CITY OF SANTA ANA FY 25/26CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Application of slurry seal, crack seal, and minor pavement resurfacing with asphalt concrete. The work also include replacement/installation of missing or damaged curbs, gutters, sidewalk, driveway approaches, wheelchair ramps, and striping.
PROJECT NEED:
The City's Pavement Management Program has been developed to identify the preventative maintenance requirements for the City's street network. The application of a surface seal to streets with improvements constructed in the last 10 years will ensure a high level of service for years to come.
PROJECT TITLE:
Main St Slurry Seal & Resurf:
Memory - N City Limit
PROJECT CATEGORY:
Street Improvements
Arterial Street Rehabilitation
LOCATION MAP
AGENCY: DIVISION: CONTACT: DATE:
Public Works Design Engineering Gilbert Castillo, Senior Engineer 24-Jul-2025 PROJECT COSTS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 Construction 676,046 - - - - - -
Engineering 30,000 - - - - - -
Other 141,954 - - - - - -
TOTAL 848,000 - - - - - -
SOURCE OF FUNDS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 M2 LOCAL FAIRSHARE 848,000 - - - - - -
TOTAL 848,000 - - - - - -
EXHIBIT 6
CITY OF SANTA ANA FY 25/26CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Reconstruction/resurfacing of existing pavement and
replacement/installation of missing or damaged, curbs, gutters, sidewalks, driveway approaches, and wheelchair ramps within this segment of roadway.
PROJECT NEED:
The City's Pavement Management Program (PMP) has been
developed to prioritize and recommend the most cost-effective roadway repairs, and maximize the return from available funding for street pavement. This segment of Bedford Road pavement rehabilitation is identified as a high priority in the PMP.
PROJECT TITLE:
Bedford Rd Rehab: Main Pl - N City
Limit
PROJECT CATEGORY:
Street Improvements
Arterial Street Rehabilitation
LOCATION MAP
AGENCY: DIVISION: CONTACT: DATE:
Public Works Design Engineering Gilbert Castillo, Senior Engineer 24-Jul-2025 PROJECT COSTS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 Construction 314,670 - - - - - -
Engineering 3,000 - - - - - -
TOTAL 317,670 - - - - - -
SOURCE OF FUNDS FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 104,670 - - - - - -
40,000 - - - - - -
SELECT STREET CONSTRUCTION
M2 LOCAL FAIRSHARE
RMRA SB1 173,000 - - - - - -
TOTAL 317,670 - - - - - -