EXHIBIT 4
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: Armstrong Cal Builders Inc.
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed vork, that they have examined the Contract Documents in its entirety and hereby proposes t urnish all material and do all the work required to complete the said work in accordance with saic plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following schedule:
Item Description Qty Unit Unit Price Amount
As-Built Plans 1 LS $5,000 $5,000
2 Potholing (As-Needed) * 5 EA $
$ $3,000.00 $15,000.00
3 Clearing and Grubbing 1 LS $$675,000.00
$675,000.00
4 Unclassified Excavation and Export 640 CY $
$450.00 $$288,000.00
5 Removal of Existing Utilities 1 LS $
$$35,000.00 $35,000.00
6 Cold Milling (2" Max) 9,100 SF $ $
$1.50 $13,650.00
7 Asphalt Concrete (HMA) 825 TON $ $
$210.00 $173,250.00
8 Crack Repair and Emulsion Aggregate 15,000 SF $ $
Slurry $3.00 $45,000.00
9 PCC Sidewalk per C.S.A. Std. 1104 4,500 SF $ $
$13.00 $58,500.00
10 PCC Sidewalk per City of Tustin Std. 2,800 SF $ $
202 $13.00 $36,400.00
11 Decorative PCC Sidewalk 2,700 SF $ $19.00 $
$51,300.00
12 8" PCC Pavement 275SF $ $
$32.00 $8,800.00
13 7" PCC Commercial Driveway Apron 620 SF $ $
and Depressed Curb per City of Tustin $27.00 $16,740.00 Std. 208
P-1 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
Item Description Qty Unit T Unit Price Amount
14 Permeable Concrete Pavers 6,700 SF $ $44.00 $
$294,800.00
15 A-2-6 Curb and Gutter per C.S.A. Std. 390 LF $ $
$45.00 $17,550.00
1101
A-2 Curb and Gutter per City of Tustin 200 LF $ $
Std. 201 $55.00 $11,000.00
B-1 (Modified) Curb per C.S.A. Std. 740| LF $ $
1101 $48.00 $35,520.00
18 3' Wide Ribbon Gutter 1,100 SF $ $
$26.00 $28,600.00
19 4' Wide Cross Gutter per C.S.A. Std. 1,030 SF $ $ $24,720.00 1109 (Modified) $24.00
20 6' Wide Cross Gutter per C.S.A. Std. 430|SF $ $
$25.00 $10,750.00
1109
21 | 4' Wide Reverse Parkway Culvert 52 LF $
$24,440.00
$470.00
22 | Local Depression per C.S.A. Std. 305 3 EA $ $
$1,800.00 $5,400.00
23 Curb Ramp Case A per Caltrans 120 SF $ $
Std.A88A $35.00 $4,200.00
24 Swale System 1 LS $ $
$46,000.00 $46,000.00
Dry Creek Structure 1 LS $ $
$145,000.00 $145,000.00
26 Pedestrian Bridge 1 LS $
$85,000.00 $85,000.00
27 Fencing 620| LF $ $
$142.00 $88,040.00
28 Pedestrian Gate 1 EA $ $
$5,000.00 $5,000.00
Adjust Valve Box Frame and Cover to 4 EA $ $
Grade per C.S.A. Std. 1410 $4,500.00 $18,000.00
30 Adjust Pullbox to Grade 3 TEA $
$750.00 $2,250.00
31 Adjust Water Vault to Grade 1 EA $ $
$6,500.00 $6,500.00
32 Adjust Meter to Grade 2 EA $ $
$700.00 $1,400.00
33 4" AWWA C900 PVC Water Main 622| LF $ $
(DR 14), with Appurtenances $225.00 $139,950.00
34 6" AWWA C900 PVC Water Main 200 LF $
(DR 14), with Appurtenances $355.00 $71,000.00
P-2 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
Item Description Qty Unit Unit Price Amount
8" AWWA C900 PVC Water Main 140 LF $ $
(DR 14), with Appurtenances $510.00 $71,400.00
36 | 6" Fire Service per C.S.A. Std. 1417, 194| LF $ $
with Appurtenances $300.00 $58,200.00
4" Gate Valve per C.S.A. Std. 1410 2 EA $ $
$7,800.00 $15,600.00
38 8" Gate Valve per C.S.A. Std. 1410 I EA $
$11,000.00$ $11,000.00
39 Cut, Plug, and Abandon Water Main 1 $ $
and/or Valves per C.S.A. Std. 1409 and $27,000.00 $27,000.00 1430
40 8" PVC Storm Drain and Bedding per 594 LF $ $
$225.00 $133,650.00
C.S.A. Std. 1150
41 18" RCP and Bedding per C.S.A. Std. 206| LF $ $ $115,360.00 1150 $560.00
42 24" RCP and Bedding per C.S.A. Std. 4 LF $ $1,500.00 $ $6,000.00 1150
43 48" RCP and Bedding per C.S.A. Std. 46 LF $ $
1150 $2,000.00 $92,000.00
44 | 63" RCP and Bedding per C.S.A. Std. 6 LF $ $
1150 $3,000.00 $18,000.00
45 Catch Basin Type "C" per C.S.A. Std. 1 EA $ $
$36,000.00 $36,000.00
303, W=3.5'with Catch Basin Filter
46 Catch Basin Type "C" per C.S.A. Std. 1 EA $ $
303, W=14', with Catch Basin Filter $52,000.00 $52,000.00 47 Catch Basin per SPPWC Std. 303, with I EA $ $
Catch Basin Filter $55,000.00 $55,000.00
48 24"' x 24" Precast Concrete Drain Inlet 3 EA $ $
with Atrium Grate and Catch Basin $10,000.00 $30,000.00 Filter
49 Diversion Structure 1 EA $
$100.000.00 $100,000.00
50 Gate Valve and Vault 1 EA $ $
$98,000.00 $98,000.00
51 Pretreatment Structure TEA $ $
$225,000.00 $225,000.00
52 Deflective System 1 TEA $ $
$160,000.00 $160,000.00
53 Subsurface Sedimentation/Storage 1 LS $ $
System $515,000.00 $515,000.00
54 Drywell 12 EA $
$55,000.00 $660,000.00
P-3 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
Item Description Qty Unit Unit Price Amount
55 Drywell Primary Chamber 1 EA $ $
$280,000.00 $280,000.00
56 | Junction Structure per SPPWC Std. TEA $ $70,000.00 331-3 $70,000.00
Junction Chamber Type "A" per EA $ $
C.S.A. Std. 306 $60,000.00 $60,000.00
Manhole per SPPWC Std. 322-3 1 EA $ $
$35,000.00 $35,000.00
59 Tree Removal (As-Needed) * 3 EA $ $
$1,500.00 $4,500.00
60 Root Shaving (As-Needed) * 15| EA
$ $900.00 $ $13,500.00
61 Swing Gate and Posts 3 EA $ $
$7,500.00 $22,500.00
62 Rolling Gate and Concrete Pad 1 LS $ $
$75,000.00 $75,000.00
63 Bench 3 EA $ $
$250.00 $750.00
64| Zoo Sign 1 LS $ $
$10,200.00 $10,200.00
65 Funding Acknowledgement Sign 1 EA $3,500 $3,500
66 Interpretive Signs 2 EA $ $
$3,000.00 $6,000.00
67 Lighting LS $ $
$78,000.00 $78,000.00
68 Electrical Improvements LS $ $
$355,000.00 $355,000.00
69 Landscaping and Irrigation LS $ $
$325,000.00 $325,000.00
70 Signing and Striping 1 IS $ $32,000.00$ $32,000.00
Construction Permit 1 LS $24,200 $24,200
72 90-Day Landscape Establishment T LS $
$17,500.00 $17,500.00
73 Construction Information Sign 1 EA $ $
$4,000.00 $4,000.00
Bid Alternates
74 Flow Meter and Vault 1 EA $
$245,000.00 $245,000.00
P-4 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
TOTAL BASE BID $6,382,620.00
TOTAL ADD ALTERNATE BID $ $6,627,620.00
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add-alternate bid items (if any). * The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the "25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly. + This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, within two hundred and twenty (220) working days after the commencement date stated in the Notice to Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place order for long-lead time items (i.e. drywells, surface sedimentation/storage system, light poles, signage, etc.).
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard Specifications, shall be $6,700 per calendar day.
Name of Firm Armstrong Cal Builders Inc.
Signature of BIDDER
Title President/CEO
(If an individual, so state. If a firm or co-partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) P-5 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
BIDDER'S STATEMENT
BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent Construction Contract Agreement shall constitute the entire agreement between BIDDER and the AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the Council with her signature and official seal noting hereon the action of approval of the Council, signed by the Public Works Agency Executive Director or his/her duly authorized agent, and signed by the City Attorney, denoting his approval of the form of this document, and its execution, and when it or an exact copy of it has been either delivered to BIDDER or deposited with the United States Postal Service properly addressed to the BIDDER with the correct postage affixed thereto.
BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she will furnish AGENCY all required bonds and certificate of liability insurance within ten (10) business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof accompanying this proposal shall become the property of the AGENCY and shall be considered as payment of damages due to the delay and other causes suffered by AGENCY because of the failure to furnish the necessary bonds and because it is distinctly agreed that the proof of damages actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER'S bond substituted in lieu thereof shall be returned to the undersigned.
BIDDER understands that a bid is required for the entire work, the estimated quantities set forth in the bid schedule are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. The BIDDER also certifies that the bid is a balanced bid.
In accordance with Section 7028.15 of the California Business and Professions Code, the undersigned certifies under penalty of perjury that the foregoing is true and correct.
Name of Firm Armstrong Cal Builders Inc.
Signature of BIDDER
Title President/CEO
(If an individual, so state. If a firm or co-partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) P-6 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
CONTRACTOR'S LICENSING AND REGISTRATION STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that he/she and all his/her subcontractors are registered with the State of California Department of Industrial Relations (DIR), and that the following is true and correct.
Contractor's Name: Armstrong Cal Builders Inc.
Business Address: 8031 Main St Stanton Ca 90680
Business E-Mail Address: [email protected] Telephone: 657-332-2300
State Contractor's License No. and Class: 990992 A,B,C10 License Expiration Date: 03/31/2026
State Dept. of Industrial Relations (DIR)
Registration No.: 1000885560
State Dept. of Industrial Relations (DIR)
Registration Expiration Date: 06/30/2027
Signed:
Title: President/CEO
P-7 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT
Contractor is aware of the requirements of California Labor Code Section 1720, et seq., as well as California Code of Regulations, Title 8, Section 16,000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. Since the services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws.
City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the services available to interested parties upon request, and shall post copies at the Contractor's principal place of business and at the project site.
Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.
The undersigned certifies that the foregoing is true and correct.
Name of Firm Armstrong Cal Builders Inc. 2
Signature of BIDDER
Title President/CEO
(if an individual, so state)
P-8 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
OWNERSHIP AFFIDAVIT
STATE OF CALIFORNIA
COUNTY OF ORANGE
CITY OF SANTA ANA
Shawn Salah _, being duly sworn, deposes and says:
• INDIVIDUAL That he/she is the party making the foregoing proposal:
LPARTNERSHIP That he/she is a member of the co-partnership firm designated as:
and who has been and is duly vested with the authority to make and execute instruments for the co-partnership by:
who constitute the other members of the co-partnership.
IX CORPORATION That he is of:
a corporation which is making the foregoing proposal: Armstrong Cal Builders Inc. •JOINT VENTURE That he is of: Shawn Salah, President/CEO one of the parties making the foregoing proposal as a joint venture, and the he/she has been mad in say bid ed wo lene authority to execute instuments for an on behalf of the parties that such a bid is genuine and not collusive or sham, and has not in any manner sought by collusion to secure any advantage against the City of Santa Ana or any person interested in the proposed contract, for himself or any other person.
Signature of Bidder
Subscribed and syrin to before me this. 8th day of October 2025 Signature of offic ministering Oath (Notary Public)
(Please find attached
JO-AN GUINO REEVES
Notary Public - California
Orange County
Commission # 2436731
My Comm, Expires Jan 31, 2027
P-9 of P-21
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate
is attached, and not the truthfulness, accuracy, or
validity of that document.
State of California
County of Orange -
Subscribed and sworn to (or affirmed) before me on this 8th day of October , 2025, by Shawn Salah
proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me.
JO-AN GUINO REEVES
Notary Public - Callfornia
Orange County
Commission # 2436731
My Comm. Expires Jan 31, 2027 g
(Seal) Signature
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
BID BOND
KNOW ALL PRESENT that,
Armstrong Cal Builders, Inc. _, as BIDDER, and
Accelerant National Insurance Company _, as SURETY,
are held and firmly bound unto the CITY OF SANTA ANA, as AGENCY, in the penal sum of Ten Percent of Amount Bid Dollars ($ 10%), which is ten percent (10%) of the total amount bid by BIDDER to AGENCY for the above-stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to AGENCY for the above-stated project, if said bid is rejected, or if said bid is accepted and a contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of AGENCY.
IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal this 9th day of October 2025
BIDDER*
Armstrong Cal Builders, Inc. 24 By:
8031 Main Street
Stanton, CA 90680 (562) 304-8899
SURETY*
Accelerant National Insurance Company By:
Chris Dobbs Attorney in-Fact
400 Northridge Road, Suite 800
Sandy Springs, GA 30350
Christopher Dobbs this_ 9th _day of
Subscribed and sworn to before me_
October 2025
Cur Doo
Signature:
Tennessee
Notary Public in and for the County of Wilson _, State of *Provide BIDDER/ SURETY name, address, and telephone number and the name, title, address, and telephone number of authorized representative.
P-10OF P-21
POWER OF ATTORNEY
Accelerant National Insurance Company
Accelerant National Insurance Company, a corporation duly organized under the laws of the State of Delaware and having its principal administrative office in Sandy Springs, Georgia, does hereby make, constitute and appoint:
as
its true and lawful attorney-in-fact, each in their separate capacity, with full power and authority to execute, acknowledge, seal and deliver on its behalf as surety any bond or undertaking of $8,000,000 or less. This Power of Attorney is void if used for any bond over that amount.
This Power of Attorney is granted under and by authority of the following resolution(s) adopted by the Board of Directors of Accelerant National Insurance Company on December 12, 2023:
NOW, THEREFORE, IT IS HEREBY RESOLVED, that that the President, CEO or any Vice-President, Secretary or Assistant Secretary shall be and is hereby vested with full power and authority to appoint suitable persons as Attorney-in-Fact to represent and act for and on behalf of the Company subject to the following provisions:
Attorney-in-Fact may be given full power and authority for and in the name of and on the behalf of the Company, to execute, acknowledge and deliver any and all bonds, contracts, or indemnity and other conditional or obligatory undertakings, including any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts, and any all notices and documents cancelling or terminating the Company's liability thereunder and any such instruments so executed by any Attorney-in Fact shall be binding upon the Company as if signed by the President and sealed by the Corporate Secretary; and further RESOLVED, that the signature of the President, CEO, any Vice-President, Secretary or Assistant Secretary of the Company may be affixed by facsimile to any power of attorney, and the signature of the Secretary or any Assistant Secretary and the seal of the Company may be affixed by facsimile to any certificate of such power, or any such power or certificate bearing such facsimile signature or seal shall be valid and binding on the Company. Any such power so executed and sealed and certified by certificate so executed and sealed with respect to any bond to which it is attached continues to be valid and binding upon the Company.
IN WITNESS WHEREOF, the Company has caused this instrument to be signed and its corporate seal to be hereto affixed.
SONAL INSURE
Randalls Gregg 01/09/2024 CORPORAT
SEAL
Randall S. Gregg, Assistant Secretary 1994
DELAWA
Virginia
State of
County of _Newport News. Virginia
On this 9th day of January, 2024, before me, a notary public, personally appeared, Randall S. Gregg, Assistant Secretary of Accelerant National Insurance Company, who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument.
I certify under the PENALTY of PERJURY under the laws of the State of that the foregoing paragraph is true and correct.
WITNESS my hand and official'seal.
My Commission Expires: _02/28/2027 Winston Now
Hindunge N RECES ANON NUMBER
Notary
Notarized online using audio-video communication
1, RandallS. Gregg, Assistant Secretary of Accelerant National Insurance Company, do hereby certify that the above and foregoing is true and correct copy of a Power of Attorney, executed by said company, which is still in full force and effect; furthermore, the resolutions of the Board of Directors set out in the Power of Attorney is in full force and effect.
In Witness Whereof, I have hereunto set my hand and affixed the seal of said Company this 9th day of January, 2024 Randall 5 Gregg 01/09/2024
Randall S. Gregg, Assistant Secretary
Attached to bond signed this 9th day of October _ 2025
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
LIST OF SUB-CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all subcontract work exceeding the following amount:
• Streets, highways including bridge projects: ½% of the bid or $10,000, whichever is greater • Buildings, parks, or other projects: ½% of the bid
Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State Department of Industrial Relations (DIR).
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
Name PRESTIGE PRIME ENGINEERING Name EBS GENERAL ENGINEERING INC License #/Exp. 1126217, 09/30/2026 License #/Exp. 720016, 03/31/2026 DIR Reg. #/Exp. 2000007145, 06/30/2027 DIR Reg. #/Exp. 1000005295, 06/30/2026 1414 SUNDALE RD 1345 QUARRY ST STE 101
Location Location CORONA, CA 92879
EL CAJON. CA 92019
Phone (619)572-4203 Phone (951) 279-6869
Type Of Work Miscellaneous Grading Type Of Work Concrete Paving/ Pedestrian Bridge Amount $ $40,000.00 Amount $ $681,994.50
Name TORRENT RESOURCES CA INCORPORATED Name JACOB ELECTRIC LLC License #/Exp. 886759, 11/30/2026 License #/Exp. 1123098, 07/31/2026 DIR Reg. #/Exp. 1000024894, 06/30/2027 DIR Reg. #/Exp. 2000006216, 06/30/2026 License # 886759, 11/30/2026 License # 1123098, 07/31/2026 1509 EAST ELWOOD STREET 2082 MICHELSON DR STE 100
Location PHOENIX, AZ 85040 Location IRVINE, CA 92612
Phone (602) 268-0785 Phone (213) 871-5152
Type Of Work Drywell / Drainage System Type Of Work Electrical Amount $ $502,649.00 Amount $ $125,611.87
Name GOLDEN BAY FENCE PLUS IRON WORKS INC Name HARDY & HARPER INC License #/Exp. 664905, 02/28/2027 License #/Exp. 215952, 12/31/2025 DIR Reg. #/Ехр. 1000000720, 06/30/2027 DIR Reg. #/Exp. 1000000076, 06/30/2028 License # 664905, 02/28/2027 License # 215952, 12/31/2025 Location 4104 SOUTH B STREET Location 32 RANCHO CIRCLE
_STOCKTON. CA 95206 LAKE FOREST, CA 92630
Phone (209) 944-9754 Phone (714) 444-1851
Type Of Work Fence & Gates Type Of Work Asphalt Paving
Amount $ $155,500.00 Amount $ $151,910.00
Signature of Bidder
P-11 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
LIST OF SUB-CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all subcontract work exceeding the following amount:
Streets, highways including bridge projects: ½% of the bid or $10,000, whichever is greater Buildings, parks, or other projects: ½% of the bid
Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State Department of Industrial Relations (DIR).
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
WGJ ENTERPRISES INC
Name dba PCI Name MARINA LANDSCAPE INC
License #/Exp. 415490, 07/31/2027 License #/Exp. 492862, 06/30/2026 DIR Reg. #/Exp. 1000813536, 06/30/2028 DIR Reg. #/Exp. 1000000079, 06/30/2026 975 W 1ST STREET 3707 W GARDEN GROVE BLVD
Location Location
AZUSA. CA 91702 ORANGE, CA 92868
Phone (562) 218-0504 Phone (714) 939-6600
Type Of Work Signing and Striping Type Of Work Landscape & Irrigation Amount $ $24,825.00 Amount $ $285,000.00
Name BLUE IRON FOUNDATIONS AND SHORING LLC Name
License #/Exp. 1009464, 12/31/2025 License #/Exp.
DIR Reg. #/Exp. 1000004297, 06/30/2027 DIR Reg. #/Exp.
License # 1009464, 12/31/2025 License #
7475 14TH AVE
Location SACRAMENTO. CA 95820 Location
Phone (916) 272-0790 Phone
Desarue Sueton Race Rid
Type Of Work Type Of Work
Sediment Storage Chamber Base Bid
Amount $ $515,000.00 Amount $
Name Name
License #/Exp. License #/Exp.
DIR Reg. #/Exp. DIR Reg. #/Exp.
License # License #
Location Location
Phone Phone
Type Of Work Type Of Work
Amount $ Amount $
Signature of Brader
P-11 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for which the BIDDER has performed similar work within the past three years.
1. Nutrition Services Seismic Upgrades Ph. 2,3333 Airport Way, Long Beach, CA 90806 Name and Address of Owner.
Steven L. Ross - (909) 331-8258
Name and Telephone Number of person familiar with project.
Voluntary Seismic strengthening to provide wall anchorage systems, sleol braced frames, and freight clavator wal $837,000 improverents to reduce the potential for structural damage in an earhquake 08/25/2023 Contract Amount Type of Work Date Completed
2. Cabrillo Highschool Structural Repairs (Building 1100), 2001 Santa Fe Ave., Long Beach, CA 90810 Name and Address of owner.
Steven L. Ross - (909) 331-8258
Name and Telephone Number of person tamiliar with project.
Provide all labor, materials, and equipment for the structural repairs to building 1100, ADA restroom upgrades to building $1,186,000 1000, and other varicus ADA upgrades at Cabrilo High School. 02/28/2024 Contract Amount Type of Work Date Completed
3. SUNKIST ELEMENTARY SCHOOL FIELD RENOVATION, 500 Sunkist Street, Anaheim, CA 92806 Name and Address of owner.
Alex Kang 714-517-7500 / 714-766-1849
Name and Telephone Number of person familiar with project.
RESTORATION OF BALL FIELD, NEW AC PAVING, FENCING / GATES. $1,178,000.00 PORTABLE BACKSTOP, PLANTING & IRRIGATION 08/12/2024 Contract Amount Type of Work Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance and bonds.
Insurance
Alliant Insurance Services, 18100 Von Karman Avenue
10th Floor Irvine, CA 92612, Soham Naik C: (949) 375-1136 Surety
SullivanCurtisMonroe | 2010 Main Street, Suite 700, Irvine, CA 92614 Adriana Valenzuela | Bond Department Manager - Vice President CA Licenses SCM 0E83670 | Individual 0D20780
Direct (949) 852-4829 | Cell (626) 260-9166 |Fax (949) 852-9762 P-12 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
ADDITIONAL REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for which the BIDDER or Subcontractor has performed similar work in the past five years. _Oak Canyon Nature Center, 6700 E. Walnut Canyon Road, Anaheim, CA 92807 Name and Address of Owner.
Annie Singhal, LLED GA Ph: (714) 765-5272 Mobile: (714) 231-5625 Name and Telephone Number of person familiar with project. $1,118,000.00 Drywall, Concrete Work, Educational Exhibits 05/24/2024 Contract Amount Type of Work Date Completed
2. Gateway Park Improvements, 3600 Newport Boulevard, Newport Beach, CA 92658 Name and Address of owner.
Tom Sandefur - (949) 644-3321
Name and Telephone Number of person familiar with projec provements to the landscaping, irrigation and
$569,283.47 06/30/2023
landscape walls at Gateway Park
Contract Amount Type of Work Date Completed
SECURITY GATES INSTALLATION AT ANAHEIM, GARDEN GROVE, AND
3. SANTA ANA BUS BASES. 600 South Main Street, Orange, California 92868 Name and Address of owner.
Briana Arquette 424-308-3583
Name and Telephone Number of person familiar with project.
The general description of this project is Security Gates Installation at Anaheim, Garden Grove, and Santa Ana bus bases and $5,542,761.55 5/20/2025
Contract Amount Type of Work Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance and bonds.
Insurance
Alliant Insurance Services, 18100 Von Karman Avenue
10th Floor Irvine, CA 92612, Soham Naik C: (949) 375-1136 Surety
SullivanCurtisMonroe | 2010 Main Street, Suite 700, Irvine, CA 92614 Adriana Valenzuela | Bond Department Manager - Vice President CA Licenses SCM 0E83670 | Individual OD20780
Direct (949) 852-4829 | Cell (626) 260-9166 |Fax (949) 852-9762 P-13 of P-21
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document
State of California Orange County of
8th October 2025 before me, Jo-an Guino Reeves, Notary Public On
(insert name and title of the officer)
personally appeared Shawn Salah
who proved to me on the basis of satisfactory evidence to be the person(s) whose name/o is/are subscribed to the within instrument and acknowledged to me that be/she/they executed the same in This/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person s) acted, executed the instrument I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
JO-AN GUINO REEVES
WITNESS my hand and official seal. Notary Public - California Orange County
Commission # 2436731
My Comm. Expires Jan 31, 2027
Signature (Seal)
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
NON-COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and Public Contract Code Section 7106) In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106 the BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any other BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.
Note: The above Non-collusion Affidavit is part of the Proposal. BIDDERS are cautioned that making a false certification may subject the certifier to criminal prosecution.
Signed Shawn Salah, President/CEO
State of California
County of Orange
Subscribed and sworn to (or affirmed) before me on this Bth day of October 2025 by Shawn Salah → proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me
gener Notary Public Seal
JO-AN GUINO REEVES
Notary Public - California
Orange County
(Please fund attached) Commission #2436731
My Comm. Expires Jan 31, 2027
P-14 of P-21
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate
is attached, and not the truthfulness, accuracy, or
validity of that document.
State of California
County of Orange
Subscribed and sworn to (or affirmed) before me on this 8th day of October , 20 25, by Shawn Salah
proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me.
JOAN GUNO REVES 4
Notary Public - California
Orange County
Commission # 2436731
My Comm. Expires Jan 31, 2027
(Seat) Signature
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
NON-DISCRIMINATION CERTIFICATE
The undersigned contractor or corporate officer, during the performance of this contract, certifies as follows:
1. The Contractor shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Contractor shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without, regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, oi transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin.
3. The Contractor shall send to each labor union or representative of workers with which he/she has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Contractor shall furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders.
6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Execution Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law.
P-15 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
7. The Contractor shall include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract or purchase order as the administering agency may direct as means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency, the Contractor may request that the United States enter into such litigation to protect the interests of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as amended, no discrimination shall be made in the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided in Section 1420, and any contractor of public works violating this Section is subject to all the penalties imposed for a violation of the Chapter.
Signed:
Title: President/CEO
Firm: Armstrong Cal Builders Inc.
Date: 10/09/2025
P-16 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor Code regarding employment of apprentices, and understands that contractors on contracts exceeding $30,000 or 20 working days shall:
1. Apply to the joint apprenticeship committee administering the apprenticeship standards of the craft or trade in the area of the site of the public work for a certificate approving the contractor under the apprenticeship standards for the employment and training of apprentices in the area or industry affected.
2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the apprenticeship standards.
3. Contribute to the fund or funds in each craft or trade in which he/she employs journeymen or apprentices on the public work, in the same amount or upon the same basis and in the same manner as the other contractors, except contractors not signatory to the trust agreement shall pay a like amount to the California Apprenticeship Council.
Signed:
Title: President/CEO
Firm: Armstrong Cal Builders Inc.
Date: 10/09/2025
P-17 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
STATEMENT REGARDING "ANTI-KICKBACK" REQUIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by these bid documents, agrees to comply with the Copeland "Anti-Kickback" Act (18 USC 74) as supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that each contractor or subcontractor shall be prohibited from inducing, by any means, any person employed in the construction or repair of public work, to give up any part of the compensation to which he/she is otherwise entitled.
Signed:
Title: President/CEO
Firm: Armstrong Cal Builders Inc.
Date: 10/09/2025
P-18 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
FLEET COMPLIANCE CERTIFICATION
Bidder hereby acknowledges that they have reviewed the California Air Resources Board's policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the "Regulation"). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder's fleet, and/or that of their subcontractors) (Fleet") is true and correct:
The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto.
The Fleet is exempt from the Regulation under section 2449.1(f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto.
Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids).
The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4).
The Fleet does not fall under the Regulation or are otherwise exempted and a detailed reasoning is attached hereto.
Name of Bidder: Armstrong Cal Builders Inc.
Signature:
Name: Shawn Salah
Title: President/CEO
Date: 10/09/2025
P-19 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE
In conformance with Public Contract Code Section 10162, the BIDDER shall complete, under penalty of perjury, the following questionnaire:
Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a proprietary interest in the BIDDER, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation?
Yes No
If the answer is yes, explain the circumstances in the following space.
P-20 of P-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 24-6604
SANTA ANA ZOO STORMWATER CAPTURE AND DIVERSION PROJECT
STATEMENT REGARDING COMMUNITY WORKFORCE AGREEMENT (CWA)
REQUIREMENTS
This is to certify that the undersigned BIDDER, and subcontractors, have read and understood the CWA entered into by and between the City of Santa Ana, the Los Angeles/Orange Counties Building and Construction Trades Council, and the signatory Craft Councils and Local Unions, effective as of June 6, 2023. The CWA is available at:
https://www.santa-ana.org/documents/community-workforce-agreement/ The undersigned BIDDER hereby agrees to comply with all terms and conditions of the CWA, and is capable of completing construction of the project continuously, and without interruptions or delays. If awarded any work covered by the CWA, BIDDER will also be required to sign the Letter of Assent that appears as Attachment A to the CWA.
The undersigned BIDDER has reviewed the Public Works Construction Permit and required deposit described in Section 2-2a and the Notice of Inviting Bids.
Signed:
Title: President/CEO
Firm: Armstrong Cal Builders Inc.
Date: 10/09/2025
BASELINE CONSTRUCTION SCHEDULE
Contractor shall include a baseline construction schedule with their bid submission that outlines all major construction activities and milestones associated with the Project.
P-21 of P-21