CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 17-6883

BRISTOL STREET AND MEMORY LANE INTERSECTION IMPROVEMENTS

BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: PALP ING OBA

EXCEL PAVING COMPANY
REQUIREMENT:

The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with said blans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the followins schedule:

Item Description Qty Unit Unit Price
Amount
1 Clearing and Grubbing 1 LS $ $
48,000.00 48,000.00
2 Unclassified Excavation* 500 CY $
$
3 $50.000 5250,000.00
Cold Mill (3")* 22,800 SF

2.00 $45,600.00
4 AC Pavement* 610 TN $
$
122.00 104,920.00
5 Asphalt Rubber Hot Mix (ARHM)* 400 TN
$
165.00 66,000.00
6 Crushed Miscellaneous Base (CMB)* 100 CY
$
598000 $9,800.00
7 PCC Sidewalk (T=4") 2,700 SF
$
$20.00 $54,000.00
8 PCC Driveway Approach (T=8") 600 SF
$
$42.00 $25,200.00
9 PCC Curb Ramp (T=4") 400 SF $
$
$53.00
10 PCC Brick Red Colored with Topcast 500 SF $ 521,200.00 Exposed Aggregate (T=4")
$40.00
11 PCC Bus Pad (Include Dowels) 200 SF $20,000.00
12 PCC Curb and Gutter (Type A-2-8) 400 $A4.00 $8,300.00 13 PCC Curb (Type B-1) 440 LF $114.00 S545,600.00
$67.00 $29,480.00
14 PCC Curb (SPPWC Type A1-6) 30 TLF $
$
$68.00 $2,040.00
P-1 of P-20

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 17-6883

BRISTOL STREET AND MEMORY LANE INTERSECTION IMPROVEMENTS Item Description Qty Unit Unit Price Amount
15 PCC Retaining Curb* 40 LF $
5250.00 $6,000.00
16 Furnish and Install Landscape (with 1 ILS
Irrigation) $
$34,000.00 $34,000.00
17 60 Working Days Landscape and LS $
Irrigation Maintenance $
57,50.00 $7,500.00
Local Depression (C.S.A STD 305) 1 EA $
$4,000.00 $4,000.00
19 Furnish and Install Modular Wetland 1 IS $ $
System (MWS-L-4-4-V-UG) or
Approved Equal $68,000.00 $68,000.00
Parkway Culvert (Modified C.S.A STD 1 EA $ $
$16,000.00 $16,000.00
21 8" SDR 26 PVC Pipe with Catch Basin 20 LF $
$
Tie-In
$300.00 $6,000.00
22 Additional Potholing (As Needed)* 5 EA $
$
$1,500.00 $7,500.00
23 Remove Block Wall & Reconstruct End 1 LS $
$14,000.00 $14,000.00
24 Remove Block Wall with Wrought Iron 1 LS
$ $
Fence & Reconstruct End
$19,000.00 $19,000.00
25 Retaining Wall 60 LF $
$
$1,700.00 $102,000.00
26 Wrought Iron Fence 45 LF $
$
$500.00 $22,500.00
27 Remove Chain Link Fence 175 LF $
$
$24.00 $4,200.00
28 Furnish and Install Chain Link Fence 165 $
$
29 Traffic Signal Modification 1 $120000 $19,300.00
LS
298,000.00 298,000.00
30 Install Video Detection System 1 EA $ $
45,00.00 45,000.00
31 Install GTT Opticom EVP System 1 EA
$
14,000.00 14,000.00
32 Install 2" PVC Conduit 450| LF
$
13,950.00
33 Install 3" PVC Conduit 500 LF
$
34 Install 4" PVC Conduit 350 LF 37.00 18.500.00

62.00 21,700.00
P-2 of P-20

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 17-6883

BRISTOL STREET AND MEMORY LANE INTERSECTION IMPROVEMENTS Item Description Qty Unit Unit Price Amount
35 Install SCE Handhole 1 EA $ $
36 Install No. 5 Pull Box 3 EA 2,00.00 2,00.00
1,300.00 3,900.00
37 Install No. 6 Pull Box 4 EA $
1,500.00 6,000.00
38 Install No. 6E Pull Box 3 EA $
$
3,000.00 9,000.00
39 Install IP Communication System 1 IS $
14,000.00 14,000.00
40 Signing and Striping 1 LS $ $
26,000.00 26,000.00
41 Install Street Light Pole 1 EA $
$
12,000.00 12,000.00
42 Remove & Salvage Street Light Pole 1 EA $
2, 700.00 1,700.00
43 Pothole Pole Locations for Utility 3 EA $
Conflicts
1,500.00 1,500.00
44 Temporary Overhead Wiring 1 LS $
9,000.00 9,000.00
45 Adjust Manhole Frame and Cover to 1 EA $
Finished Grade
4,000.00 $4,000.00
46 2" Copper Water Service 1 EA $
$49,000.00 $49,000.00
47 4" Water Service 1 EA $ $
$98,000.00 $98,000.00
48 | 6" Fire Service 1 EA $ $
$76,000.00 $76,000.00
49 Fire Hydrant 1 EA $
$59,000.00 $59,000.00
50 | Re-configure Existing Fire Protection 1 IS $ $
Backflow Assembly at 2724 N. Bristol
Street $31,000.00
51 Project Advertisement Sign 1 EA $531.00.00
$
$2,000.00 $2,000.00
52 Construction Permit 1 LS $10,000 $ 10,000.00
P-3 of P-20

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 17-6883

BRISTOL STREET AND MEMORY LANE INTERSECTION IMPROVEMENTS TOTAL BASE BID $ 1,889,790.00
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add-alternate bid items (if any). * The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the "25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly. + This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications.

TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, within number (90) working days after the commencement date stated in the Notice to Proceed.

The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard Specifications, shall be $3,300 per calendar day.

PALP INIC DSA
Name of Firm

EXCEL PAVING COMPANY
Signature of BIDDER
Curtis P. Brown III. President
(If an individual, so state. If a firm or co-partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereot.)

CORFORATION

PALP HE DSA

EXCEL PAVING COMPANY
Curtis P. Brown Ill President and Chief Executive Officer David A. Drukker Vice President and Chief Financial Officer Stefani A. Moreno Corporate Secretary
Crissa A. Phillips Assistant Secretary
P-4 of P-20