FY 25/26 FY 28/29 FY 29/30 FY 30/31
776,858 - - -
- - - -
776,858 - - -
FY 25/26 FY 28/29 FY 29/30 FY 30/31
776,858 - - -
- - - -
776,858 - - -
AGENCY: DIVISION: CONTACT: DATE:
Public Works Design Engineering Gilbert Castillo, Senior Engineer 06-Apr-2026
TOTAL - - -
M2 LOCAL FAIRSHARE
- - -
SOURCE OF FUNDS FY 26/27 FY 27/28 FY 31/32
- - -
TOTAL - - -
PROJECT COSTS FY 26/27 FY 27/28 FY 31/32
Construction - - -
- - -
CITY OF SANTA ANA FY 25/26CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Provide a Class 4 Protected Bike Lane and Class 3 Bicycle Boulevard from Harbor Boulevard to Grand Avenue in the City of Santa Ana. Project will include some pavement work, sidewalk, ramps, medians, striping and signal modifications.
PROJECT NEED:
This project is designed to increase bicyclists' safety and mobility.
PROJECT TITLE:
McFadden Ave Protected Bike Ln &
Bicycle Blvd Project: Harbor - Grand
PROJECT CATEGORY:
Traffic Improvements
Traffic Safety / Mobility
LOCATION MAP
EXHIBIT 5
FY 25/26 FY 28/29 FY 29/30 FY 30/31
1,476,525 - - -
- - - -
1,476,525 - - -
FY 25/26 FY 28/29 FY 29/30 FY 30/31
936,955 - - -
531,000 - - -
8,570 - - -
- - -
- - - -
1,476,525 - - -
---
06-Apr-2026
DATE:AGENCY: DIVISION: CONTACT:
Public Works CIP Engineering Alex Bangean, Senior Civil Engineer
TOTAL - - -
- - -
TRANSP SYSTEM IMPRV AREA - - -
RESIDENTIAL STREET IMPROV - - -
SOURCE OF FUNDS FY 26/27 FY 27/28 FY 31/32
OTHER - - -
TOTAL - - -
PROJECT COSTS FY 26/27 FY 27/28 FY 31/32
Construction - - -
- - -
CITY OF SANTA ANA FY 25/26CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
This project will widen Warner Avenue between Oak Street and Grand Avenue from 2 to 3 lanes in each direction. The project will also include additional left turn lanes at Grand Avenue, bus pads, raised medians, and a protected bike lane.
PROJECT NEED:
The MPAH (Master Plan of Arterial Highways) Strategic Plan Technical Report identified the need for Warner Avenue to be widened to a six-lane major arterial to meet MPAH requirements. The existing Average Daily Traffic (ADT) is in excess of 29,600 vehicles per day. The proposed improvements will allow the segment to accommodate future traffic volumes at a Level of Service A and increase operational efficiency.
PROJECT TITLE:
Warner Ave Impr: Ph 2 - Oak - Grand
PROJECT CATEGORY:
Street Improvements
Street/Bridge Improvements & Widening
LOCATION MAP