CITY 0F SANTA ANA
ADDENDUM NO. 01
Project 23-6998
Project 19-6947
PROPOSAL
PROJECT NO. 23J5998, ATPL 5063(179) -RA[TT ST PROTECTED AND BUFFERED BIKE LANE PROJECT NO. 19{947 -RAITT ST REHABILITATION FROM MCFADDEN AVE TO I ST ST PROJECT NO. 26J;716 -RAITT ST REHABILITATION FROM CIVIC CENTER DR TO
WASHINGTON AVE
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: All American Asphalt
Project 26-6716
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with sald plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following schedule:
Item Description Qty Total Unit Unit Price Amount
I Unclassified Excavation ATP 1500 3200 CY S S
SBl 1700
2 Soil Backfil] * ATP 380 380 CY S S
SBl 0
3 PCC Raised Curb Median(T=8..,IncludingDowels)ATP 14 14 CY S S SBI 0
4 Removal of PCC Pavement ATP 0 800 CY S S
SBl 800
5 Construct PCC (T=7") with (3-day)CurewithDowelsATP 0 660 CY S S SBl 660
6 Asphalt Concrete Pavement ATP 1500 2300 TN S S
SBl 800
7 Asphalt Rubber Hot Mix (ARHM) ATP 400 5300 TN S S
SB1 4900
8 Crack Sealing ATP I 1 LS S S
SBl 0
9 Rubberized Emulsion AggregateSlurry(REAS)Type11ATP 200 200 TN S S SBl 0
10 Cold Mill (2") ATP 0 372000 SF S S
SBl 372000
11 Variable Depth Cold Mill (2 3/8") ATP 0 3100 SF S S SBl 3100
12 Asphalt-Rubber AggregateMembrane(ARAM)ATP 0 4400 SY S S SBl 4400
13 Modifled PCC Curb and Gutter(TypeA-2-6)with3"DeepGutterATP 0 1500 LF S S SB1 1500
14 PCC Sidewalk (T=4") ATP 6200 15400 SF S S
SBl 9200
P-I of p-22
120.00
165.00
560.00
70000.00
1120.00
0.57 0.57
18.00 62.00
8.00 see last page for 15-30
500.00
245.00
225.00
170.00
CITY 0F SANTA ANA
ADDENDUM NO. 01
Project 23-6998
Project 19-6947
PROPOSAL
PROJECT NO. 23-6998, ATPL 5063(179) -RAITT ST PROTECTED AND BUFFERED BIKE LANE PROJECT NO. 19-6947 -RAITT ST REHABILITATION FROM MCFADDEN AVE TO I ST ST PROJECT NO. 26-6716 -RAITT ST REHABILITATION FROM CIVIC CENTER DR TO
WASHINGTON AVE
Project 26-6716
31 Fumisli and Install New ManholeFrameandCoverandAdjusttoFinishGradeATP 5 35 EA S S SBl 30
32 Adjust OCSD Manhole Frame andCovertoFinishGradeATP 1 16 EA S S SBl 15
33 Abandon Existing Gate Valve.RemoveValveBoxFrameandCover.CutOffRiser18"BelowGrade.BackflllwithSand,Compact,andRcoavcATP 0 I LS S S SBl I
34 Adjust Sewer Cleanout Frame andCovertoFinishGradeATP 0 3 EA S S SBl 3
35 Fumjsh and Install New #6 Pullbox ATP 8 ]0 EA S S
SBl 2
36 Adjust Survey Monument to FinishGrade ATP I 5 EA S S SBl 4
37 Furnish and Install Traffic LoopTypeF ATP 8 33 EA S S SBl 25
38 Furnish and Install Traffic LoopTypeE ATP 16 71 EA S S SBl 55
39 Furnish and Install Traffic LoopTypeQ ATP 2 6 EA S S SBl 4
40 Concrete Neighborhood Monument(Including(2)SolarLightFixturesand(I)RcmotcdSolarPancl)ATP 0 1 LS S S SBl I
41 Landscaping and Irrigation ATP 0.09 I LS S S
SBl 0.91
42 Install Street Light Pole -Foundations,PoleLuminariesATP 0 I EA S S SBl 1
43 Stormwater Pollution PreventionPlan(SWPPP)Preparation(RiskLcvcl2)andlmplcmcntationATP 0.38 1 LS S S SBI 0.62
44 14' x 8' Contech Filterra orApprovedEqual ATP 0.38 I LS S S SBl 0.62
45 6" PVC Pipe, Appurtenances, andBeddingperC.S.A.Std.I150ATP 38 loo LF S S SBl 62
P-3 of p-22
see last page for 15-30
1600.00
1600.00
600.00
1200.00
21600.00
600.00
715.00
715.00
715.00
65000.00
69000.00
11000.00
50000.00
138000.00
300.00
CITY OF SANTA ANA
AI)DENDUM NO. 01
Proj eat 23-6998
Project 19-6947
PROPOSAL
PROJECT NO. 23-6998, ATPL 5063( I 79) -RAITT ST PROTECTED AND BUFFERED BIKE LANE PROJECT NO. 19-6947 - RAITT ST REHABILITATION FROM MCFADDEN AVE To 1 ST ST PROJECT NO. 26-6716 -RAITT ST REHABILITATION FROM CIVIC CENTER DR TO
WASHINGTON AVE
Project 26-6716
46 Trafflc Signal Installation at RaittStandOccidentalDrATP I 1 LS S S SBl 0
47 Pedestrian Hybnd BeaconInstallationatRaittStand MontaVistaAyeATP I I LS S S SBl 0
48 Pedestrian Hybrid BeaconInstallationatRaittStand MyrtleStATP I I LS S S SBl 0
49 Traffic Signal Modification at RaittSt&IstSt ATP I I LS S S SBl 0
50 Install 2" PVC Conduit ATP ]50 ]50 LF S S
SBl 0
5] Install 3" PVC Conduit ATP 4910 4910 LF S S
SBl 0
52 Install 4" PVC Conduit ATP 750 750 LF S S
SBl 0
53 Install SCE Pull Box ATP 3 3 EA S S
SBl 0
54 Install No. 5 Pull Box ATP 3 3 EA S S
SBl 0
55 Install No. 6 Pull Box ATP 32 32 EA S S
SB' 0
56 Install No. 6E Pull Box ATP 7 7 EA S S
SBl 0
57 Install 12 Strand SMFO ATP 500 500 LF S S
SBl 0
58 Install 48 Strand SMFO ATP 20 20 LF S S
SBl 0
59 Install 144 Strand SMFO ATP 5500 5500 LF S S
SBl 0
60 Fusion Splice Strand of SMFO ATP ]92 192 EA S S
SBl 0
61 Install Fiber Optic Spllce Enclosure ATP 5 5 EA S S
SBl 0
62 Install lp Communicatlon System ATP I I LS S S
SBl 0
63 Pothole for Utility Conflicts forTrafflcSignalConduitsATP '8 18 EA S S SBl 0
64 CCTV Inspection of ExistingSewerMainandLaterals(Pre andPostConstmuction\ATP I I LS S S SBl 0
65 Adjust Miscellaneous Utilities toFinishGrade ATP 0 5 EA S S SB1 5
66 Construct New Water Service ( I.I) ATP 0 I EA S S
SBl I
P-4 of P-22
440,000.00
330,000.00
220,000.00
150,000.00
23.00 22.00
32.00 5800.00
1300.00
1600.00
2300.00
1.20 2.00
2.50 195.00
395.00
45000.00
480.00
50000.00
1200.00
27000.00
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 23-6998, ATPL 5063(179) -RAITT ST PROTECTED AND BUFFERED BIKE LANE PROJECT NO.19-6947 -RAITT ST REHABILITATION FROM MCFADDEN AVE TO IST ST PROJECT NO. 26-6716 -RAITT ST REHABILITATION FROM CIVIC CENTER DR TO
WASHINGTON AVE
67 Construct New Water Service ( II/2") ATP 0 I EA S S
SDI I
68 Furnish and Install New Back flowPreventionAssemblywithSteelEnclosureATP 0 2 EA S S SBl 2
69 Furnish and Install New TrafficRated#6TPullboxandAdjusttoFinishGradeATP 0 1 EA S S SBl I
70 Signing and Striping ATP I I LS S S
SBl 0
71 Construction Permit ATP 0.59 I LS $20,263 $20,263
SBl 0.41
72 As-Builts ATP 0.59 I LS S S
SBl 0.41
73 Project Advertisement Signs ATP 2 6 EA S S
SBl 4
TOTAL BASE BID (I-73)
ADD ALTERNATE NOJ
Item Deseription Qty Total Ul,it Unit Price AmolJnt
74 Irrigation ATP 0 I LS S S
SB1 1
75 Pothole for Utility Conflicts forFilterraBioscapeSystem*ATP 0 5 EA S S SBl 5
76 Construct New Water Service(3/4") ATP 0 I EA S S
SDI 1
77 Furnish and Install New BackflowPreventionAssemblywithSteelEnclosureATP 0 I EA S S SBl I
TOTAL ADD ALTERNATE NO. I BID (74-77)
P-5 of p-22
6600.00
30000.00
2500.00
924989.00
2000.00
1600.00
6300.00
1600.00
24000.0
25000.00
63,000.00
7,785,199.00
CITY OF SANTA ANA
PROPOSAL
PROJECT NO. 23-6998, ATPL 5063(179) -RAITT ST PROTECTED AND BUFFERED BIKE LANE PROJECT NO.19-6947 -RAITT ST REHABILITATION FROM MCFADDEN AYE TO IST ST PROJECT NO. 26-6716 -RAITT ST REHABILITATION FROM CIVIC CENTER DR TO
WASHINGTON AVE
The lo\vest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add-alternate bid items (if any). * The quantity for this bid item is sho\rm for bid comparison only. This bid item shall not be subject to the xp5%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly. i This bid item is considered a Specialty Item per Section 3-2 of the Standard Specificatious.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIOUIDATED DAMAGES TThe undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, within one hundred fiftv /150` working days after the commencement date stated in the Notice to Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place order for long-lead time items (i.e. INSERT LONG-LEAD ITEMS FOR PROJECT).
TThe liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard+ld Specifications, shall be $9,500 per calendar day.
Name ofFirm AII American Asphalt
Signature of BIDDER
Title Edward J Carlson, Vice President
(If an individual, so state. If a firm or co-partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) P-6 of p-22