SAHA will use up to two months of withheld and abated payment to assist with any required security deposit at the new unit. Funds will not be used for any other relocation assistance.

If the family receives a refund of a security deposit for the new unit, SAHA will not require any amount to be remitted to SAHA.

EXHIBIT 1
City Council 5 – 805 7/15/2025

Page 17 ends

17-V.D. AMENDMENTS TO THE HAP CONTRACT TO ADD OR SUBSTITUTE UNITS [24 CFR 983.207]
At the PHA’s discretion, the PHA and owner may execute an amendment to the HAP contract to substitute a different unit with the same number of bedrooms in the same project for a previously covered contract unit or to add additional contract units to the existing HAP contract without a new proposal selection.

The proposed substituted or added units may be vacant or occupied (subject to the requirements of 24 CFR 983.207(c) described below). Before any such substitution or addition can take place:
 The units must comply with housing quality standards;  The rent to owner must be reasonable; and
 One of the following conditions must apply:
- The units existed at the time of HAP contract execution; or - In the case of a project completed in stages, the units existed at the time of PHA acceptance of the last completed units; or
- A unit, office space, or common area within the interior of a building containing contract units existed at the time described above, as applicable, and is reconfigured without impacting the building envelope, subject to 24 CFR 983.207(d), into one or more units to be added or substituted.

The PHA must describe in the administrative plan the circumstances under which it will add or substitute contract units, and how those circumstances support the goals of the PBV program.

SAHA Policy
SAHA will add units to the contract on a case-by-case basis to ensure the availability of affordable housing as long as the addition of units does not exceed allowable project caps.

Addition of Contract Units [24 CFR 983.207(b)]
Before adding any contract units, the units must comply with housing quality standards and the rent to owner must be reasonable. The additional PBV units, however, are still subject to the PBV program cap and project cap. However, added units that qualify for an exclusion from the program cap (as described in 24 CFR 983.59) or an exception to or exclusion from the project cap (as described in 24 FR 983.54(c) and 24 CFR 983.59, respectively) do not count toward such caps.

EXHIBIT 1
City Council 5 – 806 7/15/2025

Page 17 ends

Substituting or Adding Occupied Units [24 CFR 983.207(c)] The PHA may place occupied units on the HAP contract subject to the following:
 The family occupying the unit must be eligible for assistance;  The unit must be the appropriate for the size of the family occupying the unit under the PHA’s subsidy standards;
 The family must be selected from the waiting list in accordance with applicable selection policies; and
 The unit may be occupied by a family who was assisted with a tenant-based voucher immediately prior to the unit being placed on the PBV HAP contract. The tenant-based HAP contract for the unit must terminate before the unit may be placed under the PBV HAP contract. The family occupying the unit is not a new admission to the voucher program. - If the family is in the initial term of the tenant-based lease, the family agreed to mutually terminate the tenant-based lease with the owner and enter into a PBV lease. - If the initial term of the tenant-based lease has passed or the end of that term coincides with the time at which the unit will be placed on the PBV HAP contract, upon the owner’s decision not to renew the tenant-based lease or to terminate the tenant-based lease in accordance with 24 CFR 982.308 or 982.310, respectively, the family agreed to relinquish the tenant-based voucher and enter into a PBV lease. 17-V.E. HAP CONTRACT YEAR, ANNIVERSARY AND EXPIRATION DATES [24 CFR 983.207(b)(2) and (g) and 983.302(e)]
The HAP contract year is the period of 12 calendar months preceding each annual anniversary of the HAP contract during the HAP contract term. The initial contract year is calculated from the first day of the first calendar month of the HAP contract term.

The annual anniversary of the HAP contract is the first day of the first calendar month after the end of the preceding contract year.

There is a single annual anniversary and expiration date for all units under a particular HAP contract, even in cases where contract units are placed under the HAP contract in stages (on different dates) or units are added by amendment. The anniversary and expiration dates for all units coincide with the dates for the contract units that were originally placed under contract.

EXHIBIT 1
City Council 5 – 807 7/15/2025

Page 17 ends

17-V.F. OWNER RESPONSIBILITIES UNDER THE HAP CONTRACT
[24 CFR 983.210]
When the owner executes the HAP contract, the owner certifies that at such execution and at all times during the term of the HAP contract:
 The owner is maintaining the premises and contract units in accordance with housing quality standards;
 The owner is providing all services, maintenance, equipment and utilities as agreed to under the HAP contract and the leases;
 Each contract unit for which the owner is receiving HAP is leased to an eligible family referred by the PHA or selected from the owner-maintained waiting list, and the lease is in accordance with the HAP contract and HUD requirements;
 To the best of the owner’s knowledge the family resides in the contract unit for which the owner is receiving HAP, and the unit is the family’s only residence;  The owner (including a principal or other interested party) is not the spouse, parent, child, grandparent, grandchild, sister, or brother of any member of a family residing in a contract unit (unless needed as a reasonable accommodation);
 The amount of the HAP the owner is receiving is correct under the HAP contract;  The rent for contract units does not exceed rents charged by the owner for comparable unassisted units;
 Except for HAP and tenant rent, the owner has not received and will not receive any other payment or consideration for rental of the contract unit;  The family does not own or have any interest in the contract unit (does not apply to family’s membership in a cooperative); and
 Repair work on the project selected as an existing project that is performed after HAP execution within such post-execution period as specified by HUD may constitute development activity, and if determined to be development activity, the repair work undertaken shall be in compliance with Davis-Bacon wage requirements.

EXHIBIT 1
City Council 5 – 808 7/15/2025

Page 17 ends

PART VI: SELECTION OF PBV PROGRAM PARTICIPANTS
17-VI.A. OVERVIEW
Many of the provisions of the tenant-based voucher regulations [24 CFR 982] also apply to the PBV program. This includes requirements related to determining eligibility and selecting applicants from the waiting list. Even with these similarities, there are requirements that are unique to the PBV program. This part describes the requirements and policies related to eligibility and admission to the PBV program.
17-VI.B. ELIGIBILITY FOR PBV ASSISTANCE [24 CFR 983.251(a) and (b)] The PHA may select families for the PBV program from those who are participants in the PHA’s tenant-based voucher program and from those who have applied for admission to the voucher program. For voucher participants, eligibility was determined at original admission to the voucher program and does not need to be redetermined at the commencement of PBV assistance.

For all others, eligibility for admission must be determined at the commencement of PBV assistance using information received and verified by the PHA within a period of 60 days before commencement of PBV assistance. For all families, the PHA must determine the total tenant payment for the family is less than the gross rent, such that the unit will be eligible for a monthly HAP.

Applicants for PBV assistance must meet the same eligibility requirements as applicants for the tenant-based voucher program. Applicants must qualify as a family as defined by HUD and the PHA, have income at or below HUD-specified income limits, and qualify on the basis of citizenship or the eligible immigration status of family members [24 CFR 982.201(a) and 24 CFR 983.2(a)]. In addition, an applicant family must provide social security information for family members [24 CFR 5.216 and 5.218] and consent to the PHA’s collection and use of family information regarding income, expenses, and family composition [24 CFR 5.230]. The PHA may also not approve a tenancy if the owner (including a principal or other interested party) of the unit is the parent, child, grandparent, grandchild, sister, or brother of any member of the family, unless needed as a reasonable accommodation. An applicant family must also meet HUD requirements related to current or past criminal activity.

SAHA Policy
SAHA will determine an applicant family’s eligibility for the PBV program in accordance with the policies in Chapter 3. Each PBV project may have income limits at or below fifty-percent AMI. To determine the specific projects income limits, refer to either of these documents, Resident Selection Plan or Tenant Selection Plan.

EXHIBIT 1
City Council 5 – 809 7/15/2025

Page 17 ends

In-Place Families [24 CFR 983.251(b)]
A family residing in a proposed contract unit on the proposal or project selection date is considered an in-place family. If an in-place family is determined to be eligible prior to placement of the family’s unit on the HAP contract, the in-place family must be placed on the PHA’s waiting list (if the family is not already on the list). Once the family’s continued eligibility is determined (the PHA may deny assistance to an in-place family for the grounds specified in 24 CFR 982.552 and 982.553), the family must be given an absolute selection preference and the PHA must refer families to the applicable project owner for an appropriately sized PBV unit in the specific project. Admission of eligible in-place families is not subject to income targeting requirements.

During the initial term of the lease under the tenant-based tenancy, an in-place tenant-based voucher family may agree, but is not required, to mutually terminate the lease with the owner and enter into a lease and tenancy under the PBV program. If the family chooses to continue the tenant-based assisted tenancy, the unit may not be added to the PBV HAP contract. The owner may not terminate the lease for other good cause during the initial term unless the owner is terminating the tenancy because of something the family did or failed to do in accordance with 24 CFR 982.310(d)(2). The owner is expressly prohibited from terminating the tenancy during the initial term of the lease based on the family’s failure to accept the offer of a new lease or revision, or for a business or economic reason.

If, after the initial term, the owner chooses not to renew the lease or terminates the lease for other good cause (as defined in 24 CFR 982.310(d)) to end the tenant-based assisted tenancy, the family would be required to move with continued tenant-based assistance or relinquish the tenant-based voucher and enter into a new lease to receive PBV assistance in order to remain in the unit.

EXHIBIT 1
City Council 5 – 810 7/15/2025

Page 17 ends

17-VI.C. ORGANIZATION OF THE WAITING LIST [24 CFR 983.251(c)] Applicants who will occupy units with PBV assistance must be selected from the waiting list for the PBV program. The PHA or owner (as applicable) may establish selection criteria or preferences for occupancy of particular PBV units. The PHA may place families referred by the PBV owner on its PBV waiting list. The PHA must establish in the administrative plan the options it will use to structure the PBV waiting list. The PHA may:
 Use a separate, central, waiting list comprised of more than one or all PBV projects;  Use the same waiting list for both tenant-based and some or all PBV projects;  Use a separate waiting list for PBV units in individual projects or buildings (or for sets of such units) (which may be used in combination with either of the above options and may be maintained by the owner); or
 Merge the PBV waiting list with a waiting list for other assisted housing programs offered by the PHA.

If the PHA chooses to offer a separate waiting list for PBV assistance, the PHA must offer to place applicants who are listed on the tenant-based waiting list on the waiting list for PBV assistance. The PHA must specify the name of the PBV projects in its administrative plan.

SAHA Policy
SAHA will use separate, site-based waiting lists for all projects or buildings that are receiving PBV assistance, except for the projects or buildings where the permanent supportive housing units require referrals from the Orange County Coordinated Entry System.

While some waiting lists will be maintained by the owner as described below, SAHA will maintain waiting lists for the following PBV projects:

Andalucia
Crossroads at Washington
This list of PBV projects above may be expanded without the need for an amendment to the HCV Administrative Plan.

PHA Waiting List Preferences [24 CFR 983.251(c)(3)]
The PHA may establish in its administrative plan any preferences for occupancy of particular units including the name of the projects and the specific preferences that are to be used by project. Criteria for occupancy of units (e.g., elderly families) may also be established, however, selection of families must be done through admission preference. The PHA may use the same selection preferences that are used for the tenant-based voucher program, establish selection criteria or preferences for the PBV program as a whole, or for occupancy of particular PBV developments or units. The PHA must provide an absolute selection preference for eligible inplace families as described in Section 17-VI.B. above. For both excepted units and units under the increased program cap, 24 CFR 983.262(b)(2) requires that the PHA must select families from the waiting list though an admission preference for these types of units.

SAHA Policy
EXHIBIT 1
City Council 5 – 811 7/15/2025

Page 17 ends

SAHA will offer waiting list preferences for PHA-maintained waiting lists in accordance with the policies in Chapter 4, except for the projects or buildings where the permanent supportive housing units require referrals from the Orange County Coordinated Entry System.

EXHIBIT 1
City Council 5 – 812 7/15/2025

Page 17 ends

17-VI.D. OWNER-MAINTAINED WAITING LISTS [24 CFR 983.251(c)(7)] When the PHA uses separate waiting lists for individual projects or buildings, the PHA may establish in the administrative plan that owners will maintain the waiting lists.

All HCV waiting list administration requirements that apply to the PBV program also apply to owner-maintained waiting lists [24 CFR part 982, subpart E, other than 24 CFR 982.201(e), 982.202(b)(2), and 982.204(d)].

Under an owner-maintained waiting list, the owner is responsible for carrying out responsibilities including, but not limited to:
 Processing changes in applicant information;
 Removing an applicant’s name from the waiting list;
 Opening and closing the waiting list;
- If the owner-maintained waiting list is open and additional applicants are needed to fill vacant units, the owner must give public notice in accordance with the requirements of 24 CFR 982.206 and the owner waiting list policy.
 Maintaining complete and accurate records as described in 24 CFR 982.158; and  Giving the PHA, HUD, and the Comptroller General full and free access to its offices and records concerning waiting list management, as described in 24 CFR 982.158(c).

Applicants already on the PHA’s waiting list (including the tenant-based waiting list) must be permitted to place their names on the project’s waiting lists.

Applicants may apply directly at the project, or the applicant may request that the PHA refer the applicant to the owner for placement on the project’s waiting list. The PHA must disclose to the applicant all the PBV projects available to the applicant, including the projects’ contact information and other basic information about the project.

SAHA Policy
SAHA will establish owner-maintained waiting lists at the following PBV projects:

Vista Del Rio
This list of PBV projects above may be expanded without the need for an amendment to the HCV Administrative Plan.

SAHA will disclose information to all applicants about all the PBV projects, including the projects’ contact information and other basic information such as the location, number of accessible units, types of excepted units (if any), amenities, and anticipated waiting time.

EXHIBIT 1
City Council 5 – 813 7/15/2025

Page 17 ends

Owner Waiting List Policy [24 CFR 983.251(c)(7)(i)]
The owner must develop and submit to the PHA a written owner waiting list policy that must include:
 Policies and procedures concerning waiting list management and selection of applicants from the project’s waiting list, including any admission preferences;  Procedures for removing applicant names from the waiting list; and  Procedures for closing and reopening the waiting list.

The owner must receive approval from the PHA in accordance with the process established in the PHA’s administrative plan, and the PHA must include the owner’s waiting list policy in the PHA’s administrative plan.

SAHA Policy
Prior to any owner initially managing a waiting list, the owner must develop and submit a written owner waiting list policy to SAHA. Owners may not operate a waiting list without prior PHA approval. SAHA will review the owner’s policy to ensure that, at a minimum, it includes policies and procedures concerning waiting list management and selection of applicants from the project’s waiting list, including any admission preferences; procedures for removing applicant names from the waiting list; and procedures for closing and reopening the waiting list. Further, if the owner will maintain waiting list preferences, the owner must also receive written approval from SAHA for any preferences that will be applicable to the project (see Preferences below).

SAHA will not approve any owner waiting list policies that do not meet minimum requirements as described in the regulations and PHA policy. Owner policies must be submitted electronically to SAHA. If, upon review, SAHA is unable to approve the policy, SAHA will send the owner written notice via email specifying the reasons the policy is being disapproved. The owner will have 14 calendar days to amend and resubmit the policy to SAHA, subject to extensions for good cause, which the owner must request prior to the end of the 14-calendar day period. The owner must receive final written approval from SAHA prior to maintaining a waiting list. Once an owner’s policy is approved, SAHA will email the owner a copy of the approval and will maintain a copy of the approval in the project records. SAHA will also amend its administrative plan to include the name of the project and the owner’s waiting list policy. All owner waiting list policies are included at the end of this chapter as Exhibit 17-3.

The owner must submit any changes to the waiting list policy to SAHA in writing electronically 30 days prior to implementing the changes. SAHA will review the proposed changes and will provide the owner with a written approval or denial letter via email. The owner may not implement any changes to the waiting list policy without prior PHA approval. Changes to the owner’s policy will be included in SAHA’s administrative plan.

EXHIBIT 1
City Council 5 – 814 7/15/2025

Page 17 ends

Owner-Maintained Waiting List Preferences [24 CFR 983.251(c)(7)(ii)] For any owner-maintained waiting lists, the owner may not give selection preferences to families without prior PHA approval. The PHA will review and approve owner preferences as part of its owner waiting list policy approval process. All owner preferences must be consistent with the PHA Plan. If applicable, the owner must give an absolute preference to eligible families residing in a proposed PBV contract unit on the date the proposal or project is selected by the PHA (“inplace families”) in accordance with 24 CFR 983.251(b).

If the project offers services for a particular type of disability, the owner’s preference must be provided to all applicants who qualify for the voluntary services offered in conjunction with the assisted units and may not require families to accept the particular services offered at the project nor require families to provide their own equivalent services if they decline the project’s services. The owner may not grant a preference for persons with specific disabilities. In advertising the project, the owner may advertise the project as offering services for a particular type of disability; however, the preference must be provided to all applicants who qualify for the voluntary services offered in conjunction with the assisted units. The owner is responsible for notifying the family of any determination that the family is not eligible for a preference.

Preliminary Eligibility Determinations [24 CFR 983.251(c)(7)(vi)] At the discretion of the PHA, the owner may make preliminary eligibility determinations for purposes of placing the family on the waiting list and preference eligibility determinations. The PHA may choose to make this determination rather than delegating it to the owner.

Once an owner selects the family from the waiting list, the owner refers the family to the PHA who then determines the family’s final program eligibility. The owner may not offer a unit to the family until the PHA determines that the family is eligible for the program.

SAHA Policy
SAHA will allow the owner to make preliminary eligibility determinations for purposes of placing the family on the waiting list. The owner must review each completed application received and make a preliminary assessment of the family’s eligibility.

Applicants for whom the waiting list is open must be placed on the waiting list unless the owner determines the family to be ineligible. If the owner determines from the information provided that a family is ineligible, the family will not be placed on the waiting list. The owner is responsible for notifying the family and SAHA of the owner’s determination not to place the applicant on the waiting list. In such a case, the owner is responsible for providing notice in accordance with 24 CFR 982.554(a). The owner must give the applicant prompt notice of a decision denying assistance to the applicant. The notice must contain a brief statement of the reasons for the owner decision and must also state that the applicant may request an informal review by SAHA.

EXHIBIT 1
City Council 5 – 815 7/15/2025

Page 17 ends

PHA Oversight [24 CFR 983.251(c)(7)(x)]
The PHA is responsible for oversight of owner-maintained waiting lists to ensure that they are administered properly and in accordance with program requirements, including but not limited to nondiscrimination and equal opportunity requirements under 24 CFR 5.105(a). The PHA must identify in the administrative plan the oversight procedures the PHA will use to ensure these requirements are met.

SAHA Policy
SAHA will review owner waiting list and waiting list procedures as needed. The owner must maintain an electronic waiting list and provide SAHA electronic records upon request. SAHA will review the owner’s waiting list policy to ensure the following:

No changes were made to the owner’s waiting list policy without prior PHA approval;
Applicants were selected from the waiting list in the proper order, recognizing applicable preferences;
If applicable, when preferences were applied, they were properly documented; If the owner opens the waiting list, the owner complied with requirements of 24 CFR 982.206;
The owner’s waiting list complies with all equal opportunity requirements listed under 24 CFR 5.105(a); and
Families in need of vacant accessible units were identified on the waiting list (as applicable).

SAHA will communicate any deficiencies found during the waiting list review to the owner in writing via email within 14 calendar days after SAHA completes its review. The owner must provide SAHA with a written response detailing how deficiencies were remedied within 30 calendar days of SAHA’s email notification.

By signing the HAP contract, the owner certifies that at all times during the term of the HAP contract, each contract unit for which the owner is receiving housing assistance payments is leased to an eligible family selected from the owner-maintained waiting list.

Serious noncompliance identified by SAHA may result in the owner losing the ability to maintain the waiting list. If SAHA determines that the owner has breached the HAP contract, SAHA may exercise any of its rights or remedies under the HAP contract, including but not limited to contract termination.

EXHIBIT 1
City Council 5 – 816 7/15/2025

Page 17 ends

17-VI.E. SELECTION FROM THE WAITING LIST [24 CFR 983.251(c)] Income Targeting [24 CFR 983.251(c)(9)]
At least 75 percent of the families admitted to the PHA’s tenant-based and project-based voucher programs during the PHASAHA fiscal year from the waiting list (including owner-maintained PBV waiting lists) must be extremely low-income families. The income targeting requirement applies to the total of admissions to both programs.

Units with Accessibility Features [24 CFR 983.251(c)(9)] Families who require particular accessibility features for persons with disabilities must be selected first to occupy PBV units with such accessibility features. The PHA must have some mechanism for referring to accessible PBV units a family that includes a person with a mobility or sensory impairment.

EXHIBIT 1
City Council 5 – 817 7/15/2025

Page 17 ends

17-VI.F. OFFER OF PBV ASSISTANCE OR OWNER’S REJECTION
Refusal of Offer [24 CFR 983.251(e)]
If a family refuses the PHA’s offer of PBV assistance or the owner rejects a family for admission, the family’s position on the PHA waiting list for tenant-based assistance is not affected regardless of the type of PBV waiting list used by the PHA. The impact (of a family’s rejection of the offer or the owner’s rejection of the family) on a family’s position on the PBV waiting list will be determined as follows:
 If a central PBV waiting list is used, the PHA’s administrative plan must address the number of offers a family may reject without good cause before the family is removed from the PBV waiting list and whether the owner’s rejection will impact the family’s place on the PBV waiting list.
 If a project-specific PBV waiting list is used, the family’s name is removed from the project’s waiting list connected to the family’s rejection of the offer without good cause or the owner’s rejection of the family. The family’s position on any other project-specific PBV waiting list is not affected.
 The PHA must define good cause in its administrative plan. The PHA’s definition of good cause must include, at minimum, that:
- The family determines the unit is not accessible to a household member with a disability or otherwise does not meet the member’s disability-related needs; - The unit has housing quality standards deficiencies;
- The family is unable to accept the offer due to circumstances beyond the family’s control (such as hospitalization, temporary economic hardship, or natural disaster); and - The family determines the unit presents a health or safety risk to a household member who is or has been a victim of domestic violence, dating violence, sexual assault, or stalking.

SAHA Policy
SAHA will define good cause for rejection of a unit offer as any of the factors listed above.

EXHIBIT 1
City Council 5 – 818 7/15/2025

Page 17 ends

The PHA must not take any of the following actions against a family who has applied for, received, or refused an offer of PBV assistance:
 Refuse to list the applicant on the waiting list for tenant-based voucher assistance; - The PHA (or owner in the case of owner-maintained waiting lists) is not required to open a closed waiting list to place the family on that waiting list.  Deny any admission preference for which the applicant is currently qualified;  Change the applicant’s place on the waiting list based on preference, date, and time of application, or other factors affecting selection from the waiting list;  Remove the applicant from the tenant-based voucher waiting list.

Acceptance of Offer [24 CFR 983.252(a) and (b)]
Family Briefing
When a family accepts an offer for PBV assistance, the PHA must give the family an oral briefing. The briefing must include information on how the program works, the responsibilities of the family and owner, and the family’s right to move.

In addition to the oral briefing, the PHA must provide a briefing packet that contains the following information:
 How the PHA determines the total tenant payment for a family;  The family obligations under the program;
 Information on federal, state, and local equal opportunity laws, the contact information for the Section 504 coordinator, a copy of the housing discrimination complaint form, and information on how to request a reasonable accommodation or modification under Section 504, the Fair Housing Act, and the Americans with Disabilities Act;  PHA subsidy standards, including when the PHA will consider granting exceptions to the standards, and when exceptions are required as a reasonable accommodation for a person with disabilities under Section 504, the Fair Housing Act, or the Americans with Disabilities Act; and
 The family’s right to move.

The PHA and family must sign the statement of family responsibility.

Persons with Disabilities
The PHA must take appropriate steps to ensure effective communication, in accordance with 24 CFR 8.6 and 28 CFR Part 35, subpart E, and must provide information on the reasonable accommodation process in conducting the oral briefing and in providing the written information packet. This may include making alternative formats available (see Chapter 2). In addition, the PHA must have a mechanism for referring a family that includes a member with a mobility impairment to an appropriate accessible PBV unit.

EXHIBIT 1
City Council 5 – 819 7/15/2025

Page 17 ends

Persons with Limited English Proficiency [24 CFR 983.252(d)] The PHA must take reasonable steps to ensure meaningful access by persons with limited English proficiency in accordance with Title VI of the Civil Rights Act of 1964, HUD’s implementing regulation at 24 CFR Part 1, Executive Order 13166 (see Chapter 2), and HUD’s Final Guidance to Federal Financial Assistance Recipients Regarding Title VI Prohibition Against National Origin Discrimination Affecting Limited English Proficient Persons (72 FR 2732) or successor authority.
17-VI.G. LEASING OF CONTRACT UNITS [24 CFR 983.252]
The owner is responsible for developing written tenant selection procedures that are consistent with the purpose of improving housing opportunities for very low-income families and reasonably related to program eligibility and an applicant’s ability to fulfill their obligations under the lease. An owner must promptly notify in writing any rejected applicant of the grounds for any rejection [24 CFR 983.253(a)(2) and (a)(3)]. The owner must provide a copy of the rejection notice to the PHA. During the term of the HAP contract, the owner must lease contract units to eligible families that are selected from the waiting list for the PBV program. The contract unit leased to the family must be the appropriate size unit for the size of the family, based on the PHA’s subsidy standards.

Filling Vacancies [24 CFR 983.254(a)]
The PHA and the owner must make reasonable, good-faith efforts to minimize the likelihood and length of any vacancy in a contract unit. However, contract units in a rehabilitated housing project undergoing development activity after HAP contract execution that are not available for occupancy are not subject to this requirement.

If an owner-maintained waiting list is used, the owner must promptly notify the PHA of any vacancy or expected vacancy in a contract unit and refer the family to the PHA for final eligibility determination. The PHA must make every reasonable effort to make such final eligibility determination within 30 calendar days.

EXHIBIT 1
City Council 5 – 820 7/15/2025

Page 17 ends

If a PHA-maintained waiting list is used, the owner must promptly notify the PHA of any vacancy or expected vacancy in a contract unit. After receiving such notice, the PHA must make every reasonable effort to promptly refer a sufficient number of families for the owner to fill such vacancies within 30 calendar days.

SAHA Policy
For units where the waiting list is owner-maintained, the owner must notify SAHA in writing via email within five business days of learning about any vacancy or expected vacancy.

The owner is responsible for notifying the family of their selection from the waiting list.

SAHA will make every reasonable effort to notify the owner in writing via email of SAHA’s eligibility determination within 30 calendar days of receiving such notice from the owner. If the family is determined eligible, SAHA will notify the family and refer them back to the owner for a suitability screening. If the owner rejects the family after conducting a suitability screening, the owner must provide a copy of the rejection notice to SAHA. The owner may not offer a unit to a family until SAHA determines that the family is eligible for the program and has given the owner written confirmation.

For units where the waiting list is PHA-maintained, the owner must notify SAHA in writing via email within five business days of learning about any vacancy or expected vacancy. SAHA will refer families determined eligible to the owner for a suitability determination within 30 calendar days of receiving such notice from the owner. If the owner rejects the family after conducting a suitability screening, the owner must provide a copy of the rejection notice to SAHA. The owner may not offer a unit to a family until SAHA determines that the family is eligible for the program and has given the owner written confirmation.

Reduction in HAP Contract Units Due to Vacancies [24 CFR 983.254(b)] If any contract units have been vacant for 120 or more days since owner notice of the vacancy, and notwithstanding the reasonable good-faith efforts of the PHA and the owner to fill such vacancies, the PHA may give notice to the owner amending the HAP contract to reduce the number of contract units by subtracting the number of contract units (according to the bedroom size) that have been vacant for this period.

SAHA Policy
If any contract units have been vacant for 120 days, SAHA will give notice to the owner that the HAP contract will be amended to reduce the number of contract units that have been vacant for this period. SAHA will provide the notice to the owner within 14 calendar days of the 120th day of the vacancy.

The amendment to the HAP contract will be effective the 1st day of the month following the date of SAHA’s notice.

EXHIBIT 1
City Council 5 – 821 7/15/2025

Page 17 ends

17-VI.H. TENANT SCREENING [24 CFR 983.255]
PHA Option
The PHA is not responsible or liable to the owner or any other person for the family’s behavior or suitability for tenancy. However, the PHA may opt to screen applicants for family behavior or suitability for tenancy and may deny applicants based on such screening.

SAHA Policy
SAHA will not conduct screening to determine a PBV applicant family’s suitability for tenancy.

The PHA must provide the owner with an applicant family’s current and prior address (as shown in PHA records) and the name and address (if known by the PHA) of the family’s current landlord and any prior landlords.

In addition, the PHA may offer the owner other information the PHA may have about a family, including information about the tenancy history of family members or about drug trafficking and criminal activity by family members. The PHA must provide applicant families a description of the PHA policy on providing information to owners, and the PHA must give the same types of information to all owners.

The protections for victims of domestic violence, dating violence, sexual assault, stalking, or human trafficking in 24 CFR part 5, subpart L, apply to tenant screening. The PHA may not disclose to the owner any confidential information provided in response to a request for documentation of domestic violence, dating violence, sexual assault, stalking, or human trafficking, except at the written request or with the written consent of the individual providing the documentation [see 24 CFR 5.2007(a)(4)].

SAHA Policy
SAHA will inform owners of their responsibility to screen prospective tenants and will provide owners with the required known name and address information, at the time of the turnover inspection or before. SAHA will not provide any additional information to the owner, such as tenancy history, criminal history, etc.

Owner Responsibility
The owner is responsible for screening and selection of the family to occupy the owner’s unit.

When screening families the owner may consider a family’s background with respect to the following factors:
 Payment of rent and utility bills;
 Caring for a unit and premises;
 Respecting the rights of other residents to the peaceful enjoyment of their housing;  Drug-related criminal activity or other criminal activity that is a threat to the health, safety, or property of others; and
 Compliance with other essential conditions of tenancy.

EXHIBIT 1
City Council 5 – 822 7/15/2025

Page 17 ends

PART VII: OCCUPANCY
17-VII.A. OVERVIEW
After an applicant has been selected from the waiting list, determined eligible by the PHA, referred to an owner and determined suitable by the owner, the family will sign the lease and occupancy of the unit will begin.
17-VII.B. LEASE [24 CFR 983.256]
The tenant must have legal capacity to enter a lease under state and local law. Legal capacity means that the tenant is bound by the terms of the lease and may enforce the terms of the lease against the owner [24 CFR 983.256(a)].

Form of Lease [24 CFR 983.256(b)]
The tenant and the owner must enter into a written lease agreement that is signed by both parties.

If an owner uses a standard lease form for rental units to unassisted tenants in the locality or premises, the same lease must be used for assisted tenants, except that the lease must include a HUD-required tenancy addendum. The tenancy addendum must include, word-for-word, all provisions required by HUD.

If the owner does not use a standard lease form for rental to unassisted tenants, the owner may use another form of lease, such as a PHA model lease.

The PHA may review the owner’s lease form to determine if the lease complies with state and local law. If the PHA determines that the lease does not comply with state or local law, the PHA may decline to approve the tenancy.

SAHA Policy
SAHA will not review the owner’s lease for compliance with state or local law.

Lease Requirements [24 CFR 983.256(c)]
The lease for a PBV unit must specify all of the following information:
 The names of the owner and the tenant;
 The unit rented (address, apartment number, if any, and any other information needed to identify the leased contract unit);
 The term of the lease (initial term and any provision for renewal);  The amount of the tenant rent to owner, which is subject to change during the term of the lease in accordance with HUD requirements;
 A specification of the services, maintenance, equipment, and utilities that will be provide by the owner; and
 The amount of any charges for food, furniture, or supportive services.

EXHIBIT 1
City Council 5 – 823 7/15/2025

Page 17 ends

Tenancy Addendum [24 CFR 983.256(d)]
The tenancy addendum in the lease must state:
 The program tenancy requirements;
 The composition of the household as approved by the PHA (the names of family members and any PHA-approved live-in aide);
 All provisions in the HUD-required tenancy addendum must be included in the lease. The terms of the tenancy addendum prevail over other provisions of the lease.

Initial Term and Lease Renewal [24 CFR 983.256(f)]
The initial lease term must be for at least one year. The lease must provide for automatic renewal after the initial term of the lease in either successive definitive terms (e.g. month-to-month or year-to-year) or an automatic indefinite extension of the lease term. For automatic indefinite extension of the lease term, the lease terminates if any of the following occur:
 The owner terminates the lease for good cause
 The tenant terminates the lease
 The owner and tenant agree to terminate the lease
 The PHA terminates the HAP contract
 The PHA terminates assistance for the family
Changes in the Lease [24 CFR 983.256(e)]
If the tenant and owner agree to any change in the lease, the change must be in writing, and the owner must immediately give the PHA a copy of all changes.

The owner must notify the PHA in advance of any proposed change in the lease regarding the allocation of tenant and owner responsibilities for utilities. Such changes may only be made if approved by the PHA and in accordance with the terms of the lease relating to its amendment.

The PHA must redetermine reasonable rent, in accordance with program requirements, based on any change in the allocation of the responsibility for utilities between the owner and the tenant.

The redetermined reasonable rent will be used in calculation of the rent to owner from the effective date of the change.

EXHIBIT 1
City Council 5 – 824 7/15/2025

Page 17 ends

Owner Termination of Tenancy [24 CFR 983.257]
With two exceptions, the owner of a PBV unit may terminate tenancy for the same reasons an owner may in the tenant-based voucher program (see Section 12-III.B. and 24 CFR 982.310). In the PBV program, terminating tenancy for “good cause” does not include doing so for a business or economic reason, or a desire to use the unit for personal or family use or other non-residential purpose. The regulations at 24 CFR 5.858 through 5.861 on eviction for drug and alcohol abuse and 24 CFR Part 5, subpart L (Protection for Victims of Domestic Violence, Dating Violence, Sexual Assault, or Stalking) apply to the PBV program.

In addition, the owner may terminate the tenancy in accordance with the requirements related to lease terminations for development activity on units under a HAP contract and for substantial improvement to units under a HAP contract.

Tenant Absence from the Unit [24 CFR 983.256(g) and 982.312(a)] The lease may specify a maximum period of family absence from the unit that may be shorter than the maximum period permitted by PHA policy. According to program requirements, the family’s assistance must be terminated if they are absent from the unit for more than 180 consecutive days. PHA termination of assistance actions due to family absence from the unit are subject to 24 CFR 981.312, except that the unit is not terminated from the HAP contract if the family is absent for longer than the maximum period permitted.

Continuation of Housing Assistance Payments [24 CFR 982.258] Housing assistance payments shall continue until the tenant rent equals the rent to owner. The cessation of housing assistance payments at such point will not affect the family’s other rights under its lease, nor will such cessation preclude the resumption of payments as a result of later changes in income, rents, or other relevant circumstances if such changes occur within 180 days following the date of the last housing assistance payment by the PHA. After the 180-day period, the unit shall be removed from the HAP contract pursuant to 24 CFR 983.211.

SAHA Policy
If a participating family receiving zero assistance experiences a change in circumstances that would result in a HAP payment to the owner, the family must notify SAHA of the change and request an interim reexamination before the expiration of the 180-day period.

EXHIBIT 1
City Council 5 – 825 7/15/2025

Page 17 ends

Security Deposits [24 CFR 983.259]
The owner may collect a security deposit from the tenant. The PHA may prohibit security deposits in excess of private market practice, or in excess of amounts charged by the owner to unassisted tenants.

SAHA Policy
SAHA will allow the owner to collect a security deposit amount the owner determines is appropriate and legal under California tenant-landlord law.

When the tenant moves out of a contract unit, the owner, subject to state and local law, may use the security deposit, including any interest on the deposit, in accordance with the lease, as reimbursement for any unpaid tenant rent, damages to the unit, or other amounts owed by the tenant under the lease.

The owner must give the tenant a written list of all items charged against the security deposit and the amount of each item. After deducting the amount used to reimburse the owner, the owner must promptly refund the full amount of the balance to the tenant.

If the security deposit does not cover the amount owed by the tenant under the lease, the owner may seek to collect the balance from the tenant. The PHA has no liability or responsibility for payment of any amount owed by the family to the owner.

EXHIBIT 1
City Council 5 – 826 7/15/2025

Page 17 ends

17-VII.C. MOVES
Overcrowded, Under-Occupied, and Accessible Units [24 CFR 983.260] If the PHA determines that a family is occupying a wrong size unit, based on the PHA’s subsidy standards, or a unit with accessibility features that the family does not require, and the unit is needed by a family that does require the features, the PHA must promptly notify the family and the owner of this determination, and within 60 days of the determination, the PHA must offer the family the opportunity to receive continued housing assistance in another unit.

SAHA Policy
SAHA will notify the family and the owner of the family’s need to move based on the occupancy of a wrong-size or accessible unit within 60 days of SAHA’s determination.

SAHA will offer the family the following types of continued assistance in the following order, based on the availability of assistance:

PBV assistance in an appropriately sized unit in the same building or project; PBV assistance an appropriately sized unit in in another project; and Tenant-based voucher assistance.

If no continued housing assistance is available, the PHA must remove the wrong-sized or accessible unit from the HAP contract to make voucher assistance available to issue the family a tenant-based voucher.

If the PHA offers the family a tenant-based voucher, the PHA must terminate the housing assistance payments for a wrong-sized or accessible unit at the earlier of the expiration of the term of the family’s voucher (including any extension granted by the PHA) or the date upon which the family vacates the unit. If the family does not move out of the wrong-sized unit or accessible unit by the expiration of the term of the family’s voucher, the PHA must remove the unit from the HAP contract.

If the PHA offers the family another form of assistance that is not a tenant-based voucher, the PHA must terminate the housing assistance payments for the wrong-sized or accessible unit and remove the unit from the HAP contract when:
 The PHA has offered PBV assistance or other project-based assistance in an appropriately sized unit, and the family does not accept the offer, does not move out of the PBV unit within a reasonable time as determined by the PHA (not to exceed 90 days); or  The PHA has offered other comparable tenant-based rental assistance, the family either accepts or does not accept the offer but does not move out of the PBV unit within a reasonable time as determined by the PHA (not to exceed 90 days).

In either of the above situations, the family may request, and the PHA may grant, one extension not to exceed up to an additional 90 days to accommodate the family’s efforts to locate affordable, safe, and geographically proximate replacement housing.

EXHIBIT 1
City Council 5 – 827 7/15/2025

Page 17 ends

The PHA must terminate the housing assistance payments for the wrong-sized or accessible unit and remove the unit from the HAP contract when the PHA has offered PBV assistance or other project-based assistance in an appropriately sized unit, and the family accepts the offer but does not move out of the PBV unit within a reasonable time as determined by the PHA (not to exceed 90 days). No extensions may be granted in this case. The PHA may reinstate a removed unit to the HAP contract after the family vacates the property, in accordance with 24 CFR 983.207(b).

SAHA Policy
When SAHA offers a family another form of assistance that is not a tenant-based voucher, the family will be given 90 days from the date of the offer to accept the offer and move out of the PBV unit. If the family does not move out within this 90-day time frame, SAHA will terminate the housing assistance payments at the expiration of this 90- day period.

Except in the case of an offer by SAHA of PBV assistance or other project-based housing assistance in an appropriate size unit, the family accepts the offer but does not move out, SAHA may make exceptions to this 90-day period if needed for reasons beyond the family’s control such as death, serious illness, or other medical emergency of a family member or to accommodate the family’s efforts to locate affordable, safe, and geographically proximate replacement housing. The family must make such a request in writing prior to the end of the 90-day period. SAHA will only grant one extension which will not exceed an additional 90 days.

EXHIBIT 1
City Council 5 – 828 7/15/2025

Page 17 ends

Family Right to Move [24 CFR 983.261]
The family may terminate the lease at any time after one year of PBV assistance. The family must give advance written notice to the owner in accordance with the lease and provide a copy of such notice to the PHA. If the family wishes to move with continued tenant-based assistance, the family must contact the PHA to request the rental assistance prior to providing notice to terminate the lease. The right to request a move with tenant-based assistance does not expire, and the family may request a move at any time after the one-year period has expired.

If the family terminates the lease in accordance with these requirements, the PHA is required to offer the family the opportunity for continued tenant-based assistance, in the form of a voucher or other comparable tenant-based rental assistance. The PHA must specify in the administrative plan whether it will offer families assistance under the voucher program or other comparable tenant-based rental assistance. If voucher assistance is offered to the family and the search term expires, the PHA must issue the voucher to the next eligible family before issuing another voucher to the family that requested to move. If voucher or other comparable tenant-based assistance is not immediately available upon the family’s request to the PHA, the PHA must give the family priority to receive the next available opportunity for continued tenant-based assistance. The PHA must describe in its Administrative Plan its policies and procedures for how the family must contact the PHA and how the PHA documents families waiting for continued tenant-based rental assistance.

If the family terminates the assisted lease before one year of PBV assistance, the family relinquishes the opportunity for continued tenant-based assistance.

SAHA Policy
Except for families seeking protection under VAWA as described below, prior to providing notice to the owner to terminate the lease, any eligible family may submit a written request to SAHA for a voucher at any time after completing the 12-month occupancy requirement. SAHA will process the request within 14 calendar days of receiving the family’s request. SAHA will verify that the family has met the 12-month occupancy requirement. No additional screening will be performed.

If the request is approved by SAHA, the family will receive the next available tenantbased voucher.

If a tenant-based voucher is not immediately available, SAHA will maintain a combined, agency-wide waiting list for all standard PBV and RAD PBV families wishing to move after one year of PBV assistance. A RAD resident does not have priority for tenant-based assistance over a non-RAD PBV resident and vice versa. The list will be maintained separately from the tenant-based HCV list. Families on this list will be given priority over families on the tenant-based waiting list. The list will be organized by date and time of the family’s written request. The list will also identify whether families live in standard or RAD PBV units. Once a family is placed on the list, SAHA will send the family an acknowledgement of receipt of their request and successful placement on the list. If a family requests a tenant-based voucher and then is unable or unwilling to move once SAHA offers the family a tenant-based voucher, the family’s name will be removed from the list. The family may resubmit a new request to move at any time.

EXHIBIT 1
City Council 5 – 829 7/15/2025

Page 17 ends

While the family will not be required to attend a standard HCV briefing in order to receive a voucher, SAHA will promptly schedule a meeting with each family at the time of voucher issuance.

Families exercising their right to move are not required to vacate their units before a lease has been entered into using their tenant-based voucher so long as the resident has not yet provided notice to vacate to the owner. At the time SAHA issues the tenant-based voucher, SAHA will notify the family of their right to remain in their unit if they are unable find a rental unit using the tenant-based voucher. If family’s search term (and any extensions) expires, SAHA must issue the voucher to the next eligible family. The family’s name will be removed from the priority list, and the family will be able to resubmit a request at a later time.

Emergency Transfers under VAWA [Notice PIH 2017-08 and 24 CFR 983.261(f) and (g)] In the case of a move due to domestic violence, dating violence, sexual assault, stalking, or human trafficking, PHAs must describe policies for facilitating emergency transfers for families with PBV assistance in their Emergency Transfer Plan, including when a victim has been living in a unit for less than a year or when a victim seeks to move sooner than a tenant-based voucher is available.

When the family or a member of the family is or has been the victim of domestic violence, dating violence, sexual assault, stalking, or human trafficking, and the move is needed to protect the health or safety of the family or family member, the family is not required to give the owner advance written notice or contact the PHA before moving from the unit. Additionally, when any family member has been the victim of a sexual assault that occurred on the premises during the 90-calendar-day period preceding the family’s request to move, the family is not required to give the owner advance written notice or contact the PHA before moving from the unit. A PHA may not terminate the assistance of a family due to a move occurring under these circumstances and must offer the family the opportunity for continued tenant-based assistance if the family had received at least one year of PBV assistance prior to moving.

If a family break-up results from an occurrence of domestic violence, dating violence, sexual assault, stalking or human trafficking, the PHA must ensure that the victim retains assistance.

EXHIBIT 1
City Council 5 – 830 7/15/2025

Page 17 ends

SAHA Policy
Except where special consideration is needed for the project-based voucher program, SAHA will follow VAWA policies as outlined in Chapter 16 Part IX of this administrative plan, including using the Emergency Transfer Plan as the basis for PBV transfers under VAWA (Exhibit 16-4).

When the victim of domestic violence, dating violence, sexual assault, stalking, or human trafficking has lived in the unit for less than one year, SAHA will provide several options for continued assistance.

SAHA will first try to transfer the participant to another PBV unit in the same development or transfer to a different development where SAHA has PBV units. SAHA will expedite the administrative processes in this case in an effort to conduct the transfer as quickly as possible.

If no units are available for an internal transfer, or if there is reasonable cause to believe that such a transfer would put the victim in jeopardy, the participant may receive continued assistance through an external transfer to either tenant-based rental assistance (HCV). Such a decision will be made by SAHA based on the availability of tenant-based vouchers. Such families must be selected from the waiting list for the applicable program.

SAHA has adopted a waiting list preference for victims of domestic violence, dating violence, sexual assault, stalking, and human trafficking in both its HCV and public housing programs in order to expedite this process. See Section 4-III.C. of this administrative plan.

If a victim wishes to move after a year of occupancy in the unit, but no tenant-based vouchers are available, SAHA will offer the participant an internal transfer to another PBV unit in the same development or a transfer to a different development where SAHA has PBV units. SAHA will expedite the administrative processes in this case in an effort to conduct the transfer as quickly as possible.

EXHIBIT 1
City Council 5 – 831 7/15/2025

Page 17 ends

PART VIII: DETERMINING RENT TO OWNER
17-VIII.A. OVERVIEW [24 CFR 983.301(a)]
The amount of the initial rent to an owner of units receiving PBV assistance is established at the beginning of the HAP contract term. Although for rehabilitated or newly constructed housing, the AHAP states the estimated amount of the initial rent to owner, the actual amount of the initial rent to owner is established at the beginning of the HAP contract term. 17-VIII.B. AMOUNT OF RENT TO OWNER [24 CFR 983.301(b)]
Except for certain tax credit units (discussed below), the rent to owner must not exceed the lowest of the following amounts:
 An amount determined by the PHA in accordance with the administrative plan not to exceed 110 percent of the applicable fair market rent (or amount of any applicable exception payment standard) for the unit bedroom size minus any utility allowance;  The reasonable rent; or
 The rent requested by the owner.

Rent to Owner for Certain Tax Credit Units [24 CFR 983.301(c)] For certain tax credit units, the rent limits are determined differently than for other PBV units.

Tax credit units that do not meet the criteria below will have their rents determined by the PHA pursuant to 24 CFR 983.301(b) as stated above.

Rents are set differently in contract units that meet all of the following criteria:
 The contract unit receives a low-income housing tax credit under the Internal Revenue Code of 1986;
 The contract unit is not located in a qualified census tract;  In the same building, there are comparable tax credit units of the same bedroom size as the contract unit and the comparable tax credit units do not have any form of rental assistance other than the tax credit; and
 The tax credit rent exceeds 110 percent of the fair market rent (or any exception payment standard) as determined in 24 CFR 983.301(b);
For contract units that meet these criteria, the rent to owner must not exceed the lowest of:
 An amount determined by the PHA in accordance with the administrative plan, not to exceed the tax credit rent minus any utility allowance;
 The reasonable rent; or
 The rent requested by the owner.

The tax credit rent is the rent charged for comparable units of the same bedroom size in the building that also receive the low-income housing tax credit but do not have any additional rental assistance (e.g., additional assistance such as tenant-based voucher assistance).

EXHIBIT 1
City Council 5 – 832 7/15/2025

Page 17 ends

Use of FMRs, Exception Payment Standards, and Utility Allowances [24 CFR 983.301(f)] When determining the initial rent to owner, the PHA must use the most recently published FMR in effect and the utility allowance schedule in effect at execution of the HAP contract. When redetermining the rent to owner, the PHA must use the most recently published FMR and the utility allowance schedule in effect at the time of redetermination. At its discretion, the PHA may for initial rent, use the amounts in effect at any time during the 30-day period immediately before the beginning date of the HAP contract, or for redeterminations of rent, the 30-day period immediately before the redetermination date.

For PBV projects that are not located in a designated SAFMR area or located in a ZIP code where the PHA has opted in to SAFMRs, any exception payment standard amount under the tenant-based voucher program also applies to the project-based voucher program. HUD will not approve a different exception payment standard amount for use in the PBV program.

For PBV projects that are located in a designated SAFMR area or located in a ZIP code where the PHA has opted in to SAFMRs, an exception payment standard amount under the tenantbased voucher program applies when setting rents under 24 CFR 983.301(b)(1) for PBV units and 983.301(c)(1)(iv) for certain tax credit units only if the PHA has adopted a policy applying SAFMRs to its PBV program and met all other requirements in 24 CFR 888.113(h), which are described below.

The PHA may not establish or apply different utility allowance amounts for the PBV program.

The same utility allowance schedule applies to both the tenant-based and project-based voucher programs.

SAHA Policy
Upon written request by the owner, SAHA will consider using the FMR or utility allowances in effect during the 30-day period before the start date of the HAP, or redetermination of rent. The owner must explain the need to use the previous FMRs or utility allowances and include documentation in support of the request. SAHA will review and make a decision based on the circumstances and merit of each request.

In addition to considering a written request from an owner, SAHA may decide to use the FMR or utility allowances in effect during the 30-day period before the start date of the HAP, or redetermination of rent, if SAHA determines it is necessary due to PHA budgetary constraints.

EXHIBIT 1
City Council 5 – 833 7/15/2025

Page 17 ends

Use of Small Area FMRs (SAFMRs) [24 CFR 888.113(h) and 24 CFR 983.301(f)(3)] Unless one of the following exceptions apply, SAFMRs do not apply to PBV projects regardless of whether HUD designates the metropolitan area or the PHA notifies HUD and implements the SAFMRs under paragraph 883.113(c)(3).
 Where the proposal or project selection date was on or before the effective dates of either or both the SAFMR designation/implementation and the PHA administrative policy, the PHA and owner may mutually agree to apply the SAFMR. The application of the SAFMRs must be prospective and consistent with the PHA administrative plan. The owner and PHA may not subsequently choose to revert back to the use of the metropolitan-wide or county-wide FMRs for the PBV project. If the rent to owner will increase as a result of the mutual agreement to apply the SAFMRs to the PBV project, the rent increase must not be effective until the next annual anniversary of the HAP contract.
 Where the proposal or project selection date was after the effective dates of both the SAFMR designation/implementation and the PHA administrative policy, the SAFMR must apply to the PBV project if the PHA administrative plan provides that SAFMRs are used for all future PBV projects. If the PHA chooses to implement this administrative policy, the SAFMRs must apply to all future PBV projects located within the same metropolitan area or nonmetropolitan county where the SAFMRs are in effect for the PHA’s HCV program. An owner and the PHA may not subsequently choose to apply the metropolitan area or county FMR to the project, regardless of whether the PHA subsequently changes its administrative plan to revert to the use of metropolitan-wide or county-wide FMR for future PBV projects.

For purposes of this section, the term effective date of the Small Area FMR designation means:
 The date that HUD designated a metropolitan area as a SAFMR area; or  The date that HUD approved a PHA request to voluntarily opt to use Small Area FMRs for its HCV program, as applicable.

For purposes of this section, the term effective date of the PHA administrative policy means the date the administrative policy was formally adopted as part of the PHA administrative plan by the PHA Board of Commissioners or other authorized PHA officials.

SAHA Policy
SAHA will not apply SAFMRs to SAHA’s PBV program.

EXHIBIT 1
City Council 5 – 834 7/15/2025

Page 17 ends

17-VIII.C. REDETERMINATION OF RENT TO OWNER [24 CFR 983.302] The PHA must redetermine the rent to owner:
 When there is a 10 percent or greater decrease in the published FMR;  Upon the owner’s request consistent with requirements established in the PHA’s administrative plan; or
 At the time of the automatic adjustment by an operating cost adjustment factor (OCAF) in accordance with 24 CFR 983.302(b)(3).

Adjusted rent to owner amount applies for the period of 12 calendar months from the annual anniversary of the HAP contract.

Rent Increase [24 CFR 983.302(b)]
During the term of the HAP contract, any increase in rent to owner is effective on the annual anniversary of the HAP contract. A rent increase may occur either through automatic adjustment by an OCAF or as the result of an owner request for a rent increase. The owner does not need to request a rent adjust when a rent increase occurs through an OCAF since the PHA redetermines the rent automatically under that option.

OCAF [24 CFR 983.302(b)(3)]
If the PHA and owner agree, the HAP contract may provide for rent adjustments using an OCAF established by the HUD pursuant to Section 524(c) of the Multifamily Assisted Housing Reform and Affordability Act of 1997 (MAHRA) at each annual anniversary of the HAP contract and published annually in the Federal Register. Further, the HAP contract may require an additional increase up to an amount determined by the PHA (pursuant to 24 CFR 983.301(b) and (c)) if requested by the owner in writing, periodically during the term of the contract. The HAP contract must require an additional increase up to an amount determined by the PHA at the point of contract extension, pursuant to 24 CFR 983.301(b) and (c), if requested by the owner in writing.

SAHA Policy
SAHA will not allow for rent increases via OCAF. All rent increases must be requested by the owner as outlined below.

EXHIBIT 1
City Council 5 – 835 7/15/2025

Page 17 ends

Owner-Requested Rent Increases [24 CFR 983.302(b)(4)]
If the HAP contract does not provide for automatic adjustment by an OCAF, and if an owner wishes to request an increase in the rent to owner from the PHA, it must be requested at the annual anniversary of the HAP contract (see Section 17-V.E.). The request must be in writing and in the form and manner required by the PHA. The PHA may only make rent increases in accordance with the rent limits described previously. There are no provisions in the PBV program for special adjustments (e.g., adjustments that reflect increases in the actual and necessary expenses of owning and maintaining the units which have resulted from substantial general increases in real property taxes, utility rates, or similar costs). The administrative plan must specify any advance notice the owner must give the PHA and the form the request must take.

SAHA Policy
An owner’s request for a rent increase must be submitted to SAHA in writing (or via email) 60 days prior to the anniversary date of the HAP contract and must include the new rent amount the owner is proposing.

The PHA may not approve, and the owner may not receive any increase of rent to owner, until and unless the owner has complied with requirements of the HAP contract, including compliance with housing quality standards, except that housing quality standards compliance is not required for units undergoing development activity that complies with 24 CFR 983.157 or substantial improvement that complies with 24 CFR 983.212. The owner may not receive any retroactive increase of rent for any period of noncompliance.

Rent Decrease [24 CFR 983.302(c)]
If the HAP contract does not provide for adjustment by an OCAF and there is a decrease in the rent to owner, as established in accordance with program requirements such as a change in the FMR or exception payment standard, or reasonable rent amount, the rent to owner must be decreased regardless of whether the owner requested a rent adjustment.

If the HAP contract provides for rent adjustments by an OCAF and there is a decrease in the fair market rent, tax credit rent, or reasonable rent that requires a decrease to the rent to owner, the rent to owner must be decreased.

However, at any time during the term of the HAP contract, the PHA may elect within the HAP contract to not reduce rents below the initial rent to owner. Where a PHA makes such an election, the rent to owner shall not be reduced below the initial rent to owner, except:
 To correct errors in calculations in accordance with HUD requirements;  If additional housing assistance has been combined with PBV assistance after the execution of the initial HAP contract and a rent decrease is required; or  If a decrease in rent to owner is required based on changes in the allocation of responsibility for utilities between the owner and the tenant.

EXHIBIT 1
City Council 5 – 836 7/15/2025

Page 17 ends

Notice of Rent Change to Owner [24 CFR 983.203(d)]
Whenever there is a change in rent to owner, the PHA must provide written notice to the owner specifying the amount of the new rent to owner. The PHA notice of rent adjustment constitutes an amendment of the rent to owner specified in the HAP contract. The adjusted amount of rent to owner applies for the period of 12 calendar months from the annual anniversary of the HAP contract.

SAHA Policy
SAHA will provide the owner with at least 30 days written notice of any change in the amount of rent to owner.

PHA-Owned Units [24 CFR 983.301(g)]
For PHA-owned PBV units, the initial rent to owner and the annual redetermination of rent at the anniversary of the HAP contract are determined by the independent entity approved by HUD.

The PHA must use the rent to owner established by the independent entity.

EXHIBIT 1
City Council 5 – 837 7/15/2025

Page 17 ends

17-VIII.D. REASONABLE RENT [24 CFR 983.301(d) and 983.303] At the time the initial rent is established and all times during the term of the HAP contract, the rent to owner for a contract unit may not exceed the reasonable rent for the unit as determined by the PHA, except where the PHA has elected within the HAP contract to not reduce rents below the initial rent under the initial HAP contract.

When Rent Reasonable Determinations Are Required
The PHA must redetermine the reasonable rent for a unit receiving PBV assistance whenever any of the following occur:
 There is a 10 percent or greater decrease in the published FMR in effect 60 days before the contract anniversary (for the unit sizes specified in the HAP contract) as compared with the FMR that was in effect one year before the contract anniversary date;  The PHA approves a change in the allocation of responsibility for utilities between the owner and the tenant;
 The HAP contract is amended to add a contract unit or substitute a different contract unit in the same building or project;
 The PHA accepts a completed unit after development activity that is conducted after HAP contract execution in accordance with 24 CFR 983.156(b)(3); and  There is any other change that may substantially affect the reasonable rent.

The PHA must determine reasonable rent in accordance with 24 CFR 983.303.

Rent Floor
The rent to owner for each contract unit may at no time exceed the reasonable rent, except in cases where the PHA has elected within the HAP contract not to reduce rents below the initial rent to owner, and upon redetermination of the rent to owner, the reasonable rent would result in a rent below the initial rent. However, the rent to owner must be reduced in the following cases:
 To correct errors in calculations in accordance with HUD requirements;  If additional housing assistance has been combined with PBV assistance after the execution of the initial HAP contract and a rent decrease is required pursuant to 24 CFR 983.55; and  If a decrease in rent to owner is required based on changes in the allocation of the responsibility for utilities between owner and tenant.

If the PHA has not elected within the HAP contract to establish the initial rent to owner as the rent floor, the rent to owner shall not at any time exceed the reasonable rent.

SAHA Policy
SAHA will elect within the HAP contract not to reduce rents below the initial level, with the exception of the circumstances listed in 24 CFR 983.302(c)(2). If, upon redetermination of the rent to owner, the reasonable rent would result in a rent below the initial rent, SAHA will use the higher initial rent to owner amount.

EXHIBIT 1
City Council 5 – 838 7/15/2025

Page 17 ends

How to Determine Reasonable Rent [24 CFR 983.303(c)]
The reasonable rent of a unit receiving PBV assistance must be determined by comparison to rent for other comparable unassisted units. When making this determination, the PHA must consider factors that affect market rent. Such factors include the location, quality, size, type and age of the unit, as well as the amenities, housing services maintenance, and utilities to be provided by the owner. The reasonable rent determination must be based on the condition of the assisted unit at the time of the determination and not on anticipated future unit conditions.

Comparability Analysis [24 CFR 983.303(d)]
For each unit, the comparability analysis must use at least three comparable units in the private unassisted market. This may include units in the premises or project that is receiving projectbased assistance. The analysis must show how the reasonable rent was determined, including major differences between the contract units and comparable unassisted units, and must be retained by the PHA. The comparability analysis may be performed by PHA staff or by another qualified person or entity. Those who conduct these analyses or are involved in determining the housing assistance payment based on the analyses may not have any direct or indirect interest in the property.

PHA-Owned Units [24 CFR 983.303(f)]
For PHA-owned units, the amount of the reasonable rent must be determined by an independent agency approved by HUD in accordance with PBV program requirements. The independent entity must provide a copy of the determination of reasonable rent for PHA-owned units to the PHA.

Owner Certification of Reasonable Rent [24 CFR 983.303(e)] By accepting each monthly housing assistance payment, the owner certifies that the rent to owner is not more than rent charged by the owner for other comparable unassisted units in the premises. At any time, the PHA may require the owner to submit information on rents charged by the owner for other units in the premises or elsewhere.

EXHIBIT 1
City Council 5 – 839 7/15/2025

Page 17 ends

17-VIII.E. EFFECT OF OTHER SUBSIDY AND RENT CONTROL
In addition to the rent limits discussed in Section 17-VIII.B above, other restrictions may limit the amount of rent to owner in a PBV unit. In addition, certain types of subsidized housing are not even eligible to receive PBV assistance (see Section 17-II.D).

Other Subsidy [24 CFR 983.304]
To comply with HUD subsidy layering requirements, at the discretion of HUD or its designee, a PHA shall reduce the rent to owner because of other governmental subsidies, including tax credits or tax exemptions, grants, or other subsidized funding.

For units receiving assistance under the HOME program, rents may not exceed rent limits as required by that program.

For units in any of the following types of federally subsidized projects, the rent to owner may not exceed the subsidized rent (basic rent) or tax credit rent as determined in accordance with requirements for the applicable federal program:
 An insured or non-insured Section 236 project;
 A formerly insured or non-insured Section 236 project that continues to receive Interest Reduction Payment following a decoupling action;
 A Section 221(d)(3) below market interest rate (BMIR) project;  A Section 515 project of the Rural Housing Service;
 Any other type of federally subsidized project specified by HUD.

Combining Subsidy
Rent to owner may not exceed any limitation required to comply with HUD subsidy layering requirements.

Rent Control [24 CFR 983.305]
In addition to the rent limits set by PBV program regulations, the amount of rent to owner may also be subject to rent control or other limits under local, state, or federal law.

EXHIBIT 1
City Council 5 – 840 7/15/2025

Page 17 ends

PART IX: PAYMENTS TO OWNER
17-IX.A. HOUSING ASSISTANCE PAYMENTS [24 CFR 983.351]
During the term of the HAP contract, the PHA must make housing assistance payments to the owner in accordance with the terms of the HAP contract. During the term of the HAP contract, payments must be made for each month that a contract unit complies with housing quality standards and is leased to and occupied by an eligible family. The housing assistance payment must be paid to the owner on or about the first day of the month for which payment is due, unless the owner and the PHA agree on a later date.

Except for discretionary vacancy payments, the PHA may not make any housing assistance payment to the owner for any month after the month when the family moves out of the unit (even if household goods or property are left in the unit).

The amount of the housing assistance payment by the PHA is the rent to owner minus the tenant rent (total tenant payment minus the utility allowance).

In order to receive housing assistance payments, the owner must comply with all provisions of the HAP contract. Unless the owner complies with all provisions of the HAP contract, the owner does not have a right to receive housing assistance payments.

EXHIBIT 1
City Council 5 – 841 7/15/2025

Page 17 ends

17-IX.B. VACANCY PAYMENTS [24 CFR 983.352]
Payment at Move-Out Month [24 CFR 983.352(a)]
If an assisted family moves out of the unit, the owner may keep the housing assistance payment for the calendar month when the family moves out. However, the owner may not keep the payment if the PHA determines that the vacancy is the owner’s fault.

SAHA Policy
If SAHA determines that the owner is responsible for a vacancy and, as a result, is not entitled to the keep the housing assistance payment, SAHA will notify the owner of the amount of housing assistance payment that the owner must repay. SAHA will require the owner to repay the amount owed in accordance with the policies in Section 16-IV.B.

Vacancy Payments [24 CFR 983.352(b)]
At the discretion of the PHA, the HAP contract may provide for vacancy payments to the owner for a PHA-determined period of vacancy extending from the beginning of the first calendar month after the move-out month for a period not exceeding two full months following the moveout month. The PHA must include in its administrative plan the PHA’s policy on the conditions under which it will allow vacancy payments in a HAP contract, the duration of the payments, amount of vacancy payments it will make to an owner, and the required form and manner of requests for vacancy payments.

SAHA Policy
SAHA will decide on a case-by-case basis if SAHA will provide vacancy payments to the owner. The HAP contract with the owner will contain any such agreement, including the amount of the vacancy payment and the period for which the owner will qualify for these payments.

The PHA may only make vacancy payments if:
 The owner gives the PHA prompt, written notice certifying that the family has vacated the unit and identifies the date when the family moved out (to the best of the owner’s knowledge and belief);
 The owner certifies that the vacancy is not the fault of the owner and that the unit was vacant during the period for which payment is claimed;
 The owner certifies that it has taken every reasonable action to minimize the likelihood and length of vacancy; and
 The owner provides any additional information required and requested by the PHA to verify that the owner is entitled to the vacancy payment.

The owner must submit a request for vacancy payments in the form and manner required by the PHA and must provide any information or substantiation required by the PHA to determine the amount of any vacancy payment.

EXHIBIT 1
City Council 5 – 842 7/15/2025

Page 17 ends

The vacancy payment to the owner for each month of the maximum two-month period is determined by the PHA, and cannot exceed the monthly rent to owner under the assisted lease, minus any portion of the rental payment received by the owner (including amounts available from the tenant’s security deposit). Any vacancy payment may cover only the period the unit remains vacant.

SAHA Policy
If an owner’s HAP contract calls for vacancy payments to be made, and the owner wishes to receive vacancy payments, the owner must have properly notified SAHA of the vacancy in accordance with the policy in Section 17-VI.G. regarding filling vacancies.

In order for a vacancy payment request to be considered, it must be made in writing (including via email) within 14 calendar days of the end of the period for which the owner is requesting the vacancy payment. The request must include the required owner certifications and SAHA may require the owner to provide documentation to support the request. If the owner does not provide the information requested by SAHA within 14 calendar days of SAHA’s request, no vacancy payments will be made.

If vacancy payments are made, SAHA will make vacancy payments for the period of vacancy extending from the beginning of the first calendar month after the move-out month for a period not exceeding two full months following the move-out month. The amount of the vacancy payment will not exceed the monthly rent to owner under the assisted lease, minus any portion of the rental payment received by the owner (including amounts available from the tenant’s security deposit). Any vacancy payment will cover only the period the unit remains vacant.

EXHIBIT 1
City Council 5 – 843 7/15/2025

Page 17 ends

17-IX.C. TENANT RENT TO OWNER [24 CFR 983.353]
The tenant rent is the portion of the rent to owner paid by the family. The amount of tenant rent is determined by the PHA in accordance with HUD requirements. Any changes in the amount of tenant rent will be effective on the date stated in the PHA notice to the family and owner.

The family is responsible for paying the tenant rent (total tenant payment minus the utility allowance). The amount of the tenant rent determined by the PHA is the maximum amount the owner may charge the family for rental of a contract unit. The tenant rent covers all housing services, maintenance, equipment, and utilities to be provided by the owner. The owner may not demand or accept any rent payment from the tenant in excess of the tenant rent as determined by the PHA. The owner must immediately return any excess payment to the tenant.

Tenant and PHA Responsibilities
The family is not responsible for the portion of rent to owner that is covered by the housing assistance payment and the owner may not terminate the tenancy of an assisted family for nonpayment by the PHA.

Likewise, the PHA is responsible only for making the housing assistance payment to the owner in accordance with the HAP contract. The PHA is not responsible for paying tenant rent, or any other claim by the owner, including damage to the unit. The PHA may not use housing assistance payments or other program funds (including administrative fee reserves) to pay any part of the tenant rent or other claim by the owner.

Utility Reimbursements [24 CFR 983.353(d)]
If the amount of the utility allowance exceeds the total tenant payment, the PHA must pay the amount of such excess to the tenant as a reimbursement for tenant-paid utilities, and the tenant rent to the owner must be zero.

The PHA may pay the utility reimbursement directly to the family or to the utility supplier on behalf of the family. If the PHA chooses to pay the utility supplier directly, the PHA must notify the family of the amount paid to the utility supplier.

SAHA Policy
SAHA will make utility reimbursements to the family.

EXHIBIT 1
City Council 5 – 844 7/15/2025

Page 17 ends

17-IX.D. OTHER FEES AND CHARGES [24 CFR 983.354]
Meals and Supportive Services
With the exception of PBV assistance in assisted living developments, the owner may not require the tenant to pay charges for meals or supportive services. Non-payment of such charges is not grounds for termination of tenancy.

In assisted living developments receiving PBV assistance, the owner may charge for meals or supportive services. These charges may not be included in the rent to owner, nor may the value of meals and supportive services be included in the calculation of the reasonable rent. However, non-payment of such charges is grounds for termination of the lease by the owner in an assisted living development.

Other Charges by Owner
The owner may not charge extra amounts for items customarily included in rent in the locality or provided at no additional cost to unsubsidized tenants in the premises. 17-IX.E. PROJECT RECORD RETENTION [24 CFR 983.12]
The regulation at 24 CFR 982.158 applies to both the PHA’s tenant-based and project-based programs. In addition, for each PBV project, the PHA must maintain the following records throughout the HAP contract term and for three years thereafter:
 Records to document the basis for PHA selection of the proposal, if selection is competitive, or project, if selection is noncompetitive, including records of the PHA’s site selection determination (see 24 CFR 983.55) and records to document the completion of the review of the selection process in the case of PHA-owned units, and copies of the written notice of proposal selection and response of the appropriate party;  The analysis of impact, if applicable;
 The subsidy layering determination, if applicable;
 The environmental review record, if applicable;
 The Agreement to enter into HAP contract (AHAP), if applicable;  Evidence of completion, if applicable;
 The HAP contract and any rider and/or amendments, including amendments to extend the term of the contract;
 Records to document the basis for PHA determination and redetermination of rent to owner;  Records to document HUD approval of the independent entity or entities, in the case of PHAowned units;  Records of the accessibility features of the project and each contract unit; and  Other records as HUD may require.

EXHIBIT 1
City Council 5 – 845 7/15/2025

Page 17 ends

EXHIBIT 1
City Council 5 – 846 7/15/2025

Page 17 ends

EXHIBIT 17-1: PBV DEVELOPMENT INFORMATION
(Fill out one for each development)

DEVELOPMENT INFORMATION
Development Name: [Insert name of PBV development]
Address: [Insert full address of PBV development]
Owner Information: [Insert PBV development owner name and contact information. If development is PHA-owned, enter “PHA-owned.”]
Property Management Company: [Insert property management company name and contact information, or enter “None”]
PHA-Owned: [Enter “Yes” or “No.” If yes, enter name of independent entity] Mixed Finance Development: [Enter “Yes” or “No.” If yes, list other types of funding (i.e., LIHTC, HOME, etc.) and units to which other funding applies.]

HAP CONTRACT
Effective Date of Contract: [Enter start date of HAP contract] HOTMA Requirements: [If HAP contract was signed prior to April 18, 2017, enter “PreHOTMA.” If HAP contract was signed on or after April 18, 2017, enter “Post-HOTMA.”] Term of HAP Contract: [Enter term from HAP contract]
Expiration Date of Contract: [Enter expiration date from HAP contract]

PBV UNITS
0 BR 1 BR 2 BR 3 BR 4 BR 5 BR Total
# of
Units
Initial
Contract
Rent
$ $ $ $ $ $
Structure Type: [Identify the structure type, i.e. Single Family Detached, Duplex or Two Family, Row House or Town House, Low Rise (3,4 Stories, including Garden Apartment), Highrise (5 or more stories)
Housing Type: [Identify if the units are an Independent Group Residence or Single Room Occupancy]
EXHIBIT 1
City Council 5 – 847 7/15/2025

Page 17 ends
← All documents from this meeting