DISCUSSION
The Public Works Agency Water Resources Division (PWA) oversees and maintains the daily operations of the City’s water and sanitary sewer systems. The water system comprises approximately 480 miles of water main, 21 groundwater wells, seven pump stations, 10 reservoirs with a storage capacity of 49 million gallons, four pressureregulating stations, and seven connection points to the Metropolitan Water District (MWD). The system has an average daily demand of 30 million gallons from its roughly 45,500 metered service connections. The sanitary sewer system consists of approximately 400 miles of sewer main, 7,000 manholes, 46,000 sewer laterals, and two sewage lift stations. All sewage carried by the City’s sewer mains is conveyed to the Orange County Sanitation District for treatment. The cost to keep these critical assets operational and invest in their replacement comes from the water and sewer rates charged to and collected from the community they serve. The California Constitution, via Proposition 218, mandates that all revenue collected from water and sewer charges is solely used for water and sewer operations and infrastructure related expenses.

Background
The American Water Works Association recommends as a best management practice that public utilities periodically review and perform cost of service and rate studies every five years to adjust water and sewer rates annually thereby ensuring rate revenue is sufficient to cover the cost of operating and maintaining public water and sewer systems.

The City last performed a Cost of Service and Rate study in 2019. Based on this study, on November 19, 2019, the City Council adopted a 5-year rate plan for the City’s water and sewer services. The adoption of the 2019 rate plan has enabled the City to keep pace with increased operation costs and enable the City to compete critical infrastructure projects, including well rehabilitation, the addition of new wells, and the implementation of a smart water meter program.

The adopted 2019 rate plan established a series of annual rate adjustments with the last adjustment taking effect on July 1, 2023. Due to several compounding factors, including heightened community affordability concerns and the City’s desire to minimize additional financial burden during a period of economic uncertainty, water and sewer rates have not been adjusted in nearly three years. While this approach provided short-term rate stability, it has also deferred necessary adjustments needed to keep pace with rising operational, regulatory, and infrastructure costs. During this same time period, the costs for delivering Santa Ana’s award-winning drinking water and maintaining its sewer systems have increased significantly. In the past two years, both the Metropolitan Water Agency and the Orange County Water District, the agencies that supply and manage the region’s imported water and groundwater basin, have raised their rates by 15% and 22.1% respectively. As a result, the City’s expenditures for water supply and system operations have increased, while revenues have remained relatively flat, reducing the City’s capacity to fund capital improvements necessary to support long-term system performance.

City Council 8 – 2 1/20/2026
Water and Sewer Rate Adjustment Authorization
January 20, 2026

Page 3 ends

Additional capital improvements, including the emerging need for treatment facilities to remove Per- and Polyfluoroalkyl Substances (PFAS) from drinking water, as well as increased operating and maintenance costs, require a review of the current rate structure and enterprise finances. PFAS emerged as a known contaminant in recent years and in 2024 the Environmental Protection Agency adopted a maximum contaminant level requiring public water systems to treat and remove PFAS from drinking water. This new treatment requirement has added an unplanned significant increase in capital, maintenance, and operational expenses. Furthermore, 50% of the water distribution infrastructure is past its useful life and an estimated 70% will reach its useful life by 2040.

Similarly, the sewer system requires an average of four (4) miles of pipe replacement per year for the next 100 years, but currently, only about one (1) mile of replacement per year can be afforded.

Since Council last adopted a rate structure, there has been new case law regarding water and sewer rates, creating additional criteria for compliance with Proposition 218. The City’s rate structure must be adjusted to comply with existing requirements and ensure that rates are fair and equitable and do not subsidize or benefit one customer class versus another (for example, low-income rates or different rates for residential vs. industrial users are not allowed).

Based on the recommendations of the 2019 Cost of Service and Rate Study and the adopted rate plan, the City issued $44 million of bonds in 2024 to fund major capital improvement projects, including the Smart Water Meter Program and water well improvement projects. The City secured favorable financing terms based in part on its AA credit rating, as evaluated by S&P Global Ratings, and the existence of an adopted rate plan demonstrating alignment between revenues and expenditures.

In more recent years, operating expenses have continued to increase while revenues have remained relatively unchanged, reducing the utilities’ ability to build and maintain reserve balances necessitated by debt covenants and best practices. Maintenance of these balances is a key factor in ongoing credit evaluations. According to the most recent S&P publication from 2025, S&P affirmed the existing AA credit rating but revised the outlook from stable to negative.

To support long-term financial sustainability and continued compliance with Proposition 218, staff recommended hiring a consultant to prepare an updated cost-of-service and rate study. On May 20, 2025, upon the completion of a competitive procurement process, the City Council awarded a contract to Robert D. Niehaus, Inc. to perform a long-term financial planning and cost-of-service study for both the water and sanitary sewer enterprises (Study) (Exhibit 1). The objectives of the Study are to examine the City’s financial and strategic goals and, if necessary, develop and recommend a new rate structure to ensure the future financial stability of both water and sewer enterprises, while ensuring that the rates are in compliance with applicable law.

City Council 8 – 3 1/20/2026
Water and Sewer Rate Adjustment Authorization
January 20, 2026

Page 4 ends

The following are key elements and recommendations of the Study.

Capital Improvement Plan
Staff has determined that both the water and sewer utilities need significant investment in the repair and rehabilitation of its aging infrastructure. PWA has completed both a water and sewer infrastructure master plan which identifies critical projects that should be constructed over the next 15 years. The water and sewer systems are already showing signs of distress. In the past year alone, the systems experienced 23 water main breaks, 200 water service leaks, and 128 sewer lateral repairs. In addition, four (4) pump stations and 16 groundwater wells were downed due to mechanical and/or electrical failures.

While PWA made cost-effective repairs, continued deferral of capital project investment will eventually result in system failure and loss of critical assets. The proposed rate plan allows for the City to invest an average of $8 million annually on water capital improvements and $5 million annually on needed sewer capital improvements over the next five (5) years. Proposed projects include (Exhibit 2):
• Water Facilities
o Garthe Pump Station Improvements
o Walnut Pump Station Improvements
o New Groundwater Wells
o Crooke Pump Station Improvements
• Water Main Improvements
o Fisher Park Neighborhood Water Main Improvements
o Heninger Park Neighborhood Water Main Improvements
o Thornton Park Neighborhood Water Main Improvements
o Riverview West Neighborhood Water Main Improvements
o Madison Park Water Main Improvements
• Sewer Main Improvements
o Washington Square Sewer Main Improvements
o Santa Ana Memorial Park Neighborhood Sewer Main Improvements o Wright Street and Old Grand Sewer Main Improvements
o Warner-Garnsey Street Sewer Main Improvements
o Casa Bonita Neighborhood Sewer Main Improvements
o Riverview West Neighborhood Sewer Main Improvements
Operations & Maintenance Plan
The water enterprise’s FY 2025/26 budget includes $73.5 million in operating expenses, of which $26.6 million is for the purchase of water supplies and $3.2 million is for the cost of electrical power to pump, treat, and distribute the water. Costs for wholesale water as well as electrical power are expected to continue climbing year over year.

City Council 8 – 4 1/20/2026
Water and Sewer Rate Adjustment Authorization
January 20, 2026

Page 5 ends

Maintenance of the City’s public water systems must adhere to strict standards set at both the State and Federal levels. Additionally, the presence of PFAS in the groundwater supplies has required unprecedented investment in PFAS treatment facilities, which will result in additional annual maintenance and operations costs for the City. Total operating expenses are expected to increase by approximately 4% each year, based on applying specific inflation factors to each budget line item. By the end of the five-year rate-setting period, total operating expenses are expected to reach $89.4 million. Without adjustments to revenues, sustaining current service levels over the planning period would be unsustainable.

The sewer enterprise’s FY 2025/26 budget includes $8.8 million in operating expenses.

Maintenance requirements of the City’s sewer system are generally steady and in accordance with the City’s adopted Sewer System Management Plan which is on file with the State. Total operating expenses are expected to increase by approximately 4% each year, based on applying specific inflation factors to each budget line item. By the end of the five-year rate-setting period, total operating expenses are expected to reach $10.7 million. At the current revenue rate, present service levels would be unattainable after fiscal year 2029 without completely depleting the reserve balance.

Financial Plan
The study examined revenue needs over the next 10 years, including expenditures for operations and maintenance, as well as anticipated capital improvements, for the water and sewer enterprises. The main inputs to the financial plan include operating expenses and inflation (including the cost of wholesale water and power), capital investment and funding sources, reserve targets, and debt service coverage requirements. The reserve policy for each utility includes the following three elements:
• Operating Reserve – three (3) months operating expenses • Capital Reserve – 50% of the average annual capital investment over 10 years (i.e. $4 million)
• Emergency Reserve - $4 million to address unanticipated system needs Revenues for the water and sewer enterprises are not keeping pace with increasing operating costs. As a result, existing revenues do not provide adequate funding to support planned capital improvements or to build and maintain reserve balances at levels recommended by the consultant and consistent with generally accepted industry practices. Over time, this limits the utilities’ capacity to reinvest in aging infrastructure or to maintain reserve and debt coverage benchmarks typically reviewed in ongoing evaluations by S&P Global Ratings, which can influence future credit ratings and borrowing costs.

The study evaluated phased rate adjustments over a five-year period to address these longer-term needs. Under the proposed rate plan, both the water and sewer enterprises are projected to gradually build reserve balances, maintain appropriate debt service City Council 8 – 5 1/20/2026
Water and Sewer Rate Adjustment Authorization
January 20, 2026

Page 6 ends

coverage, and fund planned capital improvements in a manner that supports reliable service and long-term financial sustainability.

In brief, these recommended rates evaluated in the study are intended to:
• Fully fund utility operations
o Costs to replenish the groundwater basin
o Costs to purchase imported water
o Costs for electrical power
• Fund capital improvements
o Funds $8 million a year in average water capital spending o Funds $5 million a year in sewer capital spending
• Contribute to healthy reserve balances
o Ensure the day-to-day operations of each enterprise will continue during emergencies
o Promote the future stability of each enterprise
• Maintain debt service coverage requirements
o Net revenue must exceed 120% of debt payments each year • Ensure our credit rating remains strong
Rate Design
Legal requirements surrounding water and sewer rate setting in California continue to evolve. In recent years the courts have made rulings with respect to California Constitution Article XIII (Proposition 218) that have created a higher “cost of service” standard for rate setting. Bottom line, the burden of proof is on the public water and sewer agencies to demonstrate that all aspects of water and sewer rates are directly proportionate to the cost of providing service. This means aligning fixed revenue (fixed charges) with fixed costs and variable revenue (usage rates) with variable costs, as well as ensuring rates for all customer classes are equitable.

The proposed water and sewer rates are structured to directly align with the water and sewer utility costs in a manner that fully complies with the current Proposition 218 requirements. Water usage rates are tied to the cost of purchasing water and electricity, while water fixed charges are aligned with the utility’s fixed costs such as maintenance and capital spending. Water usage rates will continue to be two-tiered, with Tier 1 water having a lower cost aligned with the cost of groundwater, and Tier 2 water having a higher cost aligned with the cost of imported water supplies. All customer classes will be charged under the same tier structure and the limit between Tier 1 and Tier 2 water usage will be based on water meter size such that, on average, water usage will be 85% on Tier 1 and 15% on Tier 2 across all customers.

Sewer rates are proposed to be fixed for all customers based on the size of their water meter, as the size of the water meter is proportionate to the amount of water returned to the sewer system.

City Council 8 – 6 1/20/2026
Water and Sewer Rate Adjustment Authorization
January 20, 2026

Page 7 ends

The table below shows the water and sewer revenue adjustments proposed in the Study to achieve the Capital Improvement, Operations and Maintenance, and Financial Plan objectives.

FY 25/26
& 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31
Implementation Date May 1,
2026
July 1,
2027
July 1,
2028
July 1,
2029
July 1,
2030
Water Enterprise 9.0% 9.0% 9.0% 9.0% 8.0%
Sewer Enterprise 13.5% 13.5% 10.0% 10.0% 10.0%
Typical Bill Impact
The financial impact of the proposed revenue adjustments and rate structure changes on the typical customer was carefully evaluated. The overall increase in the combined typical bill of a single-family residential customer will be $7.12 per month (based on the average of 8,975 gallons of water used per month by typical residential customer).

In addition to the proposed rate adjustments, the City is planning to transition from the current bi-monthly billing cycle to monthly billing following implementation of the Smart Water Meter Program. Monthly billing is intended to provide customers with more timely and manageable billing information and offers several benefits compared to bi-monthly billing, including:
• Improved ability for households to budget for and anticipate utility expenses • Lower individual bill amounts (though billed more frequently), which may make bills easier to manage and pay on time
• Earlier notification of leaks or unusual water use, allowing customers to take corrective action within approximately 30 days rather than waiting up to 60 days under the current billing cycle
When compared to neighboring cities, the typical Santa Ana customer will continue to pay a lower amount, on average, for water services as compared to other Orange County cities such as Garden Grove, La Habra, Fullerton, Tustin, Newport Beach, and San Clemente (Exhibit 4). Similarly, customers will continue to pay a lower amount, on average, for sewer service as compared to other Orange County cities such as Huntington Beach, Orange, Newport Beach, Fullerton, and San Clemente (Exhibit 5).

Staff recommends City Council authorize and direct staff to prepare all required documents necessary to proceed with the notification of proposed water and sewer rate City Council 8 – 7 1/20/2026
Water and Sewer Rate Adjustment Authorization
January 20, 2026

Page 8 ends

adjustments in compliance with Proposition 218 requirements. Proposed rates do not go into effect until approved by City Council at a future public hearing on or after March 17, 2026.

ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action.

FISCAL IMPACT
Funding for the cost of preparing and mailing Proposition 218 compliance notices (Exhibit 3) is included in the FY 2025-26 budgets for both the Water and Sewer Enterprises and is available for expenditure.

Fiscal
Year
Accounting
UnitAccount #
Fund
Description
Accounting Unit,
Account Description
Amount
FY 25-26 06017645-
63001
Water Water
Admin/Engineering.

Miscellaneous Operating
Expenses
$50,000
FY 25-26 05617640-
63001
Sanitary
Sewer Service
Sanitary Sewer Service.

Miscellaneous Operating
Expenses
$50,000
Total $100,000

EXHIBIT(S)

1. 2026 Water and Sewer Rate Study

2. Location Map

3. Proposition 218 Notice

4. Water Rate Comparison Chart

5. Sewer Rate Comparison Chart
Submitted By: Rodolfo Rosas, P.E., Acting Executive Director - Public Works Agency Approved By: Alvaro Nuñez, City Manager
City Council 8 – 8 1/20/2026

CITY OF SANTA ANA
2026 Water and Sewer Rate Study
Final Draft Report January 12, 2026
City Council 8 – 9 1/20/2026
City Council 8 – 10 1/20/2026

CITY OF SANTA ANA
2026 WATER AND SEWER RATE STUDY

FINAL DRAFT REPORT
Prepared for:

City of Santa Ana
20 Civic Center Plaza
Santa Ana, CA 92701
Prepared by:

ROBERT D. NIEHAUS, INC.
140 East Carrillo Street
Santa Barbara, CA 93101
(805) 962-0611
RDN Project Number 390
City Council 8 – 11 1/20/2026
City Council 8 – 12 1/20/2026
January 12, 2026
Armando Fernandez
Acting Deputy Public Works Director
City of Santa Ana
20 Civic Center Plaza
Santa Ana, CA 92701
Subject: 2026 Water and Sewer Rate Study
Dear Mr. Fernandez,
Robert D. Niehaus, Inc. is pleased to provide this Financial Planning, Revenue Requirements, Cost of Service, and Rate Setting Analysis report to the City of Santa Ana for its Water and Sewer services.

This rate study includes a financial plan to determine the revenue requirements for the next five years and a comprehensive review of the City’s current rates based on the cost of service principles. This report outlines the approach, methodology, findings, and recommendations of the study. Each of the components of this study has enhanced the equitability of the rates we propose.

The proposed rates were developed utilizing the City’s customer usage data, billing records, accounting, operating and management records, capital plans, and reserve policies. Based on the Cityprovided data, key assumptions were made for the study using appropriate resources and our econometric and financial expertise. We are confident that the rates proposed in this report are costbased and are fully compliant with Proposition 218 and other legal requirements.

It has been an absolute pleasure and honor to work with your city. We thank you and all additional staff who helped complete this report.

Respectfully submitted,
Robert D. Niehaus, Ph.D. Anthony Elowsky M.A.

Managing Director/Principal Economist - RDN Project Manager - RDN City Council 8 – 13 1/20/2026
i
City of Santa Ana – 2026 Water and Sewer Rate Study

TABLE OF CONTENTS
TABLE OF CONTENTS.............................................................................................................................. i LIST OF TABLES.......................................................................................................................................iii LIST OF FIGURES......................................................................................................................................v EXECUTIVE SUMMARY.............................................................................................................................1

1.1 Background...............................................................................................................................................1

1.2 Purpose of Study .....................................................................................................................................4

1.3 Rate Recommendations and Proposed Rates....................................................................................4 METHODOLOGY ......................................................................................................................................10

2.1 General Methodology........................................................................................................................... 10

2.2 Key Assumptions .................................................................................................................................. 11 Escalation Factors ........................................................................................................................................ 11 Customer Growth.......................................................................................................................................... 12 Reserve Policy .............................................................................................................................................. 14 Equivalent Meter Size .................................................................................................................................. 15 WATER UTILITY .......................................................................................................................................17

3.1 Financial Plan........................................................................................................................................ 17 Demand Projections ..................................................................................................................................... 17 Revenues ....................................................................................................................................................... 18 Operating and Maintenance (O&M) Expense .......................................................................................... 19 Other Obligations.......................................................................................................................................... 20 Capital Improvement Projects..................................................................................................................... 20 Debt Service and Coverage Ratios............................................................................................................ 21 Reserves ........................................................................................................................................................ 22 Financial Plan................................................................................................................................................ 23 Revenue Requirements ............................................................................................................................... 26

3.2 Cost of Service Analysis ...................................................................................................................... 27 Functionalization of Costs ........................................................................................................................... 27 Allocation to Customers............................................................................................................................... 37 Allocation to Units ......................................................................................................................................... 37

3.3 Water Rate Design ............................................................................................................................... 39 Monthly Fixed Charge.................................................................................................................................. 39 Variable Water Rates ................................................................................................................................... 42 City Council 8 – 14 1/20/2026
ii
City of Santa Ana – 2026 Water and Sewer Rate Study
Recycled Water Rates ................................................................................................................................. 46

3.4 Bill Impact Analysis............................................................................................................................... 47 SEWER UTILITY .......................................................................................................................................48

4.1 Financial Plan........................................................................................................................................ 48 Revenues ....................................................................................................................................................... 48 Operating and Maintenance (O&M) Expense .......................................................................................... 49 Other Obligations.......................................................................................................................................... 49 Capital Improvement Projects..................................................................................................................... 49 Debt Service and Coverage Ratios............................................................................................................ 50 Reserves ........................................................................................................................................................ 51 Financial Plan................................................................................................................................................ 53 Revenue Requirements ............................................................................................................................... 55

4.2 Cost of Service Analysis and Rate Design ....................................................................................... 56 Functionalization of Costs ........................................................................................................................... 56 Allocation to Units ......................................................................................................................................... 58 Sewer Rate Calculation ............................................................................................................................... 59 FOG Rates..................................................................................................................................................... 60 CONCLUSION...........................................................................................................................................62

5.1 Summary of Recommendations and Financial Results.................................................................. 62

5.2 Rate Impacts and Comparison ........................................................................................................... 75 APPENDIX.................................................................................................................................................77 City Council 8 – 15 1/20/2026
iii
City of Santa Ana – 2026 Water and Sewer Rate Study

LIST OF TABLES
Table 1. Current Bi-Monthly Fixed Charges by Meter Size ......................................................................................5 Table 2. Current Bi-Monthly Variable Rate Tier 1 Widths.........................................................................................5 Table 3. Current Variable Water Rates ........................................................................................................................6 Table 4. Proposed Revenue Adjustments 2026 to 2030 ...........................................................................................6 Table 5. Proposed Monthly Fixed Charges for All Customers by Meter Size, 2026 to FY 2030 ........................7 Table 6. Proposed Monthly Tier 1 Widths for All Customers, 2026 to 2030..........................................................7 Table 7. Proposed Variable Rates for All Customers, 2026 to 2030.......................................................................8 Table 8. Current Sewer Fixed Charges........................................................................................................................8 Table 9. Current Sewer FOG Charges..........................................................................................................................8 Table 10. Proposed Revenue Adjustments 2026 to 2030.........................................................................................9 Table 11. Proposed Monthly Fixed Sewer Rates 2026 to 2030................................................................................9 Table 12. Proposed Sewer FOG Charges....................................................................................................................9 Table 13. Expense Escalation Factors ......................................................................................................................12 Table 14. Annual Meter Count 2026 to 2031 .............................................................................................................13 Table 15. Annual Sewer Customer Counts, 2026 to 2031 ......................................................................................14 Table 16. Water Reserve Policies and FY 2026 target ............................................................................................15 Table 17. Sewer Reserve Policies and FY 2026 target............................................................................................15 Table 18. AWWA Equivalent Meter Ratios ................................................................................................................16 Table 19. Winter Water Flow Ratios by Meter Size..................................................................................................16 Table 20. Annual Water Use by Customer Class in ccf, FY 2026 to FY 2031......................................................18 Table 21. Water Rate Revenue by Source, FY 2026 to FY 2031 ............................................................................18 Table 22. Annual Other Operating Revenue by Source, FY 2026 to FY 2031 .....................................................19 Table 23. Annual Non-Operating Revenue by Source, FY 2026 to FY 2031........................................................19 Table 24. Water Utility Operating Forecast, FY 2026 to FY 2031 ..........................................................................19 Table 25. Operating Expenses by Expense Category, FY 2026 to FY 2031 ........................................................20 Table 26. Rate Study CIP Expenses by Expense Type, FY 2026 to FY 2031 ......................................................20 Table 27. Rate Study Debt Service Expenses, FY 2026 to FY 2031......................................................................21 Table 28. Projected Debt Service Coverage, FY 2026 to FY 2031.........................................................................22 Table 29. Water Reserve Target, FY 2026 to FY 2031 .............................................................................................22 Table 30. Status Quo Financial Pro Forma for City of Santa Ana Water System, FY 2026 to FY 2031 ..........24 Table 31. Proposed Financial Pro Forma for City of Santa Ana Water System, FY 2026 to FY 2031.............25 Table 32. Revenue Requirements for City of Santa Ana Water Utility, FY 2026.................................................26 Table 33. Percentage of Operating Costs Allocated to Standard Functions ......................................................28 Table 34. Percentage of Non-operating Costs Allocated to Standard Functions..............................................28 Table 35. Total Water Use by End User.....................................................................................................................29 Table 36. System-Wide Potable Water Use by Billing Period in ccf.....................................................................29 Table 37. Potable Water Use Divided by Billing Days in ccf..................................................................................29 Table 38. System-Wide Delivery Factors...................................................................................................................30 Table 39. Percent of Operating Function Categories Allocated to Cost Components .....................................31 Table 40. Total of Operating Functional Categories Allocated to Cost Components .......................................31 Table 41. Percent of Non-Operating Function Categories Allocated to Cost Components.............................32 Table 42. Total of Non-Operating Functional Categories Allocated to Cost Components ..............................32 Table 43. Operating and Non-Operating Cost Allocation to Cost Components ................................................33 Table 44. Rate Revenue Requirements for Test Year, FY 2026.............................................................................33 Table 45. Cost of Service Allocations with Other Operating, Non-Operating, and Net Balance Adjustments ..................................................................................................................................................................................34 City Council 8 – 16 1/20/2026
iv
City of Santa Ana – 2026 Water and Sewer Rate Study
Table 46. Total Potable Connections by Meters Size and Equivalent Meter Count...........................................35 Table 47. Total Fire Connections by Meters Size and Equivalent Meter Count .................................................35 Table 48. Determination of Meter Unit Cost..............................................................................................................36 Table 49. Allocation of Meter Costs to Potable and Fire Customers ...................................................................36 Table 50. Final Cost of Service Allocations with all Adjustments ........................................................................36 Table 51. Rate Revenue Requirements Divided by the Corresponding Units....................................................38 Table 52. Fixed Cost Components Divided by Number of Units for Potable Retail Customers .....................40 Table 53. Fixed Cost Components Divided by Number of Units for Private Fire Customers ..........................40 Table 54. Monthly Water Service Fixed Charge Calculation..................................................................................40 Table 55. Monthly Water Service Fixed Charge Calculation, Private Fire Connections ...................................41 Table 56. Proposed 5-year Fixed Charge Schedule. Potable Retail .....................................................................41 Table 57. Proposed 5-year Fixed Charge Schedule, Private Fire .........................................................................42 Table 58. Available Water Supplies Under Each Supply Category.......................................................................42 Table 59. Tier 1 Base Derivation .................................................................................................................................43 Table 60. Water Demand Under Base Derivation.....................................................................................................43 Table 61. Monthly Tier Width Under Adjusted Derivation......................................................................................43 Table 62. Total Supply Costs by Source ...................................................................................................................44 Table 63. Water Supply Costs by Water Source and Unit Cost ............................................................................44 Table 64. Water Supply Unit Costs by Tier...............................................................................................................44 Table 65. Other Water Supply Unit Cost....................................................................................................................45 Table 66. Base Delivery Unit Cost..............................................................................................................................45 Table 67. Revenue Offset Unit Credit.........................................................................................................................45 Table 68. Variable Rate Calculation ...........................................................................................................................45 Table 69. Proposed 5-Year Variable Rate Schedule................................................................................................45 Table 70. Recycled Water Fixed Revenue Collection .............................................................................................46 Table 71. Recycled Water Variable Rate Derivation................................................................................................46 Table 72. Proposed Variable Recycled Water Rates ...............................................................................................47 Table 73. Sewer System Rate Revenue Forecast, FY 2026 to FY 2031................................................................48 Table 74. Sewer System Revenue Forecast, FY 2026 to FY 2031 .........................................................................49 Table 75. Sewer System O&M Expense Forecast, FY 2026 to FY 2031 ...............................................................49 Table 76. Rate Study Sewer CIP Expenses by Expense Type, FY 2026 to FY 2031 ..........................................50 Table 77. Rate Study Debt Service Expenses, FY 2026 to FY 2031......................................................................50 Table 78. Rate Study Debt Service Coverage Ratios, FY 2026 to FY 2031..........................................................50 Table 79. Sewer Reserve Target, FY 2026 to FY 2031.............................................................................................51 Table 80. Status Quo Financial Pro Forma for City of Santa Ana Sewer System, FY 2026 to FY 2031 ........53 Table 81. Proposed Financial Pro Forma for City of Santa Ana Sewer System, FY 2026 to FY 2031 ............54 Table 82. Revenue Requirements for City of Santa Ana Sewer Utility, FY 2026 ................................................55 Table 83. Percent of O&M Functional Categories Allocated .................................................................................57 Table 84. Total of Operating Functional Categories Allocated to Cost Components .......................................57 Table 85. Total of Non-operating Functional Categories Allocated to Cost Components ...............................57 Table 86. Revenue Requirement Cost Allocation by Cost Component...............................................................58 Table 87. Cost of Service Units of Service................................................................................................................59 Table 88. Cost of Service Unit Cost ...........................................................................................................................59 Table 89. Monthly Sewer Rate Calculation ...............................................................................................................60 Table 90. Proposed Variable Sewer Rates 2026 to 2030 ........................................................................................60 Table 91. Proposed Variable Sewer Rates 2026 to 2030 ........................................................................................61 Table 92. Proposed Fixed Rates for 2026 to 2030 ...................................................................................................66 Table 93. Proposed Variable and MWD Variable Rates for 2026 to 2030 ............................................................66 Table 94. Proposed Sewer Rates Based on the Proposed Revenue Adjustment..............................................71 City Council 8 – 17 1/20/2026
v
City of Santa Ana – 2026 Water and Sewer Rate Study

LIST OF FIGURES
Figure 1. City of Santa Ana Boundary and Zoning....................................................................................................3 Figure 2. Water and Sewer Rate Study Process ......................................................................................................10 Figure 3. Annual Water Customer Growth FY 2026 to FY 2036 ............................................................................13 Figure 4. Annual Aggregate Water Use, FY 2026 to FY 2036.................................................................................17 Figure 5. Rate Study CIP Expenses by Funding Source, FY 2026 to FY 2031....................................................21 Figure 6. Water Cash Balances and Reserve Target with Current Rates, FY 2026 to FY 2031 .......................23 Figure 7. A Typical Flow for Cost of Service Analysis Process............................................................................27 Figure 8. Customer Impact by Usage for 5/8” x 3/4” Meter....................................................................................47 Figure 9. Rate Study Sewer CIP Expenses by Funding Source, FY 2026 to FY 2031 .......................................50 Figure 10. Sewer Cash Balances and Reserve Target With Current Rates, FY 2026 to FY 2031 ....................52 Figure 11. A Typical Flow for Cost of Service Analysis Process .........................................................................56 Figure 12. Rate Study Water Status Quo Financial Plan ........................................................................................63 Figure 13. Ending Water Cash Balances with No Revenue Adjustment .............................................................63 Figure 14. Water Debt Service Coverage Ratio with No Revenue Adjustment ..................................................64 Figure 15. Recommended Water Revenue Adjustment..........................................................................................65 Figure 16. Recommended Rate Study Adjusted Water Financial Plan................................................................65 Figure 17. Ending Water Cash Balances with Recommended Revenue Adjustments .....................................67 Figure 18. Water Debt Service Coverage Ratios with Recommended Revenue Adjustments ........................67 Figure 19. Rate Study Sewer Status Quo Financial Plan .......................................................................................68 Figure 20. Ending Sewer Cash Balances with No Revenue Adjustment.............................................................69 Figure 21. Sewer Debt Service Coverage Ratios without Recommended Revenue Adjustments .................70 Figure 22. Recommended Sewer Revenue Adjustment.........................................................................................71 Figure 23. Rate Study Adjusted Sewer Financial Plan ...........................................................................................72 Figure 24. Recommended Ending Sewer Cash Balances with Revenue Adjustment.......................................73 Figure 25. Sewer Debt Service Coverage Ratios with Recommended Revenue Adjustments .......................74 Figure 26. Single Family Residential 5/8” x 3/4" Water Rate Comparison at 12 ccf a Month ..........................75 Figure 27. Single Family Residential 5/8” x 3/4" Sewer Rate Comparison at 12 ccf a Month..........................76 City Council 8 – 18 1/20/2026
1 City of Santa Ana – 2026 Water and Sewer Rate Study

EXECUTIVE SUMMARY

1.1 Background
The City of Santa Ana is one of the oldest cities in Orange County and was incorporated in 1886.

Governed by a seven-member City Council, the City Public Works Agency (PWA) provides the core services of potable water production and distribution, recycled water distribution, and wastewater collection in its service area. The City encompasses an area of approximately 27.5 square miles and serves a population of 311,000 through roughly 47,100 water meters connected to the City’s water system, which includes fireline and recycled water meters. Out of the total water meters, there are around 45,500 potable water meters. There are also approximately 42,000 sewer service connections. The Water Utility consists of 20 active groundwater wells, 8 reservoirs, 7 water connections to Metropolitan Water District (MWD), 16 interconnections with neighboring water utilities, and 478 miles of water mains.

The Sewer Enterprise consists of approximately 390 miles of sanitary sewer lines, 9,000 manholes, 48,500 sewer laterals, and 2 sewer lift stations. All sewage is conveyed to the Orange County Sanitation District (OCSD) for treatment.

The City last performed a Cost of Service and Rate study in 2019. On November 19, 2019, the City Council adopted a 5-year rate plan for the City’s water and sewer services. Since adopting the 2019 rate plan, PWA has completed several major infrastructure projects, including well rehabilitation, the addition of new wells, and the implementation of a smart water meter program. The last adopted rate adjustment took effect on July 1, 2023. Due to a number of factors, water and sewer rates have not been adjusted in nearly three years. During this same time period, the cost for delivering Santa Ana’s award-winning drinking water and maintaining its sewer systems have increased significantly. In the past two years, both the Metropolitan Water Agency and the Orange County Water District, the agencies that supply and manage the region’s imported water and groundwater basin have raised their rates by 15% and 22.1% respectively.

Revenues for the water and sewer enterprises are not keeping pace with increasing operating costs. As a result, existing revenues do not provide adequate funding to support planned capital improvements or to build and maintain reserve balances at levels recommended by the consultant and consistent with generally accepted industry practices. Over time, this limits the utilities’ capacity to reinvest in aging infrastructure or to maintain reserve and debt coverage benchmarks typically reviewed in ongoing evaluations by S&P Global Ratings, which can influence future borrowing costs. In more recent years, operating expenses have continued to increase while revenues have remained relatively unchanged, City Council 8 – 19 1/20/2026
2 City of Santa Ana – 2026 Water and Sewer Rate Study
reducing the utilities’ ability to build and maintain reserve balances and meet reserve and debt service coverage benchmarks commonly reviewed in ongoing credit evaluations.

Additionally, since Council last adopted a rate structure, there has been new case law regarding water and sewer rates, creating additional criteria for compliance with Proposition 218. In 2025, two cases (Howard Jarvis Taxpayer’s Assn. v. Coachella Valley Water District and Patz v. City of San Diego) provided additional guidance on public water agency rate-setting practices. The City’s rate structure must be adjusted to comply with these new case law requirements and ensure that rates are fair and equitable and do not subsidize or benefit one customer class versus another (for example, low-income rates or different rates for residential vs. industrial users are not allowed).

PWA has completed both a water and sewer infrastructure master plan which identifies critical projects that should be constructed over the next 15 years. While PWA has excelled at making cost-effective repairs and rehabilitations, continued deferral of capital project investment will eventually result in system failure and loss of critical assets. The infrastructure master plans identified that both the water and sewer utilities need significant investment in the repair and rehabilitation of their aging infrastructure. The proposed rate plan allows for the City to invest an average of $8 million annually on water capital improvements and $5 million annually on sewer capital improvements over the next 5 years.

The study evaluated phased rate adjustments over a five-year period to address these longer-term needs. Under the proposed rate plan, both the water and sewer enterprises are projected to gradually build reserve balances, maintain appropriate debt service coverage, and fund planned capital improvements in a manner that supports reliable service and long-term financial sustainability.

Figure 1 presents the limits of the City of Santa Ana as well as the zoning.

City Council 8 – 20 1/20/2026
3 City of Santa Ana – 2026 Water and Sewer Rate Study
Figure 1. City of Santa Ana Boundary and Zoning
City Council 8 – 21 1/20/2026
4 City of Santa Ana – 2026 Water and Sewer Rate Study

1.2 Purpose of Study
The purpose of this analysis is to conduct a rate study which evaluates the City’s current utility rates and financial data and propose new rates for its Water and Sewer services, if necessary, to meet the City’s financial and strategic goals. Strategic goals include funding critical capital improvements and increasing system resilience.

The primary objectives of this Study include:
• Projecting revenues and expenses for a ten-year study period • Proposing five-year revenue adjustments to fund the City’s operational and capital plans to ensure long-term performance of the systems
• Addressing the City’s aging infrastructure by supporting timely replacements to prevent failures • Proposing rates that aim to minimize the impact on customers • Producing an administrative record which effectively summarizes all findings • Supporting the City through the Proposition 218 process

1.3 Rate Recommendations and Proposed Rates
Water
• Adjusting rates annually by the recommended revenue adjustments of 9.0 percent in May 2026, followed by 9.0 percent annual adjustments July 2027 through July 2029, with a final adjustment of 8.0 percent in July 2030
• Combining all customers into a single customer class
• Introducing monthly billing
• Adjusting tier widths to reflect current water supply ratios Sewer
• Adjusting rates annually by the recommended revenue adjustment of 13.5 percent in May 2026, followed by a 13.5 percent annual adjustment July 2027, and then 10.0 adjustments July 2028 through July 2030
• Introducing monthly billing
• Combining all customers into a single customer class
• Adjusting charges to reflect current water use ratios City Council 8 – 22 1/20/2026
5 City of Santa Ana – 2026 Water and Sewer Rate Study
Current Water Rates
Currently, the City’s water customers pay a bi-monthly fixed charge based on the customer’s meter size and customer class. Customers also pay variable charges based on water use, which is billed per hundred cubic feet (ccf). The tier width for customers with tiered rates is based on their customer class and their meter size. Recycled water customers only have one billing tier. The current rates as described are displayed in Table 1, Table 2, and Table 3.

Table 1. Current Bi-Monthly Fixed Charges by Meter Size Meter Size
Retail
Customers
Fireline
Customers
5/8" X 3/4" $48.62 $0.00
3/4" $72.94 $0.00
1" $121.56 $0.00
1 1/2" $243.10 $0.00
2" $388.96 $21.00
3" $850.88 $21.00
4" $1,531.56 $27.00
6" $3,160.36 $41.50
8" $5,834.50 $48.00
10" $0.00 $57.00
12" $0.00 $66.00
Fixed Charges
Table 2. Current Bi-Monthly Variable Rate Tier 1 Widths Meter Size
Single Family
Residential Non-Residential
Multi-Family
Residential Recycled
5/8" X 3/4" 10.5 31.0 8.5 per dwelling All Use
3/4" 16.0 46.5 8.5 per dwelling All Use
1" 26.0 77.5 8.5 per dwelling All Use
1 1/2" 52.5 155.0 8.5 per dwelling All Use
2" 84.0 248.0 8.5 per dwelling All Use
3" 184.0 542.5 8.5 per dwelling All Use
4" 331.0 976.5 8.5 per dwelling All Use
6" 682.5 2,015.0 8.5 per dwelling All Use
8" 1,260.0 3,720.0 8.5 per dwelling All Use
Tier 1 Width (ccf)
City Council 8 – 23 1/20/2026
6 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 3. Current Variable Water Rates
Tier Rate per hcf
Tier 1 $2.60
Tier 2 $5.87
Recycled $2.55
Variable Rates
Proposed Water Rates
RDN proposes the following rate and revenue adjustments to accomplish the City’s financial goals of capital and reserve funding as well as maintaining debt service coverage requirement. To achieve the proposed financial plan, RDN recommends that the City raise water revenues by 9.0 percent in May of 2026, 9.0 percent in July of 2027, 9.0 percent in July of 2028, 9.0 percent in July of 2029, and 8.0 percent in July of 2030.

Table 4. Proposed Revenue Adjustments 2026 to 2030
1-May 1-Jul 1-Jul 1-Jul 1-Jul
2026 2027 2028 2029 2030
Revenue Adjustment 9.0% 9.0% 9.0% 9.0% 8.0%
Costs were allocated equitably between all customers during the cost of service analysis. Costs of providing water service are allocated to each customer class based on two factors: (a) the specific services and costs they cause the City to incur; and (b) the proportional share attributable to the meter size based on that meter’s potential demand on the system. The rates for each meter size represent an equitable portion of the total cost of service for each class allocated to the respective meter based on the calculations shown in the Cost of Service Analysis. Variable rates are based on the available sources of water supply and reflect the City’s water portfolio limitations. The tier 1 width for each meter represents the equitable allocation of groundwater based on the increased capacity paid for by larger meters. The City will implement rate adjustments on May 1
st of 2026 and then on July 1st of successive years. The proposed rates which result from these adjustments are shown in Table 5, Table 6, and Table 7.

City Council 8 – 24 1/20/2026
7 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 5. Proposed Monthly Fixed Charges for All Customers by Meter Size, 2026 to FY 2030 Meter Size 2026 2027 2028 2029 2030
5/8" X 3/4" $26.71 $29.11 $31.73 $34.59 $37.36
3/4" $39.10 $42.62 $46.45 $50.63 $54.68
1" $63.87 $69.62 $75.89 $82.72 $89.33
1 1/2" $125.81 $137.13 $149.48 $162.93 $175.96
2" $200.14 $218.15 $237.78 $259.18 $279.92
3" $435.50 $474.70 $517.42 $563.99 $609.11
4" $782.36 $852.77 $929.52 $1,013.18 $1,094.23
6" $1,612.34 $1,757.45 $1,915.62 $2,088.02 $2,255.07
8" $2,974.99 $3,242.74 $3,534.58 $3,852.69 $4,160.91
10" $5,204.78 $5,673.21 $6,183.79 $6,740.34 $7,279.56
Retail Fixed Charges
Meter Size 2026 2027 2028 2029 2030
2" $3.90 $4.25 $4.63 $5.05 $5.45
3" $7.63 $8.32 $9.07 $9.88 $10.67
4" $14.07 $15.34 $16.72 $18.23 $19.69
6" $37.20 $40.55 $44.20 $48.17 $52.03
8" $77.08 $84.02 $91.58 $99.83 $107.81
10" $137.08 $149.42 $162.86 $177.52 $191.72
12" $220.23 $240.05 $261.66 $285.21 $308.02
Fire Line Fixed Charges
Table 6. Proposed Monthly Tier 1 Widths for All Customers, 2026 to 2030 Meter Size
Tier 1 Width
(ccf)
5/8" X 3/4" 21
3/4" 32
1" 53
1 1/2" 105
2" 168
3" 369
4" 663
6" 1,369
8" 2,527
10" 4,423
City Council 8 – 25 1/20/2026
8 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 7. Proposed Variable Rates for All Customers, 2026 to 2030 Tier 2026 2027 2028 2029 2030
Tier 1 $3.16 $3.44 $3.75 $4.09 $4.42
Tier 2 $5.12 $5.58 $6.08 $6.63 $7.16
Recycled $3.60 $3.92 $4.28 $4.66 $5.03
Variable Charges per hcf
Current Sewer Rates
Currently, the City’s sewer customers pay a bi-monthly fixed charge based on their customer class and meter size. The City also charges customers with high fat, oil, or grease (FOG) rates in their sewer outflow a bi-monthly rate based on the total FOG they produce. The current sewer rates are displayed in Table 8 and Table 9.

Table 8. Current Sewer Fixed Charges
Meter Size
Single Family
Residential
Multi-Family
Residential
NonResidential
5/8" X 3/4" $15.24 $22.82 $25.38
3/4" $21.58 $32.98 $36.78
1" $34.24 $53.24 $59.58
1 1/2" $65.90 $103.88 $116.52
2" $103.88 $164.68 $184.92
3" $224.16 $357.14 $401.46
4" $401.46 $640.82 $720.58
6" $825.68 $1,319.56 $1,484.16
8" $1,522.16 $2,433.92 $2,737.88
10" $2,408.60 $3,852.24 $4,333.42
Fixed Charges
Table 9. Current Sewer FOG Charges
Unit Rate
Per Charge $111.32
FOG Charges
Proposed Sewer Rates
The recommended sewer rates include a revenue adjustment schedule designed to contribute to the City’s reserves and fund significant capital improvements. RDN, working with City staff, determined that an annual revenue adjustment of 13.5 percent in May 2026, followed by a 13.5 percent annual adjustment July 2027, and then 10.0 adjustments July 2028 through July 2030 would fund the recommended financial plan. The proposed rates also revise the rate structure. Notably, the City’s current sewer rate ratios are City Council 8 – 26 1/20/2026
9 City of Santa Ana – 2026 Water and Sewer Rate Study
based on the maximum flow capacity of each meter size. The proposed rates adjust the rate based on the estimated ratio of sewer generation per each meter size based on the actual average winter water flow differences between meters. The proposed revenue adjustments, the proposed fixed rates, and the proposed variable rates for FY 2026 – FY 2030 are shown in Table 10, Table 11, and Table 12 respectively.

Table 10. Proposed Revenue Adjustments 2026 to 2030
1-May 1-Jul 1-Jul 1-Jul 1-Jul
2026 2027 2028 2029 2030
Revenue Adjustment 13.5% 13.5% 10.0% 10.0% 10.0%
Table 11. Proposed Monthly Fixed Sewer Rates 2026 to 2030 Meter Size 2026 2027 2028 2029 2030
5/8" X 3/4" $10.56 $11.98 $13.18 $14.50 $15.95
3/4" $10.56 $11.98 $13.18 $14.50 $15.95
1" $16.47 $18.69 $20.56 $22.61 $24.88
1 1/2" $36.16 $41.04 $45.15 $49.66 $54.63
2" $79.49 $90.22 $99.25 $109.17 $120.09
3" $280.39 $318.24 $350.06 $385.07 $423.58
4" $494.09 $560.79 $616.87 $678.55 $746.41
6" $1,088.89 $1,235.89 $1,359.48 $1,495.43 $1,644.98
8" $1,088.89 $1,235.89 $1,359.48 $1,495.43 $1,644.98
10" $1,088.89 $1,235.89 $1,359.48 $1,495.43 $1,644.98
Sewer Fixed Charges
Table 12. Proposed Sewer FOG Charges
Unit 2026 2027 2028 2029 2030
Per Charge $88.28 $100.20 $110.22 $121.25 $133.37
FOG Charges
City Council 8 – 27 1/20/2026
10 City of Santa Ana – 2026 Water and Sewer Rate Study

METHODOLOGY

2.1 General Methodology
The Water and Sewer rates were developed using requirements set forth in article XIII D, Section 6 of the California Constitution. Where appropriate and to the extent consistent with the California Constitution, RDN looked to guidance provided by principles set forth by the American Water Works Association (AWWA) and the Water Environment Federation (WEF). RDN rate-making practices incorporate methods described in the AWWA Manual 1 (M1)1for Water Systems and the WEF Financing and Charges for Sewer Systems2 wherever possible. Figure 2 presents the steps taken to develop the City’s proposed rates.

Figure 2. Water and Sewer Rate Study Process
• Financial Planning and Revenue Requirements: develop a ten-year financial plan based on the projected revenues and annual costs which include operating, debt service, and capital expenses.

The City’s target reserve level should also be considered as part of the financial planning. Based on the financial planning, revenue requirements are determined for each year of the study period. • Cost of Service: evaluate the customer classifications and allocate costs based on their service requirements.
• Rate Design: design rates to equitably recover the rate revenue requirements from each customer. 1 Principles of Water Rates, Fees, and Charges, Seventh Edition, Manual of Water Supply Practices, American Water Works Association
2 Financing and Charges for Sewer Systems, WEF Manual of Practice Number 27, Water Environment Federation Financial Planning
and Revenue
Requirements
Cost of Service Rate Design
City Council 8 – 28 1/20/2026
11 City of Santa Ana – 2026 Water and Sewer Rate Study

2.2 Key Assumptions
A test year, FY 2026, was selected for which costs are to be analyzed and rates to be established for this study. The financial plan was built for the next ten years, including the five-year study period with a detailed revenue adjustment plan. The cost of service rates are adjusted each year by the determined revenue adjustments based on the financial plan. The City’s fiscal year starts on July 1 and ends on June

30. Escalation Factors
The financial plan was built based on an assumption in the projected escalation of revenues and expenses associated with both operations and maintenance (O&M) and capital improvement projects (CIPs). Bureau of Labor Statistics (BLS) Los Angeles-Long Beach-Anaheim Consumer Price Index (CPI), Federal Reserve Bank of St. Louis (FRED) Economic Research Division, Quarterly Census of Employment and Wages (QCEW), and Engineering News Record (ENR) Building Cost Index (BCI).

Escalation factors used in this study are shown in Table 13. The Los Angeles-Long Beach-Anaheim geography was chosen.

The overall escalation factor is derived solely from the All Items series of the BLS Los Angeles-Long Beach-Anaheim CPI. The All Items series represents a broad measure of the average change in prices over time for a wide array of goods and services. The market basket includes categories such as food and beverage, housing, apparel, transportation, medical, and other goods and services.

The Utilities escalation factor is derived from the Fuels and utilities and Energy series of the BLS Los Angeles-Long Beach-Anaheim CPI. RDN takes a weighted average of the Energy and Fuels and Utilities data sets to form a combined utilities inflation factor. This escalation factor accurately captures the costs associated with energy consumption and utility service.

The payroll escalation factor was provided by City Staff based on historical actual costs and unknown impacts of employee bargaining unit negotiations.

The fuels and automobile escalation factor is derived from the Private Transportation, Fuels and Utilities, and Motor Fuel series of the BLS Los Angeles-Long Beach-Anaheim CPI. RDN takes a weighted average of the Private Transportation, Fuels and utilities, and Motor Fuel data sets to form a combined Fuels and Automobile inflation factor.

The Construction escalation factor is derived using ENR’s BCI for the selected geography. ENR publishes a building cost index for Los Angeles, San Francisco, California, and the National level. RDN analyzed all four indices and, in coordination with staff, ultimately selected the index which best represents the building cost environment in the Agency, the Los Angeles BCI.

City Council 8 – 29 1/20/2026
12 City of Santa Ana – 2026 Water and Sewer Rate Study
The insurance escalation factor is derived solely from the Federal Reserve Bank of St. Louis’ Producer Price Index for insurance premiums. This index tracks the insurance costs for both liability and property coverage for businesses in the United States.

Table 13. Expense Escalation Factors
Category FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 FY 2036 Payroll 4.1% 4.1% 4.1% 4.1% 4.1% 4.1% 4.1% 4.1% 4.1% 4.1% 4.1% Other Employee 4.1% 4.1% 4.1% 4.1% 4.1% 4.1% 4.1% 4.1% 4.1% 4.1% 4.1% Utilities 7.8% 7.8% 7.8% 7.8% 7.8% 4.3% 4.3% 4.3% 4.3% 4.3% 4.3% Chemicals 6.1% 6.1% 6.1% 6.1% 6.1% 6.1% 6.1% 6.1% 6.1% 6.1% 6.1% Water Treatment 5.2% 5.2% 5.2% 5.2% 5.2% 5.2% 5.2% 5.2% 5.2% 5.2% 5.2% Fuel/Automobile 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% Construction 5.1% 5.1% 5.1% 3.9% 3.9% 3.9% 3.9% 3.9% 3.9% 3.9% 3.9% Insurance 9.6% 9.6% 8.8% 6.4% 6.4% 4.3% 3.0% 3.0% 3.0% 3.0% 3.0% Overall 3.4% 3.4% 3.4% 3.4% 3.4% 3.4% 3.4% 3.4% 3.4% 3.4% 3.4% Equipment 0.8% 0.8% 0.8% 0.8% 0.8% 0.8% 0.8% 0.8% 0.8% 0.8% 0.8% MWD 5.6% 5.6% 5.6% 5.6% 5.6% 5.6% 5.6% 5.6% 5.6% 5.6% 5.6% OCWD 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% 3.3% Customer Growth
Customer growth projections were developed based on an analysis of historical billing records and longterm growth trends observed within the City. Additionally, per-account water use was assumed to remain stable throughout the study period.

Water
There are currently approximately 47,100 water meters connected to the City’s water system, which includes fireline and recycled water meters in addition to the around 45,500 potable water meters. In ten years, 47,627 meters are projected. A total of 269 new Water Service connections are projected to join the water system during the 5-year rate setting period, approximately 53 per year. Figure 3 shows the annual water customer growth for the study period. Table 14 shows the projected number of meters for all customer classes during the rate setting period.

City Council 8 – 30 1/20/2026
13 City of Santa Ana – 2026 Water and Sewer Rate Study
Figure 3. Annual Water Customer Growth FY 2026 to FY 2036 47,100 47,161 47,203 47,263 47,325 47,369 47,413 47,474 47,538 47,582 47,627 -
10,000
20,000
30,000
40,000
50,000
60,000
FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 FY 2036 5/8" X 3/4" 3/4" 1" 1 1/2" 2" 3" 4" 6" 8" 10"
Table 14. Annual Meter Count 2026 to 2031
Meter Size FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 5/8" X 3/4" 31,457 31,459 31,457 31,458 31,457 31,458
3/4" 5,515 5,519 5,523 5,527 5,531 5,535
1" 4,963 4,996 5,029 5,061 5,095 5,129
1 1/2" 1,360 1,359 1,360 1,360 1,361 1,361
2" 1,764 1,764 1,764 1,764 1,764 1,764
3" 323 323 323 323 323 323
4" 475 481 487 492 498 504
6" 692 710 710 727 745 745
8" 450 450 450 450 450 450
10" 101 101 101 101 101 101
Total 47,100 47,161 47,203 47,263 47,325 47,369
Sewer
During the 5-year study period, a total of 172 new sewer customer connections are expected. Growth was projected for sewer customers based on an analysis of historical billing records and City growth City Council 8 – 31 1/20/2026
14 City of Santa Ana – 2026 Water and Sewer Rate Study
trends. Table 15 shows the projected number of billing units from each customer class during the rate setting period.

Table 15. Annual Sewer Customer Counts, 2026 to 2031
Customer Class FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Single Family
5/8" X 3/4" 26,900 26,900 26,900 26,900 26,900 26,900
3/4" 4,833 4,833 4,833 4,833 4,833 4,833
1" 2,128 2,149 2,171 2,192 2,214 2,236
1 1/2" 88 88 88 88 88 88
2" 7 7 7 7 7 7
Total 33,956 33,977 33,999 34,020 34,042 34,064
Multi Family
5/8" X 3/4" 1,866 1,866 1,866 1,866 1,866 1,866
3/4" 141 145 148 152 155 159
1" 1,014 1,019 1,023 1,027 1,032 1,036
1 1/2" 237 236 237 237 238 238
2" 223 223 223 223 223 223
3" 88 88 88 88 88 88
4" 66 67 68 69 70 71
6" 28 29 29 29 30 30
8" 2 2 2 2 2 2
10" 1 1 1 1 1 1
Total 3,666 3,675 3,685 3,694 3,705 3,714
Non-Residential
5/8" X 3/4" 932 934 932 933 932 933
3/4" 211 211 211 211 211 211
1" 1,076 1,079 1,082 1,085 1,088 1,091
1 1/2" 776 776 776 776 776 776
2" 996 996 996 996 996 996
3" 173 173 173 173 173 173
4" 65 65 65 65 65 65
6" 22 22 22 22 22 22
8" 0 0 0 0 0 0
Total 4,251 4,256 4,257 4,261 4,263 4,266
FOG Units
Units 830 831 831 832 832 833
Reserve Policy
The City’s reserve policy includes reserves for each utility. The total water fund reserve target for FY 2026 is $26.4 million. The total sewer fund reserve target for FY 2026 is $8.6 million. Table 16 and Table 17 show the reserve targets for the Water and Sewer utilities for FY 2026, respectively, as well as the reserve policy for each individual reserve.

City Council 8 – 32 1/20/2026
15 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 16. Water Reserve Policies and FY 2026 target
Reserve Policy FY 2026 Target
Operating Reserve 3 Months Operating $18,373,270
Capital Reserve 50% of Average 10-year PAYGO $4,000,000 Emergency Reserve $4 Million $4,000,000
Total $26,373,270
Table 17. Sewer Reserve Policies and FY 2026 target
Reserve Policy FY 2026 Target
Operating Reserve 3 Months Operating $2,189,860
Capital Reserve 50% of Average 10-year PAYGO $2,459,601 Emergency Reserve $4 Million $4,000,000
Total $8,649,461
Equivalent Meter Size
When designing fixed water service charges, the potential demand or capacity requirements placed on the water system can be measured by the size of installed meters which receive services from the system.

The safe operating flow (or capacity) of a particular size of the meter is essentially the limiting factor in terms of the demand that can be exerted on the water system through the meter. Larger meters typically pay a higher cost to join the system, and higher fixed rates. The ratio of the safe operating capacity of various sizes of meters relative to the capacity of a base meter may be used to determine appropriate charges for the larger meter sizes3. The City considers 5/8” x 3/4” meters as the base meter capacity.

The capacity ratio is calculated using the meter capacities in gallons per minute (gpm) provided in the AWWA M1 for meters larger than 3/4 inch. The sewer ratios used in this study reflect the actual average winter flow ratios by meter size for a two-month billing period, December and January, and are calculated using ccf. Table 18 show the equivalent water meter ratios used in this study for standard meters. Table 19 shows the average winter use ratios by meter size which will be used for the sewer cost of service analysis.
3 From “Principles of Water Rates, Fees, and Charges” by American Water Works Association, 2017, Seventh Edition, Appendix B, p. 385.

City Council 8 – 33 1/20/2026
16 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 18. AWWA Equivalent Meter Ratios4
Meter Size
Meter
Capacity
AWWA Meter
Ratio
Fireline
Ratio
5/8" X 3/4" 20 1.00 1.00
3/4" 30 1.50 1.00
1" 50 2.50 1.00
1 1/2" 100 5.00 2.90
2" 160 8.00 6.19
3" 350 17.50 17.98
4" 630 31.50 38.32
6" 1,300 65.00 111.31
8" 2,400 120.00 237.21
10" 4,200 210.00 426.58
12" 5,300 265.00 689.04
Table 19. Winter Water Flow Ratios by Meter Size5
Meter Size
Average
Winter Use Sewer Ratio
5/8" X 3/4" 25 1.00
3/4" 26 1.00
1" 40 1.60
1 1/2" 93 3.60
2" 203 8.00
3" 715 28.40
4" 1,264 50.10
>=6" 2,787 110.50
4 Meter capacity is measured in maximum gallon per minute (gpm) capacity of each meter size 5 Winter water flows are the average per meter during the December-January billing period. Winter use is shown in hundred cubic feet
City Council 8 – 34 1/20/2026
17 City of Santa Ana – 2026 Water and Sewer Rate Study

WATER UTILITY

3.1 Financial Plan
RDN built a 10-year financial model for the water utility to meet the City’s long-term financial goals.

Demand Projections
Using historical billing records, RDN first calculated aggregate water usage to establish a baseline for demand projections. We then determined per-account usage for each customer class by dividing total usage by the number of accounts. For the purposes of this study, per-account usage was assumed to remain constant over the forecast period. This assumption allows projected changes in water demand to be driven solely by changes in the number of accounts. Finally, projected account counts were multiplied by per-account usage to estimate total water demand by customer class. Figure 4 shows the City’s projected water demand over the next ten years.

Figure 4. Annual Aggregate Water Use, FY 2026 to FY 2036

13.64 13.68 13.70 13.74 13.78 13.80 13.83 13.86 13.90 13.93 13.95

0.00 2.00

4.00 6.00

8.00 10.00

12.00 14.00

16.00 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 FY 2036 Million ccf Single Family Residential Multi-Family Residential Non-Residential Recycled City Council 8 – 35 1/20/2026
18 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 20 shows the annual water use projection by customer class for the rate setting period.

Table 20. Annual Water Use by Customer Class in ccf, FY 2026 to FY 2031 6 Customer Class FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Single Family Residential 4,781,196 4,784,964 4,788,732 4,792,500 4,796,425 4,800,350 Multi-Family Residential 4,454,015 4,485,754 4,505,027 4,537,410 4,571,329 4,589,512 Non-Residential 4,301,533 4,302,665 4,303,317 4,304,329 4,305,101 4,306,113 Recycled 106,800 106,800 106,800 106,800 106,800 106,800 Total 13,643,544 13,680,183 13,703,876 13,741,039 13,779,655 13,802,775 Revenues
Based on the account growth and water demand projections, RDN forecasted revenues generated from customer rates using the current water rates for the study period, which total approximately $71.4 to $72.1 million annually.

Table 21. Water Rate Revenue by Source, FY 2026 to FY 2031 Fixed Revenue FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 5/8" X 3/4" $9,176,636 $9,177,219 $9,176,636 $9,176,928 $9,176,636 $9,176,928 3/4" $2,413,585 $2,415,335 $2,417,086 $2,418,836 $2,420,587 $2,422,337 1" $3,619,814 $3,643,883 $3,667,951 $3,691,291 $3,716,089 $3,740,887 1 1/2" $1,979,320 $1,977,862 $1,979,320 $1,979,320 $1,980,779 $1,980,779 2" $3,986,062 $3,986,062 $3,986,062 $3,986,062 $3,986,062 $3,986,062 3" $1,618,374 $1,618,374 $1,618,374 $1,618,374 $1,618,374 $1,618,374 4" $1,323,268 $1,332,457 $1,341,647 $1,350,836 $1,360,025 $1,369,215 6" $1,156,692 $1,175,654 $1,175,654 $1,194,616 $1,213,578 $1,213,578 8" $70,014 $70,014 $70,014 $70,014 $70,014 $70,014
10" $35,007 $35,007 $35,007 $35,007 $35,007 $35,007
Fireline $389,328 $394,231 $394,983 $399,877 $404,754 $405,533 Total $25,768,099 $25,826,098 $25,862,734 $25,921,161 $25,981,905 $26,018,714 Variable Revenue FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Tier 1 $26,884,013 $26,966,802 $27,019,081 $27,103,038 $27,190,194 $27,241,137 Tier 2 $18,764,857 $18,793,015 $18,814,063 $18,842,663 $18,872,567 $18,893,267 Total $45,648,870 $45,759,818 $45,833,145 $45,945,700 $46,062,761 $46,134,404 Total Rate Revenue $71,416,969 $71,585,915 $71,695,879 $71,866,862 $72,044,666 $72,153,118 Rate Revenue
Other operating income and non-operating revenue are estimated to provide supplemental revenue each year. Table 22 and Table 23 shows the projected other operating and non-operating revenue for the water utility by source for FY 2026 to FY 2031, respectively. 6 Use projections derived from historical bi-monthly customer billing records provided by the City and trends in water use City Council 8 – 36 1/20/2026
19 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 22. Annual Other Operating Revenue by Source, FY 2026 to FY 2031 Other Operating Revenue FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 53709 Connection Charge $409,630 $409,630 $409,630 $409,630 $409,630 $409,630 53715 Re-Connection Charge $28,300 $28,300 $28,300 $28,300 $28,300 $28,300 53716 After Hours Service Charge $8,900 $8,900 $8,900 $8,900 $8,900 $8,900 53717 Tag Fee $17,000 $17,000 $17,000 $17,000 $17,000 $17,000 53720 Penalties & Service Charge $3,013,060 $3,013,060 $3,013,060 $3,013,060 $3,013,060 $3,013,060 Recycled Water Rates $397,490 $397,490 $397,490 $397,490 $397,490 $397,490 Total $3,874,380 $3,874,380 $3,874,380 $3,874,380 $3,874,380 $3,874,380 Table 23. Annual Non-Operating Revenue by Source, FY 2026 to FY 2031 Non-Operating Revenue FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 53722 NPDES Water $1,238,000 $1,238,000 $1,238,000 $1,238,000 $1,238,000 $1,238,000 57010 Miscellaneous Recoveries $250,000 $250,000 $250,000 $250,000 $250,000 $250,000 57363 Cell Tower Lease Agreement $20,000 $20,000 $20,000 $20,000 $20,000 $20,000 Total $1,508,000 $1,508,000 $1,508,000 $1,508,000 $1,508,000 $1,508,000 The system’s total revenue for the study period is estimated to be approximately $76.8 to $77.5 million annually under the current rates. Table 24 shows the projected revenue flow for the study period (FY 2026 – FY 2031) without any revenue adjustments, projections are based on water use and customer growth projections as well as other operating and non-operating revenue estimates provided by City staff.

Table 24. Water Utility Operating Forecast, FY 2026 to FY 2031 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
Revenue from Rates
Fixed Charges $25,768,099 $25,826,098 $25,862,734 $25,921,161 $25,981,905 $26,018,714 Variable Charges $45,648,870 $45,759,818 $45,833,145 $45,945,700 $46,062,761 $46,134,404 Rate Revenue Total $71,416,969 $71,585,915 $71,695,879 $71,866,862 $72,044,666 $72,153,118 Other Operating Revenues $3,874,380 $3,874,380 $3,874,380 $3,874,380 $3,874,380 $3,874,380 Non-operating Revenues $1,508,000 $1,508,000 $1,508,000 $1,508,000 $1,508,000 $1,508,000 Total $76,799,349 $76,968,296 $77,078,259 $77,249,242 $77,427,046 $77,535,498 Operating and Maintenance (O&M) Expense
The water utility’s budget includes $73.5 million in operating expenses for FY 2026. Total operating expenses are expected to increase approximately 4.0 percent per year based on the application of specific inflation factors to each budget line item. By the end of the five-year rate setting period, total operating expenses are expected to reach $89.4 million. Table 25 shows projected operating expenses for the rate setting period by budget category.

City Council 8 – 37 1/20/2026
20 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 25. Operating Expenses by Expense Category, FY 2026 to FY 20317 Expense Category FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Production & Supply $42,584,290 $44,407,198 $46,314,713 $48,304,730 $50,389,561 $52,412,991 System Maintenance $8,095,340 $8,425,251 $8,765,410 $9,101,500 $9,451,126 $9,796,304 Misc. Expenses $1,678,640 $1,735,042 $1,793,340 $1,853,596 $1,915,877 $1,980,250 Water Quality $2,863,500 $2,979,128 $3,098,394 $3,216,767 $3,339,878 $3,461,901 Engineering $12,154,350 $12,623,975 $13,109,058 $13,597,520 $14,104,835 $14,615,426 Meter Services $4,344,510 $4,513,700 $4,688,239 $4,862,566 $5,043,654 $5,224,348 Recycled Water $534,450 $554,327 $574,840 $595,511 $616,951 $638,547 Interfund Transfer $1,238,000 $1,238,000 $1,238,000 $1,238,000 $1,238,000 $1,238,000 Total Operating $73,493,080 $76,476,623 $79,581,992 $82,770,189 $86,099,883 $89,367,767 Other Obligations
Other obligations included in the financial plan are capital improvement projects funded by rates known as PAYGO (Pay As You Go), debt service payments, and reserve contributions made from rates.

Capital Improvement Projects
The City plans to spend an average of $8.0 million a year on capital projects during the rate setting period.

Table 26 shows the City’s scheduled capital improvement projects for the next five years. Figure 5 graphically shows the capital plan.

Table 26. Rate Study CIP Expenses by Expense Type, FY 2026 to FY 20318 Capital Expense FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PAYGO 3,548,463 4,000,000 6,000,000 8,000,000 10,000,000 12,000,000 7 City staff provided current year operating expenses by category; projections are based on individual line-item inflationary factors shown in Table 13. Interfund transfers are monies paid to the general fund for overhead and administrative services provided to the water utility.
8 City’s 10-year CIP budget as well as input from staff was used for project cost City Council 8 – 38 1/20/2026
21 City of Santa Ana – 2026 Water and Sewer Rate Study
Figure 5. Rate Study CIP Expenses by Funding Source, FY 2026 to FY 2031 Debt Service and Coverage Ratios
The water utility has three outstanding debt issuances that are currently being paid by rates: the 2024 Series Revenue bond, the DWSRF Well 32 Nitrate Treatment and Rehabilitation Project loan, and the DWSRF Automate Metering Infrastructure (AMI) Project loan. Total annual debt payments are around $4.1 million a year. Table 27 shows the water utility’s annual debt payments used in this study.

Table 27. Rate Study Debt Service Expenses, FY 2026 to FY 20319 Description FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Principal $1,044,056 $1,566,406 $1,612,125 $1,662,852 $1,718,586 $1,774,329 Interest $2,132,000 $2,586,226 $2,536,383 $2,484,156 $2,457,046 $2,400,804 Total Debt Service $3,176,056 $4,152,633 $4,148,508 $4,147,008 $4,175,633 $4,175,133 Debt issued by the water utility also includes a requirement for revenues to exceed operating expenses.

The City’s debt service coverage requirement under its current covenants is 125 percent, or 1.25 times the operating expenses. Maintaining a healthy debt coverage ratio will help the City keep a good credit rating and will allow the City to service issue debt at lower rates. Table 28 shows the current debt service coverage calculation based on the revenues and expenses under current rates. 9 Debt service payment schedules taken from original loan agreements provided by City staff City Council 8 – 39 1/20/2026
22 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 28. Projected Debt Service Coverage, FY 2026 to FY 2031 Description FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Total Revenue $76,799,349 $76,968,296 $77,078,259 $77,249,242 $77,427,046 $77,535,498 Total Operating Expense $73,493,080 $76,476,623 $79,581,992 $82,770,189 $86,099,883 $89,367,767 Total Debt Service $3,176,056 $4,152,633 $4,148,508 $4,147,008 $4,175,633 $4,175,133 Debt Service Coverage Ratio 1.04 0.12 -0.60 -1.33 -2.08 -2.83 DSCR Requirement 1.25 1.25 1.25 1.25 1.25 1.25
Reserves
The City must maintain an appropriate reserve balance to ensure the day-to-day operation will continue during emergencies and guarantee the future stability of the system. The City’s financial goal is to build an appropriate level of cash reserves for each reserve fund included in the financial plan of this Study.

The reserve target for the water utility is described below:
• Operating Reserve: three months of operating expenses • Capital Reserve: 50 percent of the 10-year average in planned rate funded capital expenditures10 • Emergency Reserve: $4.0 million
The reserve target at the end of the study period reaches $30.3 million. Table 29 shows the City’s reserve targets for FY 2026 through FY 2031 based on the current reserve policy. Figure 6 displays the resulting cash balances versus the reserve target under the current rates. Reserve targets based on reserve policy shown in Table 16 and operating and capital expenditure totals shown in Tables 25 and 26, respectively.

Table 29. Water Reserve Target, FY 2026 to FY 2031
Reserve Fund FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Operating Reserve $18,373,270 $19,119,156 $19,895,498 $20,692,547 $21,524,971 $22,341,942 Capital Reserve $4,000,000 $4,000,000 $4,000,000 $4,000,000 $4,000,000 $4,000,000 Emergency Reserve $4,000,000 $4,000,000 $4,000,000 $4,000,000 $4,000,000 $4,000,000 Total $26,373,270 $27,119,156 $27,895,498 $28,692,547 $29,524,971 $30,341,942 10 The annual average of total planned capital spending over ten years was used to calculate this reserve target City Council 8 – 40 1/20/2026
23 City of Santa Ana – 2026 Water and Sewer Rate Study
Figure 6. Water Cash Balances and Reserve Target with Current Rates, FY 2026 to FY 2031 Financial Plan
Based on the projected total revenue and necessary costs to be recovered during the study period, RDN built a financial plan that will generate sufficient revenues for the day-to-day operation and annual PAYGO and make appropriate contributions to reserves. The City currently has a projected ending cash balance of $4.0 million in FY 2025, which constitutes the beginning balance for FY 2026. Table 30 shows the status quo water pro forma with no revenue adjustments and the resulting ending balances based on the revenues and expenses outlined in this section.

City Council 8 – 41 1/20/2026
24 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 30. Status Quo Financial Pro Forma for City of Santa Ana Water System, FY 2026 to FY 2031
Rate Increase 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Rate Month Implemented
FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
Cash Position Opening Balance $ 4,000,000 $ 581,750 $ (7,079,210) $ (19,731,451) $ (37,399,406) $ (60,247,876) Revenues
Water Rate Revenue $ 71,416,969 $ 71,585,915 $ 71,695,879 $ 71,866,862 $ 72,044,666 $ 72,153,118 Adjusted Water Rate Revenue $ - $ - $ - $ - $ - $ -
Other Operating Revenue $ 3,874,380 $ 3,874,380 $ 3,874,380 $ 3,874,380 $ 3,874,380 $ 3,874,380 Non-Operating Revenue $ 1,508,000 $ 1,508,000 $ 1,508,000 $ 1,508,000 $ 1,508,000 $ 1,508,000 Total Revenues $ 76,799,349 $ 76,968,296 $ 77,078,259 $ 77,249,242 $ 77,427,046 $ 77,535,498 Operating Expenses $ 73,493,080 $ 76,476,623 $ 79,581,992 $ 82,770,189 $ 86,099,883 $ 89,367,767 Net Operating Revenues $ 3,306,269 $ 491,673 $ (2,503,733) $ (5,520,947) $ (8,672,837) $ (11,832,269) Current Rate Funded Debt Service $ 3,176,056 $ 4,152,633 $ 4,148,508 $ 4,147,008 $ 4,175,633 $ 4,175,133 New Debt Service $ - $ - $ - $ - $ - $ -
Total Rate Funded Debt Service $ 3,176,056 $ 4,152,633 $ 4,148,508 $ 4,147,008 $ 4,175,633 $ 4,175,133 DSCR 1.04 0.12 -0.60 -1.33 -2.08 -2.83
Total Operating and Debt Service $ 76,669,136 $ 80,629,256 $ 83,730,500 $ 86,917,197 $ 90,275,515 $ 93,542,900 Total Operating and Debt Net Revenues $ 130,213 $ (3,660,960) $ (6,652,241) $ (9,667,955) $ (12,848,470) $ (16,007,402) Capital Expenditure $ 3,548,463 $ 4,000,000 $ 6,000,000 $ 8,000,000 $ 10,000,000 $ 12,000,000 Net Income $ (3,418,250) $ (7,660,960) $ (12,652,241) $ (17,667,955) $ (22,848,470) $ (28,007,402) Ending Balance $ 581,750 $ (7,079,210) ($19,731,451) ($37,399,406) ($60,247,876) ($88,255,278) City Council 8 – 42 1/20/2026
25 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 31 shows the proposed water pro forma for the study period with the recommended revenue adjustments per year.

Table 31. Proposed Financial Pro Forma for City of Santa Ana Water System, FY 2026 to FY 2031 Rate Increase 9.0% 0.0% 9.0% 9.0% 9.0% 8.0%
Rate Month Implemented 1-May 1-May 1-Jul 1-Jul 1-Jul 1-Jul FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
Cash Position Opening Balance $ 4,000,000 $ 1,653,004 $ 434,777 $ 1,268,530 $ 4,803,384 $ 11,607,174 Revenues
Water Rate Revenue $ 71,416,969 $ 71,585,915 $ 71,695,879 $ 71,866,862 $ 72,044,666 $ 72,153,118 Adjusted Water Rate Revenue $ 1,071,255 $ 6,442,732 $ 13,485,995 $ 21,202,808 $ 29,652,259 $ 37,844,897 Other Operating Revenue $ 3,874,380 $ 3,874,380 $ 3,874,380 $ 3,874,380 $ 3,874,380 $ 3,874,380 Non-Operating Revenue $ 1,508,000 $ 1,508,000 $ 1,508,000 $ 1,508,000 $ 1,508,000 $ 1,508,000 Total Revenues $ 77,870,604 $ 83,411,028 $ 90,564,254 $ 98,452,050 $ 107,079,305 $ 115,380,395 Operating Expenses $ 73,493,080 $ 76,476,623 $ 79,581,992 $ 82,770,189 $ 86,099,883 $ 89,367,767 Net Operating Revenues $ 4,377,524 $ 6,934,405 $ 10,982,261 $ 15,681,861 $ 20,979,422 $ 26,012,628 Current Rate Funded Debt Service $ 3,176,056 $ 4,152,633 $ 4,148,508 $ 4,147,008 $ 4,175,633 $ 4,175,133 New Debt Service $ - $ - $ - $ - $ - $ -
Total Debt Service $ 3,176,056 $ 4,152,633 $ 4,148,508 $ 4,147,008 $ 4,175,633 $ 4,175,133 DSCR 1.38 1.67 2.65 3.78 5.02 6.23
Total Operating and Debt Service $ 76,669,136 $ 80,629,256 $ 83,730,500 $ 86,917,197 $ 90,275,515 $ 93,542,900 Net Revenues $ 1,201,468 $ 2,781,772 $ 6,833,753 $ 11,534,854 $ 16,803,790 $ 21,837,495 Capital Expenditure $ 3,548,463 $ 4,000,000 $ 6,000,000 $ 8,000,000 $ 10,000,000 $ 12,000,000 Net Income $ (2,346,996) $ (1,218,228) $ 833,753 $ 3,534,854 $ 6,803,790 $ 9,837,495 Ending Balance $ 1,653,004 $ 434,777 $ 1,268,530 $ 4,803,384 $ 11,607,174 $ 21,444,669 City Council 8 – 43 1/20/2026
26 City of Santa Ana – 2026 Water and Sewer Rate Study
Revenue Requirements
Table 32 displays the water utility’s revenue requirements for FY 2026. In the rate design section, the proposed revenue adjustments will be applied to the cost of service-based rates which were designed considering the FY 2026 revenues and expenses. The total expense for each year is offset by other operating revenues and non-operating revenues to compute a pure portion of revenue requirements that need to be recovered from customers’ rates. RDN proposes annual revenue adjustments in FY 2026 through FY 2031 to reach the financial goals set by the City.

Table 32. Revenue Requirements for City of Santa Ana Water Utility, FY 2026 Revenue Requirements FY 2026
O&M Expenses $73,493,080
Capital Expenditures $3,548,463
Debt Service $3,176,056
Other Operating Revenue ($3,874,380)
Non-Operating Revenue ($1,508,000)
Net Balance From Operations ($3,418,250)
Rate Revenue Requirement $71,416,969
City Council 8 – 44 1/20/2026
27 City of Santa Ana – 2026 Water and Sewer Rate Study

3.2 Cost of Service Analysis
The purpose of a Cost of Service (COS) analysis is to allocate costs among customers commensurate with their service requirements. RDN employed the “commodity-demand” cost-of-service method promulgated in AWWA’s M1, whereby costs are first allocated to individual functions, which are typical industry standard activities, then the costs of each function are distributed to appropriate cost causative components, which are defined by the cost driving elements. Figure 7 displays a typical process for the COS analysis.

Figure 7. A Typical Flow for Cost of Service Analysis Process Functionalization of Costs
Operating and capital costs are functionalized based on operating categories used in the City’s budget and input from City staff with expertise on the system and utility industry knowledge. The functionalization of non-operating expenses is based on total water asset values, which represents a better overall estimate of systemwide needs versus just one year of capital expenditure. The non-operating expenses for the test year are made up of debt service payments and capital expenditures totaling approximately $6.7 million. The functions of the water system for both operating and non-operating expenses include:
• Water Supply – costs associated with water procurement and purchases • Groundwater – costs associated with groundwater procurement • Storage – costs associated with water storage for distribution • Transmission and Distribution – costs associated with transmitting and distributing water to customers
• Pumping – costs associated with general pumping and energy use • Treatment – costs associated with treating water
Functionalization
The revenue requirement is
assigned to various industry
standard activities on a line-by -
line basis.

Allocation to Cost Causative
Components
The functional categories are
allocated to water supply,
groundwater, base demand,
capacity demand, customer
billing and meter costs.

Reallocation to Customers via
Rates
Each cost component is tied to
fixed and volumetric rate
components.

City Council 8 – 45 1/20/2026
28 City of Santa Ana – 2026 Water and Sewer Rate Study
• Customer – costs associated with customer service and billing related tasks • Meters – costs associated with the reading and maintenance of meters • Hydrants – costs associated with maintaining public fire hydrants • Recycled – Costs associated with the provision and administration of the recycled water system • Administrative and General – costs associated with administrative and general functions Costs and assets were functionalized based on the City’s standard budget determinations and input from staff on a line-item basis. Table 33 shows the amount and percentage of the test year’s operating expenses allocated to each function. Table 34 shows the amount and percentage of the City’s fixed assets allocated to each function. Total assets were used as a proxy for the allocation of non-operating expenses because they represent the long-term investment in the system made by the City. A single year of non-operating expenses typically does not reflect an adequate ratio of overall system investments.

Table 33. Percentage of Operating Costs Allocated to Standard Functions Operating Function Total Allocation Percent
Water Supply $39,344,290 53.5%
Transmission and Distribution $20,249,690 27.6%
Pumping $3,240,000 4.4%
Treatment $2,863,500 3.9%
Meters $4,344,510 5.9%
Recycled $534,450 0.7%
Administrative and General $2,916,640 4.0%
Total $73,493,080
Table 34. Percentage of Non-operating Costs Allocated to Standard Functions Asset Function Total Allocation Percent
Groundwater $4,149,109 3.9%
Storage $12,508,635 11.7%
Transmission and Distribution $66,948,495 62.5%
Pumping $7,499,989 7.0%
Treatment $837,015 0.8%
Hydrants $343,206 0.3%
Customer $70,808 0.1%
Administrative and General $14,813,403 13.8%
Total $107,170,660
A COS analysis considers both the average quantity of water consumed (base costs) and the highest rate at which it is consumed (peaking or capacity costs as identified by maximum demands compared to base demands). Capacity costs are costs that are incurred during peak times of consumption. There are additional costs associated with designing, constructing, operating, and maintaining facilities to meet the highest capacity of use. All current and future water facilities, including water mains, pump stations, City Council 8 – 46 1/20/2026
29 City of Santa Ana – 2026 Water and Sewer Rate Study
reservoirs, wells, and treatment plants, are designed and constructed to meet this capacity. If deficiencies are found, the existing facilities get upsized, or a secondary line or pump is installed. These peak demand costs should be allocated to those customers whose potential use generates additional costs for the utility, such as larger meters. In other words, not all customers share the same responsibility for capacity related costs. The percent of delivery capacity over an average day or base delivery was determined by using actual customer billing records. Table 35 shows the total water use. Table 36 shows actual potable customer water use by billing period. Table 37 shows the average and the highest bi-monthly potable water use divided by the number of days included in the period. The June billing period includes 61 days, so to calculate the daily use during the peak billing period, the total use in that period is divided by the increment.

Table 35. Total Water Use by End User
Use Category Total Percent
Potable 13,536,745 99.2%
Recycled 106,800 0.8%
Total 13,643,545
Table 36. System-Wide Potable Water Use by Billing Period in ccf 11 Billing
Month Total Use
Percent
of Use
August 2,378,024 17.6%
October 2,541,129 18.8%
December 2,150,362 15.9%
February 1,908,130 14.1%
April 1,903,888 14.1%
June 2,655,213 19.6%
Total 13,536,745 100%
Table 37. Potable Water Use Divided by Billing Days in ccf Total Use Days Average Day
13,536,745 ÷ 365 = 37,087
Maximum BiMonthly Use DaysMaximum
Day
2,655,213 ÷ 61 = 43,528
Table 38 shows the systemwide capacity factors based on customer use patterns as described. Delivery capacity is equal to max day divided by average day. The percentage of delivery capacity over base delivery represents the additional capacity demands which create the need for upsizing system assets to 11 Total potable water use is based on FY 2025 billing records City Council 8 – 47 1/20/2026
30 City of Santa Ana – 2026 Water and Sewer Rate Study
provide service under the highest water use conditions. The peak capacity costs are applied only to the fixed charges. Base costs are applied to both fixed and variable rates because a portion of those costs can be attributable to increased water demand such as treatment costs and the occurrence of water leaks, which require maintenance as well as development of additional storage to provide water availability.

Table 38. System-Wide Delivery Factors
Cost Component Factor
Percent
at Base
Percent at
Capacity
Base Delivery 1.00 100.0% 0.0%
Delivery Capacity 1.17 85.2% 14.8%
The cost causative components include:
• Source of Supply – water purchase costs, groundwater procurement, pumping costs, etc. • Base Delivery – delivering water to customers under average demand conditions • Delivery Capacity– the costs of delivering water to customers with the highest demand • Meters – the costs of servicing and reading meters
• Customer Service – billing and other customer service-related costs • Recycled Water – costs directly allocated to recycled water customers Water supply and groundwater costs are allocated 100 percent to the Supply component as they relate to purchasing water from other agencies as well as groundwater. Pumping costs are also allocated 100 precent to the supply component as pumping occurs to procure groundwater. Storage, Transmission and Distribution, and Treatment costs are proportionally allocated between base and delivery capacity based on annual water demand patterns shown in Table 38 since all infrastructure is constructed to meet base and capacity water use requirements. The Storage, Treatment, and Maintenance and Engineering (termed Transmission and Distribution in the cost of service analysis) budget categories include costs that may either increase with water use (Base Delivery) or are fixed based on the capacity of system assets (Delivery Capacity). These costs are allocated 85.2 percent to base and 14.8 to capacity. Meter, hydrant, and customer costs are allocated to those categories based on input from City staff. Recycled water costs are allocated between supply (0.8 percent) and recycled water components (99.8 percent) to account for the potable water saved in relation to recycled water consumption. Administrative and general costs are allocated to cost components based on the percentage of the functions allocated to the other cost categories excluding source of supply costs.

Table 39 through Table 42 show the percent and total value of functionalized operating costs and assets allocated to the cost causative components. Meter and customer service costs were allocated directly to their respective component.

City Council 8 – 48 1/20/2026
31 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 39. Percent of Operating Function Categories Allocated to Cost Components Cost Component Total Allocation
Source of
Supply
Base
Delivery
Delivery
Capacity Meters
Customer
Service
Recycled
Water
Water Supply $39,344,290 100.0% 0.0% 0.0% 0.0% 0.0% 0.0% Transmission and Distribution $20,249,690 0.0% 85.2% 14.8% 0.0% 0.0% 0.0% Pumping $3,240,000 100.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Treatment $2,863,500 0.0% 85.2% 14.8% 0.0% 0.0% 0.0%
Meters $4,344,510 0.0% 0.0% 0.0% 75.0% 25.0% 0.0%
Recycled $534,450 0.8% 0.0% 0.0% 0.0% 0.0% 99.2%
Administrative and General $2,916,640 60.8% 28.1% 4.9% 4.7% 1.6% 0.0% Operating Costs Allocation
Table 40. Total of Operating Functional Categories Allocated to Cost Components Cost Component Total Allocation
Source of
Supply
Base
Delivery
Delivery
Capacity Meters
Customer
Service
Recycled
Water
Water Supply $39,344,290 $39,344,290 $0 $0 $0 $0 $0
Transmission and Distribution $20,249,690 $0 $17,253,223 $2,996,467 $0 $0 $0 Pumping $3,240,000 $3,240,000 $0 $0 $0 $0 $0
Treatment $2,863,500 $0 $2,439,771 $423,729 $0 $0 $0
Meters $4,344,510 $0 $0 $0 $3,258,383 $1,086,128 $0
Recycled $534,450 $4,276 $0 $0 $0 $0 $530,174
Administrative and General $2,916,640 $1,773,265 $820,042 $142,421 $135,683 $45,228 $0 Total Operating Allocation 60.4% 27.9% 4.8% 4.6% 1.5% 0.7% Operating Cost Allocation
City Council 8 – 49 1/20/2026
32 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 41. Percent of Non-Operating Function Categories Allocated to Cost Components Cost Component Total Allocation
Source of
Supply
Base
Delivery
Delivery
Capacity Meters
Customer
Service
Groundwater $4,149,109 100.0% 0.0% 0.0% 0.0% 0.0%
Storage $12,508,635 0.0% 85.2% 14.8% 0.0% 0.0%
Transmission and Distribution $66,948,495 0.0% 85.2% 14.8% 0.0% 0.0% Pumping $7,499,989 100.0% 0.0% 0.0% 0.0% 0.0%
Treatment $837,015 0.0% 85.2% 14.8% 0.0% 0.0%
Hydrants $343,206 0.0% 0.0% 0.0% 100.0% 0.0%
Customer $70,808 0.0% 0.0% 0.0% 0.0% 100.0%
Administrative and General $14,813,403 0.0% 82.6% 14.4% 2.5% 0.5% Non-Operating Cost Allocation
Table 42. Total of Non-Operating Functional Categories Allocated to Cost Components Cost Component Total Allocation
Source of
Supply
Base
Delivery
Delivery
Capacity Meters
Customer
Service
Groundwater $4,149,109 $4,149,109 $0 $0 $0 $0
Storage $12,508,635 $0 $10,657,658 $1,850,977 $0 $0
Transmission and Distribution $66,948,495 $0 $57,041,727 $9,906,768 $0 $0 Pumping $7,499,989 $7,499,989 $0 $0 $0 $0
Treatment $837,015 $0 $713,156 $123,858 $0 $0
Hydrants $343,206 $0 $0 $0 $343,206 $0
Customer $70,808 $0 $0 $0 $0 $70,808
Administrative and General $14,813,403 $0 $12,241,611 $2,126,072 $369,490 $76,231 Total Non-Operating Allocation 10.9% 75.3% 13.1% 0.7% 0.1% The non-operating expenses for the test year are made up of debt service payments and capital expenditures totaling approximately $6.7 million. Those costs are distributed to the cost components based on the final percentages shown in Table 42, above, which are based on the total asset values of water assets owned by the City. Water asset values represent the long-term investment in the City’s water system and serve as a proxy value for how a single year of non-operating expenses should be allocated. Asset values do not significantly fluctuate year over year as annual capital expenditures do, which ensures that cost categories are accurately represented. Operating City Council 8 – 50 1/20/2026
33 City of Santa Ana – 2026 Water and Sewer Rate Study
allocations are based on the projected test year expenses and the total for each cost component reflect the percentages in Table 40.

Table 43 shows the projected test year expenses allocated to each cost component based on the percentages in Table 40 and Table 42.

Table 43. Operating and Non-Operating Cost Allocation to Cost Components Total Allocation
Source of
Supply
Base
Delivery
Delivery
Capacity Meters
Customer
Service
Recycled
Water
O&M Expenses $73,493,080 60.4% 27.9% 4.8% 4.6% 1.5% 0.7% O&M Allocation $44,361,831 $20,513,035 $3,562,618 $3,394,066 $1,131,355 $530,174 Non-Operating Expenses $6,724,519 10.9% 75.3% 13.1% 0.7% 0.1% 0.0% Non-Operating Allocation $730,933 $5,060,717 $878,924 $44,719 $9,226 $0 Table 44 shows the cost allocation by cost causative components under the proposed financial plan before adjustments. Revenue offsets made up of non-operating revenues for FY 2026 shown in Table 23 will be used to offset purchased water costs in the rate design section.

Other operating revenues are allocated to each cost component based on the overall cost allocation percentages shown in the “percent of total” row.

Table 44. Rate Revenue Requirements for Test Year, FY 2026 Total Allocation
Source of
Supply
Base
Delivery
Delivery
Capacity Meters
Customer
Service
Recycled
Water
O&M Expenses $73,493,080 60.4% 27.9% 4.8% 4.6% 1.5% 0.7% O&M Allocation $44,361,831 $20,513,035 $3,562,618 $3,394,066 $1,131,355 $530,174 Non-Operating Expenses $6,724,519 10.9% 75.3% 13.1% 0.7% 0.1% 0.0% Non-Operating Allocation $730,933 $5,060,717 $878,924 $44,719 $9,226 $0 Total Allocation $80,217,599 $45,092,764 $25,573,752 $4,441,542 $3,438,785 $1,140,581 $530,174 Percent of Total 56.2% 31.9% 5.5% 4.3% 1.4% 0.7%
Table 45 shows the total cost allocation by cost category that will be used to allocate costs to each customer. Other operating revenue and net balances are applied based on the overall percentages allocated to each cost category in the percent of total line. Non-operating revenues are applied directly to offset the cost of variable rates for potable and recycled water customers.

City Council 8 – 51 1/20/2026
34 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 45. Cost of Service Allocations with Other Operating, Non-Operating, and Net Balance Adjustments Total Allocation
Source of
Supply
Base
Delivery
Delivery
Capacity Meters
Customer
Service
Recycled
Water
O&M Expenses $73,493,080 60.4% 27.9% 4.8% 4.6% 1.5% 0.7% O&M Allocation $44,361,831 $20,513,035 $3,562,618 $3,394,066 $1,131,355 $530,174 Non-Operating Expenses $6,724,519 10.9% 75.3% 13.1% 0.7% 0.1% 0.0% Non-Operating Allocation $730,933 $5,060,717 $878,924 $44,719 $9,226 $0 Total Allocation $80,217,599 $45,092,764 $25,573,752 $4,441,542 $3,438,785 $1,140,581 $530,174 Percent of Total 56.2% 31.9% 5.5% 4.3% 1.4% 0.7%
Other Operating Revenue ($3,874,380)
Non-Operating Revenue ($1,508,000)
Net Revenue (Expense) ($3,418,250)
Allocation of Net and Other ($4,099,410) ($2,324,925) ($403,783) ($312,622) ($103,691) ($48,198) Allocation of Non-Operating ($1,496,196) ($11,804)
Rate Revenue Requirement $71,416,969 $39,497,158 $23,248,827 $4,037,759 $3,126,163 $1,036,890 $470,171 Finally, meter costs are allocated between potable customers and fire connections. Water systems deliver water to public and private fire lines. Public fire lines are generally visible as hydrants on the street, and are designed to deliver water in sufficient quantities and pressures to fight fires on properties served by the water system. Private fire lines provide fire flow to building and other structure sprinkler systems for fire suppression within private improvements. To determine the share of total fire flow costs responsible to each, fire flow must additionally be allocated between private and public fire connections. There are a total of 1,580 private fire connections which are equal to 249,958 equivalent fire meters. Total public fire connections are equal to 559,560 equivalent meters. Table 46 shows the potable water connections and meter equivalents.

City Council 8 – 52 1/20/2026
35 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 46. Total Potable Connections by Meters Size and Equivalent Meter Count Meter Size FY 2026
AWWA Meter
Ratio EM Count
5/8" X 3/4" 31,457 1.00 31,457
3/4" 5,515 1.50 8,273
1" 4,963 2.50 12,408
1 1/2" 1,357 5.00 6,785
2" 1,708 8.00 13,664
3" 317 17.50 5,548
4" 144 31.50 4,536
6" 61 65.00 3,965
8" 2 120.00 240
10" 1 210.00 210
Total 47,100 87,085
Table 47 shows the total public and private fire connections and their meter equivalency based on the ratios provided in Table 18.

Table 47. Total Fire Connections by Meters Size and Equivalent Meter Count Firelines
Demand
Factor Count EM Count
Public Hydrants
6" 111.31 5,027 559,560
Private Fire Lines
2" 6.19 47 291
3" 17.98 3 54
4" 38.32 328 12,569
6" 111.31 628 69,903
8" 237.21 448 106,269
10" 426.58 100 42,658
12" 689.04 26 17,915
Total 6,607 809,219
City Council 8 – 53 1/20/2026
36 City of Santa Ana – 2026 Water and Sewer Rate Study
The allocation of fire costs is based on the ratio of equivalent fire meters, 69.1 percent for public fire and 30.9 percent for private fire. The total meter equivalents are made up of all potable water EMs and fire EMs. A unit cost for the value of a single meter is determined by dividing the total allocation of meter costs in Table 45 by the total equivalent meters. Table 48 shows the unit cost for each meter equivalent.

Table 48. Determination of Meter Unit Cost
Meter Costs
Total
Equivalent
Meters
Cost per
EM
$3,126,163 896,303 $3.49
Table 49 shows the percentage of fire costs allocated to each customer class based on the number of equivalent meters.

Table 49. Allocation of Meter Costs to Potable and Fire Customers Customer Class
Equivalent
Meters
Cost
Allocation
Potable Water 87,085 $303,737
Public Hydrants 559,560 $1,951,656
Private Fire 249,658 $870,769
Total 896,303 $3,126,163
Table 50 provides the total cost allocation by category, which will be used to allocate costs to each customer.

Table 50. Final Cost of Service Allocations with all Adjustments Total Allocation
Source of
Supply
Base
Delivery
Delivery
Capacity Meters
Customer
Service
Recycled
Water Public Fire
Private
Fire
Rate Revenue Requirement $71,416,969 $39,497,158 $23,248,827 $4,037,759 $3,126,163 $1,036,890 $470,171 Allocation to Public Fire ($1,951,656) $1,951,656
Allocation to Private Fire ($870,769) $870,769
Rate Revenue Requirement $71,416,969 $39,497,158 $23,248,827 $4,037,759 $303,737 $1,036,890 $470,171 $1,951,656 $870,769

City Council 8 – 54 1/20/2026
37 City of Santa Ana – 2026 Water and Sewer Rate Study
Allocation to Customers
All customers are billed based on their meter size and water use level. The total revenue requirements reflect the final cost allocation in Table 45. These totals will be applied to customers based on the corresponding number of units allocated to that customer in the rate design.

Allocation to Units
The final step of the COS analysis is to allocate the cost causative components back to the customers.

In order to perform this, unit values were determined for each cost component. • Source of supply and recycled water costs will be further subdivided in the rate design stage based on internal parameters of each, so those costs are wholly applied to their respective category in one unit.
• The number of potable equivalent meters will be used to distribute fixed base delivery related service costs.
• The total potable water use will be used to distribute the portion of base delivery related service costs which were allocated to the variable rate.
• The number of potable equivalent meters will be used to distribute fixed delivery capacity related service costs.
• The number of potable equivalent meters will be used to distribute meter related service costs. • The number of bills in one year (the number of accounts multiplied by 12) serves as the basis for distributing billing and customer service costs associated with customer billing and collection, and other customer services costs.
• The number of potable equivalent meters will be used to distribute public fire related service costs. • The number of private fire equivalent meters will be used to distribute private fire related service costs.

Table 51 shows the total cost allocation by cost component divided by the corresponding unit values to develop a unit cost for each.

City Council 8 – 55 1/20/2026
38 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 51. Rate Revenue Requirements Divided by the Corresponding Units12 Cost Category Unit Category
Cost
Allocation Units Unit Cost
Source of Supply* Source of Supply $39,497,158 1 $39,497,158 Fixed Base Delivery Potable Water EMs $17,459,788 87,085 $200.49 Variable Base Delivery Potable Water Use $5,789,039 13,536,745 $0.43 Fixed Delivery Capacity Potable Water EMs $4,037,759 87,085 $46.37 Fixed Meter Costs Potable Water EMs $303,737 87,085 $3.49 Customer Service Costs Potable Water Bills (including fire) $1,036,890 584,220 $1.77 Recycled Water* Recycled Water $470,171 1 $470,171
Public Fire Potable Water Ems $1,951,656 87,085 $22.41
Private Fire Private Fire Ems $870,769 249,658 $3.49
12 Source of Supply and Recycled Water costs will be further subdivided in the Rate Design section City Council 8 – 56 1/20/2026
39 City of Santa Ana – 2026 Water and Sewer Rate Study

3.3 Water Rate Design
RDN proposes the following adjustments to customer water rate structures:
• Adjusting rates annually by the recommended revenue adjustments of 9.0 percent in May 2026, followed by 9.0 percent annual adjustments July 2027 through July 2029, with a final adjustment of 8.0 percent in July 2030
• Combining all customers into a single customer class
• Introducing monthly billing
• Adjusting tier widths to reflect current water supply ratios The water rates currently have two components: 1) a fixed bi-monthly service charge and 2) volumetric rates. Customers must pay the fixed charge regardless of the water use. In addition, the customers pay volumetric rates based on the volume of water use.

The proposed rates will include the following components:

1. Fixed monthly service charge: the rates are established based on the size of the meter at the property receiving water service and are calculated to recover a portion of the City’s fixed costs, such as water facilities repairs and replacements, the capacity of that meter, meter reading, and customer service.

2. Variable rates: the rates are calculated based on the cost of water supplies, the cost of managing the City’s water resources at regular levels and distributing water throughout the system to customers. The remaining fixed costs (base delivery) that are not recovered via fixed charges are also recovered from variable charges. These fixed costs are incurred based on the total volume of water used and include water storage, treatment, and engineering and maintenance of the transmission system. The variable rates are billed per hundred cubic feet based on two tiers.

Together, the two components (fixed and variable) are calculated to recover the proportionate cost of providing water service attributable to each customer
Monthly Fixed Charge
All meter, delivery capacity, and public fire and some base delivery costs are divided by the number of equivalent meters using the AWWA ratio discussed in the Key Assumptions section to compute the unit cost for each cost component. Customer service costs are simply divided by the number of bills since the service requirements of this cost type are the same regardless of the meter size installed on a property.

Table 52 and Table 53 show the total costs allocated to each cost category, the number of units for the City Council 8 – 57 1/20/2026
40 City of Santa Ana – 2026 Water and Sewer Rate Study
category, and the cost for a year and a monthly period of service for each cost unit for potable retail and private fire customers, respectively. The resulting monthly unit costs are used to calculate the fixed customer rates.

Table 52. Fixed Cost Components Divided by Number of Units for Potable Retail Customers Cost Category Cost Allocation Units Unit Cost
Monthly
Unit Cost
Fixed Meter Costs $303,737 87,085 $3.49 $0.29
Fixed Base Delivery $17,459,788 87,085 $200.49 $16.71
Fixed Delivery Capacity $4,037,759 87,085 $46.37 $3.86
Public Fire $1,951,656 87,085 $22.41 $1.87
Customer Service Costs $1,036,890 48,685 $21.30 $1.77
Base Meter Charge $24.50
Table 53. Fixed Cost Components Divided by Number of Units for Private Fire Customers Cost Category Cost Allocation Units Unit Cost
Monthly
Unit Cost
Private Fire $870,769 249,658 $3.49 $0.29
Customer Service Costs $1,036,890 48,685 $21.30 $1.77
Base Meter Charge $2.07
Table 54 shows the monthly fixed charge calculation by meter size for potable retail water customer connections.

Table 54. Monthly Water Service Fixed Charge Calculation13 Meter Size Meter Cost
Meter
Ratio
Total
Meter
Customer
Service
Fixed
Charge
5/8" X 3/4" $22.73 x 1.00 = $22.73 + $1.77 = $24.50
3/4" $22.73 x 1.50 = $34.09 + $1.77 = $35.87
1" $22.73 x 2.50 = $56.82 + $1.77 = $58.60
1 1/2" $22.73 x 5.00 = $113.65 + $1.77 = $115.42
2" $22.73 x 8.00 = $181.84 + $1.77 = $183.61
3" $22.73 x 17.50 = $397.77 + $1.77 = $399.55
4" $22.73 x 31.50 = $715.99 + $1.77 = $717.76
6" $22.73 x 65.00 = $1,477.44 + $1.77 = $1,479.21
8" $22.73 x 120.00 = $2,727.57 + $1.77 = $2,729.35
10" $22.73 x 210.00 = $4,773.25 + $1.77 = $4,775.03
13 Note that some calculations may be impacted by rounding to two decimal points City Council 8 – 58 1/20/2026
41 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 55 shows the monthly fixed charge calculation by meter size for private fire connections. Fireline ratios are based on engineering calculations of the potential capacity flow to a meter based on the service line size.

Table 55. Monthly Water Service Fixed Charge Calculation, Private Fire Connections Meter Size Meter Cost
Meter
Ratio
Total
Meter
Customer
Service
Fixed
Charge
2" $0.29 x 6.19 = $1.80 + $1.77 = $3.57
3" $0.29 x 17.98 = $5.23 + $1.77 = $7.00
4" $0.29 x 38.32 = $11.14 + $1.77 = $12.91
6" $0.29 x 111.31 = $32.35 + $1.77 = $34.13
8" $0.29 x 237.21 = $68.94 + $1.77 = $70.72
10" $0.29 x 426.58 = $123.99 + $1.77 = $125.76
12" $0.29 x 689.04 = $200.27 + $1.77 = $202.05
The proposed monthly fixed charge before revenue adjustments for the base equivalent meter (5/8 inch x 3/4 inch) is $24.50.

The proposed five-year monthly fixed charges with revenue adjustments applied for all water customers are shown in Table 56 and Table 57. FY 2026 rates are based on the cost of service rate times the revenue adjustment.

Table 56. Proposed 5-year Fixed Charge Schedule. Potable Retail 1-May 1-Jul 1-Jul 1-Jul 1-Jul
2026 2027 2028 2029 2030
Revenue Adjustment 9.0% 9.0% 9.0% 9.0% 8.0%
Meter Size 2026 2027 2028 2029 2030
5/8" X 3/4" $26.71 $29.11 $31.73 $34.59 $37.36
3/4" $39.10 $42.62 $46.45 $50.63 $54.68
1" $63.87 $69.62 $75.89 $82.72 $89.33
1 1/2" $125.81 $137.13 $149.48 $162.93 $175.96
2" $200.14 $218.15 $237.78 $259.18 $279.92
3" $435.50 $474.70 $517.42 $563.99 $609.11
4" $782.36 $852.77 $929.52 $1,013.18 $1,094.23
6" $1,612.34 $1,757.45 $1,915.62 $2,088.02 $2,255.07
8" $2,974.99 $3,242.74 $3,534.58 $3,852.69 $4,160.91
10" $5,204.78 $5,673.21 $6,183.79 $6,740.34 $7,279.56
City Council 8 – 59 1/20/2026
42 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 57. Proposed 5-year Fixed Charge Schedule, Private Fire 1-May 1-Jul 1-Jul 1-Jul 1-Jul
2026 2027 2028 2029 2030
Revenue Adjustment 9.0% 9.0% 9.0% 9.0% 8.0%
Meter Size 2026 2027 2028 2029 2030
2" $3.90 $4.25 $4.63 $5.05 $5.45
3" $7.63 $8.32 $9.07 $9.88 $10.67
4" $14.07 $15.34 $16.72 $18.23 $19.69
6" $37.20 $40.55 $44.20 $48.17 $52.03
8" $77.08 $84.02 $91.58 $99.83 $107.81
10" $137.08 $149.42 $162.86 $177.52 $191.72
12" $220.23 $240.05 $261.65 $285.20 $308.02
Variable Water Rates
Variable rates are designed based on variable costs such as water supply and base delivery costs. The current rate structure was maintained to the extent possible mitigate rate impacts. Variable rates are made up of a number of cost components, all derived based on actual customer use data: Water Supply and Base Costs. Water supply costs are offset by the City’s non-operating revenues.

Tier Widths
The City’s current tier widths take into account the availability of water supply for each customer class and meter size. The widths were designed based on common use characteristics and the capacity investment14 of different meter sizes. The current widths are shown in Table 2. The proposed tier widths are applied equally to all customer classes to ensure equitability between customers. To determine equitable tier widths, an analysis of available water supplies was completed. Total water demand is projected to be 13.5 million ccf. Table 58 shows the total available water supplies under each supply category based on the percentage of supply.

Table 58. Available Water Supplies Under Each Supply Category Supply Category Percent of Units Total Units
Total 100.0% 13,536,745
Groundwater 85.0% 11,506,233
Purchased Water 15.0% 2,030,512
In order to allocate the available groundwater to Tier 1, the total supply available was divided by the number of bills. Table 59 shows the available groundwater supply divided by the number of annual bills. The base availability of tier 1 is 21 ccf.
14 2019 Water, Recycled Water, & Sewer Rate Study Report Final. October 1, 2019. Stantec & Hidebrand. City of Santa Ana City Council 8 – 60 1/20/2026
43 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 59. Tier 1 Base Derivation
Use Category
Groundwater Supply 11,506,232
Customer Bills 546,300
Available per base Bill 21
Using the base derivation for all meter sizes, however, leads to much more water use under tier 2 than the available supply with most tier 2 use being allocated to larger meters. Table 60 shows the total water use under each tier if the base water derivation is used.

Table 60. Water Demand Under Base Derivation
Use Category Water Use Percent of Use
Total Water Demand 13,536,745
Tier 1 6,304,559 46.6%
Tier 2 7,232,186 53.4%
To ensure that 85 percent of water is billed at the Tier 1 rate based on actual water use patterns a uniform tier width would need to equal 550 ccf a month. Under a uniform tier width, smaller meters would never reach the tier 2 threshold and thus would not be paying for the required 15 percent of purchased water.

To ensure that customers are responsible for and have access to each available water source, the base water supply will be available to smaller meters, while large meters will increase the monthly supply based on their capacity ratio. This derivation takes into account both the increased investment made by larger meters when they buy in to the system, as well as the higher fixed monthly charges proposed, which pay for additional capacity demands on the system. The proposed tier widths also maintain the logic of the current rate structure and will lead to less impact on customers. Table 61 shows the updated tier widths based on the available water supply.

Table 61. Monthly Tier Width Under Adjusted Derivation
Meter Size
Base Tier
Width
Capacity
Ratio
Tier 1
Width
5/8" X 3/4" 21 1.00 21
3/4" 21 1.50 32
1" 21 2.50 53
1 1/2" 21 5.00 105
2" 21 8.00 168
3" 21 17.50 369
4" 21 31.50 663
6" 21 65.00 1,369
8" 21 120.00 2,527
10" 21 210.00 4,423
City Council 8 – 61 1/20/2026
44 City of Santa Ana – 2026 Water and Sewer Rate Study
Water Supply Costs
The City’s primary water source is local groundwater. The City’s water supply agreements require that 15 percent of the annual supply be purchased water, which is more expensive than groundwater. Water supply costs were separated based on whether they were directly attributable to water purchases or if the costs were general to all water supply. Table 62 shows the supply cost categories identified in the City’s budget and the total costs allocated to each category.

Table 62. Total Supply Costs by Source15
Cost Category Total Cost Percent
Total Supply Costs $40,993,385 100.0%
Groundwater $23,482,100 57.3%
Purchased Water $9,719,350 23.7%
Other Supply Costs $7,791,935 19.0%
In order to identify unit costs for each cost category, available supply was evaluated under each category.

Table 63 shows the total available water under each supply category, which is then divided by the total cost of that category to determine a unit cost for supply under each category.

Table 63. Water Supply Costs by Water Source and Unit Cost Supply Category Total Cost Percent of Units Total Units Cost per Unit Total $40,993,385 100.0% 13,536,745 $3.03
Groundwater $23,482,100 85.0% 11,506,233 $2.04
Purchased Water $9,719,350 15.0% 2,030,512 $4.79
Unit costs for each tier were determined by including the actual water use per tier using the tier widths under the adjusted tier derivation shown in Table 61. Table 64 shows the calculation used to determine the unit costs for each supply source in each tier.

Table 64. Water Supply Unit Costs by Tier
Water Source Total Supply Unit Cost Tier 1 Tier 2
Groundwater 11,506,233 $2.04 10,156,619 1,349,615
Purchased Water 2,030,512 $4.79 2,030,512
Water Source Unit Cost $2.04 $3.69 .

Other supply costs are divided by the total water use and applied to both tiers evenly. Table 65 shows the other supply cost unit cost.
15 Other supply costs include budgeted costs in the City’s supply department which are not directly attributable to water purchase costs.

City Council 8 – 62 1/20/2026
45 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 65. Other Water Supply Unit Cost
Other Supply Costs Water Use Unit Cost
$7,791,935 ÷ 13,536,745 = $0.58
Base Delivery Costs
Base delivery costs are divided by total water use to determine the unit cost shown in Table 66 . The base unit cost is applied to all water use.

Table 66. Base Delivery Unit Cost
Base Costs Water Use Unit Cost
$5,789,032 ÷ 13,536,745 = $0.43
Revenue Offset
Revenue offsets are only applied to tier 1 water use, so the total available funds are divided by the projected use in that tier. Allocating offsets to tier 1 ensures all customers benefit from the non-operating revenue for all usage. Table 67 shows the calculation to determine unit values for the revenue offset.

Table 67. Revenue Offset Unit Credit
Tier Revenue Offset Water Use Unit Cost
Tier 1 -$1,496,196 ÷ 10,156,619 = -$0.15
Tier 2 $0 ÷ 0 = $0.00
Table 68 shows the calculation used to determine the variable rates. Supply costs are added to base costs to calculate the variable rates. Rates are then reduced by revenue offsets, which were set aside in the cost of service analysis.

Table 68. Variable Rate Calculation
Tier Water Source Other Supply Base Delivery Revenue Offset COS Rate Tier 1 $2.04 + $0.58 + $0.43 + -$0.15 = $2.90
Tier 2 $3.69 + $0.58 + $0.43 + $0.00 = $4.69
The rates will be escalated by the revenue adjustments and the five-year rate schedule is shown in Table

69. Each adjustment will occur in January, midway through the fiscal year.

Table 69. Proposed 5-Year Variable Rate Schedule
1-May 1-Jul 1-Jul 1-Jul 1-Jul
2026 2027 2028 2029 2030
Revenue Adjustment 9.0% 9.0% 9.0% 9.0% 8.0%
Tier 1-May 1-Jul 1-Jul 1-Jul 1-Jul
Tier 1 $3.16 $3.44 $3.75 $4.09 $4.42
Tier 2 $5.12 $5.58 $6.08 $6.63 $7.16
City Council 8 – 63 1/20/2026
46 City of Santa Ana – 2026 Water and Sewer Rate Study
Recycled Water Rates
The rates for recycled water customers are calculated using the direct costs allocated to the recycled water system in the Cost of Service Analysis, $470,172. Recycled water customers also pay fixed and variable charges; however, the variable charge only contains one tier, because there is only one source of water available. In order to maintain equity with other customers, the same fixed rates are applied to recycled water customers. The remaining costs which are not recovered from fixed rates are then applied to the variable rate. Similar to the potable water rates, some fixed costs may be recovered through the variable rate; however, those costs vary with the total water demand on the system. Table 70 shows the total revenue generated from the cost of service rates for recycled customers. Monthly billed amounts are multiplied by the number of meters in each category.

Table 70. Recycled Water Fixed Revenue Collection
Meter
Size
Recycled
Water
Customers Meter Rate
Fixed
Revenue
5/8" X 3/4" 0 $24.50 $0
3/4" 0 $35.87 $0
1" 0 $58.60 $0
1 1/2" 3 $115.42 $4,155
2" 9 $183.61 $19,830
3" 3 $399.55 $14,384
4" 3 $717.76 $25,839
6" 3 $1,479.21 $53,252
8" 0 $2,729.35 $0
10" 0 $4,775.02 $0
Total Fixed Revenue $117,460
The remainder of costs are then allocated to the variable rate base. Table 71 shows the calculation used to determine the unit cost for a unit of recycled water. The total variable cost basis is divided by the projected recycled water use. Table 72 shows the proposed variable recycled water rates.

Table 71. Recycled Water Variable Rate Derivation
Revenue
Requirements
Cost
Allocation
Total $470,172
Fixed Recovery ($117,460)
Variable Base $352,712
Recycled Use 106,800
Variable Rate $3.30
City Council 8 – 64 1/20/2026
47 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 72. Proposed Variable Recycled Water Rates
1-May 1-Jul 1-Jul 1-Jul 1-Jul
2026 2027 2028 2029 2030
Revenue Adjustment 9.0% 9.0% 9.0% 9.0% 8.0%
Tier 1-May 1-Jul 1-Jul 1-Jul 1-Jul
Recycled Water $3.60 $3.92 $4.28 $4.66 $5.03

3.4 Bill Impact Analysis
This analysis compares customers’ bills under current and proposed rates. Figure 8 shows the dollar change in the bill based on 5/8” x 3/4” meter customers use at selected usage points. The City’s average 5/8” x 34”” customer uses 12 ccf of water monthly. Additionally, the 80 th percentile of use for a 5/8” x 3/4”
customer is 17 ccf per billing period.

Figure 8. Customer Impact by Usage for 5/8” x 3/4” Meter $37.31
$60.42
$72.16
$89.77
$42.50
$64.60
$70.91
$80.39
$0.00
$10.00
$20.00
$30.00
$40.00
$50.00
$60.00
$70.00
$80.00
$90.00
$100.00
5 ccf (25 percentile) 12 ccf (average) 14 ccf (75 percentile) 17 ccf (80 percentile) Current Proposed
City Council 8 – 65 1/20/2026
48 City of Santa Ana – 2026 Water and Sewer Rate Study

SEWER UTILITY

4.1 Financial Plan
RDN built a 10-year financial model for the City of Santa Ana’s sewer system to meet the system’s longterm financial goals. The detailed rate analysis was performed for the first five years.

Revenues
RDN conducted a revenue analysis using the current sewer rates. The City currently collects fixed revenues from all customers. Fixed revenue forecasts are based on the customer growth assumptions described in the Methodology Section. Table 73 shows the projected rate revenue under the current rates.

Table 73. Sewer System Rate Revenue Forecast, FY 2026 to FY 2031 Customer Class FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Single Family
5/8" X 3/4" $2,459,736 $2,459,736 $2,459,736 $2,459,736 $2,459,736 $2,459,736 3/4" $625,777 $625,777 $625,777 $625,777 $625,777 $625,777 1" $437,176 $441,548 $445,920 $450,292 $454,846 $459,399 1 1/2" $34,795 $34,795 $34,795 $34,795 $34,795 $34,795
2" $4,363 $4,363 $4,363 $4,363 $4,363 $4,363
Total $3,561,847 $3,566,219 $3,570,591 $3,574,963 $3,579,517 $3,584,070 Multi Family
5/8" X 3/4" $255,493 $255,493 $255,493 $255,493 $255,493 $255,493 3/4" $27,901 $28,616 $29,332 $30,047 $30,763 $31,478
1" $323,912 $325,403 $326,895 $328,088 $329,579 $331,070 1 1/2" $147,717 $147,131 $147,717 $147,717 $148,304 $148,304 2" $220,342 $220,342 $220,342 $220,342 $220,342 $220,342 3" $188,570 $188,570 $188,570 $188,570 $188,570 $188,570 4" $253,765 $257,442 $261,120 $264,798 $268,476 $272,153 6" $221,686 $227,520 $227,520 $233,354 $239,188 $239,188 8" $29,207 $29,207 $29,207 $29,207 $29,207 $29,207
10" $23,113 $23,113 $23,113 $23,113 $23,113 $23,113
Total $1,691,706 $1,702,838 $1,709,309 $1,720,729 $1,733,034 $1,738,918 Non-Residential
5/8" X 3/4" $141,925 $142,171 $141,925 $142,048 $141,925 $142,048 3/4" $46,563 $46,563 $46,563 $46,563 $46,563 $46,563
1" $384,648 $385,690 $386,732 $387,774 $388,815 $389,857 1 1/2" $542,517 $542,517 $542,517 $542,517 $542,517 $542,517 2" $1,105,082 $1,105,082 $1,105,082 $1,105,082 $1,105,082 $1,105,082 3" $416,715 $416,715 $416,715 $416,715 $416,715 $416,715 4" $281,026 $281,026 $281,026 $281,026 $281,026 $281,026 6" $195,909 $195,909 $195,909 $195,909 $195,909 $195,909 8" $0 $0 $0 $0 $0 $0
Total $3,114,387 $3,115,675 $3,116,470 $3,117,635 $3,118,554 $3,119,718 FOG Units
Units $554,374 $555,042 $555,042 $555,709 $555,709 $556,377 Total $8,922,314 $8,939,774 $8,951,412 $8,969,036 $8,986,813 $8,999,084 City Council 8 – 66 1/20/2026
49 City of Santa Ana – 2026 Water and Sewer Rate Study
The revenue analysis also includes other operating and non-operating revenues such as penalties and NPDES water. These revenues are used to offset the revenue requirements that need to be recovered from customers’ rates. This projection was created under the status quo rates and does not include proposed revenue adjustments.

The system’s total revenue for the study period is estimated to be approximately $9.8 million annually under the current rates. Table 74 shows the projected sewer system revenues by category for the study period (FY 2026 – FY 2031) without any revenue adjustments. Projections are based on customer growth projections as well as other operating and non-operating revenue estimates provided by City staff.

Table 74. Sewer System Revenue Forecast, FY 2026 to FY 2031 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
Revenue from Rates
Fixed Revenue $8,922,314 $8,939,774 $8,951,412 $8,969,036 $8,986,813 $8,999,084 Rate Revenue Total $8,922,314 $8,939,774 $8,951,412 $8,969,036 $8,986,813 $8,999,084 Other Operating Revenues $450,000 $450,000 $450,000 $450,000 $450,000 $450,000 Non-operating Revenues $400,000 $400,000 $400,000 $400,000 $400,000 $400,000 Total $9,772,314 $9,789,774 $9,801,412 $9,819,036 $9,836,813 $9,849,084 Operating and Maintenance (O&M) Expense
The itemized O&M expenses were carefully reviewed by the City and forecast for the study period using escalation factors discussed in the Key Assumptions section. Table 75 shows the City’s projected O&M expenses for the sewer utility during the study period. O&M Expenses are expected to increase by 4.0 percent on average annually.

Table 75. Sewer System O&M Expense Forecast, FY 2026 to FY 2031 Expense Category FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Sanitary Service $8,759,440 $9,132,875 $9,517,728 $9,894,897 $10,287,824 $10,671,969 Total Operating $8,759,440 $9,132,875 $9,517,728 $9,894,897 $10,287,824 $10,671,969 Other Obligations
Other obligations included in the financial plan are capital improvement projects funded by PAYGO (Pay As You Go), debt service obligations, and reserve contributions made from rates.

Capital Improvement Projects
The City plans to spend an average of $5.0 million a year on sewer rate funded capital expenditures during the rate setting period. Table 76 shows the capital expenditure by expenditure type. The City plans to use customer rates to accomplish the proposed capital plan. Figure 9 graphically shows the rate study capital plan by funding source, only PAYGO funded expenditure will impact customer rates.

City Council 8 – 67 1/20/2026
50 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 76. Rate Study Sewer CIP Expenses by Expense Type, FY 2026 to FY 2031 CIP Funding Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Rate Funded CIP $4,111,232 $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 Total CIP $4,111,232 $5,000,000 $5,000,000 $5,000,000 $5,000,000 $5,000,000 Figure 9. Rate Study Sewer CIP Expenses by Funding Source, FY 2026 to FY 2031 Debt Service and Coverage Ratios
The CWSRF Septic to Sewer Island Bond payments are made annually. Table 77 shows the Sewer utility’s annual debt payments used in this study. Table 78 shows the projected debt service coverage ratios under the current rates.

Table 77. Rate Study Debt Service Expenses, FY 2026 to FY 2031 Description FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Principal $35,969 $35,941 $36,875 $37,834 $38,818 $39,827 Interest $37,773 $37,801 $36,867 $35,908 $34,924 $33,915 Total Debt Service $73,742 $73,742 $73,742 $73,742 $73,742 $73,742 Table 78. Rate Study Debt Service Coverage Ratios, FY 2026 to FY 2031 Description FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Total Revenue $9,772,314 $9,789,774 $9,801,412 $9,819,036 $9,836,813 $9,849,084 Total Operating Expense $8,759,440 $9,132,875 $9,517,728 $9,894,897 $10,287,824 $10,671,969 Net Revenue $1,012,874 $656,898 $283,684 ($75,861) ($451,011) ($822,885) Total Debt Service $73,742 $73,742 $73,742 $73,742 $73,742 $73,742 Debt Service Coverage Ratio 13.74 8.91 3.85 -1.03 -6.12 -11.16 DSCR Requirement 1.25 1.25 1.25 1.25 1.25 1.25
City Council 8 – 68 1/20/2026
51 City of Santa Ana – 2026 Water and Sewer Rate Study
Reserves
The City must maintain an appropriate reserve balance to ensure the day-to-day operation will continue during emergencies and guarantee the future stability of the system. The City’s financial goal is to build an appropriate level of cash reserves for each reserve fund included in the financial plan of this Study.

The reserve target for the sewer utility is described below:
• Operating Reserve Funds: three months of operating expenses • Capital Reserve: 50% of ten year average of capital expenditures • Emergency Reserve: $4.0 million
The reserve target at the end of the study period reaches $9.1 million. Table 79 shows the City’s reserve targets for FY 2026 through FY 2031 based on the current reserve policy. Figure 10 displays the resulting cash balances versus the reserve target under the current rates. Reserve targets based on reserve policy shown in Table 17 and operating and capital totals shown in Tables 75 and 76, respectively.

Table 79. Sewer Reserve Target, FY 2026 to FY 2031
Reserve Fund FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Operating Reserve $2,189,860 $2,283,219 $2,379,432 $2,473,724 $2,571,956 $2,667,992 Capital Reserve $2,459,601 $2,459,601 $2,459,601 $2,459,601 $2,459,601 $2,459,601 Emergency Reserve $4,000,000 $4,000,000 $4,000,000 $4,000,000 $4,000,000 $4,000,000 Total Reserve Target $8,649,461 $8,742,820 $8,839,033 $8,933,326 $9,031,557 $9,127,594 City Council 8 – 69 1/20/2026
52 City of Santa Ana – 2026 Water and Sewer Rate Study
Figure 10. Sewer Cash Balances and Reserve Target With Current Rates, FY 2026 to FY 2031 City Council 8 – 70 1/20/2026
53 City of Santa Ana – 2026 Water and Sewer Rate Study
Financial Plan
Based on the projected total revenue and necessary costs to be recovered during the study period, RDN built a financial plan that will generate sufficient revenues for the day-to-day operation and annual PAYGO and make appropriate contributions to reserves. The City currently has a projected ending cash balance of $18.3 million in FY 2025, which is the beginning balance for FY 2026. Table 80 shows the status quo sewer pro forma with no revenue adjustments and the resulting ending balances based on the revenues and expenses outlined in this section.

Table 80. Status Quo Financial Pro Forma for City of Santa Ana Sewer System, FY 2026 to FY 2031
Rate Increase 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Rate Month Implemented
FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
Cash Position Opening Balance $ 18,318,613 $ 15,146,513 $ 10,729,669 $ 5,939,611 $ 790,008 $ (4,734,745) Revenues
Sewer Rate Revenue $ 8,922,314 $ 8,939,774 $ 8,951,412 $ 8,969,036 $ 8,986,813 $ 8,999,084 Adjusted Sewer Rate Revenue $ - $ - $ - $ - $ - $ -
Other Operating Revenue $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 Non-Operating Revenue $ 400,000 $ 400,000 $ 400,000 $ 400,000 $ 400,000 $ 400,000 Investment Revenue
Property Tax Revenue $ - $ - $ - $ - $ - $ -
Total Revenues $ 9,772,314 $ 9,789,774 $ 9,801,412 $ 9,819,036 $ 9,836,813 $ 9,849,084 Operating Expenses $ 8,759,440 $ 9,132,875 $ 9,517,728 $ 9,894,897 $ 10,287,824 $ 10,671,969 Net Operating Revenue $ 1,012,874 $ 656,898 $ 283,684 $ (75,861) $ (451,011) $ (822,885) Current Debt Service $ 73,742 $ 73,742 $ 73,742 $ 73,742 $ 73,742 $ 73,742 Proposed Debt Service $ - $ - $ - $ - $ - $ -
Total Operating and Debt Service $ 8,833,182 $ 9,206,618 $ 9,591,470 $ 9,968,639 $ 10,361,566 $ 10,745,711 Net Revenues Before CIP $ 939,132 $ 583,156 $ 209,942 $ (149,603) $ (524,753) $ (896,627) Capital Expenditure $ 4,111,232 $ 5,000,000 $ 5,000,000 $ 5,000,000 $ 5,000,000 $ 5,000,000 Net Income $ (3,172,100) $ (4,416,844) $ (4,790,058) $ (5,149,603) $ (5,524,753) $ (5,896,627) Ending Balance $ 15,146,513 $ 10,729,669 $ 5,939,611 $ 790,008 $ (4,734,745) $ (10,631,371) City Council 8 – 71 1/20/2026
54 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 81 shows the proposed sewer pro forma for the study period with the recommended revenue adjustments per year. All revenue adjustments will occur in January of the Fiscal Year.

Table 81. Proposed Financial Pro Forma for City of Santa Ana Sewer System, FY 2026 to FY 2031 Rate Increase 13.5% 0.0% 13.5% 10.0% 10.0% 10.0%
Rate Month Implemented 1-May 1-Jul 1-Jul 1-Jul 1-Jul 1-Jul FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031
Cash Position Opening Balance $ 18,318,613 $ 15,347,265 $ 12,137,291 $ 9,927,253 $ 8,518,164 $ 8,014,814 Revenues
Sewer Rate Revenue $ 8,922,314 $ 8,939,774 $ 8,951,412 $ 8,969,036 $ 8,986,813 $ 8,999,084 Adjusted Sewer Rate Revenue $ 200,752 $ 1,206,869 $ 2,580,021 $ 3,740,514 $ 5,021,402 $ 6,430,993 Other Operating Revenue $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 Non-Operating Revenue $ 400,000 $ 400,000 $ 400,000 $ 400,000 $ 400,000 $ 400,000 Investment Revenue
Property Tax Revenue $ - $ - $ - $ - $ - $ -
Total Revenues $ 9,973,066 $ 10,996,643 $ 12,381,432 $ 13,559,550 $ 14,858,215 $ 16,280,077 Operating Expenses $ 8,759,440 $ 9,132,875 $ 9,517,728 $ 9,894,897 $ 10,287,824 $ 10,671,969 Net Operating Revenue $ 1,213,626 $ 1,863,768 $ 2,863,705 $ 3,664,653 $ 4,570,392 $ 5,608,108 Current Debt Service $ 73,742 $ 73,742 $ 73,742 $ 73,742 $ 73,742 $ 73,742 Proposed Debt Service $ - $ - $ - $ - $ - $ -
Total Operating and Debt Service $ 8,833,182 $ 9,206,618 $ 9,591,470 $ 9,968,639 $ 10,361,566 $ 10,745,711 Net Revenues Before CIP $ 1,139,884 $ 1,790,026 $ 2,789,962 $ 3,590,911 $ 4,496,649 $ 5,534,366 Capital Expenditure $ 4,111,232 $ 5,000,000 $ 5,000,000 $ 5,000,000 $ 5,000,000 $ 5,000,000 Net Income $ (2,971,348) $ (3,209,974) $ (2,210,038) $ (1,409,089) $ (503,351) $ 534,366 Ending Balance $ 15,347,265 $ 12,137,291 $ 9,927,253 $ 8,518,164 $ 8,014,814 $ 8,549,180 Reserve Target $8,649,461 $8,742,820 $8,839,033 $8,933,326 $9,031,557 $9,127,594 City Council 8 – 72 1/20/2026
55 City of Santa Ana – 2026 Water and Sewer Rate Study
Revenue Requirements
Table 82 displays the sewer utility’s revenue requirements FY 2026. The total expense for each year is offset by other operating revenues and non-operating revenues to compute a pure portion of revenue requirements that need to be recovered from customers’ rates. RDN proposes adjusting rates annually by the recommended revenue adjustment of 13.5 percent in May 2026, followed by a 13.5 percent annual adjustment July 2027, and then 10.0 adjustments July 2028 through July 2030 Table 82. Revenue Requirements for City of Santa Ana Sewer Utility, FY 2026 Revenue Requirements FY 2026
Operating Expenses $8,759,440
Debt Service $73,742
Capital Expenditures (PAYGO) $4,111,232
Total Expenses $12,944,414
Other Operating Revenue ($450,000)
Non-Operating Revenue ($400,000)
Net Balance From Operations ($3,172,100)
Rate Revenue Requirement $8,922,314
City Council 8 – 73 1/20/2026
56 City of Santa Ana – 2026 Water and Sewer Rate Study

4.2 Cost of Service Analysis and Rate Design
In the same way as the water system’s Cost of Service analysis was performed, a sewer system’s COS analysis also utilizes a three‐step approach to allocate costs proportionally among different customers.

These steps include 1) functionalization of costs, 2) cost classification, and 3) cost allocation to customers. Provided below is a detailed discussion of the sewer COS analysis conducted for the City, and the specific steps taken for the analysis.

Figure 11. A Typical Flow for Cost of Service Analysis Process Functionalization of Costs
To allocate the cost of service among the different customer classes, costs first must be allocated to the appropriate sewer parameters. The following sections describe the allocation of the operating and capital costs of service to the appropriate parameters of the sewer system.

The total cost of sewer service is analyzed by system function in order to equitably distribute costs of service to the various classes of customers. For this analysis, sewer utility costs of service are developed consistent with the guidelines for allocating costs detailed in the Water Environment Federation (WEF) Manual of Practice No. 27, Financing and Charges for Sewer Systems.

A cost of service analysis distributes the revenue requirements (costs) to each customer class. After determining the revenue requirements, the next step is to functionalize the O&M costs based on the City’s O&M classification:
• Fixed – costs that do not vary with flow or strength, such as routine system-wide operations and maintenance
• Sewer Service – costs that are incurred for customer service related tasks Functionalization
The revenue requirement is
assigned to Cost Components
Allocation to Cost Causative
Components
The functional categories are
allocated to the applicable costs.

Reallocation to Customers via
Rates
Each cost component is tied to
fixed and volumetric rate
components.

City Council 8 – 74 1/20/2026
57 City of Santa Ana – 2026 Water and Sewer Rate Study
• Fats, Oils, and Grease (FOG) – costs related to the FOG program City staff identified the costs which were attributable to FOG customers. FOG costs make up approximately 9 percent of the total operating costs and consist of two full-time employees and $456,628 in consulting costs. Table 83 shows the costs allocated to the FOG program and the percent of total operating expenses.

Table 83. Percent of O&M Functional Categories Allocated16 FOG Program Costs FY 2026
Full Time Employees (2) $345,432
Consulting Costs $456,658
Total Costs $802,090
Total Operating Budget $8,759,440
Percent to FOG 9%
The City’s sewer system is a conveyance only system, so all of the costs are fixed besides the level of FOG treatment. For the purposes of the cost of service analysis and rate design operating and capital costs were allocated between the 3 categories described, Fixed Costs, Service Costs, and FOG Costs.

Table 84 and Table 85 show the allocation of costs into the sewer functional categories.

Table 84. Total of Operating Functional Categories Allocated to Cost Components Cost Category Cost Percent
Operating Expense $8,759,440
Total Costs $8,759,440
Fixed $455,890 5%
Service $393,268 86%
FOG $747,320 9%
Table 85. Total of Non-operating Functional Categories Allocated to Cost Components Cost Category Cost Percent
Capital Expense $4,184,974
Total Costs $4,184,974
Fixed $3,808,326 91%
Service $0 0%
FOG $376,648 9%
Table 86 displays the functionalized O&M costs and non-operating costs allocated to cost causative components for the sewer system. The non-operating expenses for the test year are made up of planned 16 City staff provided individual cost allocations for each budget item and system asset based on the standard categories shown
City Council 8 – 75 1/20/2026
58 City of Santa Ana – 2026 Water and Sewer Rate Study
PAYGO capital expenditures and debt service payments. Other operating expenses, non-operating expense, and net balance adjustments are allocated to each category based on the total percent of that category.

Table 86. Revenue Requirement Cost Allocation by Cost Component Category Total Service Fixed FOG
O&M Revenue Requirements $8,759,440 $455,890 $7,556,231 $747,320 Non-Operating Revenue Requirements $4,184,974 $0 $3,808,326 $376,648 Total $12,944,414 $455,890 $11,364,557 $1,123,967

3.5% 87.8% 8.7%
Other Operating Revenue ($450,000) ($15,849) ($395,078) ($39,074) Non-Operating Revenue ($400,000) ($14,088) ($351,180) ($34,732) Net Balance From Operations ($3,172,100) ($111,718) ($2,784,947) ($275,434) Rate Revenue Requirement $8,922,314 $314,235 $7,833,352 $774,727 Allocation to Units
In developing equitable rate structures, revenue requirements are allocated to customers commensurate with customer demand and services rendered. The City does not treat sewer flow. Impacts on the sewer system are determined based on the total sewer flow for each customer category, or meter size. Total sewer flow is reflective of use of the system. The meter ratios used to allocate costs were developed based on winter water use differences between each meter size. Table 87 shows the total functional units allocated to each meter size which is used as the unit to divide the total costs allocated to each sewer function.

City Council 8 – 76 1/20/2026
59 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 87. Cost of Service Units of Service17
Meter Size
Customer
Count
Meter Flow
Ratio
Equivalent
Meters
5/8" X 3/4" 29,698 1.00 29,698
3/4" 5,185 1.00 5,185
1" 4,218 1.60 6,749
1 1/2" 1,101 3.60 3,964
2" 1,226 8.00 9,808
3" 261 28.40 7,412
4" 131 50.10 6,563
6" 50 110.50 5,525
8" 2 110.50 221
10" 1 110.50 111
Total 41,873 75,235
FOG Customers 830 830
Costs allocated to each cost component were divided by the number of units to determine a unit cost (Table 88).

Table 88. Cost of Service Unit Cost
Rate Revenue Requirement Cost Category Units Annual Unit Cost Monthly Cost Service Costs $314,235 ÷ 41873 = $7.50 ÷ 12 $0.63
Fixed Costs $7,833,352 ÷ 75235 $104.12 ÷ 12 $8.68
FOG Costs $774,727 ÷ 830 $933.41 ÷ 12 $77.78
Sewer Rate Calculation
The proposed sewer rates will be billed monthly. To determine these rates the Fixed cost category is multiplied by the meter ratio and then added to the customer service related costs. Table 89 presents the rate calculation and resulting monthly fixed charges for all customers. 17 Meter equivalents for sewer rates were developed based on average winter water use ratios for each meter size which reflects sewer flow differences under each meter size. See Table 19 for winter water use averages.

City Council 8 – 77 1/20/2026
60 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 89. Monthly Sewer Rate Calculation
Meter Size Fixed Cost Meter Ratio
Monthly
Fixed
Montly
Service Monthly Rate
5/8" X 3/4" $8.68 x 1.00 = $8.68 + $0.63 = $9.30
3/4" $8.68 x 1.00 = $8.68 + $0.63 = $9.30
1" $8.68 x 1.60 = $13.88 + $0.63 = $14.51
1 1/2" $8.68 x 3.60 = $31.24 + $0.63 = $31.86
2" $8.68 x 8.00 = $69.41 + $0.63 = $70.04
3" $8.68 x 28.40 = $246.41 + $0.63 = $247.04
4" $8.68 x 50.10 = $434.69 + $0.63 = $435.32
6" $8.68 x 110.50 = $958.75 + $0.63 = $959.38
8" $8.68 x 110.50 = $958.75 + $0.63 = $959.38
10" $8.68 x 110.50 = $958.75 + $0.63 = $959.38
Table 90 shows the proposed five year rate schedule based on the revenue adjustments for monthly sewer service.

Table 90. Proposed Variable Sewer Rates 2026 to 2030
1-May 1-Jul 1-Jul 1-Jul 1-Jul
2026 2027 2028 2029 2030
Revenue Adjustment 13.5% 13.5% 10.0% 10.0% 10.0%
Meter Size 2026 2027 2028 2029 2030
5/8" X 3/4" $10.56 $11.98 $13.18 $14.50 $15.95
3/4" $10.56 $11.98 $13.18 $14.50 $15.95
1" $16.47 $18.69 $20.56 $22.61 $24.88
1 1/2" $36.16 $41.04 $45.15 $49.66 $54.63
2" $79.49 $90.22 $99.25 $109.17 $120.09
3" $280.39 $318.24 $350.06 $385.07 $423.58
4" $494.09 $560.79 $616.87 $678.55 $746.41
6" $1,088.89 $1,235.89 $1,359.48 $1,495.43 $1,644.98
8" $1,088.89 $1,235.89 $1,359.48 $1,495.43 $1,644.98
10" $1,088.89 $1,235.89 $1,359.48 $1,495.43 $1,644.98
FOG Rates
In future years, the FOG rates will be escalated by the proposed revenue adjustments and the five-year rate schedule shown in Table 91.

City Council 8 – 78 1/20/2026
61 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 91. Proposed Variable Sewer Rates 2026 to 203018
1-May 1-Jul 1-Jul 1-Jul 1-Jul
2026 2027 2028 2029 2030
Revenue Adjustment 13.5% 13.5% 10.0% 10.0% 10.0%
Fog Rates 2026 2027 2028 2029 2030
Fog Unit $88.28 $100.20 $110.22 $121.25 $133.37
18 FOG Costs and unit rates were identified in Table 94, this are escalated based on the revenue adjustments City Council 8 – 79 1/20/2026
62 City of Santa Ana – 2026 Water and Sewer Rate Study

CONCLUSION

5.1 Summary of Recommendations and Financial Results
Recommendations:

Water
• Adjusting rates annually by the recommended revenue adjustments of 9.0 percent in May 2026, followed by 9.0 percent annual adjustments July 2027 through July 2029, with a final adjustment of 8.0 percent in July 2030
• Combining all customers into a single customer class
• Introducing monthly billing
• Adjusting tier widths to reflect current water supply ratios Sewer
• Adjusting rates annually by the recommended revenue adjustment of 13.5 percent in May 2026, followed by a 13.5 percent annual adjustment July 2027, and then 10.0 adjustments July 2028 through July 2030
• Introducing monthly billing
• Combining all customers into a single customer class
• Adjusting charges to reflect actual water use ratios
The following figures summarize the recommendations of this report:

Figure 12 shows the status quo water financial plan used for this study.

City Council 8 – 80 1/20/2026
63 City of Santa Ana – 2026 Water and Sewer Rate Study
Figure 12. Rate Study Water Status Quo Financial Plan
Figure 13 shows the City’s water utility ending cash balances with no adjustments to the revenue requirements.

Figure 13. Ending Water Cash Balances with No Revenue Adjustment City Council 8 – 81 1/20/2026
64 City of Santa Ana – 2026 Water and Sewer Rate Study
Figure 14 shows the City’s water utility debt service coverage ratio with no adjustments to the revenue requirements.

Figure 14. Water Debt Service Coverage Ratio with No Revenue Adjustment Figure 15 shows the recommended annual water revenue adjustments for each year of the rate setting period. Note that the first revenue adjustment occurs on May 2026, then the following adjustments will occur at the beginning of each respective fiscal year, July 1, 2027 through July 1, 2030.

City Council 8 – 82 1/20/2026
65 City of Santa Ana – 2026 Water and Sewer Rate Study
Figure 15. Recommended Water Revenue Adjustment
Figure 16 shows the proposed financial plan with revenue adjustments used for this study.

Figure 16. Recommended Rate Study Adjusted Water Financial Plan City Council 8 – 83 1/20/2026
66 City of Santa Ana – 2026 Water and Sewer Rate Study
Table 92 and Table 93 show the proposed fixed rates and variable rates based on the proposed revenue adjustments and cost of service analysis for each year of the rate setting period, respectively.

Table 92. Proposed Fixed Rates for 2026 to 2030
Table 93. Proposed Variable and MWD Variable Rates for 2026 to 2030 Tier 2026 2027 2028 2029 2030
Tier 1 $3.16 $3.44 $3.75 $4.09 $4.42
Tier 2 $5.12 $5.58 $6.08 $6.63 $7.16
Recycled $3.60 $3.92 $4.28 $4.66 $5.03
Variable Charges per hcf Meter Size 2026 2027 2028 2029 2030 5/8" X 3/4" $26.71 $29.11 $31.73 $34.59 $37.36
3/4" $39.10 $42.62 $46.45 $50.63 $54.68
1" $63.87 $69.62 $75.89 $82.72 $89.33
1 1/2" $125.81 $137.13 $149.48 $162.93 $175.96
2" $200.14 $218.15 $237.78 $259.18 $279.92
3" $435.50 $474.70 $517.42 $563.99 $609.11
4" $782.36 $852.77 $929.52 $1,013.18 $1,094.23
6" $1,612.34 $1,757.45 $1,915.62 $2,088.02 $2,255.07
8" $2,974.99 $3,242.74 $3,534.58 $3,852.69 $4,160.91
10" $5,204.78 $5,673.21 $6,183.79 $6,740.34 $7,279.56
Meter Size 2026 2027 2028 2029 2030
2" $3.90 $4.25 $4.63 $5.05 $5.45
3" $7.63 $8.32 $9.07 $9.88 $10.67
4" $14.07 $15.34 $16.72 $18.23 $19.69
6" $37.20 $40.55 $44.20 $48.17 $52.03
8" $77.08 $84.02 $91.58 $99.83 $107.81
10" $137.08 $149.42 $162.87 $177.52 $191.72
12" $220.23 $240.05 $261.66 $285.21 $308.02
Retail Fixed Charges
Fire Line Fixed Charges City Council 8 – 84 1/20/2026
67 City of Santa Ana – 2026 Water and Sewer Rate Study
Figure 17 shows the City’s ending cash balances after revenue and rate adjustments are made.

Figure 17. Ending Water Cash Balances with Recommended Revenue Adjustments Figure 20 shows the City’s debt service coverage ratios after revenue and rate adjustments are made.

Figure 18. Water Debt Service Coverage Ratios with Recommended Revenue Adjustments City Council 8 – 85 1/20/2026
68 City of Santa Ana – 2026 Water and Sewer Rate Study
Figure 19 shows the status quo sewer financial plan used for this study.

Figure 19. Rate Study Sewer Status Quo Financial Plan
City Council 8 – 86 1/20/2026
69 City of Santa Ana – 2026 Water and Sewer Rate Study
Figure 20 shows the City’s sewer utility ending cash balances with no adjustments to the revenue requirements.

Figure 20. Ending Sewer Cash Balances with No Revenue Adjustment Figure 21 shows the City’s sewer debt service coverage ratios without revenue and rate adjustments are made.

City Council 8 – 87 1/20/2026
70 City of Santa Ana – 2026 Water and Sewer Rate Study
Figure 21. Sewer Debt Service Coverage Ratios without Recommended Revenue Adjustments Figure 22 shows the recommended annual sewer revenue adjustments for each year of the rate setting period. Note that the first revenue adjustment occurs on May 2026, then the following adjustments will occur at the beginning of each respective fiscal year, July 1, 2027 through July 1, 2030.

City Council 8 – 88 1/20/2026
71 City of Santa Ana – 2026 Water and Sewer Rate Study
Figure 22. Recommended Sewer Revenue Adjustment
Table 94 shows the resulting Sewer rates based on the proposed revenue adjustments and cost of service analysis for each year of the rate setting period, respectively.

Table 94. Proposed Sewer Rates Based on the Proposed Revenue Adjustment Figure 23 shows the proposed financial plan with revenue adjustments used for this study.

Meter Size 2026 2027 2028 2029 2030
5/8" X 3/4" $10.56 $11.98 $13.18 $14.50 $15.95
3/4" $10.56 $11.98 $13.18 $14.50 $15.95
1" $16.47 $18.69 $20.56 $22.61 $24.88
1 1/2" $36.16 $41.04 $45.15 $49.66 $54.63
2" $79.49 $90.22 $99.25 $109.17 $120.09
3" $280.39 $318.24 $350.06 $385.07 $423.58
4" $494.09 $560.79 $616.87 $678.55 $746.41
6" $1,088.89 $1,235.89 $1,359.48 $1,495.43 $1,644.98
8" $1,088.89 $1,235.89 $1,359.48 $1,495.43 $1,644.98
10" $1,088.89 $1,235.89 $1,359.48 $1,495.43 $1,644.98
Sewer Fixed Charges
Unit 2026 2027 2028 2029 2030
Per Charge $88.28 $100.20 $110.22 $121.25 $133.37
FOG Charges
City Council 8 – 89 1/20/2026
72 City of Santa Ana – 2026 Water and Sewer Rate Study
Figure 23. Rate Study Adjusted Sewer Financial Plan
Figure 24 shows the City’s ending cash balances after revenue and rate adjustments are made.

City Council 8 – 90 1/20/2026
73 City of Santa Ana – 2026 Water and Sewer Rate Study
Figure 24. Recommended Ending Sewer Cash Balances with Revenue Adjustment Figure 25 shows the City’s sewer debt service coverage ratios with revenue and rate adjustments are made.

City Council 8 – 91 1/20/2026
74 City of Santa Ana – 2026 Water and Sewer Rate Study
Figure 25. Sewer Debt Service Coverage Ratios with Recommended Revenue Adjustments .

City Council 8 – 92 1/20/2026
75 City of Santa Ana – 2026 Water and Sewer Rate Study

5.2 Rate Impacts and Comparison
Figure 26 and Figure 27 show current and proposed rates for an average residential customer compared to the rates of other utilities in the surrounding area.

Figure 26. Single Family Residential 5/8” x 3/4" Water Rate Comparison at 12 ccf a Month City Council 8 – 93 1/20/2026
76 City of Santa Ana – 2026 Water and Sewer Rate Study
Figure 27. Single Family Residential 5/8” x 3/4" Sewer Rate Comparison at 12 ccf a Month City Council 8 – 94 1/20/2026
77 City of Santa Ana – 2026 Water and Sewer Rate Study

APPENDIX
Water Operating Expenses
Inflation Factor FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 FY 2036 Total Operating Expense $73,493,080 $76,476,623 $79,581,992 $82,770,189 $86,099,883 $89,367,767 $92,728,916 $96,224,023 $99,858,703 $103,638,819 $107,570,492 61000 Salaries Regular Payroll $2,037,860 $2,121,208 $2,207,966 $2,298,272 $2,392,271 $2,490,115 $2,591,961 $2,697,972 $2,808,319 $2,923,179 $3,042,737 61010 Salaries Cash Out/Separation Payroll $8,910 $9,274 $9,654 $10,049 $10,460 $10,887 $11,333 $11,796 $12,279 $12,781 $13,304 61020 Salaries Part-Time Payroll $125,570 $130,706 $136,052 $141,616 $147,408 $153,437 $159,713 $166,245 $173,045 $180,122 $187,489 61040 Salaries Overtime Payroll $385,000 $400,747 $417,137 $434,198 $451,957 $470,442 $489,683 $509,711 $530,558 $552,258 $574,845 61100 Retirement-Employer Normal Cost Other Employee $191,240 $199,062 $207,203 $215,678 $224,499 $233,681 $243,239 $253,187 $263,543 $274,321 $285,541 61102 Retirement- Employer Unfunded- Miscellaneous Other Employee $235,480 $245,111 $255,136 $265,571 $276,433 $287,739 $299,508 $311,758 $324,509 $337,781 $351,596 61110 Part-Time Retirement Other Employee $7,020 $7,307 $7,606 $7,917 $8,241 $8,578 $8,929 $9,294 $9,674 $10,070 $10,482 61120 Medicare Insurance Other Employee $29,480 $30,686 $31,941 $33,247 $34,607 $36,022 $37,496 $39,029 $40,626 $42,287 $44,017 61130 Health Insurance Other Employee $479,230 $498,831 $519,233 $540,469 $562,574 $585,584 $609,534 $634,464 $660,414 $687,425 $715,540 61170 Retiree Health Benefits Other Employee $19,900 $20,714 $21,561 $22,443 $23,361 $24,316 $25,311 $26,346 $27,424 $28,545 $29,713 61180 Worker Compensation InsuranceOther Employee $90,770 $94,482 $98,347 $102,369 $106,556 $110,914 $115,451 $120,173 $125,088 $130,204 $135,529 62000 Utilities Utilities $3,240,000 $3,492,539 $3,764,761 $4,058,202 $4,374,514 $4,562,338 $4,758,227 $4,962,526 $5,175,597 $5,397,816 $5,629,577 62010 Communications Overall $25,000 $25,840 $26,708 $27,606 $28,533 $29,492 $30,483 $31,507 $32,566 $33,660 $34,791 62120 Training, Transportation, Meetings Overall $27,510 $28,434 $29,390 $30,377 $31,398 $32,453 $33,543 $34,670 $35,835 $37,039 $38,284 62140 Membership, Subscription & Dues Overall $75,000 $77,520 $80,125 $82,817 $85,600 $88,476 $91,448 $94,521 $97,697 $100,980 $104,373 62251 Other Agency Services Overall $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 62300 Contract Services-Professional OCWD $23,482,100 $24,257,009 $25,057,491 $25,884,388 $26,738,573 $27,620,945 $28,532,437 $29,474,007 $30,446,649 $31,451,389 $32,489,285 62321 Maintenance & Repair Improveme Construction $20,000 $21,027 $22,106 $22,978 $23,883 $24,824 $25,803 $26,820 $27,876 $28,975 $30,117 62322 Maintenance & Repair MachineryOverall $5,000 $5,168 $5,342 $5,521 $5,707 $5,898 $6,097 $6,301 $6,513 $6,732 $6,958 63001 Miscellaneous Operating Expenses MWD $9,719,350 $10,263,634 $10,838,397 $11,445,347 $12,086,287 $12,763,119 $13,477,853 $14,232,613 $15,029,640 $15,871,299 $16,760,092 63300 Gas & Diesel Fuel/Automobile $70,360 $72,680 $75,077 $77,552 $80,110 $82,751 $85,480 $88,299 $91,210 $94,218 $97,325 63302 Alternative Fuel-Propane Fuel/Automobile $30,000 $30,989 $32,011 $33,067 $34,157 $35,283 $36,447 $37,649 $38,890 $40,173 $41,497 65010 Rental City Equipment Overall $149,980 $155,019 $160,228 $165,612 $171,176 $176,928 $182,872 $189,017 $195,368 $201,932 $208,717 65011 Equipment Replacement Charges Overall $109,010 $112,673 $116,459 $120,372 $124,416 $128,596 $132,917 $137,383 $141,999 $146,771 $151,702 65012 Accident Repair & ReplacementOverall $62,850 $64,962 $67,144 $69,401 $71,732 $74,143 $76,634 $79,209 $81,870 $84,621 $87,464 65020 City Yard Rental Overall $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 65040 IT Maintenance Charge Overall $125,060 $129,262 $133,605 $138,094 $142,734 $147,530 $152,487 $157,611 $162,907 $168,380 $174,038 65055 Communications- Landlines Overall $17,160 $17,737 $18,333 $18,948 $19,585 $20,243 $20,923 $21,626 $22,353 $23,104 $23,880 65100 Insurance Charges Insurance $287,440 $315,062 $342,944 $364,823 $388,098 $404,748 $416,730 $429,065 $441,766 $454,843 $468,307 65105 Benefits Overhead Other Employee $22,490 $23,410 $24,367 $25,364 $26,401 $27,481 $28,605 $29,775 $30,993 $32,260 $33,580 65240 Public Works Administrative Charge Overall $288,270 $297,956 $307,967 $318,315 $329,010 $340,065 $351,491 $363,301 $375,508 $388,125 $401,166 65400 Indirect Costs Overall $1,139,590 $1,177,880 $1,217,457 $1,258,364 $1,300,645 $1,344,346 $1,389,516 $1,436,204 $1,484,460 $1,534,338 $1,585,892 66400 Machinery & Equipment Overall $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 66511 Computer Software Subscriptions Overall $77,660 $80,269 $82,966 $85,754 $88,635 $91,614 $94,692 $97,873 $101,162 $104,561 $108,074 61000 Salaries Regular Payroll $1,467,100 $1,527,104 $1,589,563 $1,654,576 $1,722,248 $1,792,688 $1,866,009 $1,942,329 $2,021,770 $2,104,461 $2,190,533 61020 Salaries Part-Time Payroll $20,430 $21,266 $22,135 $23,041 $23,983 $24,964 $25,985 $27,048 $28,154 $29,306 $30,504 61040 Salaries Overtime Payroll $387,000 $402,828 $419,304 $436,454 $454,304 $472,886 $492,227 $512,359 $533,314 $555,127 $577,831 61100 Retirement-Employer Normal Cost Other Employee $113,760 $118,413 $123,256 $128,297 $133,544 $139,006 $144,692 $150,610 $156,770 $163,181 $169,856 61102 Retirement- Employer Unfunded- Miscellaneous Other Employee $202,080 $210,345 $218,948 $227,903 $237,224 $246,927 $257,026 $267,539 $278,481 $289,871 $301,726 61110 Part-Time Retirement Other Employee $2,280 $2,373 $2,470 $2,571 $2,677 $2,786 $2,900 $3,019 $3,142 $3,271 $3,404 61120 Medicare Insurance Other Employee $21,220 $22,088 $22,991 $23,932 $24,910 $25,929 $26,990 $28,094 $29,243 $30,439 $31,684 61130 Health Insurance Insurance $382,920 $419,717 $456,861 $486,008 $517,014 $539,195 $555,156 $571,590 $588,509 $605,930 $623,867 61170 Retiree Health Benefits Other Employee $14,070 $14,645 $15,244 $15,868 $16,517 $17,193 $17,896 $18,628 $19,389 $20,183 $21,008 61180 Worker Compensation InsuranceInsurance $64,720 $70,939 $77,217 $82,144 $87,384 $91,133 $93,831 $96,608 $99,468 $102,413 $105,444 62010 Communications Overall $19,210 $19,855 $20,523 $21,212 $21,925 $22,662 $23,423 $24,210 $25,023 $25,864 $26,733 62120 Training, Transportation, Meetings Overall $20,000 $20,672 $21,367 $22,084 $22,827 $23,594 $24,386 $25,206 $26,053 $26,928 $27,833 62140 Membership, Subscription & Dues Overall $46,000 $47,546 $49,143 $50,794 $52,501 $54,265 $56,088 $57,973 $59,921 $61,934 $64,015 62300 Contract Services-Professional Overall $1,480,500 $1,530,245 $1,581,661 $1,634,805 $1,689,734 $1,746,509 $1,805,192 $1,865,847 $1,928,539 $1,993,338 $2,060,314 62320 Maintenance & Repair BuildingsConstruction $25,000 $26,284 $27,633 $28,722 $29,854 $31,030 $32,253 $33,524 $34,846 $36,219 $37,646 62322 Maintenance & Repair MachineryOverall $33,000 $34,109 $35,255 $36,439 $37,664 $38,929 $40,237 $41,589 $42,987 $44,431 $45,924 63001 Miscellaneous Operating Expenses Overall $1,313,400 $1,357,530 $1,403,143 $1,450,289 $1,499,019 $1,549,386 $1,601,445 $1,655,254 $1,710,870 $1,768,355 $1,827,772 63300 Gas & Diesel Fuel/Automobile $101,360 $104,702 $108,155 $111,721 $115,405 $119,211 $123,142 $127,202 $131,397 $135,730 $140,205 65010 Rental City Equipment Overall $282,840 $292,343 $302,166 $312,319 $322,813 $333,659 $344,870 $356,458 $368,435 $380,814 $393,610 65011 Equipment Replacement Charges Overall $271,440 $280,560 $289,987 $299,731 $309,802 $320,211 $330,970 $342,091 $353,585 $365,465 $377,745 65012 Accident Repair & ReplacementOverall $81,340 $84,073 $86,898 $89,818 $92,836 $95,955 $99,179 $102,511 $105,956 $109,516 $113,196 65020 City Yard Rental Overall $650,510 $672,367 $694,959 $718,309 $742,444 $767,391 $793,175 $819,826 $847,372 $875,843 $905,272 65040 IT Maintenance Charge Overall $104,470 $107,980 $111,608 $115,358 $119,234 $123,241 $127,382 $131,662 $136,085 $140,658 $145,384 65055 Communications- Landlines Overall $14,340 $14,822 $15,320 $15,835 $16,367 $16,917 $17,485 $18,072 $18,680 $19,307 $19,956 65100 Insurance Charges Insurance $210,420 $230,641 $251,052 $267,068 $284,107 $296,295 $305,066 $314,097 $323,394 $332,967 $342,824 65105 Benefits Overhead Other Employee $18,790 $19,559 $20,358 $21,191 $22,058 $22,960 $23,899 $24,877 $25,894 $26,953 $28,055 65240 Public Works Administrative ChOverall $389,730 $402,825 $416,360 $430,350 $444,809 $459,755 $475,203 $491,169 $507,673 $524,731 $542,361 65400 Indirect Costs Overall $357,410 $369,419 $381,831 $394,661 $407,922 $421,628 $435,794 $450,437 $465,572 $481,215 $497,384 66400 Machinery & Equipment Overall $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 62000 Utilities Utilities $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 62251 Other Agency Services Overall $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 65240 Public Works Administrative ChOverall $40 $41 $43 $44 $46 $47 $49 $50 $52 $54 $56 65500 General Fund Overhead Overall $1,678,600 $1,735,001 $1,793,297 $1,853,552 $1,915,831 $1,980,203 $2,046,738 $2,115,508 $2,186,589 $2,260,059 $2,335,997 61000 Salaries Regular Payroll $542,960 $565,167 $588,282 $612,343 $637,388 $663,457 $690,593 $718,838 $748,238 $778,841 $810,696 61010 Salaries Cash Out/Separation Payroll $6,250 $6,506 $6,772 $7,049 $7,337 $7,637 $7,949 $8,275 $8,613 $8,965 $9,332 61020 Salaries Part-Time Payroll $68,220 $71,010 $73,915 $76,938 $80,084 $83,360 $86,769 $90,318 $94,012 $97,857 $101,860 61040 Salaries Overtime Payroll $120,000 $124,908 $130,017 $135,334 $140,870 $146,631 $152,628 $158,871 $165,369 $172,132 $179,172 61100 Retirement-Employer Normal Cost Other Employee $39,220 $40,824 $42,494 $44,232 $46,041 $47,924 $49,884 $51,924 $54,048 $56,259 $58,560 61102 Retirement- Employer Unfunded- Miscellaneous Other Employee $41,740 $43,447 $45,224 $47,074 $48,999 $51,003 $53,089 $55,261 $57,521 $59,873 $62,322 61110 Part-Time Retirement Other Employee $2,560 $2,665 $2,774 $2,887 $3,005 $3,128 $3,256 $3,389 $3,528 $3,672 $3,822 61120 Medicare Insurance Insurance $7,850 $8,604 $9,366 $9,963 $10,599 $11,054 $11,381 $11,718 $12,065 $12,422 $12,789 City Council 8 – 95 1/20/2026
78 City of Santa Ana – 2026 Water and Sewer Rate Study
61130 Health Insurance Insurance $114,270 $125,251 $136,335 $145,033 $154,286 $160,905 $165,668 $170,572 $175,621 $180,820 $186,173 61170 Retiree Health Benefits Other Employee $5,200 $5,413 $5,634 $5,864 $6,104 $6,354 $6,614 $6,884 $7,166 $7,459 $7,764 61180 Worker Compensation InsuranceInsurance $21,860 $23,961 $26,081 $27,745 $29,515 $30,781 $31,693 $32,631 $33,597 $34,591 $35,615 62010 Communications Overall $9,000 $9,302 $9,615 $9,938 $10,272 $10,617 $10,974 $11,343 $11,724 $12,118 $12,525 62120 Training, Transportation, Meetings Overall $6,150 $6,357 $6,570 $6,791 $7,019 $7,255 $7,499 $7,751 $8,011 $8,280 $8,559 62140 Membership, Subscription & Dues Overall $18,900 $19,535 $20,191 $20,870 $21,571 $22,296 $23,045 $23,819 $24,620 $25,447 $26,302 62300 Contract Services-Professional Overall $690,500 $713,701 $737,681 $762,467 $788,086 $814,566 $841,935 $870,224 $899,464 $929,686 $960,923 62322 Maintenance & Repair MachinerYOverall $3,000 $3,101 $3,205 $3,313 $3,424 $3,539 $3,658 $3,781 $3,908 $4,039 $4,175 63001 Miscellaneous Operating Expenses Overall $609,300 $629,772 $650,933 $672,804 $695,410 $718,776 $742,927 $767,889 $793,691 $820,359 $847,923 63300 Gas & Diesel Fuel/Automobile $5,100 $5,268 $5,442 $5,621 $5,807 $5,998 $6,196 $6,400 $6,611 $6,829 $7,055 65010 Rental City Equipment Overall $39,920 $41,261 $42,648 $44,081 $45,562 $47,093 $48,675 $50,310 $52,001 $53,748 $55,554 65011 Equipment Replacement Charges Overall $27,320 $28,238 $29,187 $30,167 $31,181 $32,229 $33,312 $34,431 $35,588 $36,784 $38,019 65012 Accident Repair & ReplacementOverall $4,190 $4,331 $4,476 $4,627 $4,782 $4,943 $5,109 $5,281 $5,458 $5,641 $5,831 65040 IT Maintenance Charge Overall $28,770 $29,737 $30,736 $31,769 $32,836 $33,939 $35,080 $36,258 $37,477 $38,736 $40,037 65055 Communications- Landlines Overall $3,950 $4,083 $4,220 $4,362 $4,508 $4,660 $4,816 $4,978 $5,145 $5,318 $5,497 65100 Insurance Charges Insurance $69,620 $76,310 $83,064 $88,363 $94,000 $98,033 $100,935 $103,923 $106,999 $110,166 $113,427 65105 Benefits Overhead Other Employee $5,170 $5,381 $5,602 $5,831 $6,069 $6,317 $6,576 $6,845 $7,125 $7,416 $7,719 65240 Public Works Administrative ChOverall $185,560 $191,795 $198,239 $204,900 $211,785 $218,901 $226,256 $233,858 $241,715 $249,837 $258,232 65400 Indirect Costs Overall $186,920 $193,201 $199,692 $206,402 $213,337 $220,505 $227,914 $235,572 $243,487 $251,668 $260,124 66400 Machinery & Equipment Overall $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 66511 Computer Software Subscriptions Overall $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 61000 Salaries Regular Payroll $2,587,770 $2,693,610 $2,803,778 $2,918,453 $3,037,818 $3,162,064 $3,291,393 $3,426,011 $3,566,135 $3,711,990 $3,863,810 61010 Salaries Cash Out/Separation Payroll $8,910 $9,274 $9,654 $10,049 $10,460 $10,887 $11,333 $11,796 $12,279 $12,781 $13,304 61020 Salaries Part-Time Payroll $146,300 $152,284 $158,512 $164,995 $171,744 $178,768 $186,079 $193,690 $201,612 $209,858 $218,441 61040 Salaries Overtime Payroll $70,000 $72,863 $75,843 $78,945 $82,174 $85,535 $89,033 $92,675 $96,465 $100,410 $104,517 61100 Retirement-Employer Normal Cost Other Employee $284,420 $296,053 $308,161 $320,765 $333,884 $347,540 $361,755 $376,550 $391,951 $407,982 $424,669 61102 Retirement- Employer Unfunded- Miscellaneous Other Employee $302,060 $314,414 $327,274 $340,659 $354,592 $369,095 $384,191 $399,904 $416,261 $433,286 $451,007 61110 Part-Time Retirement Other Employee $5,280 $5,496 $5,721 $5,955 $6,198 $6,452 $6,716 $6,990 $7,276 $7,574 $7,884 61120 Medicare Insurance Insurance $39,540 $43,340 $47,175 $50,185 $53,386 $55,677 $57,325 $59,022 $60,769 $62,568 $64,420 61130 Health Insurance Insurance $438,140 $480,244 $522,744 $556,094 $591,571 $616,951 $635,214 $654,017 $673,377 $693,310 $713,833 61170 Retiree Health Benefits Other Employee $25,660 $26,709 $27,802 $28,939 $30,123 $31,355 $32,637 $33,972 $35,361 $36,808 $38,313 61180 Worker Compensation InsuranceInsurance $101,560 $111,320 $121,171 $128,901 $137,125 $143,008 $147,241 $151,600 $156,087 $160,708 $165,465 62010 Communications Overall $15,000 $15,504 $16,025 $16,563 $17,120 $17,695 $18,290 $18,904 $19,539 $20,196 $20,875 62120 Training, Transportation, Meetings Overall $30,000 $31,008 $32,050 $33,127 $34,240 $35,390 $36,579 $37,808 $39,079 $40,392 $41,749 62131 SAMA Wellness and Fitness Program Overall $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 62140 Membership, Subscription & Dues Overall $25,000 $25,840 $26,708 $27,606 $28,533 $29,492 $30,483 $31,507 $32,566 $33,660 $34,791 62300 Contract Services-Professional Overall $2,352,300 $2,431,337 $2,513,030 $2,597,468 $2,684,743 $2,774,950 $2,868,189 $2,964,560 $3,064,169 $3,167,125 $3,273,540 62302 Contracted Vendor Personnel Services Overall $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 62322 Maintenance & Repair MachinerYOverall $5,000 $5,168 $5,342 $5,521 $5,707 $5,898 $6,097 $6,301 $6,513 $6,732 $6,958 63001 Miscellaneous Operating Expenses Overall $193,310 $199,805 $206,519 $213,458 $220,630 $228,043 $235,705 $243,625 $251,811 $260,272 $269,017 63300 Gas & Diesel Fuel/Automobile $5,700 $5,888 $6,082 $6,283 $6,490 $6,704 $6,925 $7,153 $7,389 $7,633 $7,884 65000 Building Rental Overall $10,500 $10,853 $11,217 $11,594 $11,984 $12,387 $12,803 $13,233 $13,678 $14,137 $14,612 65010 Rental City Equipment Overall $52,510 $54,274 $56,098 $57,983 $59,931 $61,945 $64,026 $66,177 $68,401 $70,699 $73,075 65011 Equipment Replacement Charges Overall $22,100 $22,843 $23,610 $24,403 $25,223 $26,071 $26,947 $27,852 $28,788 $29,755 $30,755 65012 Accident Repair & ReplacementOverall $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 65040 IT Maintenance Charge Overall $148,380 $153,366 $158,519 $163,845 $169,350 $175,040 $180,922 $187,001 $193,284 $199,778 $206,491 65050 IT Department Specific Overall $208,290 $215,289 $222,522 $229,999 $237,727 $245,715 $253,971 $262,504 $271,324 $280,441 $289,863 65055 Communications- Landlines Overall $20,360 $21,044 $21,751 $22,482 $23,237 $24,018 $24,825 $25,659 $26,521 $27,413 $28,334 65100 Insurance Charges Overall $314,890 $325,470 $336,406 $347,709 $359,392 $371,468 $383,949 $396,850 $410,184 $423,966 $438,212 65105 Benefits Overhead Overall $26,680 $27,576 $28,503 $29,461 $30,451 $31,474 $32,531 $33,624 $34,754 $35,922 $37,129 65240 Public Works Administrative ChOverall $395,620 $408,913 $422,652 $436,853 $451,532 $466,703 $482,384 $498,593 $515,345 $532,661 $550,558 65400 Indirect Costs Overall $3,906,180 $4,037,428 $4,173,085 $4,313,301 $4,458,228 $4,608,024 $4,762,854 $4,922,886 $5,088,295 $5,259,261 $5,435,973 66400 Machinery & Equipment Overall $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 66511 Computer Software Subscriptions Overall $412,890 $426,763 $441,102 $455,923 $471,242 $487,076 $503,442 $520,358 $537,842 $555,913 $574,592 61000 Salaries Regular Payroll $649,380 $675,940 $703,586 $732,362 $762,316 $793,495 $825,948 $859,730 $894,893 $931,494 $969,592 61010 Salaries Cash Out/Separation Payroll $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 61020 Salaries Part-Time Payroll $41,460 $43,156 $44,921 $46,758 $48,670 $50,661 $52,733 $54,890 $57,135 $59,472 $61,904 61040 Salaries Overtime Payroll $100,000 $104,090 $108,347 $112,779 $117,391 $122,193 $127,190 $132,392 $137,807 $143,444 $149,310 61100 Retirement-Employer Normal Cost Other Employee $43,280 $45,050 $46,893 $48,811 $50,807 $52,885 $55,048 $57,299 $59,643 $62,082 $64,622 61102 Retirement- Employer Unfunded- Miscellaneous Other Employee $74,110 $77,141 $80,296 $83,580 $86,999 $90,557 $94,261 $98,116 $102,129 $106,306 $110,654 61110 Part-Time Retirement Other Employee $2,120 $2,207 $2,297 $2,391 $2,489 $2,590 $2,696 $2,807 $2,922 $3,041 $3,165 61120 Medicare Insurance Insurance $9,380 $10,281 $11,191 $11,905 $12,665 $13,208 $13,599 $14,002 $14,416 $14,843 $15,282 61130 Health Insurance Insurance $141,360 $154,944 $168,656 $179,416 $190,863 $199,051 $204,943 $211,010 $217,256 $223,687 $230,309 61170 Retiree Health Benefits Other Employee $6,160 $6,412 $6,674 $6,947 $7,231 $7,527 $7,835 $8,155 $8,489 $8,836 $9,198 61180 Worker Compensation InsuranceInsurance $27,450 $30,088 $32,751 $34,840 $37,063 $38,653 $39,797 $40,975 $42,188 $43,437 $44,722 62010 Communications Overall $9,170 $9,478 $9,797 $10,126 $10,466 $10,818 $11,181 $11,557 $11,945 $12,346 $12,761 62120 Training, Transportation, Meetings Overall $7,000 $7,235 $7,478 $7,730 $7,989 $8,258 $8,535 $8,822 $9,118 $9,425 $9,741 62140 Membership, Subscription & Dues Overall $3,300 $3,411 $3,525 $3,644 $3,766 $3,893 $4,024 $4,159 $4,299 $4,443 $4,592 62300 Contract Services-Professional Overall $2,220,000 $2,294,592 $2,371,690 $2,451,379 $2,533,745 $2,618,879 $2,706,874 $2,797,825 $2,891,831 $2,988,997 $3,089,427 62322 Maintenance & Repair MachineryOverall $3,000 $3,101 $3,205 $3,313 $3,424 $3,539 $3,658 $3,781 $3,908 $4,039 $4,175 63001 Miscellaneous Operating Expenses Overall $379,100 $391,838 $405,004 $418,612 $432,677 $447,215 $462,241 $477,773 $493,826 $510,418 $527,568 63300 Gas & Diesel Fuel/Automobile $17,530 $18,108 $18,705 $19,322 $19,959 $20,617 $21,297 $21,999 $22,725 $23,474 $24,248 65010 Rental City Equipment Overall $52,850 $54,626 $56,461 $58,358 $60,319 $62,346 $64,441 $66,606 $68,844 $71,157 $73,548 65011 Equipment Replacement Charges Overall $50,570 $52,269 $54,025 $55,841 $57,717 $59,656 $61,661 $63,732 $65,874 $68,087 $70,375 65012 Accident Repair & ReplacementOverall $18,680 $19,308 $19,956 $20,627 $21,320 $22,036 $22,777 $23,542 $24,333 $25,151 $25,996 65040 IT Maintenance Charge Overall $48,450 $50,078 $51,761 $53,500 $55,297 $57,155 $59,076 $61,061 $63,112 $65,233 $67,425 65055 Communications- Landlines Overall $6,650 $6,873 $7,104 $7,343 $7,590 $7,845 $8,108 $8,381 $8,662 $8,954 $9,254 65100 Insurance Charges Insurance $85,370 $93,574 $101,855 $108,353 $115,266 $120,211 $123,769 $127,433 $131,205 $135,089 $139,088 65105 Benefits Overhead Other Employee $8,710 $9,066 $9,437 $9,823 $10,225 $10,643 $11,078 $11,531 $12,003 $12,494 $13,005 65240 Public Works Administrative ChOverall $49,170 $50,822 $52,530 $54,295 $56,119 $58,005 $59,954 $61,968 $64,050 $66,202 $68,427 65400 Indirect Costs Overall $190,260 $196,653 $203,260 $210,090 $217,149 $224,445 $231,986 $239,781 $247,838 $256,165 $264,772 66400 Machinery & Equipment Overall $100,000 $103,360 $106,833 $110,422 $114,133 $117,968 $121,931 $126,028 $130,263 $134,640 $139,163 66511 Computer Software Subscriptions Overall $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 61000 Salaries Regular Payroll $49,650 $51,681 $53,794 $55,995 $58,285 $60,669 $63,150 $65,733 $68,421 $71,220 $74,133 61040 Salaries Overtime Payroll $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 61100 Retirement-Employer Normal Cost Other Employee $5,880 $6,120 $6,371 $6,631 $6,903 $7,185 $7,479 $7,785 $8,103 $8,434 $8,779 61102 Retirement- Employer Unfunded- Miscellaneous Other Employee $11,050 $11,502 $11,972 $12,462 $12,972 $13,502 $14,055 $14,629 $15,228 $15,851 $16,499 61120 Medicare Insurance Insurance $720 $789 $859 $914 $972 $1,014 $1,044 $1,075 $1,107 $1,139 $1,173 61130 Health Insurance Insurance $13,320 $14,600 $15,892 $16,906 $17,985 $18,756 $19,311 $19,883 $20,471 $21,077 $21,701 61170 Retiree Health Benefits Other Employee $490 $510 $531 $553 $575 $599 $623 $649 $675 $703 $732 61180 Worker Compensation InsuranceInsurance $2,150 $2,357 $2,565 $2,729 $2,903 $3,027 $3,117 $3,209 $3,304 $3,402 $3,503 62010 Communications Overall $250 $258 $267 $276 $285 $295 $305 $315 $326 $337 $348 63001 Miscellaneous Operating Expenses Overall $425,250 $439,538 $454,307 $469,572 $485,349 $501,657 $518,513 $535,935 $553,942 $572,554 $591,792 65040 IT Maintenance Charge Overall $3,030 $3,132 $3,237 $3,346 $3,458 $3,574 $3,695 $3,819 $3,947 $4,080 $4,217 65055 Communications- Landlines Overall $420 $434 $449 $464 $479 $495 $512 $529 $547 $565 $584 65100 Insurance Charges Insurance $6,630 $7,267 $7,910 $8,415 $8,952 $9,336 $9,612 $9,897 $10,190 $10,491 $10,802 65105 Benefits Overhead Other Employee $540 $562 $585 $609 $634 $660 $687 $715 $744 $775 $806 65240 Public Works Administrative ChOverall $3,330 $3,442 $3,558 $3,677 $3,801 $3,928 $4,060 $4,197 $4,338 $4,483 $4,634 65400 Indirect Costs Overall $11,740 $12,134 $12,542 $12,964 $13,399 $13,849 $14,315 $14,796 $15,293 $15,807 $16,338 66511 Computer Software Subscriptions Overall $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 68000 Transfer to Fund 057 No Escalation $1,238,000 $1,238,000 $1,238,000 $1,238,000 $1,238,000 $1,238,000 $1,238,000 $1,238,000 $1,238,000 $1,238,000 $1,238,000 City Council 8 – 96 1/20/2026
79 City of Santa Ana – 2026 Water and Sewer Rate Study
Water Operating Cost Allocation
Test Year 2026
Fixed Variable Direct Water
Supply Groundwater Storage
Transmission
and
Distribution
Pumping Treatment Meters Hydrants Customer Recycled Administrative and General Total
O&M Expense
Total $73,493,080 $39,344,290 $0 $0 $20,249,690 $3,240,000 $2,863,500 $4,344,510 $0 $0 $534,450 $2,916,640 $73,493,080 Percent 54% 0% 0% 28% 4% 4% 6% 0% 0% 1% 4% 100%
61000 Salaries Regular $2,037,860 100% 0% 0% 100% 100%
61010 Salaries Cash Out/Separation $8,910 100% 0% 0% 100% 100% 61020 Salaries Part-Time $125,570 100% 0% 0% 100% 100%
61040 Salaries Overtime $385,000 100% 0% 0% 100% 100%
61100 Retirement-Employer Normal Cost $191,240 100% 0% 0% 100% 100% 61102 Retirement- Employer Unfunded- Miscellaneous $235,480 100% 0% 0% 100% 100% 61110 Part-Time Retirement $7,020 100% 0% 0% 100% 100%
61120 Medicare Insurance $29,480 100% 0% 0% 100% 100%
61130 Health Insurance $479,230 100% 0% 0% 100% 100%
61170 Retiree Health Benefits $19,900 100% 0% 0% 100% 100% 61180 Worker Compensation Insurance $90,770 100% 0% 0% 100% 100% 62000 Utilities $3,240,000 100% 0% 0% 0% 100% 100%
62010 Communications $25,000 100% 0% 0% 100% 100%
62120 Training, Transportation, Meetings $27,510 100% 0% 0% 100% 100% 62140 Membership, Subscription & Dues $75,000 100% 0% 0% 100% 100% 62251 Other Agency Services $0 100% 0% 0% 100% 100%
62300 Contract Services-Professional $23,482,100 100% 0% 0% 100% 100% 62321 Maintenance & Repair Improveme $20,000 100% 0% 0% 100% 100% 62322 Maintenance & Repair Machinery $5,000 100% 0% 0% 100% 100% 63001 Miscellaneous Operating Expenses $9,719,350 100% 0% 0% 100% 100% 63300 Gas & Diesel $70,360 100% 0% 0% 100% 100%
63302 Alternative Fuel-Propane $30,000 100% 0% 0% 100% 100% 65010 Rental City Equipment $149,980 100% 0% 0% 100% 100% 65011 Equipment Replacement Charges $109,010 100% 0% 0% 100% 100% 65012 Accident Repair & Replacement $62,850 100% 0% 0% 100% 100% 65020 City Yard Rental $0 100% 0% 0% 100% 100%
65040 IT Maintenance Charge $125,060 100% 0% 0% 100% 100% 65055 Communications- Landlines $17,160 100% 0% 0% 100% 100% 65100 Insurance Charges $287,440 100% 0% 0% 100% 100%
65105 Benefits Overhead $22,490 100% 0% 0% 100% 100%
65240 Public Works Administrative Charge $288,270 100% 0% 0% 100% 100% 65400 Indirect Costs $1,139,590 100% 0% 0% 100% 100%
66400 Machinery & Equipment $0 100% 0% 0% 100% 100%
66511 Computer Software Subscriptions $77,660 100% 0% 0% 100% 100% 61000 Salaries Regular $1,467,100 100% 0% 0% 100% 100%
61020 Salaries Part-Time $20,430 100% 0% 0% 100% 100%
61040 Salaries Overtime $387,000 100% 0% 0% 100% 100%
61100 Retirement-Employer Normal Cost $113,760 100% 0% 0% 100% 100% 61102 Retirement- Employer Unfunded- Miscellaneous $202,080 100% 0% 0% 100% 100% 61110 Part-Time Retirement $2,280 100% 0% 0% 100% 100%
61120 Medicare Insurance $21,220 100% 0% 0% 100% 100%
61130 Health Insurance $382,920 100% 0% 0% 100% 100%
61170 Retiree Health Benefits $14,070 100% 0% 0% 100% 100% 61180 Worker Compensation Insurance $64,720 100% 0% 0% 100% 100% 62010 Communications $19,210 100% 0% 0% 100% 100%
62120 Training, Transportation, Meetings $20,000 100% 0% 0% 100% 100% 62140 Membership, Subscription & Dues $46,000 100% 0% 0% 100% 100% 62300 Contract Services-Professional $1,480,500 100% 0% 0% 100% 100% 62320 Maintenance & Repair Buildings $25,000 100% 0% 0% 100% 100% 62322 Maintenance & Repair Machinery $33,000 100% 0% 0% 100% 100% 63001 Miscellaneous Operating Expenses $1,313,400 100% 0% 0% 100% 100% 63300 Gas & Diesel $101,360 100% 0% 0% 100% 100%
65010 Rental City Equipment $282,840 100% 0% 0% 100% 100% 65011 Equipment Replacement Charges $271,440 100% 0% 0% 100% 100% 65012 Accident Repair & Replacement $81,340 100% 0% 0% 100% 100% 65020 City Yard Rental $650,510 100% 0% 0% 100% 100%
65040 IT Maintenance Charge $104,470 100% 0% 0% 100% 100% 65055 Communications- Landlines $14,340 100% 0% 0% 100% 100% 65100 Insurance Charges $210,420 100% 0% 0% 100% 100%
65105 Benefits Overhead $18,790 100% 0% 0% 100% 100%
65240 Public Works Administrative Ch $389,730 100% 0% 0% 100% 100% 65400 Indirect Costs $357,410 100% 0% 0% 100% 100%
66400 Machinery & Equipment $0 100% 0% 0% 100% 100%
62000 Utilities $0 100% 0% 0% 0% 100% 100%
62251 Other Agency Services $0 100% 0% 0% 100% 100%
65240 Public Works Administrative Ch $40 100% 0% 0% 100% 100% 65500 General Fund Overhead $1,678,600 100% 0% 0% 100% 100% 61000 Salaries Regular $542,960 100% 0% 0% 100% 100%
61010 Salaries Cash Out/Separation $6,250 100% 0% 0% 100% 100% 61020 Salaries Part-Time $68,220 100% 0% 0% 100% 100%
61040 Salaries Overtime $120,000 100% 0% 0% 100% 100%
61100 Retirement-Employer Normal Cost $39,220 100% 0% 0% 100% 100% 61102 Retirement- Employer Unfunded- Miscellaneous $41,740 100% 0% 0% 100% 100% 61110 Part-Time Retirement $2,560 100% 0% 0% 100% 100%
61120 Medicare Insurance $7,850 100% 0% 0% 100% 100%
61130 Health Insurance $114,270 100% 0% 0% 100% 100%
61170 Retiree Health Benefits $5,200 100% 0% 0% 100% 100% 61180 Worker Compensation Insurance $21,860 100% 0% 0% 100% 100% 62010 Communications $9,000 100% 0% 0% 100% 100%
62120 Training, Transportation, Meetings $6,150 100% 0% 0% 100% 100% 62140 Membership, Subscription & Dues $18,900 100% 0% 0% 100% 100% 62300 Contract Services-Professional $690,500 100% 0% 0% 100% 100% 62322 Maintenance & Repair MachinerY $3,000 100% 0% 0% 100% 100% 63001 Miscellaneous Operating Expenses $609,300 100% 0% 0% 100% 100% 63300 Gas & Diesel $5,100 100% 0% 0% 100% 100%
65010 Rental City Equipment $39,920 100% 0% 0% 100% 100% 65011 Equipment Replacement Charges $27,320 100% 0% 0% 100% 100% 65012 Accident Repair & Replacement $4,190 100% 0% 0% 100% 100% 65040 IT Maintenance Charge $28,770 100% 0% 0% 100% 100% 65055 Communications- Landlines $3,950 100% 0% 0% 100% 100% 65100 Insurance Charges $69,620 100% 0% 0% 100% 100%
65105 Benefits Overhead $5,170 100% 0% 0% 100% 100%
65240 Public Works Administrative Ch $185,560 100% 0% 0% 100% 100% 65400 Indirect Costs $186,920 100% 0% 0% 100% 100%
66400 Machinery & Equipment $0 100% 0% 0% 100% 100%
66511 Computer Software Subscriptions $0 100% 0% 0% 100% 100% 61000 Salaries Regular $2,587,770 100% 0% 0% 100% 100%
61010 Salaries Cash Out/Separation $8,910 100% 0% 0% 100% 100% 61020 Salaries Part-Time $146,300 100% 0% 0% 100% 100%
61040 Salaries Overtime $70,000 100% 0% 0% 100% 100%
61100 Retirement-Employer Normal Cost $284,420 100% 0% 0% 100% 100% 61102 Retirement- Employer Unfunded- Miscellaneous $302,060 100% 0% 0% 100% 100% 61110 Part-Time Retirement $5,280 100% 0% 0% 100% 100%
City Council 8 – 97 1/20/2026
80 City of Santa Ana – 2026 Water and Sewer Rate Study
Water Non-Operating Cost Allocation
61120 Medicare Insurance $39,540 100% 0% 0% 100% 100%
61130 Health Insurance $438,140 100% 0% 0% 100% 100%
61170 Retiree Health Benefits $25,660 100% 0% 0% 100% 100% 61180 Worker Compensation Insurance $101,560 100% 0% 0% 100% 100% 62010 Communications $15,000 100% 0% 0% 100% 100%
62120 Training, Transportation, Meetings $30,000 100% 0% 0% 100% 100% 62131 SAMA Wellness and Fitness Program $0 100% 0% 0% 100% 100% 62140 Membership, Subscription & Dues $25,000 100% 0% 0% 100% 100% 62300 Contract Services-Professional $2,352,300 100% 0% 0% 100% 100% 62302 Contracted Vendor Personnel Services $0 100% 0% 0% 100% 100% 62322 Maintenance & Repair MachinerY $5,000 100% 0% 0% 100% 100% 63001 Miscellaneous Operating Expenses $193,310 100% 0% 0% 100% 100% 63300 Gas & Diesel $5,700 100% 0% 0% 100% 100%
65000 Building Rental $10,500 100% 0% 0% 100% 100%
65010 Rental City Equipment $52,510 100% 0% 0% 100% 100% 65011 Equipment Replacement Charges $22,100 100% 0% 0% 100% 100% 65012 Accident Repair & Replacement $0 100% 0% 0% 100% 100% 65040 IT Maintenance Charge $148,380 100% 0% 0% 100% 100% 65050 IT Department Specific $208,290 100% 0% 0% 100% 100% 65055 Communications- Landlines $20,360 100% 0% 0% 100% 100% 65100 Insurance Charges $314,890 100% 0% 0% 100% 100%
65105 Benefits Overhead $26,680 100% 0% 0% 100% 100%
65240 Public Works Administrative Ch $395,620 100% 0% 0% 100% 100% 65400 Indirect Costs $3,906,180 100% 0% 0% 100% 100%
66400 Machinery & Equipment $0 100% 0% 0% 100% 100%
66511 Computer Software Subscriptions $412,890 100% 0% 0% 100% 100% 61000 Salaries Regular $649,380 100% 0% 0% 100% 100%
61010 Salaries Cash Out/Separation $0 100% 0% 0% 100% 100% 61020 Salaries Part-Time $41,460 100% 0% 0% 100% 100%
61040 Salaries Overtime $100,000 100% 0% 0% 100% 100%
61100 Retirement-Employer Normal Cost $43,280 100% 0% 0% 100% 100% 61102 Retirement- Employer Unfunded- Miscellaneous $74,110 100% 0% 0% 100% 100% 61110 Part-Time Retirement $2,120 100% 0% 0% 100% 100%
61120 Medicare Insurance $9,380 100% 0% 0% 100% 100%
61130 Health Insurance $141,360 100% 0% 0% 100% 100%
61170 Retiree Health Benefits $6,160 100% 0% 0% 100% 100% 61180 Worker Compensation Insurance $27,450 100% 0% 0% 100% 100% 62010 Communications $9,170 100% 0% 0% 100% 100%
62120 Training, Transportation, Meetings $7,000 100% 0% 0% 100% 100% 62140 Membership, Subscription & Dues $3,300 100% 0% 0% 100% 100% 62300 Contract Services-Professional $2,220,000 100% 0% 0% 100% 100% 62322 Maintenance & Repair Machinery $3,000 100% 0% 0% 100% 100% 63001 Miscellaneous Operating Expenses $379,100 100% 0% 0% 100% 100% 63300 Gas & Diesel $17,530 100% 0% 0% 100% 100%
65010 Rental City Equipment $52,850 100% 0% 0% 100% 100% 65011 Equipment Replacement Charges $50,570 100% 0% 0% 100% 100% 65012 Accident Repair & Replacement $18,680 100% 0% 0% 100% 100% 65040 IT Maintenance Charge $48,450 100% 0% 0% 100% 100% 65055 Communications- Landlines $6,650 100% 0% 0% 100% 100% 65100 Insurance Charges $85,370 100% 0% 0% 100% 100%
65105 Benefits Overhead $8,710 100% 0% 0% 100% 100%
65240 Public Works Administrative Ch $49,170 100% 0% 0% 100% 100% 65400 Indirect Costs $190,260 100% 0% 0% 100% 100%
66400 Machinery & Equipment $100,000 100% 0% 0% 100% 100% 66511 Computer Software Subscriptions $0 100% 0% 0% 100% 100% 61000 Salaries Regular $49,650 100% 0% 0% 100% 100%
61040 Salaries Overtime $0 100% 0% 0% 100% 100%
61100 Retirement-Employer Normal Cost $5,880 100% 0% 0% 100% 100% 61102 Retirement- Employer Unfunded- Miscellaneous $11,050 100% 0% 0% 100% 100% 61120 Medicare Insurance $720 100% 0% 0% 100% 100%
61130 Health Insurance $13,320 100% 0% 0% 100% 100%
61170 Retiree Health Benefits $490 100% 0% 0% 100% 100% 61180 Worker Compensation Insurance $2,150 100% 0% 0% 100% 100% 62010 Communications $250 100% 0% 0% 100% 100%
63001 Miscellaneous Operating Expenses $425,250 100% 0% 0% 100% 100% 65040 IT Maintenance Charge $3,030 100% 0% 0% 100% 100% 65055 Communications- Landlines $420 100% 0% 0% 100% 100% 65100 Insurance Charges $6,630 100% 0% 0% 100% 100%
65105 Benefits Overhead $540 100% 0% 0% 100% 100%
65240 Public Works Administrative Ch $3,330 100% 0% 0% 100% 100% 65400 Indirect Costs $11,740 100% 0% 0% 100% 100%
66511 Computer Software Subscriptions $0 100% 0% 0% 100% 100% 68000 Transfer to Fund 057 $1,238,000 100% 0% 0% 100% 100% Test Year 2026
Fixed Variable Direct Water
Supply Groundwater Storage
Transmission
and
Distribution
Pumping Treatment Meters Hydrants Customer Recycled Administrative and General
Total $107,170,660 $0 $4,149,109 $12,508,635 $66,948,495 $7,499,989 $837,015 $0 $343,206 $70,808 $0 $14,813,403 Percent 0% 4% 12% 62% 7% 1% 0% 0% 0% 0.0000% 14%
RESERVOIR 723 W WALNUT $0.00 100%
RESERVOIR 2736 N CAMBRIDGE ST $0.00 100%
RESERVOIR 1730 S SANTA FE $0.00 100%
RESERVOIR 1727 W ALTON $0.00 100%
RESERVOIR 730 E MEMORY LN $131,787.18 100%
RESERVOIR 2401 BRISTOL ST $2,133,520.53 100%
ELEVATED TANK 14TH & POINSETTI $0.00 100% MWD SA-1 BRISTOL & SANTIAGO $0.00 100% MWD SA-2 1ST & FLOWER $0.00 100% MWD SA-3 MCFADDEN & BRISTOL $0.00 100% MWD SA-4 BRISTOL & WARNER $0.00 100% MWD SA-5 BRISTOL & ALTON $0.00 100% MWD SA-6 TUSTIN & SANTA CLARA $0.00 100% MWD SA-7 REDHILL & WARNER $0.00 100% PRESSURE VAULT 4TH & ELK ST $13,837.28 100%
PRESSURE VAULT GRAND N/O I-5 $13,922.08 100%
PRESSURE VAULT 17TH ST & I-5 $15,399.19 100%
PRESSURE VAULT MEMORY LN & I-5 $15,449.50 100% WELL #16 1011 W 6TH ST $0.00 100% WELL #18 2401 N BRISTOL $0.00 100% City Council 8 – 98 1/20/2026
81 City of Santa Ana – 2026 Water and Sewer Rate Study
WELL #20 & #21 4426 W 1ST ST $0.00 100% 100% WELL #24 RIVERVIEW GOLF COURSE $0.00 100% 100% WELL #26 1736 S SANTA FE ST $0.00 100% 100% WELL #27 730 E MEMORY LN $20,293.16 100% 100% WELL #28 730 E MEMORY LN $20,295.91 100% 100% WELL #29 1ST & FLOWER $76,656.94 100% 100% WELL #30 4426 W 1ST ST $76,501.04 100% 100% WELL #31 PRENTICE PARK ZOO $98,586.02 100% 100% WELL #32 MORRISON PARK $110,792.71 100% 100% WELL #33 921 W WALNUT $0.00 100% 100% WELL #34 1727 ALTON $211,084.25 100% 100% WELL #35 1718 SYDNEY PLACE $320,483.21 100% 100% WELL #36 2415 N BRISTOL ST $126,285.51 100% 100% WELL #37 SE CORNER JEROME PRK $320,490.71 100% 100% WELL #38 2736 N CAMBRIDGE $320,450.28 100% 100% WM SIZE 2" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 20" $0.00 100% 100% WM SIZE 20" $0.00 100% 100% WM SIZE 20" $0.00 100% 100% WM SIZE 20" $0.00 100% 100% WM SIZE 20" $0.00 100% 100% WM SIZE 20" $0.00 100% 100% WM SIZE 20" $0.00 100% 100% WM SIZE 20" $0.00 100% 100% WM SIZE 20" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 20" $0.00 100% 100% WM SIZE 20" $0.00 100% 100% WM SIZE 20" $0.00 100% 100% WM SIZE 20" $0.00 100% 100% WM SIZE 20" $0.00 100% 100% WM SIZE 20" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 18" $0.00 100% 100% WM SIZE 18" $0.00 100% 100% WM SIZE 18" $0.00 100% 100% WM SIZE 24" $0.00 100% 100% WM SIZE 24" $0.00 100% 100% WM SIZE 24" $0.00 100% 100% WM SIZE 24" $0.00 100% 100% WM SIZE 24" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% City Council 8 – 99 1/20/2026
82 City of Santa Ana – 2026 Water and Sewer Rate Study
WM SIZE 14" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 2" $0.00 100% 100% WM SIZE 2" $0.00 100% 100% WM SIZE 2" $0.00 100% 100% WM SIZE 2" $0.00 100% 100% WM SIZE 2" $0.00 100% 100% WM SIZE 2" $0.00 100% 100% WM SIZE 2" $0.00 100% 100% WM SIZE 2" $0.00 100% 100% WM SIZE 2" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% City Council 8 – 100 1/20/2026
83 City of Santa Ana – 2026 Water and Sewer Rate Study
WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 10" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 20" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% City Council 8 – 101 1/20/2026
84 City of Santa Ana – 2026 Water and Sewer Rate Study
WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% City Council 8 – 102 1/20/2026
85 City of Santa Ana – 2026 Water and Sewer Rate Study
WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 14" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 16" $0.00 100% 100% WM SIZE 18" $0.00 100% 100% WM SIZE 18" $0.00 100% 100% WM SIZE 18" $0.00 100% 100% WM SIZE 18" $0.00 100% 100% WM SIZE 18" $0.00 100% 100% WM SIZE 18" $0.00 100% 100% WM SIZE 18" $0.00 100% 100% WM SIZE 18" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% City Council 8 – 103 1/20/2026
86 City of Santa Ana – 2026 Water and Sewer Rate Study
WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% City Council 8 – 104 1/20/2026
87 City of Santa Ana – 2026 Water and Sewer Rate Study
WM SIZE 6" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 8" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 12" $0.00 100% 100% WM SIZE 4" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% WM SIZE 6" $0.00 100% 100% City Council 8 – 105 1/20/2026
88 City of Santa Ana – 2026 Water and Sewer Rate Study
WM SIZE 6" 0.75 100% 100% WM SIZE 6" 0.72 100% 100% WM SIZE 6" 120.68 100% 100% WM SIZE 6" 86.7 100% 100% WM SIZE 6" 86.62 100% 100% WM SIZE 6" 85.05 100% 100% WM SIZE 6" 85.03 100% 100% WM SIZE 6" 71.65 100% 100% WM SIZE 6" 69.87 100% 100% WM SIZE 6" 51.72 100% 100% WM SIZE 6" 50.24 100% 100% WM SIZE 6" 47.21 100% 100% WM SIZE 6" 47.11 100% 100% WM SIZE 6" 46.48 100% 100% WM SIZE 6" 45.51 100% 100% WM SIZE 6" 45.15 100% 100% WM SIZE 6" 43.49 100% 100% WM SIZE 6" 42.92 100% 100% WM SIZE 6" 41.42 100% 100% WM SIZE 6" 38.95 100% 100% WM SIZE 6" 37.27 100% 100% WM SIZE 6" 33.55 100% 100% WM SIZE 6" 23.46 100% 100% WM SIZE 6" 20.21 100% 100% WM SIZE 6" 20.21 100% 100% WM SIZE 6" 19.92 100% 100% WM SIZE 6" 18.62 100% 100% WM SIZE 6" 18.51 100% 100% WM SIZE 6" 18.44 100% 100% WM SIZE 6" 17.32 100% 100% WM SIZE 6" 16.56 100% 100% WM SIZE 6" 16.43 100% 100% WM SIZE 6" 10.12 100% 100% WM SIZE 6" 9.91 100% 100% WM SIZE 6" 9.78 100% 100% WM SIZE 6" 9.57 100% 100% WM SIZE 6" 9.38 100% 100% WM SIZE 6" 8.37 100% 100% WM SIZE 6" 8.3 100% 100% WM SIZE 6" 8.09 100% 100% WM SIZE 6" 7.97 100% 100% WM SIZE 6" 7.94 100% 100% WM SIZE 6" 7.33 100% 100% WM SIZE 6" 5.06 100% 100% WM SIZE 6" 3.39 100% 100% WM SIZE 6" 2.99 100% 100% WM SIZE 6" 2.34 100% 100% WM SIZE 6" 1.86 100% 100% WM SIZE 6" 1.29 100% 100% WM SIZE 6" 1.21 100% 100% WM SIZE 6" 1.08 100% 100% WM SIZE 6" 0.91 100% 100% WM SIZE 6" 0.86 100% 100% WM SIZE 6" 0.79 100% 100% WM SIZE 6" 0.71 100% 100% WM SIZE 6" 0.64 100% 100% WM SIZE 6" 0.54 100% 100% WM SIZE 8" 3.11 100% 100% WM SIZE 8" 70.87 100% 100% WM SIZE 8" 48.43 100% 100% WM SIZE 8" 45.67 100% 100% WM SIZE 8" 42.77 100% 100% WM SIZE 8" 38.04 100% 100% WM SIZE 8" 33.93 100% 100% WM SIZE 8" 33.42 100% 100% WM SIZE 8" 29.3 100% 100% WM SIZE 8" 28.83 100% 100% WM SIZE 8" 28.39 100% 100% WM SIZE 8" 27.96 100% 100% WM SIZE 8" 26.57 100% 100% WM SIZE 8" 26.41 100% 100% WM SIZE 8" 25.61 100% 100% WM SIZE 8" 25.47 100% 100% WM SIZE 8" 25.16 100% 100% WM SIZE 8" 24.24 100% 100% WM SIZE 8" 22.73 100% 100% WM SIZE 8" 22.52 100% 100% WM SIZE 8" 22.21 100% 100% WM SIZE 8" 22.07 100% 100% WM SIZE 8" 21.94 100% 100% WM SIZE 8" 21.66 100% 100% WM SIZE 8" 21.65 100% 100% WM SIZE 8" 21.44 100% 100% WM SIZE 8" 21.43 100% 100% WM SIZE 8" 21.13 100% 100% WM SIZE 8" 21.13 100% 100% WM SIZE 8" 21.13 100% 100% WM SIZE 8" 20.03 100% 100% WM SIZE 8" 17.02 100% 100% WM SIZE 8" 14.45 100% 100% WM SIZE 8" 14.27 100% 100% WM SIZE 8" 13.94 100% 100% WM SIZE 8" 13.75 100% 100% WM SIZE 8" 13.28 100% 100% WM SIZE 8" 11.54 100% 100% WM SIZE 8" 10.87 100% 100% WM SIZE 8" 8.21 100% 100% WM SIZE 8" 8.08 100% 100% WM SIZE 8" 7.21 100% 100% WM SIZE 8" 6.77 100% 100% WM SIZE 8" 5.61 100% 100% WM SIZE 8" 5.39 100% 100% WM SIZE 8" 5.38 100% 100% WM SIZE 8" 5.04 100% 100% WM SIZE 8" 4.93 100% 100% WM SIZE 8" 3.44 100% 100% WM SIZE 8" 2.74 100% 100% WM SIZE 8" 2.67 100% 100% WM SIZE 8" 1.92 100% 100% WM SIZE 8" 1.66 100% 100% WM SIZE 8" 1.11 100% 100% WM SIZE 8" 1.08 100% 100% WM SIZE 8" 0.71 100% 100% WM SIZE 8" 0.64 100% 100% WM SIZE 8" 0.51 100% 100% WM SIZE 8" 0.21 100% 100% WM SIZE 10" 39.31 100% 100% WM SIZE 10" 21.03 100% 100% WM SIZE 10" 12.79 100% 100% WM SIZE 10" 8.54 100% 100% WM SIZE 10" 2.08 100% 100% WM SIZE 12" 30.25 100% 100% WM SIZE 12" 60.23 100% 100% WM SIZE 12" 58.98 100% 100% WM SIZE 12" 48.22 100% 100% WM SIZE 12" 37.75 100% 100% WM SIZE 12" 35.21 100% 100% WM SIZE 12" 35.09 100% 100% WM SIZE 12" 32.89 100% 100% WM SIZE 12" 32.75 100% 100% WM SIZE 12" 30.7 100% 100% WM SIZE 12" 29.4 100% 100% City Council 8 – 106 1/20/2026
89 City of Santa Ana – 2026 Water and Sewer Rate Study
WM SIZE 12" 29.15 100% 100% WM SIZE 12" 29.15 100% 100% WM SIZE 12" 28.35 100% 100% WM SIZE 12" 28.13 100% 100% WM SIZE 12" 28.01 100% 100% WM SIZE 12" 27.91 100% 100% WM SIZE 12" 27.88 100% 100% WM SIZE 12" 26.76 100% 100% WM SIZE 12" 26.46 100% 100% WM SIZE 12" 26.43 100% 100% WM SIZE 12" 26.11 100% 100% WM SIZE 12" 25.72 100% 100% WM SIZE 12" 25.65 100% 100% WM SIZE 12" 25.33 100% 100% WM SIZE 12" 25.27 100% 100% WM SIZE 12" 23.97 100% 100% WM SIZE 12" 23.68 100% 100% WM SIZE 12" 22.54 100% 100% WM SIZE 12" 22.19 100% 100% WM SIZE 12" 22.18 100% 100% WM SIZE 12" 21.9 100% 100% WM SIZE 12" 21.28 100% 100% WM SIZE 12" 20.48 100% 100% WM SIZE 12" 20.09 100% 100% WM SIZE 12" 19.29 100% 100% WM SIZE 12" 15.62 100% 100% WM SIZE 12" 12.7 100% 100% WM SIZE 12" 12.69 100% 100% WM SIZE 12" 10.67 100% 100% WM SIZE 12" 10.24 100% 100% WM SIZE 12" 9.44 100% 100% WM SIZE 12" 8.26 100% 100% WM SIZE 12" 4.99 100% 100% WM SIZE 12" 3.24 100% 100% WM SIZE 12" 3.24 100% 100% WM SIZE 12" 2.41 100% 100% WM SIZE 12" 2.04 100% 100% WM SIZE 12" 1.99 100% 100% WM SIZE 12" 1.99 100% 100% WM SIZE 12" 1.98 100% 100% WM SIZE 12" 0.81 100% 100% WM SIZE 12" 0.74 100% 100% WM SIZE 12" 0.7 100% 100% WM SIZE 12" 0.41 100% 100% WM SIZE 12" 0.38 100% 100% WM SIZE 14" 52.23 100% 100% WM SIZE 14" 32.69 100% 100% WM SIZE 14" 25.52 100% 100% WM SIZE 14" 16 100% 100% WM SIZE 14" 12.33 100% 100% WM SIZE 14" 11.78 100% 100% WM SIZE 14" 1.94 100% 100% WM SIZE 4" 186.66 100% 100% WM SIZE 4" 186.15 100% 100% WM SIZE 4" 4.77 100% 100% WM SIZE 6" 3.84 100% 100% WM SIZE 6" 1.64 100% 100% WM SIZE 6" 857.52 100% 100% WM SIZE 6" 840.3 100% 100% WM SIZE 6" 722.06 100% 100% WM SIZE 6" 694.07 100% 100% WM SIZE 6" 687.28 100% 100% WM SIZE 6" 687.01 100% 100% WM SIZE 6" 659.18 100% 100% WM SIZE 6" 589.89 100% 100% WM SIZE 6" 540.78 100% 100% WM SIZE 6" 520.16 100% 100% WM SIZE 6" 379.37 100% 100% WM SIZE 6" 375.38 100% 100% WM SIZE 6" 371.25 100% 100% WM SIZE 6" 365.72 100% 100% WM SIZE 6" 362.21 100% 100% WM SIZE 6" 362.1 100% 100% WM SIZE 6" 358.53 100% 100% WM SIZE 6" 347.83 100% 100% WM SIZE 6" 334.39 100% 100% WM SIZE 6" 329.5 100% 100% WM SIZE 6" 312.71 100% 100% WM SIZE 6" 290.23 100% 100% WM SIZE 6" 255.77 100% 100% WM SIZE 6" 231.74 100% 100% WM SIZE 6" 218.58 100% 100% WM SIZE 6" 204.2 100% 100% WM SIZE 6" 197.94 100% 100% WM SIZE 6" 197.73 100% 100% WM SIZE 6" 190.37 100% 100% WM SIZE 6" 189.88 100% 100% WM SIZE 6" 184.61 100% 100% WM SIZE 6" 171.01 100% 100% WM SIZE 6" 170.89 100% 100% WM SIZE 6" 156.81 100% 100% WM SIZE 6" 154.6 100% 100% WM SIZE 6" 153.62 100% 100% WM SIZE 6" 152.24 100% 100% WM SIZE 6" 146.48 100% 100% WM SIZE 6" 143.85 100% 100% WM SIZE 6" 142.81 100% 100% WM SIZE 6" 142.63 100% 100% WM SIZE 6" 142.54 100% 100% WM SIZE 6" 140.45 100% 100% WM SIZE 6" 132.77 100% 100% WM SIZE 6" 117.4 100% 100% WM SIZE 6" 116.75 100% 100% WM SIZE 6" 110.82 100% 100% WM SIZE 6" 91.94 100% 100% WM SIZE 6" 88.33 100% 100% WM SIZE 6" 85.31 100% 100% WM SIZE 6" 73.52 100% 100% WM SIZE 6" 69.62 100% 100% WM SIZE 6" 65.29 100% 100% WM SIZE 6" 65.29 100% 100% WM SIZE 6" 64.74 100% 100% WM SIZE 6" 54.25 100% 100% WM SIZE 6" 50.47 100% 100% WM SIZE 6" 40.93 100% 100% WM SIZE 6" 36.75 100% 100% WM SIZE 6" 21.61 100% 100% WM SIZE 6" 17.71 100% 100% WM SIZE 6" 14.16 100% 100% WM SIZE 6" 12.78 100% 100% WM SIZE 6" 9.87 100% 100% WM SIZE 6" 8.17 100% 100% WM SIZE 6" 6.96 100% 100% WM SIZE 6" 5.21 100% 100% WM SIZE 6" 3.84 100% 100% WM SIZE 6" 2.19 100% 100% WM SIZE 8" 12.67 100% 100% WM SIZE 8" 1023.09 100% 100% WM SIZE 8" 1022.77 100% 100% WM SIZE 8" 820.76 100% 100% WM SIZE 8" 710.47 100% 100% City Council 8 – 107 1/20/2026
90 City of Santa Ana – 2026 Water and Sewer Rate Study
WM SIZE 8" 562.46 100% 100% WM SIZE 8" 493.6 100% 100% WM SIZE 8" 454.71 100% 100% WM SIZE 8" 405.71 100% 100% WM SIZE 8" 389.85 100% 100% WM SIZE 8" 386.85 100% 100% WM SIZE 8" 369.78 100% 100% WM SIZE 8" 368.13 100% 100% WM SIZE 8" 363.63 100% 100% WM SIZE 8" 352.28 100% 100% WM SIZE 8" 296.15 100% 100% WM SIZE 8" 285.51 100% 100% WM SIZE 8" 280.74 100% 100% WM SIZE 8" 261.97 100% 100% WM SIZE 8" 260.05 100% 100% WM SIZE 8" 259.5 100% 100% WM SIZE 8" 253.51 100% 100% WM SIZE 8" 240.3 100% 100% WM SIZE 8" 226.81 100% 100% WM SIZE 8" 221.7 100% 100% WM SIZE 8" 220.94 100% 100% WM SIZE 8" 219.51 100% 100% WM SIZE 8" 211.56 100% 100% WM SIZE 8" 201.12 100% 100% WM SIZE 8" 201.12 100% 100% WM SIZE 8" 197.06 100% 100% WM SIZE 8" 197.02 100% 100% WM SIZE 8" 195.64 100% 100% WM SIZE 8" 191.63 100% 100% WM SIZE 8" 186.53 100% 100% WM SIZE 8" 174.13 100% 100% WM SIZE 8" 173.14 100% 100% WM SIZE 8" 163.82 100% 100% WM SIZE 8" 163.44 100% 100% WM SIZE 8" 153.62 100% 100% WM SIZE 8" 152.68 100% 100% WM SIZE 8" 147.24 100% 100% WM SIZE 8" 143.46 100% 100% WM SIZE 8" 141.32 100% 100% WM SIZE 8" 124.65 100% 100% WM SIZE 8" 120.04 100% 100% WM SIZE 8" 113.18 100% 100% WM SIZE 8" 110.82 100% 100% WM SIZE 8" 107.26 100% 100% WM SIZE 8" 83 100% 100% WM SIZE 8" 76.8 100% 100% WM SIZE 8" 72.97 100% 100% WM SIZE 8" 72.69 100% 100% WM SIZE 8" 65.84 100% 100% WM SIZE 8" 57.56 100% 100% WM SIZE 8" 50.03 100% 100% WM SIZE 8" 37.42 100% 100% WM SIZE 8" 26.66 100% 100% WM SIZE 8" 25.24 100% 100% WM SIZE 8" 24.69 100% 100% WM SIZE 8" 23.86 100% 100% WM SIZE 8" 16.89 100% 100% WM SIZE 8" 8.22 100% 100% WM SIZE 8" 8.22 100% 100% WM SIZE 8" 6.31 100% 100% WM SIZE 8" 6.13 100% 100% WM SIZE 8" 5.49 100% 100% WM SIZE 8" 4.94 100% 100% WM SIZE 8" 4.39 100% 100% WM SIZE 10" 436.11 100% 100% WM SIZE 10" 431.1 100% 100% WM SIZE 10" 420.27 100% 100% WM SIZE 10" 253.41 100% 100% WM SIZE 10" 18.54 100% 100% WM SIZE 12" 663.11 100% 100% WM SIZE 12" 657.97 100% 100% WM SIZE 12" 511.18 100% 100% WM SIZE 12" 483.95 100% 100% WM SIZE 12" 457.43 100% 100% WM SIZE 12" 316.14 100% 100% WM SIZE 12" 221.69 100% 100% WM SIZE 12" 219.72 100% 100% WM SIZE 12" 212.88 100% 100% WM SIZE 12" 203.07 100% 100% WM SIZE 12" 196.8 100% 100% WM SIZE 12" 172.75 100% 100% WM SIZE 12" 144.33 100% 100% WM SIZE 12" 26.91 100% 100% WM SIZE 16" 236.4 100% 100% WM SIZE 16" 59.47 100% 100% WM SIZE 4" 16.82 100% 100% WM SIZE 6" 1658.11 100% 100% WM SIZE 6" 1369.66 100% 100% WM SIZE 6" 1164.96 100% 100% WM SIZE 6" 1151.63 100% 100% WM SIZE 6" 1119.37 100% 100% WM SIZE 6" 1077.71 100% 100% WM SIZE 6" 1044.58 100% 100% WM SIZE 6" 1039.01 100% 100% WM SIZE 6" 810.69 100% 100% WM SIZE 6" 765.86 100% 100% WM SIZE 6" 721.57 100% 100% WM SIZE 6" 721.14 100% 100% WM SIZE 6" 676.63 100% 100% WM SIZE 6" 523 100% 100% WM SIZE 6" 517.43 100% 100% WM SIZE 6" 432.34 100% 100% WM SIZE 6" 339.41 100% 100% WM SIZE 6" 336.55 100% 100% WM SIZE 6" 335.9 100% 100% WM SIZE 6" 334.71 100% 100% WM SIZE 6" 317.86 100% 100% WM SIZE 6" 314.8 100% 100% WM SIZE 6" 311.64 100% 100% WM SIZE 6" 305.07 100% 100% WM SIZE 6" 293.05 100% 100% WM SIZE 6" 290.86 100% 100% WM SIZE 6" 285.38 100% 100% WM SIZE 6" 267.57 100% 100% WM SIZE 6" 266.81 100% 100% WM SIZE 6" 265.7 100% 100% WM SIZE 6" 263.3 100% 100% WM SIZE 6" 262.22 100% 100% WM SIZE 6" 260.24 100% 100% WM SIZE 6" 245.92 100% 100% City Council 8 – 108 1/20/2026
91 City of Santa Ana – 2026 Water and Sewer Rate Study
WM SIZE 6" 241.65 100% 100% WM SIZE 6" 172.21 100% 100% WM SIZE 6" 170.67 100% 100% WM SIZE 6" 167.29 100% 100% WM SIZE 6" 165.21 100% 100% WM SIZE 6" 157.02 100% 100% WM SIZE 6" 153.08 100% 100% WM SIZE 6" 146.41 100% 100% WM SIZE 6" 129.03 100% 100% WM SIZE 6" 124.65 100% 100% WM SIZE 6" 108.25 100% 100% WM SIZE 6" 102.77 100% 100% WM SIZE 6" 64.62 100% 100% WM SIZE 6" 20.22 100% 100% WM SIZE 6" 15.95 100% 100% WM SIZE 6" 13.87 100% 100% WM SIZE 6" 12.57 100% 100% WM SIZE 8" 380.73 100% 100% WM SIZE 8" 328.36 100% 100% WM SIZE 8" 157.46 100% 100% WM SIZE 8" 78.18 100% 100% WM SIZE 8" 1990.41 100% 100% WM SIZE 8" 1133.04 100% 100% WM SIZE 8" 950.76 100% 100% WM SIZE 8" 934.9 100% 100% WM SIZE 8" 801.39 100% 100% WM SIZE 8" 714.9 100% 100% WM SIZE 8" 671.61 100% 100% WM SIZE 8" 669.53 100% 100% WM SIZE 8" 600.52 100% 100% WM SIZE 8" 567.82 100% 100% WM SIZE 8" 565.53 100% 100% WM SIZE 8" 548.48 100% 100% WM SIZE 8" 529.67 100% 100% WM SIZE 8" 522.67 100% 100% WM SIZE 8" 439.23 100% 100% WM SIZE 8" 437.72 100% 100% WM SIZE 8" 425.45 100% 100% WM SIZE 8" 417.7 100% 100% WM SIZE 8" 392.54 100% 100% WM SIZE 8" 371.76 100% 100% WM SIZE 8" 361.49 100% 100% WM SIZE 8" 348.47 100% 100% WM SIZE 8" 338.85 100% 100% WM SIZE 8" 337.66 100% 100% WM SIZE 8" 336.66 100% 100% WM SIZE 8" 336.01 100% 100% WM SIZE 8" 333.82 100% 100% WM SIZE 8" 332.63 100% 100% WM SIZE 8" 329.88 100% 100% WM SIZE 8" 321.69 100% 100% WM SIZE 8" 321.15 100% 100% WM SIZE 8" 307.26 100% 100% WM SIZE 8" 304.53 100% 100% WM SIZE 8" 300.91 100% 100% WM SIZE 8" 300.7 100% 100% WM SIZE 8" 295.24 100% 100% WM SIZE 8" 294.13 100% 100% WM SIZE 8" 292.94 100% 100% WM SIZE 8" 289.75 100% 100% WM SIZE 8" 283.75 100% 100% WM SIZE 8" 276.86 100% 100% WM SIZE 8" 276.43 100% 100% WM SIZE 8" 262.97 100% 100% WM SIZE 8" 261.33 100% 100% WM SIZE 8" 241.44 100% 100% WM SIZE 8" 216.72 100% 100% WM SIZE 8" 191.02 100% 100% WM SIZE 8" 183.8 100% 100% WM SIZE 8" 180.64 100% 100% WM SIZE 8" 155.27 100% 100% WM SIZE 8" 153.73 100% 100% WM SIZE 8" 145.1 100% 100% WM SIZE 8" 137.33 100% 100% WM SIZE 8" 126.52 100% 100% WM SIZE 8" 95.34 100% 100% WM SIZE 8" 62.86 100% 100% WM SIZE 8" 61.78 100% 100% WM SIZE 8" 53.57 100% 100% WM SIZE 8" 51.5 100% 100% WM SIZE 8" 39.57 100% 100% WM SIZE 8" 35.54 100% 100% WM SIZE 8" 32.25 100% 100% WM SIZE 8" 31.27 100% 100% WM SIZE 8" 28.54 100% 100% WM SIZE 8" 19.03 100% 100% WM SIZE 8" 18.25 100% 100% WM SIZE 8" 15.95 100% 100% WM SIZE 8" 11.03 100% 100% WM SIZE 8" 5.14 100% 100% WM SIZE 8" 4.04 100% 100% WM SIZE 8" 2.06 100% 100% WM SIZE 10" 847.84 100% 100% WM SIZE 10" 700.23 100% 100% WM SIZE 10" 648.5 100% 100% WM SIZE 10" 632.85 100% 100% WM SIZE 10" 611.92 100% 100% WM SIZE 10" 517.28 100% 100% WM SIZE 10" 517.28 100% 100% WM SIZE 10" 509.71 100% 100% WM SIZE 10" 333.09 100% 100% WM SIZE 10" 265.83 100% 100% WM SIZE 10" 261.15 100% 100% WM SIZE 10" 7.57 100% 100% WM SIZE 12" 1680.43 100% 100% WM SIZE 12" 1261.68 100% 100% WM SIZE 12" 850.62 100% 100% WM SIZE 12" 783.49 100% 100% WM SIZE 12" 444.11 100% 100% WM SIZE 12" 109.25 100% 100% WM SIZE 12" 74.43 100% 100% WM SIZE 12" 40.37 100% 100% WM SIZE 12" 18.66 100% 100% WM SIZE 18" 1332.33 100% 100% WM SIZE 18" 755.65 100% 100% WM SIZE 18" 105.8 100% 100% WM SIZE 6" 675.43 100% 100% WM SIZE 6" 615.83 100% 100% WM SIZE 6" 2280.23 100% 100% WM SIZE 6" 1701.28 100% 100% WM SIZE 6" 1183.61 100% 100% WM SIZE 6" 1159.49 100% 100% WM SIZE 6" 1150.53 100% 100% WM SIZE 6" 1143.14 100% 100% WM SIZE 6" 990.16 100% 100% WM SIZE 6" 937.1 100% 100% WM SIZE 6" 784.14 100% 100% WM SIZE 6" 755.35 100% 100% WM SIZE 6" 671.82 100% 100% WM SIZE 6" 546.93 100% 100% WM SIZE 6" 416.88 100% 100% WM SIZE 6" 406.2 100% 100% WM SIZE 6" 246.33 100% 100% WM SIZE 6" 234.96 100% 100% WM SIZE 6" 224.98 100% 100% City Council 8 – 109 1/20/2026
92 City of Santa Ana – 2026 Water and Sewer Rate Study
WM SIZE 6" 205.49 100% 100% WM SIZE 6" 193.12 100% 100% WM SIZE 6" 170.53 100% 100% WM SIZE 6" 125.76 100% 100% WM SIZE 6" 85.79 100% 100% WM SIZE 6" 64.59 100% 100% WM SIZE 6" 63.72 100% 100% WM SIZE 6" 62.17 100% 100% WM SIZE 6" 29.62 100% 100% WM SIZE 6" 22.06 100% 100% WM SIZE 6" 20.16 100% 100% WM SIZE 6" 13.09 100% 100% WM SIZE 6" 11.69 100% 100% WM SIZE 8" 2972.91 100% 100% WM SIZE 8" 2438.22 100% 100% WM SIZE 8" 2426.66 100% 100% WM SIZE 8" 2374.64 100% 100% WM SIZE 8" 2274.03 100% 100% WM SIZE 8" 2168.26 100% 100% WM SIZE 8" 1418.24 100% 100% WM SIZE 8" 1297.84 100% 100% WM SIZE 8" 1240.46 100% 100% WM SIZE 8" 1175.36 100% 100% WM SIZE 8" 1117.11 100% 100% WM SIZE 8" 1111.26 100% 100% WM SIZE 8" 1059.42 100% 100% WM SIZE 8" 1042.7 100% 100% WM SIZE 8" 946.05 100% 100% WM SIZE 8" 845.99 100% 100% WM SIZE 8" 823.25 100% 100% WM SIZE 8" 797.56 100% 100% WM SIZE 8" 782.59 100% 100% WM SIZE 8" 774.32 100% 100% WM SIZE 8" 759.85 100% 100% WM SIZE 8" 739.01 100% 100% WM SIZE 8" 720.04 100% 100% WM SIZE 8" 701.12 100% 100% WM SIZE 8" 698.17 100% 100% WM SIZE 8" 676.98 100% 100% WM SIZE 8" 605.16 100% 100% WM SIZE 8" 596.54 100% 100% WM SIZE 8" 585.52 100% 100% WM SIZE 8" 472.36 100% 100% WM SIZE 8" 465.44 100% 100% WM SIZE 8" 438.25 100% 100% WM SIZE 8" 430.14 100% 100% WM SIZE 8" 425.33 100% 100% WM SIZE 8" 419.8 100% 100% WM SIZE 8" 416.88 100% 100% WM SIZE 8" 385.68 100% 100% WM SIZE 8" 382.42 100% 100% WM SIZE 8" 359.51 100% 100% WM SIZE 8" 341.07 100% 100% WM SIZE 8" 316.97 100% 100% WM SIZE 8" 315.92 100% 100% WM SIZE 8" 281.11 100% 100% WM SIZE 8" 276.48 100% 100% WM SIZE 8" 235.13 100% 100% WM SIZE 8" 221.86 100% 100% WM SIZE 8" 145.39 100% 100% WM SIZE 8" 118.85 100% 100% WM SIZE 8" 93.01 100% 100% WM SIZE 8" 88.21 100% 100% WM SIZE 8" 84.41 100% 100% WM SIZE 8" 74.24 100% 100% WM SIZE 8" 46.68 100% 100% WM SIZE 8" 33.42 100% 100% WM SIZE 8" 24.11 100% 100% WM SIZE 8" 23.96 100% 100% WM SIZE 8" 22.74 100% 100% WM SIZE 8" 17.22 100% 100% WM SIZE 10" 915.5 100% 100% WM SIZE 10" 838.79 100% 100% WM SIZE 10" 108.12 100% 100% WM SIZE 10" 93.62 100% 100% WM SIZE 10" 31.8 100% 100% WM SIZE 10" 31.8 100% 100% WM SIZE 10" 19.87 100% 100% WM SIZE 10" 19.87 100% 100% WM SIZE 10" 5.96 100% 100% WM SIZE 12" 170.73 100% 100% WM SIZE 12" 2697.03 100% 100% WM SIZE 12" 1965.97 100% 100% WM SIZE 12" 1652.91 100% 100% WM SIZE 12" 1493.71 100% 100% WM SIZE 12" 1428.71 100% 100% WM SIZE 12" 1063.59 100% 100% WM SIZE 12" 1014.3 100% 100% WM SIZE 12" 919.07 100% 100% WM SIZE 12" 808.96 100% 100% WM SIZE 12" 772.59 100% 100% WM SIZE 12" 691.89 100% 100% WM SIZE 12" 534.86 100% 100% WM SIZE 12" 25.84 100% 100% WM SIZE 12" 7.96 100% 100% WM SIZE 12" 3.18 100% 100% WM SIZE 14" 4131.59 100% 100% WM SIZE 14" 1546.77 100% 100% WM SIZE 14" 212.27 100% 100% WM SIZE 16" 69.18 100% 100% WM SIZE 16" 45.33 100% 100% WM SIZE 18" 1816.69 100% 100% WM SIZE 4" 605.77 100% 100% WM SIZE 6" 100.56 100% 100% WM SIZE 6" 3457.77 100% 100% WM SIZE 6" 2529.99 100% 100% WM SIZE 6" 2106.43 100% 100% WM SIZE 6" 1626.97 100% 100% WM SIZE 6" 1613.72 100% 100% WM SIZE 6" 1578.43 100% 100% WM SIZE 6" 1516.85 100% 100% WM SIZE 6" 990.31 100% 100% WM SIZE 6" 960.39 100% 100% WM SIZE 6" 847.35 100% 100% WM SIZE 6" 758.06 100% 100% WM SIZE 6" 721.02 100% 100% WM SIZE 6" 681.06 100% 100% WM SIZE 6" 533.65 100% 100% WM SIZE 6" 519.68 100% 100% WM SIZE 6" 392.89 100% 100% WM SIZE 6" 371.56 100% 100% WM SIZE 6" 342.12 100% 100% WM SIZE 6" 283.27 100% 100% WM SIZE 6" 280.81 100% 100% WM SIZE 6" 278.35 100% 100% WM SIZE 6" 264.62 100% 100% WM SIZE 6" 255.06 100% 100% WM SIZE 6" 134.89 100% 100% WM SIZE 6" 114.77 100% 100% WM SIZE 6" 95.89 100% 100% WM SIZE 6" 83.39 100% 100% WM SIZE 6" 79.46 100% 100% WM SIZE 6" 58.85 100% 100% City Council 8 – 110 1/20/2026
93 City of Santa Ana – 2026 Water and Sewer Rate Study
WM SIZE 6" 39.97 100% 100% WM SIZE 6" 39.22 100% 100% WM SIZE 6" 38.02 100% 100% WM SIZE 6" 37.52 100% 100% WM SIZE 6" 36.06 100% 100% WM SIZE 6" 35.31 100% 100% WM SIZE 6" 34.81 100% 100% WM SIZE 6" 34.34 100% 100% WM SIZE 6" 29.43 100% 100% WM SIZE 6" 27.95 100% 100% WM SIZE 6" 23.31 100% 100% WM SIZE 6" 22.06 100% 100% WM SIZE 6" 22.06 100% 100% WM SIZE 6" 22.06 100% 100% WM SIZE 6" 14.47 100% 100% WM SIZE 6" 9.81 100% 100% WM SIZE 6" 9.81 100% 100% WM SIZE 8" 2035.81 100% 100% WM SIZE 8" 2955.52 100% 100% WM SIZE 8" 2943.47 100% 100% WM SIZE 8" 2871.88 100% 100% WM SIZE 8" 2673.72 100% 100% WM SIZE 8" 2090.52 100% 100% WM SIZE 8" 1885.97 100% 100% WM SIZE 8" 1739.31 100% 100% WM SIZE 8" 1704.72 100% 100% WM SIZE 8" 1550.96 100% 100% WM SIZE 8" 1382.97 100% 100% WM SIZE 8" 1307.18 100% 100% WM SIZE 8" 1305.22 100% 100% WM SIZE 8" 1294.92 100% 100% WM SIZE 8" 1231.14 100% 100% WM SIZE 8" 1203.68 100% 100% WM SIZE 8" 1171.06 100% 100% WM SIZE 8" 1135.52 100% 100% WM SIZE 8" 1130.1 100% 100% WM SIZE 8" 1012.89 100% 100% WM SIZE 8" 985.89 100% 100% WM SIZE 8" 915.02 100% 100% WM SIZE 8" 908.64 100% 100% WM SIZE 8" 830.64 100% 100% WM SIZE 8" 828.93 100% 100% WM SIZE 8" 815.43 100% 100% WM SIZE 8" 778.89 100% 100% WM SIZE 8" 774.97 100% 100% WM SIZE 8" 771.56 100% 100% WM SIZE 8" 765.18 100% 100% WM SIZE 8" 758.81 100% 100% WM SIZE 8" 731.1 100% 100% WM SIZE 8" 718.58 100% 100% WM SIZE 8" 699.43 100% 100% WM SIZE 8" 698.96 100% 100% WM SIZE 8" 686.68 100% 100% WM SIZE 8" 684.23 100% 100% WM SIZE 8" 682.77 100% 100% WM SIZE 8" 672.97 100% 100% WM SIZE 8" 661.93 100% 100% WM SIZE 8" 596.18 100% 100% WM SIZE 8" 585.39 100% 100% WM SIZE 8" 572.39 100% 100% WM SIZE 8" 570.43 100% 100% WM SIZE 8" 535.39 100% 100% WM SIZE 8" 534.89 100% 100% WM SIZE 8" 522.39 100% 100% WM SIZE 8" 515.77 100% 100% WM SIZE 8" 498.35 100% 100% WM SIZE 8" 492.46 100% 100% WM SIZE 8" 445.14 100% 100% WM SIZE 8" 435.06 100% 100% WM SIZE 8" 433.6 100% 100% WM SIZE 8" 421.81 100% 100% WM SIZE 8" 402.21 100% 100% WM SIZE 8" 381.6 100% 100% WM SIZE 8" 335.97 100% 100% WM SIZE 8" 331.1 100% 100% WM SIZE 8" 316.13 100% 100% WM SIZE 8" 313.18 100% 100% WM SIZE 8" 307.77 100% 100% WM SIZE 8" 307.77 100% 100% WM SIZE 8" 304.1 100% 100% WM SIZE 8" 293.06 100% 100% WM SIZE 8" 268.06 100% 100% WM SIZE 8" 255.56 100% 100% WM SIZE 8" 253.83 100% 100% WM SIZE 8" 247.22 100% 100% WM SIZE 8" 230.52 100% 100% WM SIZE 8" 154.52 100% 100% WM SIZE 8" 150.81 100% 100% WM SIZE 8" 124.35 100% 100% WM SIZE 8" 106.18 100% 100% WM SIZE 8" 103.02 100% 100% WM SIZE 8" 73.56 100% 100% WM SIZE 8" 61.31 100% 100% WM SIZE 8" 46.6 100% 100% WM SIZE 8" 46.6 100% 100% WM SIZE 8" 44.14 100% 100% WM SIZE 8" 27.22 100% 100% WM SIZE 8" 23.31 100% 100% WM SIZE 8" 20.6 100% 100% WM SIZE 8" 20.35 100% 100% WM SIZE 8" 15.43 100% 100% WM SIZE 10" 3684.97 100% 100% WM SIZE 10" 2110.47 100% 100% WM SIZE 10" 1784.18 100% 100% WM SIZE 10" 1762.68 100% 100% WM SIZE 10" 1513.93 100% 100% WM SIZE 10" 1077.86 100% 100% WM SIZE 10" 1010.22 100% 100% WM SIZE 10" 970.61 100% 100% WM SIZE 10" 820.64 100% 100% WM SIZE 10" 631.06 100% 100% WM SIZE 10" 475.39 100% 100% WM SIZE 12" 101.86 100% 100% WM SIZE 12" 3718.93 100% 100% City Council 8 – 111 1/20/2026
94 City of Santa Ana – 2026 Water and Sewer Rate Study
WM SIZE 12" 2909.89 100% 100% WM SIZE 12" 2457.11 100% 100% WM SIZE 12" 1949.43 100% 100% WM SIZE 12" 1934.72 100% 100% WM SIZE 12" 1836.81 100% 100% WM SIZE 12" 1595.43 100% 100% WM SIZE 12" 1483.1 100% 100% WM SIZE 12" 1358.86 100% 100% WM SIZE 12" 1295.18 100% 100% WM SIZE 12" 1191.9 100% 100% WM SIZE 12" 784.43 100% 100% WM SIZE 12" 410.31 100% 100% WM SIZE 12" 183.93 100% 100% WM SIZE 12" 166.95 100% 100% WM SIZE 12" 79.22 100% 100% WM SIZE 12" 48.94 100% 100% WM SIZE 12" 45.56 100% 100% WM SIZE 12" 11.31 100% 100% WM SIZE 14" 3386.6 100% 100% WM SIZE 14" 2712.18 100% 100% WM SIZE 16" 435.68 100% 100% WM SIZE 16" 3813.1 100% 100% WM SIZE 16" 3642.97 100% 100% WM SIZE 16" 3209.68 100% 100% WM SIZE 16" 391.85 100% 100% WM SIZE 6" 4161.67 100% 100% WM SIZE 6" 182.31 100% 100% WM SIZE 6" 4405.58 100% 100% WM SIZE 6" 4404.61 100% 100% WM SIZE 6" 4049.19 100% 100% WM SIZE 6" 3205.93 100% 100% WM SIZE 6" 3137.06 100% 100% WM SIZE 6" 3091.8 100% 100% WM SIZE 6" 2240.34 100% 100% WM SIZE 6" 2219.68 100% 100% WM SIZE 6" 2206.91 100% 100% WM SIZE 6" 2195.08 100% 100% WM SIZE 6" 2180.35 100% 100% WM SIZE 6" 2172.14 100% 100% WM SIZE 6" 2151.48 100% 100% WM SIZE 6" 1857.7 100% 100% WM SIZE 6" 1535.4 100% 100% WM SIZE 6" 1521.66 100% 100% WM SIZE 6" 1495.1 100% 100% WM SIZE 6" 1459.04 100% 100% WM SIZE 6" 1226.89 100% 100% WM SIZE 6" 1121.96 100% 100% WM SIZE 6" 704.91 100% 100% WM SIZE 6" 409.85 100% 100% WM SIZE 6" 281.96 100% 100% WM SIZE 6" 220.33 100% 100% WM SIZE 6" 209.84 100% 100% WM SIZE 6" 167.21 100% 100% WM SIZE 6" 160.66 100% 100% WM SIZE 6" 101.65 100% 100% WM SIZE 6" 69.17 100% 100% WM SIZE 6" 53.45 100% 100% WM SIZE 6" 52.46 100% 100% WM SIZE 6" 52.46 100% 100% WM SIZE 6" 49.51 100% 100% WM SIZE 6" 38.05 100% 100% WM SIZE 6" 37.68 100% 100% WM SIZE 6" 29.52 100% 100% WM SIZE 6" 27.87 100% 100% WM SIZE 6" 16.4 100% 100% WM SIZE 6" 7.53 100% 100% WM SIZE 8" 3992.83 100% 100% WM SIZE 8" 3950.2 100% 100% WM SIZE 8" 3721.33 100% 100% WM SIZE 8" 2621.64 100% 100% WM SIZE 8" 2618.39 100% 100% WM SIZE 8" 2473.46 100% 100% WM SIZE 8" 2430.16 100% 100% WM SIZE 8" 2324.91 100% 100% WM SIZE 8" 2081.67 100% 100% WM SIZE 8" 1807.89 100% 100% WM SIZE 8" 1695.75 100% 100% WM SIZE 8" 1609.52 100% 100% WM SIZE 8" 1488.85 100% 100% WM SIZE 8" 1154.42 100% 100% WM SIZE 8" 1153.79 100% 100% WM SIZE 8" 1109.21 100% 100% WM SIZE 8" 1099.34 100% 100% WM SIZE 8" 1095.1 100% 100% WM SIZE 8" 1082.28 100% 100% WM SIZE 8" 1011.81 100% 100% WM SIZE 8" 968.52 100% 100% WM SIZE 8" 922.94 100% 100% WM SIZE 8" 626.23 100% 100% WM SIZE 8" 285.24 100% 100% WM SIZE 8" 148.86 100% 100% WM SIZE 8" 141.95 100% 100% WM SIZE 8" 113.12 100% 100% WM SIZE 8" 85.23 100% 100% WM SIZE 8" 47.55 100% 100% WM SIZE 8" 45.91 100% 100% WM SIZE 8" 32.1 100% 100% WM SIZE 8" 26.89 100% 100% WM SIZE 10" 9760.12 100% 100% WM SIZE 10" 2114.77 100% 100% WM SIZE 10" 1152.34 100% 100% WM SIZE 10" 972.27 100% 100% WM SIZE 10" 630.25 100% 100% WM SIZE 10" 492.19 100% 100% WM SIZE 10" 142.26 100% 100% WM SIZE 10" 132.8 100% 100% WM SIZE 12" 7571.92 100% 100% WM SIZE 12" 3055.25 100% 100% WM SIZE 12" 1964.59 100% 100% WM SIZE 12" 1399.77 100% 100% WM SIZE 12" 1263.59 100% 100% WM SIZE 12" 1237.08 100% 100% WM SIZE 12" 1086.89 100% 100% WM SIZE 12" 1083.11 100% 100% WM SIZE 12" 1071.02 100% 100% WM SIZE 12" 643.12 100% 100% WM SIZE 12" 187.27 100% 100% WM SIZE 6" 14.95 100% 100% WM SIZE 6" 5742.98 100% 100% WM SIZE 6" 5589.12 100% 100% WM SIZE 6" 4349.13 100% 100% WM SIZE 6" 4200.82 100% 100% WM SIZE 6" 3881.08 100% 100% WM SIZE 6" 3773.38 100% 100% WM SIZE 6" 3247.64 100% 100% WM SIZE 6" 2826.61 100% 100% WM SIZE 6" 2274.35 100% 100% WM SIZE 6" 1831.96 100% 100% WM SIZE 6" 1455.42 100% 100% WM SIZE 6" 1391.72 100% 100% WM SIZE 6" 1368.66 100% 100% WM SIZE 6" 1179.71 100% 100% WM SIZE 6" 930.95 100% 100% WM SIZE 6" 815.13 100% 100% WM SIZE 6" 671.08 100% 100% WM SIZE 6" 380.4 100% 100% WM SIZE 6" 272.72 100% 100% WM SIZE 6" 270.99 100% 100% WM SIZE 6" 268.83 100% 100% WM SIZE 6" 265.87 100% 100% WM SIZE 6" 256.44 100% 100% WM SIZE 6" 256.44 100% 100% WM SIZE 6" 235.1 100% 100% WM SIZE 6" 216.72 100% 100% WM SIZE 6" 85.5 100% 100% WM SIZE 6" 73.1 100% 100% WM SIZE 6" 55.16 100% 100% WM SIZE 6" 47.02 100% 100% WM SIZE 6" 42.33 100% 100% City Council 8 – 112 1/20/2026
95 City of Santa Ana – 2026 Water and Sewer Rate Study
WM SIZE 6" 41.47 100% 100% WM SIZE 6" 38.44 100% 100% WM SIZE 6" 38.02 100% 100% WM SIZE 6" 37.19 100% 100% WM SIZE 6" 37.19 100% 100% WM SIZE 6" 35.48 100% 100% WM SIZE 6" 30.77 100% 100% WM SIZE 6" 25.62 100% 100% WM SIZE 6" 18.8 100% 100% WM SIZE 6" 8.54 100% 100% WM SIZE 8" 1452.4 100% 100% WM SIZE 8" 161.15 100% 100% WM SIZE 8" 71.37 100% 100% WM SIZE 8" 7055.2 100% 100% WM SIZE 8" 5667.75 100% 100% WM SIZE 8" 4859.91 100% 100% WM SIZE 8" 3937.94 100% 100% WM SIZE 8" 3782.35 100% 100% WM SIZE 8" 3056.16 100% 100% WM SIZE 8" 3034.77 100% 100% WM SIZE 8" 2709.91 100% 100% WM SIZE 8" 2321.41 100% 100% WM SIZE 8" 2193.14 100% 100% WM SIZE 8" 2167.92 100% 100% WM SIZE 8" 1715.72 100% 100% WM SIZE 8" 1713.56 100% 100% WM SIZE 8" 1453.26 100% 100% WM SIZE 8" 1422.49 100% 100% WM SIZE 8" 1258.34 100% 100% WM SIZE 8" 1252.78 100% 100% WM SIZE 8" 1237 100% 100% WM SIZE 8" 1230.15 100% 100% WM SIZE 8" 1220.73 100% 100% WM SIZE 8" 1218.62 100% 100% WM SIZE 8" 1214.74 100% 100% WM SIZE 8" 1192.54 100% 100% WM SIZE 8" 1171.14 100% 100% WM SIZE 8" 1170.32 100% 100% WM SIZE 8" 1132.7 100% 100% WM SIZE 8" 1123.72 100% 100% WM SIZE 8" 1085.67 100% 100% WM SIZE 8" 1080.98 100% 100% WM SIZE 8" 972.82 100% 100% WM SIZE 8" 941.61 100% 100% WM SIZE 8" 842.89 100% 100% WM SIZE 8" 681.75 100% 100% WM SIZE 8" 525.73 100% 100% WM SIZE 8" 282.95 100% 100% WM SIZE 8" 237.63 100% 100% WM SIZE 8" 179.54 100% 100% WM SIZE 8" 169.24 100% 100% WM SIZE 8" 111.99 100% 100% WM SIZE 8" 81.2 100% 100% WM SIZE 8" 76.92 100% 100% WM SIZE 8" 68.39 100% 100% WM SIZE 8" 66.69 100% 100% WM SIZE 8" 61.57 100% 100% WM SIZE 8" 59.41 100% 100% WM SIZE 8" 35.05 100% 100% WM SIZE 8" 12.81 100% 100% WM SIZE 8" 12.81 100% 100% WM SIZE 10" 5340.79 100% 100% WM SIZE 10" 381.25 100% 100% WM SIZE 12" 1391.78 100% 100% WM SIZE 12" 4820.94 100% 100% WM SIZE 12" 3797.58 100% 100% WM SIZE 12" 2835.84 100% 100% WM SIZE 12" 2526.14 100% 100% WM SIZE 12" 2409.22 100% 100% WM SIZE 12" 2305.19 100% 100% WM SIZE 12" 2269.17 100% 100% WM SIZE 12" 2120.74 100% 100% WM SIZE 12" 2106.44 100% 100% WM SIZE 12" 1910.64 100% 100% WM SIZE 12" 1705.47 100% 100% WM SIZE 12" 1669.96 100% 100% WM SIZE 12" 1622.11 100% 100% WM SIZE 12" 1537.25 100% 100% WM SIZE 12" 1528.88 100% 100% WM SIZE 12" 1323.21 100% 100% WM SIZE 12" 1306.95 100% 100% WM SIZE 12" 1300.54 100% 100% WM SIZE 12" 1197.96 100% 100% WM SIZE 12" 763.95 100% 100% WM SIZE 12" 534.61 100% 100% WM SIZE 12" 302.81 100% 100% WM SIZE 12" 270.25 100% 100% WM SIZE 12" 254.46 100% 100% WM SIZE 12" 19.22 100% 100% WM SIZE 14" 3852.83 100% 100% WM SIZE 14" 2325.29 100% 100% WM SIZE 4" 21.89 100% 100% WM SIZE 6" 591.35 100% 100% WM SIZE 6" 7586.96 100% 100% WM SIZE 6" 5551.11 100% 100% WM SIZE 6" 4899.56 100% 100% WM SIZE 6" 3671.73 100% 100% WM SIZE 6" 3483.53 100% 100% WM SIZE 6" 2135.84 100% 100% WM SIZE 6" 671.98 100% 100% WM SIZE 6" 655.85 100% 100% WM SIZE 6" 521.98 100% 100% WM SIZE 6" 327.91 100% 100% WM SIZE 6" 268.26 100% 100% WM SIZE 6" 85.46 100% 100% WM SIZE 6" 41.94 100% 100% WM SIZE 6" 36 100% 100% WM SIZE 6" 29.04 100% 100% WM SIZE 6" 25.26 100% 100% WM SIZE 8" 6527.36 100% 100% WM SIZE 8" 5947.3 100% 100% WM SIZE 8" 5206.55 100% 100% WM SIZE 8" 5081.27 100% 100% WM SIZE 8" 4542.05 100% 100% WM SIZE 8" 3347 100% 100% WM SIZE 8" 3261.51 100% 100% WM SIZE 8" 1732.08 100% 100% WM SIZE 8" 1726.7 100% 100% WM SIZE 8" 1684.27 100% 100% City Council 8 – 113 1/20/2026
96 City of Santa Ana – 2026 Water and Sewer Rate Study
WM SIZE 8" 1594.48 100% 100% WM SIZE 8" 1564.38 100% 100% WM SIZE 8" 1377.3 100% 100% WM SIZE 8" 1051.52 100% 100% WM SIZE 8" 977.86 100% 100% WM SIZE 8" 423.08 100% 100% WM SIZE 8" 392.98 100% 100% WM SIZE 8" 362.88 100% 100% WM SIZE 8" 349.41 100% 100% WM SIZE 8" 312.36 100% 100% WM SIZE 8" 275.24 100% 100% WM SIZE 8" 262.34 100% 100% WM SIZE 8" 192.98 100% 100% WM SIZE 8" 185.45 100% 100% WM SIZE 8" 120.44 100% 100% WM SIZE 8" 98.36 100% 100% WM SIZE 8" 90.83 100% 100% WM SIZE 8" 90.83 100% 100% WM SIZE 8" 45.17 100% 100% WM SIZE 8" 38.72 100% 100% WM SIZE 8" 37.63 100% 100% WM SIZE 8" 37.63 100% 100% WM SIZE 8" 37.63 100% 100% WM SIZE 8" 37.63 100% 100% WM SIZE 8" 34.93 100% 100% WM SIZE 8" 32.26 100% 100% WM SIZE 10" 2986.69 100% 100% WM SIZE 10" 2316.16 100% 100% WM SIZE 10" 2227.46 100% 100% WM SIZE 10" 2210.73 100% 100% WM SIZE 10" 1829.85 100% 100% WM SIZE 10" 303.95 100% 100% WM SIZE 12" 5283.02 100% 100% WM SIZE 12" 79.37 100% 100% WM SIZE 12" 9083.57 100% 100% WM SIZE 12" 7762.32 100% 100% WM SIZE 12" 7619.06 100% 100% WM SIZE 12" 4278.17 100% 100% WM SIZE 12" 4134.84 100% 100% WM SIZE 12" 3870.6 100% 100% WM SIZE 12" 2994.12 100% 100% WM SIZE 12" 2615.14 100% 100% WM SIZE 12" 2499.76 100% 100% WM SIZE 12" 2412.91 100% 100% WM SIZE 12" 2411.69 100% 100% WM SIZE 12" 2094.7 100% 100% WM SIZE 12" 1916.68 100% 100% WM SIZE 12" 1478.15 100% 100% WM SIZE 12" 632.7 100% 100% WM SIZE 12" 501.19 100% 100% WM SIZE 12" 181.13 100% 100% WM SIZE 12" 180.48 100% 100% WM SIZE 12" 155.7 100% 100% WM SIZE 12" 155.05 100% 100% WM SIZE 12" 155.05 100% 100% WM SIZE 12" 81.88 100% 100% WM SIZE 12" 80.65 100% 100% WM SIZE 12" 53.96 100% 100% WM SIZE 12" 31 100% 100% WM SIZE 12" 22.32 100% 100% WM SIZE 12" 21.7 100% 100% WM SIZE 12" 21.1 100% 100% WM SIZE 14" 2240.48 100% 100% WM SIZE 16" 1860.85 100% 100% WM SIZE 16" 4248.74 100% 100% WM SIZE 16" 4007.56 100% 100% WM SIZE 16" 3593.72 100% 100% WM SIZE 16" 2889.56 100% 100% WM SIZE 16" 2485.36 100% 100% WM SIZE 16" 2470.51 100% 100% WM SIZE 16" 2300.03 100% 100% WM SIZE 16" 2166.8 100% 100% WM SIZE 16" 2081.94 100% 100% WM SIZE 16" 1694.16 100% 100% WM SIZE 16" 845.56 100% 100% WM SIZE 16" 616.29 100% 100% WM SIZE 16" 503.21 100% 100% WM SIZE 16" 493.51 100% 100% WM SIZE 16" 468.19 100% 100% WM SIZE 16" 442.87 100% 100% WM SIZE 16" 66.96 100% 100% WM SIZE 6" 553.57 100% 100% WM SIZE 6" 7958.8 100% 100% WM SIZE 6" 7930.8 100% 100% WM SIZE 6" 7291.24 100% 100% WM SIZE 6" 5558.13 100% 100% WM SIZE 6" 4997.38 100% 100% WM SIZE 6" 4646.32 100% 100% WM SIZE 6" 4236.66 100% 100% WM SIZE 6" 3989.19 100% 100% WM SIZE 6" 3574.94 100% 100% WM SIZE 6" 3211.52 100% 100% WM SIZE 6" 3177.03 100% 100% WM SIZE 6" 3071.52 100% 100% WM SIZE 6" 3022.67 100% 100% WM SIZE 6" 2658.59 100% 100% WM SIZE 6" 2488.58 100% 100% WM SIZE 6" 2437.13 100% 100% WM SIZE 6" 2358.98 100% 100% WM SIZE 6" 2304.26 100% 100% WM SIZE 6" 1741.58 100% 100% WM SIZE 6" 1365.09 100% 100% WM SIZE 6" 1066.83 100% 100% WM SIZE 6" 1055.09 100% 100% WM SIZE 6" 1022.5 100% 100% WM SIZE 6" 737.89 100% 100% WM SIZE 6" 664.97 100% 100% WM SIZE 6" 573.14 100% 100% WM SIZE 6" 553.57 100% 100% WM SIZE 6" 540.59 100% 100% WM SIZE 6" 426.58 100% 100% WM SIZE 6" 423.31 100% 100% WM SIZE 6" 410.33 100% 100% WM SIZE 6" 372.52 100% 100% WM SIZE 6" 372.52 100% 100% WM SIZE 6" 371.21 100% 100% WM SIZE 6" 364.72 100% 100% WM SIZE 6" 287.86 100% 100% WM SIZE 6" 264.39 100% 100% WM SIZE 6" 221.43 100% 100% WM SIZE 6" 219.47 100% 100% WM SIZE 6" 201.92 100% 100% WM SIZE 6" 136.75 100% 100% WM SIZE 6" 115.27 100% 100% WM SIZE 6" 110.69 100% 100% WM SIZE 6" 106.79 100% 100% WM SIZE 6" 95.75 100% 100% City Council 8 – 114 1/20/2026
97 City of Santa Ana – 2026 Water and Sewer Rate Study
WM SIZE 6" 92.48 100% 100% WM SIZE 8" 6540.31 100% 100% WM SIZE 8" 4038.7 100% 100% WM SIZE 8" 2424.77 100% 100% WM SIZE 8" 2172.04 100% 100% WM SIZE 8" 2168.79 100% 100% WM SIZE 8" 2148.6 100% 100% WM SIZE 8" 2067.84 100% 100% WM SIZE 8" 1878.98 100% 100% WM SIZE 8" 1802.11 100% 100% WM SIZE 8" 1737.66 100% 100% WM SIZE 8" 1566.36 100% 100% WM SIZE 8" 1512.95 100% 100% WM SIZE 8" 1435.44 100% 100% WM SIZE 8" 1081.14 100% 100% WM SIZE 8" 793.26 100% 100% WM SIZE 8" 651.29 100% 100% WM SIZE 8" 573.14 100% 100% WM SIZE 8" 532.75 100% 100% WM SIZE 8" 521.03 100% 100% WM SIZE 8" 467.64 100% 100% WM SIZE 8" 407.06 100% 100% WM SIZE 8" 403.8 100% 100% WM SIZE 8" 402.49 100% 100% WM SIZE 8" 394.01 100% 100% WM SIZE 8" 390.77 100% 100% WM SIZE 8" 365.36 100% 100% WM SIZE 8" 360.19 100% 100% WM SIZE 8" 315.86 100% 100% WM SIZE 8" 285.92 100% 100% WM SIZE 8" 227.97 100% 100% WM SIZE 8" 192.12 100% 100% WM SIZE 8" 192.12 100% 100% WM SIZE 8" 94.44 100% 100% WM SIZE 8" 91.18 100% 100% WM SIZE 8" 86.6 100% 100% WM SIZE 8" 32.54 100% 100% WM SIZE 12" 5603.1 100% 100% WM SIZE 12" 3072.09 100% 100% WM SIZE 12" 3058.57 100% 100% WM SIZE 12" 3006.73 100% 100% WM SIZE 12" 2860.17 100% 100% WM SIZE 12" 2718.88 100% 100% WM SIZE 12" 2582.11 100% 100% WM SIZE 12" 2337.16 100% 100% WM SIZE 12" 2189.85 100% 100% WM SIZE 12" 1640.5 100% 100% WM SIZE 12" 1394.74 100% 100% WM SIZE 12" 830.42 100% 100% WM SIZE 12" 826.66 100% 100% WM SIZE 12" 616.95 100% 100% WM SIZE 12" 405.82 100% 100% WM SIZE 12" 176.6 100% 100% WM SIZE 12" 154.06 100% 100% WM SIZE 12" 112.74 100% 100% WM SIZE 12" 60.14 100% 100% WM SIZE 14" 3514.3 100% 100% WM SIZE 14" 3358.25 100% 100% WM SIZE 14" 2899.28 100% 100% WM SIZE 14" 1244.47 100% 100% WM SIZE 24" 395.57 100% 100% WM SIZE 4" 286.76 100% 100% WM SIZE 6" 175.22 100% 100% WM SIZE 6" 9802.24 100% 100% WM SIZE 6" 9791.05 100% 100% WM SIZE 6" 9030.6 100% 100% WM SIZE 6" 8820.39 100% 100% WM SIZE 6" 8154.62 100% 100% WM SIZE 6" 7981.65 100% 100% WM SIZE 6" 7948.83 100% 100% WM SIZE 6" 5731.65 100% 100% WM SIZE 6" 5651.85 100% 100% WM SIZE 6" 5261.98 100% 100% WM SIZE 6" 5239.62 100% 100% WM SIZE 6" 5232.89 100% 100% WM SIZE 6" 5210.51 100% 100% WM SIZE 6" 5174.72 100% 100% WM SIZE 6" 5156.11 100% 100% WM SIZE 6" 5130.72 100% 100% WM SIZE 6" 5069.59 100% 100% WM SIZE 6" 4975.7 100% 100% WM SIZE 6" 4623.06 100% 100% WM SIZE 6" 4378.5 100% 100% WM SIZE 6" 4357.6 100% 100% WM SIZE 6" 4343.48 100% 100% WM SIZE 6" 4305.45 100% 100% WM SIZE 6" 4294.25 100% 100% WM SIZE 6" 2460.27 100% 100% WM SIZE 6" 1836.22 100% 100% WM SIZE 6" 380.2 100% 100% WM SIZE 6" 180.45 100% 100% WM SIZE 8" 12541.33 100% 100% WM SIZE 8" 6035.84 100% 100% WM SIZE 8" 5003.27 100% 100% WM SIZE 8" 4998.06 100% 100% WM SIZE 8" 4845.17 100% 100% WM SIZE 8" 4410.58 100% 100% WM SIZE 8" 3414.54 100% 100% WM SIZE 8" 2843.45 100% 100% WM SIZE 8" 2841.98 100% 100% WM SIZE 8" 2790.53 100% 100% WM SIZE 8" 2378.25 100% 100% WM SIZE 8" 2371.55 100% 100% WM SIZE 8" 2273.85 100% 100% WM SIZE 8" 1999.49 100% 100% WM SIZE 8" 784.3 100% 100% WM SIZE 8" 777.55 100% 100% WM SIZE 8" 777.55 100% 100% WM SIZE 8" 769.4 100% 100% WM SIZE 8" 726.86 100% 100% WM SIZE 8" 553.91 100% 100% WM SIZE 8" 547.94 100% 100% WM SIZE 8" 509.17 100% 100% City Council 8 – 115 1/20/2026
98 City of Santa Ana – 2026 Water and Sewer Rate Study
WM SIZE 8" 470.42 100% 100% WM SIZE 8" 362.31 100% 100% WM SIZE 8" 223.65 100% 100% WM SIZE 8" 155.05 100% 100% WM SIZE 8" 121.5 100% 100% WM SIZE 8" 89.45 100% 100% WM SIZE 8" 61.12 100% 100% WM SIZE 8" 56.68 100% 100% WM SIZE 12" 11277.61 100% 100% WM SIZE 12" 6745.05 100% 100% WM SIZE 12" 5858.18 100% 100% WM SIZE 12" 5705.92 100% 100% WM SIZE 12" 5531.29 100% 100% WM SIZE 12" 4794.03 100% 100% WM SIZE 12" 3698.14 100% 100% WM SIZE 12" 427.53 100% 100% WM SIZE 12" 255.51 100% 100% WM SIZE 12" 127.28 100% 100% WM SIZE 12" 51.62 100% 100% WM SIZE 12" 43.04 100% 100% WM SIZE 14" 6844.98 100% 100% WM SIZE 14" 3865.88 100% 100% WM SIZE 14" 2091.41 100% 100% WM SIZE 14" 964.13 100% 100% WM SIZE 20" 4143.29 100% 100% WM SIZE 20" 3946.47 100% 100% WM SIZE 20" 3766.07 100% 100% WM SIZE 20" 3633.62 100% 100% WM SIZE 20" 421.4 100% 100% WM SIZE 4" 27.7 100% 100% WM SIZE 6" 33.49 100% 100% WM SIZE 6" 6580.12 100% 100% WM SIZE 6" 3972 100% 100% WM SIZE 6" 3946.92 100% 100% WM SIZE 6" 3183.81 100% 100% WM SIZE 6" 3091.73 100% 100% WM SIZE 6" 2445.79 100% 100% WM SIZE 6" 2259.18 100% 100% WM SIZE 6" 2217.39 100% 100% WM SIZE 6" 2200.62 100% 100% WM SIZE 6" 2034.94 100% 100% WM SIZE 6" 1974.72 100% 100% WM SIZE 6" 1129.56 100% 100% WM SIZE 6" 1104.48 100% 100% WM SIZE 6" 1045.08 100% 100% WM SIZE 6" 928.77 100% 100% WM SIZE 6" 903.66 100% 100% WM SIZE 6" 334.7 100% 100% WM SIZE 6" 331.37 100% 100% WM SIZE 6" 329.65 100% 100% WM SIZE 6" 297.01 100% 100% WM SIZE 6" 234.29 100% 100% WM SIZE 6" 161.49 100% 100% WM SIZE 6" 160.68 100% 100% WM SIZE 6" 153.14 100% 100% WM SIZE 6" 146.45 100% 100% WM SIZE 6" 117.17 100% 100% WM SIZE 6" 41.83 100% 100% WM SIZE 6" 30.95 100% 100% WM SIZE 8" 1389.02 100% 100% WM SIZE 8" 443.48 100% 100% WM SIZE 8" 111.27 100% 100% WM SIZE 8" 110.46 100% 100% WM SIZE 8" 15656.29 100% 100% WM SIZE 8" 10700.26 100% 100% WM SIZE 8" 10527.87 100% 100% WM SIZE 8" 8633.48 100% 100% WM SIZE 8" 7247.86 100% 100% WM SIZE 8" 6564.26 100% 100% WM SIZE 8" 6079.75 100% 100% WM SIZE 8" 5840.47 100% 100% WM SIZE 8" 5717.47 100% 100% WM SIZE 8" 5645.49 100% 100% WM SIZE 8" 5493.2 100% 100% WM SIZE 8" 5363.49 100% 100% WM SIZE 8" 5208.73 100% 100% WM SIZE 8" 4802.88 100% 100% WM SIZE 8" 4602.09 100% 100% WM SIZE 8" 4074.1 100% 100% WM SIZE 8" 3631.48 100% 100% WM SIZE 8" 3399.68 100% 100% WM SIZE 8" 3346.96 100% 100% WM SIZE 8" 3339.42 100% 100% WM SIZE 8" 3265.78 100% 100% WM SIZE 8" 3177.94 100% 100% WM SIZE 8" 3159.54 100% 100% WM SIZE 8" 3157.85 100% 100% WM SIZE 8" 3104.34 100% 100% WM SIZE 8" 2999.72 100% 100% WM SIZE 8" 2552.08 100% 100% WM SIZE 8" 2549.54 100% 100% WM SIZE 8" 2518.59 100% 100% WM SIZE 8" 2259.18 100% 100% WM SIZE 8" 2119.49 100% 100% WM SIZE 8" 2093.54 100% 100% WM SIZE 8" 2062.56 100% 100% WM SIZE 8" 1762.15 100% 100% WM SIZE 8" 1732.86 100% 100% WM SIZE 8" 1547.11 100% 100% WM SIZE 8" 1516.2 100% 100% WM SIZE 8" 1503.59 100% 100% WM SIZE 8" 1464.29 100% 100% WM SIZE 8" 998.21 100% 100% WM SIZE 8" 958.89 100% 100% WM SIZE 8" 763.1 100% 100% WM SIZE 8" 485.3 100% 100% WM SIZE 8" 451.85 100% 100% WM SIZE 8" 409.97 100% 100% WM SIZE 8" 409.97 100% 100% WM SIZE 8" 293.66 100% 100% WM SIZE 8" 284.51 100% 100% WM SIZE 8" 234.29 100% 100% WM SIZE 8" 225.07 100% 100% WM SIZE 8" 218.41 100% 100% WM SIZE 8" 217.53 100% 100% WM SIZE 8" 173.18 100% 100% WM SIZE 8" 163.14 100% 100% WM SIZE 8" 133.85 100% 100% WM SIZE 8" 125.5 100% 100% WM SIZE 8" 117.17 100% 100% City Council 8 – 116 1/20/2026
99 City of Santa Ana – 2026 Water and Sewer Rate Study
WM SIZE 8" 113.81 100% 100% WM SIZE 8" 98.75 100% 100% WM SIZE 8" 92.05 100% 100% WM SIZE 8" 55.25 100% 100% WM SIZE 8" 41.83 100% 100% WM SIZE 8" 33.49 100% 100% WM SIZE 10" 17715.44 100% 100% WM SIZE 10" 12086.72 100% 100% WM SIZE 10" 11994.07 100% 100% WM SIZE 10" 8029.79 100% 100% WM SIZE 10" 7612.74 100% 100% WM SIZE 10" 5108.29 100% 100% WM SIZE 10" 642.06 100% 100% WM SIZE 10" 589.92 100% 100% WM SIZE 10" 349.47 100% 100% WM SIZE 10" 232.66 100% 100% WM SIZE 10" 156.41 100% 100% WM SIZE 12" 1979.19 100% 100% WM SIZE 12" 5738.72 100% 100% WM SIZE 12" 12927.67 100% 100% WM SIZE 12" 7004.47 100% 100% WM SIZE 12" 4898.78 100% 100% WM SIZE 12" 3524.93 100% 100% WM SIZE 12" 3505.61 100% 100% WM SIZE 12" 3466.07 100% 100% WM SIZE 12" 3021.9 100% 100% WM SIZE 12" 2892.56 100% 100% WM SIZE 12" 1612.34 100% 100% WM SIZE 12" 1485.85 100% 100% WM SIZE 12" 730.83 100% 100% WM SIZE 12" 154.48 100% 100% WM SIZE 12" 138.06 100% 100% WM SIZE 12" 115.84 100% 100% WM SIZE 14" 6001.34 100% 100% WM SIZE 14" 595.51 100% 100% WM SIZE 14" 162.2 100% 100% WM SIZE 16" 1528.14 100% 100% WM SIZE 16" 506.29 100% 100% WM SIZE 6" 11769.86 100% 100% WM SIZE 6" 150.58 100% 100% WM SIZE 6" 2324.39 100% 100% WM SIZE 6" 1486.89 100% 100% WM SIZE 6" 1411.61 100% 100% WM SIZE 6" 697.3 100% 100% WM SIZE 6" 602.27 100% 100% WM SIZE 6" 366.98 100% 100% WM SIZE 6" 318.08 100% 100% WM SIZE 6" 254.09 100% 100% WM SIZE 6" 143.03 100% 100% WM SIZE 6" 94.08 100% 100% WM SIZE 6" 80.9 100% 100% WM SIZE 6" 75.32 100% 100% WM SIZE 6" 55.55 100% 100% WM SIZE 8" 11859.28 100% 100% WM SIZE 8" 8403.69 100% 100% WM SIZE 8" 7839.98 100% 100% WM SIZE 8" 6822.69 100% 100% WM SIZE 8" 6248.69 100% 100% WM SIZE 8" 5420.53 100% 100% WM SIZE 8" 4968.79 100% 100% WM SIZE 8" 4838.01 100% 100% WM SIZE 8" 4589.56 100% 100% WM SIZE 8" 4449.33 100% 100% WM SIZE 8" 3912.97 100% 100% WM SIZE 8" 3824.5 100% 100% WM SIZE 8" 3660.7 100% 100% WM SIZE 8" 3579.79 100% 100% WM SIZE 8" 3352.06 100% 100% WM SIZE 8" 3166.7 100% 100% WM SIZE 8" 3093.27 100% 100% WM SIZE 8" 2860.84 100% 100% WM SIZE 8" 2804.33 100% 100% WM SIZE 8" 2657.57 100% 100% WM SIZE 8" 2554.98 100% 100% WM SIZE 8" 2446.78 100% 100% WM SIZE 8" 1759.81 100% 100% WM SIZE 8" 941.07 100% 100% WM SIZE 8" 705.78 100% 100% WM SIZE 8" 440.42 100% 100% WM SIZE 8" 414.08 100% 100% WM SIZE 8" 316.18 100% 100% WM SIZE 8" 201.39 100% 100% WM SIZE 8" 138.31 100% 100% WM SIZE 8" 124.22 100% 100% WM SIZE 8" 124.22 100% 100% WM SIZE 8" 84.7 100% 100% WM SIZE 8" 41.37 100% 100% WM SIZE 8" 37.66 100% 100% WM SIZE 8" 15.03 100% 100% WM SIZE 12" 18291.04 100% 100% WM SIZE 12" 16591.68 100% 100% WM SIZE 12" 13886.81 100% 100% WM SIZE 12" 11372.03 100% 100% WM SIZE 12" 11325.32 100% 100% WM SIZE 12" 9441.36 100% 100% WM SIZE 12" 8982.08 100% 100% WM SIZE 12" 8881.12 100% 100% WM SIZE 12" 8762.76 100% 100% WM SIZE 12" 7068.83 100% 100% WM SIZE 12" 6295.71 100% 100% WM SIZE 12" 6209.95 100% 100% WM SIZE 12" 6124.17 100% 100% WM SIZE 12" 5533.47 100% 100% WM SIZE 12" 5202.27 100% 100% WM SIZE 12" 4562.72 100% 100% WM SIZE 12" 4026.3 100% 100% WM SIZE 12" 3802.63 100% 100% WM SIZE 12" 3431.23 100% 100% WM SIZE 12" 3143.49 100% 100% WM SIZE 12" 2883.97 100% 100% WM SIZE 12" 2706.98 100% 100% WM SIZE 12" 1888.27 100% 100% WM SIZE 12" 1704.76 100% 100% WM SIZE 12" 1500.62 100% 100% WM SIZE 12" 1419.23 100% 100% WM SIZE 12" 1358.36 100% 100% WM SIZE 12" 656.93 100% 100% WM SIZE 12" 640.67 100% 100% WM SIZE 12" 251.91 100% 100% WM SIZE 12" 21.72 100% 100% City Council 8 – 117 1/20/2026
100 City of Santa Ana – 2026 Water and Sewer Rate Study WM SIZE 16" 6206.26 100% 100% WM SIZE 16" 4391.12 100% 100% WM SIZE 16" 4331.2 100% 100% WM SIZE 16" 3695.32 100% 100% WM SIZE 16" 2994.28 100% 100% WM SIZE 16" 2522.6 100% 100% WM SIZE 16" 2318.02 100% 100% WM SIZE 16" 927.77 100% 100% WM SIZE 6" 6512.63 100% 100% WM SIZE 6" 8350.4 100% 100% WM SIZE 6" 8024.3 100% 100% WM SIZE 6" 7976.95 100% 100% WM SIZE 6" 5111.41 100% 100% WM SIZE 6" 4996.78 100% 100% WM SIZE 6" 606.95 100% 100% WM SIZE 6" 147.27 100% 100% WM SIZE 8" 3409.4 100% 100% WM SIZE 8" 3106.43 100% 100% WM SIZE 8" 188.27 100% 100% WM SIZE 8" 6899.77 100% 100% WM SIZE 8" 1003.56 100% 100% WM SIZE 8" 18790.99 100% 100% WM SIZE 8" 8140.03 100% 100% WM SIZE 8" 5893.01 100% 100% WM SIZE 8" 5291.34 100% 100% WM SIZE 8" 3307.32 100% 100% WM SIZE 8" 3084.31 100% 100% WM SIZE 8" 2870.78 100% 100% WM SIZE 8" 241.93 100% 100% WM SIZE 8" 196.68 100% 100% WM SIZE 12" 20021.5 100% 100% WM SIZE 12" 10996.92 100% 100% WM SIZE 12" 8914.09 100% 100% WM SIZE 12" 8295.05 100% 100% WM SIZE 12" 8007.39 100% 100% WM SIZE 12" 2189.69 100% 100% WM SIZE 12" 16098.5 100% 100% WM SIZE 12" 747.7 100% 100% WM SIZE 12" 627.49 100% 100% WM SIZE 12" 492.81 100% 100% WM SIZE 12" 72.81 100% 100% WM SIZE 16" 19543.98 100% 100% WM SIZE 18" 48.56 100% 100% WM SIZE 18" 16358.63 100% 100% WM SIZE 6" 14852.33 100% 100% WM SIZE 6" 14757.79 100% 100% WM SIZE 6" 122.64 100% 100% WM SIZE 8" 16551.38 100% 100% WM SIZE 8" 2750.01 100% 100% WM SIZE 8" 1760.97 100% 100% WM SIZE 8" 1760.97 100% 100% WM SIZE 8" 1464.32 100% 100% WM SIZE 8" 624.7 100% 100% WM SIZE 8" 262.74 100% 100% WM SIZE 8" 245.23 100% 100% WM SIZE 8" 117.9 100% 100% WM SIZE 8" 58.39 100% 100% WM SIZE 8" 32.71 100% 100% WM SIZE 12" 14288.95 100% 100% WM SIZE 12" 6206.03 100% 100% WM SIZE 12" 5863.83 100% 100% WM SIZE 12" 5704.78 100% 100% WM SIZE 12" 5650.93 100% 100% WM SIZE 12" 4385.74 100% 100% WM SIZE 12" 3810.36 100% 100% WM SIZE 12" 1443.02 100% 100% WM SIZE 12" 1216.67 100% 100% WM SIZE 12" 683.15 100% 100% WM SIZE 12" 388.07 100% 100% WM SIZE 12" 282.95 100% 100% WM SIZE 12" 177.82 100% 100% WM SIZE 16" 11741.59 100% 100% WM SIZE 16" 7507.04 100% 100% WM SIZE 16" 177.82 100% 100% WM SIZE 16" 20732.96 100% 100% WM SIZE 16" 16184.74 100% 100% WM SIZE 16" 14394.9 100% 100% WM SIZE 16" 1870.68 100% 100% WM SIZE 16" 1164.12 100% 100% WM SIZE 16" 970.1 100% 100% WM SIZE 16" 10994.62 100% 100% WM SIZE 16" 8908.89 100% 100% WM SIZE 16" 5371.18 100% 100% WM SIZE 6" 4857.02 100% 100% WM SIZE 6" 3607.18 100% 100% WM SIZE 6" 4813.39 100% 100% WM SIZE 6" 4124.27 100% 100% WM SIZE 6" 3885.61 100% 100% WM SIZE 6" 3862.51 100% 100% WM SIZE 6" 3233.75 100% 100% WM SIZE 6" 641.62 100% 100% WM SIZE 6" 628.78 100% 100% WM SIZE 6" 423.49 100% 100% WM SIZE 6" 399.09 100% 100% WM SIZE 6" 382.42 100% 100% WM SIZE 6" 378.57 100% 100% WM SIZE 6" 378.57 100% 100% WM SIZE 6" 354.17 100% 100% WM SIZE 6" 196.31 100% 100% WM SIZE 6" 92.42 100% 100% WM SIZE 6" 89.82 100% 100% WM SIZE 6" 51.35 100% 100% WM SIZE 8" 9236.73 100% 100% WM SIZE 8" 282.28 100% 100% WM SIZE 8" 246.39 100% 100% WM SIZE 8" 15529.71 100% 100% WM SIZE 8" 14639.09 100% 100% WM SIZE 8" 12728.39 100% 100% WM SIZE 8" 8614.35 100% 100% WM SIZE 8" 6445.65 100% 100% WM SIZE 8" 5386.99 100% 100% WM SIZE 8" 5177.84 100% 100% WM SIZE 8" 5053.34 100% 100% WM SIZE 8" 4898.06 100% 100% WM SIZE 8" 3970.28 100% 100% WM SIZE 8" 3926.65 100% 100% WM SIZE 8" 3862.51 100% 100% WM SIZE 8" 3458.29 100% 100% WM SIZE 8" 3413.38 100% 100% WM SIZE 8" 3400.56 100% 100% WM SIZE 8" 3374.87 100% 100% WM SIZE 8" 3323.57 100% 100% WM SIZE 8" 3310.72 100% 100% WM SIZE 8" 3259.39 100% 100% City Council 8 – 118 1/20/2026
101 City of Santa Ana – 2026 Water and Sewer Rate Study WM SIZE 8" 3241.4 100% 100% WM SIZE 8" 3208.11 100% 100% WM SIZE 8" 2635.77 100% 100% WM SIZE 8" 1373.08 100% 100% WM SIZE 8" 1342.22 100% 100% WM SIZE 8" 767.33 100% 100% WM SIZE 8" 682.66 100% 100% WM SIZE 8" 388.8 100% 100% WM SIZE 8" 295.16 100% 100% WM SIZE 8" 234.81 100% 100% WM SIZE 8" 141.17 100% 100% WM SIZE 8" 110.35 100% 100% WM SIZE 8" 89.82 100% 100% WM SIZE 8" 76.99 100% 100% WM SIZE 8" 12.82 100% 100% WM SIZE 8" 12.82 100% 100% WM SIZE 12" 13586.47 100% 100% WM SIZE 12" 8689.91 100% 100% WM SIZE 12" 1080.84 100% 100% WM SIZE 12" 232.44 100% 100% WM SIZE 12" 28407.77 100% 100% WM SIZE 12" 19870.37 100% 100% WM SIZE 12" 10676.97 100% 100% WM SIZE 12" 9254.06 100% 100% WM SIZE 12" 9036.42 100% 100% WM SIZE 12" 5429.58 100% 100% WM SIZE 12" 3980.01 100% 100% WM SIZE 12" 3134.56 100% 100% WM SIZE 12" 2912.45 100% 100% WM SIZE 12" 2354.25 100% 100% WM SIZE 12" 1908.59 100% 100% WM SIZE 12" 1362.19 100% 100% WM SIZE 12" 1183.01 100% 100% WM SIZE 12" 1021.62 100% 100% WM SIZE 12" 433.85 100% 100% WM SIZE 12" 358.34 100% 100% WM SIZE 12" 228.01 100% 100% WM SIZE 12" 59.22 100% 100% WM SIZE 12" 45.9 100% 100% WM SIZE 20" 13965.71 100% 100% WM SIZE 20" 11520.44 100% 100% WM SIZE 20" 11092.66 100% 100% WM SIZE 20" 3591.88 100% 100% WM SIZE 20" 3387.74 100% 100% WM SIZE 20" 13939.64 100% 100% WM SIZE 6" 1956.75 100% 100% WM SIZE 6" 938.26 100% 100% WM SIZE 6" 122.58 100% 100% WM SIZE 6" 90.16 100% 100% WM SIZE 6" 6478.95 100% 100% WM SIZE 6" 1141.06 100% 100% WM SIZE 6" 1021.39 100% 100% WM SIZE 6" 619.85 100% 100% WM SIZE 6" 607.19 100% 100% WM SIZE 8" 4477.07 100% 100% WM SIZE 8" 4357.31 100% 100% WM SIZE 8" 4071.34 100% 100% WM SIZE 8" 1284.82 100% 100% WM SIZE 8" 1203.1 100% 100% WM SIZE 8" 1126.99 100% 100% WM SIZE 8" 1115.74 100% 100% WM SIZE 8" 753.71 100% 100% WM SIZE 8" 332.48 100% 100% WM SIZE 8" 84.55 100% 100% WM SIZE 8" 9664.12 100% 100% WM SIZE 8" 8706.19 100% 100% WM SIZE 8" 7931.32 100% 100% WM SIZE 8" 7687.61 100% 100% WM SIZE 8" 7466.47 100% 100% WM SIZE 8" 4106.59 100% 100% WM SIZE 8" 3733.2 100% 100% WM SIZE 8" 3662.82 100% 100% WM SIZE 8" 3172.53 100% 100% WM SIZE 8" 2880.95 100% 100% WM SIZE 8" 2749.94 100% 100% WM SIZE 8" 2558.32 100% 100% WM SIZE 8" 1449.61 100% 100% WM SIZE 8" 1321.4 100% 100% WM SIZE 8" 646.63 100% 100% WM SIZE 8" 157.8 100% 100% WM SIZE 8" 142.3 100% 100% WM SIZE 8" 129.6 100% 100% WM SIZE 8" 112.7 100% 100% WM SIZE 8" 31.02 100% 100% WM SIZE 10" 2243.22 100% 100% WM SIZE 10" 476.3 100% 100% WM SIZE 12" 14093.09 100% 100% WM SIZE 12" 10694.18 100% 100% WM SIZE 12" 9479.91 100% 100% WM SIZE 12" 8277.05 100% 100% WM SIZE 12" 5380.45 100% 100% WM SIZE 12" 3917.47 100% 100% WM SIZE 12" 10383.7 100% 100% WM SIZE 12" 10338.18 100% 100% WM SIZE 12" 4177.57 100% 100% WM SIZE 12" 97.53 100% 100% WM SIZE 12" 268.22 100% 100% WM SIZE 14" 19069.12 100% 100% WM SIZE 14" 2682.07 100% 100% WM SIZE 14" 1890.14 100% 100% WM SIZE 14" 175.55 100% 100% WM SIZE 24" 46861.28 100% 100% WM SIZE 6" 1138.53 100% 100% WM SIZE 6" 352.93 100% 100% WM SIZE 6" 280.79 100% 100% WM SIZE 6" 280.79 100% 100% WM SIZE 6" 194.88 100% 100% WM SIZE 6" 1272.07 100% 100% WM SIZE 6" 1264.41 100% 100% WM SIZE 6" 285.42 100% 100% WM SIZE 8" 1868.94 100% 100% WM SIZE 8" 245.49 100% 100% WM SIZE 8" 710.44 100% 100% WM SIZE 12" 11154.43 100% 100% WM SIZE 12" 1204 100% 100% WM SIZE 12" 1025.15 100% 100% WM SIZE 12" 16768.79 100% 100% WM SIZE 12" 9337.79 100% 100% WM SIZE 12" 8935.88 100% 100% WM SIZE 12" 8280.8 100% 100% WM SIZE 12" 6280.11 100% 100% WM SIZE 12" 5782.57 100% 100% WM SIZE 12" 5718.87 100% 100% WM SIZE 12" 5614.4 100% 100% WM SIZE 12" 5090.31 100% 100% WM SIZE 12" 5030.11 100% 100% City Council 8 – 119 1/20/2026
102 City of Santa Ana – 2026 Water and Sewer Rate Study WM SIZE 12" 4713.14 100% 100% WM SIZE 12" 3895.17 100% 100% WM SIZE 12" 2071.51 100% 100% WM SIZE 12" 1733.33 100% 100% WM SIZE 12" 1722.75 100% 100% WM SIZE 12" 1331.4 100% 100% WM SIZE 12" 1207.53 100% 100% WM SIZE 12" 1115.41 100% 100% WM SIZE 12" 660.41 100% 100% WM SIZE 12" 642.7 100% 100% WM SIZE 12" 625 100% 100% WM SIZE 12" 336.37 100% 100% WM SIZE 12" 283.32 100% 100% WM SIZE 12" 185.89 100% 100% WM SIZE 12" 88.51 100% 100% WM SIZE 12" 1274.82 100% 100% WM SIZE 12" 247.91 100% 100% WM SIZE 12" 53.1 100% 100% WM SIZE 12" 53.1 100% 100% WM SIZE 16" 5181.98 100% 100% WM SIZE 16" 2490.07 100% 100% WM SIZE 16" 1661.5 100% 100% WM SIZE 16" 63.77 100% 100% WM SIZE 16" 63.77 100% 100% WM SIZE 18" 9492.49 100% 100% WM SIZE 6" 20054.94 100% 100% WM SIZE 6" 17022.39 100% 100% WM SIZE 6" 11664.66 100% 100% WM SIZE 6" 11495.04 100% 100% WM SIZE 6" 1192.83 100% 100% WM SIZE 6" 210.03 100% 100% WM SIZE 6" 2100.08 100% 100% WM SIZE 6" 198.22 100% 100% WM SIZE 6" 136.05 100% 100% WM SIZE 6" 127.66 100% 100% WM SIZE 6" 126 100% 100% WM SIZE 6" 104.13 100% 100% WM SIZE 6" 104.13 100% 100% WM SIZE 6" 94.08 100% 100% WM SIZE 6" 70.57 100% 100% WM SIZE 6" 1745.59 100% 100% WM SIZE 8" 20485.07 100% 100% WM SIZE 8" 12951.65 100% 100% WM SIZE 8" 12755.08 100% 100% WM SIZE 8" 5398.05 100% 100% WM SIZE 8" 5169.55 100% 100% WM SIZE 8" 5105.72 100% 100% WM SIZE 8" 4747.86 100% 100% WM SIZE 8" 4440.41 100% 100% WM SIZE 8" 3492.81 100% 100% WM SIZE 8" 2461.26 100% 100% WM SIZE 8" 17528.1 100% 100% WM SIZE 8" 17059.4 100% 100% WM SIZE 8" 12432.52 100% 100% WM SIZE 8" 7777.03 100% 100% WM SIZE 8" 5334.22 100% 100% WM SIZE 8" 4521.09 100% 100% WM SIZE 8" 3949.8 100% 100% WM SIZE 8" 3054.37 100% 100% WM SIZE 8" 3014.04 100% 100% WM SIZE 8" 2582.29 100% 100% WM SIZE 8" 2479.8 100% 100% WM SIZE 8" 2420.94 100% 100% WM SIZE 8" 2006 100% 100% WM SIZE 8" 1831.25 100% 100% WM SIZE 8" 1696.83 100% 100% WM SIZE 8" 1676.73 100% 100% WM SIZE 8" 1579.24 100% 100% WM SIZE 8" 1327.24 100% 100% WM SIZE 8" 418.32 100% 100% WM SIZE 8" 236.88 100% 100% WM SIZE 8" 35.28 100% 100% WM SIZE 12" 3115.22 100% 100% WM SIZE 12" 17755.05 100% 100% WM SIZE 12" 16411.64 100% 100% WM SIZE 12" 15285.37 100% 100% WM SIZE 12" 11602.18 100% 100% WM SIZE 12" 11243.55 100% 100% WM SIZE 12" 9657.79 100% 100% WM SIZE 12" 9436.77 100% 100% WM SIZE 12" 8496.57 100% 100% WM SIZE 12" 8058.45 100% 100% WM SIZE 12" 5970.65 100% 100% WM SIZE 12" 5929.96 100% 100% WM SIZE 12" 5676.07 100% 100% WM SIZE 12" 5472.47 100% 100% WM SIZE 12" 5241.77 100% 100% WM SIZE 12" 5053.78 100% 100% WM SIZE 12" 4848.29 100% 100% WM SIZE 12" 2995.01 100% 100% WM SIZE 12" 2229.35 100% 100% WM SIZE 12" 1938.55 100% 100% WM SIZE 12" 1839.67 100% 100% WM SIZE 12" 1789.26 100% 100% WM SIZE 12" 1717.56 100% 100% WM SIZE 12" 1420.96 100% 100% WM SIZE 12" 1240.69 100% 100% WM SIZE 12" 1033.22 100% 100% WM SIZE 12" 963.47 100% 100% WM SIZE 12" 858.75 100% 100% WM SIZE 12" 775.4 100% 100% WM SIZE 12" 668.78 100% 100% WM SIZE 12" 542.77 100% 100% WM SIZE 12" 538.94 100% 100% WM SIZE 12" 290.76 100% 100% WM SIZE 12" 252.01 100% 100% WM SIZE 12" 174.49 100% 100% WM SIZE 12" 58.11 100% 100% WM SIZE 12" 38.74 100% 100% WM SIZE 16" 19093.84 100% 100% WM SIZE 16" 16904.79 100% 100% WM SIZE 16" 9760.88 100% 100% WM SIZE 16" 6441.35 100% 100% WM SIZE 16" 5329.46 100% 100% WM SIZE 16" 3419.56 100% 100% WM SIZE 16" 3033.43 100% 100% WM SIZE 16" 2049.43 100% 100% WM SIZE 16" 1374.79 100% 100% City Council 8 – 120 1/20/2026
103 City of Santa Ana – 2026 Water and Sewer Rate Study WM SIZE 16" 814.15 100% 100% WM SIZE 16" 488.48 100% 100% WM SIZE 16" 418.74 100% 100% WM SIZE 16" 297.75 100% 100% WM SIZE 16" 279.16 100% 100% WM SIZE 16" 139.57 100% 100% WM SIZE 16" 46.52 100% 100% WM SIZE 16" 26819.25 100% 100% WM SIZE 16" 1609.8 100% 100% WM SIZE 20" 30669.5 100% 100% WM SIZE 20" 23319.8 100% 100% WM SIZE 20" 1506.88 100% 100% WM SIZE 20" 537.39 100% 100% WM SIZE 6" 24700.76 100% 100% WM SIZE 6" 11488.14 100% 100% WM SIZE 6" 278.76 100% 100% WM SIZE 6" 167.22 100% 100% WM SIZE 6" 148.69 100% 100% WM SIZE 6" 24676.6 100% 100% WM SIZE 6" 4971.03 100% 100% WM SIZE 6" 765.63 100% 100% WM SIZE 6" 568.67 100% 100% WM SIZE 6" 185.82 100% 100% WM SIZE 6" 170.98 100% 100% WM SIZE 6" 13426.34 100% 100% WM SIZE 8" 21192.23 100% 100% WM SIZE 8" 13273.94 100% 100% WM SIZE 8" 13257.21 100% 100% WM SIZE 8" 13160.58 100% 100% WM SIZE 8" 12421 100% 100% WM SIZE 8" 9555.47 100% 100% WM SIZE 8" 8856.7 100% 100% WM SIZE 8" 8825.13 100% 100% WM SIZE 8" 8527.84 100% 100% WM SIZE 8" 6857.2 100% 100% WM SIZE 8" 6665.8 100% 100% WM SIZE 8" 6485.57 100% 100% WM SIZE 8" 6431.63 100% 100% WM SIZE 8" 5747.81 100% 100% WM SIZE 8" 5658.6 100% 100% WM SIZE 8" 5593.55 100% 100% WM SIZE 8" 5314.75 100% 100% WM SIZE 8" 5314.75 100% 100% WM SIZE 8" 5207.02 100% 100% WM SIZE 8" 4504.53 100% 100% WM SIZE 8" 4460 100% 100% WM SIZE 8" 4422.76 100% 100% WM SIZE 8" 3725.89 100% 100% WM SIZE 8" 2692.74 100% 100% WM SIZE 8" 1479.22 100% 100% WM SIZE 8" 947.72 100% 100% WM SIZE 8" 910.6 100% 100% WM SIZE 8" 576.08 100% 100% WM SIZE 8" 204.44 100% 100% WM SIZE 8" 6216.06 100% 100% WM SIZE 8" 3287.34 100% 100% WM SIZE 8" 942.21 100% 100% WM SIZE 8" 799.06 100% 100% WM SIZE 8" 761.9 100% 100% WM SIZE 8" 466.42 100% 100% WM SIZE 8" 328.9 100% 100% WM SIZE 8" 226.72 100% 100% WM SIZE 8" 180.29 100% 100% WM SIZE 8" 148.69 100% 100% WM SIZE 12" 19426.61 100% 100% WM SIZE 12" 15138.19 100% 100% WM SIZE 12" 14634.24 100% 100% WM SIZE 12" 7569.05 100% 100% WM SIZE 12" 7309.63 100% 100% WM SIZE 12" 5682.17 100% 100% WM SIZE 12" 5669.32 100% 100% WM SIZE 12" 5274.78 100% 100% WM SIZE 12" 1601.7 100% 100% WM SIZE 12" 849.11 100% 100% WM SIZE 12" 621.8 100% 100% WM SIZE 12" 171.57 100% 100% WM SIZE 12" 19250.76 100% 100% WM SIZE 12" 16128.82 100% 100% WM SIZE 12" 15738.55 100% 100% WM SIZE 12" 9981.32 100% 100% WM SIZE 12" 8555.42 100% 100% WM SIZE 12" 7884.24 100% 100% WM SIZE 12" 7783.49 100% 100% WM SIZE 12" 5918.06 100% 100% WM SIZE 12" 3473.61 100% 100% WM SIZE 12" 2144.21 100% 100% WM SIZE 12" 1012.07 100% 100% WM SIZE 12" 994.89 100% 100% WM SIZE 12" 660.44 100% 100% WM SIZE 12" 323.81 100% 100% WM SIZE 12" 278.76 100% 100% WM SIZE 12" 42.89 100% 100% WM SIZE 12" 40.77 100% 100% WM SIZE 12" 21.44 100% 100% WM SIZE 12" 6156.04 100% 100% WM SIZE 12" 2206.43 100% 100% WM SIZE 12" 120.07 100% 100% WM SIZE 16" 9309.32 100% 100% WM SIZE 16" 25553.01 100% 100% WM SIZE 16" 23924.31 100% 100% WM SIZE 16" 22452.45 100% 100% WM SIZE 16" 13287.26 100% 100% WM SIZE 16" 8596.55 100% 100% WM SIZE 16" 3756.64 100% 100% WM SIZE 16" 2670.81 100% 100% WM SIZE 16" 1657.07 100% 100% WM SIZE 16" 746.19 100% 100% WM SIZE 16" 617.57 100% 100% WM SIZE 16" 540.36 100% 100% WM SIZE 16" 411.71 100% 100% WM SIZE 16" 311.3 100% 100% WM SIZE 16" 193.02 100% 100% WM SIZE 18" 21210.58 100% 100% WM SIZE 18" 20101.32 100% 100% WM SIZE 18" 18977.71 100% 100% WM SIZE 18" 18283.02 100% 100% WM SIZE 18" 13437.06 100% 100% WM SIZE 18" 9157.18 100% 100% WM SIZE 18" 8619.76 100% 100% WM SIZE 18" 6115.33 100% 100% WM SIZE 18" 1000.65 100% 100% WM SIZE 18" 297.29 100% 100% WM SIZE 18" 228.71 100% 100% WM SIZE 20" 29655.9 100% 100% WM SIZE 24" 42750.46 100% 100% WM SIZE 6" 12598.32 100% 100% WM SIZE 6" 12529.12 100% 100% City Council 8 – 121 1/20/2026
104 City of Santa Ana – 2026 Water and Sewer Rate Study WM SIZE 6" 12262.48 100% 100% WM SIZE 6" 6199.38 100% 100% WM SIZE 6" 4233.35 100% 100% WM SIZE 6" 3622.79 100% 100% WM SIZE 6" 895.55 100% 100% WM SIZE 6" 606.52 100% 100% WM SIZE 6" 162.81 100% 100% WM SIZE 8" 16487.64 100% 100% WM SIZE 8" 13479.58 100% 100% WM SIZE 8" 13127.47 100% 100% WM SIZE 8" 11947.04 100% 100% WM SIZE 8" 10440.94 100% 100% WM SIZE 8" 5902.28 100% 100% WM SIZE 8" 5859.53 100% 100% WM SIZE 8" 5820.81 100% 100% WM SIZE 8" 5535.92 100% 100% WM SIZE 8" 4457.24 100% 100% WM SIZE 8" 3704.2 100% 100% WM SIZE 8" 1180.44 100% 100% WM SIZE 8" 895.55 100% 100% WM SIZE 8" 488.46 100% 100% WM SIZE 8" 223.88 100% 100% WM SIZE 8" 11411.73 100% 100% WM SIZE 8" 4278.1 100% 100% WM SIZE 8" 3030.53 100% 100% WM SIZE 8" 1939.57 100% 100% WM SIZE 8" 1310.7 100% 100% WM SIZE 8" 447.78 100% 100% WM SIZE 8" 427.39 100% 100% WM SIZE 8" 329.75 100% 100% WM SIZE 8" 166.85 100% 100% WM SIZE 8" 818.13 100% 100% WM SIZE 8" 211.7 100% 100% WM SIZE 8" 177.05 100% 100% WM SIZE 12" 20658.7 100% 100% WM SIZE 12" 5121.8 100% 100% WM SIZE 12" 4781.29 100% 100% WM SIZE 12" 1146.04 100% 100% WM SIZE 12" 328.8 100% 100% WM SIZE 12" 375.76 100% 100% WM SIZE 16" 29383.93 100% 100% WM SIZE 16" 26038.86 100% 100% WM SIZE 16" 10900.24 100% 100% WM SIZE 16" 4531.48 100% 100% WM SIZE 16" 4184.79 100% 100% WM SIZE 18" 43470.1 100% 100% WM SIZE 6" 13127.07 100% 100% WM SIZE 6" 736.58 100% 100% WM SIZE 6" 621.83 100% 100% WM SIZE 6" 565.46 100% 100% WM SIZE 6" 242.69 100% 100% WM SIZE 6" 179.78 100% 100% WM SIZE 6" 173.33 100% 100% WM SIZE 6" 6930.77 100% 100% WM SIZE 6" 7223.21 100% 100% WM SIZE 6" 7186.44 100% 100% WM SIZE 6" 6841.94 100% 100% WM SIZE 6" 6529.95 100% 100% WM SIZE 6" 6066.3 100% 100% WM SIZE 6" 379.14 100% 100% WM SIZE 6" 333.65 100% 100% WM SIZE 6" 305.45 100% 100% WM SIZE 8" 20993.8 100% 100% WM SIZE 8" 14496.3 100% 100% WM SIZE 8" 14433.52 100% 100% WM SIZE 8" 14407.53 100% 100% WM SIZE 8" 14359.81 100% 100% WM SIZE 8" 14108.49 100% 100% WM SIZE 8" 13952.55 100% 100% WM SIZE 8" 12626.65 100% 100% WM SIZE 8" 10713.56 100% 100% WM SIZE 8" 10410.23 100% 100% WM SIZE 8" 10364.75 100% 100% WM SIZE 8" 8910.94 100% 100% WM SIZE 8" 8891.5 100% 100% WM SIZE 8" 8815.66 100% 100% WM SIZE 8" 8594.71 100% 100% WM SIZE 8" 8321.67 100% 100% WM SIZE 8" 8211.16 100% 100% WM SIZE 8" 7816.9 100% 100% WM SIZE 8" 6088.01 100% 100% WM SIZE 8" 5849.64 100% 100% WM SIZE 8" 5702.35 100% 100% WM SIZE 8" 5645.97 100% 100% WM SIZE 8" 5633.05 100% 100% WM SIZE 8" 5633.05 100% 100% WM SIZE 8" 5633.05 100% 100% WM SIZE 8" 5633.05 100% 100% WM SIZE 8" 5611.31 100% 100% WM SIZE 8" 5009.08 100% 100% WM SIZE 8" 4798.92 100% 100% WM SIZE 8" 4703.57 100% 100% WM SIZE 8" 4398.04 100% 100% WM SIZE 8" 4294.08 100% 100% WM SIZE 8" 3228.17 100% 100% WM SIZE 8" 3191.27 100% 100% WM SIZE 8" 3128.51 100% 100% WM SIZE 8" 3117.66 100% 100% WM SIZE 8" 2578.2 100% 100% WM SIZE 8" 2506.66 100% 100% WM SIZE 8" 2426.55 100% 100% WM SIZE 8" 2426.55 100% 100% WM SIZE 8" 2374.52 100% 100% WM SIZE 8" 1299.91 100% 100% WM SIZE 8" 901.31 100% 100% WM SIZE 8" 691.13 100% 100% WM SIZE 8" 684.59 100% 100% WM SIZE 8" 671.65 100% 100% WM SIZE 8" 561.13 100% 100% WM SIZE 8" 498.29 100% 100% WM SIZE 8" 459.29 100% 100% WM SIZE 8" 457.1 100% 100% WM SIZE 8" 381.28 100% 100% WM SIZE 8" 368.34 100% 100% WM SIZE 8" 361.82 100% 100% WM SIZE 8" 346.63 100% 100% WM SIZE 8" 346.63 100% 100% WM SIZE 10" 497.44 100% 100% WM SIZE 10" 427.43 100% 100% WM SIZE 12" 24188.6 100% 100% WM SIZE 12" 21326.3 100% 100% WM SIZE 12" 11844.34 100% 100% WM SIZE 12" 11301.89 100% 100% WM SIZE 12" 8349.5 100% 100% WM SIZE 12" 8349.5 100% 100% City Council 8 – 122 1/20/2026
105 City of Santa Ana – 2026 Water and Sewer Rate Study WM SIZE 12" 6609.61 100% 100% WM SIZE 12" 6499.61 100% 100% WM SIZE 12" 6499.61 100% 100% WM SIZE 12" 6349.59 100% 100% WM SIZE 12" 6099.68 100% 100% WM SIZE 12" 5712.14 100% 100% WM SIZE 12" 5699.64 100% 100% WM SIZE 12" 5302.18 100% 100% WM SIZE 12" 4394.77 100% 100% WM SIZE 12" 3849.74 100% 100% WM SIZE 12" 2749.82 100% 100% WM SIZE 12" 2249.89 100% 100% WM SIZE 12" 2052.4 100% 100% WM SIZE 12" 1524.9 100% 100% WM SIZE 12" 1014.9 100% 100% WM SIZE 12" 899.93 100% 100% WM SIZE 12" 849.92 100% 100% WM SIZE 12" 837.42 100% 100% WM SIZE 12" 699.93 100% 100% WM SIZE 12" 584.93 100% 100% WM SIZE 12" 562.48 100% 100% WM SIZE 12" 524.98 100% 100% WM SIZE 12" 24.99 100% 100% WM SIZE 12" 24.99 100% 100% WM SIZE 12" 16029.08 100% 100% WM SIZE 16" 79426.46 100% 100% WM SIZE 16" 24118.62 100% 100% WM SIZE 24" 63408.33 100% 100% WM SIZE 24" 36781.88 100% 100% WM SIZE 24" 247.94 100% 100% WM SIZE 6" 14037.34 100% 100% WM SIZE 6" 8839.61 100% 100% WM SIZE 6" 1303.55 100% 100% WM SIZE 6" 1296.55 100% 100% WM SIZE 6" 420.47 100% 100% WM SIZE 6" 397.15 100% 100% WM SIZE 6" 163.51 100% 100% WM SIZE 6" 7232.39 100% 100% WM SIZE 6" 7059.57 100% 100% WM SIZE 8" 11722.29 100% 100% WM SIZE 8" 10381.42 100% 100% WM SIZE 8" 7452.03 100% 100% WM SIZE 8" 7159.95 100% 100% WM SIZE 8" 6832.92 100% 100% WM SIZE 8" 4359.08 100% 100% WM SIZE 8" 506.9 100% 100% WM SIZE 12" 24353.34 100% 100% WM SIZE 12" 20701 100% 100% WM SIZE 12" 17612.03 100% 100% WM SIZE 12" 15283.15 100% 100% WM SIZE 12" 11051.3 100% 100% WM SIZE 12" 10525.66 100% 100% WM SIZE 12" 9380.11 100% 100% WM SIZE 12" 9272.36 100% 100% WM SIZE 12" 8975.82 100% 100% WM SIZE 12" 8884.17 100% 100% WM SIZE 12" 8722.47 100% 100% WM SIZE 12" 8636.19 100% 100% WM SIZE 12" 8000.04 100% 100% WM SIZE 12" 7388.19 100% 100% WM SIZE 12" 3118.58 100% 100% WM SIZE 12" 1919.13 100% 100% WM SIZE 12" 539.07 100% 100% WM SIZE 12" 377.32 100% 100% WM SIZE 6" 9742.58 100% 100% WM SIZE 6" 8829.68 100% 100% WM SIZE 6" 7797.61 100% 100% WM SIZE 6" 1889.15 100% 100% WM SIZE 6" 1245.06 100% 100% WM SIZE 6" 1186.72 100% 100% WM SIZE 6" 400.66 100% 100% WM SIZE 8" 24774.79 100% 100% WM SIZE 8" 11030.69 100% 100% WM SIZE 8" 8401.07 100% 100% WM SIZE 8" 6658.97 100% 100% WM SIZE 8" 1724.34 100% 100% WM SIZE 8" 943.3 100% 100% WM SIZE 8" 76.1 100% 100% WM SIZE 12" 11136.06 100% 100% WM SIZE 12" 10419.23 100% 100% WM SIZE 12" 10246.63 100% 100% WM SIZE 12" 702.21 100% 100% WM SIZE 16" 13998.8 100% 100% WM SIZE 6" 29125.6 100% 100% WM SIZE 6" 26081.84 100% 100% WM SIZE 6" 1131.34 100% 100% WM SIZE 6" 748.86 100% 100% WM SIZE 6" 700.32 100% 100% WM SIZE 6" 1018.17 100% 100% WM SIZE 6" 969.63 100% 100% WM SIZE 8" 32675.76 100% 100% WM SIZE 8" 31937.68 100% 100% WM SIZE 8" 26340.42 100% 100% WM SIZE 8" 24506.1 100% 100% WM SIZE 8" 20929.1 100% 100% WM SIZE 8" 18722.99 100% 100% WM SIZE 8" 18380.97 100% 100% WM SIZE 8" 15183.67 100% 100% WM SIZE 8" 14036.2 100% 100% WM SIZE 8" 13715.7 100% 100% WM SIZE 8" 10055.14 100% 100% WM SIZE 8" 9804.61 100% 100% WM SIZE 8" 8390.47 100% 100% WM SIZE 8" 8174.94 100% 100% WM SIZE 8" 8131.85 100% 100% WM SIZE 8" 8094.17 100% 100% WM SIZE 8" 8037.58 100% 100% WM SIZE 8" 8016.03 100% 100% WM SIZE 8" 7986.41 100% 100% WM SIZE 8" 7946.05 100% 100% WM SIZE 8" 7908.28 100% 100% WM SIZE 8" 7865.2 100% 100% WM SIZE 8" 7811.37 100% 100% WM SIZE 8" 7797.89 100% 100% WM SIZE 8" 7582.38 100% 100% WM SIZE 8" 7568.89 100% 100% WM SIZE 8" 7560.82 100% 100% WM SIZE 8" 7226.86 100% 100% WM SIZE 8" 6895.54 100% 100% WM SIZE 8" 6084.81 100% 100% WM SIZE 8" 4301.67 100% 100% WM SIZE 8" 3946.09 100% 100% WM SIZE 8" 2693.55 100% 100% WM SIZE 8" 773.04 100% 100% WM SIZE 8" 716.45 100% 100% WM SIZE 8" 511.8 100% 100% WM SIZE 8" 498.31 100% 100% WM SIZE 8" 646.46 100% 100% WM SIZE 8" 581.83 100% 100% City Council 8 – 123 1/20/2026
106 City of Santa Ana – 2026 Water and Sewer Rate Study WM SIZE 8" 530.62 100% 100% WM SIZE 8" 293.63 100% 100% WM SIZE 8" 263.98 100% 100% WM SIZE 12" 38001.09 100% 100% WM SIZE 12" 14971.11 100% 100% WM SIZE 12" 10455.22 100% 100% WM SIZE 12" 10340.21 100% 100% WM SIZE 12" 6514.35 100% 100% WM SIZE 12" 4062.16 100% 100% WM SIZE 12" 2648.01 100% 100% WM SIZE 12" 2517.41 100% 100% WM SIZE 12" 2427.29 100% 100% WM SIZE 12" 2225.27 100% 100% WM SIZE 16" 708.58 100% 100% WM SIZE 20" 24501.18 100% 100% WM SIZE 20" 12918.34 100% 100% WM SIZE 20" 12849.97 100% 100% WM SIZE 20" 9887.07 100% 100% WM SIZE 20" 1481.43 100% 100% WM SIZE 20" 1267.22 100% 100% WM SIZE 20" 346.45 100% 100% WM SIZE 6" 18158.95 100% 100% WM SIZE 6" 736.37 100% 100% WM SIZE 8" 29581.32 100% 100% WM SIZE 8" 28114.41 100% 100% WM SIZE 8" 20980.79 100% 100% WM SIZE 8" 19361.34 100% 100% WM SIZE 8" 9733.91 100% 100% WM SIZE 8" 8790.44 100% 100% WM SIZE 8" 8456.76 100% 100% WM SIZE 8" 7821.04 100% 100% WM SIZE 8" 7467.24 100% 100% WM SIZE 8" 4116.18 100% 100% WM SIZE 8" 1955.93 100% 100% WM SIZE 8" 1875.45 100% 100% WM SIZE 8" 1820.83 100% 100% WM SIZE 8" 1360.54 100% 100% WM SIZE 8" 1314.54 100% 100% WM SIZE 8" 1185.06 100% 100% WM SIZE 8" 1182.21 100% 100% WM SIZE 8" 854.31 100% 100% WM SIZE 8" 612.72 100% 100% WM SIZE 8" 8494.17 100% 100% WM SIZE 12" 24865.72 100% 100% WM SIZE 12" 17159.12 100% 100% WM SIZE 8" 30295.69 100% 100% WM SIZE 8" 30289.48 100% 100% WM SIZE 8" 15642.97 100% 100% WM SIZE 8" 12551.98 100% 100% WM SIZE 8" 8765.72 100% 100% WM SIZE 8" 8747.3 100% 100% WM SIZE 8" 4733.47 100% 100% WM SIZE 8" 3229.51 100% 100% WM SIZE 8" 1310.29 100% 100% WM SIZE 12" 81342.31 100% 100% WM 3/4"meter 0 100% 100% WM 5/8" meter 0 100% 100% WM 1" meter 0 100% 100% WM 1 1/2" meter 0 100% 100% WM 2" meter 0 100% 100% WM 3" meter 0 100% 100% WM 4" meter 0 100% 100% WM 6" meter 0 100% 100% WM Multi-family 0 100% 100% LAND EASEMENT WELLS-23-24 1000 1 100%
LAND CAMILLE PLANT 1868.75 100% 100%
LAND LAURAL PLANT 3479.74 100% 100%
LAND WELL #16 4700 100% 100%
LAND EDINGER PLANT 7249.46 100% 100%
LAND VERANO PLANT 7423.45 100% 100%
LAND CENTER PLANT 8989.33 100% 100%
LAND WAL ST RESERVOIR 9506 100% 100%
LAND GOLDEN WEST PLANT 11953.55 100% 100%
LAND LOT 17500 100% 100%
LAND NE RES SITE 20422.63 100% 100%
LAND CLARA PLANT 23842.67 100% 100%
LAND FIGUEROA PLANT 25985.46 100% 100%
LAND WEST RESERVOIR 28220 100% 100%
LAND SIDNEY PLANT 30769.93 100% 100%
LAND BRISTOL ST RES 31250 100% 100%
LAND CAMBRIDGE RESERVOIR 51000 100% 100%
LAND REAL PROPERTY 57036.79 100% 100%
LAND EAST RESERVOIR 60329 100% 100%
LAND EXCESS LAND-SA GARDE 201017.93 100% 100% WM SIZE 6" 1599.51 100% 100% WM 4 WATER SERVICE 5862.72 100% 100% SL 6 VCP 12746.17 100% 100% WM SIZE 8" 10277.47 100% 100% WM SIZE 4" 11726.2 100% 100% MOTOR PUMP 350 HP 12754.27 100% 100% MOTOR PUMP 350 HP 13608.71 100% 100% FS 10 FIRE SERVICE 11982.49 100% 100%
FS FIRE SERVICE 47608.34 100% 100%
FS 8" 3401 S MAIN S 3115.82 100% 100%
FS 8" 4300 W WESTMI 3238.38 100% 100%
FS 6"730 S EUCLID 3492.61 100% 100%
FS 6" 1815 E CARNEG 3512.04 100% 100%
FS 6" 3001 W HARVAR 3695.07 100% 100%
FS 6" 1301 E 17TH S 3748.4 100% 100% WM 1 WATER SERVICE 25111.25 100% 100% FH 1901 N MCCLAY 3765.13 100% 100%
FS 8" 2600 S RED HI 3794.47 100% 100% WM 3 GATE VALVE 113 E G 3858.41 100% 100% WM 6" 201 E MACART 5517.18 100% 100% FS 8" 2901 TECH CEN 4044.11 100% 100%
FS 6" 1100 S CENTER 4160.81 100% 100%
FS 4" 1110 N MAIN S 4507.07 100% 100%
FS 10" 3401 S HARBO 4511.67 100% 100%
FS FIRE SERVICE 64510.12 100% 100% WM SIPHON GATER VAL SA 5427.38 100% 100% WM 4" WATER SERVICE 5477.11 100% 100% WM 6" 3401 S MAIN 5501.25 100% 100% FS 8" 3080 S HARBOR 5905.25 100% 100%
FS 8" 620 N SANTIAG 5987.37 100% 100%
City Council 8 – 124 1/20/2026
107 City of Santa Ana – 2026 Water and Sewer Rate Study WM 6 PVC WATER MAIN 37 3674.12 100% 100% WM 2 WATER SERVICE 41530.12 100% 100% WELL 31 IMPROV 5016.44 100% 100% 12 IRON WTR MN 114 4788 100% 100% WM 12X8" VALVE 6458.96 100% 100% FS 8" 1180 S BRISTO 6550.58 100% 100%
NEW FIRE HYDRANT ASS 5040 100% 100%
NEW FIRE HYDRANT 4037.5 100% 100% WM PINE 12X12 W VALVE 6226.86 100% 100% 20 IRON WTR MN 47 5264 100% 100%
15 2 WATER SERVICE 8 5344 100% 100% WN MAIN ST 6" MAIN 6706.7 100% 100% WM 3" 1 E MACARTHU 7824.19 100% 100% WM 19 1" WATER SRVCS 11431.67 100% 100% FS 10" 1038 E 4TH S 8351.8 100% 100%
FS 6 FIRE SERVICE 4288.33 100% 100% WM 6" 700 E DYER 8686.69 100% 100% FS 4" 1718 N FAIRVI 8967.62 100% 100% WM 6 PVC WATER MAIN 105 6721.74 100% 100% WM PINE 16X8 W VALVE 8588.85 100% 100% WM 12 MAIN DYER MAIN HA 14759.03 100% 100% 8" MAIN DI 2756.56 100% 100%
12" MAIN DI 3015.67 100% 100% WM SIZE 1" 148240.32 100% 100% 12" MAIN DI 3108.48 100% 100%
12" MAIN DI 3001.79 100% 100%
J3100B 0 100% 100%
6" MAIN DI 3325.09 100% 100%
1 WATER SRVC 11 9240 100% 100%
12" MAIN DI 3164.71 100% 100%
12" MAIN 3287.18 100% 100%
12" MAIN DI 3235.28 100% 100%
FS 12" 2200 E MCFA 13162.62 100% 100%
12" MAIN DI 3734.8 100% 100% WM 1 WATER SERVICE 240048.93 100% 100% 24 BUTTERLY VALVE 10080 100% 100%
FS 8" 1615 E 17TH S 14440.78 ` 100% 100%
10" FIRE SERVICE D 913.11 100% 100%
8" FIRE SERVICE DI 1014.2 100% 100%
6" FIRE SERVICE DI 839.03 100% 100%
5 NEW FIRE HYDRANTS 11133.34 100% 100%
6" HYDRANT 1071.92 100% 100%
4" FIRE SERVICE PE 1115.35 100% 100%
4" FIRE SERVICE DI 1083.44 100% 100%
3" SERVICE DI 797.93 100% 100%
6" FIRE SERVICE DI 928.1 100% 100%
6" HYDRANT 1157.18 100% 100%
8" FIRE SERVICE DI 746.04 100% 100%
8" MAIN AC 4043.79 100% 100%
6" FIRE SERVICE DI 1073.95 100% 100%
6" FIRE SERVICE DI 969.7 100% 100%
VERTICAL OFFSET 3556.21 100% 100%
6" HYDRANT 626.65 100% 100%
10" FIRE SERVICE D 985.24 100% 100%
8" FIRE SERVICE DI 1107.49 100% 100%
8" FIRE SERVICE DI 1232.45 100% 100%
3" SERVICE DI 431.57 100% 100% WM MAIN ST 10" MAIN 16339.97 100% 100% 3" SERVICE DI 919.04 100% 100%
6" FIRE SERVICE DI 1137.24 100% 100%
3" SERVICE DI 354.46 100% 100% WM SIZE 12" 251751.7 100% 100% 3" SERVICE DI 941.98 100% 100%
4" FIRE SERVICE DI 316.38 100% 100%
10" FS DI 532.8 100% 100%
3" SERVICE DI 953.33 100% 100%
12" SERVICE DI 1177.8 100% 100%
6" FIRE SERVICE DI 1065.76 100% 100%
3" SERVICE DI 474.12 100% 100%
10" FIRE SERVICE D 373.42 100% 100%
4" FIRE SERVICE AC 292.51 100% 100%
6" HYDRANT 188.93 100% 100%
4" SERVICE DI 644.01 100% 100%
8" FIRE SERVICE 282.34 100% 100%
6" MAIN DI 5437.11 100% 100%
8" FIRE SERVICE DI 1115.03 100% 100%
8" FIRE SERVICE AC 158.61 100% 100%
3" SERVICE AC 312.61 100% 100%
6" FIRE SERVICE DI 1129.69 100% 100%
VERTICAL OFFSET 3998.51 100% 100%
6" FIRE SERVICE DI 1133.96 100% 100%
6" HYDRANT 105.54 100% 100%
FS 4 FIRE SERVICE 10251.82 100% 100%
4" SERVICE AC 293.44 100% 100%
8" FIRE SERVICE AC 84.91 100% 100%
3" SERVICE DI 1160.36 100% 100%
4" FIRE SERVICE DI 569.66 100% 100%
8" FIRE SERVICE AC 63.46 100% 100%
3" SERVICE AC 152.71 100% 100%
12" FIRE SERVICE D 1167.96 100% 100%
3" SERVICE CU 666.92 100% 100%
6" HYDRANT 86.24 100% 100%
6" HYDRANT 154.64 100% 100%
3" SERVICE 368 100% 100%
6" HYDRANT 253.3 100% 100% WM SIZE 8" 386005.77 100% 100% 3" SERVICE DI 344.33 100% 100%
4" SERVICE DI 384.94 100% 100%
6" HYDRANT 87.67 100% 100%
6" FIRE SERVICE AC 169.17 100% 100%
8" FIRE SERVICE DI 1341.41 100% 100%
6" FIRE SERVICE AC 219.66 100% 100%
3" SERVICE AC 10.84 100% 100%
6" HYDRANT 172.7 100% 100%
3" SERVICE CI 301.73 100% 100%
3" SERVICE AC 0 100% 100%
8" FIRE SERVICE DI 1378.69 100% 100%
6" FIRE SERVICE 264.18 100% 100%
3" SERVICE DI 1122.3 100% 100%
6" HYDRANT 214.44 100% 100%
10" FIRE SERVICE A 361.11 100% 100%
6" MAIN CI 6150.59 100% 100%
10" FIRE SERVICE 0 100% 100%
8" FIRE SERVICE AC 0 100% 100%
6" SERVICE AC 92.14 100% 100%
4" FIRE SERVICE DI 1259.5 100% 100%
6" HYDRANT 92.51 100% 100%
10" FIRE SERV DI 1547.86 100% 100%
6" FIRE SERVICE AC 255.48 100% 100%
6" FIRE SERVICE DI 1265.7 100% 100% WM SIZE 8" ELDER 22836.1 100% 100% 4" SERVICE DI 1283.69 100% 100%
3" SERVICE PE 1653.67 100% 100% WM MAIN ST 15 2" SERVI 20636.04 100% 100% 3" SERVICE AC 248.09 100% 100%
6" FIRE SERVICE AC 132.59 100% 100%
3" SERVICE AC 0 100% 100%
City Council 8 – 125 1/20/2026
108 City of Santa Ana – 2026 Water and Sewer Rate Study 4" SERVICE DI 1172.49 100% 100%
8" FIRE SERVICE DI 693.9 100% 100%
4" FIRE SERVICE DI 483.13 100% 100% WM SIZE 8" 1230L 131690.1 100% 100% 3" SERVICE PE 35.62 100% 100%
12" MAIN DI 5968.04 100% 100%
4" FIRE SERVICE AC 0 100% 100%
6" FIRE SERVICE AC 72.26 100% 100%
3" WATER SERVICE 0 100% 100%
3" SERVICE AC 214.33 100% 100%
3" WATER SERVICE 0 100% 100%
3" SERVICE DI 1212.52 100% 100%
3" FIRE SERVICE AC 0 100% 100%
4" FIRE SERVICE DI 435.98 100% 100%
4" FIRE SERVICE DI 1362.57 100% 100%
4" DI SERVICE 1674.12 100% 100%
10" FIRE SERVICE 364.12 100% 100%
4" FIRE SERVICE 0 100% 100%
1 WATER SERVICE 46 17924.67 100% 100%
12" SERVICE DI 5917.45 100% 100%
3" SERVICE DI 1238.79 100% 100%
8" FIRE SERVICE AC 208.38 100% 100%
6" HYDRANT 0 100% 100%
4" FIRE SERVICE AC 0 100% 100%
4" SERVICE AC 340.11 100% 100%
3" SERVICE 0 100% 100%
6" FIRE SERVICE 0 100% 100%
8" FIRE SERVICE AC 0 100% 100%
3" SERVICE DI 0 100% 100%
10" FIRE SERVICE A 170.26 100% 100%
3" SERVICE AC 0 100% 100%
6" FIRE SERVICE AC 257.05 100% 100%
6" FIRE SERVICE 331.19 100% 100%
10" FIRE SERVICE D 572.4 100% 100%
6" HYDRANT 90.56 100% 100%
6" HYDRANT 90.65 100% 100%
8" FIRE SERVICE 0 100% 100%
8" FIRE SERVICE DI 508.24 100% 100%
3" SERVICE DI 1429.63 100% 100%
10" FIRE SERVICE A 365.13 100% 100%
10" FS DI 579.36 100% 100%
3" SERVICE AC 0 100% 100%
3" SERVICE DI 0 100% 100%
4" SERVICE AC 0 100% 100%
6" SERVICE DI 1307.85 100% 100%
10" FIRE SERVICE A 191.4 100% 100%
3" SERVICE DI 1788.6 100% 100%
8" FIRE SERVICE AC 0 100% 100%
4" FIRE SERVICE 0 100% 100%
4" SERVICE AC 0 100% 100%
3" SERVICE AC 0 100% 100%
4" FIRE SERVICE DI 412.05 100% 100%
4" FIRE SERVICE AC 0 100% 100%
8" FIRE SERVICE 0 100% 100%
4" SERVICE AC 40.57 100% 100%
10" FIRE SERVICE 0 100% 100%
3" SERVICE DI 1506.29 100% 100%
8" FIRE SERVICE 304.82 100% 100%
8" FIRE SERVICE AC 385.13 100% 100%
10" FIRE SERVICE 436.87 100% 100%
6" FIRE SERVICE AC 155.01 100% 100%
4" SERVICE AC 69.11 100% 100%
8" FIRE SERVICE AC 0 100% 100%
4" FIRE SERVICE AC 1541.56 100% 100%
10" FIRE SERVICE A 0 100% 100%
3" SERVICE 411.31 100% 100%
3" SERVICE DI 1720.6 100% 100%
12" FIRE SERVICE D 464.23 100% 100%
12" SERVICE CI 630.12 100% 100%
10" FIRE SERVICE 416.66 100% 100%
4" FIRE SERVICE DI 1568.69 100% 100%
3" WATER SERVICE 0 100% 100%
3" SERVICE AC 318.16 100% 100%
4" SERVICE CI 0 100% 100%
8" FIRE SERVICE DI 493.78 100% 100%
8" FIRE SERVICE AC 72.56 100% 100%
2" SERVICE CU 0 100% 100%
8" FIRE SERVICE AC 409.03 100% 100%
8" FIRE SERVICE DI 1606.96 100% 100%
8" FIRE SERVICE 375.54 100% 100% WM SIZE 8" LYON 39800.7 100% 100% 8" FIRE SERVICE 0 100% 100%
8" FIRE SERVICE AC 429.42 100% 100%
4" SERVICE AC 447.24 100% 100%
3" SERVICE AC 0 100% 100%
3" SERVICE DI 1791.38 100% 100%
6" SERVICE AC 447.56 100% 100%
6" FIRE SERVICE CI 448.49 100% 100%
6" HYDRANT 6707.39 100% 100%
3" SERVICE AC 396.53 100% 100%
3" SERVICE DI 1459.61 100% 100%
6" FIRE SERVICE AC 0 100% 100%
10" FIRE SERVICE A 416.14 100% 100%
4" SERVICE DI 0 100% 100%
8" FIRE SERVICE DI 1475.4 100% 100%
8" FIRE SERVICE DI 566.67 100% 100%
10" FS AC 337.59 100% 100%
4" SERVICE AC 0 100% 100%
8" COMB SERVICE 0 100% 100%
6" FIRE SERVICE 342.88 100% 100%
12" FIRE SERVICE D 686.45 100% 100%
3" SERVICE DI 0 100% 100%
6" FIRE SERVICE 345.13 100% 100%
4" SERVICE DI 1710.03 100% 100%
4" SERVICE AC 401.05 100% 100%
8" FIRE SERVICE 0 100% 100%
8" FIRE SERVICE 403.67 100% 100%
3" SERVICE AC 0 100% 100%
10" FIRE SERVICE D 621.93 100% 100%
12" MAIN DI 408.53 100% 100%
10" FIRE SERVICE A 543.49 100% 100%
INTERCONNECTION 0 100% 100%
6" FIRE HYDRANT 213.56 100% 100%
12" FIRE SERVICE A 450.41 100% 100%
10" FIRE SERVICE A 146.02 100% 100%
3" SERVICE AC 0 100% 100%
4" SERVICE DI 570.37 100% 100%
8" MAIN DI 9632.91 100% 100%
3" SERVICE AC 0 100% 100%
City Council 8 – 126 1/20/2026
109 City of Santa Ana – 2026 Water and Sewer Rate Study 3" SERVICE AC 0 100% 100%
6" HYDRANT 0 100% 100%
8" FIRE SERVICE AC 479.14 100% 100%
10" FIRE SERVICE D 684.78 100% 100%
3" SERVICE AC 0 100% 100%
3" SERVICE AC 0 100% 100%
8" FIRE SERVICE AC 133.33 100% 100%
8" FIRE SERVICE AC 133.33 100% 100%
8" FIRE SERVICE 0 100% 100%
6" FIRE SERV AC 0 100% 100%
4" SERVICE AC 0 100% 100%
3" SERVICE DI 0 100% 100%
8" FIRE SERVICE AC 261.71 100% 100%
8" FIRE SERVICE AC 499.55 100% 100%
10" FIRE SERV DI 1878.86 100% 100% WM 1" WATER SERVICE 33777 100% 100% 3" FIRE SERVICE AC 718.92 100% 100%
8" MAIN AC 7792.16 100% 100%
4" SERVICE AC 0 100% 100%
8" FIRE SERVICE AC 212.63 100% 100%
6" HYDRANT 0 100% 100%
8" FIRE SERVICE 232.59 100% 100%
6" FIRE SERVICE AC 34.53 100% 100%
12" MAIN DI 11561.4 100% 100%
8" FIRE SERVICE 0 100% 100%
8" FIRE SERVICE 0 100% 100%
1" WATER SERVICE 0 100% 100%
4" SERVICE AC 0 100% 100%
1" SERVICE 0 100% 100%
8" FIRE SERVICE 0 100% 100% WM SIZE 12" 649674.81 100% 100% 6" FIRE SERVICE 427.89 100% 100%
8" FIRE SERVICE 0 100% 100%
3" SERVICE DI 538.36 100% 100% WM 8" WT MN TOWNS MV 77719.67 100% 100% 16" MAIN AC 8571.79 100% 100%
3/4" CU SERVICE 0 100% 100%
3" SERVICE AC 0 100% 100% WM 24 IN WT BRI S CLS C 79449.48 100% 100% 8" SERVICE 0 100% 100%
6" FIRE SERVICE DI 646.72 100% 100%
2-1/2" HYDRANT 0 100% 100%
10" COMB SERVICE 0 100% 100%
4" WATER SERVICE 0 100% 100%
8" MAIN DI 11144 100% 100%
8" COMB SERVICE AC 0 100% 100%
8" FIRE SERVICE 0 100% 100%
8" COMB SERV AC 0 100% 100% WM SIZE 8" 519530.38 100% 100% 3" SERVICE AC 0 100% 100%
2" METERS 0 100% 100% MAIN RESTRAINERS 2018.99 100% 100% 10" FIRE SERVICE 394.67 100% 100%
8" FIRE SERVICE DI 2176.36 100% 100%
PIPE- CI 30IN-170LF 0 100% 100%
6" SERVICE AC 0 100% 100%
10" SERVICE AC 0 100% 100%
16" MAIN AC 10227.51 100% 100%
3" SERVICE DI 1987.06 100% 100%
8" COMB SERVICE AC 0 100% 100%
10" COMB F D AC 0 100% 100%
4" SERVICE 0 100% 100%
12" MAIN 9356.52 100% 100%
12" FIRE SERVICE 0 100% 100%
6" HYDRANT 0 100% 100%
6" HYDRANT 0 100% 100%
6X3IN DETECTOR CHECK 0 100% 100%
6X3 DETECTOR CHECK 0 100% 100%
10" LAT W/8DET 0 100% 100%
2" STL MAIN 0 100% 100%
6" MAIN AC 0 100% 100%
3" COMPOUND METERS 0 100% 100%
1" SERVICE CU 0 100% 100%
3/4 SERVICE 0 100% 100%
12" FIRE SERVICE D 2266.63 100% 100%
8IN CI MAIN 678-026 0 100% 100%
8" SERVICE FIRE AC 0 100% 100%
8" FIRE SERVICE 0 100% 100%
PIPING- WI 16-340LF 0 100% 100%
4" FIRE SERVICE 0 100% 100%
DRAFTMASTER 0 100% 100%
10" FIRE SERV 0 100% 100%
1" SERVICE PE 0 100% 100%
INTERCONNECTION 0 100% 100%
HYDRAULIC VALVE OP 0 100% 100%
5/8IN METERS 0 100% 100%
3" WATER SERVICE 0 100% 100%
12" FIRE SERVICE 0 100% 100%
2 1/2 N FIRE SERV AC 0 100% 100%
6" FIRE SERVICE 0 100% 100%
8" MAIN DI 12626.4 100% 100%
4" SERVICE AC 0 100% 100%
8" MAIN AC 9504.59 100% 100%
10INFIRESERVICE AC 0 100% 100%
10" FIRE SERVICE D 1189.33 100% 100%
PIPE- CI 24IN-235LF 0 100% 100%
8" FIRE SERV AC 0 100% 100%
12" AC CAPCO PIPE 0 100% 100%
6IN TURBOWATER METER 0 100% 100%
6" HYDRANT 0 100% 100% WM SIZE 8" RITCH 62252.44 100% 100% 4" FIRE SERV AC 0 100% 100% WM SIZE 12" 306577.21 100% 100% WM 8" MAIN RENE DAHL E 65480.27 100% 100% WM PINE 98 1 IN W SRVC 42085.25 100% 100% 10" SERVICE 0 100% 100%
4" SERVICE AC 0 100% 100% MULT SERVICE 0 100% 100%
3" SERVICE DI 0 100% 100%
10" FIRE SERVICE 0 100% 100%
12" MAIN DI 15994.65 100% 100%
CLEANER 0 100% 100%
12" MAIN DI 13155.36 100% 100%
10" FIRE SERVICE 0 100% 100% MULTIPLE SERVICE 0 100% 100% 1" PE SERVICE 0 100% 100%
PIPING- LOT OF 0 100% 100%
PIPE- 24FT OF 16IN W 0 100% 100%
3/4 SERVICE 0 100% 100%
10" FIRE SERVICE 647.37 100% 100%
8" COMB SERVICE AC 0 100% 100%
8" FIRE SERVICE DI 871.86 100% 100%
City Council 8 – 127 1/20/2026
110 City of Santa Ana – 2026 Water and Sewer Rate Study 1 1/2" METERS 0 100% 100%
4" FIRE SERVICE 0 100% 100%
10" COMB D F AC 0 100% 100%
3" WATER SERVICE 463.18 100% 100% WM 1" WATER SRVC 73606.67 100% 100% 8" FIRE SERVICE 411.98 100% 100%
4" HYDRANT 0 100% 100%
3" SERVICE DI 0 100% 100%
1-1/2 SRV 1951-1955 0 100% 100%
8" AC PIPE 0 100% 100%
1" SRV 1926-1930 0 100% 100%
8" FIRE SERVICE 495.62 100% 100%
GUILLOTINE SAW 0 100% 100%
8" MAIN DI 7453.18 100% 100%
8" FIRE SERVICE DI 642.14 100% 100%
8" FIRE SERVICE 642.3 100% 100%
STORAGE SHELTER 0 100% 100%
10" FIRE SERVICE A 892.09 100% 100%
10" SERVICE 0 100% 100%
5/8IN METERS 0 100% 100%
2" METERS 0 100% 100%
INTERCONNECTION 0 100% 100%
8" FIRE SERVICE 183.82 100% 100%
12" FIRE SERVICE 312.72 100% 100%
3" COMPOUND METERS 0 100% 100%
8" MAIN DI 20639.69 100% 100%
3" SERVICE DI 0 100% 100%
PIPE- 20IN 360LF 0 100% 100%
12" MAIN 14684.49 100% 100%
1" METERS 0 100% 100%
2" METER DISC 0 100% 100%
1" SERVICE PE 0 100% 100%
VALVE OPERATOR 0 100% 100%
1" METERS 0 100% 100%
INTERCONNECTION 0 100% 100%
PIPE- 14IN 575LF 0 100% 100% WM 8 PVC WATER MAIN 197 49498.8 100% 100% PWR FCTR CORRECT 0 100% 100%
5/8 & 3/4 METERS 0 100% 100%
PIPING- LOT OF 0 100% 100%
3" WATER SERVICE 357.23 100% 100%
8" FIRE SERVICE 469.82 100% 100%
2" SRV 1956-1960 0 100% 100%
SAW PIPE 0 100% 100%
6" MAIN DI 18291.53 100% 100%
1 1/2" METERS 0 100% 100% WM 12 PVC WATER MAIN 17 43569.47 100% 100% 1 1/2IN METERS 0 100% 100% WM SIZE 12" 73677.02 100% 100% 6" SERVICE DI 0 100% 100%
18" MAIN AC 24893.57 100% 100%
1 1/2IN METERS 0 100% 100%
3" SRV 1956-1960 0 100% 100%
8" COMB SERV AC 0 100% 100%
12" MAIN DI 0 100% 100%
8" MAIN DI 2609.74 100% 100%
12" MAIN DI 21527.05 100% 100%
1" SRV 1936-1940 0 100% 100%
12" MAIN DI 21619.04 100% 100%
12" FIRE SERVICE A 0 100% 100%
WM SIZE 8" MAIN 70772.14 100% 100%
3/4 SERVICE 0 100% 100%
BOOSTER PUMP 1 0 100% 100%
BOOSTER PUMP 2 0 100% 100%
BOOSTER PUMP 3 0 100% 100%
STD HYD 0 100% 100%
5/8IN METERS 0 100% 100%
5/8IN METERS 0 100% 100%
8" MAIN DI 25269.11 100% 100%
10" COMB SERV AC 0 100% 100%
INTERCONNECTION 0 100% 100%
3/4" METERS 0 100% 100%
12" FIRE SERVICE A 0 100% 100%
1" METERS 0 100% 100%
5/8IN METERS 0 100% 100%
8" MAIN AC 0 100% 100%
5/8 X 3/4 METER 0 100% 100%
3/4 CU SERVICE 0 100% 100%
3" SERVICE AC 0 100% 100%
1" METERS 0 100% 100%
6" AC MAIN 0 100% 100%
3" METER COMPOUND 0 100% 100%
5/8IN METERS 0 100% 100%
6" MAIN AC 0 100% 100%
1IN METERS 0 100% 100%
8" SERVICE AC 0 100% 100%
0-3/4 SRV 1921-1925 0 100% 100%
8" FIRE SERVICE AC 0 100% 100%
1" SRV 1951-1955 0 100% 100%
5/8IN METERS 0 100% 100%
0-3/4 SRV 1961-1965 0 100% 100%
PIPING- LOT OF 0 100% 100%
3/4IN METERS 0 100% 100%
POWER MAIN W/AIR BRE 0 100% 100%
8" SERVICE AC 0 100% 100%
6" MAIN AC 0 100% 100% WM HOWARD CROOKE RESEVO 97233.34 100% 100% WM CENTRAL SHELTON FLOW 98817.95 100% 100% 6" SERVICE DI 0 100% 100%
1" SRV 1976-1980 0 100% 100% WM MAIN ST 1" SERVICE 89250.8 100% 100% 1 1/2IN METERS 0 100% 100% WM WINT STN VFD CNTRL U 159928.12 100% 100% WELL 31 VAR FREQ DRI 20642.74 100% 100% INTERCONNECTION 0 100% 100%
6" MAIN AC 23145.25 100% 100%
5/8IN METERS 0 100% 100%
STD HYD 0 100% 100%
1IN METERS 0 100% 100%
5/8IN METERS 0 100% 100%
3/4" METERS 0 100% 100%
12" MAIN DI 29901.16 100% 100%
12" MAIN DI 30034.09 100% 100%
5/8IN METERS 0 100% 100%
8" MAIN DI 30680.21 100% 100%
4" SRV 1956-1960 0 100% 100%
LOT- PIPE 20-540LF 0 100% 100%
1" SRV 1956-1960 0 100% 100%
12" MAIN AC 0 100% 100%
24IN CYL 7858-1 0 100% 100%
2IN METERS 0 100% 100%
8" AC MAIN 0 100% 100%
5/8IN METERS 0 100% 100%
City Council 8 – 128 1/20/2026
111 City of Santa Ana – 2026 Water and Sewer Rate Study 6 X 12" INTERCON 0 100% 100%
6" INTERCONNECT 0 100% 100%
8" MAIN AC 0 100% 100%
12" MAIN DI 29556 100% 100%
5/8IN METERS 0 100% 100%
1" SRV 1971-1975 0 100% 100% WM SIZE 12" MCARTH 240181.33 100% 100% 6IN COMPOUND METERS 0 100% 100%
TELEMETRY SYSTEM 0 100% 100%
8" MAIN AC 0 100% 100%
16" MAIN AC 32527.46 100% 100%
8" AC MAIN 0 100% 100%
8" MAIN AC 0 100% 100%
0-3/4 SRV 1941-1945 0 100% 100%
5/8IN METERS 0 100% 100%
1IN METERS 0 100% 100%
3/4X1" METER 0 100% 100%
6" MAIN AC 0 100% 100%
8" MAIN DI 46747.52 100% 100%
1 1/2IN METERS 0 100% 100%
PIPE- 30IN 595LF 0 100% 100%
8" MAIN AC 0 100% 100%
8" MAIN AC 0 100% 100%
24IN CI MAIN 63-1 11264.83 100% 100%
5/8IN METERS 0 100% 100%
12" FIRE SERVICE A 0 100% 100%
8" MAIN DI 0 100% 100%
24 IRON WTR MN 1149 117014.8 100% 100% WM 8 " MAIN PVC 54049.26 100% 100% 1IN METERS 0 100% 100%
PIPING- LOT OF 0 100% 100%
6" MAIN AC 0 100% 100%
8" MAIN AC 0 100% 100%
12" MAIN DI 42103.63 100% 100%
5/8IN METERS 0 100% 100% WM 8" WTR MAIN BIRCH C 215163.57 100% 100% RASTER/VECTOR 0 100% 100%
8" MAIN AC 0 100% 100%
8" MAIN AC 0 100% 100%
1" SRV 1956-1960 0 100% 100%
12" MAIN DI 0 100% 100%
1IN METERS 0 100% 100%
5/8IN METERS 0 100% 100%
1" SRV 1966-1970 0 100% 100%
2IN METERS 0 100% 100%
8" MAIN AC 0 100% 100% WM PINE 8" W MAIN 173655.02 100% 100% BLDG CONTROL HOUSE 1263 S 0 100% 100%
5/8IN METERS 0 100% 100% WM EDINGER BRISTOL FLOW 199689.81 100% 100% 14" MAIN DI 67058.23 100% 100%
3/4" METERS 0 100% 100%
16" MAIN AC 0 100% 100%
5/8X3/4" METER 0 100% 100%
16" MAIN AC 72260.88 100% 100%
1IN METERS 0 100% 100%
5/8IN METERS 0 100% 100%
5/8IN METERS 0 100% 100%
PIPING- LOT OF 0 100% 100%
12" MAIN DI 57779 100% 100%
1" SRV 1951-1955 0 100% 100%
INSTR AND METERS 0 100% 100%
PIPING- LOT OF 0 100% 100%
5/8IN METERS 0 100% 100%
5/8IN METERS 0 100% 100% WM SIZE 8" 234153.54 100% 100% 2IN COMPOUND METERS 0 100% 100%
16 MAIN AC 0 100% 100%
5/8IN METERS 0 100% 100%
8" MAIN DI 87276.04 100% 100%
5/8" METERS 0 100% 100% WM SIZE 12" GRAN 279604.1 100% 100% 8" MAIN AC 0 100% 100%
0-3/4 SRV 1936-1940 0 100% 100%
8" AC MAIN 0 100% 100% WM WELL 39 142168.75 100% 100%
3/4" METERS 0 100% 100%
12" MAIN DI 0 100% 100%
SCADA CONTROL SYSTEM 0 100% 100%
20 IN MAIN DI 91264.61 100% 100%
0-3/4 SRV 1976-1980 0 100% 100%
12" MAIN DI 119912.5 100% 100%
12" MAIN DI 129076.34 100% 100%
5/8" METERS 0 100% 100%
3/4IN METERS 0 100% 100%
5/8IN METERS 0 100% 100%
0-3/4 SRV 1971-1975 0 100% 100%
4IN COMPOUND METERS 0 100% 100% WM 6 & 8 " MAIN PVC 158203.64 100% 100% 3IN COMPOUND METERS 0 100% 100%
1" SRV 1946-1950 0 100% 100%
5/8" METERS 0 100% 100%
0-3/4 SRV 1966-1970 0 100% 100%
0-3/4 SRV 1956-1960 0 100% 100% WM SIZE 12" MAIN 710606.96 100% 100% 0-3/4 SRV 1951-1955 0 100% 100%
VALVES AND FITTING 0 100% 100%
NE RES ELECTRICAL 0 100% 100%
RETROFIT RECOAT ODF 1005441.81 100% 100%
BLDG PUMP STATION 0 100% 100%
SCADA SYSTEM 0 100% 100%
0-3/4 SRV 1946-1950 0 100% 100% WM GARTHE RESER EXP PHA 4037332.44 100% 100% WM GARTHE RESER EXP PHA 4037332.44 100% 100% GG WTR SYSTEM 0 100% 100%
EZ VALVE INSTALLATION EQUIP SY 0 100% 100% WELL 28 MOTOR CONTROL UPGRADE 96307.24 100% 100% WELL 38 MOTOR CONTROL UPGRADE 96307.24 100% 100% WM 12 WATER MAIN 85739.68 100% 100% WM 8 WATER MAIN 142981.49 100% 100% 1730 S Santa fe East Reservoir 406814.46 100% 100%
207 s Mountain West Reservoir 517663.28 100% 100% WM 12 WATER MAIN 602159.23 100% 100% WM 8 WATER MAIN 788242.94 100% 100% WM 8 WATER MAIN 605541.25 100% 100% WM 12 WATER MAIN 247429.43 100% 100% City Council 8 – 129 1/20/2026
112 City of Santa Ana – 2026 Water and Sewer Rate Study WM 8 WATER MAIN 274322.66 100% 100% WM 12 WATER MAIN 157031.88 100% 100% WM 10 WATER MAIN 20027.81 100% 100% WM 8 WATER MAIN 27516.73 100% 100% SOFTWARE ENQUESTA 70808.03 100% 100% WM SIZE 8" 658368.38 100% 100% WM SIZE 12" 403896.34 100% 100% WM SIZE 8" 243825.12 100% 100% WM SIZE 8" 364116.22 100% 100% WM SIZE 12" 151471.33 100% 100% CONCRETE SAW HUSQUVARNA 20" 0 100% 100%
CRANE VENTURO ET8KX TO 59830 0 100% 100%
SEWER TRASH GRINDER 0 100% 100%
VFD SYSTEM #1 51084.89 100% 100%
VFD SYSTEM #2 51084.89 100% 100%
480 VOLTS SWITCH GEAR 51084.89 100% 100%
LONG REACH VALVE OPRTR RPT13LR 0 100% 100% WM SIZE 6" 229113.21 100% 100% WM SIZE 8" 688000.74 100% 100% WM SIZE 12" 614491.73 100% 100% CONCRETE LOAD SYSTEM 3426.78 100% 100%
CONCRETE MIX TRLR WASH WTR SYS 4760.85 100% 100%
CONCRETE MIX TRLR WASH WTR SYS 4760.85 100% 100%
CUMMINS DIESEL GENERATOR STDBY 0 100% 100%
CUMMINS DIESEL GENERATOR STDBY 0 100% 100% WM SIZE 8" 274693.2 100% 100% WM SIZE 12" 65271.43 100% 100% WM SIZE 16" 296381 100% 100% WM SIZE 8" 412483.94 100% 100% WM SIZE 12" 299192 100% 100% 093215 RECYCLED WATER CONVSION 280584.96 1 100%
2014 FORD F250 0 100% 100% WELL 28 HYPOCHLORITE GENERATIO 0 100% 100% 2014 CHEVROLET TRAVERSE 0 100% 100%
S590 T4 SKID STEER LOADER 17849.37 100% 100%
2015 HYDRO-EXCAVATOR 155322.88 100% 100%
053195 WEST PUMP STATION UPGRD 1934788.49 100% 100% WM SIZE 12" 274269.91 100% 100% WM SIZE 8" 186454.68 100% 100% WM SIZE 12" 826155.67 100% 100% WM SIZE 8" 354368.95 100% 100% 2015 HONDA CIVIC NGV2 0 100% 100%
2015 HONDA CIVIC NGV2 0 100% 100%
2015 FORD TRANSIT CONNECT 1251.45 100% 100%
2015 FORD F250 SUPER DUTY 2537.01 100% 100%
2016 PV100 VACUUM EXCAVATOR 0 100% 100%
2016 PV100 VACUUM EXCAVATOR 0 100% 100%
2016 PV100 VACUUM EXCAVATOR 0 100% 100% WM SIZE 16" 324578.54 100% 100% WM SIZE 8" 728974.07 100% 100% WM SIZE 12" 1237747.71 100% 100% WM SIZE 8" 245189.94 100% 100% WM SIZE 12" 1077474.85 100% 100% WM SIZE 8" 127288.84 100% 100% WM SIZE 12" 611437.88 100% 100% 2016 410L BACKHOE LOADER 61066.46 100% 100%
2018 DUMP TRUCK 114SD FREIGHTL 42144.87 100% 100%
S WTR RESERVOIR PERIMET WALL 141509.58 100% 100%
2017 GMC SIERRA 2500 15200.74 100% 100% WM SIZE 6" 35821.73 100% 100% WM SIZE 8" 223288.62 100% 100% WM SIZE 10" 22090.08 100% 100% WM SIZE 16" 2434682.11 100% 100% WM SIZE 18" 189258.01 100% 100% 2017 CASE BACKHOLE 590SN 71393.72 100% 100% WM SIZE 8" 683567.82 100% 100% WM SIZE 8" 3405464.05 100% 100% WM SIZE 8" 2002221.3 100% 100% 2018 CHEVROLET BOLT EV 4768.71 100% 100%
LAND 651-657 E. WASHINGTON AVE 1086496.67 100% 100%
LAND 202 S FLOWER ST 202767 100% 100%
2018 P55TRUCK-MOUNTED FORKLIFT 21236.85 100% 100% WM SIZE 8" 304605.05 100% 100% WM SIZE 12" 994955.56 100% 100% 2019 GMC CANYON CREW CAB 13475.9 100% 100%
2019 GMC CANYON CREW CAB 13708.32 100% 100%
2019 GMC CANYON CREW CAB 13715.17 100% 100%
2019 GMC CANYON CREW CAB 13838.19 100% 100%
2019 FORD TRANSIT T350 VAN 19071.32 100% 100%
2019 FORD TRANSIT T350 VAN 19944.55 100% 100% MURPHY CONTROL SYSTEMS 0 100% 100% WM SIZE 6" 5025.26 100% 100% WM SIZE 8" 2277533.61 100% 100% 2019 FORD F350 SUPER CAB 24454.55 100% 100%
2019 FORD F350 REG CAB 24237.27 100% 100%
2019 FORD F350 REG CAB 24355.27 100% 100%
2019 FORD F350 REG CAB 24753.53 100% 100%
2019 FORD F350 REG CAB 24803.82 100% 100%
2019 FORD F350 REG CAB 24371.89 100% 100%
2019 FORD TRANSIT T350 VAN 37508.36 100% 100% WEST STATION HYPOCHLORITE UNIT 73448.56 100% 100% WELL 38 HYPOCHLORITE UNIT 58930.9 100% 100% WELL 33 HYPOCHLORITE UNIT 58930.9 100% 100% 2019 FORD TRANSIT T350 VAN 19580.35 100% 100%
2020 FREIGHTLNR HYDROEX 308559.82 100% 100%
2020 FREIGHTLNR CEMENT TRK 197623.2 100% 100%
2020 FREIGHTLINER 114SD TRK 143628.98 100% 100%
2020 FREIGHTLINER 114SD TRK 143663.12 100% 100% WALNUT PUMP STATION UPGRADE 5353337.47 100% 100% CATERPILLAR C15 DIESEL ENGINE 63305.28 100% 100% WM SIZE 12" 915219.86 100% 100% FORD WATER METER TEST BENCH 127454.75 100% 100%
2020 CHEVROLET TRAVERSE AWD 16908.92 100% 100%
2020 CHEVROLET TRAVERSE AWD 16908.02 100% 100%
2020 FREIGHTLINER 114SD 240285.63 100% 100%
2020 FORD TRANSIT 350 30336.27 100% 100%
2020 FORD TRANSIT 350 30066.15 100% 100%
Land 116 and 120 S Flower St 9949 100% 100%
2021 CHEVROLET COLORADO TRUCK 19916.57 100% 100%
2021 CHEVROLET SILVERADO 25758.6 100% 100% WM SIZE 8" 154245.36 100% 100% WM SIZE 12" 967724.92 100% 100% MICROCLOR SYSTEM 54719.11 100% 100% 2021 QUENCH BUGGY TRAILER 45697.39 100% 100% WM SIZE 8" 1929326.12 100% 100% WM SIZE 12" 804845.11 100% 100% WM SIZE 8" 2040666.2 100% 100% CAPRICORN CUSTOMER PORTAL 136906 100% 100%
2022 JOHN DEERE 410L BACKHOE 108498.11 100% 100% WM SIZE 8" 1266821.75 100% 100% 2021 FREIGHTLINER 114SD 253585.99 100% 100%
2022 FORD SUPER DUTY F550 134635.19 100% 100%
City Council 8 – 130 1/20/2026
113 City of Santa Ana – 2026 Water and Sewer Rate Study Sewer Operating Expenses
Sewer Operating Cost Allocation
WM SIZE 8" 1913269.31 100% 100% WM SIZE 12" 1143838.63 100% 100% 2022 FORD F550 FLATBED TRUCK 56312.27 100% 100% MC60 TRAILER 174322.03 100% 100% WM SIZE 8" 1533763.84 100% 100% WM SIZE 12" 36143.59 100% 100% 2022 CHEVROLET SILVERADO 3500 63653.64 100% 100%
2022 CHEVROLET SILVERADO 3500 63390.19 100% 100%
2022 CHEVROLET SILVERADO 3500 64791.01 100% 100%
2022 FORD F550 SD VALVE TRUCK 129703.32 100% 100% WM SIZE 12" 2297878.12 100% 100% LAND 1415 FRENCH ST 786534.1 100% 100%
2024 FREIGHTLINER M2111 248849.77 100% 100% WM SIZE 8" 1531088.28 100% 100% WM SIZE 8" 5058585.84 100% 100% WM SIZE 12" 771144.51 100% 100% WM LATERAL GREENLEAF 17 TO 19 358793.92 100% 100% CG GREENLEAF FR 17TH TO 19TH 174770.88 100% 100%
2023 CHEVROLET COLORADO TRUCK 48440.4 100% 100%
2024 CHEVROLET SILVERADO 2500 88075.21 100% 100%
2024 JOHN DEERE 410P BACKHOE 171751.13 100% 100% WM SIZE 8" 1455000 100% 100% LAND 4404 W FIRST ST 10520798.75 100% 100% WM SIZE 12" 1574989.48 100% 100% 2024 FORD F550XL 223344.6 100% 100%
Inflation Factor FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2032 FY 2033 FY 2034 FY 2035 FY 2036 Total $8,759,440 $9,132,875 $9,517,728 $9,894,897 $10,287,824 $10,671,969 $11,053,860 $11,449,593 $11,859,676 $12,284,637 $12,725,022 61000 Salaries Regular Payroll $2,342,200 $2,437,996 $2,537,710 $2,641,502 $2,749,540 $2,861,996 $2,979,052 $3,100,895 $3,227,721 $3,359,735 $3,497,148 61010 Salaries Cash Out/Separation Payroll $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 61020 Salaries Part-Time Payroll $40,860 $42,531 $44,271 $46,081 $47,966 $49,928 $51,970 $54,096 $56,308 $58,611 $61,008 61040 Salaries Overtime Payroll $195,600 $203,600 $211,927 $220,595 $229,617 $239,009 $248,784 $258,960 $269,551 $280,576 $292,051 61100 Retirement-Employer Normal Cost Other Employee $199,850 $208,024 $216,532 $225,388 $234,607 $244,202 $254,190 $264,586 $275,408 $286,672 $298,397 61102 Retirement- Employer Unfunded- Miscellaneous Other Employee $276,290 $287,590 $299,353 $311,596 $324,341 $337,606 $351,414 $365,787 $380,748 $396,320 $412,530 61110 Part-Time Retirement Other Employee $2,250 $2,342 $2,438 $2,538 $2,641 $2,749 $2,862 $2,979 $3,101 $3,227 $3,359 61120 Medicare Insurance Insurance $33,900 $37,158 $40,446 $43,026 $45,771 $47,735 $49,148 $50,603 $52,101 $53,643 $55,231 61130 Health Insurance Insurance $469,680 $514,815 $560,374 $596,125 $634,156 $661,363 $680,941 $701,097 $721,851 $743,219 $765,219 61170 Retiree Health Benefits Other Employee $22,660 $23,587 $24,551 $25,556 $26,601 $27,689 $28,821 $30,000 $31,227 $32,504 $33,834 61180 Worker Compensation InsuranceInsurance $94,800 $103,910 $113,106 $120,322 $127,998 $133,489 $137,441 $141,509 $145,698 $150,011 $154,451 62010 Communications Overall $6,540 $6,760 $6,987 $7,222 $7,464 $7,715 $7,974 $8,242 $8,519 $8,805 $9,101 62120 Training, Transportation, Meetings Overall $21,000 $21,706 $22,435 $23,189 $23,968 $24,773 $25,606 $26,466 $27,355 $28,274 $29,224 62140 Membership, Subscription & Dues Overall $58,500 $60,466 $62,497 $64,597 $66,768 $69,011 $71,330 $73,726 $76,204 $78,764 $81,411 62300 Contract Services-Professional Overall $2,054,960 $2,124,007 $2,195,373 $2,269,138 $2,345,381 $2,424,186 $2,505,638 $2,589,828 $2,676,846 $2,766,788 $2,859,752 62322 Maintenance & Repair MachineryOverall $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 63001 Miscellaneous Operating Expenses Overall $627,160 $648,233 $670,013 $692,526 $715,794 $739,845 $764,704 $790,398 $816,955 $844,405 $872,777 63300 Gas & Diesel Fuel/Automobile $46,300 $47,827 $49,404 $51,033 $52,716 $54,454 $56,250 $58,104 $60,020 $62,000 $64,044 65010 Rental City Equipment Overall $147,180 $152,125 $157,237 $162,520 $167,980 $173,625 $179,458 $185,488 $191,721 $198,162 $204,821 65011 Equipment Replacement ChargesOverall $195,680 $202,255 $209,051 $216,075 $223,335 $230,839 $238,595 $246,612 $254,898 $263,463 $272,315 65012 Accident Repair & ReplacementOverall $77,650 $80,259 $82,956 $85,743 $88,624 $91,602 $94,680 $97,861 $101,149 $104,548 $108,060 65040 IT Maintenance Charge Overall $145,650 $150,544 $155,602 $160,830 $166,234 $171,820 $177,593 $183,560 $189,728 $196,102 $202,691 65055 Communications- Landlines Overall $19,990 $20,662 $21,356 $22,073 $22,815 $23,582 $24,374 $25,193 $26,040 $26,914 $27,819 65100 Insurance Charges Insurance $296,350 $324,828 $353,575 $376,132 $400,128 $417,295 $429,647 $442,365 $455,460 $468,942 $482,824 65105 Benefits Overhead Other Employee $26,190 $27,261 $28,376 $29,537 $30,745 $32,002 $33,311 $34,674 $36,092 $37,568 $39,104 65240 Public Works Administrative ChOverall $455,890 $471,208 $487,040 $503,405 $520,319 $537,802 $555,872 $574,550 $593,855 $613,808 $634,432 65400 Indirect Costs Overall $479,420 $495,529 $512,178 $529,387 $547,175 $565,560 $584,563 $604,204 $624,505 $645,489 $667,177 66400 Machinery & Equipment Overall $325,000 $335,920 $347,207 $358,873 $370,931 $383,394 $396,277 $409,591 $423,354 $437,578 $452,281 66511 Computer Software Subscriptions Overall $21,690 $22,419 $23,172 $23,951 $24,755 $25,587 $26,447 $27,336 $28,254 $29,203 $30,185 67311 POB Interest - Misc Other Employee $76,200 $79,317 $82,561 $85,937 $89,452 $93,111 $96,919 $100,883 $105,009 $109,304 $113,775 City Council 8 – 131 1/20/2026
114 City of Santa Ana – 2026 Water and Sewer Rate Study Test Year 2026 Fixed Variable Fixed Service Total
O&M Expense
Total $8,759,440 $8,759,440.04 $0.00 $8,303,550 $455,890 $0 $8,759,440 Percent 100% 0% 94.8% 5.2% 0.0% 100%
61000 Salaries Regular $2,342,200 100% 0% 100% 100%
61010 Salaries Cash Out/Separation $0 100% 0% 100% 100% 61020 Salaries Part-Time $40,860 100% 0% 100% 100%
61040 Salaries Overtime $195,600 100% 0% 100% 100%
61100 Retirement-Employer Normal Cost $199,850 100% 0% 100% 100% 61102 Retirement- Employer Unfunded- Miscellaneous $276,290 100% 0% 100% 100% 61110 Part-Time Retirement $2,250 100% 0% 100% 100%
61120 Medicare Insurance $33,900 100% 0% 100% 100%
61130 Health Insurance $469,680 100% 0% 100% 100%
61170 Retiree Health Benefits $22,660 100% 0% 100% 100% 61180 Worker Compensation Insurance $94,800 100% 0% 100% 100% 62010 Communications $6,540 100% 0% 100% 100%
62120 Training, Transportation, Meetings $21,000 100% 0% 100% 100% 62140 Membership, Subscription & Dues $58,500 100% 0% 100% 100% 62300 Contract Services-Professional $2,054,960 100% 0% 100% 100% 62322 Maintenance & Repair Machinery $0 100% 0% 100% 100% 63001 Miscellaneous Operating Expenses $627,160 100% 0% 100% 100% 63300 Gas & Diesel $46,300 100% 0% 100% 100%
65010 Rental City Equipment $147,180 100% 0% 100% 100%
65011 Equipment Replacement Charges $195,680 100% 0% 100% 100% 65012 Accident Repair & Replacement $77,650 100% 0% 100% 100% 65040 IT Maintenance Charge $145,650 100% 0% 100% 100%
65055 Communications- Landlines $19,990 100% 0% 100% 100% 65100 Insurance Charges $296,350 100% 0% 100% 100%
65105 Benefits Overhead $26,190 100% 0% 100% 100%
65240 Public Works Administrative Ch $455,890 100% 0% 100% 0% 100% 65400 Indirect Costs $479,420 100% 0% 100% 100%
66400 Machinery & Equipment $325,000 100% 0% 100% 100%
66511 Computer Software Subscriptions $21,690 100% 0% 100% 100% 67311 POB Interest - Misc $76,200 100% 0% 100% 100%
City Council 8 – 132 1/20/2026
115 City of Santa Ana – 2026 Water and Sewer Rate Study City Council 8 – 133 1/20/2026 City Council 8 – 134 1/20/2026
Date: Tuesday, March 17, 2026
Time: 5:30 p.m.

Location: City Council Chambers
20 Civic Center Plaza, Santa Ana, CA 92701
The City of Santa Ana will hold a public hearing at the time, date, and location specified above to consider a proposed five-year schedule of adjustments to the City’s water, sewer, and recycled water rates and charges.

The proposed changes are based on an independent cost-of-service study that was completed in January 2026. If adopted, the proposed rate adjustments and charges will become effective on May 1, 2026.

The public hearing will be conducted per California Constitution Article XIII D, Section 6 (also known as “Proposition 218”). This notice is being sent to all owners and customers of record whose parcels receive water, sewer service, and/or recycled water from the City of Santa Ana, who would be subject to the proposed rates and charges.

All members of the public are invited to attend the public hearing. Additionally, under California State Law, owners and customers of record may submit a written protest and/or objection to the proposed rate changes. Only one protest per parcel is permitted.

Please refer to the “How Can I Participate?” section of this document for instructions on submitting a formal written protest or objection against the proposed action. You may also appear at the public hearing at the date and time specified above.

More information, including a rate estimator, is available online at santaanautilityrates.com or scan the QR code.

Concerning proposed changes to the City of Santa Ana’s
water, sewer, and recycled water rate structure and
adjustments to water service, recycled water service,
sewer service and consumption charges.

NOTICE OF PUBLIC HEARING
Important Information About Your Water,
Sewer, and Recycled Water Rates
City Council 8 – 135 1/20/2026

CREATING A RESILIENT AND PREPARED SYSTEM
The proposed rate changes would ensure the City of Santa Ana’s water and sewer systems remain strong and reliable. Proactive maintenance and emergency preparedness allow the City of Santa Ana to manage risks before they become costly problems. Dependable water and sewer systems enable the City of Santa Ana to respond quickly to natural disasters, droughts, or regulatory changes while maintaining high-quality service.

ADDRESSING AGING INFRASTRUCTURE
As the City of Santa Ana’s complex system of pipes, pumps, and treatment facilities ages, it becomes increasingly susceptible to leaks and breaks that can disrupt service and waste valuable resources. The proposed rates would support the upgrade of these aging components before they risk failure. By modernizing infrastructure now, the City of Santa Ana would protect service quality for current and future generations.

ADVANCING CRITICAL CAPITAL IMPROVEMENTS
The City of Santa Ana’s water and sewer systems need ongoing investment to meet modern standards and serve the community effectively. The proposed rate changes would help fund critical projects that strengthen the City of Santa Ana’s ability to deliver clean, safe water and reliable sewer services. Investing now would help prevent higher costs in the future and make sure the City of Santa Ana’s infrastructure keeps pace with growth and evolving technology.

The City of Santa Ana is proposing changes to its water, recycled water, and sewer rates and charges. State law requires the City of Santa Ana to charge only what it costs to provide these services while continuing to maintain essential infrastructure.

To ensure the proposed rates meet this requirement, the City of Santa Ana hired an independent consultant to complete a detailed cost-of-service study. This study confirms that the proposed rates reflect the proportional cost of delivering reliable, high-quality water, recycled water, and sewer service to our community.

This notice has been sent to all customers who may be affected by the proposed rate changes. The full cost-of-service study is available for public review at the City of Santa Ana’s Public Works Agency and on our website at santaanautilityrates.com.

Why Have I Received This Notice?
Why Are Rate Adjustments Needed?
As a public agency, the City of Santa Ana is required to set rates based solely on the proportional cost of providing service, not to generate profit. Customers pay only what it takes to deliver reliable water and recycled water and provide sewer service to their parcel.

Did You Know?
THESE PROJECTS INCLUDE:

Water Capital Improvement Projects
• Garthe Pump Station Improvements
• Walnut Pump Station Improvements
• New Groundwater Wells
(Washington and Flower)
• Crooke Pump Station Improvements
• Citywide Water Pipeline Improvements
Sewer Capital Improvement Projects
• Washington Square Neighborhood
Sewer Main Improvements
• Santa Ana Memorial Park Neighborhood
Sewer Main Improvements
• Wright Street, and Old Grand Sewer Main Improvements
• Citywide Sewer Main Improvements
2 City Council 8 – 136 1/20/2026
Fixed vs. Variable Charges
FIXED CHARGES are independent of the amount of water used. They cover nonfluctuating costs such as capital projects, transmission, distribution, meters, and services.

VARIABLE CHARGES are calculated based on the amount of water moving through a customer’s meter. These charges cover expenses such as purchased water, electricity, and treatment chemicals.

RATE STRUCTURE
The proposed rate structure would replace the current tiered rates with an updated structure designed to provide stable and predictable revenue. This change would align water, sewer, and recycled water rates with the cost of providing service and maintaining system infrastructure. The new structure would support system resilience, modernization, and planned capital improvements.

MONTHLY BILLING
With new meter technology, the City of Santa Ana can begin issuing bills monthly instead of bimonthly. Monthly billing would provide customers with more frequent water use information and support more regular household budgeting.

This change would also improve the City of Santa Ana’s ability to monitor and manage system performance.

WATER RATES: $4.18 MONTHLY IMPACT TO TYPICAL CUSTOMER
For a typical single-family residential customer, proposed water rates would increase by an average of $4.18 per month. The proposed rate change would fund system reliability, maintenance, and improvement of the water system to meet service and regulatory requirements.

SEWER RATES: $2.94 MONTHLY IMPACT TO TYPICAL CUSTOMER
For a typical single-family residential customer, proposed sewer rates would increase by an average of $2.94 per month. The proposed rate change would fund continued operation, maintenance, and capital improvements to the sewer system to maintain compliance and service reliability.

What Would Change?
For More Information
To review the cost-of-service study, estimate how the proposed changes may affect your bill, and learn more about the proposed rate changes, visit santaanautilityrates.com.

If the proposed rate changes are approved by the City of Santa Ana, all water, sewer, and recycled water services will be billed at the rates outlined in the tables on the following pages.
3 City Council 8 – 137 1/20/2026
Meter Size Single
Family
NonResidentialMultiFamily
5/8" x 3/4" 21 ccf 62 ccf
17 CCF
per
Dwelling
Unit
3/4" 32 ccf 93 ccf
1" 52 ccf 155 ccf
1 1/2" 105 ccf 310 ccf
2" 168 ccf 496 ccf
3" 368 ccf 1,085 ccf
4" 662 ccf 1,953 ccf
6" 1,365 ccf 4,030 ccf
8" 2,520 ccf 7,440 ccf
Current and Proposed Water Rates
Bi-Monthly Current
Water Rate Structure
Meter Size All
Customers
5/8" x 3/4" 21 ccf
3/4" 32 ccf
1" 53 ccf
1 1/2" 105 ccf
2" 168 ccf
3" 396 ccf
4" 663 ccf
6" 1,369 ccf
8" 2,527 ccf
Monthly Proposed
Water Rate Structure
Meter
Size
All
Customers
5/8" x
3/4" $48.62
3/4" $72.94
1" $121.56
1 1/2" $243.10
2" $388.96
3" $850.88
4" $1,531.56
6" $3,160.36
8" $5,834.50
Bi-Monthly
Current Retail
Fixed Charges
Meter
Size
Effective
May 1,
2026
Effective
July 1,
2027
Effective
July 1,
2028
Effective
July 1,
2029
Effective
July 1,
2030
5/8"x
3/4" $26.71 $29.11 $31.73 $34.59 $37.36
3/4" $39.10 $42.62 $46.45 $50.63 $54.68
1" $63.87 $69.62 $75.89 $82.72 $89.33
1 1/2" $125.81 $137.13 $149.48 $162.93 $175.96
2" $200.14 $218.15 $237.78 $259.18 $279.92
3" $435.50 $474.70 $517.42 $563.99 $609.11
4" $782.36 $852.77 $929.52 $1,013.18 $1,094.23
6" $1,612.34 $1,757.45 $1,915.62 $2,088.02 $2,255.07
8" $2,974.99 $3,242.74 $3,534.58 $3,852.69 $4,160.91
10" $5,204.78 $5,673.21 $6,183.79 $6,740.34 $7,279.56
Monthly
Proposed Retail
Fixed Charges
The proposed variable water rates would be billed based on total water used, per hundred cubic foot of use (ccf or 748 gallons). The Tier 1 width is designed to consider the available groundwater supply, which constitutes 85% of the City of Santa Ana’s water.

The base monthly allocation for 5/8” x 3/4” customers, 21 ccf, would be adjusted for larger meter sizes based on the capacity ratios of those meters relative to the base meter. The proposed variable water rates and tier widths would be applied to all customers, regardless of customer class, based on that customer’s meter size.

Fixed water rates recover the costs necessary to operate and maintain a safe and reliable water system. These charges support ongoing maintenance, repair, and replacement of water pipes, pumps, and related facilities; water quality testing; meter reading; and customer service functions. These costs are incurred regardless of the volume of water a customer uses.
4 City Council 8 – 138 1/20/2026
Customer
Class
Variable
Rate
Potable
TIER 1 $2.60
TIER 2 $5.87

RECYCLED
WATER $2.55
Tier
Effective
May 1,
2026
Effective
July 1,
2027
Effective
July 1,
2028
Effective
July 1,
2029
Effective
July 1,
2030
TIER 1 $3.16 $3.44 $3.75 $4.09 $4.42
TIER 2 $5.12 $5.58 $6.08 $6.63 $7.16

RECYCLED
WATER $3.60 $3.92 $4.28 $4.66 $5.03
Bi-Monthly Current
Commodity Charges
per CCF
Monthly Proposed Commodity Charges per CCF
Pass-Through Adjustment Policy
The City of Santa Ana is considering an update to the Pass-Through Adjustment Policy to permit additional increases in City Water Usage Charges, beginning in 2026, to offset any future increases in wholesale water rates charged by Orange County Water District and/or Metropolitan Water District to the City of Santa Ana.

Ratepayers would be notified by mail at least 30 days prior to an adjustment.

An adjustment to Tier 1 rates would be based on any approved increase in the wholesale rate charged by Orange County Water District to the City of Santa Ana (in $/CCF) for purchasing wholesale groundwater. An adjustment to Tier 2 rates would be based on any approved increase in the wholesale rate charged by Metropolitan Water District to the City of Santa Ana. Pass-through adjustments may be implemented only if future increases in wholesale water rates surpass projections, and in no event shall the pass-through adjustment exceed 15% in any given year.

For customers with a private fire service connection, this fixed fee covers the cost of providing and maintaining fire flow capacity in the water system.

Meter
Size
Current
Rate
2" $21.00
3" $21.00
4" $27.00
6" $41.50
8" $48.00
10" $57.00
12" $66.00
Bi-Monthly
Current
Fire Line Fixed
Charges
Meter
Size
Effective
May 1,
2026
Effective
July 1,
2027
Effective
July 1,
2028
Effective
July 1,
2029
Effective
July 1,
2030
2" $3.90 $4.25 $4.63 $5.05 $5.45
3" $7.63 $8.32 $9.07 $9.88 $10.67
4" $14.07 $15.34 $16.72 $18.23 $19.69
6" $37.20 $40.55 $44.20 $48.17 $52.03
8" $77.08 $84.02 $91.58 $99.83 $107.81
10" $137.08 $149.42 $162.87 $177.52 $191.72
12" $220.23 $240.05 $261.66 $285.21 $308.02
Monthly Proposed Fire Line Fixed Charges
5 City Council 8 – 139 1/20/2026
Unit Effective
May 1, 2026
Effective
July 1, 2027
Effective
July 1, 2028
Effective
July 1, 2029
Effective
July 1, 2030
Per Charge $88.28 $100.20 $110.22 $121.25 $133.37
Monthly Proposed FOG Charges
Bi-Monthly Current FOG Charges
Meter Size Effective
May 1, 2026
Effective
July 1, 2027
Effective
July 1, 2028
Effective
July 1, 2029
Effective
July 1, 2030
5/8" X 3/4" $10.56 $11.98 $13.18 $14.50 $15.95
3/4" $10.56 $11.98 $13.18 $14.50 $15.95
1" $16.47 $18.69 $20.56 $22.61 $24.88
1 1/2" $36.16 $41.04 $45.15 $49.66 $54.63
2" $79.49 $90.22 $99.25 $109.17 $120.09
3" $280.39 $318.24 $350.06 $385.07 $423.58
4" $494.09 $560.79 $616.87 $678.55 $746.41
6" $1,088.89 $1,235.89 $1,359.48 $1,495.43 $1,644.98
8" $1,088.89 $1,235.89 $1,359.48 $1,495.43 $1,644.98
10" $1,088.89 $1,235.89 $1,359.48 $1,495.43 $1,644.98
Monthly Proposed Sewer Fixed Charges
Meter
Size
Single
Family
MultiFamilyNonResidential
5/8" x 3/4" $15.24 $22.82 $25.38
3/4" $21.58 $32.98 $36.78
1" $34.24 $53.24 $59.58
1 1/2" $65.90 $103.88 $116.52
2" $103.88 $164.68 $184.92
3" $224.16 $357.14 $401.46
4" $401.46 $640.82 $720.58
6" $825.68 $1,319.56 $1,484.16
8" $1,522.16 $2,433.92 $2,737.88
10" $2,408.60 $3,852.24 $4,333.42
Bi-Monthly Current Sewer Fixed Charges
FOG Rate
Fats, Oils, and Grease (FOG) Customers $111.32
Current and Proposed Sewer Service Charges
Current and Proposed FOG Charges
The proposed sewer rates are based on customer meter size, regardless of customer class, and are developed by comparing the ratio of historical winter water use between each meter size.

These rates apply to restaurants and other food-related businesses subject to the City of Santa Ana’s Fats, Oils, and Grease (FOG) Control Program, which reduces the number of local sewer line blockages and sewage overflows. Certain limited food preparation facilities may be exempt.
6 City Council 8 – 140 1/20/2026
The City of Santa Ana welcomes your participation and input throughout the process as it considers the proposed rate changes explained in this Notice. If you have questions or comments about the proposed rates, you can:

CALL OR VISIT. For questions, please visit us at City Hall, 20 Civic Center Plaza, Santa Ana or call: 714-647-3320. The cost-of-service study and other information on the proposed adjustments are available for review at the City of Santa Ana’s Public Works Agency and on our website: santaanautilityrates.com.

WRITE. Written protests may be mailed to The City of Santa Ana, Attention: City Clerk, P.O. Box 1988, M30, Santa Ana, CA 92701, or delivered in person to City Hall located at 20 Civic Center Plaza, Santa Ana. Written protests shall include the name, property address and signature of the person submitting the protest. Only one written protest per parcel will be counted. Oral protests and protests submitted by email or other electronic means do not count as formal written protests.

SUBMIT A LEGAL OBJECTION. Owners of properties affected by the proposed rate changes, as well as tenants who will be directly responsible for paying the charges, may file a legal objection against the proposed adjustments.

Written legal objections must include the following information to be valid:
• Your name, parcel number and/or service address and signature • Indicate that the submission is a legal objection
• Specify the rate or charge for which the objection is being submitted • Specify the grounds for alleging the City of Santa Ana’s noncompliance with Proposition 218 or other legal requirements. Please note that the specified grounds must be sufficiently detailed to allow the City of Santa Ana to determine whether alterations to the proposed rates are needed. By way of example, an objection stating a proposed rate change violates Proposition 218, without explaining the basis for this claim, is insufficient for the purpose of exhaustion of administrative remedies.

Written objections may be mailed to The City of Santa Ana, Attention: City Clerk, P.O. Box 1988, M-30, Santa Ana, CA 92701, or delivered in person to City Hall at 20 Civic Center Plaza. Objections submitted by email or other electronic means will not be accepted as formal written objections. The written basis supporting the proposed rates can be found at the following website: santaanautilityrates.com. Additionally, any property owner may request a mailed copy of the written basis by contacting the City Clerk’s office at (714) 647-6520.

In order to be valid, a written objection must be received by the City Clerk before 5 p.m., March 10, 2026. Failure to submit an objection on time will bar any right to challenge the water and/or sewer charges through a legal proceeding.

Additionally, there is a 120-day statute of limitations for challenging all water, sewer, and recycled water charges should the proposed rate changes be adopted, which commences the day the proposed rates are adopted.

ATTEND THE PUBLIC HEARING. Written protests may also be submitted at the Public Hearing on Tuesday, March 17, 2026 at 5:30 p.m., or thereafter in the City Council Chambers at 20 Civic Center Plaza, Santa Ana, CA 92701. All members of the public will have an opportunity to speak and give testimony regarding the proposed water, sewer, and recycled water rate changes at the Public Hearing; however, only written protests will count toward a majority protest. Written protests must be received before the conclusion of the Public Hearing.

PUBLIC HEARING PROCESS: At the time of the Public Hearing, the City Council will hear and consider all protests and objections to the proposed adjustments. Protests submitted by email or other electronic means do not count as formal written protests; oral comments do not qualify as a formal protest unless accompanied by a written protest. Upon conclusion of the hearing, the City Council will evaluate the protests and objections and consider the adoption of the proposed rates and charges. The City Council is authorized to adopt proposed rates and charges if written protests against the proposed rates and charges, as outlined above, do not represent at least a majority of identified parcels subject to the proposed rates and charges. If adopted as proposed, the adjusted rates and charges will become effective on May 1, 2026.

How Can I Participate?
7 City Council 8 – 141 1/20/2026
The City of Santa Ana
20 Civic Center PlazaSanta Ana, CA 92701
Date: Tuesday, March 17, 2026Time: 5:30 p.m.Location: City Council Chambers 20 Civic Center Plaza, Santa Ana, CA 92701

NOTICE OF PUBLIC HEARING
Concerning proposed changes to the City of Santa Ana’s water, sewer, and recycled water rate structure and adjustments to water service, recycled water service, sewer service and consumption charges.

City Council 8 – 142 1/20/2026
Exhibit 4
Typical Water Bill Impact Comparison
City Council 8 – 143 1/20/2026
Exhibit 5
Typical Sewer Bill Impact Comparison
City Council 8 – 144 1/20/2026
Finance and Management Services
www.santa-ana.org/finance
Item # 9
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
January 20, 2026
TOPIC: Fiscal Year 2024-25 General Fund Results

AGENDA TITLE
Fiscal Year 2024-25 General Fund Results

RECOMMENDED ACTION
Receive and file this informational report.

GOVERNMENT CODE §84308 APPLIES: No

DISCUSSION
The City’s independent auditors have completed their fieldwork for the fiscal year ending June 30, 2025, and the City issued its audited financial statements on December 12, 2025. The January 20, 2026 agenda also includes a separate informational report detailing the audited financial statements and related findings.

This report provides final information on General Fund performance for FY 2024–25. The spendable General Fund balance in excess of the 18% Reserve requirement is $11.7 million, which is available for one-time spending. Staff recommends considering the $11.7 million General Fund balance during the FY 2026–27 annual budget process, beginning with “Early Direction” from the City Council scheduled for March 17, 2026. This approach allows competing needs to be considered together during budget development.

Potential uses of the one-time funding may include, but are not limited to:
• An additional contribution to the Section 115 Trust to address future employee pension cost increases
• A contribution to the General Liability Fund balance to support future payment of claims
• One-time construction projects to address immediate safety needs FY24-25 General Fund Results
General Fund revenues exceeded budgeted estimates by $2.3 million at year-end, after adjusting for fair market value changes and other year-end accounting entries, representing an increase of approximately 0.6 percent over revised estimates.

City Council 9 – 1 1/20/2026
Fiscal Year 2024-25 General Fund Results
January 20, 2026

Page 2 ends