Ordinance No. NS-XXXX

Page 1 of 4 ends

ORDINANCE NO. NS-XXXX

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF

SANTA ANA APPROVING AMENDMENT APPLICATION
NO. 2025 -02 TO CHANGE THE ZONING DESIGNATION
FOR THE PROPERTY LOCATED AT 1801 EAST

CHESTNUT AVENUE AND RECOGNIZED AS ASSESSOR
PARCEL NUMBER 402-212-01 FROM GENERAL
AGRICULTURAL (A-1) TO GENERAL COMMERCIAL (C-2)

THE CITY COUNCIL OF THE CITY OF SANTA ANA DOES ORDAIN AS FOLLOWS:

Section 1. The City Council of the City of Santa Ana hereby finds, determines and declares as follows:

A. The Planning and Building Agency (PBA) and Public Works Agency (PWA) have requested approval of a change in the General Plan land use designation of 1801 East Chestnut Avenue (APN 402-212-01) (“Property”) from Open Space (OS) to General Commercial (GC), updating text portions and exhibits of the City’s General Plan to reflect this change, as well as Amendment Application No. 202 5-02 rezoning the Property from General Agriculture (A-1) to General Commercial (C-2) in order to adequately update City records and capture the changes needed in relationship with Zoo Overflow Parking Improvements, as more fully described in the City’s Staff Report dated March 3, 2026, at said Property (“Project”).

B. Historically, the proposed Project’s site has functioned as an overflow parking facility for the Santa Ana Zoo.

C. In 2018, the adoption of the Zoo Facilities Master Plan (ZFMP) formally established the existing overflow parking area as a planned site for infrastructure improvements.

D. On February 9, 2026, the Planning Commission of the City of Santa Ana held a duly noticed public hearing and voted to recommend that the City Council adopt AA No. 2025-02.

E. On March 3, 2026, the City Council o f the City of Santa Ana held a duly noticed public hearing to consider all testimony, written and oral, related to AA No. 2025-02, at which time all persons wishing to testify were heard, the Project was fully considered, and all other legal prerequisites to the adoption of this amendment occurred.

F. The City Council has reviewed applicable general plan policies and has determined that this proposed rezoning is consistent with the goals and policies of the general plan.

Ordinance No. NS-XXXX

Page 2 of 4 ends

G. For these reasons, and each of them, AA No. 2025-02 is hereby found and determined to be consistent with the intent and purpose of Chapter 41 (Zoning) of the Santa Ana Municipal Code (SAMC), thus changing the zoning district is found to be consistent with the General Plan of the City of Santa Ana and otherwise justified by the public necessity, convenience, and general welfare.

Section 2. The Amendment Application consists of amendments to the Zoning Map, as shown in Exhibit A, attached hereto and incorporated herein by reference.

Section 3. In accordance with the California Environmental Quality Act (CEQA) and the CEQA Guidelines, an Initial Study and Mitigated Negative Declaration (IS/MND) and Mitigation Monitoring and Reporting Program (MMRP) were prepared for the Project.

The Initial Study concluded that implementation of the proposed zoning amendment and related Project approvals could result in potentially significant environmental impacts; however, with incorporation of the identified mitigation measures and compliance with applicable conditions of approval, all impacts would be reduced to a less-than-significant level.

The City of Santa Ana is the Lead Agency for the project pursuant to CEQA Guidelines Section 15367. The IS/MND and MMRP were circulated for public review in accordance with CEQA requirements, and the City Council has independently reviewed and considered the environmental documentation prior to taking action on this ordinance.

Based on the whole of the administrative record, including the IS/MND and MMRP , the City Council finds that the proposed P roject will not have a significant effect on the environment with implementation of the adopted mitigation measures, and hereby certifies the IS/MND and adopts Project MMRP, attached hereto for reference as Exhibit B, in conjunction with approval of this ordinance.

Ordinance No. NS-XXXX

Page 3 of 4 ends

Section 4. An amended Sectional District Map, showing the above described changes in use district designation, is hereby approved and attached hereto as Exhibit A, and incorporated by this reference as though fully set forth herein.

Section 5. AA No. 2025-02 shall not enter into full force and effect until the current change in the site’s Land Use Designation as requested by GPA No. 2025-01 is approved and in full force and effect.

Section 6. The City Council of the City of Santa Ana, after conducting the public hearing, hereby approves AA No. 2025- 02. This decision is based upon the evidence submitted at the above said hearing, which includes, but is not limited to: the Request for Planning Commission Action dated February 9, 2026, the Request for Council Action dated March 3, 2026, and exhibits attached hereto; and the public testimony, written and oral, all of which are incorporated herein by this reference.

ADOPTED this _____ day of___________, 2026.

Valerie Amezcua
Mayor
APPROVED AS TO FORM:

Sonia R. Carvalho
City Attorney
By:

Melissa M. Crosthwaite
Senior Assistant City Attorney
AYES: Councilmembers
NOES: Councilmembers
ABSTAIN: Councilmembers
NOT PRESENT: Councilmembers

Ordinance No. NS-XXXX

Page 4 of 4 ends

CE

RTIFICATE OF ATTESTATION AND ORIGINALITY
I,
Jennifer L. Hall, City Clerk, do hereby attest to and certify the attached Ordinance No.

NS- to be the original ordinance adopted by the City Council of the City of Santa Ana on , 2026 and that said ordinance was published in accordance with the Charter of the City of Santa Ana.

D
ate:

J
ennifer L. Hall
City Clerk
City of Santa Ana

Exhibit A

E
xhibit B

Santa Ana Rezone Project
Mitigation Monitoring and Reporting Program
City of Santa Ana, Orange County, California
PREPARED FOR:

City of Santa Ana
20 Civic Center Plaza
Santa Ana, CA 92701
714.647.2700
Contact: Rudy Rosas, Deputy Public Works Director/City Engineer PREPARED BY:

FirstCarbon Solutions
250 Commerce, Suite 210
Irvine, CA 92602
714.508.4100
Contact: Jason Brandman, Project Director
Angela Wolfe, Senior Project Manager
August 14, 2025

•• • FCS
An ADEC Innovation

THIS PAGE INTENTIONALLY LEFT BLANK
Santa Ana Rezone Project
Mitigation Monitoring and Reporting Program

FCS 1
Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/0327/03270047/MMRP/03270047 Santa Ana Rezone Project MMRP.docx

PREFACE
Section 21081.6 of the California Environmental Quality Act (CEQA) and CEQA Guidelines Section 15097 require a Lead Agency to adopt a Mitigation Monitoring and Reporting Program (MMRP) whenever it adopts a Mitigated Negative Declaration (MND) in conjunction with a project approval.

The purpose of the MMRP is to ensure compliance with the mitigation measures occurs during project implementation.

The IS/MND prepared for the proposed Santa Ana Rezone Project (proposed project) concluded that project implementation could result in potentially significant effects on the environment and mitigation measures were incorporated into the proposed project or are required as a condition of project approval that reduce these potential impacts to a less than significant level. This MMRP documents how and when the mitigation measures adopted by the Lead Agency will be implemented and confirms that potential environmental impacts are reduced to less than significant levels as identified in the IS/MND.

This document does not discuss those subjects that the environmental analysis demonstrates would result in less than significant impacts and for which no mitigation was proposed or necessary.

THIS PAGE INTENTIONALLY LEFT BLANK

SANTA ANA REZONE PROJECT

MITIGATION MONITORING AND REPORTING PROGRAM

FCS 3
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/0327/03270047/MMRP/03270047 Santa Ana Rezone Project MMRP.docx Table 1: Santa Ana Rezone Project Mitigation Monitoring and Reporting Program Mitigation Measures Method of Verification
Timing of
Verification
Responsible for
Verification
Verification of Completion
Date Initial

2.4 Biological Resources
MM BIO-1a: Nesting Bird Pre-construction Surveys. If
ground-disturbing or vegetation-removing construction
activities or tree removal is proposed during the
breeding/nesting season for migratory birds (typically February 1 through September 15), a qualified Biologist shall conduct pre-construction surveys for special-status birds and other migratory birds within the construction area, including a 300- foot survey buffer, no more than 3 days prior to the start of ground-disturbing activities in the construction area
Project applicant or
contractor shall submit
the biologist’s resume or
curriculum vitae (CV)
demonstrating relevant
education, certifications,
and field experience to
the City; project applicant
shall also submit a copy
of executed contract with
the biologist, showing
scope of work and
timeline to City

Confirm pre-construction
surveys for nesting birds
were conducted
Prior to ground-
disturbing or
vegetation-removing
construction

Prior to ground-
disturbing or
vegetation-removing
construction
City of Santa Ana
Planning and
Building Agency

City of Santa Ana
Planning and
Building Agency

MM BIO-1b Avoidance of Active Avian Nests
If an active nest is located during pre-construction surveys or at any point during the construction phase of the proposed project, the United States Fish and Wildlife Service (USFWS) and/or California Department of Fish and Wildlife (CDFW) (as appropriate) shall be notified regarding the status of the nest.

Furthermore, construction activities shall be restricted as Confirm the United
States Fish and Wildlife
Service and/or California
Department of Fish and
Wildlife have been
notified

During pre-
construction
surveys; during
construction
City of Santa Ana
Planning and
Building Agency

SANTA ANA REZONE PROJECT

MITIGATION MONITORING AND REPORTING PROGRAM

FCS 4
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/0327/03270047/MMRP/03270047 Santa Ana Rezone Project MMRP.docx Mitigation Measures Method of Verification
Timing of
Verification
Responsible for
Verification
Verification of Completion
Date Initial
necessary to avoid disturbance of the nest until it is
abandoned, or a qualified Biologist deems disturbance
potential to be minimal. Restrictions may include establishment of exclusion zones (no ingress of personnel or equipment at a minimum radius of 300 feet around an active raptor nest and a 50-foot radius around an active migratory bird nest) or alteration of the construction schedule
Verify that construction
activities have been
restricted or a qualified
biologist has deemed
potential disturbance to
be minimal

2.5 Cultural Resources and Tribal Cultural
MM CUL-1: Prior to the initiation of construction activities, all construction personnel conducting ground disturbance at the site shall be provided Worker Environmental Awareness
Program (WEAP) cultural resources “tailgate” training. The training shall include visual aids, a discussion of applicable laws and statutes relating to archaeological resources, types of resources that may be found within the project site, and procedures to be followed in the event such resources are encountered. The training shall be conducted by an
Archaeologist who meets the Secretary of the Interior’s Professional Qualification Standards for archaeology.

In the event that buried archaeological resources are
discovered during construction, operations shall stop within a 100-foot radius of the find and an Archaeologist who meets the Secretary of Interior’s Professional Qualification Standards for archaeology shall be consulted to determine whether the resource requires further study. The qualified Archaeologist shall make recommendations to the Lead Agency on the
measures that shall be implemented to protect the discovered resources, including but not limited to excavation of the finds Submit evidence to City
that a WEAP training has
been conducted by an
Archaeologist who meets
the Secretary of the
Interior’s Professional
Qualification Standards
for archaeology

Document that
operations have stopped
in daily construction logs;
Project applicant or
contractor shall submit
the qualified
Archaeologist’s resume
or curriculum vitae (CV)
demonstrating relevant
Prior to the initiation
of construction
activities;

During construction;
Upon discovery of
resources;

City of Santa Ana
Planning and
Building Agency;

City of Santa Ana
Planning and
Building Agency;

SANTA ANA REZONE PROJECT

MITIGATION MONITORING AND REPORTING PROGRAM

FCS 5
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/0327/03270047/MMRP/03270047 Santa Ana Rezone Project MMRP.docx Mitigation Measures Method of Verification
Timing of
Verification
Responsible for
Verification
Verification of Completion
Date Initial
and evaluation of the finds in accordance with Section15064.5 of the CEQA Guidelines. Potentially significant cultural resources consist of, but are not limited to, stone, bone, fossils, wood, or shell artifacts or features, including hearths, structural remains, or historic dumpsites. Any previously undiscovered resources found during construction within the project area shall be recorded on appropriate California Department of Parks and Recreation (DPR) forms and evaluated for
significance in terms of CEQA criteria. If the resources are determined to be unique historic resources as defined under Section 15064.5 of the CEQA Guidelines, mitigation measures shall be identified by the monitor and recommended to the Lead Agency. Appropriate mitigation measures for significant resources could include avoidance or capping, incorporation of the site in green space, parks, or open space, or data recovery excavations of the finds. The Lead Agency, along with other relevant or Tribal officials, shall be contacted upon the discovery of cultural resources to begin coordination on the disposition of the find(s). Treatment of any significant cultural resources shall be undertaken with the approval of the Lead Agency. No further grading shall occur in the area of the discovery until the Lead Agency approves the measures to protect these resources. Upon coordination with the Lead Agency, any archaeological where they would be afforded applicable cultural resources laws and guidelines.
education, certifications,
and field experience to
the City; project applicant
shall also submit a copy
of executed contract with
the Archaeologist,
showing scope of work
and timeline to the City;

Verify that any previously
undiscovered resources
have been recorded on
appropriate DPR forms
and evaluated for
significance in terms of
CEQA criteria;

Inclusion of applicable
mitigation measures for
significant resources on
project plans;

Record that the Lead
Agency and other
relevant or Tribal officials
have been contacted to
coordinate on disposition
of the finds;

Upon discovery of
resources;

Upon discovery of
resources;

Upon discovery of
resources;

City of Santa Ana
Planning and
Building Agency

City of Santa Ana
Planning and
Building Agency

City of Santa Ana
Planning and
Building Agency

City of Santa Ana
Planning and
Building Agency

SANTA ANA REZONE PROJECT

MITIGATION MONITORING AND REPORTING PROGRAM

FCS 6
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/0327/03270047/MMRP/03270047 Santa Ana Rezone Project MMRP.docx Mitigation Measures Method of Verification
Timing of
Verification
Responsible for
Verification
Verification of Completion
Date Initial
Inclusion on project plans
that no further grading
shall occur until the Lead
Agency approves the
mitigation measures;
approval of mitigation
measures;

Verify that any artifacts
recovered are donated to
an appropriate Tribal
custodian or a qualified
scientific institution via
written documentation.

Upon discovery of
resources;

Upon discovery of
resources
City of Santa Ana
Planning and
Building Agency

City of Santa Ana
Planning and
Building Agency
MM CUL-2 Stop Construction Upon Encountering Human
Remains
In the event of the accidental discovery or recognition of any human remains, CEQA Guidelines Section 15064.5, Health
and Safety Code Section 7050.5, and Public Resources Code Sections 5097.94 and Section 5097.98 shall be followed. If during the course of project construction, there is accidental discovery or recognition of any human remains, the following steps shall be taken:

1. There shall be no further excavation or disturbance of the site where human remains are discovered and/or any
nearby area reasonably suspected to overlie adjacent
human remains until the county coroner is contacted to
determine whether the remains are Native American and if an investigation of the cause of death is required. If the coroner determines the remains to be Native American, the Confirm construction
activities have ceased,
and the County Coroner
has been contacted as
recorded in daily
construction logs;

Confirm construction
activities have ceased,
and the County Coroner
has been contacted as
recorded in daily
construction logs;

During construction

During construction

City of Santa Ana
Planning and
Building Agency

City of Santa Ana
Planning and
Building Agency

SANTA ANA REZONE PROJECT

MITIGATION MONITORING AND REPORTING PROGRAM

FCS 7
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/0327/03270047/MMRP/03270047 Santa Ana Rezone Project MMRP.docx Mitigation Measures Method of Verification
Timing of
Verification
Responsible for
Verification
Verification of Completion
Date Initial
coroner shall contact the Native American Heritage
Commission (NAHC) within 24 hours, and the NAHC shall
identify the person or persons it believes to be the Most Likely Descendant (MLD) of the deceased Native American.

The MLD may make recommendations to the City or the
person responsible for the excavation work within 48 hours, for means of treating or disposing of, with appropriate dignity, the human remains, and any associated grave
goods as provided in Public Resource Code Section
5097.98.

2. Where the following conditions occur, the City or an authorized representative shall rebury the Native American human remains and associated grave goods with
appropriate dignity either in accordance with the
recommendations of the MLD or on the project site in a
location not subject to further subsurface disturbance:
• The NAHC is unable to identify an MLD or the MLD failed to make a recommendation within 48 hours after being
notified by the commission.
• The descendant identified fails to make a
recommendation.
• The City or an authorized representative rejects the
recommendation of the descendant, and mediation by the
NAHC fails to provide measures acceptable to the City.

If the remains are
determined to be of
Native American origin,
confirm the MLD and
NAHC have been
contacted via email;

Confirm contact with
MLD and compliance
with Public Resources
Section 5097.98 via
written or email
correspondence

During construction

During construction

City of Santa Ana
Planning and
Building Agency

City of Santa Ana
Planning and
Building Agency

2.7 Geology and Soils
SC 2.5‐1: In the event that paleontological resources are encountered during grading and construction operations, all construction activities shall be temporarily halted or redirected to permit a qualified paleontologist to assess the find for Confirm construction
operations and activities
are halted and redirected
to a qualified
During grading and
construction
operations;

City of Santa Ana
Planning and
Building Agency

SANTA ANA REZONE PROJECT

MITIGATION MONITORING AND REPORTING PROGRAM

FCS 8
https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/0327/03270047/MMRP/03270047 Santa Ana Rezone Project MMRP.docx Mitigation Measures Method of Verification
Timing of
Verification
Responsible for
Verification
Verification of Completion
Date Initial
significance and, if necessary, develop a paleontological resources impact mitigation plan for the review and approval by the City prior to resuming excavation activities.
paleontologist as
recorded in daily
construction log;

Review and approval of a
paleontological
resources impact
mitigation plan that is
incorporated into project
plans

Prior to resuming
excavation activities

City of Santa Ana
Planning and
Building Agency