CITY OF SANTA ANA
PROPOS
AL
PROJECT NO.: 23-6037
ME

MORY LANE AND FLOWER STREET BIKEWAY AND TRAFFIC CALMING P-1 of P-21

BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
F
ROM:

REQUIR
EMENT:

The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following schedule:

Item Description Qty Unit Unit
Pr
ice
Amount
1 Unclassified Excavation * 1 ,008 CY $ $
2 Asphalt Concrete * 5 88 TN $ $
3 Asphalt Rubber Hot Mix (ARHM) 2,730 T N $ $
4 Cold Mill (2”) 2 05,000 SF $ $
5 Rubberized Emulsion Aggregate Slurry
(
REAS) Type II *
60 TN $ $
6 PCC Street Removal 2 10 CY $ $
7 Construct 7” PCC with (3-day) Cure
I
ncluding Dowels
210 CY $ $
8 PCC Sidewalk (T=4”) 9 ,240 SF $ $
9 PCC Curb Ramp 3 ,990 SF $ $
10 PCC Curb and Gutter (Type A-2-8) 840 L F $ $
11 PCC Curb and Gutter (Type A-2-6) 525 L F $ $
12 PCC Driveway (T=8”) 1 ,155 SF $ $
13 Cross Gutter (T=8”) 3 ,885 SF $ $
14 Monolithic PCC Bike Lane (T=6”)
(
Including Raised Buffer)
4,960 LF $ $
Legion Contractors Inc.
300 63,000
720 151,200
18 166,320
28 111,720
120 100,800
110 57,750
25 28,875
165 166,320
240 141,120
195 532,350

0.65 133,250
1,500 90,000
35 135,975
140 694,400
Exhibit 2

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-6037

MEMORY LANE AND FLOWER STREET BIKEWAY AND TRAFFIC CALMING

P-2 of P-21
Item Description Qty Unit Unit
Price
Amount
15 PCC Bike Lane (T=8”) 120 LF $ $
16 PCC Bike Lane (T=6”)
(Adjacent to Bioretention Basin)
239 LF $ $
17 Concrete Rolled Curb 320 LF $ $
18 PCC Type B-1 Curb 1,360 LF $ $
19 Colored Concrete (Red Brick) – Topcast
Exposed Aggregate Finish
830 SF $ $
20 PCC Raised Crosswalk 2 EA $ $
21 Steel Plate (Slip Resistant) 8 EA $ $
22 Tree Removal 3 EA $ $
23 Neighborhood Entry Monument Removal 2 EA $ $
24 Adjust Water Valve Frame and Cover 24 EA $ $
25 Adjust Manhole Frame and Cover 24 EA $ $
26 Adjust #6 Pullbox to Finished Grade 4 EA $ $
27 Local Depression. C.S.A STD. 305 1 EA $ $
28 Reconstruct Catch Basin Top Slab
(Including Local Depression)
2 EA $ $
29 Parkway Culvert (Type A) per CSA Std.
318
2 EA $ $
30 Crushed Miscellaneous Base (CMB) * 250 TN $ $
31 Irrigation 1 LS $ $
32 Landscape 1 LS $ $
33 Irrigation & Landscape Local
Repairs/Modifications (Curb Extension
Areas) *
1 LS $ $
34 Landscape Maintenance Period (90-Days) 1 LS $ $
110 35,200
80 108,800
25 20,750
50,000 100,000
15,000 120,000
1,500 4,500
5,000 10,000
2,000 48,000
2,000 48,000
1,500 6,000
7,000 7,000
10,000 20,000
15,000 30,000
110 27,500
145 17,400
135 32,265
115,000 115,000
135,000 135,000
40,000 40,000
10,000 10,000

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-6037

MEMORY LANE AND FLOWER STREET BIKEWAY AND TRAFFIC CALMING

P-3 of P-21
Item Description Qty Unit Unit
Price
Amount
35 Signing and Striping 1 LS $ $
36 Green Methyl Methacrylate (MMA) 250 Kits (Approx .
10,000 SF
Covera
ge)
EA $ $
37 Project Advertisement Sign 3 EA $ $
38 Adjust Survey Monument 11 EA $ $
39 Bioretention Basin 1 LS $ $
40 Stormwater Pollution Prevention Plan
(SWPPP) - Risk Level 1
1 LS $ $
41 Remove Existing and Install New Water
Meter Frame and Cover
2 EA $ $
42 New Fire Hydrant Assembly 3 EA $ $
43 Furnish and Install New Water Valve
Frame and Cover
10 EA $ $
44 Furnish and Install New Neighborhood
Entry Monument (Including (1) Water
Proof Solar Powered Light Fixtures and (1)
Remote Solar Panel)
1 LS $ $
45 Adjust Manhole Frame and Cover (per
O.C.S.D Std. S-050A, S-055 and S-055A)
8 EA $ $
46 Furnish and Install New Manhole Frame
and Cover
2 EA $ $
47 Construction Permit 1 LS $17,813 $ 17,813
48 Remove Existing Fire Hydrant Assembly 4 EA $ $
49 Remove Existing Gate Valve Frame and
Cover
3 EA $ $
50 Construct 6” Resilient Gate Valve 3 EA $ $
51 Traffic Signal Modification at Bristol
Street and Memory Lane
1 LS $ $
52 Install 2” PVC Conduit 30 LF $ $
53 Install 3” PVC Conduit 100 LF $ $
54 Install No. 6 Pull Box 8 EA $ $
SF 10,000
5,000 15,000
2,500 27,500
60,000 60,000
60,000 60,000
2,000 4,000
20,000 60,000
4,500 45,000
40,000 40,000
3,500 28,000
5,000 10,000
6,500 26,000
10,000 30,000
40,000 120,000
185,000 185,000
11 110,000
310,000 310,000
100 3,000
100 3,000
2,000 16,000

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-6037

MEMORY LANE AND FLOWER STREET BIKEWAY AND TRAFFIC CALMING

P-4 of P-21
Item Description Qty Unit Unit
Price
Amount
55 Install Type E Traffic Signal Loop
Detector
2 EA $ $
56 Pothole Traffic Signal Pole Location
for Utility Conflicts
8 EA $ $
57 Temporary Overhead Wiring at Traffic
Signal
1 LS $ $
58 Rectangular Rapid Flashing Beacon
Modification at Flower Street and
Sharon Road
1 LS $ $
59 Rectangular Rapid Flashing Beacon
Installation at Memory Lane and
Westwood Avenue
1 LS $ $
60 As-Builts 1 LS $ $

TOTAL BASE BID $

The lowest responsible bidder shall be selected bas ed on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add-alternate bid items (if any). * The quantity for this bid item is shown for bid c omparison only. This bid item shall not be subject to the “25%” limit as stated in Section 7-3.5 of the Standard Specifications. The actual amount for this item will be dictated by the actual quantity used, and the Agency reserves the right to increase or decrease the quantity of this item accordingly. † This bid item is considered a Specialty Item per Sectio n 3-2 of the Standard Specifications.

TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, within one hundred and twenty (120) working days after the commencement date stated in the Notice to Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place order for long-lead time items.

The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard Specifications, shall be $5,200 per calendar day.

5,000 5,000
2,500 5,000
2,000 16,000
25,000 25,000
30,000 30,000
40,000 40,000
4,806,808

CITY OF SANTA ANA

PROPOSAL
PROJECT NO.: 23-6037

MEMORY LANE AND FLOWER STREET BIKEWAY AND TRAFFIC CALMING P-5 of P-21
Name of Firm
Signature of BIDDER
Title
(If an individual, so state. If a firm or co-partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) Secretary
Saba Khoubanshargh
Legion Contractors Inc.

Legion Contractors, Inc. - CA Corporation
Amir Movafegh - President, Treasurer and Manager
Saba Khoubanshargh - Secretary